Laguna Verde Buried Piping Operating Experience. CFE LVNPP Juan Mercado

Size: px
Start display at page:

Download "Laguna Verde Buried Piping Operating Experience. CFE LVNPP Juan Mercado"

Transcription

1 Laguna Verde Buried Piping Operating Experience CFE LVNPP Juan Mercado October, 2013

2 INTRODUCTION - In-service failure may impact safety and plant operations that represent high cost. - Solution involves actions to Establish reasonable assurance of structural and leakage integrity of underground piping & tanks. 2

3 SOLUTIONS FOR THE BURIED PIPE ISSUES Mitigate and Arrest Degradation Develop Cathodic Protection and pipe coatings technologies that serve to stop further corrosion Program Support & Reference Materials Develop plans to effectively identify, monitor and manage buried pipe degradation

4 Diagnostic techniques Develop NDE Techniques that are effective at for finding and analyzing degradation in pipe Repair/Replace Tools SOLUTIONS FOR THE BURIED PIPE ISSUES Develop guidance and techniques for repairing or replacing buried pipe when required Coatings

5 Laguna Verde NPP DESIGN 5

6 CENTRAL NUCLEOELÉCTRICA LAGUNA VERDE Laguna Verde NPP Laguna Verde, Veracruz; 70 km. NNW FROM VERACRUZ City. Number for Units: 2 Reactor: BWR/5 General Electric Turbo-Generator: Before EPU: Mitsubishi Heavy Industries After EPU: ALSTOM Capacity per Unit: Before: 682 MWe After:810 MWe Commercial Operation (start): - Unit 1: July 29, Unit 2: Aplril 10, 1995

7 EMBEDDED PIPING ALL BUILDINGS: - FLOOR DRAIN SYSTEMS: SS PIPE TYPE 304, SCHEDULE 10, ASTM A FOR CHEMICAL WASTE RADIOACTIVE (CWR): SS PIPE TYPE 316L, SCHEDULE 40, ASTM A

8 Buried Piping CARBON STEEL PIPING STAINLES STEEL PIPING CuNi PIPING REF. M

9 PIPE COATING Pipe coating for buried Carbon Steel pipe is polyethylene film with a bonding adhesive. Pipe coating for buried Stainless Steel and CuNi pipe is polyethylene copolymer-film backing and compouned synthetic elastaners resins and filler adhesive layer. 9

10 LRA AMR/AMP XI.M.41Buried and Underground Piping and Tanks (developing) This program manages the effects of aging for buried and underground piping. The program addresses aging effects such as loss of material due to corrosion, cracking, and changes in material properties. 10

11 LRA AMR/AMP Systems, environments and materials covered by this program: EDG system: Buried Carbon Steel/Cooper nickel pipe. CSS system: Buried Stainless Steel pipe. HPCS system: Buried Stainless Steel pipe. NSW system: Buried CopperNickel pipe. M23H system: Buried Carbon Steel pipe. There are not underground piping and tanks in scope of LRA. 11

12 LRA AMR/AMP The Fire Protection System was installed in accordance with National Fire Protection Association (NFPA) Standard 24 and is subject to a flow test as described in section 7.3 of NFPA 25 at a frequency of once a year. Therefore, direct inspections are not required per XI.M41, "Buried and Underground Piping and Tanks." 12

13 LRA AMR/AMP All buried piping, regardless of their construction material, are inspected by visual means whenever they become accessible for any reason. Direct inspections of buried piping will be each 10-year period for both units, the systems are as follows: 13

14 LRA AMR/AMP - EDG system: Buried Carbon Steel pipe/copper Nickel pipe. - CSS system: Buried Stainless Steel pipe. - HPCS system: Buried Stainless Steel pipe. - NSW system: Buried Copper Nickel pipe. Inspection locations are selected based on risk, considering the coating condition, cathodic protection effectiveness, backfill characteristics, soil resistivity, pipe contents, and pipe function. Pipes with a compacted backfill will be selected instead of pipes under concrete floor. 14

15 THANK YOU!! 15

VALVES, FIRE HYDRANTS, AND APPURTENANCES

VALVES, FIRE HYDRANTS, AND APPURTENANCES VALVES, FIRE HYDRANTS, AND APPURTENANCES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Butterfly Valves B. Gate Valves C. Tapping Valve Assemblies D. Fire Hydrant Assemblies E. Flushing Devices (Blowoffs)

More information

CONTENTS. Foreword...iii. 1. Introduction...1

CONTENTS. Foreword...iii. 1. Introduction...1 Installation of Aboveground Storage Systems for Motor-Vehicle Fueling CONTENTS Foreword...iii SECTIONS 1. Introduction...1 1.1 Background...1 1.2 Purpose...1 1.3 Scope...1 1.4 Source...1 1.5 Use of PEI/RP100...1

More information

Operator Qualification (OQ) Report

Operator Qualification (OQ) Report AOCF 66102/67107 Abnormal Operating Conditions Field for Natural Gas and Hazardous Liquids 5/15/2014 5/15/2017 AOCG 67107 Abnormal Operating Conditions for Natural Gas 5/16/2014 5/16/2017 TM001 66101 02

More information

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section 7. UST Piping Corrosion Protection NCDENR Division of Waste Management Underground Storage Tank Section 1 Where piping connects to tank Piping Corrosion Protection 2 Main run of piping 3 Where piping connects

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION. A. Pipe, fittings, valves, and connections for sprinkler systems.

