DB Manual Work procedures for permanent way maintenance
|
|
- Jayson Lester
- 5 years ago
- Views:
Transcription
1 DB Manual Work procedures for permanent way maintenance CONTENTS
2 Contents Preface 19 1 General 21 2 Track equipment General The rails Insulated rails Insulated joints The sleepers The wooden sleepers The steel sleepers The reinforced concrete sleeper Special forms of concrete sleeper The sleepers of the ballastless track system The rail fastening The rail pad The types of rail fastening The ballast bed 41 3 Substructure General Substructure of new tracks Substructure foundation Checking load-bearing capability and rate of compression Measures to prevent embanking settling 47 3
3 3.2.4 Draining the track formation Drainage systems Substructure of old tracks Substructure remediation 50 4 Line layout and routing General Principles of line layout: Discretionary and approval limit values Route elements Fundamentals of routing The curved track Superelevation Lateral acceleration Compensating superelevation Determining superelevation Unbalanced superelevation Excess of superelevation Minimum superelevation Standard superelevation Transition curves and superelevation ramps The transition curve Reverse curve with transition curve Superelevation ramps Ramp forms Longitudinal track pull Slope and gradient change Graduated gradient change 59 5 Maintenance terms 60 4
4 5.1 General Explanation of individual terms and meaning for the permanent way 60 6 Inspection Inspections on foot/inspection runs Track inspections on foot Track inspection runs (see guideline ) Measurement runs Checking the track geometry with track inspection vehicles (see guideline ) Technical driving inspections (see guideline ) Ultrasonic test runs Rail inspection train equipment Manual measurements Switch diagnosis system VAE ROADMASTER Foundation survey General Execution of the geotechnical survey Evaluation of results Construction execution Conclusion Application of ground-penetrating radar Geotechnical survey report for maintenance work Evaluation and measures General Integrated inspection system (IIS) Near-surface defects in rails Planning of measures for track maintenance (see guideline A02) Special inspections with the GeoRail Xpress Servicing 137 5
5 7.1 Weed killing on and alongside railway tracks Weed killing on railway tracks using pesticides Weed killing outside of tracks using mechanical procedures Lubrication of slide base plates Lubrication of slide base plates Switch rollers Switch roller systems Repair work Planning of track maintenance Rail transport Quality assurance when loading rails Rail transport with Robel design type Rail transport with STS design type Mobile continuous welded rail unloading device Geismar design type, model EMD High-speed track renewal machine SUM 315 (Q 3) Track renewal train Matisa Overview of the track renewal train procedure Special features of track renewal trains UM-1, 2 and Special features of track renewal train UM-S 2001 (HENRY THE STRONG) Special features of P UM and UM-P from Schweerbau Track renewal train MATISA P 90 LS from JumboTec Special features of P 95 from Strukton Special features of track renewal train P 95 SR Renewal procedure Matisa P High-speed track renewal machine (SUM-Q 1) RU 800 S track renewal and ballast cleaning in one operation General Description of the working method 215 6
6 9.6 High-performance renewal procedure VFW Track renewal in a two-sleeper cycle with the SUZ 500 UVR Track renewal train SUZ 500 with SVM Preconditions for using the SUZ Preliminary work Organisation Special circumstances Track renewal with SUZ Subsequent operations (not usually by high-speed track renewal train personnel) Unloading and forwarding the continuous welded rails with the rail forwarding machine in combination withhigh-speed track renewal train SUZ Donelli portal crane Track assembly Renewal of switches General Preconditions (unloading, assembly) Revolving cranes Renewal machine unit for switches and tracks Switch renewal with switch renewal machine WM 500-U Switch transport wagon Ready-to-install, fully-assembled large switch parts from the switch supplier Objectives Technical solution Complete assembly in the switch factory Loading and transport 270 7
7 Installation Operations technology advantages Special features of the complete assembly, its transport and installation Summary Switch maintenance Switch inspection Individual replacement of parts of the switch track The locking sleeper Sleeper replacement General Track renewal trains Individual sleeper replacement by hand or with equipment Rail replacement General Rail replacement with rail changers Rail replacement with roller grips Rail replacement with the rail replacement system SR Ballast laying General Classic procedure Ballast bed finisher 311 8
8 14 Installation of tracks General Ballast superstructure Track laying with VFW Track laying with SUZ 500 UVR Niemag track renewal crane Renewal machine unit for switches and tracks Portal crane with integrated single sleeper laying device (PK 1-20/24) Track laying with revolving cranes Track laying with the portal crane (Donelli) Laying of individual sleepers Ballastless track system General The ballastless track system design types Ballastless track system laying procedures Measurement of the ballastless track system with the Hergie system Laying the lean-mixed concrete in ballastless track systems Procedure for laying continuous welded rails in ballastless track systems Switches in ballastless track systems Switches in the RHEDA 2000 design type ballastless track system Requirements on the substructure for ballastless track systems on earthwork foundations Transitions Noise insulation in ballastless track system construction Maintenance and renewal of the ballastless track system Laying of special sleepers Y-steel sleeper superstructure Y/S Twin sleeper Sleeper bed for the ballast superstructure (padded sleeper) 423 9
