Subject: Hannaford Supermarket & Pharmacy 756 Route 1 Minor Site Plan Application for Proposed CLYNK Bottle Redemption Unit & Bicycle Rack Addition
|
|
- Kristopher Jenkins
- 6 years ago
- Views:
Transcription
1 Stantec Consulting Services Inc. 482 Payne Road Scarborough Court, Scarborough ME September 8, 2017 Mr. Alexander Jaegerman, FAICP Director of Planning & Development 200 Main Street Yarmouth, ME Subject: Hannaford Supermarket & Pharmacy 756 Route 1 Minor Site Plan Application for Proposed CLYNK Bottle Redemption Unit & Bicycle Rack Addition Dear Alex: On behalf of Hannaford Bros. Co. LLC, our office is submitting supporting information for a proposed standalone CLYNK bottle redemption unit in the existing parking area at the Hannaford site. This request also includes an addition of two bicycle racks at the front entrance of the building. As was discussed with your office, it was a determined that a Minor Site Plan Application would need to be submitted for the proposed project, and this would be reviewed at the Staff level. The project includes removal of existing pavement markings and installation of a prefabricated 12 x 32 CLYNK unit. The CLYNK unit does not have a foundation; it sits directly on pavement. The power for the unit will be provided underground from a nearby power pole (see Sheet C-0 for more detail). The area adjacent to the Clynk unit will be restriped to include two reserved spaces for CLYNK customers. The majority of the text that you see on the structure is wayfinding and instructional to its use, rather than advertising. The larger colored panel to the left front is art work that is commissioned from a local artist to reflect the local area. The one exception is the small Hannaford logo, and this seems well within any sign limits. Note that this box will be located so that the front is facing inward to the private property, not out to the public way. We do not believe this unit should be considered under the Article 5, Section O: Signage Standards of the Character-Based Development Code for the Route 1 Corridor. If required, we could remove the Clynk from the pickup door and leave the Clynk and the Hannaford logo on the front. We could also remove the Hannaford logo if needed from the front. As shown on the attached Sheet C-0 Overall Site Layout Plan, two bicycle racks will also be installed in front the building.
2 Mr. Alex Jaegerman September 8, 2017 Page 2 We are providing eight hard copies of the plans and submission materials listed below: Minor Site Plan Application Supporting Site Plans CLYNK Photograph Also included is a check in the amount of $ for the Minor Site Plan Application fee made payable to the Town of Yarmouth. We trust the information provided is adequate for the purposes of review and we look forward to working with you through the approval process. If you should have any questions or need any additional information, please feel free to contact our office. Sincerely, STANTEC CONSULTING, INC. Darrin B. Stairs, PE Project Manager Phone: Fax: darrin.stairs@stantec.com Attachments c: J Lord \\Us1261-f01\workgroup\1953\active\ \Admin\Permitting\Town of Yarmouth\Clynk 2017\let_site-plan_ docx
3
