2 VOLUME II Chapter 9- Recommended Capital Improvement Program Recommended Capital Expenditures Schedule of Improvements Project Prioritization Comparison to Previous Master Planned Expenditures Guidelines for Implementation Project Verification List of Figures Page Figure Following Page 9-1 Figure Following Page 9-1 Figure Following Page 9-1 Figure Following Page 9-1 Figure Following Page 9-1 Figure Following Page 9-1 Figure Following Page 9-1 Figure Following Page 9-1 Figure Following Page 9-3 Figure Following Page 9-4 List of Tables Page Table Following Page 9-1 Table On Page 9-2 Table On Page 9-3 Table Following Page 9-5

3 SRCSD Interceptor System Master Plan 2000 Chapter 9 Recommended Capital Improvement Program 9.1 Recommended Capital Expenditures The recommended SRCSD Interceptor System Master Plan Capital Improvement Program contains 52 projects required to convey wastewater flows from existing and planned development to the Sacramento Regional Wastewater Treatment Plant. The facilities are scheduled to be constructed over the next 35 years, and when operational, will provide capacity for all planned development within the Urban Services Boundary and West Sacramento. The total capital cost of the master planned facilities is $950,100,000. This cost is in year 2000 dollars and does not include inflation or interest adjustments for any of the identified projects. The capital cost of each project is shown in Table 9-1. The capital expenditure per year is shown on Figure Schedule of Improvements The improvements identified in MP 2000 have been assigned start and completion dates based on the anticipated need for each facility to be operational. The start and completion dates for each project are contained in the project schedule, Figure 9-2. A large format, more detailed project schedule may be found in the appendix of this report. A visual representation of the recommended project implementation over time is shown in Figures 9-3 through Project Prioritization The recommended interceptor projects were developed to address existing and future capacity deficiencies in the existing interceptor system, and to extend conveyance facilities to planned development within the SRCSD service area. Each project was categorized into one of three types of project justifications: Category A: Category B: Category C: Required to relieve existing capacity deficiency Required to relieve future capacity deficiency Required to provide conveyance of wastewater generated from future planned development beyond the reaches of the existing interceptor system S:\MP 2000\Draft MP2000\Chapter 9\Chapter 9.doc 9-1

4 TABLE 9-1 ESTIMATED CAPITAL COST OF RECOMMENDED INTERCEPTOR PROJECTS Estimated Capital Project ID Project Location Cost BR-1 SRWTP to Franklin Blvd. $14,180,000 BR-6A South of Gerber Rd. to Bradshaw Rd. $16,620,000 BR-6B South of Elder Creek to Mayhew and Jackson $19,600,000 BR-7 Jackson Hwy. to International Dr. $31,890,000 BR-8 International Dr. to Folsom Blvd. $29,890,000 SR-1 Folsom Blvd. to South of American River $10,820,000 SR-2 South of American River to Pennsylvania Ave. $9,300,000 FE-1B East of Sunrise Blvd. to Folsom South Canal $10,890,000 FE-3 Iron Point Road $11,790,000 FE-3PS South of Iron Point Road $4,660,000 LE-1 SRWTP to Franklin Blvd. at Dwight Rd. $9,000,000 NN-1 Del Paso Rd. to end of pipe $3,400,000 ARPS Arden Pump Station Site to south of American River $20,000,000 RCPS Cordova Pump Station Site $9,350,000 UNW-1 Natomas PS to Del Paso Blvd. $29,200,000 UNW-2 Del Paso Blvd. to Elkhorn Blvd. $26,280,000 UNW-3 Elkhorn Blvd. to Natomas East Main Drain $8,660,000 UNW-4 Natomas East Main Drain to Cherry Lane $14,460,000 UNW-5 Cherry Lane to East of Watt Ave. $22,260,000 UNW-6 East of Watt Ave. to West of SPRR $8,290,000 DRR-1 28th St. and Elkhorn Blvd. to Scotland Dr. $7,080,000 UNW-7 West of SPRR to Van Maren PS $12,620,000 UNW-8 Van Maren Pump Station $13,920,000 UNW-9 Van Maren PS to Fair Oaks Blvd. $14,210,000 LNW-1 SRWTP to West of Sacramento River $27,500,000 SRPS Southport Regional Pump Station (Phase 1-3) $33,050,000 LNW-2 West of Sacramento River to South of Linden Rd. $84,010,000 WSCSM West Sacramento Treatment Plant $2,000,000 LNW-3 South of Linden Rd. to Natomas Pump Station $75,070,000 NNPS Natomas Pump Station Site (Phase 1-4) $21,090,000 SO-1 SRWTP to Laguna Blvd. $8,660,000 SO-2 Laguna Blvd. to Franklin Blvd. $21,360,000 SO-3 Franklin Blvd. to East of Bruceville Rd. $18,270,000 LC-1 SRWTP to Bruceville Rd. $24,840,000 LC-2 Bruceville Rd. to Waterman Rd. $44,700,000 LC-3 Waterman Rd. to Excelsior Rd. $36,040,000 LC-4 Excelsior Rd. to Sunrise Blvd. $20,500,000 LC-5 Sunrise Blvd. to end of pipe $5,430,000 DC-1 Waterman Rd. North of Bond Rd. to Deer Creek $25,430,000 DC-2 Deer Creek to Folsom South Canal $18,210,000 DC-3 Folsom South Canal to end of pipe $16,080,000 DC-4 South of Crevis Creek to end of pipe $3,320,000 MA-1 Happy Lane to East of Folsom South Canal $37,020,000 AJ-1 Sunrise and Douglas to West of Jaeger Rd. $5,080,000 AJ-2 Sunrise and Douglas to White Rock Rd. $17,400,000 AJ-2S Sunrise and Douglas to North of Morrison Creek $7,490,000 AJ-3 White Rock Rd. to South of Hwy 50 $7,680,000 AJ-3S White Rock Rd. to Old White Rock Rd. $3,930,000 AJ-4 Sunrise and Douglas to end of LC-5 $21,940,000 RL-1 Elkhorn Blvd. to Elverta Rd. East of Rio Linda Blvd. $10,800,000 BR-6BS Bradshaw Rd. to South of Elder Creek Rd. $2,990,000 FS-1 South of Hwy. 50 to Iron Point Rd. $8,440,000 Total $966,700,000

5 Figure 9-1 SRCSD Master Plan Estimated Capital Expenditures $200 $180 $160 $140 $120 $100 $80 $60 $40 $20 $0 $0 Black & Veatch 1/4/ $200 Yearly Expenditures ($ Millions) $1,200 $1,000 Yearly Expenditues Cummulative Expenditures $800 $600 $400 Cumulative Expenditures ($ Millions)

