1 FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: 3/8/2011 RE: BID/RFP #: RFP-DOT-10/ LG BID/RFP TITLE: FURNISH AND INSTALL EMERGENCY GENERATOR POWER SYSTEM AT CARYVILLE OPENING DATE: March 22, 2011 at 3:00 PM, Local Time Notice is hereby given of the following changes to the above-referenced BID/RFP: 1. Questions and Responses 2. CHANGE: Replace Appendix A with attached Appendix A Bidders/Proposers must acknowledge receipt of this Addendum by completing and returning to the Procurement Office, by no later than the time and date of the bid/proposal opening. Failure to do so may subject the bidder/proposer to disqualification. Bidder/Proposer Address Submitted by (Signature) Lillian Graham. Procurement Agent Failure to file a protest within the time prescribed in Section (3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.

2 RFP-DOT-10/ LG FURNISH AND INSTALL EMERGENCY GENERATOR POWER SYSTEM AT CARYVILLE QUESTIONS AND RESPONSES QUESTION 1 What size LP underground fuel tank is required for Caryville? 1. The site sketch, page A4 of 6 shows a 1000 gallon tank 2. Section 2.2.9, page 61 Fuel System and Storage states a 1000 gallon tank 3. Section , page 61 Fuel Tank states a 2000 gallon tank requirement. 4. Figure 2.2 Underground LPG Tank Installation Drawing, page 62 shows a 2000 gallon tank 5. Table A.1, page 111 lists a 1000 gallon tank RESPONSE 1 See Scope of Services section 1.1 last paragraph. The Contractor shall perform the work based on the requirements of the site as delineated in Appendix A. In this case a 1000 gallon fuel tank is required.

3 FLORIDA DEPARTMENT OF TRANSPORTATION APPENDIX A CARYVILLE I-10 SITE REQUIREMENTS Page A1 of A6

4 FLORIDA DEPARTMENT OF TRANSPORTATION A. 1 CARYVILLE SITE REQUIREMENTS THE CONTRACTOR SHALL NOT DEVIATE FROM THE SITE SPECIFICS WITHOUT WRITTEN AUTHORIZATION OF THE PROJECT MANAGER OR A DESIGNATED REPRESENTATIVE. The following items shall be furnished and installed at the Caryville site: A. One 35 KW (minimum) LP gas fueled emergency generator, 1000-gallon (minimum) below ground fuel tank, automatic transfer switch, and fuel level sensor, and associated SPD devices specified in this section. For commonality among other FDOT microwave site emergency generators in the District, the generator and transfer switch shall be Cummins 35GGPA and Cummins OTEC 125, respectively and the fuel level sensor shall be Squibb Taylor, Inc. Stationary Tank Monitor. The generator, fuel tank, and automatic transfer switch shall be installed as shown in Figures A.1. The tank and generator shall be located and installed in accordance with local building codes. The base of the generator shall be installed a minimum of two feet above grade. The Contractor shall wire all alarms to a Contractor s supplied punch block. The wiring shall be performed as listed in Figure 8.1 in Section 8. The Contractor shall power the generator s coolant heater from a Contractor provided circuit breaker. The circuit breaker shall be sized per the manufacturer s recommendation. B. Fencing for fuel tank enclosure in accordance with Section 2.6. New fencing and a gate shall be installed per Figure A.1. Clearing of existing shrubs and grubbing is required in the fenced area. A combination lock shall be installed on the new gate, Masterlock Model # 177. The Contractor shall coordinate with the FDOT Project Manager for establishing the combination of the lock. C. Install an AC power SPD in accordance with Section The new SPD shall be Atlantic Scientific Zone Master as shown in Figures A2. The SPD shall be installed on the load side of the outdoor main breaker, located on the exterior North Wall of the Caryville communications shelter. The secondary main breaker on the exterior wall shall be removed and conduit shall be routed outdoor to interior Panel West. D. The Caryville site has an existing MOV/SAD hybrid SPD with surge counter connected to the existing ATS. This unit is to be connected to the load side of the new 125 Ampere Cummins ATS. Page A2 of A6

5 FLORIDA DEPARTMENT OF TRANSPORTATION THE FOLLOWING TABLE LISTS THE MAJOR ITEMS TO BE FURNISHED AND/OR INSTALLED BY THE CONTRACTOR. THIS TABLE DOES NOT INCLUDE ALL PARTS AND PIECES REQUIRED BY THE CONTRACT AND SHALL BE USED FOR INFORMATIONAL PURPOSES ONLY.ITEM QUANTITIES ITEM QUANTITIES 35 KW emergency generator (Cummins 35GGPA) and foundation 1 Generator Main Breaker Rating (100 Amp, 2-Pole) 1 Automatic transfer switch (Cummins OTEC 125) 1 Below ground 1000 gallon LPG tank w/(4)- 9 lb Annodes 1 Fuel level monitoring device with SPD device 1 Generator alarm SPD devices (4 pins each) 5 Annunciator LonWorks 1 Main disconnect AC Power SPD device with spare modules 1 Distribution Panel AC Power SPD device NA Page A3 of A6

