1

2

3

4

5

6

7

8

9

10

11

12

13

14

15 APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD , , RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00 PLANNED DOW (days) DFS (days) DATE REPT NO WB KO DATE WELL SPUD DATE RIG RELEASE SUPERVISOR ENGINEER PBTMD : :00 DAVID RICHEY / DWAYNE REYNOLDS DUSTIN PETRAITIS DOL 3.63 (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,680.0 AFE COSTS DHC: 2,539,800 2,539,800 DAILY COSTS DHC: 62,539 DHC: 3,042,273 DCC: DCC: DCC: 62,539 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 0//204 MIDDLE WOLFCAMP CUMULATIVE COSTS 3,042,273 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST CASING NEXT CASING MD 4,44.0 INC AZM ,028.0 ft ,996.0 ft CURRENT OPERATIONS: DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) 00% SHALE MUD WEIGHT.6 24 HR SUMMARY: DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) F/ 3,570 T/ % SHALE 24 HR FORECAST: CONTINUE DRILLING PRODUCTION SECTION. OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 6: P-DRL DRLG PP DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 3,570' TO 4,98', = 208 ', AVERAGE ROP 34.8 HR, 20/25 WOB, 4 SPM, 476 GPM, 3,550 OFF BOTTOM 3,800ON BOTTOM SPP, 3K TORQUE ON BOTTOM, 6 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 250,000K, SLACK OFF WEIGHT 80,000K, ROTATING WEIGHT 205,000K, MOTOR RPM = 33, TOP DRIVE RPM 60, TOTAL BIT RPM = 93 SURVEY 4034' INC 88.32, AZM 78.8, 00% SHALE 0% LIME. 6:00 2: P-DRL DRLG PP DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 4,98' TO 4,347', = 49 ', AVERAGE ROP 24.8 HR, 5/30 WOB, 0 SPM, 462 GPM, 3,250 OFF BOTTOM 3,650 ON BOTTOM SPP, 2K TORQUE ON BOTTOM, 6 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 275,000K, SLACK OFF WEIGHT 65,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 29, TOP DRIVE RPM 60, TOTAL BIT RPM = 89 SURVEY 444' INC 86.20, AZM 74.96, 95% SHALE 5% LIME. 2:00 2: P-DRL RIGSER PP SERVICE TOP DRIVE, DRAW WORKS, ST-80 2:30 8: P-DRL DRLG PP DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 4,347' TO 4,445', = 98', AVERAGE ROP 7.8 HR, 5/30 WOB, 0 SPM, 462 GPM, 3,250 OFF BOTTOM 3,650 ON BOTTOM SPP, 2K TORQUE ON BOTTOM, 6 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 275,000K, SLACK OFF WEIGHT 65,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 29, TOP DRIVE RPM 60, TOTAL BIT RPM = 89 SURVEY 439' INC 84.30, AZM 76.95, 00% SHALE 0% LIME. 8:00 0: P-DRL DRLG PP DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 4,455' TO 4,528', = 83', AVERAGE ROP 3.8 HR, 5/30 WOB, 0 SPM, 462 GPM, 3,520 OFF BOTTOM 3930 ON BOTTOM, 6 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 280,000K, SLACK OFF WEIGHT 65,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 29, TOP DRIVE RPM 60, TOTAL BIT RPM = 89 SURVEY 444' INC 86.20, AZM 74.96, 00% SHALE 0% LIME = Total Hours Today Printed: 0/2/204 6:25:52AM

16 APACHE CORPORATION Page 2 of 3 Daily Drilling Report WELLBORE NAME DATE UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD REPT NO , , :00 UPDATE :00-0:30 = DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 4,528' TO 4,559', = 3', AVERAGE ROP 20.6 HR, 5/30 WOB, 0 SPM, 462 GPM, 3,250 OFF BOTTOM 3,650 ON BOTTOM SPP, 2K TORQUE ON BOTTOM, 6 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 275,000K, SLACK OFF WEIGHT 65,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 29, TOP DRIVE RPM 60, TOTAL BIT RPM = 89, 00% SHALE 0% LIME. 0:30-02:00 = SERVICE TOP DRIVE REPAIR HOSE ON THE BREAKS. 02:00-06:00 = DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 4,559' TO 4,60', = 5', AVERAGE ROP 2.7 HR, 5/30 WOB, 0 SPM, 462 GPM, 3,250 OFF BOTTOM 3,650 ON BOTTOM SPP, 2K TORQUE ON BOTTOM, 6 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 275,000K, SLACK OFF WEIGHT 65,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 29, TOP DRIVE RPM 60, TOTAL BIT RPM = 89, 00% SHALE 0% LIME. SURVEY 4,508 INC 87.0 AZM BIT DATA BIT / RUN BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Halliburton MM65D JETS OR TFA DEPTH IN / DATE IN 3, / I-O-D-L-B-G-O-R BIT OPERATIONS BIT / RUN WOB RPM FLOW RATE PRESS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG CUM ROP /40.0 / MOTOR OUTPUT RPV: 0.28rev/gal ROTARY CURRENT: 60 TOTAL RPM: 94 Company: VIS (s/qt ) HoRIZON PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) MUD PROPERTIES OIL/WAT (% ) LCM: 0.0 % SAND/MBT (% )/(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: OIL-BASE MUD /5 6/44 6.0/ / Density (ppg ).60 ECD (ppg ) 2.6 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA 8 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH Cl Ca H2S KCL LGS (% ) (kip) (kip) 55.0 (kip) 20.0 (kip) (ft-lbf), COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Agitator AGITATOR ASSEMBLY /2 IF 5 STANDS 5'' DRILL PIPE, /2 IF Crossover Sub 4 /2 IF BOX x 4 /2 XH PIN /2 IF Non-Mag Flex Drill Collar FLEX MONEL /2 XH Orienting Sub MWD PULSAR SUB /2 XH Non-Mag Drill Collar MWD MONEL /2 XH Undergauge Integral Blade Stabilizer 8 /4'' NORTRAC STABILIZER /2 XH Fixed Bend Housing 6 /2'' MUD MOTOR.83 FIXED /2 XH PDC Bit 8 /2'' HALLIBURTON MM65D /2" REG Printed: 0/2/204 6:25:52AM

