1 TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE Scoggins Creek Fire September 19, Annual Report prepared by Bernie Bonn for Scoggins Creek Fire 5 months later

2 Cover photos taken by: John Goans, Tualatin Valley Irrigation District

3 TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE 2014 Annual Report Prepared by: Bernie Bonn For: Clean Water Services In cooperation with: Oregon Water Resources Department, District 18 Watermaster

4 FLOW MANAGEMENT TECHNICAL COMMITTEE MEMBERS Kristel Fesler, Chair John Goans Jake Constans Raj Kapur Laura Porter Scott Porter Mark Rosenkranz Randy Smith Todd Winter City of Hillsboro Water Department Tualatin Valley Irrigation District Oregon Water Resources Department Clean Water Services Clean Water Services Washington County Emergency Management System Lake Oswego Corporation City of Forest Grove Washington County Parks Hagg Lake ACRONYMS USED IN THIS REPORT FULL NAME ACRONYM Facilities Spring Hill Pumping Plant SHPP Wastewater Treatment Facility WWTF Organization Barney Reservoir Joint Ownership BRJOC Commission Clean Water Services CWS Joint Water Commission JWC Lake Oswego Corporation LOC Oregon Department of Environmental Quality ODEQ Oregon Department of Fish and Wildlife ODFW Oregon Department of Forestry ODF Oregon Water Resources Department OWRD National Marine Fisheries Service NMFS Tualatin Valley Irrigation District TVID Tualatin Valley Water District TVWD Bureau of Reclamation BOR U.S. Fish and Wildlife Service USFWS U.S. Geological Survey USGS FULL NAME Units of Measurement Acre-Feet Cubic Feet per Second Micrograms per liter Milligrams per Liter Million Gallons per Day Pounds River Mile Water Year Water Quality Parameters Biochemical Oxygen Demand Dissolved Oxygen Sediment Oxygen Demand Other Biological Opinion Total Maximum Daily Load Wasteload Allocation ACRONYM ac-ft cfs g/l mg/l MGD lbs RM WY BOD DO SOD BiOp TMDL WLA Disclaimer This report and the data presented herein are provided without any warranty, explicit or implied. The data presented in this report were supplied by the members of the committee. Although every effort was made to faithfully reproduce the data as provided, the data are not warranted to be accurate, appropriate for interpretation, merchantable, or suitable for any particular purpose.

5 TABLE OF CONTENTS 2014 Summary Background Basin Description and Tualatin River Basin Map Tualatin River Water Management Member Reports for 2014 Reservoir Status Clean Water Services Joint Water Commission/Joint Barney Commission Lake Oswego Corporation Oregon Water Resources Department Scoggins Dam/Henry Hagg Lake Tualatin Valley Irrigation District Water Quality Biological Opinions Released in Scoggins Creek Fire Appendices A. Stream Gage Records Data Tables and Hydrographs of Daily Data B. Selected Releases and Withdrawals Data Tables and Hydrographs C. Scoggins Reservoir (Henry Hagg Lake) Operations Monthly Data Reports D. Barney Reservoir Operations Monthly Data Reports E. Municipal Water Use Allocations Monthly Data F. Temperature Records Data Tables and Graphs of Daily Data G. Hagg Lake omitted from the 2014 Flow Report because no monitoring was done in 2014 H. Precipitation Records I. River Mile Indices 2014 Tualatin River Flow Management Report 3

6 2014 SUMMARY This is the twenty-sixth year that the Tualatin River Flow Management Technical Committee has prepared an annual report documenting the flow management of the Tualatin River. Members of the committee include Clean Water Services (CWS), Tualatin Valley Irrigation District (TVID), Joint Water Commission (JWC), Lake Oswego Corporation (LOC) and Oregon Water Resources Department (OWRD). Highlights for 2014 include: Both Scoggins and Barney Reservoirs filled. Two Biological Opinions were issued regarding the operation of the Bureau of Reclamation's facilities in the Tualatin River basin (collectively called the Tualatin Project). The National Marine Fisheries Service (NMFS) concluded that the Tualatin Project is not likely to adversely affect Chinook salmon or steelhead, which are federally listed as threatened species. The US Fish and Wildlife Service (USFWS) concluded that the Tualatin Project did not jeopardize the continued existence of Fender s Blue butterfly (endangered) and Kincaid s lupine (threatened). A forest fire burned for 6 days in September in the Scoggins Creek area northwest of Hagg Lake. About 200 acres were burned; the damage is estimated at about $2 million. Weather highlights: January through early-february were particularly dry, resulting in low stream flows during that time. Mid-February through mid-may were very wet, resulting in periods with high stream flows. Low temperatures were above average during June-September and set records at several locations. Otherwise, the summer weather was typical dry and warm. Wapato Lake management was normal for water year 2014, with the lake pumped out by late April. The spring rains somewhat delayed the date at which the lake was finally pumped out. CWS continued its work to construct a natural treatment system at Forest Grove. The system is scheduled to be operational in Tualatin River at Farmington (RM 33.3 # ) Daily Mean Discharge (cfs) Statistical Distribution th percentile 75th percentile median 25th percentile 10th percentile /1 3/1 4/1 5/1 6/1 7/1 Date 8/1 9/1 10/1 1 12/1 12/ Tualatin River Flow Managment Report

7 BACKGROUND Basin Description The Tualatin River Basin comprises an area of 712 square miles situated in the northwest corner of Oregon and is a subbasin of the Willamette River. The headwaters are in the Coast Range and flow in a generally easterly direction to the confluence with the Willamette River. The basin lies almost entirely in Washington County. (See map below) The Tualatin River is about 80 miles long and changes dramatically from its headwaters to its mouth. The mountain or headwater reach (upstream of RM 55) is narrow (about 15 ft) and steep with an average slope of about 74 ft/mi. The meander reach (RM 55 33) is wider with an average slope of about 1.3 ft/mi. The reservoir reach (RM ) is very wide (up to 150 ft) and has an estimated slope of only 0.08 ft/mi. It includes several deep pools. Travel times through this reach are very long. The slow movement of the water causes this reach to act much like a lake. In the riffle reach (RM 3.4 0), the Tualatin River flows through a short reservoir section and then drops into a narrow gorge near the City of West Linn before it enters the Willamette River just upstream of Willamette Falls. The average slope in this reach is 10 ft/mi '30'' ' Tualatin River Basin ' ' '30'' 45 45' 26 WASHINGTON COLUMBIA Eas t Wes t R A N G E Gales Fork Fork T U A L A T I N WASHINGTON Creek MULTNOMAH C O L U M B IA R IV E R 45 30' TILLAMOOK O A C T S Study area S coggin Creek Cherry Grove Basin boundary Portland OREGON s RM 70 Henry Hagg Lake Creek YAMHILL 0 Dilley Banks Dairy Creek Cornelius Forest RM Grove 50 RM 60 TUALATIN C H E H A L E M North Plains McKay Chris tensen Cree Burris RIVER Creek McFee M O U N T A I N S Hillsboro RM 40 Creek He aton Rock Creek Beaverton Farmington Cr 5 10 MILES KILOMETERS k RM 30 Bronso n Butternut Cr Scholls Bake rcr C h ic ke n Creek PARRETT MOUNTAIN M O U N T A I N S RM 20 Creek Cedar Mill Creek Sherwood Tigard W I L L A M E T T E Creek Beaverton Fanno RM 10 Tualatin 5 Creek Nyberg Oswego Canal Cr CLACKAMAS OREGON Lake Oswego R I V E R West Linn RM ' Base modified from U.S. Geological Survey 1:100,000 topographic quadrangles, Designated urban growth area from Metro, 1998 RM 10 River mile 2014 Tualatin River Flow Management Report 5

8 Water sources to the Tualatin River Precipitation: Seasonal rainfall accounts for most of the natural flow in the Tualatin Basin; streamflow from snowmelt is minimal. The amount of rainfall ranges from 110 inches on the eastern slopes of the Coast Range to 37 inches in the southeastern area of the drainage basin. Peak months for rainfall are November through February while the driest months are normally June through October. The peak streamflow month is usually February and the lowest streamflow month is August. Barney Reservoir: Barney Reservoir is located behind Eldon Mills Dam on the Middle Fork of the North Fork of the Trask River (outside of the Tualatin Basin). A trans-basin aqueduct carries water over a low Coast Range divide to a pipeline that discharges into the Tualatin River at RM 78. Barney Reservoir has a capacity of 20,000 acre-feet and stores water for the Joint Water Commission (Cities of Hillsboro, Forest Grove and Beaverton, and the Tualatin Valley Water District) and Clean Water Services. The Barney Reservoir Joint Ownership Commission owns, operates and manages Barney Reservoir. Reservoir content is monitored through calibrated reservoir elevations; water releases are monitored using a stream gage located in the outlet flume. Water is released during the summer low-flow season to supplement shortages in natural flow. The water is used for municipal supply and for instream water quality. Storage in Barney Reservoir is also allocated to the Oregon Department of Fish and Wildlife. Those flows, to the Trask River, are measured using an instream weir. Scoggins Reservoir: In the early 1970s the Bureau of Reclamation built an earthen dam on Scoggins Creek (RM 5.1). Releases from Scoggins Reservoir (Henry Hagg Lake) flow down Scoggins Creek and enter the Tualatin River at RM Scoggins Reservoir has an active storage capacity of 53,640 acrefeet. It is a multipurpose facility with contracted water for irrigation, municipal and industrial, and water quality uses. Scoggins Reservoir is operated and maintained by the Tualatin Valley Irrigation District under contract with the Bureau of Reclamation. Flow into Scoggins Creek (RM 4.8) is monitored by a Bureau of Reclamation stream gage; Oregon Water Resources Department maintains the rating curve for this site. Clean Water Services: Clean Water Services provides sanitary and stormwater services to the urban areas of Washington County. A watershed-based NPDES permit allows Clean Water Services to discharge treated wastewater into the Tualatin River from four wastewater treatment facilities (WWTFs). The Rock Creek WWTF discharges an average of 50 cfs (33 MGD) at RM 38.1; the Durham WWTF discharges an average of 34 cfs (22 MGD) at RM 9.3. The Forest Grove and Hillsboro WWTFs (RM 55.2 and 43.8, respectively) are much smaller and do not discharge during the summer. (River mile locations given here are based on USGS topographic maps and may be slightly different from those used in Clean Water Services watershed-based NPDES permit which were obtained from a different source.) WWTF flow rates are continuously monitored at each WWTF. Clean Water Services also releases storage water from Scoggins and Barney Reservoirs for flow augmentation during the seasonal low flow periods to improve water quality in the Tualatin River, to offset a portion of the thermal load from the Rock Creek and Durham WWTFs, and to provide operational flexibility for their WWTFs. Water sources to the tributaries Clean Water Services: Clean Water Services has been using Tualatin Valley Irrigation District transmission lines to deliver water to several tributaries for flow restoration in the summer. About 1 to 2.5 cfs of water was added to McKay Creek since Similar programs were implemented for Gales Creek (2009), East Fork Dairy Creek (2010), West Fork Dairy Creek (2011) and Blackjack Creek (2014). The goal is to improve water quality, specifically increasing the dissolved oxygen concentration and decreasing the temperature.the flow augmentation water is from Clean Water Services allocation in Scoggins Reservoir Tualatin River Flow Managment Report

9 Water diversions from the Tualatin River Cherry Grove Intake (RM 73.2): The City of Hillsboro diverts water for municipal and industrial uses at the Cherry Grove Intake. This water is delivered to the rural residents of the Dilley and Cherry Grove areas (served by the City of Hillsboro), as well as the City of Gaston and the LA Water Cooperative (as Hillsboro wholesale customers). The diversion is less than 3 cfs and is monitored via metered flows. Spring Hill Pumping Plant (RM 56.3): The Spring Hill Pumping Plant is the largest diversion facility on the river. It is owned by the US Bureau of Reclamation (BOR) and operated jointly by the Tualatin Valley Irrigation District (TVID) and the Joint Water Commission (JWC). TVID, with a pumping capacity of approximately 90 MGD (140 cfs), delivers water to about 12,000 acres of irrigated cropland via a pressure pipeline. JWC, with a pumping capacity of approximately 60 MGD (90 cfs), delivers water to the Cities of Hillsboro, Forest Grove and Beaverton, to the Tualatin Valley Water District, and to the wholesale customers of these entities. Both TVID and JWC have natural flow water rights that are used when natural flow is adequate; they release contracted stored water from Scoggins and Barney Reservoirs to augment low natural flow in the summer. Pumping rates are monitored by TVID and JWC using telemetryequipped flow meters. Additional monitoring is provided by real-time stream gages on the Tualatin River located above and below the pumping plant and on Gales Creek. Wapato Canal Diversion: The US Fish and Wildlife Service (USFWS) now owns most of the land within the levees surrounding the Wapato Lake area. The duties of the now defunct Wapato Improvement District have been split between USFWS (to maintain the dike and levee system), and TVID (to operate and maintain the irrigation water delivery system). While USFWS develops a restoration plan, the area will remain in cooperative farming agreements. TVID diverts water from the Tualatin River at the Wapato Canal Diversion, near RM 62 as needed for irrigation of the historic lake bed and surrounding TVID customers. Water levels in Wapato Canal, which discharges from the lake bed into Wapato Creek, have been monitored by the USGS since September Irrigation Withdrawals: Water is obtained directly from the Tualatin River for irrigation purposes by members of the TVID and by irrigators with natural flow water rights. About 5,000 acres of cropland served by TVID is irrigated with water obtained directly from the Tualatin River. Some of the discharge from the Rock Creek WWTF (RM 38.1) is contracted to TVID to be used by downstream irrigators. Patton Valley Pump Plant: Tualatin Valley Irrigation District pumps water from Scoggins Creek (RM 1.71) into a low-pressure pipeline that serves customers along Patton Valley Road. Historically, this pipeline also diverted water into the upper Tualatin River (at RM 63.1 and RM 64.3) to supplement low flows in this reach, but this has not been needed in recent years due to releases from Barney Reservoir. Lake Oswego Canal Diversion: The Lake Oswego Corporation (LOC) diverts a portion of the Tualatin flow into the Lake Oswego Canal at RM 6.7. A headwork structure regulates the flow into this mile long canal that feeds into Lake Oswego. The Lake Oswego Corporation has several natural flow water rights, including water rights for hydropower generation, irrigation, and lake level maintenance. At RM 3.4, a combination diversion dam/fish ladder structure is used during low flow periods to elevate the Tualatin River enough to divert the flow into the canal. During most of the year, river elevation is adequate to allow diversion of the LOC water right. Historically, flash boards were installed to increase the water level during the summer, but they have not been used since The dam plus several natural basalt sills cause the water to pool in the reservoir reach. Flow in Lake Oswego Canal was monitored during the summer by a gaging station operated by the Oregon Water Resources Department, but that site was discontinued partway through Water diversions from the tributaries Irrigation withdrawals: Water is obtained directly from some tributaries for irrigation by irrigators with natural flow water rights Tualatin River Flow Management Report 7

10 Tualatin River Water Management Tualatin River Flow Management Technical Committee The Tualatin River Flow Management Technical Committee provides a mechanism for the coordination and management of flow in the Tualatin River. The members of the committee are technical staff with detailed knowledge of the specific characteristics of flow in this river. The committee meets monthly from February through November. Meetings focus on the current status of the reservoirs. In addition, a variety of other water issues and any problems are discussed. Each member updates the committee on changes that could impact the flow management of the Tualatin. The communication, coordination and cooperation among the partner agencies has proven invaluable in managing the resource. Data collection system Water in the Tualatin Basin is monitored by gages on streams and flow meters on diversions and wastewater treatment facility discharges. Stream gages are present along the mainstem Tualatin and all major tributaries that affect water distribution. Many of these monitors have telemetry, making the data available in real-time. Throughout the season, daily operations can be monitored by Clean Water Services (CWS), Joint Water Commission (JWC), Tualatin Valley Irrigation District (TVID), and the Lake Oswego Corporation (LOC). A coordinated information system was developed to provide flow information to all members of the committee. Flow conditions and a summary of daily releases are reported via daily by the superintendent of Scoggins Dam. The JWC provides a daily containing information about the rate of intake at the Spring Hill Pump Plant, releases from Scoggins and Barney Reservoirs, and available natural flow. Because use or release of water by any one of the entities can impact the other users, coordination of flow information is an important aspect of the committee's work. The data are collected by field staff from the cooperating entities or from the Corps of Engineers via telemetry. The monitoring effort makes it possible to proactively manage storage, instream flows, and diversions so that minimum instream flow requirements and general compliance with water rights and storage agreements are met. It also makes the calculation of pollutant loads possible, when it is necessary for the Total Maximum Daily Load (TMDL) program. Monitoring includes temperature as well as flow at some sites. As water quality issues have come to the forefront, the monitoring system has provided information vital to understanding the Tualatin Basin, helped guide basin management, and been an excellent example of interagency cooperation. The members of the Flow Management Committee appreciate the efforts of the Oregon Water Resources Department (District 18 Watermaster), the US Geological Survey and others who provide data. Some of the monitoring data for the Tualatin Basin can be accessed at the following web sites: Bureau of Reclamation data: Jackson Bottom Wetlands Center data: Oregon Water Resources Department data: USGS data: Annual Tualatin Basin Flow Management Report This report is published annually and describes water management, accounting, storage, stream gaging, diversions, and effluent discharge for the Tualatin Basin. Annual reports dating from 1992 are available at: Tualatin River Flow Managment Report

11 RESERVOIR STATUS After a dry January 2014, the months of February and March were particularly wet. Barney Reservoir filled in early February Scoggins Reservoir at that time was being managed for flood control. Scoggins Reservoir reached full pool on May 1st. The reservoir levels for 2014 and the reservoir filling histories are shown below. 60 Rule Curve Statistical Distribution Water Years Scoggins Reservoir Storage (thousands of acre-ft) Water Year th percentile 75th percentile median 25th percentile 10th percentile /1 10/15 10/29 Flood Control Season Nov 1 Jan /26 12/10 12/24 1/7 1/21 2/4 Target Fill Date May 1 Conservation Fill Season Jan 16 Apr 30 2/18 3/4 3/18 4/1 4/15 4/29 5/13 5/27 Conservation Release Season May 1 Oct 31 6/10 6/24 7/8 7/22 Water Year /5 8/19 9/2 9/16 9/30 Barney Reservoir Storage (thousands of acre-ft) Water Year 2014 Water Year 2001 Barney drawdown 2011 Statistical Distribution Water Years th percentile 75th percentile median 25th percentile 10th percentile 0 10/1 10/15 10/ /26 12/10 12/24 1/7 1/21 2/4 2/18 3/4 3/18 4/1 4/15 4/29 5/13 5/27 6/10 6/24 7/8 7/22 8/5 8/19 9/2 9/16 9/ Tualatin River Flow Management Report 9

12 CLEAN WATER SERVICES BY RAJ KAPUR, CLEAN WATER SERVICES Clean Water Services provides wastewater treatment, stormwater management, and watershed management to more than 550,000 customers mostly in the urban areas of Washington County. Clean Water Services has twelve member cities, and owns and operates four wastewater treatment facilities (WWTFs) at sites in Forest Grove, Hillsboro, and Tigard. Clean Water Services also implements the municipal separate storm sewer system (MS4) program in the urban parts of the Tualatin River watershed. The four WWTFs and the MS4 program are permitted by the Oregon Department of Environmental Quality (DEQ) under a watershed-based National Pollutant Discharge Elimination System (NPDES) permit. The watershedbased permit provides Clean Water Services with a mechanism to offset a portion of the thermal load from its WWTFs by releasing stored water from Scoggins and Barney Reservoirs. Stored water releases from the reservoirs are also used to improve water quality and provide operational flexibility to the WWTFs. The reservoir releases during July and August are used to mitigate part of the thermal load from the wastewater treatment facilities. Clean Water Services offsets the remainder of its thermal load by planting riparian areas along the tributaries either directly within its service area or through a partnership with the Tualatin Soil and Water Conservation District on rural lands. During the rest of the summer, the water is released to offset the effect of sediment oxygen demand on the dissolved oxygen levels in the river. The dissolved oxygen levels in the river downstream of the wastewater treatment facilities determine the ammonia limits for the wastewater treatment facilities. When dissolved oxygen levels are well above the water quality standards, the wastewater treatment facilities have more operational flexibility. Low dissolved oxygen levels can be a water quality issue in the lower Tualatin River. During the low flow season, photosynthetic production of oxygen by algae often offsets the consumption of oxygen by decaying substances in the sediment of the river (sediment oxygen demand). Low levels of dissolved oxygen can result if oxygen production by algae is less than the oxygen consumption by sediment oxygen demand. Although low dissolved oxygen can occur during any season it is more likely in the fall because photosynthetic oxygen production decreases as the days become shorter and low flows maximize the effect of sediment oxygen demand. Increasing streamflow reduces oxygen consumption by sediment oxygen demand because it shortens the contact time between the river water and the river sediments. Clean Water Services flow augmentation and treatment plant flow accounts for a significant fraction of flow in the lower Tualatin River, especially during the late summer and early fall period (see graphs on page 12) Water Releases Since 2004, Clean Water Services released water from Scoggins Reservoir for three primary reasons: thermal load trading in July and August, maintaining minimum river flows for the WWTFs, and mitigation of sediment oxygen demand after algal populations decline in late summer and early fall. Clean Water Services generally starts releasing stored water in July for thermal trading. In 2014, flow augmentation releases began on July 1. Flow augmentation was continuous until it ended for the season on October 23 when Tualatin River flow at Farmington exceeded 500 cfs and winter flow conditions started. In 2014, Clean Water Services began release of Scoggins Reservoir water on July 1; the last release day was October 22. The average release was 41.9 cfs during the July/August period and 32.0 cfs during September. Clean Water Services released a total 9,037 acre-feet from Scoggins Reservoir for This was only 72% of its allocation. Clean Water Services released water from Barney Reservoir at a constant rate of 14 cfs beginning on September 2, 2014 and continuing through October 23. Clean Water Services used a total of 1,438 acre-feet from Barney Reservoir which was 87% of its allocation. Clean Water Services released flow augmentation water for a total of 115 days in The total average daily release (for days with releases) was 45.9 cfs. The amount of water available to and released by Clean Water Services during 2014 and monthly details of the water releases are summarized on page Tualatin River Flow Managment Report

13 Reservoir CLEAN WATER SERVICES WATER AVAILABILITY AND USE 2014 Maximum Available (acre-ft) Available (acre-ft) Total CWS Release (acre-ft) Scoggins Reservoir Storage 12,618 12,618 9,037 Natural flow credit 4,282 0 Barney Reservoir Storage 2,000 1,654 1,438 Summer storage 0 Total 18,900 14,285 10,476 Percent of available 73.4% CLEAN WATER SERVICES WATER RELEASE SUMMARY 2014 Units May June July Aug Sept Oct Nov 1-18 Total Scoggins Release acre-ft 0 0 2,063 3,095 2,430 1, ,037 days Barney Release acre-ft ,438 days Total Release acre-ft 0 0 2,063 3,095 3,236 2, ,476 Daily Average Release (for days with releases) cfs Measured Flows for Tualatin River at Farmington (RM 33.3) based on daily average Measured minimum cfs Measured mean cfs ,030 Measured maximum cfs 2, ,280 1,480 Natural flow credit If the natural flow in the Tualatin River measured at West Linn is less than the flow target for the months of May, June, October and November, then Clean Water Services receives a natural flow credit of up to 4,282 acre-ft. Natural flow is calculated as the actual measured flow minus Clean Water Services released flow. The table below shows that the natural flow at West Linn exceeded the flow targets for these four months, and therefore, Clean Water Services was not entitled to a natural flow credit in Month Mean Daily Measured Flow at West Linn (cfs) BUREAU OF RECLAMATION NATURAL FLOW CREDIT 2014 Mean Daily CWS Release (cfs) Calculated Natural Flow at West Linn (cfs) Target Natural Flow at West Linn (cfs) Maximum Possible CWS Natural Flow Credit (cfs) [acre-ft] CWS Natural Flow Credit (cfs) May [798] 0 June [1250] 0 October [984] 0 November [1250] Tualatin River Flow Management Report 11

14 Tualatin River Flow at Farmington (RM 33.3) 2014 Measured flow at Farmington (RM 33.3) Calculated flow without CWS releases* CWS release from Scoggins Reservoir CWS Release from Barney Reservoir Rock Creek WWTF effluent Natural flow 500 Flow (cfs) /31 6/14 6/28 7/12 7/26 8/9 8/23 9/6 9/20 10/4 10/ Tualatin River Flow at West Linn (RM 1.75) 2014 Measured flow at West Linn Calculated flow without CWS releases* CWS release from Scoggins Reservoir CWS Release from Barney Reservoir Rock Creek WWTF effluent Durham WWTF effluent Natural flow 500 Flow (cfs) /31 6/14 6/28 7/12 7/26 8/9 8/23 9/6 9/20 10/4 10/ *Flows without CWS releases were calculated as follows. (Constant travel times and a uniform evaporative loss of 0.25% per mile were assumed.) Flow at Farmington without CWS releases = Flow at West Linn without CWS releases = + Measured flow at Farmington + Measured flow at West Linn x Rock Ck WWTF flow from the same day x Durham WWTF flow from 3 days before x CWS Scoggins Release from 2 days before x Rock Ck WWTF flow from 14 days before x CWS Barney Release from 4 days before x CWS Scoggins Release from 17 days before x CWS Barney Release from 19 days before Tualatin River Flow Managment Report

15 Historical perspective In 1987, Clean Water Services began managing the release of its water with the goal of maintaining a monthly average of 150 cfs at the Tualatin River at Farmington. Work by the United States Geological Survey in the early 1990s indicated that it was more important to have higher flows in the fall to maintain dissolved oxygen levels than in the early summer to prevent algal blooms. The flow goals were changed to maintaining 120 cfs in the early summer, 150 cfs in August and then cfs from September until the winter flows start. Winter flows are defined as flows that exceed a 7-day median of at least 350 cfs. In 2004, an additional goal of releasing water in July and August for temperature trading was added. In 2008, as a result of the Rock Creek WWTF mixing zone study, the goal was increased to 150 cfs through August. The following table shows the history of Clean Water Services releases from Scoggins Reservoir. Year Start Date End Date CLEAN WATER SERVICES SCOGGINS RESERVOIR RELEASES Total Release Days Total Release (acre-ft) Average per Release Day (cfs) Minimum Daily Flow at Farmington (RM 33.3) (cfs) /9 11/ *16, /2 11/4 126 *15, / *16, / , /12 11/ , / , /3 12/ , /21 10/ , /24 11/ , / , /4 10/2 91 6, /12 11/7 87 9, / , /21 11/ **15, / **2, /12 11/ , / , /1 11/ , /8 10/ , /1 11/ , / , /1 11/ , /1 10/ , /24 10/ , / , /7 10/ , /2 11/ , /1 10/ , *During these years, Bureau of Reclamation allowed Clean Water Services to release its entire allocation (stored and natural flow). **Clean Water Services purchased additional water for flow augmentation in 2000 because low flow conditions persisted until the end of November that year. Because the Scoggins Reservoir did not fill in 2001, all allocations were severely decreased Tualatin River Flow Management Report 13

16 Water is released from Barney Reservoir at a constant rate during the late summer to supplement the water released from Scoggins Reservoir. The following table shows the historic use of Barney Reservoir releases. Clean Water Services owns 10% of the 20,000 acre-foot reservoir. Accounting for dead pool volume and the 15% allocation to Oregon Department of Fish and Wildlife, Clean Water Services has 1,654 ac-ft available at full pool. Year Start Date End Date CLEAN WATER SERVICES BARNEY RESERVOIR RELEASES Total Release (acre-ft) Daily Release Rate (cfs) Comment /12 8/27 2, extra water released to draw down reservoir /1 10/19 1, cfs also released 6/4 6/ /8 10/23 1, /18 10/29 1, acre-ft purchased in addition to allocation; reservoir did not fill; 4,000 acre-ft held in reserve /26 10/24 1, /15 10/14 1, /1 11/2 1, /1 11/8 1, miscommunication about end date; extra water released /1 11/3 1, /1 10/30 1, /4 10/31 1, /1 10/30 1, /1 10/30 1, cfs on 9/1/2010 only, all other days 14 cfs /1 8/30 1,089 9 Barney Reservoir was drawn down for maintenance which resulted in a reduced allocation /31 10/29 1, /30 11/5 1, release suspended 9/30/ /9/ /2 10/23 1, Tualatin River Flow Managment Report

17 JOINT WATER COMMISSION BY KRISTEL FESLER, WATER RESOURCES PROGRAM COORDINATOR, JOINT WATER COMMISSION/CITY OF HILLSBORO Introduction Over 300,000 people in Washington County receive at least a portion of their water from the Joint Water Commission (JWC). JWC provides water to its member agencies: the Cities of Hillsboro (the managing and operating agency), Forest Grove, Beaverton, and the Tualatin Valley Water District. JWC also provides wholesale service directly to the City of North Plains, and to Cornelius, Gaston, and the LA Water Cooperative as wholesale customers of Hillsboro. JWC's water treatment plant is supplied with water from the nearby Tualatin River. An intake facility at Spring Hill constructed by the Bureau of Reclamation, and shared with the Tualatin Valley Irrigation District (TVID), pumps river water to the JWC water treatment plant. Flows in the Tualatin River are supplemented during the summer with water from two impoundments Hagg Lake and Barney Reservoir. Hagg Lake is located on Scoggins Creek behind Scoggins Dam. Scoggins Dam is owned by the Bureau of Reclamation (BOR) and operated by TVID under contract to the BOR. Barney Reservoir is located on the upper Trask River behind the Eldon S. Mills Dam. The reservoir and dam are owned and operated by the Barney Reservoir Joint Ownership Commission (BRJOC). The BRJOC includes the cities of Hillsboro (the managing and operating agency), Forest Grove, and Beaverton, the Tualatin Valley Water District, and Clean Water Services. The JWC water treatment plant uses conventional dual media filtration plus disinfection to produce high quality potable water. Treated water is pumped from the plant to the member agencies either directly from the plant through finished water pipelines or via the Fern Hill Reservoirs. The Fern Hill Reservoirs are located about one-third mile to the east of the treatment plant and can store up to 40 million gallons of finished water (in two 20 million gallon covered concrete tanks). The JWC finished water pipelines include master meters and pressure reducing stations at the connection points to the member agencies. Each Fern Hill Reservoir stores 20 million gallons of drinking water for the Joint Water Commission Tualatin River Flow Management Report 15

18 2014 Operations Summary The average water production rate for 2014 was 31.8 MGD. This was 3.2 MGD higher than the daily average in 2013 and the first year since 2009 to be over 30 MGD. The maximum produced in one day was 58.1 MGD on July 30, This is well below the highest ever recorded maximum daily production of 66.8 MGD in The highest production months, July and August, accounted for about 24% of the total 11,618 MG that was produced and delivered in Efficiency: JWC continued its emphasis on maximizing the capture of released waters through improved coordination of finished water storage at Fern Hill Reservoirs and careful tracking of individual JWC member use of their stored water and system demands. During the peak season, the JWC and Cherry Grove pump stations recovered an average of 98% of the water available for municipal use from natural flow rights and releases from impounded supplies. Loss Rate and Natural Flow ESTIMATED WATER CAPTURE RATES 2014 Amount Loss Released (acre-ft) Rate (percent) Total (acre-ft) Scoggins 9, % 200 Barney 6, % 360 Natural Flow (acre-ft) Total Water Available (acre-ft) Total 15, ,878 17,956 Raw Water Pumping and Finished Water Production Raw Water Pumped (acre-ft) Capture Rate (pumped/available) Finished Water Produced (acre-ft) Production Rate (produced/available) Average Daily Production (acre-ft) Peak Day Production (acre-ft) JWC Treatment Plant (Springhill) 17, % 17, % Slow Sand Filter Plant (Cherry Grove) % % Total 17, % 17, % Maintenance: JWC staff determined that pump tolerances for the raw water pump and motor #3 at the Spring Hill intake were not within specifications. NW Motors rebuilt the pump and motor; they were reinstalled by JWC staff. Back-up power project: A recent seismic resiliency study identified loss of power as one of the greatest vulnerabilities at the JWC's water treatment. The JWC is in the process of addressing this issue with the installation of a backup power facility. Two 2.5 megawatt generators and paralleling switchgear will be installed in a new concrete building on the WTP site. The generators will be capable of operating the WTP at half-capacity (37.5 million gallons per day) during a power outage. Design of this project began in 2010 with funding assistance provided by a Department of Homeland Security grant. Design work was completed in The project is scheduled to be operational by the end of Acknowledgements The Joint Water Commission appreciates the efforts of the Watermaster and our partners on the Flow Management Committee, and we extend our thanks for all of their involvement and cooperation. JWC remains a committed participant in the Tualatin Flow Management Committee. The communication and coordination that comes from this committee among the various Tualatin River users is invaluable Tualatin River Flow Managment Report

19 2014 Stored Water Releases 2014 was an average year for stored water releases. Regulation off natural flow began on June 5 with releases beginning the same day. Releases continued until October 24 for a total of 142 days. Total stored water released and average daily release were both slightly higher than average. COMPARISON OF STORED WATER RELEASES 10-YEAR RECORD Regulated Use Stored Water Release (acre-ft) Average Year Release Start End Days* Barney Scoggins Total (acre-ft/day) /5 10/ ,548 9,090 15, /4 10/ ,387 7,490 13, /23 10/ ,557 7,016 13, /28 11/ ,848 3,945 12, /30 10/ ,647 5,171 10, /14 10/ ,723 9,203 13, /18 10/ ,407 10,163 14, / ,544 10,372 15, /18 11/ ,101 11,332 19, /20 10/ ,966 10,550 16, yr average 6/9 10/ ,273 8,433 14, *Days of Regulated Use is accurate; it does not equal the elapsed days between the start and end dates for regulation when regulation was temporarily suspended during that time. The amount of stored water released by JWC for 2014 is summarized in the tables below. Slightly more than half of the total allocation was released (67% for Scoggins Reservoir and 44% for Barney Reservoir). Description STORED WATER RELEASE FROM EACH RESERVOIR 2014 Beginning Balance (acre-ft) Amount Released (acre-ft) Ending Balance (acre-ft) Average Release (acre-ft/day) Scoggins 13,500 9,090 4, Barney (M&I) 14,886 6,548 8, Total 28,386 15,638 12, Description STORED WATER RELEASE TO EACH AGENCY 2014 Beginning Storage (acre-ft) Amount Released (acre-ft) from Scoggins from Barney Total Ending Balance* (acre-ft) Average Release (acre-ft/day) Hillsboro 10,127 5,000 1,784 6,783 3, Forest Grove 4,914 1, ,523 3, Beaverton 7,556 2, ,718 3, TVWD 5,789 3,614 3,614 2, Total 28,386 9,090 6,548 15,638 12, North Plains (usage is reflected in the values for JWC partners) Tualatin River Flow Management Report 17

20 MILLS DAM/BARNEY RESERVOIR BY KRISTEL FESLER, WATER RESOURCES PROGRAM COORDINATOR, JOINT WATER COMMISSION/CITY OF HILLSBORO Overview Mills Dam/Barney Reservoir is a rock and earth impoundment on the upper Trask River. When Trask Dam was built in 1970 by the Cities of Hillsboro and Forest Grove, the reservoir held 4,000 ac-ft of water. In 1999, the dam height was raised to accommodate 20,000 ac-ft of storage and was renamed the Mills Dam. Barney Reservoir is named for J.W. Barney and Mills Dam is named for Eldon S. Mills, both former Hillsboro City Managers and key leaders in the original dam construction and its later expansion. Water stored in Barney Reservoir is released to both the Trask and Tualatin Rivers. Flows to the Trask River include all storage overflows and 15% of the stored water, which is allocated to Oregon Department of Fish and Wildlife (ODFW). A gravity flow diversion pipeline conveys water from the Trask River to the headwaters of the Tualatin River. The additional flow in the Tualatin River is used for municipal purposes and flow augmentation to improve water quality. The current owners of Barney Reservoir are the Cities of Hillsboro, Forest Grove, Beaverton, the Tualatin Valley Water District (the same entities that form the Joint Water Commission) and Clean Water Services. Release from Barney Reservoir to the Trask River through a Howell-Bunger Valve Collectively they form the Barney Reservoir Joint Ownership Commission (BRJOC). As with the Joint Water Commission, the City of Hillsboro serves as the managing and operating agency for the BRJOC. Reserved BRJOC Partners RESERVOIR OWNERSHIP AND WATER ALLOCATION FOR BARNEY RESERVOIR Water Allocation (percent) Storage at Full Capacity (acre-ft) Reservoir Ownership (percent) Dead pool 2.3% 460 Oregon Department of Fish and Wildlife (ODFW) 15.0% 3, % Clean Water Services 8.3% 1, % JWC Partners 74.4% 14, % City of Hillsboro 25.6% 5, % City of Forest Grove 2.1% % City of Beaverton 17.8% 3, % Tualatin Valley Water District (TVWD) 28.9% 5, % TOTAL 100.0% 20, % Tualatin River Flow Managment Report

21 Dam Inspection OWRD inspected the Mills Dam on March 26, 2014, to identify conditions on the dam's exterior that may affect the safety of the dam. This dam is classified as a high hazard dam based on its risk to people and property and is in need of annual inspections. OWRD determined that Mills dam is very well maintained and no major issues of concern were identified. The crest and embankment show no signs of settlement, instability or internal erosion Operations Barney Reservoir filled on February 19, By the end of the release season, 53% of the total allocated water was released. Releases to the Tualatin River: The majority of the JWC's natural flow rights were regulated off on June 5, 2014 and releases from Barney Reservoir to the Tualatin River began on June 5. Releases continued until October 23, for a total of 141 release days. Clean Water Services used 87% of their allotment and the JWC partners used 44%. Releases to the Trask River: Releases from Barney Reservoir to the Trask River for ODFW began on June 6 and continued until November 30 for a total of 178 release days. Eighty-nine percent of the stored water for ODFW was released to the Trask River. STORED WATER ALLOCATION AND RELEASES FOR BARNEY RESERVOIR 2014 BRJOC Partners Total Storage Oregon Dept of Fish and Wildlife Clean Water Services JWC Total City of Hillsboro JWC Partners City of Forest Grove City of Beaverton Water Allocation (acre-ft) 20,000 3,000 1,654 14,886 5, ,556 5,789 Water Released (acre-ft) 10,652 2,666 1,438 6,548 1, ,614 Percent Allocation Used 53% 89% 87% 44% 35% 77% 23% 62% TVWD 2014 Tualatin River Flow Management Report 19

22 LAKE OSWEGO CORPORATION BY MARK ROSENKRANZ, WATER RESOURCE SPECIALIST, LAKE OSWEGO CORPORATION Introduction The Lake Oswego Corporation (LOC), a non-profit organization, owns and manages Oswego Lake, a 163-hectare (403 acre) reservoir located 10 miles south of Portland, Oregon. LOC was formed in 1942 when the Oregon Iron and Steel Company, then owner of the land around the Lake, deeded to LOC the land, three dam structures, and all water rights. The original dam was constructed in 1871 and later upgraded in Oswego Lake is a private water body whose primary water right is hydropower generation. Secondary uses include irrigation, aesthetic viewing, contact recreation, fishing, and boating. Oswego Lake and Watershed Morphology The original natural lake, called Waluga, was formed 10,000 years ago by the Missoula glacial floods which altered the old Tualatin River channel. Today, the Lake has three basins: West Bay, the Main Lake, and Lakewood Bay. There are also two shallow, man-made canals, Blue Heron Canal and Oswego Canal. Oswego Canal is the 2.4-km conduit from the Tualatin River (RM 6.7). Total lake surface area and volume is 1.63 km 2 (403 acres) and 12.7 x 10 6 m 3 (10,300 acre-feet). Shoreline length, including bays and canals, is km (11.56 mi). Oswego Lake has a 5.08-km (3.15-mi) fetch and a narrow 0.56-km width (0.34- mi). The hydraulic residence time is 390 days. Oswego Lake's two watersheds include the natural, 7.5-mi 2 urban basin around the Lake (10:1 watershed to lake-area ratio) and the larger 700-mi 2 Tualatin River basin (1,000:1 ratio) when the LOC Headgate is open. Major inflows from the watershed include Springbrook Creek, Lostdog Creek, Blue Heron Creek, and 70-plus storm drains from the City of Lake Oswego. Aerial view of the West Bay of Lake Oswego looking to the East LOC Water Rights and Contracts Hydropower Generation: The primary hydropower water right is 57.5 cubic feet per second (cfs) obtained in 1906 that allows year around diversion. To guarantee this flow during the dry season, LOC owns and operates a diversion dam located downstream of the Oswego Canal (RM 3.4). Flaps are erected on an as needed basis. In 2014, no flaps were used. Irrigation: A contract between LOC and the Bureau of Reclamation (Oct 20, 1972) provides for up to 500 acre-feet from Scoggins Reservoir for irrigation use during March through November. The largest irrigator on the Lake is the Lake Oswego Country Club (approximately 175 acre-feet). Maintenance/Evaporation: LOC also has a maintenance/evaporation water right of 3.36 cfs dating from This water can be diverted between September 16 th and July 30 th Tualatin River Flow Managment Report

23 2014 Oswego Lake Watershed Management Water quality improvements and safety are the top priorities for LOC. The goal for the annual LOC Water Quality Management Plan is to reduce cyanobacteria productivity and maximize the aesthetic value of the Lake. To provide long-term water quality solutions and to be proactive in preserving the quality of the Lake, watershed activities are a major part of the LOC management plan. To limit the growth of algae (especially cyanobacteria) in the Lake, LOC has focussed its efforts on reducing the amount of available phosphorus. Two methods have been used in Oswego Lake: aeration and alum addition. Aeration: Release of phosphorus from sediments in Lake Oswego is increased when the lower layers (hypolimnion) of the lake are anoxic. Phosphorus in the hypolimnion is available to feed cyanobacteria that can adjust their buoyancy. At night they descend to this phosphorus-rich water to obtain phosphorus and then return to the shallow upper layer (epilimnion) during day to photosynthesize. Aeration reduces anoxia in the hypolimnion which reduces the amount of phosphorus released from sediment. Consequently, the hypolimnion provides less food for algae. Since installing hypolimnetic aeration in late 2001, phosphorus in the hypolimnion has decreased by 78% during the summer season. See figure at right. Alum: Dissolved phosphorus in the epilimnion of the lake promotes algal growth. When alum is added to lake water, dissolved phosphorus binds to alum particles making the phosphorus unavailable to algae. The alum particles settle to the bottom of the lake, taking the bound phosphorus as well. Thus, the epilimnion contains less phosphorus to feed algae. Since the alum treatment program began, the phosphorus concentration in the epilimnion has dropped by 52% during the summer season. See figure at right. Total Phosphorus ( g/l as P) Hypolimnion Hypolimetic Aeration Alum Treatment Phosphorus concentrations in the hypolimnion of Oswego Lake during the summer (June September). Before the aeration program, the average total phosphorus concentration in the hypolimnion was 299 g/l; after the aeration program (2002 present), the average concentration was 65 g/l. Total Phosphorus ( g/l as P) Epilimnion Hypolimetic Aeration Alum Treatment Phosphorus concentrations in the epilimnion of Oswego Lake during the summer (June September). Before the alum treatment program, the average total phosphorus concentration in the epilimnion was 48 g/l; after the aeration program (2005 present), the average concentration was 23 g/l. greater than 75th percentile x interquartile range lesser of: 75th percentile x interquartile range OR maximum 75th percentile median 25th percentile: greater of: 25th percentile 1.5 x interquartile range OR minimum 2014 Tualatin River Flow Management Report 21

24 Outfall treatment: In addition to treating the lake with alum, in 2014 we experimented with alum treatment at outfalls where water with elevated phosphorus concentrations enters the lake. Most of the phosphorus in the epilimnion comes from inflows from the Tualatin River and the immediate watershed. The benefit of this targeted approach is that phosphorus is removed before it has an opportunity to promote algal growth in the lake. Treatment efficiency is increased and less alum is used overall. Oswego Canal is fed by a spring that runs through Bryant Woods Park. This outfall is very high in phosphorus and is one of the main sources of nutrients to the lake during summer. Most of the phosphorus is in the soluble form which is immediately available to feed algae. (The total phosphorus concentration is 200 g/l; the soluble phosphorus concentration is 185 g/l.) In 2014 we installed a system to capture water at this outfall and treat it with alum. Although we were unable to capture all the water, 78% of the soluble phosphorus was removed from the water that was captured and treated. In 2015 we will increase the size of the system to capture more water and remove more phosphorus. Tualatin River Flows: Minimal Tualatin River flows were used to keep the lake full. Limiting river flow into the lake is desirable because river water contains high concentrations of phosphorus and sediment Lake Water Quality 2014 OSWEGO LAKE WATER QUALITY SUMMARY AVERAGES Location Season Chlorophyll-a ( g/l) Lakewood Bay (depth 3.2 m) Main Lake (depth 16 m) West Bay (depth 1.4 m) Oswego Canal (depth 1.2 m) Blue Heron Canal (depth 1.3 m) Outlet (depth 6 m) Total P ( g/l) SRP ( g/l) Total N ( g/l) Secchi (m) Turbidity (NTU) Annual Summer Annual Summer Annual Summer Annual Summer Annual Summer Annual Summer Bold = highest average during the summer; Underline = lowest average during the summer; Summer=June September Abbreviations: Total P = Total Phosphorus, SRP = Soluble Reactive Phosphorus, Total N = Total Nitrogen, Secchi = Secchi depth, ug/l = micrograms per liter, m = meters, NTU = nephelometric turbidity units Staff Changes at the City of Lake Oswego We have graduated another intern and have replaced her with another Masters student from PSU. She will be working on our watershed monitoring plan. The data collected using her plan will help us refine our nutrient budget specifically helping us track our external and internal phosphorus sources Tualatin River Flow Managment Report

25 OREGON WATER RESOURCES DEPARTMENT BY JAKE CONSTANS, WATERMASTER, DISTRICT 18 Introduction The District 18 Watermaster's Office is a field office of the Oregon Water Resources Department (OWRD) ( in cooperation with Washington County ( and is responsible for water distribution management within the Tualatin, Lake Oswego, and Lower Willamette Drainage Basins in northwestern Oregon. District 18 covers approximately 1,111 square miles and serves the majority of the population in Washington and Columbia counties, as well as parts of Clackamas, Multnomah, and Yamhill counties. There are 2,806 total surface water rights in the district which cover 58,602 acres of land. As part of the surface water rights within the Tualatin River Basin there the following streams have instream water rights: Tualatin River, Gales Creek, Scoggins Creek, Rock Creek, West Fork Dairy Creek, and Fanno Creek. To assist in monitoring surface water in the basin we currently utilize 17 total gaging stations, 10 of which are on real time data. WATERMASTER DISTRICT 18 GAGING STATIONS FOR 2014 Station Number Stream Stream Mile Latitude Longitude Type Dairy Creek at Hwy 8 near Hillsboro, OR N W *Logger E. Fk. Dairy Creek at Dairy Creek Rd near Mountaindale, OR N W Staff W. Fk. Dairy Banks, OR N W Staff W. Fk. Dairy Evers Rd near Roy, OR N W Staff Gales Old Hwy 47 near Forest Grove, OR N W *Logger Gales Clapshaw Hill Rd near Gales Creek, OR N W Staff Sain Creek above Hagg Lake near Gaston, OR N W *Logger Scoggins Creek above Hagg Lake near Gaston, OR N W Logger Scoggins Creek below Hagg Lake near Gaston, OR N W *Logger Tanner Creek above Hagg Lake near Gaston, OR N W Staff Tualatin Farmington, OR N W *Logger Tualatin Gaston, OR N W *Logger Tualatin Golf Course Rd near Cornelius, OR N W *Logger Tualatin River below Lee Falls near Cherry Grove, OR N W *Logger Tualatin Rood Bridge Rd near Hillsboro, OR N W *Logger Tualatin Tualatin (station number formerly ) (stage only) N W *Logger WAPO Wapato Canal near Gaston, OR (from Tualatin River) N W Staff *Telemetry 2014 Tualatin River Flow Management Report 23

26 2014 Highlights The Oregon Water Resources Commission meeting was held in November at Clean Water Services. As part of the meeting the District 18 Watermaster provided the Commission and attendees with an informational presentation about the Tualatin River Basin and the district in its entirety. Regulatory Overview 2014 The 2014 water year was an uncommonly warm and dry growing season. Small amounts of precipitation caused low stream flow levels throughout the summer and early fall. Due to the drier than average conditions during the irrigation season, regulation on the main stem of the Tualatin River and its tributaries occurred uncommonly far back in priority date in order to satisfy the needs of senior water right holders WATER RIGHTS REGULATION SUMMARY Date On/Off Regulatory Activity River Mile Priority Date 6/4 Off City of Beaverton (P-45455, 7/15/1980) Tualatin River 2/6/1974 City of Forest Grove (P-40615, 4/28/1976) Tualatin River City of Hillsboro (P-46423,2/6/1974) Tualatin River (Hillsboro still has 14 cfs available from the Tualatin River) City of Hillsboro (P-50879, 6/9/1988) Scoggins Creek 6/11 Off TVID (P-35792, 2/20/1963) Scoggins Creek 2/20/1963 (partial regulation 20 cfs) 6/20 Off TVID (P-35792, 2/20/1963) Scoggins Creek 2/20/1963 7/3 Off Tualatin River & tributaries above Spring Hill Pump Plant > /20/1963 Tualatin River 11, 2/20/1963 Gales Creek 62, 9/24/1963 Carpenter Creek 4, 7/10/1967 Scoggins Creek 3, 7/28/1975 7/8 Off City of Hillsboro (P-2443, 5/915) Sain Creek (2 cfs) 5/915 7/16 Off City of Hillsboro (P-1136, 1/22/1912) Sain Creek (3 cfs) 1/22/1912 7/29 Off Tualatin River & tributaries above Spring Hill Pump Plant > /14/1949 Tualatin River 18, 4/14/1949 Gales Creek 38, 4/18/1949 Carpenter Creek 5, 8/22/1949 Scoggins Creek 5, 4/18/1955 8/11 Off *EF Dairy Creek and tributaries above RM 13 EF Dairy Creek 12 =10.56 >13 3/6/1967 8/11 Off *McKay Creek and tributaries above Northrup Rd McKay Creek 6 EF McKay Creek 2 8/26 Off Tualatin River & tributaries above Spring Hill Pump Plant Tualatin River 22, 3/18/1936 Gales Creek 33, 9/6/1932 Carpenter Creek 7, 3/25/1935 Scoggins Creek 8, 4/932 = /8/1966 =2.26 >15.5 > /932 8/26 Off Stimson Lumber Co (P-10633, 4/932) Scoggins Creek > /932 10/22 On TVID (P-35792, 2/20/1963) Scoggins Creek 2/20/ /22 On Stimson Lumber Co (P-10633, 4/932) Scoggins Creek > /932 10/22 On City of Hillsboro (P-2443, 5/15/1915) Sain Creek City of Hillsboro (P-1136, 1/22/1912) Sain Creek (for a total of 5 cfs) 10/22 On City of Beaverton (P-45455, 7/15/1980) Tualatin River City of Forest Grove (P-40615, 4/28/1976) Tualatin River City of Hillsboro (P-46423,2/6/1974) Tualatin River City of Hillsboro (P-50879, 6/9/1988) Scoggins Creek *Instream Senior Water Right; all others Senior Water Rights 5/915 1/22/1912 > /6/ Tualatin River Flow Managment Report

27 SCOGGINS DAM/HENRY HAGG LAKE BY WALLY OTTO, RETIRED, TVID, JOHN GOANS, RESERVOIR SUPERINTENDENT, TVID, BERNIE BONN, AND TOM VANDERPLAAT, CLEAN WATER SERVICES Scoggins Dam/Henry Hagg Lake is located on Scoggins Creek in the upper part of the Tualatin Basin. Scoggins Dam is an earthfill dam constructed during to store water during the winter for summer and fall use. The Dam is owned by the Bureau of Reclamation (BOR) and managed by the Tualatin Valley Irrigation District (TVID). Stored water from Hagg Lake is used for irrigation, municipal and industrial use, and flow augmentation in the Tualatin Basin to support water quality and protect fish and wildlife. Three tributaries flow into Hagg Lake Sain, Scoggins and Tanner Creeks. Flows in Sain and Scoggins Creeks are monitored by Oregon Water Resources Department gages; flow Scoggins Dam in Tanner Creek is monitored by daily readings of a staff plate by TVID personnel. Outflow is measured by a BOR stream gage in Scoggins Creek at RM 4.8. Oregon Water Resources Department maintains the rating curves for Tanner Creek, Sain Creek, and for Scoggins Creek at RM 4.8. Scoggins Dam stores 53,640 acre-feet of water in Henry Hagg Lake as active storage the amount of water that can be moved in or out of the reservoir between the intake structure and the top of the spillway gates. Another 7,000 acre-feet of stored water that is not engineered to be removed exists below the intake structure. It is reserved for the protection of fish if the lake were to be drafted down completely to the intake structure. ALLOCATION OF WATER FROM SCOGGINS RESERVOIR Available Volume Contracted To Water Use ac-ft as percent Tualatin Valley Irrigation District Irrigation (up to 17,000 acres) 27,022 50% Joint Water Commission Municipal and industrial 13,500 25% City of Beaverton City of Forest Grove City of Hillsboro 4,000 4,500 5,000 Clean Water Services Instream water quality 12,618 24% Lake Oswego Corporation Irrigation 500 1% Total 53, % Scoggins Dam is authorized by the U.S. Congress to provide flood control for communities located downstream, including Gaston, Cornelius and Forest Grove. The dam controls runoff from a 39 square mile watershed (about 5% of the Tualatin Basin). From November 1st to January 15th, 20,000 acre-feet are designated for flood control storage. The dam does not generate electricity Tualatin River Flow Management Report 25

28 During the summer months, recreation is a major activity at Hagg Lake and the surrounding area. Washington County maintains and operates the 2,851 acre Scoggins Valley Park/Henry Hagg Lake recreational facility. In addition to the 1,100 acre lake, the park includes picnic areas, hiking trails, two boat launching facilities, and observation decks for bird and wildlife watching. The lake is stocked for fishing. Most of the park s facilities were designed to be accessible for disabled visitors. The park is open year round and is for day-use only. Access to the boat ramps is limited to the first Saturday in March through the last Sunday before Thanksgiving Water Use Water year 2014 marks 40 years since Scoggins Dam began storing and releasing water for downstream beneficial use. A total of 38,495 acre-feet were delivered in 2014 bringing the total delivery from the Project to more than 1.25 million acre-feet flow regulation began on June 5th for the Joint Water Commission and June 12th for TVID. With the exception of TVID s extended season irrigators, all users were permitted to return to natural flow use in the Tualatin River on October 23, As usual, TVID continued to deliver a small amount of storage water primarily to nurseries and greenhouses beginning in March and continuing until the end of November as permitted by the Oregon Water Resources Department WATER DELIVERIES FROM SCOGGINS RESERVOIR Delivered to Volume (ac-ft) Tualatin Valley Irrigation District 18,952 Clean Water Services 9,035 Municipal Use (Cities of Beaverton, Forest Grove and Hillsboro) 9,090 Lake Oswego Corporation 500 Other (includes two golf courses, from TVID allocation) 918 Total 38,495 Events in 2014 Recreation: In 2014, there were 953,000 users recorded at Scoggins Valley Park/Henry Hagg Lake. The park and lake opened on March 1st and now remains open all year. The boat ramps closed on November 23rd. In addition to the usual recreational uses, numerous races were held including triathlons. Coho Salmon: Thirty seven Coho were spotted in Scoggins Creek below the dam on November 7th. Lake Fish Habitat: Over the previous years, the Oregon Panfish Club anchored a total of 183 fish habitat structures (8' diameter) in the upper reaches of Henry Hagg Lake. These have caused no problems in terms of operation and maintenance of Scoggins Dam. They have remained in place weighted down with concrete anchors. Elk Mitigation: Most of the fir trees planted in February 2012 remain standing and continue to form a visual barrier for the elk along the side of the Control House entry road. The field remains off limits to all trespassers including dogs. On numerous occasions, elk were observed grazing in the pasture Tualatin River Flow Managment Report

29 Endangered species: As part of the consultation, BOR committed to avoid or minimize impacts to FBB and Kincaid s lupine. The Master Trail that traversed prairie patches containing FBB and Kincaid s lupine was relocated and trail maintenance practices modified to support Kincaid s lupine or FBB. Reclamation has also committed to work with partner agencies to study and control invasive weeds. Scoggins Dam Security Department of Homeland Security Alert Levels: The Project follows the Department of Homeland Security (DHS) alert levels as required by BOR. No incidences of heightened security level occurred at Scoggins Dam in 2014 due to any specific terrorist alerts. Security Gates: On July 31, 2014, security gates were installed on the north and south ends of the Dam. The gates are to allow the road to be closed in case of a security threat to the Dam. Scoggins Dam Safety At Scoggins Dam, earthquake activity, weather including temperature and precipitation, river stage levels, and water surface elevation are reported and recorded electronically. In addition, key dam behavioral instruments report electronically over BOR's Hydromet system. The data is collected, stored and transmitted via satellite to BOR s Pacific Northwest Regional office in Boise. It is available on the Internet through both secure and non-secure channels. Many of these electronic reporting stations have alarms to alert operators if sudden or unusual conditions develop including earthquakes and flooding. While operators are not on site 24/7, the Project is monitored 24/7, both by BOR and TVID personnel. Operator Training: The primary operator, John Goans, and the back-up operator, Chad Peterson, attended the BOR Emergency Action Plan table top exercise Jan 8, Spills and Water Quality: No spills or accidents that jeopardized the water quality in Henry Hagg Lake occurred in 2014 and the BOR on-site Response Trailer was not needed for emergency response. No containment booms were deployed to contain any contaminant spills during Drownings: On August 25, 2014 at around 6 pm, a 3-year old boy was found drowned in the Sain Creek recreational area. The following day the boy s three missing family members were found in the same area. They also drowned. Earthquakes in 2014: There were no earthquakes reported in 2014 that were near enough to the Dam that inspection of the facility was required. Fires: A boat caught fire near Boat Ramp C on August 24, The boat burned almost completely along with 30 feet of the adjacent dock. No one was injured. On the afternoon of September 19, 2014 a forest fire was spotted northwest of Henry Hagg Lake in the Scoggins Creek area. The lake was immediately closed. More details about the fire are in a special section in the Flow Report. Future of the Project Tualatin Basin Water Supply: In 2001, the water resource agencies (except TVID) in the Tualatin Basin began to explore and compare alternatives for providing the additional water needed to meet future needs. TVID does not need additional water because it is limited to serving 17,000 acres of irrigated land and the current supply is adequate. After studying many different options as well as seismic issues, the municipal and industrial water providers decided to focus on the Willamette River for future water supply. Clean Water Services is collaborating with Reclamation to develop alternatives that strengthen the dam to reduce risk from a Cascadia Subduction Zone earthquake and to raise it by 12 feet to meet future water supply needs for the maintenance and improvement of water quality in the Tualatin River. Progress is currently delayed pending Federal legislation that would reauthorize the Safety of Dams Act and provide funding for seismic improvements on Scoggins Dam and other dams of concern nationwide Tualatin River Flow Management Report 27

30 TUALATIN VALLEY IRRIGATION DISTRICT BY WALLY OTTO, RETIRED, TVID UPDATED BY JOHN GOANS, RESERVOIR SUPERINTENDENT, TVID Tualatin Valley Irrigation District Overview The Tualatin Valley Irrigation District (TVID), located in Forest Grove, Oregon, is the agricultural water service agency in the Tualatin Basin. In the early twentieth century, relatively little agricultural land was irrigated in Washington County: about 15 acres in 1915 and about 130 acres in By 1951, however, 18,455 acres had water rights registered in the county. When the TVID was formed in 1962, the total had grown to 33,885 acres. TVID was formed to assist in the delivery of irrigation water to about half of those acres (17,000) in the Tualatin Basin. The water was supplied from natural flow and return flows, and was extremely limited due to early summer withdrawals from the Tualatin River and increasing demands for water for irrigation and municipal use and for maintaining instream water quality and fish. The only storage at this time was Barney Reservoir which stored 4000 acre-feet for municipal use. Beginning in 1975, additional stored water became available behind the newly completed Bureau of Reclamation Project, Scoggins Dam. Approximately half of the water stored in Scoggins Reservoir (Henry Hagg Lake) is allocated to TVID. Most of the water supplied by TVID is pumped from the Tualatin River at the Spring Hill Pump Plant and delivered to TVID patrons via approximately 120 miles of pressurized pipeline. Additionally, water in both Scoggins Creek and the Tualatin River is withdrawn by irrigators for use on land abutting the river. They are known as river users and pay for their own pumping costs because they are not associated with the pressure pipeline or the Spring Hill Pumping Plant. When natural flow no longer meets demand, the District 18 Watermaster begins regulating water users with junior (or more recent) water rights off, starting with users with the most recent water right. The TVID storage right is dated 1963, so TVID patrons with water rights after that date must stop withdrawing natural and return flow water, and all water withdrawals must be supplied from storage. Storage water is discharged from Scoggins Reservoir to either augment the river flow or supply the entire need of the TVID patrons, both the pump plant/pressure pipeline users and the river users. Water for some of the TVID members on the lower Tualatin River is supplied by water discharged from Clean Water Services Rock Creek Wastewater Treatment Facility. Crops irrigated with District water range from row crops including blueberries, blackcaps, corn, pumpkins and other vegetables to nursery stock. TVID is allowed to use storage water early and late in the year because of an extended season for irrigation made possible by an agreement with the Oregon Water Resources Department. The early season begins March 1 and the extended season ends November 30. All water used outside the normal irrigation season (May through September) must come from TVID's annual contracted storage allotment of 27,022 acre-feet. TVID's total contracted amount with Reclamation is 37,000 acre-feet with the additional coming from natural and return flows in the Tualatin River and its tributaries. The extension of the irrigation season for the Tualatin Valley Irrigation District has made growing specialty crops within the District much more appealing. During the extended spring season, the water is used primarily for berries and nurseries; during the extended fall season, water is primarily used for the nurseries. A more diverse nursery stock is now possible, including flowers which are raised well into November when protected by greenhouses. Water availability and moderate temperatures make the Tualatin Valley Irrigation District home to many small specialty nurseries along with several large operations Tualatin River Flow Managment Report

31 2014 TVID Water Use For the 2014 irrigation season (March through the end of November), TVID took delivery of 18,953 acrefeet of water from storage in Henry Hagg Lake up 151 ac-ft from The least amount was 8,333 acft in 1993 and the largest was 22,188 ac-ft in TVID 2014 peak use from storage was 109 cfs on August 7th. WEATHER STATISTICS AT SCOGGINS DAM 2014 Month Description Precipitation Average Temperature Other 2014 [average ] Low High January dry 3.28 [7.85 ] 33 ºF 48 ºF February very wet 8.96 [6.11 ] 33 ºF 45 ºF March very wet 9.39 [5.65 ] 37 ºF 56ºF April wet 4.56 [3.48 ] 40 ºF 60 ºF May average 2.01 [2.25 ] 46 ºF 69 ºF June dry 0.94 [1.51 ] 49 ºF 72 ºF 1 days 80 ºF or higher July dry, warm 0.33 [0.44 ] 55 ºF Rec* 84 ºF 9 days 90 ºF or higher August dry, warm 0.10 [0.67 ] 55 ºF Rec* 84 ºF 9 days 90 ºF or higher September warm 1.37 [1.54 ] 51 ºF Rec* 78 ºF 12 days 80 ºF or higher October very wet, warm 7.15 [3.75 ] 49 ºF 67 ºF 5 days 80 ºF or higher November dry 3.75 [7.76 ] 40 ºF 52 ºF December warm 9.16 [9.14 ] 38 ºF 48 ºF *Rec= The average low temperatures for July, August and September were the highest on record TVID Operation and Maintenance The year was uneventful from an operations standpoint. A moratorium remains in place regarding new turn-out deliveries. No new deliveries were added to the delivery system during Pipeline Maintenance: TVID delivers irrigation water by high pressure pipeline to customers from Gaston to North Plains and from west of Forest Grove to Highway 219 south of Hillsboro. The water is withdrawn from the Tualatin River at the Spring Hill Pump Plant and lifted by pumps to a water regulating tank off Winter s Road. From there it flows under gravity pressure to all points of delivery through 120 miles of pipeline. Preventative maintenance continues to keep service delivery as dependable as possible. Several minor disruptions of service occurred during the year, but were quickly isolated and repaired. Service was restored in minutes in some cases or in up to a day if conditions did not allow quick access. There were no long term disruptions of service to District patrons. Tributary Flow Restoration Projects: TVID and Clean Water Services continue their cooperative effort using the TVID water distribution network to supply water to West Fork Dairy Creek, Gales Creek, East Fork Dairy Creek, Blackjack Creek and McKay Creek. Each site consists of a metered pipeline with a diffuser at the outlet. All sites are located near delivery lines for the Irrigation District. Flow augmentation occurs during the summer and fall. The water not only adds to streamflow, but it cools the stream as well. The partnership between the Tualatin Valley Irrigation District and Clean Water Services is a novel way to improve the water quality of these streams at minimal cost Tualatin River Flow Management Report 29

32 WATER QUALITY BY BERNIE BONN Concern about water quality in the Tualatin River is longstanding. Until the formation of Clean Water Services (formerly the Unified Sewerage Agency of Washington County), numerous small towns and cities discharged minimally treated sewage into the river and its tributaries. Water use by agricultural activities in the basin depleted river flow in the summer and contributed nutrients and sediment. By the 1960s, the local newspaper documented the poor water quality in the Tualatin River. In 1984, the Oregon Department of Environmental Quality (ODEQ) included sections of the Tualatin River on the 303d list as being water quality limited. Water quality issues in the Tualatin Basin have included elevated ph and nuisance algae, low dissolved oxygen, high temperatures, and excess bacteria. Many groups have worked to improve water quality in the Tualatin Basin, including Clean Water Services, the Tualatin River Watershed Council, the Tualatin Riverkeepers and others. Part of the reason for the formation of the Flow Committee is to manage river flow to improve and preserve water quality. Algal growth and ph In the reservoir section (about RM ), the Tualatin River is wide and slow moving. Because the river is so broad, streamside vegetation cannot adequately shade the full width and consequently much of the water surface is in sun. Nutrients, both naturally occurring and anthropogenic, are ample. These conditions slow movement, sunlight, and ample nutrients are ideal for algal growth during summer. Most of the algae in the Tualatin River are phytoplankton that float in the upper few feet of the water. During the day, photosynthesis by algae converts carbon dioxide dissolved in the water into biomass. As the concentration of dissolved carbon dioxide decreases, the ph of the water increases. High ph values can negatively affect aquatic resources. In the 1980s the lower section of the Tualatin River was listed by the ODEQ for elevated ph (>8.5) and degraded aesthetics due to nuisance algal growth. To address these water quality problems, the ODEQ developed a TMDL for phosphorus to limit nutrient availability. Since then, advanced wastewater treatment by Clean Water Services has dramatically decreased phosphorus concentrations in the river. In addition, summertime flows in the Tualatin River have increased due to Clean Water Services releases from Hagg Lake as well as increased discharge from the wastewater treatment facilities. Chlorophyll-a concentrations are an indicator of the amount of algae in the river. Clean Water Services measures chlorophyll-a in water samples at several sites and since 2001, chlorophyll-a is measured hourly at the Oswego Dam (RM 3.4) by the USGS as part of a cooperative agreement with Clean Water Services. Chlorophyll-a levels have decreased substantially since the 1990s (see the figure on the following page). Chlorophyll-a levels continued to be low in 2014; during the past 4 years, the maximum 3-month average chlorophyll-a concentration was less than 10 g/l. Because the algal population has declined, high ph values have become rare. The ph is monitored hourly at RM 3.4 (Oswego Dam, year-round) and RM 24.5 (summer only). In 2014, no ph values at either site exceeded 8.5. In addition to ph data from continuous monitors, weekly ph measurements are taken at a number of sites during the summer by Clean Water Services. None of these data showed values greater than 8.5. Low ph values (<6.5) are not a problem in the Tualatin River system. Dissolved oxygen The amount of oxygen dissolved in water is the net result of processes that contribute oxygen and processes that consume oxygen. In the lower Tualatin River the primary sources of oxygen are photosynthesis by algae in the daytime and inflow of oxygen rich water. The processes that consume oxygen are biochemical oxygen demand and sediment oxygen demand (from substances that decompose in the water and at the sediment water interface, respectively) and respiration by algae at night. Because the lower section of the river moves slowly and is not turbulent, oxygen exchange with the atmosphere is slow. Consequently, if dissolved oxygen becomes depleted, it cannot be quickly replenished from the air. Similarly, if dissolved oxygen is in excess, the river water stays supersaturated for a prolonged period of time Tualatin River Flow Managment Report

33 Maximum 3-month mean Chlorophyll-a ( g/l) Tualatin River at Stafford Road (RM 5.4, CWS data, grab sample) Tualatin River at Oswego Dam (RM 3.4, USGS data, continuous monitor) Number of ph violations in a year 30-day mean dissolved oxygen with no credit for supersaturation, August October (mg/l) no continuous monitoring data no continuous monitoring data water quality criterion Tualatin River at Oswego Dam (RM 3.4, USGS data, continuous monitor) Tualatin River at Oswego Dam (RM 3.4, USGS data, continuous monitor) th percentile 75th percentile median 25th percentile 10th percentile 2014 Tualatin River Flow Management Report 31

34 In the 1980s the lower section of the Tualatin River was listed by the ODEQ for low dissolved oxygen that could impair fish health. The water quality criteria for this section of the river, which is considered Cool Water Habitat, are: Grab samples: dissolved oxygen > 6.5 mg/l Continuous Monitoring: 30-day average of daily mean dissolved oxygen > 6.5 mg/l (no credit for supersaturation) 7-day average of daily minimum dissolved oxygen > 5.0 mg/l (no credit for supersaturation) Daily minimum dissolved oxygen > 4.0 mg/l ODEQ also developed a TMDL for ammonia which consumes oxygen as it decomposes into nitrate. Since then, Clean Water Services has dramatically decreased the amount of ammonia discharged to the river. Streamflow in the Tualatin River during the summer has increased since the TMDLs were instituted in Increased river flow affects two different processes with opposite effects on oxygen. Faster river flow decreases the amount of time water is in contact with sediment, thereby decreasing the extent to which sediment oxygen demand can be exerted and the resultant amount of oxygen depleted. Faster river flow also decreases the time available for algal populations to grow, which in turn decreases photosynthetic oxygen production. The net effect of decreased oxygen production plus decreased oxygen consumption is variable and not well predicted. In general, low dissolved oxygen is still an issue in the lower Tualatin River periodically during the late summer through fall (see the figure on the previous page). Dissolved oxygen conditions in the Tualatin River in 2014 met criteria from early through mid-summer. Toward the end of August, the algal population in the reservoir part of the river began to decrease as evidenced by a decrease in the chlorophyll-a concentration. With less algae, there was less photosynthesis and less oxygen production. Dissolved oxygen concentrations began to decrease and by September 7th, the 30-day dissolved oxygen criterion was not met at the Oswego Dam site (RM 3.4). Dissolved oxygen concentrations remained low there until a storm on October 22 increased flows. Even though the dissolved oxygen concentrations had increased, the 30-day mean remained below the criterion until October 30th due to previous low concentrations. Dissolved oxygen concentrations were never below the 7-day or daily criteria during Dissolved oxygen concentrations farther upstream at RM 24.5 were at or above criteria throughout the low flow season. Continuous monitors are deployed at two locations in the reservoir section of the river. The following table shows the river conditions relative to dissolved oxygen criteria at these locations. Graphs of the dissolved oxygen concentrations at these two locations are shown on the following page. NUMBER OF DAYS THAT DID NOT MEET DISSOLVED OXYGEN CRITERIA IN 2014 Criterion May June July Aug Sept Oct May October Percentage Tualatin River at RM day % 7 day % Daily % Tualatin River at Oswego Dam (RM 3.4) 30 day % 7 day % Daily % Data are available at: Tualatin River Flow Managment Report

35 Tualatin River at River Mile 24.5 ( ) Data from U.S. Geological Survey Dissolved Oxygen (mg/l) Oxygen % Saturation (% sat.) Dissolved Oxygen (mg/l) Tualatin River at Oswego Diversion Dam ( ) Data from U.S. Geological Survey Oxygen % Saturation (% sat.) Tualatin River Flow Management Report 33

36 Dissolved Oxygen Status in Tributaries Some of the tributaries in the Tualatin Basin have also had low dissolved oxygen levels. In general, the slow moving, valley bottom streams are more likely to have low dissolved oxygen than faster moving headwaters streams. It is thought that sediment oxygen demand is largely responsible for the low oxygen levels in the tributaries. The following graphs show the dissolved oxygen levels at several tributaries during the summer period as measured by the USGS using continuous monitors. These data are available at Note that continuous monitoring was discontinued at two sites in 2012: Dairy Creek at Hwy 8 (site ID= ), and Chicken Creek at Roy Rogers Road (site ID= ) Scoggins Creek below Henry Hagg Lake near Gaston, OR ( ) Data from U.S. Geological Survey Dissolved Oxygen (mg/l) During May 22 - June 6, some of the water release was not routed through the normal penstock. Different routing of water from Scoggins Dam results in different levels of aeration and air entrainment Oxygen % Saturation (% sat.) Tualatin River Flow Managment Report

37 Dissolved Oxygen (mg/l) Gales Creek at Old Hwy 47, Forest Grove, OR ( ) Data from U.S. Geological Survey Oxygen % Saturation (% sat.) 0 0 Dissolved Oxygen (mg/l) Rock Creek at Brookwood Ave, Hillsboro, OR ( ) Data from U.S. Geological Survey Oxygen % Saturation (% sat.) Tualatin River Flow Management Report 35

38 Dissolved Oxygen (mg/l) Beaverton Creek at 170th Ave, Beaverton, OR ( ) Data from U.S. Geological Survey Oxygen % Saturation (% sat.) 0 0 Dissolved Oxygen (mg/l) Fanno Creek at Durham Road ( ) Data from U.S. Geological Survey Oxygen % Saturation (% sat.) Tualatin River Flow Managment Report

39 BIOLOGICAL OPINIONS RELEASED IN 2014 BY KRISTEL FESLER, WATER RESOURCES PROGRAM COORDINATOR, JOINT WATER COMMISSION/CITY OF HILLSBORO, JOE RUTLEDGE, DISTRICT MANAGER, TUALATIN VALLEY IRRIGATION DISTRICT; LAURA PORTER, WATER RESOURCES ANALYST, CLEAN WATER SERVICES, AND BERNIE BONN Background The Endangered Species Act (ESA) directs all Federal agencies to work to conserve endangered and threatened species. Any actions taken by a Federal agency, including those funded or authorized by the agency, may not jeopardize the existence of a listed species. If an agency thinks a proposed action might affect a listed species, the agency must consult with the appropriate Federal Service typically the U.S. Fish and Wildlife Service or the National Marine Fisheries Service. The Service will then respond with a Biological Opinion (BiOp) that details their findings, including any required or recommended corrective actions. Listed species in the Tualatin Basin: The appropriate Federal Service lists an animal or plant species as endangered if it is in danger of extinction in a significant portion of its range or threatened if the species is likely to become endangered in the foreseeable future. The Tualatin Basin is home to several species that are listed. Fender s blue butterfly (Icaricia icarioides fender) is listed as endangered. Upper Willamette River UWR steelhead (Oncorhynchus mykiss), Kincaid s lupine (Lupinus sulphureus ssp. kincaidii), and Nelson s checker-mallow (Sidalcea nelsoniana) are listed as threatened. Other species may also be listed. UWR Chinook salmon (Oncorhynchus tshawytscha) are listed as threatened in Oregon, but no essential habitat has been identified in the Tualatin Basin. Acorn woodpecker, yellow-breasted chat, and willow flycatcher are considered species of concern, but not listed as endangered or threatened at this time. Fender s Blue Butterfly on Kincaid Lupine public domain image, US Fish & Wildlife Service Steelhead juvenile photo by Chris Adams, California Department of Fish & Game The Tualatin Project: The Bureau of Reclamation manages the Tualatin Project which provides irrigation water, flood control, and supplemental municipal and industrial water. Water from the Project augments flows for fish, wildlife, and improves water quality in the Tualatin Basin. The Tualatin Project includes Scoggins Dam, Henry Hagg Lake, Patton Valley Pumping Plant, Spring Hill Pumping Plant, booster pumping plants, and piped lateral irrigation distribution systems. Two biological opinions were issued in 2014 for the Tualatin Project Tualatin River Flow Management Report 37

40 U.S. Fish and Wildlife Service Opinion In 2011, Fender s blue butterfly (FBB) and its host flower, Kincaid s lupine were found in several areas around Hagg Lake. As a result, the BOR requested a reinitiation of the 2004 consultation with the U.S. Fish and Wildlife Service (USFWS) regarding the Henry Hagg Lake Resource Management Plan and how it would affect these two species. USFWS issued a Biological Opinion in September USFWS concluded that the effects of the activities conducted at Hagg Lake under the existing Resource Management Plan and general Operations and Maintenance practices of the Tualatin Project, and the cumulative effects will not jeopardize the continued existence of FBB and Kincaid s lupine. The BiOp specified the following actions: Utilizing best management practices as part of ongoing restoration of prairie habitat, including the control of invasive vegetation; Limiting chemical treatment to 1/2 1/3 of occupied habitat; Conducting a survey of FBB (annual) and Kincaid s lupine (every 3 years); Reporting annually to the Oregon Fish and Wildlife Office of USFWS. USFWS also indicated that a new consultation should be requested for any modifications to Scoggins Dam (due to a dam raise, seismic upgrades, or other reasons). National Marine Fisheries Service Opinion The National Marine Fisheries Service (NMFS) reviewed the operations and maintenance of the Tualatin Project to determine if those actions jeopardize the existence of UWR Chinook salmon and UWR steelhead. Operation and maintenance of the facilities was defined as managing the reservoir for the temporary holding, storage, release, and distribution of water out of the Scoggins Creek watershed, and the various operation, maintenance, and construction or repair of existing structures and facilities. An analysis of the Tualatin Project's likely effects on essential fish habitat (as authorized under the Magnuson-Stevens Fishery Conservation and Management Act (MSA)) was also required. NMFS released the BiOp for the Tualatin Project on October 1, 2014 (NWR ). Findings related to threatened species NMFS conclusions concerning the operations and maintenance of the Tualatin Project are summarized in the table below. NMFS DETERMINATION OF TUALATIN PROJECT ON AFFECTED SPECIES Action UWR Steelhead UWR Chinook Salmon Is the Operation and Maintenance of the Tualatin Project likely to: affect this species or its critical habitat? Yes No jeopardize this species? No No destroy or adversely modify critical habitat for this species? No No NMFS concluded that the Tualatin Project is not likely to adversely affect UWR Chinook salmon. They also found that the Project will have a limited effect on UWR steelhead, but one that is not likely to imperil the species. Water withdrawals in particular were evaluated because of their potential to entrain juvenile UWR steelhead. NMFS concluded that water withdrawal has a low likelihood of entraining fish because: The period of highest withdrawals (July August) does not coincide with the period of highest fish presence (March June). The overall number of fish present is low during high withdrawal times. The design of the intakes at Patton Valley and Spring Hill pumping plants include screens that will exclude all but the smallest smolts Tualatin River Flow Managment Report

41 Although NMFS concluded that the entrainment of steelhead at intake points would be minimal, they also noted that some entrainment would occur at Spring Hill Pumping Plant (SHPP) because the intake screen at SHPP (1/8 mesh) is coarser than the NMFS guideline (3/32 mesh). Consequently, the BiOp included an incidental take statement for steelhead regarding entrainment at the SHPP. (The term take under ESA means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct.) Measures to minimize the potential incidental take as well as nondiscretionary terms and required conditions were specified in the BiOp. NFMS found that the screen mesh size at the intake was sufficient to limit entrainment to only the smallest juvenile salmonids and that the extent of the taking was not likely to jeopardize the species. Terms and conditions related to findings: The following required actions were specified in the BiOp to minimize the amount of incidental take: Maintain screens at water intake facilities; Monitor and report occurrences of incidental take; and Submit annual reports, including intake inspection reports and withdrawal amounts from March June. The BiOp does not require the BOR to replace the fish screens at Spring Hill Pumping Plant even though they do not meet the current NMFS-compliant 3/32 mesh size. If the Tualatin Project operates under the terms just described, it will not be in violation of the take prohibition if UWR Chinook salmon or UWR steelhead are harmed. Lawful actions that harm a listed species are not considered a take provided that the action was performed in compliance with the terms and conditions outlined in a BiOp. Annual reporting to document BiOp compliance will begin in ESA regulations do not require a response for non-jeopardy BiOps. Findings related to essential fish habitat As required by the MSA, the BiOp also included the results of NMFS analysis of whether the operation and maintenance of the Tualatin Project would adversely affect essential fish habitat (EFH) for Chinook and coho salmon. NMFS concluded that operation of the Tualatin Project will adversely affect essential fish habitat for coho salmon because operation of the Tualatin Project causes: reduced flows in Scoggins Creek during the fall and winter that can restrict access to limited coho spawning habitat; and increases in the temperature in the Tualatin River in the summer that restrict rearing potential and could displace juvenile salmonids to other rearing locations. Terms and conditions related to findings: The BiOp includes conservation recommendations to avoid, minimize, or otherwise offset these potential adverse effects on essential fish habitat. The MSA conservation recommendations include: Seek ways to increase flows within Scoggins Creek during fall and winter (potentially through additional efficiencies in delivery, distribution and use of water); and Begin an integrated water management assessment for the Tualatin Project to identify if any changes to the flow management regime could benefit the listed species of salmon and essential fish habitat. On January 6, 2015 BOR issued a statutory response letter to NMFS accepting both MSA conservation recommendations. Next steps Another NMFS review of the effects on salmonids due to the activities of the Tualatin Project must occur when the withdrawals from SHPP increase to a total of 30,000 ac-ft from March through June (equivalent of 80 mgd). This represents the maximum withdrawal of the SHPP in its current configuration Tualatin River Flow Management Report 39

42 SCOGGINS CREEK FIRE BY TACY STEEL, PUBLIC INFORMATION OFFICER KRISTEL FESLER, WATER RESOURCES PROGRAM COORDINATOR, BOTH OF JOINT WATER COMMISSION/CITY OF HILLSBORO AND JOHN GOANS, RESERVOIR SUPERINTENDENT, TVID Fire Summary A brush fire two miles northwest of Hagg Lake was reported on the afternoon of Friday, September 19th, The fire was on Oregon Department of Forestry (ODF) protected private forestland in yearold reproduction timber. Hagg Lake was immediately closed. The blaze moved quickly as embers that were cast ahead of the flame-front started new spot fires. Firefighters were seeing fire whirls evidence of extreme fire behavior. Gaston Rural Fire and the Forest Grove District of ODF responded first, assisted by the landowner, Stimson Lumber Company. The fire grew to a point that mandatory evacuation was ordered for approximately 40 homes. After the Governor invoked the Conflagration Act, the State Fire Marshal and ODF formed a Unified Command Structure on Saturday, September 20th. Fire crews came in from various areas to work on containment. Fire retardant was Hagg Lake Fire (photo taken by John Goans 9/19/2014) used on the first day when the fire was out-of-control and expanding rapidly. Retardant must be dropped 300 feet or more away from any waterway. Because the fire broke out near Hagg Lake, helicopters and the Super Scooper plane were able to collect and dump loads of water in quick succession every 2 minutes. The amount of water dipped out of the lake to fight the fire was considered water well spent and amounted to a minimal 136,000 gallons (less than 1 ac-ft). After 6 days, on Tuesday, September 23, 2014, the Scoggins Creek Fire was declared 100 percent contained. No one was injured and no structures were lost. In total 211 acres burned and damages were estimated at $1,958,722. The cause of the fire is still under investigation. The burned area was replanted in early Washington County opened an Emergency Operations Center (EOC) from which the JWC and CWS coordinated communications. This included participating in the County Joint Information Center, issuing daily co-releases to the media, and networking with Incident Command to receive regular updates. Future Risks and Monitoring Plans: The JWC had been planning to begin water quality monitoring in Hagg Lake in late After the fire, CWS and JWC adjusted this monitoring plan and are jointly conducting the monitoring effort. Monitoring sites include the lake surface, the deepest point, and Sain, Tanner and Scoggins Creeks above Hagg Lake in the vicinity of the fire. The primary water quality concerns are increased turbidity due to increased erosion in fire-damaged areas and algal blooms due to increased nutrients in the water from ash or dead plant material. Many of the Flow Management Committee members cooperated in the fire response effort including: Clean Water Services, Joint Water Commission, Washington County Parks and Emergency Management, and Tualatin Valley Irrigation District Tualatin River Flow Managment Report

43 Appendix A Stream Gage Records

44 STREAM GAGE SITES LOCATIONS Barney Reservoir SCHEMATIC MAP Not to Scale V E R Sain Cr North R I TRLF Creek A T I N SCHO SCHO SCLO Scoggins Reservoir (Hagg Lake) T U A L SCOO gins Scog TANO Ta nner Cr Creek Ayers Cr AYERS to Wa pa Creek WPH Wapato Lake Bed GASO WGAS nter Cr Carpe DLLO TRGC Gales GALES Creek West Fork East Fork 5400 McFee Cr Burris Cr Christensen Cr TRJB Dairy DAIRY MCKP McKay Creek MCSC He aton Cr Baker Cr FRMO Butternut Cr ROOD RCTV BCRR Ro ck DCBR Dawson Cr RCQR Cedar Cr Chicken Cr CCSR Beav BVTS erton Creek Brons Wil Cr on Cr eek BCBR RCBL S. RockCr Hedges Cr Summer Ck FCTW S. Creek Johns on Cr Erickson Ck N. Johnson Cr low Cr CedarMill Cr BCSR Saum Cr HCTP TRT FANO Lake Oswego Canal Fanno Springbrook Cr ASMP Ash Cr 6900 SCRL Sylvan Cr Sampling and Flow Sites WSLO W I L L A M E T T E Lake Oswego Discontinued Sites Withdrawal Points R I V E R Wastewater Treatment Plants APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

45 STREAM GAGE SITES ALPHABETICAL LISTING BY SITE CODE SITE CODE SITE NAME RIVER MILE STATION ID PAGE 5400 East Fork Dairy Creek near Meacham Corner, OR A Fanno Creek at 56th Avenue A-23 BVTS Beaverton Creek at NE Guston Court near Orenco, Oregon A-19 CCSR Chicken Creek at Roy Rogers Road near Sherwood, Oregon A-22 DAIRY Dairy Creek at Hwy 8 near Hillsboro, Oregon A-16 DLLO Tualatin River at Dilley, Oregon A-11 FANO Fanno Creek at Durham Road near Tigard, Oregon A-24 FRMO Tualatin River at Farmington, Oregon A-21 GALES Gales Creek at Old Hwy 47 near Forest Grove, Oregon A-12 GASO Tualatin River at Gaston, Oregon A-5 MCSC McKay Creek at Scotch Church Rd above Waible Ck near North Plains, Oregon A-15 RCTV Rock Creek at Hwy 8 near Hillsboro, Oregon A-20 ROOD Tualatin River at Rood Bridge Road near Hillsboro, Oregon A-18 SCHO Sain Creek above Henry Hagg Lake near Gaston, Oregon A-8 SCLO Scoggins Creek above Henry Hagg Lake near Gaston, Oregon A-7 SCOO Scoggins Creek below Henry Hagg Lake near Gaston, Oregon A-10 TANO Tanner Creek above Henry Hagg Lake near Gaston, Oregon A-9 TRGC Tualatin River at Golf Course Road near Cornelius, Oregon A-13 TRJB Tualatin River at Hwy 219 Bridge A-17 TRLF Tualatin River below Lee Falls near Cherry Grove, Oregon A-4 TRT Tualatin River at Tualatin, Oregon A-25 WPH Wapato Canal at Pumphouse at Gaston, Oregon A-6 WSLO Tualatin River at West Linn A-26 Discontinued Sites ASMP Ash Creek at Metzger Park at Metzger, Oregon AYERS Ayers Creek at NE North Valley Road near Gaston, Oregon BCBR Bronson Creek at Bronson Road near Orenco, Oregon BCRR Butternut Creek at Rosa Road BCSR Bronson Creek at Saltzman Road DCBR Dawson Creek at Brookwood Road near Hillsboro, Oregon FCTW Fanno Creek at Tuckerwood HCTP Hedges Creek at Tualatin Park at Tualatin, Oregon MCKP McKay Creek at Padgett Road near Hillsboro, Oregon RCBL Rock Creek below Bethany Lake RCQR Rock Creek at Quatama Road near Orenco, Oregon SCRL Sylvan Creek at Raleighwood Lane near West Slope, Oregon WGAS Wapato Creek at Gaston Road at Gaston, Oregon APPENDIX A Stream Gage Records 2014 Tualatin River Flow Management Report A-3

46 TRLF TUALATIN RIVER BELOW LEE FALLS NEAR CHERRY GROVE, OREGON [RM 70.7] Latitude: Longitude: Source Agency: District 18 Watermaster Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL MEAN MAX MIN AC-FT Provisional data subject to revision TRLF Tualatin River below Lee Falls near Cherry Grove, Oregon [RM 70.7] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

47 GASO TUALATIN RIVER AT GASTON, OREGON [RM 62.3] Latitude: Longitude: Source Agency: District 18 Watermaster Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC e e e e e e e e e e e670 e732 e e e620 e e e e e e e e e e e e e e e e e e e e e e e e e TOTAL MEAN MAX MIN AC-FT Provisional data subject to revision; e=estimated value GASO Tualatin River at Gaston, Oregon [RM 62.3] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records 2014 Tualatin River Flow Management Report A-5

48 UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY OREGON WATER SCIENCE CENTER STATION NUMBER: WAPATO CANAL AT PUMPHOUSE AT GASTON, OREG. LATITUDE: LONGITUDE: Water Surface Elevation above NAVD88, in feet, Calendar Year January to December 2014 Daily Mean Values Day JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC MEAN MAX MIN Provisional data (10/23 12/31) subject to revision Wapato Canal Pumphouse at Gaston, Oregon Daily Mean Water Surface Elevation above NAVD88 (feet) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

49 SCLO SCOGGINS CREEK ABOVE HENRY HAGG LAKE NEAR GASTON, OREGON [RM 9.3] Latitude: Longitude: Source Agency: District 18 Watermaster Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC e e TOTAL MEAN MAX MIN AC-FT Provisional data subject to revision SCLO Scoggins Creek above Henry Hagg Lake near Gaston, Oregon [RM 9.3] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records 2014 Tualatin River Flow Management Report A-7

50 SCHO SAIN CREEK ABOVE HENRY HAGG LAKE NEAR GASTON, OREGON [RM 1.6] Latitude: Longitude: Source Agency: District 18 Watermaster Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL MEAN MAX MIN AC-FT Provisional data subject to revision SCHO Sain Creek above Henry Hagg Lake near Gaston, Oregon [RM 1.6] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

51 TANO TANNER CREEK ABOVE HENRY HAGG LAKE NEAR GASTON, OREGON [RM 1.6] Latitude: Longitude: Source Agency: Tualatin Valley Irrigation District Day 2014 Daily Mean Discharge in Cubic Feet per Second a JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL AC-FT a Values are read from a staff plate. Values may be daily readings taken at about 0800 or averages over several days TANO Tanner Creek above Henry Hagg Lake near Gaston, Oregon [RM 1.6] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records 2014 Tualatin River Flow Management Report A-9

52 SCOO SCOGGINS CREEK BELOW HENRY HAGG LAKE NEAR GASTON, OREGON [RM 4.8] Latitude: Longitude: Source Agency: Bureau of Reclamation & District 18 Watermaster Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL MEAN MAX MIN AC-FT SCOO Scoggins Creek below Henry Hagg Lake near Gaston, Oregon [RM 4.8] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

53 UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY OREGON WATER SCIENCE CENTER STATION NUMBER: TUALATIN RIVER NEAR DILLEY, OREG. LATITUDE: LONGITUDE: DRAINAGE AREA: DATUM: Discharge, Cubic Feet per Second, Calendar Year January to December 2014 Daily Mean Values Day JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL MEAN MAX MIN AC-FT Provisional data (10/23 12/31) subject to revision DLLO Tualatin River near Dilley, Oregon [RM 58.8] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records 2014 Tualatin River Flow Management Report A-11

54 GALES GALES CREEK AT OLD HWY 47 NEAR FOREST GROVE, OREGON [RM 2.36] Latitude: Longitude: Source Agency: District 18 Watermaster Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC e e e e e TOTAL MEAN MAX MIN AC-FT Provisional data subject to revision; e=estimated value GALES Gales Creek at Old Hwy 47 near Forest Grove, Oregon [RM 2.36] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

55 TRGC TUALATIN RIVER AT GOLF COURSE ROAD NEAR CORNELIUS, OREGON [RM 51.5] Latitude: Longitude: Source Agency: District 18 Watermaster Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL MEAN MAX MIN AC-FT Provisional data subject to revision TRGC Tualatin River at Golf Course Road near Cornelius, Oregon [RM 51.5] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records 2014 Tualatin River Flow Management Report A-13

56 UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY OREGON WATER SCIENCE CENTER STATION NUMBER: EAST FORK DAIRY CREEK NEAR MEACHAM CORNER, OR LATITUDE: LONGITUDE: DRAINAGE AREA: DATUM: 290 Discharge, Cubic Feet per Second, Calendar Year January to December 2014 Daily Mean Values Day JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 1 41 e e e e e e e e e e e e e TOTAL MEAN MAX MIN AC-FT Provisional data (10/21 12/31) subject to revision; e=estimated value East Fork Dairy Creek near Meacham Corner, Oregon [RM 12.4] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

57 MCSC MCKAY CREEK AT SCOTCH CHURCH RD ABOVE WAIBLE CREEK NEAR NORTH PLAINS, OREGON [RM 6.3] Latitude: Longitude: Source Agency: WEST Consultants for Clean Water Services Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC e e e e e e e e e4.1 e e e3.9 e e e3.9 e e4.3 e e4.3 e e4.3 e e e4.3 e e e4.2 e e e4.2 1e e e4.2 e e e4.3 e e e4.7 e12 25 e e e5.3 e e e5.1 e12 26 e e e e e e e e e e e e e e e e e e e e e e119 TOTAL MEAN MAX MIN AC-FT e=estimated value MCSC McKay Creek at Scotch Church Road above Waible Creek near North Plains, Oregon [RM 6.3] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records 2014 Tualatin River Flow Management Report A-15

58 DAIRY DAIRY CREEK AT HWY 8 NEAR HILLSBORO, OREGON [RM 2.06] Latitude: Longitude: Source Agency: District 18 Watermaster Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC* e1080 e1930 e e1110 e1750 e e e1250 e1530 e e1430 e1340 e e1490 e1190 e e1990 e e e2520 e e2520 e e2410 e e e2400 e e2330 e e675 e539 e e886 e1060 e e894 e1560 e e773 e1830 e e599 e2030 e e500 e2220 e e2460 e e2580 e e2490 e e2330 e e2190 e e2040 e e1840 e531 e e e e1460 e633 e e1310 e849 e e1180 e1070 e e1480 e e e1880 e e TOTAL MEAN MAX MIN AC-FT Provisional data subject to revision; *incomplete record (monthly totals were computed when at least 80% of the record was complete for the month); e=estimated value DAIRY Dairy Creek at Hwy 8 near Hillsboro, Oregon [RM 2.06] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

59 TRJB TUALATIN RIVER AT HWY 219 BRIDGE [RM 44.4] Latitude: Longitude: Source Agency: Jackson Bottom Wetland Education Center Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB* MAR* APR MAY JUN JUL AUG SEP OCT NOV DEC* TOTAL MEAN MAX MIN AC-FT *Incomplete record (monthly totals were computed when at least 80% of the record was complete for the month). TRJB Tualatin River at Hwy 219 Bridge [RM 44.4] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records 2014 Tualatin River Flow Management Report A-17

60 ROOD TUALATIN RIVER AT ROOD BRIDGE ROAD NEAR HILLSBORO, OREGON [RM 38.4] Latitude: Longitude: Source Agency: District 18 Watermaster Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL MEAN MAX MIN AC-FT Provisional data subject to revision ROOD Tualatin River at Rood Bridge Road near Hillsboro, Oregon [RM 38.4] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

61 BVTS BEAVERTON CREEK AT NE GUSTON COURT NEAR ORENCO, OREGON [RM 1.2] Latitude: Longitude: Source Agency: WEST Consultants for Clean Water Services Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL MEAN MAX MIN AC-FT BVTS Beaverton Creek at NE Guston Court near Orenco, Oregon [RM 1.2] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records 2014 Tualatin River Flow Management Report A-19

62 RCTV ** ROCK CREEK AT HWY 8 NEAR HILLSBORO, OREGON [RM 1.2] Latitude: Longitude: Source Agency: WEST Consultants for Clean Water Services Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC e e e e e e e e e e e e e e e e e53 e e e88 e e e e151 e e e405 e e e854 e88 39 e e458 e TOTAL MEAN MAX MIN AC-FT **Site moved 120 feet downstream in 2012, previous ID was ; e=estimated value RCTV Rock Creek at Hwy 8 near Hillsboro, Oregon [RM 1.2] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

63 FRMO TUALATIN RIVER AT FARMINGTON, OREGON [RM 33.3] Latitude: Longitude: Source Agency: District 18 Watermaster Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL MEAN MAX MIN AC-FT Provisional data subject to revision FRMO Tualatin River at Farmington, Oregon [RM 33.3] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records 2014 Tualatin River Flow Management Report A-21

64 CCSR CHICKEN CREEK AT ROY ROGERS ROAD NEAR SHERWOOD, OREGON [RM 2.3] Latitude: Longitude: Source Agency: WEST Consultants for Clean Water Services Day 2014 Daily Mean Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL MEAN MAX MIN AC-FT CCSR Chicken Creek at Roy Rogers Road near Sherwood, Oregon [RM 2.3] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

65 UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY OREGON WATER SCIENCE CENTER STATION NUMBER FANNO CREEK AT 56TH AVENUE LATITUDE: LONGITUDE: DRAINAGE AREA: 2.37 Discharge, Cubic Feet per Second, Calendar Year January to December 2014 Daily Mean Values Day JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL MEAN MAX MIN AC-FT Provisional data (10/30 12/31) subject to revision Fanno Creek at 56th Avenue [RM 11.9] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records 2014 Tualatin River Flow Management Report A-23

66 UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY OREGON WATER SCIENCE CENTER STATION NUMBER FANNO CREEK AT DURHAM LATITUDE: LONGITUDE: DRAINAGE AREA: Day Discharge, Cubic Feet per Second, Calendar Year January to December 2014 Daily Mean Values JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL MEAN MAX MIN AC-FT Provisional data (10/20 12/31) subject to revision FANO Fanno Creek at Durham Road near Tigard, Oregon [RM 1.2] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

67 TRT (formerly ) TUALATIN RIVER AT TUALATIN, OREGON [RM 8.9] Latitude: Longitude: Source Agency: District 18 Watermaster Day Daily Elevation in Feet above Mean Sea Level for 2014 JAN* FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC MEAN MAX MIN Preliminary data subject to revision; *Incomplete record (monthly totals were computed when at least 80% of the record was complete for the month) TRT (formerly ) Tualatin River at Tualatin, Oregon [RM 8.9] Stage (feet above sea level) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records 2014 Tualatin River Flow Management Report A-25

68 UNITED STATES DEPARTMENT OF THE INTERIOR - GEOLOGICAL SURVEY - OREGON WATER SCIENCE CENTER STATION NUMBER: TUALATIN RIVER AT WEST LINN, OREG. LATITUDE: LONGITUDE: DRAINAGE AREA: DATUM: Discharge, Cubic Feet per Second, Calendar Year January to December 2014 Daily Mean Values Day JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC e e TOTAL MEAN MAX MIN AC-FT Provisional data (19 12/31) subject to revision; e=estimated value WSLO Tualatin River at West Linn, Oregon [RM 1.75] Daily Mean Discharge (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX A Stream Gage Records A Tualatin River Flow Management Report

69 Appendix B Selected Releases and Withdrawals The following information is for selected water releases to and withdrawals from the Tualatin River and its tributaries. It is not a comprehensive listing of releases and withdrawals. Some of the data represent daily mean flows and some represent instantaneous measurements. All streamflow measurements are in Appendix A.

70 Hedges Cr SELECTED RELEASES AND WITHDRAWALS LOCATIONS TRTR TRNF Barney Reservoir CGIC SCHEMATIC MAP Not to Scale V E R Sain Cr North R I Creek Ayers Cr to Wa pa Creek A T I N T U A L PVR2 PVR1 WAPO Wapato Lake Bed McFee Cr Christensen gins Scog BJ-FA PVPP SHPP JWCS SCHO nter Cr Carpe Scoggins Reservoir (Hagg Lake) Ta CWS-FG nner Cr Gales GA-FA Council Cr Creek Creek West Fork WFD-FA East Fork EFD-FA Burris Cr Cr Dairy McKay Creek CWS-HB MK-FA He aton Cr Rock Baker Cr CWS-RC Creek Dawson Cr Butternut Cr Cedar Cr Chicken Cr Beaverton Creek Brons on Cr S. RockCr S. Johns on Cr N. Johnson Cr CedarMill Cr Fanno Creek CWS-DH Saum Cr Lake Oswego Canal LOCL Springbrook Cr Ash Cr Lake Oswego Sampling and Flow Sites Withdrawal Points W I L L A M E T T E R I V E R Wastewater Treatment Plants APPENDIX B Selected Releases and Withdrawals B Tualatin River Flow Management Report

71 SELECTED RELEASE AND WITHDRAWAL SITES ALPHABETICAL LISTING BY SITE CODE SITE CODE SITE NAME RIVER MILE PAGE BJ-FA CWS Black Jack Creek Flow Augmentation with TVID B-13 CGIC City of Hillsboro Withdrawal at Cherry Grove 73.3 B-6 CWS-DH CWS Durham WWTF Release 9.33 B-12 CWS-FG CWS Forest Grove WWTF Release 55.2 B-9 CWS-HB CWS Hillsboro WWTF Release 43.8 B-10 CWS-RC CWS Rock Creek WWTF Release B-11 EFD-FA CWS East Fork Dairy Flow Augmentation with TVID 4.9 B-13 GA-FA CWS Gales Creek Flow Augmentation with TVID 5.0 B-13 JWCS Joint Water Commission Withdrawal at Spring Hill Pump Plant 56.1 B-8 LOCL Lake Oswego Corp. Canal Diversion 6.7 * MK-FA1 CWS McKay Creek Flow Augmentation with TVID 7.0 B-13 PVPP TVID Withdrawal at Patton Valley Pump Plant 1.71 ** PVR1 TVID Patton Valley River Turnout #1 Release ** PVR2 TVID Patton Valley River Turnout #2 Release ** SHPP TVID Withdrawal at Spring Hill Pump Plant 56.1 B-7 TRNF Barney Reservoir Measured Flow to North Fork Trask River B-4 TRTR Barney Reservoir Release to Tualatin River 78.0 B-5 WAPO Wapato Canal Diversion 62.0 ** WFD-FA CWS West Fork Dairy Flow Augmentation with TVID 5.2 B-13 *Monitoring of the Lake Oswego Canal Diversion was discontinued 8/23/2012. **Withdrawals and releases at Patton Valley Pump Plant, Patton Valley River turnouts and Wapato Canal Diversion were not measured in APPENDIX B Selected Releases and Withdrawals 2014 Tualatin River Flow Management Report B-3

72 TRNF BARNEY RESERVOIR MEASURED FLOW TO NORTH FORK TRASK RIVER Source Agency: Barney Reservoir Joint Ownership Commission 2014 Instantaneous Measured Flow Rate in Cubic Feet per Second Day JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TRNF Barney Reservoir Measured Flow to North Fork Trask River /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 Flow Rate (cfs) 200 APPENDIX B Selected Releases and Withdrawals B Tualatin River Flow Management Report

73 TRTR BARNEY RESERVOIR MEASURED FLOW TO TUALATIN RIVER [RM 78.0] Source Agency: Barney Reservoir Joint Ownership Commission 2014 Instantaneous Measured Flow Rate in Cubic Feet per Second Day JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TRTR Barney Reservoir Measured Flow to Tualatin River [RM 78.0] Flow Rate (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX B Selected Releases and Withdrawals 2014 Tualatin River Flow Management Report B-5

74 CGIC CITY OF HILLSBORO WITHDRAWAL AT CHERRY GROVE [RM 73.3] Source Agency: Barney Reservoir Joint Ownership Commission Day 2014 Calculated Average Flow Rate in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC CGIC City of Hillsboro Withdrawal at Cherry Grove [RM 73.3] Flow Rate (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX B Selected Releases and Withdrawals B Tualatin River Flow Management Report

75 SHPP TVID WITHDRAWAL AT SPRING HILL PUMP PLANT [RM 56.1] Source Agency: US Geological Survey, Oregon Water Science Center Day 2014 Mean Daily Water Withdrawal in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC SHPP Tualatin Valley Irrigation District Withdrawal at Spring Hill Pump Plant [RM 56.1] Flow Rate (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX B Selected Releases and Withdrawals 2014 Tualatin River Flow Management Report B-7

76 JWCS JOINT WATER COMMISSION WITHDRAWAL AT SPRING HILL PUMP PLANT [RM 56.1] Source Agency: Joint Water Commission Day 2014 Calculated Average Flow Rate in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JWCS Joint Water Commission Withdrawal at Spring Hill Pump Plant [RM 56.1] Flow Rate (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX B Selected Releases and Withdrawals B Tualatin River Flow Management Report

77 CWSFG CLEAN WATER SERVICES FOREST GROVE WASTEWATER TREATMENT FACILITY DISCHARGE [RM 55.2] Source Agency: Clean Water Services Day 2014 Mean Daily Water Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC CWSFG Clean Water Services Forest Grove Wastewater Treatment Plant Discharge [RM 55.2] Flow Rate (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 5 0 APPENDIX B Selected Releases and Withdrawals 2014 Tualatin River Flow Management Report B-9

78 CWSHB CLEAN WATER SERVICES HILLSBORO WASTEWATER TREATMENT FACILITY DISCHARGE [RM 43.8] Source Agency: Clean Water Services Day 2014 Mean Daily Water Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC CWSHB Clean Water Services Hillsboro Wastewater Treatment Plant Discharge [RM 43.8] Flow Rate (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX B Selected Releases and Withdrawals B Tualatin River Flow Management Report

79 CWSRC CLEAN WATER SERVICES ROCK CREEK WASTEWATER TREATMENT FACILITY DISCHARGE [RM 38.08] Source Agency: Clean Water Services Day 2014 Mean Daily Water Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC CWSRC Clean Water Services Rock Creek Wastewater Treatment Plant Discharge [RM 38.08] Flow Rate (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX B Selected Releases and Withdrawals 2014 Tualatin River Flow Management Report B-11

80 CWSDH CLEAN WATER SERVICES DURHAM WASTEWATER TREATMENT FACILITY DISCHARGE [RM 9.33] Source Agency: Clean Water Services Day 2014 Mean Daily Water Discharge in Cubic Feet per Second JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC CWSDH Clean Water Services Durham Wastewater Treatment Plant Discharge [RM 9.33] Flow Rate (cfs) /1 3/1 4/1 5/1 6/1 7/1 8/1 9/1 10/1 1 12/1 APPENDIX B Selected Releases and Withdrawals B Tualatin River Flow Management Report

81 RELEASES FOR CLEAN WATER SERVICES TRIBUTARY FLOW AUGMENTATION AT TVID RELEASE POINTS Map # Site Name River Mile Start Date End Date Average Flow Total Release (cfs) (ac-ft) 1 McKay Creek 7.0 7/11/ /21/ East Fork Dairy Creek 4.9 7/11/ /21/ West Fork Dairy Creek 5.2 7/11/ /21/ Gales Creek 5.0 7/11/ /21/ Black Jack Creek 7/11/ /21/ Tributary Flow Restoration Sites 6 WestFork DairyCre ek Banks 2 North Plains McKay C ree k Flow Restoration Sites 1) McKay Creek Paul Coussens 47 2) East Fork Dairy Creek Paul Coussens Henry Hagg Lake 4 Ga les Cre e k Forest Grove Cornelius Tua l atinriver 8 Hillsboro Ro c k Cr eek 3) West Fork Dairy Creek Jim Love 4) Gales Creek Rick Sheelar 5) Black Jack Creek Charlie Reimer TVID Pipeline 219 City Boundary Scogg insc re ek 5 Gaston Tualati n Rive r 0 Miles 2 Disclaimer: Not intended as definitive property description. All users of this information should perform a separate investigation of conditions before commencing any pla n, design, construction, watershed enhancement activities, or other work. There are no warranties, expressed or implied, including the warranty of merchantability or fitness for a particular purpose, concerning this information. Path: \\Fileserv\usa\Watershed Management\Staff\Brian Shepard\ Mac Flow Restoration Sites\Flow Restoration Sites WMD.mxd Date Saved: 3/3/2015 7:25:07 AM APPENDIX B Selected Releases and Withdrawals 2014 Tualatin River Flow Management Report B-13

TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE. Tualatin Basin Annual Report. prepared by Bernie Bonn for

TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE. Tualatin Basin Annual Report. prepared by Bernie Bonn for TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE 2013 Annual Report prepared by Bernie Bonn for Tualatin Basin Cover Map Credit: Brian Shepard, Clean Water Services TUALATIN RIVER FLOW MANAGEMENT TECHNICAL

More information

TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE. Jackson Bottom Wetlands. Fernhill Wetlands Annual Report. prepared by Bernie Bonn for

TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE. Jackson Bottom Wetlands. Fernhill Wetlands Annual Report. prepared by Bernie Bonn for TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE Jackson Bottom Wetlands Fernhill Wetlands 2015 Annual Report prepared by Bernie Bonn for Cover photos taken by Michael Nipper for Clean Water Services,

More information

2012 Annual Report TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE. prepared by Bernie Bonn for

2012 Annual Report TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE. prepared by Bernie Bonn for TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE Tualatin Valley Irrigation District Irrigation Water Joint Water Commission Municipal Water Supply Clean Water Services Stormwater and Municipal Wastewater

More information

TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE

TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE Measuring streamflow, OWRD staff 2005 Annual Report prepared by Bernie Bonn for Acoustic doppler current profiler Photo Credits: Cole Beaman, Assistant

More information

TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE

TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE TUALATIN RIVER FLOW MANAGEMENT TECHNICAL COMMITTEE Scoggins Dam Henry Hagg Lake 22 Annual Report prepared by Barney Reservoir Photo Credit: Barney Reservoir, Alan Bathke, Summer 21 Scoggins Dam Henry Hagg

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

Bacteria TMDLs for Halls Bayou November 10, 2008

Bacteria TMDLs for Halls Bayou November 10, 2008 Bacteria TMDLs for Halls Bayou November 10, 2008 PARSONS Outline Watershed Overview Pollutant Pollutant Source Assessment Technical Approach: Load Duration Curves TMDL TMDL Calculations Halls Bayou Watershed

More information

Bacteria TMDLs for Brays Bayou November 11, 2008

Bacteria TMDLs for Brays Bayou November 11, 2008 Bacteria TMDLs for Brays Bayou November 11, 2008 PARSONS Outline Watershed Overview Pollutant Pollutant Source Assessment Technical Approach: Load Duration Curves TMDL TMDL Calculations Brays Bayou Watershed

More information

LAKE CHELAN ANNUAL FLOW AND WATER TEMPERATURE REPORT Final

LAKE CHELAN ANNUAL FLOW AND WATER TEMPERATURE REPORT Final LAKE CHELAN ANNUAL FLOW AND WATER TEMPERATURE REPORT 2013 LICENSE ARTICLES 405 & 408 Final LAKE CHELAN HYDROELECTRIC PROJECT FERC Project No. 637 April 30, 2014 Public Utility District No. 1 of Chelan

More information

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008 Central Coast Watershed Studies CCoWS Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008 Santa Lucia Preserve Monterey County, California Publication No. WI-2009-01

More information

SNOHOMISH COUNTY PUBLIC UTILITY DISTRICT NO.1. Your Northwest renewables utility

SNOHOMISH COUNTY PUBLIC UTILITY DISTRICT NO.1. Your Northwest renewables utility SNOHOMISH COUNTY PUBLIC UTILITY DISTRICT NO.1 Your Northwest renewables utility May 17, 2013 VIA ELECTRONIC FILING Kimberly D. Bose, Secretary Federal Energy Regulatory Commission (FERC) 888 First Street

More information

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007 Central Coast Watershed Studies CCoWS Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007 Santa Lucia Preserve Monterey County, California Publication No. WI-2008-01

More information

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683 Capacity Analysis Report For William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683 Florida Department of Environmental Protection Facility Identification No. FLA0128775

More information

Henry M. Jackson Hydroelectric Project (FERC No. 2157)

Henry M. Jackson Hydroelectric Project (FERC No. 2157) Henry M. Jackson Hydroelectric Project (FERC No. 2157) License Article 401: Water Quality Monitoring Plan 2013 Annual Report Everett, WA Final This document has been prepared for the District. It has been

More information

REASONABLE FURTHER PROGRESS REPORT FOR THE MONO BASIN PM-10 STATE IMPLEMENTATION PLAN

REASONABLE FURTHER PROGRESS REPORT FOR THE MONO BASIN PM-10 STATE IMPLEMENTATION PLAN REASONABLE FURTHER PROGRESS REPORT FOR THE MONO BASIN PM-10 STATE IMPLEMENTATION PLAN September 2001 This document provides a progress report on air quality trends in the Mono Basin federal PM-10 1 nonattainment

More information

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS VAUXHALL WASTEWATER TREATMENT PLANT 2013 ANNUAL REPORT FEBRUARY 2014 Vauxhall Wastewater Treatment Plant 2013

More information

Action Requested From AMWG

Action Requested From AMWG Action Requested From AMWG NONE, These Two Presentations Are For Information Transfer Only The information is derived from a multi-year synthesis research effort related to existing data on flow, sediment-transport

More information

Pump Station 7 Improvements

Pump Station 7 Improvements Project Business Case ID: C04 2/18/2017 Pump Station 7 Project Purpose: The purpose of this project is to ensure that Pump Station 7 continues to operate in an efficient and effective manner following

More information

Water Treatment Plant Historical Timeline

Water Treatment Plant Historical Timeline Water Treatment Plant Historical Timeline 1874 The citizens of the the Village of Evanston, with a population of 3500, started to build a communal water system. The system consisted of a 16 inch intake

More information

City Of London Environmental & Engineering Services Department Wastewater Treatment Operations

City Of London Environmental & Engineering Services Department Wastewater Treatment Operations City Of London Environmental & Engineering Services Department Wastewater Treatment Operations Greenway Wastewater Treatment Centre 2016 Annual Report February 2017 Page 1 of 96 SUMMARY This annual report

More information

Flows Atlas. Compilation of instream flow & estuary inflow statistics for the Sabine and Neches River Basins and Sabine Lake

Flows Atlas. Compilation of instream flow & estuary inflow statistics for the Sabine and Neches River Basins and Sabine Lake Compilation of instream flow & estuary inflow statistics for the Sabine and Neches River Basins and Sabine Lake April 2010 FLOWS ATLAS Compilation of instream flow & estuary inflow statistics for the Sabine

More information

Oregon Smoke Management Annual Report

Oregon Smoke Management Annual Report Oregon Smoke Management Annual Report OREGON DEPARTMENT OF FORESTRY FIRE PROTECTION DIVISION SMOKE MANAGEMENT AND FUELS General File 1-2-5-910 OREGON SMOKE MANAGEMENT ANNUAL REPORT Prepared By: FIRE PROTECTION

More information

Presentation to: Cedar Hills City Council Division of Water Quality Utah Department of Environmental Quality

Presentation to: Cedar Hills City Council Division of Water Quality Utah Department of Environmental Quality American Fork Canyon Water Quality Presentation to: Cedar Hills City Council Utah Department of Environmental Quality Meeting Purpose 1. Provide an overview of general water quality conditions in American

More information

*iiiii. May 31, 2017 VIA ELECTRONIC FILING

*iiiii. May 31, 2017 VIA ELECTRONIC FILING *iiiii. PUBLIC UTILITY DISTRICT NO. I of CHELAN COUNTY P.O. Box 1231, Wenatchee, WA 98807-1231 327 N. Wenatchee Ave., Wenatchee, WA 98801 (509) 663-8121 Toll free 1-888-663-8121 www.chelanpud.org May 31,

More information

Missouri River Mainstem Reservoir System Hydrologic Statistics on Inflows Technical Report

Missouri River Mainstem Reservoir System Hydrologic Statistics on Inflows Technical Report Missouri River Mainstem Reservoir System Hydrologic Statistics on Inflows Technical Report Fort Peck Garrison Oahe Big Bend Fort Randall Gavins Point Missouri River Basin Water Management Division Omaha,

More information

ALBENI FALLS DAM AND LAKE PEND OREILLE

ALBENI FALLS DAM AND LAKE PEND OREILLE ALBENI FALLS DAM AND LAKE PEND OREILLE Fall Public Meeting 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 Aug. 7, 2017 255 255 255 239 65 53 80 119 27 252 174.59 83 36 118 110 135 120

More information

2012 Water Consumption Statistics Report. Water Services Department

2012 Water Consumption Statistics Report. Water Services Department 212 Water Consumption Statistics Report Water Services Department Issued: December 213 TABLE OF CONTENTS 212 Water Consumption Statistics Report December 213 212 GVWD Statistics Book - Notes...3 Annual

More information

House Committee on Transportation Policy Public Hearing HB April 5, 2017

House Committee on Transportation Policy Public Hearing HB April 5, 2017 REPRESENTATIVE RICH VIAL OREGON HOUSE OF REPRESENTATIVES HOUSE DISTRICT 26 House Committee on Transportation Policy Public Hearing HB 3231 April 5, 2017 Background House District 26 Wilsonville Sherwood

More information

Element #2: Additional analysis of Tuolumne River below La Grange Dam (USGS # );

Element #2: Additional analysis of Tuolumne River below La Grange Dam (USGS # ); Districts Response to NMFS-4, Element 1 through 6 Effects of Don Pedro Project and Related Facilities on Hydrology for Anadromous Fish: Magnitude, Timing, Duration, and Rate of Change 1.0 Background On

More information

LOCAL CLIMATOLOGICAL DATA

LOCAL CLIMATOLOGICAL DATA ILLINOIS STATE WATER SURVEY DIVISION URBANA, ILLINOIS ISWS MP-21 Archive SWS0964 Illinois State Water Survey LOCAL CLIMATOLOGICAL DATA FDR HILLSBORO, IL. 1901-1962 LOCAL CLIMATOLOGICAL DATA 1901-1962 HILLSBORO

More information

Missouri River Incremental Flows Below Gavins Point Technical Report

Missouri River Incremental Flows Below Gavins Point Technical Report Missouri River Incremental Flows Below Gavins Point Technical Report Fort Peck Garrison Oahe Big Bend Fort Randall Gavins Point Missouri River Basin Water Management Division Omaha, Nebraska July 214 Missouri

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Memorandum October 5, 2017

Memorandum October 5, 2017 614 Magnolia Avenue Ocean Springs, Mississippi 39564 228.818.9626 Memorandum October 5, 2017 To: Gary Miller, U.S. Environmental Protection Agency From: David Keith, John Laplante, Matt Henderson, and

More information

Appendix E Hydrology, Erosion and Sediment Transport Studies

Appendix E Hydrology, Erosion and Sediment Transport Studies Appendix E Hydrology, Erosion and Sediment Transport Studies Hatch 2012/10 Appendix E1 EA Hydrology Memorandum February 2011 (Hatch. 2011a) Hatch 2012/10 Project Memo February 23, 2011 TO: Larry King FROM:

More information

Water Consumption Statistics Report

Water Consumption Statistics Report Water Consumption Statistics Report Operations and Maintenance Department 29 Edition TABLE OF CONTENTS 29 Water Consumption Statistics Report October 21 SYSTEM AND MUNICIPAL CONSUMPTION 29 GVWD Statistics

More information

Thirty Years of Climatological Data: 1969 to 1998

Thirty Years of Climatological Data: 1969 to 1998 Thirty Years of Climatological Data: 1969 to 1998 NMSU's Agricultural Science Center at Farmington, New Mexico Agricultural Experiment Station Research Report 744 College of Agriculture and Home Economics

More information

2016 Load & Capacity Data Report

2016 Load & Capacity Data Report Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness

More information

STRUCTURE 5A PURPOSE

STRUCTURE 5A PURPOSE STRUCTURE 5A This structure is a six unit pumping plant located on the south side of U.S. Highway 441 and Canal 51 (West Palm Beach Canal) between the canal and the borrow canals of Levees 7 and 40 about

More information

TACOMA HYDROELECTRIC PROJECT PROJECT EFFECTS ON THE WATER QUANTITY AND QUALITY OF THE ANIMAS RIVER

TACOMA HYDROELECTRIC PROJECT PROJECT EFFECTS ON THE WATER QUANTITY AND QUALITY OF THE ANIMAS RIVER TACOMA HYDROELECTRIC PROJECT PROJECT EFFECTS ON THE WATER QUANTITY AND QUALITY OF THE ANIMAS RIVER Prepared for: PUBLIC SERVICE CO. OF COLORADO Durango, Colorado Prepared by: DEVINE TARBELL & ASSOCIATES,

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

Metropolitan Domestic Water Improvement District Board of Directors Meeting. August 8, July 2011 Report

Metropolitan Domestic Water Improvement District Board of Directors Meeting. August 8, July 2011 Report Metropolitan Domestic Water Improvement District Synopsis The purpose of this agenda item is to provide the Board with an update of the District s activities for the past month. This is not an action item,

More information

CHINO DESALTER PHASE 3

CHINO DESALTER PHASE 3 CHINO DESALTER PHASE 3 Comprehensive Predesign Report Prepared for Jurupa Community Services District, City of Ontario, and Western Municipal Water District REVISED FINAL December 2010 Jurupa Community

More information

Missouri River Mainstem System Annual Operating Plan. Garrison. Oahe

Missouri River Mainstem System Annual Operating Plan. Garrison. Oahe Missouri River Basin Water Management Division Final AOP 2012-2013 Missouri River Mainstem System 2012-2013 Annual Operating Plan Fort Peck Garrison Oahe Big Bend Fort Randall Gavins Point Annual Operating

More information

Monitoring Bank Erosion On the Missouri River, Lower Brule Reservation

Monitoring Bank Erosion On the Missouri River, Lower Brule Reservation Monitoring Bank Erosion On the Missouri River, Lower Brule Reservation A cooperative study between the Lower Brule Sioux Tribe s Environmental Protection Office and the U.S. Geological Survey, with assistance

More information

City of Greenfield WWTP

City of Greenfield WWTP General Information County: Highland Counties Served: Highland Type of System: Public: X Private: Year Established: 1936 Year of Upgrades: 1985, 2005 EPA District: Southwest City of Greenfield WWTP Treatment

More information

ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study)

ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) Southern California Edison So Cal Gas Sub-transmission Project Hydrology and Hydraulics Study January 2014 2 Hydrology & Hydraulics

More information

CLIMATOLOGICAL SUMMARY

CLIMATOLOGICAL SUMMARY DEPARTMENT OF REGISTRATION AND EDUCATION CTATP OF ILLINOIS ILLINOIS STATE WATER SURVEY DIVISION URBANA, ILLINOIS ISWS MP-19 Archive ISWS Illinois State Water Survey )CAL CLIMATOLOGICAL DATA MP-19 LOCAL

More information

Section Operations Section Organizational Guidance

Section Operations Section Organizational Guidance 1 2 3 4 5 6 7 8 9 10 Section 9315 Operations Section Organizational Guidance 11 12 1 2 3 4 5 6 7 8 9 10 11 T able of Contents Section Page 12 13 14 15 16 17 18 9315 Operations Section Organizational Guidance...

More information

Project Description - 1 -

Project Description - 1 - Project Description The Mother Ann Lee Hydroelectric Station is located at Lock and Dam 7 on the Kentucky River. This dam is part of a system of 14 lock and dams installed on the Kentucky River between

More information

Lake Mead Intake No. 3

Lake Mead Intake No. 3 Lake Mead Intake No. 3 1 Lake Mead Intake No. 3 Total Project Scope INTAKE STRUCTURE PUMPING STATION ACCESS SHAFTS WATER TREATMENT FACILITY CONNECTOR TUNNEL INTAKE 1 INTAKE 2 C-2 Lake Mead Intake No. 3

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

Todd Carlson Program Coordinator Engineering MMSD PP I/I Summit 2.0 October 15,

Todd Carlson Program Coordinator Engineering MMSD PP I/I Summit 2.0 October 15, Todd Carlson Program Coordinator Engineering MMSD PP I/I Summit 2.0 October 15, 2015 1 North Shore of Lake Superior 883 feet of Elevation Aging Sanitary/Storm Sewer System dating back to 1880 s Second

More information

2016 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

2016 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton 0 2016 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station Prepared by: Steven Paton 1 Introduction This is the forth of a series of yearly reports summarising the past year

More information

ENVIRONMENTAL PERFORMANCE IN 2011 UPM Madison

ENVIRONMENTAL PERFORMANCE IN 2011 UPM Madison ENVIRONMENTAL PERFORMANCE IN 211 UPM Madison UPM CORPORATE ENVIRONMENTAL STATEMENT 211 UPM paper and pulp mills This publication, UPM Madison Environmental Performance in 211, is the mill s appendix to

More information

AOP. Final Missouri River Mainstem System Annual Operating Plan

AOP. Final Missouri River Mainstem System Annual Operating Plan US Army Corps of Engineers Northwestern Division Missouri River Basin Water Management Division Final AOP 2009-2010 Missouri River Mainstem System 2009-2010 Annual Operating Plan Fort Peck Garrison Oahe

More information

Appendix I. Canning River Fan Stream Data

Appendix I. Canning River Fan Stream Data Appendix I Canning River Fan Stream Data Table 1: Available Stream Width and Bankfull Data Collected on the Canning River Fan Within 5 Miles of the Coast Stream Width (ft) Ordinary Top of Flood- Site

More information

The City of Sturgis Wastewater Treatment Plant Septage Waste Receiving Facility Operating Plan

The City of Sturgis Wastewater Treatment Plant Septage Waste Receiving Facility Operating Plan The City of Sturgis Wastewater Treatment Plant Septage Waste Receiving Facility Operating Plan Introduction/Purpose: The City of Sturgis Wastewater Treatment Plant is owned and operated by the City of

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : June,

More information

LONG RANGE PERFORMANCE REPORT. Study Objectives: 1. To determine annually an index of statewide turkey populations and production success in Georgia.

LONG RANGE PERFORMANCE REPORT. Study Objectives: 1. To determine annually an index of statewide turkey populations and production success in Georgia. State: Georgia Grant Number: 08-953 Study Number: 6 LONG RANGE PERFORMANCE REPORT Grant Title: State Funded Wildlife Survey Period Covered: July 1, 2010 - June 30, 2011 Study Title: Wild Turkey Production

More information

Appendix G Aquilla Lake Pool Rise Recreational Resources

Appendix G Aquilla Lake Pool Rise Recreational Resources Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative

More information

/ Planning and Zoning Staff Report Lonestar Land, LLC. - Rezone, RZ

/ Planning and Zoning Staff Report Lonestar Land, LLC. - Rezone, RZ / Planning and Zoning Staff Report Lonestar Land, LLC. - Rezone, RZ2018-0019 Hearing Date: October 18, 2018 Development Services Department Applicant: Lonestar Land, LLC. Representative: Lance Warnick

More information

September 2016 Water Production & Consumption Data

September 2016 Water Production & Consumption Data September 2016 Water Production & Consumption Data September 2016 monthly water production (288.48 AF) was lowest in at least 17 years. Monthly water production has increased slightly each month since

More information

April 10, Dear Customer:

April 10, Dear Customer: Dear Customer: April 10, Attached is the monthly water supply outlook and projected operations for Yellowtail Dam and Powerplant. If you have any questions or concerns, please feel free to call me at 406-247-7334

More information

2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton 0 2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station Prepared by: Steven Paton 1 Introduction This is the second of a series of yearly reports summarising the past year

More information

Corporate Engagement in Wetlands Restoration

Corporate Engagement in Wetlands Restoration Corporate Engagement in Wetlands Restoration ConocoPhillips Coastal Wetlands A Model for Success Presentation Overview Property Overview CWPPRA Engagement ConocoPhillips/Ducks Unlimited Collaboration Restoration

More information

Missouri River Mainstem Reservoirs Runoff Volumes for Annual Operating Plan Studies RCC Technical Report Jy-08

Missouri River Mainstem Reservoirs Runoff Volumes for Annual Operating Plan Studies RCC Technical Report Jy-08 Missouri River Region Since 1953 US Army Corps of Engineers Reservoir Control Center Missouri River Region Northwestern Division Reservoir Control Center July 2008 Missouri River Basin Fort Peck Montana

More information

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Second River Prepared By AECOM Brian

More information

Exhibit 1. Background. Authorizing Legislation

Exhibit 1. Background. Authorizing Legislation Background Authorizing Legislation The Boulder Canyon Project Act (43 U.S.C. 617, et seq.), enacted by the U.S. Congress in 1928 (The 1928 Act), authorized the Secretary of the Interior to spend up to

More information

Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows

Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows 1961-2007 Background The Niagara River flow at Buffalo is currently computed

More information

Ambient PM 10 Monitoring Sechelt, B.C Update

Ambient PM 10 Monitoring Sechelt, B.C Update Ministry of Environment LOWER MAINLAND REGION Ambient PM 10 Monitoring Sechelt, B.C. 2004-2005 Update E N V I R O N M E N T A L Q U A L I T Y Library and Archives Canada Cataloguing in Publication Data

More information

2017 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

2017 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton 0 2017 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station Prepared by: Steven Paton 1 Introduction This is the 5 th of a series of yearly reports summarising the past year

More information

FINAL LICENSE APPLICATION Exhibit A Description of Project

FINAL LICENSE APPLICATION Exhibit A Description of Project FINAL LICENSE APPLICATION Exhibit A Description of Project PacifiCorp Portland, Oregon April 2004 Copyright 2004 by PacifiCorp Reproduction in whole or in part without the written consent of PacifiCorp

More information

Kelly Redmond Regional Climatologist, Western Regional Climate Center Atmospheric Sciences Division

Kelly Redmond Regional Climatologist, Western Regional Climate Center Atmospheric Sciences Division Kelly Redmond Regional Climatologist, Western Regional Climate Center Atmospheric Sciences Division Climate and the Colorado and Columbia River Basins Presented at The Aspen Global Change Institute June

More information

City of Alpena Septage Receiving Facility Operating Plan

City of Alpena Septage Receiving Facility Operating Plan City of Alpena Septage Receiving Facility Operating Plan August 2008 Amended 3/30/10 Updated 1/17/18 Alpena Water/Wastewater Utility Alpena Water Recycling Plant Septage Receiving Facility Operating Plan

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Case Study. Metropolitan Water Board. Siewert Equipment. Centrifugal Water Pump Repair MWB Eastern Pump Station. David D Angelo Water System Manager

Case Study. Metropolitan Water Board. Siewert Equipment. Centrifugal Water Pump Repair MWB Eastern Pump Station. David D Angelo Water System Manager Case Study Metropolitan Water Board & Siewert Equipment Centrifugal Water Pump Repair MWB Eastern Pump Station Bruce Collins NY Service Manager Siewert Equipment Barry Erickson, Ph.D Pump Improvement Engineer

More information

2017 Meteorological Summary for the Galeta Marine Island Laboratory. Prepared by: Steven Paton

2017 Meteorological Summary for the Galeta Marine Island Laboratory. Prepared by: Steven Paton 0 2017 Meteorological Summary for the Galeta Marine Island Laboratory Prepared by: Steven Paton 1 Introduction This is the 5 th in a series of yearly reports summarising the past year s Smithsonian Tropical

More information

Final Technical. Memorandum

Final Technical. Memorandum Federal Emergency Management Agency Task Or rder #34 Final Technical Memorandum HYDROLOGIC REVIEW FOR THE VENTURA RIVER WATERSHED AND SEVERAL TRIBUTARY STREAMS FLOOD INSURANCE STUDY Ventu ra County, CA

More information

Acid rain. Innholdsfortegnelse. Side 1 / 12

Acid rain. Innholdsfortegnelse.  Side 1 / 12 Acid rain Innholdsfortegnelse 1) Maps: Deposition of sulphur and nitrogen 2) Map: Areas where critical loads are exceeded http://www.environment.no/topics/air-pollution/acid-rain/ Side 1 / 12 Acid rain

More information

6.3 SUBSTRATE COMPOSITION AND QUALITY

6.3 SUBSTRATE COMPOSITION AND QUALITY 6.3 SUBSTRATE COMPOSITION AND QUALITY 6.3.1 METHODS The Wolman pebble count procedure (Wolman, 1954) is used to measure the diameter of the intermediate axis of 100 randomly selected stones along transects

More information

Pilot Study for Plug-In Hybrids

Pilot Study for Plug-In Hybrids Pilot Study for Plug-In Hybrids Sustainability/Energy Committee January 26, 2016 Overview Plug-in Electric Vehicle (EV) Pilot Project Employee Access to Charging Stations Next steps Purpose of Pilot Study

More information

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy ENERGY STRATEGY FOR YUKON Independent Power Production Policy May 20, 2014 Page 2 of 11 BACKGROUND The Government of Yukon released the Energy Strategy for Yukon in January 2009. The strategy sets out

More information

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman # 5 ) UN-15-17 LA SIERRA AUTO SALES SPECIAL USE PERMIT VEHICLE SALES PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: April 12, 2017 Item: UN-15-17 Prepared by: Robert Eastman GENERAL

More information

All Annual Operating Plan Recipients

All Annual Operating Plan Recipients To: All Annual Operating Plan Recipients From: Lower Colorado Region Boulder Canyon Operations Office River Operations Group Daniel Bunk P.O. Box 647 Boulder City, NV 896-47 Phone: 72-293-83 The operation

More information

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED FOR TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT CONTRACT

More information

Appendix N. The 2006 Fish Passage Implementation Plan

Appendix N. The 2006 Fish Passage Implementation Plan Appendix N The 2006 Fish Passage Implementation Plan 2006 Fish Passage Implementation Plan March 31, 2006 Background: The 2006 Fish Passage Implementation Plan describes the Corps plan for fish passage

More information

2005 City of Santa Paula Potable Water System Master Plan Amendment

2005 City of Santa Paula Potable Water System Master Plan Amendment 2005 City of Santa Paula Potable Water System Master Plan Amendment City of Santa Paula Project Engineer Randy Toedter, PE Brian Yanez June, 2012 970 Ventura Street Santa Paula, CA 93060 PURPOSE OF THE

More information

Alfred & Plantagenet Multi-Residential Cart Recycling Program CIF Project Number # Final Report October 1, 2016

Alfred & Plantagenet Multi-Residential Cart Recycling Program CIF Project Number # Final Report October 1, 2016 Alfred & Plantagenet Multi-Residential Cart Recycling Program CIF Project Number #545.3 Final Report October 1, 2016 Prepared for: Waste Diversion Ontario Continuous Improvement Fund Office Barrie, Ontario

More information

2016 Meteorological Summary for the Galeta Marine Island Laboratory. Prepared by: Steven Paton

2016 Meteorological Summary for the Galeta Marine Island Laboratory. Prepared by: Steven Paton 0 2016 Meteorological Summary for the Galeta Marine Island Laboratory Prepared by: Steven Paton 1 Introduction This is the fourth in a series of yearly reports summarising the past year s Smithsonian Tropical

More information

Sprinkler System Waiver Application Packet

Sprinkler System Waiver Application Packet Sprinkler System Waiver Application Packet According to the City s municipal code, use of sprinklers is conditional upon use of a water budget and the City continues to discourage customers from irrigating

More information

Gross Domestic Product: Third Quarter 2016 (Advance Estimate)

Gross Domestic Product: Third Quarter 2016 (Advance Estimate) EMBARGOED UNTIL RELEASE AT 8:30 A.M. EDT, FRIDAY, OCTOBER 28, 2016 BEA 16-57 Technical: Lisa Mataloni (GDP) (301) 278-9083 gdpniwd@bea.gov Media: Jeannine Aversa (301) 278-9003 Jeannine.Aversa@bea.gov

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL PRINTER'S NO. THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. Session of 0 INTRODUCED BY QUINN, DONATUCCI, SCHLOSSBERG, D. MILLER, FREEMAN, STURLA, SCHWEYER, BARRAR AND SIMS, JANUARY, 0 REFERRED TO

More information

Secondary Digester Cleaning to Meet Ohio Sludge Rules. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Secondary Digester Cleaning to Meet Ohio Sludge Rules. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP Agenda Rocky River WWTP Background Ohio Sludge Rules EPA Request for Alternative Digester Cleaning Project Page 2 Rocky River WWTP Background and History

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Committee of the Whole December 1, 016 City Council December 19, 016 Agenda Item: Bids for City Project No. 7551 Lift Station No. 17 & 17A Rehabilitation Submitted by:

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

New Franchise Agreement: Recyclables, Organics, and Waste. Town of Truckee Town Council Meeting July 25, 2017

New Franchise Agreement: Recyclables, Organics, and Waste. Town of Truckee Town Council Meeting July 25, 2017 New Franchise Agreement: Recyclables, Organics, and Waste Town of Truckee Town Council Meeting July 25, 2017 Agenda Overview of Process, Context Review Regulatory Drivers Review of Current Services Potential

More information

Annual Fish Passage Report 2012 Columbia and Snake River Projects

Annual Fish Passage Report 2012 Columbia and Snake River Projects US Army Corps of Engineers Portland District Walla Walla District Annual Fish Passage Report 2012 Columbia and Snake River Projects 2012 ANNUAL FISH PASSAGE REPORT COLUMBIA AND SNAKE RIVERS for SALMON,

More information