CONNECTION FROM FESTIVAL DRIVE / UPTOWN BOULEVARD LANDSCAPE PLANS PW

Size: px
Start display at page:

Download "CONNECTION FROM FESTIVAL DRIVE / UPTOWN BOULEVARD LANDSCAPE PLANS PW"

Transcription

1 CHIPLEY PENSACOLA FORT WALTON BEACH PANAMA CITY TALLAHASSEE LAKE CITY JACKSONVILLE ST AUGUSTINE GAINESVILLE OCALA DAYTONA BEACH DELAND CONNECTION FROM FESTIVAL DRIVE / UPTOWN BOULEVARD LANDSCAPE PLANS PW Project Location NEW PORT RICHEY TAMPA ST PETERSBURG SARASOTA - BRADENTON ORLANDO LAKELAND BARTOW FT MYERS NAPLES MELBOURNE - COCOA FT PIERCE WEST PALM BEACH FT LAUDERDALE MIAMI INDEX OF LANDSCAPE ARCHITECTURAL PLANS KEY WEST L-0 KEY L-1 - L-8 LANDSCAPE PLANTING PLAN L-8 WAYFINDING SCHEDULE AND DETAIL L-9 LANDSCAPE NOTES L-10 LANDSCAPE PLANTING SCHEDULE AND DETAILS L-11 HARDSCAPE DETAILS I-1 - I-8 LANDSCAPE IRRIGATION PLAN ALTAMONTE SPRINGS PAT BATES MAYOR GARDNER HUSSEY DISTRICT 1 COMMISSIONER STEVE WOLFRAM DISTRICT 2 COMMISSIONER SARAH REECE DISTRICT 3 COMMISSIONER JON BATMAN DISTRICT 4 COMMISSIONER FRANKLIN W. MARTZ, II CITY MANAGER CHRIS RADER, P.E. CITY ENGINEER ED TORRES, P.E. PUBLIC WORKS DIRECTOR I-8 LANDSCAPE IRRIGATION SCHEDULE I-9 LANDSCAPE IRRIGATION NOTES AND DETAILS E-1 - E-11 LANDSCAPE LIGHTING PLAN E-12 - E-13 LANDSCAPE LIGHTING SCHEDULE AND CUT S LANDSCAPE PLANS SHOP DRAWINGS TO BE SUBMITTED TO: JOHN P. GORHAM, RLA, ASLA. VANASSE HANGEN BRUSTLIN, INC. 225 E. ROBINSON STREET, SUITE 300 ORLANDO, FL FINAL PLAN SUBMITTAL DATE: JULY 1, 2016 GOVERNING STANDARDS AND SPECIFICATIONS: Florida Department of Transportation, Design Standards and revised Index Drawings as appended herein, and Standard Specifications for Road and Bridge Construction, as amended by Contract Documents For Design Standards click on the "Design Standards" link at the following web site: For the Standard Specifications for Road and Bridge Construction click on the "Specifications" link at the following web site: L-0 Tofte, Shawn 7/1/2016 1:14 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\key.dwg

2 1" = 20' WAYFINDING SIGNAGE #1 MATCH LINE STA MATCH LINE STA L-1 6/30/2016 2:00 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-planrd01.dwg

3 1" = 20' 41 DV 11 PM 81 TA 2 LN 3 ZF 50 DTV DV DTV ZF 2 LN 6 LN 103 DV 92 TA MATCH LINE STA MATCH LINE STA MS WAYFINDING SIGNAGE #2 81 LB 40 TA SHARED DUMPSTER W/ ACCESS FROM NORTH (10' DEEP X 12' WIDE ) 25 PM MATCH LINE STA MATCH LINE STA L-2 6/30/2016 2:15 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-planrd01.dwg

4 1" = 20' 81 TA 266 TA 1 LN 9 RI 9 RI 1 LN 2 MB 2 2 MB LN 50 DV 253 LB 3 QV 50 DV 298 TA WAYFINDING SIGNAGE #3 92 TA 25 PM MATCH LINE STA MATCH LINE STA ' MATCH LINE STA MATCH LINE STA L-3 6/30/2016 2:00 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-planrd01.dwg

5 1" = 20' ORIGIN OF ROADWAY SIGHT DISTANCE +2 FT. OF RESTORATION SOD 623 sf SSF WAYFINDING SIGNAGE # MB 212 SA SA REMOVE EXISTING ALUM. FENCE AND REPLACE W/ FDOT STD INDEX 852 TYPE 1 GUARDRAIL MATCH LINE STA MATCH LINE STA WAYFINDING SIGNAGE #4 71 DV 1 QV 7 LIMESTONE BOULDERS (SEE CHART ON DETAILS ) 2" STONE/GRAVEL SEE DETAIL FOR BOULDER PLACEMENT ETC. MATCH LINE STA MATCH LINE STA EXIST. R/W L-4 6/30/2016 2:01 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-planrd01.dwg

6 WAYFINDING SIGNAGE #5 +2 FT. OF RESTORATION SOD REPLACE EXISTING RAIL W/ FDOT STD INDEX 852 TYPE 1 GUARDRAIL 1" = 20' 12 FT POND ACCESS GATE (SEE DETAIL ) 1 MB 64 LB REMOVE EXISTING ALUM. FENCE AND REPLACE W/ FDOT STD INDEX 852 TYPE 1 GUARDRAIL 22 DV 2 QV 66 LB 9 RI 1 LN REMOVE EXISTING ALUM. FENCE AND REPLACE W/ FDOT STD INDEX 852 TYPE 1 GUARDRAIL EE DETAIL FOR BOULDER PLACEMENT ETC. MATCH LINE STA MATCH LINE STA MATCH LINE STA MATCH LINE STA L-5 6/30/2016 2:01 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-planrd01.dwg

7 MATCH LINE STA MATCH LINE STA " = 20' 22 DV 1 LN 2 QV 66 LB 1 MB 64 LB 9 RI 67 LB 9 RI 2 LN 59 DTV WAYFINDING SIGNAGE #6 24 DV 85 DTV 105 LB 9 RI 1 MB 87 LB 9 RI 83 LB 2 QV 23 DV 1 LN MATCH LINE STA MATCH LINE STA DTV 25 DV WAYFINDING SIGNAGE #7 61 DTV 108 TA L-6 6/30/2016 2:01 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-planrd01.dwg

8 1" = 20' 9 RI ORIGIN OF DRIVEWAY SIGHT DISTANCE WAYFINDING SIGNAG 83 LB 23 DV 1 LN 298 LB 11 RI 3 MB 13 RI 1 QV 82 IV 2 QV 1 LN 135 TA 55 DV 2 QV 439 IV 193 LB 12 RI TA MATCH LINE STA MATCH LINE STA PM 3 LN 222 TA LIMITS OF SIGHT DISTANCE MATCH LINE STA MATCH LINE STA IV L-7 6/30/2016 2:01 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-planrd01.dwg

9 1" = 20' 82 IV WAYFINDING SIGNAGE #8 4 LN WAYFINDING SIGNS* SIGN # LOCATION SIGN COPY 1 STA , 23.00' RT. CRANES ROOST, UPTOWN, RENAISSANCE CENTER 2 STA , 22.00' RT. CRANES ROOST, UPTOWN, RENAISSANCE CENTER 3 STA , 14.50' LT. SR 436, UPTOWN, RENAISSANCE CENTER 4 STA , 22.00' RT. CRANES ROOST, UPTOWN, RENAISSANCE CENTER 5 STA , ' LT. CRANES ROOST, CENTRAL PARKWAY, ALTAMONTE MALL 6 STA , 30.00' LT. CRANES ROOST, UPTOWN, CENTRAL PARKWAY 7 STA , 24.00' RT. CRANES ROOST, UPTOWN, CENTRAL PARKWAY 8 STA , 13.50' LT. CRANES ROOST, CENTRAL PARKWAY, ALTAMONTE MALL *FINAL DESIGN AND LOCATION TO BE CONFIRMED BY THE CITY PRIOR TO PRECONSTRUCTION CONFERENCE IV 103 TA MATCH LINE STA MATCH LINE STA L-8 6/30/2016 2:17 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-planrd01.dwg