9 15 Ballast solidification through plastic bonding Product Application areas Required boundary conditions Acceptance, quality control, guarantee Guarantee Work specifications Handling of the bonding during tamping work Ballast cleaning General Ballast cleaning machines RM 80 and Ballast cleaning machine RMW General Ballast bed cleaning with the RMW Rail-mounted ballast cleaning machines RM 800 and RM 800 Super 3S Rail-mounted ballast cleaning machines RM 801 and RM High-performance ballast cleaning machines RM 900 S and RM RM 900 S from SPITZKE AG RM 900 from Schweerbau High-performance ballast cleaning machine RM High-performance ballast cleaning machine RM W
10 16.9 Rail-mounted ballast cleaning machine RM 76 UHR Road-rail ballast cleaning machine ZRM Ballast cleaning using other procedures Loading and unloading systems for waste removal and ballast laying General Material conveyor and hopper unit (MFS 38, 40, 100-S, 250), belt storage device (BSG 60), bulk freight hopper wagon (BSW and 2000) and road-rail MFS Loading belts and systems Unloading systems for laying ballast Formation rehabilitation General Installation with earth-moving machines Formation rehabilitation machine PM 1000-URM General description of the PM 1000-URM work procedure Description of the PM 1000-URM work modules Formation rehabilitation machine PM (BR) General information on PM Addition of an RM ballast cleaning machine to the PM BR Formation rehabilitation machine PM 200-2R General information on PM 200-2R Work procedure Sand distribution and compacting machine (SVV 100) from Joseph Hubert and Schweerbau
11 18.7 Recycling and formation rehabilitation machines RPM 2002 and RPMW Objective of RPM Work procedure Recycling, formation rehabilitation and cleaning machine RPM-RS-900 from SPITZKE AG General Working methods RPM-RS-900 from Schweerbau Möbius soil remediation system Formation rehabilitation with ballast replacement Wiebe system Verification of installation quality Mechanical tamping work in tracks and switches Requirements on track and switch tamping machines and ballast ploughs Measuring work ahead of tamping machines Introduction Measuring work on conventionally marked tracks Measuring work with the EM-SAT track survey system Measuring work with the GEDO CE Measuring work with the Amberg GRP 3000 survey system The satellite-supported track survey during track maintenance Tamping General Compacting First and second stabilisation Creation of the ballast profile Speed regulation after laying Maintenance of the tracks General
12 Preconditions and preliminary work Elimination of long-wave track displacement on high-speed lines (v > 160 km/h) Ballast distribution system (BDS 2000) Maintenance of switches Tamping work with small machines Dynamic track stabilisation Checking execution Creation of the continuous welded rail track General Stress compensation Welded joints (intermediate and final welds) Elimination of individual defects Tracks General Correction of track displacement Gauge correction Bending up retracted insulated joints Sleeper rehabilitation Elimination of individual geometry defects in tracks and switches with individual defect tamping machines UNIMAT-Sprinter individual defect tamping machine Fully mechanised individual defect processing with the ZW Rail processing General
13 22.2 Rail processing machines, type RR Rail grinding trains, types RR 48 M and 32 M Rail grinding machines, type RR 24 M Universal grinding machines, types RR 16 M and RR 24 MC Switch grinding machines, types RR 16 P/D and 16 MS Rail processing machines types RG, SPML, RGM, GWM, SF 03/SM 03, SFU 04/SM 04, SBM Rail grinding machine RG Rail grinding machine SPML Rail grinding machine RGM Track and switch grinding machine GWM Rail milling unit SF 03/SM Rail milling machine SFU 04/SM Rail processing machine SBM Track and switch grinding machine RGH C 20 plus suction and rinsing unit (SuSE) Rail grinding machine SZ Rail milling unit SF 03 FFS-Plus High-speed grinding with grinding machine RC Rail milling train SF 03 W-FFS Hand-held grinding equipment Noise insulation and vibration protection Introduction Noise and vibration caused by railway vehicles Sources of noise Rolling noise Legal framework conditions Vibration Inspection: assessment of the actual status of the rail running table quality
14 Direct measurement processes Indirect continuous measurement processes Maintenance and repair of rail running tables Sound-reducing measures Measures on the rail Absorbent running track coverings Measures in the propagation path Measures at the immission point Vibration-reducing measures Measures in the superstructure system Measures in the propagation path Measures at the immission point Assessment and acceptance of track maintenance Principles General Acceptance Acceptance of new track construction or track renewal General Acceptance following new track construction or track renewal SR 0 values for new track construction or track renewal SR 0 values of the geodetic position of the track and other measurements Checklist for acceptance documents Acceptance of new switch construction and switch renewal General Object of acceptance Acceptance following new switch construction and switch renewal SR 0 values of the switch geometry Acceptance of track maintenance General Acceptance of track maintenance
