PARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS
|
|
- Berniece Malone
- 6 years ago
- Views:
Transcription
1 PARKING LOT REHABILITATION PROJECT FOR: DRAWING INDE SHEET NO. DRAWING TITLE C. COVER SHEET C1. - C1.17 PALATKA CAMPUS C4. CONSTRUCTION DETAILS PROJECT SITE PROJECT SITE C.
2 inch = 8 ft. C1.16 A & B C1.17 A & B 25' PARKING LOT #6 PARKING LOT #6 PARKING LOT #5 PARKING LOT #1 C1.15 A & B C1.1 A & B PARKING LOT #5 C1.14 A & B PARKING LOT #2 C1.11 A & B KEY MAP PARKING LOT #4 C1.13 A & B PARKING LOT #4 C1.12 A & B PARKING LOT #3 C1.
3 PARKING LOT REPAIR/RESTORE QUANTITIES: ITEM LF SF SEAL COAT NEW ASPHALT PAVEMENT (SEE DETAIL SHEET C4.) 16,532 NEW 4" THICK CONCRETE SIDEWALK AND/OR RAMP 65 EA ALTERNATE #1: ASPHALT REPAIR, SP-9.5, 1.5" THICK OVER RESTORED BASE 16,532 5' 5' REMOVED MATERIAL TO BE REMOVED FROM SITE OR SALVAGED TO CONTRACTOR QUANTITIES SHOWN ARE FOR THIS SHEET ONLY REMOVE AND RECONSTRUCT CONCRETE SIDEWALK IN CONFORMANCE W/ ADA MATCHLINE C1.17 MATCHLINE C ' ALTERNATE #1: BASE SCOPE: SEALCOAT LEGEND DEMO EISTING PAVEMENT AND CONSTRUCT NEW PAVEMENT ALTERNATE #1: CUT-OUT AND REPAIR (SEE REPAIR DETAIL) PARKING LOT REPAIR/RESTORE PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAILS, PAVEMENT REPAIR/RESTORE DETAILS, AND ADDITIONAL NOTES. 2. SEE SHEET C4. FOR SPECIFICATIONS ON SEALCOAT TYPE AND APPLICATION REQUIREMENTS. PAVEMENT REPAIR AND RESTORE PARKING LOT #1 BASE SCOPE: SEALCOAT PARKING LOT # ' 6.5' 27.4' MATCHLINE C1.1 MATCHLINE C1.11 C1.1_A
4 11 SPACES 14.9' 9 SPACES 24 SPACES 24" WHITE STOP BAR 25' DBL YELLOW STRIPE (PAINT) PARKING LOT MARKING PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAIL SHEET FOR PAVEMENT MARKING PLAN DETAILS AND ADDITIONAL NOTES. MATCHLINE C1.17 MATCHLINE C ALL PARKING STALL STRIPING SHALL BE EVENLY SPACED WITHIN THE DIMENSIONED AREA AS SHOWN AND SHALL BE 2' DEEP UNLESS NOTED OTHERWISE. 3. ALL 24" STOP BAR TO BE PER FDOT INDE NO PAVEMENT MARKINGS PARKING LOT #1 PARKING LOT #1 LOADING AREA STRIPED W/ WHITE CROSS HATCHING (SEE DETAILS FOR DIMENSIONING ONLY) HANDICAP PARKING STALL MARKINGS (SEE DETAIL ON C4.) DBL YELLOW STRIPE (PAINT) 25' EISTING STOP SIGN MATCHLINE C1.1 MATCHLINE C1.11 C1.1_B
5 22.3' 44.8' MATCHLINE C1.1 SIDEWALK CURB RAMP PER FDOT INDE NO. 34 CURB RAMP CR-E MATCHLINE C1.11 1' 3' 2' 5' 42.3' 25.8' 3' PARKING LOT REPAIR/RESTORE QUANTITIES: ITEM LF SF SEAL COAT 64,965 NEW ASPHALT PAVEMENT (SEE DETAIL SHEET C4.) NEW 4" THICK CONCRETE SIDEWALK AND/OR RAMP 33 ALTERNATE #1: ASPHALT REPAIR, SP-9.5, 1.5" THICK OVER RESTORED BASE 5,567 EA REMOVED MATERIAL TO BE REMOVED FROM SITE OR SALVAGED TO CONTRACTOR 3' QUANTITIES SHOWN ARE FOR THIS SHEET ONLY LEGEND BASE SCOPE: SEALCOAT DEMO EISTING PAVEMENT AND CONSTRUCT NEW PAVEMENT ALTERNATE #1: PARKING LOT #2 56.3' 13.6' CUT-OUT AND REPAIR (SEE REPAIR DETAIL) PARKING LOT REPAIR/RESTORE PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAILS, PAVEMENT REPAIR/RESTORE DETAILS, AND ADDITIONAL NOTES. 2. SEE SHEET C4. FOR SPECIFICATIONS ON SEALCOAT TYPE AND APPLICATION REQUIREMENTS. PAVEMENT REPAIR AND RESTORE PARKING LOT #2 MATCHLINE C1.11 MATCHLINE C1.12 C1.11_A
6 8 SPACES 13 SPACES 8 SPACES 7' 2 SPA 5' 5' 15 SPACES 33 SPACES MATCHLINE C1.1 12" WHITE STRIPE (PAINT) MATCHLINE C ' WHITE STRIPE (PAINT) 16' 5' 5' 3 SPACES 18' 24' 5' 18' 18' 46.5' 9 SPACES 18' 3' DBL YELLOW STRIPE (PAINT) PARKING LOT MARKING PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAIL SHEET FOR PAVEMENT MARKING PLAN DETAILS AND ADDITIONAL NOTES. 14 SPACES 2. ALL PARKING STALL STRIPING SHALL BE EVENLY SPACED WITHIN THE DIMENSIONED AREA AS SHOWN AND SHALL BE 2' DEEP UNLESS NOTED OTHERWISE. 3. ALL 24" STOP BAR TO BE PER FDOT INDE NO PARKING LOT #2 2' 25 SPACES 26 SPACES PAVEMENT MARKINGS PARKING LOT #2 2' 8' NO PARKING 7' WHITE STRIPE (PAINT) 12" WHITE STRIPE (PAINT) HANDICAP PARKING STALL MARKINGS (SEE DETAIL ON C4.) DOUBLE YELLOW W/ 18" YELLOW LETTERING (PAINT) MATCHLINE C1.11 8' NO PARKING 18' R5-1 DO NOT ENTER SIGN DBL YELLOW STRIPE (PAINT) MATCHLINE C1.12 C1.11_B
