2013 Road Maintenance List

Size: px
Start display at page:

Download "2013 Road Maintenance List"

Transcription

1 To the Ascension Parish Council and Transportation Committee members: The attached list of Roadways has been prepared by the Engineering Department and Department of Public Works staff, reviewed by Parish President, Mr. Tommy Martinez and is hereby presented for your review and authorization to proceed to finalize the Construction Bid Package for the ENG , 2013 Road Maintenance Project. As indicated in the following explanations, this list represents an update to the List previously approved by the Transportation Committee and the Ascension Parish Council in These additions are to include roads impacted by this past year s severe winter weather as well as including Maintenance Roads identified by PavementView system and field confirmation to raise the overall Ascension Parish road performance to optimal levels. This current 2013 Road List represents an update to the A Road List presented to the Transportation Committee for review on Tuesday, June 10, 2014 had inadvertently missed 14 roads from the as approved by President Martinez. Therefore, these fourteen roads have been incorporated into the List presented on Tuesday, June 10, 2014, to reflect the list as reviewed by President Martinez. This 2013 Road Maintenance Project road list represents the list prepared by staff and reviewed by President Martinez and is hereby recommended for your consideration and direction. Sincerely, Bob Horner Chief Engineer 1

2 Methodology and Nomenclature Attached is a listing of the methodology and nomenclature used in the 2013 Maintenance List roads under consideration. The Road Maintenance List has been established using three techniques to identify, categorize condition status and optimize funding utilization. PavementView Analytical System This system uses a numeric classification system and mechanical scanning, and a software optimization system of road degradation curves, condition codes and cost pricing to optimize number and road selection. This was performed in the fall of 2013 and a preliminary road list was presented to DPW road crews and inspectors for review and comment. The resulting list is highlighted with yellow in the current listing and was forwarded through the Transportation Committee to the Parish Council for approval. These roads were designed for the Road Maintenance Bid Package based on a $2 million budget. Winter of Impact The winter months following the PavementView and visual road inspections in the fall was the most severe cold weather cycle in recent memory. As a result of the drastic temperature fluctuations experienced the roadway condition changed for the worse on most roads. Therefore, a visual inspection was performed by the DPW road inspectors and reviewed in the field by the Engineering Department staff to identify a revised condition code list. This list is attached hear for consideration. Revised Budget Funding and Bid Strategy The 2013 budget funding was supplemented with the 2014 budget funding to increase the Total Available Budget to $6.2 million. The bidding strategy is to arrange the Bid Package in a Base Bid and Alternate Bid format to allow flexibility to include as many roadways as possible based on the bid results to repair and improve in priority from the Highest Need roadways to the Maintenance Need roadways. The Maintenance Need roadways of Thin Lift 2

3 Slurry is a strategy developed and promoted by DOTD and the TPO as a means to prolong the life of a roadway before a degradation condition is reached that prohibits maintenance and require extensive removal and repair. It is proposed to include a test group of Maintenance Need roads in the Base Bid to evaluate the effectiveness of the Thin Lift Slurry process in the Ascension Parish roadway system. First the roads have been mechanically scanned through cooperation with the Regional Transportation Organization using a system known as an ARAN van that drives and scans the road surface indicators using mechanical coverage. Next LEGEND OF NOTATION used in the Road Maintenance List is as follows: 1. Yellow highlighted road segments were determined using PavementView and field inspections and represent those that have been presented and approved for inclusion by the Transportation Committee and by the Parish Council. 2. ROADS DEEMED IN CRITICAL NEED OF REPAIR: a. 1 in the first column are the roads determined through field inspection by the DPW and Engineering staff. Established using PavementView, and field inspections. 3. ROADS NEAR CRITICAL NEED OF REPAIR: a. 2 in the first column and b. Activity category of Mix & Overlay are the roads determined through field inspection by the DPW and Engineering staff. Established using PavementView, and field inspections. 4. ROADS TO BE MAINTAINED AT OPTIMAL LEVELS: (preventive) a. 2 in the first column and b. Activity category of Thin Lift Slurry are the roads determined through PavementView and/or field inspection to extend maintenance life cycle. A Two Alternate Bid was considered to allow the greatest flexibility in coverage and timely response to the road maintenance needs. 3

4 A Base Bid was developed including ALL of the CRITICAL ROADS (39); and ALL of the Second NEAR CRITICAL ROADS (28); and various levels of the remainder of MAINTENANCE ROADS (Thin Lift Slurry) (12)as indicated by PavementView to provide greatest road maintenance coverage An Alternate Bid was developed to include and the remainder of the Maintenance Need roads (99) as indicated by PavementView and confirmed through visual inspections. Bob Horner 4

5 Roads at Critical Need ROAD NAME ACTIVITY 1 ALICE ST 1 Arthur Lane 1 Barbara Road Bayou Grand North 1 BLVD 1 BAYOU TERRACE DR 1 Bobby Sevario Rd 1 BROWN RD 1 CEASAR LN. 1 CECIL JAMES RD 1 CHARLOTTE AVE 1 Churchpoint RD 1 Dean St 1 FOUNTAINBLEAU 1 JD BROUSSARD RD 1 LAKEVIEW DR 1 MANCHAC ACRES RD 1 MARIE RD 1 N. MAIN STREET 1 NOAH RD 1 Nye St 1 PAMELA STREET 1 PETER BOURGEOIS ROAD 5