15 Evaluation of acceptance survey Acceptance of switch maintenance General Acceptance of switch maintenance SR 0 values for switch maintenance Acceptance of welded joints on rails General Principles Tools Acceptance of welded joints on rails Acceptance of rail processing General Acceptance of rail processing Guideline acceptance values following rail processing Guideline acceptance values following the production of special profiles Further developments General SUZW 500 new technology for track renewal in conveyor belt technology, H.F. WIEBE Ballast bed cleaning machine RM900VB Mobile maintenance system ROBEL Ballastless track system DW pre-cast concrete track panels as the track support system System description Routing principles Construction implementation The DURFLEX superstructure system Characteristics of DURFLEX Laying procedure (Durflex installation) Removal procedure and recycling
16 25.7 Drive-on ballastless track system System description Laying procedure on earthworks (rough construction sequence) The ZSX twin sleeper the special pre-stressed concrete sleeper The development objectives of the ZSX twin sleeper Laying procedure DURMINOR, the low noise protection wall New developments in ballastless track system design types New ballastless track system design type Naumburger Bauunion (NBU) design type 744 Annex Abbreviations 746 Units of measurement 747 Advertisers 747 Index 748 Authors
Technology and maintenance of tracks at ÖBB
Technology and maintenance of tracks at ÖBB Dr. Michael Mach ÖBB Infrastructure Head of Railway Construction and Infrastructure Management Dr. Rudolf Schilder Former Head of Maintenance We plan, build,
More informationCONVENTIONAL TURNOUTS
RAILWAY CONVENTIONAL Basic description Turnout mounted in the track enables passing of the vehicle in either straight or branch direction. Depending on the design we distinguish the following types of
More informationFormation of single/double Track
Formation of single/double Track Formation of track Track Stresses due to wheel load Failure of formation Due to over stressed condition Poor construction Excessive moisture content of the filling material
More informationSustainable Rail Strategy The Value of Quality
Graz University of Technology Institute of Railway Engineering and Transport Economics Sustainable Rail Strategy The Value of Quality Peter Veit June 30 th, 2015 www.ebw.tugraz.at Challenge Graz, Austria
More informationTransportation Engineering II UNIT - I
Transportation Engineering II UNIT - I I. Components of a Permanent Way: A. Rails: Rails are the I-section members of a track laid in two parallel lines to provide a level surface for the movement of trains.
More informationSimulation of railway track maintenance trains at MATISA
Simulation of railway track maintenance trains at MATISA MultiBody Simulation User Group Meeting Rémi ALLIOT, Solution Consultant, Dassault Systèmes SE Jacques ZUERCHER, Head of Calculation Department,
More informationNEOPUL KEY DATES. Creation of own competences in electrification of railways. Start of activity in Ireland. Foundation of Neopul
NEOPUL KEY DATES 2003 1983 Foundation of Neopul 1995 Neopul Branch in Spain Creation of own competences in electrification of railways 2007 Start of activity in Ireland 1900 2000 1989 Start of development
More informationPrerequisites for Increasing the Axle Load on Railway Tracks in the Czech Republic M. Lidmila, L. Horníček, H. Krejčiříková, P.
Prerequisites for Increasing the Axle Load on Railway Tracks in the Czech Republic M. Lidmila, L. Horníček, H. Krejčiříková, P. Tyc This paper deals with problems of increasing the axle load on Czech Railways
More informationReinforced edge channels KE-100
Drainage with system Technical data sheet Reinforced edge channels KE-100 ANRIN SERVICE provides custom solutions and possibilities for the contract business. Here you benefit from reliable cooperation
More informationManitoba Infrastructure and Transportation
Provincial Smoothness Specifications (MB, SK, AB, BC) Darel Mesher PhD, PEng November, 2012 Manitoba Infrastructure and Transportation 2 1 Manitoba Infrastructure and Transportation Construction Smoothness
More informationNUMERICAL ANALYSIS OF LOAD DISTRIBUTION IN RAILWAY TRACK UNDER WHEELSET
Journal of KONES Powertrain and Transport, Vol., No. 3 13 NUMERICAL ANALYSIS OF LOAD DISTRIBUTION IN RAILWAY TRACK UNDER WHEELSET Piotr Szurgott, Krzysztof Berny Military University of Technology Department
More informationDependency between super- and substructure in ballastless track systems. PCM RAIL.ONE AG October 16 Wojciech Nawrat
Dependency between super- and substructure in ballastless track systems PCM RAIL.ONE AG PCM RAIL.ONE AG October 16 Wojciech Nawrat 1 Topics Ballastless track systems Requirements and Interfaces Ballastless
More informationS&C: Understanding Root Causes & Assessing Effective Remedies C4R Final Dissemination Event, Paris 15 th March 2017
Capacity for Rail S&C: Understanding Root Causes & Assessing Effective Remedies C4R Final Dissemination Event, Paris 15 th March 2017 Presenter: Dr Yann Bezin Institute of Railway Research, University
More informationUnder Sleeper Pads on the Ofoten Line
