Solar PV Specification: Design, install and maintain Solar PV systems at. La Trobe University

Size: px
Start display at page:

Download "Solar PV Specification: Design, install and maintain Solar PV systems at. La Trobe University"

Transcription

1 Slar PV Specificatin: Design, install and maintain Slar PV systems at La Trbe University La Trbe University Dcument reference: P1647_C004_ August, Enhar Pty Ltd Suite G03 60 Leicester Street, Carltn Vic 3053 T: F: E: inf@enhar.cm.au

2 Dcument Revisin Status & Apprval Lg Date Status fr Purpse Authrs Reviewer Authriser 23/08/2017 Draft Trevr Ackland Anna Prras Trevr Ackland 24/08/2017 Final Trevr Ackland Anna Prras Trevr Ackland 26/09/2017 Update t Azz metering / LTU internet cnnectivity James Mumfrd Anna Prras Trevr Ackland Disclaimer The cntent f this dcument is prvided fr infrmatin purpses. T the extent permitted by law, Enhar des nt accept any liability fr lss r damages incurred as a result f reliance placed upn the cntent f this reprt. This dcument is prvided n the basis that the intended recipients f the undertake respnsibility fr assessing the relevance and accuracy f its cntent.

3 TABLE OF CONTENTS 1 General Specificatins Descriptin f Wrks Ancillary wrks required Prject Management Cntractr requirements and selectin Cntractr Experience and team Accreditatins and Industry awards Prject team and capabilities Sub-Cntractrs Renewable Energy Certificates Systems eligible fr LGC s General Requirements Standard f Materials and Wrkmanship Internal wrks Nise Hurs f Wrk Cmpliance with Cdes Structural Safety Electrical Safety Ntices and Fees Site Access and Cmpnent Strage Licensed Electricians Design Materials Supply and Metering Setting Out Cutting, Fixing, Drilling and Making Gd Rf penetratins Wiring Methds Fastening and Fastening Materials Reticulatin Electrical Islatin Testing and Cmmissining Defects Liability Perid Safety As-Installed Drawings and Maintenance Manuals Inspectin f Dcuments and Site Technical Requirements General Design, supply and install a grid interactive phtvltaic generating system(s) as dcumented, incrprating the fllwing: Standards and Guidelines Grid cnnectin Slar PV panel technical requirements Preferred Slar PV panels Inverters Slar system mnitring and metering Azz meter supply and installatin System perfrmance reprts and alarms Azz Metering internet cnnectin LTU Internet cnnectivity and requirements Cnnectin PV munting systems Framing and rf attachment Structural engineering apprval Warranty Design and Installatin General Slar PV Array lcatin and design Slar PV Design PV array installatin Inverter Installatin Earthing Cabling Testing and Cmmissining... 24

4 3.13 Dcumentatin Requirements Pre-installatin and shp drawings Dcumentatin general Technical infrmatin and drawings Training and handver Practical Cmpletin Warranty General: Slar Panels Inverters Framing Cabling and islatrs Maintenance Requirements Call ut Onging maintenance Maintenance handver and training Safe rf hardware General Existing rf hardware Cdes and Standards Fall Arrest Systems... 30

5 1 General Specificatins 1.1 Descriptin f Wrks The wrk cvered by this specificatin cnsists f supplying all labur, expertise, supervisin, materials and equipment necessary in designing, installatin, cmmissining and maintenance f a slar PV system ( the system ). This wrk is being prvided fr La Trbe University ( the client ). The slar PV cntractr ( the cntractr ) shall design, supply, deliver, install, test, cmmissin and maintain the system, which shall be cmplete with all necessary ancillary and minr items t facilitate the crrect cmpletin f the wrk. This shall als apply t all requirements f relevant standards and/r authrities having jurisdictin ver these wrks. In general, these wrks shall include but nt be limited t: Design f the slar PV system in accrdance with CEC guidelines and apprpriate Australian standards including slar PV mdules, grid cnnect slar inverters, slar munting systems, new AC and DC switchgear, slar framing, cabling, cabling prtectin and mnitring system Prvide Shp Drawing and OHS manuals fr client apprval prir t site wrks Prvide structural certificatin f the suitability f the building fr the prpsed wrks Prvide cntinuus nsite management and supervisin by an experienced full-time emplyee (FTE) f the head cntractr during all site wrks and inspectins Supply and install additinal temprary rf safety hardware as required fr lifting materials and wrking at heights fr cnstructin Design, supply and install permanent safe rf access hardware and fall prtectin in accrdance with AS1657 & AS1891, t allw safe n-ging peratin and maintenance f the installed slar PV system Supply and install f slar PV mdules, grid cnnect slar inverters, slar munting systems, new AC and DC switchgear, cabling, cabling prtectin, mnitring system and assciated equipment Electrical cnnectin f Slar PV array t lw vltage system via existing switchbards including electrical safety certificates Remve and dispse f all assciated wrapping, rubbish r debris related t the installatin f the slar system Grid cnnectin applicatin and apprval including inspectins and any witness testing f the Slar system as required by the DNSP Prtectin system and relays t the requirements f the DNSP Meter recnfiguratin r changever required fr slar installatin Supply and install the apprved La Trbe University utility meter t meter all slar generatin As-built drawings and Operatin & Maintenance manuals n cmpletin f prject Safety shutdwn prcedure dcumentatin and training in the basic peratin, maintenance, and truble-shting f the system t nsite staff and maintenance staff Cmmissining and testing f the cmplete electrical installatin Prvisin f 5-year-warranty and 5-year defects liability perid frm the date f practical cmpletin Equipment warranties as stated in this dcument Full maintenance and cleaning f the system, in accrdance with the CEC guidelines fr perid f five (5) years. Training f client maintenance staff fr nging maintenance pst the cntracted maintenance perid. Sundry minr wrks as specified herein 1

6 1.2 Ancillary wrks required In additin t any ther attendances and facilities nted, the fllwing building-related wrks shall be prvided: Frming penings in rf slabs, walls, firewalls, etc fr the penetratin f cable trays/ladders, cnduits and wiring, including the supply f any seals fixings, sleeves, etc; Patching, painting and making gd all building wrks after installatin f Slar PV system; Installatin f any additinal safe access infrastructure t ensure safe installatin and nging maintenance f the system and rf access Switchbard upgrades r recnfiguratin as required fr the installatin f the prpsed PV system Metering re-cnfiguratin r changever as required, t ensure metering is suitable fr the slar installatin Wrks in partnership with custmer fr prcessing f pwer statin applicatin fr LGCs purpse and create LGCs frm system s electricity generatin (if abve 100kW). 1.3 Prject Management The client, at their discretin, may nminate a third party t manage the prject ( the prject manager ). The cntractr shall accept the prject manager t act n behalf f, and with the authrity f the client. The head cntractr must have an experienced senir in-huse emplyee, preferably CEC accredited that maintains cntinuus nsite management f the installatin and all subcntractrs, and is fully respnsible fr liaisn with key La Trbe University staff and prject managers at all times. In additin t the day t day crdinatin during the prject duratin, the cntractr is t allw fr frtnightly prject prgress meetings. These meetings will discuss prgress, OH&S, public liaisn matters, etc. The cntractr shall minute frtnightly meetings and minutes f the meetings shuld be prvided within 2 days f the meeting date. These meetings wuld be attended by the University s prject representative and the cntractr, required cnsultants and subcntractrs. A phne meeting is adequate. The cntractr shall reprt n a frtnight basis the fllwings: All OH&S and Envirnmental incidents All quality nn-cnfrmances Prject prgram cmpared t cntract prgram Register f extensin f time claims Register f variatins shwing items t be apprved and date apprval is required Register f design changes Register f request fr infrmatin shwing items t be respnded t and date respnse required Frthcming hld pints and witness pints Wrks prgress phtgraphs Schedule f deliveries required fr University supplied items 2

7 1.4 Cntractr requirements and selectin Cntractr Experience and team Table 1-1: Cntractr experience and preferences Experience Experience: cmmercial slar Experience: Universities Experience: grid cnnectin Lcal presence Referees The head cntractr must have a minimum f 5 years experience in the slar PV industry, including dcumented evidence f similar sized cmmercial slar PV systems (with references). The head cntractr must have direct experience in the supply, design and installatin f cmmercial slar systems f a similar size, with preference fr lcal and Victrian based prjects. Experience with Universities r similar rganisatins in the Gvernment, Educatin r Health sectrs is desirable. The head cntractr must have direct experience with slar PV grid cnnectin apprvals in the DNSP distributin netwrk, fr systems f a similar capacity. Cntractr t have in-huse staff based in lcal area fr the prject duratin, are preferred. The cntractr must prvide at least three reference prject utlines, including descriptin, design input requirements, technical perfrmance, cnstructin prgram, budget and client cntact Accreditatins and Industry awards Table 1-2: Cntractr accreditatins and awards CEC slar PV retailer cde f cnduct Strng preference prvided t slar prviders that are listed n the CEC slar PV retailer cde f cnduct apprved list. Envirnmental Management Preference given t slar prviders that have third party certified envirnmental management system certificated t ISO Quality Management Preference given t slar prviders that have third party certified envirnmental management system certificated t ISO9001. Prject Management Preference given t cntractrs with prject management prcedures certified t ISO21500:2012. The cntractr shall have n Wrksafe infringements in the last five years. OHSE and safety Industry awards The cntractr must have written slar installatin specific dcumented OHSE prcedures. Preference given t cntractrs that have a third party certified safety management system certified t AS4801. Preference given t cntractrs with slar industry awards such as CEC, University awards r similar. 3

8 1.4.3 Prject team and capabilities Table 1-3: Prject team and capabilities Prject manager The cntractr shall have an in-huse lcally based prject manager respnsible fr cntinuus attendance n site during installatin perids, cntractr management and liaisn with staff and the public. CEC accredited inhuse staff Cntractrs must have in-huse FTE CEC accredited electricians and/r designers. CEC accredited electricians Strng preference prvided t cntractrs that have CEC accredited electricians n staff wh will be fully respnsible fr cmmissining, certificatin and sign-ff f the slar installatins. Prject Management Preference given t cntractrs with accredited prject management prcedures and a dedicated prject manager. Submissin Preference given t cntractrs that prvide a prfessinal submissin which utlines details f their understanding f a slar PV prject frm inceptin t cmmissining and nging maintenance, including site specific installatin and safety issues at a publically accessible buildings and areas Sub-Cntractrs Sub-cntractrs can be used t assist within the installatin and/r design f the slar PV systems; hwever, the head cntractr must have an experienced senir in-huse emplyee, preferably CEC accredited, that maintains cntinuus nsite management f the installatin and all sub-cntractrs, and is fully respnsible fr liaisn with key staff and prject managers. All anticipated sub-cntractrs t be utilised fr prject delivery must be clearly stated in the submissin, key persnnel fr prject delivery must nt be subcntracted. Shuld the selected sub-cntractrs be altered during the cntract term, La Trbe University is required t apprve the incming sub-cntractrs. 1.5 Renewable Energy Certificates Systems eligible fr LGC s Where the system is eligible fr Large-Scale Generatin Certificates (LGCs) under the Australian Gvernment s Large-scale Renewable Energy Target (LRET), the cntractr shall: Install and cmmissin a Clean Energy Regulatr apprved LGC meter (Azz Metering is a requirement f the prject) Cmplete and ldge pwer statin applicatins with the Clean Energy Regulatr Create large-scale generatin certificates (LGCs) frm pwer statins electricity generatin Prvide annual perfrmance reprt n the Slar PV system evaluated against lcal meterlgical data Act as the primary pint f cntact fr all regulatr cmmunicatin and cmpliance related issues 4

9 The Clean Energy Regulatr (CER) have ruled that a University Campus is cnsidered a single site, and where the aggregate f slar PV system exceeds 100kW, n system n campus will be eligible fr STC s. 5

