1 APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE Operator APACHE CORPORATION API GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report No 1 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor DAVID GRAHAM / LOREN ALFORD Engineer / Geologist BRAD MCDANIEL Field State SPRABERRY (TREND AREA RIG Name PATTERSON 31 / AFE #: CP AFE Description: County RIG PHONE NO Event Code LCM Event Type LAND-ORIG COMP RIG Fax No Tool Pusher CD KEMP AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 1,442 1,442 4,953, Status RUN 5 1/2" CASING AT 4434' Comment Summary 24 HR Forecast Objective PERPARE RIG FLOOR TO RIG UP CASING CREW, SAFETY MEETING AND RIG UP BUTCH'S CASING CREW, MAKE UP FLOAT EQUIPMENT AND TIH 5 1/2" CASING TO 593' CONTINUE TO TIH 5 1/2" CASING, CIRCULATE, WAIT ON CEMENT CREW From To Duration Operation Description 24 HR Operational Comments 6:3PM 7:3PM 1. RIG DOWN ELEVATORS, REMOVE ROTATING HEAD AND INSTALL TRIP NIPPLE, TAKE OIL BASE TRAYS OFF OF RIG FLOOR 7:3PM 1:PM 2.5 PJSM, RIG UP BUTCH'S CASING CREW, HYDRAULIC COUPLING BENT, HAD TO CHANGE OUT, FIRST SET OF TONGS TO RIG FLOOR WOULD NOT WORK, CHANGED OUT THEN HAD TO THAW OUT TO MAKE WORK 1:PM 12:AM 2. RUN 5 ½ CASING AS FOLLOWS TEST FLOAT EQUIPMENT 1-FLOAT SHOE = #2 5 ½ P-11 TXP BTC CSG JT = FLOAT COLLAR = LATCH COLLAR = 1. 1-#2 5 ½ P-11 TXP BTC CSG JT = ORIO VALVE = #2 5 ½ P-11 TXP BTC CSG JTS TO 593' Remarks : - 6: CONTINUE TO RUN 5 1/2" CASING FROM 593' TO 4434' Directional Information Initial Deviation Max Dev Max Dogleg 1, deg at 14, deg at 8,2 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE H Returns at Surface INTERMEDIATE J-55 7,539. 2,27 7, PRODUCTION P 11, P-11 15, , Company Name No of People Hours Today Cum / Event HORIZON MUD SDS BUTCH'S CASING DIVISON PATTERSON-UTI DRILLING CREST PUMPING 6.. PATTERSON-UTI DRILLING ENVIORMENTAL DRILLING S Personnel Total: BULKS Product QTY DIESEL, MUD 452. DIESEL, RIG FUEL 5,13. 1
2 APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 76 CEMENT AND CEMENTING SERVICES 17, 79 COMPANY LABOR 15, 717 CONTRACT LABOR 128, 45, 17, 15, 128, 719 CONTRACT DRILLING-DAY/TURNKEY 5,74 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 161 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 2, 5,865 5, CONTRACT SUPERVISION 5, ,8 CONSULTANTS 722 DIRECTIONAL DRILLING DIRECTIONAL DRILLERS/TOOLS 725 DRILLING FLUIDS 2,182 MUD ADDITIVES 731 EQUIPMENT RENTAL 927 SOLIDS CONTROL 731 EQUIPMENT RENTAL 35 H2S MONITORING 731 EQUIPMENT RENTAL 17 CO MAN TRAILER 731 EQUIPMENT RENTAL 9 7 ROUND BOTTOM FRACS 731 EQUIPMENT RENTAL ROTATING HEAD 731 EQUIPMENT RENTAL 17 DIRECTIONAL TRAILER 731 EQUIPMENT RENTAL 69 GENERATORS 731 EQUIPMENT RENTAL 9 DSA FOR B-SECTION 731 EQUIPMENT RENTAL 18 FLAT BOTTOM FRAC TANKS 731 EQUIPMENT RENTAL 18 WATER AND SEWER SYSTEM 731 EQUIPMENT RENTAL 92 4 BBL PREMIX TANK 731 EQUIPMENT RENTAL 4 TEXAS ENERGY INTERNET 731 EQUIPMENT RENTAL 14 INTERCOMS 731 EQUIPMENT RENTAL 14 SOLIDS CONTROL TRAILER 731 EQUIPMENT RENTAL 15 DSA FOR BOP STACK 731 EQUIPMENT RENTAL 5 TRASH TRAILER 731 EQUIPMENT RENTAL 75 TRANSFER PUMPS/ HOSES 731 EQUIPMENT RENTAL 6 OUTDOOR BATHROOM 731 EQUIPMENT RENTAL 14 MUD ENGINEER HOUSE 731 EQUIPMENT RENTAL 4, 1,475 1, , , FORMATION STIMULATION 2,731, 2,731, 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON MUD LOGGER 749 LOGGING 15, 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 774 TRUCKING AND HAULING 1, 776 TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 15, 6, 1, 1, 6,5 247,5 Total Intangible Cost 4,43, 1,442 1,442 4,392, OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 336, 15, 2, Total Tangible Cost 561, 561, Total: 4,964, 1,442 1,442 4,953,558 2
3 APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE Operator APACHE CORPORATION API GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report No 2 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor DAVID GRAHAM / LOREN ALFORD Engineer / Geologist BRAD MCDANIEL Field State SPRABERRY (TREND AREA RIG Name PATTERSON 31 / AFE #: Status Comment Summary 24 HR Forecast CP AFE Description: County RIG PHONE NO Event Code LCM Event Type LAND-ORIG COMP RIG Fax No Tool Pusher CD KEMP AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 1,442 61,737 72,179 4,891, CEMENTING PRODUCTION CASING RUN 5 1/2" CASING F/ 593' TO 7421', SAFETY STAND DOWN PER PATTERSON, RUN 5 1/2" CASING FROM 7421' TO 15,622' Objective CIRCULATE, RIG DOWN CASING CREW, SAFETY MEETING AND RIG UP CREST, CEMENT CASING, RIG DOWN, NIPPLE DOWN AND SET SLIPS, CLEAN PITS AND RELEASE RIG From To Duration Operation Description 12:AM 11:3AM 11.5 RUN 5 1/2 PRODUCTION CASING F/ 593' TO 7421' 11:3AM 12:PM.5 INSTALL AIR SPIDER SLIPS 24 HR Operational Comments 12:PM 1:PM 1. SHUT DOWN OPERATIONS ( PER PATTERSON UTI AREA MANAGER ) DUE TO ICE FALLING FROM DERRICK 1:PM 12:AM 11. RUN 5 ½ CASING AS FOLLOWS; TEST FLOAT EQUIPMENT 1-FLOAT SHOE = ,62 1-#2 5 ½ HC-11 TXP BTC CSG JT = FLOAT COLLAR = , LATCH SUB = 1. 15, #2 5 ½ HC-11 TXP BTC CSG JT = ORIO VALVE = , #2 5 ½ HC-11 TXP BTC CSG, JTS, = 2, MARKER JT = , #2 5 ½ HC-11 TXP BTC CSG, JTS, = 2, MARKER JOINT = , #2 5 ½ HC-11 BTC TXP CSG, JT, = MARKER JOINT = #2 5 ½ HC-P11 BTC TXP CSG, JT,= TOTAL PIPE RAN = 15, ,622.' OFF BOTTOM WITH 7.76 STICK UP RAN 9 CENTRALIZERS / NOTIFIED T.R.C. WITH PRODUCTION CEMENT 1:45 ON 1/3/15 AND TALKED TO FELICIA Remarks : - 1: CIRCULATE AND RIG DOWN BUTCH'S CASING CREW 1: - 3: CONTINUE TO CIRCULATE, CREST RIGGING UP 3: - 6: PJSM, TEST LINES AND CEMENT 5 1/2" 2# CASING Directional Information Initial Deviation Max Dev Max Dogleg 1, deg at 14, deg at 8,2 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE H Returns at Surface INTERMEDIATE J-55 7,539. 2,27 7, PRODUCTION P 11, P-11 15, , Company Name No of People Hours Today Cum / Event BUTCH'S CASING DIVISON PATTERSON-UTI DRILLING HORIZON MUD SDS ENVIORMENTAL DRILLING S PATTERSON-UTI DRILLING Personnel Total: BULKS Product QTY DIESEL, MUD. DIESEL, RIG FUEL 4,359. 1