Under Sleeper Pads on the Ofoten Line Bjørn G. Larsen, Infrastructure Division and Alf Helge Løhren, Technology Jernbaneverket 19th Nordic Seminar on Railway Technology 2016 Luleå, Sweden Content Test
More informationQUIET-TRACK: Track optimisation and monitoring for further noise reduction
QUIET-TRACK: Track optimisation and monitoring for further noise reduction dr.ir. Geert Desanghere Akron, Belgium geert.desanghere@akron.be www.akron.be Quiet-Track: EU-project: Consortium QUIET-TRACK:
More informationOn-the-Job Training Program. Overview of Training Programs
On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete
More informationThinking in your Visions
Thinking in your Visions 1 PRODUCTION OF RAIL VEHICLES An innovative answer to every requirement. MODERNISATION OF RAIL VEHICLES Functional, safe and economical adaptation to changing tasks. MAINTENANCE
More informationWBSA Railway Summit. Club Feroviar Romanian Railway Industry Association. Bucharest, /0605/06
WBSA Railway Summit Club Feroviar Romanian Railway Industry Association Bucharest, 2010-10 10-05/0605/06 EUROPEAN STANDARDIZATION RAILWAY APPLICATIONS INFRASTRUCTURE European Committee for Standardization
More informationNETWORK. Annex AC. Aurizon Network Ballast Fouling, 4 March 2013
NETWORK Annex AC 4 March 2013 Aurizon Network Ballast Fouling, Overview of the problem Ballast is the material that is laid on the rail bed under the sleepers, providing stability and drainage to the track
More informationBehaviour of ballasted track during high speed train passage
Behaviour of ballasted track during high speed train passage William Powrie and Jeffrey Priest University of Southampton Outline of talk Background and Aims Sub-base issues: effect of train speed on vertical
More informationTable Standardized Naming Convention for ERD Files
S-1 (2399) PAVEMENT SURFACE SMOOTHNESS (2013 version) DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. Always use with SP2005-111 (CONCRETE PAVING MIX SPECIFICATIONS PAVEMENT) and SP2005-140
More informationMOBILE MIXING PLANTS M1 - M2,5
MOBILE MIXING PLANTS M1 - M2,5 Schwing-Stetter MOVES CONCRETE. WORLDWIDE. Wherever concrete is produced and moved is where you will find Schwing-Stetter machinery. With plants in Germany, Austria, USA,
More informationINDEX ( ( ( (Brick superstructure) Model 1 (Brick superstructure) Size: 4 feet length X 4 feet breadth X 6.5 feet height Gramalaya - Tiruchirappalli Model 1 Individual household toilet (Brick superstructure)
More informationAutomotive Transmissions
Gisbert Lechner Harald Naunheimer Automotive Transmissions Fundamentals, Selection, Design and Application In Collaboration with Joachim Ryborz With 370 Figures J i Springer Contents Terms and Symbols
More informationScienceDirect. Evaluation of track design and track geometry of the track with unconventional structure of railway superstructure
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 111 (2015 ) 709 716 XXIV R-S-P seminar, Theoretical Foundation of Civil Engineering (24RSP) (TFoCE 2015) Evaluation of track
More informationOriginal operating instructions. Transit silo. Model. Transit silo
Original operating instructions Transit silo Model Transit silo Ambros Schmelzer & Sohn GmbH & Co KG Dr.-Zimmer-Str. 28, 95679 Waldershof Telefon 0923-9792-0 Fax 09231-972697 E-Mail info@a-schmelzer.de
More informationRM 900 VB. STRABAG The Group. STRABAG Rail GmbH. STRABAG Rail GmbH
8/2016, 1,000 STRABAG The Group STRABAG SE is a European-based technology group for construction services, a leader in innovation and financial strength. Our services span all areas of the construction
More informationTrack Transitions and the Effects of Track Stiffness
Track Transitions and the Effects of Track Stiffness D. Plotkin, D.D. Davis, S. Gurule and S.M. Chrismer AREMA 2006 IJ presentation - 1 Transportation Technology Center, Inc., a subsidiary of the Association
More informationShoulder Ballast Cleaning Effectiveness
Shoulder Ballast Cleaning Effectiveness AREMA 2015 Annual Conference 4 October 7 October 2015 Minneapolis, MN Scott Diercks Loram Maintenance of Way, Inc. 3900 Arrowhead Drive Hamel, MN 55340 763-478-2622
More informationGL0098P Beta+ Septic Tanks Installation & Operation Guidelines
000535 GL0098P Beta+ Septic Tanks Installation & Operation Guidelines Kingspan Environmental Service Contact Numbers: UK: 0844 846 0500 NI: 028 3025 4077 IRL: 048 3025 4077 Enclosed Documents DS1151P Beta+
More informationSafety Sense Ballast Under Cutter
Ballast Under Cutter The Stobart Rail Ballast Under Cutters and the process in which they are used has been developed and improved so that ballast can be excavated and replenished without the requirement
More informationExperimental Field Investigation of the Transfer of Lateral Wheel Loads on Concrete Crosstie Track
Experimental Field Investigation of the Transfer of Lateral Wheel Loads on Concrete Crosstie Track AREMA Annual Conference Chicago, IL 30 September 2014 Brent A. Williams, J. Riley Edwards, Marcus S. Dersch
More informationTE-II (10CV63) Ballast
Lecture-09 10CV63 TE-II Introduction Ballast The ballast is a layer of broken stones, gravel, moorum, or any other granular material placed and packed below and around sleepers for distributing load from
More informationOscillating Mountings
Type HS for hanging screens H B F E HS 7 38 D A HS 45 50 HS 50- Z C G M L M L M L Art. o. Type Load capacity Gmin. G [] A unloaded A* load B unloaded B* load C D E F H L M Weight [kg] 07 311 001 HS 7 500
More informationDESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface.