6 Figure 9-2 SRCSD Interceptor Master Plan 2000 Project Schedule Project Start Finish SRCSD Interceptor Master Plan /3/00 2/16/01 Upper NWI Design Report 7/3/00 5/11/01 Lower NWI Design Report 6/8/00 12/5/01 Interceptor Design Manual 1/3/01 11/13/01 Bradshaw Interceptor Section 1 & 2 1/3/00 10/6/00 Bradshaw Interceptor Section 6A 1/3/00 7/11/03 Bradshaw Interceptor Section 6B 1/3/00 4/16/04 Bradshaw Interceptor Section 7 1/2/01 11/29/04 Bradshaw Interceptor Section 8 1/8/01 1/14/05 Sunrise Interceptor Section 1 12/9/02 12/15/06 Sunrise Interceptor Section 2 12/9/02 12/15/06 Folsom East Interceptor Section 1B 6/5/00 12/13/02 Folsom East Section 3 & Pump Station 1/3/00 11/29/02 Laguna Interceptor Extension 2/19/01 8/29/03 North Natomas Interceptor 1/3/02 7/14/04 Arden Pump Station / Force Main 1/3/00 4/19/02 Rancho Cordova Pump Station (Phase 1) 11/1/00 7/23/02 Rancho Cordova Pump Station (Phase 2) 2/15/18 8/26/20 Upper Northwest Interceptor Section 1 1/3/03 1/11/07 Upper Northwest Interceptor Section 2 & 3 12/3/04 6/11/09 Upper Northwest Interceptor Section 4 4/2/07 10/9/09 Upper Northwest Interceptor Section 5 & 6 2/19/01 1/14/05 Dry Creek Relief 7/8/02 1/14/05 Upper Northwest Interceptor Section 7 & 8 6/4/01 4/29/05 Upper Northwest Interceptor Section 9 1/3/07 7/14/09 Lower Northwest Interceptor Section 1 4/3/02 2/28/06 Southport Regional Pump Station (Phase 1) 4/7/03 7/7/06 Southport Regional Pump Station (Phase 2) 1/4/16 4/5/19 Southport Regional Pump Station (Phase 3) 1/7/30 4/8/33 Lower Northwest Interceptor Section 2 7/8/02 6/2/06 West Sac Collection System Modifications 7/7/03 1/13/06 Lower Northwest Interceptor Section 3 10/7/02 1/19/07 Natomas Pump Station (Phase 1) 10/5/00 1/7/04 Natomas Pump Station (Phase 2) 1/2/06 4/3/09 Natomas Pump Station (Phase 3) 1/4/12 4/7/15 Natomas Pump Station (Phase 4) 1/6/20 4/7/23 South Interceptor Section 1 5/7/07 11/13/09 South Interceptor Section 2 & Pump Station 10/8/07 10/14/11 South Interceptor Section 3 6/14/10 12/21/12 Laguna Creek Interceptor Section 1 9/7/09 3/16/12 Laguna Creek Interceptor Section 2 3/19/12 2/12/16 Laguna Creek Interceptor Section 3 2/15/16 1/10/20 Laguna Creek Interceptor Section 4 1/13/20 12/8/23 Laguna Creek Interceptor Section 5 1/3/22 7/12/24 Deer Creek Interceptor Section 1 1/13/20 7/21/23 Deer Creek Interceptor Section 2 7/24/23 1/29/27 Deer Creek Interceptor Section 3 2/1/27 8/9/30 Deer Creek Interceptor Section 4 8/12/30 2/18/33 Mather Interceptor Section 1 7/5/11 1/12/15 Aerojet Interceptor Section 1 7/8/13 1/15/16 Aerojet Interceptor Section 2 1/18/16 7/27/18 Aerojet Interceptor Section 2S 1/18/16 7/27/18 Aerojet Interceptor Section 3 9/25/20 4/6/23 Aerojet Interceptor Section 3S 4/7/23 10/16/25 Aerojet Interceptor Section 4 7/16/29 6/10/33 Rio Linda Interceptor Section 1 2/6/23 8/15/25 Bradshaw Interceptor Section 6BS 1/4/21 7/14/23 Folsom South Pump Station and Force Main 1/3/20 7/14/ /3/01

7

8

9

10

11

12

13 SRCSD Interceptor System Master Plan 2000 Those projects assigned to Category A were scheduled to begin as soon as possible. Projects in Category B and C were scheduled based on the need for sewerage facilities as projected by anticipated development plans. The projects contained in each category are listed in Table 9-2. TABLE 9-2 PROJECTS LISTED BY CATEGORY Category A Category B Category C BR-1 RCPS FE-3 BR-6A UNW-9 FE-3PS BR-6B LNW-1 NN-1 BR-7 SRPS UNW-1 BR-8 LNW-2 UNW-2 SR-1 LNW-3 UNW-3 SR-2 NNPS UNW-4 FE-1B WSCSM LE-1 SO-1 ARPS SO-2 UNW-5 SO-3 UNW-6 LC-1 DRR-1 LC-2 UNW-7 LC-3 UNW-8 LC-4 RCPS LC-5 DC-1 DC-2 DC-3 DC-4 MA-1 AJ-1 AJ-2 AJ-2S AJ-3 AJ-3S AJ-4 RL-1 BR-6BS FS-1 S:\MP 2000\Draft MP2000\Chapter 9\Chapter 9.doc 9-2

14 SRCSD Interceptor System Master Plan 2000 As shown in Figure 9-1 there is a spike in project expenditures between the years 2002 and This period of high expenditures is primarily caused by the construction of three major interceptor projects: Bradshaw/Folsom, Upper Northwest, and Lower Northwest. The yearly expenditures for these projects are shown in Figure 9-9. The Bradshaw/Folsom and Upper Northwest Interceptors are required to relieve existing capacity deficiencies in the SRCSD interceptor system and CSD-1 trunk system. Although the project segments of the Lower Northwest Interceptor are classified as Category B projects, they are required to provide relief to the Natomas and Arden Pumping stations. Each of these pumping stations are being upgraded to increase capacity, however, this is intended to only be a stop-gap measure to allow a reasonable timeframe for the design and construction of the Lower Northwest Interceptor. 9.3 Comparison to Previous Master Planned Expenditures The 1994 update to the Sacramento Sewerage Expansion Study (SSES) estimated the total capital cost of the recommended interceptor projects to be $595,100,000 (1993 dollars). The current MP 2000 estimate is $966,700,000. The major increases in project costs accounting for the $371,600,000 increase are itemized in Table 9-3, below. The difference between the $385 million total increase and $372 million difference from the previous master plan is due to a net cost savings on other projects contained in the MP TABLE 9-3 PROJECTS CONTRIBUTING TO INCREASED PROGRAM COSTS Item: Inflation (ENR CCI) Lower Northwest Interceptor Upper Northwest Interceptor Newly Identified Projects Total: Increase: $93 million $148 million $61 million $82 million $385 million A description of each of these items is presented below. Inflation - The Sacramento Sewerage Expansion Study Update used an ENR Construction Cost Index (CCI) of 5,600 which represented the mid-point between the 20-cities index and the San Francisco index at the time the estimate was being generated. The January 2000 value of this index is This represents a 15.6% increase due to inflation of the seven-year period and results in an $93 million increase in program costs. Lower Northwest Interceptor The SSES estimated the cost of the Lower Northwest Interceptor to be $95 million (2000 dollars). The MP 2000 estimate for these facilities is $243 million. The MP 2000 assumes a West Sacramento route for the Lower Northwest Interceptor and increases the size of the interceptor facilities S:\MP 2000\Draft MP2000\Chapter 9\Chapter 9.doc 9-3

15 $120 Figure 9-9 Major Near Term Interceptor Projects $100 Bradshaw/Folsom Interceptor Upper Northwest Interceptor Lower Northwest Interceptor Capital Cost ($ Millions) $80 $60 $40 $20 $

16 SRCSD Interceptor System Master Plan 2000 to provide conveyance capacity for West Sacramento. A cursory review of the original estimate revealed some additional reasons for the large discrepancy. Approximately half of the base pipeline cost from the SSES was based on a unit cost for 72-inch force main of $320 per foot. This unit price appears to be low for the type of area the pipeline is routed through. Additionally, the $5 million base cost of expanding the Natomas Pump Station to 73 mgd appears to be low. Upper Northwest Interceptor The Upper Northwest Interceptor was estimated at $89 million (2000 dollars) in the SSES. The estimate from the Upper Northwest Interceptor Design Report is approximately $138 million, and the MP 2000 estimate is $150 million. The increase is primarily attributable to the increased capacity of the facilities identified in the design report to divert additional flows from impacted trunk facilities in the northeast system. Additional costs are also expected to be incurred due to the combination of poor soil and accelerated development in the North Natomas Area. The increase from the Design Report estimate to the MP 2000 estimate was related to the need to increase the size of the interceptor to convey higher flows based on modeling results, and costs associated with deepening the pipeline to provide gravity service to a larger portion of the service area. Newly Identified Projects The Interceptor System Master Plan 2000 has identified additional projects beyond those identified in the SSES that will be required to provide conveyance capacity to serve ultimate development within the Urban Services Boundary. These projects include the ARPS (Arden Pump Station Modifications), FS-1 (Folsom South Pump Station and Force Main), and AJ-1 through AJ-4 (AeroJet Interceptor). Modifications to the Arden Pump Station are needed to bring its capacity up to the value assumed in the SSES (approximately 105-mgd). The Folsom South Pump Station was required due to the realignment of Folsom East Interceptor Section 3 to Iron Point Road. The AeroJet Interceptor is required to provide service to the Mather/AeroJet Area. This area was originally identified as not requiring sewer service. However, due to changes in land use planning since the SSES, this area has been assigned an average development density of 6 ESD per acre. A comparison of expenditures in relation to time between the SSES and the MP 2000 is shown in Figure To estimate expenditure over time for the SSES the capital cost for each phase was divided evenly by the number of years per phase. The costs associated with interceptor projects completed to date are indicated in red. The total costs to date for the previously construction interceptors have been added to the cumulative MP 2000 costs in order to compare with the previous estimates of the entire program. As indicated in Figure 9-10, total expenditures since 1993 have been less than projected in the 93/94 SSES. This indicates that not all improvements identified in Phase 1 of the 93/94 SSES were completed on schedule. The delay in the construction of these facilities has contributed to the expenditure spike projected between the years 2002 and S:\MP 2000\Draft MP2000\Chapter 9\Chapter 9.doc 9-4