6 1 Rhea St 1 ROBIN LN 1 Wallace Acres Rd 1.5 BAYOU BLVD * 1.5 BISHOP WOODS 1.5 BLACK LOCUST ST. 1.5 CANNON RD ** 1.5 CANTEBURY AVE. 1.5 DENNIS RD. 1.5 GOLDUST LN 1.5 HICKORY ST 1.5 MARTY RD. 1.5 POSEY BOURGEOIS RD 1.5 RONALD RD 1.5 SAM STEWART RD 1.5 ST. JUDE DR 1.5 STATION RD 6

7 Roads Near Critical Need ROAD NAME ACTIVITY 2 2 BUXTON ROAD CEDAR STREET 2 DIXIE DRIVE 2 DOGWOOD STREET 2 GRANNY LANE 2 HENDERSON LANE 2 LANOUX ROAD EAST 2 LAUREL RIDGE ROAD 2 LENWOOD DRIVE 2 MELROSE DRIVE 2 MULBERRY STREET 2 NARVIE ROAD 2 PARK AVENUE 2 PARKBROOK DRIVE 2 PARKRIDGE DRIVE 2 PATIO COURT 2 PAYTON STREET 2 ROBERT ROAD 2 ROYAL LANE 2 RYAN AVENUE 2 SAVOY ROAD 2 SHEETS ROAD 2 SHEREE DRIVE 2 SILVER OAK DRIVE SWEET PECAN 2 AVENUE 2 TRICHE ROAD 2 WESLEY HOWE ROAD WEST LEON STREET 7

8 Roads to be maintained at Optimal Level 2 JACKSON ST. 2 LEO LAMBERT RD MANCHAC ACRES 2 AUTUMN VIEW DR BAYOU GRAND 2 SOUTH BLVD BAYOU MEADOW 2 ST 2 BAYOU OAK ST 2 Brown III Rd 2 BROWN JR RD 2 BUSY NEEDLES RD 2 Craig St 2 DAVID DR 2 Debbie St 2 Diversion Canal Rd 2 DIXON RD 2 Donna St EDWARD GUIDRY 2 Eldon St GRAVOIS 2 SUBDIVISION RD 2 JASON ST 2 Jessica St 2 JULES DR 2 LITTLE PLACE RD 8

9 2 MARRERO DR 2 MILLER RD 2 MUDDY CREEK RD 2 PACES POINTE DR 2 PAULA ST 2 PAULINE STREET 2 RIDGEWOOD AVE 2 RUTH RD 2 SALLY 2 Smith Rd 2 STANLEY 2 STERLING RD SUMMERFIELD 2 NORHT RD EARL BERCEGEAY 2 LEBEAU RD BERTRAND BABIN DROZIN MAYERS 2 FICKLIN WELLS RD GALVEZ GARDENS GEORGE 2 DUPLESSIS RD 2 JAY RD 2 MARTY LOW RD 2 MARY ANN ST 2 OTT LN 2 MAYERS ESTATE RD 9

10 2 MELANCON RD 2 PERTUIS ACRES RD RAYMOND TULLIER 2 ETIENNE RD 2 J.T. RODDY RD 2 BUTCH GORE RD 2 CABELLERO RD GERALD GAUTREAU 2 LEO GAUTREAU RD 2 NASH RD GALVEZ CHURCH 2 KATIE DR 2 ORCHARD LN 2 KERRY RD 2 MT. BETHEL LN 2 JENKINS LN 1 BRIDGWATER AVE 1 CRESTWAY AVE 1 CROSS CREEK AVE 1 DALE CT 1 E. LAKESHORE DR EVERGREEN HILL 1 DR 1 MAJESTIC DR 1 MAJESTIC OAK DR MEADOW BROOK 1 AVE 1 PLEASANT HILLS CT 10

11 1 S. LAKESHORE AVE 1 SPRING PLACE AVE 1 DAVID LESSARD RD 1 JIM MAYERS RD 1 MYRTLE OAK CT 1 QUAIL CREEK AVE 1 RENNES DR 1 CREEKROUND DR 1 E WILLOW DR 1 OSPREY POINT RD 1 SOMMER LN ASCENSION PARISH 1 HWY Brentwood Ct 1 Camille Elaine Dr 1 CYPRESS WAY ST 1 DEVALL RD 1 EAST AUTUMN DR EAST GREAT OAK 1 CT 1 Elise Catherine Dr 1 HODGESON RD 1 JENNIFER CT 1 KENNER DR 1 KIRTLEY AVE 1 KYNLEE AVE 1 LAKE PARK AVE 1 LEE DR 11

12 1 LOUIS RD MAGNOLIA 1 ESTATES RD MANCHAC 1 HIGHLANDS DR MAURICE 1 BOURGEOIS TD MEADOW BRIDGE 1 CR 1 MINDI CT 1 MINOR AVE 1 MISTY OAK CT N. GREAT OAK 1 COURT 1 OAKLAND DR 1 ST. MARK'S PL 12

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Planning Commission

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Planning Commission 1. Call to Order 2. Roll Call of Members 3. Pledge of Allegiance 4. Introduction of Staff 5. Chairman's Comments 6. General Business 7. Minutes (A) 8. Consent Agenda (A) PARISH OF ASCENSION OFFICE OF PLANNING

More information

Fire Station Location Study

Fire Station Location Study Fire Rescue Department Fire Station Location Study March 24, 2015 PRESENTATION OUTLINE BACKGROUND SCOPE OF THE STUDY STUDY METHODOLOGY STUDY COMPONENTS SUMMARY QUESTIONS CURRENT SERVICE LEVEL NUMBER OF

More information

DART Priorities Overview

DART Priorities Overview City of Dallas Transportation and Trinity River Project Committee DART Priorities Overview Gary C. Thomas President/Executive Director August 10, 2015 City of Dallas Transportation & Trinity River Committee