2399 PAVEMENT SURFACE SMOOTHNESS 2399.1 DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface. A Definitions The Department defines Smoothness as the Mean
More informationShoulder Ballast Cleaning Effectiveness
Shoulder Ballast Cleaning Effectiveness Word count: 3539 ABSTRACT AREMA 2015 Annual Conference 4 October 7 October 2015 Minneapolis, MN Scott Diercks Loram Maintenance of Way, Inc. 3900 Arrowhead Drive
More informationPN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road
More informationUSING LCC MODELLING TO DETERMINE THE BEST TRACK CHOICE : Minimising Life-Cycle Costs Whilst Maintaining Reliability
USING LCC MODELLING TO DETERMINE THE BEST TRACK CHOICE : Minimising Life-Cycle Costs Whilst Maintaining Reliability Dr Marc ANTONI USING LCC MODELLING TO DETERMINE THE BEST TRACK CHOICE : Minimising Life-Cycle
More informationSECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS
SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS 602.01 General 1. This specification establishes a standard for Portland cement concrete pavement smoothness, and defines defective pavement smoothness.
More informationCouncil of the European Union Brussels, 18 July 2014 (OR. en)
Council of the European Union Brussels, 18 July 2014 (OR. en) 11933/14 ADD 1 TRANS 368 COVER NOTE From: European Commission date of receipt: 9 July 2014 To: General Secretariat of the Council No. Cion
More informationSECTION 8 RAIL FREIGHT VEHICLE UNDERFRAME AND BODY STRUCTURES
SECTION 8 RAIL FREIGHT VEHICLE UNDERFRAME AND BODY STRUCTURES ROA MANUAL SCHEDULE OF AMENDMENTS SECTION 8 AMENDMENT NUMBER PAGES AMENDED AMENDMENT SUMMARY DATE ISSUED Portions of this Section of the ROA
More informationDRIVE OF CIRCULAR CLARIFIERS FOR SUSPENDED SOLIDS WITH THE HELP OF LINEAR ELECTRIC MOTORS
Annals of the University of Petroşani, Mechanical Engineering, 11 (2009), 205-210 205 DRIVE OF CIRCULAR CLARIFIERS FOR SUSPENDED SOLIDS WITH THE HELP OF LINEAR ELECTRIC MOTORS HORIA SIMASCHEVICI 1, SORIN
More informationTechnical specification Slipform Pavers Model Series SP 80. SP 81 SP 81 i SP 82 SP 82 i SP 84 SP 84 i
Technical specification Slipform Pavers Model Series SP 80 SP 81 SP 81 i SP 82 SP 82 i SP 84 SP 84 i SP 81 SP 81 i Slipform paver of the SP 80 model series in offset configuration Slipform pavers SP 81
More informationVALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur DEPARTMENT OF CIVIL ENGINEERING SUBJECT NAME: HIGHWAY ENGINEERING
VALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur 603 203 DEPARTMENT OF CIVIL ENGINEERING SUBJECT CODE: CE6504 SUBJECT NAME: HIGHWAY ENGINEERING YEAR: III SEM : V QUESTION BANK (As per Anna University
More informationDIVISION V SURFACINGS AND PAVEMENTS
36-3.01 GENERAL DIVISION V SURFACINGS AND PAVEMENTS 36 GENERAL 04-20-18 Replace section 36-3 with: 36-3 PAVEMENT SMOOTHNESS 36-3.01A Summary Section 36-3 includes specifications for measuring the smoothness
More informationSECTIO N 610 PAVEMENT SMO O THNESS
SECTIO N 610 PAVEMENT SMO O THNESS 610.1 Description. This work shall consist of measuring the smoothness of the final pavement surface. Smoothness shall be measured using the International Roughness Index
More informationMobile recleanable HEPA filter units for a flow of m 3 / h
Mobile recleanable HEPA filter units for a flow of 3.000 m 3 / h Page 1/11 consisting of Mobile online recleanable HEPA filter block, Type M-RHF hightec 1 x 2 and Mobile air conveyor block, Page 2/11 RHF
More informationSINGLE SIDED SAFETY BARRIER ON GROUND H2-W4-A (3n35975)
SINGLE SIDED SAFETY BARRIER ON GROUND H2-W4-A (3n397) Performance Containment level Acceleration Severity Index ASI Working width Extreme lateral position of the vehicle Dynamic deflection H2 A W4 (1.30
More informationREMAWELL. REMA TIP TOP Sidewall Conveyor Belts
REMA TIP TOP Sidewall Conveyor Belts REMAWELL Industrie Chemische Beständigkeitsliste Chemical resistance chart Tableau de résistance chimique Tabla de resistencia quimica Industrie Service and maintenance
More informationBasic introduction to Points Page 1 of 12 Uncontrolled document for information only see disclaimer** on last page
Basic introduction to Points Page 1 of 12 Uncontrolled document for information only see disclaimer** on last page Points are used to enable trains to switch tracks from one to another or into a station
More informationSwitch design optimisation: Optimisation of track gauge and track stiffness
1 Switch design optimisation: Optimisation of track gauge and track stiffness Elias Kassa Professor, Phd Department of Civil and Transport Engineering, NTNU Trondheim, Norway E-mail: elias.kassa@ntnu.no
More informationБерг АБ Тел. (495) , факс (495)
AUTOMATION Linear- and Rotary Modules Table of Contents 1 Product Overview............................................. 4 1.1 Selection of the Linear Modules................................. 8 1.2 Selection
More informationAxle Load Checkpoints (ALC) in Denmark
Axle Load Checkpoints (ALC) in Denmark 21.05.2013 Presented by Tom E. Thøgersen, Banedanmark, Teknisk Drift IT - Transition & Integration The Annual Danish Rail Convention 2013 Introductions Wheel/rail
More informationMAAG TM WPU two-stage gear unit for vertical mills
MAAG TM WPU two-stage gear unit for vertical mills 2 Our Quality Policy FLSmidth MAAG Gear is committed to creating long lasting relationships that establish us as a trustworthy, reliable and professional
More informationpanelclaw.com Polar Bear III for 10 Degree
panelclaw.com Polar Bear III for 10 Degree Installation Manual Document Number 9910024 Rev A March 2014 Revision History Rev ECO # Date Description of Changes Approved By 01 TBD 02-FEB-14 Initial Draft
More informationINDUSTRIES (Pty)Ltd MOBILE MIXING PLANTS M1 M2,25. CONTACT : Allan Pletschke CELL :
INDUSTRIES (Pty)Ltd MOBILE MIXING PLANTS M1 M2,25 CONTACT : Allan Pletschke CELL : 082 450 2258 SCHWING-STETTER MOVES CONCRETE. WORLDWIDE. Wherever concrete is produced and moved is where you will find
More informationDynamic responses of railway bridge ends: A systems performance improvement by application of ballast glue/bond
Massachusetts Institute of Technology From the SelectedWorks of Sakdirat Kaewunruen April, 2014 Dynamic responses of railway bridge ends: A systems performance improvement by application of ballast glue/bond
More informationBalancing and over-speed testing of flexible rotors
Balancing and over-speed testing of flexible rotors Installations for low- and high-speed balancing and for over-speed testing HS 16 - HS 34 Application Balancing of flexible rotors from turbo-machinery
More informationHS2 A National Strategy for High Speed Rail. Tim Smart Head of Engineering & Operations HS2 Ltd
HS2 A National Strategy for High Speed Rail Tim Smart Head of Engineering & Operations HS2 Ltd Agenda 1. HS2 New National Backbone Why the UK needs HS2 The HS2 Route Hybrid Bill 2. Engineering the Route
More informationRemanufactured Bearings. Like-New Quality at Substantial Savings.
Remanufactured Bearings Like-New Quality at Substantial Savings www.kaydonbearings.com Remanufactured Bearings to reduce operating costs Comprehensive and Cost-Effective When the bearings in your equipment
More informationSuggested improvements to existing decanting station at Anna stadium Trichy
Suggested improvements to existing decanting station at Anna stadium Trichy April 2018 TECHNICAL SUPPORT UNIT: IN ASSOCIATION WITH: Document History and Status Sheet S. No. Issue Issued by Issued Date
More informationZERO SERVICE. Services designed for SERVICES AND DOCUMENTS. Technical specification TRUCK SCALES
SERVICES AND DOCUMENTS TRUCK SCALES Technical specification Pay a dynamic view to the scales: huge amounts of goods crosses them every year and the footprint of each transaction carries the mark of warranty
More informationPROJ. NO SECTION HYDRONIC PUMPS
SECTION 23 21 23 HYDRONIC PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationFLOOR TYPE HORIZONTAL MILLING MACHINES
FLOOR TYPE HORIZONTAL MILLING MACHINES TARGET AND APPLICATION 2 AEROSPACE DIE & MOLD EARTH MOVING ENERGY OIL & GAS GENERAL MACHINING PAMA Speedmill is the ideal solution for all application requiring high
More informationInnovative designs and methods for VHST 2 nd Dissemination Event, Brussels 3 rd November 2016
Capacity for Rail Innovative designs and methods for VHST 2 nd Dissemination Event, Brussels 3 rd November 2016 Miguel Rodríguez Plaza Adif Introduction C4R WP 1.2: VHST 2 Objectives: To identify market
More informationGEARS. A longer lifetime for your crane. The Konecranes promise of quality. Maximizing safety with good design
Did you know? Gears Motors Controls CONTACT GEARS A longer lifetime for your crane The Konecranes promise of quality Maximizing safety with good design Technical details: Helical gear structure A LONGER
More informationEnglish version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface
English version of Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr. 1127 af 30. november 2012) Preface Please note that the English version is for informational
More informationTRADE EXPERIENCE LOG BOOK CANADIAN PETROLEUM CONTRACTORS ASSOCIATION. Petroleum Mechanic Training & Certification
