PROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9.
|
|
- Byron Nash
- 5 years ago
- Views:
Transcription
1
2 LAND USE: VACANT AND ELECTRICAL TRANSMISSION LINES GENERAL PLAN: PLANNED COMMUNITY ZONING: PC (CDP04-01) UTILITIES 3' WIDE BIOFILTRATION WITH UNDERDRAIN. TOP ELEVATION AT 3" BELOW PARKING LOT SURFACE SITE LIGHT NEW DRIVEWAY APPROACH PER ORANGE COUNTY STANDARD PLANS GB FIRE HYDRANT BRICK PAVERS A.C. PAVEMENT 2' OVERHANG 1.5' WIDE CURB CUTS EVERY 10'.87 FF PAVILION 1800 SF BIOFILTRATION WITH UNDERDRAIN. TOP ELEVATION AT 3" BELOW PARKING LOT SURFACE 1.5' WIDE CURB CUTS EVERY 10' TG FG 422FG SITE LIGHT 2' OVERHANG 9,000 CUBIC YARDS NET FILL GB 2' OVERHANG A.C. PAVEMENT.50 TG STREET LIGHT GB 17.0' A.C. PAVEMENT SWALE/ VALLEY GUTTER TO COLLECT RUNOFF NEW 5' WIDE SIDEWALK PARKING LOT HIGH SCHOOL SPORTS FIELD BOTTOM OF STEP ELECTRICAL ELECTRICAL PULL BOX FINISH FLOOR FINISH FLOWLINE FINISH SURFACE BREAK ERT RETAINING CURB SEWER MANHOLE TRANSFORMER TOP OF GRATE TOP OF STEP TOP OF WALL WATER WATER VALVE EARTHWORK QUANTITY SWALE/ VALLEY GUTTER TO COLLECT RUNOFF 9.0 ' BS ELEC EPB FF FG FL FS GB RC SMH T TG TS TW WTR WV 5' DETENTION 2' FEET SAND 3" COURSE SAND 2' GRAVEL 1' FREE BOARD 3,603 SQUARE FOOT BOTTOM AREA SLOPE AT 3:1 MAX SITE LIGHT E ABBREVIATIONS BIO-RETENTION BASIN BIOFILTRATION WITH UNDERDRAIN. TOP ELEVATION AT 3" BELOW PARKING LOT SURFACE G 12' OFFSET MIN. 14" BELOW FF 426.OO FF RID SAN DIEGO GAS & ELECTRIC THE GAS COMPANY CITY OF SAN JUAN CAPISTRANO CITY OF SAN JUAN CAPISTRANO AT&T CR&R COX COMMUNICATIONS RELOCATED STREET LIGHT AND PULL BOX A.C. PAVEMENT SITE LIGHT 4.0' RIPRAP LEADING INTO THE RETENTION BASIN A.C. PAVEMENT ELECTRICITY NATURAL GAS SEWER WATER TELEPHONE TRASH CABLE GB BIORETENTION BOTTOM TOP 4' DETENTION 1' FREE BOARD 3,603 SF PROVIDED 3,600 SF REQUIRED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL RELOCATED ACCESS ROAD GATE STREET LIGHT NEW 2' HIGH RETAINING WALL NEW 5' WIDE SIDEWALK NEW 5' WIDE SIDEWALK GATE IN ACCESS ROAD TO BE RELOCATED STREET LIGHT STREET LIGHT STOP SIGN LEGAL DESCRIPTION THAT PORTION OF THE 'REMAINDER PARCEL" OF TRACT NO , IN THE CITY OF SAN JUAN CAPISTRANO, COUNTY OF ORANGE, STATE OF CALIFORNIA AS SHOWN ON A MAP THEREOF FILED IN BOOK 884, PAGE 33 THROUGH 50, INCLUSIVE, OF MISCELLANEOUS MAPS, RECORDS OF COUNTY, TOGETHER WITH A PORTION OF PARCEL "B" AND A PORTION OF PARCEL "C" AS DESCRIBED IN A DEED TO RANCHO SAN JUAN DEVELOPMENT LLC, RECORDED AUGUST 23, 2011, AS INSTRUMENT NO OF OFFICIAL RECORDS OF SAID COUNTY, DESCRIBED IN WHOLE AS FOLLOWS; BEGINNING, AT THE MOST EASTERLY CORNER OF SAID "REMAINDER PARCEL"; 5.00' ' TOP OF WALL PARKING LOT 414 VACANT LAND BEGINNING OF A TANGENT CURVE CONCAVE NORTHERLY AND HAVING A RADIUS OF FEET; THENCE CONTINUING ALONG SAID BOUNDARY WESTERLY FEET ALONG SAID CURVE THROUGH A CENTRAL TYPICAL RETAINING WALL SECTION 1"=10' FEET TO THE BEGINNING OF A NON-TANGENT CURVE CONCAVE NORTHEASTERLY AND HAVING A RADIUS OF POINT BEING THE MOST SOUTHERLY CORNER OF SAID PARCEL "C"; THENCE ALONG SAID BOUNDARY OF SAID PARCEL "C" NORTHWESTERLY FEET ALONG SAID CURVE FEET TO THE BEGINNING OF A NON-TANGENT CURVE CONCAVE EASTERLY AND HAVING A RADIUS OF THENCE CONTINUING ALONG SAID BOUNDARY AND ALONG THE BOUNDARY OF PARCEL "C" AS DESCRIBED IN A DEED TO CAPISTRANO UNIFIED SCHOOL DISTRICT, RECORDED AUGUST 23, 2011, AS INSTRUMENT NO OF OFFICIAL RECORDS OF SAID COUNTY NORTHERLY FEET ALONG SAID CURVE THROUGH VICINITY MAP 1"=800' THENCE CONTINUING ALONG SAID BOUNDARY AND ALONG THE BOUNDARY OF SAID PARCEL "B" NORTHERLY TANGENT CURVE CONCAVE NORTHERLY AND HAVING A RADIUS OF FEET; NORTHEASTERLY LINE OF SAID "REMAINDER PARCEL"; FEET TO THE POINT OF BEGINNING. CONCEPTUAL GRADING PLAN C-GP-1
