1 Feasibility Report nd Avenue South Improvements Sauk Rapids, Minnesota SEH No. SAUKR September 12, 2016

2 This Page Left Blank Intentionally

3 September 12, 2016 RE: Sauk Rapids, Minnesota nd Avenue South Improvements SEH No. SAUKR Honorable Mayor and City Council c/o Mr. Ross Olson Administrator City of Sauk Rapids 250 Summit Avenue North Sauk Rapids, MN Dear Mayor and Members of the City Council: Enclosed is the Feasibility Report for the above referenced improvement. It includes recommendations, probable costs, and proposed assessments. Please contact me if you have any questions. Sincerely, Jon Halter, PE City Engineer djg P:\PT\S\SAUKR\138208\4-prelim-dsgn-rpts\feasibility report docx Engineers Architects Planners Scientists Short Elliott Hendrickson Inc., th Avenue South, P.O. Box 1717, St. Cloud, MN SEH is 100% employee-owned sehinc.com fax

4 This Page Left Blank Intentionally

5 2017 2nd Avenue South Improvements Feasibility Report Sauk Rapids, Minnesota SEH No. SAUKR September 12, 2016 I hereby certify that this report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Jon Halter, PE Date: 09/12/16 Lic. No.: Reviewed by: 09/12/16 Terrance S. Wotzka, PE Date Short Elliott Hendrickson Inc th Avenue South P.O. Box 1717 St. Cloud, MN

6 This Page Left Blank Intentionally

7 Letter of Transmittal Certification Page Table of Contents Table of Contents Page 1.0 Introduction Feasibility and Recommendations Project Improvements Street Storm Sewer Sanitary Sewer Water Main Streetscaping Decorative Street Lighting Opinion of Probable Cost Financial Considerations Street Curb and Gutter Streetscaping Lighting Storm Sewer Sanitary Sewer Water Main Sewer and Water Connection Charges Financial Summary... 7 List of Tables Table 1 Summary of Cost... 4 Figure 1 Project Location Map Figure 2 Sanitary Sewer and Water Main Figure 3 Street and Storm Sewer Figure 4 Typical Sections List of Figures Appendix A Appendix B List of Appendices Opinion of Probable Cost Preliminary Assessment Map and Worksheet SEH is a registered trademark of Short Elliott Hendrickson Inc nd Avenue South Improvements SAUKR Feasibility Report Page i

8 This Page Left Blank Intentionally

9 September 2016 Feasibility Report nd Avenue South Improvements Prepared for City of Foley, Minnesota 1.0 Introduction As authorized by the City Council, this Feasibility Report was prepared for improvements to 2 nd Avenue South as well as several side streets in the project area (see Figure 1). The improvements include installation of streets, water main, sanitary sewer, storm sewer, sidewalks, streetscaping aspects, and street lighting improvements. This report contains cost estimates and design recommendations for construction of streets, storm sewer, water main, and sanitary sewer improvements. This report has been developed based on preliminary field observations and discussions with City staff. 2.0 Feasibility and Recommendations The project, as presented in this report, is both cost effective and feasible from an engineering standpoint. The estimated project costs are presented to assist the City in deciding the feasibility of the project from a monetary standpoint. The improvements are necessary to replace deteriorating streets and utilities in the area. Based on information presented in this report, we make the following recommendations: 1. Construct utility, street, and drainage improvements as recommended herein. 2. Easements should be dedicated or retained as determined by the final project design. 3. Soil borings should be taken throughout project limits to determine subsurface conditions, such as the presence of high bedrock, soil types, and water table elevations. Final design would be subject to results of the geotechnical evaluation. 3.0 Project Improvements 3.1 Street 2 nd Avenue South: The proposed street improvements are shown in Figure 3. 2 nd Avenue will be reconstructed as a 46-foot wide urban section roadway. Both sides of the road will include 8-foot boulevards with 6-foot concrete sidewalks. The proposed structural section for 2 nd Avenue includes 12-inches of Class 5 aggregate base, 4.5-inches of bituminous, and geotextile fabric (see Figure 4). This section is typical for roads in the area of similar function. SAUKR Page 1

10 1 st Street South: The proposed street improvements are shown in Figure 3. 1 st Street South will be reconstructed as an urban section roadway that varies from 40-feet to 54-feet wide. Both sides of the road will include 6-foot concrete sidewalks installed behind the curb and gutter. The proposed structural section for 1 st Street South includes 12-inches of Class 5 aggregate base, 4.5-inches of bituminous, and geotextile fabric (see Figure 4). This section is typical for roads in the area of similar function. Side Streets (2 nd, 3 rd, and 4 th Street): The proposed street improvements are shown in Figure 3. The side streets will be reconstructed as a 32-foot wide urban section roadways. Proposed 6-foot concrete sidewalks for the side streets are shown on Figure 3. The proposed structural section for the side streets includes 8-inches of Class 5 aggregate base, 3.5-inches of bituminous, and geotextile fabric (see Figure 4). This section is typical for roads in the area of similar function. 6 th Street South: The proposed street improvements are shown in Figure 3. 6 th Street South will be reconstructed as a 30-foot wide urban section roadway. The proposed structural section for the side streets includes 8-inches of Class 5 aggregate base, 3.5-inches of bituminous, and geotextile fabric (see Figure 4). This section is typical for roads in the area of similar function. 3.2 Storm Sewer The proposed storm sewer improvements are shown in Figure 3. Concrete storm sewer pipes and catch basins are proposed throughout the project area. The storm sewer will connect to existing storm sewer systems near Benton Drive at 1 st Street South, 3 rd Street South, and 4 th Street South. There will also be a connection to the existing storm sewer at the northeast side of the Coborns parking lot at 2 nd Street South. Stormwater treatment is proposed to be provided by an underground storage chamber system. The chamber system will provide sedimentation, rate control, and volume control. The exact location and size of the chamber system will be determined during the design process; as the groundwater and bedrock information gathered will dictate how the chamber system is designed. Bedrock concerns have been raised in this area related to installation of the storm sewer mains. More information on the bedrock conditions will be known after soil borings and a geotechnical report is completed during the design phase. It is assumed 100 cubic yards of rock excavation will be needed to install the storm sewer. 3.3 Sanitary Sewer The proposed sanitary sewer improvements are shown in Figure 2. The existing gravity sanitary sewers on 2 nd Avenue South and 3 rd Street South will be replaced with PVC gravity sanitary sewers to match the existing sizes. In order to eliminate a long private services on 3 rd Street South and 6 th Avenue South, new gravity sanitary sewer mains are proposed to be extended into these areas. Slip lining the existing gravity main under 1 st Street South and the alley between Benton Drive and 2 nd Avenue is included in the project improvements nd Avenue South Improvements SAUKR Feasibility Report Page 2

11 Bedrock concerns have been raised in this area related to installation of the gravity sanitary sewer mains. More information on the bedrock conditions will be known after soil borings and a geotechnical report is completed during the design phase. It is assumed 250 cubic yards of rock excavation will be needed to install the sanitary sewer. Sewer services will be constructed from the sewer main to the property line (or as close to the building face as possible). Commercial services will be constructed of 6-inch diameter PVC pipe. Single-family residential sewer services will be constructed of 4-inch diameter PVC pipe. 3.4 Water Main The proposed water main improvements are shown in Figure 2. The existing water mains on 2 nd Avenue South, and 3 rd Street South will be replaced with 8-inch ductile iron water mains. Existing undersized water mains on 2 nd Avenue South from 3 rd Street South to 4 th Street South will be replaced and upsized to 8 ductile iron mains. In order to eliminate a long private services on 3 rd Street South and 6 th Avenue South, new 8- inch ductile iron water mains are proposed to be extended into these areas. Bedrock concerns have been raised in this area related to installation of the water mains. More information on the bedrock conditions will be known after soil borings and a geotechnical report is completed during the design phase. It is assumed 200 cubic yards of rock excavation will be needed to install the water main. Water services will be constructed from the water main to the property line (or as close to the building face as possible). Commercial water services will be 6-inch diameter ductile iron pipe. Single-family residential water services will be 1-inch diameter copper pipe, which is standard for most single-family water services. 3.5 Streetscaping Streetscaping improvements are proposed for 1 st Street South. The proposed improvements will include concrete sidewalks, paver accents, and boulevard trees. 2 nd Avenue South and the side streets will also include boulevard trees in areas where there is not utility conflicts or existing tree coverage. 3.6 Decorative Street Lighting Decorative lighting will be included for 1 st Street South and 2 nd Avenue South, and will be similar to the lighting installed as a part of the nd Avenue Improvements project. 4.0 Opinion of Probable Cost Itemized breakdowns of probable cost are presented in Appendix B. The breakdowns are presented to provide insight into the cost of various items of the total project. Total project costs are summarized in Table nd Avenue South Improvements SAUKR Feasibility Report Page 3

