RTC UPWP /11 TRUCK TRAFFIC DATA COLLECTION PROJECT
|
|
- Cecil Bryan
- 5 years ago
- Views:
Transcription
1 Venki Muthukumar (PI) Mukund Dangeti (Co-PI) Dr.Beth Xie (PM,RTC) RTC UPWP /11 TRUCK TRAFFIC DATA COLLECTION PROJECT
2 Project Budget Total Cost of the Project: $62,500 (RTC) + $13,000 (UTC) Other Cost: $24,000 (UNLV ECE GA Support) Project DuraNon: Aug 2009 July Project Approved: June 2009 Project Start Date (PI/Co- PI): Aug 2009 Project Start Date (RTC/UNLV): Jan 2010 Project End Date: July 2010.
3 Main ObjecNves The main objecnves of the proposed project include: An accurate evaluanon of current volume of freight movement by trucks on major roadway routes in and around the Las Vegas valley. Determine minimum, maximum and average truck counts by roadway segments, Nme, days and months. Determine average speed of the trucks by roadway segments, lane, Nme, day and month. Raw data delivery and CSV format data for modeling freight movements and facility planning. Comprehensive report of the work conducted
4 IniNal Research Methodology Use video based data collecnon to determine freight traffic in the Las Vegas Valley. Use Transresearch Data and Traffic Analysis Zones to idennfy locanon for video based data collecnon. Use Autoscope or Iteris video based data collecnon tools to determine the freight / Truck count, speed and other traffic parameters.
5 IdenNfy LocaNon based on
6 Mapping of FAST Sensors in ARCGIS & Google Earth
7 FAST FMS Data TIMESTAMP, PATH, ROADINDEX, ROADWAYID, SEGMENTID, LANE, DEVICEID, VOLUME, VOLUME 1-6, Etc.
8 y = 66.41x R² = Plot of total volume for path- roadwayid- DeviceID (1-2- 1) for the month ;2;1 Linear(1;2;1) y = x R² = Plot of truck volume (>=50 n) for path- roadwayid- DeviceID (1-2- 1) for the month ;2;1- T ;2;1- T Linear(1;2;1- T) Plohng of ExtracNon Data
9 Camera & Sensor LocaNons
10 Video Data CollecNon LocaNon 2- Jun 12:00 PM 4:00 PM 207 PoinNng West direcnon capturing Westbound Traffic Jun 12:00 PM 4:00 PM 209 PoinNng East direcnon capturing Westbound Traffic Jun 11:15 AM 3:15 PM 305 PoinNng South direnon capturing Northbound Traffic Jun 11:15 AM 3:15 PM 307 PoinNng North direcnon capturing Southbound Traffic Jun 11:00 AM 3:00 PM 123 PoinNng East direcnon capturing Westbound Traffic Jun 11:36 AM 3:36 PM 125 PoinNng East direcnon capturing Westbound Traffic Jun 106 PoinNng North direcnon capturing Southbound Traffic Jun 108 PoinNng North direcnon capturing Southbound Traffic 24
11 UPWP Database Design Cmd line only
12 UPWP MYSQL DATABASE Upload CSV files from FMS or VMS data extracted files (pre- processing required)
13 FMS Query Window Load KML file to see locanon of sensors
14 VMS Query Window
15 Query on FMS
16 Query on VMS
17 Extracted Data from FMS I- 15 : 132 South Bound Path & 134 North Bound Path US- 95: 133 South Bound Path & 106 North Bound Path I- 515: 99 South Bound Path & 131 North Bound Path
18 Analysis of Data Extracted from Query I- 515: 99 South Bound Path May Jun Jul Aug Sep Oct Nov Dec Total Traffic Truck (>50n) Traffic I- 515: 99 South Bound Path May Jun Jul Aug Sep Oct Nov Dec 99
19 2008 (May Dec) All Traffic May Jun Jul Aug Sep Oct Nov Dec
20 2008 (May Dec) Truck Traffic May Jun Jul Aug Sep Oct Nov Dec
21 2009 (Jan Dec) All Traffic Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
22 2009 (Jan Dec) Truck Traffic Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
23 Compare 2008/2009 All Traffic vs Truck Traffic (total) Truck Traffic All Traffic
24 Compare 2008/2009 All Traffic vs Truck Traffic (Avg. volume/month) All Traffic Truck Traffic
