PRESS RELEASE Tahoe Fire and Fuels Team

Size: px
Start display at page:

Download "PRESS RELEASE Tahoe Fire and Fuels Team"

Transcription

1 PRESS RELEASE Tahoe Fire and Fuels Team For Immediate Release November 6, 2015 Multiple agencies to conduct prescribed fire operations Contacts: North Lake Tahoe Fire Protection District, Isaac Powning Tahoe Douglas Fire Protection District, Keegan Schafer Nevada Division of Forestry, Roland Shaw U.S. Forest Service, Lisa Herron South Lake Tahoe, Calif. North Lake Tahoe and Tahoe Douglas fire protection districts, the Nevada Division of Forestry and the U.S. Forest Service will continue prescribed fire operations in multiple locations around the Lake Tahoe Basin. Operations may take place on the South Shore, off Pioneer Trail and Saddle Road, near Sawmill Pond, off lower Tata Lane and F Street and near Christmas Valley. On the East Shore, operations may take place on Kingsbury Grade near Boulder Lodge, in Edgewood Canyon, off Kimberly Brook Lane near Andria Drive and in Lake Tahoe Nevada State Park near Spooner Lake. On the West Shore, operations may take place near D.L. Bliss State Park, Meeks Bay and Ward Canyon. On the North Shore, operations may take place near Sunnyside and off Fairway Drive near Tahoe City. Operations may continue over the next several weeks as conditions allow. Fall and winter bring cooler temperatures and precipitation, which favor prescribed burning. Each prescribed fire operation follows a prescribed fire burn plan, which considers

2 temperature, humidity, wind, moisture of the vegetation, and conditions for the dispersal of smoke. This information is used to decide when and where to burn. The Tahoe Fire and Fuels Team (TFFT) will give as much advance notice as possible before burning, but some operations may be conducted on short notice. Smoke from prescribed fire operations is normal and may continue for several days after an ignition depending on the project size and environmental conditions. Agencies coordinate with state and local county air pollution control districts and monitor weather conditions closely prior to prescribed fire ignition. They wait for favorable conditions that will carry smoke up and out of the Basin. Crews also conduct test burns before igniting a larger area, to verify how effectively fuels are consumed how smoke will travel. Before prescribed fire operations are conducted, agencies post road signs around areas affected by prescribed fire, send notifications and update the local fire information line at To receive prescribed fire notifications, send an to pa_ltbmu@fs.fed.us. For more information on prescribed fire operations and smoke management tips, visit Project Information: Project Name: Talmont/Mark Twain Responsible Agency/Contact: North Lake Tahoe Fire Protection District, Isaac Powning Legal Location: T 15N R16E Sec 13 (Talmont) T15N R17E Sec 7 (Mark Twain) Descriptive Location: Talmont, North Shore Total Acreage: 15 (Talmont) 7 (Mark Twain) TOTAL 22 Planned Ignition: 11/9/2015 and continuing as conditions permit Duration of Ignition and Smoke Production: two days of burn down time, each unit Estimated Direction of Smoke Travel: north/northeast/east Communities or Smoke Sensitive Areas: Smoke may be visible throughout Tahoe Basin and Project Name: Ward Creek Responsible Agency/Contact: North Lake Tahoe Fire Protection District, Isaac Powning Legal Location: T15N R16E Sec 23 Descriptive Location: Ward Canyon

3 Total Acreage: 18 Planned Ignition: 11/11/2015 and continuing as conditions permit Duration of Ignition and Smoke Production: two days of burn down time, each unit Estimated Direction of Smoke Travel: north/northeast/east Communities or Smoke Sensitive Areas: Smoke may be visible throughout Tahoe Basin and Project Name: Fairway/Bunker Responsible Agency/Contact: North Lake Tahoe Fire Protection District, Isaac Powning Legal Location: T 15N R17E Sec 6 Descriptive Location: Fairway Drive, Tahoe City, CA Total Acreage: 28 Planned Ignition: 11/11/2015 and continuing as conditions permit Duration of Ignition and Smoke Production: two days of burn down time, each unit Estimated Direction of Smoke Travel: north/northeast/east Communities or Smoke Sensitive Areas: Smoke may be visible throughout Tahoe Basin and Project Name: Summit Village South Responsible Agency/Contact: Tahoe Douglas Fire District, Keegan Schafer Legal Location: T13N, R19E, Sec 30 Descriptive Location: Boulder Base at Heavenly Ski Resort Total Acreage: 10 Estimated Direction of Smoke Travel: south, then becoming northeast Communities or Smoke Sensitive Areas: Smoke may be visible from Tramway and South Benjamin. Project Name: Edgewood Canyon Responsible Agency/Contact: Tahoe Douglas Fire District, Keegan Schafer Legal Location: T13N, R18E, Sec 25 Descriptive Location: Edgewood Canyon Road off Buchannan Total Acreage: 30 Planned Ignition: operations began 11/5/2015 and continuing as conditions permit Estimated Direction of Smoke Travel: south, then becoming northeast Communities or Smoke Sensitive Areas: Smoke may be visible from most parts of Kingsbury Grade.