6 Generator Fuel Tank Shelter Existing Perimeter Layout Page A4 of A6 FLORIDA DEPARTMENT OF TRANSPORTATION New Pad 35 kw Spark Ignited Gas Generator Remove existing fuel tank Coolant Heater Fuel Level Sensor Battery Control Alarm Power Fuel Line Fuel Vent Conduit COMMERCIAL POWER METER Shelter 4 ft. Proposed Perimeter Layout A1. Caryville (3-3429) Scale: 1/16" = 1'-0" COMMERCIAL POWER LINE NOTES: 1.) Remove South side gate and 20' of the existing East fencing enclosure. 2.) Remove existing generator 3.) 8' X 20' fence enclosure at 4'-0" from the shelter East wall. 4.) Install gate & padlock for gas company access 5.) Install a 1000 Gallon LPG Buried Tank With 4-9 lb. Anodes for cathodic protection 6.) Install (6) 5/8" X 10'L solid copper ground rods per diagram Bond to ground ring and fence corner post. 7.) Grounding Conductor # 2 Tinned Solid Bare Copper 8.) Ground all conduit entries on North wall. 9.) Call to locate UG power line before digging.

7 Page A5 of A6 Existing Exterior North Wall FLORIDA DEPARTMENT OF TRANSPORTATION NOTE: EXTERIOR WALL PENETRATIONS HAVE BEEN CORE DRILLED PER SECTION 4.7 OF THE SCOPE DOCUMENT. 1. COOLANT HEATER 2. FUEL LEVEL SENSOR 3. BATTERY CONTROL 4. ALARM 5. AC POWER 4 3 Panel East REPLACE 200A 2P WITH 100A 2P Proposed Exterior North Wall A2. Caryville (3-3429) Scale: 1/2" = 1'-0" Panel West FROM GENERATOR COMMERCIAL POWER OUTPUT ATS POWER 16" FROM OUTPUT ATS POWER ASC ZONE MASTER OUTDOOR ENCL.

8 Page A6 of A6 ATS VoIP Existing Interior North Wall FLORIDA DEPARTMENT OF TRANSPORTATION Panel West A3. Caryville (3-3429) Panel East 125AMP ATS A 21 FL VoIP New Punch Block 1. Control Conduit 2. Fuel Level Sensor Proposed Interior North Wall Scale: 1/2" = 1'-0" 16" TO MTS COMM GENSET

ADDENDUM NO. 2 DATE: March 3, BID TITLE: Replacement of Two (2) Twenty Ton Overhead Crane Hoists, Trolley Packages, and Associated Equipment

ADDENDUM NO. 2 DATE: March 3, BID TITLE: Replacement of Two (2) Twenty Ton Overhead Crane Hoists, Trolley Packages, and Associated Equipment FLORIDA DEPARTMENT OF TRANSPORTATION Procurement Office 605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450 Phone: (850) 414-4381 Fax: (850) 414-4951 ADDENDUM NO. 2 DATE: March 3, 2016 RE: BID #:

More information

Notice is hereby given of the following changes and questions and answers to the above referenced Bid:

Notice is hereby given of the following changes and questions and answers to the above referenced Bid: FLORIDA DEPARTMENT OF TRANSPORTATION Procurement Office Joyce Plummer Joyce.plummer@dot.state.fl.us 605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450 Phone: (850) 414-4568 ADDENDUM NO. 3 DATE:

More information

VENDOR GRAND TOTAL INTENDED AWARD

VENDOR GRAND TOTAL INTENDED AWARD Page of 6 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION BID TABULATION BID NUMBER: FAILURE TO FILE A PROTEST WITHIN THE OPENING DATE: 0/8/0 TIME: :00 P.M. TIME PRESCRIBED IN SECTION 0.(3), BID TITLE: Maintenance

More information

FLORIDA DEPARTMENT OF TRANSPORTATION QUESTIONS AND ANSWERS

FLORIDA DEPARTMENT OF TRANSPORTATION QUESTIONS AND ANSWERS ADDENDUM NO. 4 RFP-DOT-14/15-4006TB FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 4 DATE: August 18, 2014 RE: RFP NUMBER: RFP-DOT-14/15-4006TB RFP TITLE: MAINTENANCE AND REPAIR OF FDOT VEHICLES AND

More information

New Panelboard for Lot H, EV Charger Energization, Las Positas College. Scope of Work and Technical Specifications

New Panelboard for Lot H, EV Charger Energization, Las Positas College. Scope of Work and Technical Specifications CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT New Panelboard for Lot H, EV Charger Energization, Las Positas College Scope of Work and Technical Specifications Chabot-Las Positas Community College District

More information

BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT

BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT The County of Hancock, Maine is seeking bids from qualified firms for the purchase and installation of at least a 20KW backup generator

More information

COMMERCIAL QUICK REFERENCE

COMMERCIAL QUICK REFERENCE COMMERCIAL QUICK REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2016 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION. 18" MIN. OF TAIL. (NEUTRAL CONDUCTOR MUST BE WHITE OR

More information

BID NUMBER: ITB-DOT-14/ SJ Page 1 of 5 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION BID TABULATION

BID NUMBER: ITB-DOT-14/ SJ Page 1 of 5 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION BID TABULATION BID NUMBER: ITB-DOT-14/1-9019-SJ Page 1 of STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION BID TABULATION BID NUMBER: ITB-DOT-14/1-9019-SJ FAILURE TO FILE A PROTEST WITHIN THE OPENING DATE: 12/18/2014 TIME:

More information

10 Commercial, Industrial, Agricultural Services

10 Commercial, Industrial, Agricultural Services 10 Commercial, Industrial, Agricultural Services This section describes the Power Company requirements for commercial, industrial, and agricultural services. This section covers single phase and three

More information

ADDENDUM NO. THREE (3) INSTALL BACKUP GENERATOR TERMINAL BUILDING SALISBURY-OCEAN CITY: WICOMICO REGIONAL AIRPORT SALISBURY, MARYLAND

ADDENDUM NO. THREE (3) INSTALL BACKUP GENERATOR TERMINAL BUILDING SALISBURY-OCEAN CITY: WICOMICO REGIONAL AIRPORT SALISBURY, MARYLAND ADDENDUM NO. THREE (3) INSTALL BACKUP GENERATOR TERMINAL BUILDING SALISBURY, MARYLAND Delta Project No. 15065 MARCH 15, 2017 From: To: Delta Airport Consultants, Inc. 9711 Farrar Court, Suite 100 Richmond,

More information

Section 6 Electric Metering: Residential

Section 6 Electric Metering: Residential Section 6 Electric Metering: Residential 6.1. Scope This section provides specific information for residential metering that is not covered by the basic requirements in Section 5, Electric Metering: General.

More information

4 FEET HIGH CHAIN LINK FENCE AND GATE. TO INCLUDE TOP RAIL AND ALL OTHER HARDWARE, POSTS, ETC. NOT INCLUDED BELOW.

4 FEET HIGH CHAIN LINK FENCE AND GATE. TO INCLUDE TOP RAIL AND ALL OTHER HARDWARE, POSTS, ETC. NOT INCLUDED BELOW. 4 FEET HIGH CHAIN LINK FENCE AND GATE. TO INCLUDE TOP RAIL AND ALL OTHER HARDWARE, POSTS, ETC. NOT INCLUDED SIGNED BID / SIGNED ADDENDUM Yes / Yes Yes / Yes Yes / Yes YEARS EXPERIENCE 25 Years 24 Years,

More information

Indianapolis Power & Light Company

Indianapolis Power & Light Company Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis

More information

Oncor Placard Guideline (rev 01/03/2012)

Oncor Placard Guideline (rev 01/03/2012) (rev 01/03/2012) Background Information Oncor requires caution or warning placards on all distributed generation projects to alert company employees of a potential alternate source of power. Oncor placard

More information

Customer Substation Manual

Customer Substation Manual Customer Substation Manual Table of Contents Section Page 2 of 81 Description 0 Preface 010.00 General 010.10 Information Required for the Review of New Customer Substations 010.20 New Customer Substation

More information

CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT

CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT ADDENDUM NO. 2 DATE: March 30, 2017 REVISIONS TO: Request for Bids Specification No. ES17-0020F METAL SOLID WASTE AND RECYCLING CONTAINERS NOTICE TO ALL

More information

ADDENDUM #2 TO BID # BID NUMBER: ISSUE DATE: Friday, January 18, 2019

ADDENDUM #2 TO BID # BID NUMBER: ISSUE DATE: Friday, January 18, 2019 Georgetown County, South Carolina 129 Screven Street, Suite 239 Post Office Drawer 421270 Georgetown, SC 29442-4200 (843) 545-3083 Fax (843) 545-3500 E-Mail purch@gtcounty.org Website http://www.gtcounty.org

More information

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE SOURCE 20V 240V STUD (PER NEC) A customer supplied and installed teaser wire is required from the neutral lug to a 5th terminal mounted on the left side of the meter block between the line and load terminals.

More information

WEST BRANDYWINE TOWNSHIP 198 Lafayette Road West Brandywine, PA Fax FEE: $75.00 (Up to 200 S.F.)

WEST BRANDYWINE TOWNSHIP 198 Lafayette Road West Brandywine, PA Fax FEE: $75.00 (Up to 200 S.F.) WEST BRANDYWINE TOWNSHIP 198 Lafayette Road West Brandywine, PA 19320 610 380-8200 Fax 610 384-4934 FEE: $75.00 (Up to 200 S.F.) PERMIT NO. ZONING PERMIT APPLICATION FOR TOOL SHED/MINOR ACCESSORY BUILDING

More information

CITY OF LOMPOC UTILITIES DEPARTMENT ELECTRICAL DIVISION SPECIFICATION NO. ELE-112 SUBSTATION CLASS VACUUM CIRCUIT BREAKERS OCTOBER 2008

CITY OF LOMPOC UTILITIES DEPARTMENT ELECTRICAL DIVISION SPECIFICATION NO. ELE-112 SUBSTATION CLASS VACUUM CIRCUIT BREAKERS OCTOBER 2008 CITY OF LOMPOC UTILITIES DEPARTMENT ELECTRICAL DIVISION SPECIFICATION NO. ELE-112 SUBSTATION CLASS VACUUM CIRCUIT BREAKERS OCTOBER 2008 SPECIFICATION NO: ELE_112_R1.doc Page 1 of 3 Rev. 10/28/2008 SPECIFICATION

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 29 21 ENCLOSED SWITCHES AND CIRCUIT BREAKERS SPEC WRITE NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not

