1 DRILLING EQUIPMENT ROTARY TOOLS Romfor International Ltd. Backup Hand DRILLING EQUIPMENT & ROTARY TOOLS

2 Backup Hand DRILLING EQUIPMENT ROTARY TOOLS 0 PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, fall protection. During Pre-Job safety meeting, review JSA s pertaining to and STARTING EQUIPMENT as per job specific. All personnel sign off on meeting and current emergency contact numbers are readily available. Inspect Equipment as Directed: Pick Up Slings, Shackles, Tag Lines, Sheaves, Back Up Alarms, Fall Protection, Hand Tools, Man Lifts, Fork Lifts, anti-fall equipment, hoisting equipment. Make sure that all open holes are covered / flagged. READY TO RIG UP Assist in running lines: Fuel, Air, Electric, Steam, Hydraulic, Water. Ensure that all lines and connections are visually inspected prior to hook up. Check to make sure that all breakers are off prior to plugging in electric lines (all power sources are off) 3 Assist in connecting chains, belts and install guards to drawworks and power supply. Ensure all bolts, fasteners are in place and secure. READY TO POWER UP RIG 4 Prior to running cold start (if applicable). Make sure that all fire extinguishers are in place and in working condition. Inspect Equipment as directed (refer to maintenance manual): Check oil, check fuel, belt positioning, make sure guards are in place, cable connections, battery, battery box/cover, crank, and air lines. Watch for pinch points. Make sure that battery is covered. Use proper hearing protection. Use extreme caution when switching belts. 5 Assist in starting the cold start (if applicable). Use electric start if possible. 6 Prior to start of generator set. Lock out tag out station in place ready for use. Make sure all ground rods are in place.

3 Backup Hand DRILLING EQUIPMENT ROTARY TOOLS Inspect Equipment as Directed (refer to maintenance manual): 7 Check oil, check fuel, check coolant & cooling system, make sure guards are in place, cable connections, grounding devices, check breakers, air filter, electrical hook-ups, belts, battery, battery box / cover, rubber mat below breaker panel, and air lines. Assist in starting generator set. Watch for pinch points. Make sure battery is covered. Be aware, there may be foreign material blowing from radiator or air starters during initial start up. Check for proper voltage and hertz. Use proper hearing protection. 8 Prior to start of air compressors. Inspect Equipment as Directed (refer to maintenance manual): Check oil, belt positioning, make sure guards are in place, air filters, air dryers, proper valve positioning, check gauges, electric lines, air tank pressure relief valves, and air lines. 9 0 Assist in starting air compressors. Check system for air leaks. Drain condensation from system. Assist in rigging up water tank and circulating system. Check plumbing to water source, centrifugal pumps, electric motors, wiring, switches, plug-ins, hoses, connections, grounding, covers, handrails, discharge lines, valves. If applicable assist in rigging up boiler/rig heating system. Check electrical wiring, pumps, switches, valves, fuel lines, fuel regulators, water lines, blow down lines, steam lines, grounding, duct work, man hole covers, pressure relief valves, chemical injecting unit, gauges, and connections. Watch for pinch points. Automatic air compressor shut off working properly. Guards in place. Use proper hearing protection. Check for proper rotation of air compressor. Ensure no leaks in water circulating system. Use fall protection 00% tie off. Watch for pinch points. Ensure no leaks in heating system. Use fall protection

4 Backup Hand DRILLING EQUIPMENT ROTARY TOOLS READY TO POWER UP DRAWWORKS Prior to power up of Drawworks (Engines Compound / Electric Motor). Inspect Equipment as directed (refer to maintenance manual): Check engines compound, check all fluid levels, chains, guards are in place, belt positioning, leaks on all lines and equipment, proper placement of all bolts and pins, drawworks tie downs, electrical power supply cords. Check traction motors, ensure connections are tight, inspect brushes, inspect electrical power cords and ends, all guards are in proper place, blower filter / hoses. Ensure lock outs are working properly, keys in place, high voltage signs are in place, all controls in the neutral / shut off position. 3 Assist in start up of Drawworks (Engines Compound / Electric Motors). Watch for pinch points, emergency shut down operational, guards in place. Use proper hearing protection. READY TO RAISE DERRICK 4 Prior to raising derrick. Raise derrick during daylight hours or with adequate lighting. Inspect Equipment as directed (refer to maintenance manual): Inspect lines, sheaves, cables, rollers, pins, safety keys, electrical lines, lights, bolts, safety cables, bridle line in sheaves properly, stand pipe and kelly hose properly secured with cables. Kelly hose secured to derrick not to standpipe. Use fall protection 00% tie off, no loose tools left in derrick, stand pipe secured, derrick climber assist line tied off, geronimo cart secure. 5 Assist in the installation of dog knot / drilling line clamp, put the proper number of wraps of drill line on the drum, and the installation of guards. Use fall protection 00% tie off. Inspect dog knot / drilling line clamp for excessive wear or improper installations. 6 Assist in the installation of drilling line on dead man / tie down anchor. Assist in installing drilling line to anchor in the proper direction with correct number of wraps and check that guide bolts are in place. Assist in installing clamp plates, nuts and bolts. Assist in installing weight indicator lines to load cell on dead man. Assist in installing secondary safety clamp device directly behind dead man. Inspect brass insert for wear and ensure that it is installed in the proper direction. Secondary safety clamp device as close to dead man as possible. 3

5 Backup Hand DRILLING EQUIPMENT ROTARY TOOLS While drilling line is tightened up ensure that all lines are in proper position. Re-inspect derrick components. Assist in securing derrick snubbing line, make sure all personnel are in proper positions. As derrick is raised, assist in saddling / snubbing in derrick to pinning position with tension on snub line. Inspect derrick pins as directed (drive pins towards each other) and install safety keepers. Assist in installing the remaining floor plates and handrails to secure floor area. If applicable, install rotary guard and chain assembly. Assist in installing the derrick anti fall equipment and ladder. Assist in unbridling and securing bridle lines according to rig design. Make sure that shackles are secured with safety devices. READY TO RIG UP FLOOR Assist in setting in remaining air or hydraulic tuggers / hoist and secure. Tie in air or hydraulic power supply and spool on line as directed. If applicable assist in rigging up wind walls / winterizing. Check tarps/steel wind walls, straps, hooks, pin pockets, safety pins, braces and frame work as directed. Check for tools and other loose objects in derrick. No personnel should be under suspended load (derrick). Observe all lines and hoses in derrick while derrick is being raised (so that they don t get fouled). Use fall protection 00% tie off, tie off line on all tools used in derrick. When working overhead, ensure that there are no personnel below the work area. Use fall protection 00% tie off. Watch for pinch points. Ensure all floor openings are covered. Use fall protection 00% tie off. Watch for pinch points. When working overhead ensure that there are no personnel below the work area. Inspect line, brake, oil, hoses, motor, and valves (inline isolation valve at hoist). Use fall protection 00% tie off. Watch for pinch points. Use tag lines. 4

6 Backup Hand DRILLING EQUIPMENT ROTARY TOOLS 6 Assist in picking up pipe handling equipment. Use tag lines. Inspect Equipment as directed (refer to maintenance manual): Proper pick up slings, choker chains, tag lines and shackles/cleaves. Look for excessive wear on all equipment, be sure that shackles / cleaves are secured with safety keepers. Tongs (pins, jaws, hangers, snub lines, dies, keepers, torque load cell, shackles / cleaves, break out line, jerk chain, handles). Slips (dies, keepers, pins, handles, hinge pins). Dog collar clamp (dies, keepers, pins, handles, hinge pins). Bails (secured to hook and elevator). Elevators (latch, springs, safety latch, hinge pins, elevator ears, check for proper sized bolts). Pipe Spinners (rollers / chains, air or hydraulic supply lines, hydraulic power unit, oil levels, snub lines, handles, safety cables, hanging spring, shackles / cleaves, lubricator). 7 Assist in picking up swivel, kelly, upper kelly valve, and hook up kelly hose according to rig design and JSA. Watch for pinch points, check kelly hose for wear. Use 00% tie off. Ensure proper installation of safety line. Inspect Equipment as directed (refer to maintenance manual): Bushings, rollers, thread connections, oil level, kelly hose secured, grease swivel packing, bales on swivel, proper lifting eyes / nubbings, and check kelly for rounding wear. 8 If applicable assist in installing air or hydraulic kelly spinner according to rig design and JSA. Inspect Equipment as directed (refer to maintenance manual): Thread connections, oil level, hose connections, fly wheel ring, turnbuckles, shackles / cleaves, spinner Ensure that shackles / cleaves are secured with keepers and that air-hydraulic lines are secured. 5

7 Backup Hand DRILLING EQUIPMENT ROTARY TOOLS 9 Assist in rigging up the remainder of the floor. 3 Wireline unit, mud bucket, floor safety valves with proper wrenches, proper wrench for kelly cock, stand pipe, handling subs, instrumentation gauges, lights, safety cables, bit breaker, related BHA equipment, floor safety mat, drilling line spooler / line guide. Inspect Equipment as directed (refer to maintenance manual): Electrical wiring, oil levels, brakes, control valves, counter, sheaves, handles, line wear, hanging cables, rubber seals, guards, safety valves operational, full opening lifting eye / nubbing, O-rings / gaskets, stand pipe valve working properly, safety cables on high pressure hoses, connection threads and faces / seals, hoses, wiring, air leaks, oil leaks, gauges functional, lenses and bulbs, safety cables on lights, bearing, bolts, rollers, shackles / cleaves. READY TO RIG UP MUD SYSTEM Ensure wireline unit is properly connected to floor. Use fall protection 00% tie off. Watch for pinch points. Ensure that all breakers are in the off position before plugging in any electrical equipment, lock out tag out. Assist in documenting the dimensions of BHA equipment, and handling subs Assist in ensuring anti fall protection devices and BOP scaffolding are in place and that conductor is installed. Assist in installing the flowline to the conductor and secure properly. Fill up line hooked up with proper safety cables. Assist in the installation of mud box / buckets return line to shaker tanks. Install / Ensure that a valve is in the bottom of the conductor and plug installed as directed. If conductor is not pre-set, review JSA on setting conductor to well design. Assist as directed in completing rig up of mud pumps and mud tanks. Check for leaks while circulating conductor and complete mud system as directed. Use fall protection 00% tie off. Watch for pinch points. Use tag lines or proper tail in device. Use fall protection 00% tie off. Watch for pinch points. Use tag lines or proper tail in device. 6

