1 City of Casselberry Public Works Department 95 Triplet Lake Drive, Casselberry, Florida Telephone (407) , Ext Fax (407) NEIGHBORHOOD IMPROVEMENT PROGRAM: AREA 1-3 ROAD REHABILITATION PROJECT WHAT IS THE PROJECT? This project consists of rehabilitation of various streets throughout Neighborhood Improvement Program Project Areas 1-3. Rehabilitation methods include isolated partial and full depth road repairs, microsurfacing (with crack sealing), and milling/resurfacing. Impacted streets will also be re-striped as needed, and some roadways will receive new shared lane markings (aka sharrows ) for bicycles. Traffic loops at signalized intersections and structures (e.g., manholes, valve covers) will be adjusted as needed. WHERE WILL THE PROJECT TAKE PLACE? IS MY STREET BEING PAVED? Areas 1-3 generally include public City streets south of Triplet Lake Drive and Crystal Bowl Circle, east of 17-92, and north of SR 436 and Red Bug Lake Road, excluding portions of Carriage Hill subdivision. Not all streets will receive rehabilitation treatment at this time. Some streets are in good enough condition currently to not warrant work at this time. Other sections of streets have been strategically delayed due to pending projects that may impact the road surface, such as water/sewer utility and stormwater projects; or because more significant rehabilitation is needed such as full road reconstruction (e.g., portions of N Oxford Road and S Triplet Lake Drive). A map of the project areas and a comprehensive list of road segments affected by the project are included at the end of this document. Generally, road segments with a Repair Code starting with SP will be milled and resurfaced. Road segments with a repair code starting with MS will be crack sealed (as needed) then microsurfaced. Specific road areas receiving special base repairs are also shown in a separate table. WHAT IS CRACK SEALING AND MICROSURFACING? WHY DOES MY ROAD LOOK LIKE THIS?:

2 Roads in need of only moderate rehabilitation will receive crack sealing (as needed) followed by microsurfacing. Crack sealing is a pavement preservation technique in which cracks in the pavement surface are sealed to reduce pavement deterioration by eliminating water penetration into base and subbase layers underneath the asphalt. Crack sealing can reduce the instance of crack propagation, potholes, and base failure. Crack sealing requires a cure time prior to microsurfacing, which is why (as of the date of this article) many roads currently look like the above photo. Once crack seals have cured, microsurfacing will follow. Microsurfacing is a special rehabilitation method that will extend the life and refresh the look of roads by applying a thin layer of special polymers, asphalt emulsion, and other additives to the entire road surface. This will cover up the crack sealing that is currently visible. WHAT IS MILLING AND RESURFACING? Milling and resurfacing of streets will be conducted on streets in need of more significant rehabilitation. Milling consists of removing the upper layers of asphalt surface. This is followed by resurfacing, in which a new layer of asphalt is place over the entire roadway. This process will correct surface defects, improve the appearance, and prolong the life of the City s roads. In some areas, this process may improve grading of roads (especially at the gutter line) by removing excessive layers of asphalt that were the result of past operations in which roads were repaved without first being milled. WHAT IS A SHARED LANE MARKING? WHAT DOES IT MEAN? WHERE ARE THEY GOING? A shared lane marking (also called a sharrow ) is special striping symbol added to a road to emphasize shared use by bicycles is appropriate. It IS NOT a dedicated bike lane, in which bicycles have their own lane and can ride side-by-side with motorists. Instead, bicycles and automobiles share the road in line rather than side-by-side. These sharrows are added both to help guide bicyclists and also to notify motorists that they should expect (and respect) bicyclists on the road. For most streets in Casselberry, roads are too narrow for both bicycles and automobiles to ride side-by-side safely. However, in general bicyclists are allowed to share the road (i.e., ride in line with traffic) in such situations (regardless of whether shared lane markings are present.) The shared lane markings being placed with this project will be on specific streets that are intended to be more bicycle friendly as part of the City s Bicycle Master Plan. These streets can be viewed on the project map included later in this document. These streets provide important connectivity between trails and other streets for bicyclists. For more information on bicycling and related laws in Florida, visit A picture of a typical shared lane marking is below:

3 WHY IS THIS PROJECT BEING DONE? The Neighborhood Improvement Program was established in 2010 to holistically address needed improvements to the City s transportation system, especially within its neighborhoods. As part of this program, the City has set aside funds dedicated to paving streets Citywide that are in need of moderate to significant rehabilitation. The City was divided into twelve separate Project Areas so that projects could be completed cohesively on a neighborhood-by-neighborhood basis. The first major road project under this program to go to construction is the rehabilitation of roads in Areas 1, 2, and 3. WHAT IS THE PROJECT SCHEDULE? Isolated pavement repairs and crack sealing were already completed by the end of November Milling and resurfacing is anticipated to commence in early January 2014 and will last through the end of the month. Microsurfacing is scheduled to commence later in January 2014 and should be completed in only a few days. Temporary roadway striping will be placed as needed in January 2014, with permanent striping to be installed later (including shared lane markings) once pavement cure times have been satisfied. The entire project should be completed before the end of March HOW BIG IS THIS PROJECT? Approximately 8 miles of roadway will be milled and resurfaced and an additional 8 miles microsurfaced, for a total project length of approximately 16 miles spread across the three project areas. DO I NEED TO DO ANYTHING? The City s contractor will notify residents in advance of any project activities that may require resident action. Generally, vehicles parked on streets will need to be moved during microsurfacing or milling/resurfacing activities. This should not impact any particular location for an extended period of time. IS THIS A GREEN PROJECT? Yes. The City of Casselberry is dedicated to sustainability both from an environmental and fiscal perspective. Casselberry is the first City in Florida to comprehensively require the use of warm mix asphalt for rehabilitation projects of this nature. Warm mix asphalt is produced at lower temperatures than conventional hot mix asphalt. This has the benefit of saving energy; reducing emissions; and improving working conditions, compaction, and pavement longevity. Further, by implementing a comprehensive pavement management program that endeavors to keep good roads good by employing cost effective measures such as crack sealing and microsurfacing that prolong the life of roads, the City is simultaneously saving money and reducing environmental impact. HOW MUCH DOES THIS PROJECT COST? HOW IS THIS PROJECT BEING FUNDED? The construction cost of this project is $1.97 million. This is being funded by the City s Neighborhood Improvement Program through a special $5.3 million construction loan approved by the City Commission. The remaining loan funds will be used in the future to rehabilitate roads in other locations. I DON T LIVE IN AREAS 1-3 WHEN WILL MY ROAD BE REHABILITATED? Additional road rehabiliation projects in other areas are planned in the near future. Later in 2014, it is anticipated rehabiliation in Areas 4-7 (approximately 15 more miles) will commence. Check back to for project updates.

