Formation of single/double Track
|
|
- Mildred Blankenship
- 6 years ago
- Views:
Transcription
1 Formation of single/double Track
2
3 Formation of track
4 Track
5 Stresses due to wheel load
6 Failure of formation Due to over stressed condition Poor construction Excessive moisture content of the filling material Weak sub grade material High ground water table Erosion or sliding of embankment Minimum formation top slope 1:20 to 1:40
7
8 Failures
9
10
11 Formation failures
12 Failure in track
13 Failures
14 Typical stress transfer
15 Failures
16 Slide failure
17 Slide failure
18 Slide failure
19 Slide failure
20 Slide failure
21 Slide failure
22 Superelevation
23 Degree of Curvature (Chord Definition) Degree of curvature D is defined as the central angle which subtends a 100 feet chord
24 For a 1 degree curve, R 50 sin(1/ 2) feet We have approximately, Where, D is the degree of curve or degree of curvature in degrees and R is the radius of curve in feet. D 5730 In the chord definition, the radius of curvature is inversely proportional to the degree of curvature. In other words, the larger the degree of curve, the shorter the radius; for example, the radius of a 1 curve is feet, and the radius of a 5 curve is feet. R
25 Superelevation
26
27 To counteract the effect of the centrifugal force, the outer rail of the curve is elevated with respect to the inner rail by an amount equal to the superelevation. A state of equilibrium is reached when both the wheels exert equal pressure on the rails and the superelevation is enough to bring the resultant of the centrifugal force and the force exerted by the weight of the vehicle at right angles to the plane of the top surface of the rails. In this state of equilibrium, the difference in the heights of the outer and inner rails of the curve known as equilibrium superelevation.
28
29
30
31
32 Double track formation
33 Railway station A place on a railway line where traffic is booked and dealt with and where an authority to proceed is given to the train Station may be flag or block, in flag station only traffic is dealt with and there is no arrangement to block the movement of train In block station no traffic is dealt with but a train cannot proceed further without obtaining permission from these station. This may be class A, class B or class C block station
34 Train station
35 Site selection Level ground and well drained Should have water supply Enough space for future extension It should not be at or near the curve on railway Station yard should never be situated on curves The site should be such that maximum permissible gradient can be obtained with out difficulty
36 Objective of train station
37 Station layout
38 Station design features For public For traffic For locomotive department General For public: booking office, platform, platform coverage, drinking water, lights, sanitary, bathroom, waiting room and retiring room, refreshment room, telephone.
39 Train station
40 Station
41 Train station For traffic: tickets issuing, checking luggage, signals for controlling trains, arrangement of cross over or overtake, platform, staff accommodation For locomotive: water, fuel for engines, cleaning/examining engines or vehicle, arrangement to accommodate the locomotive staff.
42 Train station General: have approach roads from surrounding, provision of clock, availability of coolies on the platform Types of train station: Wayside, junctions and terminals Wayside is for to cross an up and a down train or for overtaking of the slower trains Junction station is the one where branch lines meets main line, so arrangements are made for interchange of traffic also to clean and repair vehicle
43 Train station Terminals : the station at which the railway line or one of its branches terminates is known as terminal station or terminal junction. Hydraulic buffers are provided at the end. Additional facility such as servicing engines, marshalling tracks. The area is facilitated with restaurants, ticket office and with direct connection of roads
44 Platforms Passenger and goods platform Passenger platform: minimum 200ft by 12 ft, ramp, lighting, drinking water Goods platform: this is higher compare to passenger platform, have weighing facility, storage and shed.
45 Yards A yard is defined as a system of tracks laid within definite limits for various purposes such as storing of vehicles, making up trains etc., over which movements may be made (not authorized by time table), subject to the authorized rules and regulation of signals Passenger yards Goods yard Marshalling yards Locomotive yards
46 Railway track maintenance Track should be such that trains may run over it safely at the heights prescribed speed Packing: Periodic overhauling and through packing or surfacing, Shovel packing Surface on curves Surface defects and remedies
47 Railway track maintenance Irregularities in alignment and their correction Variation in gauge and re-gauging Maintenance of ballast and boxing Cleaning track and weeding Screening ballast Drainage Maintenance of level crossing Maintenance and renewal of rails
48 Railway track maintenance Maintenance and renewal of sleepers Maintenance of fittings Programming work Track imprest Creep: causes and effect Pulling back Anchors or anti-creeper Track work for high speed
49 Creep Anchor to reduce creep: Anchors are fastened to the foot of the rail and bear against the side of the sleepers
50 Creep Anchor
51 Railway track maintenance Tidiness Obstruction on track due to sand, snow etc Fence-boundary marks Permanent way workshop Curves Superelevation Miscellaneous works
52
53 The French TGV is a conventional train. Speed from Lorraine-TGV to Champagne- Ardenne-TGV is km/h (173.5 mph)
54 Shanghai Maglev Train (Magnetic Levitation Train)
55 Shanghai Maglev Train or Shanghai Transrapid is a magnetic levitation train Chinese record speed of 501 km/h (311 mph).