17 Figure 9-10 SRCSD Interceptor Actual and Recommended Expenditures $120 $100 $80 $60 $40 $20 $0 $0 Black & Veatch Final CIP Expend.xls $200 Capital Expenditure per Year ($ Millions) $1,200 $1,000 Cumulative Values 1993/94 SSES (1993 dollars) 1993/94 SSES (2000 dollars) MP 2000 Actual Expenditures $800 $600 $400 Cumulative Expenditures ($ Millions)

18 SRCSD Interceptor System Master Plan Guidelines for Implementation The MP 2000 provides a detailed plan of the interceptor facilities and right of way necessary to provide sewage conveyance within the Sacramento County USB and city limits of West Sacramento. Timing of interceptor projects identified for construction within the next 20 years is based on the operational condition of the existing regional facilities and/or SACOG growth projections within the study area. Projects identified for construction after the year 2020 are based on buildout densities within the USB that are not associated with a particular timeframe. Projects scheduled after 2020 are intended primarily to identify facilities required to provide service under a developed USB scenario. As the case with previous master planning efforts, the MP 2000 should be consider a working document and subject to review at least every year and updated every five years. Table 9-4 summarized the recommended interceptor projects, describes project drivers and timing considerations, and assigns a priority level to the project Project Verification The modeling results of the expanded interceptor system during a 10-year design period storm at buildout of the USB predict two interceptors with significant surcharging caused by limited pipe capacity. These facilities are the McClellan Interceptor and the Laguna Interceptor. The predicted surcharging may be caused by inaccurate flow monitoring information. It is recommended that additional flow monitor analysis be performed in these areas and the hydraulic model be recalibrated before identifying future relief projects. If major land use changes have occurred since the completion of this MP 2000, design flows should be updated and the hydraulic model re-run to determine the impacts the land use changes have on the interceptor system. Finally, the SRCSD should continue metering flow at strategic locations along the interceptor system. This data should be used to verify and update regional inflow coefficient (Kp) values throughout the service area. By periodically updating the hydraulic model with this information, the SRCSD may accelerate or delay recommended projects based on the most recent system response information. S:\MP 2000\Draft MP2000\Chapter 9\Chapter 9.doc 9-5

19 SCHEDULING AND PRIORITY LIST Design Construction Improvement Project Category Driver Priority Timing Considerations Start Finish Start Finish Bradshaw Interceptor Section 1&2 A Required for relief of Central and Northeast Interceptors. Needed to bring Bradshaw Sections 3, 4, 5A, and 5B into - Under Construction /6/2000 service. Bradshaw Interceptor Section 6A A Required for relief of Central and Northeast Interceptors. 1 Requires completion of Bradshaw 1 & 2, project under design 1/3/2000 5/4/2001 5/7/2001 7/11/2003 Bradshaw Interceptor Section 6B A Required for relief of Central and Northeast Interceptors. 1 Requires completion of Bradshaw 1 & 2, project under design 1/3/2000 2/8/2002 2/11/2002 4/16/2004 Bradshaw Interceptor Section 7 A Required for relief of Northeast area and Folsom Interceptor. 2 Required to abandon portion of Folsom Interceptor prior to extension of Light Rail 1/2/2001 9/23/2002 9/24/ /29/2004 Bradshaw Interceptor Section 8 A Required for relief of Northeast area and Folsom Interceptor. 2 Required to abandon portion of Folsom Interceptor prior to extension of Light Rail 1/8/2001 2/14/2003 2/17/2003 1/14/2005 Sunrise Interceptor Section 1 A Required for relief of capacity deficient trunks in Northeast area. 2 Coordinate with extension of Light Rail 12/9/2002 1/14/2005 1/17/ /15/2006 Sunrise Interceptor Section 2 A Required for relief of capacity deficient trunks in Northeast area. 2 12/9/2002 1/14/2005 1/17/ /15/2006 Folsom East Interceptor Section 1B A Existing Folsom Interceptor at capacity during PWWF. Required to provide capacity for new development in Folsom. 2 Folsom Blvd road improvements 6/5/ /5/ /8/ /13/2002 Folsom East Section 3 Folsom East 3 Pump Station Laguna Interceptor Extension North Natomas Interceptor C C A C Required to provide service to new development in Folsom East area. Required to provide service to new development in Folsom East area. Required to bring Laguna Interceptor into service and relieve existing deficiencies in Elk Grove trunk system. Required for new development in North Natomas and Metro Air Park areas. Arden Pump Station / Force Main A Existing PWWF exceeds firm capacity of pump station. 1 Rancho Cordova Pump Station (Phase 1) Rancho Cordova Pump Station (Phase 2) Upper Northwest Interceptor Section 1 Upper Northwest Interceptor Section 2 A B C C Pump station does not have firm capacity for Peak Wet Weather Flows Pump station does not have sufficient capacity for ultimate development of the area. Required for new development in North Natomas and Rio Linda and relief of Northeast area. Required for new development in North Natomas and Rio Linda and relief of Northeast area. TABLE Requires peak shaving in Folsom East Interceptor prior to completion of Bradshaw and Folsom East 1B. This project has been combined with Folsom East 3 Pump Station to form a single construction project. Requires peak shaving in Folsom East Interceptor prior to completion of Bradshaw and Folsom East 1B. This project has been combined with Folsom East Section 3 to form a single construction project. 1/3/2000 9/22/2000 9/25/ /29/2002 1/3/2000 9/22/2000 9/25/ /29/ Requires completion of MP2000 2/19/2001 6/21/2002 6/24/2002 8/29/ /3/2002 5/7/2003 5/8/2003 7/14/2004 Requires completion of MP2000 and Arden Capacity Study 1/3/ /6/ /9/2000 4/19/ Currently under design 11/1/ /16/ /17/2001 7/23/ Dependant upon actual flows as monitored at the pump station Available capacity of Dry Creek Interceptor, Natomas and Arden Pump Stations Available capacity of Dry Creek Interceptor, Natomas and Arden Pump Stations. This project has been combined with Upper Northwest Interceptor Section 3 to form a single construction project. 2/5/2018 6/7/2019 6/10/2019 8/14/2020 1/3/2003 2/10/2005 2/11/2005 1/11/ /3/2004 1/11/2007 1/12/2007 6/11/2009 Black & Veatch 1/4/2001