7 3' MATCHLINE C1.11 MATCHLINE C1.12 1' 25' 1' PARKING LOT REPAIR/RESTORE QUANTITIES: 1' 1' ITEM LF SF SEAL COAT NEW ASPHALT PAVEMENT (SEE DETAIL SHEET C4.) 6,528 NEW 4" THICK CONCRETE SIDEWALK AND/OR RAMP EA ALTERNATE #1: ASPHALT REPAIR, SP-9.5, 1.5" THICK OVER RESTORED BASE 18,187 REMOVED MATERIAL TO BE REMOVED FROM SITE OR SALVAGED TO CONTRACTOR QUANTITIES SHOWN ARE FOR THIS SHEET ONLY LEGEND BASE SCOPE: SEALCOAT PARKING LOT #3 DEMO EISTING PAVEMENT AND CONSTRUCT NEW PAVEMENT 65' ALTERNATE #1: CUT-OUT AND REPAIR (SEE REPAIR DETAIL) PARKING LOT REPAIR/RESTORE PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAILS, PAVEMENT REPAIR/RESTORE DETAILS, AND ADDITIONAL NOTES. 2. SEE SHEET C4. FOR SPECIFICATIONS ON SEALCOAT TYPE AND APPLICATION REQUIREMENTS. PAVEMENT REPAIR AND RESTORE PARKING LOT #3 6' 5' 22.3' 135' C1.12_A
8 BUS PARKING 51.2' 57.5' 2 SPACES 13 SPACES 13 SPACES 15 SPACES REPLACE ALL WHEEL STOPS 2 SPA 29 SPACES MATCHLINE C1.11 HANDICAP PARKING STALL MARKINGS (SEE DETAIL ON C4.) MATCHLINE C " WHITE STRIPE (PAINT) YELLOW STRIPE (PAINT) NO PARKING 8' 7' R5-1 DO NOT ENTER SIGN 18 SPACES DOUBLE YELLOW STRIPE (PAINT) PARKING LOT MARKING PLAN NOTES: REPLACE ALL WHEEL STOPS 1. SEE SHEET C4. CONSTRUCTION DETAIL SHEET FOR PAVEMENT MARKING PLAN DETAILS AND ADDITIONAL NOTES. DOUBLE WHITE STRIPE W/ 18" WHITE LETTERING PARKING LOT #3 2. ALL PARKING STALL STRIPING SHALL BE EVENLY SPACED WITHIN THE DIMENSIONED AREA AS SHOWN AND SHALL BE 2' DEEP UNLESS NOTED OTHERWISE. 3. ALL 24" STOP BAR TO BE PER FDOT INDE NO PAVEMENT MARKINGS PARKING LOT #3 26 SPACES 18' 18' 18' 18' 18' 18' 18' 18' DBL YELLOW STRIPE (PAINT) 3' C1.12_B
9 MATCHLINE C1.14 MATCHLINE C1.13 (TYP.) 14' 2'2' PARKING LOT REPAIR/RESTORE QUANTITIES: 3' 2' ITEM LF SF SEAL COAT NEW ASPHALT PAVEMENT (SEE DETAIL SHEET C4.) 13,127 NEW 4" THICK CONCRETE SIDEWALK AND/OR RAMP 397 EA ALTERNATE #1: ASPHALT REPAIR, SP-9.5, 1.5" THICK OVER RESTORED BASE 9,392 PARKING LOT #4 REMOVED MATERIAL TO BE REMOVED FROM SITE OR SALVAGED TO CONTRACTOR QUANTITIES SHOWN ARE FOR THIS SHEET ONLY LEGEND BASE SCOPE: SEALCOAT 55' 22' DEMO EISTING PAVEMENT AND CONSTRUCT NEW PAVEMENT ALTERNATE #1: CUT-OUT AND REPAIR (SEE REPAIR DETAIL) PARKING LOT REPAIR/RESTORE PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAILS, PAVEMENT REPAIR/RESTORE DETAILS, AND ADDITIONAL NOTES. 2. SEE SHEET C4. FOR SPECIFICATIONS ON SEALCOAT TYPE AND APPLICATION REQUIREMENTS. PAVEMENT REPAIR AND RESTORE PARKING LOT #4 23.6' 94' 9' 41.6' 29' 55' 22' SAWCUT LINE SIDEWALK CURB RAMP PER FDOT INDE NO. 34 CURB RAMP CR-K 28' SAWCUT LINE 9' SAWCUT LINE SAWCUT LINE SIDEWALK CURB RAMP PER FDOT INDE NO. 34 CURB RAMP CR-K C1.13_A
10 18 SPACES 11 SPACES 13 SPACES 18 SPACES 12 SPACES 18 SPACES 15' 24' MATCHLINE C1.14 MATCHLINE C1.13 PARKING LOT #4 PARKING LOT MARKING PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAIL SHEET FOR PAVEMENT MARKING PLAN DETAILS AND ADDITIONAL NOTES. 18 SPACES 18 SPACES 18 SPACES 18 SPACES 2. ALL PARKING STALL STRIPING SHALL BE EVENLY SPACED WITHIN THE DIMENSIONED AREA AS SHOWN AND SHALL BE 2' DEEP UNLESS NOTED OTHERWISE. 3. ALL 24" STOP BAR TO BE PER FDOT INDE NO ' 67' 67' 42' 25' 11' DBL YELLOW STRIPE (PAINT) DBL YELLOW STRIPE (PAINT) YELLOW STRIPE (PAINT) 27.75' 11 SPACES 11 SPACES 11 SPACES 11 SPACES 11 SPACES HANDICAP PARKING STALL MARKINGS (SEE DETAIL ON C4.) 18' 5' PAVEMENT MARKINGS PARKING LOT #4 18' C1.13_B