17 APACHE CORPORATION Daily Drilling Report Page 3 of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD , , Company: TYPE APACHE MD DEG ( ) AZI ( ) SURVEY TVD +N/-S +E/-W V.SECT DATE REPT NO NORMAL 4, ,66.6-5, , NORMAL 4, , , , NORMAL 4, , , , NORMAL 4, , , , NORMAL 4, , , , CASING D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # # 2 00 SURFACE H INTERMEDIATE HC L-80 8,028.0 STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: 3930 (psi) (hp/in²) SPR SPM PPSR PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS HORIZON MUD SDS GEOSITE ENERGY OILFIELD SERVICES SCIENTIFIC DRILLING NABORS DRILLING ITEM UNITS USAGE ON HAND DIESEL, RIG FUEL gal MATERIALS/CONSUMPTION SAFETY DRILLS TOTAL PERSONNEL ON BOARD: 24 TOTAL HOURS ON BOARD: 300 ITEM UNITS USAGE ON HAND BRINE bbl 4380 RAMS (psi) ANNULARS (psi) CASING LAST BOP FUNCTION LAST BOP PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. HELD A SAFETY MEETING WITH CREW ABOUT FIRST DAY BACK. THE TOOL PUSHER AND DAY CO-MAN CHANGED OUT. Printed: 0/2/204 6:25:52AM

18 APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD , , RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00 PLANNED DOW (days) DFS (days) DATE REPT NO WB KO DATE WELL SPUD DATE RIG RELEASE SUPERVISOR ENGINEER PBTMD : :00 BRIAN GRAY / DWAYNE REYNOLDS DUSTIN PETRAITIS DOL (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,680.0 AFE COSTS DHC: 2,539,800 2,539,800 DAILY COSTS DHC: 65,357 DHC: 3,07,630 DCC: DCC: DCC: 65,357 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 0/2/204 MIDDLE WOLFCAMP CUMULATIVE COSTS 3,07,630 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST CASING NEXT CASING MD 5,078.0 INC AZM ,028.0 ft ,996.0 ft CURRENT OPERATIONS: DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) 00% SHALE, SURVEY 5,268 INC AZM HR SUMMARY: DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) F/ 4,528 - T/ 5,209 IN 00% SHALE 24 HR FORECAST: DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) F /5,209 - T/ 5,996 OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 :30.50 P-DRL DRLG PP DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 4,528' TO 4,559', = 3', AVERAGE ROP 20.6 HR, 5/30 WOB, 0 SPM, 462 GPM, 3,250 OFF BOTTOM 3,650 ON BOTTOM SPP, 2K TORQUE ON BOTTOM, 6 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 275,000K, SLACK OFF WEIGHT 65,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 29, TOP DRIVE RPM 60, TOTAL BIT RPM = 89, 00% SHALE 0% LIME. :30 2: P-DRL RIGSER PP 0:30-02:00 = SERVICE TOP DRIVE REPAIR HOSE ON THE BREAKS. 2:00 6: P-DRL DRLG PP DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 4,559' TO 4,60', = 5', AVERAGE ROP 2.7 HR, 5/30 WOB, 0 SPM, 462 GPM, 3,250 OFF BOTTOM 3,650 ON BOTTOM SPP, 2K TORQUE ON BOTTOM, 6 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 275,000K, SLACK OFF WEIGHT 65,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 29, TOP DRIVE RPM 60, TOTAL BIT RPM = 89, 00% SHALE 0% LIME. SURVEY 4,508 INC 87.0 AZM :00 2: P-DRL DRLG PP DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 4,60' TO 4,84', = 23', AVERAGE ROP 38.5 HR, 5/30 WOB, 4 SPM, 479 GPM, 3,530 OFF BOTTOM 3,732 ON BOTTOM SPP, 2K TORQUE ON BOTTOM, 6 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 275,000K, SLACK OFF WEIGHT 65,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 34, TOP DRIVE RPM 60, TOTAL BIT RPM = 94, 00% SHALE 0% LIME. SURVEY 4,698 INC AZM :00 5: P-DRL DRLG PP DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 4,84' TO 4,948', = 07', AVERAGE ROP 35.6 HR, 5/30 WOB, 4 SPM, 479 GPM, 3,530 OFF BOTTOM 3,732 ON BOTTOM SPP, 2K TORQUE ON BOTTOM, 6 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 275,000K, SLACK OFF WEIGHT 65,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 34, TOP DRIVE RPM 60, TOTAL BIT RPM = 94, 00% SHALE 0% LIME. SURVEY 4,888 INC AZM :00 5: P-DRL RIGSER PP SERVICE TOP DRIVE, DRAW WORKS AND ST-80 5:30 8: P-DRL DRLG PP DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 4,948' TO 5,036', = 88', AVERAGE ROP 35.2 HR, 5/30 WOB, 4 SPM, 479 GPM, 3,530 OFF BOTTOM 3,732 ON BOTTOM SPP, 5K TORQUE ON BOTTOM, 6 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 275,000K, SLACK OFF WEIGHT 65,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 34, TOP DRIVE RPM 60, TOTAL BIT RPM = 94, 00% SHALE 0% LIME. SURVEY 4,983 INC AZM Printed: 0/3/204 9:3:40AM