4 IF I HAVE CONCERNS DURING OR AER THE PROJECT, WHO SHOULD I CONTACT?. Questions regarding the project can be directed to the Construction and Permitting Manager, Marty Pawlikowski: (407) ext 1237 or mpawlikowski@casselberry.org (Last Updated: 12/09/2013)

5 PROJECT NO. PW miles CITY WIDE RESURFACING CONTRACT km AREAS SHARED LANE MARKING ROADWAYS. CITY TO IDENTIFY EXACT PLACEMENT DURING CONSTRUCTION.

6 City Wide Resurfacing Areas 1 3 Paving Limits/Share Lane Markings AREA ROAD NAME FROM TO Repair Code Lanes Width Length Shared Lane Marking (SLM) 1 NORTHMOOR RD START OF ROAD S SUNSET DR SP2.0/M PARK AV S WINTER PARK DR PAUL MCCLURE CT SP1.5/M ,973 1 THOMAS DR SUNSET DR CASSELGROVE CV SP2.0/M Y 2 1 THOMAS DR CASSELGROVE CV S TRIPLET LAKE DR SP2.0/M Y 3 1 S TRIPLETT LAKE DR THOMAS DR S LAKE TRIPLET DR SP2.0/M ,018 Y 7 1 S TRIPLETT LAKE DR S TRIPLET LAKE DR END OF ROAD SP2.0/M Y 4 1 S TRIPLETT LAKE DR S TRIPLET LAKE DR OVERBROOK DR SP2.0/M Y 2 1 S TRIPLETT LAKE DR OVERBROOK DR SOUTHCOT DR SP2.0/M Y 5 1 OVERBROOK DR 550' W OF S SUNSET DR S SUNSET DR SP1.5/M OVERBROOK DR PINEY RIDGE RD ASCENSION DR SP1.5/M Y 2 1 OVERBROOK DR ASCENSION DR SOUTHCOT DR SP1.5/M Y 1 1 SOUTHCOT DR OVERBROOK DR CONCH SHELL LN SP1.5/M Y 3 1 SOUTHCOT DR CONCH SHELL LN S SUNSET DR SP1.5/M ,058 Y 7 1 SOUTHCOT DR SUNSET DR S TRIPLET LAKE DR MSS ,304 Y 9 1 ASCENSION OVERBROOK DR PINEY RIDGE RD MSS ,012 1 PAUL MCCLURE CT S WINTER PARK DR PARK AVE MSS PAUL MCCLURE CT PARK AVE NIBLICK DR MSS , PAUL MCCLURE CT NIBLICK DR END OF ROAD MSS QUEENS MIRROR CIR S LAKE TRIPLET DR S LOST LAKE LN MSD ,120 Y 7 1 QUEENS MIRROR CIR S LOST LAKE LN S WINTER PARK DR MSD ,479 Y 10 1 QUEENS MIRROR CIR S WINTER PARK DR S LAKE TRIPLET DR MSD ,290 Y 9 1 S SUNSET DR THOMAS DR NORTHMOOR RD MSD Y 2 1 S SUNSET DR NORTHMOOR RD OVERBROOK DR MSD Y 4 1 S SUNSET DR OVERBROOK DR SOUTHCOT DR MSD Y 4 1 S SUNSET DR SOUTHCOT DR SANDPIPER LN MSD Y 2 1 LOST LAKE LN NORRIS PL NIBLICK DR MSS* Y 7 1 LOST LAKE LN NIBLICK DR SAZA RUN MSS Y 4 1 LOST LAKE LN SAZA RUN QUEENS MIRROR CIR MSS Y 3 1 NIBLICK DR LOST LAKE LN PAUL MCCLURE CT MSS ,193 Y 8 1 PINEY RIDGE RD S US HWY OVERBROOK DR MSS PINEY RIDGE RD OVERBROOK DR ASCENSION DR MSS Y 4 1 PINEY RIDGE RD ASCENSION DR S US HWY MSS Y 2 2 BRIGHTON DR BRIGHTON WAY CANNON WAY SP1.5/M BRIGHTON DR WILSHIRE DR BRIGHTON WAY SP1.5/M JASMINE RD SR 436 TULIP TRL SP2.0/M JASMINE RD TULIP TRL TULIP TRL SP2.0/M JASMINE RD TULIP TRL PALM DR MSS JASMINE RD PALM DR VIOLET DELL DR MSS JASMINE RD VIOLET DELL DR WINTER PARK DR MSS KENTIA RD TULIP TRL PALM DR SP2.0/M KENTIA RD PALM DR VIOLET DELL DR SP2.0/M KENTIA RD VIOLET DELL DR S WINTER PARK DR SP2.0/M TULIP TRL START OF ROAD MARIGOLD RD MSS TULIP TRL MARIGOLD RD LILAC RD MSS Y 2 2 TULIP TRL LILAC RD KENTIA RD MSS TULIP TRL KENTIA RD JASMINE RD MSS TULIP TRL JASMINE RD IRIS RD MSS TULIP TRL IRIS RD HIBICUS RD MSS VIOLET DELL DR START OF ROAD MARIGOLD RD SP1.5/M VIOLET DELL DR MARIGOLD RD LILAC RD SP1.5/M VIOLET DELL DR LILAC RD KENTIA RD SP1.5/M VIOLET DELL DR KENTIA RD JASMINE RD MSS VIOLET DELL DR JASMINE RD IRIS RD MSS