25 CAMID DEVICEID Mapping :35 15: :47 15: :01 16: :02 16: :15 15: :15 15: E 68, 74*, 152* 123W 63, 67, 73*, 151* 209W 209, 223* 207E 110, 112, 116, 114, 198* 305N 307S I515 NB between I515 NB Charleston On- Ramp and I515 NB Eastern R- OFF I515 NB near 21st Street and 19th Street I515 SB between I515 SB LV Blvd On- Ramp and I515 SB Eastern R- OFF I515 NB between I515 NB Casino Ctr On- Ramp and US- 95 NB to I- 15 SB Ramp I515 SB between I- 15 NB to US- 95 SB Ramp and I- 15 SB to US- 95 Ramp SB North of Rancho Dr SB North of S Decatur Ave SB South of N Rainbow Rd SB North of Washington Ave NB North of E Wyoming Ave SB North of E Wyoming Ave US- 95 SB VALLEY VIEW ON SB US- 95 NB TORREY PINES NB US- 95 NB NB RAINBOW OFF
26 VMS Data CollecNon CAMID DATE STIME ETIME Volume ClassA ClassB ClassC ClassD ClassE TCLASS AVOL TRUCK* :35 15: :47 15: :01 16: * :02 16: :15 15: :15 15: * Class A:<20, ClassB:<30, ClassC:<60, ClassD:<90,ClassE: >90
27 FMS VMS Data Compared VMS Data for 6/15/2010 5hrs (~11 AM - ~ 4 PM) :35 15: * :47 15: * FMS Data for 6/15/ hrs (12 AM 12 PM) VMS performs bever for total volume/count VMS uses built- in vehicle classifier AVOL ~ * ~ ~ * 0* 0* ~ * 0* 0* FMS Data for 6/15/2010 5hrs (12 AM 5 PM) FMS has data reliability issues :00 17: ~ :00 17: ~
28 Future Research More comprehensive VMS data collecnon is required. VMS data collecnon on non- FMS data collecnon paths can be pursued Permanent VMS data collecnon stanons can be installed. Professional data extracnon system need to be developed.
Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow
Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationAutomated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune
Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune 2016 TRB Managed Lanes Conference May 5th, Session 6 Presentation Background Outline Metro ExpressLanes
More informationRed Light Cameras in Austin. Austin Police Department Highway Enforcement Command
Red Light Cameras in Austin Austin Police Department Highway Enforcement Command video MLK WB/I35 EF SB Video 2014 Red Light Violations Ø 10 camera approaches (direction of cameras) in Austin throughout
More informationUp and Down Months of the Stock Market
Up and Down Months of the Stock Market 1926-2017 Positive years (66) in the stock market were not good all year long and losing years (24) were not losers throughout the year. Winning years produce losing
More informationCLEARWATER POLICE DEPARTMENT. Traffic Safety Improvement Program July 1, 2012 to June 30, 2014
CLEARWATER POLICE DEPARTMENT Traffic Safety Improvement Program July 1, 2012 to June 30, 2014 Red Light Cameras were installed at two intersections to help reduce the number of red light running crashes
More informationTRAFFIC VOLUME TRENDS July 2002
TRAFFIC VOLUME TRENDS July 2002 Travel on all roads and streets changed by +2.3 percent for July 2002 as compared to July 2001. Estimated Vehicle-Miles of Travel by Region - July 2002 - (in Billions) West
More informationWIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT
WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT In order to understand the vehicle classes and groupings the Mn/DOT Vehicle Classification Scheme and the Vehicle Classification Groupings
More informationBuffalo Drive Road Safety Audit
UPWP Task 6410-11 Contract No: 11-050 Buffalo Drive Road Safety Audit CC 215 to Blue Diamond Road (SR 160) PRE CONSTRUCTION PHASE AUDIT Prepared for: Regional Transportation Commission of Southern Nevada
More informationI-405 Sepulveda Pass Improvements Project
I-405 Sepulveda Pass Improvements Project 26, 2012 Click to edit Master title January style Community Advisory Committee 1 Community Meeting Schedule for 2012 26-Jan CAC, Final Meeting Feb 22-Mar Community
More informationWIM #37 was operational for the entire month of September Volume was computed using all monthly data.
SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains
More informationUS Rt. 12/20/45 at US Rt. 20 <Westbound and Southbound>
US Rt. 12/20/45 at US Rt. 20 Village of Stone Park, Illinois R L R F o l l o w - U p E v a l u a t i o n R e p o r t Reference No: 016-43280 December 2010 Table of Contents
More informationANCR CRU Statistics February 2007 to December 2007
ANCR CRU Statistics February 2007 to December 2007 o Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes data from Perimeter phone system unavailable prior
More informationWIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT
WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT In order to understand the vehicle classes and groupings, the MnDOT Vehicle Classification Scheme and the Vehicle Classification
More informationWIM #29 was operational for the entire month of October Volume was computed using all monthly data.
OCTOBER 2015 WIM Site Location WIM #29 is located on US 53 near Cotton in St Louis county. System Operation WIM #29 was operational for the entire month of October 2015. Volume was computed using all monthly
More informationWIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT
WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT WIM #31 EAST GRAND FORKS MONTHLY REPORT - JANUARY 2015 WIM Site Location WIM #31 is located on US 2 at mile post 8.0, southeast of
More informationGreater Las Vegas Snapshot by Sale Type Last Month's Sold
Available Units Pending Units Las Vegas Market Update - November 2017 Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold
More informationGreater Las Vegas Snapshot by Sale Type Last Month's Sold
Available Units Pending Units Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Absorption
More informationHELICOPTER OPERATIONS WITHIN THE LONDON HEATHROW AND LONDON CITY CONTROL ZONES
Column Title Explanation 1 2 Total daily number of helicopter flights recorded within the London Heathrow and London City CTRs. 3 to 6 Total daily number of helicopter flights recorded within the London
More informationGreater Las Vegas Snapshot by Sale Type Last Month's Sold
Available Units Pending Units Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Absorption
More informationGreater Las Vegas Snapshot by Sale Type Last Month's Sold
Available Units Pending Units Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Absorption
More informationGreater Las Vegas Snapshot by Sale Type Last Month's Sold
Available Units Pending Units Las Vegas Market Update - August 2018 Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold Price
More informationPreston s Edmond Market Report
Preston s Edmond arket Report April 2 Prepared By Brian Preston RE/AX Associates obile: 45-826-5725 Office: 45-359-87 bpreston88@sbcglobal.net www.edmond4sale.com Realtor of the Year 1995 & 22 Lifetime
More informationGreater Las Vegas Snapshot by Sale Type Last Month's Sold
Available Pending Greater Las Vegas Snapshot by Sale Type Last Month's Sold Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Average Absorption DOM Rate
More informationGreater Las Vegas Snapshot by Sale Type Last Month's Sold
Available Pending Greater Las Vegas Snapshot by Sale Type Last Month's Sold Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Average Absorption DOM Rate
More informationGreater Las Vegas Snapshot by Sale Type Last