12 2 nd Avenue South & 1 st Street South Table 1 Summary of Cost Side Streets (2 nd Street S., 3 rd Street S., 4th Street S., and 6 th Street S.) Total Project Cost Construction $1,545,705 $574,011 $2,119,716 Contingency $154,570 $57,401 $211,971 Engineering $278,227 $103,322 $381,549 Legal and Admin $15,457 $5,740 $21,197 Financing $92,742 $34,441 $127,183 Total $2,086,701 $774,915 $2,861, Financial Considerations The proposed project presented is a street and utility reconstruction. Generally, these types of improvements are financed through special assessments to benefiting properties in the project area. The City must ultimately decide the method of financing and the time when City fees and charges will be collected. The following breakdowns are provided to assist the City in determining what portion of the total project cost the City may be responsible for. These figures are estimates and final figures would be determined by City staff at the completion of the project. 5.1 Street In conformance with current City assessment policy for street reconstruction, it is assumed all lots adjacent to the roadway being reconstructed will be assessed 25 percent of the street cost. The City and State Aid would pay the remaining street costs. 46- to 54-Foot Wide Street Assessments: For this report, it is assumed 25 percent of the street costs will be assessed to benefiting properties for properties fronting 1 st Street South and 2 nd Avenue South. The remaining 75 percent of the costs are assumed to be a State Aid cost. 30- to 32-Feet Wide Street Assessments: For this report, it is assumed 25 percent of the street costs will be assessed to benefiting properties for properties fronting 2 nd Street South, 3 rd Street South, 4 th Street South, and 6 th Street South. The remaining 75 percent of the costs are assumed to be a City cost. 2 nd Avenue South & 1 st Street South Side Streets (2 nd Street S., 3 rd Street S., 4th Street S., & 6 th Street S.) Total Estimated Total Cost $930,529 $418,688 $1,349,217 Estimated Assessment $232,632 $104,672 $337,304 Estimated State Aid $930,529 $0 $930,529 Estimated City Cost ($232,632) $314,016 $81, nd Avenue South Improvements SAUKR Feasibility Report Page 4

13 5.2 Curb and Gutter In conformance with current City assessment policy for street reconstruction, it is assumed all lots adjacent to the roadway being reconstructed will be assessed 25 percent of the curb and gutter cost. The City would pay the remaining curb and gutter costs. 2 nd Avenue South & 1 st Street South Side Streets (2 nd Street S., 3 rd Street S., 4th Street S., & 6 th Street S.) Total Estimated Total Cost $52,909 $43,367 $96,276 Estimated Assessment $17,591 $6,478 $24,069 Estimated State Aid $52,909 $0 $52,909 Estimated City Cost ($17,591) $36,889 $19, Streetscaping Streetscaping aspects have only been included on the 1 st Street South portion of the project. Boulevard trees are included for the remaining portions of the project, but are not considered streetscaping for this report, and associated costs are included in the street portion of the project. For this report, it is assumed 50 percent of streetscaping costs will be assessed to benefiting properties. The remaining 50 percent of the costs are assumed to be paid for with sales tax revenue. 2 nd Avenue South & 1 st Street South Side Streets (2 nd Street S., 3 rd Street S., 4th Street S., & 6 th Street S.) Total Estimated Total Cost $28,644 $0 $28,644 Estimated Assessment $14,322 $0 $14,322 Estimated State Aid $14,322 $0 $14,322 Estimated City Cost $0 $0 $0 5.4 Lighting Street lighting is proposed only for 1 st Street South and 2 nd Avenue South. For this report, it is assumed 50 percent of the lighting costs will be assessed to benefiting properties. The remaining 50 percent of the costs are assumed to be paid for with sales tax revenue. 2 nd Avenue South & 1 st Street South Side Streets (2 nd Street S., 3 rd Street S., 4th Street S., & 6 th Street S.) Total Estimated Total Cost $328,050 $0 $328,050 Estimated Assessment $164,025 $0 $164,025 Estimated State Aid $328,050 $0 $328,050 Estimated City Cost ($164,025) $0 ($164,025) nd Avenue South Improvements SAUKR Feasibility Report Page 5

14 5.5 Storm Sewer Current City drainage assessment policy for reconstruction is $0.22 per square foot (SF) of property. For properties included in the storm sewer assessment area, the entire parcel will be assessed for the storm sewer improvements. Property previously assessed for storm sewer improvements will not be included in the storm sewer assessment for this project. It is assumed 60 percent of the storm sewer costs will be state aid eligible. 2 nd Avenue South & 1 st Street South Side Streets (2 nd Street S., 3 rd Street S., 4th Street S., & 6 th Street S.) Total Estimated Total Cost $346,132 $66,825 $412,957 Estimated Assessment $80,819 $51,428 $132,247 Estimated State Aid $207,679 $0 $207,679 Estimated City Cost $57,634 $15,397 $73, Sanitary Sewer Current City policy is to not assess for sanitary sewer mains or services. The City is assumed responsible for all of the sanitary sewer costs for this project. 2 nd Avenue South & 1 st Street South Side Streets (2 nd Street S., 3 rd Street S., 4th Street S., & 6 th Street S.) Total Estimated Total Cost $199,363 $120,766 $320,129 Estimated Assessment $0 $0 $0 Estimated State Aid $0 $0 $0 Estimated City Cost $199,363 $120,766 $320, Water Main Current City policy is to not assess for water mains or services. The City is assumed responsible for all of the water main costs for this project. 2 nd Avenue South & 1 st Street South Side Streets (2 nd Street S., 3 rd Street S., 4th Street S., & 6 th Street S.) Total Estimated Total Cost $201,074 $125,269 $326,343 Estimated Assessment $0 $0 $0 Estimated State Aid $0 $0 $0 Estimated City Cost $201,074 $125,269 $326, Sewer and Water Connection Charges At the time properties make a new connection to the utilities or the property usage changes; sewer access (SAC) and water access (WAC) charges will be levied. Commercial SAC and WAC rates are to be determined by the City Engineer and approved by the City Council, based upon a review of the estimated use. The single-family residential (R-1) and the multi-family residential (R-2, R-3) 2017 WAC charge is $1,900 per connection. The single-family residential (R-1) and the multi-family residential (R-2, R-3) 2017 SAC charge is $1,900 per connection. These revenues may be nd Avenue South Improvements SAUKR Feasibility Report Page 6

15 used to pay for capital costs associated with construction of water and wastewater treatment facilities, wells, water storage facilities, generators, and lift station replacements. 5.9 Financial Summary In summary, the totals are as follows: 2 nd Avenue South & 1 st Street South Side Streets (2 nd Street S., 3 rd Street S., 4th Street S., & 6 th Street S.) Total Estimated Total Cost $2,086,701 $774,915 $2,861,616 Estimated Assessment $509,389 $162,578 $671,967 Estimated State Aid $1,533,489 $0 $1,533,489 Estimated City Cost $43,823 $612,337 $656, nd Avenue South Improvements SAUKR Feasibility Report Page 7

16 This Page Left Blank Intentionally

17 List of Figures Figure 1 Project Location Map Figure 2 Sanitary Sewer and Water Main Figure 3 Street and Storm Sewer Figure 4 Typical Sections