7 City Wide Resurfacing Areas 1 3 Paving Limits/Share Lane Markings AREA ROAD NAME FROM TO Repair Code Lanes Width Length Shared Lane Marking (SLM) 2 VIOLET DELL DR IRIS RD HIBICUS RD MSS LILAC RD TULIP TRL PALM DR SP2.0/M LILAC RD PALM DR VIOLET DELL DR SP2.0/M LILAC RD VIOLET DELL DR S WINTER PARK DR SP2.0/M PALM DR MARIGOLD RD LILAC RD SP1.5/M PALM DR JASMINE RD IRIS RD MSS PALM DR IRIS RD HIBICUS RD MSS BRIGHTON WAY BRIGHTON DR S WINTER PARK DR SP1.5/M ,352 2 CANNON WAY BRIGHTON DR S WINTER PARK DR SP1.5/M ,140 2 IRIS RD SR 436 TULIP TRL MSS IRIS RD TULIP TRL PALM DR MSS IRIS RD PALM DR VIOLET DELL DR MSS IRIS RD VIOLET DELL DR S WINTER PARK DR MSS MARIGOLD RD CARRIAGE HILL CIR TULIP TRL MSS Y 2 2 MARIGOLD RD TULIP TRL LOWNDES SQ MSS MARIGOLD RD LOWNDES SQ PALM DR MSS MARIGOLD RD PALM DR LOWNDES SQ MSS MARIGOLD RD LOWNDES SQ VIOLET DELL DR MSS MARIGOLD RD VIOLET DELL DR S WINTER PARK DR MSS WILSHIRE BLVD SR 436 BRIGHTON DR MSD Y 3 2 WILSHIRE BLVD BRIGHTON DR S WINTER PARK DR MSD ,504 Y 7 2 HIBISCUS RD SR 436 TULIP TRL MSS HIBISCUS RD TULIP TRL PALM DR MSS HIBISCUS RD PALM DR VIOLET DELL DR MSS HIBISCUS RD VIOLET DELL DR S WINTER PARK DR MSS EL DORADO WAY ELM DR BENEDICT WAY SP1.5/M ,086 3 EL DORADO WAY ELM DR BENEDICT WAY SP1.5/M BENEDICT CT START OF ROAD BENEDICT WAY SP1.5/M BENEDICT WAY GREGORY DR BENEDICT CT SP1.5/M Y 3 3 BENEDICT WAY BENEDICT CT DOHENY WAY SP1.5/M Y 2 3 BENEDICT WAY DOHENY WAY ELDORADO WAY SP1.5/M Y 2 3 BENEDICT WAY ELDORADO WAY BRITTANY CIR SP1.5/M Y 2 3 BENEDICT WAY BRITTANY CIR END OF ROAD SP1.5/M JEFFERSON DR LAUREL WAY KENDALL WAY SP1.5/M JEFFERSON DR CRYSTAL BOWL CIR LAUREL WAY SP1.5/M Y 2 3 ZINNIA DR START OF ROAD LILAC RD MSS ZINNIA DR LILAC RD KENTIA RD MSS ZINNIA DR KENTIA RD JASMINE RD MSS ZINNIA DR JASMINE RD IRIS RD MSS ZINNIA DR IRIS RD HIBICUS RD MSS ZINNIA DR HIBISCUS DR ELM DR MSS BRIGHTON WAY DEBBY DR GREGORY DR SP1.5/M COBBLESTONE CT START OF ROAD MARK DAVID BLVD SP1.5/M COLDWATER DR WILSHIRE DR END OF ROAD SP1.5/M DEBBY RD BRIGHTON WAY END OF ROAD SP1.5/M DEBBY RD WILSHIRE DR BRIGHTON WAY SP1.5/M DOHENY WAY ELM DR FOREST WAY SP1.5/M DOHENY WAY FOREST WAY GREGORY DR SP1.5/M DOHENY WAY GREGORY DR BENEDICT WAY SP1.5/M W FOOTHILL WAY ELM DR GREGORY DR SP1.5/M E FOOTHILL WAY HIGHLAND DR BRITTANY CIR SP1.5/M FOREST DR DOHENY WAY GREGORY DR SP1.5/M W GRANDVIEW WAY ELM DR GREGORY DR SP1.5/M E GRANDVIEW WAY HIGHLAND DR BRITTANY CIR SP1.5/M

