1 NTPC RENEWABLE ENERGY PROJECTS SUCCESS, CHALLENGES AND PERSERVERANCE September 15-17, 2015 Remote Microgrid Conference Yellowknife, NT Geraldine Byrne, Acting Manager, Energy Service, NTPC Ian Flood, Project Manager, Engineering, NTPC ntpc.com 1

2 NTPC Electrical Energy hydro: 264 GWH diesel/gas: 85 GWh ntpc.com 2

3 NTPC 2013/14 Power Generation Hydro 75% Diesel 22% Natural Gas <1% Purchased 3%* Solar <1% ntpc.com 3

4 NTPC 2014/15 Power Generation Hydro 61% Diesel 34% Natural Gas 3% Purchased 3%* Solar <1% ntpc.com 4

5 NTPC 2015/16 Q1 Power Generation Hydro 54% Diesel 40% Natural Gas 4% Purchased Power 3% Solar <1% ntpc.com 5

6 Energy Supply Large Wind Wind Energy Feasibility (GNWT) Inuvik and outside Yellowknife (Snare System) Inuvik: Storm Hills & Inuvik High Point Monitoring at Snare and Inuvik Potentially 7-10MW Expression of Interest ntpc.com 6

7 Solar Photovoltaic (PV) Power How are we doing? Existing Solar PV Installations Sachs Harbour- 4.3kW Inuvik- 5kW; 7kW; 2kW; 3.5kW; 10 kw;10kw Paulatuk- 5kW; 1.7kW Fort Good Hope- 5kW Norman Wells- 2.9kW Fort Simpson kW; 5kW; 5kW Nahanni Butte- 4.8kW Jean Marie River- 1.3kW Gameti- 5kW Wekweeti- 4.2kW Whati- 5kW Behchoko- 4.8kW; 5kW Yellowknife- 2kW; 5kW; 5kW; 1.8kW; 1.3kW; 33.5kW Hay River- 1kW; 1.7kW Fort Smith- 0.5kW kwh/kw Total: kw (2103) Total: NOW > 545kW

8 Renewable Energy Initiatives Net Billing 2010 / Net Metering 2013 Success: NTPC 55kW of installed solar capacity (NUL 40kW) Customer: Positive return banking credit at 1:1 Utility: Capacity building Challenge /Perseverance: Slow uptake / Administration IPP Lutsel K e Dene First Nation Success: PPA flexible option to meet community needs; Solar Energy Strategy Challenge /Perseverance: Policy ntpc.com 8

9 104kW Solar PV Fort Simpson Success: (2012) First Utility-Scale Low Penetration (solar system production 12% average community load) Saves 27,900 L diesel fuel or 76 tonnes GHG / Yr. Made possible through GNWT funding No vandalism Challenge: Solar production is less that 2% annual consumption 2.2 million L / Yr. in diesel fuel required to meet load ntpc.com 9

10 Colville Lake Community Located: Sahtu Region 745 km by air NW of Yellowknife Population: 147 Average Load: 50 kw Peak Load: 150 kw Challenge: Remote, economies of scale, during summer months air access only; one of the highest cost communities to serve ntpc.com 10

11 Challenge Why New Power Plant? Oldest NTPC plant 24 years Settling issues Reliable, stable power challenging to provide Load size Changing load characteristics No longer meeting (Required Firm Capacity) RFC criteria ntpc.com 11

12 Success: Meeting some needs of the community: Relocate diesel plant Reduced noise /odour in community/ reduce GHG s Employment during construction and decommissioning of old plant and relocation of fuel tanks ntpc.com 12

13 136.5kW Solar PV Colville Lake Solar / Diesel Production Modelling dec nov oct Solar sep aug jul Diesel jun may apr mar feb jan 0% 20% 40% 60% 80% 100% ntpc.com 13

14 Demonstration Project Challenge: Permit Application? What is a demonstration project? Perseverance: Projected 1% rate increase to thermal region. (. 6% power plant;. 4% Solar and BESS) ntpc.com 14

15 136.5kW Solar PV Colville Lake Phase I Solar 54kW (October 2014) Phase II Solar 82.5kW (June 2015) 112MWh expected solar generation Success: No shipment damage to solar panels On schedule on budget Capacity building / relationship building Cost/ kw installed solar reduced $12.20/W from Fort Simpson (Phase I) to Colville Lake (Phase II) $6.34/W 31,600 L diesel fuel or 86 tonnes GHG / year Average diesel consumption is 160,000L ntpc.com 15

16 Challenges Edmonton plant build duration: Deteriorating winter road conditions Switch gear build wrong parts Engine testing before dispatch ntpc.com 0

17 Challenges Short construction season: Early June before work starts on solar phase II Predetermined location rather than choose a site Load bearing survey of whole runway - exact location unspecified ntpc.com 1