20 Design Construction Improvement Project Category Driver Priority Timing Considerations Start Finish Start Finish Upper Northwest Interceptor Section 3 Upper Northwest Interceptor Section 5 Upper Northwest Interceptor Section 6 C A A Required for new development in North Natomas and Rio Linda and relief of Northeast area. Required for relief of capacity deficient trunks in Northeast area including Mission Trunk. Required for relief of capacity deficient trunks in Northeast area including Mission Trunk Available capacity of Dry Creek Interceptor, Natomas and Arden Pump Stations. This project has been combined with Upper Northwest Interceptor Section 2 to form a single construction project. Requires completion of MP2000. This project has been combined with Upper Northwest Interceptor Section 6 to form a single construction project. Requires completion of MP2000. This project has been combined with Upper Northwest Interceptor Section 5 to form a single construction project. 12/3/2004 1/11/2007 1/12/2007 6/11/2009 2/19/ /8/ /11/2002 1/14/2005 2/19/ /8/ /11/2002 1/14/2005 Dry Creek Relief A Required for relief of Dry Creek Interceptor. 1 Requires completion of Upper Northwest Section 5 & 6 7/8/ /7/ /10/2003 1/14/2005 Upper Northwest Interceptor Section 7 Upper Northwest Interceptor Section 8 Upper Northwest Interceptor Section 9 Lower Northwest Interceptor Section 1 Southport Regional Pump Station Lower Northwest Interceptor Section 2 West Sacramento Collection System Modifications Lower Northwest Interceptor Section 3 Natomas Pump Station A A B B B B Required for relief of capacity deficient trunks in Northeast area including Mission Trunk. Required for relief of capacity deficient trunks in Northeast area including Mission Trunk. Required for relief of future capacity deficiency in Northeast area. Required for relief of Northeast area and for new development in North Natomas. Required for relief of Northeast area and for new development in North Natomas and West Sacramento. Required for relief of Northeast area and for new development in North Natomas. 1 1 Requires completion of Upper Northwest 5 & 6. This project has been combined with Upper Northwest Interceptor Section 8 to form a single construction project. Requires completion of Upper Northwest 5 & 6. This project has been combined with Upper Northwest Interceptor Section 7 to form a single construction project. 6/4/2001 2/21/2003 2/24/2003 4/29/2005 6/4/2001 2/21/2003 2/24/2003 4/29/ Depends on impact of development on trunk capacity 1/3/2007 5/6/2008 5/7/2008 7/14/ Available capacity of Arden Pump Station, Natomas Interceptor, and Mission Trunk. Requires completion of Lower Northwest Design Report Project to be constructed in multiple stages to provide flexibility in the facility's ultimate capacity. Requires completion of Lower Northwest Design Report Available capacity of Arden Pump Station, Natomas Interceptor, and Mission Trunk. Requires completion of Lower Northwest Design Report 4/3/ /23/ /24/2003 2/28/2006 4/7/2003 8/6/2004 8/9/2004 7/7/2006 7/8/2002 3/26/2004 3/29/2004 6/2/2006 C Capacity considerations at West Sacramento Treatment Plant. 1 Requires completion of Lower Northwest Interceptor 7/7/ /5/ /8/2004 1/13/2006 B B Required for relief of Northeast area and for new development in North Natomas. Required for relief of Northeast area and for new development in North Natomas. TABLE CONTINUED SCHEDULING AND PRIORITY LIST 1 1 Available capacity of Arden Pump Station, Natomas Interceptor, and Mission Trunk. Requires completion of Lower Northwest Design Report Limited capacity of existing Natomas Pump Station. Project to be constructed in multiple stages to provide flexibility in the facility's ultimate capacity 10/7/ /12/ /15/2004 1/19/ /5/2000 2/6/2002 2/7/2002 1/7/2004 South Interceptor Section 1 C Required for future development in East Franklin area. 2 Requires construction of Laguna Interceptor Extension 5/7/2007 9/5/2008 9/8/ /13/2009 South Interceptor Section 2 C Required for future development in East Franklin area. 2 10/8/ /13/ /16/ /14/2011 South Interceptor Section 3 C Required for future development in East Franklin area. 2 6/14/ /14/ /17/ /21/2012 Black & Veatch 1/4/2001

21 TABLE CONTINUED SCHEDULING AND PRIORITY LIST Design Construction Improvement Project Category Driver Priority Timing Considerations Start Finish Start Finish Laguna Creek Interceptor Section 1 C Required for future development in Southeast county. 3 Available capacity in Bradshaw 9/7/2009 1/7/2011 1/10/2011 3/16/2012 Laguna Creek Interceptor Section 2 C Required for future development in Southeast county. 3 Available capacity in Bradshaw 3/19/ /6/ /9/2013 2/12/2016 Laguna Creek Interceptor Section 3 C Required for future development in Southeast county. 3 Available capacity in Bradshaw 2/15/ /3/ /6/2017 1/10/2020 Laguna Creek Interceptor Section 4 C Required for future development in Southeast county. 3 Available capacity in Bradshaw 1/13/ /1/ /4/ /8/2023 Laguna Creek Interceptor Section 5 C Required for future development in Southeast county. 3 Available capacity in Bradshaw 1/3/2022 5/5/2023 5/8/2023 7/12/2024 Deer Creek Interceptor Section 1 C Required for future development in Deer Creek basin. 3 1/13/2020 5/14/2021 5/17/2021 7/21/2023 Deer Creek Interceptor Section 2 C Required for future development in Deer Creek basin. 3 7/24/ /22/ /25/2024 1/29/2027 Deer Creek Interceptor Section 3 C Required for future development in Deer Creek basin. 3 2/1/2027 6/2/2028 6/5/2028 8/9/2030 Deer Creek Interceptor Section 4 C Required for future development in Deer Creek basin. 3 8/12/ /12/ /15/2031 2/18/2033 Mather Interceptor Section 1 C Required for new development in Sunrise-Douglas area. 3 Requires completion of Bradshaw 7 7/5/ /5/ /6/2012 1/12/2015 Aerojet Interceptor Section 1 C Required for future development in Aerojet area. 3 7/8/ /7/ /10/2014 1/15/2016 Aerojet Interceptor Section 2 C Required for future development in Aerojet area. 3 1/18/2016 5/19/2017 5/22/2017 7/27/2018 Aerojet Interceptor Section 2S C Required for future development in Aerojet area. 3 1/18/2016 5/19/2017 5/22/2017 7/27/2018 Aerojet Interceptor Section 3 C Required for future development in Aerojet area. 3 9/25/2020 1/27/2022 1/28/2022 4/6/2023 Aerojet Interceptor Section 3S C Required for future development in Aerojet area. 3 4/7/2023 8/8/2024 8/9/ /16/2025 Aerojet Interceptor Section 4 C Required for future development in Aerojet area. 3 Available capacity in Bradshaw 7/16/2029 4/4/2031 4/7/2031 6/10/2033 Rio Linda Interceptor Section 1 C Required for future development in Rio Linda. 3 2/6/2023 6/7/2024 6/10/2024 8/15/2025 Bradshaw Interceptor Section 6BS C Required for future development West of Bradshaw. 3 1/4/2021 5/6/2022 5/9/2022 7/14/2023 Folsom South PS and Force Main C Required for future development in Folsom South area. 3 1/3/2020 5/6/2021 5/7/2021 7/14/2022 Black & Veatch 1/4/2001

22 SRCSD Master Plan 2000 Project Summary Project Name: Bradshaw Interceptor Section 1 & 2 Project ID: BR-1 1 Location: Description of Facility: SRWTP to Franklin Blvd 90 and 120-inch gravity pipeline Length: 6,690 ft. Design Capacity: 206 to 303 mgd Project Justification: Category A: Required for relief of Northeast and Central Interceptors Primary Construction Method: Open Cut Special Considerations: Tunnel beneath railroad and wetlands Base Construction Cost: $5,689,592 Special Structures: $1,765,000 Traffic Control: $56,896 Environmental Mitigation: $20,000 Right-of-Way: - Special Construction/Pipe Jack: $2,778,713 Contingency: $1,031,020 Total Construction Cost $11,341,221 Engineering/Admin/Legal Costs: $2,835,305 Total Capital Cost: $14,176,526 BR-1 10/13/20006:06 PM

23

24 Bradshaw Interceptor- Sections 1, Laguna Creek Railroad Crossing Elevation 5 0 Bradshaw Equalization Structure Franklin Blvd. Transition Structure Existing 90" Dia. RCP Influent Transition Structure 120" 120" 90" Station Bradshaw1-2.xls 10/13/2000

25 SRCSD Master Plan 2000 Project Summary Project Name: Bradshaw Interceptor Section 6A Project ID: BR-6A 2 Location: Description of Facility: Elk Grove-Florin and Gerber Rds to Bradshaw Rd and Elder Creek 108-inch gravity pipeline Length: 14,875 ft. Design Capacity: 215 mgd Project Justification: Category A: Required for relief of Northeast and Central Interceptors Primary Construction Method: Open Cut Special Considerations: Railroad crossing Base Construction Cost: $11,244,678 Special Structures: - Traffic Control: - Environmental Mitigation: $100,000 Right-of-Way: $56,406 Special Construction/Pipe Jack: $158,510 Contingency: $1,733,939 Total Construction Cost $13,293,533 Engineering/Admin/Legal Costs: $3,323,383 Total Capital Cost: $16,616,916 BR-6A 10/13/20006:09 PM

26

27 80 Bradshaw Interceptor- Section 6A Elevation " Bradshaw/Central Junction Structure Gerber Road Railroad Crossing Florin Road Station Bradshaw 6A.xls 10/13/2000

28 SRCSD Master Plan 2000 Project Summary Project Name: Bradshaw Interceptor Section 6B and Jackson Connector Project ID: BR-6B 3 Location: Description of Facility: Bradshaw Rd and Elder Creek Rd to Jackson Hwy 84 and 108-inch gravity pipeline Length: 11,359 ft. Design Capacity: 205 to 215 mgd Project Justification: Category A: Required for relief of Northeast and Central Interceptors Primary Construction Method: Open Cut Special Considerations: Crossing Jackson Hwy Base Construction Cost: $10,689,142 Special Structures: $2,399,616 Traffic Control: $320,674 Environmental Mitigation: $50,000 Right-of-Way: $12,501 Special Construction/Pipe Jack: $162,540 Contingency: $2,045,171 Total Construction Cost $15,679,644 Engineering/Admin/Legal Costs: $3,919,911 Total Capital Cost: $19,599,555 BR-6B 10/13/20006:10 PM