10 2 General Requirements 2.1 Standard f Materials and Wrkmanship All electrical equipment shall be f first-grade quality in regards design, manufacture and installatin and shall be cmpleted fr satisfactry peratin, cntrl, maintenance and safety under all cnditins f service. 2.2 Internal wrks The site is a University facility and the safety f the students, parents and teachers as well as the nrmal peratin f the facility is critical. The slar cntractr must prvide a minimum 96 hurs ntice t the University prir t internal wrks within ccupied spaces. The timing f these wrks will be required utside nrmal perating hurs f the facility. All internal wrks must be cnducted at a cnvenient time t the site peratrs and may be required t be cnducted utside nrmal peratin hurs f the facility. 2.3 Nise At all times, and at the request f the site peratr, cnstructin nise must be kept t a minimum at critical times. This may require staging r ceasing rf installatin wrks t reduce nise during critical times t the site peratr. Where practical nisy installatin wrks shuld be cnducted befre 9:00am and after 3:30pm, r when the building is nt in peratin. The cntractr shuld allw fr reasnable after-hurs installatin wrks if installatin is prpsed during the University term. Required installatin dates are prpsed in the slar PV installatin and design briefs, these times are when the site is nt in full peratin. 2.4 Hurs f Wrk Unless therwise apprved, it is anticipated that the hurs f wrk will be as fllws: Nn-residential facilities: Mnday Friday 8am 5pm. Residential facilities: Mnday Friday 9am 5pm N wrk within the University will be permitted during weekends, public and University hlidays withut prir apprval. The slar cntractr must prvide a minimum 3 days ntice t University prir t cmmencement f any wrk nsite utside permitted wrking hurs. 2.5 Cmpliance with Cdes Structural Safety The supprt structure f the Slar PV shall be cmpliant with wrst-case wind ladings fr the regin specified in AS including allwance fr the building height. All PV framing must cnfrm t AS and dcumentatin must be sighted by the client r nminated agent prir t cmmencement and adhered t thrughut the installatin. The tenderer is respnsible fr adequate cnnectin f PV framing t the rf structure with reference t AS and the building height Electrical Safety All inverters f the slar PV system shall be cmpliant with AS4777 and AS3100 and apprved by a state regulatr fr safe use in Australia. All inverters must be n the apprved list f inverters supplied by the Clean Energy Cuncil. Dcumented prf f the listing f the selected inverters n the Clean Energy Cuncil list f apprved inverters must be prvided. The installatin shall als be cmpliant with: 6

11 The Electrical Netwrk Service Prvider ( the distributr ) requirements. Australian Standard AS/NZS 3000 (S.A.A. Wiring Rules). The successful tenderer shall be respnsible fr: Ensuring that all cmpnents and equipment used are apprved fr use in Australia, meet relevant Australian Standards, are C-tick apprved and are accredited fr use in slar PV installatins by the Clean Energy Cuncil; Ensuring all cmpnents, equipment and wiring including cabling, electrical prtectin, cntrls, inverters, circuit, breakers, fuses, fire prtectin fuses and lightning prtectin are installed in accrdance with the prvisins f AS/NZS 3000, AS/NZS 5033 and all ther applicable Australian Standards; The rf munting psitins, cabling reticulatin, switch bx lcatins, and any ther crdinatin necessary fr the crrect, safe and prper installatin and cmmissining f the PV system; All DC and AC wiring t cmplete the installatin including wiring and cabling between the PV panels, inverters, meters and distributin bards, as required. The successful tenderer shall: Design, engineer, cnstruct and cmmissin the PV system in accrdance with Australian Standards and best industry practices; Adhere t all earthing requirements as utlined in Australian Standards, with particular attentin t the new requirements under AS 5033; Install all PV wiring and cmpnents t minimize expsure t detrimental envirnmental effects where they are prtected frm ultravilet radiatin, crrsin, abrasin, tensin, cmpressin & cutting frces. Plastic cable ties are nt t be used as a primary means f supprt fr cables and wiring; Install cnnectrs that are mated with cnnectrs f the same type frm the same manufacturer; Install DC switch discnnectin devices that are nt plarity sensitive and cmply with the requirements f AS5033; Install DC Circuit breakers that are nt plarity sensitive. They must als be rated t interrupt the full lad when perated and have a vltage rating greater than the pen circuit vltage V OC; Ensure that all equipment and appliances prvided under this cntract are nt capable f causing any interference with any electrnic r radi equipment, lcal r therwise. Shuld any item f equipment cause interference t electrnic r radi equipment, prvide efficient devices t eliminate such interference and install withut additinal cst t this cntract. Additinal payments will nt be made fr any csts invlved in testing r btaining certificates r prfs f cmpliance. Such csts, where applicable, shall be included in the tender price. 2.6 Ntices and Fees The cntractr shall frward all relevant ntices, arrange fr inspectins and pay all fees t the distributr and ther authrities as required in electrical cnnectin with this system. 2.7 Site Access and Cmpnent Strage The Cntractr will ensure prir t accessing the Site, that it has discussed and agreed with the Client r their representative a designated lcatin(s) fr strage f materials, cmpnents, equipment and all ther related items assciated with the installatin r ther prcessed assciated with delivery f the Wrks. 7

12 The Cntractr will prvide the Client r their n-site representative with a site access plan which details the methd the Cntractr is seeking t emply in accessing the site bth fr persnnel f the Cntractr and equipment/supplies; particularly where it may be impeded the peratins f the facility r access t the Site by the Principal s emplyees r patients. Site access will be subject t: The prvisin f a Site access plan; Apprval by the Client r their site representative in writing. The Cntractr will be entirely respnsible fr the security and strage f its plant, equipment and any related materials; as well as prtectin frm damage r theft. The Cntractr will ensure that all items, cmpnents r equipment that frm the phtvltaic system shall be stred in such a way s as t prtect the items frm damage r excessive expsure t the elements prir t installatin. The Cntractr will nly deliver cmpnents f the System n and as needs basis s that excessive quantities f the cmpnents are nt left n site unnecessarily. 2.8 Licensed Electricians All electrical site wrk including the installatin f meters, slar PV panels and inverters shall be dne by electricians licensed t carry ut such wrk at the particular lcality. All installatin wrk must be perfrmed by accredited CEC installers and dcumentatin prving such accreditatin must be submitted t the University. 2.9 Design Electrical design f the system must be cmpleted and signed ff by an accredited slar PV designer accredited with the CEC. All apprpriate design dcumentatin shall be submitted t the client fr apprval prir t any wrks being undertaken Materials Supply materials, fittings, accessries and apparatus f first grade design and manufacture thrughut shall cmply with the latest relevant S.A.A. specificatins. Unifrmity f accessries and fittings thrughut the installatin shall be preserved Supply and Metering The cmplete electrical installatin shall be suitable fr cnnectin t the standard vltages and frequencies f the distributr. The cntractr shall liaise with the distributr and prvide all ntices in cnnectin with the supply f electricity t the installatin. It shall be the cntractr s respnsibility t ensure that the requirements fr the installatin f meters and ther equipment shall be prvided fr in the installatin Setting Out The psitin f equipment as shwn n the drawings shall be cnsidered as apprximate nly, and the cntractr shall determine the exact lcatins while meeting the stated cnstraints. All equipment shall be munted square t building lines walls; shall be levelled, plumbed and in alignment with similar equipment. The installatin shall present a neat and rderly appearance n cmpletin, t the satisfactin f the University Cutting, Fixing, Drilling and Making Gd The Slar PV Cntractr shall carry ut all cutting, bring and fixing necessary t install equipment, cnduits, etc. relating t the electrical installatin and its assciated wrks. 8

13 Under n circumstances shall explsive pwered fastenings be used by this trade t secure the wrks in psitin. Only apprved blts, screws, metal thread fasteners r Lxins shall be used t secure items f equipment in psitin. Any damage t the building r its attachments caused by the cntractr shall be made gd at the expense f the cntractr. If it is fund necessary t alter the finished wrk thrugh fault f the cntractr; then such wrk will be perfrmed at the expense f the cntractr. N cutting, chasing, drilling r excavatin shall be perfrmed by the cntractr withut prir ntice r apprval by the Prject Manager in regard t the type, lcatin, methd r timing f such wrks Rf penetratins The cntractr must prvide a certified plumbing certificate fr all rf penetratins. The cntractr will be required t ensure that all penetratins thrugh any building elements, such as fire rated walls and ceiling r any ther cmpnent f the building structure, will be undertaken in such a way as t cmply with: AS 1530 Methds fr fire tests n building materials, cmpnents and structures AS 4072 Cmpnents fr the prtectin f penings in fire-resistant separating elements Service penetratins and cntrl jints The cntractr will ensure that any penetratins in any frm f rfing system, structure r material, will be fully sealed and made waterprf s that will cntinue t ffer this prtectin fr the expected life f the system; being nt less than 25 years Wiring Methds All electrical wiring shall be installed in accrdance with the requirements f the Distributin Cmpany and the current versin f the AS3000 and AS5033. Unless therwise specified, wiring shall be carried ut in thermplastic insulated and sheathed cables. Cables shuld be cncealed wherever practical in false ceilings, under flrs, in wall r blck wrk cavities, etc. Wiring shall nt be directly embedded in cncrete, plaster, sandwich panels, etc; but shall be enclsed by PVC r steel cnduit. Main generatr cables shall be sheathed cable enclsed in heavy duty insulating cnduit, in accrdance t AS/2053, r n cable tray with adequate mechanical prtectin. Refer t Energy Safe Victria dcument dated July 2011 fr specific recmmendatins Fastening and Fastening Materials Cnduits, pipes, cable, switches, receptacles, wall bxes, panels, distributin bards, utlets and similar equipment must be firmly secured in place. Use expansin shields r cncrete inserts with cncrete r brick; tggle blts n hllw tile r wire lathe; wd screws f adequate gauge n wd. Wd, lead r cmpsite plugs will nt be permitted. Secure all fastenings directly t the building structure. D nt secure t wrk f ther trades such as ceiling lath, pipes r pipe racks, unless specified r nted therwise. Nuts, blts, screws, washers, etc. used as terminals shall be brass. Blt heads shall be chrme plated and plished 2.17 Reticulatin All wiring rutes must be cncealed where practical and nt affect adversely the aesthetics f the building internally r externally. All cables shall nt be psitined in lcatins f water drainage r in lcatins that are likely t prevent the egress f rainwater 9

14 Prvide weatherprf islatrs adjacent t direct cnnected appliances. Make cnnectin between the islatr and the equipment terminatin via a suitable length f PVC flexible type cnduit with cuplings at each end. The cntractr must allw fr the shrtest pssible DC/AC cable run with facilitated cable installatin and cable access withut bstructing any walkways, passages r windws. Cabling installed in ceiling spaces shall be supprted abve and clear f ceiling fabric and suspensin systems by means f cable ladder, catenary supprt r apprved alternatives. Cabling supprts must nt interfere with access The Slar PV Cntractr shall ensure that all penetratins thrugh fire walls are filled with fire stp cmpund n cmpletin f installatin t ensure cmpliance with building regulatins. All submains cables shall be run n cable tray r cable ladder r similar. All cables and cable management equipment are nt t bstruct the rf gutters. All cables t be duble insulated. In lng runs with large expected temperature variance, expansin jints need t be installed in HD cnduit Electrical Islatin The slar cntractr must prvide a minimum f 2 Weeks ntice t the cnsultant prject manager and the University prject representative prir t electrical islatin shutdwn, and cnducted at a cnvenient time t the site peratrs. The timing f any shutdwns will be required utside nrmal perating hurs f the facility. Any discnnectin event will require the presence f the Client r their designated Site representative. The Cntractr will have been deemed t have included all csts assciated with any shutdwns in the agreed Cntract Sum, including the requirements fr after hurs shutdwn. The cntractr is respnsible fr ensuring that all electrical plant and cmms are in peratin fllwing electrical shutdwn, and that nrmal peratin f the facility is ensured fllwing shutdwn Testing and Cmmissining The installatin shall be deemed t be cmpleted when it has passed all necessary tests and has been apprved t the satisfactin f the distributin cmpany. All necessary facilities including all necessary instruments and test equipment and labur fr carrying ut tests shall be prvided by the Slar PV Cntractr at n extra cst t the Client. The cntractr shall prvide training t the client s perating persnnel n the peratin and use f all equipment and systems installed under the cntract. The cntractr shall carry ut cmmissining and final acceptance tests as required by the prject manager and as specified. Cmmissining test must be perfrmed in accrdance with AS/NZS 5033:2014 Appendix I. t ensure all the slar equipment are perating crrectly including slar panels, panel strings, inverters, meter, data lgger and electrical prtectin devices. Final acceptance tests shall be dne in the presence f the prject manager and shall cnfrm t AS/NZS 3000 and AS/NZS 3017 standards. 10