18 This Page Left Blank Intentionally

19

20 This Page Left Blank Intentionally

21

22 This Page Left Blank Intentionally

23

24 This Page Left Blank Intentionally

25

26 This Page Left Blank Intentionally

27 Appendix A Opinion of Probable Cost

28 This Page Left Blank Intentionally

29 2017 2ND AVENUE IMPROVEMENTS 9/8/2016 FEASIBILITY STUDY SAUK RAPIDS, MN SEH NO. A-SAUKR OPINION OF PROBABLE COST 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET S., & 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET TOTAL PROJECT ITEM UNIT OF APPROXIMATE APPROXIMATE NO. ITEM DESCRIPTION MEASUREMENT QUANTITY QUANTITY UNIT PRICE AMOUNT AMOUNT AMOUNT STREET 1 MOBILIZATION LUMP SUM $50, $38, $11, $50, TRAFFIC CONTROL LUMP SUM $15, $11, $3, $15, SAWCUT BITUMINOUS PAVEMENT LIN FT 1, $3.00 $3, $1, $5, SAWCUT CONCRETE PAVEMENT LIN FT $5.00 $1, $1, $3, REMOVE BITUMINOUS PAVEMENT SQ YD 8, , $2.00 $17, $8, $26, REMOVE CONCRETE PAVEMENT SQ YD $4.00 $2, $2, $4, REMOVE CONCRETE SIDEWALK SQ YD 2, $2.50 $5, $ $6, REMOVE CONCRETE CURB & GUTTER LIN FT 3, , $3.00 $9, $8, $17, RESTORE STREETSCAPING SQ YD $ $10, $0.00 $10, REMOVE SANITARY MANHOLE EACH $ $0.00 $2, $2, REMOVE RC STORM SEWER PIPE LIN FT 1, $7.00 $7, $0.00 $7, REMOVE DRAINAGE STRUCTURE EACH $ $9, $0.00 $9, SALVAGE & REINSTALL IRRIGATION HEAD EACH $ $1, $ $1, REMOVE GATE VALVE & BOX EACH $ $0.00 $2, $2, SALVAGE HYDRANT & DELIVER TO CITY EACH $ $0.00 $1, $1, REMOVE WATER MAIN LIN FT , $3.00 $0.00 $6, $6, CLEAR & GRUB TREE $ $1, $1, $2, CLEAR & GRUB SHRUBS LUMP SUM $1, $ $ $1, PRIVATE UTILITY TRENCHING LIN FT $10.00 $1, $1, $2, COMMON EXCAVATION (PQ) CU YD 4, , $8.00 $38, $13, $51, AGGREGATE BASE CL 5 (CV) 100% CRUSHED QUARRY ROCK CU YD 3, , $28.00 $88, $31, $120, SUBGRADE EXCAVATION CU YD 1, $5.00 $7, $4, $12, AGGREGATE BASE CL 5 (LV) CU YD 2, , $20.00 $42, $22, $65, GEOTEXTILE FABRIC TYPE 5 SQ YD 9, , $2.00 $19, $10, $29, TYPE WEARING COURSE MIXTURE TON $70.00 $53, $26, $79, TYPE NON-WEARING COURSE MIXTURE TON 1, $68.00 $103, $34, $137, BITUMINOUS MATERIAL FOR TACK COAT GAL $3.50 $2, $ $3, B618 CONCRETE CURB & GUTTER LIN FT 3, , $12.00 $39, $32, $71, " CONCRETE WALK SQ FT 14, , $3.50 $50, $29, $79, PEDESTRIAN RAMP W/ TRUNCATED DOMES EACH $1, $14, $4, $18, RESIDENTIAL CONCRETE DRIVEWAY RESTORATION SQ YD $40.00 $5, $12, $17, COMMERCIAL CONCRETE DRIVEWAY RESTORATION SQ YD $50.00 $23, $17, $40, COMMERCIAL BITUMINOUS DRIVEWAY RESTORATION SQ YD $35.00 $15, $11, $27, SIGNING LUMP SUM $10, $7, $2, $10, " DOUBLE SOLID LINE YELLOW - PAINT LIN FT 1, $0.40 $ $0.00 $ " SOLID LINE WHITE - PAINT LIN FT 2, $0.25 $ $0.00 $ " STOP LINE WHITE - PAINT LIN FT $3.00 $ $96.00 $ ZEBRA CROSSWALK WHITE - PAINT SQ FT 1, $3.00 $3, $ $3, PAVEMENT MESSAGE - PAINT EACH $ $3, $0.00 $3, " DOUBLE SOLID LINE YELLOW - EPOXY LIN FT 1, $1.30 $2, $0.00 $2, " SOLID LINE WHITE - EPOXY LIN FT 2, $0.75 $2, $0.00 $2, " STOP LINE WHITE - EPOXY LIN FT $10.00 $2, $ $2, ZEBRA CROSSWALK WHITE - EPOXY SQ FT 1, $5.00 $5, $ $6, PAVEMENT MESSAGE - EPOXY EACH $ $6, $0.00 $6, SEEDING LUMP SUM $15, $11, $3, $15, TOPSOIL BORROW CU YD $15.00 $11, $11, $22, DECIDUOUS TREE (2.5" B&B) EACH $ $22, $11, $33, TREE GRATE EACH $1, $9, $0.00 $9, SILT FENCE, TYPE PRE-ASSEMBLED LIN FT $4.00 $ $ $ INLET PROTECTION EACH $ $8, $0.00 $8, ROCK CONSTRUCTION ENTRANCE EACH $ $4, $4, $8, PICK-UP STREET SWEEPER HR $ $ $ $1, SUBTOTAL STREET CONSTRUCTION $728, $342, $1,070, CONTINGENCY $72, $34, $107, ENGINEERING $131, $61, $192, LEGAL & ADMIN $7, $3, $10, FINANCING $43, $20, $64, TOTAL STREET $983, $462, $1,445, /8/2016

30 2017 2ND AVENUE IMPROVEMENTS 9/8/2016 FEASIBILITY STUDY SAUK RAPIDS, MN SEH NO. A-SAUKR OPINION OF PROBABLE COST 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET S., & 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET TOTAL PROJECT ITEM UNIT OF APPROXIMATE APPROXIMATE NO. ITEM DESCRIPTION MEASUREMENT QUANTITY QUANTITY UNIT PRICE AMOUNT AMOUNT AMOUNT STREETSCAPING 53 4" CONCRETE WALK SQ FT 4, $4.00 $16, $0.00 $16, CONCRETE PAVERS SQ FT $15.00 $2, $0.00 $2, DECIDUOUS TREE (2.5" B&B) EACH $ $2, $0.00 $2, SUBTOTAL STREETSCAPING $21, $0.00 $21, CONTINGENCY $2, $0.00 $2, ENGINEERING $3, $0.00 $3, LEGAL & ADMIN $ $0.00 $ FINANCING $1, $0.00 $1, TOTAL STREETSCAPING $28, $0.00 $28, /8/2016

31 2017 2ND AVENUE IMPROVEMENTS 9/8/2016 FEASIBILITY STUDY SAUK RAPIDS, MN SEH NO. A-SAUKR OPINION OF PROBABLE COST 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET S., & 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET TOTAL PROJECT ITEM UNIT OF APPROXIMATE APPROXIMATE NO. ITEM DESCRIPTION MEASUREMENT QUANTITY QUANTITY UNIT PRICE AMOUNT AMOUNT AMOUNT LIGHTING 56 STREET LIGHTING POLE $9, $243, $0.00 $243, SUBTOTAL LIGHTING $243, $0.00 $243, CONTINGENCY $24, $0.00 $24, ENGINEERING $43, $0.00 $43, LEGAL & ADMIN $2, $0.00 $2, FINANCING $14, $0.00 $14, TOTAL LIGHTING $328, $0.00 $328, /8/2016