8 City Wide Resurfacing Areas 1 3 Paving Limits/Share Lane Markings AREA ROAD NAME FROM TO Repair Code Lanes Width Length Shared Lane Marking (SLM) 3 GREGORY DR DOHENY WAY BENEDICT WAY SP1.5/M GREGORY DR BENEDICT WAY WILSHIRE DR SP1.5/M Y 2 3 GREGORY DR WILSHIRE DR BRIGHTON WAY SP1.5/M GREGORY WAY W HELM WAY W GRANDVIEW WAY SP1.5/M GREGORY WAY W GRANDVIEW WAY W FOOTHILL WAY SP1.5/M W HELM WAY ELM DR GREGORY DR SP1.5/M E HELM WAY HIGHLAND DR BRITTANY CIR SP1.5/M HIGHLAND DR E HELM WAY E GRANDVIEW WAY SP1.5/M HIGHLAND DR E GRANDVIEW WAY E FOOTHILL WAY SP1.5/M IMPERIAL DR LAUREL WAY KENDALL WAY SP1.5/M IVANHOE WAY ELM DR BRITTANY CIR SP1.5/M ,671 3 KENDALL WAY IMPERIAL DR JEFFERSON DR SP1.5/M KENDALL WAY JEFFERSON DR KINGSLEY DR SP1.5/M Y 2 3 KENDALL WAY KINGSLEY DR BRITTANY CIR SP1.5/M Y 2 3 KINGSLEY DR LAUREL WAY KENDALL WAY SP1.5/M LAUREL WAY IMPERIAL DR JEFFERSON DR SP1.5/M LAUREL WAY JEFFERSON DR KINGSLEY DR SP1.5/M LAUREL WAY KINGSLEY DR BRITTANY CIR SP1.5/M MARK DAVID CT START OF ROAD MARK DAVID BLVD SP1.5/M OLD BARN WAY WINDING RIDGE RD END OF ROAD SP1.5/M SUMMERSET TER WINDING RIDGE RD END OF ROAD SP1.5/M WINDING RIDGE RD RED BUG LAKE RD SUMMERSET TER SP1.5/M WINDING RIDGE RD SUMMERSET TER OLD BARN WAY SP1.5/M WINDING RIDGE RD OLD BARN WAY MARK DAVID BLVD SP1.5/M ,006 3 BRITTANY CIR LAUREL WAY KENDALL WAY MSD Y 6 3 BRITTANY CIR KENDALL WAY JUPITER WAY MSD Y 2 3 BRITTANY CIR JUPITER WAY IVANHOE WAY MSD Y 2 3 BRITTANY CIR IVANHOE WAY E HELM WAY MSD Y 2 3 BRITTANY CIR E HELM WAY E GRANDVILLE WAY MSD Y 2 3 BRITTANY CIR E GRANDVILLE WAY E FOOTHILL WAY MSD Y 2 3 BRITTANY CIR E FOOTHILL WAY BENEDICT WAY MSD Y 3 3 BRITTANY CIR BENEDICT WAY WILSHIRE DR MSD Y 2 3 BRITTANY CT WILSHIRE DR END OF ROAD SP1.5/M ELM DR JUPITER WAY IVANHOE WAY SP1.5/M ELM DR IVANHOE WAY W HELM WAY SP1.5/M ELM DR W HELM WAY W GRANDVIEW WAY SP1.5/M ELM DR W GRANDVIEW WAY W FOOTHILL WAY SP1.5/M ELM DR W FOOTHILL WAY EL DORADO WAY SP1.5/M ELM DR EL DORADO WAY DOHENY WAY SP1.5/M ELM DR DOHENY WAY ZINNIA DR SP1.5/M ELM DR ZINNIA DR WILSHIRE DR SP1.5/M HIBISCUS RD S WINTER PARK DR ZINNIA DR MSS IRIS RD S WINTER PARK DR ZINNIA DR MSS JASMINE RD S WINTER PARK DR ZINNIA DR MSS JUPITER WAY ELM DR BRITTANY CIR MSS ,810 3 KENTIA RD S WINTER PARK DR ZINNIA DR MSS LILAC RD S WINTER PARK DR ZINNIA DR MSS MARIGOLD RD S WINTER PARK DR END OF ROAD MSS WILSHIRE DR S WINTER PARK DR COLDWATER DR MSD Y 2 3 WILSHIRE DR COLDWATER DR DEBBY DR MSD Y 2 3 WILSHIRE DR DEBBY DR ELM DR MSD Y 3 3 WILSHIRE DR ELM DR GREGORY DR MSD Y 3 3 WILSHIRE DR GREGORY DR MARK DAVID BLVD MSD Y 2 3 WILSHIRE DR MARK DAVID BLVD WILSHIRE CT MSD Y 2

9 City Wide Resurfacing Areas 1 3 Paving Limits/Share Lane Markings AREA ROAD NAME FROM TO Repair Code Lanes Width Length Shared Lane Marking (SLM) 3 WILSHIRE DR WILSHIRE CT BRITTANY CT MSD ,018 Y 7 3 WILSHIRE DR BRITTANY CT END OF ROAD MSD WILSHIRE CT WILSHIRE DR END OF ROAD SP1.5/M Feet 85,485 Total SLM 198 Miles 16.2 Legend M1 1.75" Avg Mill Depth Full Depth Base Repair M2 2.25" Avg Mill Depth M4 M3 4" Avg Mill Depth 8" Limerock M4 6" Avg Mill Depth 2 2" SP Layers SP " Overlay SP " Overlay Partial Depth Repair MSS Microsurface Single M3 MSD Microsurface Double 2 2" SP Layers *Avg 1/2" SP Course 0

