Appendix No. 3 Hydrometric Data

Size: px
Start display at page:

Download "Appendix No. 3 Hydrometric Data"

Transcription

1 Study to Address Flooding on the Dunkellin River & Aggard Stream Appendix No. 3 Hydrometric Data iv

2 STATION NAME RATHGORGIN 22-Oct-09 STATION No RAFORD Annual Maximum Series of Recorded Water Levels & Estimated Flows YEAR (maod - Poolbeg) (m) FLOW (m3/s) N/A 30/10/ N/A 14/10/ N/A 28/12/ N/A 05/12/ /12/ /11/ /05/ /10/ /11/ /03/ /10/ /12/ /04/ /11/ /04/ /12/ /12/ /01/ /01/ /02/ /11/ N/A N/A N/A N/A /12/1979 (1) /10/ /03/ /02/ /12/ /08/ /08/ /11/ /01/ /12/ /02/ /03/ N/A N/A N/A N/A 1992 N/A N/A N/A N/A 1993 N/A N/A N/A N/A /01/1995 (1) /10/ /02/ /03/ /09/ /12/ /11/ /02/ /11/ /02/ /01/2005 (1) /09/ /12/2006 k.f /12/ /08/ /11/2009 (2) WL Max = WL Med = WL Min = Limit of Reliable Rating 13 m3/s - Flow estimates above this are extrapolated and should be treated with caution (1) Recorder malfunction - Estimated peak, recorder malfunction (2) Incomplete hydrometric year to 16/03/2010 Current Staff Gauge Zero = maod (Poolbeg)

3 STATION NAME CRAUGHWELL 18-Jan-09 STATION No L.CULLAUN Annual Maximum Series of Recorded Levels & Estimated Flows YEAR WATER LEVEL STAFF GAUGE ESTIMATED DATE (HYDROMETRIC) (maod - Malin Head) READING (m) FLOW (m3/s) /12/ /08/ /08/ /12/ /02/ /01/ /02/ /12/ /01/ /06/ /12/ /01/ /10/ /02/ /03/ /09/ /12/ /11/ /02/ /11/ /02/ /01/ /09/ /12/ /12/ /08/ /11/2009 (1) WL Max = WL Med = WL Min = Limit of Reliable Rating 55 m3/s - Flow estimates above this are extrapolated and should be treated with caution Current Staff Gauge Zero = 18.70mAOD (Malin) (1) Incomplete hydrometric year to 18/01/2009

4 STATION NAME AGGARD BRIDGE STATION No AGGARD LOUGHREA HYDROLOGY AND 19-Mar-10 Annual Maximum Series of Recorded Water Levels and Estimated Flows YEAR (maod - Poolbeg) (m) FLOW (m3/s) /04/ /01/ /08/ /01/ /12/ /01/ /01/ /02/ /12/ /11/1991(1) /12/ /12/ /01/ /02/ /02/ /01/ /09/ /12/ /11/ /02/ /11/ /01/ /01/2005 (1) /01/ /12/ /12/ /10/ /11/2009 (2) WL Max = WL Med = WL Min = Limit of Reliable Rating 2.4 m3/s - Flow estimates above this are extrapolated and should be treated with caution (1) Water backed up behind both archesof bridge (2) Incomplete hydrometric year to 16/03/2010 Current Staff Gauge Zero = maod (Poolbeg)

5 STATION NAME Rahasane Turlough STATION No Dunkellin Dunkellin 19-Mar-10 Annual Maximum Series of Recorded Water Levels and Estimated Flows YEAR (maod - Poolbeg) (m) FLOW (m3/s) /09/1971 (1) /04/ /12/ /09/ /01/ /01/ /02/ /11/ /12/ /12/ /12/ /03/ /11/ /10/ /08/1985 (2) /01/ /12/ /01/ /01/ /10/ /01/ /01/ /06/ /12/ /02/ /02/ /02/ /01/ /09/ /12/ /11/ /02/ /11/ /02/ /01/2005 (3) /09/ /01/ /12/ /08/ /11/2009 (4) Limit of Reliable Rating 22.5 m3/s up to Flow estimates above this are extrapolated and should be treated with caution Limit of Reliable Rating 39.5 m3/s from Flow estimates above this are extrapolated and should be treated with caution (1) Incomplete year, records begin 01/08/1971 (2) Estimated Level (3) Flood mark leveled due to AR malfunction (4) Incomplete hydrometric year to 20/01/2010, WL estimated from survey Current Staff Gauge Zero = maod (Poolbeg)