September 217 Greater Las Vegas Market Update Greater Las Vegas Snapshot by Sale Type Last Available Pending Month's Median List Price List Price Median Price Price Months 3 Day of Absorption DOM Inventory
More informationGreater Las Vegas Snapshot by Sale Type Last Month's Sold
Available Units Pending Units Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Absorption
More informationSELF-STORAGE FOR SALE
PURCHASE PRICE: $525,000 OCCUPANCY: 62.2% NOI: $50,600 LOT SIZE: 2.0 acres BLDG CLASS: C OVERVIEW 90 unit, multi-building storage facility in a stable region of North Central Texas. This well-maintained,
More informationGreater Las Vegas Snapshot by Sale Type Last
October 217 Greater Las Vegas Market Update Greater Las Vegas Snapshot by Sale Type Last Available Pending Month's Median List Price List Price Median Price Price Months 3 Day of Absorption DOM Inventory
More informationEnforcement Technology Wednesday 10 October Steve Smith Transport for London
Enforcement Technology Wednesday 10 October 2007 Steve Smith Transport for London Content Transport for London Transport Policing and Enforcement Results so far The Future About Transport for London 4
More informationDraft Results and Open House
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi
More informationDRAFT. Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E
Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E 2.25 2.00 2.00 2.25 2.00 2.00 1.00 2.25 2.00 2.25 2.00 A Massage 10/31/2017 9/1/2015 B MEZZANINE 2.25 2.00 2.00 2.25 2.25 2.25 2.25
More informationGreater Las Vegas Snapshot by Sale Type Last Month's Sold
Available Units Pending Units Las Vegas Market Update - January 2019 Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold
More informationM onthly arket. Jan Table of Contents. Monthly Highlights
Table of Contents Market Inventory...2 www.gaar.com Monthly Highlights January 2014 had a 12.29% increase in the number of homes sales when compared to same time last year. The average sale price of single-family
More informationGreater Las Vegas Snapshot by Sale Type
500,000 Available Greater Las Vegas Snapshot by Sale Type Pending Last Month's Sold SFR Market Prices Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory Closed
More informationTRAFFIC VOLUME TRENDS
Page 1 U. S. Department Transportation Federal Highway Administration Office Highway Policy Information TRAFFIC VOLUME TRENDS September Travel on all roads and streets changed by +2.5 (5.8 billion vehicle
More informationYear to Date Summary. Average and Median Sale Prices
A Publication of RMLS, The Source for Real Estate Statistics in Your Community Residential Review: Southwest Washington September 2018 Reporting Period September Residential Highlights Southwest Washington
More informationSound Transit Operations July 2016 Service Performance Report. Ridership
Ridership Total Boardings by Mode Mode Jul-15 Jul-16 % YTD-15 YTD-16 % ST Express 1,618,779 1,545,852-4.5% 10,803,486 10,774,063-0.3% Sounder 333,000 323,233-2.9% 2,176,914 2,423,058 11.3% Tacoma Link
More information2013 Operations Statistics Report Triangle Expressway Fourth Quarter
2013 Operations Statistics Report Fourth Quarter 1 S. Wilmington Street Raleigh, C 27601 2012 Annual Operations Last Updated: Report 1 11, 2014 Table of Contents 2013 Fourth Quarter Operations Statistics
More informationincrease of over four per cent compared to the average of $409,058 reported in January 2010.