29

30 Bradshaw Interceptor- Section 6B 90 Bradshaw Road Elder Creek Road Morrison Creek Jackson Highway Elevation Bradshaw/Jackson Junction Structure 84" 108" Bradshaw Section 6A Station Bradshaw 6B.xls 10/13/2000

31 SRCSD Master Plan 2000 Project Summary Project Name: Bradshaw Interceptor Section 7 Project ID: BR-7 4 Location: Description of Facility: Bradshaw Rd and Jackson Hwy to International Dr 72 and 84-inch gravity pipeline Length: 26,300 ft. Design Capacity: 93 to 110 mgd Project Justification: Category A: Required for relief of Northeast area and Folsom Interceptor Primary Construction Method: Open Cut Special Considerations: Traffic control for Bradshaw Rd and Kiefer Blvd Base Construction Cost: $19,827,197 Special Structures: $589,782 Traffic Control: $594,816 Environmental Mitigation: $100,000 Right-of-Way: $991,714 Special Construction/Pipe Jack: $78,100 Contingency: $3,327,241 Total Construction Cost $25,508,851 Engineering/Admin/Legal Costs: $6,377,213 Total Capital Cost: $31,886,064 BR-7 10/13/20006:11 PM

32

33 Bradshaw Interceptor- Section Bradshaw Road Keifer Boulevard Happy Lane Old Placerville Road Lower Placerville Road Elevation 60 Bradshaw/Mather Junction Structure Bradshaw/Jackson Junction Structure 84" 72" Station Bradshaw 7.xls 10/13/2000

34 SRCSD Master Plan 2000 Project Summary Project Name: Bradshaw Interceptor Section 8 Project ID: BR-8 5 Location: Description of Facility: International Dr to Folsom Blvd And Citrus Rd 48 and 72-inch gravity pipeline Length: 17,975 ft. Design Capacity: 85 mgd Project Justification: Category A: Required for relief of Northeast area and Folsom Interceptor Primary Construction Method: Open Cut Special Considerations: Traffic control for construction in International Dr, Kilgore Dr, and Folsom Blvd, Crossing Sunrise Blvd and RT tracks Base Construction Cost: $17,296,577 Special Structures: $531,086 Traffic Control: $518,897 Environmental Mitigation: $100,000 Right-of-Way: $533,532 Special Construction/Pipe Jack: $150,960 Contingency: $4,782,763 Total Construction Cost $23,913,815 Engineering/Admin/Legal Costs: $5,978,454 Total Capital Cost: $29,892,269 BR-8 10/13/20006:11 PM

35

36 Bradshaw Interceptor- Section International Drive Kilgore Road Citrus Drive Folsom Boulevard Sunrise Boulevard Railroad Crossing 110 Elevation 100 Folsom/Citrus West Junction Structure Folsom/Citrus East Junction Structure 90 48" 80 72" Station Bradshaw 8.xls 10/13/2000

37 SRCSD Master Plan 2000 Project Summary Project Name: Sunrise Interceptor Section 1 Project ID: SR-1 6 Location: Description of Facility: Folsom Blvd And Citrus Rd to Sunrise Blvd Bridge 48-inch gravity pipeline Length: 8,670 ft. Design Capacity: 23 to 25 mgd Project Justification: Category A: Required for relief of Northeast area trunks Primary Construction Method: Special Considerations: Open Cut Hwy 50 crossing, Traffic control for construction in Sunrise Blvd Base Construction Cost: $5,667,789 Special Structures: $128,961 Traffic Control: $283,389 Environmental Mitigation: $100,000 Right-of-Way: $628,222 Special Construction/Pipe Jack: $117,250 Contingency: $1,731,403 Total Construction Cost $8,657,014 Engineering/Admin/Legal Costs: $2,164,254 Total Capital Cost: $10,821,268 SR-1 10/13/20006:12 PM

38

39 Sunrise Interceptor - Section Citrus Road Sunrise Boulevard 150 Highway 50 Elevation Folsom/Citrus East Junction Structure Coloma Road 48" Vortex Drop Structure Station sunrise1 10/13/2000

40 SRCSD Master Plan 2000 Project Summary Project Name: Sunrise Interceptor Section 2 Project ID: SR-2 7 Location: Description of Facility: Sunrise Blvd Bridge to Pennsylvania Ave and Sunset Ave 36-inch gravity pipeline, 24-inch pressure pipeline Length: 7,871 ft. Design Capacity: 20 to 73 mgd Project Justification: Category A: Required for relief of Northeast area trunks Primary Construction Method: Special Considerations: Open Cut American River Crossing, Traffic control for construction along Sunrise Blvd Base Construction Cost: $4,166,806 Special Structures: $94,962 Traffic Control: $208,340 Environmental Mitigation: $100,000 Right-of-Way: $503,920 Special Construction/Pipe Jack: $880,000 Contingency: $1,488,507 Total Construction Cost $7,442,536 Engineering/Admin/Legal Costs: $1,860,634 Total Capital Cost: $9,303,170 SR-2 10/13/20006:12 PM

41

42 Sunrise Interceptor - Section 2 Pennsylvania Avenue Elevation " 130 Vortex Drop Structure American River 36" Pressure Manhole Microtunneling " Station sunrise2 10/13/2000

43 SRCSD Master Plan 2000 Project Summary Project Name: Folsom East Interceptor Section 1B Project ID: FE-1B 8 Location: Description of Facility: Folsom Blvd And Citrus Rd to Hwy 50 and Folsom South Canal 48-inch gravity pipeline Length: 10,500 ft. Design Capacity: 46 mgd Project Justification: Category A: Existing Folsom Int at capacity during PWWF and required to provide capacity for new devel. in Folsom Primary Construction Method: Open Cut Special Considerations: Traffic control for construction in Folsom Blvd Base Construction Cost: $6,151,582 Special Structures: $397,655 Traffic Control: $307,579 Environmental Mitigation: $50,000 Right-of-Way: $79,358 Special Construction/Pipe Jack: $39,700 Contingency: $1,053,881 Total Construction Cost $8,079,756 Engineering/Admin/Legal Costs: $2,019,939 Total Capital Cost: $10,099,695 FE-1B 10/13/20006:12 PM

44

45 Folsom East Interceptor- Sections 1B 150 Folsom Boulevard Vortex Drop Structure 120 Elevation 110 Folsom/Citrus East Junction Structure 48" " 90 48" Station folsomeast1b 10/13/2000

46 SRCSD Master Plan 2000 Project Summary Project Name: Folsom East Interceptor Section 3 Project ID: FE-3 9 Location: Description of Facility: Folsom Blvd and Iron Point Rd to Iron Point Rd and Oak Ave Pkwy 36 and 42-inch gravity pipeline, 16 and 24-inch force main Length: 15,154 ft. Design Capacity: 23 to 80 mgd Project Justification: Category C: Required to provide service to new development in Folsom East area Primary Construction Method: Open Cut Special Considerations: Traffic Control for construction in Iron Point Rd Base Construction Cost: $7,675,676 Special Structures: $203,114 Traffic Control: $230,270 Environmental Mitigation: $10,000 Right-of-Way: - Special Construction/Pipe Jack: $81,840 Contingency: $1,230,135 Total Construction Cost $9,431,035 Engineering/Admin/Legal Costs: $2,357,759 Total Capital Cost: $11,788,793 FE-3 10/13/20006:12 PM

47

48 Folsom East Interceptor- Section Iron Point Road 350 Elevation Folsom Boulevard FE3 Interceptor Junction Structure 36" 42" Prairie City Road 36" 16" and 24" FM Station folsomeast3 10/13/2000

49 SRCSD Master Plan 2000 Project Summary Project Name: Folsom East Interceptor Section 3 Pump Station Project ID: FE-3PS 10 Location: Iron Point Rd North of Hwy 50 Description of Facility: Length: Design Capacity: New pump station N/A 10 mgd Project Justification: Category C: Required to provide service to new development in Folsom East area Primary Construction Method: Open Cut Special Considerations: Base Construction Cost: $3,019,782 Special Structures: - Traffic Control: $0 Environmental Mitigation: $10,000 Right-of-Way: $213,542 Special Construction/Pipe Jack: - Contingency: $486,499 Total Construction Cost $3,729,822 Engineering/Admin/Legal Costs: $932,456 Total Capital Cost: $4,662,278 FE-3PS 10/13/20006:13 PM

