TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC.

Size: px
Start display at page:

Download "TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC."

Transcription

1 FOR THE INFORMATION OF RAILWAY STAFF ONLY B. R British Rail N E / N EASTERN REGION N o. 5 0 NORTHERN AREA (NORTHERN SECTION) (including Main line, York to Northallerton and York Yards) TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 12 DECEMBER TO FRIDAY 18 DECEMBER 1970 INCLUSIVE Trainmen must pay particular attention to works contained in this notice and keep a good look-outfor hand signals, which will be exhibited at the various localities in accordance with the rules and regulations. Work at places other than those mentioned may be in progress, of which it may not have been possible to give previous notice, and drivers must be on the lookout and be prepared to stop or run at reduced speed when and where hand signals may be exhibited.

2 NEN TEMPORARY SPEED RESTRICTIONS (Until further notice unless otherwise stated) Warning Boards and Indicators provided unless otherwise shown In the case of items marked t the Warning Board(s) will be lit by propane gas. In the case of items marked * the Warning Boards and Indicators will be moved as the work progresses and the restriction will not operate over more than 3 In the case of items marked t time has been allowed in the working timetable for these restrictions. Temporary speed restrictions may be eased or withdrawn earlier than shown. Trainmen must, therefore, be prepared to find a higher speed (which may be the permanent speed restriction) indicated at the Warning Boards and Indicators and they must work to such speed. Location of Work at or between Lines affected Mileage at or between Speed Restriction Remarks YORK (CHALONERS WHIN) TO TWEEDMOUTH Chs. Ni. Chs. m.p.h. Ouston in. and / Embankment slip. Tyne (Durham Station) Fast Tyne and Ouston Abandonment of single lead. Until Monday 14 December. Chevington and Clay blanketing and Alnmouth relaying. Berwick-on-Tweed and Down Ballast cleaning. Avton Until Sunday 13 December. NORTHALLERION (BOROUGHBRIDGE ROAD) TO GATESHEAD (JUNCTION) VIA HORDEN *0 OBowesf ie Id (Eag lesc I iffe Relaying and ballasting t North sin.) and Picton *00 Bowesf i el d (Eaglescl iffe Relaying and ballasting. t North sin.) and Picton *00 Wearmouth and East Boldon Down Ma in Ballast cleaning and relaying. *00Wearmouth and East Boldon Ballast cleaning and relaying. t Wearmouth and Down and Up Subsidence. East Boldon Main 00 The items marked 00 are consecutive forming an overall moveable restriction between the mileages shown. The 40 m.p.h. temporary speed restriction will be north of the 20m.p.h. temporary speed restriction. Warning boards, speed indicators and termination boards will be positioned in accordance with the Rule 218.

3 NEN-3 SECTION A TEMPORARY SPEED RESTRICTIONS continued Location of work L i n e s M i l e a g e S p e e d at or between a f f e c t e d a t or between R e s t r i c t i o n Re ma rk s M. Chs. M. Chs. m. p. h. ' BACKWORTH JUNCTION TO MORPETH VIA SEGHILL Bed! ington North D o w n and Up Subsidence. and Choppington M a i n HEATON SOUTH JUNCTION TO TYNEMOUTH (VIA WALLSEND) * Percy Main and D o w n Main Ballast cleaning and Tynemouth r e l a y i n g. NEWCASTLE TO CARLISLE (PETTERIL BRIDGE JUNCTION) (EXCLUSIVE) Prudhoe and Hexham D o w n and Up E m b a n k m e n t slip. Ma in CONSETT NORTH TO OUSTON JUNCTION Carr House East and Annfield Down and Up Subsidence. Main C o m m e n c i n g Saturday 12 December. FERRYHILL (TURSDALE) TO PELAW VIA LEAMSIDE Fencehouses and D o w n and Up Subsidence. Washington South M a i n LONDONDERRY BRANCH Ryhope Grange and D o w n Main Condition of track. Londonderry SEABANKS BRANCH (GOODS LINE) Hawthorn and D o w n and Up Constructing culvert. Seabanks M a i n SOUTH HETTON COLLIERY TO RYHOPE GRANGE Ryhope Station and D o w n and Up Contractor pipe jackiw Ryhope Grange B r a n c h MIDDLESBROUGH (GUISBOROUGH JN.) TO WHITBY Nunthorpe and S i n g l e Realigning track. Battersby

4 SECTION B NEN-4 TEMPORARY ENGINEERING WORKS (For details of Signalling or Permanent Way Alterations see Section C). Where any work involves fixing, removing or repairing of signals, or the protection of the running line during renewals, repairs and obstructions, Handsignalmen will be provided by the Engineer to act in accordance with the Rules and Regulations. Material may be lying about and disconnections may be made as required. Unless otherwise shown, work will be carried out as traffic permits. At or between L i n e s affected YORK (CHALONERS WHIN) TO TWEEDMOUTH Chaloners Whin Jn. A l l and Holgate Jn. York Station A l l York and Skelton A l l York Station A l l and Skelton Skelton Junction A l l and Tollerton Tollerton and Pi!moor A l l Tollerton and Pi lmoor A l l Pilmoor and Thirsk Pilmoor and Thirsk Thirsk Station Thirsk Station A l l Northallerton U p Main Northallerton U p Passenger Loop Northallerton and Eryholme Northallerton and Darlington South Darlington South and Eryholme Darlington South and Eryholme Lines Down and Up Slow Remarks to Cleaning and painting bridges between 186m. 14chs. and and trestles in use to Testing cables and controls to Overhauling point connections etc to Contractors building new bridge at lm. 5chs to Preparatory work for signalling alterations to Changing relays to Reconstruction of bridge No.25 at 12m. 30chs to Contractors erecting bridge at 20m. 53ohs. Mechanical plant in use to Reconstruction of bridge No.45 at 21m. 63chs. Mechanical plant in use to Repairs to Thirsk Station platform between 22m. lich s. and 22m. 22chs. Mechanical plant in use to Cleaning and painting station roof buildings and signal box exteriors at 22m. 15chs. Ladders and trestles in use to Contractors removing rear portions of Up platform roof t o ll 30 and to (except Sun). Dismantling water tanks between 32% and 3 1 Mobile crane in use. Up traffic to travel over to Preparatory work for removal of Wiske Water troughs between 31% and 32Y2m.p to Laying concrete trough ing and running cables to Bank trimming between 40m. 78chs. and 40m. lochs. Machinery in use to Boring rig in use at 42m.p.

5 NEN-5 SECTION B-TEMPORARY ENGINEERING 1NORKS-continued At or between YORK (CHALONERS WHIN) TO TWEEDMOUTH-continued -continued Darlington South A l l to (except Sat.). Renewing connectand North i o n s. Parkgate to Preparing for signalling alterations. Parkgate U p Goods R e p a i r i n g bridge No. 103 between 4 5 Parkgate and D o w n and to 13 Oa Contractors laying cables on Ferryhill No.3 U p Side between 45m. 69chs. and 46m. 14chs. Parkgate and Ferryhill No.3 Ferryhill No.3 and Ferryh i I I No.1 Down and to Boring rig in use between 48 and 50m.p. Ferryh ill No.1 D o w n Slow and Tursdale Ferryh ill No.1 and D o w n and Up Slow Tursdale Tursdale and A l l Tyne Yard Hett Mill and Brownev Hett Mill and K.E.B. Jn. Relly Mill and Durham South to 16 Oa Painting bridges. Ladders and trestles in use. Down and to 17 Oa Repairing bridge 190 at 65m. 75chs. Durham North to Contractor constructing wing walls for bridge No.193 at 66m. 19chs. Crane and machinery in use. Durham North A l l to Contractor constructing new and Ouston Jn. c u t t i n g and drainage between chs. Machinery in use. Tyne (Durham Station) and Ouston Jn. Lines affected R e m a r k s Down and Up Slow, R e m o d e l l i n g track between 56Y2 and 57m p Down Goods M a c h i n e r y in use. No.3 and North A l l Passenger traffic to travel over the Down and Goods Yard U p Fast between Ferryhill No.3 and Tursdale. F r e i g h t traffic to travel over the Down and Lin Fast or Down and Up Goods between Ferryhill No.3 and Ferryhil I No.l to Preparing for signalling alterations at Coxhoe Junction to Tipping ballast between 57m. 30chs. and 59m.p. Both signal boxes open to Laying out concrete troughing. Installing cables. Preparing for signalling alterations. Down and to Boring rig in use at 62m. 99chs. C o n t r a c t o r recovering redundant sidings between 69m. 15chs. and 691/2m.p. (Kimblesworth). Machinery in use. Tyne (Durham Station) D o w n Main to (Mon to Fri). Trimming embankment and Ouston Junction s i d e between 70Y2 and 71m.o. Gradal I in use Tyne (Durham Station) D o w n and and Ouston Junction s t r u c t 0 u 7 r 00 to Contractor demolishing redundant e s and erecting new waiting shed and lighting columns at Chester-le-Street Station at 71m. 73chs. Durham and A l l to Alterations to train description Tyne Yard c i r c u i t s. Tyne Yard A l l to 17 Oa. Alterations to circuits. Tyne Yard A l l R e n e w i n g telephone cables. Newcastle A l l C h a n g i n g relays. Newcastle A l l to Alterations to train description circuit.

6 NEN-6 SECTION B - TEMPORARY ENGINEERING WORKS - continued At or between Lines affected Remarks YORK (CHALONERS WHIN) TO TWEEDMOUTH - continued - continued Newcastle A l l Bay Platforms Overhauling depression bars. Newcastle and Heaton South Junction Manors Jn. and Heaton South Jn. Down North and Up Tynemouth Contractors removing redundant traction cables to Contractor removing redundant Down and Up Sidings and former Quayside Branch between Om. 50chs. and limp. Heaton Renewing telephone cables. Heaton Benton and Morpeth Killingworth and Dudley Killingworth and Dudley Dudley and Stannington Morpeth Morpeth and Longhirst Morpeth and Longhurst Widdrington Alnmouth Alnmouth Alnmouth Station Al Down and Down and Down and Down and Down and (BETWEEN TRAINS) Down Branch platform line Down and to Changing relays. 07 t o Renewing teiepiione cabi to Contractor constructing new overbridge at 6m. 36chs. Machinery in use to Contractors erecting new overbridge at 6m. 70chs. Machinery in use to Renewing parapets on bridge No.63 at 1 2 Contractor demolishing rear portions of platform roof and buildings to Contractor demolishing buildings at lineside between 18m. 50chs. and 1 9 Machinery in use. ( 4 8 / 7 0 ) Contractors repairing bridge No.80 at 19m. 9chs. Commencing Saturday 12 December. Contractors recovering material at 23m. 15chs. Machinery in use. Commencing Saturday 12 December to Contractors removing rear section of Down side platform roofing at 34m. 64chs. Contractors recovering material at 34m. 64chs. Machinery in use. Commencing Saturday 12 December. Providing lighting and building shelter. (48/70) Little Mill and Christon Bank Little Mill and Christon Bank Belford Lucker and Belford Belford and Tweedmouth Tweedmouth Tweedmouth Down and Down and Down and Down and to Preparing for signalling alterations and preparing for modifications to Falloden auto barriers. Contractors repairing bridges Nos. 123 and 125 at 39m. 58chs. and 39m. 67chs. Commencing Saturday 12 December to Contractor removing rear portions of platforms at 51m. 51chs. Machinery in use to Contractors bank trimming from roadside between 50 and 5 0 plant in use to Renewing telephone cables. ' to Preparatory work for strapping piers of bridge No.195 at 66m. 52chs. Contractor constructing extension to bridge No.198 at 67m. 2chs. Machinery in use.