4 PLAN REFERENCES: THIS BASE PLAN WAS PREPARED USING: PLAN SET ENTITLED "HANNAFORD PLAZA, SITE DEVELOPMENT PLANS, CONSTRUCTION SET", 756 U.S. ROUTE ONE, YARMOUTH, MAINE, PREPARED BY FAY, SPOFFORD & THORNDIKE, INC., DATED TA MAP INFORMATION OBTAINED FROM THE TOWN OF YARMOUTH, CURRENT AS OF AERIAL PHOTOGRAPHY FROM GOOGLE EARTH PRO DATED MAY ( IN FEET ) 1 inch = 50 ft. Property Owner: Hannaford Bros. Co., Attn: Real Estate Dept. P.O. Box 1000, MS 6000 Portland, ME Applicant: Hannaford Bros. Co., LLC c/o J M Lord, Maple Rock LLC P.O. Box 28 / 560 South Road Rye Beach, NH STORMWATER DETENTION POND 3. Agent: Stantec 482 Payne Road Scarborough Court Scarborough, ME Property Address: 756 U.S. Route One Yarmouth, ME Parcel ID: MAP 39, LOTS 9, Total Site Area: acres 6. Hannaford Supermarket: 59,485 SF 7. Zoning: CD4-C2 8. Area & Bulk Summary Requirements: See Site Statistics (unchanged) 9. Plan References: ZONE: MDR ZONE: CD4-C2 HTG AGENCY LIQUOR STORE EISTING HANNAFORD SUPERMARKET & PHARMACY 59,485 SF EISTING RETAIL SHOPS 3,895 SF SITE STATISTICS EISTING ZONING CD4-C2 (COMMERCIAL) OVERALL PARCEL AREA ± ACRES EISTING BUILDING AREA 59,485± SF SUPERMARKET - 3,895± SF OTHER RETAIL - 2,785± SF RESTAURANT BLDG. - 66,165± SF TOTAL BLDG. AREA PROPOSED BUILDING AREA UNCHANGED STRUCTURE/BUILDING COVERAGE 11% GREEN SPACE 50.75% (UNCHANGED) STREET FRONTAGE 810 FEET PARKING EISTING PARKING 394 PROPOSED PARKING PARKING RATIO BUILDING HEIGHT 389 (LOSS OF 5 AT CLYNK SITE) 1 SP. FOR EA. 163 SF BLDG. (RETAIL) <35 FT BUILDING SETBACKS MIN FRONT 25 FT SIDE 15 FT PROPOSED 2 NEW BIKE RACKS CART CORRAL ZONE: MDR ZONE: CD4-C2 REAR 5 FT ZONE: MDR ZONE: C GAS CLYNK EISTING TD BANK GAS PROPOSED CLYNK LOCATION PROPERTY LINE, TYP. 15' SIDE BUILDING SETBACK, TYP. OUTPARCEL 1 25' FRONT BUILDING SETBACK, TYP. V:\1953\active\ \cadd\permit_set_clynk\dwg\50257_yarmouth_base.dwg cddube 8/31/2017 3:44 PM PARKING SUMMARY BUILDING PARKING PROVIDED PARKING RATIO EISTING RETAIL SPACE - 63,380± SF SP / 1,000 SQ. FT. PROPOSED RETAIL SPACE - 63,380± SF (UNCHANGED) WITH ADDED ETERNAL CLYNK UNIT (MINUS 5 SP FOR CLYNK) = SP / 1,000 SQ. FT. U.S. ROUTE ONE PRELIMINARY - NOT FOR CONSTRUCTION BETH CONDON MEMORIAL PATHWAY
5 CART CORRAL ( IN FEET ) 1 inch = 10 ft. GAS GAS GAS GAS GAS GAS GAS ERADICATE EISTING PARKING SPACE PAVEMENT MARKINGS AND RE-PAINT AS CHEVRON AREA PROPOSED PREFABRICATED CLYNK UNIT, 12' x 32', BY OTHERS 4" DIA. BOLLARD, TYP. OF 3 WALL-PACK LIGHT FITURE BENEATH CLYNK UNIT ROOF OVERHANG ROOF OVERHANG, TYP. (3'-0" FRONT, REAR) CHEVRON PAVEMENT MARKING AREA 45' 16' TYP. 3' NO PARKING CLYNK 5' 19' 12' UGE UGE UTILITY TRENCH CAP 24" x 24" PULL BO BEHIND EISTING SIDEWALK - SEE DETAIL REMOVE & REPLACE SLIPFORM CONCRETE CURB STANDARD 'NO PARKING' SIGN CENTERED BEHIND NO PARKING AREA RAMP UGE 'CLYNK CUSTOMERS ONLY' SIGN, TYP. OF 2 PROTECT BIT. SIDEWALK AND CURB, TYP. RE-PAINT PARKING SPACE PAVEMENT MARKING TO MATCH EISTING, TYP. PRIMARY POWER CONDUIT TO CLYNK, (1) 2" C PRIMARY UGE DROP FROM EISTING UTILITY POLE COORDINATE WITH ELECTRIC UTILITY COMPANY EISTING UTILITY POLE V:\1953\active\ \cadd\permit_set_clynk\dwg\50257_yarmouth_base.dwg cddube 8/31/2017 3:45 PM PRELIMINARY - NOT FOR CONSTRUCTION
6 3' HIGH LETTERING (WHERE REQUIRED - SEE SITE PLAN) 18" GRASS AREAS SEE SITE PLAN FOR OVERALL DIMENSIONS CL TRENCH SEE SITE PLAN FOR OVERALL DIMENSIONS..c " o.) 30 Y P (T PLASTIC MARKER TAPE APPRO. 12" BELOW FINAL GRADE NO PARKING SUITABLE BACKFILL 40" 4" 4" LOAM, SEED, FERTILIZER AND MULCH 4" SOLID PAINT MARKING (TYP.) SUITABLE BACKFILL FREE OF FROZEN LUMPS, ROCKS, STONES, DEBRIS & RUBBISH 4" SERVICE LINE A JUNCTION BO SHALL BE DESIGNED TO COMPLY WITH NATIONAL ELECTRICAL SAFETY CODE SECTION 323A. PROVIDE SHOP DRAWINGS STAMPED BY AN ENGINEER LICENSED IN THE STATE OF MAINE UPON REQUEST. JUNCTION BO AND SLAB SHALL BE SET ON A SUITABLE GRAVEL BASE. 3. FRAME AND LID SHALL BE NEENAH R-6662-RH OR APPROVED EQUAL. 