1 WILMAPCO Annual Listing of Obligated Projects, FY 2013 The Annual Listing of Obligated Projects includes all projects listed in the Transportation Improvement Program (TIP) for which federal funds were obligated during the preceding federal program year by the Delaware Department of Transportation (DelDOT) or Maryland Department of Transportation (MDOT). The Annual Listing is intended to demonstrate transportation spending decisions by providing an accounting for federal funds that have been authorized and committed by the state or designated recipients for expenditure on projects programmed in the TIP. In addition to this introduction, the Annual Listing report includes reports submitted by DelDOT and MDOT. This listing is done to implement the requirement from MAP 21 that Metropolitan Planning Organizations publish an annual listing of obligated projects. Federal transportation law states: 23 CFR Annual listing of obligated projects. a) In metropolitan planning areas, on an annual basis, no later than 90 calendar days following the end of the program year, the State, public transportation operator(s), and the MPO shall cooperatively develop a listing of projects (including investments in pedestrian walkways and bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were obligated in the preceding program year. b) The listing shall be prepared in accordance with (a) and shall include all federally funded projects authorized or revised to increase obligations in the preceding program year, and shall at a minimum include the TIP information under (e)(1) and (4) and identify, for each project, the amount of Federal funds requested in the TIP, the Federal funding that was obligated during the preceding year, and the Federal funding remaining and available for subsequent years. c) The listing shall be published or otherwise made available in accordance with the MPO s public participation criteria for the TIP. Contents MDOT FY 2013 Obligated Project Listing... 2 DelDOT FY 2013 Obligated Project Listing... 3 DelDOT Federal Funding Code Balance DelDOT Federal Funding Codes WILMAPCO Annual Listing of Obligated Projects 1

2 MDOT FY 2013 Obligated Project Listing Safety and Spot Improvements (Funds 23, 27, 30, 32, 33, 75, 76, 79, 85 and 87) MD0273 AT APPLETON ROAD 320,000 MD0273 AT BLUE BALL ROAD 360,000 AT VARIOUS LOCATIONS IN DISTRICT 2 1,445,655 MODIFICATION/INSTALLATION/RECONSTRUCTION OF TRAFFIC SIGNALS IN DISTRICTS 1 & 2 500,000 VARIOUS LOCATIONS IN DISTRICT 2 1,445,655 VARIOUS LOCATIONS IN DISTRICTS 1 & 2 100,000 VARIOUS LOCATIONS IN DISTRICTS 1 & 2 500,000 TOTAL 4,671,310 Bridge Replacement and Rehabilitation (Fund 80) MD0545 BRIDGE OVER LITTLE ELK CREEK 1,806,555 MD0272 BRIDGE 7036 OVER AMTRAK 613,627 TOTAL 2,420,182 * This information is based on the State Fiscal Year 2013 (July 2012 to June 2013) Some projects grouped by State Highway Administration District. Projects for District 2 include: Caroline County, Cecil County, Kent County, Queen Anne's County, and Talbot County. Projects for District 1 and 2 also include: Dorchester County, Wicomico County, Worcester County and Somerset County WILMAPCO Annual Listing of Obligated Projects 2

3 STATE PROGRAM PROJECT FEDERAL APPORT PROJECT TOLL FED $ NUMBER FUNDS CODE TITLE REASON CREDITS AUTH L40E BIKE PEDESTRIAN PE,ROW,CONS 472, T L40E INDUSTRIAL TRACK GREENWAY PHASE III PD 132, ,000, L1CE BRIDGE PRESERVATION PE,ROW,CONS 104, M001 BRIDGE PRESERVATION PE,ROW,CONS 691, L11E BRIDGE PRESERVATION PE,ROW,CONS 238, ,400, M001 BRIDGE MANAGEMENT PE,ROW,CONS 1,353, L110 BRIDGE MANAGEMENT PE,ROW,CONS 4, Q120 BRIDGE MANAGEMENT PE,ROW,CONS 88, L1ZR BRIDGE MANAGEMENT PE,ROW,CONS 408, H1C0 BRIDGE MANAGEMENT PE,ROW,CONS 22, T , L110 BR1 032 ON N203 FOULK ROAD OVER SOUTH BRANCH ROW T , L1C0 BR1 112 ON N257 YORKLYN ROAD OVER RED CLAY CREEK PE T L11E BR1 159 ON JAMES STREET OVER CHRISTINA RIVER CONS 1,600, T L1CE BR1 159 ON JAMES STREET OVER CHRISTINA RIVER CONS 2,400, T L11E BR1 159 ON JAMES STREET OVER CHRISTINA RIVER TOLL CREDITS CONS 1,000, T L110 BR1 274 ON N312 WEDGEWOOD RD. ROW 5, L110 BR1 274 ON N312 WEDGEWOOD RD TOLL CREDITS. ROW T 1, T L1CE BR ON SR299 MAIN STREET OVER APPOQUINIMINK RIVER PE STIP MOD 160, L24E BR1 501, 501A,501B SR141 VIADUCT OVER SR4 CONVERT 4,000, L230 BR1 501, 501A,501B SR141 VIADUCT OVER SR4 CONVERT 1,720, T L23E BR1 501, 501A,501B SR141 VIADUCT OVER SR4 CONT STIP MOD 592, T L1CE BR1 543 ON N213 CARR ROAD OVER SHELLPOT CREEK PE 29, T L1C0 BR1 585 ON AUGUSTINE CUTOFF CONS 2,407, T M001 BR1 665N & 1 665S ON US 13 OVER ROW 8, T M001 BR1 665N & 1 665S ON US 13 OVER CONS STIP MOD 3,486, T M001 BR1 665N & 1 665S ON US 13 OVER TOLL CREDITS CONS STIP MOD T 871, T M001 BR N & S ON I 495 OVER STONEY CREEK CONS STIP MOD 2,172, T M001 BR N & S ON I 495 OVER STONEY CREEK TOLL CREDITS CONS STIP MOD T 543, T L1C0 BR 1 687, 1 688, 1 693, SOUTH WALNUT ST, SOUTH MARKET ST, AND FOURTH ST. CONT STIP MOD 656, OVER CHRISTINA RIVER T L1C0 BR 1 687, 1 688, 1 693, SOUTH WALNUT ST, SOUTH MARKET ST, AND FOURTH ST. CONT STIP MOD T 164, OVER CHRISTINA RIVER TOLL CREDITS T M233 BR ON N009 12TH STREET OVER NORFOLK SOUTHERN RR PE 8, LY20 COMMUTER RAIL NEWARK TO WILMINGTON LY30 COMMUTER RAIL MIDDLETOWN TO NEWARK , M480 DISADVANTAGED BUSINESS ENTERPRISE 61, M439 EDUCATION AND TRAINING 200, , L24E ENVIRONMENTAL IMPROVEMENTS ENV 18, , LS20 SAFETY IMPROVEMENT PROGRAM RURAL ROADS PE,ROW,CONS 139, LS20 SAFETY IMPROVEMENT PROGRAM RURAL ROADS TOLL CREDITS PE,ROW,CONS T 27, ,200, MS30 SAFETY IMPROVEMENT PROGRAM PE,ROW,CONS 1,804, T MS30 RUMBLE STRIPS TRAFFIC 1,616, WILMAPCO Annual Listing of Obligated Projects 3

4 STATE PROGRAM PROJECT FEDERAL APPORT PROJECT TOLL FED $ NUMBER FUNDS CODE TITLE REASON CREDITS AUTH 2,200, LS30 HIGHWAY SAFETY IMPROVEMENT PROGRAM, 11407,4050,3200 PE,ROW,CONS 5,135, ,035, LS30 HSIP CONS T LZ1E CHURCHMANN'S ROAD CHRISTIANA HOSPITAL TO SR 1 ROW 16, T LZ1E CHURCHMANN'S ROAD CHRISTIANA HOSPITAL TO SR 1 CONS 1,360, T LS30 FOULK & WILSON ROAD CONS 870, T ,200, LS3E I 95 CARR ROAD AND MARSH ROAD ROW 40, T L23E I 95 CARR ROAD AND MARSH ROAD CONS 2,800, L23E LEA BOULEVARD TATNALL STREET TO MARKET STREET CONS 1,440, T MS30 MILL CREEK AND STONEY BATTER ROAD CONS 1,958, T LS3E MILL CREEK AND STONEY BATTER ROAD CONS 537, T MS30 MILL CREEK AND STONEY BATTER ROAD TOLL CREDIT CONS 277, T , LS3E OLD BALTIMORE PIKE & SALEM CHURCH PE T , MS30 SR2 PIKE CREEK ROAD TO WOODMILL DRIVE PE T , MS30 SR72 AND OLD BALTIMORE PIKE INTERSECTION PE MS30 SR273 AND HARMONY ROAD INTERSECTION PE 521, L24E SR273 AND HARMONY ROAD INTERSECTION ROW 464, T ,960, L240 SR273 AND HARMONY ROAD INTERSECTION CONS T LS3E SR 273, APPLEBY AND AIRPORT ROAD PE 200, MS30 SR 273, APPLEBY AND AIRPORT ROAD ROW 450, T , LS3E SR 7 AT SKYLINE DRIVE/MERMAID STONEY BATTER ROAD PE T MS30 SALEM CHURCH ROAD AT CHRISTIANA HIGH SCHOOL PE 9, T LS30 SALEM CHURCH ROAD AT CHRISTIANA HIGH SCHOOL PE 3, T MS30 SALEM CHURCH ROAD AT CHRISTIANA HIGH SCHOOL ROW ADDED 9, /21 MS30 SR71, OLD PORTER ROAD TO SR 7 ROW 396, T LS3E SR71, OLD PORTER ROAD TO SR 7 CONS 500, T MS30 SR896 AND OLD CHESTNUT HILL ROAD INTERSECTION ROW 31, MS30 SR896 AND OLD CHESTNUT HILL ROAD INTERSECTION CONS 495, T LS30 SR896 AND OLD CHESTNUT HILL ROAD INTERSECTION ROW ADDED 40, /16 T , LS3E SR896 AND PORTER ROAD INTERSECTION PE T MS30 HEP, I495 AT PHILADELPHIA PIKE PE 13, MS30 HEP, US40 AT GLASGOW AVENUE PE 22, L05E I 95 AND SR141 RAMPS G & F IMPROVEMENTS PE 800, T LY20 CHRISTINA RIVER BRIDGE AND APPROACHES PE 1,040, LY20 CHRISTINA RIVER CROSSING TOLL CREDITS PE T 260, T HY20 CHRISTINA RIVER BRIDGE AND APPROACHES ROW 3,421, LY20 CHRISTINA RIVER BRIDGE AND APPROACHES ROW 5,538, LY20 CHRISTINA RIVER CROSSING TOLL CREDITS ROW T 2,240, ,800, L010 I 495 LIGHTING L01E INTERSTATE DRAINAGE REPAIR CONS 1,800, L01E INTERSTATE OPEN END DRAINAGE TOLL CREDITS CONS T 200, WILMAPCO Annual Listing of Obligated Projects 4