3 F-F A-A TC FS 3:1 2.1% TC FS -6: TG/FL ( FS) SLOPE 9:1 PAVILION FF.87-9:1-3:1 BERM AT TOP OF SLOPE 3:1 (.86 FS) 2' OF ENGINEERED SOIL MEDIA ' 5.6' 6.0' ( FS) " OF COURSE SAND ' 40.6' 60.7' 30.0' 15.0' 35.0' 23.0' 2' OF GRAVEL B-B G-G SWALE/ VALLEY GUTTER ROAD TC FS TC FS TC FS 4.7% 3.6% TC FS -0.2% TC FS 1.0% TC FS -1.0% TC TC FS FS 1.0% RETAINING WALLS.81 FS TC FS 2.7% 2.0% BUILDING FF ' 59.7' 8.9' 59.7' 19.1' 5 4.0' 5 4.0' ' 15.5' 9.2' 34.3' C-C H-H SWALE/ VALLEY GUTTER ACCESS ROAD 10.3' TC FS 1.8% 60.0' LANDSCAPE.30 TC FS 6.0' 21.9' BUILDING FF ' TC TC FS FS -1.0% 5 4.0' FS RETAINING WALLS FS TC FS 1.3% 16.2' BUILDING FF ' INDEX MAP SCALE 1"=80' D-D 435 STREET - VISTA MONTANA 435 ( FS) RETAINING WALLS 1.0% BUILDING FF (.00 FS) TG/FL PAVILIONS FF %.41 TC FS 3.0% TC.72 FS 3.3% TC FS TC FS 1.2% 1.0% ' 23.5' ' ' 14.2' 187.8' CONCEPTUAL SECTIONS C-GP-2
4 RW RW RW RW RW SS SS SS SS SS W W W W W 8" S= ' 18" S= " S=0.06 SS SS SS RW RW RW W W W TG TG TG TG 25'.80 25' TG TG TG TG TG TG TG " S= TG " S= TC " S=0.05 8" S=0.02 CONCEPTUAL STORM DRAIN PLAN C--1 -OUTLET 8" S= TG " S= TG TG TG.40TG CONNECT TO STORM DRAIN SWALE/ VALLEY GUTTER 48" TO COLLECT RUNOFF STORM DRAIN PIPE SWALE/ VALLEY GUTTER TO COLLECT RUNOFF 48" STORM DRAIN PIPE.76 18" S= TG STORM DRAIN PIPE
5 SS SS SS SS SS SS SS SECONDARY SERVICE LINE W W W W W RW RW RW RW RW SS SS SS SS SS 42' PRIMARY SERVICE LINE 12" PVC C900 WATER MAIN SS SS SS SS E W W W W W W W W W 36' 48' 39' SS W W E E SS SS SS SS SS W W W W G T G SS SS SS SS 25' 36' 23' E (402.87) W W W RW RW RW SS SS SS 12" PVC 900 RECLAIMED WATER 8" PVC SEWER MAIN SEWER MANHOLE 8" PVC SEWER LATERAL P.O.C. WATER LINE WATER CONSTRUCTION NOTES: INSTALL 6" CHECK VALVE AT FIRE LINE SURFACE. 19 INSTALL BACKFLOW PREVENTION DEVICE PER THE CITY OF SAN JUAN INSTALL 6" PUSH-ON (P.O.) D.I.P. CLASS 52 FIRE WATER SERVICE LATERAL PER SAN JUAN 11 CAPISTRANO STANDARDS. CAPISTRANO STANDARDS. 3' MIN. BELOW FINISH SURFACE. MUST BE U.L. LISTED AND/OR F.M. APPROVED. 20 INSTALL 6" DOUBLE CHECK DETECTOR ASSEMBLY PER CITY OF SAN JUAN CAPISTRANO STD. W-17. WITH METER ATTACHMENT 12 CONNECT TO BUILDING FIRE SPRINKLER LINE. UNDER SEPARATE PLAN AND PERMIT 21 CONNECT TO WATER LINE. CONTRACTOR TO POT HOLE WATER MAIN, VERIFY LOCATION OF SEWER MAIN AND 13 CONNECT TO BUILDING DOMESTIC WATER LINE. COORDINATE AND ELEVATION PRIOR TO CONSTRUCTION. LOCATION WITH THE BUILDING PLUMBING PLANS 22 INSTALL THRUST BLOCK PER CITY OF SAN JUAN CAPISTRANO STD. W INSTALL FIRE DEPARTMENT CONNECTION. MINIMUM 25' FROM BUILDING AND 2' BEHIND SIDEWALK. SEE DETAIL THIS SHEET 23 INSTALL 6" GATE VALVE (FL x MJ) CONNECT TO LANDSCAPE IRRIGATION LINE, SEE LANDSCAPING PLANS SURFACE. INSTALL FITTING (SIZE AND ANGLE PER PLAN) WITH THRUST BLOCK PER INSTALL PRIVATE FIRE HYDRANT THE CITY OF SAN JUAN CAPISTRANO STANDARDS 17 INSTALL 4" 3 COPPER IRRIGATION SERVICE LINE 26 CONNECT TO RECLAIMED