More information

Effingham County Ash Roads Update 2018 Winter Storm Grayson Jan 16, 2018

Effingham County Ash Roads Update 2018 Winter Storm Grayson Jan 16, 2018 Effingham County Ash Roads Update 2018 Winter Storm Grayson Jan 16, 2018 Brief History Ash from Georgia Pacific was applied to dirt roads starting in 2001 Georgia Environmental Protection Division approves

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component

More information

Staff Report. (925)

Staff Report. (925) 5.g Staff Report Date: September 13, 2016 To: From: Reviewed by: Prepared by: Subject: City Council Valerie J. Barone, City Manager Justin Ezell, Director of Public Works Jeff Rogers Jeff.rogers@cityofconcord.org

More information

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014 CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014 IN THE SPOTLIGHT Roadway Improvement Projects - Package #2 Construction Package #2 is the second of four groupings of similar

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC PUBLIC WORKS COMMISSION PUBLIC WORKS COMMISSION DATE: March 21, 2017 REPORT NO. PW2017-022 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger, General Manager

More information

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.

More information

Martin County, Florida 2401 SE Monterey Road Stuart, Florida Address Changes created between 03/08/2019 and 04/08/2019

Martin County, Florida 2401 SE Monterey Road Stuart, Florida Address Changes created between 03/08/2019 and 04/08/2019 Page 1 of 8 ST LUCIE FALLS 12-39-40-002 Update 12-39-40-002-059-00150-0 8904 SW FISHERMANS WHARF DR Update 12-39-40-002-059-00150-0 8918 SW FISHERMANS WHARF DR 8918 SW FISHERMANS WHARF DR 8904 SW FISHERMANS

More information

Multi-Family Development - North of I-435

Multi-Family Development - North of I-435 MULTIFAMILY DEVELOPMENT NORTH OF I-435 Multi-Family Development - North of I-435 December 31, 2016 Through December 31, 2016 47th St É A B C D E F G H Pflumm Rd I-35 Quivira Rd 100 175 105 79 US 69 91

More information

Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In -

Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In - Highway Gap New London to Paynesville Welcome Highway Gap New London to Paynesville Open House - Please Sign In - There is no formal presentation, but representatives are available to answer your questions.

More information

Lisbon Community School Bus Routes

Lisbon Community School Bus Routes Please be at the bus stop five to ten minutes before AM Buses start between 7:10am and 7:15am and drop off students at approximately 7:50am and 8:00am PM Buses leave Lisbon Community School at approximately

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

NETHERWOOD BUS ROUTES page 1 of 7

NETHERWOOD BUS ROUTES page 1 of 7 NETHERWOOD BUS ROUTES 2017 2018 page 1 of 7 Route: 19 NES A AM ROUTE 8:34 am 565 CREEK RD 8:37 am 40 EAST DORSEY LANE 8:41 am 11 PETER COOPER DR 8:44 am ENTRANCE TO THE BAHRET TRAILER PARK 8:50 am 10 HOOK

More information

Rare ±1 Acre Drive Thru Opportunity 281 S Cannon Blvd, Kannapolis, NC 28083

Rare ±1 Acre Drive Thru Opportunity 281 S Cannon Blvd, Kannapolis, NC 28083 01 Avg. HH Income HAR DIN G AVE. ADJACENT BUILDING S. 0 S. Tryon Street, Suite 500 aidginc.com / 70-71-8080 NOT IN SCOPE NO / Charlotte, NC 80 RIGHT TURN ON RED S. CANNON BLVD. ROW 55' - 0" PROPERTY LINE

More information

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF VANCOUVER ADMINISTRATIVE REPORT CITY OF VANCOUVER A19 ADMINISTRATIVE REPORT Report Date: July 10, 2007 Author: Chris Darwent Phone No.: 604.873.7358 RTS No.: 6866 VanRIMS No.: 13-1400-20 Meeting Date: July 24, 2007 TO: FROM: SUBJECT:

More information

Suppliers of Detroit Edison Approved Meter Enclosures

Suppliers of Detroit Edison Approved Meter Enclosures Page 1 of 5 Square D - Vic Marinch, Phone: 248-457-4126, Fax: 859-372-1584 Distributor Address Telephone Fax E-Mail Address Graybar - Livonia Mike LaLain 28188 Schoolcraft Livonia, MI 48250 734-421- 8900

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

Appendix 3 Traffic Technical Memorandum

Appendix 3 Traffic Technical Memorandum Appendix 3 Traffic Technical Memorandum DRAFT TECHNICAL MEMORANDUM Southport Connector Project Traffic Development Comparison of Future Year Model Results Date: September 10, 2015 Project #:11730.030 To:

More information

Orange County, Florida Public Works Department's 10-Year Roadway Program

Orange County, Florida Public Works Department's 10-Year Roadway Program Alafaya Tr (Avalon Park Bv to Mark Twain Bv) 5062 Right-of-Way Acquisition 5062 Construction All American Bv (Edgewater Dr to Forest City Rd) 3097 Right-of-Way Acquisition 3097 Construction Apopka Vineland

More information

BOWIE ELEMENTARY SCHOOL

BOWIE ELEMENTARY SCHOOL CORSICANA ISD Transportation Routes BOWIE ELEMENTARY SCHOOL 99 N. 23rd St. I N. 22nd St. I Elmwood Cir. I Belmont Cir. I E. Beverly/ Ann Arbor Dr. I Northwest Apt. I Goodwin Ln. I Cedar Crest Ln. I Dobbins

More information

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014 Midtown Corridor Alternatives Analysis Policy Advisory Committee Meeting February 12, 2014 Today s Agenda Introductions Outreach efforts and survey results Other updates since last meeting Evaluation results