5 STATE PROGRAM PROJECT FEDERAL APPORT PROJECT TOLL FED $ NUMBER FUNDS CODE TITLE REASON CREDITS AUTH L01E INTERSTATE STRUCTURE MAINTENANCE CONS 3,600, L01E INTERSTATE REPLACEMENT OF SIGN STRUCTURES CONS 3,000, L24E INTERSECTION IMPROVEMENTS CONS 800, L24E INTERSECTION IMPROVEMENTS CONS 800, L24E INTERSECTION IMPROVEMENTS TOLL CREDITS CONS T 200, L24E STATEWIDE TRAFFIC SIGNAL RELAMPING CONVERT 1,000, L01E INTERSTATE BRIDGE MAINTENANCE SOUTH CONS STIP MOD 1,288, L01E INTERSTATE BRIDGE MAINTENANCE SOUTH CONS STIP MOD 143,200.00???? TITLE L01E INTERSTATE BRIDGE MAINTENANCE SOUTH CONS 3,526, M001 INTERSTATE ROADWAY LIGHTING CONS 1,800, , E PLANNING LOCAL TRANSPORTATION ASSISTANCE PLAN PROGRAM L450 PLANNING METROPOLITAN PLANNING ORGANIZATION PLAN 772, /FHWA T ,472, L45E PLANNING METROPOLITAN PLANNING ORGANIZATION PLAN 217, /FHWA T M450 PLANNING METROPOLITAN PLANNING ORGANIZATION PLAN 483, /FHWA 472, L40E MID COUNTY DMV FACILITY PE 5,490, L40E MID COUNTY DMV FACILITY CONS 2,200, M400 MID COUNTY DMV FACILITY CONS 4,700, , LT30 MOTOR FUEL TAX COMPLIANCE AND ANTI TAX EVASION PRO L01E NORTH DISTRICT OPEN END DRAINAGE 1,800, L010 NORTH DISTRICT STRUCTURAL MAINTENANCE 3,600, M490 ON THE JOB TRAINING SUPPORTIVE SERVICES 36, ,800, L20E PAVEMENT REHABILITATIONS CONS 2,200, M001 PAVEMENT REHABILITATIONS CONS 142, M001 PAVEMENT REHABILITATIONS CONS 578, M001 PAVEMENT REHABILITATIONS TOLL CREDITS CONS T 144, M001 PAVEMENT REHABILITATIONS CONS 1,000, M001 PAVEMENT REHABILITATIONS TOLL CREDITS CONS T 250, M230 PAVEMENT REHABILITATIONS CONS 5,381, L24E PAVEMENT REHABILITATIONS CONS 4,806, L25E PAVEMENT REHABILITATIONS CONS 4,800, T M230 PAVE & REHAB CONS 3,915, T M230 PAVE & REHAB TOLL CREDITS CONS 978, T M231 PAVE & REHAB CONS 2,076, T M231 PAVE & REHAB TOLL CREDITS CONS 519, T L25E PAVE & REHAB CONS 4,800, T M232 PAVE & REHAB CONS 2,296, T L24E PAVE & REHAB TOLL CREDITS CONS T 1,774, T M001 PAVE & REHAB CONS 5,805, WILMAPCO Annual Listing of Obligated Projects 5

6 STATE PROGRAM PROJECT FEDERAL APPORT PROJECT TOLL FED $ NUMBER FUNDS CODE TITLE REASON CREDITS AUTH T M001 PAVE & REHAB TOLL CREDITS CONS T 1,451, ,975, L55E PLANNNING STATEWIDE & REGIONAL PLANNING PLAN 912, M550 PLANNNING STATEWIDE & REGIONAL PLANNING PLAN 1,063, , L56E PLANNNING STATEWIDE & REGIONAL PLANNING PLAN 416, M560 PLANNNING STATEWIDE & REGIONAL PLANNING PLAN 246, LY30 POMEROY BIKE TRAIL LS5E RAIL CROSSING SAFETY PD 81, , LS40 RAIL CROSSING SAFETY CONS 161, T , LS40 RAIL CROSSING SAFETY TOLL CREDITS CONS T 18, , LS5E RAIL CROSSING SAFETY CONS 75, , L94E REC TRAILS 986, , LU1E SAFE ROUTES TO SCHOOL PLAN 35, , LU2E SAFE ROUTES TO SCHOOL CONS 222, T , LU3E SAFE ROUTES TO SCHOOL CONS 81, LU20 SAFE ROUTES TO SCHOOL PE 16, T LU20 SAFE ROUTES TO SCHOOL, CLAYMONT, MT PLEASANT, AND EDISONS SCHOOLS AWARD 59, T MS31 SECTION 154 PENALTY TRANSFER PROGRAM CONS 854, T , M001 SIGNAGE & PAVEMENT MARKINGS CONS M001 SR 1 FROM TYBOUTS CORNER TO SR273 ROW 800, T MS31 SR 1 HIGH TENSION CABLE BARRIER CONS 1,409, T L01E SR1/I 95 INTERCHANGE STIP MOD 2,400, , L01E SR1/I 95 INTERCHANGE CONVERT 999, H020 SR1/I 95 INTERCHANGE CONVERT 1,200, LZ1E SR1/I 95 INTERCHANGE CONVERT 2,221, LZ1R SR1/I 95 INTERCHANGE CONVERT 1,998, ,000, L05E SR1/I 95 INTERCHANGE CONVERT 11,400, M001 SR1/I 95 INTERCHANGE CONVERT 330, ,000, L23E SR1/I 95 INTERCHANGE CONVERT 4,000, L23E SR1/I 95 INTERCHANGE CONVERT 6,089, L24E SR1/I 95 INTERCHANGE CONVERT 1,100, T M001 SR1/I 95 INTERCHANGE CONT INC 7,655, T , L49E TECHNOLOGY SUMMER INTERN PROGRAM 44, M230 N54 HOWELL SCHOOL ROAD ROW 800, M230 N54 HOWELL SCHOOL ROAD TOLL CREDITS ROW T 200, T , M230 ROAD A/SR 7 IMPROVEMENTS PE L050 SR1 TRUCK WEIGH STATION CONS L230 SR4 CHRISTIANA PARKWAY CONS M230 SR141 SR2 KIRKWOOD HGY TO FAULKLAND RD LANDSCAPING 254, , L40E RIDESHARE TRANSPORTATION MANAGEMENT PLAN 360, IMPROVEMENTS L40E 40' HEAVY DUTY LOW FLOOR BUSES PRO 6,246, WILMAPCO Annual Listing of Obligated Projects 6

7 STATE PROGRAM PROJECT FEDERAL APPORT PROJECT TOLL FED $ NUMBER FUNDS CODE TITLE REASON CREDITS AUTH Q400 40' HEAVY DUTY LOW FLOOR BUSES PRO 1,000, L400 40' HEAVY DUTY LOW FLOOR BUSES PRO 1,000, M400 40' HEAVY DUTY LOW FLOOR BUSES TOLL CREDIT PRO T 2,061, M400 30' LOW FLOOR BUS NEW CASTLE COUNTY PRO 652, , L40E 40' LOW FLOOR MIDDLETOWN/NEWARK VIA GLASGLOW PRO ,429, L400 45' OVER THE ROAD SR 141 CROSSTOWN PRO 981, , M400 PARATRANSIT REPLACEMENT SUSSEX PRO 381, ,400, L22E TRANSPORTATION ENHANCEMENTS FHWA 667, , L22E TRANSPORTATION ENHANCEMENTS FHWA TOLL CREDITS T 212, T M301 GREENHILL AVENUE STREETSCAPE IMPROVEMENTS CON T 673, ,240, M240 TRANSPORTATION MANAGEMENT IMPROVEMENTS 5,829, L24E TRANSPORTATION MANAGEMENT IMPROVEMENTS 1,600, L24E TRANSPORTATION MANAGEMENT IMPROVEMENTS TOLL CREDITS T 400, T Q400 DELTRAC STATEWIDE PROJECTS CONS 1,200, T L400 DELTRAC STATEWIDE PROJECTS TOLL CREDITS CONS T 300, T M240 DELTRAC SIGNAL INITIATIVES CONS 2,800, LY20 U OF DELAWARE BIKE & PEDESTRIAN PATH LY30 U OF DELAWARE FUEL CELL 7,000, L230 US 13, PHILADELPHIA PIKE, CLAYMONT TRANSPORTATION PLAN IMPLEMENTATION CONS T M001 ROAD A/SR 7/CENTER BLVD INTERSECTION IMPROVEMENTS CONS 1,526, T M001 ROAD A/SR 7/CENTER BLVD INTERSECTION IMPROVEMENTS TOLL CREDITS CONS 381, L050 US 40, PULASKI HIGHWAY & SR 72, WRANGLE HILL ROAD (INCLUDES DEL LAWS ROAD INTERSECTION) L05E US 40, PULASKI HIGHWAY & SR 72, WRANGLE HILL ROAD (INCLUDES DEL LAWS ROAD STIP MOD 160, INTERSECTION) T L05E US 301, MARYLAND STATE LINE TO SR 1 DEBT 10,984, L23E NORTHEAST CORRIDOR IMPROVEMENTS YARD TO RAGAN, CIVIL, STRUCTURAL STIP MOD 804, LY30 NORTHEAST CORRIDOR IMPROVEMENTS YARD TO RAGAN, CIVIL, STRUCTURAL STIP MOD 544, L230 WASHINGTON STREET NEW CASTLE STIP MOD 292, L23E WASHINGTON STREET NEW CASTLE STIP MOD 266, ,600, L230 WASHINGTON STREET NEW CASTLE UNAC 1,576, (5,000,000.00) RELEASES (85,413.72) 600, L24E SR 9, DELAWARE AVENUE ROW L24E SR 9, NEW CASTLE AVE., 3RD STREET TO HEALD STREET PD 400, ,000, L230 SR 2 ELKTON ROAD MD LINE TO CASHO MILL RD UNAC T H230 ELKTON ROAD, CASHO MILL ROAD TO DEL AVE STIP MOD 125, H230 ELKTON ROAD, CASHO MILL ROAD TO DEL AVE TOLL CREDITS STIP MOD T 31, ,200, L23E SR 2, SOUTH UNION STREET FROM RAILROAD BRIDGE TO SYCAMORE STREET, CONS 3,600, WILMINGTON T L23E SR 141 AND COMMONS BOULEVARD INTERSECTION IMPROVEMENTS PE STIP MOD 824, ,790, L010 SR141/I 95 INTERCHANGE PE 480, WILMAPCO Annual Listing of Obligated Projects 7

8 STATE PROGRAM PROJECT FEDERAL APPORT PROJECT TOLL FED $ NUMBER FUNDS CODE TITLE REASON CREDITS AUTH T ,800, M001 I 95/US202 INTERCHANGE UNAC 5,352, T ,000, L23E I 95/US202 INTERCHANGE UNAC 4,267, T M001 I 95/US202 INTERCHANGE CONT INC 1,781, L230 US 40, PULASKI HIGHWAY & SR 72, WRANGLE HILL ROAD (INCLUDES DEL LAWS ROAD CONS INTERSECTION) T M240 SR15, CHOPTANK ROAD FRM N437 TO N433 CONS 62, WILMAPCO Annual Listing of Obligated Projects 8