6 STATION NAME KILCOLGAN BRIDGE STATION No Mar-10 Annual Maximum Series of Recorded Water Levels & Estimated Flows YEAR (maod - Malin head) (m) FLOW (m3/s) /02/ /08/ /01/ /12/ /01/ /01/ /02/ /12/ /01/ /6/ /12/ /01/ /02/ /02/ /01/ /09/ /12/ /11/ /02/ /11/ /01/ /01/ /09/ /12/ /12/ /08/ /11/2009 (1) WL Max = WL Med = WL Min = Limit of Reliable Rating 46.7 m3/s - Flow estimates above this are extrapolated and should be treated with caution (1) Incomplete hydrometric year to 16/03/2010 Current Staff Gauge Zero = maod (Malin head) Levels given are max fluvial levels and do not include tidal peaks.

Appendix E Hydrology, Erosion and Sediment Transport Studies

Appendix E Hydrology, Erosion and Sediment Transport Studies Appendix E Hydrology, Erosion and Sediment Transport Studies Hatch 2012/10 Appendix E1 EA Hydrology Memorandum February 2011 (Hatch. 2011a) Hatch 2012/10 Project Memo February 23, 2011 TO: Larry King FROM:

More information

CVRP: Market Projections and Funding Needs

CVRP: Market Projections and Funding Needs CVRP: Market Projections and Funding Needs Public Workshop: Update to the 3-Year Plan for LDV & Transportation Equity Investments (4 Dec. 2018, El Monte CA) Brett Williams, PhD Senior Principal Advisor,

More information

Appendix I. Canning River Fan Stream Data

Appendix I. Canning River Fan Stream Data Appendix I Canning River Fan Stream Data Table 1: Available Stream Width and Bankfull Data Collected on the Canning River Fan Within 5 Miles of the Coast Stream Width (ft) Ordinary Top of Flood- Site

More information

Appendix 5. Cost Estimation Borne by the Recipient Country

Appendix 5. Cost Estimation Borne by the Recipient Country Appendix 5. Cost Estimation Borne by the Recipient Country Appendix 6. Survey Result of Hydrology Appendix6-1 Data of Climate and Meteorology Figure 6-1-1 Rainfall Gauging Station Figure 6-1-2 Water

More information

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

Action Requested From AMWG

Action Requested From AMWG Action Requested From AMWG NONE, These Two Presentations Are For Information Transfer Only The information is derived from a multi-year synthesis research effort related to existing data on flow, sediment-transport

More information

TABLE C-42. Sales and inventories in manufacturing and trade, [Amounts in millions of dollars] Manufacturing. Inventories Ratio 3.

TABLE C-42. Sales and inventories in manufacturing and trade, [Amounts in millions of dollars] Manufacturing. Inventories Ratio 3. 1970 TABLE C-4. and inventories in manufacturing, 1947-69 Inyentories i 1947 1948 1949 1950 1951 195 1953 1954 1955 1956 1957 1958 1959 35,60 54,33 5,507 59,8 70,4 7,377,1 89,05 86,9 1.4 16,16 1,714,59

More information

Element #2: Additional analysis of Tuolumne River below La Grange Dam (USGS # );

Element #2: Additional analysis of Tuolumne River below La Grange Dam (USGS # ); Districts Response to NMFS-4, Element 1 through 6 Effects of Don Pedro Project and Related Facilities on Hydrology for Anadromous Fish: Magnitude, Timing, Duration, and Rate of Change 1.0 Background On

More information

Price Category Breakdown - February 2010

Price Category Breakdown - February 2010 SINGLE FAMILY RESIDENTIAL BREAKDOWN ruary 21 ruary Sales and Average Price Increase Annually TORONTO - Wednesday, March 3, 21 7.3 % 24.6 % 1.8 % 7.3%.2%.1 % Greater Toronto REALTORS reported 7,291 sales

More information

Climatography of the United States No

Climatography of the United States No Climate Division: CA 5 NWS Call Sign: Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) Jan 45.9 26.0 36.0 67

More information

TABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods.

TABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods. TABLE C-43. Manufacturers' new and unfilled orders, -74 {Amounts in millions of dollars] New orders t, I960. 27, 559 26, 903 30,672 30,115 31,086 33,005 35,322 37,952 41, 803 45, 944 46,763 50, 243 53,

More information

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008 Central Coast Watershed Studies CCoWS Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008 Santa Lucia Preserve Monterey County, California Publication No. WI-2009-01

More information

National Routing Number Administration p-ani Activity and Projected Exhaust Report

National Routing Number Administration p-ani Activity and Projected Exhaust Report National Routing Number Administration 2016 p-ani Activity and Projected Exhaust Report The ATIS Industry Numbering Committee developed the P-ANI Administration Guidelines, which contain the following

More information

Climatography of the United States No

Climatography of the United States No Climate Division: WY 9 NWS Call Sign: LND Temperature ( F) Month (1) Min (2) Month(1) Extremes Lowest (2) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) Jan 31.9 8.7 20.3

More information

Excel 10 (240 VAC, 1-phase, 60 Hz)

Excel 10 (240 VAC, 1-phase, 60 Hz) SWCC Summary Report Manufacturer: Wind Turbine Model: Certification Number: SWCC-10-12 Bergey Windpower Company Excel 10 (240 VAC, 1-phase, 60 Hz) The above-identified Small Wind Turbine is certified by

More information

Port Wallace Development: Safety and Traffic Concerns. April 12, 2018

Port Wallace Development: Safety and Traffic Concerns. April 12, 2018 Port Wallace Development: Safety and Traffic Concerns April 12, 2018 Highway 107 at the Quarry: 2017 Traffic Figures November 21, 2017 Staff Recommendation: Traffic and Infrastructure In May 2017, the

More information

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007 Central Coast Watershed Studies CCoWS Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007 Santa Lucia Preserve Monterey County, California Publication No. WI-2008-01

More information

Algebra II Pacing Guide

Algebra II Pacing Guide Unit 13: Exploring a Business Venture (10 days) 8 May 13 - May 24 n/a MISD Pacing Guide Date Range Unit 01: Introduction to Functions in 15 Aug. 21 - Sept. 11 Sept. 12 Unit 02: Absolute Value Functions,,

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

Design Criteria Data

Design Criteria Data MEDFORD/JACKSON CO. OR Latitude = 42.37 N WMO No. 72597 Longitude =122.8 W Elevation = 1329 feet Period of Record = 1973 to 1996 Average Pressure = 28.61 inches Hg Design Criteria Data Mean Coincident

More information

Analysis of IEC Recommendations in Selected APEC Economies

Analysis of IEC Recommendations in Selected APEC Economies Reducing Losses in Power Distribution through Improved Efficiency of Distribution Transformers (EWG 05 2015A) Analysis of IEC 6007620 Recommendations in Selected APEC Economies 18 December 2017 Bangkok,

More information

NASHVILLE DISTRICT UPDATE TRVA ANNUAL CONFERENCE

NASHVILLE DISTRICT UPDATE TRVA ANNUAL CONFERENCE NASHVILLE DISTRICT UPDATE TRVA ANNUAL CONFERENCE 1 LTC Cullen A. Jones, P.E., PMP Nashville District Commander Great Lakes and Ohio River Division US Army Corps of Engineers (USACE) 10 October 2017 The

More information

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED FOR TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT CONTRACT

More information

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS VAUXHALL WASTEWATER TREATMENT PLANT 2013 ANNUAL REPORT FEBRUARY 2014 Vauxhall Wastewater Treatment Plant 2013

More information

Units of Instruction MISD Pacing Guide Days Date Range Test Date

Units of Instruction MISD Pacing Guide Days Date Range Test Date MISD Pacing Guide Date Range Test Date Introduction: Processes of Investigations (1 day) Aug. 21 Unit 01: Matter (12 days) Aug. 22-Sept. 7 Sep. 10 Unit 02: Atomic Structure and the Periodic Table (15 days)

More information

Updated: April 1, Releases Reported by Trans Mountain February 2017 (Updated: April 1, 2017)

Updated: April 1, Releases Reported by Trans Mountain February 2017 (Updated: April 1, 2017) Releases Reported by Trans Mountain - 1961- February 2017 (Updated: April 1, 2017) Trans Mountain has a comprehensive safety and preventative maintenance program that includes the protection of stream

More information

Vunivau, Bua Province Vanua Levu, Fiji Solar Home System Design. Luis A. Vega, Ph.D.

