CITY OF DULUTH STORMWATER DEPARTMENT UPDATE AUGUST 25,
|
|
- Wesley Lawson
- 5 years ago
- Views:
Transcription
1 CITY OF DULUTH STORMWATER DEPARTMENT UPDATE AUGUST 25,
2 STORMWATER DEPARTMENT Structure Inspections Stream Walks Detention Pond Inspections NPDES Construction Site Inspections Street Sweeping Dry Weather Screening Illicit Discharge Detection and Elimination Industrial and HVP Inspections Water Quality Testing SQAP Bromolow Creek Update the City s Stormwater Management Plan Revised MS4 Permit Construction and Maintenance Stormwater Communication
3 STORMWATER ZONES
4 STRUCTURE INSPECTIONS The current inventory is as follows: 2950 drainage structures (including headwalls, catch basins and inlets) 11 miles or 58,080 linear feet of ditches/swales 173 detention ponds 55 miles or 290,400 linear feet of storm drain pipes The new GIS person will work with Staff to update the infrastructure this year, since the construction of new neighborhoods and other developments, this number will increase each year The City s MS4 Permit with EPD states that we must inspect 20% of all structures each year and completed 100% of the City every 5-years. Inspections completed for the reporting year are as follows: 578 drainage structures 4.86 miles of ditches 7.29 miles of storm drain pipes 41 detention ponds As a result of the inspections 48 structures/projects were escalated for repair or replacement
5 STREAM WALKS Four (4) stream walks were performed along the Chattahoochee River and tributaries. Below are photos of Sweetwater Creek, we are coordinating a stream clean-up for this fall/winter.
6 DETENTION POND INSPECTIONS 41 detention ponds were inspected during the reporting year. The following items are included in the reports; Structural Repairs (walls, earthen dams, etc.) Structural Component Check (trash racks, inlets, orifice, etc.) Bank Erosion/Stabilization Vegetation Management Trash, Debris and Litter Sediment Removal/Volume Verification
7 DETENTION POND INSPECTIONS
8 DETENTION POND INSPECTIONS
9 DETENTION POND INSPECTIONS Lakes at Sugarloaf before \ Lakes at Sugarloaf after
10 DETENTION POND INSPECTIONS
11 STREET SWEEPING In July of this year all streets within the City limits were swept, including State and County roads. We will street sweep twice year, once in the Fall (Nov) and once in the Spring (April) The main reasons for street sweeping are: Water Quality keep the storm runoff free of sediment, metals, petroleum, trash and vegetation. To prevent the clogging of storm drain catch basins To enhance the appearance of the community To promote safety and to comply with the implementation of NPDES regulations
12 STREET SWEEPING BEFORE AND AFTER
13 STREET SWEEPING BEFORE AND AFTER
14 ILLICIT DISCHARGE DETECTION & ELIMINATION The Stormwater Department is responsible for illicit discharge inspections, complaints and enforcement. We have worked with Gwinnett County, EPD and the State to eliminate the pollutant sources.
15 ILLICIT DISCHARGE DETECTION & ELIMINATION
16 DRY WEATHER SCREENING
17 DRY WEATHER SCREENING INSPECTION PHOTOS
18 PIPE CLEANING BEFORE AND AFTER
19 PIPE CLEANING BEFORE AND AFTER The City contracted with Southern Hydrovac to clean out 22 pipe systems
20 INSPECTION PHOTOS
21 HIGHBROOKE TRAIL PROJECT - BEFORE The Highbrooke Trail Project included replacing a 24 corrugated metal pipe, replaced the headwall, adding rip-rap, and re-sodding all disturbed areas.