9 STATE FUNDS PROJECT APPORT PROJECT SUBMIT AUTH FED $ OBLIGATED NUMBER CODE TITLE REASON STIP TOLL DATE DATE AUTH TO DATE T H240 SR7, ARUNDEL DRIVE TO NEW LINDEN HILL ROAD RELEASE 4/9 4/12 (714.31) (714.31) SIDEWALK T L240 SR7, ARUNDEL DRIVE TO NEW LINDEN HILL ROAD RELEASE 4/9 4/12 (0.62) (0.62) SIDEWALK T L230 WASHINGTON STREET, NEW CASTLE AWARD STIP MOD 11/19 11/21 292, , T L23E WASHINGTON STREET, NEW CASTLE AWARD STIP MOD 11/19 11/21 266, , T L230 WASHINGTON STREET, NEW CASTLE UTILITIES 329 2/5 2/6 104, , T LY30 POMEROY BRANCH, PEDESTRIAN AND BICYCLE PATH CON 367 4/1 4/2 31, , T H050 BR AND BE ON I 95 OVER SR 72, SUNSET RELEASE 2/12 2/12 (208,645.46) (208,645.46) LAKE ROAD AND BR ON N48, SALEM CHURCH ROAD T L050 BR AND BE ON I 95 OVER SR 72, SUNSET RELEASE 2/12 2/12 (71,712.21) (71,712.21) LAKE ROAD AND BR ON N48, SALEM CHURCH ROAD T AB0 BR ON N263A, GOXHILL LANE OVER RED CLAY RELEASE 6/27 6/27 (0.02) (0.02) CREEK AND ROLLING MILL ROAD RETAINING WALL T H100 BR ON N263A, GOXHILL LANE OVER RED CLAY RELEASE 6/27 6/27 (393,073.96) (393,073.96) CREEK AND ROLLING MILL ROAD RETAINING WALL T LZ20 SR 15, CHOPTANK ROAD FROM N437 TO N433 RELEASE 6/27 6/28 (308,999.48) (308,999.48) T L240 SR 15, CHOPTANK ROAD FROM N437 TO N433 RELEASE 6/27 6/28 (882,024.60) (882,024.60) T H240 SR 15, CHOPTANK ROAD FROM N437 TO N433 CONT INCREASE 9/20 9/23 62, , T Q050 US 301, WEIGH STATION AND INSPECTION FACILITY RELEASE 6/28 6/28 (50,415.16) (50,415.16) T Q400 US 301, WEIGH STATION AND INSPECTION FACILITY RELEASE 6/28 6/28 (179,081.62) (179,081.62) T H050 US 301, WEIGH STATION AND INSPECTION FACILITY RELEASE 6/28 6/28 (8,494.20) (8,494.20) T Q550 STATEWIDE PLANNING & RESEARCH PROGRAM (02 RELEASE 12/7 12/10 (392.39) (392.39) SPR) T Q200 BR510 ON US 13 NORTHBOUND, SOUTH OF ODESSA RELEASE 1/2 1/3 (0.03) (0.03) T H230 CHURCHMANS CROSSING FY 2003 SIDEWALK & BUS RELEASE 2/5 2/6 (219,922.26) (219,922.26) STOP IMPROVEMENTS T D0 SCHOOL BELL ROAD, US 40 TO SR 7 RELEASE 6/27 6/27 (0.08) (0.08) T L240 SCHOOL BELL ROAD, US 40 TO SR 7 RELEASE 6/27 6/27 (244,556.50) (244,556.50) T H230 SCHOOL BELL ROAD, US 40 TO SR 7 RELEASE 6/27 6/27 (63,363.57) (63,363.57) T L230 SCHOOL BELL ROAD, US 40 TO SR 7 RELEASE 6/27 6/27 (63,503.43) (63,503.43) T L23E SR 2, SOUTH UNION STREET FROM RAILROAD BRIDGE ADVERTISE T 6/18 6/19 718, , TO SYCAMORE STREET, WILMINGTON T H230 SR 2, SOUTH UNION STREET FROM RAILROAD BRIDGE ADVERTISE T 6/18 6/19 356, , TO SYCAMORE STREET, WILMINGTON T L230 SR 2, SOUTH UNION STREET FROM RAILROAD BRIDGE ADVERTISE T 6/18 6/19 17, , TO SYCAMORE STREET, WILMINGTON T L23R SR 2, SOUTH UNION STREET FROM RAILROAD BRIDGE ADVERTISE T 6/18 6/19 408, , TO SYCAMORE STREET, WILMINGTON T L23E SR 2, SOUTH UNION STREET FROM RAILROAD BRIDGE AWARD T 9/4 9/5 (75,500.00) (75,500.00) WILMAPCO Annual Listing of Obligated Projects 9

10 STATE FUNDS PROJECT APPORT PROJECT SUBMIT AUTH FED $ OBLIGATED NUMBER CODE TITLE REASON STIP TOLL DATE DATE AUTH TO DATE TO SYCAMORE STREET, WILMINGTON T H050 US 202, I 95 TO AUGSTINE CUTOFF RELEASE 6/27 6/27 (390,167.23) (390,167.23) T L05E US 40, PULASKI HIGHWAY/ SR72, WRANGLE HILL ROAD PE INCREASE STIP MOD 7/31 8/5 160, , (INCLUDES DEL LAWS ROAD INTERSECTION) T H220 NEWPORT SIDEWALKS AND STREETSCAPE RELEASE 1/9 1/9 (32,826.12) (32,826.12) T Q560 POOLED FUND STUDIES AND NCHRP PARTICIPATION RELEASE 12/13 12/13 (9.79) (9.79) (04 SPR) T L05E BOYDS CORNER INTERSECTION IMPROVEMENTS RELEASE /9 10/11 (23,073.02) (23,073.02) T M230 HSIP NCC, N54, HOWELL SCHOOL ROAD, SR 896 TO SR ROW 273 T 9/5 9/5 1,000, ,000, T L1C0 BR ON ST ANNES CHURCH ROAD OVER NORFOLK RELEASE 12/14 12/17 (588,798.12) (588,798.12) SOUTHERN, SOUTH IS MIDDLETOWN T H020 DELAWARE TURNPIKE IMPROVEMENTS, I 95 MAINLINE RELEASE 10/31 10/31 (1,208,773.29) WIDENING (1,208,773.29) T L05E I 95 & US 202 INTERCHANGE CE INCREASE /25 10/25 29, , T L050 I 95 & US 202 INTERCHANGE CONVERT /26 11/27 39, , T L05E I 95 & US 202 INTERCHANGE CONVERT /26 11/27 9,608, ,608, T L05E I 95 & US 202 INTERCHANGE CE INCREASE /17 12/20 7, , T H050 I 95 & US 202 INTERCHANGE CONT INCREASE STIP MOD 9/13 9/19 369, , T L050 I 95 & US 202 INTERCHANGE CONT INCREASE STIP MOD 9/13 9/19 478, , T L05E I 95 & US 202 INTERCHANGE CONT INCREASE STIP MOD 9/13 9/19 364, , T M001 I 95 & US 202 INTERCHANGE CONT INCREASE STIP MOD 9/13 9/19 518, , T Q050 I 95 & US 202 INTERCHANGE CONT INCREASE STIP MOD 9/13 9/19 50, , T LY20 CHRISTINA RIVER BRIDGES AND APPROACHES PE INCREASE 347 T 7/18 7/31 1,300, ,300, T L1C0 BR ON SR 2 OVER MILL CREEK, EAST OF NEWARK RELEASE 6/27 6/28 (235,646.73) (235,646.73) T H560 STATEWIDE PLANNING & RESEARCH PROGRAM, RELEASE 2/14 2/15 (22,887.15) (22,887.15) RESEARCH (06 SPR) T L40E C & D CANAL RECREATIONAL TRAIL CONT INCREASE /17 12/20 455, , T L400 C & D CANAL RECREATIONAL TRAIL CE INCREASE 345 4/17 4/18 21, , T L400 C & D CANAL RECREATIONAL TRAIL CE INCREASE 114 7/12 7/17 124, , T L050 PAVEMENT & REHABILITATION, NORTH I, 2007 RELEASE 1/8 1/8 (0.02) (0.02) T L1C0 BR ON OTTS CHAPEL ROAD OVER PERSIMMON RELEASE 2/13 2/13 (81,087.50) (81,087.50) RUN T L220 TROLLEY SQUARE STREETSCAPE IMPROVEMENTS RELEASE 7/29 7/30 (74,307.07) (74,307.07) PHASE II T L23E NORTHEAST CORRIDOR IMPROVEMENTS YARD TO CE INCREASE STIP MOD 11/19 11/21 804, , RAGAN, CIVIL, STRUCTURAL T LY30 NORTHEAST CORRIDOR IMPROVEMENTS YARD TO MAINTENANCE STIP MOD 5/30 5/30 544, , RAGAN, CIVIL, STRUCTURAL T L STATEWIDE PLANNING & TRAFFIC PROGRAM RELEASE 6/27 6/28 (1,444,816.86) (TRAFFIC) (1,444,816.86) T LU20 SAFE ROUTES TO SCHOOL, INFRASTRUCTURE, NEW RELEASE 6/28 6/28 (257,843.32) (257,843.32) WILMAPCO Annual Listing of Obligated Projects 10