Vunivau, Bua Province Vanua Levu, Fiji Solar Home System Design. Luis A. Vega, Ph.D. Vunivau, Bua Province Vanua Levu, Fiji Solar Home System Design Luis A. Vega, Ph.D. Design Approach Choose design Insolation Determine battery capacity and relationship between controller LVD and DOD Determine

More information

RIDERSHIP TRENDS. March 2017

RIDERSHIP TRENDS. March 2017 RIDERSHIP TRENDS March 2017 Prepared by the Division of Strategic Capital Planning May 2017 Table of Contents Executive Summary...1 Ridership...3 Estimated Passenger Trips by Line...3 Estimated Passenger

More information

ElPower script. Contents. ElPower script diagnostics of the engine starting and charging system

ElPower script. Contents. ElPower script diagnostics of the engine starting and charging system ElPower script Contents 1. Purpose...2 2. Recording the waveforms and starting the script...3 3. Analysis results...5 3.1 The "Report" tab...5 3.2 The "Results of analysis" tab...6 3.3 The "Graphics" tab...9

More information

OECD unemployment rate down to 6.4% in March 2016

OECD unemployment rate down to 6.4% in March 2016 OECD unemployment rate down to 6.4% in March 2016 The OECD unemployment rate fell by 0.1 percentage point to 6.4% in March 2016, 1.7 percentage point below the January 2013 peak. Across the OECD area,

More information

ANCR CRU Statistics February 2007 to December 2007

ANCR CRU Statistics February 2007 to December 2007 ANCR CRU Statistics February 2007 to December 2007 o Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes data from Perimeter phone system unavailable prior

More information

40KW Solar System for Apple Sauce Co

40KW Solar System for Apple Sauce Co 2012 40KW Solar System for Apple Sauce Co Document Created for The Apple Sauce Co by Luke M Hardy lmhardy@smartconsult.com.au Smartcom P/L For further details please contact Luke M Hardy SunUp Solar Pty

More information

Table of Contents. The Waste Audit. Methodologies A. Weight-based Assessments B. Volume-based Assessments C. Considering Costs

Table of Contents. The Waste Audit. Methodologies A. Weight-based Assessments B. Volume-based Assessments C. Considering Costs Waste Audit Manual Table of Contents I. Introduction A. About PLAN B. Some Advice for Every Project C. Leadership Turnover D. Administrative Run-Arounds E. Collaboration & Intersectionality 1 2 3 9 10

More information

Annual Statistical Report

Annual Statistical Report Metro Area Motorist Assist Program Annual Statistical Report January - December Metro Area Motorist Assist Program Annual Statistical Report Table of Contents i. Introduction... i-iii ii. Report Maps...

More information

ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL BACKGROUND

ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL BACKGROUND ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL Project Manager: Chris Hayes BACKGROUND Kraft Foods 35 Reduction of Energy Costs Over The Next 5 Yrs. (5 Benchmark) Kraft Foods Financial Model

More information

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015 PDR Energy Baseline Alternative Proposal for Discussion October 27, 2015 Update Since Last Meeting Since the October 12 th Working Group Meeting Stem, Solar City, AMS and CESA have had over a half-dozen

More information

Arctic Freshwater Flux and Change

Arctic Freshwater Flux and Change Arctic Freshwater Flux and Change Daqing Yang, Doug Kane, Sveta Berezovskaya Water and Environment Research Center, Univ. of Alaska Fairbanks Main Topics Large Arctic River Streamflow Regime and Change

More information

Memorandum October 5, 2017

Memorandum October 5, 2017 614 Magnolia Avenue Ocean Springs, Mississippi 39564 228.818.9626 Memorandum October 5, 2017 To: Gary Miller, U.S. Environmental Protection Agency From: David Keith, John Laplante, Matt Henderson, and