11 PARKING LOT #5 PARKING LOT REPAIR/RESTORE QUANTITIES: ITEM LF SF SEAL COAT 3, NEW ASPHALT PAVEMENT (SEE DETAIL SHEET C4.) NEW 4" THICK CONCRETE SIDEWALK AND/OR RAMP EA ALTERNATE #1: ASPHALT REPAIR, SP-9.5, 1.5" THICK OVER RESTORED BASE 3, REMOVED MATERIAL TO BE REMOVED FROM SITE OR SALVAGED TO CONTRACTOR QUANTITIES SHOWN ARE FOR THIS SHEET ONLY LEGEND BASE SCOPE: SEALCOAT DEMO EISTING PAVEMENT AND CONSTRUCT NEW PAVEMENT ALTERNATE #1: MATCHLINE C1.15 MATCHLINE C1.14 3' 95.3' CUT-OUT AND REPAIR (SEE REPAIR DETAIL) PARKING LOT REPAIR/RESTORE PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAILS, PAVEMENT REPAIR/RESTORE DETAILS, AND ADDITIONAL NOTES. 2. SEE SHEET C4. FOR SPECIFICATIONS ON SEALCOAT TYPE AND APPLICATION REQUIREMENTS. PAVEMENT REPAIR AND RESTORE DRIVEWAY BETWEEN PARKING LOT #4 AND #5 MATCHLINE C1.14 MATCHLINE C1.13 PARKING LOT #4 C1.14_A
12 PARKING LOT #5 PARKING LOT MARKING PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAIL SHEET FOR PAVEMENT MARKING PLAN DETAILS AND ADDITIONAL NOTES. MATCHLINE C1.15 MATCHLINE C1.14 DBL YELLOW STRIPE (PAINT) 2. ALL PARKING STALL STRIPING SHALL BE EVENLY SPACED WITHIN THE DIMENSIONED AREA AS SHOWN AND SHALL BE 2' DEEP UNLESS NOTED OTHERWISE. 3. ALL 24" STOP BAR TO BE PER FDOT INDE NO PAVEMENT MARKINGS DRIVEWAY BETWEEN PARKING LOT #4 AND #5 MATCHLINE C1.14 MATCHLINE C1.13 PARKING LOT #4 C1.14_B
13 15' 88' 8' 1' MATCHLINE C1.15 MATCHLINE C1.16 PARKING LOT REPAIR/RESTORE QUANTITIES: ITEM LF SF SEAL COAT 98,486 NEW ASPHALT PAVEMENT (SEE DETAIL SHEET C4.) NEW 4" THICK CONCRETE SIDEWALK AND/OR RAMP 62 ALTERNATE #1: ASPHALT REPAIR, SP-9.5, 1.5" THICK OVER RESTORED BASE 2,246 REMOVED MATERIAL TO BE REMOVED FROM SITE OR SALVAGED TO CONTRACTOR QUANTITIES SHOWN ARE FOR THIS SHEET ONLY EA 9' 37' 15' BASE SCOPE: LEGEND 29' SEALCOAT DEMO EISTING PAVEMENT AND CONSTRUCT NEW PAVEMENT ALTERNATE #1: CUT-OUT AND REPAIR (SEE REPAIR DETAIL) PARKING LOT REPAIR/RESTORE PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAILS, PAVEMENT REPAIR/RESTORE DETAILS, AND ADDITIONAL NOTES. 2. SEE SHEET C4. FOR SPECIFICATIONS ON SEALCOAT TYPE AND APPLICATION REQUIREMENTS. PAVEMENT REPAIR AND RESTORE PARKING LOT #5 96' 42' 8' PARKING LOT #5 155' 2'8' 32' SIDEWALK CURB RAMP PER FDOT INDE NO. 34 CURB RAMP CR-E 6' 95' 29' 8' 4' MATCHLINE C1.15 4'6' MATCHLINE C1.14 C1.15_A
14 34 SPACES 32 SPACES 32 SPACES 32 SPACES 32 SPACES 32 SPACES 32 SPACES 5 SPACES 7' 5' 8' 8' 15' LF OF DBL YELLOW STRIPE (PAINT) 15' LF OF 19' LF OF DBL YELLOW STRIPE (PAINT) 15' LF OF MATCHLINE C1.15 MATCHLINE C1.16 HANDICAP PARKING STALL MARKINGS (SEE DETAIL ON C4.) WHITE CROSS-HATCH STRIPING (TYP. PARKING LOT #5) 8 SPACES HANDICAP PARKING STALL MARKINGS (SEE DETAIL ON C4.) PAVEMENT MARKINGS PARKING LOT #5 HANDICAP PARKING STALL MARKINGS (SEE DETAIL ON C4.) PARKING LOT MARKING PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAIL SHEET FOR PAVEMENT MARKING PLAN DETAILS AND ADDITIONAL NOTES. 11 SPACES 2. ALL PARKING STALL STRIPING SHALL BE EVENLY SPACED WITHIN THE DIMENSIONED AREA AS SHOWN AND SHALL BE 2' DEEP UNLESS NOTED OTHERWISE. 3. ALL 24" STOP BAR TO BE PER FDOT INDE NO PARKING LOT #5 HANDICAP PARKING STALL MARKINGS (SEE DETAIL ON C4.) DBL YELLOW STRIPE (PAINT) EISTING HANDICAP SIGNS (TYPICAL 3 PLACES) 25' MATCHLINE C1.15 MATCHLINE C1.14 C1.15_B