CANADIAN PETROLEUM CONTRACTORS ASSOCIATION Petroleum Mechanic Training & Certification TRADE EXPERIENCE LOG BOOK PM1 - Service & Maintenance PM2 - Underground Installation PM3 - Aboveground Installation
More informationDESIGN AND FABRICATION OF MULTIROD BENDING MACHINE
DESIGN AND FABRICATION OF MULTIROD BENDING MACHINE C. Anbumeenakshi 1, M.R.Thansekhar 2, Thanamani.M 3, Santhoshkumar.R 4, Parivallal.S 5, Senthilkumar.K 6 1 Assistant Professor, 2 Professor, 3,4,5,6 UG
More informationSelection BASIC LINE BASIC LINE PLUS VARIO LINE SERIES TUBE LINE STEEL LINE
PLUS 250 Extremely robust and stable steel chains* PLUS Extremely robust and stable steel chains for heavy mechanical loads and harsh environmental conditions Very long unsupported lengths also for large
More informationOfficial calculation method to be used, when new railway lines, tram lines and shunting yards are to be built or renewed
- Basics Official calculation method to be used, when new railway lines, tram lines and shunting yards are to be built or renewed Steering comitee: Ministry of transport Project - management: DB Systemtechnik
More informationBART Wheel Profile Change
BART Wheel Profile Change Cylindrical to Modified Tapered Ben Holland, P.E., Manager Vehicle Systems Engineering Rolling Stock & Shops Gregory Shivy Principal Track Engineer Maintenance & Engineering 1
More informationRailway noise mitigation factsheet 01: Overview of railway noise
Railway noise mitigation factsheet 01: Overview of railway noise 1.1 Noise sources and indicative noise levels Exterior noise sources on high-speed trains can be broadly categorised as follows and are
More informationNZQA unit standard version 5 Page 1 of 6. Demonstrate knowledge of engine design factors and machining practices
Page 1 of 6 Title Demonstrate knowledge of engine design factors and machining practices Level 4 Credits 20 Purpose People credited with this unit standard are able to demonstrate knowledge of engine design
More informationSAFETY ARTIC TIPPER GUIDANCE - PREVENTING OVERTURNS LAFARGETARMAC.COM
SAFETY ARTIC TIPPER GUIDANCE - PREVENTING OVERTURNS LAFARGETARMAC.COM DRIVING SAFETY SAFETY Lafarge Tarmac loads approximately 8500 deliveries each week on articulated vehicles. The safe delivery of product
More informationSubmersible Borehole Pump. UPAchrom. 4", UPAchrom 100 CC + DN 100. Type Series Booklet
Submersible Borehole Pump UPAchrom 4", UPAchrom 1 CC + DN 1 Type Series Booklet Legal information/copyright Type Series Booklet UPAchrom All rights reserved. The contents provided herein must neither be
More informationTITLE: Drainage, Better Drainage, and More Drainage PRESENTER: DARRELL D. CANTRELL CANTRELL RAIL SERVICES, INC VICE PRESIDENT ENGINEERING
TITLE: Drainage, Better Drainage, and More Drainage PRESENTER: DARRELL D. CANTRELL CANTRELL RAIL SERVICES, INC VICE PRESIDENT ENGINEERING AREMA CONFERENCE- SEPTEMBER 23, 2009 INTRODUCTION Most of the heavy
More informationUser Guide Rail Joint Straightener
User Guide Rail Joint Straightener Permaquip Ltd Brierley Industrial Park, Stanton Hill, Sutton-In-Ashfield, Nottinghamshire, NG17 3JZ Tel: +44 (0) 1623 513349 Fax: +44 (0) 1623 517742 E-mail: sales@permaquip.co.uk
More informationUser Guide Rail Scooter
User Guide Rail Scooter Permaquip Ltd Brierley Industrial Park, Stanton Hill, Sutton-In-Ashfield, Nottinghamshire, NG17 3JZ Tel: +44 (0) 1623 513349 Fax: +44 (0) 1623 517742 E-mail: sales@permaquip.co.uk
More informationCOOPERATIVE PATENT CLASSIFICATION
CPC E COOPERATIVE PATENT CLASSIFICATION FIXED CONSTRUCTIONS BUILDING E01 CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES (of tunnels E21D) PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF
More informationRAILWAY INVESTIGATION REPORT R00W0106 MAIN TRACK DERAILMENT
RAILWAY INVESTIGATION REPORT R00W0106 MAIN TRACK DERAILMENT CANADIAN NATIONAL FREIGHT TRAIN NO. E20531-15 MILE 154.4, REDDITT SUBDIVISION WHITE, ONTARIO 16 MAY 2000 The Transportation Safety Board of Canada
More informationMonitoring of switches & crossings (turnouts) and tracks
Monitoring of switches & crossings (turnouts) and tracks Elias Kassa, Amund Skavhaug Norwegian University of Science and Technology Amir M. Kaynia NGI Outline Background Analysis of turnout failure statistics
More informationThe Acoustic Effectiveness of Low Height Noise Barrier
The Acoustic Effectiveness of Low Height Noise Barrier Petra ČÍŽKOVÁ CTU in Prague, Faculty of Civil Engineering, Czech Republic ABSTRACT The paper deals with the description and verification of a low
More informationThe noise-absorber system. the gentle track. TRACK DAMPING SYSTEMS for highest demands.
