Traffic Signal Timing Diamond Operation. Innovation for better mobility

Size: px
Start display at page:

Download "Traffic Signal Timing Diamond Operation. Innovation for better mobility"

Transcription

1 Traffic Signal Timing Diamond Operation

2 Classic Diamond Interchange Page 2 2

3 What is a Diamond? Page 3 3

4 What is a Diamond? (Signal Terms) Two closely spaced signalized intersections of an arterial with a one way pair of frontage roads (Works more efficiently with one controller than two) Arterial Interior Frontage Road Page 4 4

5 Diamond Interchange Operation Phasing Options 4 Phase 3 Phase Separate Intersection Mode Page 5 5

6 Phasing Considerations Make it Efficient: run the heaviest movements together Three Phase Allows the main street phases (2+6) or (4+8) Four Phase Allows limited time for the Arterial and opposite side ramp Page 6 6

7 Phasing Considerations Lane Use Interchange Geometry Width of the Interchange (Internal Storage Capacity) Number of Lanes on The Approach Capacity Entering vs Capacity Inside Volume Distribution Origin Destination Page 7 7

8 Phasing Considerations Selection of Left Turn Treatment Hardware available Accident history Number of lanes Permissive should not be used with dual left turn lanes. Conflicting Vehicle Speeds Permissive should not be used with approach speeds over 40. Number of Lanes to Cross Permissive should not be used when crossing 3 or more lanes. Page 8 8

9 Classic Three Phase Arterial Interior Frontage Road Arterial Interior Clearance Frontage Roads Page 9 9

10 Three Phase Applications Most Effective: Wide Interchanges Provide adequate internal storage Rural Areas with Light Overall Traffic Fewer movements shorter cycle lengths Heavy Through Movements Will be ran simultaneously without having to cross each other Page 10 10

11 Classic Four Phase Right Arterial Right Frontage Left Arterial Left Frontage Page 11 11

12 Four Phase Applications Most Effective: Tightly Spaced Interchanges No adequate internal storage Urban Areas More movements longer cycle lengths Heavy Turning Movements Each exterior movement runs independently Page 12 12

13 Three Phase Examples Wide Intersection Spacing Rural Area (Light Traffic) Page 13 13

14 Three Phase Examples Wide Intersection Spacing Rural Area (Light Traffic) Page 14 14

15 Three Phase Examples Freeway not built yet (heavy through traffic) Page 15 15

16 Four Phase Examples Narrow Urban Diamonds Heavy Turning Traffic Page 16 16

17 Four Phase Examples Narrow Urban Diamonds Heavy Turning Traffic Page 17 17

18 Four Phase Examples Narrow Urban Diamonds Heavy Turning Traffic Page 18 18

19 Four Phase Examples Narrow Urban Diamonds Heavy Turning Traffic Page 19 19

20 Basic Three Phase Sequence Very efficient under light, even volume distribution. Problem: Does not handle uneven traffic volumes well. Page 20 20

21 Texas Three Phase Allows shorter, more efficient cycles Flexible Phasing in free and coordination Interior clearance after arterial phases Conditional Service allows backup to re-service interior with frontage road Conditional Service Intervals Page 21 21

22 Texas Diamond 3 Phase OL K=4+12 OLA= OLI OLL= OLB= OLN=8+16 Page 22 22

23 Basic Four Phase Sequence Attempts to provides progression for every entering vehicle. Problem: Tends to have long cycle lengths. Page 23 23

24 Texas Four Phase Adds two travel time (fixed time) phases into 4-phase cycle Increases efficiency Shortens Cycle Lengths Minimizes interior stops by providing internal clearances for every entering movement Travel Time Right Arterial Right Front. Rd Fixed Time Phase Left Arterial Left Front. Rd Travel Time Fixed Time Phase Page 24 24

25 Classic Four Phase Sequential Phasing Progresses every movement 25% 25% 25 s 25 s 25 s 25% 25 s 25% 100 Second Cycle Page 25 25