15 PARKING LOT REPAIR/RESTORE QUANTITIES: ITEM LF SF SEAL COAT 35,89 NEW ASPHALT PAVEMENT (SEE DETAIL SHEET C4.) NEW 4" THICK CONCRETE SIDEWALK AND/OR RAMP 547 EA BASE SCOPE: SEALCOAT LEGEND ALTERNATE #1: ASPHALT REPAIR, SP-9.5, 1.5" THICK OVER RESTORED BASE REMOVED MATERIAL TO BE REMOVED FROM SITE OR SALVAGED TO CONTRACTOR QUANTITIES SHOWN ARE FOR THIS SHEET ONLY 2,92 DEMO EISTING PAVEMENT AND CONSTRUCT NEW PAVEMENT ALTERNATE #1: CUT-OUT AND REPAIR (SEE REPAIR DETAIL) PARKING LOT REPAIR/RESTORE PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAILS, PAVEMENT REPAIR/RESTORE DETAILS, AND ADDITIONAL NOTES. 2. SEE SHEET C4. FOR SPECIFICATIONS ON SEALCOAT TYPE AND APPLICATION REQUIREMENTS. MATCHLINE C1.16 MATCHLINE C1.17 PARKING LOT #6 1' PAVEMENT REPAIR AND RESTORE PARKING LOT #6 7' 18' 22' 6' 16' REMOVE AND RECONSTRUCT CONCRETE SIDEWALK IN CONFORMANCE W/ ADA REMOVE AND RECONSTRUCT CONCRETE SIDEWALK IN CONFORMANCE W/ ADA REMOVE AND RECONSTRUCT CONCRETE SIDEWALK IN CONFORMANCE W/ ADA C1.16_A
16 25' STOP PARKING LOT MARKING PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAIL SHEET FOR PAVEMENT MARKING PLAN DETAILS AND ADDITIONAL NOTES. 2. ALL PARKING STALL STRIPING SHALL BE EVENLY SPACED WITHIN THE DIMENSIONED AREA AS SHOWN AND SHALL BE 2' DEEP UNLESS NOTED OTHERWISE. 3. ALL 24" STOP BAR TO BE PER FDOT INDE NO MATCHLINE C1.16 MATCHLINE C ' LF OF DBL YELLOW STRIPE (PAINT) 32.2' 23' LF OF WHITE CROSS HATCHING (TYP. LOT #6) PARKING LOT #6 DBL YELLOW STRIPE (PAINT) 28' LF OF 24" WHITE STOP BAR (PAINT) PAVEMENT MARKINGS PARKING LOT #6 L= SPACES 43' 5 SPACES 3' 8 SPACES 7' 2 SPACES 43.7' STOP 8 SPACES 6' 4 SPACES YELLOW CROSS HATCHING AT LOADING DOCK ACCESS C1.16_B
17 PARKING LOT REPAIR/RESTORE QUANTITIES: LEGEND ITEM LF SF SEAL COAT NEW ASPHALT PAVEMENT (SEE DETAIL SHEET C4.) NEW 4" THICK CONCRETE SIDEWALK AND/OR RAMP 2, ALTERNATE #1: ASPHALT REPAIR, SP-9.5, 1.5" THICK OVER RESTORED BASE 768 REMOVED MATERIAL TO BE REMOVED FROM SITE OR SALVAGED TO CONTRACTOR QUANTITIES SHOWN ARE FOR THIS SHEET ONLY EA BASE SCOPE: SEALCOAT DEMO EISTING PAVEMENT AND CONSTRUCT NEW PAVEMENT ALTERNATE #1: CUT-OUT AND REPAIR (SEE REPAIR DETAIL) PARKING LOT REPAIR/RESTORE PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAILS, PAVEMENT REPAIR/RESTORE DETAILS, AND ADDITIONAL NOTES. 2. SEE SHEET C4. FOR SPECIFICATIONS ON SEALCOAT TYPE AND APPLICATION REQUIREMENTS. MATCHLINE C1.16 MATCHLINE C1.17 PARKING LOT #6 PAVEMENT REPAIR AND RESTORE PARKING LOT #6 72' 8' 32' 6' REMOVE AND RECONSTRUCT CONCRETE SIDEWALK IN CONFORMANCE W/ ADA C1.17_A
18 3' PARKING LOT MARKING PLAN NOTES: 1. SEE SHEET C4. CONSTRUCTION DETAIL SHEET FOR PAVEMENT MARKING PLAN DETAILS AND ADDITIONAL NOTES. 2. ALL PARKING STALL STRIPING SHALL BE EVENLY SPACED WITHIN THE DIMENSIONED AREA AS SHOWN AND SHALL BE 2' DEEP UNLESS NOTED OTHERWISE. 3. ALL 24" STOP BAR TO BE PER FDOT INDE NO MATCHLINE C1.16 MATCHLINE C1.17 PARKING LOT #6 DBL YELLOW STRIPE (PAINT) WHITE CROSS HATCHING (TYP. LOT #6) 28' LF OF PAVEMENT MARKINGS PARKING LOT #6 23 SPACES L=41.2 3' 6' 23 SPACES C1.17_B
19 PAVEMENT REPAIR/RESTORE DETAILS PAVEMENT MARKINGS DETAILS 1.5" SP 9.5 ASPHALTIC CONCRETE COMPACT TO 95% MI DESIGN DENSITY LIMEROCK BASE COURSE MIN LBR 1, COMPACT TO 98% MA DENSITY AASHTO T-18 12" STABILIZED SUBGRADE MIN LBR 4, COMPACT TO 98% MA DENSITY SAWCUT AND REMOVE EISTING PAVEMENT & REPLACE WITH 1.5" SP 9.5 ASPHALTIC CONCRETE COMPACT TO 95% MI DESIGN DENSITY RESTORE DETERIORATED LIMEROCK TO WITHIN 1.5" OF FINAL GRADE, MIN LBR 1, COMPACT TO 98% MA DENSITY AASHTO T-18 EISTING VARIABLE DEPTH LIMEROCK BASE 6' CONCRETE SIDEWALK H.C. SIGN MA. 1:12 6' H.C. SIGN MA. 1:12 CONCRETE SIDEWALK SOILS USED FOR THE STABILIZED SUBGRADE WITH GREATER THAN 15% FINES SHALL BE COMPACTED TO 1% MAIMUM DENSITY. TYPICAL NEW PARKING LOT PAVEMENT SECTION TYPICAL PARKING LOT PAVEMENT REPAIR SECTION 1' CONC. WHEEL STOP CONC. WHEEL STOP YELLOW STRIPING UNLESS OTHERWISE NOTED ON PLANS PAVEMENT 3 4" R 1" 3, PSI CONCRETE 1' O.C. #4 CONTINUOUS NOTE: 12" 8" 24" 2" R 18" 3" R 3/4" R 7 1/2" STD. MIN. WHEN USED ON THE HIGH SIDE OF ROADWAY, THE CROSS-SLOPE OF THE GUTTER SHALL MATCH THE CROSS-SLOPE OF THE ADJACENT PAVEMENT AND THE THICKNESS OF THE LIP SHALL BE. R= 1 2" 9" SURFACE ON LOW SIDE OF PAVEMENT TO BE 1/4" ABOVE LIP OF GUTTER ECEPT FC-2 TO BE 5/8" AND FC-3 TO BE 3/4" ABOVE LIP. SURFACE ON HIGH SIDE TO BE FLUSH WITH GUTTER. 