50

51 SRCSD Master Plan 2000 Project Summary Project Name: Laguna Extension Interceptor Section 1 Project ID: LE-1 11 Location: Description of Facility: SRWTP to Franklin Blvd and Dwight Rd 60 and 108-inch gravity pipeline Length: 7,900 ft. Design Capacity: 40 to 400 mgd Project Justification: Category A: Required for relief of trunk sewer in Big Horn Blvd and to bring Laguna Interceptor into service Primary Construction Method: Open Cut Special Considerations: Tunneling under wetlands Base Construction Cost: $4,148,222 Special Structures: $1,510,653 Traffic Control: $0 Environmental Mitigation: $100,000 Right-of-Way: - Special Construction/Pipe Jack: - Contingency: $1,439,719 Total Construction Cost $7,198,594 Engineering/Admin/Legal Costs: $1,799,648 Total Capital Cost: $8,998,242 LE-1 10/13/20006:13 PM

52

53 Laguna Extension Interceptor- Section 1 25 Tunnel " Station Lei-1 10/13/2000 Elevation Connect to Existing Bradshaw Equalization Structure Connect to Existing 60" in Franklin Blvd at MH Laguna Extension Junction Structure 54" South Interceptor 108" 102" Laguna Creek Interceptor

54 SRCSD Master Plan 2000 Project Summary Project Name: North Natomas Interceptor Section 1 Project ID: NN-1 12 Location: Description of Facility: Del Paso Rd at Arco Arena to South of Elkhorn Blvd 36 and 42-inch gravity pipeline Length: 6,700 ft. Design Capacity: 13 to 22 mgd Project Justification: Category C: Required for new development in North Natomas and Metro Air Park areas Primary Construction Method: Open Cut Special Considerations: Base Construction Cost: $2,366,692 Special Structures: - Traffic Control: - Environmental Mitigation: - Right-of-Way: - Special Construction/Pipe Jack: - Contingency: $355,004 Total Construction Cost $2,721,696 Engineering/Admin/Legal Costs: $680,424 Total Capital Cost: $3,402,120 NN-1 10/13/20006:13 PM

55

56 North Natomas Interceptor- Section Elevation " -5 42" -10 Tunnel Construction Station Nni-1 10/13/2000

57 SRCSD Master Plan 2000 Project Summary Project Name: Arden Pump Station Improvements Project ID: ARPS 13 Location: Description of Facility: Length: Design Capacity: Arden Pump Station Site, Howe Ave and Enterprise Dr Upgrade of existing Arden Pump Station N/A 100 mgd +/- to be determined Project Justification: Category A: Existing PWWF exceeds firm capacity of pump station Primary Construction Method: Special Considerations: Specific improvements to be determined, $5,000,000 is a budgetary placeholder. Base Construction Cost: $5,000,000 Special Structures: - Traffic Control: - Environmental Mitigation: - Right-of-Way: - Special Construction/Pipe Jack: - Contingency: $750,000 Total Construction Cost $5,750,000 Engineering/Admin/Legal Costs: $1,437,500 Total Capital Cost: $7,187,500 ARPS 10/13/20006:14 PM

58

59 SRCSD Master Plan 2000 Project Summary Project Name: Rancho Cordova Pump Station Improvements Project ID: RCPS 14 Location: Description of Facility: Length: Design Capacity: Cordova Pump Station Site, Chase Dr Upgrade of existing pump station / construct new PS in future N/A 15 mgd Project Justification: Category A/B: Pump station does not have sufficient firm capacity for existing flows nor ultimate development of the area Primary Construction Method: Special Considerations: Project contains Phase 1 (pump station upgrade) and Phase 2 (construction of new pump station in future) Base Construction Cost: $5,985,091 Special Structures: - Traffic Control: - Environmental Mitigation: - Right-of-Way: - Special Construction/Pipe Jack: - Contingency: $1,496,273 Total Construction Cost $7,481,364 Engineering/Admin/Legal Costs: $1,870,341 Total Capital Cost: $9,351,705 RCPS 1/4/200110:34 AM

60

61 SRCSD Master Plan 2000 Project Summary Project Name: Upper Northwest Interceptor Section 1 Project ID: UNW-1 15 Location: Description of Facility: Natomas Pump Station to Del Paso Blvd 84 and 96-inch gravity pipeline Length: 10,400 ft. Design Capacity: 133 to 150 mgd Project Justification: Category C: Required for future devel. in North Natomas and Rio Linda and relief of Northeast trunks and Dry Creek Int Primary Construction Method: Tunneled Special Considerations: Poor soil conditions and high ground water Base Construction Cost: $20,232,000 Special Structures: - Traffic Control: $0 Environmental Mitigation: $50,000 Right-of-Way: $31,003 Special Construction/Pipe Jack: - Contingency: $3,046,950 Total Construction Cost $23,359,953 Engineering/Admin/Legal Costs: $5,839,988 Total Capital Cost: $29,199,941 UNW-1 10/13/20006:14 PM

62

63 Upper Northwest Interceptor- Section 1 25 East Drainage Canal 15 C1 Canal Del Paso Boulevard 5 Elevation Natomas Pump Station 84" 96" -25 Tunnel Construction Station Unwi-1 10/13/2000

64 SRCSD Master Plan 2000 Project Summary Project Name: Upper Northwest Interceptor Section 2 Project ID: UNW-2 16 Location: Description of Facility: Del Paso Blvd To Elkhorn Blvd 84-inch gravity pipeline Length: 10,652 ft. Design Capacity: 133 mgd Project Justification: Category C: Required for future devel. in North Natomas and Rio Linda and relief of Northeast trunks and Dry Creek Int Primary Construction Method: Tunneled Special Considerations: Poor soil conditions and high ground water Base Construction Cost: $18,203,242 Special Structures: - Traffic Control: - Environmental Mitigation: $50,000 Right-of-Way: $25,565 Special Construction/Pipe Jack: - Contingency: $2,741,821 Total Construction Cost $21,020,628 Engineering/Admin/Legal Costs: $5,255,157 Total Capital Cost: $26,275,785 UNW-2 10/13/20006:15 PM

65

66 Upper Northwest Interceptor- Section 2 East Drainage Canal Elkhorn Boulevard 5 Elevation -5 84" " -25 Tunnel Construction Station Unwi-2 10/13/2000

67 SRCSD Master Plan 2000 Project Summary Project Name: Upper Northwest Interceptor Section 3 Project ID: UNW-3 17 Location: Description of Facility: Elkhorn Blvd to Natomas East Main Drain 84-inch gravity pipeline Length: 6,129 ft. Design Capacity: 133 mgd Project Justification: Category C: Required for future devel. in North Natomas and Rio Linda and relief of Northeast trunks and Dry Creek Int Primary Construction Method: Open Cut Special Considerations: Base Construction Cost: $5,211,230 Special Structures: $758,292 Traffic Control: $52,112 Environmental Mitigation: - Right-of-Way: $2,648 Special Construction/Pipe Jack: - Contingency: $903,642 Total Construction Cost $6,927,924 Engineering/Admin/Legal Costs: $1,731,981 Total Capital Cost: $8,659,905 UNW-3 10/13/20006:15 PM

68

69 Upper Northwest Interceptor- Section 3 45 Elkhorn Boulevard Elevation " 84" Station Unwi-3 10/13/2000

70 SRCSD Master Plan 2000 Project Summary Project Name: Upper Northwest Interceptor Section 4 Project ID: UNW-4 18 Location: Description of Facility: Elkhorn Blvd and NEMDC to Elkhorn Blvd and Cherry Ln 66 and 84-inch gravity pipeline Length: 11,084 ft. Design Capacity: 98 to 133 mgd Project Justification: Category C: Required for future devel. in North Natomas and Rio Linda and relief of Northeast trunks and Dry Creek Int Primary Construction Method: Open Cut Special Considerations: Railroad crossing and traffic control along Elkhorn Blvd Base Construction Cost: $8,326,717 Special Structures: $572,158 Traffic Control: $249,802 Environmental Mitigation: $50,000 Right-of-Way: $554,622 Special Construction/Pipe Jack: $304,780 Contingency: $1,508,712 Total Construction Cost $11,566,790 Engineering/Admin/Legal Costs: $2,891,697 Total Capital Cost: $14,458,487 UNW-4 10/13/20006:15 PM

