1 FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: 3/8/2011 RE: BID/RFP #: RFP-DOT-10/ LG BID/RFP TITLE: FURNISH AND INSTALL EMERGENCY GENERATOR POWER SYSTEM AT CARYVILLE OPENING DATE: March 22, 2011 at 3:00 PM, Local Time Notice is hereby given of the following changes to the above-referenced BID/RFP: 1. Questions and Responses 2. CHANGE: Replace Appendix A with attached Appendix A Bidders/Proposers must acknowledge receipt of this Addendum by completing and returning to the Procurement Office, by no later than the time and date of the bid/proposal opening. Failure to do so may subject the bidder/proposer to disqualification. Bidder/Proposer Address Submitted by (Signature) Lillian Graham. Procurement Agent Failure to file a protest within the time prescribed in Section (3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.
2 RFP-DOT-10/ LG FURNISH AND INSTALL EMERGENCY GENERATOR POWER SYSTEM AT CARYVILLE QUESTIONS AND RESPONSES QUESTION 1 What size LP underground fuel tank is required for Caryville? 1. The site sketch, page A4 of 6 shows a 1000 gallon tank 2. Section 2.2.9, page 61 Fuel System and Storage states a 1000 gallon tank 3. Section , page 61 Fuel Tank states a 2000 gallon tank requirement. 4. Figure 2.2 Underground LPG Tank Installation Drawing, page 62 shows a 2000 gallon tank 5. Table A.1, page 111 lists a 1000 gallon tank RESPONSE 1 See Scope of Services section 1.1 last paragraph. The Contractor shall perform the work based on the requirements of the site as delineated in Appendix A. In this case a 1000 gallon fuel tank is required.
3 FLORIDA DEPARTMENT OF TRANSPORTATION APPENDIX A CARYVILLE I-10 SITE REQUIREMENTS Page A1 of A6
4 FLORIDA DEPARTMENT OF TRANSPORTATION A. 1 CARYVILLE SITE REQUIREMENTS THE CONTRACTOR SHALL NOT DEVIATE FROM THE SITE SPECIFICS WITHOUT WRITTEN AUTHORIZATION OF THE PROJECT MANAGER OR A DESIGNATED REPRESENTATIVE. The following items shall be furnished and installed at the Caryville site: A. One 35 KW (minimum) LP gas fueled emergency generator, 1000-gallon (minimum) below ground fuel tank, automatic transfer switch, and fuel level sensor, and associated SPD devices specified in this section. For commonality among other FDOT microwave site emergency generators in the District, the generator and transfer switch shall be Cummins 35GGPA and Cummins OTEC 125, respectively and the fuel level sensor shall be Squibb Taylor, Inc. Stationary Tank Monitor. The generator, fuel tank, and automatic transfer switch shall be installed as shown in Figures A.1. The tank and generator shall be located and installed in accordance with local building codes. The base of the generator shall be installed a minimum of two feet above grade. The Contractor shall wire all alarms to a Contractor s supplied punch block. The wiring shall be performed as listed in Figure 8.1 in Section 8. The Contractor shall power the generator s coolant heater from a Contractor provided circuit breaker. The circuit breaker shall be sized per the manufacturer s recommendation. B. Fencing for fuel tank enclosure in accordance with Section 2.6. New fencing and a gate shall be installed per Figure A.1. Clearing of existing shrubs and grubbing is required in the fenced area. A combination lock shall be installed on the new gate, Masterlock Model # 177. The Contractor shall coordinate with the FDOT Project Manager for establishing the combination of the lock. C. Install an AC power SPD in accordance with Section The new SPD shall be Atlantic Scientific Zone Master as shown in Figures A2. The SPD shall be installed on the load side of the outdoor main breaker, located on the exterior North Wall of the Caryville communications shelter. The secondary main breaker on the exterior wall shall be removed and conduit shall be routed outdoor to interior Panel West. D. The Caryville site has an existing MOV/SAD hybrid SPD with surge counter connected to the existing ATS. This unit is to be connected to the load side of the new 125 Ampere Cummins ATS. Page A2 of A6