56 Maintenance tools Pandrol Tools :Panpuller, Pansetter, Rail Turning Bar: Foot Straight Slewing Bar, Heel/Point Slewing Bar, Clipping Bar Tongs & Nips :Rail Tongs, Timber Sleeper Tongs, Timber Sleeper Nips, Concrete Sleeper Tongs, Steel Sleeper Tongs Hammers: Keying Hammer, Keying Hammer - Hickory Handle, Sledge Hammer - Hickory Handle, 14lb Sledge Hammer - Hickory Handle
57 Maintenance tools Hickory Handle, Fishplate Spanner, 36, 15" Fishplate Spanner Round-Nosed Digging Spade, Pad Scraper,Mills Clip Extractor
58 Measuring Equipment
59 Maintenance Tools
60
61 Maintenance tools
62 Maintenance tools Timber sleeper tongs Pandrol tool Timber nips Rail tongs
63 Maintenance tools
64 Maintenance tools Round nosed digging spade Fishplate nut locking spanner Pad Scraper Fishplate nut running spanner
65 Maintenance tools Keying Hammer
66 Maintenance organization For construction and maintenance in railway, there is Chief Engineer Then a number of divisions or districts under an Executive, District, or Divisional Engineer. A division or district is divided into sub-division in charge of resident Engineer or Assistant Engineer Permanent way inspectors are given charge of sections, the length of section again depend on the extent of work, average track is considered of 50 miles (single track).
67 Maintenance organization Inspectors may or may not have Assistants under them. Assistants are either incharge of the inspector s section or for generally helping the inspector Section gangs: the basic unit of organization for track maintenance is the gang length, in charge of a gang mate. The average length is 3 miles. Massed or Mobile gangs Special gangs
68 New methods of track const. Rail track construction machines rail threaders, tampers, fork grabs and various sleeper laying attachments to suit the different sleeper configurations Eight-sleeper layers eight-sleeper Octopus sleeper layers,
69 New methods of track const.
70 New methods of track const. Rail track maintenance services rail renewal, undercutting, sleeper replacement and ballast upgrade. track maintenance hi-rail is fitted with a rail threader, ballast broom, ballast plough, platypus, fork grab and under cutter.
71 New methods of track const. The method of sleeper replacement uses the Platypus attachment, which can be fitted with or without an inside clip-up ram to enable the inside clips on the sleeper to be secured as part of the operation rather than requiring a labourer to do this. This increases productivity while reducing labour costs. The Platypus is fitted to track excavators that sit ontrack while working. Using this method one can maintain an active work-site on a live track, maximising track time with minimal disruption to train time-tables. This offers our clients a very competitive and costeffective option to the more traditional methods.
72 New methods of track const.
73
74
75
76
Weld Shears. Control Valve Models
Weld Shears Rail Weld Shears FP-168 & FP-172 Melvelle Equipment Rail Weld Shears come in a variety of models, including models for tram and crane rail. Each can be powered by a hand pump mounted on the
More informationModule SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015
GE/RT8000/SP Rule Book Module SP Speeds Issue 5 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk/rgsonline Contents
More informationDESIGN AND BUILD A HIGH SPEED RAILWAY: THE FRENCH EXPERIENCE. 29 March Jean-Pierre ORSI Director Europe SYSTRA
DESIGN AND BUILD A HIGH SPEED RAILWAY: THE FRENCH EXPERIENCE Jean-Pierre ORSI Director Europe SYSTRA 1 Fundamental parameters of the Trans-European high speed railway system. Speed increase on conventional
More informationTrack Safety Standards (49 CFR Part 213)
TRACK INSPECTOR EXAMINATION Track Safety Standards (49 CFR Part 213) IDAHO NORTHERN & PACIFIC RAILROAD NEBRASKA CENTRAL RAILROAD NEW ORLEANS & GULF COAST RAILWAY WICHITA, TILLMAN & JACKSON RAILWAY EMPLOYEE:
More informationSYDNEY TRAMWAY MUSEUM TROLLEY WIRE INSPECTION PROCEDURE
TROLLEY WIRE INSPECTION PROCEDURE JUNE 2014 1. Document Details: Name: SYDNEY TRAMWAY MUSEUM Document Control Record Number STM 6029 Version Number: 15 TrolleyWire Inspection Procedure Document Status:
More informationTransportation Engineering II UNIT - I
Transportation Engineering II UNIT - I I. Components of a Permanent Way: A. Rails: Rails are the I-section members of a track laid in two parallel lines to provide a level surface for the movement of trains.
More informationSECTION 11 INTERMODAL EQUIPMENT
SECTION 11 INTERMODAL EQUIPMENT ROA MANUAL SCHEDULE OF AMENDMENTS SECTION 11 AMENDMENT NUMBER PAGES AMENDED AMENDMENT SUMMARY DATE ISSUED TABLE OF CONTENTS Section Description Page No. 11.1 SCOPE... 11-1
More informationMELVELLE EQUIPMENT CORP PTY LTD
Email:- Sales@melvelle.com.au Web: www.melvelle.com.au Phone: +61 2 49515 244 Rail Catalogue Edition 03 MELVELLE EQUIPMENT CORP PTY LTD Email:- Web: Sales@melvelle.com.au www.melvelle.com.au Phone: +61
More informationNetwork Safeworking Rules and Procedures
Network Safeworking Rules and Procedures Shunting and Marshalling Rule Number: 4013 Version 1.0, 31 March 2016 Shunting and Marshalling Rule Number: 4013 Document Control Identification Document title
More informationDB Manual Work procedures for permanent way maintenance
DB Manual Work procedures for permanent way maintenance CONTENTS Contents Preface 19 1 General 21 2 Track equipment 25 2.1 General 25 2.2 The rails 25 2.2.1 Insulated rails 26 2.2.2 Insulated joints 26
More informationTable Common AREMA Lateral Turnouts Currently in Use in Passenger Rail Systems
DRAFT CHAPTER 11 SECTIONS 3.5.11.8, 3.5.11.9 Part 3 Track and Roadway Considerations SECTION 3.5 TRACK AND ROADWAY CONSIDERATIONS 3.5.11.8 Turnouts and Crossovers (2012) Turnouts and crossovers are used
More informationWithdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.
SP (issue 1).qxd 16/4/03 1:04 pm Page 1 GE/RT8000 - SP Rule Book Module SP Speeds Issue 1 June 2003 Comes into force 6 December 2003 SP (issue 1).qxd 16/4/03 1:04 pm Page 2 Issue Date Comments Comes into
More informationMOBILE ON BOTH RAILS AND PAVEMENT. Versatility and mobility, on both rails and roads, pays off for municipal transit systems and railways
Versatility and mobility, on both rails and roads, pays off for municipal transit systems and railways Gradall railway maintenance machines represent a unique combination of mobility and versatility, able
More informationCONSTANTINOPLE. Page 1 of 5
CONSTANTINOPLE This is the very much abridged story of a large private miniature railway built by Mini Train Systems in late 2011. The owners have asked for their privacy to be respected but have kindly
More informationModule M4. Floods and snow. GE/RT M4 Rule Book. Issue 1. June 2003
GE/RT8000 - M4 Rule Book Module M4 Floods and snow Issue 1 June 2003 Comes into force 6 December 2003 Issue Date Comments Comes into force 1 June 2003 Initial issue 6 December 2003 Copyright 2003 Railway
More informationCOOPERATIVE PATENT CLASSIFICATION
CPC E COOPERATIVE PATENT CLASSIFICATION FIXED CONSTRUCTIONS BUILDING E01 CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES (of tunnels E21D) PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF
More informationCouncil of the European Union Brussels, 18 July 2014 (OR. en)
Council of the European Union Brussels, 18 July 2014 (OR. en) 11933/14 ADD 1 TRANS 368 COVER NOTE From: European Commission date of receipt: 9 July 2014 To: General Secretariat of the Council No. Cion
More informationA Guide to Key Railroad Terminology for the Northeast Corridor
A Guide to Key Railroad Terminology for the Northeast Corridor Index of terms Approach signal, 8 Diverging route, 5 Ladder, 6 Section break, 12, 13 Tie replacement, 7 Ballast, 3, 4, 7 Double slip switch,
More information4.9 RAILWAY FACILITY DEVELOPMENT PLAN FOR THE SERPONG AND
Integrated Transport JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies Chapter 4 Serpong Line Double Tracking, Access Improvement & Integrated Land Development 4.9 RAILWAY FACILITY
More informationStep 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED
Installation Guide Hydro Zones Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED In planning for the installation of a new Hydro Zone, there are many important considerations that must be evaluated
More informationSCHEDULE OF DIMENSNSION. BY S.K.Bansal SPP/IRICEN
SCHEDULE OF DIMENSNSION BY S.K.Bansal SPP/IRICEN Schedule of dimension is nothing but a schedule, which lays down :- Limiting values, recommended values, and infringement to limiting values, which can
More informationThe Knowledge Bank at The Ohio State University. Ohio State Engineer. Electrolysis in Underground Structures
The Knowledge Bank at The Ohio State University Ohio State Engineer Title: Creators: Issue Date: Publisher: Electrolysis in Underground Structures Rei, P. F. Pepper, H. C. Hoover, C. H. Frankenberg, R.
More informationTrack Inspection and Maintenance
Gauge Restraint Reader Makes FRA-mandated inspection of yard tracks easier. At a comfortable walking pace, one worker can verify no-load track gauge, then stop at intervals to apply 4000 lbs. side force
More information14.4 Simple Machines. The output of one device acts as the input of the next.
The output of one device acts as the input of the next. What are the six types of simple machines? The six types of simple machines are the lever, the wheel and axle, the inclined plane, the wedge, the
More informationDomestic, i.e. indoor cleaning A47L 5/00 - A47L 11/00. Attention is drawn to the following places, which may be of interest for search:
E01H STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING {OR PREVENTING} FOG IN GENERAL {CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS} (cleaning in general B08B) Methods and
More informationTrack Work Information Sheet 2P036 How to change a plain wooden sleeper by hand
Introduction This task covers the replacement of wooden sleepers in all categories of track. It includes the replacement of any chairs, baseplates, clips and pads. For gauge correction see TWI 2G064. Overview
More informationRAILWAY OCCURRENCE REPORT
RAILWAY OCCURRENCE REPORT DERAILMENT CANADIAN AMERICAN RAILROAD COMPANY TRAIN NO. 291-23 MILE 65.97, CP SHERBROOKE SUBDIVISION LENNOXVILLE, QUEBEC 24 JUNE 1995 REPORT NUMBER R95Q0045 The Transportation
More informationNational Aluminium Company Limited TRAFFIC RULES AND PROCEDURES
National Aluminium Company Limited TRAFFIC RULES AND PROCEDURES INTRODUCTION The following rules are designed for safe operation of vehicles in and around the mine. Operators of vehicles shall observe
More informationRSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2
3 ELECTRIC TRACTION SYSTEMS 2 3.1. SAFE FOR PEOPLE 2 3.1.1. Electric Traction System 2 3.1.2. Protection against unwanted access 2 3.1.3. Fencing 2 3.1.4. On bridges and other structures 2 3.1.5. At level
More informationPreparation and movement of trains
GERT8000-TW1 Rule Book Uncontrolled When Printed Preparation and movement of trains Issue 11 Module TW1 September 2016 Comes into force 03 December 2016 Published by: RSSB The authoritative version of
More informationRules Respecting Track Safety: Guidelines for British Columbia s Provincial Industrial Railways
Rules Respecting Track Safety: Guidelines for ritish Columbia s Provincial Industrial Railways PART I GENERAL 1. SHORT TITLE These Guidelines may be cited as the Track Safety Rules (TSR). 2. INTERPRETATION
More informationCHAPTER 2 ZONING AND DEVELOPMENT
2.200 GENERAL DEVELOPMENT STANDARDS CHAPTER 2 ZONING AND DEVELOPMENT Section 2.201 GENERAL PROVISIONS... 2.2-1 Section 2.202 FENCES AND VISIONS CLEARANCE... 2.2-2 2.202.01 Fences... 2.2-2 2.202.02 Vision
More informationChapter III Geometric design of Highways. Tewodros N.
Chapter III Geometric design of Highways Tewodros N. www.tnigatu.wordpress.com tedynihe@gmail.com Introduction Appropriate Geometric Standards Design Controls and Criteria Design Class Sight Distance Design
More informationWestland No. 1 Mine (Bob Ciminel 2012)
Westland No. 1 Mine (Bob Ciminel 2012) Westland Mine No. 1 was owned by the Pittsburgh Coal Company and located at the eastern (timetable) end of the Montour Railroad s Midland Spur/Westland Branch, just
More informationSafety Sense Ballast Under Cutter
Ballast Under Cutter The Stobart Rail Ballast Under Cutters and the process in which they are used has been developed and improved so that ballast can be excavated and replenished without the requirement
More informationCh. 157 ESTABLISHED SOUND LEVELS CHAPTER 157. ESTABLISHED SOUND LEVELS
Ch. 157 ESTABLISHED SOUND LEVELS 67 157.1 CHAPTER 157. ESTABLISHED SOUND LEVELS Subchap. A. GENERAL PROVISIONS... 157.1 B. NOISE LIMITS... 157.11 C. ADMINISTRATIVE PROVISIONS... 157.21 D. INSTRUMENTATION...
More informationItalian standards. Andrea Nardinocchi Scientific Director Italferr, Rome, Italy
Italian standards Andrea Nardinocchi Scientific Director Italferr, Rome, Italy Milan-Bologna Line Turin-Novara line MILANO 54 miles long 2 miles of tunnel 9,4 miles of viaducts 2006 in operation TORINO
More informationWorking of Trains - Rules 1 to 45
Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 201 0 04 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This
More informationSECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS
SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS 602.01 General 1. This specification establishes a standard for Portland cement concrete pavement smoothness, and defines defective pavement smoothness.
More informationApplicable standards in HS Infrastructure subsystem TSI (2008/217/EC)
Applicable standards in HS Infrastructure subsystem TSI (2008/217/EC) ERA 1.0 Page 1/8 Standards or other documents referred to in the HS infrastructure TSI (and therefore mandatory) TSI Sections Characteristics
More informationCUSTOMS TARIFF - SCHEDULE 86 - i
86 - i Chapter 86 RAILWAY OR TRAMWAY LOCOMOTIVES, ROLLING-STOCK AND PARTS THEREOF; RAILWAY OR TRAMWAY TRACK FIXTURES AND FITTINGS AND PARTS THEREOF; MECHANICAL (INCLUDING ELECTRO-MECHANICAL) TRAFFIC SIGNALLING
More informationSLEWING RING CHARACTERISTICS, APPLICATIONS
SLEWING RING CHARACTERISTICS, APPLICATIONS Slewing rings are large-sized bearings which are able to accommodate combined load, i.e. axial, radial loads and tilting moment. They are usually provided with
More informationSLUDGE DEWATERING. The costs for trucking sludge to the ultimate disposal site become substantially lower when sludge volume is reduced by dewatering.
SLUDGE DEWATERING Sludge dewatering is a physical (or) mechanical unit operation used to reduce to the moisture content of sludge. It is carried out for one or more of the following reasons. The costs
More informationONE-WAY DERAILING for FREIGHT CARS and ALL LOCOMOTIVES. For use on wood ties or full length pre-stressed concrete ties. ALDON Company, Inc.
SaberTooth Portable Derail U. S. Patent No. 7,753,317 Tool-Free Installation Guide ONE-WAY DERAILING for FREIGHT CARS and ALL LOCOMOTIVES For use on wood ties or full length pre-stressed concrete ties
More informationUnder Sleeper Pads on the Ofoten Line
Under Sleeper Pads on the Ofoten Line Bjørn G. Larsen, Infrastructure Division and Alf Helge Løhren, Technology Jernbaneverket 19th Nordic Seminar on Railway Technology 2016 Luleå, Sweden Content Test
More informationTechnology Comparison: High Speed Ground Transportation. Transrapid Superspeed Maglev and Bombardier JetTrain
Technology Comparison: High Speed Ground Transportation Transrapid Superspeed Maglev and Bombardier JetTrain December 2002 Table of Contents Introduction. 3 Technology Overview 3 Operational Experience
More informationRAYTHEON PREMIER I. TOWING Information This section of this sub-chapter provides information on towing procedures for the Model 390 airplane.
RAYTHEON PREMIER I TOWING Information This section of this sub-chapter provides information on towing procedures for the Model 390 airplane. Towing involves ground movement of the airplane without engine
More informationInnovative Stations for an Innovative Transport System the Maglev Stations Munich Central Railway Station ( Hauptbahnhof ) Airport
Innovative Stations for an Innovative Transport System the Maglev Stations Munich Central Railway Station ( Hauptbahnhof ) Airport Knut Marscholek-Uecker Deutsche Bahn AG, Berlin, knut.marscholek-uecker@bahn.de
More informationSustainable Rail Strategy The Value of Quality
Graz University of Technology Institute of Railway Engineering and Transport Economics Sustainable Rail Strategy The Value of Quality Peter Veit June 30 th, 2015 www.ebw.tugraz.at Challenge Graz, Austria
More informationRegulations relating to the Use of Vehicles, Chapter 5
Regulations relating to the Use of Vehicles, Chapter 5 Section 5-1 Limits specified on registration etc. A vehicle must not be used or authorised for use if the axle load, load from an axle combination,
More informationRegulation Respecting Occupational Health and Safety. 1. Definitions: In this regulation, the following words and expressions mean:
Quebec Québec Powered Mobile Equipment This material has been extracted from the Acts and Regulations of the Province of Quebec to aid students in understanding the subject. It is not an official source
More informationIntroduction of Overseas Technologies to JR East Track Maintenance
Introduction of Overseas Technologies to JR East Track Maintenance Katsumi Ise Introduction JR East makes great efforts in track maintenance to ensure stable transport, especially in the Tokyo capital
More informationINSTRUCTIONS IN CONNECTION WITH THE WORKING OF ELECTRIC TRAINS
BRITISH RAILWAYS (North Eastern Operatir,g Area) INSTRUCTIONS IN CONNECTION WITH THE WORKING OF ELECTRIC TRAINS ON THE TYNESIDE ELECTRIFIED LINES In operation from 1st May, 1952 (Booklet dated 1st January,
More informationASHPRINGTON ROAD Part 1
MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD Part 1 By Graham Plowman Photographed by Paul Plowman 2 MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD A 00 layout based on the Western Region Main Line between Exeter
More informationWarrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH)
Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH) 01.02.1873 Open for passengers on Geelong - Ballarat line (Chronological Index) (31.12.1878) By this date, open for general goods (Commissioners
More informationTechnology and maintenance of tracks at ÖBB
Technology and maintenance of tracks at ÖBB Dr. Michael Mach ÖBB Infrastructure Head of Railway Construction and Infrastructure Management Dr. Rudolf Schilder Former Head of Maintenance We plan, build,
More informationSpeed Workshop. In this workshop we will be covering: a. Average speed b. Units c. Relative Speeds d. Distance/time graphs
Speed Workshop In this workshop we will be covering: a. Average speed b. Units c. Relative Speeds d. Distance/time graphs Average speed Speed is how quickly an object can cover a distance. You may also
More informationUser Guide Rail Scooter
User Guide Rail Scooter Permaquip Ltd Brierley Industrial Park, Stanton Hill, Sutton-In-Ashfield, Nottinghamshire, NG17 3JZ Tel: +44 (0) 1623 513349 Fax: +44 (0) 1623 517742 E-mail: sales@permaquip.co.uk
More informationUnion Pacific Pay Rates July 1, 2018
Union Pacific Pay Rates July 1, 2018 GROUP 1: BRIDGE AND BUILDING SUBDEPARTMENT 01/01/2018 Overtime Steel Erection Foreman $33.12 $49.68 Asst. Steel Erection Foreman $31.81 $47.72 Steel Erection Truck
More informationUnion Pacific Pay Rates January 1, 2015
Union Pacific Pay Rates January 1, 2015 GROUP 1: BRIDGE AND BUILDING SUBDEPARTMENT 01/01/2015 Overtime Steel Erection Foreman $31.06 $46.59 Asst. Steel Erection Foreman $29.82 $44.73 Steel Erection Truck
More informationSpeed Limit on Railway Curves. (Use of SuperElevation on Railways)
Speed Limit on Railway Curves (Use of SuperElevation on Railways) Introduction When a train rounds a curve, it has a tendency to want to travel in a straight direction and the track must resist this movement,
More informationSimulation of railway track maintenance trains at MATISA
Simulation of railway track maintenance trains at MATISA MultiBody Simulation User Group Meeting Rémi ALLIOT, Solution Consultant, Dassault Systèmes SE Jacques ZUERCHER, Head of Calculation Department,
More informationSOLID WASTE AND RECYCLING ENCLOSURE STANDARDS
SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS Kitsap County Public Works July 2019 If you have any questions regarding the Standards or have recommendations for improvement, please contact: Sarah Olson
More informationBY-ELECTION SIGN GUIDELINES
BY-ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING BY-ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Election Sign Definition: An election sign is a temporary sign announcing
More informationTWO-WAY DERAILING for FREIGHT CARS and 4-AXLE LOCOMOTIVES. For use on wood ties or full length pre-stressed concrete ties S
SaberTooth Portable Derail U. S. Patent No. 7,753,317 Tool-Free Installation Guide TWO-WAY DERAILING for FREIGHT CARS and 4-AXLE LOCOMOTIVES For use on wood ties or full length pre-stressed concrete ties
More informationCB15 AUTOMATIC CONVEYOR BELT FOR WAGONS LOADING
AUTOMATIC CONVEYOR BELT FOR WAGONS LOADING The Automatic Conveyor Belt for Loading Wagons has been designed and made for loading wagons that transport and unload ballast. It can be accommodated to customer
More informationMETHOD OF PERMANENT WAY INSPECTION AND MAINTENANCE PRACTICES 0F RAIL TRACK
IPSS INTER PLANT STANDARD IN STEEL INDUSTRY METHOD OF PERMANENT WAY INSPECTION AND MAINTENANCE PRACTICES 0F RAIL TRACK IPSS:3-02-013A-18 (Part-A) Corresponding IS does not exist Formally : IPSS:3-02-013A-03
More informationTA20 ARTC Code of Practice for the Victorian Main Line Operations
TA20 ARTC Code of Practice for the Victorian Main Line Operations Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1.2 07 August 2011. 2.0 04 October
More informationRequirements on vehicle occupant protection, including interior fittings, head restraints, seat belts, vehicle doors
L 42/70 EN Official Journal of the European Union 17.2.2015 ANNEX XIII Requirements on vehicle occupant protection, including interior fittings, head restraints, seat belts, vehicle doors 1. Definitions
More informationPERMANENT RESIDENTIAL UNDERGROUND SERVICE
CITY OF RICHLAND ENERGY SERVICES DEPARTMENT 505 Swift Boulevard, MS-21 Richland, WA 99352 Telephone (509) 942-7403 Fax (509) 942-7405 PERMANENT RESIDENTIAL UNDERGROUND SERVICE A. INTRODUCTION This guide
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More informationThe specialist for fastening technology. Post holders NEW. to our product range
Post holders H post anchors H post anchors Fork width Dimensions a) Drill holes b) Art. no. (mm) Overall/Post support (mm) Post support (mm) PU 904722 91 600 x 60 / 300 4 x 11 904723 101 600 x 60 / 300
More informationMiddle Buster, Sub Soiler, Middle Buster SC
Middle Buster, Sub Soiler, Hardware Kit 8090000 THANK YOU FOR PURCHASING THIS PRODUCT Congratulations on your purchase. Behlen Country has been in the business of providing quality equipment to landowners
More informationProposed Two Ballots Considerations for Layout of Wayside Applicators
Proposed Two Ballots Considerations for Layout of Wayside Applicators To be incorporated into AREMA Recommended Practices for Rail / Wheel Friction Control - Section 4.11 Updated at AREMA Committee 4 Meeting,
More informationTrack System Requirements
Track System Requirements Synopsis This document mandates requirements for the safe performance of the track system by specifying minimum requirements for the design, construction, inspection and maintenance
More informationEXPERI MENTAL PROJECTS
EXPERI MENTAL PROJECTS PROVIDING SMOOTH RAILROAD GRADE CR"OSSINGS USING ASPHALT CONCRETE PAVEMENT Report Numbe r: DEPARTMENTAL I NFORMAT JON EXCHANGE STAT E AND D EPA RTM ENT P UB L IC OF HIGHWAYS T R
More informationCUSTOMS TARIFF - SCHEDULE XVII - 1
XVII - 1 Section XVII VEHICLES, AIRCRAFT, VESSELS AND ASSOCIATED TRANSPORT EQUIPMENT Notes. 1. This Section does not cover articles of heading 95.03 or 95.08, or bobsleighs, toboggans or the like of heading
More informationThe minimum number of accessory off-street parking spaces. shall conform to the requirements of the Table of General
ARTICLE VII Parking and Loading 1. Conformity with Use Table; exceptions. The minimum number of accessory off-street parking spaces shall conform to the requirements of the Table of General Use Regulations,
More informationBackdrive Installation, Set-up & Faults new standard.
Backdrive Installation, Set-up & Faults new standard. A backdrive is only used on vertical switches at type C switch and above or on inclined switches type D and above. It is primarily used to assist the
More informationSAFETY ARTIC TIPPER GUIDANCE - PREVENTING OVERTURNS LAFARGETARMAC.COM
SAFETY ARTIC TIPPER GUIDANCE - PREVENTING OVERTURNS LAFARGETARMAC.COM DRIVING SAFETY SAFETY Lafarge Tarmac loads approximately 8500 deliveries each week on articulated vehicles. The safe delivery of product
More informationGEOMETRIC ALIGNMENT AND DESIGN
GEOMETRIC ALIGNMENT AND DESIGN Geometric parameters dependent on design speed For given design speeds, designers aim to achieve at least the desirable minimum values for stopping sight distance, horizontal
More informationWhy? Faster To reduce the duration of the process
BUTE Department of Construction Management and Technology 20.10.2015 Why? Faster To reduce the duration of the process Cheaper To reduce costs (where labour is expensive) Easier To reduce (heavy) manual
More informationMoreton Sugar Mill's EMB bogie locomotive Coolum leads a rake of cane through Bli Bli in 2002.