WATER LINE. CONTRACTOR TO POT HOLE RECLAIMED WATER MAIN, VERIFY LOCATION OF SEWER MAIN AND ELEVATION PRIOR TO CONSTRUCTION INSTALL FITTING (SIZE AND ANGLE PER PLAN) TESTING NOTES: 1. UNDERGROUND LINE MUST BE FLUSHED CLEAR PRIOR TO CONNECTION TO THE OVERHEAD SPRINKLER SYSTEM 2. THRUST BLOCK INSPECTION REQUIRED PRIOR TO BURY 3. ALL TESTS MUST BE WITNESSED BY A FIRE DEPARTMENT REPRESENTATIVE SEWER CONSTRUCTION NOTES: INSTALL 6" SCHEDULE 40 P.V.C. SEWER PIPE. SEWER TO BE MINIMUM 12" BELOW FINISH PER CITY OF SAN JUAN CAPISTRANO STD. 804 (2) CONNECT TO BUILDING SEWER SYSTEM INSTALL PRIVATE SEWER CLEAN OUT PER CITY OF SAN JUAN CAPISTRANO STD DOUBLE CLEAN OUT WHERE APPLICABLE. INSTALL 8" SCHEDULE 40 PVC SEWER PIPE. SEWER TO BE MINIMUM 12" BELOW FINISH PER CITY OF SAN JUAN CAPISTRANO STD. 804 (2) CONNECT TO SEWER MAIN. CONTRACTOR TO VERIFY LOCATION AND DEPTH OF SEWER MAIN BEFORE INSTALLATION OF SEWER LINE INSTALL 4" SCHEDULE 40 P.V.C. SEWER PIPE. SEWER TO BE MINIMUM 12" BELOW FINISH PER CITY OF SAN JUAN CAPISTRANO STD. 804 (2) P.O.C. FOR TRASH ENCLOSURE CONTRACTORS NOTES: 1 CONTRACTOR TO PERFORM HYDROSTATIC PRESSURE TEST 2 CONTRACTOR TO COORDINATE CHLORINATION AND DE-CHLORINATION WITH CITY OF SAN JUAN CAPISTRANO 3 DESIGN AND INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES SHALL CONFORM TO 2010 NFPA 24 & 13 KEY NOTES: 1. IT IS THE RESPONSIBILITY OF THE CONSULTANTS AND CONTRACTORS TO INDEPENDENTLY VERIFY THE AVAILABLE PRESSURE AND FLOW CONDITIONS AND DESIGN THE VARIOUS ON-SITE SYSTEMS TO MEET THE SITE SPECIFIC REQUIREMENTS. FIRE FLOW AND PRESSURE TEST RESULTS ARE VALID ONLY WHEN FIELD TESTED BY THE APPROPRIATE FIRE AUTHORITIES HAVING JURIICTION. 2. WATER IN JOINT TRENCH WITH ELEC./TEL NOT PERMITTED. 3. ALL ON-SITE UTILITY LINES AND UTILITY LINES SERVING THE DEVELOPMENT, THAT CONFLICT WITH THIS PROJECT, SHALL BE RELOCATED, REMOVED, OR SEALED AT THE DEVELOPER'S EXPENSE TO THE SATISFACTION OF THE CITY ENGINEER AND LATEST GREEN BOOK STANDARDS NOTE: EFFECTIVE JANUARY 1, 2010, THE CALIFORNIA HEALTH AND SAFETY CODE (SECTION ) REQUIRES THAT THE MAXIMUM ALLOWABLE LEAD CONTENT IN PIPES, PIPE OR PLUMBING FITTINGS, FIXTURES, SOLDER OR FLUX INTENDED TO CONVEY OR DISPENSE WATER FOR HUMAN CONSUMPTION THROUGH DRINKING OR COOKINIG BE LIMITED TO 0.25 PERCENT LEAD, THIS APPLIES TO ALL DEVICES TO BE INSTALLED ON DOMESTIC SERVICES, LANDSCAPE IRRIGATION SERVICES AND COMBINATION FIRE AND DOMESTIC SERVICES. CONCEPTUAL UTILITY PLAN C-U-1
6 UTILITIES ELECTRICITY NATURAL GAS SEWER WATER TELEPHONE TRASH CABLE SAN DIEGO GAS & ELECTRIC THE GAS COMPANY CITY OF SAN JUAN CAPISTRANO CITY OF SAN JUAN CAPISTRANO AT&T CR&R COX COMMUNICATIONS BIORETENTION BOTTOM TOP 4' DETENTION 1' FREE BOARD 3,603 SF PROVIDED 3,600 SF REQUIRED.87 FF PAVILION 1800 SF 426.OO FF W W W W W RW RW RW RW RW SS SS SS SS SS CONTROLLED ENTRANCE / EXIT ABBREVIATIONS BS BOTTOM OF STEP ELEC ELECTRICAL EPB ELECTRICAL PULL BOX FF FINISH FLOOR FG FINISH FL FLOWLINE FS FINISH SURFACE GB BREAK ERT RC RETAINING CURB SMH SEWER MANHOLE T TRANSFORMER TG TOP OF GRATE TS TOP OF STEP TW TOP OF WALL WTR WATER WV WATER VALVE BIO-RETENTION BASIN 5' DETENTION 2' FEET SAND 3" COURSE SAND 2' GRAVEL 1' FREE BOARD 3,603 SQUARE FOOT BOTTOM AREA EARTHWORK QUANTITY 9,000 CUBIC YARDS NET FILL W W W RW RW RW SS SS SS SILT