5 FLORIDA DEPARTMENT OF TRANSPORTATION THE FOLLOWING TABLE LISTS THE MAJOR ITEMS TO BE FURNISHED AND/OR INSTALLED BY THE CONTRACTOR. THIS TABLE DOES NOT INCLUDE ALL PARTS AND PIECES REQUIRED BY THE CONTRACT AND SHALL BE USED FOR INFORMATIONAL PURPOSES ONLY.ITEM QUANTITIES ITEM QUANTITIES 35 KW emergency generator (Cummins 35GGPA) and foundation 1 Generator Main Breaker Rating (100 Amp, 2-Pole) 1 Automatic transfer switch (Cummins OTEC 125) 1 Below ground 1000 gallon LPG tank w/(4)- 9 lb Annodes 1 Fuel level monitoring device with SPD device 1 Generator alarm SPD devices (4 pins each) 5 Annunciator LonWorks 1 Main disconnect AC Power SPD device with spare modules 1 Distribution Panel AC Power SPD device NA Page A3 of A6
6 Generator Fuel Tank Shelter Existing Perimeter Layout Page A4 of A6 FLORIDA DEPARTMENT OF TRANSPORTATION New Pad 35 kw Spark Ignited Gas Generator Remove existing fuel tank Coolant Heater Fuel Level Sensor Battery Control Alarm Power Fuel Line Fuel Vent Conduit COMMERCIAL POWER METER Shelter 4 ft. Proposed Perimeter Layout A1. Caryville (3-3429) Scale: 1/16" = 1'-0" COMMERCIAL POWER LINE NOTES: 1.) Remove South side gate and 20' of the existing East fencing enclosure. 2.) Remove existing generator 3.) 8' X 20' fence enclosure at 4'-0" from the shelter East wall. 4.) Install gate & padlock for gas company access 5.) Install a 1000 Gallon LPG Buried Tank With 4-9 lb. Anodes for cathodic protection 6.) Install (6) 5/8" X 10'L solid copper ground rods per diagram Bond to ground ring and fence corner post. 7.) Grounding Conductor # 2 Tinned Solid Bare Copper 8.) Ground all conduit entries on North wall. 9.) Call to locate UG power line before digging.
7 Page A5 of A6 Existing Exterior North Wall FLORIDA DEPARTMENT OF TRANSPORTATION NOTE: EXTERIOR WALL PENETRATIONS HAVE BEEN CORE DRILLED PER SECTION 4.7 OF THE SCOPE DOCUMENT. 1. COOLANT HEATER 2. FUEL LEVEL SENSOR 3. BATTERY CONTROL 4. ALARM 5. AC POWER 4 3 Panel East REPLACE 200A 2P WITH 100A 2P Proposed Exterior North Wall A2. Caryville (3-3429) Scale: 1/2" = 1'-0" Panel West FROM GENERATOR COMMERCIAL POWER OUTPUT ATS POWER 16" FROM OUTPUT ATS POWER ASC ZONE MASTER OUTDOOR ENCL.
8 Page A6 of A6 ATS VoIP Existing Interior North Wall FLORIDA DEPARTMENT OF TRANSPORTATION Panel West A3. Caryville (3-3429) Panel East 125AMP ATS A 21 FL VoIP New Punch Block 1. Control Conduit 2. Fuel Level Sensor Proposed Interior North Wall Scale: 1/2" = 1'-0" 16" TO MTS COMM GENSET
ADDENDUM NO. 2 DATE: March 3, BID TITLE: Replacement of Two (2) Twenty Ton Overhead Crane Hoists, Trolley Packages, and Associated Equipment
FLORIDA DEPARTMENT OF TRANSPORTATION Procurement Office 605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450 Phone: (850) 414-4381 Fax: (850) 414-4951 ADDENDUM NO. 2 DATE: March 3, 2016 RE: BID #:
More informationNotice is hereby given of the following changes and questions and answers to the above referenced Bid:
FLORIDA DEPARTMENT OF TRANSPORTATION Procurement Office Joyce Plummer Joyce.plummer@dot.state.fl.us 605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450 Phone: (850) 414-4568 ADDENDUM NO. 3 DATE:
More informationVENDOR GRAND TOTAL INTENDED AWARD
Page of 6 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION BID TABULATION BID NUMBER: FAILURE TO FILE A PROTEST WITHIN THE OPENING DATE: 0/8/0 TIME: :00 P.M. TIME PRESCRIBED IN SECTION 0.(3), BID TITLE: Maintenance
More informationFLORIDA DEPARTMENT OF TRANSPORTATION QUESTIONS AND ANSWERS
ADDENDUM NO. 4 RFP-DOT-14/15-4006TB FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 4 DATE: August 18, 2014 RE: RFP NUMBER: RFP-DOT-14/15-4006TB RFP TITLE: MAINTENANCE AND REPAIR OF FDOT VEHICLES AND
More informationNew Panelboard for Lot H, EV Charger Energization, Las Positas College. Scope of Work and Technical Specifications