24" x 24" PULL BO A ALL TRAFFIC PAVEMENT MARKINGS TO BE SOLID PAINT MEETING MDOT AND MUTCD STANDARDS, AS PER DIMENSIONS SHOWN. OVERALL CHEVRON AREA DIMENSIONS TO BE AS SHOWN ON THE SITE PLAN. PAINT COLOR TO MATCH EISTING PAINT. CHEVRON PAINT DETAIL D G 7'-0" SIDEWALK AREAS / 4'-0" NON SIDEWALK AREAS 10 1/2" SERVICE CONDUIT SIZE A 2" UTILITY SCHEDULE 80 PVC TO CLYNK POWER UTILITY TRENCH - GRASS AREAS SECONDARY ELECTRIC 3' PAVED AREAS NEW 5" BIT. CONCRETE PAVEMENT, MDOT SURFACE COURSE (9.5mm) AND NEW 5" BIT. CONCRETE PAVEMENT, MDOT BINDER COURSE (19.0mm) 3 1/2" 12" CL TRENCH NEW 5" BIT. CONCRETE PAVEMENT, MDOT SURFACE COURSE (9.5mm) NEW BASE GRAVEL, MDOT TYPE 'A' (2" MINUS) GUTTER GRADE 7" END TRANSITION CURB BINDER PAVEMENT (SEE PAVEMENT SECTION) 12" SURFACE PAVEMENT (SEE PAVEMENT SECTION) 721" 2"R 1 SUITABLE BACKFILL FREE OF FROZEN LUMPS, ROCKS, STONES, DEBRIS & RUBBISH 1" REVEAL MIN. 4"R 421" PLASTIC MARKER TAPE APPRO. 12" BELOW FINAL GRADE NEW 8" SUBBASE GRAVEL, MDOT TYPE 'D' (4" MINUS) OR MATCH EISTING BINDER PAVEMENT (SEE PAVEMENT SECTION) SURFACE PAVEMENT (SEE PAVEMENT SECTION) BINDER PAVEMENT (SEE PAVEMENT SECTION) 10 12" 12" B THIS DETAIL IS TO BE USED FOR ON-SITE SIDEWALKS. FOR REPAIRS TO THE BETH CONDON MEMORIAL PATHWAY, SEE DETAIL I ON SHEET C-8. BITUMINOUS SIDEWALK DETAIL 1 E SERVICE LINE A 4"R BASE/SUBBASE GRAVEL 4,000 PSI CONCRETE WITH FIBER REINFORCEMENT. 4% TO 6% AIR ENTRAINMENT. 3. 1" TO 2" SLUMP. 4. APPLY EPOY TO BINDER PAVEMENT PRIOR TO CURB PLACEMENT. SERVICE CONDUIT SIZE A 2" UTILITY SCHEDULE 80 PVC TO CLYNK POWER NOTE: UTILITY TRENCH THROUGH BITUMINOUS SIDEWALK TO MATCH BITUMINOUS SIDEWALK DETAIL. ETRUDED SLIPFORM SLOPED CONCRETE CURB DETAIL H UTILITY TRENCH - PAVED AREAS SECONDARY ELECTRIC GALV. FENCE POST CAP 4" SCHEDULE 40 ETRA STRONG CARBON STEEL PIPE FILLED WITH CONCRETE 2" SQUARE GALV. UNISTRUT ETEND 4' INTO SOIL 7'-0" 3" 3'- ALL BOLLARDS TO HAVE A YELLOW LDPE BOLLARD COVER WITH 4.875" TOTAL OUTSIDE DIAMETER; PRODUCT NUMBER BPD-YL S AS MANUFACTURED BY IDEAL SHIELD, OR APPROVED EQUAL FINISH GRADE PAVEMENT OR CONCRETE 4'-0" FINISH GRADE 4'-0" GRANULAR BASE 4,000 PSI CONCRETE BASE UNDISTURBED SUBGRADE V:\1953\active\ \cadd\permit_set_clynk\dwg\50257_yarmouth_details.dwg cddube 8/31/2017 3:43 PM 1'-0" x 1'- x 0.080" ALUMINUM SIGN BOLT TO STEEL TUBE WITH 3/8" CADMIUM PLATED BOLTS, NUTS & WASHERS C 'CLYNK' OR 'NO PARKING' STANDARD PARKING SIGN F PIPE BOLLARD DETAIL - CLYNK PRELIMINARY - NOT FOR CONSTRUCTION I LOOP BICYCLE RACK DETAIL
Please do not hesitate to contact me with any questions or concerns. I look forward to hearing from you.
367.001.001 March 2, 2018 Mr. Anthony Fontaine Maine Department of Transportation P.O. Box 358 Scarborough, ME 04070 RE: Application for Driveway/Entrance Permit 1400 US Route 1, York Dear Tony, On behalf
More information2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM
ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the
More informationDESCRIPTION QUANTITY PRICE TOTAL
GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00
More informationItems Unit Quantity Unit Price Total Unit Price Total
Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH
More informationDUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS
PRELIMINARY ENGINEERING PLANS DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS ERIC CARLSON ARCHITECTS LOCATION MAP DRAWINGS INDE CONTACTS REV DATE NOT TO SCALE BENCHMARKS CRISSEY AVENUE IL ROUTE 38