The noise-absorber system. the gentle track. TRACK DAMPING SYSTEMS for highest demands. 01. APPlication STRAILastic_A - noise Absorber. STRAILastic_A synth & inox absorbers are rail dampers which reduce
More informationDemolition Attachments
Demolition Attachments SMC Series Multi - Crushers SUP Series Multi - processors SRG Series Demolition grabs Mini - Series Mini - Crushers Pulverizers Posher Series Pulverizers Demolition Attachments-2006.01
More informationDIN EN : (E)
DIN EN 13480-3:2017-12 (E) Metallic industrial piping - Part 3: Design and calculation Contents Page European foreword... 10 1 Scope... 12 2 Normative references... 12 3 Terms, definitions, symbols and
More informationHEAVY HAUL TURNOUT SYSTEMS INNOVATIVE WEICHENSYSTEME. voestalpine VAE Führend bei Weichen und Signaltechnik Strong turnout system solutions
IMG_VAE HH_VAE _2 HEAVY HAUL TURNOUT SYSTEMS INNOVATIVE WEICHENSYSTEME voestalpine VAE Führend bei Weichen und Signaltechnik Strong turnout system solutions voestalpine VAE GmbH www.voestalpine.com/vae
More informationITEM 585 RIDE QUALITY FOR PAVEMENT SURFACES Description. Measure and evaluate the ride quality of pavement surfaces.
ITEM 585 RIDE QUALITY FOR PAVEMENT SURFACES 585.1. Description. Measure and evaluate the ride quality of pavement surfaces. 585.2. Equipment. A. Surface Test Type A. Provide a 10-ft. straightedge. B. Surface
More informationE17M ROLLING STOCK BRAKES
E17M ROLLING STOCK BRAKES PURPOSE AND SCOPE The purpose of this Procedure is to advise Laing O Rourke personnel of the braking standards to be applied and to ensure those people involved in maintaining
More informationMethodologies and practices for non-piggable lines Andreas Landsteiner Integrity Department - Transalpine Pipeline (TAL)
Methodologies and practices for non-piggable lines Andreas Landsteiner Integrity Department - Transalpine Pipeline (TAL) COPEX 2010 Brussels 1 Presentation overview (1) What are non-piggable lines? (2)
More informationInnovative Solutions
Innovative Solutions 2 1 MK4 Introduction mk MK4 Elastomeric Bearings are deformable structural components constructed partially or wholly from elastomer. They are essentially designed to transmit vertical
More informationFatigue properties of railway axles: new results of full-scale specimens
Fatigue properties of railway axles: new results of full-scale specimens Steven Cervello Lucchini RS, Italy TC24 Meeting Advances in: Axle Durability Analysis and Maintenance Politecnico di Milano 1-2
More informationReport for CSP Joint Venture Click to edit Master text styles Second level Third level. Fifth level
Report for CSP Joint Venture Click to edit Master text styles Second level Third level Out of service examination, ultrasonic thickness Fourth survey and level paint evaluation for tanks T221 & T222 Fifth
More informationMalaysian Journal of Civil Engineering 29(2): (2017) *Corresponding Author:
Malaysian Journal of Civil Engineering 29(2):145-156 (2017) ANALYSIS OF BALLASTLESS RAILWAY TRACK STRUCTURES OVER SOFT CLAYS Mohamed Ismail Aly 1 *, Mohamed El-Shabrawy 2, Mohamed El Gendy 1 & Ahmed Adel
More informationData Sheet WÖHR PARKING PLATFORM 501
Data Sheet WÖHR PARKING PLATFORM 501 For lateral shunting. Suitable for condominium and office buildings. Dimensions in cm. Load per parking place max. 2000 kg (max. wheel load 500 kg). 500 500 90 *safety
More informationSelection BASIC LINE BASIC LINE PLUS VARIO LINE SERIES TUBE LINE
PLUS 332 - Steel cable carriers solutions for extreme applications PLUS Robust design for heavy mechanical loads High additional loads and long unsupported lengths possible Best suited for extreme and
More informationThe Use of Falling-Weight Deflectometers in Determining Critical Velocity Problems. Craig Govan, URS, Trackbed Technology
The Use of Falling-Weight Deflectometers in Determining Critical Velocity Problems Craig Govan, URS, Trackbed Technology Railway Track Science & Engineering Workshop, UIC, Paris December 5th, 2013 Content
More informationStorvik HAL Compactor
Storvik HAL Compactor Gunnar T. Gravem 1, Amund Bjerkholt 2, Dag Herman Andersen 3 1. Position, Senior Vice President, Storvik AS, Sunndalsoera, Norway 2. Position, Managing Director, Heggset Engineering
More informationCNC TURNING CENTRES B650-M-SM-Y-YS B658-M-SM-Y-YS
CNC TURNING CENTRES B6-M-SM-Y-YS B658-M-SM-Y-YS Cutting edge technology and unequalled productivity. B6-B658 2-3 Machine configurations. The re-styled B6/B658 series represents the state of the art of
More informationSiemens AG Synchronous linear motor 1FN6. The electrical gear rack. Brochure September Motors
The electrical gear rack Brochure September 2008 Motors Overview Linear motors are preferred for applications with linear axes in machine and plant engineering with stringent requirements for dynamic response
More information