15 The cntractr shall prvide a Certificate f Electrical Safety fr the installatin and include a cpy in the manuals. The cntractr must als prvide a reprt that includes vltage and temperature measurements, the current and irradiance measurements, the earth fault prtectin test and als states the cnditins f the PV array wiring after the test, including any repairs and crrectins carried ut as a result f the inspectins Defects Liability Perid All wrkmanship and installatin shall be guaranteed fr a minimum perid f five years frm the date f Practical Cmpletin. The cst f all labur and materials expended in cmplying with the abve shall be brne by the cntractr. All required material warrantees are prvided in sectin Cpies f any warranty dcuments must be frwarded t the client Safety The cntractr shall ensure safe installatin and nging maintenance/cleaning f the slar system by prviding additinal rf safety hardware as required. The cntractr, as part f the tender submissin, shall detail and utline site specific safety issues and additinal safety hardware t be installed t ensure safe installatin and nging maintenance. The cntractr is respnsible fr: Replacing any anchrs which are cvered r nt accessible due t the slar array, Installing new anchr pints where required t ensure safe rf access t all areas f the slar array. Anchrs shall be installed in accrdance with AS5532:2013, and checked and certified n annual basis fr the maintenance perid. In cmpliance with AS/NZS 4801 Occupatinal health and safety management systems, the cntractr is required t have in place a dcumented prject Wrk Health and Safety Management System (WHSMS) that cmplies with the standard. Majr elements f the system shuld include prcesses and prcedures fr: Rles and respnsibilities fr WHS management Staff training and inductin prcesses Respnding t and managing cmplaints, nn-cmpliances and incidents Health and safety reprting and crrespndence fr the prject Internal auditing and mnitring f envirnmental perfrmance Prject risk identificatin, assessment and management Setting WHS bjectives and measurable perfrmance targets Identifying and cmplying with legal and ther requirements Review and update f prject envirnmental dcumentatin La Trbe University recgnizes its bligatins under the Occupatinal Health and Safety Act and is cmmitted t prmting a healthy and safe wrking envirnment. All cntractrs must be accredited in accrdance with La Trbe University s RapidInduct system befre cmmencing wrk n site. All cntractrs requested t perfrm wrks will be invited by Infrastructure and Operatins t register with RapidInduct. ( As-Installed Drawings and Maintenance Manuals On cmpletin f the wrks, the Slar PV Cntractr shall prvide as-installed drawings f the installatin. The Slar PV Cntractr shall als prvide three (3) sets f prints f these drawings bund int the perating and maintenance instructins, as further specified herein under sectin Sft cpies in pdf frmat are als required. 11

16 The cntractr shall prvide t the Prject Manager three (3) cpies f detailed perating and maintenance instructins and manuals. Instructins shall be supplied with the "as installed" drawings in apprved bindings and shall be supplemented by diagrams and spare parts schedules. The supply f all necessary infrmatin fr the satisfactry peratin and maintenance f the services shall frm part f this cntract. Tenderers shuld nte that the supply f instructins and "as installed" drawings is a cnditin f Practical Cmpletin Inspectin f Dcuments and Site Tenderers shall, by submitting a tender, acknwledge that they have adequate knwledge f the site cnstraints and prpsed installatin details, cnsulted with all relevant authrities having jurisdictin ver the prject, and have assessed their full liabilities fr all such wrks and csts required in carrying ut the wrks specified and shwn. N recgnitin will be granted f any claims fr additinal csts resulting frm the Tenderer's failure t cmply with the abve. 12

17 3 Technical Requirements 3.1 General Design, supply and install a grid interactive phtvltaic generating system(s) as dcumented, incrprating the fllwing: Phtvltaic arrays and necessary supprt structure Grid cnnected inverter/(s) Balance f System cmpnents including DC and AC cabling and switchgear, data cabling, junctin bxes, switchbard, cnduits, cable tray, munting brackets, etc Cnnectin t lw vltage pwer system t The DNSP s requirements Grid cnnectin applicatin and apprval, including all secndary prtectin requirements require by the DNSP Bi-directinal metering t the requirements f the DNSP and retailer Data-lgger and Web-service fr displaying and mnitring PV system perfrmance LGC metering fr LGCs purpse Testing and cmmissining Training f University staff in the basic peratin, maintenance, and truble-shting f the PV system Operatin and Maintenance manual All permanent and temprary safety and access equipment necessary fr lifting materials and wrking at heights All supprts, brackets, drilling, penetratins, fire stps, water prfing and ther building wrks assciated with the abve Where site specific design and install dcuments are supplied, the lcatin and rientatin f the PV arrays n the rf is given as a guide. The tenderer can suggest alternative ptins n the rf layut, hwever; must ensure a minimum ttal PV capacity is maintained and all shading and rf bstacles adequately cnsidered, in additin t heritage, planning, structural and architectural issues. 3.2 Standards and Guidelines Fr the purpse f this wrk, cmpliance with the all relevant sectins f the fllwing standards shall be adhered t. Table 3-1: Standards CEC CEC AS/NZS 5033 AS AS AS AS/NZS 3000 Clean Energy Cuncil- Grid Cnnected Slar PV systems install and supervise guidelines fr accredited installatins Clean Energy Cuncil- N Battery Strage Grid Cnnected Slar PV systems Design guidelines fr accredited installers Installatin f phtvltaic arrays Grid cnnectin f energy system via inverters Part 1: Installatin requirements Grid cnnectin f energy system via inverters Part 2: Inverter requirements Grid cnnectin f energy system via inverters Part 3: Grid prtectin requirements Wiring Rules AS/NZS 1768 Lightning Prtectin 13

18 AS/NZS 2053 AS/NZS 3008 AS/NZS Cnduits and Fittings fr Electrical Installatin Selectin f cabling Structural design actins Wind actins AS/NZS AS/NZS 3017 ESAA SIR Energy Safe Victria BCA Lw vltage switch gear and cntrl gear Electrical installatins Testing guidelines Electricity Supply Assciatin f Australia Guidelines fr grid cnnectin f energy systems via inverters Victrian electricity distributrs services & installatin rules Installatin f grid cnnected PV systems, July 2011 Building Cde f Australia Lcal supply authrity renewable energy systems technical guidelines 3.3 Grid cnnectin The cntractr is respnsible fr grid cnnectin apprval, required grid cnnectin studies and any secndary netwrk grid prtectin relays as required by the distributr and Australian Standards. The cntractr is respnsible fr all relevant ntices, arranging fr inspectins and testing, paying all fees t the distributr and ther authrities as required in cnnectin with the slar PV installatin. The cntractr is respnsible fr managing and rganising any meter upgrades r replacements at the site required fr the slar installatin. In the case f systems cnnected t the La Trbe Bundra HV Main netwrk in the campus; the cntractr is respnsible fr any prcessing, apprval and cmpliance with statements and prcedures required by the distributr regarding the existing embedded generatr (C-generatin plant). The cntractr is respnsible fr ensuring that the required feed in tariff fr exprted slar is accepted by the retailer prir t practical cmpletin. Paperwrk required includes: Slar (renewable r lw emissins technlgy) Cnnectin Frm Electrical Wrks Request (EWR) Certificate f Electrical Safety (CES) 3.4 Slar PV panel technical requirements Table 3-2: Slar PV Panel requirements Standards Blmbergs New Energy Finance Tier Rating listing (March 2014) Apprved list f CEC panels IEC61215 and IEC certified (including the MST-23 Class C fire test) Tier 1 14

19 Design Wp DC Cell: 290Wp, dimensins f 1.0mx1.65m (indicative) Mn-crystalline r Ply r multi-crystalline Pwer tlerance: 0 t +5W Maximum Temperature c-efficient (P max) Nrmal Operating Cell temperature Glass Frame Material Cable size Cnnectrs Integral bypass dide prtectin: Perfrmance Warranty: Manufacturing warranty -0.45%/ 0 C r less (i.e. between zer and -0.45) 45 0 C +/-2 0 C Tempered r tughened glass minimum 3mm thickness Panels installed >5 0 abve hrizntal: Panel framing shall be andized aluminium ally r equivalent; r frameless glass n glass panels Panels installed <5 0 abve hrizntal: frameless glass n glass panels shall be prvided. 4mm Staubli Grup Multi Cntact MC4 r apprved equivalent (IP65 min), must be in accrdance with EN50521 and be crrsin resistant. Cnnectrs elsewhere in the slar installatin shall be f exactly the same type and manufacture as thse prvided n the slar PV mdules. Slar PV mdules shall be furnished with 3 (min) bypass dides integrated int the mdule junctin bx. At least 90% at 10 years At least 80% at 25 years Any insurance guarantee underwriting the lng-term perfrmance warranty shuld be specified, such as third party insurance arrangements. 10 years frm date f installatin Any insurance guarantee underwriting the lng-term manufacturing warranty shuld be specified, such as third party insurance arrangements. The cntractr must prvide technical datasheets f the prpsed slar PV panels. 3.5 Preferred Slar PV panels Table 3-3: Preferred Slar PV Panel manufacture requirements Manufacturer Australian Presence Warranty and Degradatin Manufacturer s Cmpany Histry and experience Preference will be given t panel manufacturers that have an Australian ffice and emplyees. Preference given t manufacturers that have Australian based technical supprt, servicing and warranty claim service. Preference given t panels that have annual lineal perfrmance utput warranty. In additin, independently tested degradatin (PID) perfrmance characteristics shall be preferred. Lnger than 5 years in PV manufacturing 15

20 Manufacturer s MW capacity installed Manufacturers quality assurance prcedures Vertical integratin Preference given t panel manufactures with a higher manufacturing vlume Dcumented quality assurance required. ISO accreditatin highly regarded Preference given t manufactures that cntrl and manage the supply line frm manufacture f silicn cells thrugh t final prduct manufacture Research and develpment Preference given t manufacturers that invests significantly in research and develpment. Prjected cmpany grwth and financial stability Preference given t panel manufactures with strng prjected grwth and financial stability Table 3-4: Preferred Slar PV panel certificatins, standards and schemes. Standard/Certificatin scheme VDE Quality Tested Phtn Labratry Internatinal test results Slar Screcard by The Silicn Valley Txins Calitin IEC Atlas 25+ Descriptin/parameter Preference given t panels that are VDE quality tested and certified, r certified with a similar independent third party testing rganisatin that prvides cntinuus quarterly testing fr reliability and degradatin. Preference given t panel manufacturers that have PV panels highest n the mst current Phtn Test result. Preference given t panel manufacturers that rank higher n the ranking n the 2015 slar screcard. Panel manufacturers which demnstrate their recycling cmmitment and txic material reductin thrugh alternative dcumentatin which des nt invlve the Slar Screcard will be given cnsideratin als. Preference given t panels that have dcumented evidence f IEC61853 cmpliance/certificatin and details f mdule perfrmance at 23 different temperature and irradiance cnditins Preference given t panels with Atlas 25+ certificatin with a basic tier classificatin r abve PV+ test (TÜV Rheinland and Slarpraxis AG) Thresher mark certificatin with TUV SUD? Preference given t panels that are n the PV+Test listing Preference given t panels have Thresher mark certificatin Fraunhfer I PDVI testing PVUSA Preference given t panels with Fraunhfer I PDVI testing with a ranking f greater than 3. Preference given t panels which are published n the Califrnia Incentive Eligible Phtvltaic Mdules list: 16

21 php and have a rati f PTC (PVUSA Test Cnditins) / STC (Standard Test Cnditins) f 89% r greater. 3.6 Inverters Table 3-5: Inverters technical requirements Standards Efficiency Ingress prtectin rating Three-phase Metering Warranty Apprved list f CEC inverters AS and A4777.3, IEC612109, IEC61727 >96.5% Eurpean weighted inverter efficiency factr r equivalent >96.5% Peak efficiency IP65 (min), r suitable fr the prpsed inverter lcatin Prvide a fully balanced three phase AC utput Be cmpatible with the University apprved meter prvider (Azz) 10 years required frm date f installatin, and include full nsite replacement f a faulty unit Any insurance guarantee underwriting the lng-term perfrmance warranty shuld be specified, such as third party insurance arrangements. Table 3-6: Inverters manufacturer requirements Manufacturing histry Inverter manufacturers shall have a minimum f 7 years inverter manufacturing histry. Manufacturer Australian Presence Inverter manufactures shall have an Australian ffice and Australian based emplyees. Engineering Technical supprt Inverters shall have Australian based engineering technical supprt services, including a dedicated custmer supprt lcal phne number. Servicing Warranty supprt Inverters shall have an in-huse Australian based servicing team, r team f certified A-grade electrician servicing partners. Inverter shall have an Australian based warranty supprt team and systems. With the tender respnse, the cntractr must prvide dcumented prf that technical infrmatin n the prpsed inverter is in cmpliance with abve. 17