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT New Panelboard for Lot H, EV Charger Energization, Las Positas College Scope of Work and Technical Specifications Chabot-Las Positas Community College District
More informationBID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT
BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT The County of Hancock, Maine is seeking bids from qualified firms for the purchase and installation of at least a 20KW backup generator
More informationCOMMERCIAL QUICK REFERENCE
COMMERCIAL QUICK REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2016 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION. 18" MIN. OF TAIL. (NEUTRAL CONDUCTOR MUST BE WHITE OR
More informationBID NUMBER: ITB-DOT-14/ SJ Page 1 of 5 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION BID TABULATION
BID NUMBER: ITB-DOT-14/1-9019-SJ Page 1 of STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION BID TABULATION BID NUMBER: ITB-DOT-14/1-9019-SJ FAILURE TO FILE A PROTEST WITHIN THE OPENING DATE: 12/18/2014 TIME:
More information10 Commercial, Industrial, Agricultural Services
10 Commercial, Industrial, Agricultural Services This section describes the Power Company requirements for commercial, industrial, and agricultural services. This section covers single phase and three
More informationADDENDUM NO. THREE (3) INSTALL BACKUP GENERATOR TERMINAL BUILDING SALISBURY-OCEAN CITY: WICOMICO REGIONAL AIRPORT SALISBURY, MARYLAND
ADDENDUM NO. THREE (3) INSTALL BACKUP GENERATOR TERMINAL BUILDING SALISBURY, MARYLAND Delta Project No. 15065 MARCH 15, 2017 From: To: Delta Airport Consultants, Inc. 9711 Farrar Court, Suite 100 Richmond,
More informationSection 6 Electric Metering: Residential
Section 6 Electric Metering: Residential 6.1. Scope This section provides specific information for residential metering that is not covered by the basic requirements in Section 5, Electric Metering: General.
More information4 FEET HIGH CHAIN LINK FENCE AND GATE. TO INCLUDE TOP RAIL AND ALL OTHER HARDWARE, POSTS, ETC. NOT INCLUDED BELOW.
4 FEET HIGH CHAIN LINK FENCE AND GATE. TO INCLUDE TOP RAIL AND ALL OTHER HARDWARE, POSTS, ETC. NOT INCLUDED SIGNED BID / SIGNED ADDENDUM Yes / Yes Yes / Yes Yes / Yes YEARS EXPERIENCE 25 Years 24 Years,
More informationIndianapolis Power & Light Company
Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis
More informationOncor Placard Guideline (rev 01/03/2012)
(rev 01/03/2012) Background Information Oncor requires caution or warning placards on all distributed generation projects to alert company employees of a potential alternate source of power. Oncor placard
More informationCustomer Substation Manual
Customer Substation Manual Table of Contents Section Page 2 of 81 Description 0 Preface 010.00 General 010.10 Information Required for the Review of New Customer Substations 010.20 New Customer Substation
More informationCITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT
CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT ADDENDUM NO. 2 DATE: March 30, 2017 REVISIONS TO: Request for Bids Specification No. ES17-0020F METAL SOLID WASTE AND RECYCLING CONTAINERS NOTICE TO ALL
More informationADDENDUM #2 TO BID # BID NUMBER: ISSUE DATE: Friday, January 18, 2019
Georgetown County, South Carolina 129 Screven Street, Suite 239 Post Office Drawer 421270 Georgetown, SC 29442-4200 (843) 545-3083 Fax (843) 545-3500 E-Mail purch@gtcounty.org Website http://www.gtcounty.org
More informationD9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE
SOURCE 20V 240V STUD (PER NEC) A customer supplied and installed teaser wire is required from the neutral lug to a 5th terminal mounted on the left side of the meter block between the line and load terminals.
More informationWEST BRANDYWINE TOWNSHIP 198 Lafayette Road West Brandywine, PA Fax FEE: $75.00 (Up to 200 S.F.)