More information

GATTIS SCHOOL RD / SH 130 SUBDIVISION

GATTIS SCHOOL RD / SH 130 SUBDIVISION AMISTAD DR MEADOWILD DR NO. DESCRIPTION INDEX ROYAL BURGESS DR. E NAKOMA SITE SH 130 CITY LIMITS LITTLE LAKE RD KAATZ LN ESTATE DR DANA DR MARJORIE DR 1 COVER 2 PRELIMINARY PLAT 3 EXISTING CONDITIONS 4

More information

~ p bl' S E. S 4,781 (ADA ComQiiance Program) $ 32,006 TOTAL $119,100 (Meadowbrook Rd Pathway) $108,600 (Taft Rd Pathway)

~ p bl' S E. S 4,781 (ADA ComQiiance Program) $ 32,006 TOTAL $119,100 (Meadowbrook Rd Pathway) $108,600 (Taft Rd Pathway) CITY of NOVI CITY COUNCIL Agenda Item K August 27, 2012 SUBJECT: Approval to award an amendment to the engineering services agreement with Spalding DeDecker Associates, Inc. related to the 2012 Pathway

More information

The meeting was called to order at 7:12 pm by Patrick Kinney, Acting Chairman.

The meeting was called to order at 7:12 pm by Patrick Kinney, Acting Chairman. TOWN OF GUILFORD PUBLIC WORKS COMMISSION SPECIAL MEETING THURSDAY December 17, 2015 7:00 PM-GUILFORD TOWN HALL Members Present: Members Excused: Members Absent: Town Officials: Patrick Kinney, Joe Travaglino,

More information

2007/ /2012 MARION COUNTY TRANSPORTATION IMPROVEMENT PROGRAM

2007/ /2012 MARION COUNTY TRANSPORTATION IMPROVEMENT PROGRAM 2007/2008 2011/2012 MRION COUNTY TRNSPORTTION IMPROVEMENT PRORM MRION COUNTY BORD O COUNTY COMMISSIONERS TIP2007 STN McCLIN, CHIRMN TBLE O CONTENTS Board Members and Staff 2 Summary..3 Phase/unding s...

More information

TAP PHASE 3.2 EXECUTIVE SUMMARY

TAP PHASE 3.2 EXECUTIVE SUMMARY TAP PHASE 3.2 EXECUTIVE SUMMARY Introduction In 2002 the North Central Texas Council of Governments (NCTCOG) launched the Thoroughfare Assessment Program (TAP), the goal of which has been to reduce vehicular

More information

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget Capital Improvement Program (CIPs) City of Industry FY 2017/18 155 FY 2017/18 156 City of Industry, California Capital Improvement Program Overview of Department The Capital Improvement Program (CIP) is

More information

DESOTO ISD SPECIAL ED BUS ROUTES RFP STUDENT TRANSPORTATION

DESOTO ISD SPECIAL ED BUS ROUTES RFP STUDENT TRANSPORTATION 1033 Rosewood Drive Desoto HS DSE-1 / 5301 74-Y 738 Sunset Desoto HS DSE-1 / 5301 84-K 641 Jamille Dr Desoto HS DSE-1 / 5301 84-G Life Skills 1220 Stinnett Pl, Desoto Desoto HS DSE-1 / 5301 83-A 801 S.

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

PASSED, APPROVED AND ADOPTED this 13 th day of November, Caretto, Jackowski, Putz, Herrick, Jahn. W.E. Jahn, Mayor ATTEST:

PASSED, APPROVED AND ADOPTED this 13 th day of November, Caretto, Jackowski, Putz, Herrick, Jahn. W.E. Jahn, Mayor ATTEST: RESOLUTION NO. 2017-34 A RESOULTION OF THE CITY COUNCIL OF THE CITY OF BIG BEAR LAKE, COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, REQUIRING NO PARKING SIGNS TO BE POSTED ON PORTIONS OF CERTAIN STREETS

More information

City of Kingston Report to Council Report Number

City of Kingston Report to Council Report Number To: From: Resource Staff: City of Kingston Report to Council Report Number 18-111 Mayor and Members of Council Jim Keech, President and CEO, Utilities Kingston Sheila Kidd, Deputy Commissioner Operations

More information

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015 Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project

More information

Highlands County Board of County Commissioners Preliminary Capital Financial Strategy FY 2014/2015 thru 2023/2024

Highlands County Board of County Commissioners Preliminary Capital Financial Strategy FY 2014/2015 thru 2023/2024 8/18/14 CAPITAL BUDGET SUMMARY CAPITAL BUDGET * Local Option Infrastructure Sales Tax to expire October 31, 219 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 FY19-2 * FY2-21 FY21-22 FY22-23 FY23-24 AD VALOREM

More information

Business Advisory Committee. November 3, 2015

Business Advisory Committee. November 3, 2015 Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal

More information

CITY OF OLATHE: COUNCIL Q & A. Q1- A. When did the City of Olathe last increase its mill levy?

CITY OF OLATHE: COUNCIL Q & A. Q1- A. When did the City of Olathe last increase its mill levy? On July 19th, the Budget Office held a budget workshop to review the proposed revisions to the adopted 2016-2020 CIP. This document provides Council detailed answers to the questions asked during the workshop.

More information

HAMPTON ROADS TRANSPORTATION PROJECT PRIORITIES FOR THE 2034 LONG-RANGE TRANSPORTATION PLAN

HAMPTON ROADS TRANSPORTATION PROJECT PRIORITIES FOR THE 2034 LONG-RANGE TRANSPORTATION PLAN HAMPTON ROADS TRANSPORTATION PROJECT PRIORITIES FOR THE 2034 LONG-RANGE TRANSPORTATION PLAN Prepared By: HRTPO Staff June 16, 2011 2 COMMITTED PROGRAMMED PROJECTS List of and Studies Committed are fully

More information

PAGE 1 OF 6 CHARGES CHARGES CHARGES CHARGES ADDRESS: NW 22ND AVE APT B208, MIAMI GARDENS, FL 33056

PAGE 1 OF 6 CHARGES CHARGES CHARGES CHARGES ADDRESS: NW 22ND AVE APT B208, MIAMI GARDENS, FL 33056 PAGE 1 OF 6 NAME: ALLEN, OTILIA JAVONDA ADDRESS: 18175 NW 22ND AVE APT B208, MIAMI GARDENS, FL 33056 AGE 34 SEX: RACE: B 3/3/2018 21:05 NAME: ANDREWS, CHARLES WAYNE ADDRESS: 3036 MUD BRIDGE RD, THE ROCK,

More information

No Return to Fitzhugh 200K Leg Type Direction Notes

No Return to Fitzhugh 200K Leg Type Direction Notes No Return to Fitzhugh 200K Leg Type Direction Notes Start CONTROL: Exxon/Speedy Stop, 1660 E. 51st St, Austin, TX 78723. Store open 24 Hours. Control open 07:00 close 08:00. Next control 58 miles. Info

More information

Price per ton. Total Contract. Price

Price per ton. Total Contract. Price Regular Meeting Thursday, April 6 th, 2017 The regular meeting of the Board of County Road Commissioners of Newaygo County was called to order by Chairman Harmon at 8:00 am on Thursday, April 6, 2017 at

More information

committee report General Permitted Development Order SPT response to consultation

committee report General Permitted Development Order SPT response to consultation committee report General Permitted Development Order SPT response to consultation Committee Strategy and Programmes Date of meeting 24 June 2011 Date of report 1 June 2011 Report by Assistant Chief Executive

More information

TRAFFIC CALMING PROGRAM

TRAFFIC CALMING PROGRAM TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic

More information

MICROMARKET REPORT EVERGREEN

MICROMARKET REPORT EVERGREEN quarter one 2012 www.coloradomicroreports.com EVERGREEN NEIGHBORHOODS 10 13 8 11 14 9 15 1 7 16 4 2 5 12 6 3 1. 2. 3. 4. Bear Mountain Brook Forest Conifer Mountain Evergreen Highlands 7. Hangen Ranch

More information

AMSA Charter School ~ Marlborough Bus Routes C-1 Bus

AMSA Charter School ~ Marlborough Bus Routes C-1 Bus C-1 Bus 7:13 4:06 2 nd Road & Bruce Road 7:14 4:07 2 nd Road & Hill Road 7:16 4:04 Resevoir @ Lakeshore 7:18 4:01 348 Bolton Street 7:22 3:53 Lodi Road & Stevens Street 7:24 3:52 Stevens Street & Upland

More information

Open Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No.

Open Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No. Board of County Commissioners of Washington County, Maryland Agenda Report Form Open Session Item SUBJECT: Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications,

More information

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA 29 OATES STREET SOUTHPORT BUSINESS, WEST, CA ±1,220 SF MATT LOFRANO Executive Vice President License #0121712 +1 916 63 306 matt.lofrano@colliers.com HANNAH CRANDALL Transaction Manager License #02043170

More information

Tahlequah Public Schools

Tahlequah Public Schools Tahlequah Public Schools Department of Transportation 820 Pendleton - 918.458.4168 Tahlequah, OK 74464 2016-2017 Bus Routes Route 1 6:20am Mathis Park & Jones Ave 6:25am Jones Ave. & West Seneca 6:30am

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA 29 OATES STREET SOUTHPORT BUSINESS, WEST, CA ±1,220 SF MATT LOFRANO Executive Vice President License #0121712 +1 916 63 306 matt.lofrano@colliers.com HANNAH CRANDALL Transaction Manager License #02043170

More information

Regular Meeting PULASKI COUNTY Mon. August 18, 2003 PUBLIC SERVICE AUTHORITY FOLLOW-UP ITEM. 1. Citizen Comments

Regular Meeting PULASKI COUNTY Mon. August 18, 2003 PUBLIC SERVICE AUTHORITY FOLLOW-UP ITEM. 1. Citizen Comments AGENDA Regular Meeting PULASKI COUNTY Mon. August 18, 2003 PUBLIC SERVICE AUTHORITY 9:00 a.m. FOLLOW-UP ITEM 1. Citizen Comments 2. Reports from the County Administrator & Staff: a. Collection Staff Activity:

More information

Public Service Commission CAPITAL CIRCLE OFFICE CENTER 2540 SHUMARD OAK BOULEVARD TALLAHASSEE, FLORIDA

Public Service Commission CAPITAL CIRCLE OFFICE CENTER 2540 SHUMARD OAK BOULEVARD TALLAHASSEE, FLORIDA State of Florida Public Service Commission CAPITAL CIRCLE OFFICE CENTER 2540 SHUMARD OAK BOULEVARD TALLAHASSEE, FLORIDA 32399-0850 -M-E-M-O-R-A-N-D-U-M- DATE: June 12, 2006 TO: FROM: RE: C. Edward Mills,

More information

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

Community Advisory Committee. October 5, 2015

Community Advisory Committee. October 5, 2015 Community Advisory Committee October 5, 2015 1 Today s Topics Hennepin County Community Works Update Project Ridership Estimates Technical Issue #4:Golden Valley Rd and Plymouth Ave Stations Technical

More information

CLEAN WATER SERVICES TECHNIQUES FOR EVALUATING FORCE MAIN CORROSION PROBLEMS

CLEAN WATER SERVICES TECHNIQUES FOR EVALUATING FORCE MAIN CORROSION PROBLEMS CLEAN WATER SERVICES TECHNIQUES FOR EVALUATING FORCE MAIN CORROSION PROBLEMS PNCWA 2012 Annual Conference & Exhibition October 21-24 Boise, ID Presented by: Mike Kebbe, P.E., Clean Water Services Acknowledgements:

More information

CODE COMPLIANCE UNIT. Special Magistrate Hearing 07/06/2016 2:00 pm "AGENDA" New Cases

CODE COMPLIANCE UNIT. Special Magistrate Hearing 07/06/2016 2:00 pm AGENDA New Cases CODE COMPLIANCE UNIT Special Magistrate Hearing 07/06/2016 2:00 pm "AGENDA" New Cases 1. CASE# 16 000209 CCO: James Wolf 2117 North ANDREWS Avenue NOTES: 2. Sec. 13 32(a i) Landscape Maintenance, Landscape

More information

City of Casselberry Public Works Department

City of Casselberry Public Works Department City of Casselberry Public Works Department 95 Triplet Lake Drive, Casselberry, Florida 32707 Telephone (407) 262-7725, Ext. 1235 Fax (407) 262-7767 Email: kbrock@casselberry.org NEIGHBORHOOD IMPROVEMENT

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT SEPTEMBER 2015

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT SEPTEMBER 2015 CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT SEPTEMBER 2015 IN THE SPOTLIGHT Roadway Improvement Projects - Package #3 The design and construction Package #3 is a grouping of similar

More information

Notice of Open Meeting

Notice of Open Meeting Notice of Open Meeting Notice is hereby given that the St. Louis County Board of Equalization will conduct an open meeting, hearings, and deliberations, beginning at 8:00 A.M. on Wednesday, December 5,

More information

Directions to Grand Lake, CO 625 mi about 13 hours 10 mins. Loading... 1 of 5 2/13/09 8:26 AM

Directions to Grand Lake, CO 625 mi about 13 hours 10 mins. Loading... 1 of 5 2/13/09 8:26 AM Directions to Grand Lake, CO 625 mi about 13 hours 10 mins Loading... 1 of 5 2/13/09 8:26 AM Yellowstone East Entrance 1. Head east on E Entrance Rd/US-14/US-16/US-20 Continue to follow US-14/US-16/US-20

More information

Waste Management Monthly Report to the City of Cedar Hill

Waste Management Monthly Report to the City of Cedar Hill Waste Management Monthly Report to the City of Cedar Hill January 2017 Steve Kellar Public Sector Solutions Manager Ryan Frazier District Manager Table of Contents Collection s 3 Residential Diversion

More information

GMLES / GMUES. 8:15 AM 3:15 PM TIME House

GMLES / GMUES. 8:15 AM 3:15 PM TIME House BUS # 54 DRIVER: Marla Naquin 7:30 19477 East Main 3:30 7:31 19447 East Main 3:31 7:32 East 179 3:31 7:32 East 178 3:32 7:32 East 175 3:33 7:35 East 172 3:35 7:36 19223 East Main 3:36 7:40 East 165 3:37

More information

AGENDA PUBLIC WORKS COMMITTEE VILLAGE OF SUSSEX 6:00 P.M. TUESDAY, MAY 1, 2018 SUSSEX CIVIC CENTER- VILLAGE BOARD ROOM 2 nd FLOOR

AGENDA PUBLIC WORKS COMMITTEE VILLAGE OF SUSSEX 6:00 P.M. TUESDAY, MAY 1, 2018 SUSSEX CIVIC CENTER- VILLAGE BOARD ROOM 2 nd FLOOR N64W23760 Main Street Sussex, Wisconsin 53089 Phone (262) 246-5200 FAX (262) 246-5222 Email: info@villagesussex.org Website: www.villagesussex.org AGENDA PUBLIC WORKS COMMITTEE VILLAGE OF SUSSEX 6:00 P.M.

More information

City of Casselberry. Santa Claus Run 2018

City of Casselberry. Santa Claus Run 2018 City of Casselberry Santa Claus Run 2018 Oh, you better watch out! You better not cry! You better not pout! I m telling you why. Santa Claus is coming to town - along with a few elves to spread goodwill

More information

PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A

PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A Page 1 of 5 PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A FY 2017 TOTAL BUDGETED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED Local Option Gas Taxes Total 49,679,000 49,679,000 49,679,000

More information

NJNG Work Schedule. 6/13/2018 Page 1

NJNG Work Schedule. 6/13/2018 Page 1 ASBURY PARK (MONTHLY BLA 1226 MONROE AV ASBPK 10692820 Retirement IDLE 6/13/18 ONE 3X3 OPENING ON MONROE AVENUE 1140 ASBURY AV ASBPK 10692863 Retirement IDLE 6/13/18 ONE 3X3 OPENING ON ASBURY AVENUE 1020

More information

PHONE # FAX # BOX ELDER COUNTY P F P F P F CACHE COUNTY

PHONE # FAX # BOX ELDER COUNTY P F P F P F CACHE COUNTY 1 1 REHABILITATION ACILITIES Mission at Bear River Rehab Ctr 460 W 600 N, Tremonton 84337 Pioneer Care Ctr 815 S 200 W, Brigham City 84302 Willow Glen Health Rehab 775 N 200 E, Brigham City 84302 Rocky

More information

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No EXISTING PAVEMENT EVALUATION WILLMER ENGINEERING INC. Prepared For Clark Patterson Lee Suwanee, Georgia Prepared By WILLMER ENGINEERING INC. 3772 Pleasantdale Road Suite 165 Atlanta, Georgia 30340-4270

More information

Mr. Peter Rosasco requested that a discussion concerning the low vacuum issue at Vacuum Station D be added to Operations Report.

Mr. Peter Rosasco requested that a discussion concerning the low vacuum issue at Vacuum Station D be added to Operations Report. Key Largo Wastewater Treatment District 103355 Overseas Hwy, Key Largo, FL Tuesday, July 11, 2017 MINUTES The Key Largo Wastewater Treatment District Board of Commissioners met for their regular scheduled

More information

Unofficial Returns -- Republican Primary Election -- August 23, John T. Stirrup. Jeffrey M. Frederick. Coles 36,752 1,784 4.

Unofficial Returns -- Republican Primary Election -- August 23, John T. Stirrup. Jeffrey M. Frederick. Coles 36,752 1,784 4. County-wide Summary Magisterial District of Reg. Voters Voting % Robert S. FitzSimmonds 13th District 36th District 39th District Richard H. "Dick" Black John T. Stirrup Tito A. Munoz M. Miller Baker Scott

More information

JEFFERSON COUNTY, TEXAS PURCHASING DEPARTMENT 1149 Pearl Street First Floor Beaumont, Texas

JEFFERSON COUNTY, TEXAS PURCHASING DEPARTMENT 1149 Pearl Street First Floor Beaumont, Texas JEFFERSON COUNTY, TEXAS PURCHASING DEPARTMENT 1149 Pearl Street First Floor Texas 77701 409-835-8593 ADDENDUM TO IFB IFB Number: RFP 12-039/KJS IFB Title: Remaining Lease of Properties Acquired as a Result

More information

MGM SPRINGFIELD OFF-SITE MITIGATION - 9/25/17 TO 10/6/17 WORK HOURS: 7:00 AM TO 3:30 PM

MGM SPRINGFIELD OFF-SITE MITIGATION - 9/25/17 TO 10/6/17 WORK HOURS: 7:00 AM TO 3:30 PM 1 A Dwight Street & I-291 Off Ramp 2 B Locust Street & Mill Street No work anticipated 3 B Main Street & East Columbus Avenue No work anticipated 4 C State Street & St. James Avenue No work anticipated

More information

Plainfield, Indiana Speed Limit Study

Plainfield, Indiana Speed Limit Study March 21 st, 2017 Prepared on behalf of: Town of Plainfield Building and Engineering Department 206 W. Main Street Plainfield, IN 46168 (317) 839-2561 Prepared by: Thomas S. Vandenberg, PE, PTOE Matthew

More information

COUNCIL COMMUNICATION

COUNCIL COMMUNICATION COUNCIL COMMUNICATION TO: FROM: DEPARTMENT: Mayor and Council Larry Nimmo Public Works DATE: June 19, 2017 SUBJECT: Award Contract for 2017 Chip Seal Program DESCRIPTION: Award Contract for 2017 Chip Seal

More information

SQUARE BASEMENT LOT SIZE ACRES FEET DATE PIN # ADDRESS SALE AMOUNT USE STYLE

SQUARE BASEMENT LOT SIZE ACRES FEET DATE PIN # ADDRESS SALE AMOUNT USE STYLE DATE PIN # ADDRESS SALE AMOUNT USE STYLE SQUARE YEAR GOOD BASEMENT LOT SIZE ACRES FEET BUILT SALES? NOTES 1/2/2018 01-26-451-020 1442 N Division St 1,359,687.00 Retail 1 story 9100 None 63956 2017 1.50

More information

DATE: August 13, 2013 AGENDA ITEM # 8. City Council. Cedric Novenario, Transportation Manager RECOMMENDATION:

DATE: August 13, 2013 AGENDA ITEM # 8. City Council. Cedric Novenario, Transportation Manager RECOMMENDATION: DATE: August 13, 2013 AGENDA ITEM # 8 TO: FROM: SUBJECT: City Council Cedric Novenario, Transportation Manager Speed zone survey RECOMMENDATION: A. Adopt Resolution No. 2013-27, approving Engineering and

More information

Nogales Transmission, L.L.C. and Nogales Frontier Operations, L.L.C., Docket No. EL Second Supplement to Petition for Declaratory Order

Nogales Transmission, L.L.C. and Nogales Frontier Operations, L.L.C., Docket No. EL Second Supplement to Petition for Declaratory Order Eversheds Sutherland (US) LLP 700 Sixth reet,, Suite 700 ashington, DC 20001-3980 D: +1 202.383.0838 F: +1 202.637.3593 danielfrank@ eversheds-sutherland.com June 30, 2017 Via Electronic Filing Hon. Kimberly

More information

Greater Ouachita Water Company. January 2016 Monthly Operations & Maintenance Report

Greater Ouachita Water Company. January 2016 Monthly Operations & Maintenance Report Greater Ouachita Water Company January 2016 Monthly Operations & Maintenance Report Severn Trent Services 6725 Cypress ST. West Monroe, LA 71291 United States T: +1 318 322 3741 www.severntrentservices.com

More information

NOTICE OF PUBLIC HEARING ANAHEIM PUBLIC UTILITES BOARD IS HOLDING A PUBLIC HEARING ON THE FORMATION OF UNDERGROUND DISTRICT No. 66 (BEACH) TO UNDERGROUND OVERHEAD FACILTIIES, INCLUDING POWER AND COMMUNICATION

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by

More information

Municipal Road and Bridge Revolving Loan Fund Program Summary Rhode Island Department of Transportation

Municipal Road and Bridge Revolving Loan Fund Program Summary Rhode Island Department of Transportation Municipal Road and Bridge Revolving Loan Fund 2014 Program Summary Rhode Island Department of Transportation The Basics The FY2014 Budget passed by the Rhode Island General Assembly included Article 20,

More information

ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE:

ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE: ST. CROIX RIVER CROSSING PROJECT 2004 SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT TECHNICAL MEMORANDUM SUPPLEMENT FOR THE PREFERRED ALTERNATIVE: TRAVEL DEMAND FORECASTS May 12, 2005 Prepared for Minnesota

More information

New Construction Absorption and Inventory Report As of March 31, 2014

New Construction Absorption and Inventory Report As of March 31, 2014 New Construction Absorption and Inventory Report As of March 31, 2014 This report identifies the current inventory levels for New Construction in Cumberland Hoke and Harnett County. For Cumberland County

More information

Nonprofit Insurance Trust (NIT) Preferred Shop Network

Nonprofit Insurance Trust (NIT) Preferred Shop Network Nonprofit Insurance Trust (NIT) Preferred Shop Network NPIA, Inc. on behalf of the Nonprofit Insurance Trust and its members, has implemented a Preferred Shop Network for vehicle repairs. These shops have

More information

What Does it All Mean?

What Does it All Mean? What Does it All Mean? September existing closing numbers are down from August they but they are up +3% over last September. While New Construction numbers are down -12% compared to last September. We

More information

PROPOSED LAND USE ORDINANCE NO. 834 Individual and General Notice June 15, 2018

PROPOSED LAND USE ORDINANCE NO. 834 Individual and General Notice June 15, 2018 PROPOSED LAND USE ORDINANCE NO. 834 Individual and General Notice 2018-05 June 15, 2018 The Washington County Planning Commission and Board of Commissioners (Board) will soon consider proposed. Listed

More information

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR MEMORANDUM TO: FROM: BY: SUBJECT: CITY COUNCIL TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR JIM GARING, INTERIM CITY ENGINEER CONSIDERATION OF TRUCK PARKING RESTRICTIONS ALONG BELL STREET, FAEH AVENUE

More information

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures Scarborough Fire Department Scarborough, Maine Standard Operating Procedures Book: Routine Operations Chapter: Apparatus Operations Subject: 2125 - Driver/Operator Recertification Revision Date: 06/17/2013

More information

LACEY CITY COUNCIL MEETING July 09, 2015

LACEY CITY COUNCIL MEETING July 09, 2015 LACEY CITY COUNCIL MEETING July 09, 2015 SUBJECT: 2016-2021 Six-Year Transportation Improvement Plan and Mitigation List RECOMMENDATION: Adopt Resolution approving the proposed 2016-2021 Six- Year Transportation

More information

AUGUST 2015 UPDATE. City of Nampa Pressure Irrigation CIP (FY ) Fiscal Year Ending September of (In 2014 Dollars)

AUGUST 2015 UPDATE. City of Nampa Pressure Irrigation CIP (FY ) Fiscal Year Ending September of (In 2014 Dollars) City of Nampa Pressure Irrigation CIP (FY2015-2030) AUGUST 2015 UPDATE ID# Project Description Cost (2014 dollars) Asset Zone 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029

More information

Recommended Transportation. Capital Improvement Program

Recommended Transportation. Capital Improvement Program Recommended 2018-2022 Transportation Capital Improvement Program 1 Overview 2017 Review 2018-2022 Considerations 2018-2022 Recommended CIP 2 Limited Resources are Directed to the Highest Priority Number

More information

John Winthrop / Valley Regional AM Stops Bus 1 Bus 2 Bus 3 6:33 PLEASANT RIDGE RD. 6:45 STRAITS PROSEPCT ST. 6:35 GOOSE HILL RD.

John Winthrop / Valley Regional AM Stops Bus 1 Bus 2 Bus 3 6:33 PLEASANT RIDGE RD. 6:45 STRAITS PROSEPCT ST. 6:35 GOOSE HILL RD. Bus 1 Bus 2 Bus 3 6:33 PLEASANT ST. @ RIDGE RD. 6:45 STRAITS RD. @ PROSEPCT ST. 6:35 GOOSE HILL RD.@ GAZEBO 6:37 PLEASANT ST.@ WIG HILL RD. 6:46 44 STRAITS RD. 6:38 PATTACONK DR. @ WATERHOUSE LA. 6:41

More information

CITY of NOVI CITY COUNCIL

CITY of NOVI CITY COUNCIL CITY of NOVI CITY COUNCIL Agenda Item N December 17,2012 SUBJECT: Approval of Traffic Control Orders 12-63 through 12-67 for traffic control signs within Orchard Hills West. I_ j /~ SUBMITTING DEPARTMENT:

More information

CONTRA COSTA COUNTY PUBLIC WORKS DEPARTMENT

CONTRA COSTA COUNTY PUBLIC WORKS DEPARTMENT Page 1 of 5 CONTRA COSTA COUNTY PUBLIC WORKS DEPARTMENT ROUTES AUTHORIZED FOR ANNUAL TRANSPORTATION PERMITS Those County of Contra Costa maintained public roads listed in Column 1 of the following table

More information

9 Cluster 7:18 Larry Ln & Durst Colebrook Rd 10 Stop 7: Warren Meadville Rd 11 Stop 7: Warren Meadville Rd

9 Cluster 7:18 Larry Ln & Durst Colebrook Rd 10 Stop 7: Warren Meadville Rd 11 Stop 7: Warren Meadville Rd High School Routes NOTE: Students must be out at their designated stops at least 5 minutes before pick up. Times may vary the first few weeks of school. HS Bus 1 Brest 1 Stop 6:55 4079 Westlake Rd 2 Stop

More information