SINGLE FAMILY RESIDENTIAL BREAKDOWN uary 211 26.8 % 1.7 % 7.%.4%.1 % Good Start to 211 TORONTO - February 4, 211 Greater Toronto REALTORS reported 4,337 transactions through the TorontoMLS system in uary
More informationA 3-Year Case Study of a Residential Photovoltaic System with Microinverters
A 3-Year Case Study of a Residential Photovoltaic System with Microinverters Clifford K. Ho Sandia National Laboratories, Albuquerque, NM Sandia National Laboratories is a multi-program laboratory managed
More informationNJ Solar Market Update As of 6/30/15
NJ Solar Market Update As of 6/30/ Prepared by Charlie Garrison July 17, 20 SOLAR INSTALLED CAPACITY DATA The preliminary installed solar capacity as of 6/30/ is approximately 1,500.7 MW. Approximately
More information/ PRELIMINARY STEEL IMPORTS INCREASE 2% IN MAY Import Market Share 23% in May
News Release FOR IMMEDIATE RELEASE June 25, 2013 CONTACT Lisa Harrison 202.452.7115/ lharrison@steel.org PRELIMINARY STEEL IMPORTS INCREASE 2% IN MAY Import Market Share 23% in May Washington, D.C. Based
More informationLocal Market Update 2012 Year In Review
Northwest Area Home Sales for the Year 2012 Sales of single-family homes reported in Toledo and the surrounding area by the Toledo Board of REALTORS totaled 6,793. This was an increase of 6% compared to
More informationGreater Las Vegas Snapshot by Sale Type Last Month's Sold
Available Units Pending Units Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Absorption
More informationValley Real Estate Review
Valley Real Estate Review 35, 3, 25, 2, 15, 1, 5, December 218 Listings Months of Inventory 217 218 % of Change 2,479 2,74 1.53% 2.46 2.77 12.6% Offices Combined Force Total Listing Issued Total Annual
More informationANCR CRU Statistics Februa.. to December 2007
ANCR CRU Statistics Februa.. to December 2007 Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes Answered dato from Perimeter phone system unavailable prior
More informationSTEEL IMPORTS DOWN 10% YEAR-TO-DATE Finished Import Market Share YTD at 25%
News Release FOR IMMEDIATE RELEASE August 24, 2018 CONTACT Lisa Harrison 202.452.7115/lharrison@steel.org STEEL IMPORTS DOWN 10% YEAR-TO-DATE Finished Import Market Share YTD at 25% Washington, D.C. Based
More informationPort Botany. Trade Statistics Bulletin 1 July June 2018
Port Botany Trade Statistics Bulletin 1 July 2017 30 June 2018 FY 2017/18 Port Botany Container Trade Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017 Jan 2018 Feb 2018 Mar 2018 Apr 2018 May 2018
More informationPrice Category Breakdown - February 2010
SINGLE FAMILY RESIDENTIAL BREAKDOWN ruary 21 ruary Sales and Average Price Increase Annually TORONTO - Wednesday, March 3, 21 7.3 % 24.6 % 1.8 % 7.3%.2%.1 % Greater Toronto REALTORS reported 7,291 sales
More informationAutomotive Gas Oil (Diesel) Price Watch
Automotive Gas Oil (Diesel) Price Watch (JANUARY 2018) Report Date: February 2018 Data Source: National Bureau of Statistics (NBS) Contents Executive Summary 1 PMS Prices Across States 2 PMS Prices Across
More informationPreliminary Steel Imports, Down 14% in June, Increase 35% in First Half of Year; Import Market Share 21% in Second Quarter 2010
News Release FOR IMMEDIATE RELEASE July 27, 2010 CONTACT: NANCY GRAVATT 202.452.7115/ ngravatt@steel.org Preliminary Steel Imports, Down 14% in June, Increase 35% in First Half of Year; Import Market Share
More informationVan Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015
Van Ness Transit Corridor Improvement Project Engineering, Maintenance and Safety Committee March 25, 2015 Project Need 16,000 daily passenger boardings within the project corridor Average bus speed 8
More informationUniversity of Michigan Eco-Driving Index (EDI) Latest data: October 2017
University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: October 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation
More information2017 SC Producers Whole Farm Revenue Protection Expected Price Justification
2017 SC Producers Whole Farm Revenue Protection Expected Price Justification RMA Projected Expected As of Average Futures Price Close As of RMA Projected Prices 4 Feb 2011 2015 % Differ 4 Feb Crop Contract
More informationWIM #40 is located on US 52 near South St. Paul in Dakota county.