22 3.7 Slar system mnitring and metering Azz meter supply and installatin The cntractr is respnsible fr the supply and installatin f the University apprved metering system, t ensure remte mnitring f the full slar generatin fr the slar system. The apprved metering prvider is Azz Pty. Ltd. ( wh have been briefed n the prpsed slar systems and metering requirements fr each specific system. The supply and installatin f Azz metering is a required cmpnent f all slar installatins. The cntractr is respnsible fr supply and installatin f the required Azz metering slutin. The cntractr is respnsible fr liaising with Azz t ensure inverter cmpliance with the metering slutin. Inverters (generic) must supprt: Supprt Mdbus RTU r TCP slave Cnnectins t SlarWeb / Sunny Pwer r similar via AZZO 3G mdem cnnectin via Ethernet cnnectin Supprt registers fr: A/C Active, Reactive, Apparent Pwer (kw, kvar, kva) / Real Energy (kwh) Supprt Active & Reactive Pwer Setpint Cntrl (fr curtailment, exprt cntrl, and Pwer Factr cntrl) Recmmended supprted slutins: SMA: Inverters cnnected t SMA Cluster Cntrller r Inverter Manager including Mdbus TCP Schneider: Inverters cnnected t XW Cntrller r direct t Cnext TL/CL including Mdbus TCP Frnius: Inverters cnnected t Data Manager including Mdbus TCP Enphase micrinverters are nt recmmended as they dn't supprt the kind f mnitring and cntrl that is standard tday. If required due t arrangements; the Enlighted API may be used via the Envy system, but the csts fr this integratin are cvered by the slar prvider. Installatin f Cmms: IP addressing prvided by AZZO t be prgrammed int Inverter/Data Manager Latest firmware t be upgraded by slar installatin fr all inverters and inverter/data managers AZZO t remtely cmmissin inverter Mdbus cmmunicatins fr LTU integratin The fllwing Azz Metering kits are available, refer t site installatin briefs fr the required metering Kits fr each system. Further infrmatin is prvided via the fllwing link: ( Kit A Kit B Enphase (per cnslidatin pint) r Small Sized Systems kw - with SMA/Frnius/SlarEdge/Schneider Inverters Directly Cnnected via Mdbus TCP AZZO-LTR G + SIM / Antenna Azz prvide engineering, cmmissining, and management/integratin int LTU sftware Medium Sized Systems (typically nly 1 cnnectin) LGC Metering 18

23 Kit C AZZO-LTR G + SIM / Antenna AZZO-LTR-5560-PQM with ptinal remte display Azz prvide engineering, cmmissining, and management/integratin int LTU sftware Large Sized Systems (typically nly 1 cnnectin) LGC & Pwer Quality Metering including Inverter Cntrl and Alarm Mnitring - AZZO-LTR G + SIM / Antenna - AZZO-LTR-8000-PQM with ptinal remte display Azz prvide engineering, cmmissining, and management/integratin int LTU sftware In all cases f meters, CTs prvided by switchbard builder r DB manufacturer. The Azz metering slutin is apprved by the Clean Energy Regulatr fr the purpse f creating LGC s (if required). Azz metering is t be used acrss all La Trbe University Campuses fr the metering f slar generatin and electrical cnsumptin System perfrmance reprts and alarms The Azz Metering platfrm will prvide quarterly reprts n system perfrmance t a designated accunt prvided by the cntractr. The Azz metering will send alarms t designated accunts n underperfrmance and faults. The cntractr is t prvide the parameters t Azz n underperfrmance r faults. 3.8 Azz Metering internet cnnectin The required Azz metering kit t be supplied and installed by the cntractr cmes with an integrated 3G/4G mdem and Sim card fr all required metering and mnitring required by the University, and cmmunicatins t La Trbe University s nline mnitring platfrm. Shuld the cntractr require additinal nline mnitring, fault alarms r the nrmal peratin f the inverter system requires an internet cnnectin, it is recmmended that the inverter system is cnnected t the chsen slar mnitring prtal via an Ethernet cable t the Azz mdem. The cntractr is respnsible fr prviding sufficient infrmatin f the inverter/mnitring system and requirements t Azz t allw cnnectin, and prvide infrmatin n the required mnthly dwnlad requirements f the system in MB per mnth. 3.9 LTU Internet cnnectivity and requirements Cnnectin 1. If an Ethernet cnnectin is used, Latrbe University (LTU) ICT prefers wired (UTP) cnnectins ver the use f wireless (Wi-Fi) fr security and reliability reasns. 2. Wired cnnectins: a. Will get a Private DHCP leased address. The address will be in the x.y range. Where x will campus specific, y will be the device b. The device will have access t the utside wrld via a NAT IP address X.X r X.X. This address is frm a pl and will change. c. Access t the device frm ff campus will nly be via the Latrbe VPN. On campus access will be t the x.y address. d. Devices WILL be able t talk t ther wired devices at LTU sites. e. POE pwer shuld be available n request. 19

24 f. Cabling is t be dne as per the ICT Cabling standard by pre-apprved PCI cntractrs. Surge and lightening prtectin will be addressed by the design. The cntractr must cntact ICT befre planning ANY UTP cable runs, and advise OCT f the apprved PCI cntractr respnsible fr installatin. 3. Wi-Fi cnnectins: a. Reliability and service guarantees are nt available. b. Cnnectins are made t LTU Wireless Access Pints (WAPs) that are precnfigured t advertise the Internet f Things (IOT) SSID. c. Until the device s wireless MAC address get registered by ICT, it will nt be able t cnnect t LTU Wi-Fi netwrk (ltu-it SSID) d. It can take up t 4 days t cmplete the registratin and prpagate the SSID t the WAP. e. Devices that nly use b are nt supprted n the LTU Wi-Fi netwrk. f. Dual band devices shuld be used (5GHz & 2.4GHz) and cnnect t LTU Wi-Fi netwrk n the 5GHz band. The 2.4 GHz band will be scaled back in the next 3 t 5 years. g. Devices shuld supprt WPA2 security methd (WPA2-enterprise r WPA2- persnal). h. DHCP leases will be fr 7 t 8 days. The IP addresses will change. i. Bradcast frwarding is nt supprted n LTU Wi-Fi netwrk. Hence devices that require lcal subnet bradcast feature will nt wrk n LTU Wi-Fi netwrk. j. ANY use f ZigBee r devices r frequencies needs t be apprved by ICT BEFORE they are t be pwered up n site. Channel allcatins will be made by ICT PV munting systems Framing and rf attachment The cntractr is t prvide munting details f the selected PV array. The dcumentatin is used as a guideline. Specific details f the munting structure are t be prvided in the tender submissin. Nn-penetrative are t be used fr the Kliplc r similar rfing materials. Nn-penetrative frame fixing must cmply with apprpriate pull-ut tests as specified by the CEC. Where penetrative methds are used, weatherprfing f the fixing methd must be maintained and ensured fr the design life f the installatin. The cntractr shall: Prvide the installatin manual identifying methds fr safely cnstructing and securing the equipment n sites, Prvide verificatin f the framing t AS including btaining frm the frame supplier a cpy f the engineering certificatin stating that the array frame is certified t AS fr a Universities lcatin; Cntractr shall prvide infrmatin n hw the frame is t be munted n the rf t maintain this certificatin; The array frame shall be installed t the manufacturers recmmendatins t ensure the array frame meets AS certificatin, with cnsideratin f the fllwing: Minimum spacing between fixing fr the specific wind regime; Type, length and gauge f screws t be used; Number f screws required per fixing; Size f batten/purlin required fr fixing Ft spacing tables fr internal and edge/crner intermediate znes at the specific AS wind regin and rf height. Number f fixing and purling lcatins fr nn-penetrative fixtures 20

25 The munting frame/supprt fr the PV arrays is t be weatherprf and crrsin resistant. The lifetime f the munting structure must exceed the lifetime f the PV arrays. All dissimilar metals must be mechanically separated t prevent galvanic crrsin Prvide a minimum 10-year warranty n framing The cntractr is respnsible t ensure adequate and safe cnnectin f the rf framing t the building/rf structure. The cntractr is required t prvide structural certificatin f the installed slar munting system and the suitability f the building structure fr the installed slar PV system Structural engineering apprval The cntractr is respnsible fr prviding a letter and certificatin frm a prfessinal structural engineer n the structural suitability f the building(s) fr the prpsed slar PV installatin(s). The site-specific structural engineering letter shuld include: Cnfirmatin f the structural suitability f the existing buildings fr the prpsed PV system framing and panels including additinal dead and wind lads; Maximum shrt-term dead lads pssible during cnstructin and recmmended lcatins fr dead lads, including ttal lad frm any unit f plant r equipment and ttal lad t any single supprt pint; Cnfirmatin f the suitability f the recmmended fixing systems f the slar PV framing, if nt incmpliance with the framing manufacturer instructins including maximum rf height and purlin spacing. The cntractr is respnsible fr any shrt-term lads during cnstructin and adequate and safe attachment t the rf structure fr the life f the system Warranty The slar array munting system and cnnectin must be prvided with a minimum manufacturing warranty f 10 years Design and Installatin General The system must cmply with AS/NZS 5033 and Clean Energy Cuncil Installatin guidelines Slar PV Array lcatin and design The cntractr is respnsible fr cnducting a shading assessment A shading analysis has been cnducted fr the rf areas where required, in additin t identificatin f rf bstacles restricting the placement f slar PV arrays. Designs that depart frm that indicative PV array layut n the attached drawings are nly permitted with the prject manager s written apprval, prvided the required verall slar PV capacity is maintained, and that all shading, rf bstacles, heritage and architectural issues are duly cnsidered and cnfirmed. General design rules that must be strictly adhered are: The spacing f tilted panels must ensure that subsequent rws f panels are nt adversely effected by shade between 10am and 2pm at the winter slstice. Panel arrays shall be lcated t ensure ease f access fr maintenance and repair f the slar system 21

26 Panel arrays shall be lcated t ensure ease f access t all rf areas including all existing rf plant, anchr pints and guttering Flush munted (nn-tilted) panels must prvide maintenance access f 600mm width every fur rws f panels as a minimum r maintenance access f 300mm width every tw rws f panels All panels must be able t be safely and easily accessed, with any ne panel able t be accessed by remved nly ne ther panel A minimum f 1.2m clearance shall be prvided arund significant items f plant that require nging maintenance, such as chillers r HVAC systems A minimum f 0.6m clearance shall be prvided arund fixed items f minr plant such as fans and vents A minimum f 0.65m between the panel and the edge f the rf sheeting Be cnfigured square t the rf line in an rderly and visibly appealing fashin Be lcated t minimise the effects f shade frm surrunding infrastructure and vegetatin Panel rientatin: It is preferred that panels are installed at 10 0 r greater abve hrizntal Panels may be installed between 6 0 and 9 0 tilt prvided that: The rf area is generally clean and nt subject t rf litter, bird drppings, vegetal material, dirt r similar Cleaning intervals are reduced t ne every six mnths during the five year maintenance perid Panels may be installed at 5 0 r less prvided that: The rf area is generally clean and nt subject t rf litter, bird drppings, vegetal material Frameless glass n glass panels are installed Cleaning intervals are reduced t ne every six mnths during the five year maintenance perid Panels shall be installed at azimuths between (W) and 90 0 (E) Where existing safety hardware exists the panel layut and design must cnsider the safe usage and access f this equipment, t ensure the safe nging usage f the equipment and riginal intended purpse f the equipment. Particular attentin must be given t ensuring that either the existing r new anchrs can be easily accessed by prviding maintenance access channels at apprpriate lcatins near the anchrs Slar PV Design The slar PV design must cmply with all the recmmendatins prvided in the mst current Clean Energy Cuncil Grid Cnnected Slar PV systems Design Guidelines fr accredited installer. The design must be cnducted by a slar PV designer with full accreditatin frm the CEC. All apprpriate dcumentatin must be prvided t the client prir t installatin and at practical cmpletin PV array installatin The installatin must cmply with all recmmendatins prvided within the Clean Energy Cuncil installatin guidelines sectin 7. Wiring Refer t the Clean Energy Cuncil installatin guidelines sectin 7.7. Earthing Refer t the Clean Energy Cuncil installatin guidelines sectin 7.8. String Prtectin 22

27 Refer t the Clean Energy Cuncil installatin guidelines sectin 7.9. and AS5033 Clause and Clause PV islatr at array Refer t the Clean Energy Cuncil installatin guidelines sectin PV array cable between array and inverter Refer t the Clean Energy Cuncil installatin guidelines sectin 7.11, and general recmmendatins abve. Nte that the site and client may have specific guidelines which must be adhered t Inverter Installatin The inverter installatin shall be installed as per sectin 8 f the Clean Energy Cuncil Installatin Guidelines, and the Design Guidelines. Fr string inverters Inverters must be lcated where they can receive adequate ventilatin t nt cmprmise inverter efficiency; Inverters are t be lcated s that they are nt expsed t the weather, and nt be in a lcatin which has direct sun light between 9am and 3pm at the equinx, the cntractr is respnsible fr adequate shade and weatherprfing f the inverter lcatin Inverters are t be accessible t maintenance staff via a safe access pint; Inverters must be prtected by a vandal resistant steel cage/ventilated bx r similar where the inverter is therwise accessible t the public; Inverter shall have apprpriate restricted access f the inverters must be prvided where the system maximum vltage exceeds 600V, Inverters shall be installed as per the manufacturers guidelines All prpsed lcatins fr inverters are subject t apprval by the client and site tenant Earthing All Systems installed as part f the delivery f the Wrks shall include an earthing system which is cmpliant with all aspects f AS/NZS 3000 and AS/NZS As a minimum, all cnductive cmpnents f the system shall be earthed using a prtective earthing cnductr with a minimum crss sectin area f sufficient capacity t prvide ttal earthing capacity t the System; as required by the System s size, capacity and cnfiguratin. The earthing cnductr must als cnnect t all cabinets and inverters, using either the cabinet prprietary attachment r ther slutin t btain a permanent earthing fixture. All hinged drs t cabinets must be fitted with a suitable sized and cnfigured earthing strap between dr and cabinet. All cmpnents that have the ptential t experience a differential in vltage (e.g. frames/munting systems) particularly under fault cnditins, shall be equiptential bnded using a bnding cnductr which cmplies in terms f material, type, insulatin, identificatin, installatin and cnnectin requirements as utlined AS3000. The crss sectin sizing f the bnding cnducted will be f sufficient capacity t accept the vltage levels prduced by the System. Standard: Equiptential bnding required in cmpliance with AS/NZS 5033 and AS/NZ5033 and CEC installatin guidelines. 23