32 2017 2ND AVENUE IMPROVEMENTS 9/8/2016 FEASIBILITY STUDY SAUK RAPIDS, MN SEH NO. A-SAUKR OPINION OF PROBABLE COST 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET S., & 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET TOTAL PROJECT ITEM UNIT OF APPROXIMATE APPROXIMATE NO. ITEM DESCRIPTION MEASUREMENT QUANTITY QUANTITY UNIT PRICE AMOUNT AMOUNT AMOUNT STORM SEWER 57 CONNECT TO EXISTING STORM SEWER EACH $1, $5, $0.00 $5, ROCK EXCAVATION CU YD $ $20, $0.00 $20, " RCP, CL V 3006 LIN FT $28.00 $6, $0.00 $6, " RCP, CL V 3006 LIN FT $30.00 $7, $0.00 $7, " RCP, CL III 3006 LIN FT $34.00 $19, $0.00 $19, "X73" RCP-A LIN FT $ $11, $0.00 $11, JET CLEAN STORM SEWER LIN FT 1, $2.00 $2, $0.00 $2, DRAINAGE STRUCTURE, DESIGN H EACH $1, $14, $0.00 $14, DRAINAGE STRUCTURE 4020 (48") EACH $2, $42, $0.00 $42, DRAINAGE STRUCTURE 4020 (60") EACH $3, $3, $0.00 $3, DRAINAGE STRUCTURE 4020 SPECIAL EACH $15, $15, $0.00 $15, CASTING SEAL EACH $ $7, $0.00 $7, UNDERGROUND STORAGE CHAMBER SYSTEM LUMP SUM $150, $100, $49, $150, SUBTOTAL STORM SEWER CONSTRUCTION $256, $49, $305, CONTINGENCY $25, $4, $30, ENGINEERING $46, $8, $55, LEGAL & ADMIN $2, $ $3, FINANCING $15, $2, $18, TOTAL STORM SEWER $346, $66, $412, /8/2016

33 2017 2ND AVENUE IMPROVEMENTS 9/8/2016 FEASIBILITY STUDY SAUK RAPIDS, MN SEH NO. A-SAUKR OPINION OF PROBABLE COST 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET S., & 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET TOTAL PROJECT ITEM UNIT OF APPROXIMATE APPROXIMATE NO. ITEM DESCRIPTION MEASUREMENT QUANTITY QUANTITY UNIT PRICE AMOUNT AMOUNT AMOUNT WATER MAIN 69 CONNECT TO EXISTING WATER MAIN EACH $1, $4, $3, $7, ROCK EXCAVATION CU YD $ $10, $30, $40, TEMPORARY WATER SERVICE LUMP SUM $10, $6, $4, $10, HYDRANT EACH $3, $10, $3, $14, " GATE VALVE AND BOX EACH $1, $10, $5, $16, " GATE VALVE AND BOX EACH $1, $27, $3, $30, " WATER MAIN - DUCTILE IRON CL 52 LIN FT 1, $32.00 $40, $29, $70, " WATER MAIN - DUCTILE IRON CL 52 LIN FT $26.00 $19, $1, $21, FITTINGS POUND 1, $7.00 $10, $ $11, " CORPORATION EACH $ $0.00 $2, $2, " CURB STOP EACH $ $0.00 $2, $2, " COPPER WATER SERVICE LIN FT $18.00 $0.00 $4, $4, " PLUG WITH 1" CORP EACH $ $4, $ $4, CONNECT TO EXISTING WATER SERVICE EACH $ $3, $2, $6, " INSULATION SQ YD $20.00 $ $0.00 $ SUBTOTAL WATER MAIN CONSTRUCTION $148, $92, $241, CONTINGENCY $14, $9, $24, ENGINEERING $26, $16, $43, LEGAL & ADMIN $1, $ $2, FINANCING $8, $5, $14, TOTAL WATER MAIN $201, $125, $326, /8/2016

34 2017 2ND AVENUE IMPROVEMENTS 9/8/2016 FEASIBILITY STUDY SAUK RAPIDS, MN SEH NO. A-SAUKR OPINION OF PROBABLE COST 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET S., & 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET TOTAL PROJECT ITEM UNIT OF APPROXIMATE APPROXIMATE NO. ITEM DESCRIPTION MEASUREMENT QUANTITY QUANTITY UNIT PRICE AMOUNT AMOUNT AMOUNT SANITARY SEWER 84 ROCK EXCAVATION CU YD $ $15, $35, $50, CONNECT TO EXISTING SANITARY SEWER EACH $1, $5, $2, $7, " PVC SANITARY SEWER (SDR 35) LIN FT $32.00 $28, $18, $47, " PVC SANITARY SEWER (SDR 35) LIN FT $35.00 $0.00 $7, $7, " PVC SANITARY SEWER (SDR 35) LIN FT $40.00 $16, $0.00 $16, SANITARY SEWER MANHOLE (0-8 FT) EACH $2, $16, $8, $24, EXCESS MANHOLE DEPTH LIN FT $ $4, $2, $7, COARSE FILTER AGGREGATE (CV) CU YD $20.00 $5, $3, $9, " X 6" PVC SERVICE WYE (SDR 26) EACH $ $2, $0.00 $2, " X 6" PVC SERVICE WYE (SDR 26) EACH $ $2, $0.00 $2, " X 4" PVC SERVICE WYE (SDR 26) EACH $ $0.00 $2, $2, " PVC SERVICE PIPE (SDR 26) LIN FT $20.00 $10, $0.00 $10, " PVC SERVICE PIPE (SDR 26) LIN FT $18.00 $0.00 $4, $4, CONNECT TO EXISTING SERVICE EACH $ $3, $2, $5, " SANITARY SEWER PIPE LINER LIN FT $40.00 $29, $0.00 $29, CORE SERVICE LINE EACH $ $ $0.00 $ CLEAN AND TELEVISE SANITARY SEWER LIN FT 1, $3.00 $3, $2, $6, CASTING SEAL EACH $ $1, $ $2, " INSULATION SQ YD $20.00 $ $ $ SUBTOTAL SANITARY SEWER CONSTRUCTION $147, $89, $237, CONTINGENCY $14, $8, $23, ENGINEERING $26, $16, $42, LEGAL & ADMIN $1, $ $2, FINANCING $8, $5, $14, TOTAL SANITARY SEWER $199, $120, $320, /8/2016

35 2017 2ND AVENUE IMPROVEMENTS 9/8/2016 FEASIBILITY STUDY SAUK RAPIDS, MN SEH NO. A-SAUKR ITEM NO. SUMMARY ITEM DESCRIPTION OPINION OF PROBABLE COST UNIT OF MEASUREMENT 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE APPROXIMATE QUANTITY 2ND STREET S., 3RD STREET S., 4TH STREET S., & 1ST STREET S. & 2ND AVE S. STATE AID ELIGIBLE 2ND STREET S., 3RD STREET S., 4TH STREET TOTAL PROJECT APPROXIMATE QUANTITY UNIT PRICE AMOUNT AMOUNT AMOUNT SUBTOTAL CONSTRUCTION $1,545, $574, $2,119, CONTINGENCY $154, $57, $211, ENGINEERING $278, $103, $381, LEGAL & ADMIN $15, $5, $21, FINANCING $92, $34, $127, TOTAL $2,086, $774, $2,861, P:\PT\S\SAUKR\138208\4-prelim-dsgn-rpts\[SAUKR estimate report xls]Estimate 7 9/8/2016

36 This Page Left Blank Intentionally

37 Appendix B Figure 5 Preliminary Assessment Map Preliminary Assessment Worksheet

38 This Page Left Blank Intentionally

39 DIVISION STREET 1ST STREET S. 2 1 BENTON DRIVE RD AVENUE S. 23 2ND STREET S. 4TH AVENUE S. 24 9/8/2016 9:34:25 AM SEH FILE P:\PT\S\SAUKR\138208\2-proj-mgmt\25-cost-est\PAW\PAW map.dgn 0 N ND AVENUE S RD STREET S TH STREET S TH STREET S. BENTON DRIVE 36 6TH STREET S FILE NO ND STREET SOUTH IMPROVEMENTS DATE: PAW MAP 09/12/16 SAUK RAPIDS, MN SAUKR FIGURE NO. 5