WIM Site Location WIM #40 is located on US 52 near South St. Paul in Dakota county. System Operation WIM #40 was operational for the entire month of November 2017. Volume was computed using all monthly
More informationInterstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output
NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical
More informationNEWS Release. U.S. Manufacturing Technology Orders. Year-to-date U.S. manufacturing technology orders up 4.1% over 2011
U.S. Manufacturing Technology Orders A statistical program of AMT NEWS Release FOR RELEASE: October 8, 2012 Contact: Pat McGibbon, AMT, 703-827-5255 Year-to-date U.S. manufacturing technology orders up
More informationTotal Production by Month (Acre Feet)
Production by Month (acre-feet) 2008 2009 2010 2011 2012 2013 2014 2015 2016 January 25 339.10 228.90 249.50 297.99 243.06 327.14 247.66 212.37 February 234.00 218.80 212.10 241.52 245.82 279.08 234.16
More informationWIM #48 is located on CSAH 5 near Storden in Cottonwood county.
WIM Site Location WIM #48 is located on CSAH 5 near Storden in Cottonwood county. System Operation WIM #48 was operational for the entire month of August 2017. Volume was computed using all monthly data.
More informationCentral Park Drives Traffic Management Overview
Central Park Drives Traffic Management Overview Spring 2015 New York City Department of Transportation Existing Traffic Management From Labor Day thru Last Day of NYC Public School: 8-10 AM weekdays (Southbound)
More informationCapital Project Tracking Report
BTC Annex IT Services: Installation Firm: DataPlus Communications Funding: $167,170 Start: March 2018 End: May 2018 NTP & Preconstruction Meeting. Bus Shelter Pad & Installation Phase 6 TBD Start: TBD
More informationEnglewood Area Board of Realtors Monthly Sales Trend Indicator 2017 Sales by Price Range - Single Family Homes & Villa s
Englewood Area Board of Realtors Englewood Area Board of Realtors Sales by Price Range - Single Family Homes & Villa s Price Range Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17
More informationOriented Strand Board Sheathing (delivered, Los Angeles) 7/16-inch 2005 to 2009
Oriented Strand Board Sheathing (delivered, Los Angeles) 7/16-inch 2005 to 2009 OSB Sheathing (del. LA) 7/16" 2005 2006 2007 2008 2009 Average Month Price Change Price Change Price Change Price Change
More informationAbout Czarnikow. The Premier Provider of Sugar Market Services. Czarnikow has been in the sugar business since 1861
About Czarnikow The Premier Provider of Sugar Market Services Czarnikow has been in the sugar business since 1861 Czarnikow is the leading professional services company in the sugar market Czarnikow has
More information24 hour service. frequent service. frequent service West of Lamb only. 54 Transit Guide. Red Rock Resort 206 CHARLESTON GRIFFITH PEAK
Sahara Express PAVILION CENTER TOWN CENTER HUALAPAI GRAND CANYON FORT APACHE LAKE SAHARA CANYON GATE 121 DURANGO CIMARRON BUFFALO TENAYA RAINBOW SUMMERLIN CENTRE DR Downtown Summerlin Red Rock Resort 206
More informationPast Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693.
11983978 Jun 19, 217 1 124 958 PAST DUE $1,693.97 Meter Reading Information Meter # 55271 May 3 655 Jun 15 6642 17 days 1397 on or about Aug 15 82 Past Due Balance payable includes an amount which is payable
More informationGeometric Design Elements to Reduce Wrong-Way (WW) Entry at Freeway Interchanges Hugo Zhou, Ph.D., P.E.