4 Project Name: Kimberly Brooke Responsible Agency/Contact: Tahoe Douglas Fire District, Keegan Schafer Legal Location: T13N, R19E, Sec 18 Descriptive Location: Between Kimberly Brooke Lane and Andria Drive Total Acreage: 5 Planned Ignition: operations began 11/5/2015 and continuing as conditions permit Estimated Direction of Smoke Travel: south, then becoming northeast Communities or Smoke Sensitive Areas: Smoke may be visible from North Benjamin and Andria Drive. Project Name: North Canyon Pile Burn Responsible Agency/Contact: Nevada Division of Forestry, Roland Shaw (775) Legal Location: T14N R18E Sec 1; T15N, R18E, Sec 35,36 Descriptive Location: Lake Tahoe Nevada State Park, one mile north of Spooner Summit, east of SR28; Also burning north and east of Spooner Lake Total Acreage: 100 Planned Ignition: 11/16/2015 and continuing as conditions permit Duration of Ignition and Smoke Production: two days of burn down time Estimated Direction of Smoke Travel: northeast Communities or Smoke Sensitive Areas: Smoke may be visible from SR28, US50 in the Spooner summit area, Tahoe Rim Trail north and south of Spooner Summit, Washoe Valley and Carson City. Project Name: Slaughterhouse Pile Burn Responsible Agency/Contact: Nevada Division of Forestry, Roland Shaw (775) Legal Location: T15N, R18E, Sec 34 Descriptive Location: Lake Tahoe Nevada State Park, 1.5 miles north of Spooner Summit, west of SR28 Total Acreage: 5 Planned Ignition: 11/23/2015 and continuing as conditions permit Duration of Ignition and Smoke Production: three days of burn down time Estimated Direction of Smoke Travel: Northeast Communities or Smoke Sensitive Areas: Smoke may be visible from SR28, US50 in the Spooner Summit area and Skunk Harbor Road, north of Glenbrook. Project Name: Pioneer ULM Legal Location: T12N, R18E, Sec 1,2,3,4 Descriptive Location: Pioneer Trail and Saddle Road Total Acreage: 70 Duration of Ignition and Smoke Production: two weeks

5 Communities or Smoke Sensitive Areas: Smoke may be visible from South Lake Tahoe and Project Name: Twin Peaks Legal Location: T12N, R18E, Sec 17,20 Descriptive Location: Sawmill Rd and Lake Tahoe Blvd. Total Acreage: 100 Duration of Ignition and Smoke Production: one week Communities or Smoke Sensitive Areas: Smoke may be visible from South Lake Tahoe, Meyers and Project Name: EBN 5-9 Legal Location: T13N, R17E, Sec 8,9 Descriptive Location: Adjacent to D.L. Bliss State Park Total Acreage: 96 Duration of Ignition and Smoke Production: 1 week Communities or Smoke Sensitive Areas: Smoke may be visible from Tahoma and surrounding communities. Project Name: Meow 175 Legal Location: T12N, R18E, Sec 9 Descriptive Location: F Street and Tata Lane Total Acreage: 10 Planned Ignition: 11/12/2015 and continuing as conditions permit Duration of Ignition and Smoke Production: three days Communities or Smoke Sensitive Areas: Smoke may be visible from South Lake Tahoe and Project Name: Grass lake ULM Legal Location: 11N, 18E, Sec. 8, 17 Descriptive Location: Hwy 89/Grass Lake Road Total Acreage: 122 Planned Ignition: operations began 10/30/2015 and continuing as conditions permit Communities or Smoke Sensitive Areas: Smoke may be visible from Meyers, Christmas Valley and Echo Summit.

6 Project Name: Bobwhite Legal Location: 14N, 17E, Sec 29, 30, 32 Descriptive Location: Meeks Bay/Meeks Meadow Type of burn: Hand Total Acreage: 285 Planned Ignition: operations began 10/30/2015 and continuing as conditions permit Estimated Direction of Smoke Travel: West/ Southwest switching to East Northeast Communities or Smoke Sensitive Areas: Smoke may be visible from the North Shore, East Shore and some South Shore Communities. ### About the Tahoe Fire and Fuels Team The Tahoe Fire and Fuels Team (TFFT) consists of representatives of Tahoe Basin fire agencies, CAL FIRE, Nevada Division of Forestry and related state agencies, University of California and Nevada Cooperative Extensions, the Tahoe Regional Planning Agency, the U.S. Forest Service, conservation districts from both states, the California Tahoe Conservancy and the Lahontan Regional Water Quality Control Board. Our Mission is to protect lives, property and the environment within the Lake Tahoe Basin from wildfire by implementing prioritized fuels reduction projects and engaging the public in becoming a Fire Adapted Community. For more information, visit

PRESS RELEASE Tahoe Fire and Fuels Team

PRESS RELEASE Tahoe Fire and Fuels Team PRESS RELEASE Tahoe Fire and Fuels Team For Immediate Release November 24, 2015 Prescribed fire operations to continue next week Contacts: U.S. Forest Service, Lisa Herron 530-543-2815 Nevada Division

More information

PRESS RELEASE Tahoe Fire and Fuels Team

PRESS RELEASE Tahoe Fire and Fuels Team PRESS RELEASE Tahoe Fire and Fuels Team For Immediate Release November 13, 2015 Widespread prescribed fire operation to continue Contacts: North Lake Tahoe Fire Protection District, Isaac Powning 775-

More information

Transportation & Transit Activities

Transportation & Transit Activities Transportation & Transit Activities IN THE TAHOE REGION Tahoe Basin AND SURROUNDING REGION Attractive to outdoor enthusiasts with over 85% of Basin land publicly owned, over 75% by the USFS The Basin is

More information

Lake Tahoe Basin Wildfire Awareness Week 2011 Summary Report January 2012

Lake Tahoe Basin Wildfire Awareness Week 2011 Summary Report January 2012 Lake Tahoe Basin Wildfire Awareness Week 2011 Summary Report January 2012 The Lake Tahoe Basin Wildfire Awareness Week is funded by a grant from the Nevada Division of Forestry and USDA Forest Service

More information

NOTICE OF PROPOSED TRANSIT SERVICE CHANGES PUBLIC COMMENT PERIOD

NOTICE OF PROPOSED TRANSIT SERVICE CHANGES PUBLIC COMMENT PERIOD NOTICE OF PROPOSED TRANSIT SERVICE CHANGES PUBLIC COMMENT PERIOD Pursuant to TTD Transit Policy, this notice solicits public comment before approving any fare increase or major service reduction. The public