10 GENERAL LANDSCAPE NOTES 1. ALL ON-SITE EXISTING CONDITIONS INCLUDING SURFACE AND SUBSURFACE UTILITIES, GRADES, DIMENSIONS AND SOIL CONDITIONS SHALL BE VERIFIED BY THE CONTRACTOR BEFORE CONSTRUCTION BEGINS. THE CONTRACTOR SHALL BECOME FAMILIAR WITH ALL PLANS PREPARED BY OTHERS THAT AFFECT THE LANDSCAPE AND IRRIGATION WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE. 2. EVERY POSSIBLE SAFEGUARD SHALL BE TAKEN TO PROTECT BUILDING SURFACES, EQUIPMENT, FURNISHINGS, CURBS, UTILITIES AND EXISTING PLANTING AREAS TO REMAIN INCLUDING LAWN. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE OR INJURY TO PERSON OR PROPERTY THAT MAY OCCUR AS A RESULT OF NEGLIGENCE IN THE EXECUTION OF THE CONTRACTOR'S WORK. 3. THE CONTRACTOR SHALL INTERFACE WITH OTHER WORK BEING PERFORMED BY OTHER CONTRACTORS. IT WILL BE NECESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE ACTIVITIES, WHERE NECESSARY, WITH OTHER CONTRACTORS AND THEIR SUBCONTRACTORS. THE LANDSCAPE CONTRACTOR SHALL INSURE THAT THEIR WORK DOES NOT IMPACT ESTABLISHED OR PROJECTED DRAINAGE PATTERNS. 4. PRIOR TO PLANTING INSTALLATION, THE CONTRACTOR SHALL CONFIRM THE AVAILABILITY OF ALL THE SPECIFIED PLANT MATERIALS AND MAKE ARRANGEMENTS WITH THE OWNER'S REPRESENTATIVE AND OWNER'S REPRESENTATIVE TO REVIEW AND MUTUALLY FIELD TAG AGREED UPON PLANT MATERIALS AT LEAST ONE (1) WEEK PRIOR TO DELIVERY TO SITE. 5. ALL PLANT MATERIAL SIZES SPECIFIED ARE MINIMUM SIZES. ALL CONTAINER AND TREE CALIPER SIZES ARE MINIMUM. CONTAINER OR CALIPER SIZE MAY BE INCREASED IF NECESSARY TO PROVIDE OVERALL PLANT SIZE SPECIFIED. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING EXISTING VEGETATION AS REQUIRED AND PREPARING PLANTING AREAS PRIOR TO INSTALLATION OF PLANT MATERIALS. TRIMMING, SODDING AND MULCHING WILL BE REQUIRED TO BLEND NEW PLANTINGS IN WITH EXISTING LANDSCAPE AREAS.. 7. THE LANDSCAPE CONTRACTOR SHALL TEST PROJECT SOILS TO VERIFY THAT THE SOILS ON-SITE ARE ACCEPTABLE FOR PROPER GROWTH OF PLANT MATERIALS AND ADEQUATE DRAINAGE IN PLANT BEDS AND PLANTERS. THE LANDSCAPE CONTRACTOR SHALL COORDINATE THE LOCATION, AND PROCUREMENT OF EXISTING ON-SITE SOIL SAMPLES WITH THE OWNER'S REPRESENTATIVE. REPRESENTATIVE SAMPLES SHALL BE SUBMITTED TO A CERTIFIED TESTING LABORATORY FOR ANALYSIS. THE FINDINGS, TOGETHER WITH RECOMMENDATIONS FOR AMENDING THE SOILS SHALL BE REVIEWED AND APPROVED BY THE OWNER, LANDSCAPE ARCHITECT, AND OWNER'S REPRESENTATIVE PRIOR TO DELIVERY AND INSTALLATION OF PLANT MATERIALS AT THE JOB. FOR THE CONVENIENCE OF THE LANDSCAPE CONTRACTOR. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL QUANTITIES AND REPORTING ANY DISCREPANCIES TO THE OWNER'S REPRESENTATIVE FOR CLARIFICATION PRIOR TO CONTRACT AWARD AND COMMENCEMENT OF WORK. 12. THE LANDSCAPE CONTRACTOR SHALL VERIFY THE EXTENT OF SOD WORK IN THE FIELD, INCLUDING GRASS AREAS DAMAGED DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING SOD IN THE AREAS SHOWN ON THE PLAN, IN SUFFICIENT QUANTITY TO PROVIDE FULL COVERAGE. ADDITIONAL GRASS REQUIRED WILL BE ADJUSTED BASED ON A SQUARE FOOTAGE UNIT PRICE. AREAS TO BE GRASSED SHALL BE AMENDED PER SOILS REPORT TO PROVIDE REQUIRED NUTRIENTS AND SOIL PH OF BETWEEN 6.0 AND THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING PLANTS, SPACED AS SPECIFIED ON THE PLANT LIST. WHEN INSTALLING SHRUBS IN PLANTING BEDS, SPACING OF MATERIAL SHALL TAKE PRECEDENCE OVER QUANTITY OF MATERIALS INDICATED FOR PLANTING AREAS. NOTIFY OWNER'S REPRESENTATIVE IMMEDIATELY IF SUCH SITUATIONS ARISE. SHRUB AND GROUNDCOVER SPACING IS GENERALLY INDICATED ON THE PLANT LIST FOR ALL 'MASS PLANTINGS'. ACCENT SHRUBS AND TREES THAT ARE NOT PART OF MASS PLANTINGS SHALL BE SPACED AS SHOWN ON THE PLANS. 14. ALL PLANTING BEDS SHALL BE TOP-DRESSED WITH A 3" LAYER OF MULCH AS SPECIFIED. ALL TREES SHALL HAVE A 3" THICK LAYER OF MULCH RING PLACED AROUND THE BASE OF THE TRUNK, LEAVING 2" CLEAR WITH BARE SOIL. THE LANDSCAPE SCOPE OF WORK INCLUDES MULCHING AS AN INTEGRAL PART THE PROJECT. 15. ALL EXISTING PLANT BEDS TO REMAIN WITHIN THE CONSTRUCTION LIMIT LINE SHALL BE LEFT UNDISTURBED. EXISTING TREES TO REMAIN, AS NOTED ON THE DRAWINGS, SHALL BE LEFT UNDISTURBED AND PROTECTED BY WOODEN BARRICADES ERECTED AT THE PERIMETER OF THE TREE DRIP-LINE(S). NO VEHICLE SHALL TRAVERSE THIS AREA NOR SHALL ANY STORAGE OF MATERIALS OR EQUIPMENT BE PERMITTED WITHIN THE AREA OF THE TREE DRIP-LINE(S). ANY EXISTING PLANT BEDS OR TREES DAMAGED BY CONSTRUCTION ACTIVITY SHALL BE REPLACED BY THE RESPONSIBLE PARTY AT THEIR OWN EXPENSE. 16. NO TREES SHALL BE PLANTED WITHIN DESIGNATED UTILITY SETBACKS NOR ANY PLANTS LOCATED WITHIN FOUR FEET (4') OF ANY SWALE CENTERLINE IDENTIFIED ON THE DRAWINGS EXCEPT FOR GROUND COVER PLANTS ADJACENT TO ROCK CHANNEL AT STA FIELD ADJUST AS NECESSARY AND REVIEW ADJUSTMENTS WITH THE OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL DEBRIS AND EXCAVATED BACKFILL OFF-SITE ON A DAILY BASIS AT NO ADDITIONAL COST TO THE OWNER SOIL PREPARATION FOR ALL PLANTED AREAS 1. AREAS TO BE PLANTED THAT ARE DENSELY COMPACTED, 85% TO 90%, SHALL BE CROSS-RIPPED TO 12 IN. DEPTH. AREAS OVER 90% COMPACTED SHALL BE CROSS-RIPPED TO 24 IN. DEPTH, AND, OVER 85% SHALL BE CULTIVATED TO ACHIEVE 80% OR LESS COMPACTION TO A DEPTH OF 18. ALL UNACCEPTABLE MATERIALS, INCLUDING LIMEROCK BASE, CONCRETE SCREENINGS, ASPHALT, ETC., SHALL BE REMOVED AND DISPOSED OF PROPERLY. 2. SOIL FOR PLANTING SHALL BE FREE OF ROCKS OVER 1/2 IN. IN DIAMETER, AND FREE OF FOREIGN DEBRIS, REFUSE, PLANTS OR ROOTS, CLODS, WEEDS, STICKS, SOLVENTS, PETROLEUM PRODUCTS, CONCRETE, BASE ROCK, OR OTHER DELETERIOUS OR UNDESIRABLE AND UNWANTED MATERIALS. SOIL SHALL BE FREE OF SOIL-BORNE DISEASES AND CAPABLE OF SUSTAINING HEALTHY PLANT LIFE. MATERIALS NOT MEETING SUCH REQUIREMENTS SHALL BE REMOVED, INCLUDING ALL TEMPORARY ROAD BASES OR PAVEMENT ALREADY IN PLACE. 3. IN AREA WHICH WILL RECEIVE IMPORT SOIL, SCARIFY THE EXISTING SOIL 12 IN. DEEP IF THE SOIL HAS BEEN COMPACTED PRIOR TO BACKFILLING. 4. BACKFILL PLANTING MEDIA FOR ALL SHRUB AND TURF AREAS SHALL BE PROVIDED AT A MIN. DEPTH OF 18" AND SHALL BE COMPRISED OF THE FOLLOWING MIXTURE: 1/3 COARSE GRAIN SAND 1/3 PEAT 1/3 NATIVE CLASS A SOIL 8. THE LANDSCAPE CONTRACTOR SHALL INSURE ADEQUATE VERTICAL SOIL DEPTH AND DRAINAGE IN ALL PLANT BEDS AND PLANTERS. EXCAVATION OF COMPACTED FILL SHALL BE ACCOMPLISHED TO INSURE PROPER SOIL DEPTH AND DRAINAGE, (SEE SOIL PREPARATION NOTES). 9. ALL PLANTING BEDS SHALL BE STAKED IN ACCORDANCE WITH THE PLANS AND APPROVED BY THE OWNER'S REPRESENTATIVE PRIOR TO PLANTING. THE LANDSCAPE CONTRACTOR SHALL PROVIDE STAKES OR IRRIGATION FLAGS TO LOCATE THE EDGES OF ALL SHRUB AND GROUNDCOVER PLANT BEDS AND INDIVIDUAL TREES AND PALMS. IF EXISTING CONDITIONS DO NOT ALLOW THE DESIGN TO BE LAID OUT AS SHOWN, NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY. 10. ALL PROPOSED TREES SHALL BE INSTALLED EITHER ENTIRELY IN OR ENTIRELY OUT OF PLANTING BEDS. PLANTING BED OUTLINES SHALL NOT BE OBSTRUCTED AND SHALL BE SMOOTH AND FLOWING. IF TREES ARE LOCATED OUTSIDE PLANTING BEDS IN GRASS AREAS, MAINTAIN A MINIMUM THREE FEET 3' WIDE OFFSET TO ALLOW FOR MOWERS TO MANEUVER. 18. CONTRACTOR IS RESPONSIBLE TO WARRANTY AND MAINTAIN ALL LANDSCAPE CONSTRUCTION FOR ONE YEAR IN ACCORDANCE WITH FDOT SPECIFICATION THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STABILITY AND PLUMB CONDITION OF ALL INSTALLED PLANT MATERIALS. THE CONTRACTOR SHALL REMOVE ALL STAKING MATERIALS THE END OF THE ESTABLISHMENT PERIOD AND DISPOSE OFFSITE. 20. TAKE RESPONSIBILITY TO COORDINATE IRRIGATION SYSTEM CONSTRUCTION WITH LANDSCAPE. IRRIGATION SUPPLY LINES MUST BE CONSTRUCTED AND OPERATIONAL PRIOR TO PLANTING OF ANY TREES. 11. THE PLANT QUANTITIES SHOWN ON THE LANDSCAPE CONTRACT DOCUMENTS ARE L-9 6/30/2016 2:01 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-planrd01.dwg