10 City Wide Resurfacing Areas 1 3 Repair Area Locations Street Location Length Width FD (SY) PD (SY) Comments S TRIPLET LAKE DR House #180 SBL SOUTHCOT DR House # EBL ASCENSION 75' S of Piney Ridge NBL PAUL MCCLURE CT 100' W of Park Av, WBL At int with Niblic Adjust structure QUEENS MIRROR CIR House # 500 NBL Outside edge of pavement House # NBL Localized slippage House # 593 SBL replace existing patches S SUNSET DR At int with Thomas, NBL House #210 SBL CANNON WAY House # EBL repair along curbline IRIS RD At int with Tulip (west) EBL At int with Tulip (east) Full width MARIGOLD RD House #380 EBL House #430 EBL House #460 EBL House # BENEDICT WAY House #702 SWBL House #703 Centerline At int with Brittny Centerline JEFFERSON DR At int with Crystal Bowl Full width At int with Laural Centerline BRIGHTON WAY At int with Gegory, Centerline COLDWATER DR At int with Wilshire Full width DEBBY RD At int with Wilshire Full width GREGORY DR At int with Wilshire MARK DAVID BLVD House # WBL Along curbline OLD BARN WAY At int with Winding Ridge Full width WINDING RIDGE RD House #21 Centerline BRITTANY CIR At int with Benedict, SEBL Slippage JUPITER WAY House #627 Centerline At int with Elm level as option WILSHIRE DR At int with Gregroy EBL Slippage At int with Elm, Centerline Replace existing patch Total 1, Full Depth Base Repair (FD) M4 8" Limerock 2-2" SP Layers Partial Depth Repair (PD) M3 2-2" SP Layers

City of Casselberry. Santa Claus Run 2018

City of Casselberry. Santa Claus Run 2018 City of Casselberry Santa Claus Run 2018 Oh, you better watch out! You better not cry! You better not pout! I m telling you why. Santa Claus is coming to town - along with a few elves to spread goodwill

More information

REQUEST FOR COUNCIL ACTION. List of Exhibits A. Project Plan Set B. Bolton & Menk Proposal for Engineering / Inspection Services

REQUEST FOR COUNCIL ACTION. List of Exhibits A. Project Plan Set B. Bolton & Menk Proposal for Engineering / Inspection Services Item #08 - CC Agenda - 05/2/2016 [Page 1 of 5] REQUEST FOR COUNCIL ACTION : May 2, 2016 ITEM NO: 8 Department Approval: Administrator Reviewed: Agenda Section: Name Adam Edwards JML Public Works Director/

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy A. GENERAL Speed humps are an effective and appropriate device for safely reducing vehicle speeds on certain types of streets when installed accordance with the provisions of this policy. In order for

More information

Revised Evaluation Scores. System Preservation

Revised Evaluation Scores. System Preservation Revised Evaluation s System Preservation This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds mmittee meeting. The information below highlights

More information

The Honorable Connie Bernardy, DFL Lead House Transportation & Regional Governance Policy Committee 253 State Office Building Saint Paul, MN 55155

The Honorable Connie Bernardy, DFL Lead House Transportation & Regional Governance Policy Committee 253 State Office Building Saint Paul, MN 55155 This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 395 John Ireland Boulevard

More information

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No EXISTING PAVEMENT EVALUATION WILLMER ENGINEERING INC. Prepared For Clark Patterson Lee Suwanee, Georgia Prepared By WILLMER ENGINEERING INC. 3772 Pleasantdale Road Suite 165 Atlanta, Georgia 30340-4270

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Characterization of Combined Use of County Road Segment

Characterization of Combined Use of County Road Segment Department of Public Works Inyo County, California Characterization of Combined Use of County Road Segment Segment Name: _Lone Pine No. 1_ Purpose: Which of the following does the combined-use segment

More information

Better roads for Van Buren s future

Better roads for Van Buren s future Better roads for Van Buren s future August 7, 2018 Road Millage Ballot Proposal What does the Road Commission maintain? 1330 miles of road 350 primary road miles 980 local road miles 66 Bridges 9099 traffic

More information

Who s doing the work? Who do I call with questions I may have after I read this FAQ? Why is my street being paved?

Who s doing the work? Who do I call with questions I may have after I read this FAQ? Why is my street being paved? Paving FAQs Who s doing the work? Who do I call with questions I may have after I read this FAQ? Why is my street being paved? What s involved in paving my street? Can I park on my street during construction?

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

City of Vallejo Public Works Department

City of Vallejo Public Works Department Streets & Potholes Frequently Asked Questions A Guide to Potholes What is a pothole? How do we fix a pothole? Why do some potholes get fixed faster? I reported a pothole but it wasn't fixed - why not?