Geometric Design Elements to Reduce Wrong-Way (WW) Entry at Freeway Interchanges Hugo Zhou, Ph.D., P.E. Department of Civil Engineering Auburn University March, 2017 Why People Drive Wrong-way? WW Entry:
More information/ Preliminary Steel Imports Increase 6% in May Import Market Share at 21%
News Release FOR IMMEDIATE RELEASE June 21, 2011 CONTACT: NANCY GRAVATT 202.452.7115/ ngravatt@steel.org Preliminary Steel Imports Increase 6% in May Import Market Share at 21% Washington, D.C. Based on
More informationNE (SE) Beam
Predicted clear day beam and diffuse irradiances (/ W m 2 ) on vertical and horizontal surfaces on specified days in northern (N) and southern (S) hemispheres (see notes at foot of table): LATITUDE 60
More informationSunrise: 05:48 N (S) Beam
Predicted clear day beam and diffuse irradiances (/ W m 2 ) on vertical and horizontal surfaces on specified days in northern (N) and southern (S) hemispheres (see notes at foot of table): LATITUDE 40
More informationI-405 Sepulveda Pass Improvements Project
I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half
More informationBalance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2
11983979 Jun 19, 217 1 124 962 Jul 11, 217 $24.34 Meter Reading Previous Bill. Balance from your previous bill $. Meter # 552711 May 3 19813 Account Account charge 12.4* Charges 17 days 82 Jun 15 19895
More informationFlorida Courts E-Filing Authority Board. Service Desk Report October 2018
Florida Courts E-Filing Authority Board Service Desk Report October 218 Customer Service Incidents October 218 Status August 218 September 218 October 218 Incidents Received 3,157 2,685 3,779 Incidents
More informationSTEEL IMPORTS DOWN 23% FROM PRIOR MONTH IN MAY Finished Import Market Share YTD at 26%
News Release FOR IMMEDIATE RELEASE June 25, 2018 CONTACT Lisa Harrison 202.452.7115/lharrison@steel.org STEEL IMPORTS DOWN 23% FROM PRIOR MONTH IN MAY Finished Import Market Share YTD at 26% Washington,
More informationFlorida Courts E-Filing Authority Board. Service Desk Report December 2018
Florida Courts E-Filing Authority Board Service Desk Report December 218 Customer Service Incidents December 218 Status October 218 November 218 December 218 Incidents Received 3,779 2,632 2,376 Incidents
More informationDraft Results and Recommendations
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System
More informationProject Advisory Committee
Meredith US 3/NH 25 Improvements Transportation Planning Study Project Advisory Committee March 18, 2008 Meredith US 3/NH 25 Improvements Transportation Planning Study Meeting Agenda Welcome Traffic Model
More informationMARKET RATES UPDATE Paula Gold-Williams Cory Kuchinsky
MARKET RATES UPDATE I N T R O D U C T I O N BY: Paula Gold-Williams President & Chief Executive Officer (CEO) P R E S E N T E D BY: Cory Kuchinsky Interim Vice President, Financial Services September 24,
More informationJanuary Manufacturing Technology Orders Off After a Strong December
Contact: Bonnie Gurney, AMT, 703-827-5277 bgurney@amtonline.org For Release: March 9, 2015 January Manufacturing Technology Orders Off After a Strong December January U.S. manufacturing technology orders
More informationInterstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results
NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results
More informationAPPENDIX B. Origin Destination Study Data
APPENDIX B Origin Destination Study Data - TABLE OF CONTENTS - Page No. EXECUTIVE SUMMARY... 1 Map of the Study area with Site Locations... 2 Summary Table of Results for the TH 14 Corridor Study... 3
More informationSTAFF REPORT INFORMATION ONLY
Insert TTC logo here STAFF REPORT INFORMATION ONLY Presentation: Subway Closures - 2016 Year In Review and 2017 Forecast Date: January 18, 2017 To: From: TTC Board Chief Executive Officer Summary The purpose
More informationLocal Market Update February 2013
Local Market Update February 213 February sales of single-family homes reported in Lucas and Upper Wood County by the Toledo Board of REALTORS totaled 315. This was unchanged compared to February of 212.