71

72 Upper Northwest Interceptor- Section 4 70 Elkhorn Boulevard Natomas East Main Drainage Canal Railroad Crossing Rio Linda Boulevard Dry Creek Elevation 30 27" Dry Creek Interceptor Dry Creek Junction Structure 20 Junction Structure 66" " 54" Rio Linda Interceptor Station Unwi-4 10/13/2000

73 SRCSD Master Plan 2000 Project Summary Project Name: Upper Northwest Interceptor Section 5 Project ID: UNW-5 19 Location: Description of Facility: Elkhorn Blvd and Cherry Ln to Elkhorn Blvd and Watt Ave 54 and 66-inch gravity pipeline Length: 19,385 ft. Design Capacity: 69 to 81 mgd Project Justification: Category A: Required for relief of Northeast area Primary Construction Method: Special Considerations: Open Cut Traffic control along Elkhorn Blvd, Watt Ave crossing Base Construction Cost: $13,610,919 Special Structures: $770,299 Traffic Control: $680,546 Environmental Mitigation: - Right-of-Way: $160,272 Special Construction/Pipe Jack: $260,480 Contingency: $2,322,377 Total Construction Cost $17,804,893 Engineering/Admin/Legal Costs: $4,451,223 Total Capital Cost: $22,256,116 UNW-5 10/13/20006:15 PM

74

75 Upper Northwest Interceptor- Section Elkhorn Boulevard 90 28th Street Watt Avenue Elevation Dry Creek Dry Creek Road Dry Creek Relief Junction Structure 54" 42" Dry Creek Relief 40 Junction Structure 66" Junction Structure Station Unwi-5 10/13/2000

SASD 2010 SYSTEM CAPACITY PLAN EXPANSION TRUNK SHEDS BR EAST RANCHO TRUNK SHED 2015 AMENDMENT

SASD 2010 SYSTEM CAPACITY PLAN EXPANSION TRUNK SHEDS BR EAST RANCHO TRUNK SHED 2015 AMENDMENT SASD 2010 SYSTEM CAPACITY PLAN EXPANSION TRUNK SHEDS BR EAST RANCHO TRUNK SHED 2015 AMENDMENT Introduction This amendment summarizes the new near-term and buildout expansion trunk shed plans. Due to recent

More information

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM

Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM This chapter presents the proposed Capital Improvement Program (CIP) for the District based on the findings of this Master Plan. The Master Plan primarily

More information

FINAL REPORT UPDATE SACRAMENTO COUNTY TRANSPORTATION DEVELOPMENT FEE PROGRAM

FINAL REPORT UPDATE SACRAMENTO COUNTY TRANSPORTATION DEVELOPMENT FEE PROGRAM FINAL REPORT UPDATE SACRAMENTO COUNTY TRANSPORTATION DEVELOPMENT FEE PROGRAM Prepared for: SACRAMENTO COUNTY Prepared by: DKS Associates In Association With: November, 2008 (Revised March, 2010) Table

More information

4.5 TRANSPORTATION AND CIRCULATION

4.5 TRANSPORTATION AND CIRCULATION The transportation and circulation section of this Draft EIR describes the existing transportation system in the Planning Area and analyzes the potential impacts associated with the proposed land uses

More information

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA 29 OATES STREET SOUTHPORT BUSINESS, WEST, CA ±1,220 SF MATT LOFRANO Executive Vice President License #0121712 +1 916 63 306 matt.lofrano@colliers.com HANNAH CRANDALL Transaction Manager License #02043170

More information

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA

2980 OATES STREET ±180,220 SF SOUTHPORT BUSINESS PARK, WEST SACRAMENTO, CA 29 OATES STREET SOUTHPORT BUSINESS, WEST, CA ±1,220 SF MATT LOFRANO Executive Vice President License #0121712 +1 916 63 306 matt.lofrano@colliers.com HANNAH CRANDALL Transaction Manager License #02043170

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

noise ContoURs C APPENDIX

noise ContoURs C APPENDIX NOISE CONTOURS APPENDIX C APPENDIX C Table 4.8-4 Noise Levels and Contours ( GP- El Centro Rd Hankview Rd Radio Rd 64.9 65.5 0.6 18 56 178 563 El Centro Rd/W El Camino Rd W Elkhorn Radio Rd I-80 61.4 64.6

More information

Executive Summary May Prepared by:

Executive Summary May Prepared by: Executive Summary May 2012 Prepared by: 1. Purpose In January 2011, the Sacramento Regional Transit District (RT) commissioned Transportation Management and Design, Inc. (TMD) to conduct a Comprehensive

More information

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on

More information

Public Information Centre

Public Information Centre Junction Street Wastewater Pumping Station & Forcemain Schedule B Municipal Class Environmental Assessment Study Public Information Centre June 28, 2017. 6:00 to 8:00 pm. The Burlington Performing Arts

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

Appendix 3 Traffic Technical Memorandum

Appendix 3 Traffic Technical Memorandum Appendix 3 Traffic Technical Memorandum DRAFT TECHNICAL MEMORANDUM Southport Connector Project Traffic Development Comparison of Future Year Model Results Date: September 10, 2015 Project #:11730.030 To:

More information

3 MOBILITY M Roadways. Introduction. Introduction. Background

3 MOBILITY M Roadways. Introduction. Introduction. Background CHAPTER 3: Mobility M-3 3 MOBILITY This Chapter addresses existing transportation systems within the Policy Area, including: roadways, transit services, bicycle facilities, airports, waterways, and railways.

More information

Rosedale Sanitary Sewer Feasibility Review Report

Rosedale Sanitary Sewer Feasibility Review Report Rosedale Sanitary Sewer Feasibility Review Report Submitted by: WEDLER ENGINEERING LLP 201 9300 Nowell Street Chilliwack BC V2P 4V7 Phone: 604 792 0651 Wedler File No: C13 5032/A December 6, 2013 STATEMENT

More information

Pump Station 7 Improvements

Pump Station 7 Improvements Project Business Case ID: C04 2/18/2017 Pump Station 7 Project Purpose: The purpose of this project is to ensure that Pump Station 7 continues to operate in an efficient and effective manner following

More information

Download Alert SacRT on your smartphone!

Download Alert SacRT on your smartphone! Download Alert SacRT on your smartphone! From the home screen, users have two easy options for contacting RT Police Services: The Report an Issue button allows users to send text or photos directly to

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

APPENDIX H. Transportation Impact Study

APPENDIX H. Transportation Impact Study APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Transitways. Chapter 4

Transitways. Chapter 4 4 Transitways Figure 4-1: Hiawatha LRT Train at the Lake Street/Midtown Station The 23 Transportation Policy Plan identifies a network of transitway corridors to be implemented by 23. Transitways recommended

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012 Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012 PLANNING FOR OUR FUTURE Planners with the Mountainland Association of Governments (MAG) have evaluated

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

Rail alignment and benefits (rab) study

Rail alignment and benefits (rab) study Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study June 5, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

Sacramento s SmaRT Ride Microtransit Pilot Project November 13, 2018 Alva Carrasco, Deputy Chief Operating Officer

Sacramento s SmaRT Ride Microtransit Pilot Project November 13, 2018 Alva Carrasco, Deputy Chief Operating Officer Sacramento s SmaRT Ride Microtransit Pilot Project November 13, 2018 Alva Carrasco, Deputy Chief Operating Officer SmaRT Ride Microtransit Project Timeline Simulation Model December 2017 (Complete) Develop

More information

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis High Speed Intercity Passenger Rail Technical Appendix Prepared by HDR August 5, 2010 The Boston South Station HSIPR Expansion Project

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

REQUEST FOR PROPOSALS FOR NFPA 70E ARC FLASH ANALYSIS AND ELECTRICAL SAFETY PROGRAM DEVELOPMENT

REQUEST FOR PROPOSALS FOR NFPA 70E ARC FLASH ANALYSIS AND ELECTRICAL SAFETY PROGRAM DEVELOPMENT REQUEST FOR PROPOSALS FOR NFPA 70E ARC FLASH ANALYSIS AND ELECTRICAL SAFETY PROGRAM DEVELOPMENT SACRAMENTO REGIONAL COUNTY SANITATION DISTRICT OPERATION AND MAINTENANCE DEPARTMENT ELECTRICAL SHOP ISSUE