40 This Page Left Blank Intentionally

41 1 9/8/ ND AVENUE SOUTH IMPROVEMENTS 9/12/2016 SAUK RAPIDS, MINNESOTA ASSESSMENT RATES SEH No. SAUKR ' TO 32' WIDE STREET (25%) $61.72 / LF 46' TO 54' STREET (25%) $96.61 / LF CURB & GUTTER (25%) $4.33 / LF STORM SEWER $0.22 / SF STREESCAPING LEVEL (50%) $29.71 / LF PRELIMINARY ASSESSMENT HEARING DATE: OCTOBER 11, 2016 LIGHTING (50%) $65.40 / LF PARCEL ID NO. 46' TO 54' WIDE STREET 30' TO 32' WIDE STREET (6) CURB & GUTTER (1) STORM SEWER STREETSCAPING (2) LIGHTING TOTAL PROPERTY DESCRIPTION OWNER OF RECORD FRONTAGE ASSESSMENT FRONTAGE ASSESSMENT FRONTAGE ASSESSMENT SQUARE ASSESSMENT FRONTAGE ASSESSMENT FRONTAGE ASSESSMENT ASSESSMENT SECT-23 TWP-036 RANGE-031 RIALTO BUILDING PARTNERSHIP 134 $12, $ $ ,450 $5, $3, $8, $31, C/O QUARLES & BRADY Lot-020,021,022,023,024,025,026 ATTN: L S SHIFFLETT ,028,029 & 030 Block N LASALLE ST, STE 4000 CHICAGO, IL SECT-23 TWP-036 RANGE-031 WELLS FARGO BANK 60 (5) $5, $ $ ,560 (7) $4, (5) $1, (5) $3, $16, C/O THOMSON PROP TAX SERVICES LOT-1,2,3,4,5,6,7,8,9,10,11,12,&13 PO BOX BLOCK-46 CARLSBAD, CA SECT-23 TWP-036 RANGE-031 COBORN REALTY CO INC 658 (3)(4) $63, (4) $3, $5, ,238 $36, $8, (3)(4) $43, $160, ST ST S LOT 1 & LOT 2 THRU 40 & VAC ALLEY SAUK RAPIDS, MN & PART VAC 2ND ST, BLOCK SECT-23 TWP-036 RANGE-031 COBORN REALTY CO INC 110 1ST ST S LOT 15, AND LOT 16 THRU 20, & PART VAC SAUK RAPIDS, MN ALLEY & PART VAC 2ND ST, BLOCK SECT-23 TWP-036 RANGE-031 COBORN REALTY CO LTD PARTNER C/O DANIEL COBORN LOT 1,2,3,4,5,6,7,8,9,10,11,12,13,14,21,22, COBORN BLVD ,25,26,27,28,29,30,31,32,33,34,35,36,37 ST CLOUD, MN ,39,40,&VAC ALLEY & PART VAC 2ND ST BLOCK SECT-23 TWP-036 RANGE-031 BROTT BROTHERS LLC 0 $ (2) $3, $ ,084 $1, $ $0.00 $5, OAK PRESERVE CT LOTS 17,& 1/2 VAC ALLEY ST CLOUD, MN LOT LOT 19 LESS HWY EASEMENT LOT 20,21,22,&23 EXC HWY & 1/2 VAC ALLEY LOT 24 EXC HWY AND 1/2 VACATED ALLEY BLOCK SECT-23 TWP-036 RANGE-031 BROTT BROTHERS LLC 100 (4) $9, (4) $3, $1, ,400 $3, $ $6, $24, OAK PRESERVE CT Lot-009 Block-043 ST CLOUD, MN & LOTS 10,11,12,13,14,15 & 16 & 1/2 VACATED ALLEY SECT-23 TWP-036 RANGE-031 DINGMANN,DOUGLAS R 75 $7, $ $ ,870 $3, $ $4, $15, TH AVE N Lot-005 Block-043 SAUK RAPIDS, MN WLY 40 FT OF LOT 5 & ALL OF LOTS 6,7 & 8 AND 1/2 VAC ALLEY & LOTS 25,26 & 27 EXC RR & HWY SECT-23 TWP-036 RANGE-031 KURT J SCHIMNICH & 75 $7, $ $ ,029 $2, $ $4, $14, ARMELLA A SCHIMNICH REV TR Lot-003 Block TH AVE S & LOT 4 & ELY 94 FT OF LOT 5 SAUK RAPIDS, MN & LOTS 28 & 29 EXC HWY & RR RT OF WAY BLK 43 & 1/2 VAC ALLEY SECT-23 TWP-036 RANGE-031 SCHWEGEL BROTHERS PROPERTIES 78 (2)(4) $7, (2)(4) $3, $ ,802 $1, $ (2) $5, $19, LINCOLN AVE Lot-001 Block-043 SAUK RAPIDS, MN & LOT 2 & 1/2 VAC ALLEY SECT-23 TWP-036 RANGE-031 SCHWAGEL BROS PROPERTIES 78 (2)(4) $7, (2)(4) $3, $1, ,957 $2, $ (2) $5, $19, LINCOLN AVE Lot-015 Block-042 SAUK RAPIDS, MN & LOTS & PART OF LOTS 8 THRU 14 & LOT 18 N & E OF BENTON DR EXC RR R/W SECT-23 TWP-036 RANGE-031 DANIEL P EHLERT & 100 $9, $ $ $ $ $6, $16, KAREN S EHLERT Lot-007 Block ND AVE S & LOT 8 LESS SLY.68 FT STE 103 SAUK RAPIDS, MN SECT-23 TWP-036 RANGE-031 JOHN DRAGICH & 100 $9, $ $ $ $ $6, $16, MICHELLE DRAGICH Lot-010 Block ND AVE S & SLY.68 FT OF LOT 8 & ALL OF SAUK RAPIDS, MN LOT 9

42 2 9/8/ ND AVENUE SOUTH IMPROVEMENTS 9/12/2016 SAUK RAPIDS, MINNESOTA ASSESSMENT RATES SEH No. SAUKR ' TO 32' WIDE STREET (25%) $61.72 / LF 46' TO 54' STREET (25%) $96.61 / LF CURB & GUTTER (25%) $4.33 / LF STORM SEWER $0.22 / SF STREESCAPING LEVEL (50%) $29.71 / LF PRELIMINARY ASSESSMENT HEARING DATE: OCTOBER 11, 2016 LIGHTING (50%) $65.40 / LF 46' TO 54' WIDE STREET 30' TO 32' WIDE STREET (6) CURB & GUTTER (1) STORM SEWER STREETSCAPING (2) LIGHTING TOTAL PARCEL ID NO. PROPERTY DESCRIPTION OWNER OF RECORD FRONTAGE ASSESSMENT FRONTAGE ASSESSMENT FRONTAGE ASSESSMENT SQUARE ASSESSMENT FRONTAGE ASSESSMENT FRONTAGE ASSESSMENT ASSESSMENT SECT-23 TWP-036 RANGE-031 US BANK CORPORATE PROPERTIES 100 (4) $9, (4) $3, $1, $ $ $6, $20, ATTN: TAX DEPT Lot-011 Block LAKE ST E & LOT 12 MINNEAPOLIS, MN SECT-23 TWP-036 RANGE-031 TONY HOMMERDING 125 (4) $12, (4) $3, $1, $ $ $8, $25, ND AVE S Lot-007 Block-031 SAUK RAPIDS, MN & LOT 8 & THE N 25 FT OF LOT 9 C/D BANKVISTA PO BOX 338 SARTELL, MN SECT-23 TWP-036 RANGE-031 ROGER W HALLER & 75 $7, $ $ $ $ $4, $12, KALA A HALLER Lot-010 Block BROADWAY AVE S & S 25 FT OF LOT 9 SAUK RAPIDS, MN SECT-23 TWP-036 RANGE-031 COBORN'S INC 100 (4) $9, (4) $3, $1, $ $ $6, $20, C/O DON R WETTER PRESIDENT Lot-011 Block HWY 23 E & LOT 12 PO BOX 6146 ST CLOUD, MN SECT-23 TWP-036 RANGE-031 SAUK RAPIDS INVESTMENTS LLC 50 (4) $4, (4) $3, $ ,200 $1, $ $3, $14, VETERANS DR Lot-009 Block-032 ST CLOUD, MN & 1/2 VAC ALLEY SECT-23 TWP-036 RANGE-031 SAUK RAPIDS INVESTMENTS LLC 100 $9, $ $ ,400 $3, $ $6, $19, VETERANS DR Lot-010 Block-032 ST CLOUD, MN & LOT 11 & 1/2 VAC ALLEY SECT-23 TWP-036 RANGE-031 DINGMANN FAMILY LTD PTSHP 100 $9, $ $ ,400 $3, $ $6, $19, PO BOX 119 Lot-012 Block-032 SAUK RAPIDS, MN & LOT 13 & 1/2 VAC ALLEY SECT-23 TWP-036 RANGE-031 DINGMANN FAMILY LTD PTSHP 100 $9, $ $ ,053 $3, $ $6, $20, PO BOX 119 Lot-014 Block-032 SAUK RAPIDS, MN & LOT 15 & 1/2 VAC ALLEY SECT-23 TWP-036 RANGE-031 TODD D MICHEAU 100 $9, $ $ ,000 $3, $ $6, $19, TH ST S Lot-007 Block-033 SAUK RAPIDS, MN & LOT SECT-23 TWP-036 RANGE-031 RALPH W WORM & 100 $9, $ $ ,000 $3, $ $6, $19, SUSAN M BIEDERMAN Lot-009 Block ND AVE S & LOT 10 SAUK RAPIDS, MN SECT-23 TWP-036 RANGE-031 GERALD J PLACHECKI REV TR 0 $ $ $ ,000 $3, $ $6, $9, C/O GERALD J PLACHECKI Lot-011 Block TH ST S & LOT 12 ST CLOUD, MN SECT-23 TWP-036 RANGE-031 THE GRACE APARTMENTS LLC 0 $ (5) $3, $ $ $ $0.00 $4, KENDALL CT Lot-001 Block-030 SARTELL, MN & LOTS 2 & SECT-23 TWP-036 RANGE-031 MARY K PALLANSCH-HOLT 0 $ (5) $3, $ $ $ $0.00 $4, RONNEBY RD NE Lot-006 Block-031 FOLEY, MN SECT-23 TWP-036 RANGE-031 DUSTIN SCHULZETENBERG 0 $ $4, $ $ $ $0.00 $4, RD ST S Lot-001 Block-031 SAUK RAPIDS, MN WLY 1/2 OF LOTS 1 & SECT-23 TWP-036 RANGE-031 KURT J SCHIMNICH & 0 $ (5) $3, $ $ $ $0.00 $3, JULIE A SCHIMNICH Lot-001 Block TH ST NE ELY 1/2 OF LOTS 1 & 2 SAUK RAPIDS, MN SECT-23 TWP-036 RANGE-031 GARY J STANG 0 $ (5) $3, $ ,200 $1, $ $0.00 $5, WINNEBAGO RD Lot-008 Block-032 SARTELL, MN & 1/2 VAC ALLEY SECT-23 TWP-036 RANGE-031 GARY J STANG 0 $ $ $0.00 7,200 $1, $ $0.00 $1, WINNEBAGO RD Lot-007 Block-032 SARTELL, MN & 1/2 VAC ALLEY SECT-23 TWP-036 RANGE-031 GARY J STANG 0 $ $ $0.00 7,200 $1, $ $0.00 $1, WINNEBAGO RD Lot-006 Block-032 SARTELL, MN & 1/2 VAC ALLEY