18 Challenges Schedule on site: Shipping damage assessed Further engine testing On site availability of SAFT & ABB field engineers ntpc.com 2

19 Challenges Meeting the budget: Demonstration/pilot project Extras not initially envisioned NTPC Labour costs 570 Transporation & accommodation 244 Consultants 224 Contractors 2,648 Diesel engines 196 Accessory electrical equipment 436 Battery bank 984 Solar panels 934 Federal funding -150 Territoral funding -1,145 Overhead (22%) 1,311 Sub-total 6,252 IDC (5.68%) 353 Total 6,605 ntpc.com 3

20 PERSERVERANCE: Sourcing a Battery Supplier: First winning proponent declared bankruptcy RFP process repeated Engine testing: Usual bugs in systems before real progress Shipping date brought forward Reduced time to dismantle and pack plant Damage After Shipping: Reduced speed during shipping Damage to switch gear and some engine systems ntpc.com 4

21 SUCCESSES: Contractors: Plant build - Adco Power Ltd northern experience Solar - Azgard Corporation and Green Sun Rising Battery Module &Controls - SAFT Batteries & ABB Inc B.A.F.N. construction support Testing and commissioning: Successful testing of batteries and diesel Successful testing of PV curtailment Powering community soon: ntpc.com 5

22 From This. ntpc.com 6

23 To This.. ntpc.com 7

24 THANK YOU ANY QUESTIONS? ntpc.com 8

Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017

Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017 Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017 Presentation Outline Understanding LPEA s expenses and what drives them Economics of net metering

More information

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107

More information

Solar. Solar Electricity. Solar Hot Water. Solar Air Heating. Passive Solar

Solar. Solar Electricity. Solar Hot Water. Solar Air Heating. Passive Solar Solar Solar Electricity Solar Hot Water Solar Air Heating Passive Solar Who s Ken? Joined AEA November, 2012 Past Employers include Green Venture, Sun Life, TransCanada Pipelines, Great West Life EGH,

More information

2016 UC Solar Research Symposium

2016 UC Solar Research Symposium 2016 UC Solar Research Symposium Beyond UCR s Sustainable Integrated Grid Initiative: Energy Management Projects in Southern California October 7, 2016 Presented by: Alfredo A. Martinez-Morales, Ph.D.

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015 PDR Energy Baseline Alternative Proposal for Discussion October 27, 2015 Update Since Last Meeting Since the October 12 th Working Group Meeting Stem, Solar City, AMS and CESA have had over a half-dozen

More information

Northwest Territories. Northwest Territories Highway Traffic, 1998

Northwest Territories. Northwest Territories Highway Traffic, 1998 Northwest Territories Northwest Territories Highway Traffic, 1998 Northwest Territories Highway Traffic, 1998 Acknowledgements This report was prepared by the Transportation Planning Division of the Department

More information

Jean Marie River Solar and Wind Monitoring Update

Jean Marie River Solar and Wind Monitoring Update Jean Marie River Solar and Wind Monitoring Update Source: MACA Prepared for By Jean-Paul Pinard, P. Eng., PhD. 703 Wheeler St., Whitehorse, Yukon Y1A 2P6 Tel. (867) 393-2977; Email jpp@northwestel.net,

More information

MCE Napa County Cleaner energy and lower rates. Honig Winery, Rutherford

MCE Napa County Cleaner energy and lower rates. Honig Winery, Rutherford MCE Napa County Cleaner energy and lower rates Honig Winery, Rutherford Public Power by Community Choice Communities collectively purchase electricity as an alternative to investor-owned utility power

More information

Montana Renewable Energy Association

Montana Renewable Energy Association Montana Renewable Energy Association Mission & Focus areas: Education and Outreach Policy and Advocacy Industry Engagement www.montanarenewables.org SolSmart Solar Ready communities making process of going

More information

May ATR Monthly Report

May ATR Monthly Report May ATR Monthly Report Minnesota Department of Transportation Office of Transportation Data and Analysis May 2011 Introduction The purpose of this report is to examine monthly traffic trends on Minnesota

More information

New Jersey Solar Roundtable

New Jersey Solar Roundtable New Jersey Solar Roundtable Transition to a Market-based REC Financing System Scott Hunter, Renewable Energy Program Administrator NJBPU, Office of Clean Energy Presented at New Jersey Institute of Technology

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7353 Available on www.roymorgan.com Roy Morgan Unemployment Profile Wednesday, 11 October 2017 2.498 million Australians (18.9%) now unemployed or under-employed In September 1.202 million

More information

MONTHLY PERFORMANCE DASHBOARD

MONTHLY PERFORMANCE DASHBOARD AUSTIN ENERGY MARCH 21 MONTHLY PERFORMANCE DASHBOARD A report highlighting key Austin Energy metrics for uary FY 21 FINANCIAL HEALTH Standard and Poor s Bond Rating Current AA AA Budget Based Revenues