More information

Alternatives Analysis Findings Report

Alternatives Analysis Findings Report 6.0 This chapter presents estimates of the potential capital, operations and maintenance costs associated with the alternatives carried forward for detailed evaluation. The methodology used to develop

More information

City of St. Pete Beach Model Capacity Report Addendum

City of St. Pete Beach Model Capacity Report Addendum Model Capacity Report - Addendum City of St. Pete Beach Model Capacity Report Addendum Prepared for: City of St. Pete Beach 155 Corey Avenue St. Pete Beach, FL 33706 Prepared By: Kimley-Horn and Associates,

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO

CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO PREPARED FOR: SHEA HOMES 9380 STATION ST., SUITE 600 LONE TREE, CO 80124 PHONE: 303-791-8180 CONTACT: RYAN MCDERMED PREPARED BY:

More information

TRAVEL DEMAND FORECASTS

TRAVEL DEMAND FORECASTS Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information

Recommended Transportation. Capital Improvement Program

Recommended Transportation. Capital Improvement Program Recommended 2018-2022 Transportation Capital Improvement Program 1 Overview 2017 Review 2018-2022 Considerations 2018-2022 Recommended CIP 2 Limited Resources are Directed to the Highest Priority Number

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Operating & Maintenance Cost Results Report

Operating & Maintenance Cost Results Report Operating & Maintenance Cost Results Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates FINAL June

More information

Tax Increment Reinvestment Zone #1 City of Kaufman, Texas

Tax Increment Reinvestment Zone #1 City of Kaufman, Texas Tax Increment Reinvestment Zone #1 City of Kaufman, Texas PRELIMINARY PROJECT AND FINANCING PLAN DECEMBER 2015 Foreword Table of Contents Introduction TIRZ Boundary Current Conditions & Ownership Proposed

More information

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015 Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

AUGUST 2015 UPDATE. City of Nampa Pressure Irrigation CIP (FY ) Fiscal Year Ending September of (In 2014 Dollars)

AUGUST 2015 UPDATE. City of Nampa Pressure Irrigation CIP (FY ) Fiscal Year Ending September of (In 2014 Dollars) City of Nampa Pressure Irrigation CIP (FY2015-2030) AUGUST 2015 UPDATE ID# Project Description Cost (2014 dollars) Asset Zone 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

Introduction. Assumptions. Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer

Introduction. Assumptions. Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer SRF No. 10482 To: From: Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer Date: May 16, 2018 Subject: City of Brooklyn Park Year 2040 Forecasts

More information

Click to edit Master title style

Click to edit Master title style P3s Come In All Shapes And Sizes Mr. Greg Slater, Administrator 7/26/2018 1 1 Customer-Driven Customer First TODAY S DISCUSSION Introduction to MDOT MDOT P3 Experience Full Delivery Stream Restoration

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

PORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting

PORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting PORTS-TO-PLAINS Corridor Planning Stakeholder Workshop - Agenda 1 Purpose of Stakeholder Workshops 3 2 Rural Transportation System Overview 4 3 Ports-to-Plains 8 4 5 6 7 I-27 Expansion Key Considerations

More information

Rail alignment and benefits (rab) study

Rail alignment and benefits (rab) study Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study May 22, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Quarterly Ridership Report Period Ending December 31, Attachment 1

Quarterly Ridership Report Period Ending December 31, Attachment 1 Attachment 1 Attachment 1 Weekday Bus and CBS Routes On-time performance is measured at time points, which are major stops shown on the public schedule (usually 4-6 per route). A bus is considered on-time

More information

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation Capital Improvements Update April 2014: Pl dp j t Planned Projects through 2019 - $ 102,233,755 Available Funding through 2019 $ 149,764,558 pp p,, Un-appropriated - $ 47,530,803 Staff s Recommendation

More information

Wastewater Capacity Evaluation Update. January 7, 2019

Wastewater Capacity Evaluation Update. January 7, 2019 Wastewater Capacity Evaluation Update January 7, 2019 Future Wastewater Needs Decision Factors driving the decision Design-Permitting-Construction timeline Will take ±4 years to deliver a project Raleigh

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON 1. INTRODUCTION This report summarizes traffic impacts of the proposed CUBES Self-Storage Mill Creek project in comparison to the traffic currently

More information

2007 Traffic Impact Mitigation Fee Update Study

2007 Traffic Impact Mitigation Fee Update Study 2007 Traffic Impact Mitigation Fee Update Study Prepared for: Council of San Benito County Governments Prepared by: Hexagon Transportation Consultants Adopted June 21, 2007 MEMORANDUM To: From: Subject:

More information

Investment Property. Rancho. Cordova. Peter Winterling CA RE License #

Investment Property. Rancho. Cordova. Peter Winterling CA RE License # Investment Property Rancho. Cordova Peter Winterling 916-367-6345 pmw@newmarkccarey.com CA RE License #00992375 Offering Summary Offering Price $2,300.000 Occupancy 100% Building Address City 11230 Trade

More information

Section 5. Manhole Inspection Report

Section 5. Manhole Inspection Report Section 5 Inspection Report Ypsilanti Community Utilities Authority Huron River Interceptor I/I Study Inspection Report Technical Memorandum December, 2008 Introduction Several manholes within the Huron

More information

Chapter 7: Corridor Visions

Chapter 7: Corridor Visions Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United

More information

Mountain Area Transportation Study Model Methodology and Assumptions Final

Mountain Area Transportation Study Model Methodology and Assumptions Final Model Methodology and Assumptions Final February 19, 2017 Submitted to: 17J17-1768.17 Prepared by Iteris, Inc. Innovating Through Informatics TABLE OF CONTENTS 1.0 OVERVIEW... 1 1.1 Project Objective and

More information

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit The Jack A. Markell Trail Delaware s Bicycle Highway 2018 New England Bike- Walk Summit The Jack A. Markell Trail Sometimes a very difficult project, including significant investment and perseverance,

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Major Widening/New Roadway

Major Widening/New Roadway Revised Evaluation s Major Widening/New Roadway This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds Committee meeting. The information

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

Chapter 5 Condition and Needs Assessment

Chapter 5 Condition and Needs Assessment Chapter 5 Condition and Needs Assessment Chapter Outline This chapter is organized into the following sections: Introduction Pumping Station Priority Rankings Pumping Station Rating Criteria Pumping Station

More information

MetroExpress Improvements

MetroExpress Improvements Improvements Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail Commuters Connectors Circulators Project

More information

The Run Ozaukee 2018

The Run Ozaukee 2018 Fs t A n n u a l 2 1 8 Rules Race Guide The course is open, unmarked, and unsupported o The course is the Interurban Trail, follow Interurban Trail signage o Runners are responsible for own safety and

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

Proposed Project I 35 Improvements from SH 195 to I 10

Proposed Project I 35 Improvements from SH 195 to I 10 I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

FINAL UTILITY REPORT Eastcreek Farm Thornton, CO

FINAL UTILITY REPORT Eastcreek Farm Thornton, CO FINAL UTILITY REPORT Eastcreek Farm Thornton, CO October 14, 2016 JN: 13049 Prepared for: York 80, LLC 12460 1 st Street Eastelake, CO 80614 P: 303.457.2966 Prepared by: Jansen Strawn Consulting Engineers

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Attachment C: Benefit-Cost Analysis Spreadsheet

Attachment C: Benefit-Cost Analysis Spreadsheet Attachment C: Benefit-Cost Analysis Spreadsheet TIGER VII Application Collier Blvd. Corridor Improvements June 5 th, 2015 Collier Blvd BCA Summary The Collier Boulevard Benefit Cost Analysis (BCA) has

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia

More information

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director Western ND Meeting February 19, 2014 Grant Levi, NDDOT Director 1 Traffic Trends in North Dakota 2 Truck Traffic 2008 3 Truck Traffic 2012 4 Average Daily Traffic 5 ND Vehicle Miles Traveled Statewide

More information

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component

More information

P3 PROJECT PIPELINE: STATUS - AUGUST 2016

P3 PROJECT PIPELINE: STATUS - AUGUST 2016 FLAGSTAFF FACILITY Swap of current ADOT facilities in Flagstaff for new space in a repurposed Harkins theatre. Construction work on new ADOT facility will begin in fall. Expected move-in date for ADOT

More information