FENCE LEGAL DESCRIPTION THAT PORTION OF THE 'REMAINDER PARCEL" OF TRACT NO , IN THE CITY OF SAN JUAN CAPISTRANO, COUNTY OF ORANGE, STATE OF CALIFORNIA AS SHOWN ON A MAP THEREOF FILED IN BOOK 884, PAGE 33 THROUGH 50, INCLUSIVE, OF MISCELLANEOUS MAPS, RECORDS OF COUNTY, TOGETHER WITH A PORTION OF PARCEL "B" AND A PORTION OF PARCEL "C" AS DESCRIBED IN A DEED TO RANCHO SAN JUAN DEVELOPMENT LLC, RECORDED AUGUST 23, 2011, AS INSTRUMENT NO OF OFFICIAL RECORDS OF SAID COUNTY, DESCRIBED IN WHOLE AS FOLLOWS; BEGINNING, AT THE MOST EASTERLY CORNER OF SAID "REMAINDER PARCEL"; ' 3.32' PARKING LOT TOP OF WALL 422 VACANT LAND BEGINNING OF A TANGENT CURVE CONCAVE NORTHERLY AND HAVING A RADIUS OF FEET; THENCE CONTINUING ALONG SAID BOUNDARY WESTERLY FEET ALONG SAID CURVE THROUGH A CENTRAL TYPICAL RETAINING WALL SECTION 1"=10' FEET TO THE BEGINNING OF A NON-TANGENT CURVE CONCAVE NORTHEASTERLY AND HAVING A RADIUS OF POINT BEING THE MOST SOUTHERLY CORNER OF SAID PARCEL "C"; THENCE ALONG SAID BOUNDARY OF SAID PARCEL "C" NORTHWESTERLY FEET ALONG SAID CURVE 1' 2 BAGS MIN. FEET TO THE BEGINNING OF A NON-TANGENT CURVE CONCAVE EASTERLY AND HAVING A RADIUS OF THENCE CONTINUING ALONG SAID BOUNDARY AND ALONG THE BOUNDARY OF PARCEL "C" AS DESCRIBED IN A DEED TO CAPISTRANO UNIFIED SCHOOL DISTRICT, RECORDED AUGUST 23, 2011, AS INSTRUMENT NO OF OFFICIAL RECORDS OF SAID COUNTY NORTHERLY FEET ALONG SAID CURVE THROUGH THENCE CONTINUING ALONG SAID BOUNDARY AND ALONG THE BOUNDARY OF SAID PARCEL "B" NORTHERLY HARD SURFACE PUBLIC ROAD CORRUGATED STEEL PLATES 24' MIN R=20' MIN 50' MIN B B 10' MIN OR AS REQUIRED TO ACCOMODATE ANTICIPATED TRAFFIC, WHICHEVER IS GREATER 1'-0" MIN FURROW VICINITY MAP 1"=800' TANGENT CURVE CONCAVE NORTHERLY AND HAVING A RADIUS OF FEET; OR FOUR TIMES THE CIRCUMFERENCE OF THE LARGEST CONSTRUCTION VEHICLE TIRE, WHICHEVER IS GREATER NORTHEASTERLY LINE OF SAID "REMAINDER PARCEL"; FEET TO THE POINT OF BEGINNING. CORRUGATED STEEL PLATES CRUSHED AGGREGATE BASE GREATER THAN 3" C/L FILTER FABRIC CRUSHED AGGREGATE BASE GREATER THAN 3" FILTER FABRIC ESCP C-EC-1
7
8
9
10
STANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationBig Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California
Big Easy RV & Boat Storage A Green Energy Project 36215 Jana Lane Wildomar, California 1 PROJECT OVERVIEW Project Description The construction and operation of a solar generation facility consisting of
More informationProject Book Worksheet for Cost Estimation
001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013
More informationALEXANDRIA, VIRGINIA PRINCE ST. SUITE 114. ADG, INC. COPYRIGHT c. PH
1600 PRINCE ST. SUITE 114 ALEXANDRIA, VIRGINIA 22314 PH. 703.549.9556 www.archdesigngroup.com ADG, INC. COPYRIGHT c C-1 1 2 3 4 5 6 E D Tie Prop. Sidewalk, Curb & Gutter Into Existing Prop. Storm Drain
More informationCENTENNIAL PARK EXPANSION
2 working days CITY ELKO EXISTING LEGEND PROPOSED CENTENNIAL PARK EXPANSION SEET LIGHT POWER POLE ELECICAL BOX 1-800-227-2600 AVOID CUTTING UNDERGROUND UTILITIES WATER VALVE GAS VALVE FIRE HYDRANT OWNER/DEVELOPER:
More informationTHORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E
THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationPlan Check Policies and Guidelines
VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.