26 Texas Four Phase Same Splits 31 % 25 s 15 s 20% Shorter Cycle 31 % 25 s 15 s 10 s 25 s 31% 15 s 15 s 25 s 31% Wraps around 10 s 80 Second Cycle Page 26 26

27 Texas Diamond TTI 4 Phase Provides One Stop Operation Always keeps the interior clear Allows fully actuated operation Page 27 27

28 Texas Diamond Overlap Assignments OL K=4+12 OLA= OLI OLL= OLB= OLN=8+16 Page 28 28

29 Texas Diamond: 3 Phase - 4 Phase Both use the same load switch assignments Both use the same detector assignments Ring Structures are Different They have a common phase which is used when switching between 3 and 4 phase operation Page 29 29

30 Ring Structures Texas Three Phase Texas Four Phase Page 30 30

31 Diamond Detector Layout Page 31 31

32 Ramp Detector Placement T = Travel Time for Phase 2 D = Detector Setback = Distance traveled during T+2 Phase 8 D Example: T = 8 seconds Phase 8 approach speed = 40MPH D = (8+2) x (40x1.47) = 588 Travel Time Phase 2 Page 32 32

33 The Magic of a Diamond Interchange Controller There is none! Pre-programmed controller for standardization Uses standard controller features Same programming rules apply Minimum Green Maximum Green Extension Page 33 33

34 Modifying a Diamond Pre-Assigned detectors (1 18) are NOT programmable Detectors above #19 are programmable Overlaps are programmable Page 34 34

35 Customizing Diamond Phasing Overlaps Are Programmable Allow you to customize odd intersections Suggestion: Standard Diamonds Use Default Ring Structure Add/Alter Overlaps Where Needed Suggestion: Unique Applications Sequential Phasing All Overlaps Page 35 35

36 Problem Heavy Right Turn Driving the Ramp Time Page 36 36

37 Heavy Right Turn Driving the Ramp Time: How the movements work together Phase 4 and 5 Progressing the SB Movement Phase 12 and 6 Right to Left Travel Time Phase 1 and 6 WB green till gap termination NOTE: After first 8 seconds, no one flows EB Phase 1 and 8 NB Ramp - Right turn finally gets a green Page 37 37

38 Phasing: Diamond Mode with Additional Overlaps Frontage Road Right Turn Page 38 38

39 Phasing Modifications Texas Four Phase Available Phase Available Phase 6? 8 Page 39 39

40 Overlap Assignments with Right Turn Overlap OL K=4+12 OLA= OLC=6+7 OLI OLL= OLB= OLN=8+16 Phase 7 Page 40 40

41 Problem Two Way Ramp Needing Left Turn Protection Page 41 41

42 Phasing : Diamond Mode with Additional Overlaps Exterior Left for 2-Way Frontage Road Page 42 42

43 Phasing Modifications Texas Four Phase Available Phase Available Phase 6? 8 Page 43 43

44 Overlap Assignments with Right Turn Overlap OL K=4+12 OLA= OLC=6+7 OLI Phase 7 2 OLL= OLB= OLN=8+16 Page 44 44

45 Problem Closely Spaced Intersection to a Diamond OL K= OLA= OLI OLL= OLB= OLN=8+16 Page 45 45

46 Phase Sequence Diagram - Diamond Mode with Adjacent Intersection OL K=4+12 OLA= OLI OLL= OLB= OLN=8+16 Page 46 46

47 Overlap Assignments Diamond Mode with Adjacent Intersection 5 2 OL K= OLD= OLO=6 OLA= OLI OLC=2+8 2 OLL= OLB= OLP=4 OLN= Page 47 47

48 Split Diamond: Diamond Mode with modified Overlaps Page 48 48

49 Texas Four Phase Texas Three Phase Right Arterial Right Front. Rd Travel Time Fixed Time Phase Left Arterial Left Front. Rd Travel Time Fixed Time Phase Conditional Service Intervals Page 49 49

50 Modified Three Phase Diamond Advantages: Runs through movements together Provides progression for left turns Design the Ring Structure A D Ph 2 B Ph 4 D B Ph 5 Ph Assign the Overlaps A B C D Ph 4 Ph 8 A Ph 3 C Ph 8 A Ph 1 C Ph 6 B A Ph 2 B Ph 6 Page 50 50

51 Modified Three Phase: Overlap Assignments 4 OLA OLC 6 2 OLD OLB 8 Page 51 51

52 Diamond Operation with coordination Coordination rule changes for diamond controllers Dependent on ring structure Still a traffic signal controller Page 52 52

53 Three Phase Diamond Coordination Phases not serviced in the normal sequence Rules: 4=8 1+2=5+6 Cycle Length = or Coordinated phase in each ring, on the same side of the barrier (4+8, 2+6, 1+6, 2+5, 1+5) Page 53 53

54 Four Phase Diamond Coordination Service road time is a combination of two phases Rules: 5 must be shorter than 4 and 2 s min time 1 must be shorter than 8 and 6 s min time Cycle Length = Coordinated phase in each ring, on the same side of the barrier (2+5, 4+5, 1+6, 1+8) Page 54 54

55 Innovative Intersection Designs Based on intersection geometry Goals Reduces the number of phase intervals Reduces cycle length Options Diverging Diamond Displaced Left Turn Diamond Page 55 55

56 Diverging Diamond Page 56 56

57 Round Rock Diverging Diamond Field Observation: Made best use of existing bridges The original phase sequence created multiple stops for the left service roads that the city wanted to change Driver routes were not as anticipated Created weaving issue with downstream intersection Page 57 57

58 Displaced Left Turn Diamond Page 58 58

59 San Marcos Displaced Left Turn Diamond Field Observation: Took advantage of existing number of lanes under the bridge Internal storage not adequate for the 3 phase operation Single left turn lane was not adequate WB Multiple pedestrian crossing point affected phasing Page 59 59

60 Hybrid Diamond????? Page 60 60

61 Questions and Comments Page 61 61

Texas Diamond Signalized Operations. Dave Holstein Administrator, Office of Traffic Engineering

Texas Diamond Signalized Operations. Dave Holstein Administrator, Office of Traffic Engineering Texas Diamond Signalized Operations Dave Holstein Administrator, Office of Traffic Engineering 614-644-8137 Dave.holstein@dot.state.oh.us Used exclusively for diamond interchanges with both ramps signalized.

More information

Project Working Group Meeting #5

Project Working Group Meeting #5 September 17, 2013 Project Working Group Meeting #5 1 September 17, 2013 www.i-80will.com Meeting Purpose Project update Discuss Range of Alternatives Discuss next steps 2 September 17, 2013 www.i-80will.com

More information

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON STANDARD NOTES SN01 2 OF 8 ROADWAY PLAN PL01 3 OF 8 ROADWAY PLAN PL02 4 OF 8 LANE 10 105 150 205 270 450 500 550 11 12 SHOULDER 115 125 MINIMUM LANE CLOSURE TAPER LENGTH = L 165 225 295 180 245 320 5 25

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON STANDARD NOTES SN01 2 OF 17 STANDARD NOTES SN02 3 OF 17 SITE PREP & T.E.S.C. NOTES GENERAL NOTES SITE PREP & T.E.S.C. PLAN SP01 4 OF 17 SITE PREP & T.E.S.C. NOTES GENERAL NOTES SITE PREP & T.E.S.C. PLAN

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

AASHTO Policy on Geometric Design of Highways and Streets

AASHTO Policy on Geometric Design of Highways and Streets AASHTO Policy on Geometric Design of Highways and Streets 2001 Highlights and Major Changes Since the 1994 Edition Jim Mills, P.E. Roadway Design Office 605 Suwannee Street MS-32 Tallahassee, FL 32399-0450

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

US 70 Corridor Planning for the Future

US 70 Corridor Planning for the Future New Bern/James City Area - Work Session US 70 Corridor Planning for the Future Brinson Elementary School Thursday, January 31, 2008 Agenda Sign-in, in, View Maps, Talk to Project Team Public Q & A Session

More information

The Design-Builder shall meet local road criteria provided by the local governing agencies.

The Design-Builder shall meet local road criteria provided by the local governing agencies. 11 ROADWAYS 11.1 General The -Builder shall conduct all Work necessary to meet the requirements of roadways. Roadway classifications include mainline, acceleration lanes, deceleration lanes, auxiliary

More information

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016 635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing

More information

Advance Warning System with Advance Detection

Advance Warning System with Advance Detection N-0002 dvance Warning System with dvance Detection Intersections with limited visibility, high speeds (55 mph and greater), temporary or newly installed intersections, or grade issues often need an advanced

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

What is ELToD and Why Use it? Toll Choice Key Concepts. ELToD Applications. SW 10 th Street. ELToD Future Enhancements

What is ELToD and Why Use it? Toll Choice Key Concepts. ELToD Applications. SW 10 th Street. ELToD Future Enhancements June 16, 2017 What is ELToD and Why Use it? Toll Choice Key Concepts ELToD Applications SW 10 th Street ELToD Future Enhancements 2 ELToD (Express Lanes Time of Day) Model is a traffic assignment model

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

Metro Highway Program

Metro Highway Program Metro Highway Program ACEC November 2018 I-5 North HOV and Truck Lanes 14 miles of HOV lanes in both directions 2 miles of truck climbing lanes at the south end 7 bridge modifications at: Gavin Canyon

More information

PERFORMANCE ACTIVITY 603 SIGNS

PERFORMANCE ACTIVITY 603 SIGNS PERFORMANCE ACTIVITY 603 SIGNS WORK DESCRIPTION 3 WORK DESCRIPTION 4 WORK DESCRIPTION 6 New Install Maintenance / Replace Temporary 603 SIGNS ACTIVITY DESCRIPTION Install new signs and maintain and replace

More information

Sight Distance. A fundamental principle of good design is that

Sight Distance. A fundamental principle of good design is that Session 9 Jack Broz, PE, HR Green May 5-7, 2010 Sight Distance A fundamental principle of good design is that the alignment and cross section should provide adequate sight lines for drivers operating their

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the

More information

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements Existing Conditions Belmont Circle Bourne, MA Speakers Pam Haznar, MassDOT Ed Hollingshead, Fay Spofford & Thorndike Heather Ostertog, Fay, Spofford & Thorndike Goals for Group Local Knowledge Work through

More information

US 67 WIDENING PROJECT

US 67 WIDENING PROJECT US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the

More information

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE EXISTING CONDITIONS (1) NO BUILD ALTERNATIVE () Compared to existing conditions Peak Hour/Train Scenario No Train 1 With Train No

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT 200' TYP. 0' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

2013 Changes to the 2011 MMUTCD, Part 6 September 2013

2013 Changes to the 2011 MMUTCD, Part 6 September 2013 2013 Changes to the 2011 MMUTCD, Part 6 September 2013 The requirements for drum spacing in Sections 6C.07 (Page 557 (MI)) and 6F.63 (Page 604 (MI)) have been revised to more closely match the pavement

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

DIRECTIONAL DRIVEWAYS AT HIGHWAYS WITHOUT CURB

DIRECTIONAL DRIVEWAYS AT HIGHWAYS WITHOUT CURB DIRECTIONAL DRIVEWAYS AT HIGHWAYS WITHOUT CURB 20 (6m) 25 (7.5m) Desirable outline of parking area 10 (3m) 16 (4.8m) 50 (15 m) R 75 (23m) R Taper Alternate outline of 20 (6m) R parking area Pave shoulders

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

JCE 4600 Basic Freeway Segments

JCE 4600 Basic Freeway Segments JCE 4600 Basic Freeway Segments HCM Applications What is a Freeway? divided highway with full control of access two or more lanes for the exclusive use of traffic in each direction no signalized or stop-controlled

More information

Alternatives Considered

Alternatives Considered 0 0 0 SECTION Alternatives Considered This section describes the process used to develop and evaluate the range of alternatives for the I-0 North EA to correct the existing and future problems identified

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 &+$37(5Ã)Ã Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 &+$37(5) 52$'6,'()$&,/,7,(6 7$%/(2)&217(176 Section Subject Page Number Page Date F.1 VEHICLE INSPECTION STATIONS... F-3 April

More information

Technical Feasibility Report

Technical Feasibility Report Prepared For: Bow Concord I-93 Improvements Project Bow and Concord, NH Prepared By: 53 Regional Drive Concord, NH 03301 NHDOT Project # 13742 Federal Project #T-A000(018) September 2018 TABLE OF CONTENTS

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides. May 23, 2017: The following update was made to the web site.

CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides. May 23, 2017: The following update was made to the web site. CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides Note: Located at https://mdotjboss.state.mi.us/tssd/tssdhome.htm May 23, 2017: The following update was made to the web site. GEO-650-D Flares

More information

Interchange Operations Study

Interchange Operations Study CUY 480 14.32 PID No. 102053 Ohio Department of Transportation District 12 550 Transportation Boulevard Garfield Heights, OH 44125 5396 Interchange Operations Study Analysis Summary August 2016 8101 N.

More information

CONVERSION OF TWO-WAY FRONTAGE ROADS TO ONE-WAY

CONVERSION OF TWO-WAY FRONTAGE ROADS TO ONE-WAY CONVERSION OF TWO-WAY FRONTAGE ROADS TO ONE-WAY IH 30 in Texarkana Introduction Video Texarkana Two cities Two states One MPO Texarkana IH 30 U.S. Post Office and Court House IH 30 Corridor IH 30 constructed

More information

Jihong Cao, PE, Parsons Brinckerhoff Arnab Gupta, PE, Parsons Brinckerhoff Jay Yenerich, PE, Valley Metro

Jihong Cao, PE, Parsons Brinckerhoff Arnab Gupta, PE, Parsons Brinckerhoff Jay Yenerich, PE, Valley Metro Jihong Cao, PE, Parsons Brinckerhoff Arnab Gupta, PE, Parsons Brinckerhoff Jay Yenerich, PE, Valley Metro Outline Background Predictive Priority Algorithm Simulation Analysis Measure of Effectives (MOE)

More information

Section 6H.01 Typical Applications

Section 6H.01 Typical Applications December 27, 2010 Draft Page 6H-1 Section 6H.01 Typical Applications Support: 01 Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. 02 The needs and control of all

More information

Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November January 2005

Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November January 2005 Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November 2008 1 January 2005 Reference Norwich Township Fire Department SOG #30 Page 1 of 6 Purpose: The purpose of this

More information

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary 8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.

More information

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012 Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012 PLANNING FOR OUR FUTURE Planners with the Mountainland Association of Governments (MAG) have evaluated

More information

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation

SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation SR 104/Paradise Bay-Shine Road Intersection Safety Improvements Intersection Control Evaluation Background and Project Needs SR 104 is functionally classified as a rural-principal arterial. It is a limited

More information

A Gap-Based Approach to the Left Turn Signal Warrant. Jeremy R. Chapman, PhD, PE, PTOE Senior Traffic Engineer American Structurepoint, Inc.

A Gap-Based Approach to the Left Turn Signal Warrant. Jeremy R. Chapman, PhD, PE, PTOE Senior Traffic Engineer American Structurepoint, Inc. A Gap-Based Approach to the Left Turn Signal Warrant Jeremy R. Chapman, PhD, PE, PTOE Senior Traffic Engineer American Structurepoint, Inc. March 5, 2019 - The problem: Existing signalized intersection

More information

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas Proceedings of the 1998 Winter Simulation Conference D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, eds. FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK Gene

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

WRONG WAY DRIVING. Ugonna U. Ughanze, P.E. Houston District

WRONG WAY DRIVING. Ugonna U. Ughanze, P.E. Houston District WRONG WAY DRIVING Ugonna U. Ughanze, P.E. Houston District Background April 2014 Director of Transportation Operations Houston District June 2014 Wrong Way Driving Initiative Kickoff DTO commissioned TTI

More information

Request for Design Exception (#1) S.M. Wright Phase IIB

Request for Design Exception (#1) S.M. Wright Phase IIB Request for Design Exception (#1) S.M. Wright Phase IIB County: Dallas CSJ s: 0092-01-059, 0092-14-088 Project Limits: From Pennsylvania Avenue to North of Al Lipscomb Way Date: June 28, 2016 Proposed

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

NEWS RELEASE November 8, 2017

NEWS RELEASE November 8, 2017 NEWS RELEASE November 8, 2017 Contact: Marsha Roa Public Information Manager 909.839.7055 mroa@diamondbarca.gov GRAND AVENUE INTERCHANGE AT SR-57 (ORANGE) AND SR-60 (POMONA) MULTIPLE ROADWAY, RAMP AND

More information

Fire Department Access & Water Supply

Fire Department Access & Water Supply ROSEBURG FIRE DEPARTMENT FIRE PREVENTION DIVISION fireprevention@cityofroseburg.org 700 SE Douglas Avenue Roseburg, OR 97470 Phone (541) 492-6770 Fire Department Access & Water Supply This brochure is

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet March 2017 PROJECT OVERVIEW Environmental Impact Statement (EIS) Project divided into 3 Segments Segment 1: Beltway 8

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Moving Operations. Introduction by. National Traffic Management & Work Zone Safety Conference March 2009

Moving Operations. Introduction by. National Traffic Management & Work Zone Safety Conference March 2009 Driver Behavior Around Moving Operations Introduction by Mli Melisa D. Fil Finley, PE P.E. National Traffic Management & Work Zone Safety Conference March 2009 Mobile Operation Intrusions New York State

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

Access Management Standards

Access Management Standards Access Management Standards This section replaces Access Control Standards on Page number 300-4 of the Engineering Standards passed February 11, 2002 and is an abridged version of the Access Management

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009 6: Brian Street & LC 111 5/26/2009 Movement EBL EBR NBL NBT SBT SBR Volume (veh/h) 116 20 8 405 137 56 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.81 0.81 0.67 0.67 0.89 0.89 Hourly flow

More information

Table Common AREMA Lateral Turnouts Currently in Use in Passenger Rail Systems

Table Common AREMA Lateral Turnouts Currently in Use in Passenger Rail Systems DRAFT CHAPTER 11 SECTIONS 3.5.11.8, 3.5.11.9 Part 3 Track and Roadway Considerations SECTION 3.5 TRACK AND ROADWAY CONSIDERATIONS 3.5.11.8 Turnouts and Crossovers (2012) Turnouts and crossovers are used

More information

Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability

Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability (http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement

More information

I-35 Access Justification Report Kearney/Clay County

I-35 Access Justification Report Kearney/Clay County I-35 Access Justification Report Kearney/Clay County March 2014 4435 Main Street, Suite 1000 Kansas City, MO 64111 I-35 Access Justification Report Kearney/Clay County March 2014 Prepared for: In coordination

More information

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Signal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St.

Signal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St. I. Overview Consultant A was retained by the Ohio Department of Transportation to conduct traffic signal timing analyses on approximately one mile of roadway on between the Main Street and the Fourth Street

More information

Thinking Through Roundabouts

Thinking Through Roundabouts Thinking Through Roundabouts Presented by: Scott Ritchie, P.E. Thinking Roundabouts Roundabouts Gaining Ground (USA Today) Why American Drivers Should Learn To Love the Roundabout (Tom Vanderbilt) ADOT

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment 2.1.5 Traffic and Circulation This section addresses the potential impacts to traffic and circulation associated with construction and long-term operation of the proposed project. The traffic and circulation

More information

CHAPTER 15 STREET LIGHTING TABLE OF CONTENTS

CHAPTER 15 STREET LIGHTING TABLE OF CONTENTS CHAPTER 15 STREET LIGHTING TABLE OF CONTENTS Section Title Page 15.1 General... 15-1 15.1.1 Fort Collins (City Limits Only) Street Lighting...15-1 15.1.2 Loveland (City Limits Only) Street Lighting...15-1

More information

CHAPTER 71: TRAFFIC REGULATIONS

CHAPTER 71: TRAFFIC REGULATIONS Section CHAPTER 71: TRAFFIC REGULATIONS General Provisions 71.01 Restrictions on direction of travel 71.02 Right-of-way; stop and yield signs 71.03 Interference with traffic control devices or railroad

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm PUBLIC MEETING Bear Creek Park Community Center January 24, 2017 5:30 pm to 7:30 pm PURPOSE OF THE MEETING This is an open House No formal presentation Introduce the project to the public Present existing

More information

LADOT Railroad Preemption Form Instructions

LADOT Railroad Preemption Form Instructions LADOT Railroad Preemption Form Instructions The LADOT Railroad Preemption Form is entirely contained on one worksheet within an Excel workbook. If Additional approaches to the crossing are analyzed, the

More information

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy)

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Mobility Investment Priorities Project Houston US 59 US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Current Conditions From IH 610 West to SH 288, US 59 operates with four or five lanes

More information

Skills and Sequences for In-Car Instruction

Skills and Sequences for In-Car Instruction The stopping procedure (shoulder parking) Check the rear view mirror Check the blind spot Right Bring the vehicle towards to the curb at designated point Stop 30 cm away from the curb Once you stop your

More information

Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide ITE Midwest Annual Meeting June 30, 2015 Branson, MO

Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide ITE Midwest Annual Meeting June 30, 2015 Branson, MO Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide 2015 ITE Midwest Annual Meeting June 30, 2015 Branson, MO Wei Zhang, Ph.D., P.E. Program Manager, Intersection Safety

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12

IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12 Mobility Investment Priorities Project Houston IH 45 IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) Current Conditions From IH 10 to IH 610 south, IH 45 is a 6- to 9-lane facility with three

More information

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN 12 September 2017 Iain McManus Civitas Planning Consultants PO Box 47020 Ponsonby AUCKLAND 1144 Dear Iain, TRAFFIC ENGINEERING ASSESSMENT 43-45 45 MOUNT EDEN ROAD, MOUNT EDEN As requested, we have prepared

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

Streetcar Level Boarding Background Memo

Streetcar Level Boarding Background Memo Level Boarding Background Memo Introduction This memo has been prepared by the and the Community Coalition to facilitate industry discussion on the application of level boarding concepts to US modern streetcar

More information

14 TRAFFIC AND CIRCULATION

14 TRAFFIC AND CIRCULATION 14 TRAFFIC AND CIRCULATION INTRODUCTION This chapter summarizes the traffic impact analysis (TIA) performed for the preferred project as well as the Commercial Project Alternative. The TIA for the preferred

More information

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing.

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing. TECHNICAL COMMITTEE: Railroad and Light Rail Transit Technical Committee DATE OF ACTION: June 25, 2004 TOPIC: Crossbuck with Yield or Stop Signs and Advance Signs. STATUS: Accepted by the National Committee

More information

2016 Congestion Report

2016 Congestion Report 2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation TRAFFIC IMPACT DATA For Dillons #98 On-Site Relocation COMMERCIAL DEVELOPMENT 1740 Massachusetts Street Lawrence, KS Revised April 6, 2011 Prepared by: Pickering Firm, Inc. Introduction The project site

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

Mobile Barrier Trailer

Mobile Barrier Trailer Mobile Barrier Trailer Protecting our employees History Born out of the need to protect employees working on highways (June 2004) 4 years of research and development Manufacture and deployment of the Mobile

More information