1 H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas API # RRC Permit # GAU letter, RRC Letter #GAU Ground Elevation GL: (Rig KB to GL = ) Rig KB = Location: 2,377 FNL & 10,501 FWL of James Campbell, A-6 X: Y: Legal: 492 FWL & 1668 FSL (westernmost) of Howell-Technik No. 2 (9700) Gas Unit as designated in Designation of Gas Unit dated April 16, 1986, by Howell B Account, et al, containing acres of land, more or less, out of the James Campbell Survey, A-6 and the William Ponton Survey, A-36, Lavaca County, Texas, as recorded in Vol. 304, Page 375 of the Lease Records of Lavaca County, Texas. Permit Depth: 10,200'; Primary Objectives: Burns Channel Secondary Objectives: Technik 9700 & Golsch Channel Directions: From Intersection US Highway 90A with US Highway 77 North, proceed north on US Hwy 77 and go 2.4 miles to gravel oilfield road on left (west). Follow road west and then north into the Technik lease and then follow flagged lease road west across East Campbell Branch, and continue past Technik #3 well and facility and continue southwest to new location. Daily Drilling Reports : Receive 1 st bid from Black Creek Drilling for Technik # : Preliminary work on Technik # : Prepare updated maps and exhibits with new location : Confer with GeoFrontiers on potential geochemical survey : Confer with JIO (Sitterle) on location selection, possibility of 3-D seismic and/or Geochemistry survey, and revised drilling prognosis : Confer with Operator on revised drilling prognosis, timing : Confer with JIO (Farwell) about new well timing and possible revised costs : Confer with Operator: request updated drilling bids and rig availability : Receive La Mesa Geophysical quote for 2 square mile 3-D seismic shoot : Confer with Operator on location access, and potential new pipeline connection : Preparing Prop Loc map for Surveyor and Operator : Continue making arrangements with Drilling Contractor : Surveyor scheduled to survey and stake location on Tuesday : Surveyor and Operator met and drill site location and alternate location (40 further north) staked yesterday to avoid creek. Checking on pipeline route. There is a Copano gas pipeline line in the area : Working with location/dirt contractor for most efficient site plan : Receive Survey Plat : Confer with JIO (Migl) about location, drill timing, depth, & pipelines. Preliminary Drilling Report- Technik #6

2 Drilling Report Page 2 of : Confirmed location will not interfere with surface use with landowner and made arrangements for cattle. Tendering surface damages prior to commencement of location work as per lease : Filed Form W-1 for permit to drill : Held field meeting with Hans Helland, Black Creek Drilling Inc. representative Kevin Coufal and dirt contractors Carl A. Bozka, Inc. representative Mike Bozka, Energy Construction Inc. representative Chad Hensley and GT Oilfield Services representative to discuss construction of drilling location and pits. Original well location does not allow room for location to be constructed due to nearby creek. Will have to use alternate well location. Location requires little to no brush clearing. One large tree may need to be removed. Corner section of permanent fence must be temporarily removed in order to build location. Approximately.25 miles of new lease road must be built in order to access location. A cattle guard must be installed in cross fence. Requested bids from dirt contractors consisting of construction of location, pits and lease access road. Also requested separate bid to repair lease road where severe washout has occurred. Will assess possibility of using Technik No. 5 existing water well to supply drilling rig : Permit granted (see above) : Receive permit. Alerted drilling rig : Summary of progress to date: Several meetings w/ road and location personnel, and received bids. Selected low bidder (GT Oilfield) and ordered work to commence. Rain has delayed most work the last 2 weeks, and it is still too wet. But, Rudy with GT has Dig Tess going by there this afternoon or tomorrow morning. Weather permitting, major work resumes Monday : Summary update: GT Oilfield continues work on road and location, receiving gravel today. They plan to work over the weekend to finish for Monday. Assuming the weather holds, we will inspect Monday for conditions and then prepare to receive the Black Creek Drilling Rig : Moving in Black Creek Drilling Rig : [1] This AM, building spud 0. Summary: Moved Black Creek Rig #1 to location; Rig up; unload & strap casing; finish rigging up; drill rat hole and mouse hole; strap & caliper BHA and mix spud mud. Expect to spud and drill surface hole in next 24 hours : [2] This 7:00 AM, drilling surface 1,025. Spud and drilled 1,025 in last 24 hrs. Mud: 9.2#, Visc: 233. Bit #1-S: 12-1/4 FS2563 surface. Deviation survey: 1/2 483'; 1/2 985'. Summary: Finish build spud mud; 1600 and drill; circ & survey; drill; circ & survey : [3] This 7:00 AM, running surface 1,785. Drilled 760 in last 24 hrs. Mud: 9.3#, Visc: 198. Bit #1-S: 12-1/4 FS2563 surface, 1,785. Deviation survey: '; 3/4 1770'. Summary: Drill; circ & survey; drill; drill; circ & survey; slug & trip out (SLM) laydown stabilizers; P/U near bit stabilizer, TIH & ream lime knots as needed; circ, slug & TOOH to run casing; R/U Ciscon casing crew & begin running 9-5/8 surface casing.