43 3 9/8/ ND AVENUE SOUTH IMPROVEMENTS 9/12/2016 SAUK RAPIDS, MINNESOTA ASSESSMENT RATES SEH No. SAUKR ' TO 32' WIDE STREET (25%) $61.72 / LF 46' TO 54' STREET (25%) $96.61 / LF CURB & GUTTER (25%) $4.33 / LF STORM SEWER $0.22 / SF STREESCAPING LEVEL (50%) $29.71 / LF PRELIMINARY ASSESSMENT HEARING DATE: OCTOBER 11, 2016 LIGHTING (50%) $65.40 / LF PARCEL ID NO. 46' TO 54' WIDE STREET 30' TO 32' WIDE STREET (6) CURB & GUTTER (1) STORM SEWER STREETSCAPING (2) LIGHTING TOTAL PROPERTY DESCRIPTION OWNER OF RECORD FRONTAGE ASSESSMENT FRONTAGE ASSESSMENT FRONTAGE ASSESSMENT SQUARE ASSESSMENT FRONTAGE ASSESSMENT FRONTAGE ASSESSMENT ASSESSMENT SECT-23 TWP-036 RANGE-031 DINGMANN FAMILY LTD PTSHP 0 $ $ $ ,400 $3, $ $0.00 $3, PO BOX 119 Lot-004 Block-032 SAUK RAPIDS, MN & LOT 5 & 1/2 VAC ALLEY SECT-23 TWP-036 RANGE-031 KEITH LOCHEN 0 $ $ $0.00 7,920 $1, $ $0.00 $1, GROUSE CT Lot-003 Block-032 ST CLOUD, MN & THE N 5 FT OF LOT 2 & ELY 1/2 VAC ALLEY SECT-23 TWP-036 RANGE-031 NORBERT DOCKENDORF 0 $ $ $ ,218 $3, $ $0.00 $3, RD AVE S Lot-001 Block-032 SAUK RAPIDS, MN & LOT 2 LESS N 5 FT OF LOT SECT-23 TWP-036 RANGE-031 DAVID J HENKEMEYER & 0 $ $ $ ,000 $4, $ $0.00 $4, DEBORAH G HENKEMEYER Lot-004 Block TH ST S & LOTS 5 & 6 SAUK RAPIDS, MN SECT-23 TWP-036 RANGE-031 ETHEL N FORBES 0 $ $ $ ,500 $2, $ $0.00 $2, TH ST S Lot-001 Block-033 SAUK RAPIDS, MN W 1/2 OF LOTS 1,2 & SECT-23 TWP-036 RANGE-031 EDWARD L MAIER & 0 $ $ $ ,500 $2, $ $0.00 $2, HELEN M MAIER Lot-001 Block TH ST S E 1/2 OF LOTS 1,2 & 3 SAUK RAPIDS, MN SECT-23 TWP-036 RANGE-031 GARY J BAUER & 0 $ $8, $ ,843 $4, $ $0.00 $13, MARY E BAUER Lot-001 Block RD AVE S & LOT 2 & W 35 FT OF LOT 3 SAUK RAPIDS, MN SECT-23 TWP-036 RANGE-031 ALLEN F OLMSCHEID & 0 $ $4, $ ,038 $1, $ $0.00 $6, VIRGINIA M OLSCHEID Lot-004 Block TH ST S & E 15 FT OF LOT 3 SAUK RAPIDS, MN SECT-23 TWP-036 RANGE-031 MARIE NOVAK MADGWICK & 0 $ $6, $ ,857 $3, $ $0.00 $9, ROBERT CHARLES MADGWICK Lot-005 Block TH ST S & LOT 6 SAUK RAPIDS, MN SECT-23 TWP-036 RANGE-031 EDWARD L MAIER & 0 $ (2) $4, $ ,415 $2, $ $0.00 $7, HELEN M MAIER Lot-007 Block TH ST S & LOT 8 SAUK RAPIDS, MN SECT-23 TWP-036 RANGE-031 JEFFREY R HANSEN & 0 $ (2) $5, $ ,548 $2, $ $0.00 $7, STAGER'S ADDN TO SAUK RAPIDS BONNIE J HANSEN Lot-009 Block TURTLE CT & LOT 10 LESS E FT COLD SPRING, MN SECT-23 TWP-036 RANGE-031 THOMAS J MITCHELL & 0 $ $6, $ ,870 $3, $ $0.00 $9, MAISY MITCHELL Lot-012 Block TH AVE N & LOT 13 EXC HWY ST CLOUD, MN C/D BEVERLY MARY KUKLOK EILERSTEN TH ST NE SAUK RAPIDS, MN SECT-23 TWP-036 RANGE-031 HOLLY J STOWE 0 $ $3, $ ,000 $1, $ $0.00 $4, TH ST S Lot-011 Block-004 SAUK RAPIDS, MN SECT-23 TWP-036 RANGE-031 LEE TORBORD 0 $ (2) $11, $ ,932 $6, $ $0.00 $18, TYROL DR Lot-007 Block-004 ST CLOUD, MN & LOT W/LE TO DOROTHY ANN KEEHR SECT-23 TWP-036 RANGE-031 EDWARD L MAIER & 0 $ (2) $4, $ ,037 $2, $ $0.00 $6, STAGER'S ADDN TO SAUK RAPIDS HELEN M MAIER Lot-006 Block TH ST S W 81 FT OF LOTS 6,7 & 8 SAUK RAPIDS, MN EXC N FT OF LOT 6 TOTAL 2,408 $232, ,696 $104, ,558 $24, ,121 $132, $14, ,508 $164, $671, (1) CURB AND GUTTER FRONTAGE IS ACTUAL FRONTAGE (2) ODD SHAPED PARCELS HAVE AN ADJUSTED FRONT FOOTAGE BASED ON THE AREA OF THE LOT DIVIDED 10,500 SQAURE FEET (WHICH IS DEFINED AS THE AVERAGE LOT SIZE) AND THEN MULTIPLIED BY 75 FEET (WHICH IS DEFINED AS THE AVERAGE LOT FRONTAGE). (3) 50% OF THE PROPERTY AREA WAS USED IN THE ODD SHAPE LOT ADJUSTMENT SINCE HALF THE PROPERTY FRONTS BENTON DRIVE (4) CORNER LOT ADJUSTMENT (5) THE SHORT SIDE OF THE LOT WAS INCLUDED IN A PREVIOUS ASSESSSMENT, THEREFORE, PER THE CORNER LOT ADJUSTMENT, THIS ASSESSMENT INCLUDES 1/2 THE LONG SIDE (UP TO 60') (6) PER THE ASSESSMENT POLICY, RESIDENTIAL LOTS WILL BE ASSESSED 25% THE COST OF AN EQUIVALENT 32' WIDE ROADWAY. ALL OTHER PROPERTIES WILL BE ASSESSED 25% OF THE ACTUAL ROADWAY WIDTH. (7) 10,590 SF OF THIS PROPERTY WAS PREVIOUSLY ASSESSED FOR STORM SEWER P:\PT\S\SAUKR\138208\2-proj-mgmt\25-cost-est\PAW\paw.XLS