11 PLANT SCHEDULE ITEM TREES CODE COMMON NAME BOTANICAL NAME CONT CAL SIZE QTY REMARKS P-22 LN Nitida Palm Livistona nitida F.G. 12` C.T. 24 MATCHED SPECIMEN T-45 MB Bracken`s Southern Magnolia Magnolia grandiflora `Brackens Brown Beauty` 100 gal 4"Cal 14` Ht., 6` Spd. 11 4` C.T. MIN. T-3 QV Southern Live Oak Quercus virginiana 100 gal 4"Cal 14` Ht., 8` Spd. 11 FLORIDA FANCY 1.5x ROOTBALL DIA. PROVIDE MINIMUM PIT CLEARANCE AROUND ROOTBALL 12" ALL SIDES AND 6" UNDER BOTTOM 1 REINFORCED RUBBER HOSE #10 GAUGE WIRE FROM CENTRAL TRUNK TO THREE STAKES REINFORCING RUBBER ELBOW TWO 2"x4"x8' P.T. WOOD STAKES, IF TREE IS LESS THAN 4" CALIPER OR FOUR 2"x4"x8' P.T. WOOD STAKES, IF TREE IS MORE THAN 4" CALIPER MINIMUM 3" MULCH, 12" IN DIAMETER AROUND TRUNK SOIL BERM 1/3 ROOTBALL DIA. POSTS TO BE LOCATED 3 1 OF THE ROOT BALL DIAMETER AWAY FROM THE EDGE OF THE ROOTBALL PLANTING SOIL MIXED PER SPECIFICATIONS PLANTING SOIL MIXED PER SPECIFICATIONS AS IDENTIFIED IN A SOIL REPORT AS SECURED BY THE LANDSCAPE CONTRACTOR AND CERTIFIED BY THE LANDSCAPE ARCHITECT. TREE PLANTING DETAIL WITH POLE STAKING NTS 3x TO 5x ROOTBALL DIA. PRUNE AND TIE FRONDS WITH HEMP TWINE PRIOR TO RELOCATION, UNLESS OTHERWISE NOTED OR DIRECTED. NOTE: DATE PALMS DO NOT PRUNE FROND LENGTHS, REMOVE ONLY DEAD FRONDS. PALM (TYP.). SECURE BRACES TO BATTENS W/ MIN. OF 2 NAILS EACH BRACE, TYP. TOE-NAIL BRACE TO P.T. STAKE, STAKES SHALL BE 1"-2" BELOW FINISHED GRADE, TYP. NOTE: NO MULCH WITHIN 4" OF TRUNK, TYP. 2 PALM BRACING DETAIL NTS PLAN TWO BANDS TO SECURE BATTENS. FIVE FOAM BACKED BATTENS-NOTCHED, MIN. (MORE MAY BE REQUIRED TO KEEP STRAPS OFF PALM TRUNK W/ LARGER DIA.). 3-2" X 4" X 8' FT. P.T. BRACES CUT TO FIT BATTENS AND STAKES. WOOD STAKES TO BE FLUSH W/ FINISH GRADE. PAINT AS DIRECTED. 1"-2" DEPTH MULCH (SEE PLAN) 4" WATER RING - (WITHIN ROOT BALL DIA.), FILL 3 TIMES IMMEDIATELY AFTER PLANTING. RAKE OUT PRIOR TO MULCHING AND PLANTING. FINISH GRADE - 1"-2" BELOW TOP OF ROOTBALL. BACKFILL: TOP SOIL TYPICAL OF AREA. (BACKFILL SHALL BE AMENDED THROUGHOUT ENTIRE SITE W/ FERTILIZER AND COMPOST AS REQUIRED). S-50 S-24 S-21 S-15 S-66 S-70 S-61 S-65 S-31 S-71 SHRUBS CODE COMMON NAME BOTANICAL NAME CONT SIZE SPACING QTY REMARKS PM Podocarpus Podocarpus macrophyllus 7 gal 60" Ht., 18" Spd. 3` O.C. 99 DENSELY FOLIATED RI White Indian Hawthorn Rhaphiolepis indica `Alba` 3 gal 18" x 18" 3` O.C. 90 DENSELY FOLIATED ZF Coontie Fern Zamia floridana 3 gal 15" x 15" 3` O.C. 8 FULL SHRUB AREAS CODE COMMON NAME BOTANICAL NAME CONT SIZE SPACING QTY REMARKS DTV Variegated Flax Lily Dianella tasmanica `Variegata` 1 gal 12" O.A. 12" o.c. 379 FULL DV African Iris Dietes vegeta 1 gal 12" O.A. 18" o.c. 498 MIN. 3 STEMS IV Blue Flag Iris versicolor 1 gal 12" O.A. 12" o.c. 599 MIN. 3 STEMS LB Big Blue Lilyturf Liriope muscari `Big Blue` 1 gal 12" o.c. 1,297 FULL MS Sunshine Mimosa Mimosa strigillosa 1 gal 8" SPD. 24" o.c. 19 WELL ROOTED TA Asiatic Jasmine Trachelospermum asiaticum `Asiatic` 1 gal 12" Runners 12" o.c. 1,345 FULL GROUND COVERS CODE COMMON NAME BOTANICAL NAME CONT SIZE SPACING QTY REMARKS SA Narroleaf Blue-eyed Grass Sisyrinchium angustifolium 1 gal 6" HT. 8" o.c. 331 MIN. 3 STEMS SD-3 SSF `Floratam` St. Augustine Sod Stenotaphrum secundatum `Floratam` sod Solid Panels 623 sf REINFORCED RUBBER HOSE HEAVY DUTY NYLON STRAPS OR EQUAL FROM CENTRAL TRUNK TO THREE STAKES 1.5x ROOTBALL DIA. 3 THREE 2"x4"x8' P.T. WOOD STAKES MINIMUM 3" MULCH (SEE PLAN) SOIL BERM MULTI-STEM TREE PLANTING DETAIL NTS 3x TO 5x ROOTBALL DIA. PLANTING SOIL MIXED PER SPECIFICATIONS AS IDENTIFIED IN A SOIL REPORT AS SECURED BY THE LANDSCAPE CONTRACTOR AND CERTIFIED BY THE LANDSCAPE ARCHITECT. PROVIDE MINIMUM PIT CLEARANCE AROUND ROOTBALL 12" ALL SIDES AND 6" UNDER BOTTOM. ASSURE TOP OF ROOTBALL IS PLANTED 1 TO 2 INCHES ABOVE SURROUNDING GRADE. 4 MINIMUM 3" MULCH SEE PLAN MINIMUM 12" DEPTH OF PLANTING SOIL IN GROUNDCOVER PLANTING BEDS PLANTING SOIL MIXED PER SPECIFICATIONS AS IDENTIFIED IN A SOIL REPORT AS SECURED BY THE LANDSCAPE CONTRACTOR AND CERTIFIED BY THE LANDSCAPE ARCHITECT. ASSURE TOP OF ROOTBALLS ARE PLANTED 1 INCH ABOVE SURROUNDING GRADE. PROVIDE MINIMUM PIT CLEARANCE AROUND ROOTBALL OF 6" SIDES AND BOTTOM SHRUB/GROUNDCOVER PLANTING DETAIL NTS 5 EDGE OF PAVEMENT OR CURB SOD EDGE OF BEDLINE NOTE: CONTRACTOR SHALL ASSURE PERCOLATION OF ALL PLANTING PITS/BEDS PRIOR TO INSTALLATION AS SHOWN, SPACED EQUIDISTANT FROM EACH OTHER (AT SPACING SPECIFIED IN THE PLANT LIST) SHRUB/GROUNDCOVER SPACING PLAN NTS NOTE: THE PERIMETER OF ALL CURVED PLANTING BEDS SHALL BE PLANTED WITH A ROW OF SHRUBS AS SHOWN IN THE PLANS AND AT THE SPACING SHOWN IN THE PLANT LIST. INTERIOR PORTIONS OF EACH BED SHALL BE PLANTED AT APPROPRIATE SPACING ACCORDING TO THIS PLANT SPACING DETAIL. L-10 6/30/2016 4:04 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-planrd01.dwg