More information

US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT

US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT April 25, 2012 Tahoe Transportation District (TTD) Tahoe Transportation District (TTD) established 1980 as Bi-State Agency TTD Goals Implement Transportation

More information

MICRO MARKET REPORT Q UA RT E R

MICRO MARKET REPORT Q UA RT E R MICRO MARKET REPORT E AST S H O R E L A K E TA H O E Q UA RT E R 1 20 1 8 TA H O E M I C RO R E P O RTS.CO M EAST SHORE LAKE TAHOE NEIGHBORHOODS 5 4 3 2 6 1 1 Stateline 3 Skyland 5 Glenbrook 2 Zephyr Cove/Round

More information

Caltrans Shopp Lump Sum Projects and Backup List

Caltrans Shopp Lump Sum Projects and Backup List appendix d Caltrans Shopp Lump Sum Projects and Backup List 46 Tahoe Regional Planning Agency - Federal Transportation Improvement Program (Dollars in Whole) State Highway System DIST: PPNO: 03 COUNTY:

More information

MICRO MARKET REPORT NORTH & WEST SHORE LAKE TAHOE QUARTER TAHOEMICROREPORTS.COM

MICRO MARKET REPORT NORTH & WEST SHORE LAKE TAHOE QUARTER TAHOEMICROREPORTS.COM MICRO MARKET REPORT NORTH & WEST SHORE LAKE TAHOE QUARTER 2 2018 NORTH & WEST SHORE LAKE TAHOE NEIGHBORHOODS 1 3 4 2 1 North Shore - Lake Tahoe 2 West Shore - Lake Tahoe 3 Squaw Valley 4 Alpine Meadows

More information

5. Meyers 6. Y Area 7. Heavenly Valley 8. Stateline

5. Meyers 6. Y Area 7. Heavenly Valley 8. Stateline MICROMARKET REPORT SOUTH LAKE TAHOE Year-End 2013 www.tahoemicroreports.com SOUTH LAKE TAHOE NEIGHBORHOODS 3 1 8 7 9 6 4 2 10 5 1. Tahoe Keys 2. Montgomery Estates 3. Cascade Properties 4. Pioneer Trail

More information

Information as of August 25, SUMMER 2006 GPCA PLENARY September 9-10, South Lake Tahoe, CA. Hosted by Green Party of El Dorado County.

Information as of August 25, SUMMER 2006 GPCA PLENARY September 9-10, South Lake Tahoe, CA. Hosted by Green Party of El Dorado County. Information as of August 25, 2006 SUMMER 2006 GPCA PLENARY September 9-10, South Lake Tahoe, CA. Hosted by Green Party of El Dorado County. Day 1 Lake Tahoe Community College One College Drive South Lake

More information

Characterization of Combined Use of County Road Segment

Characterization of Combined Use of County Road Segment Department of Public Works Inyo County, California Characterization of Combined Use of County Road Segment Segment Name: _Lone Pine No. 1_ Purpose: Which of the following does the combined-use segment

More information

MICRO MARKET REPORT SOUTH LAKE TAHOE QUARTER TAHOEMICROREPORTS.COM

MICRO MARKET REPORT SOUTH LAKE TAHOE QUARTER TAHOEMICROREPORTS.COM MICRO MARKET REPORT SOUTH LAKE TAHOE QUARTER 1 2018 SOUTH LAKE TAHOE NEIGHBORHOODS 8 3 7 1 6 4 9 2 10 5 1 Tahoe Keys 2 Montgomery Estates 3 Cascade Properties 4 Pioneer Trail 5 Meyers 6 Y Area 7 Heavenly

More information

Truckee Meadows Fire Protection District Monthly Report

Truckee Meadows Fire Protection District Monthly Report Truckee Meadows Fire Protection District Monthly Report August 2013 The following report contains non-audited figures based on data extracted from the District s incident reporting system and Washoe County

More information

Bullhead City, AZ. Topock, Lake Havasu, Parker, Vidal Jct, Needles, AVI- 205 miles. Full day ride. Take Laughlin Ranch Blvd to Bullhead Pkwy

Bullhead City, AZ. Topock, Lake Havasu, Parker, Vidal Jct, Needles, AVI- 205 miles. Full day ride. Take Laughlin Ranch Blvd to Bullhead Pkwy Bullhead City, AZ to Bullhead Area Chamber of Commerce Topock, Lake Havasu, Parker, Vidal Jct, Needles, AVI- 205 miles. Full day ride Drive 205 miles, 4 h 3 min Map data 2015 Google 10 mi Bullhead City,

More information

MICROMARKET REPORT TRUCKEE. 6. Gray s Crossing 7. Old Greenwood 8. Lahontan 9. Martis Valley 10. Northstar

MICROMARKET REPORT TRUCKEE. 6. Gray s Crossing 7. Old Greenwood 8. Lahontan 9. Martis Valley 10. Northstar MICROMARKET REPORT TRUCKEE Quarter 3 2013 www.tahoemicroreports.com TRUCKEE NEIGHBORHOODS 1 2 4 3 5 6 7 8 9 10 1. Sierra County 2. Donner Summit 3. Donner Lake 4. Tahoe Donner 5. Truckee 6. Gray s Crossing

More information

Oregon Smoke Management Annual Report

Oregon Smoke Management Annual Report Oregon Smoke Management Annual Report OREGON DEPARTMENT OF FORESTRY FIRE PROTECTION DIVISION SMOKE MANAGEMENT AND FUELS General File 1-2-5-910 OREGON SMOKE MANAGEMENT ANNUAL REPORT Prepared By: FIRE PROTECTION

More information

MICROMARKET REPORT TRUCKEE. 6. Gray s Crossing 7. Old Greenwood 8. Lahontan 9. Martis Valley 10. Northstar