44 This Page Left Blank Intentionally

45 This Page Left Blank Intentionally

46

Feasibility Report Overlay Improvements. Sauk Rapids, Minnesota

Feasibility Report Overlay Improvements. Sauk Rapids, Minnesota Feasibility Report 2018 Overlay Improvements Sauk Rapids, Minnesota SAUKR 144480 January 8, 2018 January 8, 2018 RE: 2018 Overlay Improvements Feasibility Report Sauk Rapids, Minnesota SEH No. SAUKR 144480

More information

FEASIBILITY REPORT. 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY. October 2, 2017

FEASIBILITY REPORT. 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY. October 2, 2017 FEASIBILITY REPORT 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY October 2, 2017 Prepared for: City of Inver Grove Heights 8150 Barbara Avenue Inver Grove Heights,

More information

Stemmer Ridge Road Street & Utility Improvement Project

Stemmer Ridge Road Street & Utility Improvement Project City of Prior Lake 4646 Dakota Street SE Prior Lake, MN 55372 June 9, 2014 Stemmer Ridge Road Street & Utility Improvement Project City of Prior Lake Scott County, Minnesota WSB Project No. 1964-14 FEASIBILITY

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

Feasibility Report. Olson Lake Trail Improvements. City of Lake Elmo, Minnesota. City Project No SEH No

Feasibility Report. Olson Lake Trail Improvements. City of Lake Elmo, Minnesota. City Project No SEH No Feasibility Report Olson Lake Trail Improvements City of Lake Elmo, Minnesota City Project No. 2015.125 SEH No. 139299 April 4, 2017 April 4, 2017 RE: Olson Lake Trail Improvements Feasibility Report City

More information

2014 Street and Utility Improvement Project

2014 Street and Utility Improvement Project City of Circle Pines 200 Civic Heights Circle Circle Pines, MN 55014 January 28, 2014 2014 Street and Utility Improvement Project City of Circle Pines Anoka County, Minnesota WSB Project No. 1507-57 FEASIBILITY

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

CITY OF DELANO. City Council Date. January 5, 2016

CITY OF DELANO. City Council Date. January 5, 2016 CITY OF DELANO REQUEST FOR ACTION Department Head Vince Vander Top, City Engineer City Council Date January 5, 2016 Agenda Item 2016 Infrastructure Improvements Feasibility Report ACTION REQUESTED Accept

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

Items Unit Quantity Unit Price Total Unit Price Total

Items Unit Quantity Unit Price Total Unit Price Total Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH

More information

FOCUS ENGINEERING, inc STREET, DRAINAGE, AND UTILITY IMPROVEMENTS 10TH STREET N. CITY OF LAKE ELMO, MN. Project No

FOCUS ENGINEERING, inc STREET, DRAINAGE, AND UTILITY IMPROVEMENTS 10TH STREET N. CITY OF LAKE ELMO, MN. Project No 2016 STREET, DRAINAGE, AND UTILITY IMPROVEMENTS 30TH STREET N 20TH STREET 10TH STREET N SEPTEMBER, 2015 CITY OF LAKE ELMO, MN. Project No. 2015.129 www.focusengineeringinc.com FOCUS ENGINEERING, inc. 2016

More information

STANDARD DRAWING INDEX

STANDARD DRAWING INDEX ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

2017 Industrial Rail and Transportation Study. Becker, Minnesota

2017 Industrial Rail and Transportation Study. Becker, Minnesota 2017 Industrial Rail and Transportation Study Becker, Minnesota BECKR 140932 August 2, 2017 2017 Industrial Rail and Transportation Study Becker, Minnesota SEH No. BECKR 140932 August 2, 2017 I hereby

More information

Revised. Feasibility Report

Revised. Feasibility Report Revised Feasibility Report for 2016 Street,, Utility and Retaining Wall Improvements Bartlett Boulevard Tuxedo Boulevard Cypress Lane/Maywood Road City of Mound, Minnesota Prepared by: Bolton & Menk, Inc.

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

DRAFT Design Study Report February 2015 Eagle River Traffic Mitigation Phase 1 MOA Project No Appendix D Utilities

DRAFT Design Study Report February 2015 Eagle River Traffic Mitigation Phase 1 MOA Project No Appendix D Utilities Appendix D Utilities This page intentionally left blank. Utilities There are numerous utilities present within the project area, including natural gas, sewer, water, electric, communications, and street

More information

DRAFT. Feasibility Report for 2016 Infrastructure Project. City of Delano. WENCK File # November Prepared for:

DRAFT. Feasibility Report for 2016 Infrastructure Project. City of Delano. WENCK File # November Prepared for: WENCK File #0564-0180 November 2015 Feasibility Report for 2016 Infrastructure Project Prepared for: City of Delano 234 2 nd Street North Delano, MN 55328 Prepared by: WENCK Associates, Inc. 1800 Pioneer

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

FINAL UTILITY REPORT Eastcreek Farm Thornton, CO

FINAL UTILITY REPORT Eastcreek Farm Thornton, CO FINAL UTILITY REPORT Eastcreek Farm Thornton, CO October 14, 2016 JN: 13049 Prepared for: York 80, LLC 12460 1 st Street Eastelake, CO 80614 P: 303.457.2966 Prepared by: Jansen Strawn Consulting Engineers

More information

SITE PLANS ASSISTED LIVING REDEVELOPMENT

SITE PLANS ASSISTED LIVING REDEVELOPMENT SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

Oaks Commerce Center

Oaks Commerce Center Mansour Edlin Consulting 1515 Mockingbird Lane Charlotte, NC 28209 Oaks Commerce Center Water & Sanitary Sewer Improvements Phase I - Concept Utility Plan Gravity Sanitary Sewer A1 Connect to Existing

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

2011 LOCAL STREET IMPROVEMENTS

2011 LOCAL STREET IMPROVEMENTS 11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE

More information

CENTENNIAL PARK EXPANSION

CENTENNIAL PARK EXPANSION 2 working days CITY ELKO EXISTING LEGEND PROPOSED CENTENNIAL PARK EXPANSION SEET LIGHT POWER POLE ELECICAL BOX 1-800-227-2600 AVOID CUTTING UNDERGROUND UTILITIES WATER VALVE GAS VALVE FIRE HYDRANT OWNER/DEVELOPER:

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 07-5424 AN ORDINANCE OF THE CITY OF BILLINGS, PROVIDING THAT THE BILLINGS, MONTANA CITY CODE BE AMENDED BY REVISING SECTION 6-1208; PROVIDING CHANGES TO CERTAIN CURB CUT LENGTHS AND REGULATIONS.