11 STATE FUNDS PROJECT APPORT PROJECT SUBMIT AUTH FED $ OBLIGATED NUMBER CODE TITLE REASON STIP TOLL DATE DATE AUTH TO DATE CASTLE COUNTY T HU20 SAFE ROUTES TO SCHOOL, INFRASTRUCTURE, NEW RELEASE 6/28 6/28 (1,377.29) (1,377.29) CASTLE COUNTY T LS50 SUNSET LAKE ROAD (N356) RAILROAD CROSSING RELEASE 1/9 1/10 (42.12) (42.12) IMPROVEMENT T LS3E HSIP NCC, SR 52 AND SR 82 INTERSECTION AWARD /2 11/5 85, , IMPROVEMENT T MS30 HSIP NCC, US 13, BACON AVENUE TO MCMULLEN CONT INCREASE 293 3/12 3/13 2, , AVENUE T LS3E HSIP NCC, FOULK ROAD AND WILSON ROAD CONT INCREASE 265 2/13 2/19 73, , INTERSECTION IMPROVEMENTS T MS30 HSIP NCC, FOULK ROAD AND WILSON ROAD CONT INCREASE 265 4/1 4/2 74, , INTERSECTION IMPROVEMENTS T MS30 HSIP NCC, FOULK ROAD AND WILSON ROAD CE INCREASE 265 8/12 8/13 14, , INTERSECTION IMPROVEMENTS T LS30 HSIP NCC, SR 896 AND FOUR SEASONS PARKWAY RELEASE 6/28 6/28 (144,621.43) (144,621.43) INTERSECTION IMPROVEMENT T LS3E HSIP NCC, SR273 AND HARMONY ROAD INTERSECTION PE /26 11/27 521, , IMPROVEMENT T LS30 HSIP NCC, SR 896 AND OLD CHESTNUT HILL ROAD PE INCREASE 305 8/15 8/15 27, , INTERSECTION IMPROVEMTS T LS30 HSIP NCC, SR 896 AND OLD CHESTNUT HILL ROAD ROW STIP MOD 9/5 9/5 31, , INTERSECTION IMPROVEMTS T LS30 HSIP NCC, SR 896 AND OLD CHESTNUT HILL ROAD INTERSECTION IMPROVEMTS ROW STIP MOD 9/13 9/16 40, , T LS30 HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) 2008, 2009, 2010 RELEASE 6/28 6/28 (275,158.43) (275,158.43) T L400 DELTRAC SIGNAL INITIATIVES, 2008 RELEASE 1/9 1/9 (1,110,262.91) (1,110,262.91) T Q400 DELTRAC SIGNAL INITIATIVES, 2008 RELEASE 1/9 1/9 (1,042,488.58) (1,042,488.58) T L050 PAVEMENT & REHABILITATION, NORTH II, 2008 RELEASE 4/8 4/8 (15.64) (15.64) T L050 PAVEMENT & REHABILITATION, NORTH III, 2008 RELEASE 6/27 6/27 (100,773.63) (100,773.63) T H010 STRUCTURE MAINTENANCE, INTERSTATE, NORTH CONT INCREASE /28 12/31 6, , DISTRICT, NCC T L1C0 BRIDGE PAINTING, BRIDGE 1 112, 1 179A & RELEASE 4/8 4/8 (13,195.28) (13,195.28) T L1C0 BRIDGE PAINTING, NEW CASTLE COUNTY, FY09 RELEASE 11/5 11/5 (48,008.54) (48,008.54) T L05E SR1/I 95 INTERCHANGE CONVERT /26 11/27 5,000, ,000, T L01E SR1/I 95 INTERCHANGE CONT INCREASE 244 1/29 1/31 2,400, ,400, T LZ1R SR1/I 95 INTERCHANGE CONVERT 244 4/1 4/2 1,998, ,998, T LZ1E SR1/I 95 INTERCHANGE CONVERT 244 4/1 4/2 2,221, ,221, T Q010 SR1/I 95 INTERCHANGE CONVERT 244 4/1 4/2 47, , WILMAPCO Annual Listing of Obligated Projects 11

12 STATE FUNDS PROJECT APPORT PROJECT SUBMIT AUTH FED $ OBLIGATED NUMBER CODE TITLE REASON STIP TOLL DATE DATE AUTH TO DATE T H010 SR1/I 95 INTERCHANGE CONVERT 244 4/1 4/2 328, , T L01E SR1/I 95 INTERCHANGE CONVERT 244 4/1 4/2 403, , T M001 SR1/I 95 INTERCHANGE CONT INCREASE 244 7/18 7/22 7,655, ,655, T H020 SR1/I 95 INTERCHANGE CONVERT 244 8/8 8/13 1,208, ,208, T M001 SR1/I 95 INTERCHANGE CONVERT 244 8/8 8/13 4,541, ,541, T LZ20 SR1/I 95 INTERCHANGE CONVERT 244 9/10 9/11 770, , T LZ2E SR1/I 95 INTERCHANGE CONVERT 244 9/10 9/11 127, , T M001 SR1/I 95 INTERCHANGE CONVERT 244 9/10 9/11 2,013, ,013, T L240 SR1/I 95 INTERCHANGE CONVERT 244 9/25 9/25 352, , T L220 LEXINGTON PARKWAY, CLAIRBORNE DEVELOPMENT, RELEASE 7/29 7/30 (50,510.87) (50,510.87) SIDEWALK IMPROVEMENTS T L22E LEXINGTON PARKWAY, CLAIRBORNE DEVELOPMENT, RELEASE 7/29 7/30 (42,509.59) (42,509.59) SIDEWALK IMPROVEMENTS T L22E RODNEY SQUARE BEAUTIFICATION CE INCREASE 76 4/15 4/16 6, , T L22E RODNEY SQUARE BEAUTIFICATION CE INCREASE 76 5/10 5/10 7, , T L290 EDUCATION AND TRAINING FY 08 7/1/07 6/30/08 RELEASE 3/26 3/26 (14,798.00) (14,798.00) L240 T C240 SR 404A NEWTOWN ROAD (S582) RAILROAD CROSSING RELEASE 2/13 2/13 (33,835.11) (33,835.11) IMPROVEMENT T H280 SR 896 NEW LONDON ROAD (N313) RAILROAD RELEASE 1/9 1/11 (19,800.00) (19,800.00) CROSSING IMPROVEMENT T C240 PARK & RIDE EXPANSION SR299, ODESSA RELEASE 4/16 4/17 (146,429.13) (146,429.13) T C240 PARK & RIDE EXPANSION SR299, ODESSA RELEASE 5/23 5/24 (1,476.60) (1,476.60) T L400 FY09 DELTRAC STATEWIDE PROJECTS RELEASE 6/5 6/6 (348,187.20) (348,187.20) T L050 PAVEMENT & REHABILITATION, NORTH II, 2009 RELEASE 6/27 6/27 (422,733.63) (422,733.63) T C240 PAVEMENT & REHABILITATION, NORTH VI, 2009 RELEASE 3/5 3/6 (35,117.95) (35,117.95) T L00E PAVEMENT & REHABILITATION, NORTH VII, 2009 RELEASE 5/23 5/24 (6,608.56) (6,608.56) T D0 PAVEMENT & REHABILITATION, NORTH VII, 2009 RELEASE 5/23 5/24 (117,106.77) (117,106.77) T C240 PAVEMENT & REHAVILITATION, NORTH X, 2009 RELEASE 2/13 2/13 (16,426.65) (16,426.65) T C240 PAVEMENT & REHABILITATION, NORTH XI, 2009 RELEASE 3/15 3/19 (147,622.15) (147,622.15) T C240 PAVEMENT & REHABILITATION, NORTH XII, 2009 RELEASE 3/1 3/1 (24,446.24) (24,446.24) T L1C0 BRIDGE INSPECTION PROGRAM FY 09 RELEASE 6/17 6/18 (339,318.12) (339,318.12) T H1C0 BR 1 501, 1 501A, 1 501B SR 141 VIADUCT OVER 54 CE INCREASE 404 1/11 1/11 134, , T L1C0 BR 1 501, 1 501A, 1 501B SR 141 VIADUCT OVER 54 CE INCREASE 404 1/31 1/31 61, , T L23E BR 1 501, 1 501A, 1 501B SR 141 VIADUCT OVER 54 CONT INCREASE STIP MOD 6/4 6/4 592, , T Q010 INTERSTATE BRIDGE MAINTENANCE, I 495 RELEASE 3/1 3/1 (32,064.15) (32,064.15) T C240 INTERSTATE BRIDGE MAINTENANCE, CHRISTINA RELEASE 4/16 4/18 (1,025.14) (1,025.14) T L23E INTERSTATE BRIDGE MAINTENANCE, CHRISTINA RELEASE 4/16 4/18 (69,731.10) (69,731.10) T C242 INTERSTATE BRIDGE MAINTENANCE, PAINTING RELEASE 5/17 5/20 (0.93) (0.93) T L050 EPOXY PAVEMENT MARKINGS DISTRIC I 2009, 2010, RELEASE 6/27 6/28 (245,982.26) (245,982.26) 2011 T L01E ROADWAY LIGHTING REPLACEMENT, I 95 CONT INCREASE 242 T 11/8 11/19 127, , WILMAPCO Annual Listing of Obligated Projects 12

13 STATE FUNDS PROJECT APPORT PROJECT SUBMIT AUTH FED $ OBLIGATED NUMBER CODE TITLE REASON STIP TOLL DATE DATE AUTH TO DATE T L010 ROADWAY LIGHTING REPLACEMENT, I 95 CONT INCREASE 242 T 11/8 11/19 643, , T C243 I 95 NEWARK TOLL PLAZA HIGHWAY SPEED EZ PASS CONT INCREASE 232 4/23 4/24 5, , LANES T C TRAFFIC SIGNAL IMPROVEMENTS, STATEWIDE RELEASE 5/6 5/6 (18,979.11) (18,979.11) T L23E SR141 LANDSCAPING KIRKWOOD HWY TO FAULKLAND ADVERTISE /5 11/5 121, , ROAD T L23E SR141 LANDSCAPING KIRKWOOD HWY TO FAULKLAND AWARD 297 1/15 1/15 (57,406.60) (57,406.60) ROAD T L22E PAPER MILL ROAD SIDEWALK IMPROVEMENTS ROW 76 1/17 1/ T L22E PAPER MILL ROAD SIDEWALK IMPROVEMENTS ADVERTISE 76 4/8 4/8 93, , T B0 PAPER MILL ROAD SIDEWALK IMPROVEMENTS ADVERTISE 76 4/8 4/8 15, , T H220 PAPER MILL ROAD SIDEWALK IMPROVEMENTS ADVERTISE 76 4/8 4/8 142, , T Q220 PAPER MILL ROAD SIDEWALK IMPROVEMENTS ADVERTISE 76 4/8 4/8 315, , T Q220 PAPER MILL ROAD SIDEWALK IMPROVEMENTS AWARD 76 9/4 9/5 (44,107.38) (44,107.38) T L22E TOWN OF TOWNSEND STREETSCAPE IMPROVEMENTS ADVERTISE 76 3/19 3/20 408, , T L22E TOWN OF TOWNSEND STREETSCAPE IMPROVEMENTS ADVERTISE 76 T 3/19 3/20 5, , T L22R TOWN OF TOWNSEND STREETSCAPE IMPROVEMENTS ADVERTISE 76 T 3/19 3/20 86, , T C240 NCC MILL CREEK GREENWAY RELEASE 3/26 3/26 (23,397.59) (23,397.59) T C240 NCC GREENWAY, INDUSTRIAL TRACK PHASE I RELEASE 3/19 3/19 (119,662.14) (119,662.14) T C220 NCC GREENWAY, INDUSTRIAL TRACK PHASE I RELEASE 3/19 3/19 (11,085.40) (11,085.40) T C240 OLD LANCASTER PIKE STREETSCAPE IMPROVEMENTS TRANSFER 5/1 5/2 (39,020.82) (39,020.82) T C240 OLD LANCASTER PIKE STREETSCAPE IMPROVEMENTS RELEASE 5/6 5/7 (241,823.11) (241,823.11) T L240 EDUCATION AND TRAINING RELEASE /28 11/28 (20,783.36) (20,783.36) T L400 35' HYBIRD (7) EXPANSION FY10 SPEND RELEASE 3/26 3/26 (18,811.00) (18,811.00) T L SPR RESEARCH PROGRAM RELEASE 6/28 6/28 (283,159.47) (283,159.47) T FY09 LOCAL TRANSPORATION ASSISTANCE PROGRAM RELEASE 1/11 1/14 (41,866.24) (41,866.24) T LZ20 PAVEMENT & REHABILITATION, NORTH II, 2010 RELEASE 6/27 6/27 (158,349.11) (158,349.11) T L240 PAVEMENT & REHABILITATION, NORTH III, 2010 RELEASE 6/27 6/27 (163,626.91) (163,626.91) T L24E PAVEMENT & REHABILITATION, NORTH III, 2010 RELEASE 6/27 6/27 (23,429.20) (23,429.20) T C243 PAVEMENT & REHABILITATION, NORTH IV, 2010 CE INCREASE 79 4/23 4/24 34, , T C240 PAVEMENT & REHABILITATION, NORTH VI, 2010 RELEASE 5/28 5/28 (33,741.52) (33,741.52) T L00E PAVEMENT & REHABILITATION, NORTH VI, 2010 RELEASE 5/28 5/28 (9,235.98) (9,235.98) T L00E PAVEMENT & REHABILITATION, NORTH XI, 2010 CONT INCREASE 79 12/3 12/12 281, , T L24E PAVEMENT & REHABILITATION, NORTH XI, 2010 CONT INCREASE 79 12/3 12/12 66, , T L24E PAVEMENT & REHABILITATION, NORTH XI, 2010 CE INCREASE 79 1/8 1/9 88, , T L24E PAVEMENT & REHABILITATION, NORTH XI, 2010 CE/CONT 79 3/21 3/22 273, , INCREASE T L1C0 BRIDGE INSPECTION PROGRAM FY10 RELEASE 6/27 6/27 (159,430.46) (159,430.46) T L1CE BR ON N399 CHEASPEAKE CITY ROAD OVER CE INCREASE 73 5/30 5/30 7, , GUTHRIE RUN T L1CE BR ON N049 AUGUSTINE CUTOFF OVER BRANDYWINE CREEK AWARD STIP MOD /4 12/11 1,032, ,032, WILMAPCO Annual Listing of Obligated Projects 13