More informationNew McNicoll Bus Garage Public Open House
New McNicoll Bus Garage Public Open House Kennedy Public School 1 The Need for a New Bus Garage Riders Increased ridership means Buses Need for new buses Garage And a new buses facility Problems Garages
More information2017 Adjusted Count Report February 12, 2018
A statewide multi-use trail user study and volunteer data collection program 2017 Adjusted Count Report February 12, 2018 The following report includes the final adjusted infrared (IR) counter data at
More informationProject Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013
MnDOT Contract No. 998 Work Order No.47 213 Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/3/213 TASK #4:
More informationIndustry Overview. Powersports Market Update
2017 Q1 Industry Overview Powersports Market Update Sport side-by-sides continue to lead led the powersports industry, with that segment s pricing once again averaging higher than any of the previous three
More informationPreliminary Steel Imports Decline 9% in September Import Market Share at 20%
News Release FOR IMMEDIATE RELEASE October 25, 2011 CONTACT: NANCY GRAVATT 202.452.7115/ ngravatt@steel.org Preliminary Steel Imports Decline 9% in September Import Market Share at 20% Washington, D.C.
More informationMacroeconomic Outlook. Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus
Macroeconomic Outlook Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus Waterways Symposium Cincinnati, OH November 15-17, 2016 Topics Energy Macro Implications Inflation
More informationMETROPOLITAN COAL ENVIRONMENTAL PROTECTION LICENCE MONITORING SUMMARY
Introduction The Protection of the Environment Operations Act 1997 (POEO Act) requires that holders of an environment protection licence make their pollution monitoring data publicly available in a timely
More informationSTEEL IMPORTS UP 15% IN 2017 Finished Import Market Share Increased to 27%
News Release FOR IMMEDIATE RELEASE January 26, 2018 CONTACT Lisa Harrison 202.452.7115/lharrison@steel.org STEEL IMPORTS UP 15% IN 2017 Finished Import Market Share Increased to 27% Washington, D.C. Based
More informationMobility Management: Caltrain
Mobility Management: Caltrain Community Relations Committee October 4, 2017 Agenda Item 7 Presentation Outline Operating Statistics Ridership On-time Performance Fleet Reliability Capital Program Review
More informationTABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods.
TABLE C-43. Manufacturers' new and unfilled orders, -74 {Amounts in millions of dollars] New orders t, I960. 27, 559 26, 903 30,672 30,115 31,086 33,005 35,322 37,952 41, 803 45, 944 46,763 50, 243 53,
More informationFINISHED STEEL IMPORT MARKET SHARE AT 25% IN JANUARY
News Release FOR IMMEDIATE RELEASE March 27, 2019 CONTACT Lisa Harrison 202.452.7115/lharrison@steel.org FINISHED STEEL IMPORT MARKET SHARE AT 25% IN JANUARY Washington, D.C. Based on preliminary Census
More informationProject Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013
Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013 TASK #3 PROCESS TRUCK GPS DATA AND DERIVE PERFORMANCE
More informationSTEEL IMPORTS UP 17% IN JANUARY Finished Import Market Share at 26%
News Release FOR IMMEDIATE RELEASE February 26, 2018 CONTACT Lisa Harrison 202.452.7115/lharrison@steel.org STEEL IMPORTS UP 17% IN JANUARY Finished Import Market Share at 26% Washington, D.C. Based on
More information/ PRELIMINARY STEEL IMPORTS INCREASE 15% IN APRIL Import Market Share 27% in April
News Release FOR IMMEDIATE RELEASE May 23, 2014 CONTACT Lisa Harrison 202.452.7115/ lharrison@steel.org PRELIMINARY STEEL IMPORTS INCREASE 15% IN APRIL Import Market Share 27% in April Washington, D.C.
More informationDaily output in May 32 m³
Parameter Location: Serbia, Novi Sad (45 North; 19 East) Total dynamic head: 50 m Required daily output: 30 m³; Sizing for May Motor cable: 55 m Dirt loss: 5.0 % Pipeline: - Water temperature: 20 C Products
More information