More information

Creative Bus Dba Getaway Bus REPRESENTING New England Wheels

Creative Bus Dba Getaway Bus REPRESENTING New England Wheels Creative Bus Dba Getaway Bus REPRESENTING New England Wheels ORDER PACKET Contract #TRIPS-15-MB-GB MiniBus with ADA Option CONTRACT # TRIPS-15-MB-GB ORDER PACKET FOR MiniBus with ADA Option Creative Bus

More information

City of Hammond Purchasing Department RFP # General Maintenance and Repair Service Contract City Generators

City of Hammond Purchasing Department RFP # General Maintenance and Repair Service Contract City Generators 1 City of Hammond Purchasing Department RFP # 15-33 General Maintenance and Repair Service Contract City Generators Proposals Shall Be Received by the Purchasing Department, City of Hammond 310 East Charles

More information

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections Page 1 of 7 17-02-420 Electric Service Conversion Overhead-to-Underground Overview and process of converting residential

More information

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service. UNDERGROUND SERVCE tems to consider f your trenching route has to be dug by hand, or if a cable must be installed under a paved surface, additional charges apply. f your service cable has to be moved later

More information

Approved Meter Sockets and Cabinets

Approved Meter Sockets and Cabinets Single Unit Residential Guide 1 PHASE, 120/240 VOLT SERVICES SERVICE CAPACITY OWNED METERING (Metering sockets and cabinets are supplied by Customer). Outdoor meter mounting height is 1730 mm ( 5 8 ) to

More information

LIFT STATION 11 ONE-LINE DIAGRAM

LIFT STATION 11 ONE-LINE DIAGRAM LAC JOB : 118-086 OSG-D-ELEC06.DWG LIFT STATION 11 ONE-LINE DIAGRAM DWG : SHEET : E15 33 47 NEW NEW GENERATOR PAD BOLLARD BOLLARD WETWELL ACCESS HATCH WETWELL OUTLINE HANDHOLE SEWER MANHOLE LIFT STATION

More information

RESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering

RESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering 1036 20 TH ST. PO BOX 1389 VERO BEACH, FLORIDA 32961-1389 TELEPHONE: (772) 978-5100 FAX: (772) 978-5125 Important Notice to Builders/Contractors/Developers From Electrical Engineering You must contact

More information

Approved Contractor Construction e-guide Residential Commercial

Approved Contractor Construction e-guide Residential Commercial Approved Contractor Construction e-guide Residential Commercial Clark Public Utilities PO Box 8900 Vancouver, WA 98668 (PAGE 2) TABLE OF CONTENTS PAGE Trenching 3 Wire 8 Single-Phase Transformer Set 13

More information

CREATIVE BUS SALES, INC. REPRESENTING MOBILITY VENTURES, LLC

CREATIVE BUS SALES, INC. REPRESENTING MOBILITY VENTURES, LLC CREATIVE BUS SALES, INC. REPRESENTING MOBILITY VENTURES, LLC ORDER PACKET Contract #TRIPS-12-SNV-CBS Special Needs Type Vehicles TRIPS-12-SNV-CBS - 1 - October 2012 CONTRACT # TRIPS-12-SNV-CBS ORDER PACKET

More information

DESIGNER SUPPLEMENTAL INSTRUCTIONS DSI NO. MCA-DSI-0018

DESIGNER SUPPLEMENTAL INSTRUCTIONS DSI NO. MCA-DSI-0018 DESIGNER SUPPLEMENTAL INSTRUCTIONS DSI NO. MCA-DSI-0018 DATE: 09/15/2016 PROJECT NAME: NOAB Project # 8910-01233 Louis Armstrong New Orleans International Airport North Terminal Development Program Phase

More information

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated

More information

SECTION 500 METERING AND ASSOCIATED EQUIPMENT

SECTION 500 METERING AND ASSOCIATED EQUIPMENT SECTION 500 METERING AND ASSOCIATED EQUIPMENT 500.0 General Meter sockets shall be provided, installed and maintained by Customer. When the ratings of meter sockets are exceeded, transockets shall be used.

More information

South Dock Replacement Prescott Park. This addendum forms part of the original document marked: Bid#44-14 South Dock Replacement Prescott Park.

South Dock Replacement Prescott Park. This addendum forms part of the original document marked: Bid#44-14 South Dock Replacement Prescott Park. City of Portsmouth Public Works Department June 27, 2014 Addendum #3 Bid #44-14 South Dock Replacement Prescott Park This addendum forms part of the original document marked: Bid#44-14 South Dock Replacement

More information

COUNTY OF ROCKLAND Department of General Services Purchasing Division

COUNTY OF ROCKLAND Department of General Services Purchasing Division COUNTY OF ROCKLAND Department of General Services Purchasing Division Title: Contract Period: Sludge Hauling and Disposal November 8, 2016 through November 7, 2017 with 2 one-year options, Extended through

More information

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work

Section SWITCHBOARDS. Introduction. Part 1 - General. Related Work Section 16435 - SWITCHBOARDS Introduction Part 1 - General Related Work Section 16070 Seismic Anchorage and Restraint Section 16075 Electrical Identification Section 16080 Power Distribution Acceptance