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION. A. Pipe, fittings, valves, and connections for sprinkler systems. SECTION 210500 - COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, valves, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS A. Section 099000

More information

Underground Gas Polyethylene (PE) Piping

Underground Gas Polyethylene (PE) Piping Underground Gas Polyethylene (PE) Piping Installation Guide February, 2011 Featuring the Con-Stab I.D. Seal Fittings from Continental Industries, Inc. ASSEMBLY INSTRUCTIONS: I.D. SEAL CON-STAB STEP 1 Verify

More information

ASTM Standard for Hit/Miss POD Analysis

ASTM Standard for Hit/Miss POD Analysis ASTM Standard for Hit/Miss POD Analysis Jennifer Brown, Steve James Pratt & Whitney Rocketdyne MAPOD Working Group Meeting November 19, 2010 1 Agenda ASTM Standard General Information Scope & Rationale

More information

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India Paper No. CAP34 CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS Vipul Vilas Sawant Mahanagar Gas Ltd, Mumbai, India vsawant@mahanagargas. com ABSTRACT Mahanagar Gas Ltd is a City

More information

FACILITY WATER DISTRIBUTION PIPING

FACILITY WATER DISTRIBUTION PIPING SECTION 221113 - FACILITY WATER DISTRIBUTION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

High Voltage Copper, Smooth Aluminum Shield/Sheath

High Voltage Copper, Smooth Aluminum Shield/Sheath High Voltage Copper, Smooth Aluminum Shield/Sheath XLPE Insulation, HDPE Jacket, 69 kv - 138 kv Features True triple vertical extrusion system for optimum insulation concentricity, and excellent electric

More information

Northern Natural Gas Contractor Covered Task List Last updated 4/26/2018

Northern Natural Gas Contractor Covered Task List Last updated 4/26/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Energy Transfer Partners LP Contractor Covered Task List Last updated 3/2/2018

Energy Transfer Partners LP Contractor Covered Task List Last updated 3/2/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Doctor V.E. Petrenko Regional Workshop in Tbilisi on Gas Infrastructure and European standard EN 1594, 2015

Doctor V.E. Petrenko Regional Workshop in Tbilisi on Gas Infrastructure and European standard EN 1594, 2015 What is the analysis of normative references? Example of analysis of normative references for the main European functional gas standard EN1594: 2013 (for maximum operating pressure (MOP) over 16 bar) Doctor

More information

Energy Transfer Partners LP Contractor Covered Task List Last updated 12/10/2018

Energy Transfer Partners LP Contractor Covered Task List Last updated 12/10/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005

More information

BUFFALO - XP. A StongFast Product. For more information call Or log on to

BUFFALO - XP. A StongFast Product. For more information call Or log on to Features and Benefits Version: 25/09/2017 Good bond strength with High load resistance Used with all grades of threaded rod Used in concrete and masonry Fast gelling and curing Used in dry and wet conditions

More information

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Demonstration Test Program for Long term Dry Storage of PWR Spent Fuel

Demonstration Test Program for Long term Dry Storage of PWR Spent Fuel IAEA-CN-226-79 Demonstration Test Program for Long term Dry Storage of PWR Spent Fuel 17 June 2015 S.Fukuda, The Japan Atomic Power Company N.Irie, The Kansai Electric Power Co., Inc. Y.Kawano, Kyusyu

More information

FRP VENTS. Fiberglass Reinforced Plastic Vents... No Exposed Metal Components. Distributed by Relevant Solutions relevantsolutions.

FRP VENTS. Fiberglass Reinforced Plastic Vents... No Exposed Metal Components. Distributed by Relevant Solutions relevantsolutions. FRP VENTS Fiberglass Reinforced Plastic Vents...... No Exposed Metal Components PROTECTOSEAL SERIES STYLE SIZES1 P8540 H End-of-Line Pressure / Vacuum 12" - 12" P18540 H Pipe-Away Pressure / Vacuum 12"

More information

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018 003 Test Breakout Tank Overfill Protective 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective 195.428 Oral 005 Repair Breakout Tank Overfill Protective 195.428 006 Inspection of Breakout

More information

The IAEA does not normally maintain stocks of reports in this series.