22 HIGHBROOKE TRAIL PROJECT - AFTER
23 CURRENT STORMWATER PROJECTS Bridlewood Drive 48 pipe replacement Longlake Drive 36 pipe replacement Chattawood Drive 36 pipe and headwall replacement Balleycastle Lane 48 pipe replacement Church Street 15 & 12 pipe replacement, regrade ditch and repave driveway apron Hall Circle 18 pipe replacement Highbrooke Trail 30 headwall repair Mill Run Drive 18 pipe replacement McClure Woods Drive 78 headwall repair River Summit Trail 24 & 48 pipe replacement Stonecroft Place 18 pipe and headwall replacement
24 CURRENT MAINTENANCE PROJECTS Balleycastle Lane catch basin replacement Clearbrooke Court catch basin replacement Howell Ferry Road catch basin replacement Lancing Court catch basin top replacement & add ladder Kenwood Drive catch basin top replacement Montheath Pass catch basin top replacement Stonebriar Court catch basin replacement Summercrest Lane catch basin top replacement Wyesham Circle catch basin top replacement
25 STORMWATER COMMUNICATION Complaints/Report a problem Phone Calls Website/Stormwater Page Intergovernmental Communication Duluth App Updates E-Blast Duluth Life Website
Baltimore City Department of Public Works
Baltimore City Department of Public Works Clean Sweep: Baltimore s Street Sweeping Program Kimberly L. Grove, P.E. Department of Public Works City of Baltimore December 2016 2 Street Sweeping since 1999
More informationB2. Fueling Operations
B2. Fueling Operations Commercial / Industrial / Institutional & Municipal Pollution Prevention Goal: Prevent or reduce the risk of discharge of pollutants to stormwater from vehicle and equipment fueling
More informationAutomotive Service Service Stations
Description This category includes facilities that provide vehicle fueling services, including self-serve facilities as well as those that provide a convenience store. Information specific to auto dismantling,
More informationSnow Dump Sites. APWA & PNS North American Snow Conference. April Designing a new snow dump site. Designing a new snow dump site
Snow Dump Sites Understanding What to Do with Collected Snow Québec City Among cities with a population of 500,000 or more, Québec City ranks second in the world for the highest snowfall, behind Sapporo,
More informationADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18
November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed
More informationPublic Works Committee Meeting AGENDA. June 5, 2018 City Hall
Public Works Committee Meeting AGENDA June 5, 2018 City Hall I CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Monthly Solid Waste Report 2. Monthly Streets & Transportation Report III. ADJOURN Public Works
More informationBID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.
PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00
More information2005 Land Development Review/ State of Public Works
2005 Land Development Review/ State of Public Works Overview Of Public Works Department Organization 2005 Land Development Review 2005 Positives Challenges Facing Public Works Department Organizational
More informationCity of Peachtree City
City of Peachtree City Lake Peachtree Spillway Replacement City Council Update September 15, 2016 Project Team Integrated Science & Engineering 1 Spillway Alternatives Analysis Spillway Alternatives Evaluated
More informationVehicle and Equipment Fueling
Vehicle and Equipment Fueling SC-20 Objectives Cover Contain Educate Reduce/Minimize Description Spills and leaks that occur during vehicle and equipment fueling can contribute hydrocarbons, oil and grease,
More informationATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study)
ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) Southern California Edison So Cal Gas Sub-transmission Project Hydrology and Hydraulics Study January 2014 2 Hydrology & Hydraulics
More informationTENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016
TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement
More informationTYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES
TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES This document is a summary of the Douglas County regulations and policies for constructing residential driveways. It is intended
More informationDESCRIPTION QUANTITY PRICE TOTAL
GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationCITY OF AVON PARK Highlands County, Florida Office of the City Manager 110 East Main Street Avon Park, Florida 33825
CITY OF AVON PARK Highlands County, Florida Office of the City Manager 110 East Main Street Avon Park, Florida 33825 JOINT WORKSHOP AVON PARK CITY COUNCIL & PLANNING AND ZONING BOARD CITY COUNCIL CHAMBERS
More informationLA CONNER MARINA MANDATORY BEST MANAGEMENT PRACTICES
LA CONNER MARINA MANDATORY BEST MANAGEMENT PRACTICES The following mandatory BMPs will be implemented at the La Conner Marina, per the Boatyard General Permit (effective June 1, 2011), issued by the Department
More informationPlattsburgh Downtown Parking Study
Plattsburgh Downtown Parking Study Study Update October 2017 Powered by Purpose of Study Engage Community in Parking Discussion Assess Current Conditions Parking Demand Patron Service Levels Administration
More informationMobility Program. City of St. Augustine. Mobility Program Update. City Commission Meeting Monday, August 27, Moving People Through History
Mobility Program City of St. Augustine Mobility Program Update City Commission Meeting Monday, August 27, 2018 Moving People Through History Program Update: North Florida Safe Streets Summit 2018 Program
More informationBus Stop Optimization Study
Bus Stop Optimization Study Executive Summary February 2015 Prepared by: Passero Associates 242 West Main Street, Suite 100 Rochester, NY 14614 Office: 585 325 1000 Fax: 585 325 1691 In association with:
More informationAMENDED CULVERT POLICY WITH MAIL BOX POLICY
AMENDED CULVERT POLICY WITH MAIL BOX POLICY REVISED MARCH 28, 2017 COMMISSIONERS COURT ORDER NO. 17-03-168 POLICY ACCEPTANCE AGREEMENT This page is to be signed by the Requesting Party and returned in
More informationSOLID WASTE AND RECYCLING ENCLOSURE STANDARDS
SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS Kitsap County Public Works July 2019 If you have any questions regarding the Standards or have recommendations for improvement, please contact: Sarah Olson
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:
Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationMobility Program. City of St. Augustine. Mobility Program Update. City Commission Meeting Monday, October 22, Moving People Through History
Mobility Program City of St. Augustine Mobility Program Update City Commission Meeting Monday, October 22, 2018 Moving People Through History Program Update: Activity Management Progress to Date Level/Initiative
More informationThis chapter shall be known and may be cited as the "Driveway Opening Local Law of the Town of Skaneateles."