28 Cabling Standard: T AS/NZS 3000 & AS/NZS 5033 r equivalent General: DC Vltage drp shall be belw 3% between the slar PV array r string and the respective inverter. AC Vltage drp shall be belw 1% between inverter and the POC at the MSB. Nrmal AC cable shall be f type 0.6/1kV X-90 insulated, PVC sheathed t AS/NZS500.1 cpper cnducted 900C (XLPW) insulated and TPE sheathed t AS3191 and where applicable DC cabling shall be fine stranded tinned cpper cnductrs. Main generatr cabling shall be sheathed cable enclsed in heavy duty insulating cnduit t AS2053. Refer the Energy safe dcument July 2011 fr specifics. Phase cluring shall be in accrdance with AS/NZS3000 (A: Ref, B: White, C: Blue) Installatin f cabling shall be gruped tgether, parallel t each ther, parallel t the building structure and penetratin in accrdance with AS/NZS3006 and t minimise magnetic fields. Installatin in a lgical and reasnable way such that cables are easily accessible and nt subject t damage. Any cabling subject t rain, UV, r the like shall be designed fr that lcatin. Where cabling is likely t be subject t mechanical stress r ptential damage, apprpriate cver strips and shielding shall be used. Wiring thrugh cavity walls shall prtect against misture bridging D nt run wiring thrugh damp curse r flashing, Installatin f cables within walls shall be run vertically. Installatin f cables within slid walls shall use cnduit. Labelling All labelling f the system shall be f trifliate engraved type, adequately secured and screwed where expsed, and cmply with the requirements in the CEC installatin guidelines Testing and Cmmissining General: T AS and the Clean Energy Cuncil installatin guidelines Prir t practical cmpletin, the cntractr shall submit test reprts frm manufacturers r suppliers, verifying the perfrmance f safety and cntrl functins f each system. The cmmissining sheets as per the Clean Energy Cuncil Guidelines must be filled in and prvided t the client as the Clean Energy Cuncil guidelines. All apprpriate signage must be prvided as per sectin 12 f the Clean Energy Cuncil Guidelines Dcumentatin Requirements Pre-installatin and shp drawings Prir t cmmencement f the installatin f the slar system, the cntractr shall prvide detailed dcumentatin and shp drawings fr apprval by La Trbe University manager. The cntractr shall prvide shp drawings a minimum f 2 weeks prir t the prpsed cmmencement date fr apprval. The Pre-installatin and shp drawings shall include as a minimum: 24

29 Fr cnstructin drawings including Prpsed rf panel layut drawings which are fully labelled and scaled in A3 frmat. This shall include prpsed panel rientatin, spacing between panel rws and prpsed munting/fixing t the rf structure Single line electrical wiring diagrams clearly stating: DC and AC electrical design including string layut, islatr sizing, wiring sizing, slar DB s and prpsed AC cnnectin details Lcatin f prpsed inverters and munting, including a pht f the prpsed lcatin and schematic diagrams. Descriptin f prpsed AC and DC wiring runs including lcatin f wiring runs, fixing and mechanical prtectin Detailed descriptins and mdels f all equipment prpsed in the installatin including panels, inverters, islatrs and mnitring equipment as a minimum Fully detailed Scpe f wrks dcument including details f all equipment supplied and descriptin f wrks Prject Safety Plan which, includes site specific infrmatin n prject details, first aid representatin f the install team, evacuatin prcedures and lcatins, site islatin and signage requirements, prpsed wrk areas and access, prject rles and respnsibilities and OH&S site specific issues Site specific Safe Wrk Methd Statement and/r JSA The DNSP grid cnnectin apprval frm, deed r letter Dcumentatin general The installed slar systems manuals shall be supplied with three (3) cpies f Operatr and User Manual as specified in AS/NZS 5033 and the CEC installatin guidelines: The manuals shall include the fllwing as a minimum: The Manuals shall be supplied in a ring binder with the prject name clearly displayed n the cver. The Manuals shall be split int sectins such as Slar PV panels, inverter accessries, mnitring system lg-n, as-built drawings, equipment shp drawings, certificates, schedules, warranties, maintenance histry etc., with apprpriate dividers and an index. All equipment infrmatin sheets shall be supplied. A set f hard-cpy as built drawings shall be supplied within the Manuals. The as-built drawings shall include lcatins/munting f all equipment, ratings f all equipment, catalgue references numbers fr all equipment, circuit numbers, rutes f cable trays/submains/cnduits/cables etc., schematic diagrams. The Slar cntractr shall insert their wn cmpany name and details t each drawing (as-built drawings becme the respnsibility f the cntractr). All as-built drawings shall be clear and legible t the satisfactin f the prject manager. Space within the manual must be prvided fr the maintenance histry f PV installatin t be recrded Technical infrmatin and drawings The manuals must include the fllwing technical infrmatin and drawings: List f equipment supplied including technical specificatin and user manuals fr all supplied panels and inverters Prf f the selected slar panel type being n the apprved CEC listing, plus additinal infrmatin belw; Prf f the selected inverter being n the apprved CEC listing. A list f actins t be taken in the event f an earth fault alarm 25

30 Step-by-step perating prcedure Emergency shutdwn prcedure dcumentatin Maintenance guidelines fr the system Cmmissining sheet and installatin checklist as per the CEC installatin guidelines Array frame engineering certificates fr wind and mechanical lading, Site-specific structural engineering certificate signed by a structural engineer Installer/designer declaratin f cmpliance Warranty infrmatin n all supplied equipment A cpy f Certificate f Electrical Safety Drawings including General arrangement f equipment A circuit diagram, including the electrical ratings f the PV systems, and the ratings f all fuses, circuit breakers and cable specificatins Supprt details 3.14 Training and handver The cntractr shall prvide training and handver f the slar system after a certificate electrical safety has been issued and meter changer ver/re-cnfiguratin had been cmpleted. The training shall be cnducted fr nsite maintenance staff, prject manager and the building ccupiers. The training must be rganised in advance and cnducted at a cnvenient time fr all stakehlders. The training shall be undertaken n site and include the fllwing subjects as a minimum: Slar PV peratin Inverter peratin System islatin System mnitring Fault diagnsis Safety and emergency shutdwn prcedure User manuals and drawings explanatin The cntractr is respnsible fr switching n the system at handver. This is a requirement fr practical cmpletin Practical Cmpletin All f the fllwing items must, withut exceptin, be cmpleted prir t requesting the client t make final inspectins fr Practical Cmpletin and the final invice: Test the cmplete installatin wrks and leave the wrk area in perfect clean cnditin. Thrughly clean all equipment and parts. Prepare cmplete perating and maintenance instructins, warranty dcumentatin and 'as built' recrds t the apprval f the Superintendent. Carry ut all specified testing and cmmissining. Supply Authrity inspectin f the cmpleted installatin and Certificate f Electrical Safety. Supply all grid cnnectin apprval dcumentatin frm the distributr Cnduct training t University staff and prject managers n safe peratin f the system Physically switch n the system 26

31 Ensure that the mnitring systems are cnfigured Warranty General: The head cntractr shall prvide electrician/installer/wrkmanship warranties including a minimum 5-year warranty and defects liability perid n the entire installatin f the system. Individual system cmpnents must meet further warranty requirements as specified Slar Panels Prvide slar PV panel manufacturer s warranty: Manufacturer s Warranty: A minimum perid f 10 years manufacturer warranty is required. Perfrmance warranty: minimum perfrmance f at least 90% at 10 years and at least 80% at 25 years. Any insurance guarantee underwriting the lng-term perfrmance warranty shuld be specified, such as third party insurance arrangements Inverters Prvide inverter manufacturer s warranty: Manufacturer s warranty fr 10 years is required and must include full nsite replacement f a faulty unit Any insurance guarantee underwriting the lng-term perfrmance warranty shuld be specified, such as third party insurance arrangements Framing Prvide framing manufacturer s warranty: Manufacturer s warranty fr 10 years is required Cabling and islatrs Prvide manufacturer s warranty: Manufacturer s warranty fr 10 years is required 3.17 Maintenance Requirements Call ut The cntractr shall respnd t call uts fr breakdwns r ther faults requiring crrective maintenance fr 5 years. Attend n site within 48 hurs f ntificatin. Rectify faults and replace faulty materials and equipment Onging maintenance A maintenance plan is t be prvided t the client with recmmended maintenance actins, clearly stating instructins t cmplete the task and the frequency f which the tasks shuld be cmpleted. The maintenance plan must be included in the manuals. Onging maintenance by the cntractr fr a perid f 5 years shall be included in the tender respnse. This shall include as a minimum: 27

32 Bi-annual inspectin and maintenance f the system fr the five years, including 1 at 6 mnths and 1 at 12 mnths frm the date f practical cmpletin Written maintenance schedule and reprt submitted prject manager at each required inspectin. This dcument shuld be ed t the La Trbe University representative in pdf frmat, in additinal t cmpletin f the maintenance lg n site. The inspectin and maintenance shall be cnducted by an accredited CEC electrician and as a minimum shall include: Inspectin f the slar PV array t check: - Cleanliness f the mdules and the mdules cleaned if required - Adequacy f the panel cnnectins and munting structure - Mechanical cnditin f the array cabling - Electrical cnditin f the array cabling - Recrd array utput vltage - Recrd array utput current Inspectin f the inverter t check - Cleanliness - Adequate cnnectins f cables t the inverter - Adequate functining f the inverter Inspectin f the balance f system, t check - Switches/circuit breakers are perating crrectly - Cables/cnduits mechanically kay - Electrical cnnectins kay Annual testing f all installed anchr pints An nging maintenance lg shall be cnducted and recrded within the supplied manuals fr each PV installatin with assciated paperwrk prvided t the client Maintenance handver and training At the cmpletin f the cntracted maintenance perid, the cntractr is respnsible fr training f La Trbe University maintenance cntractrs. This may be cnducted at the final maintenance visit. 28

33 4 Safe rf hardware 4.1 General The cntractr is respnsible fr the design, supply and installatin f safety hardware and fall arrest systems t ensure safe access t the prpsed Slar PV installatin area. It is the cntractr s respnsibility t design the prpsed safety hardware and system in accrdance with the apprpriate Australian Standards and regarding their prpsed slar system design. The rf safety hardware system must be designed by a cmpetent persn wh is trained in height safety t AS/NZ1891 and has the experience, knwledge and skills t ensure the pendulum effect is eliminated t the greatest pssible level. The system must be installed by cmpetent height safety installers using NATA apprved prducts which cmply with the lads fr ne and tw persn fall arrest applicatins. The height safety system will cnsist f safe access and egress t the rf ensuring the end user is restrained when at a height f 2m and within 2m f the rf edge. Each cmpnent installed n a rf fr height safety purpses must meet all current lad ratings as stipulated in AS1891:2009. Test Certificates shall be prvided. The installer shall prvide a statement f the systems cmpliance and must install in accrdance t the manufacturer s instructins. The installer cannt use mix & match hardware and must use prprietary hardware t cmply with the Australian Standards. 4.2 Existing rf hardware Where existing rf safety hardware is remved, nt accessible due t the slar installatin, r restricts the current intended purpse f the hardware fllwing slar installatin; it is the cntractr s respnsibility t design and supply replacement safe rf hardware t ensure safe rf access is maintained and the riginal purpse f the safe rf hardware is achieved. The relcated anchr pints/safe rf hardware must include certificatin f cmpliance, a new rigging plan, the same lad bearing ratings t the existing anchr systems and cmply with all apprpriate Australian Standards. There is a strng preference t maintain the existing safe rf hardware by prviding apprpriate slar PV designs and installatin t allw the nging safe usage f the equipment. The design f panel arrays shuld prvide sufficient access t be achieved while tethered with a safety harness t the new r existing anchrs. The rpe arc shall nt be inhibited, and there must be access t walk back t the anchr, detach frm the anchr, then mve safely t the next anchr, tether and mve t the gutter r area required t be accessed. 4.3 Cdes and Standards The design, installatin, materials and equipment shall cmply with the fllwing standards and Cdes: AS 1657 Fixed Platfrms, Walkways and Ladders: design, cnstructin and installatin AS5532 Manufacturing requirements fr single pint anchr devices fr wrking at height AS :2011 Structural designs Part 2- Wind actins AS Steel Structures AS Industrial safety belts and harnesses Australian Standard AS Safety belts and Harnesses Australian Standard AS Hrizntal life line and rail systems 29