More information

The International Cost Estimating and Analysis Association (ICEAA) Southern California Chapter September 9, 2015

The International Cost Estimating and Analysis Association (ICEAA) Southern California Chapter September 9, 2015 Sustainable Integrated Grid Initiative (SIGI): Technical and Economic Challenges of Integrating Renewable Energy, Electric Vehicle Charging and Battery Energy Storage in a Modern Grid The International

More information

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR Ameren Missouri AMENDED Renewable Energy Standard Compliance Report 2015 Prepared in Compliance with 4 CSR 240-20.100 June 23, 2016 NP Table of Contents Page INTRODUCTION...4 SECTION (8) (A) 1 A: TOTAL

More information

Monthly Operating Report. September 2016

Monthly Operating Report. September 2016 Monthly Operating Report September 20 September overview» For the month of September 20 Contact recorded: Electricity, gas and steam sales of 819 GWh (September 2015: 821 GWh) Netback of $79.50/MWh (September

More information

MONTHLY PERFORMANCE DASHBOARD

MONTHLY PERFORMANCE DASHBOARD AUSTIN ENERGY JULY MONTHLY PERFORMANCE DASHBOARD A report highlighting key Austin Energy metrics for e FY FINANCIAL HEALTH Standard and Poor s Bond Rating Austin Energy Rating AA AA Budget Based Revenues

More information

Operational Opportunities to Minimize Renewables Curtailments

Operational Opportunities to Minimize Renewables Curtailments Operational Opportunities to Minimize Renewables Curtailments Clyde Loutan Principal, Renewable Energy Integration July 24, 2017 2017 CAISO - Public Page 1 Agenda Background Real-time control performance

More information

MONTHLY PERFORMANCE DASHBOARD

MONTHLY PERFORMANCE DASHBOARD AUSTIN ENERGY MONTHLY PERFORMANCE DASHBOARD A report highlighting key Austin Energy metrics for uary FY 219 FINANCIAL HEALTH Standard and Poor s Bond Rating Austin Energy Rating AA AA Budget Based Revenues

More information

This presentation was given as part of a workshop on February 7, Presenters were:

This presentation was given as part of a workshop on February 7, Presenters were: This presentation was given as part of a workshop on February 7, 2018. Presenters were: Andrew Valainis, Montana Renewable Energy Association Bryan Von Lossberg, Renewable Energy Consultant Paul Herendeen,

More information

Thomas Alston Director of Business and Policy Development. Presented By N. Scottsdale Rd, Suite 410 Scottsdale Arizona 85257

Thomas Alston Director of Business and Policy Development. Presented By N. Scottsdale Rd, Suite 410 Scottsdale Arizona 85257 Residential Solar Workshop May 7 th 2008 Thomas Alston Director of Business and Policy Development Presented By 1475 N. Scottsdale Rd, Suite 410 Scottsdale Arizona 85257 Workshop Agenda An Overview of

More information

Northwest Territories Highway Traffic, 2004

Northwest Territories Highway Traffic, 2004 Northwest Territories Highway Traffic, 2004 Northwest Territories Highway Traffic, 2004 Department of Transportation Government of the Northwest Territories October 2005 Acknowledgements This report was

More information

Joint presentation by: Lead investor EPC, O&M

Joint presentation by: Lead investor EPC, O&M Rwanda 8.5 MW project -the first utility-scale solar plant in East Africa 12 months from PPA to Interconnection - the quickest power project ever in Africa? Joint presentation by: Lead investor EPC, O&M

More information

40KW Solar System for Apple Sauce Co

40KW Solar System for Apple Sauce Co 2012 40KW Solar System for Apple Sauce Co Document Created for The Apple Sauce Co by Luke M Hardy lmhardy@smartconsult.com.au Smartcom P/L For further details please contact Luke M Hardy SunUp Solar Pty

More information

December 2018 RenewableGenerations Monthly Report

December 2018 RenewableGenerations Monthly Report 2018 RenewableGenerations Monthly Report Ecosystem of Clean Energy Programs Contractor Training Webinar Table of Contents Solar Electric... 3 Solar Thermal Heating (Northern Nevada Gas Customers)... 5

More information

University of Michigan Eco-Driving Index (EDI) Latest data: October 2017

University of Michigan Eco-Driving Index (EDI)   Latest data: October 2017 University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: October 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation

More information

Northwest Territories Highway Traffic, 2002

Northwest Territories Highway Traffic, 2002 Northwest Territories Highway Traffic, 22 Northwest Territories Highway Traffic, 22 Department of Transportation Government of the Northwest Territories January 24 Acknowledgements This report was prepared

More information

MONTHLY PERFORMANCE DASHBOARD

MONTHLY PERFORMANCE DASHBOARD AUSTIN ENERGY MONTHLY PERFORMANCE DASHBOARD A report highlighting key Austin Energy metrics for ember FY 219 FINANCIAL HEALTH Standard and Poor s Bond Rating Austin Energy Rating AA AA Budget Based Revenues

More information

This presentation was given as part of a workshop on November 14, Presenters were:

This presentation was given as part of a workshop on November 14, Presenters were: This presentation was given as part of a workshop on November 14, 2017. Presenters were: Andrew Valainis, Montana Renewable Energy Association Bryan Von Lossberg Paul Herendeen, Missoula Federal Credit

More information

SolarPACE + Storage Expanding Opportunities and Improving Project Economics. Presented By:

SolarPACE + Storage Expanding Opportunities and Improving Project Economics. Presented By: SolarPACE + Storage Expanding Opportunities and Improving Project Economics Presented By: Introductions GELI Geli provides software solutions to help project developers and hardware suppliers bring commercial

More information

WinnCompanies Community Solar Photovoltaic to Benefit Affordable Housing Darien Crimmin Vice President of Energy & Sustainability

WinnCompanies Community Solar Photovoltaic to Benefit Affordable Housing Darien Crimmin Vice President of Energy & Sustainability WinnCompanies Community Solar Photovoltaic to Benefit Affordable Housing Darien Crimmin Vice President of Energy & Sustainability dcrimmin@winnco.com Massachusetts Solar Policy SREC I Program 2010 through

More information

Graph #1. Micro-Generation Generating Units in Alberta 20

Graph #1. Micro-Generation Generating Units in Alberta 20 2, Graph #1. Micro-Generation Generating Units in Alberta 2 Cumulative # of Generating Units 1,9 1,8 1,7 1,6 1,5 1,4 1,3 1,2 1,1 1, 9 8 7 6 5 4 3 2 Number of MGG Units as of 216 Mar 31 Number of Solar

More information

NJ Solar Market Update As of 10/31/15

NJ Solar Market Update As of 10/31/15 NJ Solar Market Update As of 10/31/15 Prepared by Charlie Garrison Renewable Energy Committee Meeting November 10, 2015 SOLAR INSTALLED CAPACITY DATA The preliminary installed solar capacity as of 10/31/15

More information

DMM 2017 Q4 Report Highlights

DMM 2017 Q4 Report Highlights DMM 2017 Q4 Report Highlights Gabe Murtaugh Senior Analyst Department of Market Monitoring Conference Call February 21, 2018 Outline Real-time market performance Higher prices in the 15-minute market Large

More information

Northwest Territories 2015 Highway Traffic Report

Northwest Territories 2015 Highway Traffic Report Northwest Territories 2015 Highway Traffic Report Northwest Territories Highway Traffic, 2015 Department of Transportation Government of the Northwest Territories September 2016 Acknowledgements This report

More information

August ATR Monthly Report

August ATR Monthly Report August ATR Monthly Report Minnesota Department of Transportation Office of Transportation Data and Analysis August 2011 Introduction The purpose of this report is to examine monthly traffic trends on

More information

Fort Providence Solar and Wind Monitoring Analysis

Fort Providence Solar and Wind Monitoring Analysis Fort Providence Solar and Wind Monitoring Analysis Source: NWT Bureau of Statistics Prepared for By Jean-Paul Pinard, P. Eng., PhD. 703 Wheeler St., Whitehorse, Yukon Y1A 2P6 Tel. (867) 393-2977; Email

More information

Lithium Ion Battery Energy Storage for Microgrids

Lithium Ion Battery Energy Storage for Microgrids Lithium Ion Battery Energy Storage for Microgrids David Mall Power Up Defense Energy Forum Fort Walton Beach, FL October 28, 215 Saft. A world leader for advanced and innovative applications Saft is the

More information

BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada. IEEE PES Meeting July 2014

BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada. IEEE PES Meeting July 2014 1 BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada IEEE PES Meeting July 2014 General BC Hydro Overview Crown Corporation Serving about 95% of province and 1.9 million customers

More information

Northwest Territories Highway Traffic, 2012

Northwest Territories Highway Traffic, 2012 Northwest Territories Highway Traffic, 2012 Northwest Territories Highway Traffic, 2012 Department of Transportation Government of the Northwest Territories August 2013 Acknowledgements This report was

More information

160 MW Solar-Wind Hybrid project with BESS at Ramgiri, Andhra Pradesh

160 MW Solar-Wind Hybrid project with BESS at Ramgiri, Andhra Pradesh Presentation on 160 MW Solar-Wind Hybrid project with BESS at Ramgiri, Andhra Pradesh by Solar Energy Corporation of India Ltd. Feb 3, 2019 2 February 2019 Solar Energy Corporation of India Ltd 1 Indian

More information

MAN engines supporting Wind power EAPIC, Nairobi, 2 nd September 2010

MAN engines supporting Wind power EAPIC, Nairobi, 2 nd September 2010 MAN engines supporting Wind power EAPIC, Nairobi, 2 nd September 2010 2010 Susanne S. Bech Managing Director MAN Diesel & Turbo Kenya Ltd. < 1 > Table of contents 1. MAN Diesel & Turbo Update on the strong

More information

What is the Future of Competitive Markets? Some Fundamental Preliminaries and View from Events in the PJM Market

What is the Future of Competitive Markets? Some Fundamental Preliminaries and View from Events in the PJM Market What is the Future of Competitive Markets? Some Fundamental Preliminaries and View from Events in the PJM Market Paul M. Sotkiewicz, Ph.D President December 7, 2016 What are the ideal properties of competitive

More information

GROWTH IN TENTH DISTRICT MANUFACTURING WAS SLIGHTLY POSITIVE Federal Reserve Bank of Kansas City Releases February Manufacturing Survey

GROWTH IN TENTH DISTRICT MANUFACTURING WAS SLIGHTLY POSITIVE Federal Reserve Bank of Kansas City Releases February Manufacturing Survey FOR RELEASE Thursday, February 27, 2014 EMBARGOED FOR 10 A.M. CENTRAL TIME CONTACT: Pam Campbell 405-270-8617 Pam.Campbell@kc.frb.org GROWTH IN TENTH DISTRICT MANUFACTURING WAS SLIGHTLY POSITIVE Federal

More information

Northwest Territories. Northwest Territories Highway Traffic, 2001

Northwest Territories. Northwest Territories Highway Traffic, 2001 Northwest Territories Northwest Territories Highway Traffic, 21 Northwest Territories Highway Traffic, 21 Acknowledgements This report was prepared by the Transportation Planning Division of the Department

More information

Storage in the energy market

Storage in the energy market Storage in the energy market Richard Green Energy Transitions 216, Trondheim 1 including The long-run impact of energy storage on prices and capacity Richard Green and Iain Staffell Imperial College Business

More information

MONTHLY PERFORMANCE DASHBOARD

MONTHLY PERFORMANCE DASHBOARD AUSTIN ENERGY MAY MONTHLY PERFORMANCE DASHBOARD A report highlighting key Austin Energy metrics for ch FY FINANCIAL HEALTH Standard and Poor s Bond Rating Current AA Target AA Budget Based Revenues and

More information

Northwest Territories 2017 Highway Traffic Report

Northwest Territories 2017 Highway Traffic Report Northwest Territories 2017 Highway Traffic Report Northwest Territories Highway Traffic, 2017 Department of Infrastructure Government of the Northwest Territories September 2018 Acknowledgements This report

More information

Energy Markets in Turmoil The Consumer Perspective

Energy Markets in Turmoil The Consumer Perspective Energy Markets in Turmoil The Consumer Perspective Sonny Popowsky Consumer Advocate of Pennsylvania Illinois State University Institute for Regulatory Policy Studies 63682 Springfield, IL May 17, 2001

More information

Renewable energy. and the smart grid. Presentation 3 rd Asian IAEE. 21 February 2012 Kyoto, Japan. Perry Sioshansi Menlo Energy Economics

Renewable energy. and the smart grid. Presentation 3 rd Asian IAEE. 21 February 2012 Kyoto, Japan. Perry Sioshansi Menlo Energy Economics Renewable energy and the smart grid Presentation 3 rd Asian IAEE 21 February 2012 Kyoto, Japan Perry Sioshansi Menlo Energy Economics San Francisco CA www.menloenergy.com Pleasure to be in Kyoto Always

More information

Generation and Reservoirs Statistics September 25, 2017

Generation and Reservoirs Statistics September 25, 2017 Generation and Reservoirs Statistics September 25, 2017 PUBLIC UTILITIES COMMISSION OF SRI LANKA Daily Generation Mix in MWh 1,560 4% 250 1% 8,010 10,900 28% 10,460 27% 7,820 CEB Hydro CEB Thermal Oil

More information

ELECTRICITY RATES. Rates Effective October 1, 2009

ELECTRICITY RATES. Rates Effective October 1, 2009 ELECTRICITY RATES FOR COMMERCIAL AND INDUSTRIAL CUSTOMERS Rates Effective October 1, 2009 If you would like information about our services, details about your rights and responsibilities, or a copy of

More information

Northwest Territories Highway Traffic, 2014

Northwest Territories Highway Traffic, 2014 Northwest Territories Highway Traffic, 2014 Northwest Territories Highway Traffic, 2014 Department of Transportation Government of the Northwest Territories August 2015 Acknowledgements This report was

More information

Modeling and Comparison of Dynamics of AC and DC Coupled Remote Hybrid Power Systems

Modeling and Comparison of Dynamics of AC and DC Coupled Remote Hybrid Power Systems Modeling and Comparison of Dynamics of AC and DC Coupled Remote Hybrid Power Systems Presenter: Tanjila Haque Supervisor : Dr. Tariq Iqbal Faculty of Engineering and Applied Science Memorial University

More information

Northwest Territories Highway Traffic, 2013

Northwest Territories Highway Traffic, 2013 Northwest Territories Highway Traffic, 2013 Northwest Territories Highway Traffic, 2013 Department of Transportation Government of the Northwest Territories August 2014 Acknowledgements This report was

More information

Macroeconomic Outlook. Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus

Macroeconomic Outlook. Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus Macroeconomic Outlook Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus Waterways Symposium Cincinnati, OH November 15-17, 2016 Topics Energy Macro Implications Inflation

More information

Northwest Territories 2016 Highway Traffic Report

Northwest Territories 2016 Highway Traffic Report Northwest Territories 2016 Highway Traffic Report Northwest Territories Highway Traffic, 2016 Department of Infrastructure Government of the Northwest Territories September 2017 Acknowledgements This report

More information

Solar photovoltaic research: Drakenstein Municipality

Solar photovoltaic research: Drakenstein Municipality Rooftop Solar PV Solar photovoltaic research: Drakenstein Municipality Karin Kritzinger and Imke Meyer, Date 22/04/2015 Dialogue on Utility and Local Scale Renewable Energy in South Africa 22 April 2015-1

More information

Advances in Energy Storage and Implementing a Peak Shaving Battery at Fort Carson

Advances in Energy Storage and Implementing a Peak Shaving Battery at Fort Carson Advances in Energy Storage and Implementing a Peak Shaving Battery at Fort Carson Travis Starns Business Development Manager - AECOM Nov. 20, 2018 Agenda Applications for energy storage Advances in energy

More information

NJ Solar Market Update As of 6/30/15

NJ Solar Market Update As of 6/30/15 NJ Solar Market Update As of 6/30/ Prepared by Charlie Garrison July 17, 20 SOLAR INSTALLED CAPACITY DATA The preliminary installed solar capacity as of 6/30/ is approximately 1,500.7 MW. Approximately

More information

Ministério de Minas e Energia. Minister Eduardo Braga. Brazil - Texas Chamber of Commerce - BRATECC May/2015

Ministério de Minas e Energia. Minister Eduardo Braga. Brazil - Texas Chamber of Commerce - BRATECC May/2015 1 Minister Eduardo Braga Brazil - Texas Chamber of Commerce - BRATECC May/2015 2 3 World s 7 th largest economy; Investment grade Fiscal adjustment taking place; Inflation being controlled; Large and diversified

More information

Docket No. DE Dated: 05/04/2015 Attachment CJG-1 Page 1

Docket No. DE Dated: 05/04/2015 Attachment CJG-1 Page 1 Docket No. DE - Dated: 0/0/0 Attachment CJG- Page 8 9 Summary of Forecasted Energy Service 0 Cost For January 0 Through December 0 TOTAL COST Cents per KWH Reference Fossil energy costs $ 9,9 $. Attachment

More information

ENERGY STORAGE. Integrating Renewables thanks to Consumers Flexibility. Energy Pool Développement SAS

ENERGY STORAGE. Integrating Renewables thanks to Consumers Flexibility. Energy Pool Développement SAS ENERGY STORAGE Integrating Renewables thanks to Consumers Flexibility 1 Introduction to Energy Pool The leading European Demand Response Operator YOUNG, FAST DEVELOPING COMPANY 2009 2010 2013 Company set

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 5842 Available on www.roymorgan.com Roy Morgan Unemployment Profile Thursday, 2 October 2014 Unemployment climbs to 9.9% in September as full-time work lowest since October 2011; 2.2 million

More information

MONTHLY PERFORMANCE DASHBOARD

MONTHLY PERFORMANCE DASHBOARD AUSTIN ENERGY MONTHLY PERFORMANCE DASHBOARD A report highlighting key Austin Energy metrics FINANCIAL HEALTH Standard and Poor s Bond Rating Austin Energy Rating AA AA Budget Based Revenues and Expenses

More information

Large scale solar power plant in Nordic conditions. Antti Kosonen, Jero Ahola, Christian Breyer, Albert Albó

Large scale solar power plant in Nordic conditions. Antti Kosonen, Jero Ahola, Christian Breyer, Albert Albó Large scale solar power plant in Nordic conditions Antti Kosonen, Jero Ahola, Christian Breyer, Albert Albó 25.8.214 Finland Finland: Location: between latitudes of 6 7 Area: 338 435 km 2 Population: 5.4

More information

Monthly Operating Report. February 2018

Monthly Operating Report. February 2018 Monthly Operating Report February 2018 February overview» For the month of February 2018 Contact recorded: Electricity and gas sales of 534 GWh (February 20: 551 GWh) Netback of $82.16/MWh (February 20:

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 6928 Available on www.roymorgan.com Roy Morgan Unemployment Profile Wednesday, 17 August 2016 Australian real unemployment jumps to 10.5% (up 0.9%) in July during post-election uncertainty

More information

NE (SE) Beam

NE (SE) Beam Predicted clear day beam and diffuse irradiances (/ W m 2 ) on vertical and horizontal surfaces on specified days in northern (N) and southern (S) hemispheres (see notes at foot of table): LATITUDE 60

More information

Sunrise: 05:48 N (S) Beam

Sunrise: 05:48 N (S) Beam Predicted clear day beam and diffuse irradiances (/ W m 2 ) on vertical and horizontal surfaces on specified days in northern (N) and southern (S) hemispheres (see notes at foot of table): LATITUDE 40

More information

Meridian Energy monthly operating report for December 2017

Meridian Energy monthly operating report for December 2017 Release Stock exchange listings: NZX (MEL) ASX (MEZ) Meridian Energy monthly operating report for December 217 Attached is Meridian Energy Limited's monthly operating report for the month of December 217.

More information

System Status Briefing

System Status Briefing System Status Briefing Phakamani Hadebe Interim Group Chief Executive 3 May 2018 Contents 1 Performance summary 2 Operational highlights 3 Generation performance 4 Distribution overview 5 Transmission

More information

Electricity Rates. For Commercial and Industrial Customers

Electricity Rates. For Commercial and Industrial Customers Electricity Rates For Commercial and Industrial Customers Rates Effective May 1, 2011 If you would like information about our services, details about your rights and responsibilities, or a copy of our

More information

TABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods.

TABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods. TABLE C-43. Manufacturers' new and unfilled orders, -74 {Amounts in millions of dollars] New orders t, I960. 27, 559 26, 903 30,672 30,115 31,086 33,005 35,322 37,952 41, 803 45, 944 46,763 50, 243 53,

More information

TENTH DISTRICT MANUFACTURING SURVEY REBOUNDED MODERATELY Federal Reserve Bank of Kansas City Releases January Manufacturing Survey

TENTH DISTRICT MANUFACTURING SURVEY REBOUNDED MODERATELY Federal Reserve Bank of Kansas City Releases January Manufacturing Survey FOR RELEASE Thursday, January 23, 2014 EMBARGOED FOR 10 A.M. CENTRAL TIME CONTACT: Bill Medley 816-881-2556 Bill.Medley@kc.frb.org TENTH DISTRICT MANUFACTURING SURVEY REBOUNDED MODERATELY Federal Reserve

More information

Unalakleet Update: Lessons learned & continual improvement. Alaska WWG

Unalakleet Update: Lessons learned & continual improvement. Alaska WWG Unalakleet Update: Lessons learned & continual improvement { Alaska WWG Welcome 1. System 2. Performance 3. Next steps Northwind 100 Turbines * Rated 600 kw * Predicted annual production: 1,500,000

More information

Scaling Successful Mini-grid Programs: Experience of Bangladesh

Scaling Successful Mini-grid Programs: Experience of Bangladesh Frontier Developments in Mini-grids Scaling Successful Mini-grid Programs: Experience of Bangladesh Farzana Rahman Unit Head (Investment), Renewable Energy IDCOL, Bangladesh 6 December 2017 Abuja, Nigeria

More information

ELECTRIC SERVICE RATE SCHEDULES. Effective November 1, 2017

ELECTRIC SERVICE RATE SCHEDULES. Effective November 1, 2017 ELECTRIC SERVICE RATE SCHEDULES Effective November 1, 2017 SCHEDULE 100 RESIDENTIAL SERVICE Residential Customers for all domestic uses. CHARACTER OF SERVICE: Alternating current, sixty-hertz 120/240 volts

More information

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th Alex Bettencourt Managing Director National Association Made Up of Entire Industry Utilities Industry Academia / R&D

More information

Design Criteria Data

Design Criteria Data OKLAHOMA CITY OK Latitude = 35.4 N WMO No. 72353 Longitude = 97.6 W Elevation = 133 feet Period of Record = 1973 to 1996 Average Pressure = 28.62 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693.

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693. 11983978 Jun 19, 217 1 124 958 PAST DUE $1,693.97 Meter Reading Information Meter # 55271 May 3 655 Jun 15 6642 17 days 1397 on or about Aug 15 82 Past Due Balance payable includes an amount which is payable

More information

The impact of electric vehicle development on peak demand and the load curve under different scenarios of EV integration and recharging options

The impact of electric vehicle development on peak demand and the load curve under different scenarios of EV integration and recharging options The impact of electric vehicle development on peak demand and the load curve under different scenarios of EV integration and recharging options Electricity demand in France: a paradigm shift Electricity

More information

Alternative Energy Development Board February 2019

Alternative Energy Development Board February 2019 Hybrid Grid Solar PV Power Projects Alternative Energy Development Board February 2019 Introduction A Hybrid system can be achieved by harnessing energy through two or more different resources There are

More information

Design Criteria Data

Design Criteria Data MEDFORD/JACKSON CO. OR Latitude = 42.37 N WMO No. 72597 Longitude =122.8 W Elevation = 1329 feet Period of Record = 1973 to 1996 Average Pressure = 28.61 inches Hg Design Criteria Data Mean Coincident

More information

CLEAN POWER HEALTHY COMMUNITIES CONFERENCE

CLEAN POWER HEALTHY COMMUNITIES CONFERENCE CLEAN POWER HEALTHY COMMUNITIES CONFERENCE May 10 th, 2012 Tony Seba tony@tonyseba.com Solar Trillions Copyright 2008-2012 by Tony Seba Solar vs Conventional Power Costs Solar costs go down while conventional

More information

Regulation Update. Operating Committee September 12, PJM 2017

Regulation Update. Operating Committee September 12, PJM 2017 Regulation Update Operating Committee September 12, 2017 Regulation Market Clearing Price *Data up to Aug 22 2 Mileage Ratio Mileage Ratio has increased since the new signal implementation Larger Utilization

More information

Creating A Greener Energy Future For the Commonwealth. Massachusetts Solar Carve-Out (SRECs): Overview & Program Basics.

Creating A Greener Energy Future For the Commonwealth. Massachusetts Solar Carve-Out (SRECs): Overview & Program Basics. Massachusetts Solar Carve-Out (SRECs): Overview & Program Basics December 18, 2012 Outline Learn how the solar PV market has grown in MA since 2007 Understand the policy design of the MA Solar Carve-Out

More information

Up and Down Months of the Stock Market

Up and Down Months of the Stock Market Up and Down Months of the Stock Market 1926-2017 Positive years (66) in the stock market were not good all year long and losing years (24) were not losers throughout the year. Winning years produce losing

More information

Design Criteria Data

Design Criteria Data DES MOINES IA Latitude = 41.53 N WMO No. 72546 Longitude = 93.65 W Elevation = 965 feet Period of Record = 1973 to 1996 Average Pressure = 28.96 inches Hg Design Criteria Data Mean Coincident (Average)

More information

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN WORKSHOP ON SMALL WIND ENERGY AND HYBRID SYSTEMS & ITS RELEVANCE

More information

Operational Overview. Operational Forum, 24 th March 2010

Operational Overview. Operational Forum, 24 th March 2010 Operational Overview Operational Forum, 24 th March 21 Weather Weather February 21 The cold weather continued throughout February with all but one day being colder than the 17-year seasonal normal CWV.

More information

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy ENERGY STRATEGY FOR YUKON Independent Power Production Policy May 20, 2014 Page 2 of 11 BACKGROUND The Government of Yukon released the Energy Strategy for Yukon in January 2009. The strategy sets out

More information

Commuter Rail Update. October 25, 2018

Commuter Rail Update. October 25, 2018 Commuter Rail Update October 25, 2018 2 page page 3 State of Commuter Rail Network, July 2014 The 2014 Commuter Rail network had multiple issues and a history of neglect & under-investment FIRST UP? UPGRADES

More information

Design Criteria Data

Design Criteria Data LAS VEGAS/MCCARRAN NV Latitude = 36.8 N WMO No. 72386 Longitude =115.1 W Elevation = 2179 feet Period of Record = 1973 to 1996 Average Pressure = 27.67 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Residential Load Profiles

Residential Load Profiles Residential Load Profiles TABLE OF CONTENTS PAGE 1 BACKGROUND... 1 2 DATA COLLECTION AND ASSUMPTIONS... 1 3 ANALYSIS AND RESULTS... 2 3.1 Load Profiles... 2 3.2 Calculation of Monthly Electricity Bills...

More information

Design Criteria Data

Design Criteria Data PHOENIX/SKY HARBOR AZ Latitude = 33.43 N WMO No. 72278 Longitude =112. W Elevation = 116 feet Period of Record = 1973 to 1996 Average Pressure = 28.72 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Rojas Manyame General Manager: Regulation Electricity Control Board (ECB) Namibia

Rojas Manyame General Manager: Regulation Electricity Control Board (ECB) Namibia Rojas Manyame General Manager: Regulation Electricity Control Board (ECB) Namibia CONTENTS Background Renewable Resources Potential Institutional Framework Namibian ESI Current RE Procurement Status Challenges

More information

Action Requested From AMWG

Action Requested From AMWG Action Requested From AMWG NONE, These Two Presentations Are For Information Transfer Only The information is derived from a multi-year synthesis research effort related to existing data on flow, sediment-transport

More information