More information

Commuter Rail Update. October 25, 2018

Commuter Rail Update. October 25, 2018 Commuter Rail Update October 25, 2018 2 page page 3 State of Commuter Rail Network, July 2014 The 2014 Commuter Rail network had multiple issues and a history of neglect & under-investment FIRST UP? UPGRADES

More information

1.1 Purpose of This Environmental Impact Report EIR Process Use of This Report Report Organization...

1.1 Purpose of This Environmental Impact Report EIR Process Use of This Report Report Organization... Table of Contents SUMMARY PAGE S.1 Project Location and Project Characteristics... S-1 S.2 Project Objectives... S-9 S.3 Project Approvals... S-11 S.4 Impacts and Mitigation Measures... S-12 S.5 Alternatives...

More information

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT In order to understand the vehicle classes and groupings, the MnDOT Vehicle Classification Scheme and the Vehicle Classification

More information

increase of over four per cent compared to the average of $409,058 reported in January 2010.

increase of over four per cent compared to the average of $409,058 reported in January 2010. SINGLE FAMILY RESIDENTIAL BREAKDOWN uary 211 26.8 % 1.7 % 7.%.4%.1 % Good Start to 211 TORONTO - February 4, 211 Greater Toronto REALTORS reported 4,337 transactions through the TorontoMLS system in uary

More information

Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows

Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows 1961-2007 Background The Niagara River flow at Buffalo is currently computed

More information

Federal Road Development Project 2011 Procurement Plan.

Federal Road Development Project 2011 Procurement Plan. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Federal Road Development Project 20 Procurement Plan. 1. General Project Information: Country: Borrower:

More information

2017 Adjusted Count Report February 12, 2018

2017 Adjusted Count Report February 12, 2018 A statewide multi-use trail user study and volunteer data collection program 2017 Adjusted Count Report February 12, 2018 The following report includes the final adjusted infrared (IR) counter data at

More information

Transmitter CSA-591 Instruction Manual

Transmitter CSA-591 Instruction Manual Transmitter CSA-591 Instruction Manual EN294-1141-F FOREWORD Thank you very much for your purchasing our Transmitter CSA 591. This manual explains installation procedures and connecting method and also

More information

Transmission Planning Attachment K Public Input Meeting

Transmission Planning Attachment K Public Input Meeting Transmission Planning Attachment K Public Input Meeting FERC 890 6 th Quarter Meeting May 25, 2011 Agenda Mountain Time Topic Presenter 1:00 1:15 Greetings and Introduction Dennis Desmarais 1:15 1:30 Attachment

More information

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES January 10, 2011 Presentation to Arvada City Council CONSULTANT TEAM LBA Associates MSW Consultants Denver based recycling and waste management consultant

More information

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

WIM #37 was operational for the entire month of September Volume was computed using all monthly data. SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains

More information

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Second River Prepared By AECOM Brian

More information

Water side Economizer WC chiller

Water side Economizer WC chiller Appendices Water side Economizer WC chiller Power Loading Lighting Load W/ft^2 Area (ft^2) W kw 3.5 48152 168532 Water Cooled Chiller kw/ton 0.7 UA Supply Fan BHP kw wall 1069 58 43 window 3642 roof 295

More information

Climatography of the United States No

Climatography of the United States No Climate Division: MA 3 NWS Call Sign: BOS Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) 36.5 22.1 29.3 72

More information

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit The Jack A. Markell Trail Delaware s Bicycle Highway 2018 New England Bike- Walk Summit The Jack A. Markell Trail Sometimes a very difficult project, including significant investment and perseverance,

More information

/ PRELIMINARY STEEL IMPORTS INCREASE 15% IN APRIL Import Market Share 27% in April

/ PRELIMINARY STEEL IMPORTS INCREASE 15% IN APRIL Import Market Share 27% in April News Release FOR IMMEDIATE RELEASE May 23, 2014 CONTACT Lisa Harrison 202.452.7115/ lharrison@steel.org PRELIMINARY STEEL IMPORTS INCREASE 15% IN APRIL Import Market Share 27% in April Washington, D.C.