More information

AMENDMENT ELECTRIC SERVICE MANUAL 2014

AMENDMENT ELECTRIC SERVICE MANUAL 2014 AMENDMENT (Pages 20,43,50,72,74,,76,78,83,86,99) ELECTRIC SERVICE MANUAL 2014 Effective April 1, 2015 18-7 6.0 SERVICE AND SERVICE ENTRANCES (General), Continued Conductor Sizing It is recommended that

More information

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE PAGE 261116-1 SECTION 261116 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Medium Voltage Standby non-paralleling Control GUIDE FORM SPECIFICATION

Medium Voltage Standby non-paralleling Control GUIDE FORM SPECIFICATION Medium Voltage Standby non-paralleling Control 1. GENERAL GUIDE FORM SPECIFICATION A. The requirements of the contract, Division 1, and part 16 apply to work in this section. 1.01 SECTIONS INCLUDE A. Medium

More information

10. METERING General Requirements

10. METERING General Requirements 10. METERING 10.1 General Requirements A. The Company will not supply service to a Customer whose wiring is designed for resale of electricity through submetering except for recreational campgrounds, marinas,

More information

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS Network(s): Summary: ENGINEERING CONSTRUCTION STANDARD ECS 03-0054 CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS EPN, LPN, SPN This standard details the procedures to be undertaken

More information

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein. 16425 SWITCHBOARD ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 13 An optional keynote to

More information

See NT POWERCOS , Classification Based On Service Size.

See NT POWERCOS , Classification Based On Service Size. Newmarket-Tay Power Distribution Ltd. Conditions of Service Number: NT POWER COS 310 01 Issue Date: July, 2007 Next Review Date: February, 2020 Residential 1. Preamble This section covers all items that

More information

enclosures and tanks kw gensets Specification sheet

enclosures and tanks kw gensets Specification sheet Specification sheet Enclosures and s 35-230 kw gensets Enclosure features 14-gauge, low carbon, hot-rolled ASTM A569 steel construction (panels) 12-gauge, low carbon, hot-rolled ASTM A569 steel construction

More information

Chapter 6 Generator-Voltage System

Chapter 6 Generator-Voltage System Chapter 6 Generator-Voltage System 6-1. General The generator-voltage system described in this chapter includes the leads and associated equipment between the generator terminals and the low-voltage terminals

More information

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet DRAWING NUMBER INTRODUCTORY INFORMATION Important Notices Underground Plant Protection Information Code Clearances Commercial/Industrial Information Sheet Work Management Customer Projects Engineering

More information

For Conduit Inspections

For Conduit Inspections Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit

More information

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS Prepared by: ABB1 AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS 05619 Asset Type: Electric Metering Function: Design and Construction Issued by: Lisseth Villareal (LDV2) Date: 07-31-15 Rev. #10: This

More information

City of Mobile. Recycling Equipment Rental & Hauling BID NUMBER: 5024

City of Mobile. Recycling Equipment Rental & Hauling BID NUMBER: 5024 Recycling Equipment Rental & Hauling BID NUMBER: 5024 BID DUE DATE MARCH 31, 2017 NEW BID DUE DATE APRIL 4, 2017 ADDENDUM #1 TO BID 5024 ISSUE DATE 03/28/2017 Notice to Contractors: Sealed bids for the

More information

BID SPECIFICATIONS FOR (1) 300kW STANDBY GENERATOR

BID SPECIFICATIONS FOR (1) 300kW STANDBY GENERATOR BID SPECIFICATIONS FOR (1) 300kW STANDBY GENERATOR Bid Specifications for 300 kw Standby Generator Compliance CITY OF GENEVA PUBLIC WORKS DEPARTMENT ENGINE In-Line Six Cylinder, turbocharged ATAAC aspirated,

More information

Appendix A Technical Specifications Class I, II, III, IV Sewage Pumping Lift Station Wet Well Cleaning and Hauling

Appendix A Technical Specifications Class I, II, III, IV Sewage Pumping Lift Station Wet Well Cleaning and Hauling Appendix A 075-18 Technical Specifications Class I, II, III, IV Sewage Pumping Lift Station Wet Well Cleaning and Hauling INTENT JEA is soliciting proposals for industrial services to remove & dispose

More information

UNDERGROUND SERVICES - SECONDARY

UNDERGROUND SERVICES - SECONDARY UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service

More information

New Commercial Service Request-Job Process

New Commercial Service Request-Job Process New Commercial Service Request-Job Process HILCO Electric Cooperative, Inc. thanks you for the opportunity to be your electric provider. We are committed in providing you the best electric service promptly

More information

Quik-Spec Coordination Panelboard Specifications

Quik-Spec Coordination Panelboard Specifications Quik-Spec Coordination Panelboard Specifications 30A - 400A Fusible Panelboards SECTION 26 24 XX (This Specification references CSI MasterFormat 2004) FUSIBLE BRANCH CIRCUIT PANELBOARDS PART 1 1.01 SUMMARY

More information

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for ADDENDUM #1 The Plymouth Airport Commission is committed to fulfilling the New Fuel Farm Facility project within the scope of the permit, not exceeding our funding and to satisfy the time constraint associated

More information

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power 40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power WHO SHOULD FILE THIS APPLICATION: Anyone expressing interest to install generation which will interconnect

More information

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016

ELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016 UTILITY/CATV SERVICES CHAPTER 9 900. GENERAL A. Alliant Energy receives many requests for electric service from other utilities; telephone, telecommunications companies, cable television, the Department