7 A b i e t NEN-7 SECTION B TEMPORARY ENGINEERING WORKS - continued At or between YORK (CHALONERS WHIN) TO TWEEDMOUTH-continued Skelton sin. and D o w n Independent Skelton Bridge ( B L O C K E D by local arrangement) Nos.1 and 2 Down Sidings Skelton New Yard Cha loners Whin and Holgate Skelton Bridge and To! lerton Pilmoor and Thirsk Thirsk Green Lane (Nos. 122 and 123 Points) and Thirsk Avenue (Nos. 101 and 102 (To be Kept Clear) Down and Up Reception and Down and Up HoIgate Loop Down Fast (BLOCKED except as shown in remarks) or hallerton U p Main 0 to Renewing N111, 140/141 an U Down and Up Fast N 5 and N20 signal mechanism. YACI; Ferryhill No.3 and Parkgate Ferryhil I No.1 and D o w n Main - Tyne (Durham St ( B L O C K Tyne Yard Tyne Yard Lines affected R e m a r k s Down Slow Down Fast (BETWEEN TRAINS) Down and Up Fast to 1 (BLOCKED except as shown, i n remarks) 6ferQ 444,0 to (BETWEEN TRAINS) Hump Area to Changing rails and re-sleepering between 2m.p. and 2m. 30chs. Crane in use. Skelton frame manned to Changing timbers on Nos. 423 and 430 points between 187Y4 m.p. and 187m. 22chs to Removing obsolete joints at 7m. lichs. and 7m. 30chs. Arrangements made to pass 1N33, Doncaster to Newcastle. other Down traffic to travel over the Down Slow to Loading rails between 18 and 1 9 Down traffic to travel over the Down Fast to Renewing culvert between 22m. lichs. and 22m. 22chs. Mechanical plant in use. traffic to travel over the Down and Up Slow 1 1 3)/ e to Destressing between 511/4 and 50m.p. Tamping machines in use between 561/4 and 53m.p, and replacing and aligning concrete cable ducts. A l l a n g e m e n t s - m a d e to Ki ngs -G ros s -a nd-6 F5 1 7 Edinburgh-to-Kings-Grass-ever-Up-Main. Both signal boxes open (or a ft,r , EdinburgW)io Destre s i n s QJld 6 0 etwee 5 9 ng e w o r k i n g Tursdale, Hett Mill, Browney R e l l y Mill signal boxes open. Ouston Jn. and t i Up a i n to Rep t o waybeams on bridge Tyne (Durham St io n ) C K a l e nt - r e arks) Aberdeen to Kings Cross and Newcastle to Kings Cross Ouston Jn. and a 6 Low Fell h. traffic to travel over Down and Up Slow to Renewing facing point lock bars to Overhauling point and retarder equipment.

8 SECTION B - TEMPORARY ENGINEERING WORKS - continued At or between Newcastle Benton Morpeth Morpeth and Longhirst Chevington and Alnmouth (Southside) Alnmouth and Belford Lines affected YORK (CHALONERS WHIN) TO TWEEDMOUTH - continued -continued Newcastle W e s t End of No to Re-timbering switches and crossings. Lead of No.503B points Platform affected. at East End to to to (BETWEEN TRAINS) to (BLOCKED except as shown in remarks) to to (BETWEEN TRAINS) Tweedmouth and Ayton D o w n and Up MONDAY 14 DECEMBER Tollerton and U p Slow Skelton Bridge ( B L O C K E D ) MONDAY to FRIDAY 14 to 18 DECEMBER Tweedmouth D o w n Main and Ayton TUESDAY to THURSDAY 15 to 17 DECEMBER Skelton Bridge and D o w n Slow Tol tenon ( B L O C K E D ) THURSDAY and FRIDAY 17 and 18 DECEMBER Thirsk and Pilmoor U p Slow FRIDAY 18 DECEMBER Tollerton and D o w n Slow Pilmoor ( B L O C K E D ) Remarks to Overhauling insulated block joints to Overhauling altenators and signalling power supply equipment to Testing cables and track circuits (or after 1S72, King's Cross to Edinburgh) to Destressing between 18m. 68chs. and 20m. 5chs. Crane in use. Both signal boxes open (or after 1S72, King's Cross to to Edinburgh) to Destressing and loading rails between 28m. 25chs. and 23m. 14chs. Cranes in use to Single line working over. Both signal boxes open to Tamping and lining machines in use between 51m. 39chs. and 50m. 39chs. and renewing gutters on Little Mill signal box at 39m. 34chs. on Down side also tamping and lining machines in use between 42m. 79chs. and 44m.p. and renewing drain at 45m. 68chs. Gradall in use, also loading rails between to Crane in use. Arrangements made to pass 051, (Sat) Aberdeen to Kings Cross. Alnmouth, Little Mill, Christon Bank, Chathill, Lucker and Belford signal boxes open. Stamford and Newham gate boxes and Falloden auto barriers manned to Rerailing. Crane in use to Removing joints on bridge No.18 between 8 m.p. and 8m. 5chs. Traffic to travel over the Up Fast to daily. Tamping and lining machines in use between 65 and 68 open to each day. Tamping machine in use between 5 Down traffic to travel over the Down Fast to each day. Tamping and lining machines in use between 18 Up traffic to travel over Up Fast to Tamping machine in use between 91/2 and 10 Down traffic to travel over the Down Fast.

9 SECTION B-TEMPORARY ENGINEERING WORKS-continued At or between YORK YARDS Lines affected York Yard South N o. 2 Down Yard and North ( B L O C K E D by local arrangement) York Yard North A l l York Yard North D o w n and Up Goods and Nos. 1 to 5 Up Reception York Yard North A l l WEDNESDAY 16 DECEMBER York Yard North U p Warehouse Line Remarks to Contractors removing redundant track. Mechanical plant in use to Work in connection with alterations to signal box to Contractors building new bridge at 1 m.o (Sun) to (Mon). Laying foundations to new bridge at lm.p. Pile driver in use. York Yard North signal box open to Signalling alterations. (See Section 'C'). NORTHALLERTON (BOROUGHBRIDGE ROAD) TO GATESHEAD (JUNCTION) VIA HORDEN Low Gates A l Picton and Bovvesfield (Eaglescliffe South Jri.) Bomesfield (Eaglescliffe A l l South Jn.) and (Eaglescliffe North Jn.) Bishopton Lane U p Main Down and Primrose Hill D o w n and Billingham A l l Billingham-on-Tees A l l and Greatham Billingham-on-Tees and Greatham Cliff House and Stranton Easington and Hawthorn Easington and Pe law Seaham Ryhope Station and Ryhope Grange Ryhope Station and Ryhope Grange Sunderland and Wearmouth Monkwearmouth and Gateshead Down and to Preparatory work for provision of manned barriers to (Mon to Fri). Repairing Yarm Viaduct between 55m. 33chs. and 55m. 63chs to (Mon to Fri). Painting station footbridge. Scaffolding in use to (Mon to Fri). Constructing relay room at 59m. 60chs to Lines ide drainage between 60m. lochs. and 60m. 22chs to Preparing for signalling alterations to Laying concrete troughing and running cables to Contractor repairing bridge No.176 at 66m. 70chs. mobile plant in use. Contractor constructing new bridge No. 185B at lineside at 70m. 74chs Machinery in use to Lineside drainage between 8 0 and 811/4m.p to Painting bridges. Ladders and trestles in use to Contractor demolishing station buildings. Machinery in use to Contractors pile driving at 87m. 42chs. Machinery in use. Contractor pipe jacking at 87m. 42chs to Installing cables, locations and commissioning cables. Installing cable troughing etc.

10 NEN-10 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected R e m a r k s NORTHALLERTON (BOROUGHBRIDGE ROAD) TO GATESHEAD (JUNCTION) VIA HORDEN continued continued Tile Shed and U p Independent East Bo'don Boldon Colliery A l l Boldon Colliery D o w n and and Pelaw Pe!eV and Gateshead D o w n Pelaw Main SATURDAY and SUNDAY 12 and 13 DECEMBER Sunderland D o w n and Northallerton and Low Gates Down and Up Northallerton Loop Picton and to Bowesfield U p Main (Eaglescliffe South sin.) (BL OCKED except as shown in remarks) to (BLOCKED except as shown in remarks) to (BETWEEN TRAINS) Picton and A l l Bowesfield (Eaglescliffe South sin.) Bowesfield D o w n and (Eaglescliffe North Jn.) and Hartburn Billingham-on-Tees A l l Cliff House and U p Main Creatham Cliff House A l l Easington and Dawdon to Down and to Down and (BETWEEN TRAINS) Contractors recovering redundant Up Sidings in East Bo;don Goods Yard. Commencing Saturday 12 December. Preparing for signalling alterations to Boring rig in use to stabilise embankment between 951/4 and GO to Contractors demolishing buildings at lineside at 99m. 43chs to each day. Installing new propane heater pipe lines and concrete ducts to Loading rails between 0 and 1 Crane in use. Both signal bokes open to Re-railing and destressing between 55m. 63chs. and 56m. 63chs. Crane and tamping machines in use. Arrangements made to pass 1N96, York to Newcastle over and 1M67, Newcastle to Liverpool and 1A29, Newcastle to King's Cross over. freight traffic diverted via Darlington. Picton signal box open to Overhauling track circuits to Overhauling track circuits to Overhauling track circuits. Signal box open to Tamping machines in use between 69 Both signal boxes open to Overhauling interlocking. Signal box open to Drainage between 82 and 821/2 m.o. Both signal boxes open.

11 NEN-11 SECTION B TEMPORARY ENGINEERING WORKS continued At or between L i n e s affected NORTHALLERTON (BOROUGHBRIDGE ROAD) TO GATESHEAD (JUNCTION) VIA HORDEN continued continued Wearmouth and East Bo!don Pelaw A l l SUNDAY to MONDAY 1 3 Cemetery North and Blackha I I Rocks to Down and (BLOCKED except as shown in remarks) to to (BETWEEN TRAINS) Down Ma in (BLOCKED except as shown in remarks) MONDAY to WEDNESDAY 14 to 16 DECEMBER Wearmouth and D o w n Main East Boldon ( B L O C K E D except as shown in remarks) WEDNESDAY to FRIDAY 15 to 18 DECEMBER Gateshead and Pelaw U p Pelaw Main Remarks to Relaying and ballasting and lifting and packing between 92m. 12chs. and 93m. 21chs. Traxcavators, cranes and tamping machines in use. Arrangements made to pass 1N96, York to Newcastle over under Single line working conditions. 3N28, Leeds to Sunderland, 1M67, Newcastle to Liverpool and 1A29, Newcastle to Kings Cross over. Bus service between Sunderland and East Boldon for all other passenger trains to Single line working over. Wearmouth, East Boldon and Tile Sheds signal boxes open to Testing cables and changing relays (Sun) to (Mon). Tamping machines in use between 731/2 and 75 Arrangements made to pass 1N54, Middlesbrough to Newcastle over to Single line working over. Both signal boxes open (Mon and Tue) to (Tue and Wed). Tamping machine in use between 92m. 12chs. and 93m. 21chs. Single line working over. Both signal boxes open (Wed and Thu) to (Thu and Fri). Tamping machine in use between 99m. 57chs. and 98m. 23chs. Up traffic to travel over Up Pelaw Goods. The instructions laid down on Pages 92/93 of the General Appendix to be observed if applicable. Both signal boxes open. BACKWORTH JUNCTION TO MORPETH VIA SEGHILL Backworth Station Jn. D o w n and and Earsdon ill I Down and Bebside Holywell and Newsham South Down Mai n Down and to Contractor demolishing former Backworth signal box at 6m. 61chs. Contractors recovering redundant sidings between 9 and 9 Commencing Saturday 12 December. Contractors recovering m Machinery in use. Commencing Saturday 12 December to Destressing and loading rails between 10m. 5chs. and 10m. 73chs. Cranes in use. Both signal boxes open. Hartley auto barriers and Seghill North crossing manned.

12 NEN-12 SECTION B TEMPORARY ENGINEERING WORKS continued At or between L i n e s affected HOLYWELL TO HAZELRIGG COLLIERY BRANCH (N.C.B. LINES) Seghill Crossing A l l Remarks Contractors constructing new overbridge. Machinery and cranes in use. BEDLINGTON TO LYNEMOUTH N.C.B. Bedlington North and Down and West Sleekburn Ashington Ashington Down and Down and Contractors constructing new underbridge No. la at 'A m.o. Crane and machinery in use. Contractor renewing superstructure of bridge No.5 at 3m. 1 ch. Machinery and cranes in use. Contractor demolishing former Woodburn signal box at 4m. 7chs. Machinery in use. NEWCASTLE (MANORS JUNCTION) TO TYNEMOUTH VIA BACKINORTH Manors Jn. D o w n B. & T. Manors Jn. and D o w n and Up B. & T. South Gosforth Manors Jn. and South Gosforth Station Junction Manors Junction and A l l Tynemouth Manors Junction and A l l Tynemouth Manors Jn. and Tynemouth South Manors Station A l l Manors Junction and A l l South Gosforth Benton Station Jn. and Backvvorth Stn. Jn. Backworth Station Jn. South Gosforth MONDAY 14 DECEMBER Manors Jn. and South Gosforth Station Jn. Down and Up B. & T. Down and Down and Up B & I Down and Up Tynemouth Car Sheds Lines 1 and 2 Down and Up B.& T. Contractors constructing bored pile retaining wall between 0 rn.p. and Om. 2chs to Repairing bridge No. 4 at Om. 35chs. Scaffolding in use to Contractor reconstructing bridge No. 9 at lm. 25chs Mechanical plant in use. Contractors removing electrification equipment. Work in connection with signalling alterations. Contractors removing redundant signs from stations and lineside. Overhauling point layout. Renewing telephone cables to Contractor constructing new overbridge at lineside at 6m. 27chs. Cranes and machinery in use to Contractor demolishing former Backworth signal box to Renewing point fittings and timbers. Nos. 106A and B end points affected. Empty sets to travel via South Gosforth West Jn to Contractors reconstructing bridge No.9 at lm. 25 chs. Mechanical plant in use. traffic diverted via Benton South West Curve.

13 SECTION B At or between BENTON SOUTH EAST CURVE Lines affected Benton Quarry Junction D o w n and Up and Benton East Jri NEN-13 Remarks Contractor removing redundant traction cables. SOUTH GOSFORTH TO CALLERION (I.C.I. SIDINGS) South Gosforth and D o w n and South Gosforth West Junction Contractors removing redundant traction cables. HEATON SOUTH JUNCTION TO TYNEMOUTH (VIA WALLSEND) Heaton South Junction A l l and Tynemouth Contractors removing electrification equipment. Heaton South junction Preparatory work for signalling alterations. and Tynemouth Heaton South Jn. and Tynemouth South Heaton Heaton SATURDAY 12 DECEMBER Church Pit and Heaton East sin. Percy Main and Tynemouth South Down and to Up Tynemouth to Up Tynemouth (BETWEEN TRAINS) Down and (BLOCKED except as shown in remarks) Contractor removing redundant signs from stations1 and I ineside. Renewing telephone cables to Changing relays to Overhauling fastenings between lm. achs. and Om. 68chs. Both signal boxes open to Relaying and ballasting between 5 tamping machine in use. trains to start and terminate at Percy Main and Tynemouth Stations, with connecting bus services calling at North Shields station except arrangements made to pass Newcastle to North Shields and return over proper lines. RIVERSIDE BRANCH Riverside Junction D o w n and and Percy Main St. Peters and A l l Wi I I ington Quay Carville and D o w n and Point Pleasant Contractors removing redundant traction cables to Installing cables etc to Contractor rebuilding boundary wall and embankment at 4m. 57chs.

14 NEN-14 SECTION B-TEMPORARY ENGINEERING WORKS-continued At or between Lines affected Remarks BENTON (EARSDON) TO TYNE COMMISSIONERS QUAY Percy Main North and D o w n Main Engine Shed Percy Main North D o w n and Contractor recovering redundant Down Sidings between 3% and to Renewing facing point connections and timbers. Nos.21 and 23 points affected. NEiNCASTLE TO CARLISLE (PETTERIL BRIDGE JUNCTION EXCLUSIVE) Newcastle A l l Bay Platforms O v e r h a u l i n g depression bars. Newcastle A l l to Alterations to train description and signalling circuit. Scotswood and Down and to Contractor repairing bridge No.29 Blaydon at 3m. 21chs. Wylam and Prudhoe Hexham Hexham Warden and Haydon Bridge Low Row and Blenkin sop Blenkinsop and Low Row Low Row and Blenkinsop Denton School Newcastle Prudhoe and Dilston Crossing Hexham Bardon Mill and Haltwhistle Down and Down and Down and Nos.11 and 12 Platforms Down and Down and Down and to Contractor demolishing buildings at lineside at 9m. 79chs. Machinery in use to Painting station buildings. Ladders and trestles in use to Contractor demolishing rear section of former Hexham West signal box at 20m. 71chs Contractor recovering former Warden Up Relief siding between 2 3 sidings between 24m. 55chs. and 25m.p to Contractors demolishing lineside cottage at 41m. 5chs to Contractors removing rear portions of former Gilsland station platforms at 42m. 34chs. Machinery in use to Contractor removing rear portions of Gilsiand Up Platform at 42m. 34chs. Machinery in use to Preparing for signalling alterations and auto-barriers to Reballasting platform lines to Contractors reconstructing bridge No.57 at 1 3 signal boxes open to Renewing P'oint connections and timbers. No.38 and 39 points affected. Signal box open to Transposing and turning rails between 36 and 36% rn.p. Both signal boxes open. SCOTSWOOD TO NEWBURN Newburn S i n g l e to Contractor demolishing former Newburn signal box.

15 NEN-15 SECTION B TEMPORARY ENGINEERING WORKS continued At or betneen L i n e s affected CONSETT NORTH TO OUSTON JUNCTION Annfield and A l l Beam ish Beamish and Ouston Junction Carr House East and South Pelaw Down and Down and Remarks to Replacing overhead route with aerial cable to Contractor using boring rig at 2m. 50chs. and Om. 46chs to Ballast cleaning machine in use between 7 and lm.p. Removing smokeplates and repairs to bridge No.42 at 12Y2m.p. Carr House East, Annfield, Beamish and South Pelaw signal boxes open. SOUTH PELAW TO WASHINGTON (CHEMICAL WORKS) South Pelaw and A l l Washington Chemical Works South Pelaw A l l South Pelaw and D o w n and Washington South to Painting bridges. Ladders and trestles in use to Contractor using boring rig at 11 n1 41cns to Contractor constructing new bridge No.19A at 8m. 73chs. Machinery in use. BOLDON COLLIERY (NCB) TO TYNE DOCK BOTTOM Boldon Colliery (NCB) A l l and Tyne Dock Bottom Green Lane and D o w n Main Tyne Dock Bottom to Painting bridges. Ladders and trestles in use. Contractor recovering redundant Down Sidings between 1 BOLDON COLLIERY STATION TO GREEN LANE Boldon Colliery Station A l l and Green Lane to Painting bridges. Ladders and trestles in use. GATESHEAD (GREENSFIELD JUNCTION DUNSTON LINES) TO BLAYDON VIA NORWOOD Norwood and D o w n and Derwenthaugh Gateshead (KEB,Jn.) and Bensham Curve Jn to Down Goods to Down and Up Goods (BETWEEN TRAINS) to Contractor excavating at I ineside at 3m. 6chs. Machinery in use to Replacing defective rails also painting bridge No.9 at Om.52chs.

16 NEN-16 SECTION B TEMPORARY ENGINEERING WORKS continued At or between L i n e s affected DUNSTON STAITHS Norwood Yard A l l Inspector's Office Remarks to Painting bridges. Ladders and trestles in use. LOW FELL SIDINGS JN. Low Fell Sidings Jn. Low Fell Sidings Jn. TO BENSHAM CURVE JN Down and Up Goods Down and Up Low Fell Curve, Down and Up Goods to Renewing timbers and switches and crossings. 503 and 504 points affected. traffic between Tyne and Gateshead to travel via Main lines to Renewing cables and air pipe. LOW FELL JUNCTION TO NORWOOD JUNCTION Low Fell D o w n and Up Goods Sidings Jr). ( B L O C K E D ) to Renewing timbers and switches and crossings. 503 and 504 points affected. traffic between Tyne and Gateshead to travel via Main lines. REDHEUGH BRANCH Dunston West and D o w n and Dunston East to Contractors excavating at I ineside at Om. 8chs. Machinery in use. PELAW TO SOUTH SHIELDS Pelaw and Harton D o w n and Pelaw and Harton D o w n and Harton Harton Pe law Pelaw and Harton and Down Siding to to to Contractor constructing overbridge at east end of Jarrow Station. Machinery in use to (Mon to Fri). Trimming banks between to Contractor demolishing former High Shields signal box and platelayers cabin at 6rn. 46chs. Machinery in use. Contractor recovering redundant sidings in High Shields Goods Yard. Machinery in use to Testing cables to Renewing waybeams on bridge No.8 at 2m. 57chs. also testing rails with flaw detector between 4m. 79chs. and 5m. 8chs. and repairing bridge No. 39 at 6m. 69chs Both signal boxes open.,

17 NEN-17 SECTION B TEMPORARY ENGINEERING WORKS continued At or between L i n e s affected Remarks FERRYHILL (TURSDALE) TO PELAW VIA LEAMSIDE Tursdale and D o w n and Whitwell Penshaw North U p Goods PenshaN North U p Main Vilardley D o w n and Pelaw A l l to Contractor rebuilding bridge No.14 at 5m. 29chs. Machinery in use. Trestle erected to support bridge No.54 at 14m. 71chs. Reduced clearance. Trainmen not to put their heads out. Contractor recovering redundant Up Sidings and Goods Lines between 15m.p. and 14m. 55chs to Contractor erecting fences alongside track and constructing bridges to replace new overbridge at 19m. 66chs. and bridge No.68 at 19m. 75chs. Mechanical plant in use to Testing cables. PALLION YARD TO HENDON JUNCTION Pallion arid D o w n and Hendon Janction Contractors reconstructing bridges Nos. 2 and 3 at Om. 15chs. and constructing tunnel between these bridges. Mechanical plant in use. Scaffolding erected. Trainmen not to put their heads out. SEABANKS BRANCH (GOODS LINE1 Hawthorn and D o w n and Seabanks to Contractor driving pipe culvert under tracks at Om. 65chs. Seabaniz. D o w n and to Renewing point connections Nos. 30 and 32 points affected. Signal box open. WEST HARTLEPOOL (CEMETERY NORTH) TO HAWTHORN COLLIERY Cemetery North D o w n and to Contractor constructing new and Weill reld overbridge No.14A and using temporary crossing at 5m. 36chs. Machinery in use. Wellfielti Wellfield Single Single SATURDAY to SUNDAY 12 to 13 DECEMBER Welluiekl S i n g l e to Contractor reconstructing bridge No.42 at 12m. 35chs to Lineside drainage between 12 and (Sat) to (Sun). Contractor reconstructing bridge No. 42 at 12m. 35chs. Mechanical plant in use. Signal br

18 NEN-18 SECTION B - TEMPORARY ENGINEERING WORKS-continued At or between L i n e s affected SOUTH HETTON COLLIERY TO RYHOPE GRANGE Seaton and A l l Ryhope Station Ryhope Station and Ryhope Grange lernarks to Contractors constructing new bridge No. 62A at 18 Down and C o n t r a c t o r pipe jacking at 21m. 13chs. BISHOP AUCKLAND EAST TO EASTGATE (A.P.C.M. SIDINGS) Wolsingham and S i n g l e Stanhope Wolsingham and Stanhope Single Contractor removing redundant track between 7 and 7 60chs. Machinery in use to Contractor reconstructing bridge No. 22 at 10m. 62chs. Machinery in use. DARLINGTON (PARKGATE) TO BISHOP AUCKLAND EAST DAILY UNTIL FURTHER NTOICE Parkgate and D o w n and Up Goods Hopetown Heighington and U p Main Charity Shildon and Bishop A l l Auckland East SATURDAY to SUNDAY 12 to 13 DECEMBER Shildon and Bishop A l l Auckland East ( B L O C K E D ) to Contractor demolishing former Albert Hill signal box at Om. 35chs. Machinery in use to Contractor building at lineside at lm. 37chs. Machinery in use to Contractor using boring rig at 10m. 52chs (Sat) to (Sun). Repairing Shildon Tunnel between 8m. 70chs. and 9 Both signal boxes open. NORTHALLERTON TO REDMIRE Northallerton and A l l Leyburn to (Mon to Fri). Painting S. & T. apparatus and I ineside work. Ladders and scaffolding in use. FERRYHILL NO.3I10 NORTON-ON-TEES SOUTH Ferryhill No.3 and D o w n and Bishop Middleham Bishop Middleham D o w n and and Stillington Bishop Middleham D o w n and and Stillington to Contractor thrust boring new culvert No.31 at 10m.p to Contractor removing rear portions of former Sedgefield Station platforms at 8m. 28chs. Machinery in use to Contractor removing lineside material between 8m. 70chs. and 81/2m.p. 4m. 25chs. and 4m.p. and also in Sedgefield Goods Yard. Machinery in use.

19 NEN-19 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected R e m a r k s FERRYHILL NO.3 TO NORTON-ON-TEES SOUTH continued continued Sti I I ington D o w n and Stillington and Norton-on-Tees West Stillington and Norton-on-Tees West Down and Down and to Laying lineside drain between 4m. lochs. and 3m. 70chs. Machinery in use to Contractor reconstructing bridge No. 11 at 3m. 21chs. Machinery in use to Track drainage and levelling spoil between 2m. lochs. and 2m.p. Machinery in use. SEATON-ON-TEES BRANCH (GOODS LINE) Cliff House (Seaton S i n g l e Snook Jn.) and Seaton-on-Tees Cliff House (Seaton A l l Snook in.) and Seaton -on-tees to Contractor preparing foundations and erecting scaffolding at bridge No.2 at lm to Contractors taking trial holes and levelling land between lm. 28chs. and 1 m. 50chs. Machinery in use. WEST HARTLEPOOL GOODS AND DOCK LINES Central Marine A l l Ground Frame to daily. Constructing new level cross ing. BILLINGHAM ON TEES TO PORT CLARENCE Billingham-on-Tees and A l l Belasis Lane to Contractor painting bridge No.1 at Om. 42chs. BILLINGHAM BECK BRANCH Haverton Hill South A l l Haverton Hill South E n t r a n c e to North Tees Power Station MONDAY to FRIDAY 14 to 18 DECEMBER North Shore and S i n g l e Haverton Hill South ' ( B L O C K E D except as shown in remarks) to Renewing signal wires and connections. Signal box open to Renewing lead to North Tees power station. Signal box open to Welding rails between 62 rn.p. and 62m. 70chs. Arrangements made to pass trains to and from Portrack Sidings ground frame. other traffic diverted via Belasis Lane. Both signal boxes per

20 NEN Zu SECTION B TEMPORARY ENGINEERING WORKS continued At or between L i n e s affected DARLINGTON (SOUTH) TO SALTBURN Geneva and A l l Bowesfield Bowesf le Id (Eag lesc I iffe A l l South Jn.) and (Eaglescliffe North Jn.). Urlay Nook and Bowesfield (Eaglescliffe South Jn.) Bowesfield and Tees (Thornaby East Junction) Tees (Thornaby East Jn.) U p Main and Bowesfield South Bank C l a y Lane Sidings South Bank and Grangetown Grangetown Grangetown and Longbeck Redcar Bowesfield (Eaglescliffe South Jn) and Urlay Nook Bowesfield Tees (Newport East) and Grangetown Whitehouse Cargo Fleet Down and Up Darlington Main Down and Longbeck(Saltburn A l l Station) SATURDAY to SUNDAY 12 to 13 DECEMBER Tees (Thornaby (Sat) to (Sun) East JO A l l (BLOCKED except as shown in remarks) (Sun) to (BETWEEN TRAINS) Urlay Nook and Bowesfield (Eaglesclifte South Jn.) Down and and Goods Lines Up Goods (BLDCKED) Down and and Down Goods (BETWEEN TRAINS) Remarks to (Mon to Fri). Painting bridges, S& I apparatus and lineside work. Ladders and scaffolding in use to (Mon to Fri). Painting station footbridge. Scaffolding in use to Contractor painting road markings on Aliens West level crossing at 8m. 14chs to Contractor erecting scaffolding on bridge No.20 at 11m. 25chs to Contractor recovering redundant sidings between 1 1 use. Alterations to track and signalling in private sidings to Contractor repairing bridge No. 50b at 17m. 39chs to Jointing cables to Preparing for signalling alterations Contractor removing redundant track between 22 and 23m.p. Machinery in use. Contractor removing redundant track between 27 and (Sat) to (Sun). Turning rails and rerailing between (Sat) to (Sun). Crane in use. Arrangements made to pass 0E50, LE Port Clarence to Thornaby over Down Goods to Overhauling track circuits to Changing rails between 8 8m.p. Both signal boxes open. Aliens West auto barriers manned to Overhauling track circuits to Loading spoil between 15 and 19 m.o. Renewing waybeams on bridge No. 57 at 18m. 46chs. Guisborough Jo., Cargo Fleet, South Bank and Grangetown signal boxes open to Signalling alterations. (See Section 'C'). Signal box open to Signalling alterations. (See Section 'C'. Signal box open.

21 NEN-21 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected R e m a r k s DARLINGTON (SOUTH) TO SALTBURN continued continued Grangetovvn A l l Longbeck A l l to Overhauling track circuits to Overhauling track circuits. FIGHTING COCKS BRANCH (GOODS LINES) Paton and Baldwins A l l Ground Frame and Oak Tree to (Mon to Fri). Painting bridges. S. & T. apparatus and lineside work. Ladders and scaffolding in use. HARTBURN CURVE Hartburn and A l Bowesf laid to Preparing for signalling alterations. WILTON WORKS BRANCH (GOODS LINES) Contractor removing redundant former Grangetown S i n g l e between 19Y2 rn.p. and 20m. 12chs. Machinery in use. TEES, THORNABY EAST JUNCTION TO GUISBOROUGH JUNCTION (GOODS LINES) Tees A l l to Overhauling point machines. NORMANBY BRANCH Cargo Fleet Inner in. A l l Ground Frame to Contractor painting bridge No.3 at Om. 53chs. Scaffolding in use. LONGBECK (SALTBURN WEST JN.) TO CRAG HALL Saltburn West and S i n g l e Crag Hall to (Mon to Fri). Repairing bridge No.3 at 28m. 16chs. MIDDLESBROUGH (GUISBOROUGH JN.) TO WHITBY North Ormesby D o w n and North Ormesby U p Main to Contractor constructing new bridge No.4 at Om. 41chs. Machinery in use to Preparing for signalling alterations.

22 NEN-22 SECTION ii-itrvifokary ENGINEERING WORKS continued At or between L i n e s affected Remarks MIDDLESBROUGH (GUISBOROUGH JN.): TO WHITBY continued Nunthorpe and S i n g l e Battersby Battersby P l a t f o r m Lines Castleton Moor S i n g l e and Grosmont Glaisdale A l l Sleights and D o w n and Bog Hall Grosmont and Sleights Single continued to Rebuilding Great Ayton platform wall to Repairing platform walls and copings. (See Section 'WO to (Mon to Fri). Welding rails to Preparing for signalling alterations to Contractor laying sewer at I ineside and under tracks between 29m. 4chs. and 29m. 17chs to Examining bridge No.50 at 26m. 58chs. Viaduct inspection unit in use. Both signal boxes open.

23 SECTION C NEN-23 SIGNALLING AND PERMANENT WAY ALTERATIONS * WHITEHOUSE DETAILS OF WORK REFERRED TO IN SECTION B The Outer Distant signal will be abolished and incorporated in the new Cargo Fleet Home 3 aspect col:jur light signal situated to the left of the 397 yards from Cargo Fleet signal box. (2) CARGO FLEET The bracket signal carrying the Home together with Whitehouse Outer Distant below, will be abolished and replaced by a 3 aspect colour light signal displaying red, yellow or green aspects, situated on the left hand side of the 397 yards from the signal box. ( 2 ) WEDNESDAY 16 DECEMBER YORK YARD NORTH The shunting signal Up Warehouse to Goods or Up Shunting line or Up Arrival lines will be renewed on the same site with the arm at a reduced height of 16 feet 6 inches above rail level. ( 2 ) DETAILS OF WORK ALREADY CARRIED OUT TYNEMOUTH NORTH The bracket signal formerly situated 918 yards from the signal box and carrying the Distant and to platform Distant arms, has been abolished. A new straight post signal, Distant has been brought into use, 1063 yards from the signal box. The distance between the Distant and Home signals is 890 yards. ( 5 1 / 5 2 ) FERRYHILL NO.1 The Down Slow Distant signal has been abolished. FERRYHILL NO.3 The Up Slow to Distant signal has been abolished. FERRYHILL NO.2 The Down Goods No.3 to Down Goods No.2 signal has been removed and replaced by a ground disc signal 60 yards nearer the signal box. ( 5 1 / 5 2 ) BEAL The auto right hand bracket signal (No.U59) has been renewed as a straight post signal in the same position with the red aspect 12 ft. above rail level. ( 5 1 / 5 2 )

24 NEN-24 SECTION 6 SIGNALLING AND PERMANENT WAY ALTERATIONS continued DETAILS OF WORK ALREADY CARRIED OUT continued NORTHALLERTON LOW GATES The level crossing gates have been replaced by lifting barriers controlled from the signal box. (51/52) * * Ogdens Lane ground frame and all associated signalling has been abolished. Notice boards have been provided on either side of the level crossing at 440 yards worded: "OGDENS LANE YARDS" and at 25 yards either side of the level crossing worded: "STOP FOR ORDERS" (50) *BOLDON COLLIERY AND PONTOP CROSSING Pontop Crossing The signal box, together with all signals worked therefrom, has been abolished. connections have been secured out of use in the normal position pending removal. - Bo!don Colliery The Home signal has been abolished and replaced by the former Pontop Crossing Home, 640 yards from the signal box. The Starting signal with Pontop Crossing Distant below has been abolished and replaced by the former Pontop Crossing Home with Tile Shed Distant below, 591 yards from the signal box. Diamond signs have been fitted to each signal. The Up Goods line between Green Lane signal box and Boldon Colliery (N.C.B.) has become a single line and renamed "Up and Down Pontop". It is worked under "One Train Working Regulations" and a staff has been provided worded "Boldon Colliery (N.C.B.) and Green Lane", Notice boards have been provided as follows at the Green Lane end: At commencement of single line " START OF ONE TRAIN WORKING. MOVEMENTS MUST NOT BE MADE PAST THIS SIGN WITHOUT THE BRANCH STAFF". 50 yards before the end of the single line: "END OF ONE TRAIN WORKING". The existing trap points on this line, 40 yards either side of the main lines at the former Pontop Crossing are now worked from Boldon Colliery signal box. The following new signals have been brought into use: BY28, a colour light, situated to the left of the single line (Up direction), 2 yards in rear of trap points, displaying a red aspect with subsidiary signal below. A fixed distant has been provided 712 yards on the approach side. BY27, a colour light situated to the left of the single line (Down direction), 10 yards in rear of trap points displaying a red aspect with subsidiary signal below. A fixed distant has been provided 964 yards on the approach side. Telephones have been provided at these signals. ( 5 0 )

25 SECTION D NEN-25 GENERAL INSTRUCTIONS AND NOTICES * Denotes new or amended item * * *BRITISH OXYGEN CO. LTD. MOVEMENT OF 100 TON G.L.W. BOGIE TANKS LOADED WITH CRYOGENIC GASES When the above tanks are conveyed, in addition to the instructions contained in Section F3 (Pink Pages) of B.R /3 "Working Manual for Rail Staff", the following MUST appl y: 1. These vehicles are subject to a speed restriction of 60m.p.h. 2. These vehicles must not be loose shunted, or allowed to pass over marshalling yard humps 3. The following notice is displayed on each vehicle: Important If this vehicle is involved in any accident, immediately: (a) Eliminate all naked lights. (b) Telephone Fire Service. (c) Telephone B.O.C. at Widnes: /2505/4128,also Amersham 7081 (reverse charge) and say "Rail-car Emergency". Do not touch any valves or equipment until expert advice is available. 4. With reference to 3(c) above, this should be done through H.O. Control, York telephone , extension LEAKAGE The pressure relief valve is set at 45p.s.i., and under normal circumstances of travel should prevent escape of vapour. If, however, there is any evidence of leakage, which would appear as a cloud of vapour, from the valve chest, situated at mid-span underneath the tank barrel, or from elsewhere from the tank, then the wagon should be taken out of service immediately, and B.O.C. advised through the Control as in 3(c) and 4 above. 6. WAGON DERAILMENT (a) Wagon remaining upright with no leakage. In this event, advice to B.O.C. must be made through H.Q. Control. Thereby the laid down accident procedure would follow. In this event, there would be no need to wait arrival of B.O.C. representatives before simply jacking the vehicle up in order to rerail the wagon. Inform the local authority Fire Service to be in attendance during this operation. (b) Wagon Derailed on its side with no leakage of product. Advise B.O.C. through H.O. Control and follow accident procedure as painted on the tank wagon. In this event, it is considered unwise to commence lifting and re-railment operations until the B.O.C. representatives have arrived on the scene and inspected the vehicle. Inform the local authority Fire Service to be in attendance. (c) Wagon Derailed on its side with contents leaking. This is a major accident. Take all possible action to prevent injury to persons; (a) Keep everyone on the windward side. (b) Prohibit smoking and the use of naked lights. (c) Inform the local authority Fire Service to be in attendance. B.O.C. to be advised through H.Q. Control. Await arrival of B.O.C. representatives before any further action is taken. movements must be accompanied by Form B.R /3 (advice to Train Crews).

E31British Rail EASTERN REGION NORTHERN AREA (NORTHERN SECTION) (including Main line, York to Northallerton and York Yards)

E31British Rail EASTERN REGION NORTHERN AREA (NORTHERN SECTION) (including Main line, York to Northallerton and York Yards) FOR THE INFORMATION OF RAILWAY STAFF ONLY B.R. 31262 NE/N E31British Rail EASTERN REGION No.47 NORTHERN AREA (NORTHERN SECTION) (including Main line, York to Northallerton and York Yards) TEMPORARY SPEED

More information

TEMPORARY SPEED RESTRICTIONS - c SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC.

TEMPORARY SPEED RESTRICTIONS - c SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. PRIVATE AND NOT FOR PUBLICATION B.R.31262 British Rail S TEMPORARY SPEED RESTRICTIONS - c SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 10 AUGUST TO FRIDAY 16 AUGUST 1974 Trainmen must pay particular

More information

TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 19 OCTOBER FRIDAY 25 OCTOBER 1974

TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 19 OCTOBER FRIDAY 25 OCTOBER 1974 PRIVATE AND NOT FOR PUBLICATION B. R. 3 1 2 6 2 British Rail' NN EASTERN REGION No.42 TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 19 OCTOBER

More information

East Coast Berwick to Alnmouth

East Coast Berwick to Alnmouth East Coast Berwick to Alnmouth NW 0 Scottish Border Berwick Station Scremerston Tweedmouth Goswick Beal Crossovers Crag Mill Chathill Station Belford Fallodon & Christon Bank Little Mill Crosovers Alnmouth

More information

INSTRUCTIONS FOR INSTALLATION AND USE OF A SCENARIO PACK FOR RAILWORKS

INSTRUCTIONS FOR INSTALLATION AND USE OF A SCENARIO PACK FOR RAILWORKS (PRIVATE and not for Publication) F.S. 101/2 fastline simulation AGES OF THE TRAIN 01 ECML FREIGHT 1973-1986 INSTRUCTIONS FOR INSTALLATION AND USE OF A SCENARIO PACK FOR RAILWORKS This book is for the

More information

INSTRUCTIONS IN CONNECTION WITH THE WORKING OF ELECTRIC TRAINS

INSTRUCTIONS IN CONNECTION WITH THE WORKING OF ELECTRIC TRAINS BRITISH RAILWAYS (North Eastern Operatir,g Area) INSTRUCTIONS IN CONNECTION WITH THE WORKING OF ELECTRIC TRAINS ON THE TYNESIDE ELECTRIFIED LINES In operation from 1st May, 1952 (Booklet dated 1st January,

More information

NETWORK RAIL LONDON NORTH EASTERN

NETWORK RAIL LONDON NORTH EASTERN Private and not for publication B R 3 0 0 1 8 / 7 Persons supplied with this Section must make themselves acquainted with it and will be held responsible for the observance of all instructions contained

More information

Private and not for publication B R I 8/7 L O N D O N N O R T H EAST ERN Z O NE

Private and not for publication B R I 8/7 L O N D O N N O R T H EAST ERN Z O NE Private and not for publication B R 3 0 0 8/7 Persons supplied with this Section must make themselves acquainted with it and will be held responsible for the observance of all instructions contained therein

More information

Preparation works for Junior Great North Run changes in week prior to the main event Monday 4 to Friday 8 September 2017.

Preparation works for Junior Great North Run changes in week prior to the main event Monday 4 to Friday 8 September 2017. Preparation works for Junior Great North Run changes in week prior to the main event Monday 4 to Friday 8 September 2017. (Friday Only) Buses will be unable to serve South Shore Road between Mill Road

More information

Morwell. (88 miles 75 chains 47 links, km)

Morwell. (88 miles 75 chains 47 links, km) Morwell (88 miles 75 chains 47 links, 144.372 km) 01.06.1877 Opened with line between Morwell and Sale. Staff and Ticket not provided initially. (VR to 62, Leo Harrigan, WTT) (01.04.1878) By this date,

More information

British Rail PERIODICAL OPERATING NOTICE

British Rail PERIODICAL OPERATING NOTICE PRIVATE AND NOT FOR PUBLICATION BR.31262/D British Rail ND EASTERN REGION (Northern Area) 32D PERIODICAL OPERATING NOTICE CONTAINING GENERAL INSTRUCTIONS AND NOTICES SATURDAY 4 AUGUST 1984 TO FRIDAY 5

More information

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 26 SEPTEMBER FRIDAY 23 OCTOBER 1970

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 26 SEPTEMBER FRIDAY 23 OCTOBER 1970 1 B.R.31262/D ND British Rail EASTERN REGION (NORTHERN AREA) No. 39D GENERAL INSTRUCTIONS AND NOTICES SATURDAY 26 SEPTEMBER (4 WEEKLY PERIOD) 10 FRIDAY 23 OCTOBER 1970 INCLUSIVE For additional items during

More information

Making Rail Accessible: Helping Older and Disabled Passengers. January 2017

Making Rail Accessible: Helping Older and Disabled Passengers. January 2017 Making Rail Accessible: Helping Older and Disabled Passengers January 2017 1. Introduction From 1st April 2017 Metro is being directly operated by Nexus, the Passenger Transport Executive for Tyne and

More information

Top floor Grade A Office To Let 13,030 sq ft (1,210 sq m)

Top floor Grade A Office To Let 13,030 sq ft (1,210 sq m) www.cobaltpark.co.uk The UK s largest Office Park Top floor Grade A Office To Let 13,030 sq ft (1,210 sq m) 3 FLOORS LET TO Welcome to a new generation of self contained environmentally sustainable office

More information

KEY: PROPOSED SPENNYMOOR - NORTON 400kV OVERHEAD LINE EIA NON-TECHNICAL SUMMARY A3

KEY: PROPOSED SPENNYMOOR - NORTON 400kV OVERHEAD LINE EIA NON-TECHNICAL SUMMARY A3 540000 538000 420000 422000 424000 426000 City of Durham Bowburn 446000 448000 540000 538000 SPENNYMOOR SUBSTATION Spennymoor SECTION A Cornforth Coxhoe Kelloe SECTION B Trimdon Deaf Hill Trimdon Grange

More information

Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH)

Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH) Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH) 01.02.1873 Open for passengers on Geelong - Ballarat line (Chronological Index) (31.12.1878) By this date, open for general goods (Commissioners

More information

METROFUTURES. The combined future of Metro and local rail in the North East

METROFUTURES. The combined future of Metro and local rail in the North East METROFUTURES The combined future of Metro and local rail in the North East Foreword 2 Welcome to this brochure, which sets out the aims and objectives of the North East Combined Authority s forthcoming

More information

Freedom of Information Act 2000 (FOIA) Request 392/13 - Thefts from police

Freedom of Information Act 2000 (FOIA) Request 392/13 - Thefts from police Freedom of Information Act 2000 (FOIA) Request 392/13 - Thefts from police Year Item Item Value Where (Sector) Recovered (Y/N/Partial) Outcome 2008 sat nav 200 Ashington N Undetected 2008 beacon 150 Sunderland

More information

WORKING SAFELY NEXT TO WEST MIDLANDS METRO

WORKING SAFELY NEXT TO WEST MIDLANDS METRO WORKING SAFELY NEXT TO WEST MIDLANDS METRO GUIDELINES FOR BUSINESSES, CONTRACTORS, EVENT ORGANISERS & OTHERS WORKING ON OR NEAR TO WEST MIDLANDS METRO. If you own, occupy a building or other assets near

More information

Newcastle upon Tyne - Carlisle

Newcastle upon Tyne - Carlisle 685 bus time schedule & line map 685 Newcastle upon Tyne - Carlisle View In Website Mode The 685 bus line (Newcastle upon Tyne - Carlisle) has 3 routes. For regular weekdays, their operation hours are:

More information

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1. SP (issue 1).qxd 16/4/03 1:04 pm Page 1 GE/RT8000 - SP Rule Book Module SP Speeds Issue 1 June 2003 Comes into force 6 December 2003 SP (issue 1).qxd 16/4/03 1:04 pm Page 2 Issue Date Comments Comes into

More information

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 8 MAY FRIDAY 4 JUNE 1911

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 8 MAY FRIDAY 4 JUNE 1911 FOR THE INFORMATION OF RAILWAY STAFF ONLY British Rail EASTERN REGION B.R.31262/D No. 19D (NORTHERN AREA) GENERAL INSTRUCTIONS AND NOTICES SATURDAY 8 MAY (4 WEEKLY PERIOD) TO FRIDAY 4 JUNE 1911 INCLUSIVE

More information

Local bus links in Sunderland Designing a network to meet your needs

Local bus links in Sunderland Designing a network to meet your needs Local bus links in Designing a network to meet your needs TYNE AND WEAR INTEGRATED TRANSPORT AUTHORITY Public consultation 15 March - 4 June 2010 Local bus links in Designing a network to meet your needs

More information

Ouyen - Pinnaroo GALAH (298 MILES)

Ouyen - Pinnaroo GALAH (298 MILES) Ouyen - Pinnaroo TIEGA (295 1/4 MILES) (19.12.1910) Opened for goods not requiring shed accommodation or crane power. Traffic handled by Construction Branch. (WN 51) 25.06.1912 Line opened. No-one-in-charge.

More information

Tel: (0191) ext

Tel: (0191) ext Blandford House Blandford Square Newcastle upon Tyne NE1 4JA Tel: (0191) 2326789 ext 22248 Email: twas@gateshead.gov.uk www.tyneandweararchives.org.uk USER GUIDE 15C SCHOOLS NORTH TYNESIDE MBC This User

More information

Formation of single/double Track

Formation of single/double Track Formation of single/double Track Formation of track Track Stresses due to wheel load Failure of formation Due to over stressed condition Poor construction Excessive moisture content of the filling material

More information

Warragul. (61 miles 20 chains 0 links, km)

Warragul. (61 miles 20 chains 0 links, km) Warragul (61 miles 20 chains 0 links, 96.766 km) GALLAGHERS LANE (60 MILES 37 CHAINS) 30.10.1945 Flashing lights provided. Work automatically for all trains. (WN 45, AGST 16/298/2) 80.09.1971 Provision

More information

Finally, Police and Fire Authority records may contain reports on incidents of vandalism, fires etc.

Finally, Police and Fire Authority records may contain reports on incidents of vandalism, fires etc. TYNE & WEAR ARCHIVES USER GUIDE 15E SCHOOLS - SOUTH TYNESIDE This User Guide outlines the records held relating to individual schools in South Tyneside. Separate User Guides are available for records of

More information

DRIVING AND OFF-DUTY TIME

DRIVING AND OFF-DUTY TIME FACT SHEET DRIVING AND OFF-DUTY TIME for Heavy Vehicle Drivers 4 PREVIOUS DAYS RULE To drive, you are required to have taken at least 24 consecutive hours of off-duty time during the 4 previous days. In

More information

Broadmeadows BROADMEADOWS (10 1/2 MILES)

Broadmeadows BROADMEADOWS (10 1/2 MILES) Broadmeadows BROADMEADOWS (10 1/2 MILES) Broadmeadows is situated at the top of the long climb out of the Moonee Ponds Creek valley. It served the established communities of Keilor (to the west) and Campbellfield

More information

WORKING TIMETABLE MANDATORY TRAIN SERVICES

WORKING TIMETABLE MANDATORY TRAIN SERVICES (C) Swanage Railway Co. Ltd. 016 SECTION WG (SWANAGE BRANCH) WORKING TIMETABLE OF MANDATORY TRAIN SERVICES WORGRET JCN TO SWANAGE DIESEL GALA 016 6 MAY 014 to 8 MAY 016 (including preview day May) When

More information

Somerton SOMERTON (13 MILES 42 CHAINS)

Somerton SOMERTON (13 MILES 42 CHAINS) Somerton SOMERTON (13 MILES 42 CHAINS) Somerton has had four phases of existence. The first, from 1881 to 1889, was as a simple passenger platform which served the village of Somerton on Sydney Road. Between

More information

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015 GE/RT8000/SP Rule Book Module SP Speeds Issue 5 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk/rgsonline Contents

More information

Tel: (0191) ext

Tel: (0191) ext Blandford House Blandford Square Newcastle upon Tyne NE1 4JA Tel: (0191) 2326789 ext 22248 Email: twas@gateshead.gov.uk www.tyneandweararchives.org.uk USER GUIDE 15E SCHOOLS - SOUTH TYNESIDE This User

More information

INDUSTRIAL ROADS ACT

INDUSTRIAL ROADS ACT PDF Version [Printer-friendly - ideal for printing entire document] Published by Quickscribe Services Ltd. Updated To: [includes 2017 Bill 9, c. 10 amendments (effective November 2, 2017)] Important: Printing

More information

Department for Transport Government Office for the North East Tyneside Area Multi-Modal Study - Study Report. November 2002

Department for Transport Government Office for the North East Tyneside Area Multi-Modal Study - Study Report. November 2002 Department for Transport Tyneside Area Multi-Modal Study - Study Report November 2002 Department for Transport Government Office for the North East Tyneside Area Multi-Modal Study Study Report November

More information

PUBLIC NOTICE BEDFORD BOROUGH COUNCIL PROPOSES TO INTRODUCE A RESTRICTED BUS STOP OUTSIDE RENHOLD PRIMARY, RENHOLD

PUBLIC NOTICE BEDFORD BOROUGH COUNCIL PROPOSES TO INTRODUCE A RESTRICTED BUS STOP OUTSIDE RENHOLD PRIMARY, RENHOLD PUBLIC NOTICE BEDFORD BOROUGH COUNCIL PROPOSES TO INTRODUCE A RESTRICTED BUS STOP OUTSIDE RENHOLD PRIMARY, RENHOLD Reason for Proposal: Bedford Borough Council has received a request to introduce a dedicated

More information

Traffic Accident Statistics

Traffic Accident Statistics 2000 Missouri State Highway System Traffic Accident Statistics Missouri State Highway System Traffic Accident Statistics Table of Contents Subject Chapter 1: Statewide Traffic Accident Statistics, Introduction

More information

London North Eastern Zone

London North Eastern Zone Private and not for publication B R 3 0 0 8 / 2 Persons supplied with this Section must make themselves acquainted with it and will be held responsible for the observance of all instructions contained

More information

TA20 ARTC Code of Practice for the Victorian Main Line Operations

TA20 ARTC Code of Practice for the Victorian Main Line Operations TA20 ARTC Code of Practice for the Victorian Main Line Operations Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1.2 07 August 2011. 2.0 04 October

More information

Ballast Usually stone chippings, or similar material, which support the sleepers and hold them in place on the ground.

Ballast Usually stone chippings, or similar material, which support the sleepers and hold them in place on the ground. Model Rail Terminology Alternating Current/AC The electric current that flows alternately through each wire in a rapid sequence called a cycle. The normal mains electricity supply is powered by Alternating

More information

Appendix D. List of Existing Structures

Appendix D. List of Existing Structures A120 Braintree to A12 Technical Appraisal Report Appendix D. List of Existing Structures B3553T41-JAC-HGN-00-REP-C-0002 Page 134 of 135 A120 Braintree to A12 - Existing Structures Existing Structure Name

More information

Photography BGORUG NEWS RELEASE RAIL DISRUPTION TO CONTINUE AS ELECTRIFICATION PROJECT OVERRUNS

Photography BGORUG NEWS RELEASE RAIL DISRUPTION TO CONTINUE AS ELECTRIFICATION PROJECT OVERRUNS BARKING GOSPEL OAK RAIL USER GROUP F O U N D E D 1 9 6 4 Chair: Graham Larkbey Secretary: Glenn Wallis (020) 8529 2361; 07789 791224 www.barking-gospeloak.org.uk info@barking-gospeloak.org.uk @RidingtheGoblin

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Shunting and Marshalling Rule Number: 4013 Version 1.0, 31 March 2016 Shunting and Marshalling Rule Number: 4013 Document Control Identification Document title

More information

Glengowrie Depot Upgrade. Nick Marciano, Manager Tram Maintenance, PTS

Glengowrie Depot Upgrade. Nick Marciano, Manager Tram Maintenance, PTS Glengowrie Depot Upgrade Nick Marciano, Manager Tram Maintenance, PTS Introduction Nick Marciano Took up role of Tram Maintenance Manager in June 2009. Prior to that: 35 years in manufacturing starting

More information

WORKING TIMETABLE MANDATORY TRAIN SERVICES

WORKING TIMETABLE MANDATORY TRAIN SERVICES SECTION WG ( BRANCH) WORKING TIMETABLE OF MANDATORY TRAIN SERVICES WORGRET JCN TO DIESEL GALA 14 9 MAY 14 to 11 MAY 14 When trains are running late, drivers must endeavour to make up time with due regard

More information

10-10 TEMPORARY PARKING PROHIBITION FOR SNOW PLOWING AND REMOVAL. Brighton Avenue Both Between Route NJ 71 (Norwood Avenue) and Railroad Avenue.

10-10 TEMPORARY PARKING PROHIBITION FOR SNOW PLOWING AND REMOVAL. Brighton Avenue Both Between Route NJ 71 (Norwood Avenue) and Railroad Avenue. 10-10 TEMPORARY PARKING PROHIBITION FOR SNOW PLOWING AND REMOVAL Name of Street Sides Location Brighton Avenue Both Between Route NJ 71 (Norwood Avenue) and Railroad Avenue. Campbell Court Both Entire

More information

Wallan WALLAN (29 MILES 40 CHAINS)

Wallan WALLAN (29 MILES 40 CHAINS) Wallan WALLAN (29 MILES 40 CHAINS) Like most of the other stations on the line to Seymour the township of Wallan is located on the Hume Highway and is some 2 kilometres west of the station. The station

More information

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017 Elected Officials Briefing North Metro Rail Line Update February 9, 2017 Dave Genova, RTD General Manager and CEO Openings 2016-2017 Flatiron Flyer, Jan. 3, 2016 University of Colorado A Line, April 22,

More information

1999 Missouri State Highway System. Missouri Department of Transportation - Transportation Management Systems

1999 Missouri State Highway System. Missouri Department of Transportation - Transportation Management Systems 1999 Missouri State Highway System Traffic Accident Statistics - Transportation Management Systems Missouri State Highway System Traffic Accident Statistics Table of Contents Subject Chapter 1: Statewide

More information

The Picton/Mittagong line was opened in March 1867 as part of the Main South line.

The Picton/Mittagong line was opened in March 1867 as part of the Main South line. Read below as Bob Newham, Loco Division Passenger Organiser, explores some of the incredible history behind rail in New South Wales. As you will discover, the month of March has many stories to tell March

More information

The West Lancashire Light Railway OPERATING RULE BOOK

The West Lancashire Light Railway OPERATING RULE BOOK The West Lancashire Light Railway OPERATING RULE BOOK Revision 4-5th November 2008 This supersedes any previous versions of the Rule Book CONTENTS 1 Definitions and Abbreviations 2 Method of Operation

More information

Westland No. 1 Mine (Bob Ciminel 2012)

Westland No. 1 Mine (Bob Ciminel 2012) Westland No. 1 Mine (Bob Ciminel 2012) Westland Mine No. 1 was owned by the Pittsburgh Coal Company and located at the eastern (timetable) end of the Montour Railroad s Midland Spur/Westland Branch, just

More information

ASHPRINGTON ROAD Part 1

ASHPRINGTON ROAD Part 1 MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD Part 1 By Graham Plowman Photographed by Paul Plowman 2 MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD A 00 layout based on the Western Region Main Line between Exeter

More information

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES Spa Valley Railway 08 SECTION WE A DESTINATION AT EVERY STATION! WORKING TIMETABLE OF PASSENGER TRAIN SERVICES SOUTHERN REGION (CENTRAL DIVISION) SPA VALLEY LINE Thursday nd, Friday 3 rd, Saturday 4 th

More information

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES Spa Valley Railway 2018 SECTION WE A DESTINATION AT EVERY STATION! WORKING TIMETABLE OF PASSENGER TRAIN SERVICES SOUTHERN REGION (CENTRAL DIVISION) SPA VALLEY LINE Thursday 2 nd, Friday 3 rd, Saturday

More information

CTA Capital Construction Update December 12, 2006

CTA Capital Construction Update December 12, 2006 Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction

More information

Uncontrolled When Printed Document to be superseded as of 01/06/2013 To be superseded by GORT3056-E Iss 3 published on 02/03/2013

Uncontrolled When Printed Document to be superseded as of 01/06/2013 To be superseded by GORT3056-E Iss 3 published on 02/03/2013 Section E MOVEMENT OF FREIGHT TRAINS Contents Page Latest Issue Contents E1 December 03 E1 Authorised Vehicles E3 December 03 E2 E3 E4 E5 Movement of Defective Vehicles Special Movement Conditions Vehicles

More information

Centralised Traffic Control System - Rules 1 to 17

Centralised Traffic Control System - Rules 1 to 17 Centralised Traffic Control System - Rules 1 to 17 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 2 13 May 2012 0 04 October 2015 Australian Rail

More information

North Eastern Railway: The Buses - Fleet History North Eastern Railway: The Buses - Bus Fleet List

North Eastern Railway: The Buses - Fleet History North Eastern Railway: The Buses - Bus Fleet List CONTENTS North Eastern Railway: The Buses - Fleet History 1903-1923. North Eastern Railway: The Buses - Bus Fleet List 1903-1923....... Page 3 Page 8 Cover Illustration: No. 230 was the last bus to enter

More information

Runaway and derailment of a rail vehicle near Bury, Greater Manchester, 22 March 2016

Runaway and derailment of a rail vehicle near Bury, Greater Manchester, 22 March 2016 Independent report Runaway and derailment of a rail vehicle near Bury, Greater Manchester, 22 March 2016 1. Important safety messages This accident demonstrates the importance of: ensuring that trains

More information

This rule applies to interlocking only. It does not apply to controlled points in traffic control systems.

This rule applies to interlocking only. It does not apply to controlled points in traffic control systems. Subpart C Interlocking - Standards 236.301 Where signals shall be provided. This rule requires that a signal be provided to govern train movements into and through interlocking limits except over electrically

More information

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 1 DECEMBER 1979

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 1 DECEMBER 1979 PRIVATE AND NOT FOR PUBLICATION B.R. 31262/ a) ND British Rail EASTERN REGION 48D (Northern Area) GENERAL INSTRUCTIONS AND NOTICES SATURDAY 1 DECEMBER 1979 TO FRIDAY 1 FEBRUARY 1980 INCLUSIVE For additional

More information

Interim Report into Cement Train Derailment at the Suir River Viaduct On 07/10/03

Interim Report into Cement Train Derailment at the Suir River Viaduct On 07/10/03 Interim Report into Cement Train Derailment at the Suir River Viaduct On 07/10/03 1.0 Summary: 1.1 The cement train derailment that occurred at Cahir at approximately 06.00 hours on 07/10/03 resulted in

More information

M60/M62 smart motorways

M60/M62 smart motorways Public information exhibition Highways England creative N150128 Welcome We re improving the M60 between junction 8 (Carrington Spur) and M62 junction 20 (Rochdale and Oldham). The M60 and M62 are vital

More information

SYDNEY TRAMWAY MUSEUM TROLLEY WIRE INSPECTION PROCEDURE

SYDNEY TRAMWAY MUSEUM TROLLEY WIRE INSPECTION PROCEDURE TROLLEY WIRE INSPECTION PROCEDURE JUNE 2014 1. Document Details: Name: SYDNEY TRAMWAY MUSEUM Document Control Record Number STM 6029 Version Number: 15 TrolleyWire Inspection Procedure Document Status:

More information

THE BELT RAILWAY COMPANY OF CHICAGO

THE BELT RAILWAY COMPANY OF CHICAGO THE BELT RAILWAY COMPANY OF CHICAGO CORA Update 2017-003 Effective 0001, June 19, 2017: Summary of Changes: Replacement section for entire BRC Section of CORA Operating Guide Designation of Lines with

More information

Table of Contents. Metro Access Guide: April 2010 Page 1

Table of Contents. Metro Access Guide: April 2010 Page 1 Table of Contents 1. Introduction... 3 2. Metro Stations... 7 3. Airport... 8 4. Bank Foot... 10 5. Bede... 12 6. Benton... 14 7. Brockley Whins... 16 8. Byker... 18 9. Callerton Parkway... 20 10. Central

More information

NORTH EASTERN EXPRESS

NORTH EASTERN EXPRESS The NORTH EASTERN EXPRESS INDEX TO ISSUE Nos. 121-144 ISSN 0962 87 46,., ----- The Journal of the NORTH EASTERN RAILWAY ASSOCIATION Published by the N.E.R.A. June 1998 -------------------------- --- -----

More information

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998 Rapid Response Railway Group Standard Lineside Signal Spacing Synopsis This Standard specifies the minimum distance that must be provided between the first signal displaying a cautionary aspect and the

More information

Hydrant Replacement Methods and Techniques

Hydrant Replacement Methods and Techniques Hydrant Replacement Methods and Techniques Water Service Disruption Reports Are prioritized and submitted to the Clearances and Locations Work Group. City of Saskatoon - Water Service Disruption Report

More information

City State Zip Code City State Zip Code

City State Zip Code City State Zip Code Town of Brighton Office of the Fire Marshal Fire Apparatus Access and Fire Hydrant Worksheet The information contained in this worksheet is provided solely for the convenience of determining compliance

More information

McNICOLL BUS GARAGE. Public Open House June 12, 2017 Mary Ward Catholic School

McNICOLL BUS GARAGE. Public Open House June 12, 2017 Mary Ward Catholic School McNICOLL BUS GARAGE Public Open House June 12, 2017 Mary Ward Catholic School THE NEED FOR A NEW BUS GARAGE riders Increased ridership means buses Need for new buses garage And a new bus facility Garages

More information

Chapter 5 Route Window NE4 Ilford station. Transport for London

Chapter 5 Route Window NE4 Ilford station. Transport for London Chapter 5 Route Window NE4 Ilford station ILFORD STATION 5 Route Window NE4 Ilford station 5.6 The construction programme for the station works is expected to take about two years. Operations at Aldersbrook

More information

Collision between a train and an engineering trolley, Stowe Hill Tunnel, 7 December 2016

Collision between a train and an engineering trolley, Stowe Hill Tunnel, 7 December 2016 Collision between a train and an engineering trolley, Stowe Hill Tunnel, 7 December 2016 1. Important safety messages This accident demonstrates the importance of: Track workers and managers being aware

More information

Wollaston Dudley. Monday to Friday. Via Stourbridge, Pedmore, Lye, Merry Hill Centre and Darby End Stourbridge Interchange Website Page 1

Wollaston Dudley. Monday to Friday. Via Stourbridge, Pedmore, Lye, Merry Hill Centre and Darby End Stourbridge Interchange Website Page 1 7 Wollaston Dudley Via Stourbridge, Pedmore, Lye, Merry Hill Centre and Darby End. Monday to Friday Wollaston, Traffic Island.. 0635 0655 0710 0730 0750 0815 0835 0900 0920 0940 1000 1020 Norton, Shenstone

More information

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue Section E MOVEMENT OF FREIGHT TRAINS Contents Page Latest Issue Contents E1 E1 Authorised Vehicles E2 E2 Loads for which Special E3 Conditions have to be Applied E3 Vehicles Equipped with E6 Changeover

More information

Local bus links in Gateshead Designing a network to meet your needs

Local bus links in Gateshead Designing a network to meet your needs Local bus links in Gateshead Designing a network to meet your needs TYNE AND WEAR INTEGRATED TRANSPRT AUTHRITY Public consultation 15 March - 4 June 2010 Local bus links in Gateshead Designing a network

More information

Code of Practice. For works on, near or adjacent to the Luas Tramway

Code of Practice. For works on, near or adjacent to the Luas Tramway Code of Practice For works on, near or adjacent to the Luas Tramway Overhead power cables and any support cables should be treated as "live" at all times. Before attempting to carry out works close to

More information

1 GENERAL Project Description Labrador Island Transmission Link (LIL) Language and Units Site Climate Data...

1 GENERAL Project Description Labrador Island Transmission Link (LIL) Language and Units Site Climate Data... SLI Doc. No. 505573-8600-40EW-0001 02 26-Aug-2014 iii TABLE OF CONTENTS PAGE 1 GENERAL... 1 1.1 Project Description... 2 1.1.1 Labrador Island Transmission Link (LIL)... 3 1.2 Language and Units... 4 1.3

More information

Box 4 Book 1. Photographs (Lakefront - Toledo) Number Date Description

Box 4 Book 1. Photographs (Lakefront - Toledo) Number Date Description Photographs (Lakefront - Toledo) Box 4 Book 1 Number Date Description 7/29/1946 General view of track and dock area 92 9/19/1946 East Approach C & O Overhead Bridge 9-A 6/28/1947 Lakefront Project from

More information

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road

More information

Control, Safe Use and Operation of Road-Rail Plant

Control, Safe Use and Operation of Road-Rail Plant Control, Safe Use and Operation of Page 1 of 13 Part A Synopsis A Standard detailing the requirements for the control, safe use and operation of road-rail plant in the railway environment. Approval and

More information

RAILROAD ACCIDENT INVESTIGATION. Report No THE NEW YORK CENTRAL RAILROAD COMPANY POCA, W. VA. NOVEMBER 21, 1961 INTERSTATE COMMERCE COMMISSION

RAILROAD ACCIDENT INVESTIGATION. Report No THE NEW YORK CENTRAL RAILROAD COMPANY POCA, W. VA. NOVEMBER 21, 1961 INTERSTATE COMMERCE COMMISSION RAILROAD ACCIDENT INVESTIGATION Report No. THE NEW YORK CENTRAL RAILROAD COMPANY POCA, W. VA. NOVEMBER 21, 1961 INTERSTATE COMMERCE COMMISSION Washington 2 SUMMARY DATE: November 21, 1961 RAILROAD: New

More information

Hot Spot Recommendations

Hot Spot Recommendations Recommendations Name of Location MP Curves I-95 Bridge 76-75.5 & Gang Advanced 1 2 1 ise under bridge 125 MPH end of Torresdale Curve 75-75.5 S' Curve 1 3 3 S curves east & west Traffic noise from I-95

More information

CHAPTER 69 PARKING REGULATIONS

CHAPTER 69 PARKING REGULATIONS 69.01 Parking Limited or Controlled 69.08 Persons with Disabilities Parking 69.02 Park Adjacent to Curb 69.09 Truck Parking Limited 69.03 Park Adjacent to Curb One-way Street 69.10 Snow Removal 69.04 Angle

More information

East Coast Mainline. Copyright RailSimulator.com 2012, all rights reserved Release Version 1.0

East Coast Mainline. Copyright RailSimulator.com 2012, all rights reserved Release Version 1.0 East Coast Mainline CONTENTS 1 ROUTE INFORMATION...... 3 2 ROLLING STOCK......... 4 2.1 Locomotives...4 2.1.1 Class 55 Deltic Locomotive...4 2.1.2 Class 47 'Spoon Locomotive...5 2.1.3 IC125 High Speed

More information

Working of Trains - Rules 1 to 45

Working of Trains - Rules 1 to 45 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 201 0 04 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This

More information

A route for Train Simulator 2012

A route for Train Simulator 2012 A route for Train Simulator 2012 Contents 2. Details of the route and how it will progress. 3. A Brief history of the route. 3. Route requirements 4. Scenarios The Pilot Episode Alternative Arrangements

More information

AND THROUGH THE SMOKE WE CAN SEE CLEARLY NOW!

AND THROUGH THE SMOKE WE CAN SEE CLEARLY NOW! AND THROUGH THE SMOKE WE CAN SEE CLEARLY NOW! Another perfect hectic week has passed in the Eastern Free State and even through a smoke screen of work we could see clearly our goal: Steam! During this

More information

SKEENA SUBDIVISION. Mile TERRACE Y 0.0 AMSBURY 9.6 EXSTEW SALVUS KWINITSA SKEENA 58.5 TYEE SOCKEYE 78.

SKEENA SUBDIVISION. Mile TERRACE Y 0.0 AMSBURY 9.6 EXSTEW SALVUS KWINITSA SKEENA 58.5 TYEE SOCKEYE 78. [107 ] Method of Control W SKEENA SUBDIVISION E Mile Siding Capacity In Feet DOB / TGBO SWITCHING ZONES Hot Box and Dragging Equipment Detectors RTC Radio Channel, Tones and DTMF Codes TERRACE Y 0.0 0.0

More information

Street Area AHG Works Location Organisation Works Reference Traffic Management. Works Description

Street Area AHG Works Location Organisation Works Reference Traffic Management. Works Description Page 1 of 7 19/02/2018 19/02/2018 Sandbach North CE AHG Congleton SANDBACH ROAD NORTH JUNC SANDBACH ROAD CHURCH LAWTON ALSAGER CHESHIRE 19/02/2018 26/02/2018 Crewe CE AHG Congleton OPP 35 TO OPP 31 ON

More information

Bankstown to Panania & East Hills

Bankstown to Panania & East Hills Bus Route Numbers 923 924 Bankstown to Panania via Revesby and Picnic Point Services operates seven days a week Bankstown to East Hills via Revesby and Panania Services operates seven days a week Look

More information

Road Races Act 1982 CLASSIC MOTOR CYCLE RACES ORDER 2003 CASTLETOWN, ARBORY AND MALEW. Introductory

Road Races Act 1982 CLASSIC MOTOR CYCLE RACES ORDER 2003 CASTLETOWN, ARBORY AND MALEW. Introductory Statutory Document No. 374 /03 Road Races Act 1982 CLASSIC MOTOR CYCLE RACES ORDER 2003 CASTLETOWN, ARBORY AND MALEW Coming into Operation 19th m May 2003 In exercise of the powers conferred on the Department

More information

Moreton Sugar Mill's EMB bogie locomotive Coolum leads a rake of cane through Bli Bli in 2002.

Moreton Sugar Mill's EMB bogie locomotive Coolum leads a rake of cane through Bli Bli in 2002. These notes were written to give the reader an insight into the operations and equipment used to transport the sugarcane from the fields to the sugar mills over the vast narrow gauge railways used throughout

More information

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2 3 ELECTRIC TRACTION SYSTEMS 2 3.1. SAFE FOR PEOPLE 2 3.1.1. Electric Traction System 2 3.1.2. Protection against unwanted access 2 3.1.3. Fencing 2 3.1.4. On bridges and other structures 2 3.1.5. At level

More information

Steaming CHERRY!!! All in total we had 10 trains over the 3 day period and everyone had a time of their lives. Thursday 10H00 12H00 14H00

Steaming CHERRY!!! All in total we had 10 trains over the 3 day period and everyone had a time of their lives. Thursday 10H00 12H00 14H00 Steaming CHERRY!!! The last week the Eastern Free State was really steaming, with 2 NGG 16 Garret Locomotives as well as the Reefsteamers Class 25NC and 15F. It was this time of the year when we had the

More information

PORTLAND TO MAROONA ROUTE ACCESS STANDARDS

PORTLAND TO MAROONA ROUTE ACCESS STANDARDS PORTLAND TO MAROONA ROUTE ACCESS STANDARDS 1. MAXIMUM AUTHORISED LOADING OUTLINES The loading of all vehicles operating within the Network, or passing through the Network to or from other systems, shall

More information

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3.

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3. GE/RT8000/DC Rule Book Module DC DC electrified lines Issue 3 March 2014 Comes into force 07 June 2014 Conventions used in the Rule Book Example A black line in the margin indicates a change to that rule

More information

Rail Accident Investigation: Interim Report. Fatal accident involving the derailment of a tram at Sandilands Junction, Croydon 9 November 2016

Rail Accident Investigation: Interim Report. Fatal accident involving the derailment of a tram at Sandilands Junction, Croydon 9 November 2016 Rail Accident Investigation: Interim Report Fatal accident involving the derailment of a tram at Sandilands Junction, Croydon 9 November 2016 Report IR1/2016 November 2016 Note: This interim report contains

More information