12 1" = 10' A A B B VALUES SHOWN ARE NOMINAL AND NOT TO BE USED FOR INSTALLATION PURPOSES. SEE PRODUCT SPECIFICATION FOR INSTALLATION REQUIREMENTS. L-11 6/30/2016 2:01 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-planrd01.dwg

13 1" = 20' MATCH LINE STA MATCH LINE STA I-1 6/28/2016 5:09 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-irrigation.dwg

14 1" = 20' (2) 2" 3608 HDPE IPS DIRECTIONAL BORES C " 3608 HDPE IPS DIRECTIONAL BORES 9.4 C3 MATCH LINE STA MATCH LINE STA ALL IRRIGATION EQUIPMENT SHALL BE INSTALLED WITHIN THE LANDSCAPE AREA. SHOWN OUTSIDE FOR CLARITY PURPOSES ONLY. MATCH LINE STA MATCH LINE STA I-2 Tofte, Shawn 7/1/ :37 AM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-irrigation.dwg

15 1" = 20' RM C S C2 C MATCH LINE STA MATCH LINE STA ALL IRRIGATION EQUIPMENT SHALL BE INSTALLED WITHIN THE LANDSCAPE AREA. SHOWN OUTSIDE FOR CLARITY PURPOSES ONLY. MATCH LINE STA MATCH LINE STA I-3 Tofte, Shawn 7/1/ :37 AM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-irrigation.dwg

16 1" = 20' RM MATCH LINE STA MATCH LINE STA ALL IRRIGATION EQUIPMENT SHALL BE INSTALLED WITHIN THE LANDSCAPE AREA. SHOWN OUTSIDE FOR CLARITY PURPOSES ONLY. 8.0 B1 S B RM MATCH LINE STA MATCH LINE STA EXIST. R/W I-4 Tofte, Shawn 7/1/ :40 AM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-irrigation.dwg

17 MATCH LINE STA " = 20' MATCH LINE STA MATCH LINE STA MATCH LINE STA I-5 6/28/2016 5:11 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-irrigation.dwg

18 1" = 20' RM 113 A A6 MATCH LINE STA MATCH LINE STA A MATCH LINE STA MATCH LINE STA ALL IRRIGATION EQUIPMENT SHALL BE INSTALLED WITHIN THE LANDSCAPE AREA. SHOWN OUTSIDE FOR CLARITY PURPOSES ONLY. I-6 6/28/2016 4:46 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-irrigation.dwg

19 1" = 20' S A MATCH LINE STA MATCH LINE STA A "&2" 3608 HDPE IPS DIRECTIONAL BORES 17.6 A3 4" 3608 HDPE IPS DIRECTIONAL BORES ALL IRRIGATION EQUIPMENT SHALL BE INSTALLED WITHIN THE LANDSCAPE AREA. SHOWN OUTSIDE FOR CLARITY PURPOSES ONLY. A MATCH LINE STA MATCH LINE STA I-7 6/28/2016 4:46 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-irrigation.dwg

20 1" = 20' IRRIGATION_SCHEDULE SYMBOL MANUFACTURER/MODEL QTY ARC PSI GPM RADIUS Rain Bird RD-12-S-P30-NP 15 Strip Series or approved equal 1 EST 'x15' Rain Bird RD-12-S-P30-NP 15 Strip Series or approved equal 9 LCS 'x15' Rain Bird RD-12-S-P30-NP 15 Strip Series or approved equal 10 RCS 'x15' Rain Bird RD-12-S-P30-NP 15 Strip Series or approved equal 37 SST 'x30' Rain Bird RD-12-S-P30-NP 8 Series MPR or approved equal ' Rain Bird RD-12-S-P30-NP 8 Series MPR or approved equal ' Rain Bird RD-12-S-P30-NP 8 Series MPR or approved equal ' Rain Bird RD-12-S-P30-NP 10 Series MPR or approved equal ' Rain Bird RD-12-S-P30-NP 12 Series MPR or approved equal ' Rain Bird RD-12-S-P30-NP 12 Series MPR or approved equal ' Rain Bird RD-12-S-P30-NP 12 Series MPR or approved equal ' Rain Bird RD-12-S-P30-NP 12 Series HE VAN or approved equal 1 Adj 30 12' Rain Bird RD-12-S-P30-NP 15 Series HE VAN or approved equal 1 Adj 30 15' Rain Bird RD-12-S-P30-NP 6 Series HE VAN or approved equal 6 Adj 30 6' Rain Bird RD-12-S-P30-NP HE VAN or approved equal 5 Adj 30 10' MATCH LINE STA MATCH LINE STA MATCH LINE STA Rain Bird RD-06-S-P30-NP 5 CST ' Two Rain Bird 1401 bubbler or approved equal ' SYMBOL MANUFACTURER/MODEL/ QTY A B RM C Rain Bird 100PGA in 12" Purple Valve Box or approved equal 11 Install a reclaimed water advisory sign by each group of control valves. Rain Bird ESP8LXME-LXMM-PED Metal Pedestal 3 Reclaim Water Meter 3 4" by others 3 Irrigation Lateral Line: PVC Class 160 Purple Irrigation Mainline: PVC 1-1/2" Schedule 40 Purple 2,000 l.f. 620 l.f. Pipe Sleeve: PVC Schedule 40 under new pavement and HDPE 3608 directional bore under existing pavement per FDOT specifications section 555 for pressurized pipes. Extend sleeves and bores 30" beyond edges of paving or construction. IRRIGATION CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN TAKE OFF I-8 6/28/2016 4:46 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-irrigation.dwg