More information

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards 1 General 1.1 Switchboards shall be U.L. listed and labeled. 1.2 Each switchboard shall have its own main disconnecting means unless it is located in the same room as its source of origin. In most cases

More information

GENERAL INFORMATION 1.01 PURPOSE

GENERAL INFORMATION 1.01 PURPOSE GENERAL INFORMATION 1.01 PURPOSE The purpose of this manual is to supply essential information to customers, employees, architects, engineers, contractors, and others concerned with electrical installations

More information

Expedited Permitting Process for Electric Vehicle Charging Stations

Expedited Permitting Process for Electric Vehicle Charging Stations Expedited Permitting Process for Electric Vehicle Charging Stations BPC-062 Purpose: This document provides all of the needed links to forms and checklists necessary to utilize Permit Sonoma s Expedited

More information

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code 2. DEFINITIONS 2.1 ACCEPTABLE Acceptable to the Company. 2.2 ADVANCED METER A meter that is capable of remote reading, and is capable of storing electric consumption data at specified time intervals of

More information

CHAPTER V RESIDENTIAL WIRING

CHAPTER V RESIDENTIAL WIRING CHAPTER V RESIDENTIAL WIRING 5.1. THE SERVICE ENTRANCE Buildings and other structures receive the electrical energy through the service entrance. In residential wiring, the electric company supply this

More information

ADDENDUM NO. 1. April 6, Project: Gas and Diesel Bid for School System Stations

ADDENDUM NO. 1. April 6, Project: Gas and Diesel Bid for School System Stations Livingston Parish Public Schools Excellence in Education! 13909 Florida Boulevard P.O. Box 1130 Livingston, Louisiana 70754-1130 Phone: (225) 686-7044 Fax: (225) 686-3052 Website: www.lpsb.org John Watson

More information

AAMA/WDMA/CSA 101/I.S.2/A TEST REPORT. Rendered to: MASTER WINDOW SYSTEMS, INC.

AAMA/WDMA/CSA 101/I.S.2/A TEST REPORT. Rendered to: MASTER WINDOW SYSTEMS, INC. AAMA/WDMA/CSA 101/I.S.2/A440-05 TEST REPORT Rendered to: MASTER WINDOW SYSTEMS, INC. SERIES/MODEL: Master 2000 Double Hung Window PRODUCT TYPE: PVC Double Hung Window Summary of Results Title Test Specimen

More information

PURCHASING DEPARTMENT

PURCHASING DEPARTMENT PURCHASING DEPARTMENT TWELVE EAST 4 TH AVENUE, SUITE 106 ROME, GEORGIA 30161 PHONE: 706.291.5118 FAX: 706.290.6099 www.romefloyd.com Date: 7/26/2016 To: To Whom It May Concern Request for Quote: 16-0808

More information

ADDENDUM NO. 1 INVITATION FOR BIDS FOR LUBRICANT AND FLUID SUPPLY. RFP NO.: 2018-SP-03 Date Issued: March 13, 2018

ADDENDUM NO. 1 INVITATION FOR BIDS FOR LUBRICANT AND FLUID SUPPLY. RFP NO.: 2018-SP-03 Date Issued: March 13, 2018 ADDENDUM NO. 1 INVITATION FOR BIDS FOR LUBRICANT AND FLUID SUPPLY RFP NO.: 2018-SP-03 Date Issued: March 13, 2018 INSTRUCTIONS: (1) BIDDER is required to comply with this Addendum No. 1. (2) This Addendum

More information

Metering and Service Installation:

Metering and Service Installation: Table of Contents 1. Metering Installation Requirements, General... 1 2. Type of Service... 2 3. Definitions... 2 4. Who Provides Metering Equipment?... 2 5. Establishment of Service... 2 6. Meter Access...

More information

FOR SALE Acres Improved Agricultural Land Former Aquaculture Facility in Martin County, Florida SW Martin Highway, Indiantown, FL 34956

FOR SALE Acres Improved Agricultural Land Former Aquaculture Facility in Martin County, Florida SW Martin Highway, Indiantown, FL 34956 FOR SALE + 40 Acres Improved Agricultural Land Former Aquaculture Facility in Martin County, Florida N 22205 SW Martin Highway, Indiantown, FL 34956 www.tccommercialre.com For More Information Contact:

More information

CurrentGuard. CurrentGuard. CurrentGuard. Plus. Surge Protective Devices. Installation,Operation and Maintenance Manual PN

CurrentGuard. CurrentGuard. CurrentGuard. Plus. Surge Protective Devices. Installation,Operation and Maintenance Manual PN Installation,Operation and Maintenance Manual PN 750-0098-001 CurrentGuard CurrentGuard Plus Surge Protective Devices CurrentGuard CurrentGuard and CurrentGuard Plus Installation, Operation and Maintenance

More information

Identify nozzle placement options

Identify nozzle placement options Identify nozzle placement options aves: 8-10 foot spacing is recommended Fences: 8-10 foot spacing is recommended- locate up wind nozzles high and down wind nozzles middle or low. In some cases it won

More information

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION ATTACHMENT I BID SCHEDULE IFB NO. 19-021, CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION Item No. Description Qty Unit Unit Cost Amount Pump Station Site Work 1 Site Demolition / Removals / Haul