More informationCITY OF STANDARD SPECIFICATIONS
CITY OF Published May 4, 2016 CALIFORNIA Stephan Kiefer, Community Development Director Cheri Sheets, City Engineer CITY OF LIVERMORE 1052 South Livermore Avenue Livermore, CA 94550 4DEV0001.doc 03/12
More informationApplication for Service Residential Subdivision / Development
Application for Service Residential Subdivision / Development Please complete this application and submit the completed form and attachments to PG&E Application for Service at P.O. Box 24047 Fresno CA
More informationPlan Check Policies and Guidelines
Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation
More informationDESIGN STANDARDS SECTION DS 3 STREETS
DESIGN STANDARDS SECTION DS 3 STREETS DS 3-01 GENERAL: A. INTENT: The intent of these Design Standards is to provide minimum standards for the design of public streets. These standards are intended to
More informationCITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES
CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required
More informationHILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.
PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE
More informationSOUTH COVE PARK MULTI-COURT IMPROVEMENTS FOR OCONEE COUNTY PARKS, RECREATION AND TOURISM SENECA, SOUTH CAROLINA FEBRUARY 2018
Pursuant to agreement between, Inc. (HMW) and the party for which these documents have been prepared, these documents and all data, plans, specifications and other information contained herein are the
More informationTemporary Sales Trailer Application
Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 Temporary Sales Trailer Application General: Requests for temporary sales trailers, which comply with
More informationFor Conduit Inspections
Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit
More informationDELETE first sentence of first paragraph that reads: REPLACE with the following:
To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationBID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.
PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00
More informationORDINANCE NO
ORDINANCE NO. 07-5424 AN ORDINANCE OF THE CITY OF BILLINGS, PROVIDING THAT THE BILLINGS, MONTANA CITY CODE BE AMENDED BY REVISING SECTION 6-1208; PROVIDING CHANGES TO CERTAIN CURB CUT LENGTHS AND REGULATIONS.
More informationSITE PLANS ASSISTED LIVING REDEVELOPMENT
SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE
More informationResolution No RECYCLING AND WASTE ENCLOSURE STANDARDS AND GUIDELINES
Resolution No. 05-001 RECYCLING AND WASTE ENCLOSURE STANDARDS AND GUIDELINES Purpose This following provides the standards and guidelines for the construction of recycling and waste container enclosures
More informationCommercial Electric Service Handbook
Commercial Electric Service Handbook January 2011 CONTACTS Clark Public Utilities: Website........................................... www.clarkpublicutilities.com Construction Services department (To initiate
More informationTOWN OF BRIDGTON TRAFFIC ORDINANCE
TOWN OF BRIDGTON TRAFFIC ORDINANCE AN ORDINANCE REGULATING TRAFFIC UPON THE PUBLIC STREETS OF THE TOWN OF BRIDGTON AND REPEALING ALL OTHER ORDINANCES AND SECTIONS OF ORDINANCES IN CONFLICT HEREWITH. Be
More informationCITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG.
SKAGIT COUNTY WASHINGTON CITY OFFICIALS STEVE SEXTON Mayor TED MONTGOMERY JAMES STAVIG City Council RICK DEGLORIA JOE DEGLORIA CHRIS LOVING BILL ASLETT EDIE EDMUNDSON City Council DON ERICKSON SEWER DEPARTMENT
More informationPlease Refer to Attached Sample Form
Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32104-E Cancelling Revised Cal. P.U.C. Sheet No. 28312-E Electric Sample Form No. 62-0685 Application for Service
More informationLake County Building Department
Lake County Building Department P.O. Box 513 505 Harrison Avenue Leadville, CO 80461 (719) 486-2875 Fax (719) 486-4179 Driveway Permit (Resolutions 98-15 and 98-35) PERMIT: To connect a driveway or parking
More informationDESCRIPTION QUANTITY PRICE TOTAL
GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00
More informationBUILDING PERMIT FEES
D-2-a 07/01/11 BUILDING PERMIT S COMMERCIAL RATES Rate MINIMUM New Assembly New Business New Education New Factory/Industrial New Institutional New Mercantile New Storage New Miscellaneous Renovation/Change
More informationPROJECT DATA PROJECT ADDRESS: OWNER:
AFFORABLE STORAGE 51 UNIVERSITY AVE. "L" LOS GATOS, C 95030 (408) 3952555 VICINITY MAP SITE PROJECT DIRECTORY ARCHITECT: KOHLSAAT & ASSOCIATES 51 UNIVERSITY AVENUE, SUITE L LOS GATOS, CA 95030 TEL: (408)
More information2011 LOCAL STREET IMPROVEMENTS
11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE
More informationGATTIS SCHOOL RD / SH 130 SUBDIVISION
AMISTAD DR MEADOWILD DR NO. DESCRIPTION INDEX ROYAL BURGESS DR. E NAKOMA SITE SH 130 CITY LIMITS LITTLE LAKE RD KAATZ LN ESTATE DR DANA DR MARJORIE DR 1 COVER 2 PRELIMINARY PLAT 3 EXISTING CONDITIONS 4
More informationANN ARBOR CITY NOTICE ORDINANCE NO. ORD OFF STREET PARKING CHAPTER 59
ANN ARBOR CITY NOTICE ORDINANCE NO. ORD-12-04 OFF STREET PARKING CHAPTER 59 AN ORDINANCE TO AMEND SECTIONS 5:168 AND 5:169 OF CHAPTER 59 (OFF- STREET PARKING) OF TITLE V OF THE CODE OF THE CITY OF ANN
More informationMIDWAY CITY Municipal Code