8 Backup Hand DRILLING EQUIPMENT ROTARY TOOLS Assist with the pressure testing of mud lines to lower kelly valve. After test is complete assist in bleeding off mud lines and opening the kelly valve. After rig up is complete assist with pre-spud inspection. Attend pre-spud safety meeting prior to drill out. END OF PROCEDURE Keep all personnel clear of high pressure lines while testing. 7

9 TOP DRIVE Romfor International Ltd. Backup Hand TOP DRIVE

10 Backup Hand TOP DRIVE 0 PPE Requirements Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, fall protection. During Pre-Job safety meeting, review JSA s pertaining to TOP DRIVE with all third party personnel at the start of the day, one person will be designated to give signal directions for movement of equipment (usually the Truck Supervisor with hand held radio), Rig Manager and Drillers responsibility to direct and organize crew throughout rig up. All personnel sign off on meeting and current emergency contact numbers are readily available. Make sure all rig up personnel have adequate radio communications (truck & crane operators). Inspect Equipment as directed: Load Lines, Air Tuggers / Hydraulic Tuggers (and lines), Pick Up Slings, Tail Chains, S-Hooks, C- Hooks, Boomers / Load Binders, Shackles, Tag Lines, Sheaves, Top Drive raising assembly, Communication Equipment, Back Up Alarms, Fall Protection, Hand Tools, Fork Lifts, anti-fall equipment, check all top drive skids for loose debris, ensure that shipping pins (on top drive transport skid) are secure quantity four. READY TO SPOT TOP DRIVE SCR HOUSE (SCR MAY BE SPOTTED DURING RIG UP WITH TRUCKS AND CRANES) Assist in spotting Top Drive SCR House (Top Drive support unit) according to grasshopper design and rig design. Make sure that all open holes are covered/flagged. All third party equipment has been visually inspected. Rig up during daylight hours or with adequate lighting. If needed have Top Drive technician on location. On initial rig up or if required have Top Drive technician on location. Watch for pinch points, check loading hitches, use tag lines, watch for overhead loads, use fall protection 00% tie off. 3 Prior to powering up Top Drive SCR unit (Top Drive support unit). Inspect Equipment as directed (refer to maintenance manual): If applicable with additional power pack (Check oil, check fuel, make sure guards are in place, check coolant & cooling system, air filter, belts) cable connections are tight, grounding devices, check breakers, electrical, battery, hook-ups, belts, rubber coverings on plug-ins where required, rubber mat below breaker panel, air lines, grasshopper, hinges, electric cords, hydraulic unit, and hoses. Use 00% tie off, avoid pinch points. 4 Ready to set grasshopper. Assist in positioning of grasshopper to rig floor using proper lifting device. Use tag lines, avoid pinch points, use 00% tie off..

11 Backup Hand TOP DRIVE READY TO RIG UP TOP DRIVE (ASSUMING TOP DRIVE COMPONETS ARE ON LOCATION, DERRICK IS UP AND FLOOR IS READY FOR TOP DRIVE INSTALLATION) For initial rig up have Top Drive technician on location. 5 If applicable assist in installing torque reaction beam (Top Drive technician should be on location for initial installation). Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points 6 Assist in clearing the front end of substructure of all rig components (v-door / beaver slide and cat walk). Use slings for lifting devices. Make sure hand rails, gates are closed, and fall protection is in place for rigging up Top Drive. When working around open V- door section of sub use 00% tie off. 7 Assist in bringing Top Drive lifting assembly on to rig floor and assist in installing into block. Avoid pinch points. 8 If applicable, assist in installing blower inlet hood. 9 Assist in positioning of truck with Top Drive load in front of substructure. Use flagger to position truck. Make sure that truck is centered with well and that load is square on truck. 0 Assist in extending service support / remote blower to proper position using ratchet (swing out). Watch for pinch points. Assist in lifting top section of Top Drive torque guide to floor using proper lifting equipment specific to Rig JSA. (Crane, Air Tugger, Blocks). Stay clear of all lifting lines, use 00% tie off when working with V-Door / Beaver slide door open. Assist in securing top of torque guide while hooking up raising assembly components. Watch for pinch points. Assist in removing runner frame stop pins. Watch for pinch points. 3 While torque guide is unfolding from truck watch all cables and service lines for snags. While torque guide is raising to floor monitor torque guide to a safe distance from substructure while raising. Use flagger to position truck. Stay clear from trucks path. Use handheld radios. Keep floor clear of personnel. Stay clear of overhead/suspended loads.

12 Backup Hand TOP DRIVE Assist in placing local blower in working position and bolt into place. Assist in disconnecting truck winch line from the torque guide when the guide is vertical and in the mast. Assist in lowering truck winch line with air/hydraulic hoist / tugger to ground. Close the V-door gate and secure. Assist in removing the live roller assembly. Assist in installing rig components (v-door / beaver slide and cat walk). While the blocks are lowered watch for any snags. Assist in attaching the air / hydraulic hoist / tugger to lower frame as directed by derrickman. Assist in attaching second air / hydraulic hoist / tugger to lifting eye on yoke. Assist (If qualified) in removing bale pins from yoke (before complete removal of pin ensure that pin is secured with tie off), and assist in lowering to the floor with air / hydraulic hoist / tugger. Assist in installing and pinning upper connecting links to block adapter. Avoid pinch points. Avoid pinch points. Watch for wicker / bur / frayed line on winch. Avoid pinch points. Properly secure with air / hydraulic hoist / tugger while removing and watch for load shifting. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Keep floor clear of personnel. Stay clear of overhead / suspended loads. Keep floor clear of personnel. Stay clear of overhead / suspended loads. Avoid pinch points. Stay clear of overhead / suspended loads. Use air / hydraulic hoist / tugger to keep assembly clear of Top Drive while lowering. Avoid pinch points. Use 00% tie off. Stay clear of overhead/ suspended loads. Avoid pinch points. Ensure that all pin keepers are securely fastened. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. 3

13 Backup Hand TOP DRIVE Assist in installing the blower hose. Assist in removal of upper transport pin from torque guide. Assist in removal of lower transport pin from torque guide. Assist in installing of electric and hydraulic lines from grasshopper to torque guide. Assist in hook up of power and communication cables to driller console. After hydraulic power unit is turned on check for leaks. Assist in removing pins from cylinders, and assist in attaching tensioning cables. Assist in clamping torque guide skid to torque reaction beam as per drillers instructions. Assist in aligning Top Drive to wellbore center as per drillers instructions. Assist with maintenance check list on the Top Drive. Check back up wrench dies. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. 4

14 Backup Hand TOP DRIVE 35 Assist with function test as directed. 36 Assist in installing elevator links, elevators and Stay clear of overhead / attaching link tilt cylinders. suspended loads. Avoid pinch points Watch for Top Drive interference as driller raises Top Drive. Assist in the installation of lower well control valves and clamps, as per drillers directions. Assist in installing of the rotary hose. Assist in making up the first stand of BHA and checking Top Drive alignment with wellbore center. END OF PROCEDURE Stay clear of overhead / suspended loads. Avoid pinch points. Avoid pinch points. Make sure rotary hose is secured at both ends, use tag lines, 00% tie off. Avoid pinch points. Review by JSA and avoid pinch points 5

15 TRUCKS & CRANES Romfor International Ltd. Backup Hand TRUCKS & CRANES

16 Backup Hand TRUCKS & CRANES 0 PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, fall protection. During Pre-Job safety meeting, review JSA s pertaining to with all third party personnel at the start of the day, one person will be designated to give signal directions for movement of equipment (usually the Truck Supervisor with hand held radio), Rig Manager and Drillers responsibility to direct and organize crew throughout rig up. All personnel sign off on meeting and current emergency contact numbers are readily available. Make sure all rig up personnel have adequate radio communications (truck & crane operators) Inspect Equipment as Directed: Load Lines, Pick Up Slings, Tail Chains, S-Hooks, C- Hooks, Boomers / Load Binders, Shackles, Tag Lines, Sheaves, Communication Equipment, Back Up Alarms, Fall Protection, Hand Tools, Man Lifts, Fork Lifts, anti-fall equipment. READY TO RIG UP (ASSUMING RIG COMPONETS ARE ON LOCATION) WHEN UNLOADING OR POSITIONING ANY HEAVEY OR CRITICAL LOADS (SCR-GENERATOR HOUSE, ENGINES, PUMPS, DRAWWORKS) USE ADDITIONAL LIFTING SUPPORT. Assist in setting center line and flag for setting in rig. If required role out protective liner prior to setting matting boards. Assist in setting matting boards to rig specifications. Assist in covering cellar. Assist in spotting substructure on matting boards, assemble, and center over hole. Ensure that all pins and safety keepers are in place. Drive all pins in towards the wellbore. Make sure that all open holes are covered/flagged. All third party equipment has been visually inspected. Rig up during daylight hours or with adequate lighting. Use slings for lifting devices. Never shake loads off of trucks. Use a crane if on location, use short tag lines, keep hands and feet clear while setting mats, replace hole covers if removed. Remove any loose materials from top of matting boards. Keep hands and feet clear, use tag lines, be aware of overhead loads, and use fall protection 00% tie off. Look for rocks, dirt, and loose items on substructure..