More information

FLORIDA SHERIFFS ASSOCIATION, FLORIDA FIRE CHIEFS ASSOCIATION, & FLORIDA ASSOCIATION OF COUNTIES

FLORIDA SHERIFFS ASSOCIATION, FLORIDA FIRE CHIEFS ASSOCIATION, & FLORIDA ASSOCIATION OF COUNTIES FLORIDA SHERIFFS ASSOCIATION, FLORIDA FIRE CHIEFS ASSOCIATION, & FLORIDA ASSOCIATION OF COUNTIES SPECIFICATION #01 TYPE I AMBULANCE 2 WHEEL DRIVE 4 WHEEL DRIVE OPTIONAL (DIESEL ENGINE, DUAL REAR WHEEL,

More information

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION PULL BOX F SECONDARY SYSTEM Typical grade Pentahead bolts See note 2 Conduit run as specified Plastic or fiberglass for grass areas or Polymer concrete for light duty areas (see notes 2, 3, & 4) Company

More information

Requirements for Secondary Voltage Revenue Metering (750 V and less)

Requirements for Secondary Voltage Revenue Metering (750 V and less) Requirements for Secondary Voltage Revenue Metering (750 V and less) To view the latest revision of this document go to: http://www.bchydro.com/ext/metering/ January 28, 2010 Copyright 2008 by BC Hydro.

More information

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018. SUMMARY This bulletin introduces a new PG&E program that allows the installation of an electric meter socket adapter that will accept a wired connection directly from a residential customer s Photo Voltaic

More information

Electrical Safety Program

Electrical Safety Program Electrical Safety Program Medford Area Public School District 124 West State St School District: Medford, WI 54451 715 748 4620 Review Date(s): January 2018 Program Dave Makovsky Coordinator: Purpose and

More information

INVITATION TO BID PURCHASING DEPARTMENT P. O. BOX E. CENTRAL AVENUE THIRD FLOOR VALDOSTA, GEORGIA 31601

INVITATION TO BID PURCHASING DEPARTMENT P. O. BOX E. CENTRAL AVENUE THIRD FLOOR VALDOSTA, GEORGIA 31601 INVITATION TO BID PURCHASING DEPARTMENT P. O. BOX 1125 216 E. CENTRAL AVENUE THIRD FLOOR VALDOSTA, GEORGIA 31601 BID # 29-17-18 FOR: One Standby Diesel Pump for Lift Station OPENING DATE: May 22, 2018

More information

DOCUMENTATION PACKAGE

DOCUMENTATION PACKAGE INDUSTRIAL DIVISION 13131 WEST LITTLE YORK ROAD HOUSTON, TX77041 PHONE: (713) 466-0277 - (800) 231-1412 FACSIMILE: (713) 896-5220 DOCUMENTATION PACKAGE Processed By: Contact Person& Title: Email: Project

More information

Customer Requirements Downtown Secondary Network Service

Customer Requirements Downtown Secondary Network Service Application This standard describes the limitations and requirements for receiving service from the Tacoma Power secondary network system within the City of Tacoma downtown core area. In This Standard

More information

STOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION

STOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION CHAPTER 1 - GENERAL INFORMATION 100. Purpose 101. Codes and rules 102. Continuity of service 103. Frequency, Voltage, and Amperage Limitations 104. High voltages 105. Unusual capacity requirements 106.

More information

Electric & Gas Service Requirements (Greenbook) Overview

Electric & Gas Service Requirements (Greenbook) Overview INTRODUCTION The Greenbook contents and standard documents are updated regularly to provide users with the most current information possible. In conjunction with this effort, the 2016 Greenbook was reviewed

More information

City of Manhattan Beach Community Development

City of Manhattan Beach Community Development City of Manhattan Beach Community Development Phone: (310) 802-5500 FAX: (310) 802-5501 TDD: (310) 546-3501 Photovoltaic Solar Panel Plan Check Guidelines Updated: 12-20-16 ORDINANCE NO. 15-0022 MBMC 9.06

More information

Grounding Systems. Equipment Grounding & Grounded Conductors

Grounding Systems. Equipment Grounding & Grounded Conductors Grounding Systems Equipment Grounding & Grounded Conductors Definitions A Grounded or Earthed system is one that is connected to the earth Grounded Conductor is a conductor that normally carries current

More information

CONTENTS. Foreword...iii. 1. Introduction...1

CONTENTS. Foreword...iii. 1. Introduction...1 Installation of Aboveground Storage Systems for Motor-Vehicle Fueling CONTENTS Foreword...iii SECTIONS 1. Introduction...1 1.1 Background...1 1.2 Purpose...1 1.3 Scope...1 1.4 Source...1 1.5 Use of PEI/RP100...1

More information

Construction and Connection of Street Light Assets

Construction and Connection of Street Light Assets Construction and Connection of Street Light Assets 1. INTRODUCTION... 2 2. FURTHER INFORMATION... 3 3. DEFINITIONS... 3 3.1 Designer... 3 3.2 Street Light Asset Owner... 3 3.3 Road Owner... 4 3.4 Developer...