Chapter 50 DRIVEWAY OPENINGS [HISTORY: Adopted by the Town Board of the Town of Skaneateles 6-6-1988 by L.L. No. 3-1988. Amendments noted where applicable.] Excavations in streets See Ch. 66. Streets and
More informationBeneficial Use Designations for Stream Reaches: Lower St. Croix River Watershed ( )
Beneficial Use Designations for Stream Reaches: Lower St. Croix River Watershed (07030005) Beneficial Use Legend 1A Domestic Consumption (does not require treatment) 1B Domestic Consumption (requires moderate
More informationStatewide Park & Ride Inventory and Usage Study, March 13, 2013 Liz McAdory, VDOT, Transportation & Mobility Planning Division
Statewide Park & Ride Inventory and Usage Study, 2013 March 13, 2013 Liz McAdory, VDOT, Transportation & Mobility Planning Division VDOT Park & Ride Lot Inventory & Usage Study Project Team: VDOT SIR Kimley-Horn
More informationFirst Defense. Stormwater Treatment System. Operation and Maintenance Manual
First Defense Stormwater Treatment System Operation and Maintenance Manual First defense OPERATION AND MAINTENANCE Table of Contents 3 First Defense by Hydro International - Benefits of the First Defense
More informationPurpose: General Provisions:
10-19-1 Purpose: The purpose of off-street parking requirements is to promote traffic/pedestrian safety and efficiency and to minimize hard surfaced areas to reduce storm water run-off and visual impacts
More informationCommunity Meeting Station Elements
Community Meeting Station Elements North Metro Rail Line September 25, 2014 1 RRP Shawn Plichta Design Build Coordination Manager 2 RTD Jane Donovan Deputy Project Manager 3 The RTD FasTracks Plan 122
More informationStormwater Treatment System
The Up-Flo Filter Stormwater Treatment System Table of Contents 3 Up-Flo Filter - Overview - General Product Description - Typical Configurations - Maintenance Services 4 Operation - Introduction - Pollutant
More informationRolling Road (Route 638) Widening Project
Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public
More informationDRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES
DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES These guidelines are provided to assist you in the construction of your driveway to help you determine: The best location on your property. What you need to
More informationLife Along The Apalachicola River (American Chronicles) By Jim McClellan READ ONLINE
Life Along The Apalachicola River (American Chronicles) By Jim McClellan READ ONLINE If searched for a book Life Along the Apalachicola River (American Chronicles) by Jim McClellan in pdf form, then you
More informationForm A STORM WATER POLLUTION PREVENTION PLAN ANNUAL UPDATE QUESTIONNAIRE
Form A-1 2016 STORM WATER POLLUTION PREVENTION PLAN ANNUAL UPDATE QUESTIONNAIRE 1. Contact Information a. Company Name: b. Street Address: City, State, Zip: c. Designated Contact: Title d. Contact Phone
More informationAll Annual Operating Plan Recipients
To: All Annual Operating Plan Recipients From: Lower Colorado Region Boulder Canyon Operations Office River Operations Group Daniel Bunk P.O. Box 647 Boulder City, NV 896-47 Phone: 72-293-83 The operation