More information

TRAFFIC CALMING PROGRAM

TRAFFIC CALMING PROGRAM TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

Table Standardized Naming Convention for ERD Files

Table Standardized Naming Convention for ERD Files S-1 (2399) PAVEMENT SURFACE SMOOTHNESS (2013 version) DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. Always use with SP2005-111 (CONCRETE PAVING MIX SPECIFICATIONS PAVEMENT) and SP2005-140

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

If it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA

If it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA $9 $8 $7 $6 $5 $4 $3 $2 $1 Month-Year Ton Tonne 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA The Tennessee Program HMA Thin Lifts for Pavement Preservation in Tennessee Mark Woods TDOT 5,109 Interstate Lane

More information

Kentucky Highway District 6

Kentucky Highway District 6 Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011)

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011) (Amended May 23, 2011) 1. Speed humps are an appropriate mechanism for reducing speeds on certain streets in Pasadena when properly installed under the right circumstances. 2. Speed humps can be considered

More information

Plan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP

Plan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP 414 Nicollet Mall Minneapolis, MN 55401 March 13, 2017 Daniel P. Wolf Executive Secretary Minnesota Public Utilities Commission 121 7 th Place East, Suite 350 St. Paul, MN 55101 Via Electronic Filing RE:

More information

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION 1) TITLE: Old Hwy 91 (Swiss Village, Santa Clara to 200 East, Ivins) 2) DESCRIPTION: This joint Ivins/Santa Clara

More information

I.D.O.T. Update Version -

I.D.O.T. Update Version - I.D.O.T. Update - 2007 Version - RUBBLIZATION Rubblization with HMA Overlay Rehabilitation method for deteriorated concrete pavements Alternative to extensive patching or reconstruction Pavement in effect

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

INLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY

INLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY INLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY Howard Hamby Spokane County Road Maintenance Administrator PAVEMENT CUT FAILURES 1. Sloughing 2. Poor Compaction 3. Poor

More information

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014 CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014 IN THE SPOTLIGHT Roadway Improvement Projects - Package #2 Construction Package #2 is the second of four groupings of similar

More information

DRIVEWAY/SIDEWALK PERMIT APPLICATION

DRIVEWAY/SIDEWALK PERMIT APPLICATION JOB INFORMATION CITY OF ALEXANDRIA 704 Broadway Alexandria, MN 56308 Phone: 320-763-6678 Fax: 320-763-3511 DRIVEWAY/SIDEWALK PERMIT APPLICATION Permit Fee: $50.00 Deposit: $300.00 PERMIT NUMBER: ROW DATE:

More information

Open Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No.

Open Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No. Board of County Commissioners of Washington County, Maryland Agenda Report Form Open Session Item SUBJECT: Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications,

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS CITY OF GRAND PRAIRIE TRANSPORTATION SERVICES DEPARTMENT SPEED CUSHION INSTALLATION POLICY A. GENERAL Speed cushions are an effective

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B... Speed Hump Program CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 1. GENERAL... 3 2. ELIGIBILITY REQUIREMENTS... 3 A. PETITION... 3 B. OPERATIONAL AND GEOMETRIC CHARACTERISTICS OF

More information

Pavement Management Program Report

Pavement Management Program Report Pavement Management Program Report for the City of Placentia 2018 Citywide Pavement Management Program Update June 19, 2018 June 19, 2018 Luis Estevez Director of Public Works City of Placentia 401 East

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

HURON COUNTY ENGINEER S OFFICE

HURON COUNTY ENGINEER S OFFICE HURON COUNTY ENGINEER S OFFICE 2017 ENGINEER S ANNUAL REPORT The Ohio Revised Code requires that each Ohio County Engineer publish an annual report to the commissioners outlining the general condition

More information

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc. OHIO Department of Transportation Project #140378 Franklin County, OH ISSA Presidents Award Submission Strawser Construction Inc. Columbus, Ohio Applicant Information Strawser Construction Inc. 1392 Dublin

More information

HMA Thin Lifts for Pavement Preservation in Tennessee

HMA Thin Lifts for Pavement Preservation in Tennessee HMA Thin Lifts for Pavement Preservation in Tennessee The Tennessee Program 5,109 Interstate Lane Miles 26,244 State Route LM 31,353 Total* MARK WOODS, P.E. TDOT DIV. OF MATERIALS AND TESTS * As of 2008

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

1400 MISCELLANEOUS Traffic Engineering Manual

1400 MISCELLANEOUS Traffic Engineering Manual TABLE OF CONTENTS Part 14 - MISCELLANEOUS 1400 GENERAL... 14-3 1415 RUMBLE STRIPS (INCLUDING STRIPES) IN THE ROADWAY... 14-4 1415-1 General... 14-4 1415-2 Transverse Rumble Strips... 14-4 1415-2.1 General...

More information

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb

More information

Do I have a problem?

Do I have a problem? Spray Injection Patching Dan Horner Regional Sales Manager Cimline Pavement Maintenance Group Do I have a problem? It is estimated It is estimated that there are OVER 50,000,000 potholes on the nation

More information

Purpose of Tonight s Meeting

Purpose of Tonight s Meeting Purpose of Tonight s Meeting Point Dume Neighborhood Traffic Calming Project background, goals Resident Safety Concerns Existing Conditions Fact Sheets Map of Proposed Improvements Discussion Next Steps

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

Effingham County Ash Roads Update 2018 Winter Storm Grayson Jan 16, 2018

Effingham County Ash Roads Update 2018 Winter Storm Grayson Jan 16, 2018 Effingham County Ash Roads Update 2018 Winter Storm Grayson Jan 16, 2018 Brief History Ash from Georgia Pacific was applied to dirt roads starting in 2001 Georgia Environmental Protection Division approves