14 STATE FUNDS PROJECT APPORT PROJECT SUBMIT AUTH FED $ OBLIGATED NUMBER CODE TITLE REASON STIP TOLL DATE DATE AUTH TO DATE T L1CE BRS 1 687, 1 688, 1 693, SOUTH WALNUT ST, SOUTH CE INCREASE 73 T 12/17 12/20 52, , MARKET ST AND FOURTH ST OVER CHRISTINA RIVER T L1C0 BRS 1 687, 1 688, 1 693, SOUTH WALNUT ST, SOUTH CONT INCREASE STIP MOD T 3/26 3/27 821, , MARKET ST AND FOURTH ST OVER CHRISTINA RIVER T L1CE BRS 1 687, 1 688, 1 693, SOUTH WALNUT ST, SOUTH CE INCREASE 416 T 7/26 7/30 81, , MARKET ST AND FOURTH ST OVER CHRISTINA RIVER T C240 I 95 NEWARK TOLL PLAZA HIGHWAY SPEED EZ PASS RELEASE 5/8 5/8 (180,480.45) (180,480.45) LANES T L05E US 301, GARVEE DEBT SERVICE DEBT /9 10/9 10,984, ,984, T Q220 6TH STREET ENHANCEMENTS, CITY OF WILMINGTON RELEASE SPLIT ISSUE 10/22 10/22 (0.01) (0.01) T L22E 6TH STREET ENHANCEMENTS, CITY OF WILMINGTON CE INCREASE 76 5/10 5/10 25, , T L22E GREENHILL AVENUE LANDSCAPE IMPROVEMENTS, CITY CONT INCREASE 77 7/10 7/10 2, , OF WILMINGTON T L220 BAYARD SQUARE ENHANCEMENTS, CITY OF ADVERTISE 77 T 10/10 10/15 390, , WILMINGTON T L220 BAYARD SQUARE ENHANCEMENTS, CITY OF AWARD 77 T 2/4 2/5 49, , WILMINGTON T L220 BAYARD SQUARE ENHANCEMENTS, CITY OF AWARD 77 T 2/6 2/7 (39.00) (39.00) WILMINGTON T L22R CARPENTER STREET ENHANCEMENTS, CITY OF ADVERTISE 77 10/22 10/25 227, , WILMINGTON T L22R CARPENTER STREET ENHANCEMENTS, CITY OF ADVERTISE 77 T 10/22 10/25 8, , WILMINGTON T L22R CARPENTER STREET ENHANCEMENTS, CITY OF AWARD 77 2/8 2/12 (27,026.63) (27,026.63) WILMINGTON T L22E CARPENTER STREET ENHANCEMENTS, CITY OF CE INCREASE 77 T 4/3 4/4 14, , WILMINGTON T L22R CARPENTER STREET ENHANCEMENTS, CITY OF CONT INCREASE 77 T 7/10 7/10 8, , WILMINGTON T L22E CONCORD AVENUE STREETSCAPE IMPROVEMENTS, CONT INCREASE 76 12/12 12/13 74, , CITY OF WILMINGTON T L220 CONCORD AVENUE STREETSCAPE IMPROVEMENTS, CONT INCREASE 76 6/5 6/6 44, , CITY OF WILMINGTON T L400 PARATRANSIT VEHICLE REPLACEMENT BUSES FY11 (80) RELEASE 6/27 6/27 (261,413.78) (261,413.78) T L24E EDUCATION AND TRAINING FY10 RELEASE 6/21 6/24 (258,384.18) (258,384.18) T Q240 EDUCATION AND TRAINING FY10 RELEASE 6/21 6/24 (267.44) (267.44) T L550 TRAFFIC IMPACT STUDIES (OPTION A) FY10 RELEASE 6/26 6/26 (239,821.74) (239,821.74) T L450 WIMAPCO, 2010 UPWP RELEASE 4/24 4/24 (364,952.53) (364,952.53) T LU1E CONCORD AVENUE STREETSCAPE IMPROVEMENTS, PD 104 3/12 3/13 30, , CITY OF WILMINGTON T LU1E SAFE ROUTES TO SCHOOL, PLANNING AND PROGRAM PD 104 3/12 3/13 33, , WILMAPCO Annual Listing of Obligated Projects 14

15 STATE FUNDS PROJECT APPORT PROJECT SUBMIT AUTH FED $ OBLIGATED NUMBER CODE TITLE REASON STIP TOLL DATE DATE AUTH TO DATE MANAGEMENT 2010, STATEWIDE T LU3E SAFE ROUTES TO SCHOOL, PLANNING AND PROGRAM MANAGEMENT 2010, STATEWIDE PD 104 3/12 3/13 116, , T LS5E STATEWIDE RAILROAD CROSSING REPAIR II, 2011 ADVERTISE 88 T 5/23 5/24 326, , T LS5E STATEWIDE RAILROAD CROSSING REPAIR II, 2011 AWARD 88 T 8/15 8/15 19, , T LS50 STATEWIDE RAILROAD CROSSING REPAIR II, 2011 AWARD 88 T 8/15 8/15 4, , T MS50 STATEWIDE RAILROAD CROSSING REPAIR II, 2011 AWARD 88 T 8/15 8/15 57, , T LS40 US 40 RAILROAD CROSSING REPLACEMENT ADVERTISE 88 T 7/31 7/31 389, , T LS3E HSIP NCC, SR92 NAAMANS ROAD AT I 95 CONT INCREASE 93 10/25 10/25 1, , T LS HIGH RISK RURAL ROADS PROGRAM STUDIES TRAFFIC 95 12/28 1/2 22, , T L23E PAVEMENT & REHABILITATION, NORTH I, 2011 CE INCREASE 79 10/26 10/31 4, , T L01E PAVEMENT & REHABILITATION, NORTH XIIII, 2011 RELEASE 6/19 6/19 (504,541.87) (504,541.87) T H100 BR 1 665N AND 1 665S CARRYING US 13 BAYLOR BLVD PE /14 12/17 72, , T M001 BR 1 665N AND BR 1 665S CARRYING US 13 OVER UTILITIES 412 T 3/13 3/20 90, , BAYLOR BLVD. T M001 BR 1 665N AND BR 1 665S CARRYING US 13 OVER ROW 412 6/7 6/11 8, , BAYLOR BLVD. T M001 BR 1 665N AND BR 1 665S CARRYING US 13 OVER ADVERTISE STIP MOD T 6/12 6/12 4,358, ,358, BAYLOR BLVD. T M001 BR 1 665N AND BR 1 665S CARRYING US 13 OVER AWARD 412 T 8/28 8/28 (372,576.84) (372,576.84) BAYLOR BLVD. T M001 BR N & S ON I 495 OVER STONEY CREEK ADVERTISE STIP MOD T 6/11 6/12 2,715, ,715, T M001 BR N & S ON I 495 OVER STONEY CREEK AWARD STIP MOD T 8/13 8/15 225, , T L1CE BRIDGE PAINTING, NEW CASTLE COUNTY, 2013 AWARD 79 10/26 10/31 (97,794.90) (97,794.90) T L23E SR 141 AND COMMONS BOULEVARD INTERSECTION PE 250 2/22 2/27 824, , IMPROVEMENTS T L22E TOWN OF ELSMERE PEDESTRIAN AND BICYCLE IMPROVEMENTS PE 76 3/19 3/19 24, , T M301 GREENHILL AVENUE STREETSCAPE IMPROVEMENTS ADVERTISE 76 T 9/13 9/16 673, , T L49E SUMMER TRANSPORTATION INSTITUTE, 2011 RELEASE 149 1/30 1/30 (5,297.76) (5,297.76) T LS30 HSIP NCC, OLD BALTIMORE PIKE AND SALEM CHURCH PE 275 3/8 3/11 19, , ROAD T MS30 HSIP NCC, OLD BALTIMORE PIKE AND SALEM CHURCH PE 275 3/8 3/11 25, , ROAD T LS30 HSIP NCC, SALEM CHURCH ROAD AT CHRISTIANA HIGH PE 277 8/21 8/28 9, , SCHOOL T LS30 HSIP NCC, SALEM CHURCH ROAD AT CHRISTIANA HIGH SCHOOL PE INCREASE 277 9/13 9/16 3, , T LY6A HEP NCC, SR 72 AND OLD BALTIMORE PIKE PE 259 T 12/7 12/10 53, , INTERSECTION IMPROVEMENTS T LY6A HEP NCC, SR2, PIKE CREEK ROAD TO WOODMILL DRIVE PE 261 T 12/7 12/10 153, , T M230 PAVEMENT & REHABILITATION, NORTH I, 2012 ADVERTISE 79 T 9/23 9/23 5,381, ,381, WILMAPCO Annual Listing of Obligated Projects 15

16 STATE FUNDS PROJECT APPORT PROJECT SUBMIT AUTH FED $ OBLIGATED NUMBER CODE TITLE REASON STIP TOLL DATE DATE AUTH TO DATE T L23E PAVEMENT & REHABILITATION, NORTH IV, 2012 AWARD 79 T 12/12 12/13 585, , T LS40 PAVEMENT & REHABILITATION, NORTH IV, 2012 CE/CONT 79 T 7/31 8/1 519, , INCREASE T D0 PAVEMENT & REHABILITATION, NORTH VII, 2012 AWARD 79 1/9 1/10 (13,458.40) (13,458.40) T M001 PAVEMENT & REHABILITATION, NORTH IX, 2012 ADVERTISE 79 T 7/18 7/19 3,150, ,150, T L23E PAVEMENT & REHABILITATION, NORTH XI, 2012 AWARD 80 T 10/9 10/11 54, , T L23R PAVEMENT & REHABILITATION, NORTH XI, 2012 AWARD 80 T 10/9 10/11 (117,490.09) (117,490.09) T M001 PAVEMENT & REHABILITATION, NORTH XII, 2012 ADVERTISE 79 T 7/12 7/15 1,849, ,849, T L05E SR1 JOINT SEALING, NEW CASTLE COUNTY, FY2012 ADVERTISE 79 T 1/8 1/9 4,868, ,868, T M001 SR1 JOINT SEALING, NEW CASTLE COUNTY, FY2012 ADVERTISE 79 T 1/8 1/9 26, , T L05E SR1 JOINT SEALING, NEW CASTLE COUNTY, FY2012 AWARD 79 T 3/4 3/6 (2,031,039.15) (2,031,039.15) T L24E INSPECTION OF OVERHEAD SIGN STRUCTURES, FY12 16 PE 72 10/18 10/23 720, , T L11E BR ON JAMES STREET OVER CHRISTINA RIVER PE 74 10/10 10/11 39, , T L11E BR ON JAMES STREET OVER CHRISTINA RIVER PE 74 10/22 10/23 4, , T L11E BR ON JAMES STREET OVER CHRISTINA RIVER PE 74 11/18 11/19 79, , T L11E BR ON N312 WEDGEWOOD ROAD OVER EAST ROW 394 T 7/18 7/19 7, , BRANCH CHRISTINA CREEK T M001 EPOXY PAVEMENT MARKINGS (DISTRICT I) NCC 2012, CONT INCREASE 82 8/15 8/15 166, , , 2014 T L22E MIDTOWN BRANDYWINE STREETSCAPE PE 76 1/14 1/14 57, , IMPROVEMENTS T L22E NEWARK TRAIN STATION HISTORICAL IMPROVEMENTS CON 76 10/26 10/31 57, , T L22E NEWARK TRAIN STATION HISTORICAL IMPROVEMENTS AWARD 76 2/1 2/4 (35,760.00) (35,760.00) T L22E COOL SPRING STREETSCAPE IMPROVEMENTS PE 76 T 1/14 1/14 183, , T L40E NORTHERN DELAWARE GREENWAY TALLEY ROAD ADVERTISE 334 T 1/8 1/9 1,840, ,840, SECTION T L40E NORTHERN DELAWARE GREENWAY TALLEY ROAD AWARD 334 T 3/8 3/12 (168,797.25) (168,797.25) SECTION T L40E OPEN END CONSTRUCTION SERVICES, STATEWIDE AWARD 114 2/27 2/27 (379,744.85) (379,744.85) TRAILS, NCC T L40E MID COUNTY DMV FACILITY PE 439 1/22 1/22 (352,500.00) (352,500.00) T L40E MID COUNTY DMV FACILITY AWARD 439 1/22 1/22 6,064, ,064, T LS3E HEP NCC, US40 AT GLASGOW AVENUE PE 429 2/13 2/19 22, , T LS3E HEP NCC, I495 AT PHILADELPHIA PIKE PE 427 2/14 2/19 13, , T LS50 LANCASTER PIKE RAILROAD CROSSING REPLACEMENT, TR/RR 88 T 2/7 2/8 186, , FY2013 T LS5E LANCASTER PIKE RAILROAD CROSSING REPLACEMENT, RR 88 T 2/7 2/8 173, , FY2013 T LS20 RUMBLE STRIP INSTALLATION, STATEWIDE, OPEN END PE 95 T 11/18 11/19 110, , T LS20 RUMBLE STRIP INSTALLATION, STATEWIDE, OPEN END RELEASE 95 T 9/23 9/23 (110,024.73) (110,024.73) T LS20 DE RUMBLE STRIPS BROCHURE TRAFFIC 95 T 4/15 4/16 10, , WILMAPCO Annual Listing of Obligated Projects 16

17 STATE FUNDS PROJECT APPORT PROJECT SUBMIT AUTH FED $ OBLIGATED NUMBER CODE TITLE REASON STIP TOLL DATE DATE AUTH TO DATE T L97E BRANDYWINE HOME TOWN OVERLAY PLAN PLANNING 106 8/23 8/26 92, , T M001 INTERSTATE MAINTENANCE DRAINAGE REPAIR, FY14 ADVERTISE 236 T 6/6 6/10 500, , FY16, OPEN END T L01E INTERSTATE MAINTENANCE DRAINAGE REPAIR, FY14 ADVERTISE 236 T 6/6 6/10 1,500, ,500, FY16, OPEN END T M001 INTERSTATE MAINTENANCE DRAINAGE REPAIR, FY14 AWARD 236 T 9/3 9/3 (2,801.17) (2,801.17) FY16, OPEN END T M001 INTERSTATE MAINTENANCE DRAINAGE REPAIR, FY14 AWARD 236 T 9/9 9/9 2, , FY16, OPEN END T Q240 PARK AVENUE RELOCATION PE /3 12/3 228, , T L40E RIDESHARE FY13 15 PD 160 1/28 1/31 320, , T M230 MICRO SURFACING B, NORTH DISTRICT, FY13 FY14 ADVERTISE 79 T 7/3 7/3 1,232, ,232, T M230 MICRO SURFACING B, NORTH DISTRICT, FY13 FY14 AWARD 79 T 9/5 9/5 (423,072.90) (423,072.90) T L1CE BRIDGE INSPECTION FY13 PE 71 3/19 3/20 241, , T L1CE BR ON SR299 MAIN STREET OVER PE INCREASE STIP MOD 5/8 5/8 160, , APPOQUINIMINK RIVER T M001 ROAD A/SR 7/CENTER BLVD INTERSECTION ADVERTISE STIP MOD T 9/13 9/19 1,907, ,907, IMPROVEMENTS T L22E CITY OF WILMINGTON BIKE FACILITY IMPROVEMENTS PLANNING 76 T 3/14 3/15 20, , T L22E CITY OF WILMINGTON STREET TREE IMPROVEMENTS PLANNING 76 T 3/14 3/15 20, , T L22E 11TH STREET IMPROVEMENTS PLANNING 76 T 3/8 3/12 20, , T L22E NORTH STREET SIDEWALK IMPROVEMENTS PLANNING 76 T 3/8 3/12 20, , T L40E INDUSTRIAL TRACK GREENWAY PHASE III PLANNING 114 4/15 4/17 400, , T L40E INDUSTRIAL TRACK GREENWAY PHASE III PLANNING 114 7/29 8/2 128, , T L40E INDUSTRIAL TRACK GREENWAY PHASE III PLANNING STIP MOD 9/13 9/19 132, , T M490 SUMMER TRANSPORTATION INSTITUTE, 2013 TRAINING 149 6/4 6/5 55, , T L56E LOCAL TRANSPORTATION ASSISTANCE PROGRAM 2013 PLANNING /28 11/28 190, , T L450 WILMAPCO, 2013 UPWP PLANNING /31 1/2 136, , T L45E WILMAPCO, 2013 UPWP PLANNING /31 1/2 217, , T LU2E SAFE ROUTES TO SCHOOL, CLAYMONT MT PLEASANT ADVERTISE 104 7/15 7/15 276, , AND EDISON SCHHOLS T LU20 SAFE ROUTES TO SCHOOL, CLAYMONT MT PLEASANT AWARD 104 9/18 9/19 59, , AND EDISON SCHHOLS T LS HIGH RISK RURAL ROADS PROGRAM TRAFFIC TRAFFIC 95 T 8/19 8/19 359, , CONTROL DEVICE IMPROVEMENTS T MS HAZARD ELIMINATION PROGRAM TRAFFIC TRAFFIC 93 T 7/22 7/22 600, , CONTROL DEVICE IMPROVEMENTS T MS HAZARD ELIMINATION PROGRAM TRAFFIC TRAFFIC 93 T 8/29 8/29 443, , CONTROL DEVICE IMPROVEMENTS T MS30 FY2014 HIGHWAY SAFETY IMPROVEMENT PROGRAM TRAFFIC 93 T 7/22 7/22 864, , STUDIES T LS40 FY2014 HIGHWAY RAIL GRADE CROSSING PROGRAM TRAFFIC 88 T 7/19 7/22 95, , WILMAPCO Annual Listing of Obligated Projects 17

18 STATE FUNDS PROJECT APPORT PROJECT SUBMIT AUTH FED $ OBLIGATED NUMBER CODE TITLE REASON STIP TOLL DATE DATE AUTH TO DATE STUDIES T MS31 SR 1 HIGH TENSION CABLE BARRIER, ROTH BRIDGE TO CONS 93 9/19 9/20 1,409, ,409, US 13 T MS31 FY2013 SECTION 154 PENALTY TRANSFER (SANCTION) TRAFFIC 93 9/23 9/23 419, , PROGRAM T LS20 RUMBLE STRIP INSTALLATION, STATEWIDE, OPEN END ADVERTISE 93 9/24 9/24 110, , T LS30 RUMBLE STRIP INSTALLATION, STATEWIDE, OPEN END ADVERTISE 93 9/24 9/24 307, , T MS30 RUMBLE STRIP INSTALLATION, STATEWIDE, OPEN END ADVERTISE 93 9/24 9/24 874, , T MS31 RUMBLE STRIP INSTALLATION, STATEWIDE, OPEN END ADVERTISE 93 9/24 9/24 435, , T MS30 RUMBLE STRIP INSTALLATION, STATEWIDE, OPEN END ADVERTISE 93 9/25 9/25 4, , T MS31 RUMBLE STRIP INSTALLATION, STATEWIDE, OPEN END ADVERTISE 93 9/25 9/ T L24E FY 14 TRAFFIC INTERSECTION IMPROVEMENTS TRAFFIC 101 5/23 5/24 1,000, ,000, PROGRAM T L24E FY 14 TRAFFIC INTERSECTION IMPROVEMENTS TRAFFIC 101 7/18 7/19 1,000, ,000, PROGRAM T M400 FY 14 DELTRAC STATEWIDE PROJECTS TRAFFIC 166 T 9/13 9/16 278, , T Q400 FY 14 DELTRAC STATEWIDE PROJECTS TRAFFIC 166 T 9/13 9/16 1,221, ,221, T L24E FY 14 DELTRAC PROJECTS STATE WIDE SUPPORT TRAFFIC 166 T 9/9 9/9 1,250, ,250, T M240 FY 14 DELTRAC SIGNAL INITIATIVES TRAFFIC 167 9/12 9/12 2,800, ,800, T D0 UTLTA THIN P.C.C OVERLAY, KENT, 2014 ADVERTISE 79 T 9/23 9/23 206, , T H240 UTLTA THIN P.C.C OVERLAY, KENT, 2014 ADVERTISE 79 T 9/23 9/23 353, , T TE UTLTA THIN P.C.C OVERLAY, KENT, 2014 ADVERTISE 79 T 9/23 9/23 120, , T L10 UTLTA THIN P.C.C OVERLAY, KENT, 2014 ADVERTISE 79 9/23 9/23 54, , T L240 UTLTA THIN P.C.C OVERLAY, KENT, 2014 ADVERTISE 79 T 9/23 9/23 1,180, ,180, T H1C0 BRIDGE INSPECTION FY14 PE 71 9/17 9/18 22, , T L12R BRIDGE INSPECTION FY14 PE 71 9/17 9/18 408, , T M001 BRIDGE INSPECTION FY14 PE 71 9/17 9/18 1,353, ,353, T Q120 BRIDGE INSPECTION FY14 PE 71 9/17 9/18 88, , T M233 BR ON N009 12TH STREET OVER NORFOLK PE 73 8/7 8/8 8, , SOUTHERN RR T C0 DBE/SS PROGRAM ACTIVITIES FFY 2014 PROGRAM 143 9/19 9/ T H480 DBE/SS PROGRAM ACTIVITIES FFY 2014 PROGRAM 143 9/19 9/20 1, , T L480 DBE/SS PROGRAM ACTIVITIES FFY 2014 PROGRAM 143 9/19 9/20 12, , T L48E DBE/SS PROGRAM ACTIVITIES FFY 2014 PROGRAM 143 9/19 9/ T M480 DBE/SS PROGRAM ACTIVITIES FFY 2014 PROGRAM 143 9/19 9/20 44, , T Q480 DBE/SS PROGRAM ACTIVITIES FFY 2014 PROGRAM 143 9/19 9/20 2, , WILMAPCO Annual Listing of Obligated Projects 18

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

Maryland Gets to Work

Maryland Gets to Work I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY BINGHAMTON METROPOLITAN TRANSPORTATION STUDY ANNUAL LISTING OF FEDERAL AID PROJECT OBLIGATIONS FEDERAL FISCAL YEAR Federal regulations require an annual listing of transportation projects, including investments

More information

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER WILLIAMSON/ MAURY NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 SR-247 (Duplex Road) Widening TIP # 2004-051 Road Widening Spring Hill Williamson Length 3.10 Regional Plan ID 1062-170 Air

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

Williamson County Projects

Williamson County Projects Williamson Projects SR-6/ US-31/ Franklin Road TIP # 2006-408 Road Widening TDOT Williamson Length 2.30 Regional Plan ID 1062-160 Air Quality Status Non-Exempt TDOT PIN 105717.00 $38,000,000.00 SR-31/Franklin

More information

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit The Jack A. Markell Trail Delaware s Bicycle Highway 2018 New England Bike- Walk Summit The Jack A. Markell Trail Sometimes a very difficult project, including significant investment and perseverance,

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects October 12, 2006 Town of Ashland Counties of Charles City Chesterfield Goochland Hanover Henrico New Kent Powhatan City of Richmond Richmond Regional Planning

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, FFY Section 2A State Prioritized Reliability s Bridge Program/On-System (NHS) Increase the Cost of Holyoke (600936)

More information

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000 SFY 2022-2023 Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000 DES NUM LPA PROJECT TITLE TYPE TOTAL SCORE FUND TYPE SFY FEDERAL COST LOCAL COST

More information

Region PROJECT PHASE PROGRAM ROUTE TOWN DESCRIPTION TOTAL COST

Region PROJECT PHASE PROGRAM ROUTE TOWN DESCRIPTION TOTAL COST CAPITOL 10 0001-0105 ROW BRZ TIMES FARM ANDOVER BR 04581 O/ HOP RIVER 58 46 12 0 10 0004-0131 PE BRZ WHEELER LANE AVON REHAB BR 05850 O/ ROARING BROOK (PD ONLY) 110 88 0 22 10 0004-0132 PE STPH CT 10/OLD

More information

Local Public Agency Obligated Projects SFY 2015

Local Public Agency Obligated Projects SFY 2015 Local Public Agency Obligated Projects SFY 2015 Des# Project Description/Location Sponsor Project Type Funding Type Previously Obligated (Prior to SFY 2015) SFY 2015 Obligated Total Obligation Unobligated

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program

More information

LACEY CITY COUNCIL MEETING July 09, 2015

LACEY CITY COUNCIL MEETING July 09, 2015 LACEY CITY COUNCIL MEETING July 09, 2015 SUBJECT: 2016-2021 Six-Year Transportation Improvement Plan and Mitigation List RECOMMENDATION: Adopt Resolution approving the proposed 2016-2021 Six- Year Transportation

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (7B) Submitting Agency: Fairfax County Basic Project Information Project Title: South Van Dorn Street and Franconia Road Interchange 7B Project Type (check one): Roadway

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) DIXIE COUNTY Highways: State Highways 4135211 D2 - DIXIE COUNTY TRAFFIC SIGNAL

More information

US 10 Corridor Performance

US 10 Corridor Performance Corridor Context The corridor runs northwest 18 miles from I-35W to the edge of Anoka County. The corridor connects the cities of Ramsey, Anoka,, Mounds View, and Blaine. Current Corridor Characteristics

More information

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike 3275 South to 2625 South $ 839,800 $ 666,408 The 1200 West roadway is a very narrow road just enough for two lanes of traffic and

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6 U.S. Department of Transportation Federal Transit Administration Federal Highway Administration 901 Locust Street, Suite 404 6111 SW 29 th Street, Suite 100 Kansas City, MO 64106 Topeka, KS 66614-4271

More information

Public Works. Capital Projects FY

Public Works. Capital Projects FY Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) PUTNAM COUNTY Highways: State Highways 4135331 D2-PUTNAM COUNTY TRAFFIC SIGNAL

More information

Rural Planning. Highway Projects - CULLMAN COUNTY

Rural Planning. Highway Projects - CULLMAN COUNTY 4/17/2015 ALABAMA DEPARTMENT OF TRANSPORTATION Page - 1 of 9 Length CR-1742 4.770 Highway s - CULLMAN COUNTY RESURFACE CR-1742 FROM SR-74 (US-278) TO SR-67 RESURFACING 100063223 ST-022-888-011- ( ) CONSTRUCTION

More information

FY Regional Surface Transportation Program (RSTP) Allocations *

FY Regional Surface Transportation Program (RSTP) Allocations * FY 2015-2020 Regional Surface Transportation Program (RSTP) Allocations * Cost Previous Actual Other Source Total Allocation Jurisdiction/Project Description UPC Estimate Funding Allocation * Projected

More information

Population Trends. US 12 Corridor Performance

Population Trends. US 12 Corridor Performance Corridor Context The corridor runs over 81 miles from Willmar to the Twins Cities metropolitan area. It connects the Twin Cities and the cities of Montrose, Howard Lake, Cokato, Dassel, Litchfield, Atwater,

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

WICHITA AREA METROPOLITAN PLANNING ORGANIZATION

WICHITA AREA METROPOLITAN PLANNING ORGANIZATION WICHITA AREA METROPOLITAN PLANNING ORGANIZATION March 18, Stephanie Watts Bureau of Transportation Planning Kansas Department of Transportation 700 S.W. Harrison Street Topeka, KS 66603 3754 Dear Ms. Watts:

More information

Anderson Area Transportation Study ANATS Transportation Improvement Plan FY

Anderson Area Transportation Study ANATS Transportation Improvement Plan FY Anderson Area Transportation Study ANATS Transportation Improvement Plan FY 2017-2022 www.cityofandersonsc.com Table of Contents Introduction 1 Process 2 Products 3 Funding 4 Certification 6 Financial

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Annual Listing of Projects Receiving Federal Funds

Annual Listing of Projects Receiving Federal Funds Communities working together to meet Chittenden County s transportation needs CHITTENDEN COUNTY METROPOLITAN PLANNING ORGANIZATION Annual Listing of s Receiving Federal Fiscal Year 2007 October 1, 2006

More information

Current Corridor Characteristics. MN 62 Corridor Performance

Current Corridor Characteristics. MN 62 Corridor Performance Corridor Context The corridor runs 12 miles between I-494 and MN 55 south of Minneapolis. The corridor serves as an important East-West connection for the Metro area. A portion of the corridor has been

More information

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program New Jersey Turnpike Authority Interchange 6 to 9 Widening Program Tuesday, September 18, 2007 Public Hearings: Time: 5:00 PM - 8:00 PM Wednesday, September 19, 2007 Senior Center 3 Municipal Drive Bordentown,

More information

Transportation Improvement Program

Transportation Improvement Program FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION CITY OF FLAGSTAFF COCONINO COUNTY ARIZONA DOT Office: 100 West Birch Avenue Flagstaff, Arizona 86001 Mail: 211 West Aspen Avenue Flagstaff, Arizona 86001 Phone:

More information

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017 Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017 Background PSRC s 2017 funding: Rural Town Centers and Corridor program Regional FTA competition May - Board released projects

More information

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director Western ND Meeting February 19, 2014 Grant Levi, NDDOT Director 1 Traffic Trends in North Dakota 2 Truck Traffic 2008 3 Truck Traffic 2012 4 Average Daily Traffic 5 ND Vehicle Miles Traveled Statewide

More information

TransNet Dollars Keep San Diego Moving

TransNet Dollars Keep San Diego Moving TransNet Dollars Keep San Diego Moving In 1987, San Diego region voters approved the TransNet program a half-cent sales tax to fund a variety of important transportation projects throughout the region.

More information

1 2 3 TONS/YEAR TONS/YEAR TONS/DAY TONS/DAY Estimated NOx Emissions EPA Budget Estimated VOC Emissions EPA Budget 60 50 40 30 20 10 0 2015 2020 2025 2030 2035 2040 2045 YEAR 30 25 20 15 10 5 0 2015 2020

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

The Future of Rail in Maryland. Kevin B. Quinn, Jr. Administrator

The Future of Rail in Maryland. Kevin B. Quinn, Jr. Administrator The Future of Rail in Maryland Kevin B. Quinn, Jr. Administrator The Future of Rail in Maryland Rolling Stock Metro Railcar Replacement Under the project, MDOT MTA is replacing the metro fleet with 78

More information

Janice Fortunato Senior Director Business Partnerships

Janice Fortunato Senior Director Business Partnerships Janice Fortunato Senior Director Business Partnerships What are Megaprojects? They are large-scale projects distinguished by cost, complexity and the potential impact on the community. Collectively, these

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION DVRPC FY 2014 Authorized Projects (obligation plan funds only $ millions) Burlington Route 38, Route 30/130 to Lenola Road (CR 608) (DB #11334) NHPP CON $15.400 $15.400 $15.322 $0.078 Route 38, Route 30/130

More information

INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM

INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM TO: FROM: Indianapolis Regional Transportation Council Policy Committee Anna M.