More information6.16 OFF-STREET PARKING AND LOADING REQUIREMENTS
6.16 OFF-STREET PARKING AND LOADING REQUIREMENTS 6.16.1 Off-Street Parking Off-street parking and loading spaces shall be required for all land uses as set forth in this section. A. Minimum Parking Space
More information3. Application Fees, Certificate Of Insurance & Performance Bond
SUBSECTION 13.10 CONSTRUCTION OF DRIVEWAYS 13.10A PERMIT REQUIREMENTS 1. General A driveway or access road serving private property and intersecting with a town road shall be constructed in such a manner
More informationSITE PLANS ASSISTED LIVING REDEVELOPMENT
SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE
More informationMaine Turnpike Authority
Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin
More informationProject Book Worksheet for Cost Estimation
001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013
More informationPARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS
PARKING LOT REHABILITATION PROJECT FOR: DRAWING INDE SHEET NO. DRAWING TITLE C. COVER SHEET C1. - C1.17 PALATKA CAMPUS C4. CONSTRUCTION DETAILS PROJECT SITE PROJECT SITE C. 8 4 8 16 32 1 inch = 8 ft. C1.16
More informationSt. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016
St. Johns River State College BID-SJR-10-2016 Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 TO BID-SJR-10-2016 Bid Specifications/Project Manual (Plans) PARKING LOT REHABILITATION PROJECT FOR: DRAWING
More informationPLANNING COMMISSION REPORT Regular Agenda -- Public Hearing Item. PC Staff Report 5/23/16 TEXT AMENDMENT TO LAND DEVELOPMENT CODE; VALET PARKING (SLD)
PC Staff Report 5/23/16 TA-16-00128 Item No. 5-1 PLANNING COMMISSION REPORT Regular Agenda -- Public Hearing Item PC Staff Report 5/23/16 ITEM NO. 5 TEXT AMENDMENT TO LAND DEVELOPMENT CODE; VALET PARKING
More informationPERMANENT RESIDENTIAL UNDERGROUND SERVICE
CITY OF RICHLAND ENERGY SERVICES DEPARTMENT 505 Swift Boulevard, MS-21 Richland, WA 99352 Telephone (509) 942-7403 Fax (509) 942-7405 PERMANENT RESIDENTIAL UNDERGROUND SERVICE A. INTRODUCTION This guide
More informationTemporary Sales Trailer Application
Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 Temporary Sales Trailer Application General: Requests for temporary sales trailers, which comply with
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationSTANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationRESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS
SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated
More informationFederal Project No.: OC-095-1(348)
Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING
More informationMaine Turnpike Authority
Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,
More informationProject # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements
Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices
More informationADDENDUM No. 1 Prospective Bidders
Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal
More informationOhio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director
Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. A. AN APPLICANT S GUIDE TO PROCEDURES FOR: B. C. D.
More informationCONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO
Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,
More informationMaine Turnpike Authority
Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING
More informationMaine Turnpike Authority
York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00
More informationCENTENNIAL PARK EXPANSION
2 working days CITY ELKO EXISTING LEGEND PROPOSED CENTENNIAL PARK EXPANSION SEET LIGHT POWER POLE ELECICAL BOX 1-800-227-2600 AVOID CUTTING UNDERGROUND UTILITIES WATER VALVE GAS VALVE FIRE HYDRANT OWNER/DEVELOPER:
More informationARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS
ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET
More information7 Single Family Service
7 Single Family Service 7. General The location of the service entrance on the Customer s premises is an important consideration. For clearance and location information see section 5 (Clearances). Consult
More information11 October 12, 2011 Public Hearing APPLICANT:
11 October 12, 2011 Public Hearing APPLICANT: CARING TRANSITIONS PROPERTY OWNER: HARDEE REALTY CORPORATION REQUEST: Conditional Use Permit (motor vehicle rental) STAFF PLANNER: Leslie Bonilla ADDRESS /
More informationFederal Project No.: HSIP-5A27(567)
Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING
More informationRequest for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV
Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV Issued: Monday, Site Tour: Friday, January 30, 2015 at 10:00 a.m. Submittal Deadline: 5:00 p.m. on Friday,
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More informationCITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES
CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required
More informationMaine Turnpike Authority
Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00
More informationHARDEE COUNTY ROAD AND BRIDGE DEPARTMENT Driveway-Culvert Installation Permit
1 HARDEE COUNTY ROAD AND BRIDGE DEPARTMENT Driveway-Culvert Installation Permit The word Applicant shall mean Person or Persons as defined per Hardee County Ordinance No. 2010-09, as individuals, firms,
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior
More informationParking Investigation / San Antonio UDC
Parking Investigation / San Antonio UDC Parking requirements: Minimum 0.8 per room plus 1 per 800 sf of public meeting areas and restaurant space Maximum 1 per room plus 1 per 400 sf of public meeting
More informationDEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS
DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY NOVEMBER 30, 2017 SUBMITTED BY: LYDON LYNCH ARCHITECTS TABLE OF CONTENTS LETTER OF INTRODUCTION PROJECT
More informationCharter Township of Plymouth Zoning Ordinance No. 99 Page 164 Article 15: VP Vehicular Parking District Amendments:
Charter Township of Plymouth Zoning Ordinance No. 99 Page 164 PURPOSE ARTICLE XV VP VEHICULAR PARKING DISTRICT Vehicular Parking Districts (VP) are designed to accommodate off-street parking for the exclusive
More informationMETRO Magnolia Transit Center - Bid Tab
Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's
More informationUTILITY CROSSING DETAIL
6" OF CSBC COMPACTED TO A FIRM AND UNYIELDING CONDITION. NOTE: - SILT FENCE SHALL CONFORM TO 8-01.3(9)A - SILT FENCES SHALL BE INSTALLED ALONG CONTOUR WHENEVER POSSIBLE. - POST SPACING MAY BE INCREASED
More informationSALEM CITY POWER ELECTRICAL REQUIREMENTS & STANDARDS MANUAL
SALEM CITY POWER DEPARTMENT TABLE OF CONTENTS Section 1 General Requirements Purpose...1.1 Codes and Ordinances...1.1 Changes or Conflicts in Requirements and Guidelines...1.1 Application for Service...1.2
More informationCT Consultants, Inc.
Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS
More informationMcCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1
McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John
More informationMaine Turnpike Authority
Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross
More informationMOTOR VEHICLE ORIENTED BUSINESSES.
ARTICLE 23. MOTOR VEHICLE ORIENTED BUSINESSES. Sec. 25-23.1. Conditional Use. Motor vehicle oriented businesses (MVOB) shall require a Conditional Use Permit in all districts as indicated in Appendix B,
More informationFOR SALE OR LEASE EBERHARDT & BARRY INC.
FOR SALE OR LEASE Property Video: https://vimeo.com/215049252/1384e4fcbe 500,000± SF Manufacturing / Distribution Facility - 25.48± Acres Formerly 1888 Mills 904 N. Hightower Street Thomaston, Upson County,
More informationDESIGN STANDARDS SECTION DS 3 STREETS
DESIGN STANDARDS SECTION DS 3 STREETS DS 3-01 GENERAL: A. INTENT: The intent of these Design Standards is to provide minimum standards for the design of public streets. These standards are intended to
More informationSolid Waste Service Company Review and Collection Space Standards
Handout 109 Solid Waste Service Company Review and Collection Space Standards Development Services Department 1775 12 th Ave. NW P.O. Box 1307 Issaquah, WA 98027 425-837-3100 DSD@issaquahwa.gov Review
More informationInstructions for Signage Permit Application Sublette County, Wyoming
Instructions for Signage Permit Application Sublette County, Wyoming A sign permit is required for signs announcing or advertising a business including home business and occupations. Signs not included
More informationFederal Project No.: STP-5128(388)
Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)
More informationGrays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14
Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.
201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal
More informationSHALER TOWNSHIP PLANNING COMMISSION October 15, 2018
SHALER TOWNSHIP PLANNING COMMISSION October 15, 2018 The Regular Meeting of the Shaler Township Planning Commission was held on October 15, 2018, at 7:30 p.m. Mr. Piekarski called the meeting to order.
More informationPROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS
PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS To review the proposed amendments Approval of the amendments (5-3) Ogden City Planning is proposing several amendments and clarifications to the parking
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207
More informationDRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group
DRIVEWAY GUIDE June 2017 TABLE OF CONTENTS Definitions Building Requirements Material Standards Drainage Administrative Requirements Zoning Requirements Yard Requirements Design Requirements Public Ways
More informationARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.02 OFF STREET PARKING AND LOADING SPACE REQUIREMENTS
ARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.01 STORAGE IN FRONT YARD Nothing in this Ordinance shall permit the storage or parking of any vehicle or non-permanent structure within the required
More informationBARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY
IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE
More information(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,
78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction
More information/Volumes/work-1/e+a projects/2015 Projects/15-02-013 The Metro On Manchester - Brentwood MO/02 Schematic Design/B. Drawings/A. Archicad Files/ 8019 FAWN CT MARY SUSAN WARD FA W N CO 8015 FAWN CT MALLORY
More information5. Underground Requirements
Un d e rg ro u n d Re q u ire me n ts Section 5 2016 Electric Service Requirements, 3rd Edition Section 5 Underground Requirements Directory Page 5.1 General 34 5.2 Conduit Requirements 34 5.3 Trench and
More informationPurpose: General Provisions:
10-19-1 Purpose: The purpose of off-street parking requirements is to promote traffic/pedestrian safety and efficiency and to minimize hard surfaced areas to reduce storm water run-off and visual impacts
More informationThis letter summarizes our observations, anticipated traffic changes, and conclusions.