The IAEA does not normally maintain stocks of reports in this series. IAEA-TECDOC- The IAEA does not normally maintain stocks of reports in this series. However, microfiche copies SAFETY ASPECTS OF STATION BLACKOUT AT NUCLEAR POWER PLANTS IAEA, VIENNA, 1985 IAEA-TECDOC-332

More information

Comparison Between PE 4710 (PE 4710 PLUS) and PE 100 (PE 100+, PE 100 RC)

Comparison Between PE 4710 (PE 4710 PLUS) and PE 100 (PE 100+, PE 100 RC) Comparison Between PE 4710 (PE 4710 PLUS) and PE 100 (PE 100+, PE 100 RC) Author: Dr. Gene Palermo, President, Palermo Plastics Pipe Consulting, www.plasticspipe.com Abstract The scope of this paper is

More information

Polyfixer PSF. Features and Benefits Version: 14/04/2015

Polyfixer PSF. Features and Benefits Version: 14/04/2015 Features and Benefits Version: 14/04/2015 Good bond strength with High load resistance Used with all grades of threaded rod Used in concrete and masonry Fast gelling and curing Used in dry and wet conditions

More information

TransCanada US Contractor Covered Task List Last updated 9/27/2018

TransCanada US Contractor Covered Task List Last updated 9/27/2018 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Water Connection Repair Method and Techniques

Water Connection Repair Method and Techniques Water Connection Repair Method and Techniques LINE LOCATES APWA Colour Codes Representatives from utility companies can field locate their lines if required. Excavation Ensure excavation is on the opposite

More information

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 103 Non-destructive Testing (Other than testing of welds) -- Mag Particle 104 Non-destructive Testing (Other than testing of

More information

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018 Abnormal Operating Conditions Outside of 101.01 Room Abnormal Operating Conditions Inside of 101.02 Room 102.01 Measure Structure-to-Soil Potentials 102.02 Advanced Cathodic Testing 102.03 Active Corrosion/MIC

More information

AG1-BC BUTTERFLY VALVE

AG1-BC BUTTERFLY VALVE AG1-BC BUTTERFLY VALVE From 1970 close to our clients Technical datasheet Butterfly valve.. Edition 9.4 09/2016 ANGODOS Since 1970 ANGODOS has been technological leader in valves industry, manufacturing

More information

Noble Energy Contractor Covered Task List Last updated 2/20/2019

Noble Energy Contractor Covered Task List Last updated 2/20/2019 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005

More information

MATERIALS AND EQUIPMENT STANDARD FOR COAL TAR ENAMEL (HOT APPLIED) ORIGINAL EDITION MAY 1993

MATERIALS AND EQUIPMENT STANDARD FOR COAL TAR ENAMEL (HOT APPLIED) ORIGINAL EDITION MAY 1993 MATERIALS AND EQUIPMENT STANDARD FOR COAL TAR ENAMEL (HOT APPLIED) ORIGINAL EDITION MAY 1993 This standard specification is reviewed and updated by the relevant technical committee on Jan. 1999(1) and

More information

Columbia Pipeline Group Contractor Covered Task List Last updated 1/8/2018

Columbia Pipeline Group Contractor Covered Task List Last updated 1/8/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018

Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 018 Inspect Navigable Waterway Crossing 195.412(b) 201 Abnormal Operating Conditions Related to Welding on Pipelines 192.225

More information

High Voltage Aluminum, Smooth Aluminum Shield/Sheath

High Voltage Aluminum, Smooth Aluminum Shield/Sheath High Voltage Aluminum, Smooth Aluminum Shield/Sheath XLPE Insulation, HDPE Jacket, 69 kv - 138 kv Features True triple vertical extrusion system for optimum insulation concentricity, and excellent electric

More information

SECTION 17 FIRE HYDRANT ASSEMBLIES General

SECTION 17 FIRE HYDRANT ASSEMBLIES General SECTION 17 FIRE HYDRANT ASSEMBLIES 17-1.01 Scope 17-1 General This section describes the requirements for furnishing and installing as appurtenances to treated water mains. These requirements include the

More information

Black Hills Energy Contractor Covered Task List Last updated 10/10/2018

Black Hills Energy Contractor Covered Task List Last updated 10/10/2018 007 Operate Valves 103 Non-destructive Testing (Other than testing of welds) -- Mag Particle 201 Abnormal Operating Conditions Related to Welding on Pipelines 195.452(h) 192.225 192.227 192.715 192.717

More information

High-Strength Steel Reinforced HDPE Pipe. For pipe specifications, please visit:

High-Strength Steel Reinforced HDPE Pipe. For pipe specifications, please visit: Kanaflex Steel Reinforced Pipe (SRPE) Kanapipe for Storm and Sanitary Sewer Applications-12"-72" Kanaflex Steel Reinforced Pipe (SRPE) is the sound solution for storm drainage, combined sewer overflow,

