1 CHAPTER 5 ESTIMATED TRAFFIC AND TOLL REVENUE Estimated traffic and toll revenue for the proposed ICC is based on the volume of traffic that would be diverted from existing routes in the travel corridor, plus induced traffic resulting from the implementation of the ICC facility. Motorists would be expected to divert to the ICC due to time and/or distance savings afforded over the present highway system after recognizing the cost of tolls. The primary objective of this study was to develop annual traffic and toll revenue forecasts for the proposed ICC. In developing these estimates, a comprehensive computerized transportation model provided by the WMCOG through the MdTA was utilized to determine optimum toll rates and develop annual traffic and revenue forecasts. Chapter 5 presents an overview of the modeling methodology and general approach used in this analysis. It also includes the discussion of selected per mile toll rates, weekday traffic estimates for multiple years, and annual traffic and revenue forecasts for the proposed ICC. A series of sensitivity tests aimed at gauging the potential impacts associated with hypothetical variations in basic assumptions are also addressed. BASIC ASSUMPTIONS Base-case traffic and revenue estimates for the proposed Intercounty Connector are predicated on the following basic assumptions, all of which are considered reasonable for purposes of this traffic and revenue study. 1. The proposed ICC is assumed to provide three travel lanes in each direction, or a total of six lanes, over its entire length. 2. The SHA phasing schedule for the proposed ICC was segmented into five major contracts having varying completion dates. For the purpose of this analysis the SHA phasing schedule was simplified by grouping contracts B, C, D and E into one phase. Under the revised phasing schedule it was assumed the ICC project would open in two phases: June 12, 2006 Page 5-1

2 Phase 1 I-370 to MD 97 October 2009; and Phase 2 MD 97 to U.S. 1 October The configuration of the ICC, including the location and timing of proposed interchanges, will be as described in this report. 4. Toll rates on the facility are in future year dollars and will be as set forth subsequently in this chapter. Commercial vehicle rates will be proportionately higher than passenger cars. 5. An inflation rate of 2.5 percent per year has been assumed. Annual toll revenue estimates, and per mile toll rates are expressed in future year dollars. 6. Per-mile toll rates utilized in this study analysis were developed assuming base case $0.17 peak and $0.13 off-peak per mile toll rates calculated in 2004 dollars inflated by 2.5 percent per year resulting in equivalent 2010 per mile toll rates rounded to the nearest nickel of $0.20 peak and $0.15 off-peak. Due to rounding to the nearest nickel the $0.20 peak and $0.15 off-peak rates remain in affect through Equivalent per mile toll rates are assumed to equal $0.25/$0.20 in 2020, $0.30/$0.20 in 2025 and $0.35/$0.25 in ETC and video equipment will be provided and will be available to all passenger car vehicles using the project. The video tolling option would not be available to commercial vehicles. Electronic tolls will be based on distance traveled with an assumed minimal toll equal to a minimum distance of three-miles of travel on the ICC. Video tolls will also be based on distance traveled but will also be assessed an administration fee of $2.50. Toll collection operations are assumed to be actively monitored and strictly enforced to minimize potential revenue losses due to toll evasion and/or system failure. 8. For purposes of this analysis, the $2.50 per transaction video surcharge was not assumed to be changed in future years. 9. An 8 percent reduction has been made to annual toll revenue estimates included in this report to reflect the impacts associated with possible toll evasion, or other form of uncollectible tolls; 10. Base case annual transactions and toll revenue have been adjusted downward to reflect ramp-up during the first three years of operation. June 12, 2006 Page 5-2

3 11. Only those highway improvements which are committed in the regional transportation improvement plan will be implemented during the projection period. Specific improvements assumed in future year networks are described below. No other competing highway projects, toll or toll-free or other significant competing improvements are assumed to be constructed in the project corridor during the forecast period. 12. Regional and corridor socioeconomic growth will generally be in accordance with forecasts provided by WMCOG, as reviewed and adjusted by the independent economic consultant, Market-Economics, Inc. 13. Travel demand modeling was performed through estimating weekday travel on the ICC. For purposes of annualization of transactions and revenue, weekend transactions were assumed to be 67 percent (twothirds) of weekday transactions. Weekend revenue was assumed to be 60 percent of weekday revenue. This differential reflects the fact that peak period pricing is not assumed to be in place on weekends for the purposes of this analysis. 14. For purposes of this analysis, it was assumed that 80 percent of potential ICC users would be equipped with electronic toll collection; 20 percent would be video users. However, since video tolls would be higher, the project would attract a smaller portion of video users. Therefore the actual video share of traffic on the ICC would be less than the initial 20 percent. 15. The proposed ICC will be well-maintained, efficiently-operated and effectively signed and promoted to encourage maximum usage. Effective promotion, both before and after opening of the road, is critical to minimizing the negative revenue impacts of ramp up during the early months of operation. 16. Motor fuel will continue to remain in adequate supply and the rate of price increase will not significantly exceed the overall rate of inflation. A sensitivity test assuming a doubling of assumed gasoline prices ($2.50 per gallon) was conducted as part of this study analysis the impacts of which are addressed in greater detail in Chapter 6 of this report. 17. No local, regional or national emergency will arise which would abnormally restrict the use of motor vehicles, or substantially alter economic activity or freedom of mobility. June 12, 2006 Page 5-3

4 Any significant departure from the above basic assumptions could materially affect estimated traffic and revenue for the proposed Intercounty Connector. HIGHWAY IMPROVEMENTS The most recent regional transportation improvement plan was obtained and reviewed to identify any committed improvements which could potentially impact traffic and revenue on the proposed Intercounty Connector. Only two committed improvements were identified in the primary corridor; both of these were included in appropriate future year networks and considered in the traffic and revenue analysis. U.S. 29 (Columbia Pike) is currently being upgraded to increasingly controlled access, with grade separations at major intersections, from M.D. 198 to a point south of Randolph Road. Since this is now underway, it is assumed to be completed prior to opening of the Intercounty Connector. A new interchange on I-95 is also planned, to connect with a relocated Contee Road. The project includes distributor roads which will also serve the interchange with the Intercounty Connector. This improvement is assumed to be completed by No other significant improvements in the project corridor were included in the committed transportation improvement plan. The long-range transportation plan includes a proposal for widening of M.D. 28/M.D. 198 to an ultimate six lanes, between M.D. 97 (Georgia Avenue) and U.S. Route 1. This improvement is not committed or funded, and is not even contemplated before As such, it was not assumed to be implemented for purposes of this traffic and revenue analysis. It would, however, provide additional competing capacity to significant portions of the Intercounty Connector. Finally, while not included in the committed transportation improvement plan, studies are underway concerning the possible establishment of HOT lanes along I-270 and/or I-495 within Maryland. Neither of these projects is committed at this point in time and were not assumed for purposes of this analysis. If ultimately implemented, the projects may or may not result in any significant increase in net capacity, and may ultimately only constitute a change in operating parameters for existing HOV lanes. June 12, 2006 Page 5-4