Mr. David Jorschumb Project Manager Boulder Valley School District Re: Review of proposed school access improvements at the Foothills Elementary School in Boulder Dear Mr. Jorschumb, At your request, the
More informationFor Conduit Inspections
Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit
More informationMcCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS
BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS
More informationGUIDELINES FOR ADVERTISING SIGNS
GUIDELINES FOR ADVERTISING SIGNS SIGN PERMITS A Sign Permit is required to install or alter any advertising sign, except for the following exempt types of signs: One identification sign displaying only
More informationZONED: GC - GENERAL COMMERCIAL SAN WOODED AREA A-2 OHE OHE A-13 X X CONCRETE OUTLET STRUCTURE 20' BUILDING SETBACK A-6 C-37 A-12 C-36
38.50' I U.S. 23 C-8 CL C-19 SITE PLAN SCALE: 1" = 50'-0" DESC. & M. N.00 55'26"W. A - EIING SITE FEATURES TO REMAIN N. 87-57' - 43" E. DESC. & M. 297.42' 7 07/14/15 ENGINEERING MMENTS 8 07/29/15 ENGINEERING
More information2011 LOCAL STREET IMPROVEMENTS
11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE
More informationMaine Turnpike Authority
Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM
More informationANN ARBOR CITY NOTICE ORDINANCE NO. ORD OFF STREET PARKING CHAPTER 59
ANN ARBOR CITY NOTICE ORDINANCE NO. ORD-12-04 OFF STREET PARKING CHAPTER 59 AN ORDINANCE TO AMEND SECTIONS 5:168 AND 5:169 OF CHAPTER 59 (OFF- STREET PARKING) OF TITLE V OF THE CODE OF THE CITY OF ANN
More informationCITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS
CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS JANUARY 1996 EDITION ADDENDA THROUGH JULY 2017 DIANNA JENSEN City Engineer 1717 Fifth Street Davis, CA 95616 530-757-5686 2017 Edition STANDARD
More informationVIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017
MANASSAS PARK STATION PARKING EXPANSION Public Meeting June 20, 2017 1 AGENDA Project Status Schematic Design Circulation Traffic Analysis Proposed Garage Location Next Steps Cost Estimate 2 PROJECT PHASES
More informationCITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS
CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN
More informationParking And Loading
Title 33, Planning and Zoning Chapter 33.266 2/1/17 Parking And Loading 33.266 Parking And Loading 266 Sections: 33.266.010 Introduction Motor Vehicle Parking 33.266.100 General Regulations 33.266.110
More informationZONING CODE PARKING REGULATIONS
CHAPTER 169 ZONING CODE PARKING REGULATIONS 169.01 Purpose 169.06 Design For Parking Facilities 169.02 Authority and Application 169.07 Stacking Spaces For Drive-Through Facilities 169.03 Off-Street Loading
More informationHILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.
PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE
More informationFertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,
BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity
More informationARTICLE 8: Parking and Loading Standards
ARTICLE 8: Parking and Loading Standards... 8-1 17.8.1: General...8-1 17.8.1.1: Purpose and Intent... 8-1 17.8.1.2: Applicability... 8-1 17.8.1.3: General Standards... 8-1 17.8.1.4: Design and Development
More informationPlan Check Policies and Guidelines
Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation
More informationSPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION
Roseville Electric SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION REVISED 04/25/18 Specifications for Residential Construction Revision List REVISION Date Page No. Description 03/20/00 6.1-6.2 Added Armorcast
More informationTRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation
TRAFFIC IMPACT DATA For Dillons #98 On-Site Relocation COMMERCIAL DEVELOPMENT 1740 Massachusetts Street Lawrence, KS Revised April 6, 2011 Prepared by: Pickering Firm, Inc. Introduction The project site
More informationENGINEERING BEST PRACTICE BP2.2.1
1. SUBJECT DRIVEWAY REQUIREMENT POLICIES RESIDENTIAL 2. DEFINITIONS Driveway Paved area that provides access from a roadway to private property. Frontage Exterior lot line abutting a public right-of-way,
More informationCHAPTER 140 DRIVEWAYS
CHAPTER 140 DRIVEWAYS 140.01 Purpose 140.10 Driveway Location 140.02 Definitions 140.11 Driveway Maintenance 140.03 Driveway Construction 140.12 Failure To Maintain 140.04 Driveway Surfaces 140.13 Permit
More informationCreekSide XVI & XVIII
Project Overview CreekSide XVI & XVIII Building Dimensions CreekSide XVI - 155,866 square feet CreekSide XVIII - 236,140 square feet 32 clear height 50 x 54 column spacing and 60 speed bay CreekSide Advantage
More informationCITY OF ESTHERVILLE, IOWA MISCELLANEOUS FEES & CHARGES. At Sewer Main.. $
CITY OF ESTHERVILLE, IOWA MISCELLANEOUS FEES & CHARGES Revised 4-6-09 UTILITY FEES Sanitary Sewer Taps: At Manhole... $ 400.00... At Sewer Main.. $ 500.00... All excavation, labor and materials by property
More informationNOTICE OF PUBLIC HEARING ANAHEIM PUBLIC UTILITES BOARD IS HOLDING A PUBLIC HEARING ON THE FORMATION OF UNDERGROUND DISTRICT No. 66 (BEACH) TO UNDERGROUND OVERHEAD FACILTIIES, INCLUDING POWER AND COMMUNICATION
More informationOFF-STREET PARKING. A. Parking facilities for each use shall be provided in accord with the minimum requirements set forth in Table 9-1.
09 ARTICLE NINE OFF-STREET PARKING 9-1 Purpose The off-street parking regulations require that developments provide parking in proportion to the need created by each use. The regulations further establish
More informationSaint Paul s Off-Street Parking Revisions. Hilary Holmes City Planner
Saint Paul s Off-Street Parking Revisions Hilary Holmes City Planner Today: Citywide off-street parking revisions 2009 Bar & restaurant revisions 2012 Establishing maximums Other off-street reductions
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP
More informationUNDERGROUND CONDUIT SYSTEMS for Primary and Secondary Conductors (Rev. 7)
April 2018 UNDERGROUND CONDUIT SYSTEMS for Primary and Secondary Conductors (Rev. 7) Engineering & Asset Management Policy No. 242 Rocky Mountain Power Utah Wyoming Idaho This policy and related documents
More informationPlan Check Policies and Guidelines
VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.
More informationCommercial Electric Policy
Commercial Electric Policy 7/19/16 1 Table of Contents General Information..3 Construction.3 Ownership.4 Multi-Unit/Multi-Service Buildings....4 Secondary Termination Enclosures.4 Meter Bases.5 Temporary
More informationBID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST
PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL
More informationTRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT
TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic
More informationMEDICAL / OFFICE. Professional buildings at 105 Mt. Blue Circle and 107 Mt. Blue Circle are available for sale. PROFESSIONAL BUILDINGS FOR SALE
PROFESSIONAL BUILDINGS FOR SALE MEDICAL / OFFICE 107 MT. BLUE 105 MT. BLUE Mt. Blue Circle is located directly on Route 2 (Wilton Road) across from Franklin Memorial Hospital in Farmington. Route 2 is
More informationChapter. Parking SECTION OFF STREET PARKING AND LOADING REQUIREMENTS
Chapter 14 Parking It is the purpose and intent of this Ordinance that parking and loading areas be provided and adequately maintained in every zoning district for the purposes of promoting safe and efficient
More information