More information

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 12/12/2017

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 12/12/2017 Abnormal Operating Conditions Outside of 101.01 Room Abnormal Operating Conditions Inside of 101.02 Room 102.01 Measure Structure-to-Soil Potentials 102.02 Advanced Cathodic Testing 102.03 Active Corrosion/MIC

More information

Health Monitoring of Rotating Equipment from Torsional Vibration Features

Health Monitoring of Rotating Equipment from Torsional Vibration Features College of Engineering Health Monitoring of Rotating Equipment from Torsional Vibration Features Martin W. Trethewey Department of Mechanical and Nuclear Engineering Penn State University April 13, 2007

More information

HP Sanitary Sewer Pipe 12 60

HP Sanitary Sewer Pipe 12 60 SaniTite HP Sanitary Sewer Pipe 12 60 The Most Advanced Name in Water Management Solutions TM Sanitite HP pipe 12 60 FOR SANITARY SEWER Meets ASTM F2764* SaniTite HP (High Performance) couples advanced

More information

INSTALLATION GUIDELINES

INSTALLATION GUIDELINES SUMP TANKS INSTALLATION GUIDELINES Thank you for purchasing a quality SumpTank. In order to gain the maximum benefit from your purchase, we have outlined the following instructions for the installation

More information

The Tecnatom s news bulletin JULY

The Tecnatom s news bulletin JULY JULY 2015 Nozzles inspection at Ringhals nuclear plant (Sweden) Inspection of control rods at Krsko nuclear The Tecnatom s plant (Slovenia) news bulletin Simulator for a combined cycle plant in Mexico

More information

National Fire Protection Association

National Fire Protection Association National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Liquefied Petroleum

More information

Standard G50 90 degree Table with cable to upper machine crosshead and G227 upper grips. G Width 130 mm (5.1 )

Standard G50 90 degree Table with cable to upper machine crosshead and G227 upper grips. G Width 130 mm (5.1 ) G50 Peel Test Fixture 90 Degrees with optional angle adjustment laminated surface coatings films packaging and rigid backings The G50 test fixture is ideal to test inflexible adherends for which a 180

More information

Boardwalk Pipeline Partners, LP Contractor Covered Task List Last updated 9/17/2018

Boardwalk Pipeline Partners, LP Contractor Covered Task List Last updated 9/17/2018 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Obtaining ASTM D6400- D6868 Approval

Obtaining ASTM D6400- D6868 Approval Rev 3.0 Obtaining ASTM D6400- D6868 Approval Woods End Laboratories inc. is a BPI Approved Certifier lab 1 Key BPI Requirements All products must meet ASTM D6400, ASTM D6868, ISO17088 or EN13432 Not contain

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS R913 FRP COMPOSITE STEEL UNDERGROUND STORAGE TANKS INSTALLATION INSTRUCTIONS February 2017 1.0 EXCAVATION AND BEDDING 1.1 The bottom of the excavation shall be covered with a minimum of 12 inches (305

More information

T.I. Midwood Co Ltd Green Lane Wardle Nantwich Cheshire CW5 6BJ T: +44 (0) F: +44 (0)

T.I. Midwood Co Ltd Green Lane Wardle Nantwich Cheshire CW5 6BJ T: +44 (0) F: +44 (0) Features and Benefits Version 05/07/2014 High bond strength with High load resistance Used with all grades of threaded rod and rebar in accordance with TR029 Used in non-cracked and cracked concrete Fast

More information

Fact Sheet #4 Reducing the Risk of Groundwater Contamination by Improving Petroleum Product Storage

Fact Sheet #4 Reducing the Risk of Groundwater Contamination by Improving Petroleum Product Storage Fact Sheet #4 Reducing the Risk of Groundwater Contamination by Improving Petroleum Product Storage N E W M E X I C O FARM A SYST Farmstead Assessment System Fact Sheet #4 Reducing the Risk of Groundwater

More information

Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018

Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018 Best Management Practice Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018 2018-0028 The Canadian Association of Petroleum Producers (CAPP) represents companies, large

More information

PASSIVE OPERATION Completely self-contained with no reliance on power supplies, sensors, actuators or any external components.

PASSIVE OPERATION Completely self-contained with no reliance on power supplies, sensors, actuators or any external components. GAS CONTROL VAREC 9 Series IN-LINE DETONATION FLAME ARRESTER The 9 Series In-Line Detonation Flame Arreresters are designed for installation in piping systems to provide explosion protection. Introduction

More information

TRADE EXPERIENCE LOG BOOK CANADIAN PETROLEUM CONTRACTORS ASSOCIATION. Petroleum Mechanic Training & Certification

TRADE EXPERIENCE LOG BOOK CANADIAN PETROLEUM CONTRACTORS ASSOCIATION. Petroleum Mechanic Training & Certification CANADIAN PETROLEUM CONTRACTORS ASSOCIATION Petroleum Mechanic Training & Certification TRADE EXPERIENCE LOG BOOK PM1 - Service & Maintenance PM2 - Underground Installation PM3 - Aboveground Installation