WEST BRANDYWINE TOWNSHIP 198 Lafayette Road West Brandywine, PA 19320 610 380-8200 Fax 610 384-4934 FEE: $75.00 (Up to 200 S.F.) PERMIT NO. ZONING PERMIT APPLICATION FOR TOOL SHED/MINOR ACCESSORY BUILDING
More informationCITY OF LOMPOC UTILITIES DEPARTMENT ELECTRICAL DIVISION SPECIFICATION NO. ELE-112 SUBSTATION CLASS VACUUM CIRCUIT BREAKERS OCTOBER 2008
CITY OF LOMPOC UTILITIES DEPARTMENT ELECTRICAL DIVISION SPECIFICATION NO. ELE-112 SUBSTATION CLASS VACUUM CIRCUIT BREAKERS OCTOBER 2008 SPECIFICATION NO: ELE_112_R1.doc Page 1 of 3 Rev. 10/28/2008 SPECIFICATION
More informationSECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 29 21 ENCLOSED SWITCHES AND CIRCUIT BREAKERS SPEC WRITE NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not
More informationCreative Bus Dba Getaway Bus REPRESENTING New England Wheels
Creative Bus Dba Getaway Bus REPRESENTING New England Wheels ORDER PACKET Contract #TRIPS-15-MB-GB MiniBus with ADA Option CONTRACT # TRIPS-15-MB-GB ORDER PACKET FOR MiniBus with ADA Option Creative Bus
More informationCity of Hammond Purchasing Department RFP # General Maintenance and Repair Service Contract City Generators
1 City of Hammond Purchasing Department RFP # 15-33 General Maintenance and Repair Service Contract City Generators Proposals Shall Be Received by the Purchasing Department, City of Hammond 310 East Charles
More informationElectric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota
Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections Page 1 of 7 17-02-420 Electric Service Conversion Overhead-to-Underground Overview and process of converting residential
More informationUNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.
UNDERGROUND SERVCE tems to consider f your trenching route has to be dug by hand, or if a cable must be installed under a paved surface, additional charges apply. f your service cable has to be moved later
More informationApproved Meter Sockets and Cabinets
Single Unit Residential Guide 1 PHASE, 120/240 VOLT SERVICES SERVICE CAPACITY OWNED METERING (Metering sockets and cabinets are supplied by Customer). Outdoor meter mounting height is 1730 mm ( 5 8 ) to
More informationLIFT STATION 11 ONE-LINE DIAGRAM
LAC JOB : 118-086 OSG-D-ELEC06.DWG LIFT STATION 11 ONE-LINE DIAGRAM DWG : SHEET : E15 33 47 NEW NEW GENERATOR PAD BOLLARD BOLLARD WETWELL ACCESS HATCH WETWELL OUTLINE HANDHOLE SEWER MANHOLE LIFT STATION
More informationRESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering
1036 20 TH ST. PO BOX 1389 VERO BEACH, FLORIDA 32961-1389 TELEPHONE: (772) 978-5100 FAX: (772) 978-5125 Important Notice to Builders/Contractors/Developers From Electrical Engineering You must contact
More informationApproved Contractor Construction e-guide Residential Commercial
Approved Contractor Construction e-guide Residential Commercial Clark Public Utilities PO Box 8900 Vancouver, WA 98668 (PAGE 2) TABLE OF CONTENTS PAGE Trenching 3 Wire 8 Single-Phase Transformer Set 13
More informationCREATIVE BUS SALES, INC. REPRESENTING MOBILITY VENTURES, LLC
CREATIVE BUS SALES, INC. REPRESENTING MOBILITY VENTURES, LLC ORDER PACKET Contract #TRIPS-12-SNV-CBS Special Needs Type Vehicles TRIPS-12-SNV-CBS - 1 - October 2012 CONTRACT # TRIPS-12-SNV-CBS ORDER PACKET
More informationDESIGNER SUPPLEMENTAL INSTRUCTIONS DSI NO. MCA-DSI-0018
DESIGNER SUPPLEMENTAL INSTRUCTIONS DSI NO. MCA-DSI-0018 DATE: 09/15/2016 PROJECT NAME: NOAB Project # 8910-01233 Louis Armstrong New Orleans International Airport North Terminal Development Program Phase
More informationRESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS
SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated
More informationSECTION 500 METERING AND ASSOCIATED EQUIPMENT
SECTION 500 METERING AND ASSOCIATED EQUIPMENT 500.0 General Meter sockets shall be provided, installed and maintained by Customer. When the ratings of meter sockets are exceeded, transockets shall be used.
More informationSouth Dock Replacement Prescott Park. This addendum forms part of the original document marked: Bid#44-14 South Dock Replacement Prescott Park.
City of Portsmouth Public Works Department June 27, 2014 Addendum #3 Bid #44-14 South Dock Replacement Prescott Park This addendum forms part of the original document marked: Bid#44-14 South Dock Replacement
More informationCOUNTY OF ROCKLAND Department of General Services Purchasing Division
COUNTY OF ROCKLAND Department of General Services Purchasing Division Title: Contract Period: Sludge Hauling and Disposal November 8, 2016 through November 7, 2017 with 2 one-year options, Extended through
More informationSection SWITCHBOARDS. Introduction. Part 1 - General. Related Work
Section 16435 - SWITCHBOARDS Introduction Part 1 - General Related Work Section 16070 Seismic Anchorage and Restraint Section 16075 Electrical Identification Section 16080 Power Distribution Acceptance
More informationAMENDMENT ELECTRIC SERVICE MANUAL 2014
AMENDMENT (Pages 20,43,50,72,74,,76,78,83,86,99) ELECTRIC SERVICE MANUAL 2014 Effective April 1, 2015 18-7 6.0 SERVICE AND SERVICE ENTRANCES (General), Continued Conductor Sizing It is recommended that
More informationMichigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE
PAGE 261116-1 SECTION 261116 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationMedium Voltage Standby non-paralleling Control GUIDE FORM SPECIFICATION
Medium Voltage Standby non-paralleling Control 1. GENERAL GUIDE FORM SPECIFICATION A. The requirements of the contract, Division 1, and part 16 apply to work in this section. 1.01 SECTIONS INCLUDE A. Medium
More information10. METERING General Requirements
10. METERING 10.1 General Requirements A. The Company will not supply service to a Customer whose wiring is designed for resale of electricity through submetering except for recreational campgrounds, marinas,
More informationECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS
Network(s): Summary: ENGINEERING CONSTRUCTION STANDARD ECS 03-0054 CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS EPN, LPN, SPN This standard details the procedures to be undertaken
More informationA. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.
16425 SWITCHBOARD ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 13 An optional keynote to
More informationSee NT POWERCOS , Classification Based On Service Size.
Newmarket-Tay Power Distribution Ltd. Conditions of Service Number: NT POWER COS 310 01 Issue Date: July, 2007 Next Review Date: February, 2020 Residential 1. Preamble This section covers all items that
More informationenclosures and tanks kw gensets Specification sheet
Specification sheet Enclosures and s 35-230 kw gensets Enclosure features 14-gauge, low carbon, hot-rolled ASTM A569 steel construction (panels) 12-gauge, low carbon, hot-rolled ASTM A569 steel construction
More informationChapter 6 Generator-Voltage System
Chapter 6 Generator-Voltage System 6-1. General The generator-voltage system described in this chapter includes the leads and associated equipment between the generator terminals and the low-voltage terminals
More informationTABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet
DRAWING NUMBER INTRODUCTORY INFORMATION Important Notices Underground Plant Protection Information Code Clearances Commercial/Industrial Information Sheet Work Management Customer Projects Engineering
More informationFor Conduit Inspections
Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit
More informationAGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS
Prepared by: ABB1 AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS 05619 Asset Type: Electric Metering Function: Design and Construction Issued by: Lisseth Villareal (LDV2) Date: 07-31-15 Rev. #10: This
More informationCity of Mobile. Recycling Equipment Rental & Hauling BID NUMBER: 5024
Recycling Equipment Rental & Hauling BID NUMBER: 5024 BID DUE DATE MARCH 31, 2017 NEW BID DUE DATE APRIL 4, 2017 ADDENDUM #1 TO BID 5024 ISSUE DATE 03/28/2017 Notice to Contractors: Sealed bids for the
More informationBID SPECIFICATIONS FOR (1) 300kW STANDBY GENERATOR
BID SPECIFICATIONS FOR (1) 300kW STANDBY GENERATOR Bid Specifications for 300 kw Standby Generator Compliance CITY OF GENEVA PUBLIC WORKS DEPARTMENT ENGINE In-Line Six Cylinder, turbocharged ATAAC aspirated,
More informationAppendix A Technical Specifications Class I, II, III, IV Sewage Pumping Lift Station Wet Well Cleaning and Hauling
Appendix A 075-18 Technical Specifications Class I, II, III, IV Sewage Pumping Lift Station Wet Well Cleaning and Hauling INTENT JEA is soliciting proposals for industrial services to remove & dispose
More informationUNDERGROUND SERVICES - SECONDARY
UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service
More informationNew Commercial Service Request-Job Process
New Commercial Service Request-Job Process HILCO Electric Cooperative, Inc. thanks you for the opportunity to be your electric provider. We are committed in providing you the best electric service promptly
More informationQuik-Spec Coordination Panelboard Specifications
Quik-Spec Coordination Panelboard Specifications 30A - 400A Fusible Panelboards SECTION 26 24 XX (This Specification references CSI MasterFormat 2004) FUSIBLE BRANCH CIRCUIT PANELBOARDS PART 1 1.01 SUMMARY
More informationADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for
ADDENDUM #1 The Plymouth Airport Commission is committed to fulfilling the New Fuel Farm Facility project within the scope of the permit, not exceeding our funding and to satisfy the time constraint associated
More information40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power
40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power WHO SHOULD FILE THIS APPLICATION: Anyone expressing interest to install generation which will interconnect
More informationELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016
UTILITY/CATV SERVICES CHAPTER 9 900. GENERAL A. Alliant Energy receives many requests for electric service from other utilities; telephone, telecommunications companies, cable television, the Department
More information2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards
1 General 1.1 Switchboards shall be U.L. listed and labeled. 1.2 Each switchboard shall have its own main disconnecting means unless it is located in the same room as its source of origin. In most cases
More informationGENERAL INFORMATION 1.01 PURPOSE
GENERAL INFORMATION 1.01 PURPOSE The purpose of this manual is to supply essential information to customers, employees, architects, engineers, contractors, and others concerned with electrical installations
More informationExpedited Permitting Process for Electric Vehicle Charging Stations
Expedited Permitting Process for Electric Vehicle Charging Stations BPC-062 Purpose: This document provides all of the needed links to forms and checklists necessary to utilize Permit Sonoma s Expedited
More information2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code
2. DEFINITIONS 2.1 ACCEPTABLE Acceptable to the Company. 2.2 ADVANCED METER A meter that is capable of remote reading, and is capable of storing electric consumption data at specified time intervals of
More informationCHAPTER V RESIDENTIAL WIRING
CHAPTER V RESIDENTIAL WIRING 5.1. THE SERVICE ENTRANCE Buildings and other structures receive the electrical energy through the service entrance. In residential wiring, the electric company supply this
More informationADDENDUM NO. 1. April 6, Project: Gas and Diesel Bid for School System Stations
Livingston Parish Public Schools Excellence in Education! 13909 Florida Boulevard P.O. Box 1130 Livingston, Louisiana 70754-1130 Phone: (225) 686-7044 Fax: (225) 686-3052 Website: www.lpsb.org John Watson
More informationAAMA/WDMA/CSA 101/I.S.2/A TEST REPORT. Rendered to: MASTER WINDOW SYSTEMS, INC.
AAMA/WDMA/CSA 101/I.S.2/A440-05 TEST REPORT Rendered to: MASTER WINDOW SYSTEMS, INC. SERIES/MODEL: Master 2000 Double Hung Window PRODUCT TYPE: PVC Double Hung Window Summary of Results Title Test Specimen
More informationPURCHASING DEPARTMENT
PURCHASING DEPARTMENT TWELVE EAST 4 TH AVENUE, SUITE 106 ROME, GEORGIA 30161 PHONE: 706.291.5118 FAX: 706.290.6099 www.romefloyd.com Date: 7/26/2016 To: To Whom It May Concern Request for Quote: 16-0808
More informationADDENDUM NO. 1 INVITATION FOR BIDS FOR LUBRICANT AND FLUID SUPPLY. RFP NO.: 2018-SP-03 Date Issued: March 13, 2018
ADDENDUM NO. 1 INVITATION FOR BIDS FOR LUBRICANT AND FLUID SUPPLY RFP NO.: 2018-SP-03 Date Issued: March 13, 2018 INSTRUCTIONS: (1) BIDDER is required to comply with this Addendum No. 1. (2) This Addendum
More informationMetering and Service Installation:
Table of Contents 1. Metering Installation Requirements, General... 1 2. Type of Service... 2 3. Definitions... 2 4. Who Provides Metering Equipment?... 2 5. Establishment of Service... 2 6. Meter Access...