21 1. THE PLANS AND DRAWINGS ARE DIAGRAMMATIC OF THE WORK TO BE PERFORMED. SOME COMPONENTS MAY BE SHOWN OUTSIDE THE WORK AREA FOR CLARITY. THE WORK SHALL BE EXECUTED IN A MANNER TO AVOID CONFLICTS WITH UTILITIES AND OTHER ELEMENTS OF CONSTRUCTION, INCLUDING LANDSCAPE MATERIALS. ALL DEVIATIONS FROM THE PLANS SHALL BE APPROVED BY THE OWNER'S REPRESENTATIVE BEFORE BEING INSTALLED. THE CONTRACTOR SHALL NOT WILLFULLY INSTALL ANY ASPECT OF THE IRRIGATION SYSTEM AS SHOWN ON THE PLANS AND DRAWINGS, WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS, GRADE DIFFERENCES, OR DISCREPANCIES EXIST THAT MIGHT NOT HAVE BEEN KNOWN DURING THE DESIGN OF THE IRRIGATION SYSTEM. IN THE EVENT THAT NOTIFICATION OF THE CONFLICT IS NOT APPROVED BY THE OWNER'S REPRESENTATIVE, THE CONTRACTOR WILL ASSUME FULL RESPONSIBILITY FOR ALL REVISIONS. PROVIDE MEASUREMENTS FROM 2 REFERENCE POINTS TO STUB UP ON THE AS-BUILD DRAWING 2. THE IRRIGATION SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE PLANS, IRRIGATION SYSTEM SPECIFICATIONS AND ALL CONTRACT DOCUMENTS. THE CONTRACTOR SHALL COMPLY WITH ALL PREVAILING LOCAL CODES, ORDINANCES, AND REGULATIONS. 3. CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS, INCLUDING UTILITY LOCATIONS, BEFORE INSTALLATION OF THE IRRIGATION SYSTEM. ALL UTILITIES AND STRUCTURES MAY NOT BE SHOWN ON THE PLANS - CONTRACTOR TO VERIFY. COORDINATE ALL IRRIGATION SYSTEM CONSTRUCTION WITH EXISTING AND NEW PLANTINGS TO AVOID CONFLICT OR INTERFERENCE WITH LOCATION OF PIPING, SLEEVING, CABLES, AND SERVICE UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING INSTALLATION WITH ALL OTHER CONSTRUCTION ON SITE, ESPECIALLY LANDSCAPE INSTALLATION. IRRIGATION SYSTEM SHALL BE RELOCATED AT NO ADDITIONAL COST FOR ANY CONFLICT WITH LANDSCAPE INSTALLATION OR ANY OTHER SITE CONSTRUCTION OR EXISTING CONDITIONS. ALL COMPONENTS THAT ARE NOT CONTAINED WITHIN THE SPECIFIC AREAS SHOWN OR CALLED OUT ON THE DRAWINGS WILL NOT BE ACCEPTED. ALL PIPING AND OTHER COMPONENTS ARE TO REMAIN WITHIN THE PROPERTY OF THE OWNER. 4. WHERE EXISTING OR NEW TREES, LIGHT STANDARDS, SIGNS, ELECTRONIC CONTROLLERS AND/OR OTHER OBJECTS ARE AN OBSTRUCTION TO AN IRRIGATION SPRINKLER'S PATTERN, THE COMPONENT AND PIPING SHALL BE RELOCATED AS NECESSARY TO OBTAIN PROPER COVERAGE OF AN IRRIGATION SPRINKLER'S PATTERN, THE COMPONENT AND PIPING SHALL BE RELOCATED AS NECESSARY TO OBTAIN THE PROPER COVERAGE WITHOUT DAMAGING THE OBSTRUCTION. OWNER'S REPRESENTATIVE SHALL DETERMINE WHETHER AN OBSTRUCTION OCCURS OR NOT. 5. COMPONENT SPACINGS ARE MAXIMUM. DO NOT EXCEED SPACINGS SHOWN OR NOTED ON THE PLANS. COMPONENT SPACINGS MAY BE ADJUSTED TO ACCOMMODATE CHANGES IN TERRAIN AND PLANTING LAYOUT AS LONG AS THE MODIFIED SPACINGS DO NOT EXCEED THE SPACINGS SHOWN IN THE PLANS. UNLESS SHOWN OTHERWISE, CONTRACTOR SHALL PROVIDE 100% COVERAGE. 6. ALL MATERIALS AND EQUIPMENT SHOWN SHALL BE NEW AND INSTALLED AS DETAILED ON THE PLANS. IF THE DRAWINGS DO NOT THOROUGHLY DESCRIBE THE TECHNIQUES TO BE USED, THE INSTALLER SHALL FOLLOW THE INSTALLATION METHODS AND INSTRUCTIONS RECOMMENDED BY THEIR MANUFACTURER. 7. THE LOCATION OF THE IRRIGATION MAINLINE SHALL BE IDENTIFIED IN THE FIELD AND APPROVED BY THE OWNER'S REPRESENTATIVE BEFORE INSTALLATION. 8. IRRIGATION CONTRACTOR SHALL ADJUST ALL SPRINKLERS, CONTROLLER AND OTHER DEVICES TO OBTAIN SPECIFIED OPERATING PARAMETERS, INCLUDING COVERAGE, OPERATING PRESSURE, FLOW RATES AND OPERATION TIME, AS INDICATED ON THE DRAWINGS AND IN THE IRRIGATION SYSTEM SPECIFICATIONS. 9. CONTRACTOR TO PROVIDE INSTALLATION SHOP DRAWINGS AND MANUFACTURER PRODUCT INFORMATION FOR ALL IRRIGATION COMPONENTS. ALL INSTALLATIONS SHALL BE AS RECOMMENDED BY MANUFACTURERS. THE QUANTITIES SHOWN IN THE LEGENDS AND SYMBOL S SHALL NOT BE USED FOR BIDDING PURPOSES. THE CONTRACTOR WILL BE RESPONSIBLE FOR CONDUCTING A COMPREHENSIVE MATERIALS TAKEOFF TO DETERMINE THE ACTUAL QUANTITIES OF MATERIAL NECESSARY TO EXECUTE THE WORK DESCRIBED IN THE DOCUMENTS. FINISH GRADE COMPACTED CLEAN FILL VARIABLE WIDTH 10. ALL TRENCHES SHALL BE BACKFILLED WITH CLEAN, DEBRIS-FREE MATERIALS. CLEAN SAND SHALL BE USED FOR BEDDING MATERIAL IF PARENT SOIL CANNOT BE ADEQUATELY RID OF ROCK AND OTHER EXTRANEOUS DEBRIS. PULLING PIPE SHALL BE PROHIBITED. 18" 12" POP-UP SPRAY HEAD INSTALLED AT FINISH GRADE 11. ALL SOLVENT WELDING SHALL BE PRECEDED BY PRIMING OF THE FITTINGS AND PIPE AS RECOMMENDED BY THE MANUFACTURER. 12. CONTRACTOR TO PLACE TREE BUBBBLERS AT OUTER EDGE OF ROOT BALL, NOT OUTER EDGE OF PLANTING HOLE. 13. THE OWNER SHALL DETERMINE FINAL LOCATION AND PROVIDE WATER METERS. 14.LOCATE ALL VALVES WITH A MINIMUM OFFSET OF 3'-0" FROM BACK OF CURB OR EDGE OF PAVEMENT. TOP OF IRRIGATION MAINLINE 18" BELOW FINISH GRADE TOP OF LATERAL LINE 12" BELOW FINISH GRADE ZONE LATERAL LINE LATERAL TEE FLEXIBLE PVC 1 2" S X MT ALL VALVES (SOLENOID, GATE, ISOLATION, AIR RELIEF AND FLUSH), SURGE PROTECTORS AND FILTERS SHALL BE LOCATED WITHIN THE SPECIFIED VALVE BOXES. 16. THE IRRIGATION CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR ALL SLEEVES AND DIRECTIONAL BORES. 17. ALL UNSIZED PIPE SHALL BE 3/4". 18.IRRIGATION LATERAL LINES TO BE BURIED AT A DEPTH OF 12" UNLESS NOTED OTHERWISE. NOTES: 1. DEPTH MEASUREMENTS ARE TO BE DONE FROM FINISH GRADE TO TOP OF PIPE. 2. PROVIDE A 6" MINIMUM VERTICAL SEPARATION BETWEEN MAINLINES AND LATERAL LINES. 3. ALL TRENCHES SHALL BE BACKFILLED WITH CLEAN SOIL FREE OF DEBRIS & NOXIOUS WEEDS. N.T.S. 19.IRRIGATION MAINLINES TO BE BURIED AT A DEPTH OF 18" UNLESS NOTED OTHERWISE. 20.CONTROLLERS, RAIN SENSOR, VALVES, MAINLINE, DIRECTIONAL BORES AND SLEEVE CROSSINGS INSTALLED BY THE IRRIGATION CONTRACTOR, SHALL BE LOCATED ON THE "AS-BUILT" DRAWINGS. LOCATION OF COMPONENTS SHALL HAVE DIMENSION OF LOCATION RELATIVE TO HAND POINTS ON SITE SHOWN ON THE "AS-BUILT" DRAWINGS. 21.IRRIGATION CONTRACTOR SHALL SECURE ANY AND ALL NECESSARY PERMITS FOR THE WORK PRIOR TO COMMENCEMENT OF HIS OPERATIONS ON-SITE. COPIES OF THE PERMITS SHALL BE SENT TO THE LANDSCAPE SUPERVISOR. WORK IN THE RIGHT OF WAY SHALL CONFORM TO THE STANDARDS AND SPECIFICATIONS OF LOCAL AND/OR STATE HIGHWAY JURISDICTION. 22. ALL RECLAIMED WATER IRRIGATION SYSTEM PIPING, FIXTURES AND DEVICES SHALL BE COLOR PATONE 522c. THE PATONE COLOR SHALL BE ADDED AS A PIGMENT TO THE MATERIAL AT THE TIME OF MANUFACTURE. FIELD INSTALLED PATONE CAPS WILL NOT BE PERMITTED ON NEW INSTALLATIONS. 23. IRRIGATION CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF THE ELECTRICAL SERVICE FOR THE IRRIGATION CONTROLLERS. IRRIGATION CONTRACTOR SHALL COORDINATED THE ELECTRICAL SERVICE INSTALLATION WITH THE ELECTRICAL SERVICE PROVIDER. IRRIGATION CONTRACTOR SHALL COORDINATE THE LOCATION OF THE IRRIGATION CONTROLLER WITH CITY PERSONNEL. R.O.W. HDPE PIPES ROADWAY 3' MINIMUM DEPTH SIDEWALK CROSS SECTION R.O.W. I-9 6/28/2016 5:14 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-irrigation.dwg

22 N 1" = 20' MATCH LINE STA MATCH LINE STA REVISIONS LANDSCAPE LIGHTING PLAN E-1 6/30/2016 3:39 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