4 APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 11,8 11,8 33,2 CASING CREW RAN 15,622' 5 1/2" CAS 76 CEMENT AND CEMENTING SERVICES 17, 79 COMPANY LABOR 15, 717 CONTRACT LABOR 128, 17, 15, 128, 719 CONTRACT DRILLING-DAY/TURNKEY 7 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 24,8 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 2, 5,865 25,5 31, CONTRACT SUPERVISION 5, 92 4, 4,92 45,8 CONSULTANTS 722 DIRECTIONAL DRILLING DIRECTIONAL DRILLERS/TOOLS 725 DRILLING FLUIDS 2,182 1,14 3,197 MUD ADDITIVES 731 EQUIPMENT RENTAL 3 GENERATORS 731 EQUIPMENT RENTAL 15 ROTATING HEAD 731 EQUIPMENT RENTAL 8 FLAT BOTTOM FRAC TANKS 731 EQUIPMENT RENTAL 325 TRANSFER PUMPS/ HOSES 731 EQUIPMENT RENTAL 39 7 ROUND BOTTOM FRACS 731 EQUIPMENT RENTAL 25 OUTDOOR BATHROOM 731 EQUIPMENT RENTAL 65 DSA FOR BOP STACK 731 EQUIPMENT RENTAL 4 4 BBL PREMIX TANK 731 EQUIPMENT RENTAL 2 TRASH TRAILER 731 EQUIPMENT RENTAL 75 DIRECTIONAL TRAILER 731 EQUIPMENT RENTAL 4,32 SOLIDS CONTROL 731 EQUIPMENT RENTAL 6 SOLIDS CONTROL TRAILER 731 EQUIPMENT RENTAL 12,425 CRT AND HAND 731 EQUIPMENT RENTAL 15 H2S MONITORING 731 EQUIPMENT RENTAL 6 INTERCOMS 731 EQUIPMENT RENTAL 6 MUD ENGINEER HOUSE 731 EQUIPMENT RENTAL 8 WATER AND SEWER SYSTEM 731 EQUIPMENT RENTAL 175 TEXAS ENERGY INTERNET 731 EQUIPMENT RENTAL 4 DSA FOR B-SECTION 731 EQUIPMENT RENTAL 75 CO MAN TRAILER 731 EQUIPMENT RENTAL 4, 1,475 18,987 2, , , FORMATION STIMULATION 2,731, 2,731, 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON MUD LOGGER 749 LOGGING 15, 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 15, 6, 1, 774 TRUCKING AND HAULING 1, ,565 BACKHAUL AGITATOR AND NORTRAC 776 TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 6,5 247,5 Total Intangible Cost 4,43, 1,442 61,737 72,179 4,33, OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 336, 15, 2, Total Tangible Cost 561, 561, Total: 4,964, 1,442 61,737 72,179 4,891,821 2
5 APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE Operator APACHE CORPORATION API GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report No 3 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor DAVID GRAHAM / LOREN ALFORD Engineer / Geologist BRAD MCDANIEL Field State SPRABERRY (TREND AREA RIG Name PATTERSON 31 / AFE #: Comment Summary 24 HR Forecast CP AFE Description: County RIG PHONE NO Event Code LCM Event Type LAND-ORIG COMP RIG Fax No Tool Pusher CD KEMP AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 72,179 37,77 19,256 4,854, From To Duration Operation Description 24 HR Operational Comments 12:AM 1:AM 1. : - 1: CIRCULATE AND RIG DOWN BUTCH'S CASING CREW Objective 1:AM 3:AM 2. HELD SAFETY MEETING WITH RIG AND CREST PERSONNEL, SPOT TRUCKS AND RIG UP TO CEMENT WHILE CIRCULATING CASING 3:AM 7:AM 4. RU CREST CMT HEAD.TEST LINES TO 5 PSI. PUMP 1 BBL, 11. PPG GXT SPACER. PUMP LEAD W/ 47 SKS ( 139 BBLS) 5/5 POZ H AT 11.9 WT, 2.41 YLD,TAIL W/ 174 SKS ( 495 BBLS) CLASS H PLUS AT 13.2 WT, 1.6 YLD.DISPLACE W/ 345 BBLS FW AT 6 BPM. FCP AT 3 BPM WAS 31 PSI. BUMP PLUG AT 6:42, 1/4/215 W/ 36 PSI. GOOD CIRCULATION AND FLOATS HELD. DID NOT GET ANY OF THE GXT SPACER TO SURFACE. CREST CALCULATED 245' USING LIFT PRESSURE 7:AM 8:AM 1. RIG DOWN AND LOAD OUT CEMENTING EQUIPMENT 8:AM NIPPLE DOWN AND LIFT STACK Directional Information Initial Deviation Max Dev Max Dogleg 1, deg at 14, deg at 8,2 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE H Returns at Surface INTERMEDIATE J-55 7,539. 2,27 7, PRODUCTION P 11, P-11 15, , Company Name No of People Hours Today Cum / Event PATTERSON-UTI DRILLING PATTERSON-UTI DRILLING SDS BUTCH'S CASING DIVISON ENVIORMENTAL DRILLING S HORIZON MUD Personnel Total: BULKS Product QTY. DIESEL, MUD. DIESEL, RIG FUEL 4,359. 1
6 APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 11,8 11,8 76 CEMENT AND CEMENTING SERVICES 17, 79 COMPANY LABOR 15, 717 CONTRACT LABOR 128, 33,2 17, 15, 128, 719 CONTRACT DRILLING-DAY/TURNKEY 24,8 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 7 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 2, 31,365 25,5 56, CONTRACT SUPERVISION 5, 4,92 4, 8,92 41,8 CONSULTANTS 722 DIRECTIONAL DRILLING DIRECTIONAL DRILLERS/TOOLS 725 DRILLING FLUIDS 3,197 1,14 4,211 MUD ADDITIVES 731 EQUIPMENT RENTAL 75 CO MAN TRAILER 731 EQUIPMENT RENTAL 65 DSA FOR BOP STACK 731 EQUIPMENT RENTAL 2 TRASH TRAILER 731 EQUIPMENT RENTAL 4 DSA FOR B-SECTION 731 EQUIPMENT RENTAL 39 7 ROUND BOTTOM FRACS 731 EQUIPMENT RENTAL 75 DIRECTIONAL TRAILER 731 EQUIPMENT RENTAL 8 FLAT BOTTOM FRAC TANKS 731 EQUIPMENT RENTAL 6 SOLIDS CONTROL TRAILER 731 EQUIPMENT RENTAL 6 INTERCOMS 731 EQUIPMENT RENTAL 4,32 SOLIDS CONTROL 731 EQUIPMENT RENTAL 3 GENERATORS 731 EQUIPMENT RENTAL 6 MUD ENGINEER HOUSE 731 EQUIPMENT RENTAL 4 4 BBL PREMIX TANK 731 EQUIPMENT RENTAL 8 WATER AND SEWER SYSTEM 731 EQUIPMENT RENTAL 175 TEXAS ENERGY INTERNET 731 EQUIPMENT RENTAL 15 ROTATING HEAD 731 EQUIPMENT RENTAL 25 OUTDOOR BATHROOM 731 EQUIPMENT RENTAL 325 TRANSFER PUMPS/ HOSES 731 EQUIPMENT RENTAL 15 H2S MONITORING 731 EQUIPMENT RENTAL 4, 2,462 6,562 27,25 143, , FORMATION STIMULATION 2,731, 2,731, 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON MUD LOGGER 749 LOGGING 15, 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 774 TRUCKING AND HAULING 1, TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 15, 6, 1, 99,565 6,5 247,5 Total Intangible Cost 4,43, 72,179 37,77 19,256 4,293, OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 336, 15, 2, Total Tangible Cost 561, 561, Total: 4,964, 72,179 37,77 19,256 4,854,744 2
7 APACHE CORPORATION Page 1 of 3 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE Operator APACHE CORPORATION API GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report No 3 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor DAVID GRAHAM / LOREN ALFORD Engineer / Geologist BRAD MCDANIEL Field State SPRABERRY (TREND AREA RIG Name PATTERSON 31 / AFE #: Status Comment Summary 24 HR Forecast CP AFE Description: County RIG PHONE NO Event Code LCM Event Type LAND-ORIG COMP RIG Fax No Tool Pusher CD KEMP AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 72, ,814 52,993 4,443,7 1.5 RIGGING DOWN, PREPARING RIG TO MOV Objective CIRCULATE AND RIG DOWN CASING CREW, CONTINUE CIRCULATING AND RIG UP CREST, CEMENT CASING, RIG DOWN CREST, NIPPLE DOWN AND SET SLIPS, INSTALL TA CAP, CLEAN PITS AND RIG DOWN, RELEASE PATTERSON 31 1/4/215 AT 23:59 RIG DOWN, PREPARE RIG TO MOVE TO WM SCHROCK 34 1 HC From To Duration Operation Description 12:AM 1:AM 1. CIRCULATE AND RIG DOWN BUTCH'S CASING CREW 24 HR Operational Comments 1:AM 3:AM 2. HELD SAFETY MEETING WITH RIG AND CREST PERSONNEL, SPOT TRUCKS AND RIG UP TO CEMENT WHILE CIRCULATING CASING 3:AM 7:AM 4. RU CREST CMT HEAD.TEST LINES TO 5 PSI. PUMP 1 BBL, 11. PPG GXT SPACER. PUMP LEAD W/ 47 SKS ( 139 BBLS) 5/5 POZ H AT 11.9 WT, 2.41 YLD,TAIL W/ 174 SKS ( 495 BBLS) CLASS H PLUS AT 13.2 WT, 1.6 YLD.DISPLACE W/ 345 BBLS FW AT 6 BPM. FCP AT 3 BPM WAS 31 PSI. BUMP PLUG AT 6:42, 1/4/215 W/ 36 PSI. GOOD CIRCULATION AND FLOATS HELD. DID NOT GET ANY OF THE GXT SPACER TO SURFACE 7:AM 8:AM 1. RIG DOWN AND LOAD OUT CEMENTING EQUIPMENT 8:AM 2:PM 6. NIPPLE DOWN AND LIFT STACK, SET 1K, CUTOFF AND LAY DOWN CASING. INSTALL AND TEST TA CAP. REMOVE DSA, MOVE AND SECURE STACK 2:PM 12:AM 1. CLEAN MUD TANKS AND RIG, PREPARE FOR 5 MILE RIG MOVE, RIG DOWN, LAY DOWN TOP DRIVE AND TRACK, RELEASE PATTERSON 31 1/4/215 AT 23:59 11:59PM 11:59PM. RELEASE PATTERSON 31 1/4/215 AT 23:59 Remarks : - 6: CLEANING SOLIDS CONTROL EQUIPMENT AND RIG, PREPARE RIG TO MOVE TO WM SCHROCK 34 1 HC Directional Information Initial Deviation Max Dev Max Dogleg 1, deg at 14, deg at 8,2 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE H Returns at Surface INTERMEDIATE J-55 7,539. 2,27 7, PRODUCTION P 11, P-11 15, , Company Name No of People Hours Today Cum / Event PATTERSON-UTI DRILLING PATTERSON-UTI DRILLING SDS BUTCH'S CASING DIVISON ENVIORMENTAL DRILLING S HORIZON MUD Personnel Total: BULKS Product QTY DIESEL, MUD. DIESEL, RIG FUEL 3,75. 1