More information

FFY Transportation Improvement Program (TIP) Development

FFY Transportation Improvement Program (TIP) Development FFY 2016-2019 Transportation Improvement Program (TIP) Development MAY 18, 2015 CAPE COD METROPOLITAN PLANNING ORGANIZATION Highway Funding Regional s Year STP HSIP CMAQ FFY 2016 2019 TOTAL Regional with

More information

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0 TSPLOST 2018 Project Statements from Submitted Projects Project # 01, 01 Airport Capital Improvements Program (CIP) Matching Funds, will include the construction of numerous FAA and GDOT funded projects

More information

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Transportation Planning: Non-System Specific

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Transportation Planning: Non-System Specific FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) LEVY COUNTY Highways: State Highways 4135251 D2-LEVY COUNTY TRAFFIC SIGNAL

More information

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb

More information

Kentucky Highway District 6

Kentucky Highway District 6 Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Over-Dimensional Vehicle Restriction Study for US 129 in TN

Over-Dimensional Vehicle Restriction Study for US 129 in TN Over-Dimensional Vehicle Restriction Study for US 129 in TN July 30,2015 TDOT Region 1 US 129 Location Map US 129 Topography and Scenery Operational and Safety Study August 2014, US129 Operational and

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

PARTIAL PROGRAM OF PROJECTS FFY

PARTIAL PROGRAM OF PROJECTS FFY PARTIAL PROGRAM OF PROJECTS FFY 2016-17 The proposed Partial Program of Projects for FFY 2016-17 is attached. The proposed Partial Program of Projects was introduced at the SCTA Board at its meeting on

More information

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation

More information

City of University Place

City of University Place City of University Place City Engineering Department Six Year Transportation Improvement Plan Amended November 10, 2008 Resolution No. 604 City of University Place, Washington SIX-YEAR TRANSPORTATION PLAN

More information

Major Widening/New Roadway

Major Widening/New Roadway Revised Evaluation s Major Widening/New Roadway This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds Committee meeting. The information

More information

Developing a Toll Demand Model for DelDOT s Statewide Travel Demand Model

Developing a Toll Demand Model for DelDOT s Statewide Travel Demand Model Developing a Toll Demand Model for DelDOT s Statewide Travel Demand Model TRB 87 th Annual Meeting Washington, D.C. Introduction DelDOT is facing the same deteriorating infrastructure, increasing congestion

More information

TITLE VII: TRAFFIC CODE 70. GENERAL PROVISIONS 71. TRAFFIC REGULATIONS 72. PARKING REGULATIONS 73. TRAFFIC SCHEDULES 74.

TITLE VII: TRAFFIC CODE 70. GENERAL PROVISIONS 71. TRAFFIC REGULATIONS 72. PARKING REGULATIONS 73. TRAFFIC SCHEDULES 74. TITLE VII: TRAFFIC CODE Chapter 70. GENERAL PROVISIONS 71. TRAFFIC REGULATIONS 72. PARKING REGULATIONS 73. TRAFFIC SCHEDULES 74. PARKING SCHEDULES 1 2 Wakarusa - Traffic Code CHAPTER 70: GENERAL PROVISIONS

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

Triangle Mobility Action Partnership (Tri-MAP) Friday, July 18, 2014 RDU Airport Authority

Triangle Mobility Action Partnership (Tri-MAP) Friday, July 18, 2014 RDU Airport Authority Triangle Mobility Action Partnership (Tri-MAP) Friday, July 18, 2014 RDU Airport Authority Strategic Transportation Investments Prioritization Mark Ahrendsen Durham-Chapel Hill-Carrboro MPO Alex Rickard

More information

FFY2013 Obligated or Grant Projects

FFY2013 Obligated or Grant Projects CAPITOL 10 0053-0181 CON CMAQ Main St GLASTONBURY SIGNAL SYSTEM - PUTNAM BLVD TO 2,583 2,514 0 68 WELLES ST (6) 10 0053-0187 PE CMAQ Griswold St GLASTONBURY INT. IMPR. @ HARRIS ST & HOUSE ST 150 120 30

More information

FFY2014 Federal Obligated or Grant Projects

FFY2014 Federal Obligated or Grant Projects CAPITOL 10 0426-0065 OTH 5307C GHTD GHTD - PURCHASE SUPPORT EQUIPMENT FY 14 10 0426-0065 ACQ 5307C GHTD GHTD - PURCHASE PARATRANSIT VEHICLES FY 14 COST COST 50 40 10 0 2,850 2,280 570 0 10 0426-0065 ACQ

More information

TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS

TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015 Overview Transportation Alternatives Program (TAP) overview MPO TAP Scoring

More information

Click to edit Master title style

Click to edit Master title style P3s Come In All Shapes And Sizes Mr. Greg Slater, Administrator 7/26/2018 1 1 Customer-Driven Customer First TODAY S DISCUSSION Introduction to MDOT MDOT P3 Experience Full Delivery Stream Restoration

More information

Middle Georgia Transportation Executive Committee. September 27, 2017

Middle Georgia Transportation Executive Committee. September 27, 2017 Middle Georgia Transportation Executive Committee September 27, 2017 Project Discussions MACON BIBB, CRAWFORD, MONROE Project List Development Process to Date Cities, Counties and MPOs submitted projects

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Revised Evaluation Scores. System Preservation

Revised Evaluation Scores. System Preservation Revised Evaluation s System Preservation This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds mmittee meeting. The information below highlights

More information

Arkansas State Highway and Transportation Department. Rotary Club of Stuttgart Tuesday, April 7, 2015

Arkansas State Highway and Transportation Department. Rotary Club of Stuttgart Tuesday, April 7, 2015 Arkansas State Highway and Transportation Department Rotary Club of Stuttgart Tuesday, April 7, 2015 The Facts: 12 th Largest System in USA 43 rd Highway Revenue Per Mile State Highway Systems State Mileage

More information

Local Public Agency Obligated Projects SFY 2018

Local Public Agency Obligated Projects SFY 2018 Local Public Agency Obligated Projects SFY 2018 DES # Project Description/Location Sponsor County Project Type Funding Type Federal Programmed Previously Obligated (Prior to SFY 2018) SFY 2018 Obligated

More information

New Jersey Department of Transportation

New Jersey Department of Transportation Prepared by: New Jersey Department of Transportation September 2013 TABLE OF CONTENTS Page CURRENT STATUS OF STATE HIGHWAY SYSTEM... 1 Description of System... 1 Figure 1: NJ Roadway System, Breakdown

More information

Central Loop Bus Rapid Transit

Central Loop Bus Rapid Transit Central Loop Bus Rapid Transit Transportation Goals of the Chicago Central Area ACTION Plan, page 2-6 Central Area Plan Improve Transit in Central Area Improve Pedestrian Environment Manage Traffic Circulation

More information

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle Chapter 7: Travel Demand Analysis Chapter 8 Plan Scenarios LaSalle Community Center. Image Credit: Town of LaSalle 164 Chapter 8: Plan Scenarios Moving Ahead for Progress in the 21 st Century Act (MAP

More information

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by 2. Assessment of Current Conditions and Needs In order to prepare a plan to reach the vision desired by the residents of Texarkana, it is first necessary to ascertain the current situation. Since there

More information

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013 Building our future, together Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013 Vision In 2030, the City of Tyler will be nationally known for its commitment to community,

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) BAKER COUNTY Highways: Interstate 4386501 I-10 BAKER CO SPRAYFIELD EB REST

More information

Reston Transportation Strategy July 9, 2018

Reston Transportation Strategy July 9, 2018 Reston Transportation Strategy July 9, 2018 Background: On February 11, 2014, the Board of Supervisors adopted the Reston Phase I Comprehensive Plan Amendment for the core areas of Reston between Sunset

More information

Chapter 7: Corridor Visions

Chapter 7: Corridor Visions Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United

More information

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX:

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX: 435 Martin Street, #3000 BLAINE, WA 98230 BUS: 360.332.8311 FAX: 360.332.8330 www.cityofblaine.com September 10, 2018 To: From: Subject: City Council Department Heads Michael Jones, City Manager Jeffrey

More information

Open Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No.

Open Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No. Board of County Commissioners of Washington County, Maryland Agenda Report Form Open Session Item SUBJECT: Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications,

More information

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014 TBARTA USF to Wesley Chapel Express Bus Service Operating Plan Draft 3/25/2014 March 2014 Table of Contents 1.0 Introduction... 1 2.0 Study Area... 1 3.0 Existing Available Service... 3 4.0 Proposed Service...

More information

Metro Highway Program

Metro Highway Program Metro Highway Program ACEC November 2018 I-5 North HOV and Truck Lanes 14 miles of HOV lanes in both directions 2 miles of truck climbing lanes at the south end 7 bridge modifications at: Gavin Canyon

More information

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget Capital Improvement Program (CIPs) City of Industry FY 2017/18 155 FY 2017/18 156 City of Industry, California Capital Improvement Program Overview of Department The Capital Improvement Program (CIP) is

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

East Kings Highway and Roberts Avenue Speed Hump Analysis

East Kings Highway and Roberts Avenue Speed Hump Analysis East Kings Highway and Roberts Avenue Speed Hump Analysis BOROUGH OF HADDONFIELD, CAMDEN COUNTY, NEW JERSEY 5/18/2018 Prepared By: Remington & Vernick Engineers 232 EAST KINGS HIGHWAY, HADDONFIELD, NEW

More information

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road

More information

2013 AMERICA S 9/11 RIDE FRIDAY, AUGUST 16

2013 AMERICA S 9/11 RIDE FRIDAY, AUGUST 16 FRIDAY, AUGUST 16 Start: Highland HD, Somerset, Pennsylvania DEPARTS 7:15am Right turn out of Highland HD onto Center Street Left turn onto Stoystown Road (Rt 281 North) Right turn onto Pompey Hill Road

More information

TRANSPORTATION IMPROVEMENT PROGRAM

TRANSPORTATION IMPROVEMENT PROGRAM 2016 2021 TRANSPORTATION IMPROVEMENT PROGRAM 25 21 12 1 24 C B 26 13 29 30 3 6 19 7 27 14 18 17 15 16 28 22 11 10 9 A 7 D E 4 23 5 2 8 20 PROJECTS ON THE TIP PROJECTS ADDED TO THE TIP MAP I.D. PROJECT

More information

Five-Year Work Plan FY FY June 29, 2018

Five-Year Work Plan FY FY June 29, 2018 FY 2019 - FY 2023 June 29, 2018 FY 2019 - FY 2023 June 29, 2018 Prepared for: CENTRAL FLORIDA EXPRESSWAY AUTHORITY 4974 ORL Tower Road Orlando, Florida 32807 Prepared by: Dewberry Engineers Inc. General

More information

The Georgia CMAQ Program. Practice Makes Perfect

The Georgia CMAQ Program. Practice Makes Perfect The Georgia CMAQ Program Practice Makes Perfect Outline Georgia s Air Quality Georgia s CMAQ Process Prioritized Projects Project Mix Georgia and Air Quality Out of the 6 pollutants measured by EPA, Georgia