More informationFOR SALE Acres Improved Agricultural Land Former Aquaculture Facility in Martin County, Florida SW Martin Highway, Indiantown, FL 34956
FOR SALE + 40 Acres Improved Agricultural Land Former Aquaculture Facility in Martin County, Florida N 22205 SW Martin Highway, Indiantown, FL 34956 www.tccommercialre.com For More Information Contact:
More informationCurrentGuard. CurrentGuard. CurrentGuard. Plus. Surge Protective Devices. Installation,Operation and Maintenance Manual PN
Installation,Operation and Maintenance Manual PN 750-0098-001 CurrentGuard CurrentGuard Plus Surge Protective Devices CurrentGuard CurrentGuard and CurrentGuard Plus Installation, Operation and Maintenance
More informationIdentify nozzle placement options
Identify nozzle placement options aves: 8-10 foot spacing is recommended Fences: 8-10 foot spacing is recommended- locate up wind nozzles high and down wind nozzles middle or low. In some cases it won
More informationATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION
ATTACHMENT I BID SCHEDULE IFB NO. 19-021, CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION Item No. Description Qty Unit Unit Cost Amount Pump Station Site Work 1 Site Demolition / Removals / Haul
More informationFLORIDA SHERIFFS ASSOCIATION, FLORIDA FIRE CHIEFS ASSOCIATION, & FLORIDA ASSOCIATION OF COUNTIES
FLORIDA SHERIFFS ASSOCIATION, FLORIDA FIRE CHIEFS ASSOCIATION, & FLORIDA ASSOCIATION OF COUNTIES SPECIFICATION #01 TYPE I AMBULANCE 2 WHEEL DRIVE 4 WHEEL DRIVE OPTIONAL (DIESEL ENGINE, DUAL REAR WHEEL,
More informationPentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION
PULL BOX F SECONDARY SYSTEM Typical grade Pentahead bolts See note 2 Conduit run as specified Plastic or fiberglass for grass areas or Polymer concrete for light duty areas (see notes 2, 3, & 4) Company
More informationRequirements for Secondary Voltage Revenue Metering (750 V and less)
Requirements for Secondary Voltage Revenue Metering (750 V and less) To view the latest revision of this document go to: http://www.bchydro.com/ext/metering/ January 28, 2010 Copyright 2008 by BC Hydro.
More informationThe Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.
SUMMARY This bulletin introduces a new PG&E program that allows the installation of an electric meter socket adapter that will accept a wired connection directly from a residential customer s Photo Voltaic
More informationElectrical Safety Program
Electrical Safety Program Medford Area Public School District 124 West State St School District: Medford, WI 54451 715 748 4620 Review Date(s): January 2018 Program Dave Makovsky Coordinator: Purpose and
More informationINVITATION TO BID PURCHASING DEPARTMENT P. O. BOX E. CENTRAL AVENUE THIRD FLOOR VALDOSTA, GEORGIA 31601
INVITATION TO BID PURCHASING DEPARTMENT P. O. BOX 1125 216 E. CENTRAL AVENUE THIRD FLOOR VALDOSTA, GEORGIA 31601 BID # 29-17-18 FOR: One Standby Diesel Pump for Lift Station OPENING DATE: May 22, 2018
More informationDOCUMENTATION PACKAGE
INDUSTRIAL DIVISION 13131 WEST LITTLE YORK ROAD HOUSTON, TX77041 PHONE: (713) 466-0277 - (800) 231-1412 FACSIMILE: (713) 896-5220 DOCUMENTATION PACKAGE Processed By: Contact Person& Title: Email: Project
More informationCustomer Requirements Downtown Secondary Network Service
Application This standard describes the limitations and requirements for receiving service from the Tacoma Power secondary network system within the City of Tacoma downtown core area. In This Standard
More informationSTOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION
CHAPTER 1 - GENERAL INFORMATION 100. Purpose 101. Codes and rules 102. Continuity of service 103. Frequency, Voltage, and Amperage Limitations 104. High voltages 105. Unusual capacity requirements 106.
More informationElectric & Gas Service Requirements (Greenbook) Overview
INTRODUCTION The Greenbook contents and standard documents are updated regularly to provide users with the most current information possible. In conjunction with this effort, the 2016 Greenbook was reviewed
More informationCity of Manhattan Beach Community Development
City of Manhattan Beach Community Development Phone: (310) 802-5500 FAX: (310) 802-5501 TDD: (310) 546-3501 Photovoltaic Solar Panel Plan Check Guidelines Updated: 12-20-16 ORDINANCE NO. 15-0022 MBMC 9.06
More informationGrounding Systems. Equipment Grounding & Grounded Conductors
Grounding Systems Equipment Grounding & Grounded Conductors Definitions A Grounded or Earthed system is one that is connected to the earth Grounded Conductor is a conductor that normally carries current
More informationCONTENTS. Foreword...iii. 1. Introduction...1
Installation of Aboveground Storage Systems for Motor-Vehicle Fueling CONTENTS Foreword...iii SECTIONS 1. Introduction...1 1.1 Background...1 1.2 Purpose...1 1.3 Scope...1 1.4 Source...1 1.5 Use of PEI/RP100...1
More informationConstruction and Connection of Street Light Assets
Construction and Connection of Street Light Assets 1. INTRODUCTION... 2 2. FURTHER INFORMATION... 3 3. DEFINITIONS... 3 3.1 Designer... 3 3.2 Street Light Asset Owner... 3 3.3 Road Owner... 4 3.4 Developer...