8 APACHE CORPORATION Page 2 of 3 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 11,8 11,8 33,2 76 CEMENT AND CEMENTING SERVICES 88,458 CEMENT PROD CASING 76 CEMENT AND CEMENTING SERVICES 9,543 PROD FLOAT EQUIPMENT 76 CEMENT AND CEMENTING SERVICES 17, 98,2 98,2 71, COMPANY LABOR 15, 15, 717 CONTRACT LABOR 1,66 NIPPLE DOWN CREW 717 CONTRACT LABOR 1,768 CASING SLIP TECH 717 CONTRACT LABOR 128, 3,428 3, CONTRACT DRILLING-DAY/TURNKEY 24,8 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 7 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 2, 31,365 25,5 56, CONTRACT SUPERVISION 5, 4,92 4, 8,92 41,8 CONSULTANTS 722 DIRECTIONAL DRILLING DIRECTIONAL DRILLERS/TOOLS 725 DRILLING FLUIDS 3,197 2,49 5,65 MUD ADDITIVES 731 EQUIPMENT RENTAL 75 CO MAN TRAILER 731 EQUIPMENT RENTAL 65 DSA FOR BOP STACK 731 EQUIPMENT RENTAL 2 TRASH TRAILER 731 EQUIPMENT RENTAL 4 DSA FOR B-SECTION 731 EQUIPMENT RENTAL 39 7 ROUND BOTTOM FRACS 731 EQUIPMENT RENTAL 75 DIRECTIONAL TRAILER 731 EQUIPMENT RENTAL 8 FLAT BOTTOM FRAC TANKS 731 EQUIPMENT RENTAL 6 SOLIDS CONTROL TRAILER 731 EQUIPMENT RENTAL 6 INTERCOMS 731 EQUIPMENT RENTAL 4,32 SOLIDS CONTROL 731 EQUIPMENT RENTAL 3 GENERATORS 731 EQUIPMENT RENTAL 6 MUD ENGINEER HOUSE 731 EQUIPMENT RENTAL 4 4 BBL PREMIX TANK 731 EQUIPMENT RENTAL 8 WATER AND SEWER SYSTEM 731 EQUIPMENT RENTAL 175 TEXAS ENERGY INTERNET 731 EQUIPMENT RENTAL 15 ROTATING HEAD 731 EQUIPMENT RENTAL 25 OUTDOOR BATHROOM 731 EQUIPMENT RENTAL 325 TRANSFER PUMPS/ HOSES 731 EQUIPMENT RENTAL 15 H2S MONITORING 731 EQUIPMENT RENTAL 4, 2,462 6,562 27,25 124, , , FORMATION STIMULATION 2,731, 2,731, 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON MUD LOGGER 749 LOGGING 15, 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 774 TRUCKING AND HAULING 1, TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 15, 6, 1, 99,565 6,5 247,5 Total Intangible Cost 4,43, 72, ,9 212,79 4,19, OTHER SUBSURFACE EQUIPMENT 1, 1, 714 PRODUCTION CASING 29,569 15,622' 5.5" CASING 714 PRODUCTION CASING 18,345 ORIO VALVE AND TECH 714 PRODUCTION CASING 336, 38,914 38,914 27, TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 15, 2, Total Tangible Cost 561, 38,914 38, ,86 2
9 APACHE CORPORATION Page 3 of 3 Daily Land - Orig Comp Report Total: 4,964, 72, ,814 52,993 4,443,7 3
10 APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE Operator APACHE CORPORATION API GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report No 4 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor RICK MADDOX / MICHEAL VERNER Engineer / Geologist MICHAEL LYON Field SPRABERRY (TREND AREA State County Event Code LCM Event Type LAND-ORIG COMP Objective RIG Name RIG PHONE NO RIG Fax No Tool Pusher AFE #: Status CP AFE Description: AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 52,993 47, ,264 4,395, RCBL Comment Summary 24 HR Forecast 24 HR Operational Comments From To Duration Operation Description 12:AM 12:AM 24. MIRU RENEGADE WIRELINE AND GERONIMO KILL TRK. RIH WITH 4.65" G.R. 8226'' RIH WITH CBL START 8226' TO SURFACE. MARKER JOINTS FOUND@ '. RDMO ALL SERVICES. Directional Information Initial Deviation Max Dev Max Dogleg 1, deg at 14, deg at 8,2 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE H Returns at Surface INTERMEDIATE J-55 7,539. 2,27 7, PRODUCTION P 11, P-11 15, , Company Name No of People Hours Today Cum / Event PATTERSON-UTI DRILLING SDS ENVIORMENTAL DRILLING S PATTERSON-UTI DRILLING HORIZON MUD BUTCH'S CASING DIVISON Personnel Total: ,248. BULKS Product QTY. DIESEL, MUD. DIESEL, RIG FUEL 3,75. 1
11 APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 11,8 11,8 76 CEMENT AND CEMENTING SERVICES 17, 98,2 98,2 79 COMPANY LABOR 15, 717 CONTRACT LABOR 128, 3,428 3,428 33,2 71,998 15, 124, CONTRACT DRILLING-DAY/TURNKEY 7 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 24,8 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 2, 56,865 25,5 82, CONTRACT SUPERVISION 4, CONSULTANTS 721 CONTRACT SUPERVISION 1,3 MICHEAL VERNER 721 CONTRACT SUPERVISION 5, 8,92 5,3 14, DIRECTIONAL DRILLING DIRECTIONAL DRILLERS/TOOLS 725 DRILLING FLUIDS 5,65 2,49 8,14 MUD ADDITIVES 731 EQUIPMENT RENTAL 15 H2S MONITORING 731 EQUIPMENT RENTAL 15 ROTATING HEAD 731 EQUIPMENT RENTAL 4,32 SOLIDS CONTROL 731 EQUIPMENT RENTAL 8 WATER AND SEWER SYSTEM 731 EQUIPMENT RENTAL 65 DSA FOR BOP STACK 731 EQUIPMENT RENTAL 8 FLAT BOTTOM FRAC TANKS 731 EQUIPMENT RENTAL 75 DIRECTIONAL TRAILER 731 EQUIPMENT RENTAL 75 CO MAN TRAILER 731 EQUIPMENT RENTAL 25 OUTDOOR BATHROOM 731 EQUIPMENT RENTAL 39 7 ROUND BOTTOM FRACS 731 EQUIPMENT RENTAL 3 GENERATORS 731 EQUIPMENT RENTAL 6 INTERCOMS 731 EQUIPMENT RENTAL 4 4 BBL PREMIX TANK 731 EQUIPMENT RENTAL 4 DSA FOR B-SECTION 731 EQUIPMENT RENTAL 2 TRASH TRAILER 731 EQUIPMENT RENTAL 6 SOLIDS CONTROL TRAILER 731 EQUIPMENT RENTAL 175 TEXAS ENERGY INTERNET 731 EQUIPMENT RENTAL 6 MUD ENGINEER HOUSE 731 EQUIPMENT RENTAL 325 TRANSFER PUMPS/ HOSES 731 EQUIPMENT RENTAL 4, 27,25 6,562 33, ,635 35,78 366, FORMATION STIMULATION 2,731, 2,731, 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON MUD LOGGER 749 LOGGING 15, 7,5 7,5 142,5 WIRELINE SERVICES 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 774 TRUCKING AND HAULING 1, TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 6, 1, 99,565 6,5 247, PUMP TRUCK SERVICE BACKSIDE PUMP Total Intangible Cost 4,43, 212,79 47, ,35 4,143, OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 38,914 38, TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 27,86 15, 2, Total Tangible Cost 561, 38,914 38, ,86 Total: 4,964, 52,993 47, ,264 4,395,736 2
12 APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE Operator APACHE CORPORATION API GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report No 5 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor CHARLES GRAVES Engineer / Geologist MICHAEL LYON Field SPRABERRY (TREND AREA State County Event Code LCM Event Type LAND-ORIG COMP Objective RIG Name RIG PHONE NO RIG Fax No Tool Pusher AFE #: Status Comment Summary 24 HR Forecast CP AFE Description: AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 568,64 4,14 572,78 4,391, WOF MIRU PETROPLEX. LOAD BS TO 15 PSI. TEST LINES TO 95 PSI, OPEN CSG, SICP.TEST CSG 7K/ 3MIN, LOST 7 PSI, GOOD TEST. BROUGHT PUMPS ONLINE TO 1 BPM,ORIO 91 PSI. FLUSHED CSG W/ 349 BBLS TFW. WOF From To Duration Operation Description 24 HR Operational Comments 2:3PM 4:3PM 2. MIRU PETROPLEX. LOAD BS TO 15 PSI. TEST LINES TO 95 PSI, OPEN CSG, SICP.TEST CSG 7K/ 3MIN, LOST 7 PSI, GOOD TEST. BROUGHT PUMPS ONLINE TO 1 BPM,ORIO 91 PSI. FLUSHED CSG W/ 349 BBLS TFW ( BIOCIDE, CORROSION, SCALE). HAD TO DROP RATE TO 7 BPM DUE TO PRESSURE. Directional Information Initial Deviation Max Dev Max Dogleg 1, deg at 14, deg at 8,2 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE H Returns at Surface INTERMEDIATE J-55 7,539. 2,27 7, PRODUCTION P 11, P-11 15, , Company Name No of People Hours Today Cum / Event SDS PATTERSON-UTI DRILLING PATTERSON-UTI DRILLING ENVIORMENTAL DRILLING S BUTCH'S CASING DIVISON HORIZON MUD Personnel Total: ,56. BULKS Product QTY. DIESEL, MUD. DIESEL, RIG FUEL 3,75. 1