More information

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation Capital Improvements Update April 2014: Pl dp j t Planned Projects through 2019 - $ 102,233,755 Available Funding through 2019 $ 149,764,558 pp p,, Un-appropriated - $ 47,530,803 Staff s Recommendation

More information

2. ELIGIBILITY REQUIREMENTS

2. ELIGIBILITY REQUIREMENTS Speed Hump Policy 1. GENERAL The purpose of this policy is to provide guidelines for the application of speed humps. A "speed hump" is a gradual rise and fall of pavement surface across the width of the

More information

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT PROJECT CONTEXT 510 Hicks L A C E Y Mullen Rd SE Thurston County Fairgrounds Rd SE Carpenter Long Woodland Elementary Rd SE Marvin Old Paci c H w y 510 Reservation Rd SE Nisqually Indian Community Nis

More information

SECTIO N 610 PAVEMENT SMO O THNESS

SECTIO N 610 PAVEMENT SMO O THNESS SECTIO N 610 PAVEMENT SMO O THNESS 610.1 Description. This work shall consist of measuring the smoothness of the final pavement surface. Smoothness shall be measured using the International Roughness Index

More information

Northeast Pavement Preservation Partnership Burlington, Vermont. Rhode Island DOT

Northeast Pavement Preservation Partnership Burlington, Vermont. Rhode Island DOT Northeast Pavement Preservation Partnership Burlington, Vermont Rhode Island DOT April 8, 2014 SHRP2 R26 (Preservation of High-Traffic Volume Roadways) and MAP-21 Impacts to RIDOT Pavement Management David

More information

Who s doing the work? Who do I call with questions I may have after I read this FAQ? Why is my street being slurry sealed?

Who s doing the work? Who do I call with questions I may have after I read this FAQ? Why is my street being slurry sealed? Slurry Seal FAQs Who s doing the work? Who do I call with questions I may have after I read this FAQ? Why is my street being slurry sealed? What s involved in slurry sealing my street? Can I park on my

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) CFS:TEH 1 of 10 APPR:KPK:JFS:07-07-16 FHWA:APPR:07-15-16 a. Description. This

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.

More information

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE CATEGORY 500 PAVING 1 of 9 SECTION 535.01 DESCRIPTION. This work shall consist of measuring the roughness of the final surface of hot mix asphalt (HMA) or portland cement concrete (PCC) pavements. The

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

To: Al Martin From: Brian Munson CC: Date: Wednesday, February 24, 2010 Re: UDC Informational Submittal: Grandview Commons Grocery Store

To: Al Martin From: Brian Munson CC: Date: Wednesday, February 24, 2010 Re: UDC Informational Submittal: Grandview Commons Grocery Store To: Al Martin From: Brian Munson CC: Date: Wednesday, February 2, 20 Re: UDC Informational Submittal: Grandview Commons Grocery Store Attached please find 1 copies of the Submittal for the Grocery Store

More information

Tempe Streetcar. March 2, 2016

Tempe Streetcar. March 2, 2016 Tempe Streetcar March 2, 2016 Tempe Profile 40 sq. miles, highest density in state University Town, center of region Imposed growth boundaries (density increase) Mixed use growth/intensifying land use

More information

COUNCIL COMMUNICATION

COUNCIL COMMUNICATION COUNCIL COMMUNICATION TO: FROM: DEPARTMENT: Mayor and Council Larry Nimmo Public Works DATE: June 19, 2017 SUBJECT: Award Contract for 2017 Chip Seal Program DESCRIPTION: Award Contract for 2017 Chip Seal

More information

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011 Project Status Update Meeting Project Status Update Meeting Holman United Methodist Church January 27, 2011 Phase 1 Project Description Phase 1 from Downtown Los Angeles to Culver City: 8.6 mile corridor

More information

DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface.

DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface. 2399 PAVEMENT SURFACE SMOOTHNESS 2399.1 DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface. A Definitions The Department defines Smoothness as the Mean

More information

Private Roads & Municipal Waste Collection Policy POLICY NUMBER: 12 DATE APPROVED: April 21, 2015 (# ) DATE REVISED:

Private Roads & Municipal Waste Collection Policy POLICY NUMBER: 12 DATE APPROVED: April 21, 2015 (# ) DATE REVISED: TOPIC: Private Roads & Municipal Waste Collection Policy POLICY NUMBER: 12 DATE APPROVED: April 21, 2015 (#2015-053) DATE REVISED: TITLE: This Policy may be cited as the Private Roads Policy of the Municipality

More information

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee Why We Are Here: GDOT s Transportation Improvement Act (TIA) Office, the City of Columbus, and the project delivery team are here this evening to display and answer questions concerning the proposed roadway

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road

More information

2007/ /2012 MARION COUNTY TRANSPORTATION IMPROVEMENT PROGRAM

2007/ /2012 MARION COUNTY TRANSPORTATION IMPROVEMENT PROGRAM 2007/2008 2011/2012 MRION COUNTY TRNSPORTTION IMPROVEMENT PRORM MRION COUNTY BORD O COUNTY COMMISSIONERS TIP2007 STN McCLIN, CHIRMN TBLE O CONTENTS Board Members and Staff 2 Summary..3 Phase/unding s...