5 These operational changes were also not assumed for purposes of the traffic and revenue forecasts on the Intercounty Connector. MODELING METHODOLOGY Models obtained from the MWCOG were used as the basis for the current estimates of traffic and revenue. The model inputs are Version 2.1D, #50. The models use as part of the inputs socioeconomic data at the traffic zone level for their forecast dataset Round 6.4a. The following sections discuss the modeling framework, highway network and trip table development and give an overview of the parameters and traffic assignment process used in this study. WMCOG MODEL FRAMEWORK The WMCOG regional transportation model is a computer-based traffic forecasting model designed to forecast traffic volumes in the Washington, DC region, which includes parts of Maryland and Virginia as well as the District itself. WSA was provided with trip tables and networks for a base year (2000), as well as forecast years at five-year increments from 2010 through The model has a sequential procedure for generating trips based on the traditional four-step transportation demand modeling process (trip generation, trip distribution, person-to-vehicle trip factoring, and highway assignment) with several loop-back steps to take congestion levels into account. Trip tables representing a.m. peak period, p.m. peak period, midday, and overnight travel are developed in the WMCOG model using factors from regional household surveys. New trip tables for each of the forecast years (2005, 2010, 32015, 2020, 2025 and 2030) were generated using the Round 6.4a socioeconomic forecasts, but with adjustments recommended by Market-Economics, as detailed in Chapter 4. This resulted in increases in trips across the region ranging from 1.2 percent in 2005 to 4.1 percent in HIGHWAY NETWORK ASSUMPTIONS The WMCOG model contains highway networks for each forecast year representing the highways, arterial and local streets of the region. The year 2005 roadway network, in combination with 2005 traffic assignments, was reviewed and adjusted based on current speed observations and number of roadway lanes. June 12, 2006 Page 5-5

6 The future year networks were then reviewed against the current transportation improvement plans to confirm that committed and funded improvements were included. For this study, we have assumed that important improvements that would affect the project (such as the projected interchange at I-95 and Contee Road) would be included. However, after discussions with MDOT staff, other improvements that were not committed (such as high occupancy toll lanes on I-495) were not assumed to be in place. TRIP TABLE ADJUSTMENTS WSA ran a series of 2005 traffic assignments initially using trips generated solely by the WMCOG model to understand the underlying model output. Adjustments were made to attempt to obtain a better fit between the ground counts at several screenline locations and traffic volumes assigned by the model. As a result of this review process, WSA shifted traffic from the p.m. peak period trip tables into the midday trip tables for all years since it appeared that the base assignments did not match the observed time-of-day distribution of traffic across several screenline locations. In addition, it appears that the model consistently over assigned northsouth roadways in the study area. This was a pattern that was also reflected in the model documentation from WMCOG s website. For the purposes of this study, a select-link adjustment process was used to adjust the north-south trips crossing the south survey screenline downward by 10 percent. The base year trip tables were adjusted to better reflect the travel pattern information obtained from the origin-destination surveys. Trips passing through links that represent locations where the travel pattern surveys were collected were extracted and adjusted to match the trip patterns from the survey. This ensures that a better representation of actual travel patterns is incorporated in the early part of the forecast period. OVERVIEW OF TOLL DIVERSION ASSIGNMENT PROCESS A series of tolled diversion assignments at the years 2009, 2012, 2015, 2020, 2025 and 2030 were run under no-build, toll-free, and build conditions, with a range of different toll rates charged for travel on the ICC, and different combinations of video processing fees. Trip tables were divided into five potential market segments for the project based on different trip purposes and methods of payment, including: passenger car work ETC, passenger car non-work ETC, passenger car work video, passenger car non-work video, and commercial June 12, 2006 Page 5-6

7 vehicle traffic. These market segments were assigned to the network using a modified version of a multi-class user equilibrium assignment process. Appropriate toll rates and fees were used for each of these categories of vehicles; only the trips in the video categories were subjected to an additional fee during the assignment process. For the tolled condition, WSA used software which is designed to estimate the share of traffic for each travel movement which would be expected to choose the toll routing at each toll rate. This is specifically designed to assess motorists willingness to pay tolls at varying toll levels and congestion conditions. The process builds two sets of minimum time paths for each origin-destination zone pair: one using the toll facility (where appropriate) and the other using competing toll-free facilities. A proportion of the total trips moving between the zones are assigned to each network path based on the relative total cost between the two paths considering vehicle operating costs, travel time costs, and tolls. As the cost of the tolled routing increases as compared to the toll-free routing, the share of traffic using the toll road decreases; and vice versa. The time cost is equal to the time spent traveling between two zones, multiplied by the weighted average value-of-time of the two zones. The total number of households in each of the two zones is used as the weighting criteria for the calculation of the average value-of-time. The distance cost for each of the two paths is equal to the vehicle operating cost multiplied by the distance traveled for each path. VALUES-OF-TIME AND VEHICLE OPERATING COSTS Traffic and revenue on a toll facility is dependent on motorists willingness to pay a toll for benefits received in using the toll facility. These benefits can include mileage savings, improved quality of travel, safety, and reduced congestion. The motorist s value of-time, vehicle operating cost, and toll charges are the three key elements in determining the cost of making a particular trip and, therefore, the share of traffic assigned to tolled vs. toll-free paths to travel from the origin to the destination of the trip. As described previously in Chapter 3, based on the results of the stated preference surveys conducted for this study by Resource Systems Group, Inc. (RSG), the year 2005 overall average value-of-time (VOT) for trips in the corridor was calculated to be $0.238 per minute for motorists traveling during peak periods, for work/business trip purposes. VOT for non-work trips was calculated at $0.212 per minute. Off-peak VOT s were calculated to be $0.22 and $0.149 for work/business and non-work trip purposes, respectively. These VOT s were assumed to inflate 2.5 percent June 12, 2006 Page 5-7

8 each year up to (A copy of the RSG report summarizing the methodology and results of the stated preference surveys is provided in Appendix B of this document). The traffic assignments actually used differential values-of-time estimated by traffic analysis zone, which was developed using income information from the MWCOG socioeconomic data files. For each zone, there is a field with a factor that represents the ratio of median household income in that zone as compared to the regional average. This factor was applied to the average value-of-time for the region to develop an estimate of current VOT for each TAZ. In general, zones in the ICC corridor tend to have median household incomes that are greater than the regional average. However, since the SP surveys were conducted mostly in the project corridor, income levels of survey percentages were, on average, about 15 percent higher than the regional average. As such, values of time were reduced by 15 percent for each traffic zone to bring the baseline VOT in line with regional averages. This enables the modeling process to recognize the variance in incomes in the corridor and throughout the region. The vehicle operating cost used in the analysis was calculated by taking into account the average per-mile costs of gasoline and oil, and to a lesser extent, maintenance, and wear and tear of tires for the regions drivers. This value was calculated to be around $0.14 per mile at 2005 levels. No adjustment was made to reflect the impact of recent increases in gasoline prices. A sensitivity test was performed to test the impact of future major increases. The values-of-time and vehicle operating costs used in the analysis were inflated to future year levels assuming a 2.5 percent annual inflation rate for all future year traffic assignments. ASSUMED ETC/VIDEO MARKET SHARES Since electronic tolls and video payment categories will have different effective toll rates, an important factor in estimating traffic and revenue for the ICC was making reasonable assumptions regarding the share of motorists which might be expected to use electronic toll collection. WSA reviewed actual experience on other new urban toll facilities with non-cash toll collection, and it was determined that it would be appropriate June 12, 2006 Page 5-8

9 to use a split of 80 percent utilizing ETC and 20 percent utilizing video within the range of the administration fee ($2.50) tested, for purposes of this analysis. It is important to note that the ETC/video market share was used to subdivide the model trip tables before actually making traffic assignments. For example, if the total travel volume between two pairs of zones were 100 trips, this particular travel movement would be divided into two categories, 80 trips as potential ETC users and 20 trips as potential video users. Each of these respective trip tables were then subjected to individual diversion analyses, based on the individual pricing assumptions for each payment mode. Since the ETC toll rates would be lower than video for many movements, the electronic toll capture rates were higher for ETC than video. As such, the net final mix of ETC and video components were slightly different than the nominal shares input into the analysis process. TOLL DIFFERENTIAL ASSUMPTIONS As indicated, it was assumed that there will be a toll differential between ETC collection and video collection, and between passenger cars and commercial vehicles. The differential between ETC and video use is designed to encourage the use of ETC as well as to cover the additional transaction processing costs. Table 5-1 displays the assumed toll differential factors used for the purposes of this study. Table 5-1 Toll Differential Structure Collection Type Vehicle Type ETC Video Passenger Car $X X + $2.50 Commercial Vehicle 2.5(X) Not Allowed Note: Assumed Average Commercial Vehicle = 3.5 Axles June 12, 2006 Page 5-9

10 As indicated in Table 5-1 passenger car ETC vehicles would be assessed a base per-mile toll rate with traffic paying through the video toll collection system paying that same per-mile toll rate plus a flat per-trip administration fee. For example, if the ETC passenger car per mile toll rate was $0.20, a vehicle traveling six miles on the ICC would be assessed a toll of $1.20. If this same six-mile trip was made by a passenger car using the video payment option, that vehicle would be assessed the same $1.20 toll plus a $2.50 administration fee, or a total fare of $3.70. Commercial vehicle average per mile toll rates were calculated assuming an average per-mile toll rate 2.5 times those assessed to passenger cars. This commercial vehicle factor was developed based on a summary of commercial vehicle class counts conducted in the corridor which indicated that average commercial vehicle equated approximately to 3.5 axles. TOLL RATE SENSITIVITY ANALYSIS Traffic assignments were performed at multiple toll levels for each analysis year 2012, 2020, 2025 and For years 2012 and 2020 ETC passenger per mile toll rates ranging from $0.10 to $0.50 per mile were tested. ETC per mile toll rates tested at 2025 year levels ranged from $0.10 to $0.70 per mile and from $0.10 to $0.80 per mile for year As a result of this, toll sensitivity curves were prepared to determine optimum rates. Separate curves were prepared for peak and off-peak conditions. The toll sensitivity analysis assumed a three mile minimum toll and reflects the assumed ETC/Video market share and toll differential structure described above. Toll sensitivity curves for the full project opening year, 2012, and future year, 2030, are shown in Figures 5-1 and 5-2. While the levels shown on the x-axis of the graphs in Figures 5-1 and 5-2 are expressed in terms of the passenger car ETC per mile toll rates, proportionately higher rates were assumed to be charged for trucks and video toll collection during the actual toll diversion process. As shown in Figure 5-1, maximum revenue potential during peak periods at 2012 levels would be in the range of $0.35 per mile. In off-peaks, maximum revenue potential would be in the range of $0.25/$0.30 per mile. Toll rates are increased, of course, total weekday trips estimated to use the ICC would, of course, decrease. Peak period users, for example, would likely exceed 1 at very low toll rates, dropping to less than June 12, 2006 Page 5-10

11 MD / Graphics / Final Report / landscape.ppt / ICC Peak Period Off Peak Period $175 $150 $175 $150 Revenue (Thousands) $125 $100 $75 $50 $25 $0 $0.10 $0.15 $0.20 $0.25 $0.30 $0.35 $0.40 $0.45 $0.50 Passenger Car Per Mile Toll Rate $125 $100 $75 $50 $25 $0 $0.10 $0.15 $0.20 $0.25 $0.30 $0.35 $0.40 $0.45 $0.50 Passenger Car Per Mile Toll Rate Trips (Thousands) $0.10 $0.15 $0.20 $0.25 $0.30 $0.35 $0.40 $0.45 $0.50 Passenger Car Per Mile Toll Rate $0.10 $0.15 $0.20 $0.25 $0.30 $0.35 $0.40 $0.45 $0.50 Passenger Car Per Mile Toll Rate ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates 2012 TOLL SENSITIVITY CURVES FIGURE 5-1

12 MD / Graphics / Final Report / landscape.ppt / ICC Peak Period Off Peak Period $500 $500 Revenue (Thousands) $400 $300 $200 $100 $0 $0.10 $0.20 $0.30 $0.40 $0.50 $0.60 $0.70 $0.80 Passenger Car Per Mile Toll Rate $400 $300 $200 $100 $0 $0.10 $0.20 $0.30 $0.40 $0.50 $0.60 $0.70 $0.80 Passenger Car Per Mile Toll Rate Trips (Thousands) $0.10 $0.20 $0.30 $0.40 $0.50 $0.60 $0.70 $0.80 Passenger Car Per Mile Toll Rate $0.10 $0.20 $0.30 $0.40 $0.50 $0.60 $0.70 $0.80 Passenger Car Per Mile Toll Rate ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates 2030 TOLL SENSITIVITY CURVES FIGURE 5-2

13 75,000 at a rate of $0.30 per mile and about 50,000 per weekday at a rate of about $0.45 per mile. Off-peak users would decline slightly more sharply, as might be expected. Toll rates assumed at 2012 levels for purposes of base case revenue forecasts are noted with a dot. Peak period rates would begin at $0.20 per mile while off-peak rates would begin a $0.15 per mile. These rates are well below the maximum point on the toll sensitivity curves, in terms of revenue production. However, they are consistent with toll rates assumed in the environmental impact study for the project, nominally adjusted for inflation to 2012 levels. It is noted that 2012 is the first year in which the full ICC project (including Phases 1 and 2) will be open to traffic. The relative position of opening-year toll rates on the toll sensitivity curves show that additional revenue could likely be generated by using rates in excess of those assumed in the base case forecast. Figure 5-2 shows toll sensitivity curves at 2030 levels, the most distant forecast year for which model inputs and trip tables were available. In 2030, the optimum peak period toll would be at least $0.60 per mile, while maximum revenue during off-peak periods would be in the range of $0.40 to $0.50. Base case revenue forecasts were calculated at rates shown with a dot; $0.35 per mile in peak periods and $0.25 per mile in off-peak periods. It is noted that the rates selected for base case revenue forecasts are well below the maximum revenue point on the toll sensitivity curves in both 2012 and This indicates that it would be possible to increase revenue by using rates higher than those assumed in the analysis, if needed. In practice, it may ultimately be necessary to use higher rates in the later years of the forecast period, particularly beyond 2025, to more effectively manage peak period traffic demand. Per mile toll rates utilized in this analysis have not been adjusted to levels which may be required to effectively manage demand during future year peak periods. It is a goal of MdTA to establish pricing on the ICC to manage demand and ensure a high level of service during all travel hours. Selected rates in 2030, and all prior years, generally follow a nominal inflation assumption of 2.5 percent per year by 2025 or 2030, peak period traffic volumes on isolated locations along the ICC may necessitate higher tolls. These volumes are below the theoretical capacity of the facility, but might result in degraded operating conditions if higher tolls are not used. June 12, 2006 Page 5-11

14 The slopes of the curves in Figures 5-1 and 5-2 indicate that if higher rates were needed, for demand management reasons, this would likely produce higher revenue than assumed in the base case forecast. As noted above, based on the desire of MdTA staff to maintain a level of consistency between the previous ICC Final EIS Study and the current traffic and revenue analysis, it was determined that a combination of base case selected peak and off-peak period per mile toll rates would be appropriate. The EIS Study analysis assumed mid-range per mile toll rates of $0.17 during peak-periods and $0.13 during off-peak periods calculated in 2004 dollars. Utilizing the EIS Study per mile toll rates as a baseline, year 2010 per mile toll rates were calculated by applying a 2.5 percent per year inflation rate to the 2004 per mile rates and rounding to the nearest nickel. As shown in Table 5-2 from opening-year 2009 through future-year 2015 the peak-period per mile toll rate of $0.20 and off-peak per mile toll rate of $0.15 was maintained. By 2020 per mile toll rates would increase to $0.25 peak and $0.20 off-peak. In 2025 peak period per mile toll rates would increase to $0.30 with the $0.20 off-peak period rate being retained. By 2030 per mile toll rates would equal $0.35 peak and $0.25 off-peak based on assumed inflation levels. These per mile toll rates were developed utilizing the identical methodology employed to calculate the 2010 per mile rates and are thus very comparable to those assumed in the EIS analysis. All of the above per mile toll rates fall well below the apex point of the toll sensitivity curves and would provide the opportunity for future toll increases. While it continues to be the intent of the MdTA to maintain free-flow conditions along all segments of the ICC (generally 5,000 vehicles per hour, per direction), implementation of the above per mile toll rates may not accomplish this task. This could especially be the case in future-years 2025 and 2030 where additional peak period per mile toll rate increases might be required to meet desired capacity targets. However, the magnitude and exact timing of these potential per mile toll rate increases were not part of this study analysis and are therefore not addressed in this report. Toll rates for point to point movements are presented in Figure 5-3 for opening-year conditions. The figure illustrates the selected rates used for this analysis for passenger cars vs. trucks, for electronic transponder vs. video toll collection. It also shows the effect of the minimum toll assumption, as trips between interchanges that are less than three miles apart are assessed the equivalent to three miles of travel. Minimum tolls June 12, 2006 Page 5-12

15 are typically used to discourage short distance trips from using the toll road for only one or two segments, and to ensure that the tolls collected for each trip are sufficient to cover transaction processing and other accounting costs. Table 5-2 Selected Per Mile Toll Rates Based On $0.17 Peak/$0.13 Off-Peak Per Mile Toll Rates Expressed In 2004 Dollars Per Mile Toll Rates Year Peak Period Off-Peak Period 2009 $0.20 $ $0.20 $ $0.20 $ $0.25 $ $0.30 $ $0.35 $0.25 TYPICAL TIME-DISTANCE COMPARISONS To illustrate the benefits to motorists of the ICC, a comparison of travel time and distance under a.m. and p.m. peak period travel conditions at 2012 and 2030 levels was made for selected typical movements within the project corridor under the preferred alternative configuration. This timedistance comparison for three hypothetical movements is presented in Figures 5-4 and 5-5. The time-distance relationship compares the mileage and distance between the project (blue routing) versus the best alternative routing via the existing roadway system depicted in Figures 5-7 and 5-8 by the purple, green, pink and orange routings. Any savings in distance for a motorist can be translated into savings in vehicle operating costs, while a June 12, 2006 Page 5-13

16 MD / Graphics / Final Report / landscape.ppt / ICC Passenger Car ETC $0.20 Per Mile Peak I-370 MD 97 MD 182 MD 650 US 29 BCR I-95 VMR US 1 I MD MD MD US BCR I VMR US Passenger Car ETC $0.15 Per Mile Off-Peak I-370 MD 97 MD 182 MD 650 US 29 BCR I-95 VMR US 1 I MD MD MD US BCR I VMR US Commercial Vehicle ETC I-370 MD 97 MD 182 MD 650 US 29 BCR I-95 VMR US 1 I MD MD MD US BCR I VMR US Commercial Vehicle ETC I-370 MD 97 MD 182 MD 650 US 29 BCR I-95 VMR US 1 I MD MD MD US BCR I VMR US Video Administration Fee Passenger Car Video I-370 MD 97 MD 182 MD 650 US 29 BCR I-95 VMR US 1 I MD MD MD US BCR I VMR US Video Administration Fee Passenger Car Video I-370 MD 97 MD 182 MD 650 US 29 BCR I-95 VMR US 1 I MD MD MD US BCR I VMR US ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates PEAK AND OFF-PEAK PER MILE TOLL RATE TABLES YEARS 2009 THROUGH 2015 FIGURE 5-3

17 savings in travel time can be translated into value-of-time savings for the motorist. A.M. PEAK PERIOD As shown in Figure 5-4, a.m. peak period travelers wishing to use the proposed ICC for travel between I-95 and I-270 (movement D to A highlighted in blue) would experience the greatest time savings when compared to the arterial D to A routing highlighted in orange). Trips using the project route would save about 14.0 minutes at opening-year 2012 levels. By year 2030 time savings would equal 14.6 minutes. Average speeds for this movement are approximately 19 mph faster using the project route versus the existing route. It is important to recognize that the overall average speeds for each movement include the total route of travel. In many cases, the routing which uses the ICC also will include a portion of travel on alternative routes, which would have average operating speeds lower than the ICC. Hence, there may be increases in travel time between 2012 and 2030 on the ICC routing, even though travel conditions on the ICC itself have not degraded. A.M. peak-period movements (D to B), which would only use a portion of the project along with a segment of the existing arterial roadway system (MD 28) would also be expected to accrue travel time savings over their best alternative using existing routes (highlighted in pink). Movements using the D to B ICC alignment would save an estimated 12.1 minutes at year 2012 levels. These time savings are expected to increase to 14.5 minutes by year Average travel speeds are approximately13.0 to 14.0 mph faster using the ICC routing in 2012 and 2030, respectively. Motorists traveling along the E to C project routing would experience the least amount of time savings when compared to the best existing alternative route (highlighted in purple) as indicated in Figure 5-4. Opening-year 2012 are estimated to equal 5.5 minutes, decreasing slightly to 5.2 minutes by year These lower travel time savings can be attributed to the need for the project routing to utilize a portion of existing U.S. 1 which negatively impacts overall travel speeds along the project routing. A.M. peak-period movements traveling between F to C would experience time savings of 7.3 minutes during 2012 when choosing the ICC for their travel as shown in Figure 5-4. By 2030 time savings would equal 6.4 minutes. These time savings translate to average speeds approximately 21 June 12, 2006 Page 5-14

18 MD / Graphics / Final Report / landscape.ppt / ICC 190 A Gaithersburg Rockville Muncaster Mill Laytonsville B Norbeck Rockville Montgomery Veirs Mill Pike Georgia C onnecticut 185 Ave Ave. C Georgia Ave. Randolph Ashton New Hampshire Ave. 108 Spencerville Briggs Fairland Chaney F 198 Van Dusen 95 Howard D Virginia Manor Laurel Prince George's 1 E Movement D-A Alt Rte 2 ICC Alt Rte 2 ICC Distance (miles) Time (min.) Time Saved (min.) Movement D-B Alt Rte ICC Alt Rte ICC Distance (miles) Time (min.) Time Saved (min.) Movement E-C Alt Rte ICC Alt Rte ICC Distance (miles) Time (min.) Time Saved (min.) Fairfax 355 District of Columbia Distance (miles) Time (min.) Time Saved (min.) Movement F-C Alt Rte 1 ICC Alt Rte 1 ICC ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates TIME - DISTANCE COMPARISON A.M. Peak Period FIGURE 5-4

19 mph faster in 2012 and 16 mph faster when using the ICC routing versus the arterial routing. P.M. PEAK-PERIOD Project patrons making the trip between I-270 and I-95 along the ICC project configuration (movement A to D) during the p.m. peak-period will save 17.7 minutes over the existing A to D I-270, I-495, I-95 routing during 2012, increasing to 21.2 minutes by year This translates to improved travel speeds of approximately 23 to 24 mph (see Figure 5-5). The partial B to D routing experienced p.m. peak-period time savings of 13.5 minutes during opening-year 2012, increasing to 17.6 minutes by design-year These time savings produce improved travel speeds of approximately 12 mph when using the project over the existing B to D routing. As shown in Figure 5-5, ICC p.m. peak-period patrons traveling along the C to E routing are afforded time savings of 6.7 and 8.4 minutes over the existing C to E routing during opening-year 2012 and future-year 2030 respectively. This leads to improved average travel speeds of approximately 15 to 18 mph. P.M. peak-period movements traveling between C to F would experience time savings of 8.0 minutes during 2012 when choosing the ICC for their travel as shown in Figure 5-5. By 2030 time savings would equal 8.1 minutes. Average travel speeds would improve by approximately 23 mph in 2012 and 18 mph in 2030 when using the ICC routing versus the arterial routing. ESTIMATED AVERAGE WEEKDAY TRAFFIC As noted previously, traffic assignments were run using trip table information supplied by MWCOG and modified for this project by WSA. Traffic assignments were run at 2009 levels (the assumed opening-year of the Phase 1 Segment of the ICC from I-370 to MD 97), 2012 ( the assumed opening-year of the Phase 2 Segment of the ICC from MD 97 to U.S. 1), 2015, 2020, 2025 and 2030 levels under the proposed ICC preferred configuration. The assignment results were reviewed for reasonableness, using both select link and screenline corridor share analyses. In the screenline review, special attention was paid to the overall level of growth in traffic June 12, 2006 Page 5-15

20 MD / Graphics / Final Report / landscape.ppt / ICC 190 A Gaithersburg Rockville Muncaster Mill Laytonsville B Norbeck Rockville Montgomery Veirs Mill Pike Georgia C onnecticut 185 Ave Ave. C Georgia Ave. Randolph Ashton New Hampshire Ave. 108 Spencerville Briggs Fairland Chaney F 198 Van Dusen 95 Howard D Virginia Manor Laurel Prince George's 1 E Movement A-D Alt Rte 2 ICC Alt Rte 2 ICC Distance (miles) Time (min.) Time Saved (min.) Movement B-D Alt Rte ICC Alt Rte ICC Distance (miles) Time (min.) Time Saved (min.) Movement C-E Alt Rte ICC Alt Rte ICC Distance (miles) Time (min.) Time Saved (min.) Fairfax 355 District of Columbia Distance (miles) Time (min.) Time Saved (min.) Movement C-F Alt Rte 1 ICC Alt Rte 1 ICC ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates TIME - DISTANCE COMPARISON P.M. Peak Period FIGURE 5-5

21 throughout the projection period, and the relative share of total screenline demand expected to be accommodated by the proposed ICC. The traffic assignment process utilized the selected per mile toll rates described previously. For years 2009 through 2015 a $0.20 peak per mile toll rate and a $0.15 off-peak per mile toll rate was assumed. Based on inflation assumptions, in 2020, $0.25 peak and $0.20 off-peak per mile toll rates were employed. In the 2025 and 2030 assignments per mile toll rates of $0.30 peak and $0.20 off-peak and $0.35 peak and $0.25 off-peak were assumed, respectively. During each assignment year a minimal per mile toll rate equal to three miles of travel was assumed. It was also assumed that all video toll trips would be assessed a flat per trip $2.50 administration fee in addition to the base per mile toll charge associated with a specific trip. The surcharge rate of $2.50 was assumed to remain at that level throughout the future forecast years. ESTIMATED 2009 PHASE 1 WEEKDAY TRAFFIC Traffic estimates were made for the proposed ICC under the planned phasing schedule. The I-370 to MD 97 segment (Phase 1) was assumed to open on October 1, The Phase 2 portion from MD 97 to U.S.1 was assumed to open on October 1, Traffic volumes represent traffic levels on an average weekday in 2009 are presented graphically in Figure 5-6. Average weekday traffic volumes for the ICC project at Phase 1 openingyear 2009 is presented in Figure 5-6. The proposed ICC is expected to accommodate 24,720 vehicles per day (VPD) on an average weekday in This is expected to generate a.m. peak-hour volumes between 740 and 1,330 vehicles per hour (VPH) and p.m. peak-hour volumes of between 1,000 and 2,050 VPH. We recognize that the Phase 1 project only connects between two interchanges. Only one travel movement is possible, although this has a length of more than five miles. Also, weekday traffic estimates shown in Figure 5-6 have not been adjusted downward to reflect the effect of rampup. This adjustment is made subsequently as described below. ESTIMATED 2012 WEEKDAY TRAFFIC As might be expected, the completion of the entire project would also act to increase traffic on the Phase 1 section, which is estimated to reach slightly more than 42,000 vehicles per weekday in In no case is estimated peak hour volumes, in either travel direction, levels which would result in degraded operating performance. However, should peak period traffic volumes be significantly higher than those estimated in June 12, 2006 Page 5-16

22 MD / Graphics / Final Report / landscape.ppt / ICC LEGEND Total Day WB Total Day EB P.M. A.M. A.M. P.M. Mainline Peak Hour Volume Total Two-Way Mainline Peak Hour Volume Total Day Ramp Volume Note: Higher peak period per mile toll rates would be required to manage traffic demand where mainline peak hour traffic volumes exceed the 5,000 peak hour capacity target in a single travel direction. Not to Scale INT. 1 I-370 INT. 2 MD 97 11,510 13,210 1,000 1,330 24, ,050 11,510 13,210 ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates ESTIMATED PHASE AVERAGE WEEKDAY TRAFFIC VOLUMES $0.20 Per Mile Peak - $0.15 Per Mile Off-Peak - $2.50 Video Administration Fee FIGURE 5-6

23 Figure 5-7, it might be necessary for MdTA to use higher toll rates to manage demand. If this proved to be necessary, it would likely result in an increase in revenue, as compared to the base case forecast. It is also noted that traffic estimates shown in Figure 5-7 (and similar figures for other years in this report) reflect weekday traffic conditions. It should be assumed that traffic levels on weekend day conditions would be somewhat lower. For purposes of this analysis, it has been assumed that weekend day traffic would be approximately two-thirds of the weekday volumes shown in Figure 5-7. Average weekday traffic volumes for the full ICC project configuration at 2012 opening-year levels are presented in Figure 5-7. Mainline two-way average weekday traffic volumes range from a low of 20,190 VPD to a high of 54,110 VPD. At the mainline segment located between I-95 and Briggs Chaney Road, average weekday traffic volumes are expected to reach 54,110 VPD, producing a.m. peak-hour volumes between 1,970 and 2,230 VPD and p.m. peak-hour volumes between 2,420 and 3,080 VPD well below the hourly capacity targets outlined previously. The I-95 Interchange would generate the highest entering and exiting traffic volumes. The I-95 Interchange would accommodate more than 57,060 entering and almost 25,780 exiting VPD in CORRIDOR SHARE ANALYSIS In reviewing the overall reasonableness of the opening-year 2012 and future-year 2030 traffic estimates, an analysis was made of the share of total corridor demand which is expected to be accommodated by the ICC facility. As shown in Figure 5-8, a series of three traffic screenlines were developed to examine the share of the project corridor that would be expected to patronize the ICC and its competing routes. Corridor share is defined as the amount of traffic utilizing each of the various routes within a specific screenline, including the proposed facility, as a proportion of the total screenline value. Screenline No. 1 is located west of MD 97. Screenline No. 2 is positioned west of MD 650 and Screenline No. 3 west of I-95. The results of the corridor share analysis at opening-year and future-year levels for the proposed ICC, under no-build and tolled conditions are shown in Figure 5-8. At Screenline No. 1 under 2012 no-build conditions, I-495, Norbeck Road and Randolph Road accommodate 47.0, 15.2 and 10.6 percent, respectively, of total corridor demand. The remaining routes currently accommodate the balance of corridor demand. In opening-year 2012, the newly opened ICC full project would accommodate about 7.4 June 12, 2006 Page 5-17

24 MD / Graphics / Final Report / landscape.ppt / ICC LEGEND Total Day WB Total Day EB P.M. A.M. A.M. P.M. Mainline Peak Hour Volume Total Two-Way Mainline Peak Hour Volume Total Day Ramp Volume Note: Higher peak period per mile toll rates would be required to manage traffic demand where mainline peak hour traffic volumes exceed the 5,000 peak hour capacity target in a single travel direction. Not to Scale INT. 1 I-370 INT. 2 MD 97 INT. 3 MD 182 INT. 4 MD ,320 1,970 2,040 5,900 6,570 20,990 2,100 1,790 3,710 4,000 21,280 2,120 1,630 3,420 9,020 28,880 2,570 2,200 42,140 43,920 44,350 53,370 21,820 1,380 3,160 6,380 7,490 22,930 1,850 2,630 4,430 4,570 23,070 1,990 2,290 5,210 8,630 26,490 2,180 2,600 INT. 5 US 29 INT. 6 Briggs Chaney INT. 7 I-95 INT. 8 Virginia Manor INT. 9 Baltimore Ave./ Route 1 10,500 7,930 24,310 2,640 1,760 4,190 28,500 3,080 1,970 20,540 6,360 14,320 1, ,550 10,770 1, ,390 54,110 27,030 20,190 10,970 7,560 23,080 1,950 2,150 2,530 25,610 2,230 2,420 19,420 6,520 12,710 1,080 1,220 3,290 9, ,060 ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates ESTIMATED FULL PROJECT AVERAGE WEEKDAY TRAFFIC VOLUMES $0.20 Per Mile Peak - $0.15 Per Mile Off-Peak - $2.50 Video Administration Fee With Minimum Toll / No Maximum FIGURE 5-7

25 percent of total corridor demand under the tolled conditions. While traffic on I-495 would decline slightly, it still would handle over 44 percent of the total corridor demand, about six times the share of the ICC. As shown in Figure 5-8 at Screenline No. 2 the proposed Intercounty Connector captures 9.1 percent of total corridor demand under the tolled alternative at 2012 levels. I-495 total corridor demand declines from 51.5 percent under no-build conditions to 48.4 percent assuming the implementation of the ICC. Norbeck Road corridor demands levels fall from 7.2 percent under no-build conditions to 5.8 percent assuming the project is in place under tolled conditions. At the Screenline No. 3 location, the ICC mainlanes capture 11.9 percent of total corridor demand during opening-year 2012 assuming tolls were in place. As shown in Figure 5-8, I-495, Scaggsville Road and MD 198 contribute the lion s share of the ICC demand. Figure 5-8 also shows corridor screenline information at 2030 levels. As might be expected, the share of corridor traffic carried by the ICC generally increases while the share carried by I-495 and other routes slightly decreases. This is due to the fact that in spite of toll increases, the ICC becomes increasingly competitive over time, as congestion levels on competing routes continue to deteriorate. This is particularly true with respect to I-495, which shows relatively small traffic growth between 2012 and 2030, due to capacity constraints which are already quite severe. By 2030, the ICC is expected to capture between 10 and 15 percent of total corridor demand, depending on screenline location. However, even with this increased share, it is still a relatively small proportion of total travel in the corridor, which is from over 450,000 per day to almost 570,000 per day in ESTIMATED 2025 AVERAGE WEEKDAY TRAFFIC Traffic estimates were made for the proposed ICC under the preferred project configuration at future-year Traffic volumes represent traffic levels on average weekday in 2030 and are presented graphically in Figure 5-9. The proposed ICC mainlanes are expected to accommodate average weekday traffic volumes ranging from a low of 22,320 VPD on the mainlane section west of U.S. 1 to a high of 86,080 VPD along the mainlane section east of MD 650 in At the peak load point east of MD 650, this equates to a.m. peak-hour volumes of 1,930 and 4,760. June 12, 2006 Page 5-18

26 MD / Graphics / Final Report / landscape.ppt / ICC Fairfax Proposed Inter-County Connector 270 Rockville Gaithersburg 370 Muncaster Mill Laytonsville Norbeck 108 Montgomery Rockville Georgia Veirs Mill Pike 1 1 C Ave. 185 Ave. 97 Georgia onnecticut 182 Ave. 97 Randolph District of Columbia Ashton New Hampshire Ave Spencerville Briggs Fairland 3 Chaney Howard Van Dusen Virginia Manor 3 Laurel Prince George's Screenline No. 1 West of MD 97 MD 108 ICC Muncaster Mill Norbeck Veirs Mill Randolph Strathmore I-495 Other Total Screenline No. 2 West of MD 650 Ashton Norbeck Norwood ICC Randolph University I-495 Other Total Screenline No. 3 West of I-95 Scaggsville MD 198 ICC Briggs Chaney Fairland Cherry Hill I-495 Other Total Full Project Opening Year 2012 Future Year 2030 No Build No Build No Build Tolled Tolled Tolled Full Project No Build No Build No Build Tolled Tolled Tolled ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates PROJECT CORRIDOR SHARE COMPARISON FIGURE 5-8

Traffic and Toll Revenue Estimates

Traffic and Toll Revenue Estimates The results of WSA s assessment of traffic and toll revenue characteristics of the proposed LBJ (MLs) are presented in this chapter. As discussed in Chapter 1, Alternatives 2 and 6 were selected as the

More information

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis High Speed Intercity Passenger Rail Technical Appendix Prepared by HDR August 5, 2010 The Boston South Station HSIPR Expansion Project

More information

1 On Time Performance

1 On Time Performance MEMORANDUM: US 29 Travel Time & OTP To: From: Joana Conklin, Montgomery County DOT James A. Bunch, SWAI Subject: US 29 Travel Time and On Time Performance Analysis Date: This memorandum documents the US

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

Funding Scenario Descriptions & Performance

Funding Scenario Descriptions & Performance Funding Scenario Descriptions & Performance These scenarios were developed based on direction set by the Task Force at previous meetings. They represent approaches for funding to further Task Force discussion

More information

CLRP. Performance Analysis of The Draft 2014 CLRP. Long-Range Transportation Plan For the National Capital Region

CLRP. Performance Analysis of The Draft 2014 CLRP. Long-Range Transportation Plan For the National Capital Region NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD Item 12 CLRP Financially Constrained Long-Range Transportation Plan For the National Capital Region 2014 Performance Analysis of The Draft 2014 CLRP

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

Task Force Meeting January 15, 2009

Task Force Meeting January 15, 2009 Task Force Meeting January 15, 2009 Study Update August 14 th Task Force Meeting Update on Traffic Projections and Financial Feasibility Study presented by Kane County and WSA staff The presentation summarized

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information

Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections What s New for 2015

Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections What s New for 2015 Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections Prepared by Texas A&M Transportation Institute August 2015 This memo documents the analysis

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Bella Vista Bypass Traffic and Revenue Report

Bella Vista Bypass Traffic and Revenue Report Bella Vista Bypass Traffic and Revenue Report August 27, 2009 Prepared for the: Prepared by: in association with Stantec TABLE OF CONTENTS 1.0 Introduction...2 2.0 Identification of Key Factors from HNTB/WSA

More information

Expansion Projects Description

Expansion Projects Description Expansion Projects Description The Turnpike expansion program was authorized by the Florida Legislature in 1990 to meet the State s backlog of needed highway facilities. The Legislature set environmental

More information

Fueling Savings: Higher Fuel Economy Standards Result In Big Savings for Consumers

Fueling Savings: Higher Fuel Economy Standards Result In Big Savings for Consumers Fueling Savings: Higher Fuel Economy Standards Result In Big Savings for Consumers Prepared for Consumers Union September 7, 2016 AUTHORS Tyler Comings Avi Allison Frank Ackerman, PhD 485 Massachusetts

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

TRAVEL DEMAND FORECASTS

TRAVEL DEMAND FORECASTS Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components

More information

Benefit Cost Analysis

Benefit Cost Analysis Benefit Cost Analysis The Benefit Cost Analysis (BCA) was performed in accordance with the ARRA guidance provided in the Federal Register. These benefits and costs were quantified in accordance with the

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY

DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY APPENDIX 1 DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY INTRODUCTION: This Appendix presents a general description of the analysis method used in forecasting

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

Appendix G Traffic Study Methodology

Appendix G Traffic Study Methodology REVISED DRAFT ENVIRONMENTAL IMPACT REPORT/ Appendix G Traffic Forecasting Model Methodology In addition to the existing/baseline condition (year 2005), a level of service (LOS) analysis was conducted for

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Executive Summary: Metrobus Network Evaluation and Future Fleet Needs Presented to: Washington Metropolitan Area Transit Authority Submitted by: In Association with P 2 D Joint Venture Introduction Metrobus

More information

Bella Vista Bypass TABEL OF CONTENTS

Bella Vista Bypass TABEL OF CONTENTS TABEL OF CONTENTS DRAFT TRAFFIC AND REVENUE REPORT Introduction 1 Identification of Key Factors from HNTB/WSA Traffic and Revenue Report 3 Summary of 2007 Field Work Data Collection 8 Traffic and Revenue

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

Travel Time Savings Memorandum

Travel Time Savings Memorandum 04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

8.2 ROUTE CHOICE BEHAVIOUR:

8.2 ROUTE CHOICE BEHAVIOUR: 8.2 ROUTE CHOICE BEHAVIOUR: The most fundamental element of any traffic assignment is to select a criterion which explains the choice by driver of one route between an origin-destination pair from among

More information

Costco Gasoline Fuel Station Transportation Characteristics

Costco Gasoline Fuel Station Transportation Characteristics Exhibit A MEMORANDUM Date: May 23, 2013 Project #: I-10 To: Jennifer Murillo, Costco Wholesale Terry Odle, Mulvanny G2 Architecture From: Sonia Hennum, PTOE Project: Subject: Signal Hill Costco Gasoline

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Why Peachtree? Why Now? I. THE CONTEXT High Level View of Phasing Discussion Potential Ridership Segment 3 Ease

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

City of Pacific Grove

City of Pacific Grove Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency

More information

Bella Vista Bypass Benefit Cost Analysis

Bella Vista Bypass Benefit Cost Analysis Bella Vista Benefit Cost Analysis The Benefit Cost Analysis (BCA) was performed in accordance with the ARRA guidance provided in the Federal Register. These benefits and costs were quantified in accordance

More information

Disruptive Technology and Mobility Change

Disruptive Technology and Mobility Change Disruptive Technology and Mobility Change What it Might Mean for Urban Transportation Ed Regan Senior Vice President June 1, 2018 Presented at Transport Chicago Ed Regan, SVP, CDM Smith 43-year veteran

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

Operating & Maintenance Cost Results Report

Operating & Maintenance Cost Results Report Operating & Maintenance Cost Results Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates FINAL June

More information

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling.

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling. Mode Selection Report 7 Cost Evaluation The cost evaluation criteria used in the evaluation of the transit modes are: Capital cost. operating costs. Fare revenue. Net cost per passenger/passenger-mile.

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Toll Impact Study Tier 1 Environmental Impact Statement

Toll Impact Study Tier 1 Environmental Impact Statement PPMS: 67587 PROJECT NO: 0081-961-111 PPMS: 67588 PROJECT NO: 0081-962-116 PPMS: 67589 PROJECT NO: 0081-968-123 Tier 1 Environmental Impact Statement This technical report was prepared to support the Tier

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Signal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St.

Signal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St. I. Overview Consultant A was retained by the Ohio Department of Transportation to conduct traffic signal timing analyses on approximately one mile of roadway on between the Main Street and the Fourth Street

More information

Post Opening Project Evaluation. M6 Toll

Post Opening Project Evaluation. M6 Toll M6 Toll Five Post Years Opening After Study: Project Summary Evaluation Report Post Opening Project Evaluation M6 Toll Five Years After Study Summary Report October 2009 Document History JOB NUMBER: 5081587/905

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report Office of Transportation Bureau of Traffic Management 1997 Downtown Parking Meter District Rate Report Introduction The City operates approximately 5,600 parking meters in the core area of downtown. 1

More information

Maryland Gets to Work

Maryland Gets to Work I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 11, 2018 To: The Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 19, 2008 DATE: July 10, 2008 SUBJECT: Enactment of an Ordinance to amend, reenact and recodify Section 25-14 (Rates of Fare) of Chapter

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

Travel Forecasting Methodology

Travel Forecasting Methodology Travel Forecasting Methodology Introduction This technical memorandum documents the travel demand forecasting methodology used for the SH7 BRT Study. This memorandum includes discussion of the following:

More information

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018 UTA Transportation Equity Study and Staff Analysis Board Workshop January 6, 2018 1 Executive Summary UTA ranks DART 6 th out of top 20 Transit Agencies in the country for ridership. UTA Study confirms

More information

AECOM 30 Leek Cres., 4 th Floor Richmond Hill, ON L4B 4N4 Canada

AECOM 30 Leek Cres., 4 th Floor Richmond Hill, ON L4B 4N4 Canada \ AECOM 30 Leek Cres., 4 th Floor Richmond Hill, ON L4B 4N4 Canada www.aecom.com 905-882-4401 tel 905-882-4399 fax Memorandum To CC Subject Peter Dorton (MTO), Eric Terro (MTO) Olga Garces (MTO) Page 1

More information

JCE 4600 Basic Freeway Segments

JCE 4600 Basic Freeway Segments JCE 4600 Basic Freeway Segments HCM Applications What is a Freeway? divided highway with full control of access two or more lanes for the exclusive use of traffic in each direction no signalized or stop-controlled

More information

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

Mercer Island Center for the Arts Parking Management Plan

Mercer Island Center for the Arts Parking Management Plan Parking Stalls Mercer Island Center for the Arts Parking Management Plan June 15, 2016 This Parking Management Plan (P) covers all tenants at the Mercer Island Center for the Arts (MICA) campus, including

More information

Public Transportation Problems and Solutions in the Historical Center of Quito

Public Transportation Problems and Solutions in the Historical Center of Quito TRANSPORTATION RESEARCH RECORD 1266 205 Public Transportation Problems and Solutions in the Historical Center of Quito JACOB GREENSTEIN, Lours BERGER, AND AMIRAM STRULOV Quito, the capital of Ecuador,

More information

SEPULVEDA PASS CORRIDOR

SEPULVEDA PASS CORRIDOR SEPULVEDA PASS CORRIDOR PUBLIC PRIVATE PARTNERSHIP DELIVERY PRE-DEVELOPMENT AGREEMENT PDA Sepulveda Pass Mobility Issues Most congested highway segment in the U.S. 295,000 vehicles per day (2010) 430,000

More information

TECHNICAL MEMORANDUM. Part A: Introduction

TECHNICAL MEMORANDUM. Part A: Introduction TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,

More information

State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT

State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT April 2016 I. COST-EFFECTIVENESS ANALYSIS A Benefit-Cost Analysis (BCA) was conducted in conformance

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS Michigan / Grand River Avenue TECHNICAL MEMORANDUM #18 From: URS Consultant Team To: CATA Project Staff and Technical Committee Topic:

More information

Road User Cost Analysis

Road User Cost Analysis Road User Cost Analysis I-45 Gulf Freeway at Beltway 8 Interchange CSJ #500-03-382 1994 Texas Transportation Institute ROAD USER COST ANALYSIS CSJ #500-03-382 The Texas Department of Transportation (TxDOT)

More information

APPENDIX C ROADWAY BEFORE-AND-AFTER STUDY

APPENDIX C ROADWAY BEFORE-AND-AFTER STUDY APPENDIX C ROADWAY BEFORE-AND-AFTER STUDY The benefits to pedestrians and bus patrons are numerous when a bus bay is replaced with a bus bulb. Buses should operate more efficiently at the stop when not

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Geneva, 67th SC.2 Session October 2013 High Speed Trains Master Plan

Geneva, 67th SC.2 Session October 2013 High Speed Trains Master Plan Geneva, 67th SC.2 Session 23 25 October 2013 High Speed Trains Master Plan Work Package I Work Package II Work Package III Project Management Review of related Work Socio economic framework of the ECE

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

What is ELToD and Why Use it? Toll Choice Key Concepts. ELToD Applications. SW 10 th Street. ELToD Future Enhancements

What is ELToD and Why Use it? Toll Choice Key Concepts. ELToD Applications. SW 10 th Street. ELToD Future Enhancements June 16, 2017 What is ELToD and Why Use it? Toll Choice Key Concepts ELToD Applications SW 10 th Street ELToD Future Enhancements 2 ELToD (Express Lanes Time of Day) Model is a traffic assignment model

More information

Pilot Project Evaluation Summary

Pilot Project Evaluation Summary SFpark Pilot Project Evaluation Summary A summary of the SFMTA s evaluation of the SFpark pilot project M U N I June 2014 2 / Overview SFpark: Pilot Project Evaluation Summary / 3 Pilot Project Evaluation

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Appendix B: Travel Demand Forecasts July 2017

Appendix B: Travel Demand Forecasts July 2017 Appendix B: Travel Demand Forecasts July 2017 Table of Contents 1 Introduction... 2 2 Model Review and Updates... 2 2.1 Overview of Smart Moves Model ( City of London Model )... 2 2.1.1 Network and Zone

More information

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas Proceedings of the 1998 Winter Simulation Conference D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, eds. FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK Gene

More information

Future Funding The sustainability of current transport revenue tools model and report November 2014

Future Funding The sustainability of current transport revenue tools model and report November 2014 Future Funding The sustainability of current transport revenue tools model and report November 214 Ensuring our transport system helps New Zealand thrive Future Funding: The sustainability of current transport

More information

Rate Review 2017 Off-Street Municipal Parking Facilities

Rate Review 2017 Off-Street Municipal Parking Facilities PA3.2 REPORT FOR ACTION Rate Review 2017 Off-Street Municipal Parking Facilities Date: August 31, 2017 To: Board of Directors, Toronto Parking Authority From: Acting President, Toronto Parking Authority

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

7 COMPARATIVE EVALUATION OF ALTERNATIVES

7 COMPARATIVE EVALUATION OF ALTERNATIVES 7 COMPARATIVE EVALUATION OF ALTERNATIVES 7.1 INTRODUCTION This chapter presents the comparative analysis of the four Level 2 build alternatives along with a discussion of the relative performance of the

More information

Electric Vehicle Cost-Benefit Analyses

Electric Vehicle Cost-Benefit Analyses Electric Vehicle Cost-Benefit Analyses Results of plug-in electric vehicle modeling in five Northeast & Mid-Atlantic states Quick Take With growing interest in the electrification of transportation in

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information