More information

DOCUMENTATION PACKAGE

DOCUMENTATION PACKAGE INDUSTRIAL DIVISION 13131 WEST LITTLE YORK ROAD HOUSTON, TX77041 PHONE: (713) 466-0277 - (800) 231-1412 FACSIMILE: (713) 896-5220 DOCUMENTATION PACKAGE Processed By: Contact Person& Title: Email: Project

More information

City of Portsmouth Portsmouth, New Hampshire Department of Public Works. Bid# Five (5) 2018 Ford Trucks INVITATION TO BID

City of Portsmouth Portsmouth, New Hampshire Department of Public Works. Bid# Five (5) 2018 Ford Trucks INVITATION TO BID City of Portsmouth Portsmouth, New Hampshire Department of Public Works Bid#52-18 Five (5) 2018 Ford Trucks INVITATION TO BID Sealed bid proposals, plainly marked Bid#52-18 Five (5) 2018 Ford Trucks on

More information

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS November 17, 2016 Engineering Service Specifications Table of Contents Commercial Service Requirements SLEMCO Commercial

More information

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5 PAGE 1 OF 5 USE: Requirements for entrance equipment. PREVIOUS REVISION 07-01-98 ORIGINATED 03-94 PREVIOUS NUMBER ER 100 (12-01-81) LATEST REVISION: Updated meter socket labeling specification and instrument

More information

REQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES

REQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES REQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES The City of Abbeville, South Carolina is soliciting sealed proposals for Fire Hydrant Maintenance Services. All proposals must be in writing and

More information

Service & Installation Rules

Service & Installation Rules Service & Installation Rules CONSOLIDATED AMENDMENTS - MARCH 2011 Published 3 September 2012 SA Power Networks www.sapowernetworks.com.au Issue 3 September 2012 Page 1 of 55 Revision Notes: DATE SECTION

More information

Generator Fire Safety: Generator assemblies should be located outside the building.

Generator Fire Safety: Generator assemblies should be located outside the building. SECTION 33 70 00 - ELECTRICAL DISTRIBUTION PACKAGED GENERATOR ASSEMBLIES Generator Fire Safety: Generator assemblies should be located outside the building. All fuel piping from the outside of the building

More information

Solar Power Installation Application

Solar Power Installation Application Solar Power Installation Application This Form must be filled out and submitted to Logan City Light and Power Department and given authorization to proceed PRIOR to installing a solar system. Also, please

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Rocky Mountain Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system

More information

CONTRA COSTA COMMUNITY COLLEGE DISTRICT

CONTRA COSTA COMMUNITY COLLEGE DISTRICT ADDENDUM #1 CONTRA COSTA COMMUNITY COLLEGE DISTRICT Date: 11/15/2018 D 4014 Warehouse Demolition Project Diablo Valley College 321 Golf Club Road, Pleasant Hill, CA 94523 NOTICE TO ALL CONTRACTORS: You

More information

E/ECE/324/Rev.2/Add.104/Rev.2 E/ECE/TRANS/505/Rev.2/Add.104/Rev.2

E/ECE/324/Rev.2/Add.104/Rev.2 E/ECE/TRANS/505/Rev.2/Add.104/Rev.2 28 September 2011 Agreement Concerning the adoption of uniform technical prescriptions for wheeled vehicles, equipment and parts which can be fitted and/or be used on wheeled vehicles and the conditions

More information

ELECTRIC DIVISION RULES AND PROCEDURES FOR ELECTRIC SERVICE

ELECTRIC DIVISION RULES AND PROCEDURES FOR ELECTRIC SERVICE Public Works and Utilities 1250 N. Highland St. Mount Dora, FL 32757 352-735-7151 ext. 1805 Fax: 352-735-1539 E-mail: publicworks@cityofmountdora.com ELECTRIC DIVISION RULES AND PROCEDURES FOR ELECTRIC

More information

Outdoor Enclosure Power System ENC X100MP48F20-AC6

Outdoor Enclosure Power System ENC X100MP48F20-AC6 Outdoor Enclosure Power System ENC673034-1X100MP48F20-AC6 Manual MA015151A4 Issue 1 Nov 2010 Copyright 2010 Myers Power Products, Inc. Part# A015151A4 MA015151A4 Iss1 Page 1 of 24 Dimensions Outdoor Enclosure

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER KADENA AIR BASE AIR FORCE INSTRUCTION 23-204 KADENA AIR BASE Supplement 30 MAY 2013 Certified Current, 8 June 2017 Material Management ORGANIZATIONAL FUEL TANKS COMPLIANCE WITH

More information

GENERAL NOTES ELECTRICAL NOTES MATCH LINE SEE SHEET E1.11 KEY PLAN NTS MATCH LINE SEE SHEET E1.12 SPR-2" SPR-2" SPR-2" SPR-2" SPR-2" SPR-2" TYP DH-108

GENERAL NOTES ELECTRICAL NOTES MATCH LINE SEE SHEET E1.11 KEY PLAN NTS MATCH LINE SEE SHEET E1.12 SPR-2 SPR-2 SPR-2 SPR-2 SPR-2 SPR-2 TYP DH-108 MATCH NE SEE SHEET E. N DH-6 DH-7 DH-9 DH-9 DH-8 DH-6 DH-8 MATCH NE SEE SHEET E. GENERAL NOTES KE PLAN NTS 407 North st Street, Suite 0 (5) 96-050 Fax (5) 96-06 N MATCH NE SEE SHEET E. DH- DH- DH- DH-7

More information