17 Backup Hand TRUCKS & CRANES Inspect Equipment as Directed: Bent beams, cracked weld, loose pin pockets, safety chains on pins, safety cables on lights, electric cords, dog house outriggers, mud lines, water lines, air lines, steam lines. 7 Assist in placing required BOP equipment between substructure and secure. Ensure equipment is 00% secure before releasing hoisting equipment. Avoid pinch points. 8 Continue to completely assemble substructure and level. Ensure that all pins and safety keepers are in place. Keep hands and feet clear, use tag lines, be aware of overhead loads, and use fall protection 00% tie off. 9 Assist in installing required floor plates, hand rails, racking board, beaver slide / v-door, catwalk, pipe racks / pipe tubs, stairs, blocks on block stand or catwalk, cover all open holes on rig floor, install required ground rods. If applicable, install air or hydraulic tugger / hoist. Avoid pinch points, use fall protection 00% tie off, make sure that the top of all steps are secured. 0 Assist in placing drawworks and power supply (engines compound, electric motors) in proper position and secure. Inspect loading hitches. Keep hands and feet clear, use tag lines, be aware of overhead loads, use fall protection 00% tie off, be aware of pinch points. Inspect equipment as Directed: Tie downs (turnbuckles, pins, bolts, cables, shackles, cleaves), roller chains, sprockets, guards in place, safety keepers, water lines, oil lines, air lines, loading hitches. Look for rocks, dirt, tools or loose items in skids. THE FOLLOWING SEQUENCE IS A GENERAL GUIDLINE AND WILL VARY DEPENDING ON RIG DESIGN

18 Backup Hand TRUCKS & CRANES Assist in assembling the derrick, ensuring that all pins and keepers are in the proper position. Drive all pins according to rig design. Extend A-Legs to assemble spreader bar with proper pins and safety keepers. Use fall protection 00% tie off, watch for overhead loads, watch for pinch points, and use tag lines. Use a ladder or man lift to pin A-Leg spreader bar (never stand under or between raised A-legs). Inspect equipment as Directed: Crown sheaves, bridle lines, cable sheaves & cables, safety cables on sheaves, safety cable on lights, antifall devices, electrical wires, standpipe clamps, all bolt nuts pins and keepers, climbing ladder, safety lines on tong counter weight bucket, girts (bent), crown saver boards and covers, crown light, cracked welds, lube and grease all sheaves. Look for rocks, dirt, tools or loose items in derrick beams. Use fall protection 00% tie off. 3 Assist in stringing all lines, cables, ropes, electrical lights, and secure in proper position. Make up stand pipe. Use fall protection 00% tie off. Check O-rings in hammer unions. When derrick is in the proper position, pin to derrick shoes, and place on derrick stand as directed (place derrick stand under upright bracing). Watch lines, stay clear of overhead loads, make sure the derrick stand is on level ground, watch for pinch points, have a designated person giving directions. Never place derrick stand directly under crown itself. 3 When derrick board is in proper position pin to derrick. Drive all pins from inside to outside, install all pins and keepers as directed. Assist in rigging up wind walls / winterizing around board to derrick if applicable. Avoid pinch points, use fall protection 00% tie off, look for loose items in / on board. Use tag lines. Check tarps / steel wind walls, straps, hooks, pin pockets, safety pins, sala blocks, braces and frame work. Inspect equipment as Directed: Proper securing devices on fingers, footing flaps, diving board, winches, hand rails, fall protection, pins and safety keepers properly installed, geronimo cart, all equipment properly secured. Make sure proper pin and keeper are used in the geronimo cart. Inspect geronimo cart brake equipment and rollers. 3

19 Backup Hand TRUCKS & CRANES 4 When A-Legs are in proper position assist in pinning in place, be sure that the bridle / bull / raising line stays in sheaves properly, use the cranes spreader beam with two short chokers to raise the A-Legs. Whenever possible according to rig design and JSA. Avoid pinch points, use fall protection 00% tie off. 5 When dog house is in proper position, secure to outriggers. Install all remaining stairs and handrails as directed. Use tag lines, use fall protection 00% tie off. 6 When mud tanks/pits are in proper position, assist in installing flow line, stairs, hand rails, shakers, degasser, desander, desilter, ground rods, lighting fixtures, safety cables, slides, other required equipment, and remove equipment from mud tanks/ pits. Use fall protection 00% tie off. Inspect Equipment as Directed: Mud lines, water lines, electric lines & plugs, dresser couplings, steam lines, door seals, shakers, eye wash station, showers, and all PP&E equipment. 7 When mud pumps are in proper position, hook up to power source if required. Assist in plumbing mud pumps into tanks / pits, assist in installing high pressure mud lines, safety cables, safety clamps, ground rods, electric cables, proper guards. Watch for pinch points, check loading hitches, use tag lines, watch for overhead loads, use fall protection 00% tie off. 8 When mud house and mud mixing/related equipment are in proper position, assist in hooking up all required lines and cables. Watch for pinch points, check loading hitches, use tag lines, watch for overhead loads, use fall protection 00% tie off, check grounding equipment. Inspect Equipment as Directed: Eye wash stations, PP&E, electrical, dresser couplings, plumbing, lifting eyes, loading hitches. Look for rocks, dirt, tools or loose items in the skids. 9 When water tank, fuel tank, accumulator house, generator house, generator sets, boilers, heaters, toolpushers house, change house, parts house, catch all box, choke manifold, gas buster / gas separator, trip tank, are in proper position according to rig design hook up all required lines, cables and plumbing as For fuel tank follow SPCC plan or environmental control plan. Watch for pinch points, check loading hitches, use tag lines, watch for overhead loads, use fall protection 00% tie off. 4

20 Backup Hand TRUCKS & CRANES Inspect Equipment as Directed: Electrical, ground cables, loading hitches, fuel lines, fuel connections, air lines, exhaust stacks, lights, fuel/ propane tank. 0 Assist in installing bridle line in hook, if applicable secure yolk side of bridle line to equalizer to prevent overbalancing of bridle line when lowering to floor. Watch for pinch points, make sure that hook latches. Assist in stringing up blocks and crown. Use string up crew whenever possible (review JSA), secure blocks to block stand / catwalk. Make sure that lines are not crossed. Watch for pinch points, watch for overhead loads, use fall protection 00% tie off. Inspect Equipment as Directed: String up cable, snakes, crown sheaves, block sheaves, drilling line, line retainers, dead man/ drilling line anchor, lattice grooving / drum line, brakes, drum drilling line clamp, secondary safety clamp on drilling line anchor, tie downs on blocks. Use ratchet type load binders / boomer on chain that secures blocks to block stand or cat walk. Before setting pipe racks / pipe tubs, refer to Best Practices Handling Tubulars Procedure. Avoid pinch points, keep hands and feet clear, watch for overhead load, use tag lines. On pipe tubs do not use drilling line for chokers / lifting / bridle line. 3 Ensure that all ditches have been dug deep enough and large enough to handle all anticipated fluids in case of a spill. Use trenching equipment whenever possible. Refer to SPCC section of HSE manual. Stay clear of trenching equipment while in operation. END OF PROCEDURE 5

21 DRILLING EQUIPMENT ROTARY TOOLS Romfor International Ltd. Derrickman DRILLING EQUIPMENT & ROTARY TOOLS

22 Derrickman DRILLING EQUIPMENT ROTARY TOOLS 0 PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, fall protection. During Pre-Job safety meeting, review JSA s pertaining to and STARTING EQUIPMENT as per job specific. All personnel sign off on meeting and current emergency contact numbers are readily available. Inspect Equipment as Directed: Pick Up Slings, Shackles, Tag Lines, Sheaves, Back Up Alarms, Fall Protection, Hand Tools, Man Lifts, Fork Lifts, anti-fall equipment and hoisting equipment. Make sure that all open holes are covered/flagged. READY TO RIG UP Run lines: Fuel, Air, Electric, Steam, Hydraulic, Water Ensure that all lines and connections are visually inspected prior to hook up. Check to make sure that all breakers are off prior to plugging in electric lines (all power sources are off). 3 Connect chains, belts and install guards to drawworks and power supply. Ensure all bolts, fasteners are in place and secure. READY TO POWER UP RIG 4 Prior to running cold start (if applicable). Make sure that all fire extinguishers are in place and in working condition. Inspect Equipment (refer to maintenance manual): Check oil, check fuel, belt positioning, make sure guards are in place, cable connections, battery, battery box cover, crank, and air lines. Watch for pinch points. Make sure that battery is covered. Use proper hearing protection. Use extreme caution when switching belts. 5 Assist in start up of the cold start (if applicable). Use electric start if possible. 6 Prior to start of generator set. Lock out tag out station in place ready for use. Inspect Equipment as Directed (refer to maintenance manual): Check oil, check fuel, check coolant & cooling system, make sure guards are in place, cable connections, grounding devices, check breakers, air filter, electrical hook-ups, belts, battery, battery box cover, rubber mat below breaker panel, and air lines..

23 Derrickman DRILLING EQUIPMENT ROTARY TOOLS 7 Assist in start up of generator set. Watch for pinch points. Make sure battery is covered. Be aware, there may be foreign material blowing from radiator or air starters during initial start up. Check for proper voltage and hertz. Use proper hearing protection. 8 Prior to start of air compressors. Inspect Equipment as Directed (refer to maintenance manual): Check oil, belt positioning, make sure guards are in place, air filters, proper valve positioning, check gauges, electric lines, air tank pressure relief valves, and air lines. 9 0 Assist in start up of air compressors. Assist in rig up of water tank and circulating system. Check plumbing to water source, centrifugal pumps, electric motors, wiring, switches, plug-ins, hoses, connections, grounding, covers, handrails, discharge lines, valves. If applicable, assist in rig up of boiler / rig heating system. Check electrical wiring, pumps, switches, valves, fuel lines, fuel regulators, water lines, blow down lines, steam lines, grounding, duct work, man hole covers, pressure relief valves, chemical injecting unit, gauges, and connections. READY TO POWER UP DRAWWORKS Watch for pinch points. Automatic air compressor shut off working properly. Guards in place. Use proper hearing protection. Ensure no leaks in water circulating system. Use fall protection 00% tie off. Watch for pinch points. Ensure no leaks in heating system. Use fall protection 00% tie off. Watch for pinch points.