More informationResidential and Municipal Solid Waste Collections Contract. January 15, 2019
Residential and Municipal Solid Waste Collections Contract January 15, 2019 1 Overview Background and history RFP Process and Results Automated and Manual Collections CalRecycle Compliance Recommendation
More information2011 STORM WATER POLLUTION PREVENTION PLAN ANNUAL UPDATE QUESTIONNAIRE
Form A-1 2011 STORM WATER POLLUTION PREVENTION PLAN ANNUAL UPDATE QUESTIONNAIRE 1. Contact Information a. Company Name: b. Street Address: City, State, Zip: c. Designated Contact: Title: d. Contact Phone
More informationCOLLEGE TOWNSHIP CENTRE COUNTY, PENNSYLVANIA ORDINANCE O ZONING REQUIREMENTS FOR STORAGE TANKS ORDINANCE
COLLEGE TOWNSHIP CENTRE COUNTY, PENNSYLVANIA ORDINANCE O-06-20 ZONING REQUIREMENTS FOR STORAGE TANKS ORDINANCE PROPOSED ORDINANCE TO AMEND THE COLLEGE TOWNSHIP CODE, CHAPTER 200 TO REGULATE THE LOCATION
More informationALBENI FALLS DAM AND LAKE PEND OREILLE
ALBENI FALLS DAM AND LAKE PEND OREILLE Fall Public Meeting 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 Aug. 7, 2017 255 255 255 239 65 53 80 119 27 252 174.59 83 36 118 110 135 120
More informationEffingham County Ash Roads Update 2018 Winter Storm Grayson Jan 16, 2018
Effingham County Ash Roads Update 2018 Winter Storm Grayson Jan 16, 2018 Brief History Ash from Georgia Pacific was applied to dirt roads starting in 2001 Georgia Environmental Protection Division approves
More informationBacteria TMDLs for Halls Bayou November 10, 2008
Bacteria TMDLs for Halls Bayou November 10, 2008 PARSONS Outline Watershed Overview Pollutant Pollutant Source Assessment Technical Approach: Load Duration Curves TMDL TMDL Calculations Halls Bayou Watershed
More informationPRESS RELEASE Tahoe Fire and Fuels Team
PRESS RELEASE Tahoe Fire and Fuels Team For Immediate Release November 13, 2015 Widespread prescribed fire operation to continue Contacts: North Lake Tahoe Fire Protection District, Isaac Powning 775-
More informationMonitoring Bank Erosion On the Missouri River, Lower Brule Reservation
Monitoring Bank Erosion On the Missouri River, Lower Brule Reservation A cooperative study between the Lower Brule Sioux Tribe s Environmental Protection Office and the U.S. Geological Survey, with assistance
More informationLane Reverse Q Pond Outlet Installation and Maintenance Guide
Lane Reverse Q Pond Outlet Installation and Maintenance Guide Introduction The Lane Reverse Q (RQ) Pond Outlet is a unique and extremely cost effective storm water Best Management Practices (BMP), which
More information6/ Lorraine Cassista. Paradise Ln. Oxford
6/15-16 Lorraine Cassista Paradise Ln Oxford Rip-Rap Cubic Yards 14 26.16 366.24 Erosion Control Mulch Cubic Yards 2 35.00 70.00 Bar Harbor Junipers 3 gallon 5 37.00 185.00 Bar Harbor Junipers 2 gallon
More informationVIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017
MANASSAS PARK STATION PARKING EXPANSION Public Meeting June 20, 2017 1 AGENDA Project Status Schematic Design Circulation Traffic Analysis Proposed Garage Location Next Steps Cost Estimate 2 PROJECT PHASES
More informationtraversing them. Speed dips may be installed in lieu of speed humps where the 85 th percentile speed on a street is at least 36 mph.