More information

Alberta Transportation Rumble Strips - C-TEP Lunch and Learn

Alberta Transportation Rumble Strips - C-TEP Lunch and Learn Alberta Transportation Rumble Strips - C-TEP Lunch and Learn Bill Kenny P.Eng, Director: Design, Project Management and Training, Technical Standards Branch. - July 2011 What are Rumble Strips? A preventative

More information

Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity

Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity Presented March 6, 2013 by Alan Plunkett, INDOT Bill Smith, INDOT Tom Brennan, Purdue Alan Plunkett/Bill Smith US 231 MOTIVATION

More information

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT SEPTEMBER 2015

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT SEPTEMBER 2015 CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT SEPTEMBER 2015 IN THE SPOTLIGHT Roadway Improvement Projects - Package #3 The design and construction Package #3 is a grouping of similar

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

APPENDIX G. Greenhouse Gas and Climate Change Analysis

APPENDIX G. Greenhouse Gas and Climate Change Analysis APPENDIX G Greenhouse Gas and Climate Change Analysis GHG Running Exhaust and Fuel Cycle Emissions (CO2e) Year Emission Factor (g/mi)* ADT (vehicles per day) Length (mi) g/day MT/day MT/year 2015 638.13

More information

THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE

THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE Wilke, P.W.; Hatalowich, P.A. 1 THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE Paul Wilke, P.E. Principal Engineer Corresponding Author Applied Research Associates Inc. 3605 Hartzdale Drive

More information

APPENDIX H. Transportation Impact Study

APPENDIX H. Transportation Impact Study APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett

More information

2017 Jefferson County Outreach Jefferson County Maintenance. Matthew Burkett ~ Jefferson County Maintenance Manager

2017 Jefferson County Outreach Jefferson County Maintenance. Matthew Burkett ~ Jefferson County Maintenance Manager Outreach 2017 2017 Jefferson County Outreach Jefferson County Maintenance Matthew Burkett ~ Jefferson County Maintenance Manager MATERIAL 2016-2017 Jefferson County Outreach Winter Maintenance Information

More information

Dixie Transportation Planning Office

Dixie Transportation Planning Office A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation

More information

SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS

SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS City of Panama City, Florida Public Works Department 9 Harrison Avenue Panama City, Florida 32401 Phone: (850) 872-3015 Effective 1/22/08 Table of

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

STAFF REPORT # CHANGE OF ZONING

STAFF REPORT # CHANGE OF ZONING STAFF REPORT #17-2000-0007 CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application

More information

New Jersey Department of Transportation

New Jersey Department of Transportation Prepared by: New Jersey Department of Transportation September 2013 TABLE OF CONTENTS Page CURRENT STATUS OF STATE HIGHWAY SYSTEM... 1 Description of System... 1 Figure 1: NJ Roadway System, Breakdown

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension Date of Meeting: July 20, 2017 # 6 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Design Endorsement for Sterling Boulevard Extension

More information

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013 Building our future, together Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013 Vision In 2030, the City of Tyler will be nationally known for its commitment to community,

More information

PUBLIC WORKS DEPARTMENT DECEMBER 2017 UPDATE DESIGN & CONSTRUCTION DIVISION

PUBLIC WORKS DEPARTMENT DECEMBER 2017 UPDATE DESIGN & CONSTRUCTION DIVISION TESTER ROAD WATER MAIN UPGRADE PUBLIC WORKS DEPARTMENT DECEMBER 2017 UPDATE DESIGN & CONSTRUCTION DIVISION The City will be replacing an aging water main under Tester Road this year. The project will begin

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

CTA Blue Line Study Area

CTA Blue Line Study Area CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING

More information

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary 8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION 03SP502(P) SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) C&T:TEH 1 of 8 C&T:APPR:JFS:MJE:01-28-08 FHWA:APPR:02-01-08 a. Description. Provide

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

~ p bl' S E. S 4,781 (ADA ComQiiance Program) $ 32,006 TOTAL $119,100 (Meadowbrook Rd Pathway) $108,600 (Taft Rd Pathway)

~ p bl' S E. S 4,781 (ADA ComQiiance Program) $ 32,006 TOTAL $119,100 (Meadowbrook Rd Pathway) $108,600 (Taft Rd Pathway) CITY of NOVI CITY COUNCIL Agenda Item K August 27, 2012 SUBJECT: Approval to award an amendment to the engineering services agreement with Spalding DeDecker Associates, Inc. related to the 2012 Pathway

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44 Engineering Report: Shasta-Trinity National Forest South Fork Management Unit Analysis of National Forest System Road 30N44 (milepost 0.00 to 0.40) for Motorized Mixed Use Designation Forest: Shasta-Trinity

More information

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by 2. Assessment of Current Conditions and Needs In order to prepare a plan to reach the vision desired by the residents of Texarkana, it is first necessary to ascertain the current situation. Since there

More information

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, DECEMBER 27, 2017

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, DECEMBER 27, 2017 The Board of Public Works and Safety of Plymouth, Indiana, met in Regular Session on December 27, 2017, at 6:00 p.m. in the meeting room of the Plymouth Fire Department, 111 N. Center St., Plymouth, IN.

More information

WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing

WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: 424009-3 Public Hearing May 9, 2013 This Public Hearing is being held in accordance with the Federal-aid

More information

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc. OHIO Department of Transportation Project #140378 Franklin County, OH ISSA Presidents Award Submission Strawser Construction Inc. Columbus, Ohio Strawser Construction Project Team Chris Anspaugh Regional

More information

Ultra-thin Bonded Wearing Course Performance Update, Minnesota

Ultra-thin Bonded Wearing Course Performance Update, Minnesota 2009-30 Ultra-thin Bonded Wearing Course Performance Update, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research Ultra-thin Bonded Wearing Course Performance

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins