Abandonment BAS-3. Frisia Zout B.V. 4 December 2013

Size: px
Start display at page:

Download "Abandonment BAS-3. Frisia Zout B.V. 4 December 2013"

Transcription

1 Abandonment BAS-3 Frisia Zout B.V. 4 December 213

2 Contents BAS-3 status Definitieve afsluiting van caverne BAS-3 verdere plannen Algemene aandachtspunten 2

3 BAS-3 Start Item Description Well diagram version Depth GL Depth GL Hole ID Pipe OD Collar OD Pipe ID m m in in in in tvd ah 36" x 1/2" WT stove pipe, welded 3 3 driven 36. welded " x 1/2" WT 35 ksi conductor, welded welded welded ,814" Dart-sub 41 2,562" Dart-sub 42 volume 72liter Top of 11-3/4" at 432m bgl " Suspension String at 433m bgl TJ 3.25 Pack-off / Circulation Sub 43 Bit-sub, 1 3/8" Bullnose (Stabiliser) 431 Top cement in 18 5/8 " x 13 3/8" annulus 18 5/8" 87.5 ppf K55 Big Omega casing " 84,5 ppf C85 Hydrill / End Status Observation Well is open. Outflow measured in cubic container Returns 4.8ltr/day Volume (assumed 191m³ 3361 Shooting depth (1mar13) 3366 Top of Cement in 5" DP TOC 11 3/4" x 14" csg Assumed top cement 11 3/4" x 13 3/8" annul Top Zechstein /8" 68 ppf P11 VAM-TOP casing TOC Sealing 11 3/4" x 14" csg Bottom of 5" Cemented DP at 3816 Top of Cement in 11-3/4" Unknown Top of Stump/ 11-3/4 Mechanical cut at 3825 Bridgeplug #3 (fitted w/ flapper valve) 3827 Bridgeplug #2 (fitted w/ flapper valve) 3835 Top Carnalite Fired 1x 48" split shot (13jun12) 11 3/4" Connection 3866 Fired 1+2x 48" split shot (2dec11, 22feb12) Bridgeplug #1 (fitted w/ flapper valve) Fired 1x 48" split shot (19dec11) Bottom Carnalite, workstring 17jul12 Roof of cavern (Flodim EM 6 dec 211) Fired 2x 48" split shot (24nov11) 11 3/4" 65 ppf P11, VAM FJL 2x splitshot " heavy wall 16 ppf N8 hydrill MAC II Sump level (Flodim dummy 6 dec 211)

4 BAS-3 Plan L Retrieve suspension string Fish DP, perform USIT Plug inside 11 3/4 Retrieve 11 3/4 set whipstock Planned ( ) Retrieve suspension string Remove fish Perform USIT (Assess annulus) 1 Secure/abandon well Operations planned wk End Q1 drilling rig 6 n Retrieve 11 ¾ Final abandonment cavern Drill BAS-3 Original 2 4

5 BAS-3 status CT internal clean-out failed CT Fish left inside 5 DP Well remained stable during all operations.5 ltr per 24 hrs returned from well (temperature?) 5

6 CT on HWU 6

7 BAS-3 Status Item Description Depth GL Depth GL Hole ID Pipe OD Collar OD Pipe ID Well diagram version (zoomed) m m in in in in tvd ah Coevorden Shooting depth (1mar13) hold up depth WL top fish Bunter TOC 11 3/4" x 14" csg Calculated TOC 11 3/4" x 13 3/8" annulus 357 Z Leine Z3 361 Top Zechstein Salt VAM-TOP casing /8" 68 ppf P TOC Sealing 11 3/4" x 14" csg m Below TOP Zechstein Max. Calc. TOC 5"DP x 11-3/4" Anhydrite Bottom of 5" Cemented DP at Bridgeplug #3 (w / flapper valve, 3825m), Bridgeplug #2 (w / flapper valve 3827m) 383 Top of Stump/ 11-3/4 Mechanical cut at 3825 split shot (13jun12) Fired 1x 48" Carnalitiet /4" Connection Fired 1+2x 48" split shot (2dec11, 22feb12, 3866m) Bridgeplug #1 (fitted w/ flapper valve) Fired 1x 48" split shot (19dec11, 394m), Bridgeplug #1 (w / flapper valve, 3894m) 39 Bottom Carnalite, Haliet Z2 391 Roof of cavern (Flodim EM 6 dec 211) Fired 2x 48" split shot (24nov11, 3917m not thru csg) /4" 65 ppf P11, VAM FJL 2x splitshot " heavy wall 16 ppf N8 hydrill MAC II Sump level (Flodim dummy 6 dec 211)

8 CT Fish 8

9 Schets op semi-schaal Geactualiseerd t Anhydriet Carnalitiet 9

10 Cement Fish Item Description Depth GL Depth GL Hole ID Pipe OD Collar OD Pipe ID Well diagram version (zoomed) m m in in in in tvd ah Coevorden Shooting depth (1mar13) hold up depth WL top fish Bunter TOC 11 3/4" x 14" csg Calculated TOC 11 3/4" x 13 3/8" annulus 357 Z Leine Z3 361 Top Zechstein Salt VAM-TOP casing /8" 68 ppf P TOC Sealing 11 3/4" x 14" csg m Below TOP Zechstein Max. Calc. TOC 5"DP x 11-3/4" Anhydrite Bottom of 5" Cemented DP at Bridgeplug #3 (w / flapper valve, 3825m), Bridgeplug #2 (w / flapper valve 3827m) 383 Top of Stump/ 11-3/4 Mechanical cut at 3825 split shot (13jun12) Fired 1x 48" Carnalitiet /4" Connection Fired 1+2x 48" split shot (2dec11, 22feb12, 3866m) Bridgeplug #1 (fitted w/ flapper valve) Fired 1x 48" split shot (19dec11, 394m), Bridgeplug #1 (w / flapper valve, 3894m) 39 Bottom Carnalite, Haliet Z2 391 Roof of cavern (Flodim EM 6 dec 211) Fired 2x 48" split shot (24nov11, 3917m not thru csg) /4" 65 ppf P11, VAM FJL 2x splitshot " heavy wall 16 ppf N8 hydrill MAC II Sump level (Flodim dummy 6 dec 211)

11 Cementation 23 m3 low vis 1.98 sg cement Ca 15 l/min Tickening time ca 1 hrs Gravitate in place Circulate out excess, check displacement efficiency WOC, check inflow. 11

12 BAS-3 Abandonment Current Abandonment option Cement in 11 ¾ x 5 annulus to top Coevorden -> 3m below kick-off point Cement up to top Coevorden Retrieve 11 ¾ where free Set whipstock 33 kick-off point 12

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

SERVICE TOOLS. Magnus MDT Service Packer V-III Un-Loader Valve MANC Storm Valve

SERVICE TOOLS. Magnus MDT Service Packer V-III Un-Loader Valve MANC Storm Valve s ervice packers Magnus MDT Service Packer V-III Un-Loader Valve MANC Storm Valve Magnus MDT Service Packer Magnus MDT Retrievable Packer consists is a compression set packer with hydraulic hold down that

More information

Dynamic MDT Service Packer V-III Un-Loader Valve ANC Storm Valve

Dynamic MDT Service Packer V-III Un-Loader Valve ANC Storm Valve Dynamic MDT Service Packer V-III Un-Loader Valve ANC Storm Valve Dynamic MDT Service Packer Dynamic MDT Retrievable Packer consists of a compression set packer with hydraulic hold down that is designed

More information

Thru-Tubing. Motors and standard tools

Thru-Tubing. Motors and standard tools Thru-Tubing Motors and standard tools Thru-Tubing Reliable. Innovative. Premium. We are proud of our products and their contribution to the downhole drilling and thru-tubing industries. Research Innovate

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

TECHNICAL UNIT DAVIS-LYNCH INC. TYPE 778-MC & 777-HY STAGE COLLAR JCE 02/17/03. FILE: 778-MC TECH NEW.doc REV. 1 Page 1 of 6 DAVIS

TECHNICAL UNIT DAVIS-LYNCH INC. TYPE 778-MC & 777-HY STAGE COLLAR JCE 02/17/03. FILE: 778-MC TECH NEW.doc REV. 1 Page 1 of 6 DAVIS FILE: 778-MC TECH NEW.doc REV. 1 Page 1 of 6 DAVIS FILE: 778-MC TECH NEW.doc REV. 1 Page 2 of 6 DESCRIPTION In the process of cementing a casing string of an oil or gas well, it may be desirable or necessary

More information

Coiled Tubing Tools Table of Contents Primary Tools Slim Line Dimple / Slip Connector...Page 6 Full Size Dimple / Slip Connector...Page 6 Slimconnect External Slip Connector...Page 7 External Slip Connector...Page

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

Coiled Tubing Tool EXTERNAL SLIP CONNECTOR. Feature. Specification Tool O.D. inch. Coiled Tubing O.D. inch. Tool I.D. inch. Conn.

Coiled Tubing Tool EXTERNAL SLIP CONNECTOR. Feature. Specification Tool O.D. inch. Coiled Tubing O.D. inch. Tool I.D. inch. Conn. Coiled Tubing Tool EXTERNAL SLIP CONNECTOR The External Slip Connector is designed through a unique non-rotational slip, the upper end is connected with the coiled tubing, and the lower end is connected

More information

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi Ballistics on Tractor Conveyance Brian Schwanitz- VP Welltec MENAPS 2011, Abu Dhabi Outline Tractor Activity with Ballisticservices Tractor and Ballistic Safe Sub Operation Addressable Switches and Related

More information

TOP TOOLS GmbH Alter Flugplatz Vechta

TOP TOOLS GmbH Alter Flugplatz Vechta Unit No. CTC 001-006 Page 3 of 50 Internal Coiled Tubing Connector Coiled Tubing Connectors provide a means of attaching a tool string to the end of the coiled tubing. The connectors, when installed correctly,

More information

COILED TUBING TOOLS SALE RENTAL - LEASE

COILED TUBING TOOLS SALE RENTAL - LEASE COILED TUBING TOOLS SALE RENTAL - LEASE GTECH Energy Services LLC 67 Pinepath Pl. Spring, Texas 77381 PH: 713-703-2959 Fax: 713-510-1802 sales@gtechenergyservices.com SALES@GTECHENERGYSERVICES.COM 1 PRODUCT

More information

Grout pumps and dosing systems - for grouting with 2 components

Grout pumps and dosing systems - for grouting with 2 components Grout pumps Grout pumps and dosing systems - for grouting with 2 components Type LP 20-20/3 LP 20-20/PA Electric drive 220 V/ 50 Hz lighting current Option Electric drive 400 V/ 50 Hz three-phase current

More information

Nut The standard bottom nut is a bullnose nut. Optional nut types, sub, mill, and side hill, are available.

Nut The standard bottom nut is a bullnose nut. Optional nut types, sub, mill, and side hill, are available. Overview Logan Releasing Spears provide a positive means to engage and retrieve an internal fish from the well. The design of this rugged, dependable, and inexpensive internal catch fishing tool ensures

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

Oiltools main product lines

Oiltools main product lines Archer Oiltools What we will cover The road from Seadrill to Archer The Well Company Services that Archer provide Archer s Global Footprint Archer Oiltools Global Footprint Archer Oiltools - What we do

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

Cloppenburg Germany Germany Tel.: +49 (0) Hohe Tannen 14

Cloppenburg Germany Germany Tel.: +49 (0) Hohe Tannen 14 Downhole Tools Fangmann Energy Services GmbH & Co. KG Hohe Brietzer Tannen Weg 14 10 49661 29410 Cloppenburg Salzwedel Tel.: Tel.: +49 +49 (0)4471 (0)3901 98008-0 8363-0 Fax: Fax: +49 +49 (0)4471 (0)3901

More information

Downhole Tools Worldwide.

Downhole Tools Worldwide. Downhole s Worldwide. INFLATABLES PRODUCTION PACKER SEV-SET PACKER THRU TUBING PACKER CASING PACKER STRADDLE PACKER HYDRAULIC DISCONNECT ON-OFF SEAL Table of Contents 1-1 1-2 1-3 1-4 1-5 1-6 1-7 TechWest

More information

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford 2013 Latin America Perforating Symposium Perforating Options Available Today in Horizontal Shale Oil and Gas Wells Kerry Daly, Weatherford Typical Eagle Ford Well Costs Total well cost approximately $10

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

Casing Drilling Technology Implementation In Petrom

Casing Drilling Technology Implementation In Petrom Casing Drilling Technology Implementation In Petrom Presentation Outline Background Overview of Petrom Casing Drilling achievements to date Benefits To Petrom from Casing Drilling Case History 228 Sotanga

More information

ANCR CRU Statistics February 2007 to December 2007

ANCR CRU Statistics February 2007 to December 2007 ANCR CRU Statistics February 2007 to December 2007 o Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes data from Perimeter phone system unavailable prior

More information

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation 2/5/2013 Roger L. Schultz TTS Drilling Solutions Presentation Overview Frictional Forces, Vibratory

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

WLTC Retrievable Bridge Plug

WLTC Retrievable Bridge Plug service Tools WLTC Retrievable Bridge Plug The WLTC Retrievable Bridge Plug is designed to perform all tasks normally required of a tubing run packer-type bridge plug and can be quickly converted to run

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

Up and Down Months of the Stock Market

Up and Down Months of the Stock Market Up and Down Months of the Stock Market 1926-2017 Positive years (66) in the stock market were not good all year long and losing years (24) were not losers throughout the year. Winning years produce losing

More information

Casing Scraper. Service Equipment. Features

Casing Scraper. Service Equipment. Features Casing Scraper The Casing Scraper is a spring type, mechanical casing scraper, featuring a large by-pass area between the blades to allow circulation of debris. The body is constructed of the highest quality

More information

WIF Categorization Exercise. Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil

WIF Categorization Exercise. Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil WIF Categorization Exercise Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil WIF Well Integrity Workshop, May 26, 2011 Category Principles & Colours Category Principle

More information

National Routing Number Administration p-ani Activity and Projected Exhaust Report

National Routing Number Administration p-ani Activity and Projected Exhaust Report National Routing Number Administration 2016 p-ani Activity and Projected Exhaust Report The ATIS Industry Numbering Committee developed the P-ANI Administration Guidelines, which contain the following

More information

University of Michigan Eco-Driving Index (EDI) Latest data: October 2017

University of Michigan Eco-Driving Index (EDI)   Latest data: October 2017 University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: October 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation

More information

TOP DRIVE OPERATIONS & MAINTENANCE MANUAL JULY 2007 HYBRID TECHNOLOGY UNIVERSAL LIFTING CEMENT HEAD. Det Norske Vertis Type Certificate D-2928

TOP DRIVE OPERATIONS & MAINTENANCE MANUAL JULY 2007 HYBRID TECHNOLOGY UNIVERSAL LIFTING CEMENT HEAD. Det Norske Vertis Type Certificate D-2928 TOP DRIVE UNIVERSAL LIFTING CEMENT HEAD SUPER SUB SEA OPERATIONS & MAINTENANCE MANUAL JULY 2007 Det Norske Vertis Type Certificate D-2928 HYBRID TECHNOLOGY 1443 South Gage Street, San Bernardino, California

More information

Completion Solutions Inc.

Completion Solutions Inc. Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both

More information

Thru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x

Thru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x Services Gun Shot Coiled Phasing Density Gun Size Explosive Tubing Slick Line Tubing Wireline Deep Big Hole Gun Type (Degrees) (SPF)Max (inches) Type Conveyed Conveyed Conveyed Conveyed Penetrating Thru

More information

On May 28, 2015 Freeport-McMoRan filed with DOGGR a written notice of intention to plug and abandon Fourth Ave Well #4.

On May 28, 2015 Freeport-McMoRan filed with DOGGR a written notice of intention to plug and abandon Fourth Ave Well #4. PA IDC Report #2 If the scope of this request had been broader and additional items evaluated the findings may have been different. Please receive and file this report. II. TIMELINE On January 14, 2015,

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

DRAFT. Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E

DRAFT. Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E 2.25 2.00 2.00 2.25 2.00 2.00 1.00 2.25 2.00 2.25 2.00 A Massage 10/31/2017 9/1/2015 B MEZZANINE 2.25 2.00 2.00 2.25 2.25 2.25 2.25

More information

Update on Tractor Conveyed Ballistics Including API RP-67 Revision

Update on Tractor Conveyed Ballistics Including API RP-67 Revision Update on Tractor Conveyed Ballistics Including API RP-67 Revision BRIAN SCHWANITZ WELLTEC MENAPS 3 DECEMBER, 2013 MENA Perforating Symposium Outline: The Downhole Tractor - Briefly Tractors in the Industry

More information

Vendor Item UOM Qty. Needle Valve Type MFL - 1-1/8" -12 UNF 15 K WP Each 15. Pressure Guage 1-1/8" 12UNF Each 6

Vendor Item UOM Qty. Needle Valve Type MFL - 1-1/8 -12 UNF 15 K WP Each 15. Pressure Guage 1-1/8 12UNF Each 6 Vendor Item UOM Qty Uniexcel Sumitomo Sumitomo 7" OD Pup Joint 35 PPF P110-5 ft Long PTB007 Pin X Box Ea 9 7" Integral Cross Over 24" OAL 35ppf VAM TOP Pin x NSCC Box materal AISI Ea 1 USED ITEM 7" Integral

More information

SERVICE and PRODUCT CATALOGUE

SERVICE and PRODUCT CATALOGUE SERVICE and PRODUCT CATALOGUE We ll stay as long as you need us! Rangeview has a large list of motors and thru-tubing tools available. Our motors are the premium power to produce well made products that

More information

Casing Cementation Equipment

Casing Cementation Equipment Casing Cementation Equipment Float Equipment Cementing Plugs Casing Centralizers Stage Tools Inflatable Casing Packers Extended Reach Casing Equipment Swellable Casing Packers Liner Equipment Quality Control/Assurance

More information

IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA TEL: IMT PART NUMBER

IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA TEL: IMT PART NUMBER CRANE LOG CALENDAR YEAR CRANE MODEL Daily Inspections Weekly Inspections Monthly Inspections Lubrication Record Maintenance Record Damage & Repair Record Modification Record Reference Specifications CRANE

More information

Production Part Approval - Material, Performance Test Results Discrete Semiconductor Component Qualification Plan

Production Part Approval - Material, Performance Test Results Discrete Semiconductor Component Qualification Plan 電話 :886-2-89-88 XindianDist., New Taipen City, Taiwan, R.O.C. 231 傳真 :886-2-89-88 Tel:886-2-89-88 Fax:886-2-89-88 Customer P/N: SS26 Product Engineer: Reyn Required PPAP Submission Date:8-Mar-12 Supplier

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

PENETRATION Diameter BIT BIT IADC Serial Jets or DEPTH Last 24 hr R.O.P. CUMUL In Maker Type Code N TFA Start Mtrs Hours m/h Mtrs Hours

PENETRATION Diameter BIT BIT IADC Serial Jets or DEPTH Last 24 hr R.O.P. CUMUL In Maker Type Code N TFA Start Mtrs Hours m/h Mtrs Hours Date : jun15 DAILY DRILLING REPORT Report N 1 Well : HONGT01S1 Sidetrack code: S2 Depth ref: Basket handrail Rig : BPC HWU SpaceSaver II From (m MD): TBA BHR to GL = 17,93m GL to NAP = 0,57m Size Weight

More information

UST General Requirements Inspection Checklist

UST General Requirements Inspection Checklist UST General Requirements Inspection Checklist Inspection Date: Inspector s Name: Facility ID#: I. Ownership of s II. Location of s Owner's Name (Corporation, Individual, Public Agency, or other entity):

More information

Internal Cutters. Manual E535

Internal Cutters. Manual E535 Internal Cutters Manual E535 CONTENTs Logan Internal Cutters Overview...2 Uses...2 Construction...2 Operation...2 Operating Precautions... 2 Cutting Procedure...2 Determining Free Length of Pipe... 6 Maintenance...2

More information

Bulk Storage Containers

Bulk Storage Containers UCSB AST SPCC SELF-INSPECTION CHECKLIST Year: Responsible Department: Tank Location: Tank ID: Bulk Storage Containers Total tank capacity: Petroleum type and amount: Secondary containment type: (diesel,

More information

Subsurface Flow Controls

Subsurface Flow Controls Subsurface Flow Controls Subsurface Flow Controls Landing Nipples X, R, RPT, FBN Lock Mandrels and accessories Nippleless Tubing Plugs - Mirage plug, Monolock DuraSleeve Sliding Side-Door circulating device

More information

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693.

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693. 11983978 Jun 19, 217 1 124 958 PAST DUE $1,693.97 Meter Reading Information Meter # 55271 May 3 655 Jun 15 6642 17 days 1397 on or about Aug 15 82 Past Due Balance payable includes an amount which is payable

More information

Performance Measures Second Quarter 2012

Performance Measures Second Quarter 2012 Performance Measures Second Quarter 2012 2Q2011 Earn & Retain Community Trust 6 Performance Measures: Ridership Cost Effectiveness (Cost per Passenger) Cost Efficiency (Cost per Revenue Hour) Service Effectiveness

More information

Balance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2

Balance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2 11983979 Jun 19, 217 1 124 962 Jul 11, 217 $24.34 Meter Reading Previous Bill. Balance from your previous bill $. Meter # 552711 May 3 19813 Account Account charge 12.4* Charges 17 days 82 Jun 15 19895

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

MANUFACTURING. PD Impact Tools

MANUFACTURING. PD Impact Tools PD Impact Tools Upper Connector MANUFACTURING Drive Mandrel Female Spline Bearing Female Spline PD Impact Tools optimize your drilling operations. Knocker Housing Knocker Pressure Piston Hydraulic Mandrel

More information

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD Presented at SDG Short Course I on Exploration and Development of Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 10-31, 2016. Kenya Electricity

More information

Algebra II Pacing Guide

Algebra II Pacing Guide Unit 13: Exploring a Business Venture (10 days) 8 May 13 - May 24 n/a MISD Pacing Guide Date Range Unit 01: Introduction to Functions in 15 Aug. 21 - Sept. 11 Sept. 12 Unit 02: Absolute Value Functions,,

More information

ANCR CRU Statistics Februa.. to December 2007

ANCR CRU Statistics Februa.. to December 2007 ANCR CRU Statistics Februa.. to December 2007 Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes Answered dato from Perimeter phone system unavailable prior

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

Performance Measures 4 th Quarter/Year End 2010

Performance Measures 4 th Quarter/Year End 2010 Performance Measures 4 th Quarter/Year End 2010 Earn & Retain Community Trust 6 Performance Measures: Ridership Cost Effectiveness (Cost per Passenger) Cost Efficiency (Cost per Revenue Hour) Service Effectiveness

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

Construction Sector Indices

Construction Sector Indices STATISTICAL RELEASE UGANDA BUREAU OF STATISTICS January to April 212 Construction Sector Indices HIGHLIGHTS Annual Changes show that the prices for the Whole Construction Sector (covering material prices,

More information

INTECH AUGUST QHSE PERFORMANCE

INTECH AUGUST QHSE PERFORMANCE INTECH QHSE PERFORMANCE - MONTHLY QHSE PERFORMANCE Goal Zero Days ( worked days without Lost Time Injury (LTI)) 751 This Month Minor Accidents or Incidents 01 This Month Major Accidents or Incidents 00

More information

Monthly Operating Report. January 2019

Monthly Operating Report. January 2019 Monthly Operating Report January 2019 January overview For the month of January 2019» The Customer business recorded: Mass market electricity and gas sales of 281 GWh (January 20: 282 GWh) Mass market

More information

Primary Heat Transport (PHT) Motor Rotor Retaining Ring Failure

Primary Heat Transport (PHT) Motor Rotor Retaining Ring Failure 1 Primary Heat Transport (PHT) Motor Rotor Retaining Ring Failure Ali Malik Components & Equipment Eng. Ontario Power Generation - Darlington Nuclear 2 Ontario Power Generation Darlington Darlington Nuclear

More information

The Impact of Well Features on CT Reach. Presented by Patrick Kelleher

The Impact of Well Features on CT Reach. Presented by Patrick Kelleher The Impact of Well Features on CT Reach Presented by Patrick Kelleher ICoTA Calgary Round Table 2014 October 29, 2014 Based on Forthcoming SPE-173666-MS Patrick Kelleher, Ken Newman - Athena Engineering

More information

PRODUCT LINE. CPS Oil & Gas Equipments Private Limited. Liner Hanger System. Gas Lift Equipment. Cementing and Casing Accessories

PRODUCT LINE. CPS Oil & Gas Equipments Private Limited. Liner Hanger System. Gas Lift Equipment. Cementing and Casing Accessories PRODUCT LINE CPS Oil & Gas Equipments Private Limited Liner Hanger System Cementing and Casing Accessories Completion and Downhole Equipment Gas Lift Equipment COMPANY PROFILE CPS, a company based on Indian

More information

OPERATIONS TOTALS ,135 7,511 8,823 8,056 8,021 8,319 8,039 8,283 8,001 8,738 8,219 8,094 98,239

OPERATIONS TOTALS ,135 7,511 8,823 8,056 8,021 8,319 8,039 8,283 8,001 8,738 8,219 8,094 98,239 2007 OPERATIONS AIRCRAFT OPS-2006 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL AIR CARRIER - ITINERANT 748 725 907 804 930 969 832 996 841 899 990 1,249 10,890 AIR TAXI - ITINERANT 3,744 3,638

More information

Monthly Operating Report. February 2018

Monthly Operating Report. February 2018 Monthly Operating Report February 2018 February overview» For the month of February 2018 Contact recorded: Electricity and gas sales of 534 GWh (February 20: 551 GWh) Netback of $82.16/MWh (February 20:

More information

Product meeting October 27th - Kick-OFF meeting Euro4. TRAKKER Euro-4. Medium & Heavy Commercial Vehicles B.U. Claudio Crivellaro

Product meeting October 27th - Kick-OFF meeting Euro4. TRAKKER Euro-4. Medium & Heavy Commercial Vehicles B.U. Claudio Crivellaro Product meeting October 27th - Kick-OFF meeting Euro4 TRAKKER Euro-4 B.U. Claudio Crivellaro TRAKKER Euro-4 Summary TRAKKER Euro-4 Range in brief (carry over / new content) TRAKKER Euro-4 Engines (Euro-3

More information

Case Histories Gas Lifting Gas Wells

Case Histories Gas Lifting Gas Wells Case Histories Gas Lifting Gas Wells Boots Rouen US Land Gas Lift Schlumberger Continuous Lift 2 RR A relatively low ratio of gas is injected continuously into the producing fluid column to aerate or lighten

More information

Mining and quarrying 13,503 19,062 26,170 35,190 38,511 53,515 74,386 85,792 99, ,422

Mining and quarrying 13,503 19,062 26,170 35,190 38,511 53,515 74,386 85,792 99, ,422 Table A1.1: Gross Domestic Product (GDP), at Factor Cost by kind of Economic Activity at Current Prices,Tanzania Mainland, 1992-2001 Millions of TZS Activity 1992 1993 1994 1995 1996 1997 1998 1999 2000

More information

GAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case

GAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case Overview A consensus forecast is used to estimate the prime rate charged by commercial banks. As the prime rate is subject to competitive pressures faced by individual lenders and is set on an individual

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

- you succeed! We do Welcome to. Holland OilTech Services BV.

- you succeed! We do Welcome to. Holland OilTech Services BV. DRILL BITS WELL HEAD EQUIPMENT CASING / TUBING CASING HARDWARE LINER HANGER EQUIPMENT COMPLETION EQUIPMENT NOWAX SERVICES DRILL BITS WELL HEAD EQUIPMENT CASING / TUBING CASING HARDWARE LINER HANGER EQUIPMENT

More information

Full Flow Reverse Circulation Junk Baskets. Manual B320

Full Flow Reverse Circulation Junk Baskets. Manual B320 Full Flow Reverse Circulation Junk Baskets Manual B320 CONTENTS Logan Full Flow Reverse Circulation Junk Basket Overview... 2 Uses... 2 Construction... 2 Tool Illustration... 3 Operation... 4 Recovering

More information

Casing Running Tools (CRTi2-8.63)

Casing Running Tools (CRTi2-8.63) Casing Running Tools (CRTi2-8.63 CRTi Internal Grip Casing Running Tool Volant s CRTi casing running tool is designed f casing running drilling with top drive equipped rigs to makeup, breakout, reciprocate,

More information

A 3-Year Case Study of a Residential Photovoltaic System with Microinverters

A 3-Year Case Study of a Residential Photovoltaic System with Microinverters A 3-Year Case Study of a Residential Photovoltaic System with Microinverters Clifford K. Ho Sandia National Laboratories, Albuquerque, NM Sandia National Laboratories is a multi-program laboratory managed

More information

INSTALLATION INSTRUCTIONS AND PARTS LIST MODEL , GRIP STEPS (BOARDS ONLY) UNIVERSAL APPLICATIONS

INSTALLATION INSTRUCTIONS AND PARTS LIST MODEL , GRIP STEPS (BOARDS ONLY) UNIVERSAL APPLICATIONS INSTALLATION INSTRUCTIONS AND PARTS LIST MODEL 415114, GRIP STEPS (BOARDS ONLY) UNIVERSAL APPLICATIONS 1. Read instructions completely and check to make sure that all required parts (listed on the service

More information

Streetcar Update. Review of December 2018

Streetcar Update. Review of December 2018 Streetcar Update Review of December 2018 Number of Incidents Safety Metrics: Near Miss Near Miss Incident Breakdown 19% decrease near-miss events year over year (2017 versus 2018) 66% decrease at 5 th

More information

Turbine Lubricant Varnish Removal Case Studies using SVR

Turbine Lubricant Varnish Removal Case Studies using SVR Turbine Lubricant Varnish Removal Case Studies using SVR 5/14 As of May 14 there are over 4 SVR installations on turbine lubricant reservoirs operating throughout the world. These systems have gained an

More information

Coil Tubing Intervention in MultiLateral Wells from a Semi-submersible

Coil Tubing Intervention in MultiLateral Wells from a Semi-submersible Coil Tubing Intervention in MultiLateral Wells from a Semi-submersible Ragan Stonier (Lead CE, AusBU) 5 th March 2009 Agenda Overview Where, what, why??? Preparation Rig challenges, interfaces Engineering

More information

increase of over four per cent compared to the average of $409,058 reported in January 2010.

increase of over four per cent compared to the average of $409,058 reported in January 2010. SINGLE FAMILY RESIDENTIAL BREAKDOWN uary 211 26.8 % 1.7 % 7.%.4%.1 % Good Start to 211 TORONTO - February 4, 211 Greater Toronto REALTORS reported 4,337 transactions through the TorontoMLS system in uary

More information

Generation IV Single- Trip Multizone FracPac System. Overview

Generation IV Single- Trip Multizone FracPac System. Overview Generation IV Single- Trip Multizone FracPac System Overview Ricki Jannise Principal Product Champion Multizone Sand Control 281 988 2282 or 713 702 6716 Ricki.jannise@halliburton.com What is it? Single-Trip

More information

Drillmec HH-300 spec.

Drillmec HH-300 spec. Drillmec HH-300 spec. Drillmec HH-300 Fast moving trailer mounted automatic drilling rig. Designed for cold climate and Geothermal applications and is fully capable of working in heavy winds. It is capable

More information

Climatography of the United States No

Climatography of the United States No Climate Division: CA 5 NWS Call Sign: Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) Jan 45.9 26.0 36.0 67

More information

Florida Courts E-Filing Authority Board. Service Desk Report December 2018

Florida Courts E-Filing Authority Board. Service Desk Report December 2018 Florida Courts E-Filing Authority Board Service Desk Report December 218 Customer Service Incidents December 218 Status October 218 November 218 December 218 Incidents Received 3,779 2,632 2,376 Incidents

More information

Industry Overview. Powersports Market Update

Industry Overview. Powersports Market Update 2017 Q1 Industry Overview Powersports Market Update Sport side-by-sides continue to lead led the powersports industry, with that segment s pricing once again averaging higher than any of the previous three

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information