24 Derrickman DRILLING EQUIPMENT ROTARY TOOLS Prior to power up of Drawworks (Engines Compound/ Electric Motor). Inspect Equipment as Directed (refer to maintenance manual): Check engines compound, check all fluid levels, chains, guards are in place, belt positioning, leaks on all lines and equipment, proper placement of all bolts and pins, drawworks tie downs, electrical power supply cords. Check traction motors, ensure connections are tight, inspect brushes, inspect electrical power cords and ends, all guards are in proper place, blower filter / hoses. Ensure lock outs are working properly, keys in place, high voltage signs are in place, all controls in the neutral/shut off position. 3 Assist in start up of Drawworks (Engines Compound / Electric Motors). Watch for pinch points, emergency shut down operational, guards in place. Use proper hearing protection. READY TO RAISE DERRICK 4 Prior to raising derrick. Raise derrick during daylight hours or with adequate lighting. Inspect Equipment (refer to maintenance manual): Inspect lines, sheaves, cables, rollers, pins, safety keys, electrical lines, lights, bolts, safety cables, bridle line in sheaves properly, stand pipe and kelly hose properly secured with cables. Kelly hose secured to derrick not to standpipe. Use fall protection 00% tie off, no loose tools left in derrick, stand pipe secured, derrick climber assist line tied off, geronimo cart secure. 5 Ensure drilling line is strung up properly. Assist in the installation of dog knot / drilling line clamp and put the proper number of wraps of drill line on the drum. Set crown saver in proper position. Inspect brakes and linkage. Assist in the installation of guards. Use fall protection 00% tie off. Inspect dog knot / drilling line clamp for excessive wear or improper installations. 6 Assist in the installation of drilling line on dead man / tie down anchor. Install drilling line to anchor in the proper direction with correct number of wraps and check that guide bolts are in place. Install clamp plates, nuts and bolts. Install weight indicator lines to load cell on dead man. Install secondary safety clamp device directly behind dead man. Inspect brass insert for wear and ensure that it is installed in the proper direction. Secondary safety clamp device as close to dead man as possible. 3

25 Derrickman DRILLING EQUIPMENT ROTARY TOOLS While drilling line is tightened up ensure that all lines are in proper position. Re-inspect derrick components. Secure derrick snubbing line, make sure all personnel are in proper positions. As derrick is raised, saddle / snub in derrick to pinning position with tension on snubbing line. Inspect derrick pins (drive pins towards each other) and install safety keepers. Assist in installing the remaining floor plates and handrails to secure floor area. If applicable, install rotary guard and chain assembly. Ensure proper installation of derrick anti fall equipment and ladder. Unbridle and secure bridle lines according to rig design. Make sure that shackles are secured with safety devices. Prepare derrick board for handling tubulars (lower fingers, diving board, rig up anti-fall devices, and mechanical pull back device). Inspect: Handling ropes, anti-fall devices, work belts, mechanical pull back device and geronimo cart. READY TO RIG UP MUD SYSTEM Check for tools and other loose objects in derrick. No personnel should be under suspended load (derrick). Observe all lines and hoses in derrick while derrick is being raised (so that they don t get fouled). Use fall protection 00% tie off, tie off line on all tools used in derrick. When working overhead, ensure that there are no personnel below the work area. Use fall protection 00% tie off. Watch for pinch points. Ensure all floor openings are covered. Use fall protection 00% tie off. Watch for pinch points. When working overhead ensure that there are no personnel below the work area. Use fall protection 00% tie off. Watch for pinch points. When working overhead ensure that there are no personnel below the work area. Ensure geonimo cart has proper brass, pin, and cart is in the correct direction with safety cable installed. 4

26 Derrickman DRILLING EQUIPMENT ROTARY TOOLS 5 Ensure proper rig up of mud pumps. Belts, guards, suction lines, discharge lines, pop off lines and settings, dresser sleeves, pulsation dampeners, lights, electrical wiring, switches, charge pumps, cooling pumps, lock outs, oil levels, gauges, valves, safety lines, safety cables, grounding devices. Ensure there are no tools in on or around mud equipment. Ensure that all breakers are in the off position before plugging in any electrical equipment, lock out tag out. Use fall protection 00% tie off. Watch for pinch points. 6 7 Ensure proper rig up of mud tanks. Mud hoppers / house, desander, desilter, agitators, low pressure gun lines, valves, degasser, shale shaker, discharge slides, shaker screens, flow line, dresser sleeves, dump gates and seals, lighting, electrical wiring, plug-ins, switches, new design caustic barrel, PPE boxes, eye wash stations, fire extinguishers, shower, mud gas separator, grounding devices, bar-salt-gel-chemical silos, corrosion inhibitor pumps, trip tanks, trip pumps, mud monitoring equipment. Ensure anti fall protection / devices and BOP scaffolding are in place and that conductor is installed. Assist in installing the flowline to the conductor and secure properly. Fill up line hooked up with proper safety cables. Assist in the installation of mud box / buckets return line to shaker tanks. Install / Ensure that a valve is in the bottom of the conductor and plug installed. If conductor is not pre-set, review JSA on setting conductor to well design. Ensure that any equipment / tools on tanks that are not in use are properly stored. Ensure that all breakers are in the off position before plugging in any electrical equipment, lock out tag out. Use fall protection 00% tie off. Watch for pinch points. Use fall protection 00% tie off. Watch for pinch points. Use tag lines or proper tail in device Ensure mud tanks are filled with the proper drilling fluid per well design. Check for leaks in mud system. Run agitators, low pressure mixing system, electric degasser, and solids control equipment. Check for leaks while circulating conductor and complete mud system. Circulate thru pop off valves and lines. Reset pop off valves to proper setting, and pressure test mud lines to lower kelly valve. Pressure up to anticipated working pressure. Make sure that all centrifugal pumps are rotating in the proper direction. Check mud pumps for proper lubrication, on gear end and fluid end. Keep all personnel clear of high pressure lines while testing. 5

27 Derrickman DRILLING EQUIPMENT ROTARY TOOLS After test is complete, bleed off mud lines and open kelly valve. Ensure all required mud chemicals are on location as per drilling plan. After rig up is complete assist with pre-spud inspection. Attend pre-spud safety meeting prior to drill out. END OF PROCEDURE 6

28 TOP DRIVE Romfor International Ltd. Derrickman TOP DRIVE

29 Derrickman TOP DRIVE 0 PPE Requirements Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, fall protection. During Pre-Job safety meeting, review JSA s pertaining to TOP DRIVE with all third party personnel at the start of the day, one person will be designated to give signal directions for movement of equipment (usually the Truck Supervisor with hand held radio), Rig Manager and Drillers responsibility to direct and organize crew throughout rig up. All personnel sign off on meeting and current emergency contact numbers are readily available. Make sure all rig up personnel have adequate radio communications (truck & crane operators). Inspect Equipment as directed: Harpoon assembly (properly installed and latches in working order before derrick is raised), Load Lines, Air Tuggers / Hydraulic Tuggers (and lines), Pick Up Slings, Tail Chains, S-Hooks, C-Hooks, Boomers/Load Binders, Shackles, Tag Lines, Sheaves, Top Drive raising assembly, Communication Equipment, Back Up Alarms, Fall Protection, Hand Tools, Fork Lifts, anti-fall equipment, check all Top Drive skids for loose debris, ensure that shipping pins (on Top Drive transport skid) are secure quantity four. READY TO SPOT TOP DRIVE SCR HOUSE (SCR MAY BE SPOTTED DURING RIG UP WITH TRUCKS AND CRANES) Assist in spotting Top Drive SCR House (Top Drive support unit) according to grasshopper design and rig design. Make sure that all open holes are covered/flagged. All third party equipment has been visually inspected. Rig up during daylight hours or with adequate lighting. If needed have Top Drive technician on location. On initial rig up or if required have Top Drive technician on location. Watch for pinch points, check loading hitches, use tag lines, watch for overhead loads, use fall protection 00% tie off. 3 Prior to powering up Top Drive SCR unit (Top Drive support unit). Inspect Equipment as directed (refer to maintenance manual): If applicable with additional power pack (Check oil, check fuel, make sure guards are in place, check coolant & cooling system, air filter, belts) cable connections are tight, grounding devices, check breakers, electrical, battery, hook-ups, belts, rubber coverings on plug-ins where required, rubber mat below breaker panel, air lines, grasshopper, hinges, electric cords, hydraulic unit, and hoses. Use 00% tie off, avoid pinch points..