24" 12" 12" NOTE: INSTALL EPANSION JOINTS AT 5' INTERVALS, STRIKE CONSTRUCTION JOINTS AT 1' INTERVALS. 1 2 " 7" TOP OF PAVEMENT 3' TYPICAL STRIPING AT LOADING ENTRANCE 2" 18' WHITE NOTE: BLUE H.C. LOGO 6 12" 6' BLUE H.C. LOGO BLUE WHITE REFER TO PLAN SHEETS FOR INDIVIDUAL RAMP DESIGNS AT HC PARKING. HANDICAP PARKING LAYOUT AND STRIPING DETAIL 12" TYPICAL CURB CURB & GUTTER TYPE "F" MIAMI CURB DETAIL 5' (TYP) EISTING PAVEMENT SEE SITE PLAN FOR ELEVATION AND WIDTH 4" THICK 3, P.S.I. CONCRETE W/12" x 12" W2.7 W2.7 NOTES: SLOPE OR CROWN 1/4" per FOOT CONST. 6' O.C. EP. 3' O.C. 1. THE SIDEWALK SHALL BE CONSTRUCTED ON A CLEAN SAND SUB-BASE COMPACTED TO 95% MA DENSITY. 2. SAWCUT CONTROL JOINTS SHALL BE CONSTRUCTED 5 FEET ON CENTER. 3. FULL DEPTH TRANSVERSE EPANSION JOINTS WITH PERFORMED JOINT FILLER SHALL BE CONSTRUCTED AT INTERVALS NOT TO ECEED 5 FEET. TYPICAL SIDEWALK DETAIL FINISH GRADE PAVEMENT 4" 4" 4" 8" 45 3, PSI CONCRETE W/12"x12" W2.7 W2.7 #5 REBAR CONTINOUS RAISED SIDEWALK DETAIL (ADJACENT TO PAVEMENT) E. S/W VARIES 7' 12:1 MA 5 FDOT CURB RAMP CR-K TAPERED RAMP WITH WALK-AROUND SIDEWALK DETAIL 7' SIGN FTP-25 SIGN FTP 55 FINE = $25 MA FINE FINE AMOUNT VARIES FROM CITY/COUNTY. REFER TO LOCAL JURISDICTION FOR AMOUNT. CONTRACTOR SHALL VERIFY. 12" PARKING BY DISABLED PERMIT ONLY $25 FINE F.S " GENERAL NOTES: SEALCOAT NOTES: 15" 3" R. 2" 1 22 / 2 2" METAL POST FINISH GRADE OF ADJACENT SIDEWALK 6' TO BOTTOM OF SIGN 1) THE CONTRACTOR SHALL TEMPORARILY REMOVE, STOCKPILE IN A DESIGNATED LOCATION, AND REINSTALL ALL EISTING WHEEL STOPS AS REQUIRED FOR COMPLETION OF THE WORK. 2) THE CONTRACTOR SHALL PRE-COORDINATE ALL LOT CLOSURES AND SITE ACCESS LOGISTICS WITH SJRSC FACILITIES PRIOR TO AND THROUGHOUT COMPLETION OF THE WORK. THE CONTRACTOR IS RESPONSIBLE FOR ALL ASSOCIATED MAINTENANCE OF TRAFFIC (MOT) AND EQUIPMENT AS REQUIRED FOR COMPLETION OF THE WORK. 1) SEALCOAT SHALL BE SEALMASTER POLYMER MODIFIED MASTERSEAL ASPHALT BASED PAVEMENT SEALER (SMT-16). 2) EQUIPMENT USED FOR APPLICATION OF SEALCOAT SHALL CONFORM TO THE MANUFACTURER'S INSTALLATION REQUIREMENTS. 3) BEFORE APPLYING ANY SEALER MATERIAL, REMOVE ALL LOOSE MATERIAL, DUST, DIRT, CAKED CLAY AND OTHER FOREIGN MATERIAL WHICH MIGHT PREVENT PROPER BOND WITH THE EISTING SURFACE FOR THE FULL WIDTH OF THE APPLICATION. TAKE PARTICULAR CARE IN CLEANING THE OUTER EDGES OF THE STRIP TO BE TREATED, TO ENSURE THAT THE SEALCOAT WILL ADHERE. ALL PREPARATION SHALL CONFORM TO MANUFACTURER'S PREPARATION REQUIREMENTS. 4) WHEN APPLYING THE SEALCOAT ADJACENT TO CURB AND GUTTER, VALLEY GUTTER, OR ANY OTHER CONCRETE SURFACES, COVER SUCH CONCRETE SURFACES WITH HEAVY PAPER OR OTHERWISE PROTECT THEM AS APPROVED BY THE ENGINEER, WHILE APPLYING THE SEALCOAT. REMOVE ANY SEALER MATERIAL DEPOSITED ON CONCRETE SURFACES. 5) INSTALL AT APPLICATION RATE AND UNDER CONDITIONS AS PRESCRIBED BY MANUFACTURER'S INSTALLATION REQUIREMENTS. 3" 1" R. NOTE: AT HANDICAP PARKING SPACES PROVIDE 4" WIDE BLUE STRIPES 2" INSIDE AND 4" WIDE WHITE PARKING SPACE STRIPES AT EA. SIDE OF H.C. SPACE TYP. HANDICAP PARKING LOGO 5" 12" 18"x18"x18" CONCRETE FOOTING SIGN NOTES: 18" 18" 1. SIGN CONSTRUCTION, DESIGN AND PLACEMENT SHALL COMPLY WITH STATE AND LOCAL STATUTES. HANDICAP PARKING SIGN 8" 6) KEEP THE SEALCOAT SURFACE FREE FROM TRAFFIC UNTIL IT HAS COMPLETELY CURED AND ITS SURFACE IS NO LONGER ADHESIVE. C4.