3 Drilling Report Page 3 of : [4] This 7:00 AM, testing casing 1,790. Drilled 5 in last 24 hrs. Mud: 9.2#, Visc: 70. Bit #2: 8-3/4 Rock bit XR +C 1,785, Bit #3: 8-3/4 PDC D519D Deviation survey: none new. Summary: Finish running 9-5/8 casing & rig down Ciscon; Total casing was 39 jts 9-5/8 36.0# J55 ST&C casing to 1, including float shoe and 12 centralizers; Circ w/ rig pump & R/U Halliburton; mix, pump & displace cement w/halliburton; Total cement was Lead: 350 sks extendacem 11.8 ppg, 2.64 yld, and Tail: 110 sks Halcem system@ 14.8 ppg w 1.33 yld and bumped plug 500 over. Wait on cement, R/D Halliburton; Note: had 95 bbls cement returns to surface; Back-off landing jt, screw on 11 C22 wellhead; nipple up BOPs; R/U Curtis BOP testers and test blind rams, pipe rams, choke assembly to 5000 psi/annular 3000 psi/casing 900 psi; finish R/U flow line & choke vent lines; M/U rock bit, stage in 944 & 1760; drill float equipment & 5 new formation, circ; slug & trip out hole; M/U PDC bit, P/U 60 & 90, TIH; circ & test casing seat to eq 12.7 # mud wt (330 psi) : [5] This 7:00 AM, 3,443. Drilled 1,653 in last 24 hrs. Mud: 9.2#, Visc: 56, WL 8.1. Bit #3: 8-3/4 PDC D519D Deviation survey: 1/2 3686'; 1/4 4186'; 1/4 4657'. Summary: Rig service; drill; survey; drill; drill; survey; drill; survey; drill : [6] This 7:00 AM, 4,791. Drilled 1,348 in last 24 hrs. Mud: 9.3#, Visc: 57, WL 9.4. Bit #3: 8-3/4 PDC D Deviation survey: 1/4 2268'; 1/2 2744'; 1/2 3215'. Summary: Rig service; drill; survey; drill; survey; drill; survey; drill : [7] This 7:00 AM, bit 5,446. Drilled 655 in last 24 hrs. Mud: 9.5#, Visc: 62, WL 5.8. Bit #3: 8-3/4 PDC D , Bit #4: 8-3/4 PDC D Deviation survey: 1/2 5152'. Summary: Rig service; drill; survey; drill; drill; circ; POOH bit trip; change bit TIH to 1770; circ & slip and cut drill line; finish stage in hole 3579 & on bottom : [8] This 7:00 AM, 6,199. Drilled 753 in last 24 hrs. Mud: 9.6#, Visc: 57, WL 4.9. Bit #4: 8-3/4 PDC D Deviation survey: '; '. Summary: Rig service; circ, condition mud and C/O CPU in mud log trailer; drill; survey; drill; drill; survey; drill : [9] This 7:00 AM, 6,921. Drilled 722 in last 24 hrs. Mud: 9.6#, Visc: 65, WL 4.9. Bit #4: 8-3/4 PDC D Deviation survey: 1/2 6598'. Summary: Rig service; drill survey; drill : [10] This 7:00 AM, 7,434. Drilled 513 in last 24 hrs. Mud: 10.0#, Visc: 53, WL 4.9. Bit #4: 8-3/4 PDC D Deviation survey: 1/2 7069'. Summary: Drill; circ & survey; drill; level rig subs w/ smarts pole trucks; drill; drill. Mud log reports Av BG gas: units; Gas Hallettsville (7100) Bailout sand field pay had 171 Max gas units : [11] This 7:00 AM, 7,829. Drilled 395 in last 24 hrs. Mud: 10.0#, Visc: 58, WL 4.7. Bit #4: 8-3/4 PDC D Deviation survey: '. Summary: Drill; circ bottoms up; slug & trip into casing (wiper or short trip ); 1770, stage in hole, circ 3215, 4657, 6097; finish trip to bottom; circ bottoms up & 7568; drill. Mud log reports Av BG gas: units; Short trip gas 43 units; Max Gas: sand/lignite; sand/lignite. Expect to continue drilling Lower Wilcox and the Holik 8700 sand in next 48 hours; Primary objective in 4-5 days.

4 Drilling Report Page 4 of : [12] This 7:00 AM, 8,474. Drilled 645 in last 24 hrs. Mud: 10.0#, Visc: 56, WL 4.3. Bit #4: 8-3/4 PDC D Deviation survey: 1-1/4 8008'. Summary: Drill; circ & survey; drill; drill. Mud log reports Av BG gas: units; Max Gas: sand/lignite; sand/lignite; sand/lignite; sand/lignite. Expect to continue drilling Lower Wilcox and the Holik 8700 sand in next 24 hours; Primary objective in 3-4 days : [13] This 7:00 AM, 8,754. Drilled 280 in last 24 hrs. Mud: 10.5#, Visc: 60, WL 4.4. Bit #4: 8-3/4 PDC D Deviation survey: '. Summary: Drill; circ & survey; drill; slug & trip into casing (wiper or short trip ); C/O swivel packing; 1770 & stage back in hole; stage in hole, circ 3529, 5219, 6912 & bottom; drill. Mud log reports Av BG gas: units; Max Gas: (Holik sand/lignite) : [14] This 7:00 AM, 9,267. Drilled 513 in last 24 hrs. Mud: 10.7#, Visc: 57, WL 5.0. Bit #4: 8-3/4 PDC D Deviation survey: '. Summary: Drill; drill; circ & survey; drill. Mud log reports Av BG gas: units; Max Gas: : [15] This 7:00 AM, bit 9,485. Drilled 218 in last 24 hrs. Mud: 10.7#, Visc: 60, WL 5.3. Bit #4: 8-3/4 PDC D , 9485; Bit #5 8-3/4 SS Deviation survey: '. Summary: Drill; drill; circ; POOH for bit trip, SLM & drop survey; change bit, stage in hole 1770, Mud log reports Av BG gas: units; Max Gas: 625 units & 756 units in 2 shows. Show #1: Probable ; fair drill break; 756 max units gas, with CC5; cut mud weight from 10.7 to 10.4; no fluorescence. Show #2: Probable 9400 sand ; good drill break; 625 max units gas, with CC5; cut mud weight from 10.7 to 10.3; no fluorescence : [16] This 7:00 AM, 9,864. Drilled 379 in last 24 hrs. Mud: 11.2#, Visc: 60, WL 4.7. Bit #5 8-3/4 SS Deviation survey: none new. Summary: Finish stage in hole 5514, 7386; Circ & wash to bottom; drill; drill. Mud log reports Av BG gas: units; Max Gas: 635 & 1085 units in 2 shows. Show #3: Probable Burns * ; good drill break; 635 max units gas, w/ CC5; cut mud weight from 10.9 to 10.7; no fluorescence; *samples indicate gross sand may exceed 70-feet. Show #4: Probable 9800 sand *9831 ; poor drill break; 1085 max units gas, with CC5; cut mud weight from 11.1 to 10.3; no fluorescence; samples & continuing gas kicks may indicate +100-feet of gross sand interval : [17] This 7:00 AM, conditioning TD 10,200. Drilled 336 in last 24 hrs. Mud: 11.5#, Visc: 60, WL 4.5. Bit #5 8-3/4 SS Summary: Drill; drill; circ & raise mud weight from 11.2# to 11.5#; POOH for wiper trip. Mud log reports Av BG gas: units; Max Gas: 511 units.