MICROMARKET REPORT TRUCKEE. 6. Gray s Crossing 7. Old Greenwood 8. Lahontan 9. Martis Valley 10. Northstar MICROMARKET REPORT TRUCKEE Quarter 1 2013 www.tahoemicroreports.com TRUCKEE NEIGHBORHOODS 1 2 4 3 5 6 7 8 9 10 1. Sierra County 2. Donner Summit 3. Donner Lake 4. Tahoe Donner 5. Truckee 6. Gray s Crossing

More information

NORTH & WEST SHORE LAKE TAHOE

NORTH & WEST SHORE LAKE TAHOE MICROMARKET REPORT Quarter 3 2013 www.tahoemicroreports.com NORTH AND WEST SHORE LAKE TAHOE NEIGHBORHOODS 1 2 3 4 1. Lake Tahoe - North Shore 2. Squaw Valley 3. Alpine Meadows 4. Lake Tahoe - West Shore

More information

Lake Tahoe Real Estate Report Quarter Two, 2013

Lake Tahoe Real Estate Report Quarter Two, 2013 Lake Tahoe Real Estate Report Quarter Two, 2013 Quarter-two 2013 compared to Quarter-one, 2013 Y-O-Y comparison between quarter-two 2013 and quarter-two 2012 Notes and analysis for each region median sales

More information

MICROMARKET REPORT NORTH & WEST SHORE LAKE TAHOE YEAR END 2015 WWW.

MICROMARKET REPORT NORTH & WEST SHORE LAKE TAHOE YEAR END 2015 WWW. MICROMARKET REPORT WWW. NORTH AND WEST SHORE LAKE TAHOE NEIGHBORHOODS 1. Lake Tahoe - North Shore 2. Squaw Valley 3. Alpine Meadows 4. Lake Tahoe - West Shore MARKET MARKETS BY AREA NORTH SHORE SINGLE

More information

An Inside Look at Electric Reliability 2016 Electric Reliability Report

An Inside Look at Electric Reliability 2016 Electric Reliability Report An Inside Look at Electric Reliability 2016 Electric Reliability Report Stockton, Bakersfield, California California November November 6, 2017 3, 2016 Welcome 2 David Meier Senior Manager, Stockton Division

More information

Welcome. Liberty Utilities Reliability Reporting Workshop. October 3 & 6, 2017

Welcome. Liberty Utilities Reliability Reporting Workshop. October 3 & 6, 2017 Welcome Liberty Utilities Reliability Reporting Workshop October 3 & 6, 2017 1 Agenda Purpose of Workshops System Overview Key Utility Initiatives Reliability Performance Plans for Reliability Improvements

More information

Bullhead City, AZ. Topock, London Bridge, Lake Havasu, Yuma, Ogilby, Ripley, Needles. 437 miles. Two or three day ride

Bullhead City, AZ. Topock, London Bridge, Lake Havasu, Yuma, Ogilby, Ripley, Needles. 437 miles. Two or three day ride Bullhead City, AZ to Bullhead City, AZ Topock, London Bridge, Lake Havasu, Yuma, Ogilby, Ripley, Needles. 437 miles. Two or three day ride Drive 437 miles, 7 h 56 min Map data 2015 Google, INEGI 20 mi

More information

Preserving Railroad History along the Donner Pass Route. A Tale of Two Locomotives (and Their Donner Route Connections)

Preserving Railroad History along the Donner Pass Route. A Tale of Two Locomotives (and Their Donner Route Connections) DONNER CROSSINGS www.psrhs.org A Publication of Placer-Sierra Railroad Heritage Society Issue No. 12, Spring 2017 Preserving Railroad History along the Donner Pass Route A Tale of Two Locomotives (and

More information

STOREY CARSON CITY DOUGLAS NEVADA MILES KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775)

STOREY CARSON CITY DOUGLAS NEVADA MILES KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775) H U M B O L D T E L K O W A S H O E P E R S H I N G L A N D E R E U R E K A STOREY C H U R C H I L L W H I T E P I N E CARSON CITY L Y O N DOUGLAS M I N E R A L N Y E E S M E R A L D A L I N C O L N NEVADA

More information

MICROMARKET REPORT NORTH LAKE TAHOE

MICROMARKET REPORT NORTH LAKE TAHOE year end 2011 www.tahoemicroreports.com NEIGHBORHOODS 4 6 3 2 1 5 1. 2. 3. 4. 5. 6. Alpine Meadows Resort at Squaw Creek Squaw Valley Tahoe Donner Houses Tahoe Lakefront Houses Village at Squaw Valley

More information

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44 Engineering Report: Shasta-Trinity National Forest South Fork Management Unit Analysis of National Forest System Road 30N44 (milepost 0.00 to 0.40) for Motorized Mixed Use Designation Forest: Shasta-Trinity

More information

Year End Market Report Yearly % Difference

Year End Market Report Yearly % Difference Market Report Lake Tahoe Basin Single Family (Excluding lakefront) Lake Tahoe Basin Condo/Townhome (Excluding lakefront & lakefront condo project) Total Units Sold 318 309 3% Total Units Sold 84 57 47%

More information

Lake Tahoe Basin Management Unit and Tahoe National Forest, California; Calpeco 625 and 650 Electrical Line Upgrade Project EIS/EIS/EIR

Lake Tahoe Basin Management Unit and Tahoe National Forest, California; Calpeco 625 and 650 Electrical Line Upgrade Project EIS/EIS/EIR This document is scheduled to be published in the Federal Register on 04/10/2012 and available online at http://federalregister.gov/a/2012-08579, and on FDsys.gov [3410-11- P] DEPARTMENT OF AGRICULTURE

