1 \ AECOM 30 Leek Cres., 4 th Floor Richmond Hill, ON L4B 4N4 Canada tel fax Memorandum To CC Subject Peter Dorton (MTO), Eric Terro (MTO) Olga Garces (MTO) Page 1 Mike Neumann (Ainley) Highway 400 / Pooles Road Interchange Needs and Justification Traffic Analysis From Ilya Sher (AECOM) Davoud Shirazi (AECOM) Date June 23, 2015 Introduction The following provides a Needs and Justification assessment for the future Highway 400/Pooles Road interchange in the Township of Springwater. AECOM was retained by the Township of Springwater through Ainley Consulting Group to undertake a Needs and Justification study for the Highway 400 interchange at Pooles Road. The Needs and Justification assessment was generally built on the following background studies: 1. Simcoe Area Multi-Modal Transportation Strategy (MTO); 2. The on-going Highway 400 Widening from Highway 89 to the Highway 11 Split Preliminary Design (MTO); and 3. Midhurst Environmental Assessment and Transportation Master Plan (Township of Springwater). In order to determine future travel demands within the specified area, a modeling approach was developed and adopted, which was based on anticipated land uses as per the Midhurst Master Plan. Subarea models obtained from the Strategic Area Forecasting Office (SAFO MTO) were used to project traffic volumes into the future horizon years of 2031 and Information on provincial and municipal road network assumptions were obtained from both studies, and are discussed later in this report. Future population and employment figures for the Midhurst community were obtained from the Midhurst Transportation Master Plan study undertaken by Ainley Group for the Township of Springwater. The study area is illustrated in Figure 1.

2 P a g e 2 Figure 1. Midhurst Study Area MIDHURST Background Studies Simcoe Area Multi-Modal Transportation Strategy (MTO) The purpose of the study was to develop 2011, 2021, 2031 and 2041 multi-modal travel demand forecast models (weekday AM and Sunday) for the Simcoe Area. The study tested various transportation scenarios pertaining not only to improvements to the existing vehicular capacity, but also considering various TDM and transit initiatives. Although the study did not provide recommendations, it did identify anticipated capacity constraints/requirements for each scenario analyzed. The following general scenarios were assessed: 1. Maximize Transit; 2. Optimize Existing Capacity (maximize transit and optimize the existing road network); 3. A: New Transportation Corridors (Scenarios 1 and 2 plus build a new corridor west of Highway 400; and B: New Transportation Corridors (Scenarios 1 and 2 plus build a new corridor east of Highway 400). Scenario 3A incorporates a Highway 427 Extension to north of Barrie, while Scenario 3B has Highway 404 extending to Highway 12. Both scenarios also incorporate other improvements to the road network, including the Bradford Bypass between Highway 404 and Highway 427 Extension with a connection at Highway 400. It should be noted that the cross-section of the Highway 400 corridor north of Highway 9 was assumed to be as per the earlier Environmental Assessment and Preliminary Design recommendations, which suggested that Highway 400 would require 10 lanes by the ultimate horizon year (2011 at that time).

3 P a g e 3 The study results showed that Highway 400 would operate acceptably by the 2041 horizon year under both Scenarios 3A and 3B (Scenario 3A yields slightly better operations along the freeway corridor). As previously noted, both Scenarios 3A and 3B assumed transit improvements and optimization of existing capacity (existing road network) along with the new freeway corridors. Springwater Transportation Master Plan The Springwater Transportation Master Plan identified road improvements required to facilitate anticipated growth in population and employment, specifically within the Midhurst Community. The study identified a significant growth in population within the community by the 2031 horizon year, which triggers various improvements within and outside the immediate area. One of the improvements identified was a partial interchange with Highway 400 at Pooles Road (to and from the south). Other road network improvements within Midhurst are illustrated in Figure 9. Highway 400 Widening from Highway 89 to Highway 11 At the time of preparation of this report, the Highway 400 Widening Preliminary Design project was still ongoing. The study s objective is to determine needs for a freeway widening by the ultimate horizon year of The study is building on the previously completed Simcoe Area Multi-Modal Transportation Strategy study. The travel demand and forecast component is being undertaken using subarea models obtained from the Simcoe Area model with certain assumptions with respect to provincial road network improvements. Specifically, the study assumes that Highway 427 Extension would only be extended to King Road by the 2031 horizon year, while Highway 404 would be extended to Ravenshoe Road/Woodbine Avenue. With respect to the Midhurst community, population and employment growth assumptions within the community were not as significant as were identified in the Midhurst Transportation Master Plan (discussed later in this report). Current Study (Highway 400/Pooles Road Interchange Needs and Justification) The purpose of this study is to assess needs and justification for a potential partial interchange at Pooles Road and Highway 400. The earlier listed background studies were used to develop assumptions and a basis for the analysis. Specifically, the 2031 horizon year was selected for Phase I completion (currently approved) and the 2041 horizon year was selected as the ultimate horizon year for a full build out of the Midhurst development as per the Midhurst Transportation Master Plan. Since the recommendations from the Highway 400 widening EA and PD study were not available at the time of this report, assumptions with respect to Highway 400 improvements were made, which were primarily based on the results of the previously completed EA and Preliminary Design project for the subject Highway 400 corridor and work completed to date on the concurrent Highway 400 widening EA and PD. Other assumptions are listed below: Phase I Horizon Year Ultimate Horizon Year 2041; Peak Hour Weekday AM; Highway 400 cross-section Ten lanes south of Duckworth Street, eight lanes from Duckworth Street to Highway 11; Bradford Bypass between Highway 404 and Highway 400; Highway 427 Extension to King Road; Highway 404 Extension to Ravenshoe/Woodbine; Road network improvements within Midhurst As per the Midhurst Transportation Master Plan; Population/Employment for Midhurst As per the Midhurst Transportation Master Plan; and Population/Employment for Simcoe and GTA Ontario Growth Plan for the Greater Golden Horseshoe (Places to Grow). Figure 2 illustrates locations of the proposed developments within the Midhurst community (Source: Midhurst Transportation Master Plan Study by Ainley Group).

4 P a g e 4 Model Calibration/Validation The EMME 4 platform was selected for the travel demand forecast component of the study. The subarea model used in this analysis is also being used in the concurrent Highway 400 Widening EA and PD study. It should be noted that the model validation for the latter was completed at the time of preparation of this report. The weekday AM peak hour model was calibrated and validated based on screenline volumes and Highway 400 link volumes at key locations. For the purpose of this assignment, additional screenlines were selected around the Midhurst community as depicted in Figure 3. After reviewing the road network within Midhurst in the subarea model as provided by SAFO, AECOM refined the network by including roadways, which would help to fine-tune existing and future traffic assignments in the immediate area. The differences between the road network from the original subarea from SAFO and the fine-tuned one are depicted in Figure 4. It should also be noted certain connectors to the traffic zones within the immediate study area were adjusted to replicate a more reasonable assignment of traffic to the surrounding links. One example includes a removal of a connector to Highway 93 from one of the Midhurst traffic zones, which had substantial traffic volumes bypass adjacent links, resulting in unreasonable traffic assignment. This adjustment saw additional traffic utilizing Highway 400 via Forbes Road rather than via Highway 93. Upon completion of the road network refinement within Midhurst, the AM peak hour matrix (2011) was assigned to the network and checked for accuracy while comparing the overall results against the original subarea model. The results of the screenline analysis are illustrated in Table 1. It should be noted that actual traffic volumes were obtained from MTO, and include ATR counts on all Simcoe County Roads, undertaken between 2009 and 2011 (collected as part of the Simcoe Area Multi-Modal Transportation Strategy study). In addition, most recent traffic volumes (AADT) were obtained from the City of Barrie web site for St Vincent Street and Anne Street to complete the screnlines. Daily traffic volumes were converted to directional peak hour volumes based on a review of applicable conversion factors (AADT to DHV) for highways with similar classification, as well as directional distribution of traffic on the adjacent roads. Figure 2. Midhurst Transportation Master Plan Proposed Developments Source: Transportation Master Plan (Ainley Group)

5 P a g e 5 Figure 3. Additional Screenlines Around Midhurst Area In general, all screenline volumes revealed a close match with actual traffic volumes obtained from previous surveys. The table above also provides GEH factors used to determine correlation between actual and modeled traffic volumes. Factors below 5.0 suggest close correlation, while factors between 5 and 10 typically require more investigation. GEH factors above 10 typically suggest no correlation between modeled and actual traffic volumes. Screenline 2 in the northbound direction has a GEH factor of 8.68, which suggests not as strong of a match in the off-peak direction. Screenline 3 volumes (both directions) in the model were found to differ significantly from volumes from actual traffic surveys. A further analysis revealed that based on traffic surveys, morning peak hours on certain roads occur at different times between 6 AM and 9 AM, and in some cases later in the morning. Lower volumes were noted on Simcoe Roads 22 and 43 between 6 AM and 9 AM. Since the predominant movement of traffic in the AM peak hour is southward, Screenlines 1 and 2 (especially in the southbound direction) are considered to be the most crucial of the four. As such, the model is considered to be suitable for further analysis and forecast to the horizon years of 2031 and 2041 with and without the Midhurst development as per the Midhurst Transportation Master Plan.

6 P a g e 6 Figure 4. Road Network Refinements Midhurst Area Simcoe Subarea Model Modified Subarea Model Table 1. Screenline Analysis Results Screenline 1 ScreenLine - Station Description 2011 Subarea (AM) 2010 Actual (AM) SB Simcoe Rd 28 N of Barrie N Lmt SB Hwy 400 N of Hwy 11 Split SB Simcoe Rd 93 N of Hwy 11 Split SB Hwy 26 N of Barrie N Lmt SB Simcoe Road 53 N of Barrie N Lmt GEH SB St Vincent Street N of Barrie N Lmt SB Anne Street N of Barrie N Lmt Total Screenline 1 ScreenLine - Station Description 2011 Subarea (AM) 2010 Actual (AM) NB Simcoe Rd 28 N of Barrie N Lmt NB Hwy 400 N of Hwy 11 Split NB Simcoe Rd 93 N of Hwy 11 Split GEH NB Hwy 26 N of Barrie N Lmt NB Simcoe Road 53 N of Barrie N Lmt NB St Vincent Street N of Barrie N Lmt NB Anne Street N of Barrie N Lmt Total Screenline 2 ScreenLine - Station Description 2011 Subarea (AM) 2010 Actual (AM) GEH SB Hwy 26 N of Rd SB Simcoe Rd 27 N of Forbes SB Hwy 400 N of Forbes SB Simcoe Rd 93 N of Forbes Total Screenline 2 ScreenLine - Station Description 2011 Subarea (AM) 2010 Actual (AM) GEH NB Hwy 26 N of Rd NB Simcoe Rd 27 N of Forbes NB Hwy 400 N of Forbes NB Simcoe Rd 93 N of Forbes 0 94 Total Screenline 3 ScreenLine - Station Description 2011 Subarea (AM) 2010 Actual (AM) EB Simcoe Rd 22 E of Simcoe Rd EB Simcoe Rd 43 E of Simcoe Rd EB Simcoe Rd 40 E of Simcoe Rd EB Simcoe Rd 90 E of Simcoe Rd GEH Total Screenline 3 ScreenLine - Station Description 2011 Subarea (AM) 2010 Actual (AM) WB Simcoe Rd 22 E of Simcoe Rd WB Simcoe Rd 43 E of Simcoe Rd WB Simcoe Rd 40 E of Simcoe Rd WB Simcoe Rd 90 E of Simcoe Rd GEH Total Screenline 4 ScreenLine - Station Description 2011 Subarea (AM) 2010 Actual (AM) EB Simcoe Rd 22 E of Hwy EB Simcoe Rd 11 E of Hwy GEH Total Screenline 4 ScreenLine - Station Description 2011 Subarea (AM) 2010 Simcoe Volume (veh) WB Simcoe Rd 22 E of Hwy WB Simcoe Rd 11 E of Hwy GEH Total

7 P a g e 7 Development of Future Traffic Matrices Methodology The methodology of developing traffic matrices includes a review and comparison of population and employment forecasts between the two sources: Simcoe Subarea Model and Midhurst Transportation Master Plan. Trip generation for the subject lands is obtained from the Transportation Master Plan study assumptions, as well as the BA Group memorandum dated May 23, 2014, and entitled Update to EA Traffic Forecasts Based on Updated Employment Estimates, while trip distribution is based on the Transportation Tomorrow Survey data, which was also used to develop matrices for the subarea model. Assumptions in terms of the internal and linked trips within the future developments were based on the discussions outlined in the previously noted reports/documents. Population and Employment Forecast Population and employment figures for the entire subarea model (on the traffic zone basis) were obtained from the Ministry of Transportation. A comparison between these forecasts against the ones from the Midhurst Transportation Master Plan was made, with an emphasis on traffic zones within Midhurst. Figures 5 and 6 illustrate traffic zones from the subarea model. The Midhurst service area comprises seven traffic analysis zones in the SAFO Simcoe Subarea Model. Table 2 summarizes population and employment forecast by zone as per the SAFO Simcoe Subarea Model. It should be noted that the proposed development area as outlined in the Midhurst Transportation Master Plan overlaps with the following four traffic zones: 8875, 8878, 8881, and Figure 5. Township of Springwater Traffic Zone Map (Source: SAFO Simcoe Subarea Model)

8 P a g e 8 Figure 6. Midhurst Traffic Zone Map (Source: SAFO Simcoe Subarea Model). Table 2. Population and Employment Forecast Source: MTO Employment Growth Employment 2031 Employment 2011 Employment Population Growth Population 2031 Population 2011 Population Zone Sub-Total Grand Total Note: highlighted zones represent traffic zones that capture Midhurst development area (immediate analysis area) From the table above, the anticipated growth in population and employment within Midhurst is considered to be moderate based on the subarea model. In general, there is approximately a 59% growth in population (2011 to 2041), and less than 5% in employment for the same period. In comparison, population and employment forecasts from the Midhurst Transportation Master Plan are more pronounced as summarized in Table 3 (broken down by traffic zone and development area).

9 P a g e 9 Table 3. Population and Employment Forecast Source: Midhurst Transportation Master Plan Phase 1/Full Build Out Mixed Use Employment Land (sq ft GFA) Phase 1/Full Build Out Light Industrial Employment Growth (Basic Jobs) Full Build Out Population Growth (People) Phase I Population Growth (People) Zone Sum , ,000 Trip Generation The morning peak hour trip generation data for the subject traffic zones were extracted and reviewed from the subarea model for the years 2011 and Table 4 provides a summary of trip generation as per the subarea model. Table 4. Trip Generation by Traffic Zone from the Subarea Model Trip Attraction Growth Trip Attraction 2031 Trip Attraction 2011 Trip Attraction Trip Production Growth Trip Production 2031 Trip Production 2011 Trip Production Zone Sum The above table shows that the forecast growth in trip production and trip attraction within the four traffic zones is modest in the subarea model. The number of trips produced by the subject four traffic zones is anticipated to grow by 40 percent, and the number of trips attracted by the zones is anticipated to grow by 21 percent between 2011 and Trip generation from the TMP was subdivided into the four traffic analysis zones, and is represented in Table 5.

10 P a g e 10 Table 5. Trip Generation Growth by Traffic Zone from Midhurst Transportation Master Plan Trip Attraction Growth associated with Full Build Out Trip Attraction Growth associated with Phase I Trip Production Growth associated with Full Build Out Trip Production Growth associated with Phase I Zone Sum The Midhurst development is expected to generate 4325 total trips in the 2031 AM peak hour and 6,060 total trips in the 2041 AM peak hour. Table 6 summarizes the additional trips in the Midhurst Transportation Master Plan (TMP) compared to the MTO subarea model. The distribution of these extra trips among pairs of traffic analysis zones are explained in the next section. Table 6. Additional Trips by Traffic Zone in Midhurst TMP Compared to MTO Subarea Model Extra Trips Attracted (Full-Build-Out vs 2041 MTO) Extra Trips Attracted (Phase I vs 2031 MTO) Extra Trips Produced (Full-Build-Out vs 2041 MTO) Extra Trips Produced (Phase I vs 2031 MTO) Zone Sum Upon completion of the trip generation comparison between the subarea model and the Midhurst Transportation Master Plan, an additional 3,642 trips in 2031 and 5,473 trips in 2041 need to be assigned to the network in order to match projected population and employment forecast as outlined in the Midhurst TMP. Trip Distribution Trip distribution for the extra trips in the Midhurst TMP was based on the distribution used in the Simcoe subarea model, which in turn was based on the Transportation Tomorrow Survey data. The

11 P a g e 11 extra trips from/to zones 8878, 8881, and 8882 were distributed according to the distribution of the trips from/to the corresponding zones in the Simcoe subarea model (2031 and 2041 AM peak hour matrices). The distribution of extra trips associated with zone 8875 was assumed to be slightly different. This zone encompasses a large area within the Township of Springwater, however, the proposed developments in zone 8875 are in close proximity to the existing developments in zone As such, the extra trips produced and attracted by zone 8875 were distributed according to the distribution of the trips from/to zone 8877 in the Simcoe Subarea model. Generally, majority of trips generated in Midhurst are destined to other areas within the Simcoe County, including the City of Barrie (totaling 85%). Approximately 12% are destined to the GTA. The rest are destined to other areas. Approximately 70% of all outbound trips in the AM peak hour are southbound trips (to the south of Midhurst). Once the trip distribution had been established, trip tables were updated accordingly, and additional trips were assigned to the future road network in the Simcoe subarea model. The updated trip tables (2031 and 2041 AM peak hour matrix) were assigned to the road network in Scenarios 2 and 3 (standard traffic assignment in EMME4). The results of these assignments are discussed in the following sections. Alternatives Analysis The following scenarios were assessed using the updated subarea models (future AM Peak Hour): 1&2. 3&4. 5&6. Base case with planned and committed improvements, without the Midhurst development, Scenario 1 for 2031, Scenario 2 for 2041; Planned and committed improvements with the Midhurst development and no interchange at Pooles Road, Scenario 3 for 2031 including Phase 1, Scenario 4 for 2041 including full development; and Partial interchange at Pooles Road in place, planned and committed improvements with Midhurst development, Scenario 5 for 2031 including Phase 1, Scenario 6 for 2041 including full development. Scenarios 1&2 Base Case: No Midhurst Development Scenarios 1 and 2 are the Base Case scenarios without the Midhurst development as outlined in the Midhurst Transportation Master Plan study, but with the anticipated growth in population and employment as suggested by the Simcoe Subarea model. These scenarios do not incorporate road improvements recommended by the TMP; however, incorporate all other planned and committed road improvements discussed earlier in this report. In general, all major north-south roadways north of the Barrie city limits were found to have relatively low volume-to-capacity ratios. Figures 7 and 8 illustrate 2031 and 2041 link volumes, respectively, for the Base Case scenarios. The screenline analysis showed that all screenlines (north-south and east-west) have reserve capacity available (within Midhurst). It should be noted that the same screenlines were used in this analysis as in the model calibration/validation process. Figures 9 and 10 summarize link v/c ratios on all roads within the study area. Table 7 provides a summary of volume-to-capacity ratios in 2031 and 2041 AM peak hours on a screenline basis.

12 P a g e 12 Figure 7. Scenario 1 - Base Case 2031 AM Peak Hour Volumes (Source: EMME4) Figure 8. Scenario 2 - Base Case 2041 AM Peak Hour Volumes (Source: EMME4)

13 P a g e 13 Figure 9. Scenario 1 - Base Case 2031 AM Volume-to-Capacity Ratios V/C Ratios >0.97 Figure 10. Scenario 2 - Base Case 2041 AM Volume-to-Capacity Ratios V/C Ratios >0.97

14 P a g e 14 Table and 2041 AM Base Case Volume to Capacity Ratios (Screenlines) Screenline 1 ScreenLine - Station Description 2031 Base Case 2041 Base Case SB Simcoe Rd 28 N of Barrie N Lmt SB Hwy 400 N of Hwy 11 Split SB Simcoe Rd 93 N of Hwy 11 Split SB Hwy 26 N of Barrie N Lmt SB Simcoe Road 53 N of Barrie N Lmt SB St Vincent Road SB Anne Street Total Screenline 1 ScreenLine - Station Description 2031 Base Case 2041 Base Case NB Simcoe Rd 28 N of Barrie N Lmt NB Hwy 400 N of Hwy 11 Split NB Simcoe Rd 93 N of Hwy 11 Split NB Hwy 26 N of Barrie N Lmt NB Simcoe Road 53 N of Barrie N Lmt SB St Vincent Road SB Anne Street Total Screenline 2 ScreenLine - Station Description 2031 Base Case 2041 Base Case SB Hwy 26 N of Rd SB Simcoe Rd 27 N of Forbes SB Hwy 400 N of Forbes SB Simcoe Rd 93 N of Forbes Total Screenline 2 ScreenLine - Station Description 2031 Base Case 2041 Base Case NB Hwy 26 N of Rd NB Simcoe Rd 27 N of Forbes NB Hwy 400 N of Forbes NB Simcoe Rd 93 N of Forbes Total Screenline 3 ScreenLine - Station Description 2031 Base Case 2041 Base Case EB Simcoe Rd 22 E of Simcoe Rd EB Simcoe Rd 43 E of Simcoe Rd EB Simcoe Rd 40 E of Simcoe Rd EB Simcoe Rd 90 E of Simcoe Rd Total Screenline 3 ScreenLine - Station Description 2031 Base Case 2041 Base Case WB Simcoe Rd 22 E of Simcoe Rd WB Simcoe Rd 43 E of Simcoe Rd WB Simcoe Rd 40 E of Simcoe Rd WB Simcoe Rd 90 E of Simcoe Rd Total Screenline 4 ScreenLine - Station Description 2031 Base Case 2041 Base Case EB Simcoe Rd 22 E of Hwy EB Simcoe Rd 11 E of Hwy EB Highway 11 E of Highway 400 split EB Pooles Rd of Highway 400 split EB Partridge Rd of Highway 400 split Total Screenline 4 ScreenLine - Station Description 2031 Base Case 2041 Base Case WB Simcoe Rd 22 E of Hwy WB Simcoe Rd 11 E of Hwy WB Highway 11 E of Highway 400 split WB Pooles Rd of Highway 400 split WB Partridge Rd of Highway 400 split Total Scenarios 2&4 Midhurst Development without Pooles Road Interchange These scenarios incorporate all improvements as per the Midhurst Transportation Master Plan recommendations; however, exclude the partial interchange at Pooles Road. The main access to the freeway in the immediate area is provided via the full interchange at Forbes Road. Figure 11 summarizes road improvements within Midhurst and surrounding areas as per the TMP. Figures 12 and 13 illustrate AM peak hour volumes with Midhurst Phase I development in 2031 and full development in 2041 respectively. Figures 14 and 15 illustrate link v/c ratios in 2031 and 2041, respectively. Table 8 summarizes v/c ratios on the screenline basis in 2031 and 2041 AM peak hours. In these scenarios, additional traffic associated with the future development results in higher volumeto-capacity ratios on certain links. The southbound on-ramp at the Forbes Road interchange was found to carry approximately 700/1100 vehicles per hour in the AM peak hour by 2031/2041, compared to approximately 450/600 vehicles in the base case scenario. Forbes Road is expected to operate with high v/c ratios in the eastbound direction in the AM peak hour. Although the PM peak hour analysis was not part of this assessment, given that PM peak hour volumes are in general 4% higher than AM peak hour volumes (from a comparison of existing AM and PM peak hour traffic flows) congestion on Forbes Road in the westbound direction (return movement) can also be anticipated with potential impacts on traffic operations at the east ramp terminal intersection. Highway 26 (Bayfield Street) in the southbound direction was also found to operate at capacity approaching the northern limits of Barrie (toward the Highway 400 interchange). As previously noted, the future development is generally located south-west of the Highway 400/Forbes Road interchange, which would require commuters destined to the south (approximately 70% of all outbound trips) to

15 P a g e 15 either traverse in the southbound direction toward Highway 400 interchanges in Barrie or back track to the interchange at Forbes Road. There is a significant reliance on the Highway 400 corridor not only for the Midhurst traffic but also traffic from the City of Barrie and surrounding areas. Screenline 1 (southbound) is the most critical of the four, with certain roadways operating at or approaching capacity. In particular, St Vincent Road was found to operate over capacity north of Barrie (southbound in the AM peak hour) by It should be noted that St Vincent Street has a fourlane cross-section between Livingstone Street and just north of Highway 400 (immediately to the south from the screenline station). However, lane (capacity) reductions to the north and over Highway 400 make this corridor less attractive to commuters. Anne Street was found to operate with the v/c ratio of 0.89 in 2041.The V/C ratio for Screenline 1 (AM peak hour in the southbound direction) is 0.67/0.88 in 2031/2041. It should be noted that even though the PM forecast was not part of this assessment, as previously stated, a review of existing traffic volumes on Highway 400 within the study area revealed that traffic volumes in the PM peak hour/direction are at least 4% higher than the AM peak hour volumes in the southbound direction, which would make return volumes in the PM peak period further impact crossing roads and the off-ramps, potentially triggering additional improvements as a result. In addition, the TMP anticipates a significant share of retail uses in their employment forecast, traffic for which typically peaks in the PM peak period and on weekends. With this in mind, individual link and screenline v/c ratios could be higher in the PM peak hour, resulting in further deteriorated operations at locations with already high v/c ratios in the AM peak hour. Figure 11. Proposed Transportation Improvements in Midhurst (Source: Midhurst TMP)

16 P a g e 16 Figure 12. Scenario AM Midhurst Development Without Interchange Figure 13. Scenario AM Midhurst Development Without Interchange

17 P a g e 17 Figure 14. Scenario 3 Midhurst Without Pooles Road I/C 2031 AM Volume-to-Capacity Ratios V/C Ratios >0.97 Figure 15. Scenario 4 - Midhurst Without Pooles Road I/C 2041 AM Volume-to-Capacity Ratios V/C Ratios >0.97

18 P a g e 18 Table 8. Midhurst Development Without Pooles Rd Interchange 2031 and 2041 V/C Ratios (Screenlines) Screenline 1 ScreenLine - Station Description 2031 no IC 2041 no IC SB Simcoe Rd 28 N of Barrie N Lmt SB Hwy 400 N of Hwy 11 Split SB Simcoe Rd 93 N of Hwy 11 Split SB Hwy 26 N of Barrie N Lmt SB Simcoe Road 53 N of Barrie N Lmt SB St Vincent Road SB Anne Street Total Screenline 1 ScreenLine - Station Description 2031 no IC 2041 no IC NB Simcoe Rd 28 N of Barrie N Lmt NB Hwy 400 N of Hwy 11 Split NB Simcoe Rd 93 N of Hwy 11 Split NB Hwy 26 N of Barrie N Lmt NB Simcoe Road 53 N of Barrie N Lmt SB St Vincent Road SB Anne Street Total Screenline 2 ScreenLine - Station Description 2031 no IC 2041 no IC SB Hwy 26 N of Rd SB Simcoe Rd 27 N of Forbes SB Hwy 400 N of Forbes SB Simcoe Rd 93 N of Forbes Total Screenline 2 ScreenLine - Station Description 2031 no IC 2041 no IC NB Hwy 26 N of Rd NB Simcoe Rd 27 N of Forbes NB Hwy 400 N of Forbes NB Simcoe Rd 93 N of Forbes Total Screenline 3 ScreenLine - Station Description 2031 no IC 2041 no IC EB Simcoe Rd 22 E of Simcoe Rd EB Simcoe Rd 43 E of Simcoe Rd EB Simcoe Rd 40 E of Simcoe Rd EB Simcoe Rd 90 E of Simcoe Rd Total Screenline 3 ScreenLine - Station Description 2031 no IC 2041 no IC WB Simcoe Rd 22 E of Simcoe Rd WB Simcoe Rd 43 E of Simcoe Rd WB Simcoe Rd 40 E of Simcoe Rd WB Simcoe Rd 90 E of Simcoe Rd Total Screenline 4 ScreenLine - Station Description 2031 no IC 2041 no IC EB Simcoe Rd 22 E of Hwy EB Simcoe Rd 11 E of Hwy EB Highway 11 E of Highway 400 split EB Pooles Rd of Highway 400 split EB Partridge Rd of Highway 400 split Total Screenline 4 ScreenLine - Station Description 2031 no IC 2041 no IC WB Simcoe Rd 22 E of Hwy WB Simcoe Rd 11 E of Hwy WB Highway 11 E of Highway 400 split WB Pooles Rd of Highway 400 split WB Partridge Rd of Highway 400 split Total Scenarios 5&6 Midhurst Development with Pooles Road Interchange These scenarios assume a partial interchange (from/to the south) with Highway 400 at Pooles Road. The analysis shows that the new interchange would attract over 400/800 trips from the west in 2031/2041 AM peak hour that are destined to Highway 400 south. This translates to the fact that Pooles Road is expected to be fully utilized by 2041 should the partial interchange at Highway 400 be constructed. It should be noted that the Midhurst Transportation Master Plan study estimated approximately 510 vehicles using the W-S ramp at this location in the AM peak hour. The TMP also estimated 590 vehicles in the AM peak hour using the W/E-S ramp at Forbes Road in 2041, while the updated subarea model shows 450 vehicles using the W/E-S ramp once the Pooles Road interchange becomes available. The totals in traffic volumes for the on-ramps between the two interchanges; however, are quite comparable, adding to 1,250 vehicles per hour in the updated subarea model versus 1,100 vehicles in the AM peak hour in the TMP. The model, however, predicts heavier utilization of the south interchange should it be constructed. This is somewhat expected given that the majority of the development will occur to the south of Forbes Road, while trip distribution is such that most of the outbound trips are south-oriented, which makes the partial interchange at Pooles Road more attractive. Figures 16 and 17 summarize link volumes for these two scenarios and Figures 18 and 19 illustrate volume-to-capacity ratios for these scenarios. Table 9 illustrates 2041 v/c ratios on the screenline basis, while Figures 20 and 21 show a comparison between the scenarios with and without the interchange at Pooles Road.

19 P a g e 19 Figure 16. Scenario 5 Midhurst Phase I With Pooles Road Interchange in 2031 AM Figure 17. Scenario 6 Midhurst Development With Pooles Road Interchange in 2041 AM

20 P a g e 20 The partial interchange at Pooles Road will attract traffic from Forbes Road that is destined to Highway 400 south. The v/c ratio on Forbes Road is expected to decrease once the interchange at Pooles Road is constructed from 1.06 to 0.67 (2041). This is a significant improvement from the no interchange at Pooles Road scenario. Volume to capacity ratios on St. Vincent Road and Highway 26 are also expected to improve as a result as a portion of traffic from those roads is expected to divert to the new interchange at Pooles Road. Slight reductions in traffic volumes are expected at the Duckworth, Bayfield and Dunlop interchanges. The v/c ratio on Highway 400 in the southbound direction south of Pooles Road would increase from 0.85 to 0.91 in 2041 with additional traffic volumes entering the freeway north of Barrie at the new interchange rather than traversing in the southbound direction toward the interchanges in Barrie. A more pronounced difference in traffic volumes was found to be in the off-peak direction, where approximately 150 vehicles were found to continue on Highway 400 northbound rather than exiting earlier and taking north-south arterial and collector roads to Midhurst. The most notable difference was found on Highway 26 where approximately 150 vehicles in the AM peak hour (southbound) were found to divert from it should the new interchange at Pooles Road be provided. Highway 26 is one of the most heavily utilized roads in the vicinity of the Highway 400 interchange.

21 P a g e 21 Figure 18. Scenario 5 - Midhurst with Pooles Road I/C 2031 AM Volume-to-Capacity Ratios V/C Ratios >0.97 Figure 19. Scenario 6 - Midhurst with Pooles Road I/C 2041 AM Volume-to-Capacity Ratios V/C Ratios >0.97

22 P a g e 22 Table 9. Midhurst Development With Pooles Rd Interchange 2031 and 2041 V/C Ratios (Screenlines) Screenline 1 ScreenLine - Station Description 2031 with IC 2041 with IC SB Simcoe Rd 28 N of Barrie N Lmt SB Hwy 400 N of Hwy 11 Split SB Simcoe Rd 93 N of Hwy 11 Split SB Hwy 26 N of Barrie N Lmt SB Simcoe Road 53 N of Barrie N Lmt SB St Vincent Road SB Anne Street Total Screenline 1 ScreenLine - Station Description 2031 with IC 2041 with IC NB Simcoe Rd 28 N of Barrie N Lmt NB Hwy 400 N of Hwy 11 Split NB Simcoe Rd 93 N of Hwy 11 Split NB Hwy 26 N of Barrie N Lmt NB Simcoe Road 53 N of Barrie N Lmt SB St Vincent Road SB Anne Street Total Screenline 2 ScreenLine - Station Description 2031 with IC 2041 with IC SB Hwy 26 N of Rd SB Simcoe Rd 27 N of Forbes SB Hwy 400 N of Forbes SB Simcoe Rd 93 N of Forbes Total Screenline 2 ScreenLine - Station Description 2031 with IC 2041 with IC NB Hwy 26 N of Rd NB Simcoe Rd 27 N of Forbes NB Hwy 400 N of Forbes NB Simcoe Rd 93 N of Forbes Total Screenline 3 ScreenLine - Station Description 2031 with IC 2041 with IC EB Simcoe Rd 22 E of Simcoe Rd EB Simcoe Rd 43 E of Simcoe Rd EB Simcoe Rd 40 E of Simcoe Rd EB Simcoe Rd 90 E of Simcoe Rd Total Screenline 3 ScreenLine - Station Description 2031 with IC 2041 with IC WB Simcoe Rd 22 E of Simcoe Rd WB Simcoe Rd 43 E of Simcoe Rd WB Simcoe Rd 40 E of Simcoe Rd WB Simcoe Rd 90 E of Simcoe Rd Total Screenline 4 ScreenLine - Station Description 2031 with IC 2041 with IC EB Simcoe Rd 22 E of Hwy EB Simcoe Rd 11 E of Hwy EB Highway 11 E of Highway 400 split EB Pooles Rd of Highway 400 split EB Partridge Rd of Highway 400 split Total Screenline 4 ScreenLine - Station Description 2031 with IC 2041 with IC WB Simcoe Rd 22 E of Hwy WB Simcoe Rd 11 E of Hwy WB Highway 11 E of Highway 400 split WB Pooles Rd of Highway 400 split WB Partridge Rd of Highway 400 split Total Screenline 1 analysis illustrates close to capacity conditions, however, v/c ratios on critical links/sections have reduced due to more balanced distribution of traffic across the screenline. In fact, v/c ratio on Simcoe Road 93 has decreased from 0.88 to 0.74 in Other critical locations also see a reduction in the v/c ratio, including St Vincent Road, where v/c ratio has reduced from 1.04 to 0.99 in 2041.

23 P a g e 23 Figure 20. Scenario Comparison in 2031: With Interchange vs. Without Interchange Figure 21. Scenario Comparison in 2041: With Interchange vs. Without Interchange

24 P a g e 24 Conclusions Phase 1 Completion in 2031 By 2031, Midhurst Phase 1 is in place. The development associated with this phase is expected to generate more than 4300 trips during the AM peak hour. The majority of those trips are southbound trips, mostly destined the City of Barrie, the rest of Simcoe County and GTA. High percentage of such trips is via Highway 400. The subarea model forecast results indicate the southbound on-ramp at Forbes Road Interchange will carry about 700 vehicles per hour while the level of service on northsouth roadways worsen. In fact, the 2031 AM peak v/c ratios for southbound directions of Highway 26, St Vincent Road, and Anne Street were found to increase from 0.58, 0.48, 0.59 to 0.72, 0.80, 0.79, respectively. With the Pooles Road Interchange, the new southbound on-ramp is expected to attract approximately 750 vehicles per hour. The majority of those trips are attracted from Forbes Road Interchange as they found it more convenient to use Pooles Road in order to access the highway. With the new interchange, Pooles Road is expected to carry over 600 vehicles per hour in both directions west of Highway 400. The v/c ratio for the eastbound direction was found to be over 0.5. Full Development in 2041 Based on the Midhurst Transportation Master Plan, new developments within the Midhurst community are expected to generate 6,060 trips during the AM peak hour in Trips associated with the new development that are destined to the south are distributed between the interchange at Forbes Road and other interchanges in the City of Barrie mostly via Highway 26, County Road 28, St. Vincent Road, and County Road 53. The subarea model suggests that with the new development in place, traffic volumes on Forbes Road are expected to increase to approximately 1,300 vehicles in both directions (2041 AM peak hour). The eastbound link on Forbes Road approaching the interchange was found to be oversaturated with the v/c ratio of The W/E-S ramp volume was also found to increase to about 1,100 vehicles per hour. Similarly, southbound traffic volumes on CR 28, Highway 26, St Vincent Road, Anne Street, and CR 53 were also found to increase significantly with v/c ratios increasing to on certain sections just north of the City of Barrie limits. Traffic diversion in the northbound direction (off-peak direction) was found to be in the 150 vehicles/hr range, where traffic chooses to stay on Highway 400 (to Pooles Road) rather than exiting earlier and taking arterial roads to Midhurst. Traffic volumes in the PM peak hour in the northbound direction are expected to be at least 4% higher than southbound AM peak hour volumes, potentially impacting the already congested arterial roads even further. The screenline analysis showed that close to capacity conditions are anticipated on north-south roadways just north of the City of Barrie limits. In addition, traffic is found to concentrate around roadways that provide access to Highway 400. With the Pooles Road interchange in place, a shift in travel patterns is noted with significant volumes traversing toward the interchange along Pooles Road. As a result, traffic volumes on Forbes Road were found to decrease significantly (with v/c ratios decreasing from 1.06 to 0.67) as the Pooles Road interchange provides a more direct access to and from Highway 400 for Midhurst traffic. The W/E-S on-ramp at Pooles Road is anticipated to carry over 1,100 vehicles in 2041 AM peak hour. With the new interchange in place, traffic volumes on north-south arterial roads were also found to decrease as a result, which translates to fewer vehicles using busy interchanges in the City of Barrie at Dunlop, Bayfield and Essa. Volume-to-capacity ratios especially on Highway 26, CR 93 and St. Vincent Road were found to improve. Although the V/C improvements at certain locations are relatively minor, they may still have some positive effects on ramp terminal operations at Bayfield,

25 P a g e 25 Dunlop and Duckworth interchanges (analyses of these interchanges are outside of the study scope). It should also be noted that latent demand usually exists on links where volumes approach capacity. As capacity constraints result in traffic diverting to other routes, once reserve capacity becomes available (i.e. St Vincent Road, Anne Street, etc.) it is likely to be used up by the latent demand. The analysis results show a notable demand for the new partial interchange at Pooles Road that would see a change in travel pattern with fewer vehicles utilizing busy interchanges in Barrie opting to travel eastward to the new interchange instead. With the addition of 6,060 new two-way trips to and from the Midhurst community (once fully built out), the new partial interchange would provide improved flexibility and capacity in the overall road network with long trip commuters having to travel shorter distances on municipal roads to access the freeway (quicker access). Improvements to v/c ratios on north-south arterial roads were also noted as a result of the new interchange. Given that the proposal is for a partial interchange, and considering current interchange spacing, the new interchange is not expected to have adverse traffic impacts on Highway 400 operations (subject to further analysis using microsimulation tools). Based on all of the above, a partial interchange at Pooles Road is justified.

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

Transit City Etobicoke - Finch West LRT

Transit City Etobicoke - Finch West LRT Delcan Corporation Transit City Etobicoke - Finch West LRT APPENDIX D Microsimulation Traffic Modeling Report March 2010 March 2010 Appendix D CONTENTS 1.0 STUDY CONTEXT... 2 Figure 1 Study Limits... 2

More information

Traffic and Toll Revenue Estimates

Traffic and Toll Revenue Estimates The results of WSA s assessment of traffic and toll revenue characteristics of the proposed LBJ (MLs) are presented in this chapter. As discussed in Chapter 1, Alternatives 2 and 6 were selected as the

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Appendix B: Travel Demand Forecasts July 2017

Appendix B: Travel Demand Forecasts July 2017 Appendix B: Travel Demand Forecasts July 2017 Table of Contents 1 Introduction... 2 2 Model Review and Updates... 2 2.1 Overview of Smart Moves Model ( City of London Model )... 2 2.1.1 Network and Zone

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TOWNSHIP OF UXBRIDGE P/N 05-1993 June 2011 Revised -August 2011 Prepared by: Skelton, Brumwell & Associates Inc. 93 Bell Farm Road, Suite 107 Barrie,

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

TRAVEL DEMAND FORECASTS

TRAVEL DEMAND FORECASTS Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL

TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL Prepared For: 1602850 Ontario Ltd. 2800 Highway 7 Vaughan, Ontario L4K 1W8 Prepared By: URS Canada Inc.

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

3.0 Future (2040) Transportation

3.0 Future (2040) Transportation 30 Future () Transportation Conditions Future traffic and structural bridge conditions within the I-84 Hartford Project Area have been analyzed to identify the needs and deficiencies which the Project

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited 105 Toronto Street South, Markdale Transportation Impact Study Paradigm Transportation Solutions Limited December 2016 Project Summary Project Number 162060 December 2016 Client Zelinka Priamo Ltd 318

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Future Needs Assessment Report

Future Needs Assessment Report Background Report Future Needs Assessment Report York Region Transportation Master Plan by IBI Group June 2016 Table of Contents 1 Introduction... 1 1.1 TMP Update Process... 1 1.2 Purpose of Report...

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study 354 Carling Avenue Community Transportation Study/ Transportation Impact Study prepared for: Holloway Lodging Corporation 69 Quinpool Road, th Floor Halifax, NS B3K 5J7 prepared by: 223 Michael Street

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Ce document est aussi disponible en français

Ce document est aussi disponible en français Ministry of Community Safety and Correctional Services August 2005 Ce document est aussi disponible en français What Is A Community Safety Zone? C ommunity Safety Zones are sections of roadways where public

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No.

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No. TECHNICAL MEMORANDUM TO: FROM: Molly McCartney MnDOT Project Manager Haifeng Xiao, PE Tom Sohrweide, PE, PTOE DATE: November 27, 2012 RE: Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

2405 Mer Bleue Orleans, (Ottawa), ON Community Transportation Study Mattamy Homes. Prepared By: Stantec Consulting Ltd. Version 2

2405 Mer Bleue Orleans, (Ottawa), ON Community Transportation Study Mattamy Homes. Prepared By: Stantec Consulting Ltd. Version 2 2405 Mer Bleue Orleans, (Ottawa), ON Community Transportation Study Mattamy Homes Prepared By: Stantec Consulting Ltd. Version 2 April 2014 Stantec Consulting Ltd. 400-1331 Clyde Avenue, Ottawa ON K2C

More information

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

APPENDIX 6: Transportation Modelling Considerations City of Toronto, February 2014

APPENDIX 6: Transportation Modelling Considerations City of Toronto, February 2014 APPENDIX 6: Transportation Modelling Considerations City of Toronto, February 2014 Transportation and Infrastructure The future of the elevated Gardiner Expressway east of Jarvis Street forms part of a

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS

TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS This document reviews the methodologies and tools used to calculate the projected ridership and parking space needs from the proposed Texas City Park & Ride to

More information

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. Trafalgar Road & Lower Base Line Transportation Study 1255723 Ontario Inc. 1465 Pickering Parkway Suite 200 Pickering ON L1V 7G7

More information

Airport Road Improvements

Airport Road Improvements Airport Road Improvements October 2015 ENVIRONMENTAL STUDY REPORT Airport Road from 1.0 km north of Mayfield to 0.6 km north of King Street Town of Caledon D TRAFFIC STUDY & ROUNDABOUT EVALUATIONS Airport

More information

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project Chapter 3 Transportation Environment and Consequences 3. Introduction This chapter summarizes the characteristics of the transportation system in the East Link Project vicinity and discusses potential

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report

Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report Capability City of Mississauga Creditview Road Schedule C Class Environmental Assessment Traffic Operations Analysis Final Report Prepared by: AECOM 5080 Commerce Boulevard 905 238 0007 tel Mississauga,

More information

APPENDIX B. Origin Destination Study Data

APPENDIX B. Origin Destination Study Data APPENDIX B Origin Destination Study Data - TABLE OF CONTENTS - Page No. EXECUTIVE SUMMARY... 1 Map of the Study area with Site Locations... 2 Summary Table of Results for the TH 14 Corridor Study... 3

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE

5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE 5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY

DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY APPENDIX 1 DEVELOPMENT OF RIDERSHIP FORECASTS FOR THE SAN BERNARDINO INFRASTRUCTURE IMPROVEMENT STUDY INTRODUCTION: This Appendix presents a general description of the analysis method used in forecasting

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

HALTON REGION SUB-MODEL

HALTON REGION SUB-MODEL WORKING DRAFT GTA P.M. PEAK MODEL Version 2.0 And HALTON REGION SUB-MODEL Documentation & Users' Guide Prepared by Peter Dalton July 2001 Contents 1.0 P.M. Peak Period Model for the GTA... 4 Table 1 -

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS 5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS The Transportation Services Committee recommends the adoption of the recommendations contained in the following report

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

Project Advisory Committee

Project Advisory Committee Meredith US 3/NH 25 Improvements Transportation Planning Study Project Advisory Committee March 18, 2008 Meredith US 3/NH 25 Improvements Transportation Planning Study Meeting Agenda Welcome Traffic Model

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Evaluation of Renton Ramp Meters on I-405

Evaluation of Renton Ramp Meters on I-405 Evaluation of Renton Ramp Meters on I-405 From the SE 8 th St. Interchange in Bellevue to the SR 167 Interchange in Renton January 2000 By Hien Trinh Edited by Jason Gibbens Northwest Region Traffic Systems

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information