5 Drilling Report Page 5 of 9 Show #5: Possible Hathaway 10,036-10,056 ; poor drill break; 441 max units gas, w/ CC5; cut mud weight from 11.2 to 10.9; no fluorescence : [18] This 7:00 AM, logging TD 10,200. Drilled 0 in last 24 hrs. Mud: 11.5#, Visc: 61, WL 4.7. Bit #5 8-3/4 SS , 10,200 Bit #6 8-3/4 XT-C 10,200. Deviation survey: 3/4 10,190'. Summary: Stage in hole 1760, 3881, 6002, 8123; circ & wash to bottom; POOH-drop survey; POOH-Chain out to log; rig up Baker Atlas; Run Baker Hughes- High Definition Induction Log, Compensated Z-Densilog; Compensated Neutron Log, Gamma Ray Log from 10,199 to 1,782 ; log on 0530 AM ; Turnkey complete-go on daywork; R/D Baker logging truck. Mud log reports Av BG gas: units. Log confirms multiple productive zones including Primary objective. Presently conditioning hole to run production casing and expect to run same in next 24 hours : [19] This 7:00 AM, running production TD 10,200. Mud: 10.5#, Visc: 50, WL 4.6. Bit #6 8-3/4 XT-C 10,200. Summary: R/D Baker logging truck; TIH to 1760; circ; slip & cut drill line; stage in hole 3881, 6002, 8123; unload & strap 5-1/2 casing; circ & wash to bottom; circ & wait for laydown truck; circ & R/U laydown machine from Cison; laydown Drill pipe & Collars; R/U Ciscon & run 5-1/2 casing : [20] This 7:00 AM, rigging TD 10,200 w/ casing set as per below. Summary: Finish running 10,191 of 5-1/2 17.0# P100 LT&C production casing and ; circ w/ rig pump, rig down Cison, R/U Texas Cement Services; Mix, pump and displace cement as follows: Lead-160 sks/15:poz:class 12.5 PPG w 2.16 yld and tail-1560 sks/txi 13.8 PPG w 1.19 yld. Bumped plug w/ 500# over; drop & set casing slips, nipple down; cut 5-1/2 casing, nipple up & test tubing head; clean mud tanks & rig down; rig down. Note: Rig 0600 AM : [21] This 7:00 AM, rigging TD 10,200 w/ rig released. Summary: Rig down & rig repairs; wash & clean rig. Daily Completion Reports : This AM, Meeting on location to review the flowline route to existing tank battery and design plumbing. New surface equipment needed includes a line heater, high pressure separator, meter run and Barton recorder. The tank battery and the rest of the necessary equipment are already in place as existing infrastructure. Summary of Operations since : Mobilize and move-out Black Creek Drilling rig (to Louisiana). Back drag location and prepare for completion operations. Plan is to install production flowline and facilities starting this week; and move-in completion rig mid next week to run completion logs, tubing, perforate and flowback the well down the sales line : Summary last 24 hours: Met GT Oilfield Services backhoe at lease. Using bull rock from corner edge of location, backhoe dressed and leveled location for completion rig and equipment. Held field meeting with Hans Helland and gauger, Darrell Bludau, to discuss layout and installation of production facilities. Measured distance of proposed flowline route to be approximately 750 from edge of location to edge of central tank battery. Measured distance of proposed, possible future sales pipeline route to be approximately 460 from edge of location at well to Kinder Morgan pipeline ROW. Ordered needed production equipment, pipe, fittings and supplies.

6 Drilling Report Page 6 of : Met Energy Construction lease crew and backhoe at lease. Held safety meeting. Buesing Production Services delivered reconditioned 16 x 5 x 1440 psi 2PH vertical separator with controls, 250,000 BTU line heater and 2 simplex meter run on skid. Buesing Production Services delivered fittings and supplies needed to install production facilities. Salazar JL Trucking haul truck delivered one belly dump load of post oak material, totaling 22 yards, from GT Oilfield. Hardin Tubular delivered 67 joints of 2-3/8 4.7#/ft J-55 EUE 8RD used, tested tubing, totaling Strung out pipe for flowline and future sales pipeline from well to tank battery. Using backhoe, set and leveled HP separator and 2 simplex meter run on blocks. Began tying-in HP separator. Shut down for night : Met Energy Construction lease crew and backhoe at lease. Held safety meeting. Backhoe dug ditch for flowline and future sales pipeline from well to tank battery. Strung out and made up pipe for flowline and future sales pipeline. Began coating flowline and future sales pipeline, with bitumastic, and placing in ditch. Backhoe began backfilling and dressing ditch. Tied-in HP separator gas outlet to 2 simplex meter run. Installed bypass around meter run. Tied-in meter run outlet to gas sales line at downstream of 3 simplex meter run for Technik No. 5. Shut down for night : Met Energy Construction lease crew and backhoe at lease. Held safety meeting. Finished coating flowline and future sales pipeline, with bitumastic, and placing in ditch. Backhoe continued backfilling and dressing ditch. Tied-in flowline at HP separator inlet. Installed HP separator dump valve. Installed HP separator bypass on inlet riser and tied into dump line. Installed drain on HP separator and tied into bypass and dump line. Installed riser on future sales pipeline. Tied-in HP separator dump line to existing LP separator, from Technik No. 4, inlet and bypass. Shut down until workover rig moves out in order to tie-in flowline from well to line heater. Tentatively scheduled to do same beginning Monday : Prior to arriving on lease. TripleUs delivered forklift and portable toilet to lease. Waited on Nabors workover rig and equipment to arrive on lease. Moved in Nabors workover rig No. 6. Held safety meeting with rig crew and haul truck drivers. Spotted and rigged up base beam, open top rig tank, rig pump and dual drum workover rig. Opened well. SICP = 0 psi. Pro Field Services delivered and unloaded 150 bbls of 2% KCl water into open top rig tank. MILAMORE haul truck delivered 2 sets of pipe racks and hydraulic cat walk. Unloaded pipe racks and rigged up hydraulic cat walk. MILAMORE also delivered 4-3/4" rock bit, 2-3/8" bit sub and 5-1/2" x 2-3/8" casing scraper. Nippled down 7-1/16" dry hole flange containing needle valve. Nippled up 7-1/16" 5M rig BOP's. Changed out 2-7/8" rams and blind rams to 2-3/8" rams and blind rams. ETI Trucking delivered 314 joints of 2-3/8" N-80, 4.7#/ft, EUE, 8RD tubing form Watson Pipe. Unloaded tubing onto pipe racks. Rigged up floor and 2-3/8" tubing tongs. Changed out blocks on tubing tongs. Removed thread protectors from tubing. Tallied tubing on the pipe racks. Total tubing length 10,275.69'. Rigged up kelly line and flow back iron to the open top tank. Secured well and shut down for the night. Currently expect to perforate on Monday morning : Held safety meeting with Nabors rig crew No. 6. SICP = 0 psi. M/U & RIH w/ 4-3/4" rock bit, 5-1/2" casing scraper and 2-3/8" 8RD x 2-3/8" REG bit sub. Tallied IH w/ 248 joints of 2-3/8" N-80 tubing. Texas Downhole Tools delivered 5-1/2" x 2-3/8" AS-1X 10K packer, with BX nipple, and 2-3/8" left hand release On/Off skirt. Continued rock bit and casing scraper run. RIH w/ 63 joints of 2-3/8" N-80 tubing. Tagged soft material at 10,090'. POOH w/ 1 joint of 2-3/8" N-80 tubing. Made up 1.5K BOP stripping rubber. RIH w/ 1 joint of 2-3/8" N-80 tubing. Made up 2-3/8" x 2" crossover, 2" chickson and kelly hose. Washed down to 10,127' tubing measurement. Tagged solid. Recovered a moderate amount of drilling mud in the returns for a short period of time. Pro Field Services delivered and unloaded 100 bbls of 2% KCl water into open top tank. Reverse circulated wellbore clean with 230 bbls of 2% KCl water. RD Kelly hose. POOH laying down 20 joints of 2-3/8" N-80 tubing. POOH and stood back 120 joints of 2-3/8" N-80 tubing. Secured well and shut down for the night.

7 Drilling Report Page 7 of : Held safety meeting with Nabors rig crew No. 6. Opened well. SICP = 0 psi. POOH standing back 128 joints of 2-3/8" tubing. MI PLPS electric line unit onto lease. RU 5K lubricator flange on rig BOP's. MU & RIH PLPS Case Hole Logging tools as listed: 225TECKO 2-1/4 neutron, CCL-275TECKO 2-3/4" 450 degree rare earth magnet, GR-225TECKO 2-1/4" Gamma Ray, 2BS 2' bow spring, SCBL-225TECKO 2-1/4" radial, 2BS 2' bow spring and 1-7/16" fishing neck on 3/8" electric wireline. RIH to 10,120' wireline measurement. Started cement bond logging. Logged from 10,120' to 9,620'. The log showed the cement bond to be questionable. Ran in hole to 10,120'. Pressured up 5-1/2" casing to 1000 psi. Started cement bond logging. The log showed good cement bonding. Logged from 10,120' to 7,000'. Released 5-1/2" casing pressure into open top tank. POOH w/ logging tools. RD PLPS equipment. PLPS left logging truck on lease for perforating on 6/15/15. ACME Truck Lines delivered 7-1/16" 5M upper tree assembly consisting of double 2-1/16" master valve, single 2-1/16" wing valve and 2-1/16" positive choke, 7' x 2-3/8" tubing hanger, R-46 ring gasket, /8" x 10-3/4" flange studs with nuts, 1/2" needle valve and 5K pressure gauge. MU & RIH w/: 5-1/2" x 2-3/8" AS-1X 10K packer, 2-3/8" left hand release On/Off skirt and 290 joints of 2-3/8" N-80 tubing. RD tubing tongs and rig floor. Stripped rig BOP's over tubing. Set 5-1/2" AS-1X 10K Packer at '. Packer was set in 12,000# of compression. Tested packer to 1000 psi. Good Test. Bled off pressure into open top tank. NU upper tree assembly. Secured well and shut down for the weekend : Met Energy Construction lease crew and backhoe and Buesing Production Services technician at lease. Held safety meeting. Backhoe finished backfilling and dressing ditch at central tank battery. Using leftover post oak material, backhoe rebuilt section of firewall. Rebuilt fence around central tank battery. Installed sight glass, with sight glass valves, on HP separator. Set and leveled existing fuel pot from LP separator, on concrete block at HP separator. Tied-in gas supply line from HP separator to fuel pot inlet. Buesing Production Services technician plumbed SS tubing from fuel pot to HP separator and LP separator dump valves. Installed 100 x1500 psi 3 pen Barton recorder onto 2 simplex meter run. Technician plumbed SS tubing to Barton recorder. Backhoe set and leveled 250,000 BTU line heater on concrete blocks. Installed Norseal 2200 safety valve at line heater inlet. Installed gas supply fuel bottle at line heater outlet. Tied-in gas supply line off fuel bottle to line heater. Tied-in flowline riser at line heater outlet. Began tying-in line heater bypass to flowline. Shut down for night : This AM, SITP 1650#. Prep to flow test well to sales. In last 24 hours, Held safety meeting with Nabors rig crew No. 6, PLPS wireline crew and Production Equipment well service tech. On inspection of the upper tree assembly, the 2-1/16" wing valve didn't operate properly. The Production Equipment tech contacted his office to send out a new 2-1/16" valve. Tightened the flanges on the upper tree assembly. Tested upper tree to 3500 psi. Good test. Rigged up swabbing equipment. Swabbed well as follows using dual 2-3/8" swabbing cups: Run Tagged Fluid Pulled From Recovered 1 0' 1000' 4 bbls of 2% KCl water ' 2000' 3 bbls of 2% KCl water ' 3000' 4 bbls of 2% KCl water ' 4000' 4 bbls of 2% KCl water ' 5000' 4 bbls of 2% KCl water ' 6000' 1 bbl of 2% KCl water During swabbing operations, PLPS rigged up 24' of 5K lubricator with pack off, 7' x 1-11/16' weight bar, 6' x 1-11/16" gamma gun and 1' x 1-11/16" magnet. Rigged up PLPS electric line unit on well. RIH as listed: 6' 1-11/16" evolution strip gun, 0 degree phased, decentralized and loaded with 4spf, 1' x 1-11/16" gun sub, 1' x 1-11/16" magnet, 6' x 1-11/16" gamma gun and 7' x 1-11/16" weight bar. Correlated using Baker Hughes open hole log, dated May 21, 2015, and PLPS

8 Drilling Report Page 8 of Cont: cement bond log, dated June 12, Perforated (#1 set) 5-1/2" casing from 9618' to 9624'. All shots fired. POOH w/ wireline tools. (Between perforation runs Production Equipment well tech replaced 2-1/16" wing valve). MU & RIH w/: 10' 1-11/16" evolution strip gun, rigged as above. Correlated as above. Perforated (#2 set) 5-1/2" casing from 9602' to 9612'. All shots fired. POOH w/ wireline tools. MU & RIH w/: 18' 1-11/16" evolution strip gun, rigged as above. Correlated as above. Perforated (#3 set) 5-1/2" casing from 9570' to 9588'. All shots fired. POOH w/ wireline tools. MU & RIH w/: 4' 1-11/16" evolution strip gun, rigged as above. Correlated as above. Perforated (#4 set) 5-1/2 casing from 9562' to 9566'. All shots fired. POOH w/ wireline tools. MU & RIH w/: 4' 1-11/16" evolution strip gun, rigged as above. Correlated as above. Perforated (#5 set) 5-1/2" casing from 9547' to 9551'. All shots fired. POOH w/ wireline tools. RD and released PLPS electric line unit. Opened well and began flow back into rig open top tank on a 6/64" adjustable choke with Load to recover 20 bbls. FTP = 100 psi. Well unloaded gas and trace load water. Elect to swab well in. RU & RIH w/ 2-3/8" swab and swabbed well as follows: Run Tagged Fluid Pulled From Total BBLs Rec Load to Rec Remarks ' 3100' Load water / gas ' 2200' 6 14 Load water / gas ' 1000' 9 11 Load water / gas Well kicked-off free flow on a 6/64" adjustable choke. Opened choke to a 25/64". FTP = 1100 psi. Worked choke to clear debris from choke body. Flowed well on a 12/64" choke at 1100 psi. Recovered 21 bbls total load from well w/ steady gas flow. Shut well in. Rigged down swabbing equipment, floor and dual drum workover rig. Pro Field Services vacuum truck hauled 130 bbls of fluid to disposal. ISITP = 1100 psi. Secured well and shut down for the night : This AM, resume flow test operations (shut down yesterday due to Tropical Storm Bill). SITP 1440#. Opened 7:30 on 11/64 choke and flow to facilities. At 9:00 increased to 12/64 choke with FTP 733 MCF rate, and made 1 bbl oil, ½ bbl water. Summary for last 24 hours: Met Energy Construction lease crew, backhoe and Buesing Production Services technician at lease. Held safety meeting. SITP = 1650 psi. Moved base beam, pipe racks, open top tank and pump to edge of location in order to finish digging ditch for flowline and future sales pipeline. M/O Nabors workover rig. Backhoe finished digging ditch from line heater to well. Using 6 joints of leftover 2-3/8 4.7#/ft, N-80, EUE, 8RD tubing, made up flowline from well to line heater and placed in ditch. Tied-in flowline at line heater inlet and bypass. Installed hairpin and riser on tree and tied into flowline. Coated flowline and risers with bitumastic. Backhoe finished digging ditch from well to West edge of location, closest to possible future Kinder Morgan pipeline sales tap. Finished making up future sales pipeline from central tank battery to edge of location at well. Installed temporary riser on future sales pipeline. Backhoe backfilled ditch. Opened well, purged and pressured up flowline from well to central tank battery to 1000 psi. Monitored pressure for 30 minutes to test for leaks. Test OK. No leaks. Buesing Production Services Technician installed Hi/Lo safety stick pilots on line heater fuel bottle. Safety pilot Hi kill set at 1200 psi and Lo kill set at 200 psi. Plumbed SS tubing gas supply lines for safety system. Pro Field Services filled line heater with fresh water. Lit line heater burner and set temperature at 120 degrees F. Installed 16/64 positive choke at tree and set line heater adjustable choke to 12/64. Opened well. SITP = 1650 psi. At 1700 hours, turned well to sales. Differential on Barton recorder was off the chart on a 12/64 choke. Therefore, decreased choke size on the line heater to a 10/64. At 1730 hours, FTP = 1300 psi making approximately 670 mcfd and no fluids. Reset adjustable choke on line heater to 12/64. At 1745 hours, FTP = 900 psi making approximately 635 mcfd and no fluids. At 1800 hours, well began making little fluid. FTP = 1050 psi making approximately 300 mcfd. Adjustable choke on line heater plugged up. Rocked adjustable choke back

9 Drilling Report Page 9 of Cont: and forth in order to clear trash. At 1830 hours, FTP = 1000 psi making approximately 440 mcfd. Contacted office. Decision was made to shut well in overnight due to heavy rainfall (Tropical Storm Bill) and potential access issues (creek flooding). Pending weather, gauger will resume flow test Wed morning. Released well to gauger & SD until further notice.

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250 DAKOTA RESOURCES, INC. UNIVERSITY KATELYN #3 467 FWL & 800 FNL SEC. 6, BLK. 30 CRANE CO., TX API #: 42-103-36244 Proposed TD: 9400 AFE: $1,704,475.00 PROP: 346-3 PERMIT #: 769425 8/28/13: Luchini and Mertz

More information

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas H. H. HOWELL, INC. Wildcat Field Bee County, Texas API #42-025-33864 RRC Permit #759535 GAU letter, RRC Letter 3-27-13 #SC-5794 = 1000 isolate 0-350. RRC approval 450. Ground Elevation (note correction)

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT UNIVERSITY LANDS 11-7 NO. 1 PAGE 1 12-14-11: BEGIN MIRU TRINIDAD 204. 12-15-11: CONTINUE MIRU TRINIDAD 204. DRILLED WATER WELL W/LATZEL WATER WELL TO 620. RU ROTARY TOOLS. APPROX. 40% THIS AM. ESTIMATED

More information

Gulftex Energy III LP DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT 07//3 University D- SPUD TYPE PV YP GELS MANUFACTURER LINER STROKE GAL / STK SPM GPM AV DP AV DC MTR DIFF DEPTH MUD. SPM PSI PRODUCTION INTERVAL/PERFORATIONS DESCRIPTION LENGTH SIZE INTERVAL TOP BOTTOM

More information

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00 DAKOTA RESOURCES UNIVERSITY EMILIE #3R 560 FEL & 1680 FSL, SEC. 35, BLK. 4 ANDREWS CO., TX API 42-003-45115 TD: 11,200 AFE: 377 PROP: 000307 PERMIT: 756090 02/01/2013: Surveying, Luchinni & Mertz, University

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig : 4/8/2016 Release Wait on daylight to complete rig move. 95,193.70 95,193.70 24hr MIRU from FCU 7220 to FCU 7442. Change out gen #2 motor. Clean and service rig. Wait on daylight to complete rig move.

More information

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00 Job Category COMPLETION AFE Number E14178 Job Contacts Roger Web Primary Job Type Initial Completion Start Date Secondary Job Type Status 1 End Date 6/9/2015 06:00 870-314-2454 Buddy Haney 580-799-0217

More information

3/25/15 University DC 1H Devonian Completion

3/25/15 University DC 1H Devonian Completion 3/25/15 DAILY: $ 292,266.34 ACC: $ 292,266.34 Toe Prep. (12:22-13:24) SPRAYBERRY FORMATION Casing Tested @ 6076 psi and chart for 5 minutes (RRCT), Open Toe Tool @ 6557 psi, Injection Rate @ 1 bpm, Pumped

More information

Drilling & Completion Summary

Drilling & Completion Summary API/UWI 42-003-41996-0000 Property Sub 927817-001 Operator PIONEER NATURAL RESRC USA, INC State TEXAS County ANDREWS Field Name Surface Legal Location SPRABERRY (TREND AREA) BREEDLOVE (STRAWN) 660' FNL,

More information

DATE: 01/03/ DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT DATE: 01/03/2012 045797 OPERATOR. LONE STAR, LLC 01/01/2012 01/02/2012 12/30/11 thru 01/01/12 No activity. DAILY COST.... 0 COMPLETION DAYS. 97 CUMULATIVE COST. 3,400,985 DROVE TO LOCATION / HELD A SAFETY

More information

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS DATE RIG NO. BIFFLE WATER WELL SERVICE MORNING REPORT 2012-09-13 893 WELLNAME MUD OPS SAFETY TIME LOG ACCIDENTS OR NEAR MISSES: Time Mud Wt IN / OUT Funnel Vis PV YLD PT 10 S GEL 10 M GEL Fl. Loss Mud

More information

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY # 6/7/2010 1 API #: 42-003-41652 Cased Hole Log PB SUPERVISOR: RAY DAVIS MIRU Wood Group WL on a crane truck. RIH w/gr/cnl/rcbl tool string. Found TD @ 11,113' WL depth. Logged a 300' repeat section. Main

More information

PRODUCTION HYDRAULIC PACKER FIELD TEST

PRODUCTION HYDRAULIC PACKER FIELD TEST DOE/RMOTC/020120 PRODUCTION HYDRAULIC PACKER FIELD TEST Field Report for the period of October 21, 1999 November 01, 1999 Date Published: June 30, 2000 Tricia Schneller, Halliburton Energy Services Jose

More information

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013 Event In Progress CAMERON-7 Hole 09/30/2013 Dev Completion - Cased Daily Summary CAMERON 7 WOC-Chuck Pannell Daily Cost=$9700 Cum Cost=$9700 9-30-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR,

More information

Daily Drilling Summary Report

Daily Drilling Summary Report Date: 12/22/16 Rig: Norton Rig #2 Daily Cost: $32,507 Report #: 3 Current Depth: Progress Last 24 Hrs: 1628 Cum Cost: $268,248 Norton Rig #2 finished PU BHA, tested motor, filled conductor. Spudded well

More information

CNL, CCL, GR, CBL. RDMO

CNL, CCL, GR, CBL. RDMO Event Waiting on Tour Sheet CARRIE-18WD Hole 11/16/2013 Dev Completion - Cased Wireline - Logging 11-16-13 -MIRU Halliburton wireline. RIH and log CNL, CCL, GR, CBL. RDMO wire line. SIW & SDFN PBTD=6068.

More information

Athlon Energy Operating LLC

Athlon Energy Operating LLC Day 1 x University 5-39-4 10/21/2013 1 12,250' Capitan WL logging 16' 5 1/2" N-80 20# 4.653 12,275' MIRU Capitan ELU. RIH w/logging tools & ran GR-CBL-CCL ELTD 12,222' finding ETOC @ RIH w/ 4 5/8 GR/JB

More information

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 35.00 Objective Install Completion Original

More information

Intervention Barriers

Intervention Barriers Intervention Barriers A barrier is defined as a means of containing wellbore pressure and fluids. Two effective barriers are required for most intervention operations. Consider when barriers are effective

More information

OPERATIONS SUMMARY REPORT

OPERATIONS SUMMARY REPORT Today's Date: 10/25/2010 DATE: 10/21/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE: 1,495.00 24.00 A RU MIRU. RECIEVED 5 LOADS. MUD PUMPS, ONE MOTOR, DATE: 10/22/2010 DSS: DEPTH: 0 MUD WT: CUM COST TO DATE:

More information

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford 2013 Latin America Perforating Symposium Perforating Options Available Today in Horizontal Shale Oil and Gas Wells Kerry Daly, Weatherford Typical Eagle Ford Well Costs Total well cost approximately $10

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int

More information

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017 6//27 5:3:45 Report Version: 4..6R9 Report 3 5/3/27 Company Type bore WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 53H UNIVERSITY 9 PW UNIT 53H 32653 / 423337 Event Summary Event Type Completion

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

Elevation Resources LLC

Elevation Resources LLC FIELD: Emma COUNTY/STATE Andrews/Texas PMD: 16,600 PVD: 11,075 LOCATION: ELEVATION (RKB): 3,158 API #: 4200347221 SERIAL NO: SPUD DATE: Sep 29 2015 OBJECTIVE: Drill 5300' lateral JOB NAME: University 1-20

More information

Callon Petroleum Company Drilling Report

Callon Petroleum Company Drilling Report LEASE: PARISH /STATE: SPUD 7/5/04 WELL: University 7-34 #LH 4005AFE #: FIELD: DOL: LOC BLD DAYS: DFS: 45 RR: TX REPORT #: API #: 4-383-38968 DEPTH (): DEPTH (): FOOTAGE: ELEV / KB: ELEV / GL: LAST BOP

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 2/1/2014

More information

LEE NAK GUI TCP SERVICE COORDINATOR APPS

LEE NAK GUI TCP SERVICE COORDINATOR APPS Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

APACHE CORPORATION Daily Drilling Report Page of 3 WELLBORE NAME UNIVERSITY 2303 E 7HM API # 24 HRS PROG TMD TD TVD 4238338764 00 542.0 4,528.0 8,669.2 32 RIG NABORS F34 FIELD NAME SPRABERRY AUTH TMD 5,97.00

More information

APACHE CORPORATION. Daily Land - Orig Comp Report

APACHE CORPORATION. Daily Land - Orig Comp Report APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report

More information

DAILY DRILLING REPORT DATE : 08/01/2012

DAILY DRILLING REPORT DATE : 08/01/2012 DAILY DRILLING REPORT DATE : 08/01/2012 FIELD: SOUTH MIDLAND MD : 80 TVD : 80 DOL: 2 DSS: -1 STATE: TX CROCKETT PROGRESS : FOREMAN: REGION: MID-CON REGION HRS AFE #: 11DC120289 API #: 4210541480 RIG CONTR:

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT, TEXAS OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVANS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/28/2014

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES Prepared for the University of Texas by Pettigrew Engineering, PLLC Tom Pettigrew, PE President Revision: 5 15 October

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 353 KB -14.08' MORNING DRILLING REPORT Well Name Date 7/3/2010 Day# University 42-15 #3 AFE10-84J ' Crockett 1 Present Operation Misting / Drilling Surface z i i

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/18/15 Rig Mo Sendero Rig #3University

More information

MORNING DRILLING REPORT

MORNING DRILLING REPORT APPROACH OPERATING LLC. RIG - Nabors # 714 KB - '22 MORNING DRILLING REPORT Date 3/13/2011 Day # 1 Well Name University 42-21 #1 H County Crockett Present Operation Mist drlg. 17 1/2'' hole Depth 800 Ft.

More information

T-2 On-Off Tool. Available with all common wireline profiles, the stinger works with industrystandard blanking plugs, standing valves and regulators.

T-2 On-Off Tool. Available with all common wireline profiles, the stinger works with industrystandard blanking plugs, standing valves and regulators. T-2 On-Off Tool Classic Oilfield s T-2 On-Off Tool enables the tubing string to be disconnected above a packer for zonal isolation, tubing retrieval, and temporary zone abandonment. The tool contains an

More information

Casing Scraper. Service Equipment. Features

Casing Scraper. Service Equipment. Features Casing Scraper The Casing Scraper is a spring type, mechanical casing scraper, featuring a large by-pass area between the blades to allow circulation of debris. The body is constructed of the highest quality

More information

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO.. DATE: 04/02/2012 04/02/2012 CURRENT DEPTH: 0' DAILY PROGRESS: 0' **BEGIN OPERATIONS** Move In rotary tools Remove derrick from unit, change out top drive and crown, (the sub, steel pits and water tanks

More information

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI

More information

Completion Solutions Inc.

Completion Solutions Inc. Completion Solutions Inc. Simple Designs That Simply Work! Company Introduction Dec 2012 1 Who is Completions Solutions Inc? Founded in 2012 Focused on efficient and economical well bore stimulation (both

More information

Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE

Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE - 114191 C. A. Rubio P. A. Agudelo: Weatherford Colombia Limited J. E. Peñaloza: Meta Petroleum Limited Houston

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE IRION OPERATOR EP ENERGY OPERATOR REPRESENTATIVE JIMMY DAVIS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 12132015 Casing

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 1 AUGUST 13 T H TO AUGUST 18 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

San Antonio, Texas 78222

San Antonio, Texas 78222 1.01 3 EA Pump Removal $1,125.00 $3,375.00 1.02 3 EA Pump Installation $1,200.00 $3,600.00 1.03 1 EA Downhole Video Survey $2,000.00 $2,000.00 1.04 1 EA Geophysical Logging $2,500.00 $2,500.00 2.01 50

More information

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE HM150 150MT DRILLING RIG HUISMAN PRODUCT BROCHURE M150 ENERAL INTRODUCTION 02 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

Special Features. u By-pass below upper slips to wash. debris when valve is opened. u By-pass is opened before upper slips.

Special Features. u By-pass below upper slips to wash. debris when valve is opened. u By-pass is opened before upper slips. Quality We Know Downhole. ASI-X Packer The D&L ASI-X Packer is the most versatile of the mechanically set retrievable packers and may be used in any production application. The ASI-X Packer is suited for

More information

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Endeavor Energy Resources, LP. DAILY DRILLING REPORT Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment

More information

Special Features. u Blanking plug seats in top of. u Bonded seal allows disconnects. and re-connects. u Right-hand or left-hand release

Special Features. u Blanking plug seats in top of. u Bonded seal allows disconnects. and re-connects. u Right-hand or left-hand release DT-2 On/Off Tool The D&L DT-2 On/Off Tool is a tubing seal receptacle allowing isolation of a lower zone using a wireline blanking plug. The tubing string can then be removed from the well. When re-run,

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

JTC ENERGY GROUP, LLC. Jarmon #1D

JTC ENERGY GROUP, LLC. Jarmon #1D JTC ENERGY GROUP, LLC Commercial Salt Water Disposal Permit Jarmon #1D (Re-entry of Existing Wellbore API# 177-31597) Summary JTC Energy Group, LLC is offering for sale the Permit for a Commercial Salt

More information

Thru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x

Thru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x Services Gun Shot Coiled Phasing Density Gun Size Explosive Tubing Slick Line Tubing Wireline Deep Big Hole Gun Type (Degrees) (SPF)Max (inches) Type Conveyed Conveyed Conveyed Conveyed Penetrating Thru

More information

DAILY DRILLING REPORT

DAILY DRILLING REPORT General Information LEASE UNIVERSITY EAST COUNTY, STATE CROCKETT OPERATOR EP ENERGY OPERATOR REPRESENTATIVE PERRY EVENS Texas Railroad Commission TRRC JOB NUMBER DISPATCH TRRC CONTACT DATE 1/1/2014 Casing

More information

Completion Tools Catalog

Completion Tools Catalog Completion Tools Catalog www.teamoiltools.com 2012 TEAM Oil Tools. All rights reserved. www.teamoiltools.com 2012 TEAM Oil Tools. All rights reserved. TABLE OF CONTENTS P/N Description Page P/N Description

More information

About Cobra Downhole Motors

About Cobra Downhole Motors February 2016 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

Large Scale CO 2 Flood Begins Along Texas Gulf Coast (Technical Challenges in Re-Activating an Old Oil Field)

Large Scale CO 2 Flood Begins Along Texas Gulf Coast (Technical Challenges in Re-Activating an Old Oil Field) 1 Large Scale CO 2 Flood Begins Along Texas Gulf Coast (Technical Challenges in Re-Activating an Old Oil Field) Darrell Davis, Mark Scott, Adam Robinson, Kris Roberson, Bill Freeman Denbury Resources Inc.

More information

Daily Activity Report

Daily Activity Report 605 Richard Arrington Blvd. Daily Activity Report Drilling Activity API Code: 4249533363 Well User ID : 43UNIV204801 Operator : Energen Resources Corp S/T/R : 48// County, St. : Winkler, TX Field : WILDCAT

More information

SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING

SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 8 NOVEMBER 13 TH TO NOVEMBER 18 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1

More information

About Cobra Downhole Motors

About Cobra Downhole Motors October 2017 1 About Cobra Downhole Motors Cobra Downhole Motors combines new material technology and innovative product features with a customer driven approach. We add value to our customers drilling

More information

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD: FIELD: COUNTY/STATE: PMD: 17,368 PVD: 10,915 SURFACE LOCATION: BOTTOM HOLE LOCATION: ELEVATION (RKB): 3,143 Emma (Devonian) Andrews/Texas API #: 42-003-47000 PERMIT NUMBER: 801928 SPUD DATE & TIME: Mar

More information

Rig Move Hazard Mitigation Procedure

Rig Move Hazard Mitigation Procedure Page 1 Purpose This Department procedure defines the requirements for rig move pre-planning, detailed route assessments that identify hazards and mitigation steps, and safe rig move execution. Scope This

More information

Service Tools Catalog

Service Tools Catalog Service Tools Catalog www.teamoiltools.com 2012 TEAM Oil Tools. All rights reserved. www.teamoiltools.com 2012 TEAM Oil Tools. All rights reserved. TABLE OF CONTENTS P/N Product Description Page Type P

More information

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas Casing Drilling- Recent Advances for Drilling Challenges Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas SPE Gulf Coast Section January 10, 2001 Casing Drilling History Casing

More information

Lessons Learned in Fort Worth Urban Gas Drilling

Lessons Learned in Fort Worth Urban Gas Drilling Lessons Learned in Fort Worth Urban Gas Drilling 2012 Texas APA Conference Fort Worth, Texas October 4, 2012 Presented by Rick Trice, P.E. Issues Facing Municipal Government Permitting Options Public Involvement

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations MLC Opertating Daily Drilling Report Date: 7/22/21 Spud Date: 6/27/21 at 1 hours Days F/ Spud: 26 Operator: MLC Operating Consultant: Mike Satterfield/Dean Johnson Pres. Depth: 11,67 Well Name & #: From

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 4 Brand Taylor Power: 500 HP Year: 2004 Double Drum: Drawworks and Sandline Drums : Self-propelled Land Rig

More information

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve Todd Gooding Business Development Manager WELL COMMANDER A COMPLETE redesign of the ball-activated Centurion

More information

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE NNORIG GENERAL INTRODUCTION 2 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN UL 6-40 UNIT #05LS /4/206 05 05 205-D-003 JUSTIN/GLEN SB DANIEL County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft ANDREW TEXAS Daily Mud CUM MUD COST H&P #625 7,282 9,484 432-254-2230 Surface Intermediate

More information

INSTALLATION AND OPERATION MANUAL

INSTALLATION AND OPERATION MANUAL INSTALLATION AND OPERATION MANUAL Models S120U & S240U Read all instructions before assembling or using the SunHeater system. Retain this manual for future use. TABLE OF CONTENTS Important Safety Information...2

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Submitted

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 2 Brand Wilson Power: 550 HP Year: 1982 (Repotenciado en el 2009) Double Drum: Drawworks and Sandline Drums

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 6 Brand Loadcraft Power: 550 HP Year: 2013 Double Drum: Drawworks and Sandline Drums : Self-propelled Land

More information

NeoProducts, LLC New Orleans, LA USA Ph:

NeoProducts, LLC New Orleans, LA USA Ph: NeoHybridPositiveDisplacementBailer Systems General Preparation & Run-in Procedures (NeoHybridPDB Systems) Document # ********************************************************************************************

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 1 AUGUST 20 T H TO AUGUST 25 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

Full Flow Reverse Circulation Junk Baskets. Manual B320

Full Flow Reverse Circulation Junk Baskets. Manual B320 Full Flow Reverse Circulation Junk Baskets Manual B320 CONTENTS Logan Full Flow Reverse Circulation Junk Basket Overview... 2 Uses... 2 Construction... 2 Tool Illustration... 3 Operation... 4 Recovering

More information

IMPROVING BLOWOUT RESILIENCE

IMPROVING BLOWOUT RESILIENCE IMPROVING BLOWOUT RESILIENCE DrillSafe Perth, Thursday 6 th March 2014 Colin Stuart BEng. FIMechE Blowout incidents prevalence & impact Dissecting a blowout Human & organisational factors Blowout resilience

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P Well Name STATERUBYGRACE#1A Date: 9/19/2010 Report # Deviation Surveys Cont/Rig UNITED RIG #43 Op at RT DRILLING AHEAD Depth Angle Depth 1,431 1,391 Foreman: DALE THOMASON 375 0.25 MudWT. Vis PV YP Gels

More information

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT

ROTARY TOOLS. Romfor International Ltd. Backup Hand RIGGING UP DRILLING EQUIPMENT & ROTARY TOOLS DRILLING EQUIPMENT DRILLING EQUIPMENT ROTARY TOOLS Romfor International Ltd. Backup Hand DRILLING EQUIPMENT & ROTARY TOOLS Backup Hand DRILLING EQUIPMENT ROTARY TOOLS 0 PPE Requirements - Hard Hat, Safety Glasses, Work Gloves,

More information

AADE 01-NC-HO-54. Abstract

AADE 01-NC-HO-54. Abstract AADE 01-NC-HO-54 High Performance/High Temperature Water Based Fluid Drills Wilcox Test Rene St. Pierre, Belco Energy Corp Dennis Welch, Newpark Drilling Fluids, LLC Copyright 2001 AADE National Drilling

More information

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

PERMANENT RESIDENTIAL UNDERGROUND SERVICE CITY OF RICHLAND ENERGY SERVICES DEPARTMENT 505 Swift Boulevard, MS-21 Richland, WA 99352 Telephone (509) 942-7403 Fax (509) 942-7405 PERMANENT RESIDENTIAL UNDERGROUND SERVICE A. INTRODUCTION This guide

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

GLOBAL DRILLING SOLUTIONS, INC STOCK LIST

GLOBAL DRILLING SOLUTIONS, INC STOCK LIST GLOBAL DRILLING SOLUTIONS, INC STOCK LIST Item Description Qty in Stock Lighting Equipment LED Flood Light. IECEX Certificed. Explosion proof / Zone & ; Ex d IIB T Gb; IP. / Rated voltage: 00 00VAC, 0/0Hz.

More information

Specified Conventional Tube Tracers Suggested TraceBOOST Tracers

Specified Conventional Tube Tracers Suggested TraceBOOST Tracers > TraceBOOST TM Installation Guide Tracing System Application Overview TraceBOOST is intended for pipe heating applications which feature a large temperature difference between the heating medium (i.e.,

More information

RODEC TUBING ROTATOR SOLUTIONS

RODEC TUBING ROTATOR SOLUTIONS RODEC TUBING ROTATOR SOLUTIONS RODEC TUBING ROTATOR SOLUTIONS One Company, Unlimited Solutions Since 1841, National Oilwell Varco has been dedicated to ensuring customers receive the highest quality oilfield

More information

DETAILS OF THE EXPRESSION OF INTEREST(EOI)

DETAILS OF THE EXPRESSION OF INTEREST(EOI) DETAILS OF THE EXPRESSION OF INTEREST(EOI) for offering A Commercially Viable Technology for Exploitation of High Pour Point(HPP) and High Viscous(HV) Crude in Oil India Limited(OIL) 1.0 Expression of

More information

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD Presented at SDG Short Course I on Exploration and Development of Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Nov. 10-31, 2016. Kenya Electricity

More information

RIGS LOADCRAFT INDUSTRIES, LTD. WORKOVER. drawworks PARTS/SERVICE. mud systems (80 0 ) L O A D C R A F T I N D U S T R I E S, LT D.

RIGS LOADCRAFT INDUSTRIES, LTD. WORKOVER. drawworks PARTS/SERVICE. mud systems (80 0 ) L O A D C R A F T I N D U S T R I E S, LT D. LOADCRAFT INDUSTRIES, LTD. WE BUILD RIGS. L O A D C R A F T I N D U S T R I E S, LT D. RIGS drawworks WORKOVER mud systems PARTS/SERVICE (80 0 ) 8 0 3-018 3 3811 N. BRIDGE B R A D Y, T E X A S 7 6 8 2

More information

ISOLATION/UNIVERSAL TOOLS

ISOLATION/UNIVERSAL TOOLS ISOLATION/UNIVERSAL TOOLS stingercanada.com Grande Prairie 11303 96 Avenue Grande Prairie, AB T8V 5M3 780-513-3696 Calgary 420-510 5th Street SW Calgary, AB T2P 3S2 403-340-0716 Red Deer 334-28042 Hwy

More information

Composite Plugs. Index

Composite Plugs. Index Composite Plugs Downhole Isolation Tools - Multi-Stage Operations Index Rapid Mill Ball Drop... 1-2 Rapid Mill Flo-Back Flapper... 3-4 Series (Ball Drop, Bridge, Flo-Back, Flo-Back with Bio-Ball)... 5-6

More information