More information

Surface Protective Systems

Surface Protective Systems Surface Protective Systems Technical information Oxydur VEL-SR Mechanical applied electrically conductive laminate system Base Vinyl ester resin Material Group Membranes Tank- / vessel linings - laminates

More information

527 ECOSHIELD BIODEGRADABLE ROCK DRILL OIL ISO 46 through 320

527 ECOSHIELD BIODEGRADABLE ROCK DRILL OIL ISO 46 through 320 527 ECOSHIELD BIODEGRADABLE ROCK DRILL OIL ISO 46 through 320 Ecoshield Biodegradable Rock Drill Oil is a readily biodegradable, anti-wear, extreme pressure, emulsifiable, low fog generating oil that is

More information

7. Protection System Testing

7. Protection System Testing MANUAL FOR INSTALLATION AND MONITORING OF UNDERGROUND STORAGE TANKS WITH FACTORY INSTALLED ANODES 1. SCOPE Manufactured by: Granby Industries 1020 André-Liné Granby, Québec, Canada, J2J 1J9. Telephone:

More information

Technical Data. Sizes 2 in. to 24 in. (DN50 to DN600) Approvals UL and ULC Listed FM Approved

Technical Data. Sizes 2 in. to 24 in. (DN50 to DN600) Approvals UL and ULC Listed FM Approved Worldwide Contacts www.tyco-fire.com Model TJP Resilient-Seated Gate Valves with Vertical or Cross Wall Post Indicator General Description TYCO Model TJP Resilient-Seated Gate Valves with Vertical and

More information

Reference Data. Schedule 40 Steel Pipe Data. Schedule 80 Steel Pipe Data

Reference Data. Schedule 40 Steel Pipe Data. Schedule 80 Steel Pipe Data Schedule 40 Steel Pipe Data Maximum Recommended Pipe Size Pipe O.D. Thickness Weight of Pipe Filled With Water Span* Hanger Rod Ft. Meter Sizes 3/8" (10).675 (17.1).091 (2.3).6 (.9).7 (1.0) 7 (2.13) 3/8"-16

More information

Medium Voltage Cables for PermaLife Nuclear Utility Applications

Medium Voltage Cables for PermaLife Nuclear Utility Applications Medium Voltage Cables for PermaLife Nuclear Utility Applications The science behind our medium voltage cables. Fig. 1 Fig. 2 non-conducting stress control layer 100% production tested in accordance with

More information

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions WARNING HIGH VOLTAGE 115V 4 M AP Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions Important: For your protection and the safety of the

More information

Analyses of the grid resistance measurement of an operating transformer station

Analyses of the grid resistance measurement of an operating transformer station Ŕ periodica polytechnica Electrical Engineering 53/1-2 (2009) 73 77 doi: 10.3311/pp.ee.2009-1-2.09 web: http:// www.pp.bme.hu/ ee c Periodica Polytechnica 2009 Analyses of the grid resistance measurement

More information

Depth of Bury Tables 9B-5. A. General. B. Rigid Pipe Assumptions. Design Manual Chapter 9 - Utilities 9B - Trench Design

Depth of Bury Tables 9B-5. A. General. B. Rigid Pipe Assumptions. Design Manual Chapter 9 - Utilities 9B - Trench Design Design Manual Chapter 9 - Utilities 9B - Trench Design 9B-5 Depth of Bury Tables A. General The depth of bury tables on the following pages are based upon the design methodology from the various pipe material

More information

Standard G50 90 degree Table with cable to upper machine crosshead and G227 upper grips

Standard G50 90 degree Table with cable to upper machine crosshead and G227 upper grips G50 90 Degree Peel Test Fixtures G50 test fixtures are ideal to test inflexible adherends for which a 180 peel test is not suitable because of the cracking, breaking or delamination of the adherend. The

More information

This article discusses a tank

This article discusses a tank CASE HISTORY Hot Oil Aboveground Storage Tank Bottom Corrosion Failure and Cathodic Protection Upgrade Part 2 KEVIN C. GARRITY AND PHILIP D. SIMON, CC Technologies, Inc. Several types of anode installations

More information

PIGGING PRODUCTS. Capex supply. PIG LAUNCHER and RECEIVER

PIGGING PRODUCTS. Capex supply. PIG LAUNCHER and RECEIVER PIGGING PRODUCTS Capex supply PIG LAUNCHER and RECEIVER Before Cleaning After Cleaning TYPES OF PIGS DISPLACEMENT AND BATCHING PIGS AND PIG WITH BLADES (FOR CLEANING) 2 to 6 3 and 4 PIG with blades 5 to

More information

CATALOGUE SEWAGE MANHOLES

CATALOGUE SEWAGE MANHOLES CATALOGUE SC SEWAGE MANHOLES Table of contents TABLE OF CONTENTS Introduction 4 Inspection chamber, type 315 7 Inspection chamber, type 400 10 Inspection chamber, type 425 14 Assembly instruction 19 Catch

More information

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017 003 Test Breakout Tank Overfill Protective N/A 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective N/A 195.428 Oral 005 Repair Breakout Tank Overfill Protective N/A 195.428 007 Operate

More information

RG7H1R-1,8/3 26/45 kv RG7H1OR-1,8/3 18/30 kv

RG7H1R-1,8/3 26/45 kv RG7H1OR-1,8/3 18/30 kv Medium voltage - Energy RG7H1R-1,8/3 26/45 kv RG7H1OR-1,8/3 18/30 kv Structure and electrical, physical, mechanical requirements: CEI 20-13 IEC 60502 Flame propagation: EN 60332-1-2 Measurement of partial

More information

DONKIN ASSET PROTECTION SYSTEM WARRANTY UP TO 20 YEARS* DONKIN ASSET PROTECTION SYSTEM

DONKIN ASSET PROTECTION SYSTEM WARRANTY UP TO 20 YEARS* DONKIN ASSET PROTECTION SYSTEM DONKIN ASSET PROTECTION SYSTEM WARRANTY UP TO 20 YEARS* DONKIN ASSET PROTECTION SYSTEM THE DONKIN ASSET PROTECTION SYSTEM FOR VALVES As part of AVK s commitment to provide our customers with solutions,

More information

Environment Restoration Operations Solid Waste Management Unit (SWMU) 52: Filling Tanks 2 and 4 with a Permanent Insoluble Material - September 2013

Environment Restoration Operations Solid Waste Management Unit (SWMU) 52: Filling Tanks 2 and 4 with a Permanent Insoluble Material - September 2013 University of New Mexico UNM Digital Repository Environmental Restoration Sandia National Labs/NM Technical Reports 10-9-2013 Environment Restoration Operations Solid Waste Management Unit (SWMU) 52: Filling

More information

Epoxy Technology Embedded Poles

Epoxy Technology Embedded Poles Embedded Poles ABB Power Technologies / 1-6994 E 14-03-03 - Epoxy processing Experience in manufacturing of epoxy resin for indoor and outdoor applications Processing of more than 1,000 tons epoxy resin

More information

Williams Contractor Covered Task List Last updated 11/7/2017

Williams Contractor Covered Task List Last updated 11/7/2017 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Installation manual. NEMO fiberglass tanks

Installation manual. NEMO fiberglass tanks Installation manual NEMO fiberglass tanks We recommend that you read all installation instructions before installing or setting-up tanks or reservoirs. Contractor: Before setting-up or installing tank

More information

SOLID CONSTRUCTION PTFE STEP FACE GASKETS FOR IMPROVED SEALING PERFORMANCE IN MONDI PIPING

SOLID CONSTRUCTION PTFE STEP FACE GASKETS FOR IMPROVED SEALING PERFORMANCE IN MONDI PIPING SOLID CONSTRUCTION PTFE STEP FACE GASKETS FOR IMPROVED SEALING PERFORMANCE IN MONDI PIPING MIKE SHORTS, VP & GM TRIANGLE FLUID CONTROLS LTD. BELLEVILLE, ONTARIO, CANADA PHONE: 1-613-968-1100 MIKE@TRIANGLEFLUID.COM

More information

MADE OF STAINLESS...

MADE OF STAINLESS... MADE OF STAINLESS... Size : Ends : Min Temperature : Max Temperature : DN 15 to DN 200 Flanged R.F. PN25/40-29 C + 425 C Max Pressure : 40 Bars Specifications : Stainless steel removable filter Bolted

More information

Rigid Tube and Couplings

Rigid Tube and Couplings Rigid Tube and Couplings CONTENT 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Rigid Tube 291 Metric Tube Couplings 295 Imperial Tube Couplings 309 Stainless Steel Tube Couplings 317 Brass Tube Couplings 323 Twin Ferrule

More information

Commissioning Manual PLATE HEAT EXCHANGER. Customer Name: Serial number: Purchase order number: Project:

Commissioning Manual PLATE HEAT EXCHANGER. Customer Name: Serial number: Purchase order number: Project: Commissioning Manual PLATE HEAT EXCHANGER Customer Name: Serial number: Purchase order number: Project: Table of Contents ----------------------------------------------------------------- Page: 2 3 Name

More information

TECHNICAL GUIDE R410a SPLIT SYSTEM 1.5 to 5.0 NOMINAL TONS

TECHNICAL GUIDE R410a SPLIT SYSTEM 1.5 to 5.0 NOMINAL TONS Version.MDT-2016.T3.103 TECHNICAL GUIDE R410a SPLIT SYSTEM 1.5 to 5.0 NOMINAL TONS FEATURES AND BENEFITS COMPRESSOR: Compressors are protected with internal temperature and current overloads. An internal

More information

County of Fresno DEPARTMENT OF PUBLIC HEALTH

County of Fresno DEPARTMENT OF PUBLIC HEALTH County of Fresno DEPARTMENT OF PUBLIC HEALTH Purpose UNDERGROUND STORAGE TANK CLOSURE GUIDELINES This document has been prepared as a guide for underground storage tank (UST) owners and other interested

More information

DCP Midstream Contractor Covered Task List Last updated 7/11/2018

DCP Midstream Contractor Covered Task List Last updated 7/11/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 009 Movement and/or Relocation of Liquid Pipelines 195.424 011 Inspect,

More information

(The information contained in this document is for reference only and should not be used as a basis for product guarantee or warranty.

(The information contained in this document is for reference only and should not be used as a basis for product guarantee or warranty. Technical Specification for Professional Camcorder of Ni-MH Rechargeable Battery Pack Product Description Product No. Model No. : 12.0V Ni-MH, 4000mAh Camcorder Battery Pack : VMH9011 : Replace Sony NP-1B,

More information

Pump Station. Ama-Porter CK Pump Station. Type Series Booklet

Pump Station. Ama-Porter CK Pump Station. Type Series Booklet Pump Station Ama-Porter CK Pump Station Type Series Booklet Legal information/copyright Type Series Booklet Ama-Porter CK Pump Station All rights reserved. The contents provided herein must neither be

More information

TML TML. Socketless cast iron waste water system for civil engineering applications. Product information

TML TML. Socketless cast iron waste water system for civil engineering applications. Product information TM TM waste water system for civil engineering applications Product information TM Product range, technical data TM waste water system for civil engineering applications TM product information Tough and

More information

Innerlynx Type UL Fire Rated 3Hour Fire Stop ADVANCE PRODUCTS & SYSTEMS, INC. ISO-9001 CERTIFIED COMPANY - FM

Innerlynx Type UL Fire Rated 3Hour Fire Stop ADVANCE PRODUCTS & SYSTEMS, INC. ISO-9001 CERTIFIED COMPANY - FM Innerlynx Type UL Fire Rated 3Hour Fire Stop ADVANCE PRODUCTS & SYSTEMS, INC. ISO-9001 CERTIFIED COMPANY - FM53705 www.apsonline.com Why choose Innerlynx? offer 21 different sizes for all pipe diameters

More information

Nexans Network Solutions Div. Euromold

Nexans Network Solutions Div. Euromold Catalogue 2012 Nexans Network Solutions Div. Euromold COMPANY PRESENTATION EUROMOLD Euromold is the leading European specialised designer, manufacturer and distributor of prefabricated cable accessories

More information

PETROLEUM TANKS LIST PRICE EFFECTIVE: JANUARY 1, 2018 PUBLICATION NO. PG 11000X SUPERSEDES PG 11000W01/18

PETROLEUM TANKS LIST PRICE EFFECTIVE: JANUARY 1, 2018 PUBLICATION NO. PG 11000X SUPERSEDES PG 11000W01/18 PETROLEUM TANKS LIST PRICE EFFECTIVE: JANUARY 1, 2018 PUBLICATION NO. PG 11000X SUPERSEDES PG 11000W01/18 TABLE OF CONTENTS: Double-Wall Tanks...3 Tank Mounted Accessories...4 Miscellaneous Accessories...5

More information

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS Prepared by: ABB1 AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS 05619 Asset Type: Electric Metering Function: Design and Construction Issued by: Lisseth Villareal (LDV2) Date: 07-31-15 Rev. #10: This

More information

Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS

Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS BH TANK A Division Of American Tank Co., Inc. Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS American Tank Co., Inc. P.O. Box 340 Windsor CA 95492 www.bhtank.com

More information

Test Stations and Pipe-to-Soil Potential Measurements

Test Stations and Pipe-to-Soil Potential Measurements Test Stations and Pipe-to-Soil Potential Measurements Period #7 Practical Applications Course 2017 Mark James NACE CP II #5619, NACE CIP I #37041 1 Introduction Test Stations Wire Connection to Pipe Pipe-to-Soil

More information

Effective and flexible energy distribution. Conductor Rails. for electronic components. Multilayer Bus-Bar

Effective and flexible energy distribution. Conductor Rails. for electronic components. Multilayer Bus-Bar Effective and flexible energy distribution for electronic components Multilayer Bus-Bar Conductor Rails Multilayer Bus-Bar Cutting insulations to customer specification Conductor rails such as the multilayer

More information

Válvulas AG1-BD BUTTERFLY VALVE. From 1970 close to our clients

Válvulas AG1-BD BUTTERFLY VALVE. From 1970 close to our clients Válvulas AG1-BD BUTTERFLY VALVE From 1970 close to our clients Technical datasheet Butterfly valve.. Edition 2.5 06/2017 ANGODOS Since 1970 ANGODOS has been technological leader in valves industry, manufacturing