County of San Mateo Department of Public Works Residential Speed Control Device Program PURPOSE The purpose of the Residential Speed Control Devices 1 Program is to provide a consistent, fair and cost-effective
More informationSanta Fe Calvada Mine. Final Closure of a Heap Leach Facility Case Study in Design and Construction of E-cells
Santa Fe Calvada Mine Final Closure of a Heap Leach Facility Case Study in Design and Construction of E-cells Site Location Location with Surrounding Topography Overall Site Layout Google Earth View History
More informationA13 AVILA RANCH DEVELOPMENT PLAN SITE PLAN. Typical 58 R-1 Residential Street Section STREET SECTION. July 19, 2016 #
STREET SECTION SITE PLAN Typical 58 R-1 Residential Street Section 0 4 8 16 SCALE: 1 =8 (24 x36 sheet) A13 STREET SECTION SITE PLAN Typical 60 Collector Street Section 0 4 8 16 SCALE: 1 =8 (24 x36 sheet)
More informationPRESS RELEASE Tahoe Fire and Fuels Team
PRESS RELEASE Tahoe Fire and Fuels Team For Immediate Release November 6, 2015 Multiple agencies to conduct prescribed fire operations Contacts: North Lake Tahoe Fire Protection District, Isaac Powning
More informationEXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No
EXISTING PAVEMENT EVALUATION WILLMER ENGINEERING INC. Prepared For Clark Patterson Lee Suwanee, Georgia Prepared By WILLMER ENGINEERING INC. 3772 Pleasantdale Road Suite 165 Atlanta, Georgia 30340-4270
More informationPark & Ride Lot Investment Strategies
Park & Ride Lot Investment Strategies Hampton Roads Transportation Technical Advisory Committee May 7, 2014 Carl E. Jackson, AICP Transportation Planning Specialist Hampton Roads District VDOT Park & Ride
More informationPUBLIC WORKS DEPARTMENT DECEMBER 2017 UPDATE DESIGN & CONSTRUCTION DIVISION
TESTER ROAD WATER MAIN UPGRADE PUBLIC WORKS DEPARTMENT DECEMBER 2017 UPDATE DESIGN & CONSTRUCTION DIVISION The City will be replacing an aging water main under Tester Road this year. The project will begin
More informationClarksville Street Department. Fiscal Year 2018 Budget Presentation
Clarksville Street Department Fiscal Year 2018 Budget Presentation Clarksville Street Department FY 2018 Proposed Budget 4.2% 42.0% Salaries/Benefits 53.8% Operating Expenses Capital Outlay Clarksville
More informationThere was an excessive accumulation of grease in the 820 Pump Station.
June 19, 2009 Barrett Harrison, Mayor Blytheville WWTP - West P.O. Box 1784 Blytheville, AR 72315 RE: Sanitary Sewer Overflow Inspection - West AFIN: 47-00145 NPDES Permit No.: AR0022560 Dear Mr. Harrison:
More informationSidewalk Working Group Update October 22, 2018
Sidewalk Working Group Update October 22, 2018 The Neighborhood Sidewalk Repair Program & The Sidewalk Gap Program Improving Mobility Freedom in Denver Neighborhood Sidewalk Repair Program: Repairing hazardous
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationAppendix G Aquilla Lake Pool Rise Recreational Resources
Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative
More informationAsta Construction Inc., S. Schmitt, personal communication, (Per Wagner & Bonsignore)
Section 8 References Albert Webb and Associates. (1969). Analysis of the Flow of the Santa Ana River at the Riverside Narrows in Riverside County, San Diego. (Per Wagner & Asta Construction Inc., S. Schmitt,
More informationTOWN OF PRIMROSE DANE COUNTY, WI DRIVEWAY ORDINANCE
TOWN OF PRIMROSE DANE COUNTY, WI DRIVEWAY ORDINANCE 1.01 PURPOSE The purpose of this Ordinance is to regulate the establishment, construction, improvement, modification, or the reworking of a driveway
More informationFORT RUCKER Environmental Management System
Washrack and Oil Water Separator Operations and Maintenance Approved By: Phil Anderson / Melissa Lowlavar 1.0 PURPOSE This procedure defines the requirements for proper operation and maintenance of washracks
More informationBeneficial Use Designations for Stream Reaches: Clearwater River Watershed ( )
Beneficial Use Designations for Stream Reaches: Clearwater River Watershed (09020305) Beneficial Use Legend 1A Domestic Consumption (does not require treatment) 1B Domestic Consumption (requires moderate
More informationPublic Works Department, Capital Improvement Program Project Tracking
Community Facilities Name CF-01 Eastshore State Park/Powell Street Bioswale Seeking grant funding. TT CF-02 South Bayfront Bridge and Horton Landing Park CF-03 / - 04 Transit Center Updated plans are being
More informationPublic Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street
Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street Department of Environmental Services, Transportation Division Sept. 27, 2018
More informationFIS Terminal A Terminal B Aircraft Movement Area (Not Subject to Industrial Activities) AOA Boundary Attachment #1 SJC Airport AOA Site Map : Legend Date: Revised 6/20/2016 AIRPORT NAME:
More informationNOTE: ALL PRINTED EQUIPMENT OPERATING PROCEDURES ARE CONSIDERED UNCONTROLLED UNLESS STAMPED IN RED: CONTROLLED DOCUMENT.