34 Australian Standard AS Hrizntal life line and rail systems - Prescribed cnfiguratins (Supplement 1) Australian Standard AS Fall arrest devices Australian Standard AS/NZ Parts 1 & 2 - Industrial Rpe Access Australian Standard AS Selectin, use and maintenance AS480 Health and Safety Cmpliance 4.4 Fall Arrest Systems Anchrs, static lines and fall arrest systems shall: be lcated t allw safe access t any panels which are lcated within 2m f an unprtected vertical edge be lcated t cmply with the requirements fr safe use, safe access, the pendulum effect and signage, as stipulated in clause 3.2 f AS be supprted by a structural supprt that is assessed separately by a suitably qualified engineer (as stipulated in AS , clause ) r by a cmpetent persn, as apprpriate, and the assessment dcumented shall be inspected fr cmpliance with the requirements in clause f AS and the inspectin dcuments. The dcumentatin shuld specify any nging requirement t carry ut testing f anchr pints be prperly labelled as per the Australian standards include instructins fr safe use and apprpriate rigging plans include rf plan shwing lcatins f all new equipment prvide infrmatin n the fixing methd f the anchr/fall arrest system prvide a list f cmpnents serial numbers 30

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY January 31, 2017 VANCOUVER FRASER PORT AUTHORITY Nn-Rad Diesel Emissins Fuel Efficiency Plan Guideline Table f Cntents

More information

Design Standard - Fume Hoods & Fume Hood Exhausts

Design Standard - Fume Hoods & Fume Hood Exhausts 1.0 Intrductin Design Standard - Fume Hds & Fume Hd Exhausts The fume hd is the primary cntrl device in mst labratries fr prtecting emplyees and students frm expsure t hazardus chemicals. It is als an

More information

MEDMASTER TROFFER Luminaires for MRI/Imaging Suites LED MRIT SERIES

MEDMASTER TROFFER Luminaires for MRI/Imaging Suites LED MRIT SERIES MEDMASTER TROFFER Luminaires fr MRI/Imaging Suites PRODUCT FEATURES: Recessed munt Grid; 2' 2', 2' 4' Nn-ferrus cnstructin safe fr sensitive MRI equipment High-utput, high-cri LED lamp ptins NSF2 rating

More information

CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date

CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52 Respnsible Officer: Respnsible Executive: Grup Manager Health and Safety Executive General Manager Crprate DOCUMENT HISTORY Key Changes Prepared By Checked By

More information

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations Draft ADEM Guidance Prpsed Additins t the Alabama UST Regulatins Yu may have heard abut upcming changes t the undergrund strage tank regulatins (UST regulatins). On Octber 13, 2015 EPA finalized the first

More information

Delta RPI-M50A - India. Grid-Tied Solar Inverter RPI-M50A. The Power Behind Competitiveness. Product Features

Delta RPI-M50A - India. Grid-Tied Solar Inverter RPI-M50A. The Power Behind Competitiveness. Product Features The Pwer Behind Cmpetitiveness Delta - India Grid-Tied Slar Inverter Prduct Features Transfrmerless Inverter Dual MPP Trackers Peak Efficiency up t 98.6% Cnnects up t 10 Strings Ergnmic Grip Design Ultra

More information

CONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY

CONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY Page: 1 f 8 TABLE OF CONTENTS 1. Purpse... 2 2. Scpe... 2 3. Definitins... 2 4. General Rules... 3 5. Vehicles... 3 6. Site Access Areas... 4 7. Cnditin f Vehicles... 5 8. Drivers Licence Cnfirmatin...

More information

3000-series Remote Start System with Keyless Entry. Owner's Guide

3000-series Remote Start System with Keyless Entry. Owner's Guide 3000-series Remte Start System with Keyless Entry Owner's Guide Cngratulatins Cngratulatins n the purchase f yur state-f-the-art remte start system with keyless entry. Reading this Owner s Guide prir

More information

Delta RPI-M50A. Grid-Tied Solar Inverter RPI-M50A. The Power Behind Competitiveness. Product Features

Delta RPI-M50A. Grid-Tied Solar Inverter RPI-M50A. The Power Behind Competitiveness. Product Features The Pwer Behind Cmpetitiveness Delta Grid-Tied Slar Inverter Prduct Features Transfrmerless Inverter Dual MPP Trackers Peak Efficiency up t 98.6% Cnnects up t 12 Strings Ergnmic Grip Design Ultra Cmpact

More information

TECHNICAL SPECIFICATION. SPC-4T Stirling Process Cryogenerator

TECHNICAL SPECIFICATION. SPC-4T Stirling Process Cryogenerator TECHNICAL SPECIFICATION SPC-4T Stirling Prcess Crygeneratr Reference 80 8044_00 Issue Date April 20, 2016 Stirling Crygenics is a registered trade name f DH Industries BV Fr mre infrmatin n the Stirling

More information

Technical Manual. eluma. Aluminum Frame LED Panels. patents pending. Technical Specifications Subject to Change

Technical Manual. eluma. Aluminum Frame LED Panels. patents pending. Technical Specifications Subject to Change Technical Manual eluma Aluminum Frame LED Panels patents pending TM Technical Specificatins Subject t Change TABLE OF CONTENTS General Specificatins.. Page 3 Prfile Specificatins EL001.. Page 4 Prfile

More information

Traffic Logix SafePace 400 Radar Speed Sign Product Specifications Version 1.2

Traffic Logix SafePace 400 Radar Speed Sign Product Specifications Version 1.2 Traffic Lgix SafePace 400 Radar Speed Sign Prduct Specificatins Versin 1.2 Traffic Lgix Crp. I 3 Harriet Lane I Spring Valley, New Yrk 10977 T (866) 915-6449 F (866)995-6449 I www.trafficlgix.cm I inf@trafficlgix.cm

More information

Traffic Logix SafePace 475 Radar Speed Signs Product Specifications Version 1.2

Traffic Logix SafePace 475 Radar Speed Signs Product Specifications Version 1.2 Traffic Lgix SafePace 475 Radar Speed Signs Prduct Specificatins Versin 1.2 1 Table f Cntents Dimensins... 3 Sign Weight... 3 Accessries... 3 Technical Specificatins... 4 Pwer... 4 Radar... 4 Display...

More information

TAFE Digital Application Form for Certificate III UEE30811 Electrotechnology Electrician

TAFE Digital Application Form for Certificate III UEE30811 Electrotechnology Electrician ELECTROTECHNOLOGY - CERT III ELECTRICIAN Natinal cde: UEE30811 Training package: UEE11 TAFE Digital Applicatin Frm fr Certificate III UEE30811 Electrtechnlgy Electrician OFFICE USE ONLY Date received:

More information

REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION

REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION The Twn f Salem, New Hampshire is requesting qualificatins frm qualified

More information

HIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems!

HIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems! The HB Series Advantage SGS listed cnfirming t UL Standard 2108 & 8750 Certified t CSA Standard C22.2 N.9 LED Life f 50K+ hurs, under nrmal perating cnditins Lw wattage, lw heat, lw vltage (12DVC & 24VDC

More information

ROOF INSPECTION GUIDE

ROOF INSPECTION GUIDE INSURANCE INSTITUTE FOR BUSINESS & HOME SAFETY ROOF INSPECTION GUIDE COMMERCIAL ROOF-MOUNTED BALLASTED PHOTOVOLTAIC (PV) WIND PROTECTION ON LOW-SLOPED ROOFS Use the fllwing guidance t cnduct baseline and

More information

21 Econo Place, Silverdale, NSW 2752 P F SPAN TABLES

21 Econo Place, Silverdale, NSW 2752 P F SPAN TABLES 21 Ecn Place, Silverdale, NS 2752 P 1300 132 787 F 02 4774 2679 www.quickbuiltsystems.cm.au SPAN TABLES ROSS Engineers have prepared these tables fr use by peple skilled in the design and specificatin

More information

Motor Vehicle Working group 15 February 2017 Access to vehicle repair and maintenance information (RMI)

Motor Vehicle Working group 15 February 2017 Access to vehicle repair and maintenance information (RMI) Mtr Vehicle Wrking grup 15 February 2017 Access t vehicle repair and maintenance infrmatin (RMI) Internal market, Industry, Entrepreneurship and SMEs What is RMI? Vehicle repair and maintenance infrmatin

More information

ABTQ-103 rev 01 Last review:

ABTQ-103 rev 01 Last review: INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH PCS Cntrl Statin Purpse f Instructins Wrking in hazardus areas, the safety f persnnel and plant depends n cmplying with all relevant safety

More information

BHC-P-11.1 Temporary Works

BHC-P-11.1 Temporary Works Berkeley Hme Cunties Safety Prcedures Cntents 1.0 Purpse 2.0 Scpe 3.0 Definitins 4.0 Main requirements 5.0 Guidance dcuments and references 6.0 Appendices Revisin register BHC-P-11.1 Temprary Wrks Date

More information

CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM

CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM PROGRAM OVERVIEW Ecnmic Vitality is a critical factr in ensuring Castle Rck s lng-term success and in achieving its Visin f being a Self-Sufficient

More information

Highfields Independent School and Day Nursery Mini Bus Policy

Highfields Independent School and Day Nursery Mini Bus Policy Highfields Independent Schl and Day Nursery Mini Bus Plicy Last Reviewed: Nv 2015 Apprved n: Cmmittee Respnsible: Pupil and Persnnel Next Review: Nv 2017 Apprved by: Full Gvs Highfields Schl is cmmitted

More information

Franchised Hauler Exemption for Recycling Application

Franchised Hauler Exemption for Recycling Application Franchised Hauler Exemptin fr Recycling Applicatin City f Ann Arbr Franchised Hauler Exemptin fr Recycling Applicatin Exemptins frm cmmercial trash services prvided by the city-selected franchised hauler

More information

Traffic Logix SafePace 450 (Full & Compact) Radar Speed Signs Product Specifications Version 1.6

Traffic Logix SafePace 450 (Full & Compact) Radar Speed Signs Product Specifications Version 1.6 Traffic Lgix SafePace 450 (Full & Cmpact) Radar Speed Signs Prduct Specificatins Versin 1.6 2014-2016 Traffic Lgix Crpratin www.tapcnet.cm 5100 West Brwn Deer Rad Brwn Deer, WI 53223 1 Table f Cntents

More information

Traffic Logix SafePace 475 Radar Speed Signs Product Specifications Version 1.0

Traffic Logix SafePace 475 Radar Speed Signs Product Specifications Version 1.0 Traffic Lgix SafePace 475 Radar Speed Signs Prduct Specificatins Versin 1.0 1 Table f Cntents Dimensins... 3 Sign Weight... 3 Accessries... 3 Technical Specificatins... 4 Pwer... 4 Radar... 4 Display...

More information

FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994

FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994 FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994 Guidelines fr Maintenance and Inspectin Prgrams fr Natural Gas and Prpane Appliances and their Fuel Features In Schls The Ontari Gas Utilizatin Cde states

More information

Printer/Copier Request for Proposals

Printer/Copier Request for Proposals The First Unitarian Church f Hamiltn Printer/Cpier RFP Cntents Printer/Cpier Request fr Prpsals Intrductin... 2 Type f Prpsal... 2 Managed Printing Cntract... 2 Equipment Lease, Maintenance Cntract Cmbinatin...

More information

PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY

PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY Planning Meetings PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY The Arctic Winter Games Internatinal Cmmittee (AWGIC) establishes a series f planning meetings with each Hst Sciety and Chefs de Missin

More information

Gearbox Installation Manual

Gearbox Installation Manual Gearbx Installatin Manual Rtrk Gears HOB/MPR & HOS/MPR ranges (Electrnic cpy available n www.rtrk.cm)! This manual cntains imprtant safety infrmatin. Please ensure it is thrughly read and understd befre

More information

EnergyBar 6. Setup Guide

EnergyBar 6. Setup Guide EnergyBar 6 Setup Guide WELCOME Cngratulatins n yur purchase f the Apex EnergyBar 6! The EnergyBar 6 allws the Apex system t cntrl up t six 230 vlt items such as lights, pumps, fans, heaters, chillers

More information

REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES

REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES The Twn f Sundre is requesting prpsals frm qualified engineering firms fr civil engineering services. This will invlve prviding advice and recmmendatins

More information

Webinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs

Webinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs Webinar: Ontari s 2012 Building Cde: Electric Vehicle Charging Presented by the Ministry f Municipal Affairs Ntice This presentatin is intended fr general infrmatin purpses related t electric vehicle charging

More information

IQUPS.com Have you checked the IQ of your Power Systems?

IQUPS.com Have you checked the IQ of your Power Systems? IQUPS.cm Have yu checked the IQ f yur Pwer Systems? TMSPDC Transprtable Mdular (Trailer-Mdular Pwer Strage - Offices) Characteristics: Transprtable; Mdular; Simple; Rugged; Military Grade. Systems Designed

More information

SOMSAS Student User Manual Overseas Short Term Programs

SOMSAS Student User Manual Overseas Short Term Programs SOMSAS Student User Manual Overseas Shrt Term Prgrams Table f cntents WHAT IS SOMSAS? 2 CREATE A NEW APPLICATION 2 Shrt Term Prgram 3 ADD SUBJECTS TO YOUR APPLICATION 3 Hst Institutin Details 4 Partner

More information

DRAFT Testing and Reporting Requirements for Linear Replacement Lamps

DRAFT Testing and Reporting Requirements for Linear Replacement Lamps DRAFT Testing and Reprting Requirements fr Linear Replacement Lamps Nte: This draft represents updates t the existing Testing and Reprting Requirements fr Linear Replacement Lamps. All changes frm the

More information

ITU-T. FG Distraction. Report on Vehicle-to-Applications Communications Interface. ITU-T Focus Group on Driver Distraction

ITU-T. FG Distraction. Report on Vehicle-to-Applications Communications Interface. ITU-T Focus Group on Driver Distraction I n t e r n a t i n a l T e l e c m m u n i c a t i n U n i n ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU FG Distractin Versin 1.0 (03/2013) ITU-T Fcus Grup n Driver Distractin Reprt n Vehicle-t-Applicatins

More information

PARKING ENFORCEMENT ON PRIVATE PROPERTY BY AUTHORIZED CITY BY-LAW ENFORCEMENT OFFICERS

PARKING ENFORCEMENT ON PRIVATE PROPERTY BY AUTHORIZED CITY BY-LAW ENFORCEMENT OFFICERS ENFCEMENT ON PRIVATE PROPERTY BY AUTHIZED CITY BY-LAW ENFCEMENT OFFICERS T: Supervisr f Parking Services, City f Brantfrd: I, Of Name (print) Municipal Address (print) Brantfrd, ON Psitin (print) Type

More information

Installation Guide Contigo 6100

Installation Guide Contigo 6100 Installatin Guide Cmmercial Vehicle Prductivity and Security The is a high-perfrmance beacn designed fr cmmercial prductivity and security. It is ideally suited t installatins in delivery and service fleets

More information

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE 1. INTRODUCTION... 3 2. PRECAUTIONS... 3 3. INSPECTION UPON RECEIPT OF GOODS... 4 3.1 GENERAL... 4 3.2 VISIBLE DAMAGE... 4 3.3 CONCEALED DAMAGE...

More information

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS 120 Mdel: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS IF YOU CANNOT READ OR UNDERSTAND THESE INSTALLATION INSTRUCTIONS DO NOT ATTEMPT TO INSTALL OR OPERATE INTRODUCTION This Wired Wall Timer system was

More information

Testing and Reporting Requirements for Linear Replacement Lamps

Testing and Reporting Requirements for Linear Replacement Lamps Testing and Reprting Requirements fr Linear Replacement Lamps The DLC defines all tube-style LED prducts that use the lamp hlders (i.e. sckets r tmbstnes) in the luminaire t mechanically r electrically

More information

100 KW / 125 KVA POWERED by

100 KW / 125 KVA POWERED by 100 KW / 125 KVA POWERED by MODEL Tritn Pwer is a wrld leader in the design, manufacture f statinary, mbile and rental generatr sets and Pwer Mdules frm 10 t 2000 kw. Thrugh ur cmmitment t quality we manufacture

More information

Hydro One Electricity Bills. Summer 2010

Hydro One Electricity Bills. Summer 2010 Hydr One Electricity Bills Summer 2010 Agenda Explanatin f Bills Reasns fr High Bills Tax Exemptin Cntact Infrmatin 1. Explanatin f Bills Page 1 f the Bill Balance Infrmatin: Balance Frward Budget Billing

More information

Update on Emerging Technologies of the RfG

Update on Emerging Technologies of the RfG An Cimisiún um Rialáil Fóntas Cmmissin fr Regulatin f Utilities Update n Emerging Technlgies f the RfG Reprting Perid March May 2018 Infrmatin Paper Reference: CRU/18/121 Date Published: 26/07/2018 Clsing

More information

ADVISORY: General Motors Upfitter Integration Bulletin #108d P a g e 1 May 18, 2016

ADVISORY: General Motors Upfitter Integration  Bulletin #108d P a g e 1 May 18, 2016 Subject: Aftermarket ALDL r DLC Interface Devices Causing Multiple Issues Mdels All Passenger Cars and Trucks Affected: Mdel Years: 2006 and beynd Date: February 4, 2013 Revisin Date: May 18, 2016 ADVISORY:

More information

Effective Date: 10-January Table of Contents

Effective Date: 10-January Table of Contents Versin: 3 Page: 1 f 7 Table f Cntents 1.0 Intrductin... 2 1.1 Purpse... 2 1.2 Scpe... 2 1.3 Definitins... 2 1.4 Training Requirements... 3 2.0 General Requirements... 3 3.0 Inspectin... 3 4.0 Testing...

More information

Update on Emerging Technologies of the RfG

Update on Emerging Technologies of the RfG An Cimisiún um Rialáil Fóntas Cmmissin fr Regulatin f Utilities Update n Emerging Technlgies f the RfG Reprting Perid May July 2018 Infrmatin Paper Reference: CRU18223 Date Published: 1/10/2018 Clsing

More information

SECOND DRAFT Testing and Reporting Requirements for Linear Replacement Lamps

SECOND DRAFT Testing and Reporting Requirements for Linear Replacement Lamps SECOND DRAFT Testing and Reprting Requirements fr Nte: This draft represents updates t the existing Testing and Reprting Requirements fr t include 3-ft, 8-ft, and 2G11 base lamps. All changes frm the existing

More information

TRUCK AND TRANSPORT MECHANIC STATUTORY DECLARATION OF WORK EXPERIENCE

TRUCK AND TRANSPORT MECHANIC STATUTORY DECLARATION OF WORK EXPERIENCE T qualify t challenge certificatin in this trade r be granted authrity t supervise and sign-ff n apprentices in this trade, individuals must have: wrked a minimum f 9,540 hurs perfrming the tasks listed

More information

Pre-Planning Delivery Guide

Pre-Planning Delivery Guide Pre-Planning Delivery Guide Need Assistance? Call 1-888-768-6772 Pre-Delivery Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time f yur

More information

Introduction Specifications Structure & Performance Assembly Folding Operation Care & Maintenance...

Introduction Specifications Structure & Performance Assembly Folding Operation Care & Maintenance... n Intrductin... 3 Specificatins... 4 Structure & Perfrmance... 5 Assembly... 6 Flding... 7 Operatin... 8-12 Care & Maintenance... 13-15 2 P a g e Read and fllw all instructins, warnings, and ntes in this

More information

Proposed Changes to Ontario s Building Code Summer and Fall 2017 Consultation: Electric Vehicle Charging in Multi-Unit Residential Buildings

Proposed Changes to Ontario s Building Code Summer and Fall 2017 Consultation: Electric Vehicle Charging in Multi-Unit Residential Buildings Prpsed Changes t Ontari s Building Cde Summer and Fall 2017 Cnsultatin: Electric Vehicle Charging in Multi-Unit Residential Buildings Purpse T prvide infrmatin n prpsed changes t the Building Cde regarding

More information

INVERTER/CHARGERS EVOLUTION SERIES. Off-Grid Power Solutions. How an Inverter/ Charger. Works... ORDER NOW

INVERTER/CHARGERS EVOLUTION SERIES. Off-Grid Power Solutions. How an Inverter/ Charger. Works... ORDER NOW D yu yu need reliable AC pwer in a vehicle, remte lcatin r fr emergency back-up? Samlex s inverter/charger is THE chice fr a cmplete ff-grid pwer slutin. Off-Grid Pwer Slutins LUTION SERIES S Sine 1 Pure

More information

Summary of Regulations for Commercial Driver s Licenses from the Federal Motor Carrier Safety Administration (Excerpts 2010)

Summary of Regulations for Commercial Driver s Licenses from the Federal Motor Carrier Safety Administration (Excerpts 2010) Summary f Regulatins fr Cmmercial Driver s Licenses frm the Federal Mtr Carrier Safety Administratin (Excerpts 2010) Classes f License: The Federal standard requires States t issue a CDL t drivers accrding

More information

PRE-PLANNING & DELIVERY GUIDE

PRE-PLANNING & DELIVERY GUIDE TM PRE-PLANNING & DELIVERY GUIDE Need Assistance? Call 1-888-329-4847 PRE-DELIVERY Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time

More information

Underground Storage Tank Management Practices

Underground Storage Tank Management Practices Prgram #: Envirnmental Management Prgram Revisin # 1.0 Implementatin Date 1/30/08 Page #: 1 f 13 Authr: Envirnmental Prgrams Apprval: W. Brewer Undergrund Strage Tank Management Practices 1.0 Purpse /

More information

Texas Christian University Policy

Texas Christian University Policy Texas Christian University Plicy Plicy Number: 6.060 Subject: Off Rad Vehicle Plicy Effective Date: January 16, 2009 Apprved: By Chancellr s Cabinet, January 15, 2009 I. Purpse This plicy prvides guidelines

More information

FC Sıcaklık Serisi FLAMEPROOF SWITCHES. IECEx CoC

FC Sıcaklık Serisi FLAMEPROOF SWITCHES. IECEx CoC FLAMEPROOF SWITCHES SPECIFIER'S GUIDE FOR PRESSURE SWITCHES PRESSURE DIFFERENCE SWITCHES VACUUM SWITCHES TEMPERATURE SWITCHES APPROVED with IECEx CC CCOE apprved KLPL apprved FC Sıcaklık Serisi 7 Using

More information

Delta RPI Commercial Series. Grid-Tied Solar Inverter RPI-M12 / RPI-M15A / RPI-M20A / RPI-M30. The Power Behind Competitiveness.

Delta RPI Commercial Series. Grid-Tied Solar Inverter RPI-M12 / RPI-M15A / RPI-M20A / RPI-M30. The Power Behind Competitiveness. The Pwer Behind Cmpetitiveness Delta RPI Cmmercial Series Grid-Tied Slar Inverter RPI-M12 / RPI-M15A / RPI-M20A / RPI-M30 Prduct Features Transfrmerless Inverter Dual MPP Trackers Peak Efficiency up t

More information

PARKING POLICY JULY 2012

PARKING POLICY JULY 2012 1. DEFINITIONS DRAFT POLICY RELATING TO PARKING Designated parking area: means basement parking bays, pen parking bays and ther parking bays at the Mangaung Metrplitan Municipality s premises. Lading Zne:

More information

Update on Emerging Technologies of the RfG

Update on Emerging Technologies of the RfG An Cimisiún um Rialáil Fóntas Cmmissin fr Regulatin f Utilities Update n Emerging Technlgies f the RfG Reprting Perid July 2017 Infrmatin Paper Reference: CRU17326 Date Published: 27/11/2017 Clsing Date:

More information

Compact Safedrive with built-in Safety Brake. innovative drive systems for industrial doors. Variable Speed Safedrive with built-in Safety Brake

Compact Safedrive with built-in Safety Brake. innovative drive systems for industrial doors. Variable Speed Safedrive with built-in Safety Brake GfA-ELEKTROMATEN Chain Drive Operatr fr Rller Shutter Cmpact Safedrive with built-in Safety Brake Safedrive with built-in Safety Brake Chain Drive with separate Safety Brake Fire Shutter Operatr innvative

More information

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angla, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.cm Website: www.vestil.cm 0317 DCR-205-DC, MANUAL DCR-205-XX-DC Pwered Drum Rtatrs

More information

Diagram1- typical B-Triple. Diagram 2 typical AB-Triple. Diagram 3 typical Road Train

Diagram1- typical B-Triple. Diagram 2 typical AB-Triple. Diagram 3 typical Road Train NSW ROAD TRAIN MODERNISATION PROGRAM B-TRIPLE & AB-TRIPLE OPERATING CONDITIONS Applicatin These perating cnditins apply t: B-Triples, which are a vehicle cmbinatin cnsisting f a prime mver twing three

More information

LED Driver Feedback Signs

LED Driver Feedback Signs LED Driver Feedback Signs Installatin Instructins (029-04151-0000) Nvember 2012 Slar Kit 35AH / 55W 70AH / 55W 70AH / 85W M75-SOLAR-000S M75-SLR70-000S M75-SOLAR-000C E. 5676 Seltice Way Pst Falls, Idah

More information

VEHICLE ACTIVATED SPEED LIMIT SIGNS

VEHICLE ACTIVATED SPEED LIMIT SIGNS VEHICLE ACTIVATED SPEED LIMIT SIGNS TRS-VASL VEHICLE ACTIVATED SPEED LIMIT SIGNS Vehicle Activated Speed Limit (VASL) signs measure the speed f appraching vehicles. If the speed f the vehicle is higher

More information

Generator/Loadbank Quick Connection Switchboard

Generator/Loadbank Quick Connection Switchboard / Generatr/Ladbank Quick Cnnectin Switchbard FS2-Series Generatr/Ladbank Quick Cnnectin Slutins Brchure www.apt-pwer.cm 433 N. 36 th Street Lafayette, IN 47905 (765) 446-2343 ALN: 516 Rev. 01 Standard

More information

Hub/Remote Operations in version 3.0

Hub/Remote Operations in version 3.0 Hub/Remte Operatins in versin 3.0 In StckTrac Enterprise 3.0, the Hub and Remte perate quite a bit differently than they did in 2.0. In 2.0, the shps stred their business fr the day int daily files which

More information

Temporary Use and Vendor Stand Online Permit Submittal

Temporary Use and Vendor Stand Online Permit Submittal Temprary Use and Vendr Stand Online Permit Submittal A Temprary Use Permit is an pen-air small business that is there fr a limited time fr the uses listed belw. Temprary Use Duratin Extensin Agricultural

More information

Installation Guide Contigo 6150 & 6151

Installation Guide Contigo 6150 & 6151 Installatin Guide Cntig 6150 & 6151 Cmmercial Vehicle Prductivity and Security The Cntig 6150 & 6151* (cllectively knwn as the Cntig 615X) are highperfrmance beacns designed fr cmmercial prductivity and

More information

APPLICATION FORM FOR DIGITAL TACHOGRAPH DRIVER CARD

APPLICATION FORM FOR DIGITAL TACHOGRAPH DRIVER CARD APPLICATION FORM FOR DIGITAL TACHOGRAPH DRIVER CARD Use the checklists belw t make sure that yur applicatin is cmplete befre yu return it. Have yu cnsidered applying fr yur driver card nline? It s quicker

More information

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY Dc N: DRIVING Issue Date JAN 1995 Revisin Versin Revisin N. 02 Next Revisin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance

More information

- No object may be left inside the vehicle;

- No object may be left inside the vehicle; GENERAL CONDITIONS AND RULES OF USE OF THE CAR PARK ARTICLE 1 General prvisins and respnsibilities 1.1 - In the absence f a prir written agreement with PARKING, upn entering these premises the USER uncnditinally

More information

TECHNICAL STANDARD ORDERS (TSO) CERTIFICATION CONSIDERATION IN CHINA FOR INTEGRATED MODULAR AVIONICS (IMA) HARDWARE ELEMENTS

TECHNICAL STANDARD ORDERS (TSO) CERTIFICATION CONSIDERATION IN CHINA FOR INTEGRATED MODULAR AVIONICS (IMA) HARDWARE ELEMENTS TECHNICAL STANDARD ORDERS (TSO) CERTIFICATION CONSIDERATION IN CHINA FOR INTEGRATED MODULAR AVIONICS (IMA) HARDWARE ELEMENTS Presented By: Frank(Fei) Xia, AVIAGE SYSTEMS Date: April 21, 2016 ABOUT AVIAGE

More information

FOOD TRUCK VENDOR INSTRUCTIONS

FOOD TRUCK VENDOR INSTRUCTIONS FOOD TRUCK VENDOR INSTRUCTIONS City f Clumbia 208 S. Rapp Ave. Clumbia, IL 62236 618.281-7144 x 134 Please allw tw weeks fr prcessing. The fllwing dcuments must be submitted with this applicatin: - Cmpleted

More information

APPLICATION FOR SPECIAL EVENT PERMIT EVENT BASICS

APPLICATION FOR SPECIAL EVENT PERMIT EVENT BASICS Date Applicatin Received: Permit Number: APPLICATION FOR SPECIAL EVENT PERMIT Please return cmpleted applicatin frm with permit fee and paperwrk t: Events Crdinatr, Twn f Beaufrt 701 Frnt Street P.O. Bx

More information

City of San Luis Obispo Zoning Regulations December 2013

City of San Luis Obispo Zoning Regulations December 2013 City f San Luis Obisp Zning Regulatins December 2013 parking areas, parking f vehicles fr purpses f vernight camping r sleeping is prhibited by and shall be subject t enfrcement in accrdance with Chapter

More information

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314)

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314) Architectural Review Bard Sign Review Applicatin 139 S. Kirkwd Rd. Kirkwd, MO 63122 (314) 822-5816 Fax (314) 822-5898 Prperty Address: Case # Permit# _ Persn Requesting Review Applicatin Date: Name: Address:

More information

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314)

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314) Architectural Review Bard Sign Review Applicatin 139 S. Kirkwd Rd. Kirkwd, MO 63122 (314) 822-5816 Fax (314) 822-5898 Prperty Address: Case # Persn Requesting Review Applicatin Date: Name: Address: City/State/Zip:

More information

Mobile Delineator Safe Work Practice Template with Application for Approval

Mobile Delineator Safe Work Practice Template with Application for Approval Mbile Delineatr Safe Wrk Practice Template with Applicatin fr Apprval [Insert yur cmpany name and graphic, if desired. Expand space as required] [Insert yur cmpany dcument reference number, if desired.

More information

Tips & Technology For Bosch business partners

Tips & Technology For Bosch business partners Tips & Technlgy Fr Bsch business partners Current tpics fr successful wrkshps N. 35/2011 Gasline injectin Invented fr life Lambda sensr Knw-hw frm the market leader Bsch, innvative cmpany and wrld's largest

More information

Safe Handling of High Voltage Electrical components in Electrical End of Life Vehicles

Safe Handling of High Voltage Electrical components in Electrical End of Life Vehicles Safe Handling f High Vltage Electrical cmpnents in Electrical End f Life Vehicles The fllwing infrmatin is extracted frm the dcument Safe Handling f High Vltage Electrical cmpnents in Electrical End f

More information

NEXT UPS Systems MANTIS II Tower 750/1000/1500 Installation and user manual English

NEXT UPS Systems MANTIS II Tower 750/1000/1500 Installation and user manual English NEXT UPS Systems MANTIS II Twer 750/1000/1500 Installatin and user manual English CONTENT IMPORTANT SAFETY INSTRUCTIONS... 1 1. Intrductin... 4 2. Descriptin f Features... 4 3. Package Cntents... 4 4.

More information

HANDLING AND STORAGE PRACTICE

HANDLING AND STORAGE PRACTICE PREFERRED RELIABILITY PRACTICES Practice N. PD-ED-1109 Page 1 f 5 Ni-H SPACECRAFT BATTERY HANDLING AND STORAGE PRACTICE Practice: Develp and implement handling and strage prcedures t ensure reliable peratin,

More information

RICHARD L. OREAIR & CO. Safety Management System

RICHARD L. OREAIR & CO. Safety Management System SAFETY Dc N: Revisin Date: Revisin N. 2 Initial Versin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance with lcal regulatry

More information

STS 640 LIFTING EQUIPMENT

STS 640 LIFTING EQUIPMENT Hunter Water Crpratin A.B.N. 46 228 513 446 Standard Technical Specificatin fr: STS 640 LIFTING EQUIPMENT This Standard Technical Specificatin (STS) was develped by Hunter Water Crpratin t be used in the

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST UNDERGROUND STORAGE TANK INSTALLATION PLAN REVIEW CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST UNDERGROUND STORAGE TANK INSTALLATION PLAN REVIEW CHECKLIST July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST UNDERGROUND STORAGE TANK INSTALLATION PLAN REVIEW CHECKLIST Address: Permit #: Inspectr: Date: Status: Inspectr: Date:

More information

SAE Certified Vehicle Electrification Professional

SAE Certified Vehicle Electrification Professional SAE Certified Vehicle Electrificatin Prfessinal Bdy f Knwledge fr the CVEP Secnd Editin Table f Cntents Intrductin... 2 CVEP Examinatin Structure... 4 Essential Safety Examinatin... 4 Knwledge-based Examinatin...

More information

Genesys Certification Study Guide

Genesys Certification Study Guide Genesys Certificatin Study Guide Genesys Certified Prfessinal 8 System Cnsultant, iwd Slutin (GCP8 - CiWD) Exam Cde Type f Exam Number f Items GCP8-CiWD (Prmetric cde: GE0_809) Written, multiple-chice

More information

Trouble Shooting Guide for AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves)

Trouble Shooting Guide for AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves) Truble Shting Guide fr AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves) AFVK-SP, AFVK-SP-H/L, AFVK-SP-MH/L AFVK-SP Series Valve Kit Truble Shting Guide (AF-4000 Series) TABLE OF CONTENTS General Infrmatin

More information

C.O.I.S. Technical Data Sheet CAD Operation Installation Specification

C.O.I.S. Technical Data Sheet CAD Operation Installation Specification Literature C.O.I.S. TD CSI 3 part 200 series dcuments 400 series dcuments 600 series dcuments C.O.I.S. Technical Data Sheet CAD Operatin Installatin Specificatin Dcument #409 Issued 08-2007 MODEL 100SS-R

More information

Self Consumption in residential systems

Self Consumption in residential systems Self Cnsumptin in residential systems Brad Bassett Sr. Applicatin Engineer Jan 27, 2017 San Dieg, CA What is Self Cnsumptin? A direct grid tie system is where slar energy prduced, pwers the huse lads as

More information

CERTIFICATE OF APPROVAL No CF 119 DORMA UK LTD

CERTIFICATE OF APPROVAL No CF 119 DORMA UK LTD CERTIFICATE OF APPROVAL N CF 119 1 This is t certify that, in accrdance with TS00 General Requirements fr Certificatin f Fire Prtectin Prducts The undermentined prducts f Wilbury Way, Hitchin, Hertfrdshire

More information

PSS INSTALLATION INSTRUCTIONS

PSS INSTALLATION INSTRUCTIONS PSS INSTALLATION INSTRUCTIONS Imprtant - Read Befre Starting! Befre starting yur installatin carefully read the fllwing warnings and instructins. Failure t prperly fllw the warnings and instructins culd

More information

IB Regional Workshops: Guidelines for Host Schools in Latin America

IB Regional Workshops: Guidelines for Host Schools in Latin America IB Reginal Wrkshps: Guidelines fr Hst Schls in Latin America Page 1/11 Dear Head f Schl and IB crdinatr, Thank yu fr cnsidering hsting an IB Prfessinal Develpment event at yur schl. As a leader in prfessinal

More information

The MODUM Fire Escape Ladder

The MODUM Fire Escape Ladder The MODUM Fire Escape Ladder The MODUM Fire Escape Ladder is elegantly designed fr permanent wall munting - and it is ready fr use in secnds. The MODUM Fire Escape Ladder is designed and manufactured in

More information

EP12M248 7 Stage Automatic Smart Battery Charger, Desulphuration& Maintainer 12V, 2 / 4 / 8A FOR AGM, GEL AND WET BATTERIES USER MANUAL

EP12M248 7 Stage Automatic Smart Battery Charger, Desulphuration& Maintainer 12V, 2 / 4 / 8A FOR AGM, GEL AND WET BATTERIES USER MANUAL EP12M248 7 Stage Autmatic Smart Battery Charger, Desulphuratin& Maintainer 12V, 2 / 4 / 8A FOR AGM, GEL AND WET BATTERIES USER MANUAL THIS MANUAL CONTAINS IMPORTANT SAFETY AND OPERATING INSTRUCTIONS 1

More information

Track Lateral Stability

Track Lateral Stability Discipline: Engineering (Track & Civil) Categry: Cde f Practice Track Lateral Stability Sectin 6 Applicability ARTC Netwrk Wide Primary Surce Dcument Status Versin Date Reviewed Prepared by Reviewed by

More information

Methanol Recovery Systems

Methanol Recovery Systems Methanl Recvery Systems Methanl Recvery fr bidiesel is an imprtant part f the entire bidiesel prcess and invlves the highest cst f peratin fr a bidiesel plant. Only abut half f the methanl used is actually

More information