23 N 1" = 20' MATCH LINE STA MATCH LINE STA MATCH LINE STA MATCH LINE STA REVISIONS LANDSCAPE LIGHTING PLAN E-2 6/30/2016 3:39 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

24 N 1" = 20' MATCH LINE STA MATCH LINE STA MATCH LINE STA MATCH LINE STA MH: 18 REVISIONS LANDSCAPE LIGHTING PLAN E-3 6/30/2016 3:39 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

25 1" = 20' MATCH LINE STA MATCH LINE STA MATCH LINE STA MATCH LINE STA EXIST. R/W E-4 Tofte, Shawn 7/1/ :05 AM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

26 1" = 20' N MATCH LINE STA MATCH LINE STA MH: MH: MH: MATCH LINE STA MATCH LINE STA REVISIONS LANDSCAPE LIGHTING PLAN E-5 6/30/2016 3:40 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

27 N 1" = 20' MATCH LINE STA MATCH LINE STA MATCH LINE STA MATCH LINE STA REVISIONS LANDSCAPE LIGHTING PLAN E-6 6/30/2016 3:40 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

28 N 1" = 20' MATCH LINE STA MATCH LINE STA MATCH LINE STA MATCH LINE STA REVISIONS LANDSCAPE LIGHTING PLAN E-7 6/30/2016 3:40 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

29 N 1" = 20' SLC MATCH LINE STA MATCH LINE STA SLC SLC MATCH LINE STA MATCH LINE STA REVISIONS LANDSCAPE LIGHTING PLAN E-8 6/30/2016 3:40 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

30 1" = 20' N MATCH LINE STA MATCH LINE STA SLC SLC SLC MATCH LINE STA MATCH LINE STA SLC REVISIONS LANDSCAPE LIGHTING PLAN E-9 6/30/2016 3:40 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

31 1" = 20' MATCH LINE STA MATCH LINE STA SLC SLC SLC SLC MATCH LINE STA MATCH LINE STA N REVISIONS LANDSCAPE LIGHTING PLAN E-10 6/30/2016 3:40 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

32 SLC2-208 N 1" = 20' SLC MATCH LINE STA MATCH LINE STA REVISIONS LANDSCAPE LIGHTING PLAN E-11 6/30/2016 3:41 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

33 Landreth Lighting Luminaire Schedule Symbol [MANUFAC] Qty Label Arrangement Description LLF Lum. Watts Lum. Lumens BUG Rating SUN VALLEY LIGHTING 30 BACK-BACK LCAC-PM-APA-V-80LED-NW 350mA 277v 180-RAL9005-S-20SP-CP; POLE 16' AFG ON A 36SB-RNTA PT27 (MOD 11.5 IN BC-BBA30(2)-BREAKAWAY BOLTS AND SKIRT B3-U3-G3 SUN VALLEY LIGHTING 9 SLC2-208 BACK-BACK LCAC-PM-APA-V-80LED-NW 350mA 208v 180-RAL9005-S-20SP-CP; POLE 16' AFG ON A 36SB-RNTA PT27 (MOD 11.5 IN BC-BBA30(2)-BREAKAWAY BOLTS AND SKIRT B3-U3-G3 REVISIONS LANDSCAPE LIGHTING CUT S E-12 6/30/2016 3:41 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

34 REVISIONS LANDSCAPE LIGHTING CUT S E-13 6/30/2016 3:41 PM \\vhb\proj\orlando\ festival drive\cad\te\ festivaldr\landscp\la-lighting.dwg

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information

ARTICLE 4 RIGHT-OF-WAY UTILIZATION

ARTICLE 4 RIGHT-OF-WAY UTILIZATION RIGHT-OF-WAY UTILIZATION Index 4.01 GENERAL 4.02 DEFINITIONS 4.03 EXCLUSIONS 4.04 GENERAL REGULATIONS 4.05 RESTORATION AND MAINTENANCE 4.06 UTILITY ACCOMMODATION 4.07 INSPECTION 4.08 OPERATIONAL SAFETY

More information

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016

St. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 St. Johns River State College BID-SJR-10-2016 Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 TO BID-SJR-10-2016 Bid Specifications/Project Manual (Plans) PARKING LOT REHABILITATION PROJECT FOR: DRAWING

More information

DEPARTMENT OF TRANSPORTATION

DEPARTMENT OF TRANSPORTATION THIS PROJECT TO BE LET TO CONTRACT WITH FINANCIAL PROJECT ID 3875-3-5-0 CHIPLEY 0 95 75 TALLAHASSEE PENSACOLA CONTRACT PLANS JACKSONVILLE 0 FORT WALTON BEACH 95 PANAMA CITY CITY ST AUGUSTINE GAINESVILLE

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. A. AN APPLICANT S GUIDE TO PROCEDURES FOR: B. C. D.

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

PARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS

PARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS PARKING LOT REHABILITATION PROJECT FOR: DRAWING INDE SHEET NO. DRAWING TITLE C. COVER SHEET C1. - C1.17 PALATKA CAMPUS C4. CONSTRUCTION DETAILS PROJECT SITE PROJECT SITE C. 8 4 8 16 32 1 inch = 8 ft. C1.16

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

EXISTING TREE (TYP.) PRUNE TREES IN ACCORDANCE WITH NATIONAL ARBORIST ASSOCIATION STANDARDS TO ACHIEVE PROPER HEALTH AND A UNIFORM MASS.

EXISTING TREE (TYP.) PRUNE TREES IN ACCORDANCE WITH NATIONAL ARBORIST ASSOCIATION STANDARDS TO ACHIEVE PROPER HEALTH AND A UNIFORM MASS. JOHNSON ST P.O. BOX 550 FORT MYERS, FLORIDA 3390-550 PHONE (39) 334-0046 FAX (39) 334-366 E.B. #64 & L.B. #64 EXISTING (TYP.) AT ALL ROADWAY INTERS DIAGRAM ABOVE SHALL APPLY (FDOT INDEX NO. 546) dl = 40'

More information

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

PERMANENT RESIDENTIAL UNDERGROUND SERVICE CITY OF RICHLAND ENERGY SERVICES DEPARTMENT 505 Swift Boulevard, MS-21 Richland, WA 99352 Telephone (509) 942-7403 Fax (509) 942-7405 PERMANENT RESIDENTIAL UNDERGROUND SERVICE A. INTRODUCTION This guide

More information

AMENDED CULVERT POLICY WITH MAIL BOX POLICY

AMENDED CULVERT POLICY WITH MAIL BOX POLICY AMENDED CULVERT POLICY WITH MAIL BOX POLICY REVISED MARCH 28, 2017 COMMISSIONERS COURT ORDER NO. 17-03-168 POLICY ACCEPTANCE AGREEMENT This page is to be signed by the Requesting Party and returned in

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

5. Underground Requirements

5. Underground Requirements Un d e rg ro u n d Re q u ire me n ts Section 5 2016 Electric Service Requirements, 3rd Edition Section 5 Underground Requirements Directory Page 5.1 General 34 5.2 Conduit Requirements 34 5.3 Trench and

More information

Spray and Rotary Nozzles

Spray and Rotary Nozzles Spray and Rotary Nozzles Introduction Spray Bodies Rotors Valves Controllers Central Controls Landscape Drip Pumps & Filtration Drainage Products Resources Major Products Water Saving Tips HE-VAN nozzles

More information

UTILITY CROSSING DETAIL

UTILITY CROSSING DETAIL 6" OF CSBC COMPACTED TO A FIRM AND UNYIELDING CONDITION. NOTE: - SILT FENCE SHALL CONFORM TO 8-01.3(9)A - SILT FENCES SHALL BE INSTALLED ALONG CONTOUR WHENEVER POSSIBLE. - POST SPACING MAY BE INCREASED

More information

For Conduit Inspections

For Conduit Inspections Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit

More information

ANDERSON DRIVE & LANDSCAPE 10'-0" PUE SETBACK BUILDING SETBACK SIGN 20'-0" ENTRY /EXIT 71'-3" CHILD CARE CENTER 4,700 S.F. EXIT EXIT PLAYGROUND

ANDERSON DRIVE & LANDSCAPE 10'-0 PUE SETBACK BUILDING SETBACK SIGN 20'-0 ENTRY /EXIT 71'-3 CHILD CARE CENTER 4,700 S.F. EXIT EXIT PLAYGROUND SI GNAGE LANDSCAPE SETBACK T COMPACT 8'-0" 16'-0" LOCATION LIGHT POST LIGHT POST NEW STREET (E) STREET RELOCATE CL 36'-0" SHARED DRIVEWAY 20'-0" 6'-0" TRASH ENCLOSURE, SEE DETAIL 1/DR-2.1 20'-0" 20'-0"

More information

Spray and Rotary Nozzles

Spray and Rotary Nozzles Introduction Spray Bodies Rotors Valves Controllers Central Controls Landscape Drip Pumps Drainage Products Resources Major Products Water Saving Tips HE-VAN nozzles are fully adjustable from 0 to 360