More informationDOCUMENTATION PACKAGE
INDUSTRIAL DIVISION 13131 WEST LITTLE YORK ROAD HOUSTON, TX77041 PHONE: (713) 466-0277 - (800) 231-1412 FACSIMILE: (713) 896-5220 DOCUMENTATION PACKAGE Processed By: Contact Person& Title: Email: Project
More informationCity of Portsmouth Portsmouth, New Hampshire Department of Public Works. Bid# Five (5) 2018 Ford Trucks INVITATION TO BID
City of Portsmouth Portsmouth, New Hampshire Department of Public Works Bid#52-18 Five (5) 2018 Ford Trucks INVITATION TO BID Sealed bid proposals, plainly marked Bid#52-18 Five (5) 2018 Ford Trucks on
More informationSOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS
SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS November 17, 2016 Engineering Service Specifications Table of Contents Commercial Service Requirements SLEMCO Commercial
More informationENTRANCE EQUIPMENT ER D PAGE 1 OF 5
PAGE 1 OF 5 USE: Requirements for entrance equipment. PREVIOUS REVISION 07-01-98 ORIGINATED 03-94 PREVIOUS NUMBER ER 100 (12-01-81) LATEST REVISION: Updated meter socket labeling specification and instrument
More informationREQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES
REQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES The City of Abbeville, South Carolina is soliciting sealed proposals for Fire Hydrant Maintenance Services. All proposals must be in writing and
More informationService & Installation Rules
Service & Installation Rules CONSOLIDATED AMENDMENTS - MARCH 2011 Published 3 September 2012 SA Power Networks www.sapowernetworks.com.au Issue 3 September 2012 Page 1 of 55 Revision Notes: DATE SECTION
More informationGenerator Fire Safety: Generator assemblies should be located outside the building.
SECTION 33 70 00 - ELECTRICAL DISTRIBUTION PACKAGED GENERATOR ASSEMBLIES Generator Fire Safety: Generator assemblies should be located outside the building. All fuel piping from the outside of the building
More informationSolar Power Installation Application
Solar Power Installation Application This Form must be filled out and submitted to Logan City Light and Power Department and given authorization to proceed PRIOR to installing a solar system. Also, please
More informationTo complete the process for a net metering interconnection, please follow the steps below:
We appreciate your interest in Rocky Mountain Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system
More informationCONTRA COSTA COMMUNITY COLLEGE DISTRICT
ADDENDUM #1 CONTRA COSTA COMMUNITY COLLEGE DISTRICT Date: 11/15/2018 D 4014 Warehouse Demolition Project Diablo Valley College 321 Golf Club Road, Pleasant Hill, CA 94523 NOTICE TO ALL CONTRACTORS: You
More informationE/ECE/324/Rev.2/Add.104/Rev.2 E/ECE/TRANS/505/Rev.2/Add.104/Rev.2
28 September 2011 Agreement Concerning the adoption of uniform technical prescriptions for wheeled vehicles, equipment and parts which can be fitted and/or be used on wheeled vehicles and the conditions
More informationELECTRIC DIVISION RULES AND PROCEDURES FOR ELECTRIC SERVICE
Public Works and Utilities 1250 N. Highland St. Mount Dora, FL 32757 352-735-7151 ext. 1805 Fax: 352-735-1539 E-mail: publicworks@cityofmountdora.com ELECTRIC DIVISION RULES AND PROCEDURES FOR ELECTRIC
More informationOutdoor Enclosure Power System ENC X100MP48F20-AC6
Outdoor Enclosure Power System ENC673034-1X100MP48F20-AC6 Manual MA015151A4 Issue 1 Nov 2010 Copyright 2010 Myers Power Products, Inc. Part# A015151A4 MA015151A4 Iss1 Page 1 of 24 Dimensions Outdoor Enclosure
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER KADENA AIR BASE AIR FORCE INSTRUCTION 23-204 KADENA AIR BASE Supplement 30 MAY 2013 Certified Current, 8 June 2017 Material Management ORGANIZATIONAL FUEL TANKS COMPLIANCE WITH
More informationGENERAL NOTES ELECTRICAL NOTES MATCH LINE SEE SHEET E1.11 KEY PLAN NTS MATCH LINE SEE SHEET E1.12 SPR-2" SPR-2" SPR-2" SPR-2" SPR-2" SPR-2" TYP DH-108
MATCH NE SEE SHEET E. N DH-6 DH-7 DH-9 DH-9 DH-8 DH-6 DH-8 MATCH NE SEE SHEET E. GENERAL NOTES KE PLAN NTS 407 North st Street, Suite 0 (5) 96-050 Fax (5) 96-06 N MATCH NE SEE SHEET E. DH- DH- DH- DH-7
More information