19 APACHE CORPORATION Page 2 of 3 Daily Drilling Report WELLBORE NAME DATE UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD REPT NO , , OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 8:00 0: P-DRL DRLG PP DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 5,036' TO 5,209', = 73', AVERAGE ROP 28.8 HR, 5/30 WOB, 4 SPM, 479 GPM, 3,600 OFF BOTTOM 4,060 ON BOTTOM SPP, 5K TORQUE ON BOTTOM, 7 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 285,000K, SLACK OFF WEIGHT 70,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 34, TOP DRIVE RPM 60, TOTAL BIT RPM = 94, 00% SHALE 0% LIME. SURVEY 5,078 INC AZM = Total Hours Today 06:00 UPDATE :00-06:00 = DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 5209,' TO 5,384', = 75', AVERAGE ROP 29. HR, 5/30 WOB, 4 SPM, 479 GPM, 3,600 OFF BOTTOM 4,060 ON BOTTOM SPP, 5K TORQUE ON BOTTOM, 7 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 285,000K, SLACK OFF WEIGHT 70,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 34, TOP DRIVE RPM 60, TOTAL BIT RPM = 94, 00% SHALE 0% LIME. SURVEY 5,268 INC AZM BIT DATA BIT / RUN BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Halliburton MM65D JETS OR TFA 6x20 DEPTH IN / DATE IN 3, / I-O-D-L-B-G-O-R BIT OPERATIONS BIT / RUN WOB RPM FLOW RATE PRESS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG CUM ROP /40.0 / , MOTOR OUTPUT RPV: 0.28rev/gal ROTARY CURRENT: 60 TOTAL RPM: 27 Company: VIS (s/qt ) HoRIZON PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) MUD PROPERTIES OIL/WAT (% ) LCM: % SAND/MBT (% )/(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: OIL-BASE MUD /4 5/40 / / / Density (ppg ).60 ECD (ppg ) 2.09 PP DAILY COST 0 CUM COST 0 %OIL % H2O 2.00 BHA 8 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT 8 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH Cl Ca H2S KCL LGS (% ) (kip) (kip) 70.0 (kip) 20.0 (kip) (ft-lbf), COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Agitator AGITATOR ASSEMBLY /2 IF 5 STANDS 5'' DRILL PIPE, /2 IF Crossover Sub 4 /2 IF BOX x 4 /2 XH PIN /2 IF Non-Mag Flex Drill Collar FLEX MONEL /2 XH Orienting Sub MWD PULSAR SUB /2 XH Non-Mag Drill Collar MWD MONEL /2 XH Undergauge Integral Blade Stabilizer 8 /4'' NORTRAC STABILIZER /2 XH Fixed Bend Housing 6 /2'' MUD MOTOR.83 FIXED /2 XH PDC Bit 8 /2'' HALLIBURTON MM65D /2" REG Printed: 0/3/204 9:3:40AM

20 APACHE CORPORATION Daily Drilling Report Page 3 of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD , , Company: TYPE APACHE MD DEG ( ) AZI ( ) SURVEY TVD +N/-S +E/-W V.SECT DATE REPT NO NORMAL 5, , , , NORMAL 4, , , , NORMAL 4, , , , NORMAL 4, , , , NORMAL 4, , , , NORMAL 4, , , , NORMAL 4, , , , CASING D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # # 2 00 SURFACE H INTERMEDIATE HC L-80 8, PRODUCTION P-0 5,999.0 STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: 4060 (psi) (hp/in²) SPR SPM PPSR PUMPS # 30/40/50 825/960/,5 PUMPS # 2 50/40/30,095/940/790 PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS HORIZON MUD SDS GEOSITE ENERGY OILFIELD SERVICES SCIENTIFIC DRILLING NABORS DRILLING ITEM UNITS USAGE ON HAND DIESEL, RIG FUEL gal MATERIALS/CONSUMPTION SAFETY DRILLS TOTAL PERSONNEL ON BOARD: 24 TOTAL HOURS ON BOARD: 300 ITEM UNITS USAGE ON HAND DIESEL, MUD gal RAMS (psi) ANNULARS (psi) CASING LAST BOP FUNCTION LAST BOP PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. SAFETY MEETING ON WORKING AROUND THIRD PARTIES. Printed: 0/3/204 9:3:40AM