TITLE 8 STREETS AND SIDEWALKS MIDWAY CITY Municipal Code CHAPTER 8.01 UTAH CRIMINAL AND TRAFFIC CODE ADOPTED CHAPTER 8.02 UNLAWFUL PARKING CHAPTER 8.03 TRAFFIC REGULATIONS CHAPTER 8.04 RIGHT-OF-WAY REGULATIONS
More informationDate: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:
DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project
More informationSPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES
9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54
More informationStandards for Design and Construction
Standards for Design and Construction Of Water, Wastewater, Fiber optics and Reclaimed Water Facilities For Pasco County Utilities Department Revised: March 2018 Board of County Commissioners: Kathryn
More informationMETRO Magnolia Transit Center - Bid Tab
Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's
More informationBID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST
PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL
More informationM I D - C O A S T REGIONAL PLANNING COMMISSION 166 SOUTH MAIN STREET, SUITE 201 ROCKLAND, ME (207)
M I D - C O A S T REGIONAL PLANNING COMMISSION 166 SOUTH MAIN STREET, SUITE 201 ROCKLAND, ME 04841 (207) 594-2299 Appropriate access management of municipal roadways can enhance safety, maintain roadway
More informationHousing Development Corp of Dekalb
Housing Development Corp of Dekalb Campaign Contributions Disclosure Form Have you as applicant, agent for applicant, property owner, or person associated with the application for property, located at,
More informationPROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS
PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS To review the proposed amendments Approval of the amendments (5-3) Ogden City Planning is proposing several amendments and clarifications to the parking
More informationThe minimum number of accessory off-street parking spaces. shall conform to the requirements of the Table of General
ARTICLE VII Parking and Loading 1. Conformity with Use Table; exceptions. The minimum number of accessory off-street parking spaces shall conform to the requirements of the Table of General Use Regulations,
More informationRESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS
SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated
More informationZONED: GC - GENERAL COMMERCIAL SAN WOODED AREA A-2 OHE OHE A-13 X X CONCRETE OUTLET STRUCTURE 20' BUILDING SETBACK A-6 C-37 A-12 C-36
38.50' I U.S. 23 C-8 CL C-19 SITE PLAN SCALE: 1" = 50'-0" DESC. & M. N.00 55'26"W. A - EIING SITE FEATURES TO REMAIN N. 87-57' - 43" E. DESC. & M. 297.42' 7 07/14/15 ENGINEERING MMENTS 8 07/29/15 ENGINEERING
More informationUTILITY CROSSING DETAIL
6" OF CSBC COMPACTED TO A FIRM AND UNYIELDING CONDITION. NOTE: - SILT FENCE SHALL CONFORM TO 8-01.3(9)A - SILT FENCES SHALL BE INSTALLED ALONG CONTOUR WHENEVER POSSIBLE. - POST SPACING MAY BE INCREASED
More informationSOLID WASTE AND RECYCLING ENCLOSURE STANDARDS
SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS Kitsap County Public Works July 2019 If you have any questions regarding the Standards or have recommendations for improvement, please contact: Sarah Olson
More informationPlease Refer to Attached Sample Form
Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32105-E Cancelling Revised Cal. P.U.C. Sheet No. 28313-E Electric Sample Form No. 62-0686 Application for Service
More informationDR SE WAY SOMERSIDE. C-N Neighborhood Commercial Site. R-LD - Development in accordance. Fully Landscaped Park/ Playground.
LAND & BUSINESS SUPPORT DEPT Southlands Phase 6A Plan 01231 City of Medicine Hat Land & Business Support Ph (03) 52-1 Fax (03) 502-055 land_properties@medicinehat.ca updated August 20, 201 SOMERSET BAY
More informationCONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO
Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,
More informationARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS
ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET
More informationOhio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director
Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion
More informationPERMANENT RESIDENTIAL UNDERGROUND SERVICE
CITY OF RICHLAND ENERGY SERVICES DEPARTMENT 505 Swift Boulevard, MS-21 Richland, WA 99352 Telephone (509) 942-7403 Fax (509) 942-7405 PERMANENT RESIDENTIAL UNDERGROUND SERVICE A. INTRODUCTION This guide
More informationCITY OF MIAMI HISTORIC AND ENVIRONMENTAL PRESERVATION BOARD BAYSIDE HISTORIC DISTRICT PARKING DESIGN GUIDELINES
CITY OF MIAMI HISTORIC AND ENVIRONMENTAL PRESERVATION BOARD BAYSIDE HISTORIC DISTRICT PARKING DESIGN GUIDELINES Purpose and Intent The Bayside Historic District's (BHD) streetscape is irregular and differs
More informationCHAPTER 2 ZONING AND DEVELOPMENT
2.200 GENERAL DEVELOPMENT STANDARDS CHAPTER 2 ZONING AND DEVELOPMENT Section 2.201 GENERAL PROVISIONS... 2.2-1 Section 2.202 FENCES AND VISIONS CLEARANCE... 2.2-2 2.202.01 Fences... 2.2-2 2.202.02 Vision
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More informationTRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT
TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic
More informationSTREET IMPROVEMENTS PROPOSAL BID ITEMS
STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.
201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal
More informationLAND FOR SALE. LIVE OAK RAILROAD RAIL SPUR 10 Acres & 1 Mile of Track East Basse Road, Suite 100 San Antonio, TX
LAND FOR ALE RAIL PUR 10 Acres & 1 Mile of Track Three Rivers IH-37 Your ign Here George West 10 acre site including 1 mile of track Dedicated Union Pacific ervice Guaranteed daily service from an Antonio
More informationPERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL
PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL Submit To Martin County Judge s Office P.O. Box 1330 Stanton Texas 79782-1330 mhernandez@co.martin.tx.us APPLICATION: Permittee
More informationDIVISION 4: STREET. Improvement Design Standards City of Dundee Oregon. Division 4 : Street Page 1
DIVISION 4: STREET 4.1 DESIGN CRITERIA A. APPLICABILITY 1. These Design Standards shall govern the construction and upgrade of all public and private streets in the City of Dundee and applicable work within
More information(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,
78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction
More informationREZ Zoning A-1 R-3C A-1 C-1 A-1 R-2AC R-3C A-1 R-5C R-4C O/SC O/SC O/SC R-2AC RTHC O/SC B-2C O-2C B-2C R-6C 400 A-1. OS/C to M-1C Ac.
56 5500 5429 542 570 Shady Ridge 5420 0 207 202 2008 HOLMAN LN 203 2009 2004 2005 2000 200 5425 9 56 0 54 7 62 5904 70 5 62 8 56 2 6 6 624 67 5700 62 0 620 6 2 72 5560 OLDE COVINGTON WAY 62 4 63 2 70 5704
More informationSt. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016
St. Johns River State College BID-SJR-10-2016 Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 TO BID-SJR-10-2016 Bid Specifications/Project Manual (Plans) PARKING LOT REHABILITATION PROJECT FOR: DRAWING
More informationDUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS
PRELIMINARY ENGINEERING PLANS DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS ERIC CARLSON ARCHITECTS LOCATION MAP DRAWINGS INDE CONTACTS REV DATE NOT TO SCALE BENCHMARKS CRISSEY AVENUE IL ROUTE 38
More informationBID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.
BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010
More informationDRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group
DRIVEWAY GUIDE June 2017 TABLE OF CONTENTS Definitions Building Requirements Material Standards Drainage Administrative Requirements Zoning Requirements Yard Requirements Design Requirements Public Ways
More informationTYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES
TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES This document is a summary of the Douglas County regulations and policies for constructing residential driveways. It is intended
More informationMcCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS
BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS
More informationPARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS
PARKING LOT REHABILITATION PROJECT FOR: DRAWING INDE SHEET NO. DRAWING TITLE C. COVER SHEET C1. - C1.17 PALATKA CAMPUS C4. CONSTRUCTION DETAILS PROJECT SITE PROJECT SITE C. 8 4 8 16 32 1 inch = 8 ft. C1.16
More informationCITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS
CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS JANUARY 1996 EDITION ADDENDA THROUGH JULY 2017 DIANNA JENSEN City Engineer 1717 Fifth Street Davis, CA 95616 530-757-5686 2017 Edition STANDARD
More informationII. PROJECT DESCRIPTION
II. PROJECT DESCRIPTION A. PROJECT APPLICANT The project applicants for the proposed Sepulveda/Rosecrans Site Rezoning are: Mar Ventures, Inc., 2050 West 190 th Street, Suite 108, Torrance, California,
More informationVehicle and Equipment Fueling
Vehicle and Equipment Fueling SC-20 Objectives Cover Contain Educate Reduce/Minimize Description Spills and leaks that occur during vehicle and equipment fueling can contribute hydrocarbons, oil and grease,
More informationINFORMATION BULLETIN / PUBLIC - ZONING CODE REFERENCE NO.: L.A.M.C A5 Effective: DOCUMENT NO.: P/ZC Revised:
INFORMATION BULLETIN / PUBLIC - ZONING CODE REFERENCE NO.: L.A.M.C. 12.21A5 Effective: 10-01-1999 DOCUMENT NO.: P/ZC 2002-001 Revised: 11-28-2018 Previously Issued As: IB ZO-1, RGA 3-72 PARKING DESIGN
More informationOaks Commerce Center
Mansour Edlin Consulting 1515 Mockingbird Lane Charlotte, NC 28209 Oaks Commerce Center Water & Sanitary Sewer Improvements Phase I - Concept Utility Plan Gravity Sanitary Sewer A1 Connect to Existing
More informationFire Apparatus Access Roads in Marysville
Fire Apparatus Access Roads in Marysville 1094 Cedar Avenue, Marysville, Washington 98270 Phone (360) 363-8500 Fax (360) 659-1382 These documents all address various requirements for Fire Apparatus Access
More informationLand Title Survey ACRES CITY OF MCKINNEY COLLIN COUNTY, TEXAS SURVEYOR'S CERTIFICATION
SURVEYED DESCRIPTION: BEING a tract of land situated in the Oliver Hedgecoxe Survey, Abstract No. 392, in the City of McKinney, Texas, being a portion of a tract of land described by deed to TFI McKinney
More informationTENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016
TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement
More informationRESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS
SECTION II This section discusses the City of Palo Alto's requirements for establishing electric service to new or upgraded residential installations. The same requirements apply to both underground and
More informationEL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD
EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EMERGENCY APPARATUS ACCESS WAYS STANDARD #B-003 EFFECTIVE 05-05-2009 PURPOSE To establish a consistent guideline for fire access roadways required by
More informationFederal Project No.: STP-5128(388)
Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)
More informationChapter PARKING REGULATIONS
17.112.010 Chapter 17.112 PARKING REGULATIONS Sections: 17.112.010 Scope of Regulations Applicability. 17.112.020 Schedule of Off-Street Parking Requirements. 17.112.030 Off-Street Loading Requirements.
More informationApproved Contractor Construction e-guide Residential Commercial
Approved Contractor Construction e-guide Residential Commercial Clark Public Utilities PO Box 8900 Vancouver, WA 98668 (PAGE 2) TABLE OF CONTENTS PAGE Trenching 3 Wire 8 Single-Phase Transformer Set 13
More informationVista Municipal Code
Section 16.57.050 Private streets prohibited in certain zones. No lots zoned for multi-family, commercial, or industrial uses may be created using private street easements for access, except as provided
More informationPurpose: General Provisions:
10-19-1 Purpose: The purpose of off-street parking requirements is to promote traffic/pedestrian safety and efficiency and to minimize hard surfaced areas to reduce storm water run-off and visual impacts
More informationChapter. Parking SECTION OFF STREET PARKING AND LOADING REQUIREMENTS
Chapter 14 Parking It is the purpose and intent of this Ordinance that parking and loading areas be provided and adequately maintained in every zoning district for the purposes of promoting safe and efficient
More informationWHITE OAK RIDGE PROJECT NO. 53B2384 D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION CITY OF MADISON
WHITE OAK RIDGE D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION ORIGINATOR:, STREETS DIVISION REV. DATE: PLOT NAME: PLOT SCALE: THE LOCATION AND INFORMATION FOR PROPOSED NEW TREES, IN THE PUBLIC RIGHT OF
More informationChassis camper means any motor vehicle with a cab and a habitable structure permanently attached to the motor vehicle chassis.
ARTICLE II. - TRAILERS AND RECREATIONAL VEHICLES FOOTNOTE(S): --- (2) --- Cross reference Traffic and vehicles, ch. 82. (Back) Sec. 54-31. - Conditions for parking or storage on residential property. The
More informationCITY OF SAN DIEGO PUBLIC UTILITIES DEPARTMENT APPROVED MATERIALS LIST TABLE OF CONTENTS
CITY OF SAN DIEGO PUBLIC UTILITIES DEPARTMENT TABLE OF CONTENTS SYSTEM Page A. Bronze Water Service Fittings.... 3 Corporation Stop, Curb Stop, Property Valve, Coupling, Compression Fittings, Adaptors,
More informationBID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -
BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b
More informationCHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards
9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher
More informationTECHNICAL DESIGN STANDARDS Pickaway County, Ohio
TECHNICAL DESIGN STANDARDS Pickaway County, Ohio UPDATED 02/08 PREFACE It is the intent of these requirements to provide a standard for subdivisions for the purpose of protecting the public health, safety,
More informationProject # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements
Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices
More informationGarNat Engineering, LLC
GNE Designing our client s success GarNat Engineering, LLC P.O. Box 116 (72018) 406 West South Street, Suite B Benton, Arkansas 72015 PH: (501) 408-4650 FX: (888) 900-3068 garnatengineering@gmail.com September
More informationRESOLUTION NO A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF
RESOLUTION NO. 2017-08-21-2 A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF HEWITT, TEXAS, ADOPTING THE " MASTER FEE SCHEDULE"; REPEALING ALL RESOLUTIONS IN CONFLICT; DECLARING AN EFFECTIVE DATE; AND RINDING
More informationARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.02 OFF STREET PARKING AND LOADING SPACE REQUIREMENTS
ARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.01 STORAGE IN FRONT YARD Nothing in this Ordinance shall permit the storage or parking of any vehicle or non-permanent structure within the required
More informationCHAPTER 140 DRIVEWAYS
CHAPTER 140 DRIVEWAYS 140.01 Purpose 140.10 Driveway Location 140.02 Definitions 140.11 Driveway Maintenance 140.03 Driveway Construction 140.12 Failure To Maintain 140.04 Driveway Surfaces 140.13 Permit
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS
San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance