1 THE BELT RAILWAY COMPANY OF CHICAGO CORA Update Effective 0001, June 19, 2017: Summary of Changes: Replacement section for entire BRC Section of CORA Operating Guide Designation of Lines with milepost changes incorporating milepost suffix designations Update to turnout speeds at various locations Change of Medium Speed to 20 MPH All changes from BRC CORA UPDATE and BRC CORA UPDATE are incorporated into this document BRC CORA UPDATE is cancelled BRC CORA UPDATE is cancelled BRC CORA UPDATE is cancelled CORA Operating Guide, 8 th Edition, Effective May 1, 2016, Belt Railway Company of Chicago Section is replaced in its entirety by this document. BRC CORA UPDATE PAGE: 1

2 THE BELT RAILWAY COMPANY OF CHICAGO CORA GUIDE SECTION Document Structure and Rules in Effect The General Code of Operating Rules, 7 th Edition, Effective April 1, 2015 is in effect BRC Line Segments As a step to implementing Positive Train Control (PTC), the BRC now consists of one subdivision. This subdivision is known as the Belt Railway Subdivision. The Belt Railway Subdivision is divided into two main track lines, the Kenton Line, extending from Cragin to CP 509, and the 59 th Street Line, extending from 55 th Street Interlocking to West Sub Interlocking. Three additional segments of other than main track territory, the South Chicago District Industrial Lead, the Elsdon Industrial Lead, and Clearing Yard are shown on their own pages. Individual Lines: Each station page also contains the special instructions specifically in effect on that line. A linear profile of each line segment is included with the individual line station page. The System Special Instructions Section follows, presenting specific instructions, and including all rules from the General Code of Operating Rules that are modified for use on the BRC. BRC CORA UPDATE PAGE: 2

3 KENTON LINE MILEPOST TRACK SOUTH NORTH RULE AEI SIDING STATIONS MT CRAGIN I, J TH STREET I, J, X ND STREET YARD Y 5.6 HAWTHORNE I, J, R, X 6.6 LEMOYNE I, J, R, X TH STREET I, J, R, X TH STREET X2, I, T MT EAST END SWITCHES I, J, X HAYFORD I, J, R, X ROCKWELL STREET Y 13.0 WESTERN AVENUE I, J, X MT FOREST HILL R CSXT RB DS I, R 7.8 3, MT BELT JUNCTION I, J, X TH STREET I, J, X MT 87 TH STREET YARD Y 12, PULLMAN JUNCTION I, J, R, 19.4 X ROCK ISLAND JUNCTION I, J, X Y MT CP 509 R NS CHGO WEST DS I NOTES: BRC mileposts on the Kenton Line encompass the NS connection, ending at west limit, NS CP 509. BRC Trackage south of MP 21.6, South Limits of Rock Island Junction, towards South Chicago is considered part of the South Chicago District Industrial Lead, with its own mileposts designated with an S suffix. BRC CORA UPDATE PAGE: 3

4 Operating Characteristics: Main Track: Operating Characteristics: Other than Main Track: Speed Restrictions: Supplemental Speed Restrictions: Trains from the Elsdon Industrial Lead, moving southward onto the Kenton Line at 55 TH STREET, MP 8.4 will comply with GCOR at 55 TH STREET Highway Crossing. BRC CORA UPDATE PAGE: 4

5 Speed Restrictions (Turnouts and Crossovers): BRC CORA UPDATE PAGE: 5

6 Manual Interlockings: Train Dispatchers and Radio Communication: Line Special Instructions: Maximum Gross Weight of Car 143 tons Outlying Yards: 22 nd Street Yard, controlled by BRC North Dispatcher Rockwell Street Yard, controlled by BRC South Dispatcher Commercial Avenue Yard, controlled by BRC South Dispatcher South Chicago District Yard, controlled by BRC South Dispatcher Trains setting out or picking up must notify the Train Dispatcher of the south and north car numbers left in any track at these locations. BRC CORA UPDATE PAGE: 6

7 Daily Operating Bulletin: Highway Rail Grade Crossings: The City of Chicago has designated specific crossings throughout the city as critical for the delivery of emergency services. These crossings are designated as 911 Crossings, and notated in the table below with an X. 911 Crossings must not be obstructed for more than 10 minutes. When trains are stopped, or anticipated to be stopped, on a 911 crossing, the Train Dispatcher must be notified immediately. The Train Dispatcher, will contact the City of Chicago Office of Emergency Communications. When a train, previously stopped on a 911 crossing, clears the crossing, the Train Dispatcher must be notified. Crossings (Kenton Line): Rule 5.8.4, Whistle Quiet Zone, applies at all crossings on the Kenton Line, except sound whistle signal (7) at Archer Avenue, MP 7.99 and Columbus Avenue (Southwest Highway) MP GCOR BRC CORA UPDATE PAGE: 7

8 BRC CORA UPDATE PAGE: 8

9 KENTON LINE MP 0.03 MP 2.0 Main Track Authorization: CTC Train Dispatcher: NORTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted 15 BRC CORA UPDATE PAGE: 9

10 BRC CORA UPDATE PAGE: 10

11 KENTON LINE MP 2.0 MP 4.0 Main Track Authorization: CTC Train Dispatcher: NORTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted TH STREET, NORTH CROSSOVER 20 WHEN MEDIUM SPEED SIGNALS ARE DISPLAYED TH STREET, SOUTH CROSSOVER 15 BRC CORA UPDATE PAGE: 11

12 BRC CORA UPDATE PAGE: 12

13 KENTON LINE MP 4.0 MP 6.0 Main Track Authorization: CTC Train Dispatcher: NORTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted HAWTHORNE, CROSSOVER 20 WHEN MEDIUM SPEED SIGNALS ARE DISPLAYED BRC CORA UPDATE PAGE: 13

14 BRC CORA UPDATE PAGE: 14

15 KENTON LINE MP 6.0 MP 8.0 Main Track Authorization: CTC Train Dispatcher: NORTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted LEMOYNE, CROSSOVERS LEMOYNE, CONNECTION TO CN LEMOYNE, CONNECTION TO BNSF 15 Special Instructions: Sound Whistle Signal (7) at Archer Avenue, MP 7.99 BRC CORA UPDATE PAGE: 15

16 BRC CORA UPDATE PAGE: 16

17 KENTON LINE MP 8.0 MP 10.0 Main Track Authorization: CTC Train Dispatcher: SOUTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted TH STREET, CONNECTION TO 59 TH STREET LINE TH STREET, CONNECTION TO 59 TH STREET LINE 8.4 CONNECTION TO ELSDON INDUSTRIAL LEAD 25 MT1 to 59 TH STREET LINE 25 MT2 to 59 TH STREET LINE TH STREET, CROSSOVER 20 WHEN MEDIUM SPEED SIGNALS ARE DISPLAYED Special Instructions: GCOR applies for southward trains entering the Kenton Line from Elsdon Industrial Lead at 55 TH STREET, MP 8.4 Whistle Quiet Zone, GCOR applies at the following locations: 55 TH STREET MP TH STREET MP RD STREET MP 9.92 BRC CORA UPDATE PAGE: 17

18 BRC CORA UPDATE PAGE: 18

19 KENTON LINE MP 10.0 MP 12.0 Main Track Authorization: CTC Train Dispatcher: SOUTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, 15 except as noted below TH STREET CROSSOVER 20 WHEN MEDIUM SPEED SIGNALS ARE DISPLAYED TH STREET CROSSOVER 20 WHEN MEDIUM SPEED SIGNALS ARE DISPLAYED EAST END SWITCHES 20 WHEN MEDIUM SPEED SIGNALS ARE DISPLAYED 11.3 EAST END SWITCHES CROSSOVER, MT1-MT2 25 WHEN LIMITED SPEED SIGNS ARE DISPLAYED HAYFORD 20 WHEN MEDIUM SPEED SIGNALS ARE DISPLAYED 11.6 HAYFORD CONNECTION TO CSXT 15 ELSDON CONNECTION ELSDON SUBDIVISION 11.7 HAYFORD CROSSOVER, MT1-MT2 25 WHEN LIMITED SPEED SIGNALS ARE DISPLAYED BRC CORA UPDATE PAGE: 19

20 BRC CORA UPDATE PAGE: 20

21 K ENTON LINE MP 12.0 MP 14.0 Main Track Authorization: CTC Train Dispatcher: NORTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 ROCKWELL STREET YARD, 6 axle unit through turnouts, except to and from Track 1 5 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted WESTERN AVENUE CROSSOVER, WABASH LEAD MT WESTERN AVENUE CROSSOVERS BRC CORA UPDATE PAGE: 21

22 BRC CORA UPDATE PAGE: 22

23 KENTON LINE MP 14.0 MP 16.0 Main Track Authorization: CTC Train Dispatcher: NORTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted BELT JUNCTION CROSSOVERS TH STREET SWITCH TH STREET CROSSOVERS TH STREET SWITCH MT3 MT2 25 TO UP VILLA GROVE SUB BRC CORA UPDATE PAGE: 23

24 BRC CORA UPDATE PAGE: 24

25 KENTON LINE MP 16.0 MP 18.0 Main Track Authorization: CTC Train Dispatcher: NORTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted 15 Special Instructions: Third Rail Siding between MP and MP 19.1 is Other than Main Track, GCOR 6.28 applies Electrically locked switch at MP must not be operated without permission of the BRC South Train Dispatcher. GCOR 9.18 applies. Beware of falling concrete in vicinity of NS bridge, MP BRC CORA UPDATE PAGE: 25

26 BRC CORA UPDATE PAGE: 26

27 KENTON LINE MP 18.0 MP 20.0 Main Track Authorization: CTC Train Dispatcher: SOUTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted PULLMAN JUNCTION CROSSOVER PULLMAN JUNCTION CROSSOVER 25 Special Instructions: Third Rail Siding between MP and MP 19.1 is Other than Main Track, GCOR 6.28 applies Trains using CN Lead at Pullman Junction must contact BRC South Dispatcher for permission to occupy track beyond CN 94 th Street connection switch. BRC CORA UPDATE PAGE: 27

28 BRC CORA UPDATE PAGE: 28

29 KENTON LINE MP 20.0 MP Main Track Authorization: CTC Train Dispatcher: SOUTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 COMMERCIAL AVENUE YARD 6 axle units on lead tracks 5 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted ROCK ISLAND JUNCTION CROSSOVER 20 MT2 TO MT (NS CONNECTION) Line Special Instructions: Trains must secure permission of BRC South Dispatcher to occupy Commercial Avenue Yard Trains setting out must notify BRC South Dispatcher of south and north cars left in any track at Commercial Avenue Yard. Trains yarding will ensure they clear 17/18 switch at the south end of the yard by 200 feet, when possible. BRC CORA UPDATE PAGE: 29

30 59 TH STREET LINE Operating Characteristics: Main Track: Operating Characteristics: Other than Main Track: Speed Restrictions: BRC CORA UPDATE PAGE: 30

31 Speed Restrictions (Turnouts and Crossovers): BRC Speed Signals apply at all location on the 59 TH STREET LINE Limited Speed = 25 MPH, Medium Speed = 20 MPH, Slow Speed = 15 MPH Train Dispatchers and Radio Communication: Line Special Instructions: Maximum Gross Weight of Car 143 tons Outlying Yards: None Clearing Yard Instructions are contained in the Clearing Yard Section BRC CORA UPDATE PAGE: 31

32 Highway/Rail Grade Crossings: The City of Chicago has designated specific crossings throughout the city as critical for the delivery of emergency services. These crossings are designated as 911 Crossings, and notated in the table below with an X. 911 Crossings must not be obstructed for more than 10 minutes. When trains are stopped, or anticipated to be stopped, on a 911 crossing, the Train Dispatcher must be notified immediately. The Train Dispatcher, will contact the City of Chicago Office of Emergency Communications. When a train, previously stopped on a 911 crossing, clears the crossing, the Train Dispatcher must be notified. Restrictions for CLEARING YARD are contained in the Clearing Yard Section BRC CORA UPDATE PAGE: 32

33 THIS PAGE INTENTIONALLY LEFT BLANK BRC CORA UPDATE PAGE: 33

34 BRC CORA UPDATE PAGE: 34

35 59 TH STREET LINE MP 0.0F MP 2.0F Main Track Authorization: CTC Train Dispatcher: NORTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted S 55 TH STREET CROSSOVER 20 Special Instructions: Sound Whistle Signal (7) at Archer Avenue, MP 7.99, KENTON LINE BRC CORA UPDATE PAGE: 35

36 BRC CORA UPDATE PAGE: 36

37 59 TH STREET LINE MP 2.0F MP 4.0F Main Track Authorization: CTC Train Dispatcher: NORTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted S NARRAGANSETT CROSSOVER 20 WHEN MEDIUM SPEED SIGNALS ARE RECEIVED BRC CORA UPDATE PAGE:37

38 BRC CORA UPDATE PAGE: 38

39 59 TH STREET LINE MP 4.0F MP 5.0F Main Track Authorization: CTC Train Dispatcher: NORTH Radio Channel: Speeds: TRACKS MPH MAIN TRACK 25 OTHER THAN MAIN TRACK, unless otherwise stated 10 Speeds Turnouts and Crossovers: MILEPOST DESCRIPTION MPH NOTES Main Track Turnouts, except as noted F 65 TH STREET CROSSOVER 20 NORTHWARD MOVEMENTS ONLY BRC CORA UPDATE PAGE: 39

40 BRC CORA UPDATE PAGE: 40

41 ELSDON INDUSTRIAL LEAD Method of Operation: Operating Characteristics: Other than Main Track: Speed Restrictions: Supplemental Speed Restrictions: Trains moving from Elsdon Industrial Lead to Kenton Line at 55 TH STREET apply GCOR at 55 TH STREET Highway Crossing Special Instructions: Trains at Elsdon Interlocking or End BRC must contact the BRC North Train Dispatcher for permission to occupy the Elsdon Industrial Lead. BRC CORA UPDATE PAGE: 41

42 BRC CORA UPDATE PAGE: 42

43 BRC CORA UPDATE PAGE: 43

44 SOUTH CHICAGO DISTRICT INDUSTRIAL LEAD Method of Operation: Speed Restrictions: Train Dispatchers and Radio Communication: Line Special Instructions: Maximum Gross Weight of Car 143 Tons Northward trains entering BRC Trackage must contact the BRC South Dispatcher prior to passing 106 th Street, MP 1.57S for permission to proceed. Contact the BRC South Train Dispatcher for permission to use the Wall or Fence Tracks between ROCK ISLAND JUNCTION and SOUTH CHICAGO. BRC South Train Dispatcher must be notified of the south and north car number of any cars set out or picked up in the South Chicago District Yard. Erie Siding, between MP 1.6S and MP 2.2S, GCOR 6.28 applies. Daily Operating Bulletin: System Special Instructions Rule applies. All crews must have a copy of the Daily Operating Bulletin, unless authorized by the BRC South Train Dispatcher. Highway/Rail Grade Crossings: BRC CORA UPDATE PAGE: 44

45 BRC CORA UPDATE PAGE: 45

46 BRC CORA UPDATE PAGE: 46

47 Clearing Yard Special Instructions Speed Restrictions: SPEED LOCATION MILEPOST DESCRIPTION NOTE 10 MPH ALL ALL ALL EXCEPT WHEN RESTRICTED TO 5MPH Remote Control Zones: EAST DEPARTURE YARD 6 LEAD LOCATION East End of East Departure Yard LIMITS 40 XO Switch to a point 240 feet west of 6 Lead Signal at EAST END SWITCHES CONTACT East Humpmaster EQUIPPED WITH SIGN East End of RCZ SPECIAL CONDITIONS Both ends of 35XO must be lined normal and locked before use PULL BACK STOP PROTECTION (PSP) Equipped 5 LEAD LOCATION LIMITS CONTACT EQUIPPED WITH SIGN SPECIAL CONDITIONS PULL BACK STOP PROTECTION (PSP) East End of East Departure Yard 120 feet east of 35XO on 5 Lead to 240 feet west of 5 Lead Signal (x) at EAST END SWITCHES East Humpmaster Both ends of RCZ Both ends of 35XO must be lined normal and locked before use Equipped 4 LEAD LOCATION LIMITS CONTACT EQUIPPED WITH SIGN SPECIAL CONDITIONS PULL BACK STOP PROTECTION (PSP) East End of East Departure Yard 60 feet east of 4 Lead Switch to a point approximately 240 feet west of 4 Lead Signal (x) at EAST END SWITCHES East Humpmaster Both ends of RCZ 3/4 Lead XO must be lined normal and locked Equipped BRC CORA UPDATE PAGE: 47

48 3 LEAD LOCATION LIMITS CONTACT EQUIPPED WITH SIGN SPECIAL CONDITIONS PULL BACK STOP PROTECTION (PSP) East End of East Departure Yard 60 feet east of 3 Lead Switch to a point approximately 240 feet west of 3 Lead Signal at EAST END SWITCHES East Humpmaster Both ends of RCZ 3/4 Lead XO must be lined normal and locked Equipped WEST DEPARTURE YARD CABBAGE PATCH LEAD LOCATION LIMITS CONTACT EQUIPPED WITH SIGN SPECIAL CONDITIONS PULL BACK STOP PROTECTION (PSP) West End of West Departure Yard 20 west of Cabbage Patch Lead Switch off the low side of the West Departure Yard to 280 east of the High Side/Cabbage Patch Lead divide switch West Humpmaster Both Ends of RCZ None Equipped HIGH SIDE LEAD LOCATION LIMITS CONTACT EQUIPPED WITH SIGN SPECIAL CONDITIONS PULL BACK STOP PROTECTION (PSP) West End of West Departure Yard 75 west of Yard Access Crossing on High Side Lead to a point 285 west of the High Side/Cabbage Patch Lead divide switch West Humpmaster Both Ends of RCZ None Equipped RCL Zone Instructions: Only remote control crews may activate a remote-control zone (RCZ). RCZ s are equipped with signs that lie between the rails while the zone is deactivated. After activating a zone equipped with a sign, the remote-control crew must put the sign up. Non-Remote Control crews must advise the Humpmaster if they encounter a sign in their route, and must not pass the sign until the zone has been deactivated. BRC CORA UPDATE PAGE: 48

49 Operating Characteristics (Clearing Yard): LOCATION EMPLOYEE IN CHARGE METHOD OF OPERATION CLEARING YARD TRACKS AS DESIGNATED GCOR 6.28 applies DIESEL SHOP TRACKS DIESEL SHOP FOREMAN GCOR 6.28 applies, 5 MPH CAR SHOP TRACKS MECHANICAL FOREMAN GCOR 6.28 applies, 5 MPH SOUTH THOROUGHFARE EAST HUMPMASTER GCOR 6.28 applies NORTH THOROUGHFARE WEST HUMPMASTER GCOR 6.28 applies (OUTSIDE SHOP LIMITS) NORTH THOROUGHFARE DIESEL SHOP FOREMAN GCOR 6.28 applies, 10MPH (WITHIN SHOP LIMITS) NORTH CLEARING WEST HUMPMASTER GCOR 6.28 applies INDUSTRIAL DISTRICT SOUTH CLEARING INDUSTRIAL DISTRICT EAST HUMPMASTER GCOR 6.28 applies Operating Characteristics (East Receiving Yard): LOCATION EMPLOYEE IN METHOD OF OPERATION CHARGE 1-2 LEAD EAST RECEIVING WEST HUMPMASTER GCOR 6.28 applies 1-23 EAST RECEIVING WEST HUMPMASTER GCOR 6.28 applies WATER PLUG LEAD WEST HUMPMASTER GCOR 6.28 applies 68 TH STREET WYE WEST HUMPMASTER GCOR 6.28 applies 67 TH STREET WYE WEST HUMPMASTER GCOR 6.28 applies NORTH THOROUGHFARE (East Shop Limits to Cicero Ave) WEST HUMPMASTER GCOR 6.28 applies CLEARING DISTRICT YARD WEST HUMPMASTER GCOR 6.28 applies Operating Characteristics (West Receiving Yard): LOCATION EMPLOYEE IN CHARGE METHOD OF OPERATION 1-15 WEST RECEIVING EAST HUMPMASTER GCOR WEST RECEIVING (West of XO) WEST HUMPMASTER GCOR 6.28 BACK LEAD EAST HUMPMASTER GCOR 6.28 LADDER LEAD EAST HUMPMASTER GCOR WEST APPROACH EAST HUMPMASTER GCOR 6.28 SOUTH THOROUGHFARE (West Sub to Central Ave) EAST HUMPMASTER GCOR 6.28 Hump Subway to Diesel Shop Switch EAST HUMPMASTER GCOR 6.28 applies, Maximum Height 17 1 BRC CORA UPDATE PAGE: 49

50 Operating Characteristics (East Departure Yard): LOCATION EMPLOYEE IN METHOD OF OPERATION CHARGE 3-8 LEADS EAST HUMPMASTER GCOR EAST DEPARTURE EAST HUMPMASTER GCOR 6.28 SOUTH THOROUGHFARE (Central to Cicero) EAST HUMPMASTER GCOR 6.28 SOUTH CLEARING INDUSTRIAL DISTRICT EAST HUMPMASTER GCOR 6.28 MARTIN YARD CSXI YARDMASTER CSXT Rule 502 applies Operating Characteristics (West Departure Yard): LOCATION EMPLOYEE IN METHOD OF OPERATION CHARGE WEST DEPARTURE WEST HUMPMASTER GCOR 6.28 NORTH THOROUGHFARE WEST HUMPMASTER GCOR 6.28 HIGH SIDE LEAD (West Departure to 65 TH St) WEST HUMPMASTER GCOR 6.28 CABBAGE PATCH LEAD WEST HUMPMASTER GCOR / 2 MAINS (West of Shop Limits) WEST HUMPMASTER GCOR 6.28 NORTH CLEARING INDUSTRIAL DISTRICT WEST HUMPMASTER GCOR 6.28 PRAIRIE YARD WEST HUMPMASTER GCOR 6.28 Humpmasters and Radio Communication: LOCATION TERRITORY RADIO CHANNEL PHONE NUMBER WEST HUMPMASTER EAST HUMPMASTER WEST DEPARTURE YARD WEST CLASSIFICATION YARD EAST RECEIVING YARD NORTH CLEARING ID EAST DEPARTURE YARD EAST CLASSIFICATION YARD WEST RECEIVING YARD SOUTH CLEARING ID (708) (708) DIESEL SHOP DIESEL SHOP LIMITS (708) Clearing Yard Special Instructions: YARD TEST PLANT AIR IN DEPARTURE YARDS Cars worked by Mechanical Department forces will be left with air coupled and cut-in. Air will be coupled to the end which will be used as the head end of the train. Crews pulling outbound trains will tie on to tracks and turn both angle cocks prior to uncoupling hoses. Do not allow the train to go into EMERGENCY. Yard air hoses, after being disconnected, must not be left where they can cause a stumbling hazard. BRC CORA UPDATE PAGE: 50