More information

VALVES, FIRE HYDRANTS, AND APPURTENANCES

VALVES, FIRE HYDRANTS, AND APPURTENANCES VALVES, FIRE HYDRANTS, AND APPURTENANCES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Butterfly Valves B. Gate Valves C. Tapping Valve Assemblies D. Fire Hydrant Assemblies E. Flushing Devices (Blowoffs)

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES This document is a summary of the Douglas County regulations and policies for constructing residential driveways. It is intended

More information

SITE PLANS ASSISTED LIVING REDEVELOPMENT

SITE PLANS ASSISTED LIVING REDEVELOPMENT SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

SECTION 17 FIRE HYDRANT ASSEMBLIES General

SECTION 17 FIRE HYDRANT ASSEMBLIES General SECTION 17 FIRE HYDRANT ASSEMBLIES 17-1.01 Scope 17-1 General This section describes the requirements for furnishing and installing as appurtenances to treated water mains. These requirements include the

More information

3. Application Fees, Certificate Of Insurance & Performance Bond

3. Application Fees, Certificate Of Insurance & Performance Bond SUBSECTION 13.10 CONSTRUCTION OF DRIVEWAYS 13.10A PERMIT REQUIREMENTS 1. General A driveway or access road serving private property and intersecting with a town road shall be constructed in such a manner

More information

SALEM CITY POWER ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

SALEM CITY POWER ELECTRICAL REQUIREMENTS & STANDARDS MANUAL SALEM CITY POWER DEPARTMENT TABLE OF CONTENTS Section 1 General Requirements Purpose...1.1 Codes and Ordinances...1.1 Changes or Conflicts in Requirements and Guidelines...1.1 Application for Service...1.2

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

RESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering

RESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering 1036 20 TH ST. PO BOX 1389 VERO BEACH, FLORIDA 32961-1389 TELEPHONE: (772) 978-5100 FAX: (772) 978-5125 Important Notice to Builders/Contractors/Developers From Electrical Engineering You must contact

More information

REQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES

REQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES REQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES The City of Abbeville, South Carolina is soliciting sealed proposals for Fire Hydrant Maintenance Services. All proposals must be in writing and

More information

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET

More information

Matched Precipitation Rate (MPR) Nozzles

Matched Precipitation Rate (MPR) Nozzles Tech Spec Matched Precipitation Rate (MPR) Nozzles Primary Application Matched Precipitation Rate (MPR) Nozzles simplify the design process by allowing sprinklers with various arcs and radii to be mixed

More information

DESIGN STANDARDS SECTION DS 3 STREETS

DESIGN STANDARDS SECTION DS 3 STREETS DESIGN STANDARDS SECTION DS 3 STREETS DS 3-01 GENERAL: A. INTENT: The intent of these Design Standards is to provide minimum standards for the design of public streets. These standards are intended to

More information

KENT COUNTY ROAD COMMISSION

KENT COUNTY ROAD COMMISSION KENT COUNTY ROAD COMMISSION Rules to regulate driveways, banners and parades upon and over public highways under the jurisdiction of the Board of County Road Commissioners of the County of Kent. Promulgated

More information

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL Submit To Martin County Judge s Office P.O. Box 1330 Stanton Texas 79782-1330 mhernandez@co.martin.tx.us APPLICATION: Permittee

More information

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION WATER DISTRIBUTION VALVES

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION WATER DISTRIBUTION VALVES SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 33 12 16 WATER DISTRIBUTION VALVES PART 1 GENERAL... 2 1.1 Description... 2 1.2 Reference Specifications, Codes, and

More information

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic

More information

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS Section Page 12-1 GENERAL...12.1 12-2 FLAGGING...12.1 12-2.01 Flaggers...12.1 12-2.02 Flagging Costs...12.1 12-3 TRAFFIC-HANDLING EQUIPMENT

More information

PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS

PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS To review the proposed amendments Approval of the amendments (5-3) Ogden City Planning is proposing several amendments and clarifications to the parking

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

Underground Gas Polyethylene (PE) Piping

Underground Gas Polyethylene (PE) Piping Underground Gas Polyethylene (PE) Piping Installation Guide February, 2011 Featuring the Con-Stab I.D. Seal Fittings from Continental Industries, Inc. ASSEMBLY INSTRUCTIONS: I.D. SEAL CON-STAB STEP 1 Verify

More information

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections Page 1 of 7 17-02-420 Electric Service Conversion Overhead-to-Underground Overview and process of converting residential

More information

SECTION VIII. (Sub-section 430) Wastewater Valves and Appurtenances. 1. General thru Gate Valves thru 430-3

SECTION VIII. (Sub-section 430) Wastewater Valves and Appurtenances. 1. General thru Gate Valves thru 430-3 SECTION VIII (Sub-section 430) Wastewater Valves and Appurtenances Article Page 1. General 430-1 thru 430-2 2. Gate Valves 430-2 thru 430-3 3. Plug Valves 430-3 thru 430-4 4. Check Valves 430-4 5. Tapping

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

SECTION FIRE HYDRANTS WITH HYDRANT LOCKS

SECTION FIRE HYDRANTS WITH HYDRANT LOCKS SECTION 33 12 19 FIRE HYDRANTS WITH HYDRANT LOCKS PART 1: GENERAL 1.01 SCOPE A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33

More information

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62: 1365 S. Camino del Rio Durango, CO 81303 970-382-6363 DRIVEWAY STANDARDS Resolution 2014-40 EXHIBIT A The following definition shall replace the definition of driveway in Section 62: Driveway means a roadway,

More information

77'-0" 77'-0" 40'-4" 9'-0" 0'-0" 1'-4" Site Plan Maximum Impervious Coverage Scale: /2"=1'-0" SET BACK (REAR) SET BACK (FRONT) 140'-0" 60'-8" 52'-4" 27'-0" 11'-8" 11'-8" 8'-8" 1'-8" FUTURE POOL POOL DECK

More information

570Z Series. Reliability is simply stated in. 570Z Series 20 years of solid. performance. Add to that its. extensive product line offering and

570Z Series. Reliability is simply stated in. 570Z Series 20 years of solid. performance. Add to that its. extensive product line offering and 570Z Series S P R I N K L E R S RESIDENTIAL COMMERCIAL Reliability is simply stated in 570Z Series 20 years of solid performance. Add to that its extensive product line offering and you have a successful

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

Moraga-Orinda Fire District

Moraga-Orinda Fire District Moraga-Orinda Fire District Fire Prevention Division Subject: Fire Apparatus Access Roads Approved by: Fire Marshal Kathy Leonard Reference: CFC 2016, MOFD Ordinance 16-02 Standard Number: 2016.503 Effective

More information

DRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group

DRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group DRIVEWAY GUIDE June 2017 TABLE OF CONTENTS Definitions Building Requirements Material Standards Drainage Administrative Requirements Zoning Requirements Yard Requirements Design Requirements Public Ways

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) CFS:TEH 1 of 10 APPR:KPK:JFS:07-07-16 FHWA:APPR:07-15-16 a. Description. This

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 07-5424 AN ORDINANCE OF THE CITY OF BILLINGS, PROVIDING THAT THE BILLINGS, MONTANA CITY CODE BE AMENDED BY REVISING SECTION 6-1208; PROVIDING CHANGES TO CERTAIN CURB CUT LENGTHS AND REGULATIONS.

More information

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION CONTRACT PLANS FINANCIAL PROJECT ID (FEDERAL FUNDS) SEMINOLE COUNTY (77320)

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION CONTRACT PLANS FINANCIAL PROJECT ID (FEDERAL FUNDS) SEMINOLE COUNTY (77320) CHIPLEY 7 CONTRACT PLANS PENSACOLA FORT WALTON BEACH PANAMA CITY TALLAHASSEE LAKE CITY JACKSONVILLE ST AUGUSTINE GAINESVILLE INDEX OF LIGHTING PLANS FINANCIAL PROJECT ID 000---0 OCALA DELAND DAYTONA BEACH

More information

2011 LOCAL STREET IMPROVEMENTS

2011 LOCAL STREET IMPROVEMENTS 11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE

More information

Georgia Public Service Commission

Georgia Public Service Commission COMMISSIONERS: ROBERT B. BAKER, JR., CHAIRMAN CHUCK EATON H. DOUG EVERETT ANGELA ELIZABETH SPEIR STAN WISE DEBORAH K. FLANNAGAN EXECUTIVE DIRECTOR REECE McALISTER EXECUTIVE SECRETARY (404) 656-4501 1-(800)

More information

DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS

DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS PRELIMINARY ENGINEERING PLANS DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS ERIC CARLSON ARCHITECTS LOCATION MAP DRAWINGS INDE CONTACTS REV DATE NOT TO SCALE BENCHMARKS CRISSEY AVENUE IL ROUTE 38

More information

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair 1. Objective: 1.1. To repair the sewer main in a timely and efficient manner, minimizing disruption

More information

CHAPTER 140 DRIVEWAYS

CHAPTER 140 DRIVEWAYS CHAPTER 140 DRIVEWAYS 140.01 Purpose 140.10 Driveway Location 140.02 Definitions 140.11 Driveway Maintenance 140.03 Driveway Construction 140.12 Failure To Maintain 140.04 Driveway Surfaces 140.13 Permit

More information

PROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9.

PROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9. LAND USE: VACANT AND ELECTRICAL TRANSMISSION LINES GENERAL PLAN: PLANNED COMMUNITY ZONING: PC (CDP04-01) UTILITIES 3' WIDE BIOFILTRATION WITH UNDERDRAIN. TOP ELEVATION AT 3" BELOW PARKING LOT SURFACE SITE

More information

Special Specification 7010 Debris Removal and Disposal

Special Specification 7010 Debris Removal and Disposal Special Specification 7010 Debris Removal and Disposal 1. DESCRIPTION Provide emergency removal and disposal of debris from the highway right of way which is created by a hurricane or other type of natural

More information

COMMERCIAL QUICK REFERENCE

COMMERCIAL QUICK REFERENCE COMMERCIAL QUICK REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2016 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION. 18" MIN. OF TAIL. (NEUTRAL CONDUCTOR MUST BE WHITE OR

More information

Removal of Underground Storage Tanks (UST) Encountered during Construction

Removal of Underground Storage Tanks (UST) Encountered during Construction Removal of Underground Storage Tanks (UST) Encountered during Construction Technical Guide Environmental Affairs Division TxDOT Environmental Affairs Division Release Date: 2/2014 510.06.GUI Version 1

More information

City of Grand Island Tuesday, February 13, 2018 Council Session

City of Grand Island Tuesday, February 13, 2018 Council Session City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

Revised DEC STATE OF OKLAHOMA GARFIELD COUNTY PUBLIC SERVICE/PIPELINE OWNER LINE INSTALLATION

Revised DEC STATE OF OKLAHOMA GARFIELD COUNTY PUBLIC SERVICE/PIPELINE OWNER LINE INSTALLATION Revised DEC. 2013 STATE OF OKLAHOMA GARFIELD COUNTY PUBLIC SERVICE/PIPELINE CROSSING LINE INSTALLATION Permit# We, the undersigned, hereby petition the Garfield County Board of Commissioners to grant a

More information

STANDARD DRAWING INDEX

STANDARD DRAWING INDEX ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard

More information

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 APPLICATION/PERMIT TO INSTALL ACCESS DRIVEWAY TO A COUNTY TRUNK HIGHWAY

More information

Commercial Electric Service Handbook

Commercial Electric Service Handbook Commercial Electric Service Handbook January 2011 CONTACTS Clark Public Utilities: Website........................................... www.clarkpublicutilities.com Construction Services department (To initiate

More information

UNDERGROUND SERVICES - SECONDARY

UNDERGROUND SERVICES - SECONDARY UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service

More information

570Z Series Fixed-Spray Sprinklers and MPR Plus Spray Nozzles

570Z Series Fixed-Spray Sprinklers and MPR Plus Spray Nozzles S P I N K L E S SpecSheet 570Z Series Fied-Spray Sprinklers and MP Plus Spray s Advanced fied-spray performance. 570Z Series sprinklers are ideal for small turf areas and intricate designs. These sprinklers

More information

Installing or Rebuilding Your Electric Service

Installing or Rebuilding Your Electric Service Installing or Rebuilding Your Electric Service 2 3 Contents Policies for New and Rebuilt Electric Service 2-4 Paperwork and fees...2 Five-year policy...3 Proposed route location and conditions...3 Construction

More information

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES

DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES These guidelines are provided to assist you in the construction of your driveway to help you determine: The best location on your property. What you need to

More information

WSB clean: Installation Manual

WSB clean: Installation Manual WSB clean: Installation Manual Models: WSB 400 WSB 1250 WSB 500 WSB 1500 WSB 600 WSB 1600 WSB 750 WSB 1800 WSB 1000 TABLE OF CONTENTS 1 INTRODUCTION...3 2 SAFETY INFORMATION...3 3 WSB CLEAN SYSTEM OPERATION...4

More information

HARDEE COUNTY ROAD AND BRIDGE DEPARTMENT Driveway-Culvert Installation Permit

HARDEE COUNTY ROAD AND BRIDGE DEPARTMENT Driveway-Culvert Installation Permit 1 HARDEE COUNTY ROAD AND BRIDGE DEPARTMENT Driveway-Culvert Installation Permit The word Applicant shall mean Person or Persons as defined per Hardee County Ordinance No. 2010-09, as individuals, firms,

More information

GB-250. Submittal Specifications Installation Application Specific Details

GB-250. Submittal Specifications Installation Application Specific Details GREASE INTERCEPTOR TECHNICAL DATA Submittal Specifications Installation Application Specific Details 68" (1,727 mm) 13½" (343 mm) 51½" (1,308 mm) 38" (965 mm) SUBMITTAL 33½" (851 mm) STANDARD: 4" plain

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

Initial Start-Up. What We Will Cover

Initial Start-Up. What We Will Cover 03 03 Initial Start-Up Once you have a firm grasp on the components of the assembly head and drip line, it s time for the initial installation. When installing your head assembly, there are a few different

More information

CITY OF ESCONDIDO Planning Division 201 North Broadway Escondido, CA (760) Fax: (760)

CITY OF ESCONDIDO Planning Division 201 North Broadway Escondido, CA (760) Fax: (760) CITY OF ESCONDIDO Planning Division 201 North roadway Escondido, CA 92025-2798 (760) 839-4671 Fax: (760) 839-4313 PARALLEL PARKING PERMIT FOR INTERNAL USE ONLY Case No: Date Submitted: Fees Submitted:

More information

Chapter PARKING REGULATIONS

Chapter PARKING REGULATIONS 17.112.010 Chapter 17.112 PARKING REGULATIONS Sections: 17.112.010 Scope of Regulations Applicability. 17.112.020 Schedule of Off-Street Parking Requirements. 17.112.030 Off-Street Loading Requirements.

More information

SIDEWALK CAFE AND PARKING PATIO GUIDELINES

SIDEWALK CAFE AND PARKING PATIO GUIDELINES SIDEWALK CAFE AND PARKING PATIO GUIDELINES The following guidelines establish requirements for the licensing and operation of Sidewalk Cafes and Parking Patios located on City of Saskatoon right-of-way

More information

DRIVEWAY/SIDEWALK PERMIT APPLICATION

DRIVEWAY/SIDEWALK PERMIT APPLICATION JOB INFORMATION CITY OF ALEXANDRIA 704 Broadway Alexandria, MN 56308 Phone: 320-763-6678 Fax: 320-763-3511 DRIVEWAY/SIDEWALK PERMIT APPLICATION Permit Fee: $50.00 Deposit: $300.00 PERMIT NUMBER: ROW DATE:

More information

ONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report

ONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report ONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report These instructions are for homeowners and inspectors completing the onsite wastewater treatment system

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

U:\0-PROJECT\Groton - sidewalk\main STREET\MAIN ST CONST-PLAN.dwg, 4/26/ :07:22 AM, AutoCAD PDF (General Documentation).pc3

U:\0-PROJECT\Groton - sidewalk\main STREET\MAIN ST CONST-PLAN.dwg, 4/26/ :07:22 AM, AutoCAD PDF (General Documentation).pc3 ' MIN 1.0% FROM STA 8+80 TO STA 9+0 STA 1+40 TO STA 11+00 STA 119+0 TO STA 10+4 CURB TYPE OVER H BINDER VARIED PROP.." H OVER 8" GRAVEL TYPE C 1:1. :1 PROP. GRANITE CURB TYPE VA, IN REVEAL OVER MIN. DEPTH

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION Roseville Electric SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION REVISED 04/25/18 Specifications for Residential Construction Revision List REVISION Date Page No. Description 03/20/00 6.1-6.2 Added Armorcast

More information

DIG Corporation Irrigation product Specifications

DIG Corporation Irrigation product Specifications DIG Corporation Irrigation product Specifications SECTION 02810 Part 2 Products IRRIGATION SYSTEMS 2.1 Automatic Irrigation Controller [Light][Solar] Irrigation controllers shall be single, solid-state

More information

SITE ACCESS EQUIPMENT

SITE ACCESS EQUIPMENT SITE ACCESS EQUIPMENT THE LEADING PRODUCER & DISTRIBUTOR OF TRENCH SHIELDING & SHORING EQUIPMENT SINCE 1995 ROAD PLATES Designed with ease of use in mind, Pro-Tec Equipment s Steel Road Plates include

More information

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension Appendix C 5% Design Plan and Profile Drawings/ Additional Design Information The 5% plan and profile drawings were provided in a separate volume with the Draft Local EA and have not changed. Hard copies

More information

SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS

SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS Kitsap County Public Works July 2019 If you have any questions regarding the Standards or have recommendations for improvement, please contact: Sarah Olson

More information

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair 1. Objective: 1.1. To repair the sanitary sewer connection in a timely and efficient

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information