These notes were written to give the reader an insight into the operations and equipment used to transport the sugarcane from the fields to the sugar mills over the vast narrow gauge railways used throughout
More information7. Residential Single-Family and Duplex Buildings (Dwellings)
Sin g le -F a mily a n d Du p le x Bu ild in g s 2016 Electric Service Requirements, 2 nd Edition Section 7 Section 7 Residential Single-Family and Duplex Buildings (Dwellings) Directory Page 7.1 General
More informationSpecialising in: Complete Stockyard Systems Cattle Crushes, Calf Cradles and Weighing Systems. Manufacturing quality stockyards since 1990
Australian Manufactured Specialising in: Complete Stockyard Systems Cattle Crushes, Calf Cradles and Weighing Systems 02 6785 1977 M&M Stockyards: 25 Arthur Street, Manilla, NSW 2346 Fax: 02 6785 2580
More informationAl-Saudia Virtual Academy Online Tuition Pakistan Pakistan Online Tutor Magnet and Electromagnetism
Al-Saudia Virtual Academy Online Tuition Pakistan Pakistan Online Tutor Magnet and Electromagnetism DEFINITION: A substance having ability to attract magnetic materials is called magnet. The properties
More informationPart 8: Mill Layouts and Yards
Part 8: Mill Layouts and Yards Mill layouts Balloon: Mills that use the balloon arrangement usually only have one way in and out of the mill or the factory site is in an area that limits the space in which
More informationBallast Usually stone chippings, or similar material, which support the sleepers and hold them in place on the ground.
Model Rail Terminology Alternating Current/AC The electric current that flows alternately through each wire in a rapid sequence called a cycle. The normal mains electricity supply is powered by Alternating
More informationStudy on Incremental Launching of Lane L8 Steel Box Girder of Main Bridge in Xiamen Xianyue Flyover
Advances in Engineering Research (AER), volume 124 2nd International Symposium on Advances in Electrical, Electronics and Computer Engineering (ISAEECE 2017) Study on Incremental Launching of Lane L8 Steel
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationWHEEL LOAD SCALES THE PURCHASING DECISION GUIDE
WHEEL LOAD SCALES THE PURCHASING DECISION GUIDE The term wheel weigher covers a wide range of products and prices and it is important to understand the competitive benefits and limitations of the various
More informationCONVENTIONAL TURNOUTS
RAILWAY CONVENTIONAL Basic description Turnout mounted in the track enables passing of the vehicle in either straight or branch direction. Depending on the design we distinguish the following types of
More informationRules Respecting Key Trains and Key Routes
Rules Respecting Key Trains and Key Routes February 12, 2016 version CONTENTS 1. SHORT TITLE 2. APPLICATION 3. DEFINITIONS 4. KEY TRAINS 5. KEY ROUTES 6. KEY ROUTE RISK ASSESSMENTS 7. CONSULTATIONS WITH
More informationMorwell. (88 miles 75 chains 47 links, km)
Morwell (88 miles 75 chains 47 links, 144.372 km) 01.06.1877 Opened with line between Morwell and Sale. Staff and Ticket not provided initially. (VR to 62, Leo Harrigan, WTT) (01.04.1878) By this date,
More informationHydrostatic And Mechanical Lubricators
FRONZ / ONTRACK APPROVED CODE OF PRACTISE FOR HERITAGE NETWORK OPERATORS Mechanical Supplementary Code B3.3.2.03 Hydrostatic And Mechanical Lubricators Issue Prepared (P), Approved by Effective Date Reviewed
More informationCEE 320. Fall Horizontal Alignment
Horizontal Alignment Horizontal Alignment Objective: Geometry of directional transition to ensure: Safety Comfort Primary challenge Transition between two directions Fundamentals Circular curves Superelevation
More informationLIRR Emergency Procedures & Familiarization
LIRR Emergency Procedures & Familiarization presented by Brian P. Ludica Training Specialist Safety & Emergency Response Training Long Island Rail Road Fred Loiacono Assistant Fire Marshal OFM Corporate
More informationStudy on System Dynamics of Long and Heavy-Haul Train
Copyright c 2008 ICCES ICCES, vol.7, no.4, pp.173-180 Study on System Dynamics of Long and Heavy-Haul Train Weihua Zhang 1, Guangrong Tian and Maoru Chi The long and heavy-haul train transportation has
More informationTechnical specification Cold milling machine W 2200
Technical specification Cold milling machine W 2200 Technical specification Cold milling machine W 2200 Milling width max. Milling depth * 1 7 3 (2,200 mm) 0 14 (0 350 mm) Milling drum Tool spacing 15
More informationSYDNEY TRAMWAY MUSEUM
DISABLED TRAMCARS Instruction Manual For Retrieving Disabled Tramcars Prepared for Traffic Officers-in-Charge Disabled Tramcars Manual STM 6152 Version 1 19/5/08 1. Document Details: Name: SYDNEY TRAMWAY
More information