51 CLASS 1 AIR BRAKE TEST Crews completing a Class I Air Brake Test are to confirm the rear car number with the employee at the rear of the train. Immediately contact the Humpmaster if the number does not match the train list. Written notification of a Class I Air Brake Test will be provided on the Conductor s Train List. If not noted on the list, written notification of a Class 1 Air Brake Test will be left in the knuckle of the lead car on each track. TRACKS DOUBLING VERIFICATION SHEET SWITCHES All crews doubling trains out of Departure Yard tracks will be provided a Train Doubling Verification Sheet. Crews must confirm the car number matches the car number of the head car on each track. In the event of a discrepancy, contact the Humpmaster immediately. Where switches are equipped with locking pins or hasps, they must be used. Report missing pins or hasps to the Humpmaster. GCOR 8.8 applies. Switch Locks are in use at the following locations: EAST DEPARTURE YARD 3 LEAD to 4 LEAD CROSSOVER 35 CROSSOVER 40 CROSSOVER 35 EAST DEPARTURE to LOW SIDE LADDER LEAD 34 EAST DEPARTURE to 34 POCKET WEST RECEIVING YARD 16 WEST RECEIVING to 15 WEST RECEIVING CROSSOVER Crossover switches on the hump approaches and the South Thoroughfare must be restored to normal position after use. SOUTH THOROUGHFARE SOUTH THOROUGHFARE to East End CSXI Bedford Park Intermodal Facility Crossover switches must be restored to normal position for South Thoroughfare after use. BRC CORA UPDATE PAGE: 51

52 BRC CORA UPDATE PAGE: 52

53 BRC CORA UPDATE PAGE: 53

54 BRC CORA UPDATE PAGE: 54

55 BRC CORA UPDATE PAGE: 55

56 BRC CORA UPDATE PAGE: 56

57 BRC CORA UPDATE PAGE: 57

58 BRC CORA UPDATE PAGE: 58

59 BRC CORA UPDATE PAGE: 59

60 BRC System Special Instructions BRC CORA UPDATE PAGE: 60

61 BRC CORA UPDATE PAGE: 61

62 BRC CORA UPDATE PAGE: 62

63 BRC CORA UPDATE PAGE: 63

64 BRC CORA UPDATE PAGE: 64

65 BRC CORA UPDATE PAGE: 65

66 BRC CORA UPDATE PAGE 66

67 BRC CORA UPDATE PAGE 67

68 BRC CORA UPDATE PAGE 68

69 BRC CORA UPDATE PAGE 69

70 BRC CORA UPDATE PAGE 70

71 BRC CORA UPDATE PAGE 71

72 BRC CORA UPDATE PAGE 72

73 BRC CORA UPDATE PAGE 73

74 BRC CORA UPDATE PAGE 74

75 BRC CORA UPDATE PAGE 75

76 BRC CORA UPDATE PAGE 76

77 BRC CORA UPDATE PAGE 77

78 BRC CORA UPDATE PAGE 78

79 BRC CORA UPDATE PAGE 79

80 BRC CORA UPDATE PAGE 80

81 BRC CORA UPDATE PAGE 81

82 BRC Speed Signals BRC Speed Signals are in effect on all main tracks and at all interlockings. Where speed signals and timetable turnout speeds do not correspond, the lower speed is in effect. Signal Speed Maximum Authorized Speed SLOW 15 MEDIUM 20 LIMITED 25 BRC CORA UPDATE PAGE 82

83 BRC CORA UPDATE PAGE 83

84 BRC CORA UPDATE PAGE 84

85 BRC CORA UPDATE PAGE 85

86 BRC CORA UPDATE PAGE 86

87 BRC CORA UPDATE PAGE 87

88 Close Clearances Employees are cautioned about close clearances as noted below: Kenton Line: Bridge girders between CRAGIN and LEMOYNE on all tracks Employees must not ride cars within Commercial Avenue Yard unless the adjacent track is clear South Chicago District Industrial Lead: Fence adjacent to east side of Fence Track between ROCK ISLAND JUNCTION and SOUTH CHICAGO Clearing Yard Ladder Lead at west end of West Receiving Yard M/W ballast loading adjacent to Water Plug Lead in East Receiving Yard Close clearances, when riding equipment, on east end of East Receiving Yard Vertical Clearances Subdivision Location Maximum Notes Height KENTON LINE 59TH STREET ALL LOCATIONS ALL LOCATIONS N/A N/A ARGO LEAD UNDER CSXT N/A (IHB) ARGO LEAD ARCHER N/A KENTON LINE 46 TH AVENUE CONNECTION TO CSXT ALTENHEIM SUBDIVISION KENTON LINE EJ&E LEAD, OUT OF SERVICE ROCK ISLAND JUNCTION CLEARING YARD HUMP SUBWAY N/A BRC CORA UPDATE PAGE 88

89 END OF BRC SECTION BRC CORA UPDATE PAGE 89

The Belt Railway Company of Chicago CORA Guide Revision

The Belt Railway Company of Chicago CORA Guide Revision BRC CORA Guide Revision No. 4 July 19, 2013 Page 1 of 14 The Belt Railway Company of Chicago CORA Guide Revision BRC CORA Guide Revision No. 4 Date: July 21, 2013 Belt Railway Company of Chicago CORA Guide

More information

BATON ROUGE SUBDIVISION

BATON ROUGE SUBDIVISION TRACK CHART & SIDINGS SIDING LENGTH SIDING SWITCH LOCATIONS STATION SIGN S N O O U R T T H STATIONS H METHOD OF OPERATION DEFECT DETECTORS 65 RADIO CHANNELS CALL INS 365.5 GLSR KCS 361.2 UP HAMMOND SUBDIVISION

More information

New Mexico Rail Runner

New Mexico Rail Runner New Mexico Rail Runner New Mexico Division Employee Timetable No. 1 Effective 0001 MST December 6, 2008 Emergency Phone Number: (866) 874 6679 Chief Dispatcher: (505) 843 1702 Train Dispatcher: (505) 245

More information

THE BELT RAILWAY COMPANY OF CHICAGO Office of General Manager Transportation

THE BELT RAILWAY COMPANY OF CHICAGO Office of General Manager Transportation THE BELT RAILWAY COMPANY OF CHICAGO Office of General Manager Transportation General Order No. 2 Effective 12:01 AM, June 1, 1006 May 31, 2006 TO ALL CONCERNED: Purpose of revision: RCL Rules revisions

More information

SKEENA SUBDIVISION. Mile TERRACE Y 0.0 AMSBURY 9.6 EXSTEW SALVUS KWINITSA SKEENA 58.5 TYEE SOCKEYE 78.

SKEENA SUBDIVISION. Mile TERRACE Y 0.0 AMSBURY 9.6 EXSTEW SALVUS KWINITSA SKEENA 58.5 TYEE SOCKEYE 78. [107 ] Method of Control W SKEENA SUBDIVISION E Mile Siding Capacity In Feet DOB / TGBO SWITCHING ZONES Hot Box and Dragging Equipment Detectors RTC Radio Channel, Tones and DTMF Codes TERRACE Y 0.0 0.0

More information

TIME TABLE NO 82 p-~ ^ I DEUX-MONTAGNES SUB MAY 29, 2009 I I \ PAGE 95

TIME TABLE NO 82 p-~ ^ I DEUX-MONTAGNES SUB MAY 29, 2009 I I \ PAGE 95 TIME TABLE NO 82 p-~ ^ I DEUX-MONTAGNES SUB MAY 29, 2009 I I \ PAGE 95 i t DEUX-MONTAGNES SUBDIVISION N S LLJ _l ^ 0.0 WELLINGTON 0,0 0, 0 (Jet with St-Hyacinthe Sub.) A k CB1 RUE WILLIAM 0,2 BONAVENTURE

More information

INSTRUCTOR EMPLOYEE: ID NUMBER: DATE: INSTRUCTOR: SCORE:

INSTRUCTOR EMPLOYEE: ID NUMBER: DATE: INSTRUCTOR: SCORE: TRAIN HANDLING PHYSICAL CHARACTERISTICS LOCOMOTIVE ENGINEERS NEBRASKA CENTRAL RAILROAD COMPANY EMPLOYEE: INSTRUCTOR ID NUMBER: DATE: INSTRUCTOR: SCORE: 1 CIRCLE THE CORRECT RESPONSE TO EACH QUESTION DIRECTLY

More information

System General Orders In effect December 10, 2018

System General Orders In effect December 10, 2018 In effect December 10, 2018 For business purposes only. Unauthorized access, use, distribution, or modification of Union Pacific computer systems or their content is prohibited by law. Order Category listed

More information

NEWMARKET SUBDIVISION

NEWMARKET SUBDIVISION FOURTH CLASS 893 NORTHWARD TRAINS FIRST CLASS 129 123 Friday 147 Ex 3 121 Ex o o I Yard Limits SUBDIVISION STATIONS 20 28 2113 2119 2120 York 893 From S2325 S2112 S2O S21 27 2143 SOOO5 S215O OO1O 2156

More information

Air Brake Tests and Procedures TABLE OF CONTENTS

Air Brake Tests and Procedures TABLE OF CONTENTS General Operating Instructions (GOI) Section Air Brake Tests and Procedures TABLE OF CONTENTS 1.0 General...160 2.0 Locomotive Brake Test...161 3.0 RSC (Safety Control System)...162 4.0 Locomotive and

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Public Meeting #2 March 13, 2018 Summit Park District Welcome to the second Public Meeting for the preliminary engineering and environmental studies of Illinois 43

More information

SAFETY FIRST Palouse River & Coulee City Railroad (MLAC Section)

SAFETY FIRST Palouse River & Coulee City Railroad (MLAC Section) SAFETY FIRST Palouse River & Coulee City Railroad (MLAC Section) TIMETABLE NO. 105 EFFECTIVE 0001 PACIFIC STANDARD TIME FRIDAY, July 01, 2005 325 Mill Road Lewiston, Idaho 83501 208-743-2559 Ray Leiterman

More information

Table of Contents Air Brake Tests Basic Conductor/Certification Course Basic Conductor/Mechanical (Combination Package) Basic Hazardous Materials

Table of Contents Air Brake Tests Basic Conductor/Certification Course Basic Conductor/Mechanical (Combination Package) Basic Hazardous Materials Course Catalogue 2009 Table of Contents Air Brake Tests 1 Basic Conductor/Certification Course 2 Basic Conductor/Mechanical (Combination Package) 3 Basic Hazardous Materials 4 Basic Locomotive Braking

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Setting Back or Propelling on Running Lines Rule Number: 4015 Version 1.0, 31 March 2016 Setting Back or Propelling on Running Lines Rule Number: 4015 Document

More information

ROADRAILER EQUIPMENT (ROADRAILER TRIPLE CROWN) AUTORAILER, and ALLRAILER)

ROADRAILER EQUIPMENT (ROADRAILER TRIPLE CROWN) AUTORAILER, and ALLRAILER) ROADRAILER 60 MPH Loaded and 55 MPH Empty UNDER AIR BRAKE AND TRAIN HANDLING RULES - No.2 - Page No. 42 and 42a revised October 10, 1999 RULE 103.9 ROADRAILER EQUIPMENT (ROADRAILER TRIPLE CROWN) AUTORAILER,

More information

Kalium Switcher Operating Instructions

Kalium Switcher Operating Instructions Kalium Switcher Operating Instructions Oct. 2004 Kalium Switcher Directory Potash Co-ordinator Mark Severson 1-306-931-7479 Cell 1-306-222-2730 Kalium Switcher 1-306-631-0941 Message # 631-0941 Password

More information

AMT-3 STUDY GUIDE. What is the maximum allowable brake pipe leakage on a Locomotive?

AMT-3 STUDY GUIDE. What is the maximum allowable brake pipe leakage on a Locomotive? 1. When coupling a diesel locomoitve to another diesel locomotive in a multiple unit consist which will be used for Over-The-Road movement, which hose connections must be made? A: Only the hoses on the

More information

NJ TRANSIT STANDARD MAINTENANCE PROCEDURE MECHANICAL DEPARTMENT. The following approvals were obtained prior to the issuance of this procedure:

NJ TRANSIT STANDARD MAINTENANCE PROCEDURE MECHANICAL DEPARTMENT. The following approvals were obtained prior to the issuance of this procedure: Subject: Blue Signal Protection Morrisville Number: 398004 Revision: 3 Effective: September 8, 2014 Supersedes #: Rev. 2 of January 15, 2014 NJ TRANSIT STANDARD MAINTENANCE PROCEDURE MECHANICAL DEPARTMENT

More information

UNION PACIFIC RAILROAD Air Brake and Train Handling Transition Guide Table of Contents (Old to New) 12/8/2011

UNION PACIFIC RAILROAD Air Brake and Train Handling Transition Guide Table of Contents (Old to New) 12/8/2011 UNION PACIFIC RAILROAD Air Brake and Train Handling Transition Guide Table of Contents (Old to New) 12/8/2011 The following is designed to give a side by side transition between the Union Pacific Air Brake

More information

Railway Transportation Safety Investigation Report R17Q0088

Railway Transportation Safety Investigation Report R17Q0088 Railway Transportation Safety Investigation Report R17Q0088 CROSSING COLLISION VIA Rail Canada Inc. Passenger train P60321-25 Mile 77.2, Canadian National Railway Company La Tuque Subdivision Hervey-Jonction,

More information

SEQUENCE OF OPERATIONS Como-Harriet Streetcar Line

SEQUENCE OF OPERATIONS Como-Harriet Streetcar Line This sequence of Operations applies to streetcars No. 265, No. 322 and No. 1300. Some of the procedures described in this Sequence of Operations do not apply to No. 322 because the controls on that car

More information

Site DNL Calculator. Guidelines:

Site DNL Calculator. Guidelines: http://portal.hud.gov/hudportal/hud?src=/program_offices/comm_planning/environment/... Page 1 of 3 1/9/214 HUD > Program Offices > Community Planning and Development > Environment > Site For more information

More information

RAILROAD ACCIDENT INVESTIGATION. Report No THE NEW YORK CENTRAL RAILROAD COMPANY POCA, W. VA. NOVEMBER 21, 1961 INTERSTATE COMMERCE COMMISSION

RAILROAD ACCIDENT INVESTIGATION. Report No THE NEW YORK CENTRAL RAILROAD COMPANY POCA, W. VA. NOVEMBER 21, 1961 INTERSTATE COMMERCE COMMISSION RAILROAD ACCIDENT INVESTIGATION Report No. THE NEW YORK CENTRAL RAILROAD COMPANY POCA, W. VA. NOVEMBER 21, 1961 INTERSTATE COMMERCE COMMISSION Washington 2 SUMMARY DATE: November 21, 1961 RAILROAD: New

More information

Rule Book, Section 1 Revised June 26, 2011

Rule Book, Section 1 Revised June 26, 2011 February 2012 Rule Book, Section 1 Revised June 26, 2011 UTA TRAX Pre-Test Study Guide TRAX personnel must be able to communicate clearly in English and understand the specialized language of our business.

More information

Air Brake and Train Handling Rules

Air Brake and Train Handling Rules BNSF Railway Safety Vision We believe every accident or injury is preventable. Our vision is that BNSF Railway will operate free of accidents and injuries. BNSF Railway will achieve this vision through:

More information

Operating Practices Manual OP-1

Operating Practices Manual OP-1 Operating Practices Manual OP-1 Effective 0001 January 1, 2017 General Notice: The Operating Practices Section (OP-1) of the Belt Railway of Chicago Operating Manual is intended for all employees whose

More information

HIGH GREEN ARGENTINE. Chicago Division , KS. Along the "Santa Fe Route"

HIGH GREEN ARGENTINE. Chicago Division , KS. Along the Santa Fe Route HIGH GREEN TO ARGENTINE Along the "Santa Fe Route" NOTE: THIS BOOK IS FOR REFERENCE ONLY AND MAY OR MAY NOT REFLECT THE CORRECT LOCATION AND/OR TYPES OF SIGNALS, SPEED BOARDS, CROSSOVERS, ETC. WHEN IN

More information

SAFETY FIRST Quick Reference Guide prepared by:

SAFETY FIRST Quick Reference Guide prepared by: SAFETY FIRST Quick Reference Guide prepared by: T. J. Donnigan, BLE General Chairman WR D. W. Hannah, BLE General Chairman WL C. R. Rightnowar, BLE General Chairman CR M. A. Young, BLE General Chairman

More information

Document Control Identification. Document History. Authorisation

Document Control Identification. Document History. Authorisation Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail 1 October 2016 Table of Contents Glossary for this Rule... 4... 9... 9... 9... 10... 11... 12... 13...

More information

Table Common AREMA Lateral Turnouts Currently in Use in Passenger Rail Systems

Table Common AREMA Lateral Turnouts Currently in Use in Passenger Rail Systems DRAFT CHAPTER 11 SECTIONS 3.5.11.8, 3.5.11.9 Part 3 Track and Roadway Considerations SECTION 3.5 TRACK AND ROADWAY CONSIDERATIONS 3.5.11.8 Turnouts and Crossovers (2012) Turnouts and crossovers are used

More information

Passenger Train Brake Inspection and Safety Rules: Guidelines for British Columbia s Heritage Railways

Passenger Train Brake Inspection and Safety Rules: Guidelines for British Columbia s Heritage Railways Passenger Train Brake Inspection and Safety Rules: Guidelines for British Columbia s Heritage Railways Part I: General 1. SHORT TITLE 1.1 For ease of reference, these rules may be referred to as the "Train

More information

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT

More information

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair 1. Objective: 1.1. To repair the sanitary sewer connection in a timely and efficient

More information

CTA Blue Line Study Area

CTA Blue Line Study Area 1 CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING

More information

1.0 INTRODUCTION Organization of this Report Study Area EXISTING CONDITIONS CTA Rail Forest Park Branch...

1.0 INTRODUCTION Organization of this Report Study Area EXISTING CONDITIONS CTA Rail Forest Park Branch... Table of Contents 1.0 INTRODUCTION... 4 1.1 Organization of this Report... 4 1.2 Study Area... 4 2.0 EXISTING CONDITIONS... 5 2.1 CTA Rail Forest Park Branch... 5 3.0 SERVICE PATTERNS... 6 3.1 Car Requirements...

More information

District of Columbia

District of Columbia Oversize/ Overweight Permit Manual District of Columbia Foreword The Specialized Carriers & Rigging Association is pleased to publish this Oversize/ Overweight Permit Manual. Each state analysis includes

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Shunting and Marshalling Rule Number: 4013 Version 1.0, 31 March 2016 Shunting and Marshalling Rule Number: 4013 Document Control Identification Document title

More information

The Racetrack Aurora to Chicago

The Racetrack Aurora to Chicago The Racetrack Aurora to Chicago BNSF's Chicago Subdivision a route for Train Simulator 2015 by USER MANUAL Page 1 Table of Contents History... 3 Operations... 3 Locomotives and Rolling Stock...4 Cab Controls...

More information

RAILWAY INVESTIGATION REPORT R13Q0012 COLLISION AT A LEVEL CROSSING

RAILWAY INVESTIGATION REPORT R13Q0012 COLLISION AT A LEVEL CROSSING RAILWAY INVESTIGATION REPORT R13Q0012 COLLISION AT A LEVEL CROSSING PASSENGER TRAIN NO. 24 OPERATED BY VIA RAIL CANADA INC. MILE 15.62, BRIDGE SUBDIVISION NEAR THE GARE DU PALAIS QUÉBEC, QUEBEC 02 MAY

More information

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair 1. Objective: 1.1. To repair the sewer main in a timely and efficient manner, minimizing disruption

More information

Heavener Yard Yardmaster s Playbook

Heavener Yard Yardmaster s Playbook Heavener Yard Yardmaster s Playbook Warning: Do not drive or operate heavy equipment or machinery while using this guide. May cause drowsiness and/or extreme boredom. Welcome to Heavener Yard on the Kansas

More information

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44 Engineering Report: Shasta-Trinity National Forest South Fork Management Unit Analysis of National Forest System Road 30N44 (milepost 0.00 to 0.40) for Motorized Mixed Use Designation Forest: Shasta-Trinity

More information

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing.

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing. TECHNICAL COMMITTEE: Railroad and Light Rail Transit Technical Committee DATE OF ACTION: June 25, 2004 TOPIC: Crossbuck with Yield or Stop Signs and Advance Signs. STATUS: Accepted by the National Committee

More information

Issue Date: May 25, 2016 Next Review Date: May 2021 Area: Grains Receiving

Issue Date: May 25, 2016 Next Review Date: May 2021 Area: Grains Receiving St. Clair Ethanol Standard GRAINS TRANSPORT DRIVER ACCESS Issue Date: May 25, 2016 Next Review Date: May 2021 Area: Grains Receiving Document Owner: Document Contact: Operations Group Grains Receiving

More information

Port of Vancouver Schedule 1 Rail Engineering, Operations, and Safety Review Final Report Prepared for: HDR

Port of Vancouver Schedule 1 Rail Engineering, Operations, and Safety Review Final Report Prepared for: HDR Port of Vancouver Schedule 1 Rail Engineering, Operations, and Safety Review Final Report Prepared for: HDR Prepared by: TÜV Rheinland Mobility Rail Sciences Division March 25, 2014 1 Who We are TUV Rheinland

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

Summary of the Alcoa Highway Redevelopment Project

Summary of the Alcoa Highway Redevelopment Project Appendix B Summary of the Alcoa Highway Redevelopment Project By Marcia Finfer, October 2009 The Timberlake community, along with numerous other concerned citizen groups (including the Lakemoor Hills community)

More information

FRA FACTUAL RAILROAD ACCIDENT REPORT

FRA FACTUAL RAILROAD ACCIDENT REPORT .Name of Railroad Operating Train # SOO Line RR Co. [SOO ] 2.Name of Railroad Operating Train #2 SOO Line RR Co. [SOO ] 3.Name of Railroad Operating Train #3 a. Alphabetic SOO 2a. Alphabetic SOO 3a. Alphabetic

More information

SOUTH PORTLAND FIRE DEPARTMENT STANDARD OPERATING GUIDELINES

SOUTH PORTLAND FIRE DEPARTMENT STANDARD OPERATING GUIDELINES STANDARD OPERATING GUIDELINES Policy #: 5.313 Effective Date: 12/14/2015 Title: Driver Certification and Refresher Training # of pages: 7 Category: Training Classification: Red 1. PURPOSE: To define the

More information

Train Order System - Rules 1 to 37

Train Order System - Rules 1 to 37 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04 October 2015 1 01 July 2018 Australian Rail Track Corporation Limited (ARTC)

More information

BNSF 2185, an END GP 38, was doing flat switching in the Yard during our visit.

BNSF 2185, an END GP 38, was doing flat switching in the Yard during our visit. A VISIT TO BNSF HAVRE MONTANA YARD by Charles H. Bogart In our drive across Montana, one of the places we wanted to stay overnight at was Havre, Montana. Havre is home to a major BN-SF Yard, locomotive

More information

Validation Study. Proposed Railroad Grade Separation Algonquin Road at the Union Pacific Milwaukee Railroad. May 15, 2008.

Validation Study. Proposed Railroad Grade Separation Algonquin Road at the Union Pacific Milwaukee Railroad. May 15, 2008. Validation Study Proposed Railroad Grade Separation Algonquin Road at the Union Pacific Milwaukee Railroad May 15, 2008 Prepared for: City of Des Plaines Des Plaines Civic Center 1420 Miner Street Des

More information

Centralised Traffic Control System - Rules 1 to 17

Centralised Traffic Control System - Rules 1 to 17 Centralised Traffic Control System - Rules 1 to 17 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 2 13 May 2012 0 04 October 2015 Australian Rail

More information

AMT-5 STUDY GUIDE. Which of the following types of footwear are acceptable personal protective equipment (PPE)?

AMT-5 STUDY GUIDE. Which of the following types of footwear are acceptable personal protective equipment (PPE)? AMT-5 STUY GUIE 1. Which of the following types of footwear are acceptable personal protective equipment (PPE)? A: Sandals, open toe, canvas, sports, sneaker, moccasin or loafer styles. : Footwear not

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap

More information

RULES FOR EQUIPMENT OPERATION AND HANDLING NS-1

RULES FOR EQUIPMENT OPERATION AND HANDLING NS-1 RULES FOR EQUIPMENT OPERATION AND HANDLING NS-1 EFFECTIVE: OCTOBER 1, 2007 NS-1 RULES THIS BOOK IS THE PROPERTY OF NORFOLK SOUTHERN AND ITS RAILROAD SUBSIDIARIES ISSUED TO NAME EMPLOYED AS who must return

More information

AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS

AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS AIR BRAKE AND TRAIN HANDLING RULES AND INSTRUCTIONS Table of Content Divided into five sections Updated Mechanical Standards and Tables & Forms Definitions Added Electronically Controlled Pneumatic Brake

More information

Appendix E Description of Alternatives DRAFT ENVIRONMENTAL IMPACT STATEMENT

Appendix E Description of Alternatives DRAFT ENVIRONMENTAL IMPACT STATEMENT Appendix E Description of Alternatives DRAFT ENVIRONMENTAL IMPACT STATEMENT Chicago Red Line Extension Project Description of Alternatives October 31, 2012 Updated July 29, 2015 Prepared for: Chicago Transit

More information

SERVICE IMPROVEMENT GUIDE

SERVICE IMPROVEMENT GUIDE SOUTH COOK COUNTY / WILL COUNTY RESTRUCTURING INITIATIVE SERVICE IMPROVEMENT GUIDE Working to Improve Your Commute Change has arrived for residents of south and southwest Cook County, in the form of improved

More information

East Lake Tarpon Special Fire Control District

East Lake Tarpon Special Fire Control District East Lake Tarpon Special Fire Control District Implementation Date: 11/2000 Forms or Attachments: None SOP 803 Vehicle Safety Revision Date(s): 07/2004 Reviewed Date(s): A. All operators of Departmental

More information

CTA Capital Construction Update December 12, 2006

CTA Capital Construction Update December 12, 2006 Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction

More information

RULES FOR EQUIPMENT OPERATION AND HANDLING

RULES FOR EQUIPMENT OPERATION AND HANDLING RULES FOR EQUIPMENT OPERATION AND HANDLING Effective January 1, 2015 NORFOLK SOUTHERN CORPORATION Further instructions may be issued by proper authority. MARK D. MANION Executive Vice President and Chief

More information

RAILWAY INVESTIGATION REPORT R00W0106 MAIN TRACK DERAILMENT

RAILWAY INVESTIGATION REPORT R00W0106 MAIN TRACK DERAILMENT RAILWAY INVESTIGATION REPORT R00W0106 MAIN TRACK DERAILMENT CANADIAN NATIONAL FREIGHT TRAIN NO. E20531-15 MILE 154.4, REDDITT SUBDIVISION WHITE, ONTARIO 16 MAY 2000 The Transportation Safety Board of Canada

More information

Wind and Temperature Tip Over Hazard Do not add notice boards or similar

Wind and Temperature Tip Over Hazard Do not add notice boards or similar Lift & Work Platform Safety Information Safety Information: Boom Lifts Safety Information: Scissor Lifts Safety Information: Boom Lifts Power Lines Electrocution Hazard Maintain safe clearance from Electrical

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015 1 B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015 Northwest Rail (B) Line 6.2 miles electric commuter rail Downtown to Westminster at the 71 st /Lowell Station 11-minute travel time

More information

Future Project Cost Adjustments

Future Project Cost Adjustments C H A P T E R 9 SCHEDULE OF IMPROVEMENTS The results of prioritizing the improvements assisted with establishing an implementation schedule that can be used by the City for preparing its 6-year CIP and

More information

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington DESIGN DEVIATION NOs. 1 & 2 Horizontal Stopping Sight Distance and Shoulder Width Reduction SR 99 S. Holgate St to S. King St. Viaduct Replacement Stage 2 MP 29.89 TO MP 30.78 XL-3237 PIN-809936D June

More information

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY SPECIAL AUTHORIZATION Licence Holder: Trade Name(s): PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE Passenger Transportation Licence NEWTON WHALLEY HI WAY TAXI LTD.

More information

willingness to obey the rules Canadian Pacific Railway Ingenuity. Time Table Northern Ontario Service Area

willingness to obey the rules Canadian Pacific Railway Ingenuity. Time Table Northern Ontario Service Area Canadian Pacific Railway Ingenuity. Northern Ontario Service Area Time Table 10 Effective Friday November 1 2002, at: 1100 Central Standard Time 1200 Eastern Standard Time willingness to obey the rules

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

A Guide to Key Railroad Terminology for the Northeast Corridor

A Guide to Key Railroad Terminology for the Northeast Corridor A Guide to Key Railroad Terminology for the Northeast Corridor Index of terms Approach signal, 8 Diverging route, 5 Ladder, 6 Section break, 12, 13 Tie replacement, 7 Ballast, 3, 4, 7 Double slip switch,

More information

Interface between Rail Vehicle Weights and Underline Bridges

Interface between Rail Vehicle Weights and Underline Bridges Interface between Rail Vehicle Weights and Synopsis This document sets out the requirements for managing the risk of overloading of underline bridges by rail vehicles Submitted by Signatures removed from

More information

CANADA CATTRON RCLS Special Instructions

CANADA CATTRON RCLS Special Instructions RCL Operation CANADA CATTRON RCLS Special Instructions In the application of the Rule Book for Train & Engine Employees Item 2.2(c)(iv) and /or CROR General Rule A (ii), employees connected with the operation

More information

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1. SP (issue 1).qxd 16/4/03 1:04 pm Page 1 GE/RT8000 - SP Rule Book Module SP Speeds Issue 1 June 2003 Comes into force 6 December 2003 SP (issue 1).qxd 16/4/03 1:04 pm Page 2 Issue Date Comments Comes into

More information

Approximately 11,200 mm c/c (field measurement) Two glulam slab girders mm x 1210 mm; 3100 mm clear distance between girders.

Approximately 11,200 mm c/c (field measurement) Two glulam slab girders mm x 1210 mm; 3100 mm clear distance between girders. BRIDGE INSPECTION BRIDGE NO./NAME SI - 3041: Mt. Brenton FSR (2.00 KM) Inspection Date: October 31 st 2012 Inspected By: D. Chen, D. Harrison Year Built: 1995 Number of Spans: 1 Span Lengths: Superstructure

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation

More information

Railroad Technology. As the basis for a Skype virtual SIG Presentation Ken Sandock

Railroad Technology. As the basis for a Skype virtual SIG Presentation Ken Sandock Railroad Technology As the basis for a Skype virtual SIG Presentation Ken Sandock 10-1-14 Railroad technology has always been at the forefront of engineering: Steam Hydraulic Pneumatic Electrical Electronic

More information

POCAHONTAS DIVISION. Eastern Region Timetable Number. In Effect At 12:01 AM Sunday, January 25, 2004 Eastern Standard Time

POCAHONTAS DIVISION. Eastern Region Timetable Number. In Effect At 12:01 AM Sunday, January 25, 2004 Eastern Standard Time POCAHONTAS DIVISION Eastern Region Timetable Number 4 In Effect At 12:01 AM Sunday, January 25, 2004 Eastern Standard Time For The Government of Employees Only DO YOUR PART TO ACHIEVE DOUBLE ZEROS ZERO

More information

IMPROVING OUR NETWORK PERFORMANCE. BNSF Service Update

IMPROVING OUR NETWORK PERFORMANCE. BNSF Service Update IMPROVING OUR NETWORK PERFORMANCE BNSF Service Update 1 Service Challenges Taking Action Progress Service Challenges Service Challenges Increasing Volumes Support Continued BNSF Growth 11,000 2006 Units

More information

CANADA LABOUR CODE PART II OCCUPATIONAL SAFETY AND HEALTH

CANADA LABOUR CODE PART II OCCUPATIONAL SAFETY AND HEALTH Decision: 92-009 CANADA LABOUR CODE PART II OCCUPATIONAL SAFETY AND HEALTH Review under section 146 of the Canada Labour Code, Part II of a direction issued by a safety officer Applicant: Interested Party:

More information

Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH)

Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH) Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH) 01.02.1873 Open for passengers on Geelong - Ballarat line (Chronological Index) (31.12.1878) By this date, open for general goods (Commissioners

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

Section 2B.59 Weight Limit Signs - Interim Revisions

Section 2B.59 Weight Limit Signs - Interim Revisions Note: this document is an interim modification to Section 2B.59 of the Virginia Supplement to the MUTCD, Revision #1. Once the VDOT District Structure & Bridge section has made the determination that a

More information

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015 Chicago to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015 1 History: Chicago-St. Louis Corridor» IDOT has actively developed the Chicago to St. Louis corridor since the mid 1980 s» In

More information

RCLS Operation -CANAC

RCLS Operation -CANAC Canadian Pacific Railway Job Aids/Special Instructions CANAC REMOTE CONTROL LOCOMOTIVE SYSTEM RCLS Operation -CANAC Special Instructions for the use of Canac Remote Control Locomotive System (RCLS) 1.0

More information

SASD 2010 SYSTEM CAPACITY PLAN EXPANSION TRUNK SHEDS BR EAST RANCHO TRUNK SHED 2015 AMENDMENT

SASD 2010 SYSTEM CAPACITY PLAN EXPANSION TRUNK SHEDS BR EAST RANCHO TRUNK SHED 2015 AMENDMENT SASD 2010 SYSTEM CAPACITY PLAN EXPANSION TRUNK SHEDS BR EAST RANCHO TRUNK SHED 2015 AMENDMENT Introduction This amendment summarizes the new near-term and buildout expansion trunk shed plans. Due to recent

More information

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04 Western Area Power Administration Rocky Mountain Region 2014 Annual Progress Report Projects Weld Substation Stage 04 Lovell Yellowtail 115-kV rebuild Curecanti 230/115-kV 150 MVA transformer Terry Ranch

More information

Westland No. 1 Mine (Bob Ciminel 2012)

Westland No. 1 Mine (Bob Ciminel 2012) Westland No. 1 Mine (Bob Ciminel 2012) Westland Mine No. 1 was owned by the Pittsburgh Coal Company and located at the eastern (timetable) end of the Montour Railroad s Midland Spur/Westland Branch, just

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

TABLE OF CONTENTS SECTION TITLE PAGE NUMBER

TABLE OF CONTENTS SECTION TITLE PAGE NUMBER Worker Falls from Trailer Type of Incident: Fatality Date of Incident: January 29, 2009 TABLE OF CONTENTS SECTION TITLE PAGE NUMBER 1.0 DATE AND TIME OF INCIDENT 3 2.0 NAME & ADDRESS OF PRINCIPAL PARTIES

More information

OIL SANDS ENGINEERING PROCEDURE 00-PRO-PC-0051 CNRL HORIZON ACCESS ROAD AND BRIDGE PROCEDURES

OIL SANDS ENGINEERING PROCEDURE 00-PRO-PC-0051 CNRL HORIZON ACCESS ROAD AND BRIDGE PROCEDURES OIL SANDS ENGINEERING PROCEDURE 00-PRO-PC-0051 CNRL HORIZON ACCESS ROAD AND BRIDGE PROCEDURES 0 13-Sep-05 Issued for Implementation GD DM PJ Rev # Date Revision Description By Checked Checked App d File

More information

Mt. Diablo Unified School District

Mt. Diablo Unified School District Mt. Diablo Unified School District Parent Handbook Special Education Transportation 2015 Dispatch (925) 825-7440 extension 3710 or 3712 1 The Mt. Diablo Unified School District has prepared this information

More information

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book GERT8000-HB15 Rule Book Duties of the machine controller (MC) and ontrack plant operator Handbook 15 Issue 5 September 2017 Comes into force 02 December 2017 Published by: RSSB The authoritative version

More information

RAILWAY FREIGHT AND PASSENGER TRAIN BRAKE INSPECTION AND SAFETY RULES

RAILWAY FREIGHT AND PASSENGER TRAIN BRAKE INSPECTION AND SAFETY RULES RAILWAY FREIGHT AND PASSENGER TRAIN BRAKE INSPECTION AND SAFETY RULES TC O 0-95 Approved July 10, 2008 Effective October 1, 2008 Contents PART I GENERAL 3 1 Short Title 3 2 Scope 3 3 Definitions 3 4 Certification

More information

APPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL

APPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL APPENDIX 7.1 Annex E South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL Ref: 402-03640-00006 March 2013 VATTENFALL i Ref: 402.03640.00006 CONTENTS 1.0 INTRODUCTION... 2 1.1 Proposed

More information

UPGRADING THE AMTRAK KEYSTONE CORRIDOR

UPGRADING THE AMTRAK KEYSTONE CORRIDOR UPGRADING THE AMTRAK KEYSTONE CORRIDOR Mark A. Wurpel Director Project Initiation & Development Amtrak 2005 AREMA Conference & Exposition Chicago, Illinois ABSTRACT: Upgrading the Amtrak Keystone Corridor

More information