EOP 7K01-0011 OPERATION OF AEROBIC DIGESTER AND SPRAY IRRIGATION PROCEDURE 1-11 I. INTRODUCTION II. BACK FLUSHING SPRAY IRRIGATION PUMPS III. PUMPING SLUDGE IV. CLEANING BASKET STRAINERS V. APPENDIX A
More informationSpeed Limit Reduction. January 24, 2017
Speed Limit Reduction January 24, 2017 History Dating back to 2001 the City Commission has discussed lowering the speed limit in certain areas to 25 mph in response to residential concerns. In May of 2015
More informationCSO/STORMWATER MANAGEMENT. Hydrovex VHV / SVHV Vertical Vortex Flow Regulator
CSO/STORMWATER MANAGEMENT Hydrovex VHV / SVHV Vertical Vortex Flow Regulator HYDROVEX VHV / SVHV VERTICAL VORTEX FLOW REGULATOR INTRODUCTION One of the major problems of urban wet weather flow management
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationPoint A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017
Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master
More informationRequest For Bids. Sewer Cleaning Truck
Release: Thursday 22 September 2006 Closes: Friday 6 October 2006 CITY OF BISHOP 377 West Line Street - Bishop, California 93514 Post Office Box 1236 - Bishop, California 93515 760-873-8458 publicworks@ca-bishop.us
More informationCITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN
Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add
More informationTown of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166
Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW
More information1) Activity Description: Management of Petroleum Storage Tanks and Containers
ES-301-4.09 Management of Petroleum Storage Tanks and Containers Document Identification Number ES-301-4.09 Document Owner: John Hambright 1) Activity Description: Management of Petroleum Storage Tanks
More informationCommunity Advisory Committee. October 5, 2015
Community Advisory Committee October 5, 2015 1 Today s Topics Hennepin County Community Works Update Project Ridership Estimates Technical Issue #4:Golden Valley Rd and Plymouth Ave Stations Technical
More informationEAGLE RIVER and COLORADO RIVER
FLOODPLAIN INFORMATION REPORT EAGLE RIVER and COLORADO RIVER EAGLE COUNTY, COLORADO PREPARED FOR: EAGLE COUNTY, COLORADO and the COLORADO WATER CONSERVATION BOARD This Floodplain Information Report of
More information1
1 2 3 4 5 6 7 8 9 10 11 12 Breakdown of License Changes Definitions First Draft ROW License Changes in Revised Draft Explanation of Change Dockless sharing Shared active transportation vehicle NACTO recommendation
More informationElected Officials Briefing North Metro Rail Line Update. November 10, 2016
Elected Officials Briefing North Metro Rail Line Update November 10, 2016 Dave Genova, RTD General Manager and CEO Five lines opening in 2016 Flatiron Flyer, Jan. 3 University of Colorado A Line, April
More informationOIL & GAS FIELD SYSTEMS
OIL & GAS FIELD SYSTEMS Washing + CONTAINMENT + TREATMENT = ground water protection The Solution is Clear with Riveer SM Engineered Wash Water Recovery Systems OIL & GAS Washing + Containment + Treatment
More informationFats, Oils & Grease Ordinance and Program. Presented by Lance McAvoy Deputy Director of Operations
Fats, Oils & Grease Ordinance and Program Presented by Lance McAvoy Deputy Director of Operations 1 Introduction What is FOG? What is the source of FOG? Why is FOG important? What is in the FOG Ordinance?