13 APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 11,8 11,8 33,2 76 CEMENT AND CEMENTING SERVICES 17, 98,2 98,2 71, CHEMICALS (WSS) 1,5 BIO SCALE CORROSION 79 COMPANY LABOR 15, 15, 711 COMPANY SUPERVISION 5 CHARLES GRAVES 717 CONTRACT LABOR 128, 3,428 3, CONTRACT DRILLING-DAY/TURNKEY 2, 82,365 82, CONTRACT SUPERVISION 5, 14,22 14,22 124, ,635 35, DIRECTIONAL DRILLING 725 DRILLING FLUIDS 8,14 8, EQUIPMENT RENTAL 4, 33, , ,363 FRACK TANK 734 FORMATION STIMULATION 2,731, 2,731, 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON 749 LOGGING 15, 6,5 6,5 765 SITE PREPARATION 6, 143,5 6, 767 SALT WATER DISPOSAL 1, 1, 774 TRUCKING AND HAULING 1, ,135 98,865 WINCH TRUCK 776 TUBULAR INSPECTION/TESTING 6,5 6,5 777 WATER 247,5 247, PUMP TRUCK SERVICE 8 1,264 2,64 PETROPLEX Total Intangible Cost 4,43, 259,15 4,14 263,164 4,139, OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 38,914 38, TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 27,86 15, 2, Total Tangible Cost 561, 38,914 38, ,86 Total: 4,964, 568,64 4,14 572,78 4,391,922 2
14 Page 1 of 1 Legal Well Name: UNIVERSITY 244 4HU API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SW District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/23/215 Report Number: 7 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 23. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $3,425 Cum Field Est To Date (Cost): $62,733 Current Status: 24 Hour Forecast: SUSPEND REPORTS UNTIL FRAC DATE SECRURE 24 Hour Summary: INSTALL FRAC TREE Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details : : 24. BOPS PP NU FRAC STACK Printed Date: 7/24/215 Printed Time: 9:46 AM
15 Page 1 of 1 Legal Well Name: UNIVERSITY 244 4HU API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SE District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/3/215 Report Number: 9 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 214. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,18 Cum Field Est To Date (Cost): $625,28 Current Status: 24 Hour Forecast: MIRU FRAC EQUIPMENT 24 Hour Summary: MIRU FRAC EQUIPMENT : : 24. Stim, MIRU, MIRU RU_RD PP MIRU FRAC EQUIPMENT, PUMP MAINTENANCE Printed Date: 8/4/215 Printed Time: 9:46 AM
16 Page 1 of 1 Legal Well Name: UNIVERSITY 244 4HU API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SE District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/4/215 Report Number: 1 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 215. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,18 Cum Field Est To Date (Cost): $644,28 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: MIRU FRAC EQIPMENT, STAGE FRAC 1 : 6: Stim, STAGE 1, STIMULATION RU_RD PP FINISH PUMP MAINTENANCE, PRESSURE TEST LINES. PREPARE TO FRAC SAFETY MEETING: (6:3-6:45). 6:58 9: Stim, STAGE 4, PERFORATE STIM PP FRAC STAGE 1: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 48 BBLS HCl, 4831 BBLS Slickwater, 1214 BBLS Linear Gel, BBLS Crosslink, 23998# 1 Mesh, 1984# 4/7, #, #, TOTAL PROP = 4382#, TOTAL LTR = 693 BBLS. AVG PRES = 632 PSI, MAX PRES = 777, AVG RATE = 7.6 BPM, MAX RATE = 71.8 BPM, ISIP = 3266 PSI, FG =.8332 PSI/FT. 9:22 : Stim, STAGE 4, PERFORATE PERF PP PERF STAGE 2: RU RENEGADEWIRELINE & 1K LUBE. PRESSURE TEST LUBE TO 85#. RIH W/ BOSS HOG 1k COMPOSITE FRAC PLUG TO 14.3 BPM W/ 328 BBLS TFW. UNABLE TO GET DOWN TO 15,328'. POOH W/ WIRELINE. FLUSHED WELL W/ 569 BBLS TFW. RIH W/ PLUG ON 2ND RUN TO 12.5 BPM W/ 297 BBLS TFW. UNABLE TO GET DOWN. LINE SPEED FLUCTUATED FROM TO 14, 61'. POOH W/ WIRELINE. SKIP STAGE 2 & 3, SHOOT STAGE 4 PERF STAGE 4: RU RENEGADE & 1K LUBE, RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/296 BBLS 45 PSI, SET 14,82', PERF'D UPPER 14,795' - 14,797', 14,755-14,757', 14,719-14,721', 14,677' - 14,679', 14,654' - 14,655', 14,616' - 14,617'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2." OD 1.8 SG BALL SEALER, POOH PULLING COLLAR LOG Printed Date: 8/5/215 Printed Time: 9:47 AM
17 Page 1 of 2 Legal Well Name: UNIVERSITY 244 4HU API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SE District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/5/215 Report Number: 11 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 216. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,82 Cum Field Est To Date (Cost): $664,28 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC: FRAC STAGES 4 THRU 8 : 3: 3. Stim, STAGE 4, PERFORATE PERF PP CONT POOH W/ WIRELINE 3: 3:12.2 Stim, STAGE 4, CHANGE-OVER WOO PP CHANGE OVER TIME 3:12 5: Stim, STAGE 5, PERFORATE STIM PP FRAC STAGE 4: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4417 BBLS Slickwater, 1792 BBLS Linear Gel, BBLS Crosslink, 2351# 1 Mesh, 19184# 4/7, #, #, TOTAL PROP = 42694#, TOTAL LTR = 6233 BBLS. AVG PRES = 6656 PSI, MAX PRES = 6656, AVG RATE = 7.9 BPM, MAX RATE = 72 BPM, ISIP = 335 PSI, FG =.856 PSI/FT. 5:5 7: Stim, STAGE 5, CHANGE-OVER PERF PP PERF STAGE 5: RU RENEGADE & 1K LUBE, RIH W/ WEATHERFORD 1K 55-FS TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/331 BBLS 363 PSI, SET 14,584', PERF'D UPPER 14,555' - 14,557', 14,523' - 14,525', 14,493-14,495', 14,459' - 14,461', 14,427' - 14,428', 14,395' - 14,396; 14,363' - 14,364'; 14,331' - 14,332'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2." OD 1.8 SG BALL SEALER, SAFETY MEETING: 7:15-7:3 7:3 7:41.18 Stim, STAGE 5, STIMULATION WOO PP CHANGE OVER TIME 7:41 1: Stim, STAGE 6, PERFORATE STIM PP FRAC STAGE 5: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 567 BBLS Slickwater, 1848 BBLS Linear Gel, BBLS Crosslink, 28538# 1 Mesh, 2872# 4/7, #, #, TOTAL PROP = 5724#, TOTAL LTR = 7873 BBLS. AVG PRES = 5696 PSI, MAX PRES = 622, AVG RATE = 79.6 BPM, MAX RATE = 81 BPM, ISIP = 3691 PSI, FG =.8855 PSI/FT. 1:1 13:1 3. Stim, STAGE 6, CHANGE-OVER PERF PN PERF STAGE 6: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/231 BBLS PSI, SET 14,36', PERF'D UPPER 14,281' - 14,283', 14,251' - 14,253', 14,221' - 14,223', 14,194' - 14,196', 14,161' - 14,162', 14,131' - 14,132'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, RENEGADE REPLACING O RINGS ON LUBE 1:4-11:4. 13:1 13:18.14 Stim, STAGE 6, STIMULATION WOO PP CHANGE OVER TIME. Printed Date: 8/6/215 Printed Time: 9:45 AM
18 Page 2 of 2 13:18 15: Stim, STAGE 6, STIMULATION STIM PP FRAC STAGE 6 - Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4653 BBLS Slickwater, 136 BBLS Linear Gel, BBLS Crosslink, 2397# 1 Mesh, 1919# 4/7, #, #, TOTAL PROP = 4316#, TOTAL LTR = 6268 BBLS. AVG PRES = 5565 PSI, MAX PRES = 622, AVG RATE = 71.5 BPM, MAX RATE = 73.8 BPM, ISIP = 3654 PSI, FG =.881 PSI/FT. 15:12 17: Stim, STAGE 7, PERFORATE PERF PP PERF STAGE 7: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/233 BBLS PSI, SET 14,114', PERF'D UPPER 14,81' - 14,83', 14,49' - 14,51', 14,17' - 14,19', 13,985' - 13,987', 13,953' - 13,954', 13,921' - 13,922'; 13,889' - 13,89'; 13,86' - 13,861'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, 17:3 17:13.17 Stim, STAGE 7, STIMULATION WOO PP CHANGE OVER TIME 17:13 19: Stim, STAGE 7, STIMULATION STIM PP FRAC STAGE 7. - Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 5375 BBLS Slickwater, 1895 BBLS Linear Gel, BBLS Crosslink, 2864# 1 Mesh, 28534# 4/7, #, #, TOTAL PROP = 57138#, TOTAL LTR = 7527 BBLS. AVG PRES = 6249 PSI, MAX PRES = 7118, AVG RATE = 79.6 BPM, MAX RATE = 8.5 BPM, ISIP = 3692 PSI, FG =.8855 PSI/FT. 19:11 21:5 1.9 Stim, STAGE 8, CHANGE-OVER PERF PP PERF STAGE 8: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/199 BBLS PSI, SET 13,832', PERF'D UPPER 13,87' - 13,89', 13,782' - 13,784', 13,747' - 13,749', 13,719' - 13,721', 13,686' - 13,687', 13,657' - 13,658'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING 21:5 21:15.17 Stim, STAGE 8, STIMULATION WOO PP CHANGE OVER TIME 21:15 23: Stim, STAGE 9, PERFORATE STIM PP FRAC STAGE 8: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4429 BBLS Slickwater, 149 BBLS Linear Gel, BBLS Crosslink, 2393# 1 Mesh, 19124# 4/7, #, #, TOTAL PROP = 4354#, TOTAL LTR = 6142 BBLS. AVG PRES = 5845 PSI, MAX PRES = 671, AVG RATE = 71.1 BPM, MAX RATE = 72.3 BPM, ISIP = 3639 PSI, FG =.8789 PSI/FT. Printed Date: 8/6/215 Printed Time: 9:45 AM
19 Page 1 of 2 Legal Well Name: UNIVERSITY 244 4HU API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SE District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/6/215 Report Number: 12 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 217. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $26,34 Cum Field Est To Date (Cost): $69,368 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC: FRAC STAGES 9 THRU 13 : :45.75 Stim, STAGE 9, PERFORATE PERF PP PERF STAGE 9: CONT POOH W/ WIRELINE :45 :58.22 Stim, STAGE 9, STIMULATION WOO PP CHANGE OVER TIME :58 2: Stim, STAGE 9, STIMULATION STIM PP FRAC STAGE 9: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 443 BBLS Slickwater, 1432 BBLS Linear Gel, BBLS Crosslink, 23778# 1 Mesh, 1986# 4/7, #, #, TOTAL PROP = 42864#, TOTAL LTR = 652 BBLS. AVG PRES = 6181 PSI, MAX PRES = 7313, AVG RATE = 69.9 BPM, MAX RATE = 7.9 BPM, ISIP = 348 PSI, FG =.855 PSI/FT 2:45 4: Stim, STAGE 1, CHANGE-OVER PERF PP PERF STAGE 1: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/195 BBLS 372 PSI, SET 13,432', PERF'D UPPER 13,47' - 13,49', 13,377' - 13,379', 13,352' - 13,354', 13,317' - 13,319', 13,287' - 13,288', 13,257' - 13,258'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING 4:35 4:49.23 Stim, STAGE 1, STIMULATION WOO PP CHANGE OVER TIME 4:49 7:1 2.2 Stim, STAGE 11, PERFORATE STIM PP FRAC STAGE 1: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4712 BBLS Slickwater, 1219 BBLS Linear Gel, BBLS Crosslink, 23732# 1 Mesh, 19168# 4/7, #, #, TOTAL PROP = 429#, TOTAL LTR = 615 BBLS. AVG PRES = 5435 PSI, MAX PRES = 8346, AVG RATE = 69.1 BPM, MAX RATE = 69.8 BPM, ISIP = 3445 PSI, FG =.8552 PSI/FT. 7:1 9: Stim, STAGE 11, CHANGE-OVER PERF PP PERF STAGE 11: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/187 BBLS PSI, SET 13,232', PERF'D UPPER 13,27' - 13,29', 13,174' - 13,176', 13,147' - 13,149', 13,117' - 13,119', 13,87' - 13,88', 13,57' - 13,58'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING 8:55-9:1. 9:1 9:18.13 Stim, STAGE 11, CHANGE-OVER WOO PP CHANGE OVER TIME Printed Date: 8/7/215 Printed Time: 9:46 AM
20 Page 2 of 2 9:18 11: Stim, STAGE 12, PERFORATE STIM PP FRAC STAGE 11: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4718 BBLS Slickwater, 122 BBLS Linear Gel, BBLS Crosslink, 2354# 1 Mesh, 1893# 4/7, #, #, TOTAL PROP = 42434#, TOTAL LTR = 6131 BBLS. AVG PRES = 5217 PSI, MAX PRES = 5853, AVG RATE = 69.2 BPM, MAX RATE = 71.3 BPM, ISIP = 3455 PSI, FG =.8567 PSI/FT. 11:1 13:1 2. Stim, STAGE 12, CHANGE-OVER PERF PP PERF STAGE 12: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/166 BBLS PSI, SET 13,32', PERF'D UPPER 13,11' - 13,13', 12,975' - 12,977', 12,943' - 12,945', 12,911' - 12,913', 12,879' - 12,88', 12,847' - 12,848'; 12,812' - 12,813'; 12,783' - 12,784'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, 13:1 13:14.7 Stim, STAGE 12, STIMULATION WOO PP CHANGE OVER TIME. 13:14 15: Stim, STAGE 12, STIMULATION STIM PP FRAC STAGE 12 - Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 5465 BBLS Slickwater, 1937 BBLS Linear Gel, BBLS Crosslink, 28568# 1 Mesh, 28692# 4/7, #, #, TOTAL PROP = 5726#, TOTAL LTR = 7592 BBLS. AVG PRES = 5646 PSI, MAX PRES = 6141, AVG RATE = 81.2 BPM, MAX RATE = 82.7 BPM, ISIP = 3621 PSI, FG =.8771 PSI/FT. 15:15 17: Stim, STAGE 13, CHANGE-OVER PERF PP PERF STAGE 13: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/175 BBLS PSI, SET 12,758', PERF'D UPPER 12,735' - 12,737', 12,73' - 12,75', 12,673' - 12,675', 12,64' - 12,642', 12,613' - 12,614', 12,583' - 12,584'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, GREASE FRAC VALVES 17:-17:35 17:35 18:5.5 Stim, STAGE 13, STIMULATION WOO PP CHANGE OVER TIME 18:5 2:6 2.2 STIM PP FRAC STAGE 13 - Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4383 BBLS Slickwater, 13 BBLS Linear Gel, BBLS Crosslink, 2372# 1 Mesh, 1966# 4/7, #, #, TOTAL PROP = 42768#, TOTAL LTR = 5881 BBLS. AVG PRES = 591 PSI, MAX PRES = 6957, AVG RATE = 69.2 BPM, MAX RATE = 7.6 BPM, ISIP = 343 PSI, FG =.853 PSI/FT. :3 MIN DT DUE TO BLENDER SLURRY RATE ISSUE 2:6 22: Stim, STAGE 14, CHANGE-OVER PERF PP PERF STAGE 14: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/152 BBLS 347 PSI, SET 12,556', PERF'D UPPER 12,533' - 12,535', 12,51' - 12,53', 12,469' - 12,471', 12,433' - 12,435', 12,45' - 12,46', 12,373' - 12,374', 12,341' - 12,342', 12,39' - 12,31'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING-21:5-22:5 22:5 22:1.8 Stim, STAGE 14, STIMULATION WOO PP CHANGE OVER TIME 22:1 : 1.83 Stim, STAGE 14, STIMULATION STIM PP FRAC STAGE 14: INFO CONT'D ON NEXT DAYS REPORT Printed Date: 8/7/215 Printed Time: 9:46 AM
21 Page 1 of 3 Legal Well Name: UNIVERSITY 244 4HU API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SE District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/7/215 Report Number: 13 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 218. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $25,44 Cum Field Est To Date (Cost): $71,38 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC: FRAC STAGES 14 THRU 19 : :12.2 Stim, STAGE 14, STIMULATION STIM PP FRAC STAGE 14: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 55 BBLS Slickwater, 1439 BBLS Linear Gel, BBLS Crosslink, 23546# 1 Mesh, 19176# 4/7, #, #, TOTAL PROP = 42722#, TOTAL LTR = 663 BBLS. AVG PRES = 5122 PSI, MAX PRES = 665, AVG RATE = 7.6 BPM, MAX RATE = 78.5 BPM, ISIP = 3587 PSI, FG =.8729 PSI/FT. :12 6: PERF PP PERF STAGE 15: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/16 BBLS 358 PSI, SET 12,286', PERF'D UPPER 12,259' - 12,261', 12,229' - 12,231', 12,199' - 12,21', 12,169' - 12,171', 12,139' - 12,14', 12,112' - 12,113'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, DOWN DUE TO HORSE HEAD WHEEL SPLIT IN HALF ON PERFORATOR. 2:-5:45 6:1 6:21.18 Stim, STAGE 15, CHANGE-OVER WOO PP CHANGE OVER TIME 6:21 8: Stim, STAGE 16, PERFORATE STIM PP FRAC STAGE 15: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4541 BBLS Slickwater, 1299 BBLS Linear Gel, BBLS Crosslink, 237# 1 Mesh, 1916# 4/7, #, #, TOTAL PROP = 4286#, TOTAL LTR = 624 BBLS. AVG PRES = 528 PSI, MAX PRES = 768, AVG RATE = 7.6 BPM, MAX RATE = 71.8 BPM, ISIP = 3621 PSI, FG =.8767 PSI/FT. 8:32 1:32 2. Stim, STAGE 16, CHANGE-OVER PERF PP PERF STAGE 16: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/145 BBLS PSI, SET 12,84', PERF'D UPPER 12,58' - 12,6', 12,27' - 12,29', 11,995' - 11,997', 11,963' - 11,965', 11,931' - 11,932', 11,899' - 11,9'; 11,867' - 11,868'; 11,835' - 11,836'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING 1:25-1:32 1:32 1:41.15 Stim, STAGE 16, STIMULATION WOO PP CHANGE OVER TIME Printed Date: 8/8/215 Printed Time: 9:45 AM
22 Page 2 of 3 1:41 12: Stim, STAGE 16, STIMULATION STIM PP FRAC STAGE 16: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 5282 BBLS Slickwater, 286 BBLS Linear Gel, BBLS, 28852# 1 Mesh, 28762# 4/7, #, #, TOTAL PROP = 57614#, TOTAL LTR = 7537 BBLS. AVG PRES = 5478 PSI, MAX PRES = 613, AVG RATE = 79.4 BPM, MAX RATE = 8.6 BPM, ISIP = 3662 PSI, FG =.8815 PSI/FT. 12:42 14: Stim, STAGE 17, PERFORATE PERF PP PERF STAGE 17: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/143 BBLS PSI, SET 11,816', PERF'D UPPER 11,785' - 11,787', 11,753' - 11,755', 11,725' - 11,727', 11,689' - 11,691', 11,657' - 11,658', 11,625' - 11,626'; 11,598' - 11,599'; 11,561' - 11,562'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, 14:18 14:25.12 Stim, STAGE 17, STIMULATION WOO PP CHANGE OVER TIME 14:25 16: Stim, STAGE 18, PERFORATE STIM PP FRAC STAGE 17 - Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 5311 BBLS Slickwater, 1995 BBLS Linear Gel, BBLS, 28716# 1 Mesh, 2888# 4/7, #, #, TOTAL PROP = 57524#, TOTAL LTR = 7473 BBLS. AVG PRES = 5392 PSI, MAX PRES = 5856, AVG RATE = 79.2 BPM, MAX RATE = 8.5 BPM, ISIP = 3559 PSI, FG =.8692 PSI/FT 16:31 18: Stim, STAGE 18, PERFORATE PERF PP PERF STAGE 18: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/13 BBLS PSI, SET 11,536', PERF'D UPPER 11,512' - 11,514', 11,479' - 11,481', 11,447' - 11,449', 11,415' - 11,417', 11,386' - 11,387', 11,351' - 11,352'; 11,319' - 11,32'; 11,287' - 11,288'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, 18:6 18:16.17 Stim, STAGE 18, STIMULATION WOO PP CHANGE OVER TIME 18:16 2:16 2. Stim, STAGE 19, PERFORATE STIM PP FRAC STAGE 18 - Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 5615 BBLS Slickwater, 1795 BBLS Linear Gel, BBLS, 28426# 1 Mesh, 28658# 4/7, #, #, TOTAL PROP = 5784#, TOTAL LTR = 7564 BBLS. AVG PRES = 5354 PSI, MAX PRES = 6789, AVG RATE = 79.4 BPM, MAX RATE = 81.8 BPM, ISIP = 3269 PSI, FG =.8339 PSI/FT. 2:16 22: 1.73 Stim, STAGE 19, PERFORATE PERF PP PERF STAGE 19: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/18 BBLS 319 PSI, SET 11,264', PERF'D UPPER 11,237' - 11,239', 11,26' - 11,28', 11,177' - 11,179', 11,147' - 11,149', 11,117' - 11,118', 11,88' - 11,89'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING: 21:45-22: 22: 22:6.1 Stim, STAGE 19, CHANGE-OVER WOO PP CHANGE OVER TIME Printed Date: 8/8/215 Printed Time: 9:45 AM
23 Page 3 of 3 22:6 23: Stim, STAGE 2, PERFORATE STIM PP FRAC STAGE 19: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4543 BBLS Slickwater, 134 BBLS Linear Gel, BBLS, 2371# 1 Mesh, 19156# 4/7, #, #, TOTAL PROP = 42866#, TOTAL LTR = 5979 BBLS. AVG PRES = PSI, MAX PRES = 6893, AVG RATE = 69.5 BPM, MAX RATE = 7.4 BPM, ISIP = 3517 PSI, FG =.8643 PSI/FT. Printed Date: 8/8/215 Printed Time: 9:45 AM
24 Page 1 of 2 Legal Well Name: UNIVERSITY 244 4HU API/UWI: Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SE District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/8/215 Report Number: 14 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): Job Day (days): 219. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,94 Cum Field Est To Date (Cost): $73,248 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC: FRAC STAGES 2 THRU 21 : 1:3 1.5 Stim, STAGE 2, PERFORATE PERF PP PERF STAGE 2: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/15 BBLS 347 PSI, SET 11,62', PERF'D UPPER 11,37' - 11,39', 11,8' - 11,1', 1,977' - 1,979', 1,947' - 1,949', 1,917' - 1,918', 1,892' - 1,893'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING: 21:45-22: 1:3 1:41.19 Stim, STAGE 2, STIMULATION WOO PP CHANGE OVER TIME 1:41 3: Stim, STAGE 21, PERFORATE STIM PP FRAC STAGE 2: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4543 BBLS Slickwater, 134 BBLS Linear Gel, BBLS, 2371# 1 Mesh, 19156# 4/7, #, #, TOTAL PROP = 42866#, TOTAL LTR = 5979 BBLS. AVG PRES = PSI, MAX PRES = 6893, AVG RATE = 69.5 BPM, MAX RATE = 7.4 BPM, ISIP = 3517 PSI, FG =.8643 PSI/FT. Printed Date: 8/9/215 Printed Time: 9:45 AM
25 Page 2 of 2 3:54 5: Stim, STAGE 21, CHANGE-OVER PERF PP PERF STAGE 21: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/18 BBLS PSI, SET 1,862', PERF'D UPPER 1,837' - 1,839', 1,812' - 1,814', 1,777' - 1,779', 1,747' - 1,749', 1,715' - 1,716', 1,687' - 1,688'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING: 21:45-22: 5:35 19: WOO PP CHANGE OVER TIME-APACHE EQUIPMENT FAILURE AT WATER PIT. 19:35 21: Stim, STAGE 22, PERFORATE STIM PP FRAC STAGE 21: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4543 BBLS Slickwater, 134 BBLS Linear Gel, BBLS, 2371# 1 Mesh, 19156# 4/7, #, #, TOTAL PROP = 42866#, TOTAL LTR = 5979 BBLS. AVG PRES = PSI, MAX PRES = 6893, AVG RATE = 69.5 BPM, MAX RATE = 7.4 BPM, ISIP = 3517 PSI, FG =.8643 PSI/FT. 21:25 23:25 2. Stim, STAGE 22, PERFORATE PERF PP PERF STAGE 22: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/91 BBLS 394 PSI, SET 1,662', PERF'D UPPER 1,632' - 1,634', 1,67' - 1,69', 1,577' - 1,579', 1,547' - 1,549', 1,517' - 1,518', 1,487' - 1,488'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING: 23:1-23:25 23:25 23:37.2 Stim, STAGE 22, STIMULATION WOO PP CHANGE OVER TIME 23:37 :.38 Stim, STAGE 22, STIMULATION STIM PP BEGIN STAGE FRAC ON STAGE 22 Printed Date: 8/9/215 Printed Time: 9:45 AM
APACHE CORPORATION. Daily Land - Orig Comp Report
APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int
More informationDrilling & Completion Summary
API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,
More information02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00
DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University
More information8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250
DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz
More informationAPACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00
More information3/25/15 University DC 1H Devonian Completion
3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped
More informationCompletion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00
Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217
More informationExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #
6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main
More informationDaily Drilling Report
Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES
More informationEP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017
6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion
More informationDaily Drilling Report
Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM
More informationCNL, CCL, GR, CBL. RDMO
Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.
More informationView Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013
Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,
More informationDAILY DRILLING REPORT
UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED
More informationPage of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB
More informationAPPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28
MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:
More informationElevation Resources LLC
FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20
More informationAPPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28
MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move
More informationPartner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig
: 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.
More informationDaily Drilling Report
Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204
More informationDATE: 01/03/ DAILY COMPLETION REPORT
DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY
More informationGulftex Energy III LP DAILY COMPLETION REPORT
07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM
More informationDaily Drilling Report
Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG
More informationAthlon Energy Operating LLC
Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB
More informationH. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas
H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)
More informationDaily Drilling Summary Report
Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well
More informationDATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS
DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud
More informationCurrent Depth. Proposed TD. Current Operation
Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University
More informationCallon Petroleum Company Drilling Report
LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP
More informationCurrent Depth. Proposed TD. Current Operation
Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI
More information19,683 8,
General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg
More informationDAILY DRILLING REPORT DATE : 08/01/2012
DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:
More informationPROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..
DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks
More informationDAILY OPERATIONS PARTNER 30 HOUR REPORT Date:
DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing
More informationDaily Activity Report
605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT
More informationbbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P
Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels
More informationEP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017
1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original
More informationWell Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:
Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.
More information2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford
2013 Latin America Perforating Symposium Perforating Options Available Today in Horizontal Shale Oil and Gas Wells Kerry Daly, Weatherford Typical Eagle Ford Well Costs Total well cost approximately $10
More information1042 FNL, 1935 FEL - ECTOR, TX
Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:
More informationMORNING DRILLING REPORT
APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.
More informationRAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG
RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Submitted
More informationMLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations
MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From
More informationDrilling & Completion Summary - Ascending
UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion
More informationMORNING DRILLING REPORT
APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i
More informationElevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:
FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar
More informationCompletion Solutions Inc.
Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both
More informationThru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x
Services Gun Shot Coiled Phasing Density Gun Size Explosive Tubing Slick Line Tubing Wireline Deep Big Hole Gun Type (Degrees) (SPF)Max (inches) Type Conveyed Conveyed Conveyed Conveyed Penetrating Thru
More informationOPERATIONS SUMMARY REPORT
Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:
More informationPRODUCTION HYDRAULIC PACKER FIELD TEST
DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose
More informationBallistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi
Ballistics on Tractor Conveyance Brian Schwanitz- VP Welltec MENAPS 2011, Abu Dhabi Outline Tractor Activity with Ballisticservices Tractor and Ballistic Safe Sub Operation Addressable Switches and Related
More informationOn May 28, 2015 Freeport-McMoRan filed with DOGGR a written notice of intention to plug and abandon Fourth Ave Well #4.
PA IDC Report #2 If the scope of this request had been broader and additional items evaluated the findings may have been different. Please receive and file this report. II. TIMELINE On January 14, 2015,
More informationOklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:
Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box 52000 Oklahoma City, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A API No.: 35051237310000 OTC Prod. Unit No.: 051-212434
More informationEndeavor Energy Resources, LP. DAILY DRILLING REPORT
Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment
More informationLEE NAK GUI TCP SERVICE COORDINATOR APPS
Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers
More informationWIF Categorization Exercise. Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil
WIF Categorization Exercise Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil WIF Well Integrity Workshop, May 26, 2011 Category Principles & Colours Category Principle
More informationMOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES
MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October
More informationMcKissick 200mt. Stabbing board
MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014
More informationGeneral Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN
UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate
More informationOklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:
Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box 52000 Oklahoma City, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A API No.: 35017248570000 OTC Prod. Unit No.: 017-217813
More informationCasing Drilling Technology Implementation In Petrom
Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga
More informationFOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)
FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing
More informationReport No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE
Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well
More informationRotary Snubbing Technology Option for Long Reach
Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results
More informationISOLATION/UNIVERSAL TOOLS
ISOLATION/UNIVERSAL TOOLS stingercanada.com Grande Prairie 11303 96 Avenue Grande Prairie, AB T8V 5M3 780-513-3696 Calgary 420-510 5th Street SW Calgary, AB T2P 3S2 403-340-0716 Red Deer 334-28042 Hwy
More information2/7-2IS OPEN HOLE WIRELINE LOGGING SUMMARY
/7-IS OPEN HOLE WIRELINE LOGGING SUMMARY LOG TYPE RUN # DATE INTERVAL LOGGED (T) INTERVAL LOGGED (B) BIT SIZE BHT TIME ELAPSED S/CIRC (hrs) MUD WEIGHT (ppg) MUD TYPE REMARS DIL/LSS/GR 9/7/89 3465 879 7.5
More informationComposite Plugs. Index
Composite Plugs Downhole Isolation Tools - Multi-Stage Operations Index Rapid Mill Ball Drop... 1-2 Rapid Mill Flo-Back Flapper... 3-4 Series (Ball Drop, Bridge, Flo-Back, Flo-Back with Bio-Ball)... 5-6
More informationIdeco - H25 Information Document
Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig
More informationDAILY DRILLING REPORT
General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014
More informationAbandonment BAS-3. Frisia Zout B.V. 4 December 2013
Abandonment BAS-3 Frisia Zout B.V. 4 December 213 Contents BAS-3 status Definitieve afsluiting van caverne BAS-3 verdere plannen Algemene aandachtspunten 2 BAS-3 Start Item Description Well diagram version
More informationMaersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced
Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore
More informationDAILY OPERATIONS REPORT Date:
OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:
More informationH. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas
H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API #42-285- 33965 RRC Permit # 805188 GAU letter, RRC Letter #GAU- 5123 Ground Elevation GL: 287.6 (Rig KB
More informationIntervention Barriers
Intervention Barriers A barrier is defined as a means of containing wellbore pressure and fluids. Two effective barriers are required for most intervention operations. Consider when barriers are effective
More informationJTC ENERGY GROUP, LLC. Jarmon #1D
JTC ENERGY GROUP, LLC Commercial Salt Water Disposal Permit Jarmon #1D (Re-entry of Existing Wellbore API# 177-31597) Summary JTC Energy Group, LLC is offering for sale the Permit for a Commercial Salt
More informationComparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE
Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE - 114191 C. A. Rubio P. A. Agudelo: Weatherford Colombia Limited J. E. Peñaloza: Meta Petroleum Limited Houston
More informationAtlas Copco Oil and Gas Rigs. The Predator Advantage
Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India
More informationUsing Drilling Dynamics To Reduce Drilling costs
1 Welcome Using Drilling Dynamics To Reduce Drilling costs 2 Using Drilling Dynamics The cost of the drill bit, mud motor, and other BHA components depends the downhole conditions in which they operate.
More information1 st Run in Russia Novatek (largest independent gas producer) TCE700 lands intermediate 7 casing on ERD well in Yarudeyskoye field
1 st Run in Russia Novatek (largest independent gas producer) TCE700 lands intermediate 7 casing on ERD well in Yarudeyskoye field Land critical 7 intermediate casing at near horizontal through notorious
More informationPressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A
4.2 Formation Multi-Test (FMT) Analysis Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A summary 6. DRILL STEM TESTING A dual
More information5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.
MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b
More informationLOC 400 Drilling Rig
TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP
More informationEP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017
Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original
More informationDSI THRU-TUBING INC. Bear Claw Composite Bridge & Frac Plug Systems. Proof in Performance
DSI THRU-TUBING INC Bear Claw Composite Bridge & Frac Plug Systems Proof in Performance Proof in Performance www.dsithrutubing.com CANADA Toll Free Dispatch 855-346-9788 3300, 205 5th Ave SW Calgary T2P
More informationDAILY OPERATIONS PARTNER 30 HOUR REPORT Date:
03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@
More informationGEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD
Presented at SDG Short Course I on Exploration and Development of Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 10-31, 2016. Kenya Electricity
More informationReimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications
Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of
More informationWyoming EORI 2nd Annual Wyoming CO2 Conference 5/29/08
Wyoming EORI 2nd Annual Wyoming CO2 Conference 5/29/08 The Beaver Creek Madison CO2 Project Spring 2008 Chuck Peterson Sr. Reservoir Engineering Advisor Beaver Creek Madison CO 2 Flood Project Overview
More informationWith its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.
PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE
More informationPlug & Abandonment Light Drilling Workover Well Intervention
Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE
More informationQQUALITY SERVICE QUALITY PRODUCTS QUALITY PERSONNEL
QQUALITY SERVICE QUALITY PRODUCTS QUALITY PERSONNEL www.mcclintonenergy.com Q QQUALITY SERVICE QUALITY PRODUCTS QUALITY PERSONNEL uality Service, is the pinnacle of our business. Our service is one of
More informationHigh Energy Gas Fracturing Test
DOERMOTC - 020131 High Energy Gas Fracturing Test Final Report for the Period April 10, 2000 August 31, 2000 Date Published: February 27, 2001 R. Schulte PREPARED FOR THE UNITED STATES DEPARTMENT OF ENERGY
More informationVendor Item UOM Qty. Needle Valve Type MFL - 1-1/8" -12 UNF 15 K WP Each 15. Pressure Guage 1-1/8" 12UNF Each 6
Vendor Item UOM Qty Uniexcel Sumitomo Sumitomo 7" OD Pup Joint 35 PPF P110-5 ft Long PTB007 Pin X Box Ea 9 7" Integral Cross Over 24" OAL 35ppf VAM TOP Pin x NSCC Box materal AISI Ea 1 USED ITEM 7" Integral
More informationSPE Improved Hydraulic Fracturing Perforation Efficiency Observed With Constant Entry Hole and Constant Penetration Perforation
SPE-184878 Improved Hydraulic Fracturing Perforation Efficiency Observed With Constant Entry Hole and Constant Penetration Perforation D. Cuthill, W. Yang, & J. Hardesty, GEODynamics, Inc. OUTLINE Slide
More informationRIG 32. Rig 32. Page 1 of 13
Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with
More informationField Overview. Central West Ecuadorian Basin Discovered in 1994 OOIP: 1,605 MBbls Maximum production rate: 65,200 bopd in year 2007 IPS-12-03
Dynamic Underbalance Perforating in Mature Fields in Ecuador Rafael Rodriguez, Robert Peňaranda - REPSOL YPF Byron Corella, Marcia Benavides Schlumberger Field Overview 320000 340000 360000 380000 Tivacuno
More informationFRAC STACKS stingercanada.com
FRAC STACKS stingercanada.com Grande Prairie 11303 96 Avenue Grande Prairie, AB T8V 5M3 780-513-3696 Calgary 420-510 5th Street SW Calgary, AB T2P 3S2 403-340-0716 Red Deer 334-28042 Hwy 11 Red Deer County,
More information