More information

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California Big Easy RV & Boat Storage A Green Energy Project 36215 Jana Lane Wildomar, California 1 PROJECT OVERVIEW Project Description The construction and operation of a solar generation facility consisting of

More information

PROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9.

PROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9. LAND USE: VACANT AND ELECTRICAL TRANSMISSION LINES GENERAL PLAN: PLANNED COMMUNITY ZONING: PC (CDP04-01) UTILITIES 3' WIDE BIOFILTRATION WITH UNDERDRAIN. TOP ELEVATION AT 3" BELOW PARKING LOT SURFACE SITE

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724 National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269)

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269) City of South Haven City Hall 539 Phoenix Street South Haven, Michigan 49090-1499 Telephone (269) 637-0700 Fax (269) 637-5319 Dunkley and Black River Infrastructure Improvements Dunkley - Dyckman Avenue

More information

ANN ARBOR CITY NOTICE ORDINANCE NO. ORD OFF STREET PARKING CHAPTER 59

ANN ARBOR CITY NOTICE ORDINANCE NO. ORD OFF STREET PARKING CHAPTER 59 ANN ARBOR CITY NOTICE ORDINANCE NO. ORD-12-04 OFF STREET PARKING CHAPTER 59 AN ORDINANCE TO AMEND SECTIONS 5:168 AND 5:169 OF CHAPTER 59 (OFF- STREET PARKING) OF TITLE V OF THE CODE OF THE CITY OF ANN

More information

3. Application Fees, Certificate Of Insurance & Performance Bond

3. Application Fees, Certificate Of Insurance & Performance Bond SUBSECTION 13.10 CONSTRUCTION OF DRIVEWAYS 13.10A PERMIT REQUIREMENTS 1. General A driveway or access road serving private property and intersecting with a town road shall be constructed in such a manner

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

DRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group

DRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group DRIVEWAY GUIDE June 2017 TABLE OF CONTENTS Definitions Building Requirements Material Standards Drainage Administrative Requirements Zoning Requirements Yard Requirements Design Requirements Public Ways

More information

City of Grand Island Tuesday, February 13, 2018 Council Session

City of Grand Island Tuesday, February 13, 2018 Council Session City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

City of Grand Island Tuesday, June 26, 2018 Council Session

City of Grand Island Tuesday, June 26, 2018 Council Session City of Grand Island Tuesday, June 26, 2018 Council Session Item G-21 #2018-188 - Approving Change Order No. 3 for Sanitary Sewer Collection System Rehabilitation Various Locations; Project No. 2017-S-2A

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Interstate Drive Extension

Interstate Drive Extension Interstate Drive Extension Sponsor County Highway Project No. RB19-000004 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $2,700,000.00 $2,150,000.00 Project Description This project continues

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

REQUEST FOR COUNCIL ACTION. List of Exhibits A. Project Plan Set B. Bolton & Menk Proposal for Engineering / Inspection Services

REQUEST FOR COUNCIL ACTION. List of Exhibits A. Project Plan Set B. Bolton & Menk Proposal for Engineering / Inspection Services Item #08 - CC Agenda - 05/2/2016 [Page 1 of 5] REQUEST FOR COUNCIL ACTION : May 2, 2016 ITEM NO: 8 Department Approval: Administrator Reviewed: Agenda Section: Name Adam Edwards JML Public Works Director/

More information

DESIGN STANDARDS SECTION DS 3 STREETS

DESIGN STANDARDS SECTION DS 3 STREETS DESIGN STANDARDS SECTION DS 3 STREETS DS 3-01 GENERAL: A. INTENT: The intent of these Design Standards is to provide minimum standards for the design of public streets. These standards are intended to

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

WHITE OAK RIDGE PROJECT NO. 53B2384 D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION CITY OF MADISON

WHITE OAK RIDGE PROJECT NO. 53B2384 D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION CITY OF MADISON WHITE OAK RIDGE D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION ORIGINATOR:, STREETS DIVISION REV. DATE: PLOT NAME: PLOT SCALE: THE LOCATION AND INFORMATION FOR PROPOSED NEW TREES, IN THE PUBLIC RIGHT OF

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

Comprehensive Lift Station Evaluation Buffalo, Minnesota

Comprehensive Lift Station Evaluation Buffalo, Minnesota City of Buffalo Comprehensive Lift Station Evaluation Buffalo, Minnesota W3.088 Submitted by: Bolton & Menk, Inc. 040 Hwy East Willmar, MN 560 P: 30-3-3956 F: 30-3-970 Certification Comprehensive Lift

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections Page 1 of 7 17-02-420 Electric Service Conversion Overhead-to-Underground Overview and process of converting residential

More information

DRIVEWAY/SIDEWALK PERMIT APPLICATION

DRIVEWAY/SIDEWALK PERMIT APPLICATION JOB INFORMATION CITY OF ALEXANDRIA 704 Broadway Alexandria, MN 56308 Phone: 320-763-6678 Fax: 320-763-3511 DRIVEWAY/SIDEWALK PERMIT APPLICATION Permit Fee: $50.00 Deposit: $300.00 PERMIT NUMBER: ROW DATE:

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS

PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS To review the proposed amendments Approval of the amendments (5-3) Ogden City Planning is proposing several amendments and clarifications to the parking

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

Temporary Sales Trailer Application

Temporary Sales Trailer Application Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 Temporary Sales Trailer Application General: Requests for temporary sales trailers, which comply with

More information

CITY OF STANDARD SPECIFICATIONS

CITY OF STANDARD SPECIFICATIONS CITY OF Published May 4, 2016 CALIFORNIA Stephan Kiefer, Community Development Director Cheri Sheets, City Engineer CITY OF LIVERMORE 1052 South Livermore Avenue Livermore, CA 94550 4DEV0001.doc 03/12

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated

More information

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016 TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement

More information

Lake County Building Department

Lake County Building Department Lake County Building Department P.O. Box 513 505 Harrison Avenue Leadville, CO 80461 (719) 486-2875 Fax (719) 486-4179 Driveway Permit (Resolutions 98-15 and 98-35) PERMIT: To connect a driveway or parking

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

CITY of NOVI CITY COUNCIL

CITY of NOVI CITY COUNCIL CITY of NOVI CITY COUNCIL Agenda Item 3 July 9, 2018 ci tyofnovi.org SUBJECT: Approval to award design engineering services to AECOM Great Lakes, Inc., for the Flint Street Realignment and Reconstruction

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices

More information

DRAINAGE. December

DRAINAGE. December DRAINAGE December 2017-1 TAB - 2501 STATEMENT OF ESTIMATED QUANTITIES TAB SHT NO ITEM DESCRIPTION UNITS ARPONS TOTAL ESTIMATED QUANTITY D 25 2104.502 CATCH BASIN EACH 1 D 25 2104.502 S EACH 9 D 25 2104.503

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER

More information

CITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS

CITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS CITY OF FONTANA HANDBOOK ON RESIDENTIAL APPROACH CONSTRUCTION PERMITS GENERAL INFORMATION A driveway approach is an area, construction or improvement between the roadway of a public street and private

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

Director of Building and Deputy Chief Building Official. 1. North York Community Council approve the request for sign variance at 515 Drewry Avenue.

Director of Building and Deputy Chief Building Official. 1. North York Community Council approve the request for sign variance at 515 Drewry Avenue. STAFF REPORT ACTION REQUIRED Sign Variance 515 Drewry Avenue (New Application & Report) Date: October 19, 2009 To: From: Wards: Reference Number: North York Community Council Director of Building and Deputy

More information

DR SE WAY SOMERSIDE. C-N Neighborhood Commercial Site. R-LD - Development in accordance. Fully Landscaped Park/ Playground.

DR SE WAY SOMERSIDE. C-N Neighborhood Commercial Site. R-LD - Development in accordance. Fully Landscaped Park/ Playground. LAND & BUSINESS SUPPORT DEPT Southlands Phase 6A Plan 01231 City of Medicine Hat Land & Business Support Ph (03) 52-1 Fax (03) 502-055 land_properties@medicinehat.ca updated August 20, 201 SOMERSET BAY

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information