More information

/ PRELIMINARY STEEL IMPORTS INCREASE 2% IN MAY Import Market Share 23% in May

/ PRELIMINARY STEEL IMPORTS INCREASE 2% IN MAY Import Market Share 23% in May News Release FOR IMMEDIATE RELEASE June 25, 2013 CONTACT Lisa Harrison 202.452.7115/ lharrison@steel.org PRELIMINARY STEEL IMPORTS INCREASE 2% IN MAY Import Market Share 23% in May Washington, D.C. Based

More information

A Sustainable Scenario for Energy and Water in Bahrain

A Sustainable Scenario for Energy and Water in Bahrain A Sustainable Scenario for Energy and Water in Bahrain John Barton, j.p.barton@lboro.ac.uk Murray Thomson, m.thomson@lboro.ac.uk Centre for Renewable Energy Systems Technology (CREST), Loughborough University

More information

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items Stakeholder Meeting January 30, 2018 Keith Johnson Infrastructure and Regulatory Policy

More information

Task Force Meeting January 15, 2009

Task Force Meeting January 15, 2009 Task Force Meeting January 15, 2009 Study Update August 14 th Task Force Meeting Update on Traffic Projections and Financial Feasibility Study presented by Kane County and WSA staff The presentation summarized

More information

ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL December 2008 BACKGROUND

ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL December 2008 BACKGROUND ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL December 2008 Project Manager: Chris Hayes Advisor: Paul I-Hai Lin 1 BACKGROUND Kraft Foods 35 uction of Energy Costs Over The Next 5 Yrs. (2005

More information

Design Criteria Data

Design Criteria Data OKLAHOMA CITY OK Latitude = 35.4 N WMO No. 72353 Longitude = 97.6 W Elevation = 133 feet Period of Record = 1973 to 1996 Average Pressure = 28.62 inches Hg Design Criteria Data Mean Coincident (Average)

More information

US Rt. 12/20/45 at US Rt. 20 <Westbound and Southbound>

US Rt. 12/20/45 at US Rt. 20 <Westbound and Southbound> US Rt. 12/20/45 at US Rt. 20 Village of Stone Park, Illinois R L R F o l l o w - U p E v a l u a t i o n R e p o r t Reference No: 016-43280 December 2010 Table of Contents

More information

2019 Tide Tables. Volume 1 of 2

2019 Tide Tables. Volume 1 of 2 2019 Tide Tables Volume 1 of 2 Created: 12/1/2018 PREFACE: These tables depict the predicted times and heights of the high and low waters for each day of the year for the following locations: Publication

More information

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014 Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing July 24, 2014 Project Description The Central City Line is a High Performance Transit project that will extend from Browne

More information

NJ Solar Market Update As of 10/31/15

NJ Solar Market Update As of 10/31/15 NJ Solar Market Update As of 10/31/15 Prepared by Charlie Garrison Renewable Energy Committee Meeting November 10, 2015 SOLAR INSTALLED CAPACITY DATA The preliminary installed solar capacity as of 10/31/15

More information

Design Criteria Data

Design Criteria Data INDIANAPOLIS IN Latitude = 39.73 N WMO No. 72438 Longitude = 86.27 W Elevation = 87 feet Period of Record = 1973 to 1996 Average Pressure = 29.15 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data DENVER/STAPLETON CO Latitude = 39.75 N WMO No. 72469 Longitude =14.8 W Elevation = 5332 feet Period of Record = 1973 to 1995 Average Pressure = 24.66 inches Hg Design Criteria Data Mean Coincident (Average)

More information

CVRP: Projected Funding Need and Program-Change Scenarios

CVRP: Projected Funding Need and Program-Change Scenarios CVRP: Projected Funding Need and Program-Change Scenarios CVRP Work Group #2 (22 Mar. 2019, Sacramento CA) Brett Williams, PhD Senior Principal Advisor, EV Programs, CSE John Anderson Research Analyst,

More information

Meteorology of Monteverde, Costa Rica 2005

Meteorology of Monteverde, Costa Rica 2005 Meteorology of Monteverde, Costa Rica 2005 Technical Report submitted to the Monteverde Institute Andrew J. Guswa, Asst Professor, Picker Engineering Program Amy L. Rhodes, Asst Professor, Department of

More information

Design Criteria Data

Design Criteria Data DES MOINES IA Latitude = 41.53 N WMO No. 72546 Longitude = 93.65 W Elevation = 965 feet Period of Record = 1973 to 1996 Average Pressure = 28.96 inches Hg Design Criteria Data Mean Coincident (Average)

More information

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT In order to understand the vehicle classes and groupings the Mn/DOT Vehicle Classification Scheme and the Vehicle Classification Groupings

More information

Design Criteria Data

Design Criteria Data SPRINGFLD MO Latitude = 37.23 N WMO No. 7244 Longitude = 93.38 W Elevation = 127 feet Period of Record = 1973 to 1996 Average Pressure = 28.66 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Final Technical. Memorandum

Final Technical. Memorandum Federal Emergency Management Agency Task Or rder #34 Final Technical Memorandum HYDROLOGIC REVIEW FOR THE VENTURA RIVER WATERSHED AND SEVERAL TRIBUTARY STREAMS FLOOD INSURANCE STUDY Ventu ra County, CA

More information

Design Criteria Data

Design Criteria Data MIDLAND TX Latitude = 31.95 N WMO No. 72265 Longitude =2. W Elevation = 2861 feet Period of Record = 1973 to 1996 Average Pressure = 27.3 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

All Annual Operating Plan Recipients

All Annual Operating Plan Recipients To: All Annual Operating Plan Recipients From: Lower Colorado Region Boulder Canyon Operations Office River Operations Group Daniel Bunk P.O. Box 647 Boulder City, NV 896-47 Phone: 72-293-83 The operation

More information

Design Criteria Data

Design Criteria Data WASHINGTON/DULLES VA Latitude = 38.95 N WMO No. 7243 Longitude = 77.45 W Elevation = 322 feet Period of Record = 1973 to 1996 Average Pressure = 29.68 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data LAS VEGAS/MCCARRAN NV Latitude = 36.8 N WMO No. 72386 Longitude =115.1 W Elevation = 2179 feet Period of Record = 1973 to 1996 Average Pressure = 27.67 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data PHOENIX/SKY HARBOR AZ Latitude = 33.43 N WMO No. 72278 Longitude =112. W Elevation = 116 feet Period of Record = 1973 to 1996 Average Pressure = 28.72 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data LANDER/HUNT WY Latitude = 42.82 N WMO No. 72576 Longitude =18.7 W Elevation = 5558 feet Period of Record = 1973 to 1996 Average Pressure = 24.44 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data ALBUQUERQUE NM Latitude = 35.5 N WMO No. 72365 Longitude =16.6 W Elevation = 5315 feet Period of Record = 1967 to 1996 Average Pressure = 24.72 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS Michigan / Grand River Avenue TECHNICAL MEMORANDUM #18 From: URS Consultant Team To: CATA Project Staff and Technical Committee Topic:

More information

12/14/07 Table 2.1 NANRICH WATER MANAGEMENT CONSULTANTS LTD STATION ANALYSIS. Station Name MATTHEW CREEK ABV DIVERSIONS Station No.

12/14/07 Table 2.1 NANRICH WATER MANAGEMENT CONSULTANTS LTD STATION ANALYSIS. Station Name MATTHEW CREEK ABV DIVERSIONS Station No. Table 1.2 12/14/07 Table 2.1 NANRICH WATER MANAGEMENT CONSULTANTS LTD STATION ANALYSIS Station Name MATTHEW CREEK ABV DIVERSIONS Station No. 08NG086 YEAR 2007 STAGE RECORD: Type of Gauge, Automatic X Logger

More information

INTECH AUGUST QHSE PERFORMANCE

INTECH AUGUST QHSE PERFORMANCE INTECH QHSE PERFORMANCE - MONTHLY QHSE PERFORMANCE Goal Zero Days ( worked days without Lost Time Injury (LTI)) 751 This Month Minor Accidents or Incidents 01 This Month Major Accidents or Incidents 00

More information

INTECH JUNE QHSE PERFORMANCE

INTECH JUNE QHSE PERFORMANCE INTECH QHSE PERFORMANCE - MONTHLY QHSE PERFORMANCE Goal Zero Days ( worked days without Lost Time Injury (LTI)) 689 This Month Minor Accidents or Incidents This Month Major Accidents or Incidents Last

More information

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683 Capacity Analysis Report For William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683 Florida Department of Environmental Protection Facility Identification No. FLA0128775

More information

Presented by Eric Englert Puget Sound Energy September 11, 2002

Presented by Eric Englert Puget Sound Energy September 11, 2002 Results from PSE s First Year of Time of Use Program Presented by Eric Englert Puget Sound Energy September 11, 2002 Puget Sound Energy Overview 973,489 Total Electric Customers 908,949 are AMR Capable

More information

Design Criteria Data

Design Criteria Data RENO/CANNON INTL NV Latitude = 39.5 N WMO No. 72488 Longitude =119.7 W Elevation = 44 feet Period of Record = 1973 to 1996 Average Pressure = 25.57 inches Hg Design Criteria Data Mean Coincident (Average)

More information

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 31, 2007 GROSS DOMESTIC PRODUCT: FOURTH QUARTER 2006 (ADVANCE)

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 31, 2007 GROSS DOMESTIC PRODUCT: FOURTH QUARTER 2006 (ADVANCE) NEWS RELEASE EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 31, 2007 Virginia H. Mannering: (202) 606-5304 BEA 07-02 Recorded message: (202) 606-5306 GROSS DOMESTIC PRODUCT: FOURTH QUARTER

More information

AVM Series. Voice Coil Actuators

AVM Series. Voice Coil Actuators AVM Series Voice Coil Actuators Direct drive, zero cogging, zero backlash voice coil motors Low coil mass with very fast response and bandwidth No contact between coil and core movement (no wear and tear)

More information

Civil Works Construction Cost Index System (CWCCIS)

Civil Works Construction Cost Index System (CWCCIS) EM 1110-2-1304 31 March 2017 Amendment #1 Tables Revised as of 30 September 2017 Civil Works Construction Cost Index System (CWCCIS) EM 1110-2-1304 31 Mar 17 This Page Intentionally Left Blank DEPARTMENT

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

September 2016 Water Production & Consumption Data

September 2016 Water Production & Consumption Data September 2016 Water Production & Consumption Data September 2016 monthly water production (288.48 AF) was lowest in at least 17 years. Monthly water production has increased slightly each month since

More information

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. PSC NO: 12 Electricity Leaf: 4 Rate I Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. Applicable to demand-metered service, street lighting in The City of New

More information

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. PSC NO: 12 Electricity Leaf: 4 Rate I Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. Applicable to demand-metered service, street lighting in The City of New

More information

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. PSC NO: 12 Electricity Leaf: 4 Rate I Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. Applicable to demand-metered service, street lighting in The City of New

More information

Monitoring Bank Erosion On the Missouri River, Lower Brule Reservation

Monitoring Bank Erosion On the Missouri River, Lower Brule Reservation Monitoring Bank Erosion On the Missouri River, Lower Brule Reservation A cooperative study between the Lower Brule Sioux Tribe s Environmental Protection Office and the U.S. Geological Survey, with assistance

More information

Operational Opportunities to Minimize Renewables Curtailments

Operational Opportunities to Minimize Renewables Curtailments Operational Opportunities to Minimize Renewables Curtailments Clyde Loutan Principal, Renewable Energy Integration July 24, 2017 2017 CAISO - Public Page 1 Agenda Background Real-time control performance

More information

NTPC RENEWABLE ENERGY PROJECTS SUCCESS, CHALLENGES AND PERSERVERANCE

NTPC RENEWABLE ENERGY PROJECTS SUCCESS, CHALLENGES AND PERSERVERANCE NTPC RENEWABLE ENERGY PROJECTS SUCCESS, CHALLENGES AND PERSERVERANCE September 15-17, 2015 Remote Microgrid Conference Yellowknife, NT Geraldine Byrne, Acting Manager, Energy Service, NTPC Ian Flood, Project

More information

DRINKING WATER SYSTEM ANNUAL REPORT Reporting Period: January 1 st to December 31 st, 2016

DRINKING WATER SYSTEM ANNUAL REPORT Reporting Period: January 1 st to December 31 st, 2016 DRINKING WATER SYSTEM ANNUAL REPORT Reporting Period: January 1 st to December 31 st, 2016 Water System: Coal Harbour Water System Water System Owner Regional District of Mount Waddington Primary Contact

More information