21 APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD , , RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00 PLANNED DOW (days) DFS (days) DATE REPT NO WB KO DATE WELL SPUD DATE RIG RELEASE SUPERVISOR ENGINEER PBTMD : :00 BRIAN GRAY / DWAYNE REYNOLDS DUSTIN PETRAITIS DOL (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,680.0 AFE COSTS DHC: 2,539,800 2,539,800 DAILY COSTS DHC: 90,38 DHC: 3,98,0 DCC: DCC: DCC: 90,38 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 0/3/204 MIDDLE WOLFCAMP CUMULATIVE COSTS 3,98,0 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST CASING NEXT CASING MD 5,946.0 INC AZM ,028.0 ft ,996.0 ft CURRENT OPERATIONS: PULLING OUT OF THE HOLE RACKING STANDS BACK IN THE DERRICK TILL STRING IS FREE TO START LAYING DOWN DRILL PIPE. 24 HR SUMMARY: DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 5209,' TO 5,999', TD WELL AT 5,999, CIRCULATE TO CLEAN HOLE TO RUN 5.5 CASING. 24 HR FORECAST: LAY DOWN DRILL PIPE AND RIG UP TO RUN 5.5 CASING. OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 2: P-DRL DRLG PP DRILL LATERAL HOLE SECTION (SLIDE/ROTATE) FROM 5209,' TO 5,999', = 790', AVERAGE ROP 37.6 HR, 5/30 WOB, 0 SPM, 462 GPM, 3,450 OFF BOTTOM 3,950 ON BOTTOM SPP, 5K TORQUE ON BOTTOM, 7 K TORQUE OFF BOTTOM, DIFFERENTIAL PRESSURE , PICK UP WEIGHT 280,000K, SLACK OFF WEIGHT 40,000K, ROTATING WEIGHT 20,000K, MOTOR RPM = 29, TOP DRIVE RPM 60, TOTAL BIT RPM = 89, 00% SHALE 0% LIME. SURVEY 5,946 INC AZM :00 2: P-DRL M_TDFin PP TD WELL AT 5,999. 2:00 0: P-DRL CIRCT PP CIRCULATING AND CONDUCTION HOLE WITH 7 BOTTOMS UP TO RUN 5.5 CASING. CIRCULATING WITH 462 GPM, 60 RPM. CONSTANT MOVEMENT OF THE DRILL STRING = Total Hours Today 06:00 UPDATE :00-05:30 = CONTINUE TO CIRCULATE TO CLEAN THE HOLE TO RUN 5.5 CASING WIT 462 GPM AT 0 SPM, 60 RPM, ICP/TOURQ /0,000 FCP/ TOURQ - 3,400/8, :30-06:00 = PULLING OUT OF THE HOLE FROM 5,999' RACKING BACK IN THE DERRICK TILL THE HOLE IS FREE TO START LAYING DOWN DRILL PIPE. BIT DATA BIT / RUN BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Halliburton MM65D JETS OR TFA 6x20 DEPTH IN / DATE IN 3, / I-O-D-L-B-G-O-R BIT OPERATIONS BIT / RUN WOB RPM FLOW RATE PRESS P BIT HRS 24 Hr PROG 24 HR ROP CUM HRS CUM PROG CUM ROP /30.0 / , MOTOR OUTPUT RPV: 0.28rev/gal ROTARY CURRENT: 60 TOTAL RPM: 89 Printed: 0/4/204 5:32:24AM

22 APACHE CORPORATION Daily Drilling Report Page 2 of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD , , Company: VIS (s/qt ) HoRIZON PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) MUD PROPERTIES OIL/WAT (% ) LCM: 0.0 % SAND/MBT (% )/(lbm/bbl ) ph/pm Pf/Mf (cc ) MUD TYPE: OIL-BASE MUD Cl Ca DATE H2S REPT NO /5 4/37 / / Density (ppg ).60 ECD (ppg ) 2.09 PP DAILY COST 0 CUM COST 0 %OIL % H2O 6.00 BHA 8 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT 8 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH KCL LGS (% ) (kip) (kip) 40.0 (kip) 20.0 (kip) (ft-lbf), COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Agitator AGITATOR ASSEMBLY /2 IF 5 STANDS 5'' DRILL PIPE, /2 IF Crossover Sub 4 /2 IF BOX x 4 /2 XH PIN /2 IF Non-Mag Flex Drill Collar FLEX MONEL /2 XH Orienting Sub MWD PULSAR SUB /2 XH Non-Mag Drill Collar MWD MONEL /2 XH Undergauge Integral Blade Stabilizer 8 /4'' NORTRAC STABILIZER /2 XH Fixed Bend Housing 6 /2'' MUD MOTOR.83 FIXED /2 XH PDC Bit 8 /2'' HALLIBURTON MM65D /2" REG Company: APACHE SURVEY TYPE MD DEG ( ) AZI ( ) TVD NORMAL 5, , , , NORMAL 5, , , , NORMAL 5, , , , NORMAL 5, , , , NORMAL 5, , , , NORMAL 5, , , , NORMAL 5, , , , NORMAL 5, , , , NORMAL 5, , , , CASING +N/-S +E/-W V.SECT D.L ( /00ft) S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH # # 2 00 SURFACE H INTERMEDIATE HC L-80 8, PRODUCTION P-0 5,999.0 STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: 3950 (psi) 0.36 (hp/in²) SPR SPM PPSR PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS HORIZON MUD GEOSITE SDS ENERGY OILFIELD SERVICES SCIENTIFIC DRILLING NABORS DRILLING TOTAL PERSONNEL ON BOARD: 24 TOTAL HOURS ON BOARD: 300 Printed: 0/4/204 5:32:24AM

23 APACHE CORPORATION Daily Drilling Report Page 3 of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD , , ITEM UNITS USAGE ON HAND DIESEL, RIG FUEL gal MATERIALS/CONSUMPTION SAFETY DRILLS DATE REPT NO ITEM UNITS USAGE ON HAND DIESEL, MUD gal RAMS (psi) ANNULARS (psi) CASING LAST BOP FUNCTION LAST BOP PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 0/4/204 5:32:24AM

24 APACHE CORPORATION Daily Drilling Report Page of 2 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD , , RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00 PLANNED DOW (days) DFS (days) DATE REPT NO WB KO DATE WELL SPUD DATE RIG RELEASE SUPERVISOR ENGINEER PBTMD : :00 BRIAN GRAY / DWAYNE REYNOLDS DUSTIN PETRAITIS DOL (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,680.0 AFE COSTS DHC: 2,539,800 2,539,800 DAILY COSTS DHC: 57,08 DHC: 3,255,9 DCC: DCC: DCC: 57,08 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 0/4/204 MIDDLE WOLFCAMP CUMULATIVE COSTS 3,255,9 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST CASING NEXT CASING MD 5,946.0 INC AZM ,028.0 ft ,996.0 ft CURRENT OPERATIONS: LAYING DOWN DIRECTIONAL TOOLS 24 HR SUMMARY: LAY DOWN DRILL PIPE, DIRECTIONAL TOOLS, 24 HR FORECAST: RUN 5.5 PRODUCTION CASING. OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 5: P-DRL CIRCT PP CIRCULATING AND CONDUCTION HOLE WITH 7 BOTTOMS UP TO RUN 5.5 CASING. CIRCULATING WITH 462 GPM, 60 RPM. CONSTANT MOVEMENT OF THE DRILL STRING. 5:30 0: P-DRL PU_LD PP PULL 5 STANDS RACK IN DERRICK F/ 5999' T/ 4698', LAY DOWN DRILL PIPE. F/ 4,698' T/,70' = Total Hours Today 06:00 UPDATE :00-00:30 = RUN IN THE HOLE WITH THE STANDS FROM DERRICK F/,637 T/ 2, :30-04:00 = CONTINUE TO LAY DOWN DRILL PIPE F/ 2,900 T/05' 04:00-06:00 = LAY DOWN DIRECTIONAL TOOLS. BIT DATA BIT / RUN BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Halliburton MM65D JETS OR TFA 6x20 DEPTH IN / DATE IN 3, / I-O-D-L-B-G-O-R MOTOR OUTPUT RPV: 0.28rev/gal Company: HoRIZON ROTARY CURRENT: MUD PROPERTIES LCM: TOTAL RPM: MUD TYPE: OIL-BASE MUD VIS (s/qt ) PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) OIL/WAT (% ) % SAND/MBT (% )/(lbm/bbl ) /5 4/ / Density (ppg ).60 PP DAILY COST 0 CUM COST 0 %OIL % H2O BHA 8 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT 8 BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH ph/pm Pf/Mf (cc ) Cl Ca H2S KCL LGS (% ) (kip) (kip) (kip) (kip) (ft-lbf), Printed: 0/5/204 4::33AM

25 APACHE CORPORATION Daily Drilling Report Page 2 of 2 WELLBORE NAME DATE UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD REPT NO , , COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Agitator AGITATOR ASSEMBLY /2 IF 5 STANDS 5'' DRILL PIPE, /2 IF Crossover Sub 4 /2 IF BOX x 4 /2 XH PIN /2 IF Non-Mag Flex Drill Collar FLEX MONEL /2 XH Orienting Sub MWD PULSAR SUB /2 XH Non-Mag Drill Collar MWD MONEL /2 XH Undergauge Integral Blade Stabilizer 8 /4'' NORTRAC STABILIZER /2 XH Fixed Bend Housing 6 /2'' MUD MOTOR.83 FIXED /2 XH PDC Bit 8 /2'' HALLIBURTON MM65D /2" REG CASING S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH 00 SURFACE H INTERMEDIATE HC L-80 8,028.0 STROKE SPM MUD PUMPS/HYDRAULICS LINER FLOW RATE SPP: AV(DP): AV(DC): HP: PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS HORIZON MUD SDS GEOSITE ENERGY OILFIELD SERVICES SCIENTIFIC DRILLING NABORS DRILLING MATERIALS/CONSUMPTION SPR SPM PPSR TOTAL PERSONNEL ON BOARD: 24 TOTAL HOURS ON BOARD: 300 ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND DIESEL, RIG FUEL gal SAFETY DRILLS RAMS (psi) ANNULARS (psi) CASING LAST BOP FUNCTION LAST BOP PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. Printed: 0/5/204 4::33AM

26 APACHE CORPORATION Daily Drilling Report Page of 2 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD , , RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00 PLANNED DOW (days) DFS (days) DATE REPT NO WB KO DATE WELL SPUD DATE RIG RELEASE SUPERVISOR ENGINEER PBTMD : :00 BRIAN GRAY / DWAYNE REYNOLDS DUSTIN PETRAITIS DOL (days) REGION DISTRICT STATE / PROV COUNTY / PARISH RIG PHONE NO RIG FAX NO PERMIAN SW DISTRICT - TX CZ TEXAS REAGAN AFE # DH DESCRIPTION: DEFAULT DATUM / ELEVATION RKB/RT / 2,680.0 AFE COSTS DHC: 2,539,800 2,539,800 DAILY COSTS DHC: 7,706 DHC: 3,326,825 DCC: DCC: DCC: 7,706 LAST SAFETY MEETING BLOCK OCSG# TARGET FORMATION 0/5/204 MIDDLE WOLFCAMP CUMULATIVE COSTS 3,326,825 BHA HRS OF SERVICE LAST SURVEY LAST CSG SHOE TEST (EMW) LAST CASING NEXT CASING MD 5,946.0 INC AZM ,028.0 ft ,996.0 ft CURRENT OPERATIONS: SEE LCM 24 HR SUMMARY: LDDP, LD BHA, RIG CASING CREW 24 HR FORECAST: RUN CASING OPERATION SUMMARY From To HRS Op Phase Op Code PT/NPT NPT CODES ACTIVITY SUMMARY 0:00 0: P-DRL TRIP PP RUN IN THE HOLE WITH THE STANDS FROM DERRICK F/,637 T/ 2,900. 0:30 4: P-DRL PU_LD PP CONTINUE TO LAY DOWN DRILL PIPE F/ 2,900 T/05' 4:00 6: P-DRL PU_LD PP LAY DOWN DIRECTIONAL TOOLS. 6:30 7:30.00 P-DRL RIGSER PP SERVICE RIG CLEAN RIG FLOOR TO RUN CASING. 7:30 8: P-DRL SFTY PP HOLD A SAFETY MEETING WITH ALL PERSONEL ON SITE ON RUNNING 5.5 PRODUCTION CASING. 8:00 2: P-DRL RU_RD PP RIG DOWN BAILS EVEVATORS, RIG UP CASING CREW EQUIPMENT BAILS ELEVATORS, TONGS SPOT ALL CENTRALIZER'S = Total Hours Today BIT DATA BIT / RUN BIT SIZE (in) MANUFACTURER TYPE SERIAL NO Halliburton MM65D JETS OR TFA 6x20 DEPTH IN / DATE IN 3, / I-O-D-L-B-G-O-R -2-CT-S- --CT-TD MOTOR OUTPUT RPV: 0.28rev/gal Company: HoRIZON ROTARY CURRENT: MUD PROPERTIES LCM: TOTAL RPM: MUD TYPE: OIL-BASE MUD VIS (s/qt ) PV/YP (cp ) / (lbf/00ft² ) GELS (lbf/00ft² ) WL/HTHP (cc/30min ) FC/T.SOL (32nd" ) / (% ) OIL/WAT (% ) % SAND/MBT (% )/(lbm/bbl ) /6 5/33 / / Density (ppg ).60 PP DAILY COST 0 CUM COST 0 %OIL % H2O 6.00 BHA 8 JAR S/N BHA / HOLE CONDITIONS JAR HRS BIT BHA WT BELOW JARS STRING WT UP STRING WT DN STRING WT ROT TORQUE/UNITS BHA LENGTH ph/pm Pf/Mf (cc ) Cl Ca H2S KCL LGS (% ) (kip) (kip) (kip) (kip) (ft-lbf), Printed: 0/6/204 6:26:49AM

27 APACHE CORPORATION Daily Drilling Report Page 2 of 2 WELLBORE NAME DATE UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD REPT NO , , COMPONENT TYPE ITEM DESCRIPTION NO JTS LENGTH O.D I.D CONN SIZE CONN TYPE Agitator AGITATOR ASSEMBLY /2 IF 5 STANDS 5'' DRILL PIPE, /2 IF Crossover Sub 4 /2 IF BOX x 4 /2 XH PIN /2 IF Non-Mag Flex Drill Collar FLEX MONEL /2 XH Orienting Sub MWD PULSAR SUB /2 XH Non-Mag Drill Collar MWD MONEL /2 XH Undergauge Integral Blade Stabilizer 8 /4'' NORTRAC STABILIZER /2 XH Fixed Bend Housing 6 /2'' MUD MOTOR.83 FIXED /2 XH PDC Bit 8 /2'' HALLIBURTON MM65D /2" REG CASING S/T DESCRIPTION SIZE WEIGHT GRADE SETTING DEPTH 00 SURFACE H INTERMEDIATE HC L-80 8, PRODUCTION P-0 5,999.0 PERSONNEL DATA COMPANY QTY HRS COMPANY QTY HRS HORIZON MUD SDS GEOSITE ENERGY OILFIELD SERVICES SCIENTIFIC DRILLING EXPRESS ENERGY SERVICES, LLC TEAM OIL TOOL NABORS DRILLING TOTAL PERSONNEL ON BOARD: 40 TOTAL HOURS ON BOARD: 384 SAFETY DRILLS RAMS (psi) ANNULARS (psi) CASING LAST BOP FUNCTION LAST BOP PRESSURE TEST NEXT BOP PRESS TEST FIRE DRILL H2S DRILL ABND. DRILL / / INCIDENT REPORT INCIDENTS TYPE LOST TIME? NO INCIDENTS DESCRIPTION No incidents reported in last 24 hours. HAD A MEETING WITH ALL PERSONEL ON RIG SITE FOR THE UP COMING CASING JOB. Printed: 0/6/204 6:26:49AM

Page of 4238338775 00 0.0 08.0 08.0 3 RIG PIONEER 29 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,587.00 PLANNED DOW 22.00 (days) DFS 0.00 (days) 09-2-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB

More information

Daily Drilling Report

Daily Drilling Report Page of 4238338873 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -24-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB JAMES

More information

Daily Drilling Report

Daily Drilling Report Page of 2 78662 00 24.0 24.0 RIG PATTERSON 30 FIELD NAME SPRABERRY (TREND AREA) AUTH 5,605.00 PLANNED DOW 2.40 (days) DFS 0.00 (days) -0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB DAVID GRAHAM

More information

Daily Drilling Report

Daily Drilling Report Page of 3 4238338757 00 48.0 520.0 59.9 6 RIG PIONEER 56 FIELD NAME SPRAYBERRY AUTH 6,400.00 PLANNED DOW (days) DFS 0.00 (days) 0-0-204 WB KO WELL SPUD RIG RELEASE SUPERVISOR ENGINEER PB 0-0-204 2:00 0-0-204

More information

Daily Drilling Report

Daily Drilling Report Page of UNIVERSITY 4 TAYLOR DRAW 30HU 424639065 00 0.0 08.0 08.0 2 RIG PATTERSON 73 FIELD NAME SPRABERRY (TREND AREA) AUTH 3,820.00 PLANNED DOW 8.00 (days) DFS 0.00 (days) 09-08-204 WB KO WELL SPUD RIG

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017 Report /25/27 Company Type bore WBS No/API No PERMIAN Development 325794 / 4233324 Event Summary Event Type Drilling only Event Start Date /5/27 Days on Location. Objective Drill - Wolfcamp B Shale Original

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By: UL G 9-46 Unit 2H END OF WELL REPORT END OF WELL REPORT UL G 9-46 Unit 2H ANDREWS COUNTY, TX Trinidad 121 May 11, 2017 Report Prepared By: Tom Schmidt Operations Coordinator Nephi Smith Well Planner of

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

CUSTOMER WELL NAME COUNTY, STATE

CUSTOMER WELL NAME COUNTY, STATE DRILLING SYSTEMS PROPOSAL FOR CUSTOMER WELL NAME COUNTY, STATE Presented By: Joe Lyons VP Sales / Business Development Mike Grupa Sr. Directional Coordinator Table of Contents 1 Company Profile 2 Proposed

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code: Report No: 1 Report Date: 6/5/2015 Surface Location: 1980 FNL, 1757 FWL - WARD, TX Report No: 1 Rpt T. Activity: 01 - Rig Up & Tear Down AFE #: PBE1510032 Operation Desc: RIGGING DOWN. RIG IN TRANSPORT.

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: DAILY OERATIONS ARTNER 3 HOUR REORT Event: DEV COMLETION VAQUERO UL 3221 56215 rim. Reason: CASED HOLE Report No: 24 Wellbore Top MD: Today's MD: rev MD: BMD: Current Formation Current s: 24-Hr Summary:

More information

DAILY OPERATIONS REPORT Date:

DAILY OPERATIONS REPORT Date: OXY USA WTP LP DAILY OPERATIONS REPORT Event: EXPL DRILLING DRONE BEE 0001 Date: 01/26/2010 Prim. Reason: ORIG DRILL VERT USA Report No: 1 Wellbore / Top MD: Today's MD: Prev MD: PBMD: Current Formation:

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date: 03202015 Report No: 5 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 1576 ft Progress: 1576 ft Rot Today: Avg ROP Today: RUSTLER@

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

DAILY DRILLING REPORT DATE : 04/20/2011

DAILY DRILLING REPORT DATE : 04/20/2011 DAILY DRILLIG REPORT DATE : 04/20/2011 WELL: UIVERSITY 46-24 1H FIELD: SOUTH MIDLAD MD : 0 TVD : 0 DOL: 1 DSS: STATE: TX CROCKETT PROGRESS : FOREMA: HARVEY FRACIS REGI MID-CO REGIO HRS DRLG: AFE #: 110DC114539

More information

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SEM Operating Company, LLC Well ID: 42-235-35002 Well

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Upper Connector Megaton Impact Tools optimize your drilling operations. Drive Mandrel Female Spline Bearing Female Spline New-Generation Drilling Tools Megaton Drilling Jar Frees the

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

RENTAL TOOL SERVICES. Megaton Impact Tools

RENTAL TOOL SERVICES. Megaton Impact Tools Megaton Impact Tools Megaton Impact Tools optimize your drilling operations. Megaton Impact Tools Ulti-Torq high-torque, double shoulder connections Involute spline design High-strength steel developed

More information

Rotary Snubbing Technology Option for Long Reach

Rotary Snubbing Technology Option for Long Reach Rotary Snubbing Technology Option for Long Reach Horizontal Completions Presentation Overview Completion Program & Well Data Case History Underbalanced Rotary Equipment Technology Accomplishments Results

More information

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Spud meeting with Periscope Connect electric lines, r/u v-door install shak Daily Activity Information From To Hrs. 0600 1400 8.0 Continued rigging up derrick,work on pumps Prepare to raise sub mast. s/m raise subs a 1400 1500 1.0 Spud meeting with Periscope 1500 1800 3.0 Connect

More information

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

1042 FNL, 1935 FEL - ECTOR, TX

1042 FNL, 1935 FEL - ECTOR, TX Drilling Report Report No: 1 Report 7/1/211 : EPSAU 826 Surface Location: 142 FNL, 1935 FEL - ECTOR, TX Report No: 1 Rpt T. Activity: 6 - Trips Operation Spud Date: 6/3/211 API Code: 42135418 AFE DHC:

More information

Ashmin HammR Drill Motor

Ashmin HammR Drill Motor Ashmin HammR Drill Motor By: Dr. Gunther (Doc) Tuesday, September 12 th, 2017 Research. Innovate. Test. Deploy. Agenda Drilling Challenges Alternative Designs Drilling Hammer Trends Ashmin HammR Drill

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #:

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #: MIDLAND OPERATIONS CENTER OFFICE: (432) 538-3195 P.O Box 8587 MIDLAND, TX 79708 Rail Road Commission of Texas Oil and Gas Division P.O. Box 12967 Capitol Station Austin, TX 78711 December 20, 2016 Attention:

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

AADE 01-NC-HO-54. Abstract

AADE 01-NC-HO-54. Abstract AADE 01-NC-HO-54 High Performance/High Temperature Water Based Fluid Drills Wilcox Test Rene St. Pierre, Belco Energy Corp Dennis Welch, Newpark Drilling Fluids, LLC Copyright 2001 AADE National Drilling

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

Latest Advancements in DrillString Mechanics

Latest Advancements in DrillString Mechanics Services, Trainings, Softwares Latest Advancements in DrillString Mechanics SPE Gulf Coast Section 03/09/2016 Stephane Menand, Ph.D. stephane.menand@drillscan.com 1 DrillScan Intro Directional Drilling

More information

Gyrodata Incorporated

Gyrodata Incorporated Gyrodata is an independent supplier and service provider delivering precision wellbore placement and evaluation solutions for drilling, completions and production challenges. Since 1980, we have been partnering

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending UNIVERSITY -4 22 AI/UWI 42-00-4652-0000 ield Name SRABERRY (TREND AREA) Spud 12/12/2014 Ground Elevation (ft) 2,952.00 roperty Sub 9268-022 TD 1/12/2015 KB Elevation (ft) 2,98.00 Drilling & Completion

More information

Gyrodata Incorporated

Gyrodata Incorporated Gyrodata is an independent supplier and service provider delivering precision wellbore placement and evaluation solutions for drilling, completions and production challenges. Since 1980, we have been partnering

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

Using Drilling Dynamics To Reduce Drilling costs

Using Drilling Dynamics To Reduce Drilling costs 1 Welcome Using Drilling Dynamics To Reduce Drilling costs 2 Using Drilling Dynamics The cost of the drill bit, mud motor, and other BHA components depends the downhole conditions in which they operate.

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

Daily Drilling Report

Daily Drilling Report Date: 02/25/2017 REPT NO. OPERATOR FIELD NAME RIG NAME TMD TVD FOOTAGE ROP 1 ANADARKO E&P ONSHORE LLC PHANTOM PRECISION 576 120.0 120.0 120.0 0.0 SPUD DATE API DFS: STATE COUNTY DIVISION 4230133110 TEXAS

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi Ballistics on Tractor Conveyance Brian Schwanitz- VP Welltec MENAPS 2011, Abu Dhabi Outline Tractor Activity with Ballisticservices Tractor and Ballistic Safe Sub Operation Addressable Switches and Related

More information

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures IADC Southern Arabian Peninsula Chapter February 15 th, 2018 Top Drive Automation Overcoming Inefficiencies

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

LAGO Energy Presents,

LAGO Energy Presents, LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION

More information

MANUFACTURING. PD Impact Tools

MANUFACTURING. PD Impact Tools PD Impact Tools Upper Connector MANUFACTURING Drive Mandrel Female Spline Bearing Female Spline PD Impact Tools optimize your drilling operations. Knocker Housing Knocker Pressure Piston Hydraulic Mandrel

More information

Highlights of Achievements at Loc. TU

Highlights of Achievements at Loc. TU Highlights of Achievements at Loc. TU Planned-80 days / Actual-74 days. Different BHAs for drilling in rotary mode designed by in-house expertise. Sliding was limited to

More information

Successful New Technology Introduction and Applications of Rotary Steerable System.

Successful New Technology Introduction and Applications of Rotary Steerable System. Successful New Technology Introduction and Applications of Rotary Steerable System. Mohammed Ibrahim Schlumberger Copyright 2003, MPC 2004 This paper was prepared for the 8th MEDITERRANEAN PETROLEUM CONFERENCE

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL PATTERSON-UTI DRILLING COMPANY MORNING REPORT 212-12-4 215 HORIZONAL 25713 OIL CURRENT DEPTH LAST PEN. RATE ROT. MAX. GAS BCKGR GAS CONN. GAS TRIP GAS Time Mud Wt IN / OUT Funnel Vis PV YLD PT 1 S GEL

More information

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation 2/5/2013 Roger L. Schultz TTS Drilling Solutions Presentation Overview Frictional Forces, Vibratory

More information

Drillmec HH-300 spec.

Drillmec HH-300 spec. Drillmec HH-300 spec. Drillmec HH-300 Fast moving trailer mounted automatic drilling rig. Designed for cold climate and Geothermal applications and is fully capable of working in heavy winds. It is capable

More information

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE HM150 150MT DRILLING RIG HUISMAN PRODUCT BROCHURE M150 ENERAL INTRODUCTION 02 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

HYDRAULIC WORKOVER SERVICES

HYDRAULIC WORKOVER SERVICES HYDRAULIC WORKOVER SERVICES Technology at work for you. Cudd Energy Services (CES) offers a diversified portfolio of solutions for today s well challenges. From a simple completion job to a complex well

More information

Common Coiled Tubing Drilling (ComCTD)

Common Coiled Tubing Drilling (ComCTD) Common Coiled Tubing Drilling (ComCTD) www. renhesun.com 2-1/2 in. Common Coiled Tubing Drilling-Wireline (ComCTD-2W) Features Flexible setup the integrated CTD system Data transmission & communication

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network Figures v Tables vii Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Well Planning 5 Bits 9 Bit Selection 9 Bit Design 11 How Bits Drill 12 Roller Cone Bits 13 Natural Diamond Bits

More information

Motor Handbook. 4th Edition Ver. 1.0a ALL RIGHTS RESERVED. Issue Date; December 23, 2013 Wenzel Downhole Tools

Motor Handbook. 4th Edition Ver. 1.0a ALL RIGHTS RESERVED.  Issue Date; December 23, 2013 Wenzel Downhole Tools MOTOR HANDBOOK Motor Handbook 4th Edition Ver. 1.0a Issue Date; December 23, 2013 Wenzel Downhole Tools ALL RIGHTS RESERVED The information contained in this manual is provided for informational and illustration

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

DRILLING MOTOR HANDBOOK

DRILLING MOTOR HANDBOOK DRILLING MOTOR HANDBOOK GORILLA Drilling Motors TM rev213.6.19 DRILLING MOTOR HANDBOOK www.axonep.com The information contained in this handbook is for reference only. AXON Downhole Products Inc. does

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL SCHEDULE 1 DATE: DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) JULY 2016 CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 6,000 METERS WITH 127.0 mm DRILL

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve Todd Gooding Business Development Manager WELL COMMANDER A COMPLETE redesign of the ball-activated Centurion

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information