More information

Miamisburg, Ohio Train Derailment

Miamisburg, Ohio Train Derailment HAZMAT HISTORY The National Hazardous Materials offers as an avenue for responders to learn from the past and apply those lessons learned to future incidents for a more successful outcome. This coincides

More information

MICROMARKET REPORT EVERGREEN

MICROMARKET REPORT EVERGREEN quarter one 2012 www.coloradomicroreports.com EVERGREEN NEIGHBORHOODS 10 13 8 11 14 9 15 1 7 16 4 2 5 12 6 3 1. 2. 3. 4. Bear Mountain Brook Forest Conifer Mountain Evergreen Highlands 7. Hangen Ranch

More information

Nonprofit Insurance Trust (NIT) Preferred Shop Network

Nonprofit Insurance Trust (NIT) Preferred Shop Network Nonprofit Insurance Trust (NIT) Preferred Shop Network NPIA, Inc. on behalf of the Nonprofit Insurance Trust and its members, has implemented a Preferred Shop Network for vehicle repairs. These shops have

More information

Mountain Area Transportation Study Model Methodology and Assumptions Final

Mountain Area Transportation Study Model Methodology and Assumptions Final Model Methodology and Assumptions Final February 19, 2017 Submitted to: 17J17-1768.17 Prepared by Iteris, Inc. Innovating Through Informatics TABLE OF CONTENTS 1.0 OVERVIEW... 1 1.1 Project Objective and

More information

The Run Ozaukee 2018

The Run Ozaukee 2018 Fs t A n n u a l 2 1 8 Rules Race Guide The course is open, unmarked, and unsupported o The course is the Interurban Trail, follow Interurban Trail signage o Runners are responsible for own safety and

More information

PHONE # FAX # BOX ELDER COUNTY P F P F P F CACHE COUNTY

PHONE # FAX # BOX ELDER COUNTY P F P F P F CACHE COUNTY 1 1 REHABILITATION ACILITIES Mission at Bear River Rehab Ctr 460 W 600 N, Tremonton 84337 Pioneer Care Ctr 815 S 200 W, Brigham City 84302 Willow Glen Health Rehab 775 N 200 E, Brigham City 84302 Rocky

More information

Montour No. 10 (Bob Ciminel 2012)

Montour No. 10 (Bob Ciminel 2012) Montour No. 10 (Bob Ciminel 2012) As we continue eastward from Montour No. 4, we reach Library Junction at Mile post 35.08. The west leg of the wye takes us onto the Library Branch. After crossing Library

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

VOUCHER INCENTIVE PROGRAM. Application Package

VOUCHER INCENTIVE PROGRAM. Application Package Application Package Please print clearly or type all requested information on this application. Submit all supporting documentation listed on the application checklist. Complete one application for each

More information

Emergency Vehicle Application Package

Emergency Vehicle Application Package Emergency Vehicle Application Package Please print clearly or type all requested information on this application. Submit all supporting documentation listed on the application checklist on page 3. Complete

More information

Fine particle pollution

Fine particle pollution www.pca.state.mn.us Fine particle pollution Fine particle pollution is a complex mixture of extremely small particles and liquid droplets that are created during combustion and can also be formed as other

More information

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009 State Regulatory Affairs and Local Relations Update ATC Customer Meeting November 19, 2009 Project Certification Steve Parker Manager State Regulatory Affairs CA/CPCN Applications (Filed/Ordered/Under

More information

VOUCHER INCENTIVE PROGRAM Application Package

VOUCHER INCENTIVE PROGRAM Application Package VOUCHER INCENTIVE PROGRAM Application Package Please print clearly or type all requested information on this application. Submit all supporting documentation listed on the application checklist on page

More information

Tri-State December 2013 Board Meeting

Tri-State December 2013 Board Meeting 1 For more information Tri-State webpage: www.tristategt.org click Operations then Transmission Planning (http://www.tristategt.org/transmissionplanning/puc3627_trans missionprojects.cfm) Email: (transmissionplanning@tristategt.org)

More information

Point Fire Case Study student handout (adapted from PMS 419, BLM Engine Operator Training)

Point Fire Case Study student handout (adapted from PMS 419, BLM Engine Operator Training) Point Fire Case Study student handout (adapted from PMS 419, BLM Engine Operator Training) You will only be concerned with the mistakes you feel that were made by the engine operators in Engines 10 and

More information

MOUNTAIN REGION EMERGENCY ROAD CAPACITY STUDY

MOUNTAIN REGION EMERGENCY ROAD CAPACITY STUDY MOUNTAIN REGION EMERGENCY ROAD CAPACITY STUDY April 16, 2012 2020 East First Street, Suite 400 Santa Ana, CA 92705 714-8356886 MOUNTAIN REGION EMERGENCY ROAD CAPACITY STUDY NOEL CASIL AND NEELAM SHARMA

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

VOUCHER INCENTIVE PROGRAM Application Package

VOUCHER INCENTIVE PROGRAM Application Package VOUCHER INCENTIVE PROGRAM Application Package Please print clearly or type all requested information on this application. Submit all supporting documentation listed on the application checklist on page

More information

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Engine Module Page 1 of 12 Wildland Back Fire Burn Out Revised

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Engine Module Page 1 of 12 Wildland Back Fire Burn Out Revised Engine Module Page 1 of 12 BACKFIRE/BURNOUT OPERATIONS During wildland firefighting operations firefighters occasionally fight the fire with fire. In situations where the flame length exceeds 15 or the

More information

4/23/2013 5:17 PM. Directions to University of Minnesota Duluth 1049 University Dr, Duluth, MN mi about 4 hours 53 mins. Loading...

4/23/2013 5:17 PM. Directions to University of Minnesota Duluth 1049 University Dr, Duluth, MN mi about 4 hours 53 mins. Loading... Directions to University of Minnesota Duluth 1049 University Dr, Duluth, MN 55812 245 mi about 4 hours 53 mins Loading... 2013 Google - Map data 2013 Google - Rosedale Shopping Center, Roseville, MN 55113

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

THOMAS FIRE INCIDENT SANTA BARBARA COUNTY DRAFT CONTINGENCY PLAN FOR MULTI DAY POWER OUTAGE December 2017

THOMAS FIRE INCIDENT SANTA BARBARA COUNTY DRAFT CONTINGENCY PLAN FOR MULTI DAY POWER OUTAGE December 2017 THOMAS FIRE INCIDENT SANTA BARBARA COUNTY DRAFT CONTINGENCY PLAN FOR MULTI DAY POWER OUTAGE December 2017 Situation Summary Santa Barbara County South Coast Electrical Supply Electrical service to the

More information

Mid-Coast Corridor Transit Project

Mid-Coast Corridor Transit Project San Diego Transportation Development Association Mid Coast Construction Update June 11, 2018 Mid-Coast Corridor Transit Project Mid-Coast Project 11-mile extension of Trolley Blue Line New LRT Infrastructure:

More information

Table of Contents PRIME INDUSTRIAL LAND. Arrowhead Drive /- acres Carson City, Nevada. For Sale $3.95 / SF

Table of Contents PRIME INDUSTRIAL LAND. Arrowhead Drive /- acres Carson City, Nevada. For Sale $3.95 / SF Arrowhead Dr., Carson City, NV Table of Contents Property Description...2 Lot Information...3 Lot Area Maps...4 Parcel Map...5 Powerline Map...6 Site Vicinity...7 Water & Sewer Lines...8 Test Pit Location...9

More information

Santa Clara County Parks and Recreation Department Roads and Airport Department Fire Prevention Operational Procedure

Santa Clara County Parks and Recreation Department Roads and Airport Department Fire Prevention Operational Procedure Santa Clara County Parks and Recreation Department Roads and Airport Department Fire Prevention Operational Procedure When Mowing, Disking and Performing Hot Work In Non-Irrigated Grass, Brush or Forest

More information

Engineering Report: Shasta-Trinity National Forest. Shasta McCloud Management Unit. Analysis of. National Forest System Road 37N79

Engineering Report: Shasta-Trinity National Forest. Shasta McCloud Management Unit. Analysis of. National Forest System Road 37N79 Engineering Report: Shasta-Trinity National Forest Shasta McCloud Management Unit Analysis of National Forest System Road 37N79 (milepost 0.56 to 2.28) for Motorized Mixed Use Designation Forest: Shasta-Trinity

More information

LAKE TAHOE BASIN AMERICANS WITH DISABILITIES ACT PARATRANSIT PLAN

LAKE TAHOE BASIN AMERICANS WITH DISABILITIES ACT PARATRANSIT PLAN LAKE TAHOE BASIN AMERICANS WITH DISABILITIES ACT PARATRANSIT PLAN PREPARED FOR Tahoe Regional Planning Agency PREPARED BY [ TRA N ~f'o RTATI ON C ON~l l l T \ N T~, INC. LAKE TAHOE BASIN AMERICANS WITH

More information

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.

More information

2018/2019 Big Bear Mountain Resorts Traffic Management Plan REVISED BIG BEAR MOUNTAIN RESORTS 2018/2019 TRAFFIC MANAGEMENT PLAN

2018/2019 Big Bear Mountain Resorts Traffic Management Plan REVISED BIG BEAR MOUNTAIN RESORTS 2018/2019 TRAFFIC MANAGEMENT PLAN REVISED 10-17-18 BIG BEAR MOUNTAIN RESORTS 2018/2019 TRAFFIC MANAGEMENT PLAN 1 TRAFFIC MANAGEMENT PLAN 2018/2019 SKI SEASON As a mitigation measure for Big Bear Mountain Resort (Resort) expansion, projects

More information

PASSED, APPROVED AND ADOPTED this 13 th day of November, Caretto, Jackowski, Putz, Herrick, Jahn. W.E. Jahn, Mayor ATTEST:

PASSED, APPROVED AND ADOPTED this 13 th day of November, Caretto, Jackowski, Putz, Herrick, Jahn. W.E. Jahn, Mayor ATTEST: RESOLUTION NO. 2017-34 A RESOULTION OF THE CITY COUNCIL OF THE CITY OF BIG BEAR LAKE, COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, REQUIRING NO PARKING SIGNS TO BE POSTED ON PORTIONS OF CERTAIN STREETS

More information

2005 City of Santa Paula Potable Water System Master Plan Amendment

2005 City of Santa Paula Potable Water System Master Plan Amendment 2005 City of Santa Paula Potable Water System Master Plan Amendment City of Santa Paula Project Engineer Randy Toedter, PE Brian Yanez June, 2012 970 Ventura Street Santa Paula, CA 93060 PURPOSE OF THE

More information

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2

More information

STOREY C A RSON DOUGLAS NEVADA MILES 50 KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775)

STOREY C A RSON DOUGLAS NEVADA MILES 50 KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775) H U M B O L D T E L K O W A S H O E P E R S H I N G L A N D E R E U R E K A C H U R C H I L L OREY W H I T E P I N E L Y O N C A RSON C IT Y DOUGLAS M I N E R A L N Y E E S M E R A L D A L I N C O L N

More information

TransNet Dollars Keep San Diego Moving

TransNet Dollars Keep San Diego Moving TransNet Dollars Keep San Diego Moving In 1987, San Diego region voters approved the TransNet program a half-cent sales tax to fund a variety of important transportation projects throughout the region.

More information

CITY OF BEVERLY HILLS STAFF REPORT

CITY OF BEVERLY HILLS STAFF REPORT Meeting Date: July 7, 2011 To: From: Subject: CITY OF BEVERLY HILLS STAFF REPORT Honorable Mayor & City Council Pamela Mottice Muller, Director of Emergency Management 405 Closure Attachments: 1. 1-405

More information

FDOT Debris Staging Areas (LEASED ST. JOE SITES) BAY COUNTY FRANKLIN COUNTY GULF COUNTY

FDOT Debris Staging Areas (LEASED ST. JOE SITES) BAY COUNTY FRANKLIN COUNTY GULF COUNTY FDOT Debris Staging Areas (LEASED ST. JOE SITES) BAY COUNTY FRANKLIN COUNTY GULF COUNTY Prepared For: Mr. Tom Bowen Florida Department of Transportation District Three Chipley, Florida Prepared By: Post,

More information

Sacramento Municipal Utility District s EV Innovators Pilot

Sacramento Municipal Utility District s EV Innovators Pilot Sacramento Municipal Utility District s EV Innovators Pilot Lupe Jimenez November 20, 2013 Powering forward. Together. Agenda SMUD Snapshot Pilot Plan v Background v At-a-Glance v Pilot Schedule Treatment

More information

Regional Woody Biomass Feedstock Assessments. Woody Biomass Utilization Workshop Quincy, California May 25, 2010

Regional Woody Biomass Feedstock Assessments. Woody Biomass Utilization Workshop Quincy, California May 25, 2010 Regional Woody Biomass Feedstock Assessments Woody Biomass Utilization Workshop Quincy, California May 25, 2010 Anatomy of a Woody Biomass Fuel Assessment Define Targeted Feedstocks Confirm Feedstock Sources

More information

WAKE TRANSIT PLAN Summer 2018

WAKE TRANSIT PLAN Summer 2018 WAKE TRANSIT PLAN Summer 2018 Planning for growth WAKE COUNTY s population already exceeds ONE MILLION and grows by more than 60 people a day. That s 23,000 people a year or basically another Morrisville.

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

Alachua/Bradford TIM Meeting February 14, 2017 Meeting Minutes

Alachua/Bradford TIM Meeting February 14, 2017 Meeting Minutes Alachua/Bradford TIM Meeting February 14, 2017 Meeting Minutes The list of attendees, agenda, and meeting handouts are attached to these meeting minutes. Introductions and TIM Updates provided by Dee Dee

More information

To: Operations & Scheduling Committee Date: 09/21/2017. From: Ruby Horta, Director of Planning & Marketing Reviewed by:

To: Operations & Scheduling Committee Date: 09/21/2017. From: Ruby Horta, Director of Planning & Marketing Reviewed by: To: Operations & Scheduling Committee Date: 09/21/2017 From: Ruby Horta, Director of Planning & Marketing Reviewed by: SUBJECT: Walnut Creek Transit Village Background: Construction at Walnut Creek BART

More information

15 Year Road Improvement / Maintenance Plan 2017 through 2031 Elko County Infrastructure Tax Allocation Roads Plan

15 Year Road Improvement / Maintenance Plan 2017 through 2031 Elko County Infrastructure Tax Allocation Roads Plan 15 Year Road Improvement / Maintenance Plan 2017 through 2031 Elko County Infrastructure Tax Allocation Roads Plan Estimated Annual Resources - $2,000,000 Elko County $ 1,500,000 75.00% $ 46,403 2.32%

More information

Lake Tahoe Basin Management Unit; CA; Meeks Bay Restoration Project. Notice of intent to prepare an environmental impact statement.

Lake Tahoe Basin Management Unit; CA; Meeks Bay Restoration Project. Notice of intent to prepare an environmental impact statement. This document is scheduled to be published in the Federal Register on 09/11/2018 and available online at https://federalregister.gov/d/2018-19682, and on govinfo.gov [3411-15- P] DEPARTMENT OF AGRICULTURE

More information

Rail alignment and benefits (rab) study

Rail alignment and benefits (rab) study Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study May 22, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create

More information

San Diego RX Club Well of the Eight Echoes Desert Run 2014

San Diego RX Club Well of the Eight Echoes Desert Run 2014 San Diego RX Club Well of the Eight Echoes Desert Run 2014 Rev: 1/11/2014 Event Details Date: Sunday, January 19 th Time: Meet at 8:30 AM Driver s mtg: 8:45 AM Promptly depart at 9:00 AM Location: Safari

More information

Page 1 of 7 YOUR TRIP: Total Route: 1 hr 55 min - 54.4 miles Est. Fuel cost: $3.23 - IRS Reimbursement: $29.39 650 9th Ave S, Safety Harbor, FL 34695-4246 1. Start out going west on 7th St S toward S Railroad

More information

Robb Drive Development

Robb Drive Development O f f e r i n g M e m o r a n d u m Robb Drive Development Interstate 80 & Robb Drive Reno, Nevada 8 5 A c r e s p r e s e n t e d e x c l u s i v e l y b y R o n C o b b Principal Direct: (775) 329-4000

More information

Historical count data from Page 7-14

Historical count data from Page 7-14 Project Background The annual Lawrence count data was collected following the National Bicycle & Pedestrian Documentation Project (NBPDP) methodology (http://bikepeddocumentation.org). The project aims

More information

Vehicle Classification Distribution Report By Route

Vehicle Classification Distribution Report By Route 2017 Vehicle Classification Distribution Report By Route Compiled by Nevada Department of Transportation Traffic Information Division 1263 S. Stewart St. Carson City, NV 89712 Printed June 2017 4 PREFACE

More information

A memorial service was held on October 24th for Mark and Jeanne Hounsell at LifePoint Church in Minden, NV.

A memorial service was held on October 24th for Mark and Jeanne Hounsell at LifePoint Church in Minden, NV. NEWSLETTER Celebrating our 50th Anniversary! November 2015 / Volume 4 / Issue 11 Inside this Issue Tragic Loss of Mark Hounsell Tahoe Agencies Awarded $9M for Bike Projects Turkey Trot Fun Run Regan Beach

More information

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be

More information

MICROMARKET REPORT BOULDER

MICROMARKET REPORT BOULDER Year-End 2013 www.coloradomicroreports.com BOULDER NEIGHBORHOODS 7 10 4 3 13 9 8 6 5 1 2 14 11 12 1. Central Boulder 2. East Boulder 3. Gunbarrel 4. Legend Ridge 5. Mapleton Hill 6. Newlands 7. Niwot 8.

More information

The Need to Reduce Marine Shipping Emissions

The Need to Reduce Marine Shipping Emissions The Need to Reduce Marine Shipping Emissions Doug Allard, Director, Santa Barbara County Air Pollution Control District Kathy Patton, Division Manager, Santa Barbara County Air Pollution Control District

More information

APPENDIX H. Transportation Impact Study

APPENDIX H. Transportation Impact Study APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett

More information

ANNUAL VEHICLE MILES OF TRAVEL

ANNUAL VEHICLE MILES OF TRAVEL NEVADA DEPARTMENT OF TRANSPORTATION AVMT AVMT AVMT AVMT AVMT AVMT AVMT ANNUAL VEHICLE MILES OF TRAVEL In Cooperation with U.S. Department of Transportation Federal Highway Administration, Nevada Division

More information

Request For Bids Elko County Solid Waste Refuse Hauling and Disposal in the Midas Solid Waste Management Districts

Request For Bids Elko County Solid Waste Refuse Hauling and Disposal in the Midas Solid Waste Management Districts Request For Bids Solid Waste Refuse Hauling and Disposal in the Midas Solid Waste Management Districts is requesting bid proposals for the Solid Waste Refuse Hauling and Disposal for the Midas Solid Waste

More information

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina Public Meeting & Open House July 23, 2013 Project Roadway Limits From: FM 1957 To: FM 471 MAP OR PHOTO Counties Bexar & Medina 1 I. Project History II. III. IV. Project Overview Project Alternatives Response

More information

CITY OF DULUTH STORMWATER DEPARTMENT UPDATE AUGUST 25,

CITY OF DULUTH STORMWATER DEPARTMENT UPDATE AUGUST 25, CITY OF DULUTH STORMWATER DEPARTMENT UPDATE AUGUST 25, 2 0 1 4 STORMWATER DEPARTMENT Structure Inspections Stream Walks Detention Pond Inspections NPDES Construction Site Inspections Street Sweeping Dry

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

REASONABLE FURTHER PROGRESS REPORT FOR THE MONO BASIN PM-10 STATE IMPLEMENTATION PLAN

REASONABLE FURTHER PROGRESS REPORT FOR THE MONO BASIN PM-10 STATE IMPLEMENTATION PLAN REASONABLE FURTHER PROGRESS REPORT FOR THE MONO BASIN PM-10 STATE IMPLEMENTATION PLAN September 2001 This document provides a progress report on air quality trends in the Mono Basin federal PM-10 1 nonattainment

More information

TAP PHASE 3.2 EXECUTIVE SUMMARY

TAP PHASE 3.2 EXECUTIVE SUMMARY TAP PHASE 3.2 EXECUTIVE SUMMARY Introduction In 2002 the North Central Texas Council of Governments (NCTCOG) launched the Thoroughfare Assessment Program (TAP), the goal of which has been to reduce vehicular

More information

Crestmont Development Update 2017 AGM

Crestmont Development Update 2017 AGM Crestmont Development Update 2017 AGM West Crestmont West Crestmont Will be built in phases finally reaching about 524 residential units. Rough grading for phases 9 & 10 already underway. First show home

More information

LOON LAKE HYDRO ACOUSTIC SURVEY RESULTS AND TREATMENT DATA 2012

LOON LAKE HYDRO ACOUSTIC SURVEY RESULTS AND TREATMENT DATA 2012 LOO LAKE HYDRO ACOUSTIC SURVEY RESULTS AD TREATMET DATA 212 632 W. Eastwood Drive Mequon, WI Hydro acoustics utilizes sound energy to detect objects and contours underwater. By integrating digital echo

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

INDUSTRIAL FOR SALE S Chestnut Ave, Fresno, CA FREESTANDING ±11,900 SF WAREHOUSE + LAND + TRUCK REPAIR BUSINESS PROPERTY FEATURES

INDUSTRIAL FOR SALE S Chestnut Ave, Fresno, CA FREESTANDING ±11,900 SF WAREHOUSE + LAND + TRUCK REPAIR BUSINESS PROPERTY FEATURES SALE PRICE: $1,525,000 (RE + Business) LOT SIZE: 1.64 Acres BUILDING SIZE: 11,900 SF APN: 331-090-15 ZONING: M-3 Zoning (Heavy Industrial) POWER: 800 Amps, 220V, 3-Phase MARKET: Southwest Fresno PROPERTY

More information

ASSEMBLY MEMBERS ADDRESS AND PHONE LIST

ASSEMBLY MEMBERS ADDRESS AND PHONE LIST Revised: September 26, 2017 ASSEMBLY MEMBERS ADDRESS AND PHONE LIST Assemblyman Elliot T. Anderson (D) (Clark, No. 15) 3135 South Mojave Road Unit 227 Las Vegas, Nevada 89121-8315 Assemblyman Nelson Araujo

More information

Lake Mead Intake No. 3

Lake Mead Intake No. 3 Lake Mead Intake No. 3 1 Lake Mead Intake No. 3 Total Project Scope INTAKE STRUCTURE PUMPING STATION ACCESS SHAFTS WATER TREATMENT FACILITY CONNECTOR TUNNEL INTAKE 1 INTAKE 2 C-2 Lake Mead Intake No. 3

More information