St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016
St. Johns River State College BID-SJR-10-2016 Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 TO BID-SJR-10-2016 Bid Specifications/Project Manual (Plans) PARKING LOT REHABILITATION PROJECT FOR: DRAWING
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationCITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS
CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN
More informationRiverside County Transportation Department Summary of Bids
1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00
More informationRiverside County Transportation Department Summary of Bids
Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00
More informationTHORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E
THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross
More informationPlan Check Policies and Guidelines
Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation
More informationUTILITY CROSSING DETAIL
6" OF CSBC COMPACTED TO A FIRM AND UNYIELDING CONDITION. NOTE: - SILT FENCE SHALL CONFORM TO 8-01.3(9)A - SILT FENCES SHALL BE INSTALLED ALONG CONTOUR WHENEVER POSSIBLE. - POST SPACING MAY BE INCREASED
More informationSTREET IMPROVEMENTS PROPOSAL BID ITEMS
STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove
More informationTown of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166
Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW
More informationPlan Check Policies and Guidelines
VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.
More informationDESIGN STANDARDS SECTION DS 3 STREETS
DESIGN STANDARDS SECTION DS 3 STREETS DS 3-01 GENERAL: A. INTENT: The intent of these Design Standards is to provide minimum standards for the design of public streets. These standards are intended to
More informationDRIVEWAY/SIDEWALK PERMIT APPLICATION
JOB INFORMATION CITY OF ALEXANDRIA 704 Broadway Alexandria, MN 56308 Phone: 320-763-6678 Fax: 320-763-3511 DRIVEWAY/SIDEWALK PERMIT APPLICATION Permit Fee: $50.00 Deposit: $300.00 PERMIT NUMBER: ROW DATE:
More informationGrays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14
Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component
More informationTransportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.
Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,
More informationSTANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationCounty of Santa Cruz 0579
County of Santa Cruz 0579 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA 95060-4070 (831) 454-2160 FAX (831) 454-2385 TOO (831) 454-2123 DIRECTOR OF PUBLIC WORKS SANTA CRUZ COUNTY BOARD OF SUPERVISORS 701
More informationDELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT
200' TYP. 0' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'
More informationFertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,
BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity
More informationCOST ESTIMATES: Curb-Running
COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway
More information2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00
1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron
More informationINLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY
INLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY Howard Hamby Spokane County Road Maintenance Administrator PAVEMENT CUT FAILURES 1. Sloughing 2. Poor Compaction 3. Poor
More informationSUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71
BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,
More informationDELETE first sentence of first paragraph that reads: REPLACE with the following:
To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation
More informationBID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.
PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00
More informationOhio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director
Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion
More informationPROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS
PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS To review the proposed amendments Approval of the amendments (5-3) Ogden City Planning is proposing several amendments and clarifications to the parking
More informationAustin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724
National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00
More information3. Application Fees, Certificate Of Insurance & Performance Bond
SUBSECTION 13.10 CONSTRUCTION OF DRIVEWAYS 13.10A PERMIT REQUIREMENTS 1. General A driveway or access road serving private property and intersecting with a town road shall be constructed in such a manner
More informationCITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS
CITY OF FONTANA HANDBOOK ON RESIDENTIAL APPROACH CONSTRUCTION PERMITS GENERAL INFORMATION A driveway approach is an area, construction or improvement between the roadway of a public street and private
More informationREQUEST FOR COUNCIL ACTION. List of Exhibits A. Project Plan Set B. Bolton & Menk Proposal for Engineering / Inspection Services
Item #08 - CC Agenda - 05/2/2016 [Page 1 of 5] REQUEST FOR COUNCIL ACTION : May 2, 2016 ITEM NO: 8 Department Approval: Administrator Reviewed: Agenda Section: Name Adam Edwards JML Public Works Director/
More informationSPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES
9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54
More informationSITE PLANS ASSISTED LIVING REDEVELOPMENT
SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE
More informationCITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES
CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required
More information2011 LOCAL STREET IMPROVEMENTS
11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE
More informationDRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group
DRIVEWAY GUIDE June 2017 TABLE OF CONTENTS Definitions Building Requirements Material Standards Drainage Administrative Requirements Zoning Requirements Yard Requirements Design Requirements Public Ways
More informationKENT COUNTY ROAD COMMISSION
KENT COUNTY ROAD COMMISSION Rules to regulate driveways, banners and parades upon and over public highways under the jurisdiction of the Board of County Road Commissioners of the County of Kent. Promulgated
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. A. AN APPLICANT S GUIDE TO PROCEDURES FOR: B. C. D.
More informationGuam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012
Guam Transportation Program Project Updates Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Agenda Road Construction Highlights Ongoing Construction Route 17 Rehabilitation and
More informationDate: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:
DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project
More informationALEXANDRIA, VIRGINIA PRINCE ST. SUITE 114. ADG, INC. COPYRIGHT c. PH
1600 PRINCE ST. SUITE 114 ALEXANDRIA, VIRGINIA 22314 PH. 703.549.9556 www.archdesigngroup.com ADG, INC. COPYRIGHT c C-1 1 2 3 4 5 6 E D Tie Prop. Sidewalk, Curb & Gutter Into Existing Prop. Storm Drain
More informationDUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS
PRELIMINARY ENGINEERING PLANS DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS ERIC CARLSON ARCHITECTS LOCATION MAP DRAWINGS INDE CONTACTS REV DATE NOT TO SCALE BENCHMARKS CRISSEY AVENUE IL ROUTE 38
More informationAppendix "A" Transit Bus Stop Accessibility Criteria & Guidelines
Appendix "A" Transit Bus Stop Accessibility Criteria & Guidelines Public Works Department, Transportation Division January 2014 Transit Bus Stop Accessibility Criteria & Guidelines These criteria and guidelines
More informationARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS
ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET
More informationORDINANCE NO
ORDINANCE NO. 07-5424 AN ORDINANCE OF THE CITY OF BILLINGS, PROVIDING THAT THE BILLINGS, MONTANA CITY CODE BE AMENDED BY REVISING SECTION 6-1208; PROVIDING CHANGES TO CERTAIN CURB CUT LENGTHS AND REGULATIONS.