More informationTaylor s Falls Business Park
Site Information Taylor s Falls Business Park County Road 37, Taylors Falls, MN Chisago County HRA-EDA 12/23/2014 Taylors Falls Business Park County Road 37 Taylors Falls, MN 55084 PROPERTY FEATURES: Zoned
More informationCity of Belmont FY 2019 Budget Capital Improvement Program (in millions)
City of Belmont FY 2019 Budget Capital Improvement Program (in millions) Fleet and Equipment, $0.42 Storm Drainage, $0.51 Facilities Management, $0.05 Comcast, $0.12 Measure I Projects, $2.50 RMRA Street,
More informationFats, Oil, and Grease (FOG) Best Management Practices (BMP) For Food Service Facilities Information, Pollution Prevention, and Compliance Information
Fats, Oil, and Grease (FOG) Best Management Practices (BMP) For Food Service Facilities Information, Pollution Prevention, and Compliance Information Fats, oil and grease (FOG) can have negative impacts
More informationOWS OPERATIONS & MAINTENANCE
SUPPLEMENTAL INSTRUCTIONS 1. INTRODUCTION 1.1. Containment Solutions manufactures Oil/Water Separator (OWS) tanks with internal coalescing plates. These units are available in single or double-wall model
More informationAction Requested From AMWG
Action Requested From AMWG NONE, These Two Presentations Are For Information Transfer Only The information is derived from a multi-year synthesis research effort related to existing data on flow, sediment-transport
More informationUtilizing Collector for the Valve and Hydrant Crews. Colleen Larsen, GIS Coordinator Yelena Granovskaya, GIS/CAD Specialist
Utilizing Collector for the Valve and Hydrant Crews Colleen Larsen, GIS Coordinator Yelena Granovskaya, GIS/CAD Specialist Padre Dam Vicinity Statistics About Padre Dam Municipal Water District - Padre
More informationSection III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year
Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020
More informationThe Johnston VT Range
The Johnston VT Range GVWR: 26-36,000lbs ISO 9001 Certificate No. FM 83396 ISO 14001 Certificate No. EMS 533329 Extraordinary results from our most popular machines The VT has established itself as the
More informationMEMORANDUM. TO: Common Council-City of Madison, WI. FROM: Greg Galica and Ken Hallam (District 10 Residents) DATE: 06/15/2010
MEMORANDUM TO: Common Council-City of Madison, WI FROM: Greg Galica and Ken Hallam (District 10 Residents) DATE: 06/15/2010 SUBJECT: The need for the City of Madison to implement an automated waste cart/dumpster
More informationTRANSFER STATION OPERATING PLAN TOWN OF NORTH KINGSTOWN (Revised June 2016)
TRANSFER STATION OPERATING PLAN TOWN OF NORTH KINGSTOWN (Revised June 2016) This Operating Plan is for the Town s Transfer Station located at 345 Devils Foot Road for licensing period September 1, 2015
More informationREASONABLE FURTHER PROGRESS REPORT FOR THE MONO BASIN PM-10 STATE IMPLEMENTATION PLAN
REASONABLE FURTHER PROGRESS REPORT FOR THE MONO BASIN PM-10 STATE IMPLEMENTATION PLAN September 2001 This document provides a progress report on air quality trends in the Mono Basin federal PM-10 1 nonattainment
More informationCity of Tega Cay, South Carolina
Fats, Oil and Grease (FOG) Best Management Practices (BMP s) HOW GREASE TRAPS AND INTERCEPTORS WORK Every business that disposes of FOG (restaurants, grocery stores, meat markets, hotels, factory and office
More informationBaltimore City Opportunities The Year Ahead
Opportunities The Year Ahead Presented By: Azzam Ahmad, Acting Chief Office of Engineering and Construction November 7, 2017 FY 2018 Capital Improvement Program Summary (Millions) 6 Solid Waste Program
More informationStormwater Utility Agency Mission Agency Overview
Stormwater Utility Agency Mission The mission of the Stormwater Utility is to provide stormwater management services to the public, while maintaining an equitable rate structure. Agency Overview The Agency
More informationChapter 18 - REGULATIONS OF SOLID WASTE DISPOSAL, TRANSPORTATION AND STORAGE ON PUBLIC AND PRIVATE LANDS
Chapter 18 - REGULATIONS OF SOLID WASTE DISPOSAL, TRANSPORTATION AND STORAGE ON PUBLIC AND PRIVATE LANDS Sec. 18-1. Authority. Under authority granted in 24 VSA Chapter 1 Section 1-105(D) the City Council
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationTransportation Sustainability Program
Transportation Sustainability Program Photo: Sergio Ruiz A Comprehensive Approach to Growing Sustainably Public Investment and Strategies for Existing and Future Population Underway Transit capital and
More informationBeneficial Use Designations for Stream Reaches: Minnesota River - Mankato Watershed ( )
Beneficial Use Designations for Stream Reaches: Minnesota River - Mankato Watershed (07020007) Beneficial Use Legend 1A Domestic Consumption (does not require treatment) 1B Domestic Consumption (requires
More information