JACKSON ELECTRIC COOP METER LOOP CONSTRUCTION SPECIFICATIONS JUNE 2018
|
|
- Rachel Atkinson
- 5 years ago
- Views:
Transcription
1 JACKSON ELECTRIC COOP METER LOOP CONSTRUCTION SPECIFICATIONS JUNE 2018 GANADO OFFICE PHYSICAL ADDRESS: 8925 State Highway 111 E Ganado, TX Phone: (361) BAY CITY OFFICE PHYSICAL ADDRESS: 100 COOPERATIVE WAY Bay City, TX Phone: (979) MAILING ADDRESS: P.O. Box 1189 Edna, TX Web Page: Myjec.coop YOU WILL NEED TO CONTACT ONE OF JACKSON ELECTRIC COOP'S ENGINEERS BEFORE ANY ACTIONS ARE MADE TOWARDS ALL NEW, CONVERTED, OR MOVED SERVICES PG 1 OF 10
2 PREFACE : THE SPEC SHEETS INCLUDED IN THIS PACKET ARE IN NO WAY INTENDED TO CONFLICT WITH THE NATIONAL ELECTRICAL SAFETY CODE (NESC), THE NATIONAL ELECTRICAL CODE (NEC), OR SUCH STATE OR LOCAL LAWS AND ORDINANCES AS MAY BE IN EFFECT IN JACKSON ELECTRIC COOP'S SERVICE AREA. NOTES: APPENDIX: PAGE 1: COVER PAGE PAGE 2: PREFACE, APPENDIX, AND NOTES PAGE 3: NOTES PAGE 4: OVERHEAD SERVICE ON POLE PAGE 5: OVERHEAD SERVICE ON HOUSE - SURFACE MOUNT PAGE 6: OVERHEAD SERVICE ON HOUSE - THROUGH ROOF PAGE 7: UNDERGROUND SERVICE ON HOUSE PAGE 8: UNDERGROUND SERVICE ON RACK PAGE 9: OVERHEAD TEMPORARY SERVICE PAGE 10: UNDERGROUND TEMPORARY SERVICE 1) JACKSON ELECTRIC COOP REQUIRES THERE BE A VISIBLE MAIN DISCONNECT WITHIN 20' OF THE METER CAN. 2) ALL METER CANS ARE REQUIRED TO BE ALUMINUM, ALUMINUM POWDER COATED, OR STAINLESS. ALL METER CANS AND MAIN DISCONNECTS ARE REQUIRED TO BE U/L LISTED. 3) ALL METERLOOPS INSTALLED MUST USE CORROSIVE RESISTANT HARDWARE TO ATTACH METERLOOP AND USE STAINLESS OR ALUMINUM 2-HOLE STRAPS. 4) ALL METALLIC CONDUIT USED TO INSTALL A METERLOOP MUST BE U/L LISTED THICK WALLED ALUMINUM OR STAINLESS. 5) ALL METERLOOPS INSTALLED IN BRAZORIA, CALHOUN, JACKSON, AND MATAGORDA COUNTY WILL BE SUBJECT TO THE NEC CORROSIVE AREA CLASSIFICATION. 6) ALL METERLOOPS SHOULD BE GROUNDED IN A MANNER THAT MEETS OR EXCEEDS THE CURRENT NEC GROUNDING CODE (NEC: SEC-250). PG 2 OF 10
3 7) COMMUNICATION COMPANIES ARE FORBIDDEN TO GROUND THEIR SYSTEMS TO ANY PART OF THE METER ENCLOSURE. ALL COMMUNICATIONS MUST BE BONDED ON A COMMUNICATIONS BONDING BLOCK IN ACCORDANCE WITH NEC: SEC ) NATIONAL ELECTRIC CODE (NEC) REQUIRES A MINIMUM OF 2 BONDED GROUND RODS, THE FIRST BEING DRIVEN AS NEAR AS PRACTICAL TO THE METER ENCLOSURE, BONDED TO THE SECOND WHICH, SHOULD BE DRIVEN A MINIMUM OF 6 AWAY FROM THE FIRST. 9) JACKSON ELECTRIC REQUIRES COPPER OR COPPER CLAD GROUND RODS A MINIMUM OF 5/8 DIAMETER BY 8 LONG WITH MINIMUM GROUND WIRE SIZE BEING #6 AWG COPPER WIRE. 10) ALL PVC CONDUIT USED FOR ANY PART OF A METERLOOP MUST BE U/L LISTED ELECTRICAL GRADE CONDUIT. 11) EACH PAD MOUNT TRANSFORMER WILL HAVE AN ADDITIONAL COST OF $500. THE MEMBER WILL BE REQUIRED TO PROVIDE THE CONDUIT AND A MINIMUM OF 2 LONG SWEEPING 'S, AS DESCRIBED IN THE SPEC SHEET. 12) MEMBERS INSTALLING SERVICE FOR MOBILE HOMES ARE NOT PERMITTED TO ATTACH METERLOOP TO MOBILE HOME STRUCTURE. NO EXCEPTIONS. 13) TEMPORARY OVERHEAD SERVICES ARE NOT TO EXCEED 40' FROM THE TRANSFORMER POLE TO THE TEMPORARY POLE. CALL AND SET UP APPOINTMENT WITH ONE OF JACKSON ELECTRIC COOP'S ENGINEERS BEFORE SETTING A TEMP POLE. Conductor Types and Sizes for 120/240-Volt, Single-Phase Dwelling Services and Feeders. Conductor Types RHH, RHW-2, THHN, THHW, THW, THW-2, THWN, THWN-2, XHHW, XHHW-2, SE, USE, USE-2 [ROP 6-53, 6-85] Service or Feeder Rating (Amperes) Conductor (AWG or Kcmil) Copper Aluminum or Copper- Clad Aluminum / / /0 3/ /0 4/ / / PG 3 OF 10
4 SPECS FOR OVERHEAD SERVICE ON METER POLE - JACKSON ELECTRIC COOP WEATHER HEAD 24" MIN TAILS WITH NEUTRAL MARKED***** CONDUIT **** 3' MIN FROM WEATHER HEAD TO TOP OF POLE TWO HOLE CONDUIT STRAPS PLACED WITHIN EVERY 2' (STRAPS MUST BE STAINLESS OR ALUMINUM) METER CAN SOCKET *** MIN 30' POLE * 2" MIN BETWEEN METER CAN AND DISCONNECT NEC CURRENT GROUNDING CODE SEC 250- MIN 5' OF POLE IN GROUND METER SOCKET HEIGHT ** COMMUNICATIONS BONDING BLOCK MIN #6 AWG COPPER GROUND WIRE MIN 5/8" X 8' COPPER GROUND ROD *JACKSON ELECTRIC COOP WILL INSTALL MEMBERS METER POLE UNDER POLICY GUIDELINES ** METER SOCKET SHALL BE 5'-6' FROM GROUND LEVEL TO CENTER OF METER CAN UNLESS MEMBERS FLOOD PLAIN PERMIT STATES OTHERWISE *** ANY METERLOOP INSTALLED WITHIN 20 MILES OF THE COAST MUST USE AN ALUMINUM OR ALUMINUM POWDER COATED METER CAN AND USE ALL STAINLESS HARDWARE TO ATTACH METERLOOP **** 2" MIN SCH 80 ELECTRICAL GRADE PVC CONDUIT, THICK WALLED ALUMINUM CONDUIT, OR STAINLESS ***** 24" MIN WIRE TAIL MUST BE LEFT HANGING OUT OF WITH NEUTRAL CLEARLY MARKED (METERLOOP WILL NOT PASS INSPECTION IF NEUTRAL IS NOT MARKED) PG 4 OF 10
5 SPECS FOR OVERHEAD SERVICE ON HOUSE SURFACE MOUNTED - JACKSON ELECTRIC COOP MIN 24" WIRE TAILS WITH NEUTRAL MARKED**** MIN 2" CONDUIT EITHER ALUMINUM OR SCH 80 PVC 2 HOLE CONDUIT STRAPS WITHIN EVERY 2' (STRAPS MUST BE STAINLESS OR ALUMINUM) MIN 13.5' FROM GROUND LEVEL TO METER SOCKET*** COMMUNICATIONS BONDING BLOCK METER SOCKET HEIGHT** 1/2" CONDUIT WITH #6 AWG GROUND WIRE 5/8" X 8' COPPER GROUND ROD NEC CURRENT GROUNDING CODE SEC 250- PG 5 OF 10 2 HOLE CONDUIT STRAPS WITHIN EVERY 2' *MIN OF 13.5' FROM GROUND LEVEL TO IS REQUIRED UNLESS OTHERWISE NOTED BY ONE OF JACKSON ELECTRIC COOP'S ENGINEERS ** METER SOCKET SHALL BE MIN 5' TO MAX 6' FROM GROUND LEVEL TO CENTER OF METER SOCKET UNLESS MEMBERS FLOOD PLAIN PERMIT STATES OTHERWISE *** METER SOCKET MUST BE A U/L LISTED ALUMINUM, ALUMINUM POWDERCOATED, OR STAINLESS OVERHEAD METER SOCKET **** 24" MIN WIRE TAILS MUST BE LEFT HANGING OUT OF WITH NEUTRAL MARKED (METERLOOP WILL NOT PASS INSPECTION IF NEUTRAL IS NOT MARKED)
6 SPECS FOR OVERHEAD SERVICE ON HOUSE THROUGH ROOF - JACKSON ELECTRIC COOP MIN 18" MAX 36" FROM ROOF TO UNLESS GUYED 24" MIN TAILS WITH NEUTRAL MARKED *** MAX 3' FROM ROOF EDGE TO CONDUIT MIN 2", THICK WALLED ALUMINUM CONDUIT MIN 13.5' FROM GROUND LEVEL TO 2 HOLE CONDUIT STRAPS WITHIN EVERY 2' (STRAPS MUST BE STAINLESS OR ALUMINUM) METER SOCKET ** METER SOCKET HEIGHT * COMMUNICATIONS BONDING BLOCK NEC CURRENT GROUNDING CODE SEC 250-2" MIN BETWEEN METER SOCKET AND DISCONNECT 2 HOLE CONDUIT STRAPS WITHIN EVERY 2' (STRAPS MUST BE STAINLESS OR ALUMINUM 1/2" CONDUIT WITH MIN #6 AWG GROUND WIRE MIN 5/8" X 8' COPPER GROUND ROD * METER SOCKET SHALL BE A MIN 5' AND MAX 6' FROM GROUND LEVEL TO CENTER OF METER SOCKET UNLESS MEMBERS FLOOD PLAIN PERMIT STATES OTHERWISE ** METER SOCKET MUST BE A U/L LISTED ALUMINUM, ALUMINUM POWDERCOATED, OR STAINLESS OVERHEAD METER SOCKET PG 6 OF 10 ***24" MIN WIRE TAILS MUST BE LEFT HANGING OUT OF WITH NEUTRAL MARKED (METERLOOP WILL NOT PASS INSPECTION IF NEUTRAL IS NOT MARKED)
7 SPECS FOR UNDERGROUND SERVICE ON HOUSE - JACKSON ELECTRIC COOP METER SOCKET ** MIN 2.5" MALE ADAPTER 2.5" MIN CONDUIT SCH 80 ABOVE GROUND SCH 40 BELOW GROUND 2 HOLE CONDUIT STRAPS WITHIN EVERY 2' (STRAPS MUST BE PVC, STAINLESS OR ALUMINUM) METER SOCKET HEIGHT * 30" MIN FROM GROUND LEVEL TO TOP OF CONDUIT MIN 2.5" LONG RADIUS 90 2" MIN BETWEEN METER CAN AND DISCONNECT COMMUNICATIONS BONDING BLOCK 1/2" CONDUIT WITH MIN #6 AWG GROUND WIRE NEC CURRENT GROUNDING CODE SEC 250- MIN 5/8" X 8' COPPER GROUND ROD * METER SOCKET SHALL BE A MIN OF 5' TO MAX 6' FROM GROUND LEVEL TO CENTER OF METER SOCKET UNLESS MEMBERS FLOOD PLAIN PERMIT STATES OTHERWISE ** METER SOCKET MUST BE A U/L LISTED UNDERGROUND CAN THAT IS ALUMINUM, ALUMINUM POWDERCOATED, OR STAINLESS NO MORE THAN 2-90 ELBOWS AND 1-45 ELBOW FROM TRANSFORMER POLE TO METER CAN MUST HAVE A SUFFICIENT PULL STRING IN CONDUIT FROM PIPE STUBBED UP AT TRANSFORMER POLE TO METER CAN STUB PIPE UP 8-10" AWAY FROM JEC TRANSFORMER POLE PG 7 OF 10
8 SPECS FOR UNDERGROUND SERVICE ON METER RACK - JACKSON ELECTRIC COOP UNDERGROUND METER SOCKET ** 2" MIN BETWEEN METER SOCKET AND DISCONNECT BRACE BOARDS **** POSTS *** COMMUNICATIONS BONDING BLOCK METER SOCKET HEIGHT * 30" MIN FROM GROUND LEVEL TO TOP OF CONDUIT 2.5" MIN CONDUIT SCH 80 ABOVE GROUND SCH 40 BELOW GROUND 1/2" CONDUIT WITH MIN #6 AWG GROUND WIRE NEC CURRENT GROUNDING CODE SEC 250- MIN 5/8" X 8' COPPER GROUND ROD 4' MIN POST IN GROUND MIN 2.5" LONG RADIUS 90 * METER SOCKET SHALL BE A MIN OF 5' TO MAX 6' FROM GROUND LEVEL TO CENTER OF METER SOCKET UNLESS MEMBERS FLOOD PLAIN PERMIT STATES OTHERWISE ** METER SOCKET MUST BE A U/L LISTED UNDERGROUND CAN THAT IS ALUMINUM, ALUMINUM POWDERCOATED, OR STAINLESS *** POSTS MUST BE EITHER TREATED WOOD AT MIN 4"x4"x10' OR A CORROSIVE RESISTANT METAL SUCH AS UNI-STRUT **** BRACE BOARDS: MIN OF 2" THICK TREATED WOOD OR UNI-STRUT NO MORE THAN 2-90 ELBOWS AND 1-45 ELBOW FROM TRANSFORMER POLE TO METER CAN MUST HAVE A SUFFICIENT PULL STRING IN CONDUIT FROM PIPE STUBBED UP AT TRANSFORMER POLE TO METER CAN STUB PIPE UP 8-10" AWAY FROM JEC TRANSFORMER POLE PG 8 OF 10
9 SPECS FOR OVERHEAD TEMPORARY SERVICE - JACKSON ELECTRIC COOP MIN 24" WIRE TAILS WITH NEUTRAL MARKED ***** MIN 2" CONDUIT *** TEMPORARY SERVICE POLE ANGLE BRACE BOARDS TOWARDS TRANSFORMER POLE BRACE BOARDS MIN 18' POLE MIN 2" BETWEEN METER CAN AND DISCONNECT MIN 5' MAX 6' FROM GROUND LEVEL TO CENTER OF METER SOCKET UNLESS PERMIT STATES OTHERWISE BRACE BOARD ****** NEC CURRENT GROUNDING CODE SEC 250- CONDUIT LENGTH ** 2 HOLE CONDUIT STRAPS WITHIN EVERY 2' (STRAPS MUST BE STAINLESS OR ALUMINUM OVERHEAD METER SOCKET * COPPER GROUND WIRE **** MIN 5/8" X 8' COPPER GROUND ROD MIN 4' OF POLE BELOW GROUND PG 9 OF 10 TRANSFORMER POLE DISTANCE FROM TRANS POLE TO TEMP IS TO NOT EXCEED 40' TEMPORARY SERVICE WILL BE APPLICABLE FOR NO MORE THAN 6 MONTHS UNLESS GRANTED BY COOP FOR MEANS OF LONG-TERM CONSTRUCTION OR OTHER CASES, SUBJECT TO COOP DISCRETION * METER SOCKET MUST BE A U/L LISTED ALUMINUM, ALUMINUM POWDERCOATED, OR STAINLESS OVERHEAD METER SOCKET ** CONDUIT LENGTH SHOULD BE LONG ENOUGH THAT THE WEATHER HEAD IS WITHIN A MIN OF 12" FROM THE TOP OF THE POLE *** CONDUIT MUST BE MIN 2" DIAMETER AND BE U/L LISTED THICK WALLED ALUMINUM, OR SCH 80 ELECTRICAL GRADE PVC **** MIN #6 AWG COPPER GROUND WIRE STAPLED TO POLE OR STRAPPED TO POLE INSIDE 1/2" ELECTRICAL CONDUIT ***** 24" MIN WIRE TAILS MUST BE LEFT HANGING OUT OF WITH NEUTRAL MARKED (METERLOOP WILL NOT PASS INSPECTION IF NEUTRAL IS NOT MARKED) ****** BRACE BOARDS SHOULD BE DIRECTED TOWARDS TRANSFORMER POLE AS SHOWN IN DIAGRAM ABOVE
10 SPECS FOR UNDERGROUND TEMPORARY SERVICE - JACKSON ELECTRIC COOP 2" MIN BETWEEN METER CAN AND DISCONNECT METER SOCKET ** 2 HOLE CONDUIT STRAPS WITHIN EVERY 2' (STRAPS MUST BE STAINLESS OR ALUMINUM) BACK BOARD ***** METER SOCKET HEIGHT * MIN 2.5" SCH 80 ELECTRICAL GRADE CONDUIT ELBOW DEPTH **** MIN 5/8" X 8' COPPER GROUND ROD WITH MIN #6 AWG COPPER GROUND WIRE STAPLED TO POST OR IN CONDUIT POST LENGTH BELOW GROUND LEVEL *** TEMPORARY SERVICE WILL BE APPLICABLE FOR NO MORE THAN 6 MONTHS UNLESS GRANTED BY COOP FOR MEANS OF LONG-TERM CONSTRUCTION OR OTHER CASES, SUBJECT TO COOP DISCRETION * METER SOCKET SHALL BE A MIN OF 5' TO MAX 6' FROM GROUND LEVEL TO CENTER OF METER SOCKET UNLESS MEMBERS FLOOD PLAIN PERMIT STATES OTHERWISE ** METER SOCKET MUST BE A U/L LISTED UNDERGROUND CAN THAT IS ALUMINUM, ALUMINUM POWDERCOATED, OR STAINLESS *** POST MUST BE TREATED WOOD AND A MIN 4"x4"x10' OR 10' LONG ROUND POST AND BE SET A MIN 4' BELOW GROUND LEVEL **** CONDUIT ELBOW SHALL BE BELOW GROUND LEVEL A MIN 10" AND FACE TOWARDS PAD MOUNT TRANSFORMER ***** BACK BOARD USED TO MOUNT METER SOCKET AND PANEL SHALL BE AT MIN 3/4" TREATED PLYWOOD PG 10 OF 10
SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS
SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS November 17, 2016 Engineering Service Specifications Table of Contents Commercial Service Requirements SLEMCO Commercial
More informationMetering and Control Standards OFF-PEAK & DUAL FUEL WIRING DIAGRAMS
Metering and Control Standards OFF-PEAK & DUAL FUEL WIRING DIAGRAMS REVISED FEBRUARY 2017 TABLE OF CONTENTS Metering Equipment & Installation Standards... 1 Metering Equipment & Installation Standards
More informationEngineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes
Engineering Service Specifications Commercial Single-Phase Current Transformer Metering Schemes Specifications for Commercial Underground Current Transformer Metering Requirements for a Single-Phase Customer
More informationSECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems
COUNTY OF SANTA CRUZ PLANNING DEPARTMENT 701 OCEAN STREET, 4 th FLOOR, SANTA CRUZ, CA 95060 (831) 454-2580 FAX: (831) 454-2131 TDD: (831) 454-2123 KATHLEEN MOLLOY PREVISICH, PLANNING DIRECTOR Photovoltaic
More informationThe Reliable Choice. Field Pocket Guide
The Reliable Choice Field Pocket Guide Allowable Ampacities of STABILOY Brand XHHW-2 and Copper 75 C (167 F) 90 C (194 F) 75 C (167 F) 90 C (194 F) Conductor Size (AWG or kcmil) Types RHW, THHW, THW, THWN,
More informationSERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING
SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING Obtain acceptance and specific details from the local Company office. 1. Service entrance duct (see Note 1). Company
More informationTable of Contents. Electrical Service Requirements. 1. General Requirements
Table of Contents 1. General Requirements 1.1 General Definition.................................................... 1 1 1.2 Booklet Purpose and Organization....................................... 1-1
More informationMecklenburg County Common Code Defects
Electrical Code Defects Improper Over Current Protection Code Description 310.15 Ampacities for s Rated 0 2000 Volts. (A) General. (1) Tables or Engineering Supervision. Ampacities for conductors shall
More informationCommercial Electric Policy
Commercial Electric Policy 7/19/16 1 Table of Contents General Information..3 Construction.3 Ownership.4 Multi-Unit/Multi-Service Buildings....4 Secondary Termination Enclosures.4 Meter Bases.5 Temporary
More informationSERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp
Printed from NIPSCO.com 04-01-17 PAGE 1 OF 6 USE: Arrangement of service equipment to supply electric energy to an underground, outdoor self contained meter installation. LATEST REVISION: PREVIOUS REVISION
More informationDISCONTINUED PRODUCT POWER PROTECTION. Series 600 UPS. Multi-Module Three Phase 338 kva to 1000 kva; 60 Hz. Installation Manual
POWER PROTECTION Series 600 UPS Multi-Module Three Phase 338 kva to 1000 kva; 60 Hz Installation Manual TABLE OF CONTENTS IMPORTANT SAFETY INSTRUCTIONS.............................................1 1.0
More informationPentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION
PULL BOX F SECONDARY SYSTEM Typical grade Pentahead bolts See note 2 Conduit run as specified Plastic or fiberglass for grass areas or Polymer concrete for light duty areas (see notes 2, 3, & 4) Company
More informationgrounded in service wired to innovate STABILOY Type XHHW-2 and USE-2/RHH/RHW-2
grounded in service wired to innovate STABILOY Type XHHW-2 and USE-2/RHH/RHW-2 grounded in service wired to innovate www.cable.alcan.com Type XHHW-2 and Type USE-2/RHH/RHW-2 Alcan manufactures XHHW-2 and
More informationCustomer Requirements Downtown Secondary Network Service
Application This standard describes the limitations and requirements for receiving service from the Tacoma Power secondary network system within the City of Tacoma downtown core area. In This Standard
More informationSECTION 300 OVERHEAD SERVICE
SECTION 300 OVERHEAD SERVICE 300.01 General Company provides, installs, and maintains service drop to point of delivery approved by Company. Customer provides point of attachment which is acceptable to
More informationAMENDMENT ELECTRIC SERVICE MANUAL 2014
AMENDMENT (Pages 20,43,50,72,74,,76,78,83,86,99) ELECTRIC SERVICE MANUAL 2014 Effective April 1, 2015 18-7 6.0 SERVICE AND SERVICE ENTRANCES (General), Continued Conductor Sizing It is recommended that
More information320A Single Phase URD Meter Loop Installations
320A Single Phase URD Meter Loop Installations Location: The meter loop shall be mounted on the side of the pedestal facing the consumer's lot. (The side being one of the four flat surfaces of the pedestal
More informationCOMMERCIAL QUICK REFERENCE
COMMERCIAL QUICK REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2016 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION. 18" MIN. OF TAIL. (NEUTRAL CONDUCTOR MUST BE WHITE OR
More informationPART A General Conductor Requirements
PART A General Conductor Requirements 6.1 Conductor Insulation Property Table 310.13 of the NEC provides information on conductor properties such as permitted use, maximum operating temperature, and other
More informationELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016
DISTRIBUTED GENERATION CHAPTER 5 500. SCOPE This chapter includes distributed or customer-owned generation connected in parallel and operating with Alliant Energy s electric distribution system. For all
More informationD9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE
SOURCE 20V 240V STUD (PER NEC) A customer supplied and installed teaser wire is required from the neutral lug to a 5th terminal mounted on the left side of the meter block between the line and load terminals.
More informationTHREE PHASE WIRING SPECIFICATIONS
THREE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425
More informationNew Service. From... BARRON. Spooner Office: P.O. Box 261 Spooner, WI Barron Office: P.O. Box 40 Barron, WI
New Service Guidelines and Diagrams From... BARRON www.barronelectric.com email: janderson@barronelectric.com Barron Office: P.O. Box 40 Barron, WI 54812-0040 Spooner Office: P.O. Box 261 Spooner, WI 54801-0261
More informationSINGLE PHASE WIRING SPECIFICATIONS
SINGLE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425
More informationAGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS
Prepared by: ABB1 AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS 05619 Asset Type: Electric Metering Function: Design and Construction Issued by: Lisseth Villareal (LDV2) Date: 07-31-15 Rev. #10: This
More informationNEC 2014 Code Changes
NEC 2014 Code Changes Articles 310 310.120 CHANGES FROM 2011 TO 2014 CODE ARE IN RED ARTICLE 310 Conductors for General Wiring I. General 310.2 Definitions Electrical Ducts Electrical conduits, or other
More informationElectrical Design/Build Guide
2017 Electrical Design/Build Guide Based on the 2017 National Electrical Code Copyright Durand & Associates 1986-2016 60 C Copper Ampacity 4 - Wire Fill - (Non-Current Carrying Neutral) 4 or 5 - Parallel
More information7. Residential Single-Family and Duplex Buildings (Dwellings)
Sin g le -F a mily a n d Du p le x Bu ild in g s 2016 Electric Service Requirements, 2 nd Edition Section 7 Section 7 Residential Single-Family and Duplex Buildings (Dwellings) Directory Page 7.1 General
More information9. Non-Residential Services (Commercial, Industrial, and Agricultural)
Section 9 2016 Electric Service Requirements, 3rd Edition Section 9 Non-Residential Services Directory Page 9.1 General Requirements 68 9.2 Direct-Connect Metering, Single Installations 69 9.3 Direct-Connect
More informationUNDERGROUND SERVICES - SECONDARY
UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service
More informationCode Calculations. for an Off-Grid PV System
Code Calculations for an Off-Grid PV System John Wiles Sponsored by the Photovoltaic Systems Assistance Center, Sandia National Laboratories Judy LaPointe s home is on its way to becoming a finished, off-grid
More informationUNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.
UNDERGROUND SERVICE No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. Entrance cabinet must be directly through wall or directly under meter in basement.
More informationChapter 4 NEC & NEMA Standards 1
Chapter 4 NEC & NEMA Standards 1 This section lists excerpts from industry, national, and international standards The excerpts are for illustration and educational purposes There are often several related
More informationSECTION VII METERING INSTALLATIONS
SECTION VII METERING INSTALLATIONS 1. GENERAL Outdoor metering is required for all new service installations to one, two, and three family detached, semi-detached and row houses. 2. COMPANY FURNISHES AND
More informationAccessories. Accessories. Meter Mounting Equipment
Covers & Sealing Rings..................................................................... 119 AW & H-Base Hubs.......................................................................... 119 Flush Trim
More informationUNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.
UNDERGROUND SERVICE No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. Entrance cabinet must be directly through wall or directly under meter in basement.
More informationCHAPTER V RESIDENTIAL WIRING
CHAPTER V RESIDENTIAL WIRING 5.1. THE SERVICE ENTRANCE Buildings and other structures receive the electrical energy through the service entrance. In residential wiring, the electric company supply this
More informationDISCONTINUED PRODUCT
The following WARNING applies to all battery cabinets supplied with UPS systems: WARNING HAZARD INTERNAL BATTERY STRAPPING MUST BE VERIFIED BY MANU- FACTURER PRIOR TO MOVING A BATTERY CABINET. Battery
More information7 Single Family Service
7 Single Family Service 7. General The location of the service entrance on the Customer s premises is an important consideration. For clearance and location information see section 5 (Clearances). Consult
More informationQuick Connection Panel (QCP) Installation Guide
Quick Connection Panel (QCP) Installation Guide DANGER HAZARD OF ELECTRICAL SHOCK, EXPLOSION, OR ARC FLASH Read this document first. The installer is responsible for compliance with National Electrical
More informationCON EDISON EQUIPMENT
CON EDISON EQUIPMENT Con Ed Navtech Size Volts Amps List Spec. Cat. No Description Price 205 N-205 10x10x5 100 $72.00 205 RTN-205 10x10x5 100 190.00 215 N-215 24x12x8 200 144.00 215 RTN-215 24x12x8 200
More informationResidential Application for New Electric Service
Attn: Engineering Department 42 Wescom Rd Johnson VT 05656 1-800-832-2667 ext. 1171 802-635-2331 ext. 1171 802-635-4210 fax Residential Application for New Electric Service INVOICE Attn: Engineering Department
More informationELECTRIC SERVICE MANUAL
ELECTRIC SERVICE MANUAL Issued: November 2018 For the most current version of the Jo-Carroll Energy electric service manual please visit www.jocarroll.com TABLE OF CONTENTS Chapter 1. General Information...1
More informationFor Conduit Inspections
Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit
More informationApproved Contractor Construction e-guide Residential Commercial
Approved Contractor Construction e-guide Residential Commercial Clark Public Utilities PO Box 8900 Vancouver, WA 98668 (PAGE 2) TABLE OF CONTENTS PAGE Trenching 3 Wire 8 Single-Phase Transformer Set 13
More informationOVERHEAD SERVICE. Items to consider
OVERHEAD SERVICE Items to consider The maximum length of the service wire from the ComEd pole to the point of attachment on your residence is 150 feet, if practical. Your service wire installation must
More informationSALEM CITY POWER ELECTRICAL REQUIREMENTS & STANDARDS MANUAL
SALEM CITY POWER DEPARTMENT TABLE OF CONTENTS Section 1 General Requirements Purpose...1.1 Codes and Ordinances...1.1 Changes or Conflicts in Requirements and Guidelines...1.1 Application for Service...1.2
More informationInstalling or Rebuilding Your Electric Service
Installing or Rebuilding Your Electric Service 2 3 Contents Policies for New and Rebuilt Electric Service 2-4 Paperwork and fees...2 Five-year policy...3 Proposed route location and conditions...3 Construction
More informationSouthwire Company. Current Rating 70 AMPERE (60 DEG C), 85 AMPERE (75 DEG C), 95 AMPERE (90 DEG C) Ground Conductor Size
3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 SEU43500 4-4-4 Seu Cable-500' Southwire Company Catalog Number SEU43500 Manufacturer Southwire Company Description Copper
More informationWPS SERVICE MANUAL. Section Amp and Smaller - Common
Revised 01/2017 Section 2 200 AMP AND SMALLER - COMMON Page 1 of 17 Section 2 200 Amp and Smaller - Common 2-0 General Metering Requirements... 2 2-1 Basic Calculations... 4 2-2 100-200 Amp Single-Phase
More informationJACKSON ENERGY AUTHORITY ELECTRIC SERVICE POLICY EFFECTIVE SEPTEMBER 26 th, 2005 *REVISED JULY 12 th, 2017
JACKSON ENERGY AUTHORITY ELECTRIC SERVICE POLICY EFFECTIVE SEPTEMBER 26 th, 2005 *REVISED JULY 12 th, 2017 JEA SHALL MAKE ALL METER SPOTS BEFORE ELECTRICAL WORK BEGINS AS TO DETERMINE THE POINT OF ATTACHMENT
More informationIntroduction. Nexans wire and cable. Contact us for all your wire and cable needs
Introduction Nexans is one of the largest wire and cable manufacturers in the world, and in North America. In North America we manufacture in locations across the United States and Canada. We design and
More informationInstalling a Downstream Distribution Panelboard
Job Sheet 5 Installing a Downstream Distribution Panelboard OBJECTIVE To install a downstream distribution panelboard (DDP) on the Mobile Workstation. To mechanically and electrically connect the DDP to
More informationElectrical Tech Note 106
Electrical Tech Note 106 Biosystems & Agricultural Engineering Department Michigan State University Master Exam Study Guide and Sample Questions 1 Based on the 2014 NEC, Part 8 of PA 230, PA 407, and the
More information34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE
4. METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 4.-4 4. SELF-CONTAINED METERING, SINGE-PHASE INSTALLATION DETAILS /4 VOLT SINGLE-PHASE UNDERGROUND RESIDENTIAL SERVICE AND METER
More informationPHOTOVOLTAIC SYSTEMS
PV WORKSHEET STANDARD STRING ARRAY Solar photovoltaic (PV) systems have widely gained acceptance as an alternative energy source. Installations range from small arrays supplying bus stop luminaires to
More informationA. Submit manufacturer's literature and technical data before starting work.
SECTION 16425 SWITCHBOARD PART 1 GENERAL 1.01 SUMMARY A. Related Section: 1. 16450 - Grounding. 1.02 SUBMITTALS A. Submit manufacturer's literature and technical data before starting work. B. Submit Shop
More informationE R C. R E R C ; ; W T E C
WTEC and its affiliates is an engineering, manufacturing, procurement and construction company dedicated to the alternative energy market. It designs and produces products to move energy from the generation
More informationIndianapolis Power & Light Company
Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis
More informationContents. Obtaining Electric Service from Your Cooperative...1. Bonding Frames of Major Appliances...4. Voltage Drop...8. Drawings...
Contents Obtaining Electric Service from Your Cooperative...1 Bonding Frames of Major Appliances...4 Voltage Drop...8 Drawings...14 Agricultural Buildings...23 Optional Standby Systems...42 Grounding &
More informationCustomer Guide to Electric Service Requirements
Customer Guide to Electric Service Requirements Tillamook People s Utility District Power Services Group 1115 Pacific Avenue Tillamook, Oregon 97141 OFFICE: 503.815.8629 FAX: 503.815.8648 TOLL FREE: 800.422.2535
More informationELECTRIC SERVICE RULES UTILITY/CATV SERVICES Issued Jan 2016
UTILITY/CATV SERVICES CHAPTER 9 900. GENERAL A. Alliant Energy receives many requests for electric service from other utilities; telephone, telecommunications companies, cable television, the Department
More information10. METERING General Requirements
10. METERING 10.1 General Requirements A. The Company will not supply service to a Customer whose wiring is designed for resale of electricity through submetering except for recreational campgrounds, marinas,
More informationELECTRICAL ACCESSORIES FOR 1 5 8" (41 MM) WIDTH SERIES CHANNEL
ELECTRICL CCESSORIES FOR 5 8" (4 MM) WIDTH SERIES CHNNEL Page Electrical Fittings Receptacles Fixture Hangers ccessories and Connectors Junction Boxes In-Channel Joiners Swivel Hangers Cable Entrance Tubing
More informationMarshfield Utilities Rules for Electric Service Installations. Table of Contents
ELECTRIC SERVICE MANUAL 2018 Marshfield Utilities Rules for Electric Service Installations Table of Contents Section Topic Page Table of Contents... I Mission and Vision Statements... VII Introduction
More informationSTREAMLINED SOLAR CHECKLIST Owner Name:
STREAMLINED SOLAR CHECKLIST Owner Name: Address: DEPARTMENT OF PUBLIC WORKS AND PLANNING ALAN WEAVER, DIRECTOR This checklist must be completed by the contractor or an authorized agent of the contractor
More informationManufacturing quality. Delivering service. Single Conductors DESCRIPTION: Single copper conductor, tinned stranded insulated with moisture and heat resistant, chemically cross-linked polyethylene insulation
More informationPHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST
PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST The following checklist is an outline of the general requirements found in the 2005 National Electrical Code (NEC) Article 690 for Photovoltaic
More information2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code
2. DEFINITIONS 2.1 ACCEPTABLE Acceptable to the Company. 2.2 ADVANCED METER A meter that is capable of remote reading, and is capable of storing electric consumption data at specified time intervals of
More informationADDENDUM No. 1 Prospective Bidders
Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal
More informationMotor Branch Circuit Over-Current Protection
Motor Branch Circuit Over-Current Protection For HVAC Project Engineers Fachgesprach 9 WTF Institute of Higher Learning By Mat Ansari PE 2-18-2016 For HVAC Project Engineer's Reference Use Only Not for
More informationTEMPORARY ELECTRICAL SERVICE
ENERGY SERVICES ENGINEERING 840 Northgate Drive Telephone (509) 942-7403 Fax (509) 942-7405 P.O. Box 190 Richland, WA 99352 www.ci.richland.wa.us/energyservices TEMPORARY ELECTRICAL SERVICE A. INTRODUCTION
More informationSAFETY SOCKET BOX. Note 8 3" MIN. 3" Max. (200 A)
.&. SAFETY SOCKET BOX USE: 1 12/24V 1A & 2A 4 Terminal EUSERC Dwg. No's 34 & 35 (With Factory Installed Test-Bypass Facilities) Refer to SR-452 for the complete Front View Lower-Panel Removed Note 3 3"
More informationCustomer Requirements Pole Attachment Requirements for Telecommunications (non-rf)
Application This standard establishes the attachment requirements to utility pole structures owned and operated by Tacoma Power and communication facilities owned and operated by others. This standard
More informationSolar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings
Your City logo here Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for utility-interactive central/string inverter systems
More informationSolar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings
PV TOOLKIT DOCUMENT #3 Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for utility-interactive central/string inverter systems
More information(The actual state exam will be closer to 50 questions in 4 hours time) Master Electrician Practice Test
(The actual state exam will be closer to 50 questions in 4 hours time) Master Electrician Practice Test 1. Accessible as applied to wiring methods means capable of being removed or exposed without damaging
More informationDIVISION 16 - ELECTRICAL SECTION 16xx0 MANUFACTURED WIRING SYSTEM ACCESS FLOOR
DIVISION 16 - ELECTRICAL SECTION 16xx0 16xx0-1. GENERAL MANUFACTURED WIRING SYSTEM ACCESS FLOOR The modular convenience power system ensures the electrification and delivery of power from the power panels
More informationResidential Transition Box. Model RU-1. Specifications. Electrical
Residential Transition Box Model RU-1 Model RU-1 transition box provides a quick, simple, and easy transition between a microinverter trunk cable and stranded wire. Using only a single flathead screwdriver,
More informationWestern Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast
Western Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast 1.Question: An add on unit for a hydromassage bathtub consists of a small 1-gallon water heater
More informationSpring Test 7 due 05/03/2013
Spring Test 7 due 05/03/2013 Multiple Choice Identify the choice that best completes the statement or answers the question. 1. A raceway contains two 3-phase, 3-wire circuits that supply 38 ampere continuous
More information10 Commercial, Industrial, Agricultural Services
10 Commercial, Industrial, Agricultural Services This section describes the Power Company requirements for commercial, industrial, and agricultural services. This section covers single phase and three
More information2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE
2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE PAGE 1 OF 5 This Reference provides a very comprehensive list of aspects of a solar PV installation that could be reviewed, clarifying
More informationSPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION
Roseville Electric SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION REVISED 04/25/18 Specifications for Residential Construction Revision List REVISION Date Page No. Description 03/20/00 6.1-6.2 Added Armorcast
More informationNEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT
NEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT Meter Installations There are three basic ways to measure electricity consumption: Small and medium services are metered directly using direct connect
More informationMeter Mounting Equipment DTE Energy Area
Meter Mounting Equipment DTE Energy Area MILBANK OVERVIEW MILBANK OVERVIEW Charles A. Milbank 879-9 Bill Martin Robert F. Waldrop, 9-00 Robert F. Waldrop, II Chairman Katrina Waldrop Henke Vice Chairman
More informationSECTION 500 METERING AND ASSOCIATED EQUIPMENT
SECTION 500 METERING AND ASSOCIATED EQUIPMENT 500.0 General Meter sockets shall be provided, installed and maintained by Customer. When the ratings of meter sockets are exceeded, transockets shall be used.
More informationMTW/TEW UL STYLE MTW/TEW UL STYLES 1028/1283/ UL STYLES 1007/ UL STYLE SWITCHBOARD WIRE (SIS)...
MTW/TEW UL STYLE 1015...2 MTW/TEW UL STYLES 1028/1283/1284...3 UL STYLES 1007/1569...4 UL STYLE 1061...5 SWITCHBOARD WIRE (SIS)...6 UL STYLES 3173/3195/3196...7 UL STYLE 3321...8 TFN/TFFN/THHN-2/THWN-2/MTW...9
More informationRevised: April 2018 ¹ SERVICE TO WIRELESS DEVICE ANTENNA ATTACHMENTS ON CUSTOMER SERVICE POLES (SHEET 1) CUSTOMER: 1. An overcurrent protective device including a disconnect switch shall
More informationSection 6 Electric Metering: Residential
Section 6 Electric Metering: Residential 6.1. Scope This section provides specific information for residential metering that is not covered by the basic requirements in Section 5, Electric Metering: General.
More informationSpring Test 10 due 05/11/2013
Spring Test 10 due 05/11/2013 Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1. When installed in an agricultural building that houses livestock
More informationService Requirements
Service Requirements General Contact Idaho Power before beginning work on any new service. All meter installations must meet current electrical code requirements and display the proper electrical permit.
More informationINSTALL SERVICE- ENTRANCE SYSTEMS
SUBCOURSE EN5141 EDITION B US ARMY ENGINEER SCHOOL INSTALL SERVICE- ENTRANCE SYSTEMS INSTALL SERVICE- ENTRANCE SYSTEMS Subcourse Number EN5141 EDITION B United States Army Engineer School Fort Leonard
More information2016 Photovoltaic Solar System Plan Review List
Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Photovoltaic Solar System Plan Review List GENERAL PROJECT INFORMATION PLAN CHECK NO DATE JOB ADDRESS CITY ZIP REVIEWED BY PHONE
More informationGENERAL INFORMATION 1.01 PURPOSE
GENERAL INFORMATION 1.01 PURPOSE The purpose of this manual is to supply essential information to customers, employees, architects, engineers, contractors, and others concerned with electrical installations
More informationData Bulletin. Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT?
Data Bulletin March 2002 Lexington, KY, USA Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT? Table 1: Insulation Type Figure 1: Figure 2: Ampacity of a 1/0
More informationSPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION
Roseville Electric SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION REVISED 10/03/17 Specifications for Residential Construction Revision List REVISION Date Page No. Description 8/18/09 T.O.C., 8.1-8.1.5 &
More informationOREGON TRAIL ELECTRIC CO-OP ELECTRIC SERVICE REQUIREMENTS & GUIDELINES
10/12/2016 ARTICLE OREGON TRAIL ELECTRIC CO-OP ELECTRIC SERVICE REQUIREMENTS & GUIDELINES TABLE OF CONTENTS LOCATION OF OTEC OFFICES... IV OTEC SERVICE AREA... V SECTION I GENERAL INFORMATION 1.1 PURPOSE...
More informationHave You Been Grounded Lately
Have You Been Grounded Lately Thurs, Oct. 26, 2017 9:15-10:15 Phil Simmons Author, Electrical Grounding and Bonding Author Cengage Learning Phil Simmons Have You Been Grounded Lately 2017 NEC Changes Relative
More informationRESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering
1036 20 TH ST. PO BOX 1389 VERO BEACH, FLORIDA 32961-1389 TELEPHONE: (772) 978-5100 FAX: (772) 978-5125 Important Notice to Builders/Contractors/Developers From Electrical Engineering You must contact
More information