30 Derrickman TOP DRIVE Ready to set grasshopper. Assist in positioning of grasshopper to rig floor using proper lifting device. READY TO RIG UP TOP DRIVE (ASSUMING TOP DRIVE COMPONETS ARE ON LOCATION, DERRICK IS UP AND FLOOR IS READY FOR TOP DRIVE INSTALLATION) If applicable assist in installing torque reaction beam (Top Drive technician should be on location for initial installation). Ensure that derrick board area is clear to receive Top Drive. Assist in hoisting Top Drive lifting assembly to rig floor and installing into blocks. If applicable, assist in installing the blower inlet hood. Assist in extending the service support / remote blower to proper position using ratchet (swing out). Assist in lifting top section of Top Drive torque guide to floor using proper lifting equipment specific to Rig JSA (Crane, Air Tugger, Blocks). Assist in securing top of torque guide while hooking up raising assembly components. Slowly follow top of torque guide up thru derrick while torque guide is unfolding from truck and watch for hang up points or interference in derrick. When torque guide is in position and is ready to be latched, be in position to latch harpoon. Use tag lines, avoid pinch points, use 00% tie off. For initial rig up have Top Drive technician on location. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points Use slings for lifting devices. Make sure hand rails, and fall protection is in place for rigging up Top Drive. Watch for pinch points. When working around open V-door section of sub use 00% tie off. Avoid pinch points, lube ratchet device on load binders. Stay clear of all lifting lines, use 00% tie off when working with V-Door / Beaver slide door open. Watch for pinch points. Use handheld radios for communication. Stay clear of overhead / suspended loads. Watch service loops and tensioning cable for snags or problems. Use 00% tie off. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points.

31 Derrickman TOP DRIVE Ensure that harpoon is latched. Attach both safety cables to the torque guide. Remove safety pin and unlock the lifting hook latch with the key prior to lowering raising assembly. Monitor assembly for snags while lowering blocks to Top Drive. Be in position on Top Drive to remove lower interface lifting frame from torque guide as per installation instructions. Attach air / hydraulic hoist / tugger to lower frame. After driller lowers upper runner frame, remove from torque guide as per installation instructions. Attach second air / hydraulic hoist / tugger to lifting eye on yoke. With qualified assistance remove bale pins from yoke (before complete removal of pin secure with tie off), and lower assembly to floor with air / hydraulic hoist / tugger. With qualified assistance pin upper connecting links to block adapter. With qualified assistance install blower hose. With qualified assistance remove upper transport pins from torque guide. With qualified assistance remove lower transport pin from torque guide. Ensure that both latch dogs are supporting torque guide. Shackles / cleaves are secured with keepers. Keep floor clear of personnel. Avoid pinch points. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. Use 00% tie off. Stay clear of overhead/ suspended loads. Use air / hydraulic hoist / tugger to keep assembly clear of Top Drive while lowering. Avoid pinch points. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. Install all pin keepers and secure. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead/ suspended loads. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. 3

32 Derrickman TOP DRIVE Assist in installing electric and hydraulic lines from grasshopper to torque guide. Assist in hook up of power and communication cables to driller console. Remove pins from tensioning cylinders, and attach tensioning cables. Shift hydraulic valve on lower skid section to retract the two hydraulic cylinders that will tighten the torque guide tensioning cables. With qualified assistance clamp torque guide skid to torque reaction beam and secure as per installation instructions. Adjust Top Drive alignment to wellbore center as directed. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. Make sure to use lock out / tag out. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points. Use 00% tie off. Keep floor clear of personnel. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points Assist with maintenance check on the Top Drive. Assist with function test, check all electrical connections, and rotation of electric motors. Use 00% tie off. Stay clear of overhead / suspended loads. Avoid pinch points Assist in installing of elevator links and elevators. Attach link tilt cylinders. Monitor Top Drive travel to ensure no interference. Check blower clearance near crown. Assist in installing the rotary hose. Assist in making up first stand of BHA and checking Top Drive alignment with wellbore center. END OF PROCEDURE Stay clear of overhead / suspended loads. Avoid pinch points. Watch for clearance on derrick board and service supports. Make sure rotary hose is secured at both ends, use tag lines, 00% tie off. 4

33 TRUCKS & CRANES Romfor International Ltd. Derrickman TRUCKS & CRANES

34 Derrickman TRUCKS & CRANES 0 PPE Requirements - Hard Hat, Safety Glasses, Work Gloves, Steel Toe Shoes, Back Support, fall protection. During Pre-Job safety meeting, review JSA s pertaining to with all third party personnel at the start of the day, one person will be designated to give signal directions for movement of equipment (usually the Truck Supervisor with hand held radio), Rig Manager and Drillers responsibility to direct and organize crew throughout rig up. All personnel sign off on meeting and current emergency contact numbers are readily available. Make sure all rig up personnel have adequate radio communications (truck & crane operators) Inspect Equipment as Directed: Load Lines, Pick Up Slings, Tail Chains, S-Hooks, C- Hooks, Boomers / Load Binders, Shackles, Tag Lines, Sheaves, Communication Equipment, Back Up Alarms, Fall Protection, Hand Tools, Man Lifts, Fork Lifts, anti-fall equipment. READY TO RIG UP (ASSUMING RIG COMPONETS ARE ON LOCATION) WHEN UNLOADING OR POSITIONING ANY HEAVEY OR CRITICAL LOADS (SCR-GENERATOR HOUSE, ENGINES, PUMPS, DRAWWORKS) USE ADDITIONAL LIFTING SUPPORT. Assist in setting center line and flag for setting in rig. If required, role out protective liner prior to setting matting boards. Assist in setting matting boards to rig specifications. Assist in covering cellar. Assist in spotting substructure on matting boards, assemble, and center over hole. Ensure that all pins and safety keepers are in place. Drive all pins in towards the wellbore. Make sure that all open holes are covered/flagged. All third party equipment has been visually inspected. Rig up during daylight hours or with adequate lighting. Use slings for lifting devices. Never shake loads off of trucks. Use a crane if on location, use short tag lines, keep hands and feet clear while setting mats, replace hole covers if removed. Remove any loose materials from top of matting boards. Keep hands and feet clear, use tag lines, be aware of overhead loads, and use fall protection 00% tie off. Look for rocks, dirt, and loose items on substructure..

Superintendent Rig Checklist

Superintendent Rig Checklist Superintendent Rig Checklist Rig #: Operating Company: Well Name & #: Date/Time of Inspection: Inspected By: Company Man: Tool pusher: Driller: Ton Miles Logged and up to date: BOP Drill date and time:

More information

NATIONAL 110 UE 1500 HP SCR

NATIONAL 110 UE 1500 HP SCR NATIONAL 110 UE 1500 HP SCR DRAWWORKS: NATIONAL 110 UE lsoohp Single Drum Drawworks, LEBUS Grooved f/1-3/8" line, Makeup & Breakout Catheads, w I PETRON Driller's Control Console, Crown-0-Motic. Drawworks

More information

Oil Rigs Now Houston, Texas

Oil Rigs Now Houston, Texas Oil Rigs Now Houston, Texas 713-570-6450 sales@oilrigsnow.com DRAWWORKS: DRILLMASTER 1200M New (2009) Single Drum Drawworks, 1,200 Hp Lebus grooved for 1-1/4 Drilling Line, Hydraulic operated Makeup &

More information

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG

SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SPECIFICATION OF ZJ40/2250LDB DRILLING RIG SECTION CATEGORY A HOISTING EQUIPMENT B ROTARY EQUIPMENT C PUMPING AND HIGH PRESSURE DISCHARGE SYSTEM D LOW PRESSURE MUD SYSTEM E PRIME MOVERS / TRANSMISSION

More information

Oil Rigs Now Houston, Texas

Oil Rigs Now Houston, Texas Oil Rigs Now Houston, Texas 713-570-6450 DRAWWORKS: SUPERIOR 1000M New (2006) Single Drum Drawworks, 1,000 Hp Lebus grooved for 1-1/4 Drilling Line, Air operated Makeup & Breakout Catheads, Over-Running

More information

McKissick 200mt. Stabbing board

McKissick 200mt. Stabbing board MOMENTUM RIG 5 RIG TYPE AND NUMBER: Momentum 5 AGE OF RIG: DATE OF COMPLETION OF LAST CONTRACT: New 1998 delivered May 2003. Working for Karasu At Present DRAWWORKS Make and Model Cooper 750 Carrier #

More information

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM 750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM PAGE 1 OF 7 DRAWWORKS: TSM 7000 Drawworks, 750hp, grooved f/1-1/8 Drill Line, p/b 540HP CAT C-15, w/allison CLT- 6061 Automatic Transmission, Right Angle Drive,

More information

JSAP - AC - Main MCC - Shutdown.doc JSAP - AC - Main MCC - Start Up - REV1.doc JSAP - AC - MCC Feeder - Shutdown.doc JSAP - AC - MCC Feeder - Start

JSAP - AC - Main MCC - Shutdown.doc JSAP - AC - Main MCC - Start Up - REV1.doc JSAP - AC - MCC Feeder - Shutdown.doc JSAP - AC - MCC Feeder - Start JSAP - AC - Main MCC - Shutdown.doc JSAP - AC - Main MCC - Start Up - REV1.doc JSAP - AC - MCC Feeder - Shutdown.doc JSAP - AC - MCC Feeder - Start Up.doc JSAP - AC - Mud Pump(s) - Rig Out.doc JSAP - AC

More information

OilRigsNow.com Houston,TX USA (713)

OilRigsNow.com Houston,TX USA (713) Current DRAWWORKS: WILSON Mogul Single Drum Drawworks S/N 5131, Lebus Grooved f/ 1-1/8 Line, WILSON Torcair Brake, FOSTER/AMERICAN Catheads, Air Drillers Control Console, Crown-O-Matic. COMPOUND: EMSCO

More information

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications Reimpet International Corporation, 1302 Miles St., Houston, TX 77015 sales@reimpetintl.com Inventory of

More information

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) FOR MORE DETAILS CONTACT: info@petrowatch.com SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS) THE RIG IS COMPLETE IN ALL RESPECTS AND EQUIPPED WITH

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information

Services. Rental Equipment RENTAL DIVISION PRODUCT LINES. LOAD RESTRAINTS Load Binders (Lever & Ratchet) Truck Tie-down Assemblies Boomer Chains

Services. Rental Equipment RENTAL DIVISION PRODUCT LINES. LOAD RESTRAINTS Load Binders (Lever & Ratchet) Truck Tie-down Assemblies Boomer Chains RENTAL DIVISION PRODUCT LINES In a continuing effort to give the customer the opportunity to get an assortment of equipment, services and products from one supplier, our rental division was established

More information

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton. MOMENTUM RIG 4 RIG TYPE AND NUMBER: Wilson 75. Carrier Drive Momentum Rig 4 AGE OF RIG: Man. Dec. 1981, Refurb. July. 2011 DATE OF COMPLETION OF LAST CONTRACT: 1 DRAW WORKS a Make and Model Wilson 75 b

More information

DRAWWORKS/POWER MAST/SUB STRUCTURE MUD PUMPS

DRAWWORKS/POWER MAST/SUB STRUCTURE MUD PUMPS DRAWWORKS/POWER NATIONAL T 32 Single Drum Drawworks, S/N N/A, 400 HP, LEBUS Grooved f/1 1/8 Line, AMERICAN Makeup & Breakout Catheads, Rotary Table Drive, Quad Water Brake, Driller s Control Console w/air

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,000 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 4,800 METERS WITH 127 mm DRILL PIPE A.

More information

LAGO Energy Presents,

LAGO Energy Presents, LAGO Energy Presents, www.lagoenergyusa.com ONE 15OO HP ELECTRIC DIESEL LAND RIG A PROJECT AVAILABLE NOW FOR SALE mball@lagoenergyusa.com Ref. LEATLAND01 Sales Price: US$15.2 million 1 PRODUCT INFORMATION

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

Top Drive Rig Floor Safety Orientation Doghouse Manual

Top Drive Rig Floor Safety Orientation Doghouse Manual Bulletin 20900e TESCO TOP DRIVES CASING DRILLING AZIMUTH TUBULAR SERVICES Top Drive Rig Floor Safety Orientation Doghouse Manual Better Ways to The Bottom www.tescocorp.com Page TESCO Better Ways to The

More information

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE BIOFUEL

More information

HMIS Top Drive System

HMIS Top Drive System Installation Guide HMIS Top Drive System 250TON HMIS 475HP DOCUMENT NAME: 880026 REV 3 INSTALLATION GUIDE COPYRIGHT AND DISCLAIMER Tesco Corporation ( TESCO ) has made every effort to ensure that this

More information

19,683 8,

19,683 8, General Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep UL MS HZ BLK 6 Unit #3107 1 8/19/017 Rig Information 105 105 D-017-006 Wilson / Mahan Category Field Operator Daily Ftg

More information

GENERAL HOUSEKEEPING. 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash?

GENERAL HOUSEKEEPING. 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash? Inspection Checklist GENERAL HOUSEKEEPING 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash? 2. Is oil, grease, or other liquids, when spilled on the floor

More information

Table of Content 1 Technical Description... 3

Table of Content 1 Technical Description... 3 Page: 2 of 15 Table of Content 1 Technical Description... 3 1.1 General Description... 3 1.2 Swivel & Gearbox Assembly... 4 1.3 Suspension System... 5 1.4 Drilling Motor Assembly... 6 1.4.1 AC Drilling

More information

Rig 90. Rig 97. Future Technology From NOV

Rig 90. Rig 97. Future Technology From NOV Rig 90 Rig 97 Future Technology From NOV 1 - The Masts - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 2 - The Substructures - - - - - - - - - - - - - - - - - - - - - - - - - 2 3 - The

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A. SCHEDULE 1 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) DATE: CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL

More information

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 11,480 ft (3,500 m) Operating Tubulars Range III - Singles

More information

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m) General Fast Moving Triple Rig Max. Hoisting Capacity Max. Drilling Depth 24,600 ft (7,500 m) Operating Tubulars Range II - Triple Overall Rig Height 180.4 ft (55.0 m) Transportation Street Legal Loads

More information

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity Max. Pushing Capacity 72.8 short tons (66 metric tonnes) Max. Drilling Depth 16,400 ft (5,000 m) Operating Tubulars Range III - Singles

More information

contents iii Figures and Tables Foreword Acknowledgments Units of Measurement xii

contents iii Figures and Tables Foreword Acknowledgments Units of Measurement xii Figures and Tables Foreword ix Acknowledgments Units of Measurement vi xi xii Introduction 1 Derricks versus Masts 2 Hoisting System Components 2 Top Drives 3 Blocks 4 Drilling Line 4 Deadline Tie-Down

More information

While handling materials, employees must abide by the following requirements:

While handling materials, employees must abide by the following requirements: Material Handling and Equipment 12.1 Material Handling by Individuals While handling materials, employees must abide by the following requirements: a) Know the safe way to lift: i. A secure footing, feet

More information

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500 SCHEDULE 1 DATE: NOVEMBER 2018 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) CONTRACTOR: JOMAX DRILLING (1988) LTD. DEPTH CAPACITY: 5,400 METERS WITH 127 mm DRILL PIPE A.

More information

RIGS LOADCRAFT INDUSTRIES, LTD. WORKOVER. drawworks PARTS/SERVICE. mud systems (80 0 ) L O A D C R A F T I N D U S T R I E S, LT D.

RIGS LOADCRAFT INDUSTRIES, LTD. WORKOVER. drawworks PARTS/SERVICE. mud systems (80 0 ) L O A D C R A F T I N D U S T R I E S, LT D. LOADCRAFT INDUSTRIES, LTD. WE BUILD RIGS. L O A D C R A F T I N D U S T R I E S, LT D. RIGS drawworks WORKOVER mud systems PARTS/SERVICE (80 0 ) 8 0 3-018 3 3811 N. BRIDGE B R A D Y, T E X A S 7 6 8 2

More information

LOC 400 Drilling Rig

LOC 400 Drilling Rig TABLE OF CONTENTS 1 DESCRIPTION...3 1.1 INTRODUCTION 3 1.2 CASING WHILE DRILLING 4 1.3 CONTAINERIZED DESIGN 5 1.4 AUTOMATED DRILLING 6 1.5 INTEGRATED DESIGN 7 1.6 OFFLINE BOP TESTING 8 1.7 EMERGENCY BACKUP

More information

RIG 32. Rig 32. Page 1 of 13

RIG 32. Rig 32. Page 1 of 13 Rig 32 Page 1 of 13 1 INTRODUCTION 1.1 RIG Rig Name: Rig Manufacturer: Year of Manufacturer: Rig Depth Rating: MB Century Rig 32 HH350-B Super Single Electric/Hydraulic Rig 2012 12,000 ft (3,650 m) with

More information

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. PACE -B Series Rig With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation. Introducing the PACE -B Series Rig D r a w w o r k s The new PACE

More information

PARTIAL PRODUCT LIST. Carbon Steel Tubes for Boiler & Heat Exchanger: Carbon Steel Pipe for Ordinary Piping: Carbon Steel Pipes for Pressure service:

PARTIAL PRODUCT LIST. Carbon Steel Tubes for Boiler & Heat Exchanger: Carbon Steel Pipe for Ordinary Piping: Carbon Steel Pipes for Pressure service: Carbon Steel Pipe for Ordinary Piping: Carbon Steel Tubes for Boiler & Heat Exchanger: Carbon Steel Pipes for Pressure service: Carbon Steel Pipes for Stucture purposes: Arc welded carbon steel pipes for

More information

SAFETY GUIDANCE MATERIAL

SAFETY GUIDANCE MATERIAL SAFETY GUIDANCE MATERIAL SAFETY OPERATIONS GUIDANCE MONDAY MARCH 23, 2015 This safety resource was written for the scrap industry by the scrap industry and was developed to assist you in making your scrap

More information

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28 MORNING DRILLING REPORT Date: 6/5/2013 Day: 1 Present Operation: Drilling 12 1/4" hole with bit # 1 Depth: 609 Footage: 569 Rot. Hrs.: 6 Cum Rot Hrs: 6 Daily ROP: 94.83 Brief Description Of Operations:

More information

Schede tecniche Corsair 300 PDB

Schede tecniche Corsair 300 PDB Progetto per la realizzazione di un impianto geotermico pilota nell area del Permesso di Ricerca Scarfoglio PROGETTO DEFINITIVO Documento SCA-001-PD-00-A01 Schede tecniche Corsair 300 PDB gennaio 2015

More information

TRUCKINGTRUTH.COM T T. Daniel B s Pre-Trip Inspection Checklist

TRUCKINGTRUTH.COM T T. Daniel B s Pre-Trip Inspection Checklist TRUCKINGTRUTH.COM T T Daniel B s Pre-Trip Inspection Checklist 1 My pre-trip begins as I approach the vehicle. I am looking for leaks, leaning one way or the other (which may indicate a low tire or bad

More information

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28 MORNING DRILLING REPORT Date: 8/18/2013 Day: 1 Present Operation: waiting on daylight to finish rig move Depth: Footage: Rot. Hrs.: Cum Rot Hrs: 0 Daily ROP: ##### Brief Description Of Operations: move

More information

Ideco - H25 Information Document

Ideco - H25 Information Document Ideco - H25 Information Document CONTENTS Ideco H25 Drilling Rig Inventory... 1 Auxiliary Equipment... 3 Well Control Equipment... 3 Drill String Primary and Secondary String, API Premium Grade... 4 Rig

More information

Operator s Manual A-1 Series EZ Rig Crane

Operator s Manual A-1 Series EZ Rig Crane Manual No. 00201 February 2009 Operator s Manual A-1 Series EZ Rig Crane WARNING: Before operating this lift, read and understand this operator s manual. Become familiar with the potential hazards associated

More information

1 CLEAN BELT TABLES Apr CLEAN UNDER MOVING CONVEYOR Apr CLEAN PRODUCT CHUTES Apr CLEAN TRUCK PITS Apr-08

1 CLEAN BELT TABLES Apr CLEAN UNDER MOVING CONVEYOR Apr CLEAN PRODUCT CHUTES Apr CLEAN TRUCK PITS Apr-08 TABLE OF CONTENTS FOR # 1 PAGE # SHIPPING UNIT # 1 REVISED 1 CLEAN BELT TABLES Apr-08 2 CLEAN UNDER MOVING CONVEYOR Apr-08 3 CLEAN PRODUCT CHUTES Apr-08 4 CLEAN TRUCK PITS Apr-08 5 CLEAN CONVEYOR MAGNETS

More information

Operator s Manual. 2010, 2015, 2020, 2025 Material Lifts

Operator s Manual. 2010, 2015, 2020, 2025 Material Lifts Operator s Manual 2010, 2015, 2020, 2025 Material Lifts April 2005! Before operating this lift, read and understand this Operator s Manual. Become familiar with the potential hazards of this unit. Call

More information

Package Contents Part A (3) I-Beam (1) Base (2) Other parts

Package Contents Part A (3) I-Beam (1) Base (2) Other parts Page 1 Installation Instructions for 81245 Adjustable Height Gantry Crane 1-Ton Capacity Table of Contents Important Safety Information pg. 2 Specific Operation Warnings pg. 2 Main Parts of Product pg.

More information

Plug & Abandonment Light Drilling Workover Well Intervention

Plug & Abandonment Light Drilling Workover Well Intervention Plug & Abandonment Light Drilling Workover Well Intervention Small foot print Light weight Modular High capacity Cantilever based or Single lift to platform CANTILEVER PACKAGE SPECIFICATIONS TOP DRIVE

More information

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS 1. Scope: This policy and procedure applies to the design, construction testing, use, and maintenance or personnel platforms and hosting of personnel platforms

More information

contents iii Figures and Table vi Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Conventional Rotating System 3

contents iii Figures and Table vi Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Conventional Rotating System 3 Figures and Table vi Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 contents Conventional Rotating System 3 Top-Drive System 7 To summarize 8 Rotary Table Assembly 9 Definition

More information

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE NNORIG GENERAL INTRODUCTION 2 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

Top Drive System Installation and Commissioning Manual

Top Drive System Installation and Commissioning Manual TDS-1000A Top Drive System Installation and Commissioning Manual SM01040 General Information Conventions.............................. 1-3 Notes, Cautions, and Warnings......................... 1-3 Illustrations.........................................

More information

INSPECTION AND MAINTENANCE CHECKLIST

INSPECTION AND MAINTENANCE CHECKLIST INSPECTION AND MAINTENANCE CHECKLIST Lattice-Boom Crawler Cranes Models 111-21000 & MLC Series Does Not Apply to Small Crawler Models or Model 31000 This record applies to the following crane: Crane Model:

More information

Safety. Chapter 13 SAFETY PROGRAM GENERAL SAFETY RULES

Safety. Chapter 13 SAFETY PROGRAM GENERAL SAFETY RULES Chapter Safety Supervisors are responsible for ensuring that personnel follow safety standards. Time is usually the controlling factor in construction operations in the theater of operations. The necessity

More information

SIDE PULL WINCHING WITH THE 35K WINCH TWO PART LINE WARNING

SIDE PULL WINCHING WITH THE 35K WINCH TWO PART LINE WARNING 0011.4 00 90 SIDE PULL WINCHING WITH THE 35K WINCH TWO PART LINE WARNING Performing a 35K Winch 90 Degree Side-Pull with the FWTRD should be performed ONLY after determining that a straight line pull configuration

More information

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1)125 KW Generator (1)75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95 105 Ton Double Telescoping

More information

Important. Contents. Contact us:

Important. Contents. Contact us: Operator's Manual First Edition Ninth Printing Important Read, understand and obey these safety rules and operating instructions before operating this machine. Only trained and authorized personnel shall

More information

440/880LB ELECTRIC HOIST STF-4488EH

440/880LB ELECTRIC HOIST STF-4488EH ELECTRIC HOIST 440/880LB WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result

More information

RECOMMENDED PRACTICE TKC FJ-150

RECOMMENDED PRACTICE TKC FJ-150 1.0 SCOPE 1.1 This document sets forth Hunting s recommended practice for the field running and handling procedures that should be used in conjunction with all Hunting tubing and casing product line connections.

More information

CUSTOMIZED SERVICE & REPAIR SOLUTIONS

CUSTOMIZED SERVICE & REPAIR SOLUTIONS Offering exceptional repair services, across all brands, both in the shop and in the field CUSTOMIZED SERVICE & REPAIR SOLUTIONS 5060 74 Avenue SE, Calgary, AB Ph: 403-263-3133 Fax: 403-263-3155 info@drillform.com

More information

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL SCHEDULE 1 DATE: DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A) JULY 2016 CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: DEPTH CAPACITY: 6,000 METERS WITH 127.0 mm DRILL

More information

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Atlas Copco Oil and Gas Rigs. The Predator Advantage Atlas Copco Oil and Gas Rigs The Predator Advantage Atlas Copco Drilling Solutions Leading supplier globally of rotary drilling equipment Three manufacturing locations Garland, Texas, USA Nasik, India

More information

Important. Contents. Contact us:

Important. Contents. Contact us: Operator's Manual Third Edition Third Printing Important Read, understand and obey these safety rules and operating instructions before operating this machine. Only trained and authorized personnel shall

More information

OPERATOR S MANUAL 2200 SERIES LIFT - LIL HOISTER. July 2017

OPERATOR S MANUAL 2200 SERIES LIFT - LIL HOISTER. July 2017 July 2017 OPERATOR S MANUAL 2200 SERIES LIFT - LIL HOISTER! Before operating this lift, read and understand this Operator s Manual. Become familiar with the potential hazards of this unit. Call SUMNER

More information

ALLEGAN COUNTY ROAD COMMISSION SPECIFICATION FOR BIDS

ALLEGAN COUNTY ROAD COMMISSION SPECIFICATION FOR BIDS ALLEGAN COUNTY ROAD COMMISSION SPECIFICATION FOR BIDS PROPOSAL FOR DUMP BOX BODIES, V BOX SPREADERS, UNDER BODY SCRAPERS, PLOW WINGS, FABRICATION AND ASSEMBLY OF COUNTY DUMP TRUCKS Board of County Road

More information

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth Series 60 Detroit Diesel Engine Allison 5860 Transmission (1) 125 KW Generator (1) 75 KW Generator Sky Top 4210 (470HP) 1 Drill Line 95

More information

OVERHEAD CRANE SAFETY:

OVERHEAD CRANE SAFETY: ERI Safety Videos DVDs, Digital Media & Custom Production 1313 OVERHEAD CRANE SAFETY: Safety Is In Your Hands Leader s Guide Safety Source Productions OVERHEAD CRANE SAFETY: Safety Is In Your Hands This

More information

As a safety precaution, remove keys from the ignition while working under or around the vehicle.

As a safety precaution, remove keys from the ignition while working under or around the vehicle. CAB AND CHASSIS As a safety precaution, remove keys from the ignition while working under or around the vehicle. 1. Approach Check the overall appearance of vehicle stance (not leaning). Check for signs

More information

COUNTER SHAFT NUT LOCKING PLATE 1 $ HOIST DRUM CLUTCH EYE BOLTS 1 $ LEFT DRUM CLUTCH THREADED PIN 2 $ 138.

COUNTER SHAFT NUT LOCKING PLATE 1 $ HOIST DRUM CLUTCH EYE BOLTS 1 $ LEFT DRUM CLUTCH THREADED PIN 2 $ 138. 1 2184 PULLEY FOR RADIATOR FAN 1 $ 326.25 2 2184 PULLEY FOR RADIATOR FAN 1 $ 326.25 3 3331 REAR DRUM BRAKE RETURN SPRING 5 $ 51.31 5 10285 LEFT REAR DRUM BRAKE AIR CAN REACH ROD ( LONG ROD ) 1 $ 85.12

More information

LIME PLANT AREA 5 MAINTENANCE AND SHUT-DOWN TASK

LIME PLANT AREA 5 MAINTENANCE AND SHUT-DOWN TASK Lime Plant Area 5 Maintenance and Shut-down Task Reversal Trap K662-1 STANDARD TASK INSTRUCTION: LKM10 and 11 LIME PLANT AREA 5 MAINTENANCE AND SHUT-DOWN TASK WORK O/No.: WORK PACK No.: ORIGINATOR: LKM10

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 6 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 6 Brand Loadcraft Power: 550 HP Year: 2013 Double Drum: Drawworks and Sandline Drums : Self-propelled Land

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 4 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 4 Brand Taylor Power: 500 HP Year: 2004 Double Drum: Drawworks and Sandline Drums : Self-propelled Land Rig

More information

CRANE OPERATION INSTRUCTION AND GUIDELINES

CRANE OPERATION INSTRUCTION AND GUIDELINES CRANE OPERATION INSTRUCTION AND GUIDELINES Qualifications Crane operation, to be safe and efficient, requires skill, the exercise of extreme care and good judgment, alertness and concentration, and a rigid

More information

A SYSTEMATIC SEQUENCE FOR PM INSPECTIONS

A SYSTEMATIC SEQUENCE FOR PM INSPECTIONS A SYSTEMATIC SEQUENCE FOR PM INSPECTIONS TYPE OF INSPECTION UNDER THE HOOD GASOLINE AND DIESEL 1 Fuel, oil, exhaust leaks - inspect 2 Oil and fuel lines inspect for kinks and wear 3 Automatic transmission

More information

Equipment Log Book. Unit #

Equipment Log Book. Unit # Equipment Log Book Unit # EDMS ID# 004256563 January 2013 Introduction The purpose of this booklet is to assist with the operations inspection and maintenance of Heavy Equipment. For more details see TOP

More information

WINCH OPERATING PRACTICES 1. Read the manufacturer's instructions before operating the winch. 2. Always inspect, test maintain and operate this winch in accordance with American National Standards Institute

More information

VDD 400 Offshore Super Single - Automated Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System Chapter 1 - General General Rack and Pinion Max. Hoisting Capacity 400 short tons (363 metric tonnes) Max. Pushing Capacity 100 short tons (91 metric tonnes) Max. Drilling Depth 16,500 ft (5,000 m) Operating

More information

INSTALLATION INSTRUCTIONS AMBASSADOR DRUM OVERHEAD SERIES 100 DUMBWAITER

INSTALLATION INSTRUCTIONS AMBASSADOR DRUM OVERHEAD SERIES 100 DUMBWAITER INSTALLATION INSTRUCTIONS AMBASSADOR DRUM OVERHEAD SERIES 100 DUMBWAITER The installation of Matot Drum Dumbwaiters should only be performed by qualified, experienced, and trained elevator installers.

More information

REPORT OF SURVEY. Land Rig HUNT RIG 3. Prepared for. Stuart Petroleum Limited Updated for GSLM Australia. MODUSPEC AUSTRALIA PTY LTD Perth

REPORT OF SURVEY. Land Rig HUNT RIG 3. Prepared for. Stuart Petroleum Limited Updated for GSLM Australia. MODUSPEC AUSTRALIA PTY LTD Perth REPORT OF SURVEY Land Rig HUNT RIG 3 Prepared for Stuart Petroleum Limited Updated for GSLM Australia By MODUSPEC AUSTRALIA PTY LTD Perth Dates: 7 13 August 2007 Status Update 11 th 15 th December 2008

More information

America s Largest Importer/Wholesaler of Wire Rope, Chain and Fittings!

America s Largest Importer/Wholesaler of Wire Rope, Chain and Fittings! America s Largest Importer/Wholesaler of Wire Rope, Chain and Fittings BLOCKS BINDERS Failure to design and use tackle block systems properly may cause a load to slip or fall - the result could be serious

More information

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE

COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE COMPLETIONS AND WORKOVER RIG RIG DISCOVERY 2 SPECIFICATIONS BROCHURE HIGHLIGHTS Name: Discovery 2 Brand Wilson Power: 550 HP Year: 1982 (Repotenciado en el 2009) Double Drum: Drawworks and Sandline Drums

More information

KWSL2000RM ! CAUTION!! READ AND UNDERSTAND THIS MANUAL BEFORE INSTALLATION AND OPERATION OF THIS PRODUCT. DO NOT RETURN THIS PRODUCT TO SELLER.

KWSL2000RM ! CAUTION!! READ AND UNDERSTAND THIS MANUAL BEFORE INSTALLATION AND OPERATION OF THIS PRODUCT. DO NOT RETURN THIS PRODUCT TO SELLER. Assembly & Operating Instructions KWSL2000RM 2000 Lb. 12VDC Electric Winch! CAUTION!! READ AND UNDERSTAND THIS MANUAL BEFORE INSTALLATION AND OPERATION OF THIS PRODUCT. DO NOT RETURN THIS PRODUCT TO SELLER.

More information

OPERATOR S MANUAL R-Series Roust-a-Bout

OPERATOR S MANUAL R-Series Roust-a-Bout December 2017 OPERATOR S MANUAL R-Series Roust-a-Bout! Before operatingthis lift, readand understandthis Operator s Manual. Become familiar with the potentialhazards of thisunit. Call SUMNER if youhaveanyquestions.

More information

Star Swivel-Arm Hoist Installation and Operating Instructions

Star Swivel-Arm Hoist Installation and Operating Instructions Star Swivel-Arm Hoist Installation and Operating Instructions Conveying & Hoisting Solutions P/L ABN 78 6 7. Purpose of Equipment Star Swivel-Arm Hoists are intended for the transport of materials. Star

More information

WARNING WARNING WARNING. Warnings and Cautions MOVING PARTS ENTANGLEMENT HAZARD CHEMICAL AND FIRE HAZARD FALLING OR CRUSHING HAZARD

WARNING WARNING WARNING. Warnings and Cautions MOVING PARTS ENTANGLEMENT HAZARD CHEMICAL AND FIRE HAZARD FALLING OR CRUSHING HAZARD Warnings and Cautions As you read these instructions, you will see S, S, NOTICES and NOTES. Each message has a specific purpose. S are safety messages that indicate a potentially hazardous situation, which,

More information

1500 Hour PM Inspection

1500 Hour PM Inspection 1500 Hour PM Inspection Electrical Start Time Stop Time 1. Perform initial walk around RTG prior to start and verify no excessive damage to crane. Report to Maintenance team immediately if damage is found

More information

RECOMMENDED PRACTICE TKC-4040 V.I.T. and HO-I

RECOMMENDED PRACTICE TKC-4040 V.I.T. and HO-I 1.0 SCOPE 1.1 This document sets forth Hunting's recommended practice for the field running and handling procedures that should be used in conjunction with the product line. 2.0 REFERENCES 2.1 The following

More information

MAINTENANCE WORK INSTRUCTION. Mech OFF Replace Head Pulley CVXXX

MAINTENANCE WORK INSTRUCTION. Mech OFF Replace Head Pulley CVXXX OPF MAINTENANCE WORK INSTRUCTION PYXIS DOCUMENT CLEAN TEMPLATE SCOPE NOTE: SPECIAL TOOLING REQUIRED PREPARATION AND INFORMATION CVXXX Head Pulley The purpose of this document is to detail the safe replacement

More information

PAGE # SHIPPING UNITS # 2 # 3 REVISED. 1 CLEANING BELT TABLES UNITS # 2 & # 3 Apr CHANGING PRODUCTS IN SYSTEM UNIT # 2 Apr-08

PAGE # SHIPPING UNITS # 2 # 3 REVISED. 1 CLEANING BELT TABLES UNITS # 2 & # 3 Apr CHANGING PRODUCTS IN SYSTEM UNIT # 2 Apr-08 TABLE OF CONTENTS PAGE # SHIPPING UNITS # 2 # 3 REVISED 1 CLEANING BELT TABLES UNITS # 2 & # 3 Apr-08 2 CHANGING PRODUCTS IN SYSTEM UNIT # 2 Apr-08 3 CLEANING HAMMER MILL UNIT # 2 Apr-08 4 CLEANING UNDER

More information

DWHOIST. Drywall Hoist Assembly & Operating Instructions

DWHOIST. Drywall Hoist Assembly & Operating Instructions DWHOIST Drywall Hoist Assembly & Operating Instructions READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. This manual provides important information

More information

Glossary of Crane and Rigging Terms

Glossary of Crane and Rigging Terms Glossary of Crane and Rigging Terms Crane Industry Terms Many terms are used by crane operators which refer to crane function, assembly, operation and maintenance. The following glossary provides a list

More information

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE HM150 150MT DRILLING RIG HUISMAN PRODUCT BROCHURE M150 ENERAL INTRODUCTION 02 Over the last several years, the oil and gas exploration and production industry has seen a shift towards the exploitation

More information

Owner s Manual for Bethlehem Equipment Company Burial Vault Handler

Owner s Manual for Bethlehem Equipment Company Burial Vault Handler Owner s Manual for Bethlehem Equipment Company Burial Vault Handler Safe and proper operation of a Burial Vault Handler is similar to learning to drive a car for the first time. All the manuals, videos,

More information

Appendix D Glossary of Common Crane Terms

Appendix D Glossary of Common Crane Terms 32 Appendix D Glossary of Common Crane Terms Many terms are used by crane operators which refer to crane function, assembly, operation and maintenance. The following glossary provides a list and brief

More information

This information covers the proper procedure for replacing the Volvo D16F engine in a VT or VNL chassis.

This information covers the proper procedure for replacing the Volvo D16F engine in a VT or VNL chassis. Volvo Trucks North America Greensboro, NC USA Engine, Replacement DService Bulletin Trucks Date Group No. Page 10.2007 210 139 1(47) Engine, Replacement Volvo D16F VNL, VT W2005773 This information covers

More information

OPERATING & INSTRUCTION MANUAL

OPERATING & INSTRUCTION MANUAL 251 Welsh Pool Rd Exton, PA 19341 610-941- 4333 www.safetyhoistcompany.com OPERATING & INSTRUCTION MANUAL VH-300 BRIGGS & STRATTON VH-300 HONDA IMPORTANT RETAIN THIS MANUAL For instruction on assembly

More information

SECTION 1 LUBRICATION

SECTION 1 LUBRICATION SECTION 1 LUBRICATION Model M2500 OMPS1 M2500 10-2002 Avoid injury! Bring all crane functions to complete stop and turn off engine before lubricating crane. If necessary, spot grease fittings at access

More information

Responsible Unit: Facilities Management

Responsible Unit: Facilities Management Policy Sponsor: Assistant Vice President Approval Date: January 2010 Mobile Overhead Cranes Safe Work Instructions Responsible Unit: Revisions: Service: Trade Services Shop: Mechanical & Welding Hazards

More information

ITEM NO DESCRIPTION STUD CENTER WEIGHT ITEM NO DESCRIPTION STUD CENTER WEIGHT ITEM NO DESCRIPTION STUD CENTER WEIGHT NARROW FRAMES WALK THROUGH FRAMES

ITEM NO DESCRIPTION STUD CENTER WEIGHT ITEM NO DESCRIPTION STUD CENTER WEIGHT ITEM NO DESCRIPTION STUD CENTER WEIGHT NARROW FRAMES WALK THROUGH FRAMES NARROW FRAMES Stud Cent e r ITEM NO DESCRIPTION STUD CENTER WEIGHT NF3H-2W NF5H-2W NF6H-2W NF6H-3W 3 H X 2 W 5 H X 2 W 6 4 H X 2 W 6 4 H X 3 W 2 4 4 4 16 LBS 25 LBS 33 LBS 40 LBS WALK THROUGH FRAMES ITEM

More information