More information

For Sales & Information, Call Toll Free: (888)

For Sales & Information, Call Toll Free: (888) Outline Dimensions Serial Number (2) 0.28" (7.1 mm) 0.56" (14 mm) 10.0" (254 mm) 2.87" (72.9 mm) (19 mm) 0.19"(4.8 mm) thick Enclosure 12.25" (311 mm) 13.75" (349 mm) 2.75" (69.9 mm) (19 mm) 6.50" (165

More information

Heat Shrink closure Non - Pressurized & Pressurized RTSM Dome Closure RLSS RPBS Vault Closure Lead Sleeve Mechanical Closure Pillar Dp Jointing Kit

Heat Shrink closure Non - Pressurized & Pressurized RTSM Dome Closure RLSS RPBS Vault Closure Lead Sleeve Mechanical Closure Pillar Dp Jointing Kit Cable Joint Products Heat Shrink closure Non - Pressurized & Pressurized RTSM Dome Closure RLSS RPBS Vault Closure Lead Sleeve Mechanical Closure Pillar Dp Jointing Kit Compound Splice Filling BOOK 1.indd

More information

Test report P E. J. Magner Dipl.-Ing. (FH) N. Machill

Test report P E. J. Magner Dipl.-Ing. (FH) N. Machill Kiwa Polymer Institut GmbH Quellenstraße 3 D-65439 Flörsheim-Wicker Tel. +49 (0)61 45-5 97 10 Fax +49 (0)61 45-5 97 19 www.kiwa.de Test report P 8464-2-E Testing order: Tests on the coating Wecryl 124

More information

RESILIENT SEATED GATE VALVE FAF 6200

RESILIENT SEATED GATE VALVE FAF 6200 PRODUCTION STANDARTS DN40 DN800 PN 10-16 Design EN 1171 / EN 1074 Connection Face to Face EN 1092-2 / ISO 7005-2 - Flanged EN 558 Series 15 / DIN 3202 F5 Marking EN 19 Tests EN 12266-1 Corrosion Protection

More information

Steam Turbine Generator Core Isolation Issues at the Redhawk Combined Cycle Plant

Steam Turbine Generator Core Isolation Issues at the Redhawk Combined Cycle Plant Steam Turbine Generator Core Isolation Issues at the Redhawk Combined Cycle Plant Marques Montes Arizona Public Service Company Phoenix, AZ Includes material provided by John Demcko Redhawk Power Plant

More information

Pultruded carbon fibre plates for structural strengthening as part of a Sika CarboDur system

Pultruded carbon fibre plates for structural strengthening as part of a Sika CarboDur system Product Data Sheet Edition 31/03/2011 Identification no: 02 04 01 01 001 Sika CarboDur S Pultruded carbon fibre plates for structural strengthening as part of a Sika CarboDur system Construction System

More information

RAINWATER HARVESTING INSTALLATION GUIDE RH High Capacity Vortex Rainwater Fine Filter for Above or Below Grade Application

RAINWATER HARVESTING INSTALLATION GUIDE RH High Capacity Vortex Rainwater Fine Filter for Above or Below Grade Application RAINWATER HARVESTING INSTALLATION GUIDE RH9521-12 High Capacity Vortex Rainwater Fine Filter for Above or Below Grade Application RH9521-12 Vortex Filter Operation and Maintenance Overview The RH9521-12

More information

CENTRIFUGAL PUMP AND SEAL (API Std. 610 and 682) Presented By Prakash Kumar ME(NSPL)

CENTRIFUGAL PUMP AND SEAL (API Std. 610 and 682) Presented By Prakash Kumar ME(NSPL) CENTRIFUGAL PUMP AND SEAL (API Std. 610 and 682) Presented By Prakash Kumar ME(NSPL) CONTENTS OF PRESENTATION BRIEF ABOUT CENTRIFUGAL PUMPS AS PER Std.API 610. MECHANICAL SEAL DESIGN AS PER Std.API 682.

More information

Alliant Energy - Gas Service Manual Chapter 4 Gas Meter Connections

Alliant Energy - Gas Service Manual Chapter 4 Gas Meter Connections Gas Service Manual Chapter 4: Gas Meter Connections Page 1 of 24 Alliant Energy - Gas Service Manual Chapter 4 Gas Meter Connections Issued: 2018 Supersedes: 2015 A. GAS METER CONNECTIONS 1. All service

More information

LIST OF PUBLISHED STANDARDS

LIST OF PUBLISHED STANDARDS Report : 08-0-6 Page o : Of 5 LST OF PUBLSHED STDRDS Total Count: 78 umber SS umber pproved mendment SBS/TC 066 SS 97:07 7.0 Electric cables - mpregnated paper-insulated 07-0-7 metal-sheathed cables for

More information