More informationNAU DESIGN GUIDELINES FOR DISABLED ACCESS PARKING AND ACCESSIBLE ROUTE AT VEHICULAR TRAFFIC AREAS
NAU DESIGN GUIDELINES FOR DISABLED ACCESS PARKING AND ACCESSIBLE ROUTE AT Intent, Purpose And Goals: The intent and purpose of these NAU technical requirements is to establish minimum requirements to safeguard
More informationMETRO Magnolia Transit Center - Bid Tab
Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's
More informationProject # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements
Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices
More information2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary
8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.
More informationBID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -
BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b
More informationCITY OF FARMERSVILLE, TEXAS
CITY OF FARMERSVILLE, TEXAS THOROUGHFARE STANDARDS DESIGN MANUAL Adopted September 12, 2006 By Ordinance #2006-46 Amended June 12, 2007 By Ordinance #2007-23 TABLE OF CONTENTS I. General Requirements.....1
More informationSECTION STREETS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA
SECTION 5200 - STREETS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA These criteria shall be adhered to for the design of all streets within the City of Lee s Summit, Missouri and shall supersede KC Metro
More informationPublic Works Right of Way Permit Application
Public Works Right of Way Permit Application City and County of Denver Public Works Permit Operations 2000 West 3rd Avenue, Room 107 Denver, CO 80223-1027 Telephone: (303) 446-3469 www.denvergov.com Application
More informationDIVISION 4: STREET. Improvement Design Standards City of Dundee Oregon. Division 4 : Street Page 1
DIVISION 4: STREET 4.1 DESIGN CRITERIA A. APPLICABILITY 1. These Design Standards shall govern the construction and upgrade of all public and private streets in the City of Dundee and applicable work within
More information8 Crucial Tactics for Asphalt Pavement Protection. Since 1941 // WolfPaving.com
8 Crucial Tactics for Asphalt Pavement Protection Since 1941 // WolfPaving.com Your asphalt pavement protection plan: How, Why, and When of asphalt pavement care. You ve invested in a new asphalt parking
More informationCity of Grand Island Tuesday, June 26, 2018 Council Session
City of Grand Island Tuesday, June 26, 2018 Council Session Item G-21 #2018-188 - Approving Change Order No. 3 for Sanitary Sewer Collection System Rehabilitation Various Locations; Project No. 2017-S-2A
More informationOrdinance Title Parking Facilities
Ordinance 3587 Title 12.22 Parking Facilities Sections: 12.22.010 Purpose 12.22.020 Applicability 12.22.030 Conflicting Provisions 12.22.035 Acronyms/References 12.22.040 Definitions 12.22.050 General
More informationCROW WING COUNTY HIGHWAY DEPARTMENT APPLICATION FOR PERMIT TO CONSTRUCT DRIVEWAY ACCESS TO ROADS UNDER COUNTY JURISDICTION CONSTRUCTION INFORMATION
CROW WING COUNTY HIGHWAY DEPARTMENT APPLICATION FOR PERMIT TO CONSTRUCT DRIVEWAY ACCESS TO ROADS UNDER COUNTY JURISDICTION Crow Wing County Highway Department 16589 CR 142 Brainerd, MN 56401 Crow Wing
More informationBARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY
IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE
More informationHILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.
PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00
More informationProject Book Worksheet for Cost Estimation
001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013
More informationADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal.
ADDENDUM NO. 1 DATE: August 7, 2014 PROJECT: FROM: TO: 2014 MFT Section 14-00000-00-GM, SUPP1 United City of Yorkville Kendall County, IL Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) CFS:TEH 1 of 10 APPR:KPK:JFS:07-07-16 FHWA:APPR:07-15-16 a. Description. This
More informationPROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9.
LAND USE: VACANT AND ELECTRICAL TRANSMISSION LINES GENERAL PLAN: PLANNED COMMUNITY ZONING: PC (CDP04-01) UTILITIES 3' WIDE BIOFILTRATION WITH UNDERDRAIN. TOP ELEVATION AT 3" BELOW PARKING LOT SURFACE SITE
More informationWHITE OAK RIDGE PROJECT NO. 53B2384 D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION CITY OF MADISON
WHITE OAK RIDGE D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION ORIGINATOR:, STREETS DIVISION REV. DATE: PLOT NAME: PLOT SCALE: THE LOCATION AND INFORMATION FOR PROPOSED NEW TREES, IN THE PUBLIC RIGHT OF
More informationDiagram 1 - Shoulder Assistance
Diagram - Shoulder Assistance Approx. skip (40 ). Notify K. C. Scout. Turn on the emergency directional flashers and top rear facing strobe lights. 3. Pull to the shoulder and stop approximately 40 feet
More informationMidwest Roadside Safety Facility
22860 900" D D 914 36" 1000 39 3/8" SOIL AND TARMAC CUT-OUT CONCRETE TARMAC BRIDGE DECK B PLAN VIEW C A C 15 20 [3/4"] Deck Gap BRIDGE DECK A 3900 153 1/ Impact 30V 45720 1800" 34290 13" 11430 4" RAIL
More informationDRIVEWAY ENTRANCES GENERAL. 1. Description
GENERAL 1. Description This standard identifies the minimum requirements that shall be met for all driveway entrances in the design and construction of elements for Arlington County Horizontal Design Standards.
More informationPERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL
PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL Submit To Martin County Judge s Office P.O. Box 1330 Stanton Texas 79782-1330 mhernandez@co.martin.tx.us APPLICATION: Permittee
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More informationEXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY
EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY DESCRIPTION QTY J ] COST/ _ ] TOTAL AMOUNT STREET IMPROVEMENTS 16,271 LF $151.6 $2,467,247 WATER DISTRIBUTION SYSTEM LF $412,110
More information(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,
78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction
More informationCITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS
CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS JANUARY 1996 EDITION ADDENDA THROUGH JULY 2017 DIANNA JENSEN City Engineer 1717 Fifth Street Davis, CA 95616 530-757-5686 2017 Edition STANDARD
More informationFranklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation
7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,
More informationSubject: Hannaford Supermarket & Pharmacy 756 Route 1 Minor Site Plan Application for Proposed CLYNK Bottle Redemption Unit & Bicycle Rack Addition
Stantec Consulting Services Inc. 482 Payne Road Scarborough Court, Scarborough ME 04074-8929 September 8, 2017 Mr. Alexander Jaegerman, FAICP Director of Planning & Development 200 Main Street Yarmouth,
More informationADDENDUM No. 1 Prospective Bidders
Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal
More informationZG 521 Padvault Three-Phase Transformer
E n g in e e r :R.An th o n Ap p r o v e r :Jo s h u a Jo n e s 2 0 De c 1 7 2 0 De c 1 7 ZG 521 Padvault Three-Phase Transformer ZG 521 Padvault Three-Phase Transformer 1. Scope This material specification
More informationPN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road
More informationParking and Loading. Page 1 of 7
Parking and Loading 21.03.020 Off-street parking and loading. A. Purpose. The purpose of this section is to ensure that sufficient off-street parking and loading areas are provided and properly designed
More informationDRIVEWAY/APPROACH PERMIT APPLICATION Applicant Type: Architect/Engineer Contractor Owner
DRIVEWAY/APPROACH PERMIT APPLICATION Applicant Type: Architect/Engineer Contractor Owner Lake Elmo City Hall 651-747-3900 3880 Laverne Avenue North Lake Elmo, MN 55042 Project Address: Property Owner:
More information2, total unit $ total unit $ total unit $ total $
BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;
More informationPre-Installation. Surface Preparation TRAFFIC STRIPES, EPOXY RESIN
3-11-2013 Traffic Stripes TRAFFIC STRIPES, EPOXY RESIN Pre-Installation Striping Plan The contractor is required to submit the striping plan 20 days prior to beginning striping operations to the RE for
More informationLet our professional customer service and product selection improve your bottom line.
We offer a complete line of diamond tools to suit every cutting need, engineered and designed to make the job easier. Let our professional customer service and product selection improve your bottom line.
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All
More informationDIRECTIONAL DRIVEWAYS AT HIGHWAYS WITHOUT CURB
DIRECTIONAL DRIVEWAYS AT HIGHWAYS WITHOUT CURB 20 (6m) 25 (7.5m) Desirable outline of parking area 10 (3m) 16 (4.8m) 50 (15 m) R 75 (23m) R Taper Alternate outline of 20 (6m) R parking area Pave shoulders
More informationAPPLICATION FOR PERMIT TO INSTALL A DRIVEWAY ON A COUNTY TRUNK HIGHWAY
APPLICATION FOR PERMIT TO INSTALL A DRIVEWAY ON A COUNTY TRUNK HIGHWAY Chapter 86.07(2) of Wisconsin State Statutes provides that the authority maintaining the highway issue a permit before any excavation
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationMcCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS
BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS
More information11004 CHAPEL HILL ROAD PRE-LEASING SHOPS ±1,200 SF TO 20,000 SF MORRISVILLE, NC PROVIDENCE PLACE NEW WAKE TECH CAMPUS (UNDER CONSTRUCTION)
SOUTH MIAMI BOULEVARD 45,000 VPD PARAMOUNT PARKWAY PROVIDENCE PLACE 18,000 VPD MARRIOTT TOWNE PLACE SUITES NEW WAKE TECH CAMPUS (UNDER CONSTRUCTION) MORRISVILLE, NC PRE-LEASING SHOPS ±1,200 SF TO 20,000
More informationENGINEERING BEST PRACTICE BP2.2.1
1. SUBJECT DRIVEWAY REQUIREMENT POLICIES RESIDENTIAL 2. DEFINITIONS Driveway Paved area that provides access from a roadway to private property. Frontage Exterior lot line abutting a public right-of-way,
More informationTemporary Sales Trailer Application
Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 Temporary Sales Trailer Application General: Requests for temporary sales trailers, which comply with
More informationPN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least
More information5. Underground Requirements
Un d e rg ro u n d Re q u ire me n ts Section 5 2016 Electric Service Requirements, 3rd Edition Section 5 Underground Requirements Directory Page 5.1 General 34 5.2 Conduit Requirements 34 5.3 Trench and
More informationCIS 26.txt MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT MGR.NO. 055 PAGE 001
MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT 323216 MGR.NO. 55 PAGE 1 CONT 1 SEC 13 JOB 76 RES ENGR ICENHOWER, KENNETH PROJ MG 22(313) HWY US 67 BOX 538 TEXARKANA CNTY BOWIE DIST 19 CONTRACT PRICE
More informationTOWN OF LEICESTER COMMMONWEALTH OF MASSACHUSETTS PARKING RULES & REGULATIONS
TOWN OF LEICESTER COMMMONWEALTH OF MASSACHUSETTS PARKING RULES & REGULATIONS The following rules and orders regulating the parking of vehicles upon streets and highways within the Town of Leicester are
More informationPLANS OF PROPOSED GOLDEN GATE CITY STORMWATER IMPROVEMENTS NW QUADRANT COLLIER COUNTY PROJECT # LOGAN BOULEVARD C.R. 951 COLLIER BOULEVARD
OAD COMPOETS OF COTRACT PLAS SET DRAIAGE PLAS A DETAILED IDEX APPEARS O THE KEY SHEET OF EACH COMPOET PLAS OF PROPOSED COLLIER COUTY PROJECT # 029.7.2 IDEX OF ROADWAY PLAS SHEET O. SHEET DESCRIPTIO COVER
More information