BERLIN MEADOWS. Faris Planning & Design SOUTH LANDSCAPE PLAN EXHIBIT D-1 PLANT KEY TYPICALS SEE PLANT LIST FOR SPECIFIC PLANT SPECIES
|
|
- Edwin Oswin Mason
- 5 years ago
- Views:
Transcription
1 ROA PRESERVE S TO FULLEST EXTENT POSSIBLE SEE DETAIL ON SHEET D- FOR TOT LOT SEE DETAIL ON SHEET D- FOR TOT LOT ROAD "A" ROAD "F" ROAD "C" ROAD "G" ROAD "H" ROAD "I" ROAD "F" SEE DETAIL ON SHEET D- FOR TOT LOT MEADOW MIX S S S S ROAD "E" S S MEADOW MIX S STREET TREES S ROAD "D" ROAD "A" ROAD "C" ROAD "B" 4 S STREET TREES S SHANAHAN ROAD SEE DETAIL ON SHEET D- FOR SOUTH ENTRY SOUTH LANDSCAPE PLAN EXHIBIT D- NORTH "=00' N. 5th Street Suite 40 Columbus, OH 45
2 , , SEE DETAIL ON SHEET D-5 PEACHBLOW ROAD 950 S SEE DETAIL 5 ON SHEET D-5 FOR NORTH ENTRY S 950 S STREET TREES S S STREET TREES ROAD "M" ROAD "N" ROAD "L" 9 70 MEADOW MIX STREET TREES ROAD "M" S STREET TREES S S PRESERVE S TO FULLEST EXTENT POSSIBLE ROAD "K" ROAD "L" ROAD "L" 6 4 ROAD "K" NORTH LANDSCAPE PLAN EXHIBIT D- NORTH "=00' N. 5th Street Suite 40 Columbus, OH 45
3 STREET TREES STREET TREES S MEADOW MIX S S STONE BENCH S 8' WIDE BIKE PATH ROAD "C" TOT LOT SEE DETAIL, SHEET D-4 8' WIDE BIKE PATH S LARGE EVERGREEN SHURBS ROAD "G" ROAD "I" EAST BOSQUE ENLARGEMENT LANDSCAPE PLAN SCALE: "=0' WEST BOSQUE ENLARGEMENT LANDSCAPE PLAN SCALE: "=0' ROAD "F" STREET TREES S STONE BENCH S 8' WIDE BIKE PATH ROAD "E" SOUTH LAWN ENLARGEMENT LANDSCAPE PLAN SCALE: "=0' SOUTH LANDSCAPE S EXHIBIT D- 4 N. 5th Street Suite 40 Columbus, OH 45
4 STREET TREES ROAD "A" S ENTRY FEATURE - SEE DETAILS AND - SHEET D-4 S LARGE S ORNAMENTAL GRASSES TEMPORARY SIGN - SEE DETAIL 4 - SHEET D-4, MIN 9' FROM R.O.W. 5' WIDE SIDEWALK 0' WIDE MULTI-USE PATH PROPOSED 60' R.O.W. PER THOROUGHFARE PLAN S SMALL DECIDUOUS SHRUBS FLOWERING DECIDUOUS SHRUBS SHANAHAN ROAD SOUTH ENTRY ENLARGEMENT LANDSCAPE PLAN SCALE: "=0' SAMPLE GAZEBO IMAGE SCALE: N.T.S. PROPOSED PLAYGROUND STRUCTURE (OR OWNER APPROVED EQUAL) SOUTH LANDSCAPE S EXHIBIT D-4 4 N. 5th Street Suite 40 Columbus, OH 45
5 , , ' WIDE BIKE PATH (TYP.) PEACHBLOW ROAD 5' WIDE CONC. WALK (TYP.) 0' WIDE MULTI-USE PATH (TYP.) PROPOSED 60' R.O.W. PER THOROUGHFARE PLAN SMALL FLOWERING S (TYP.) SMALL S (TYP.) LARGE ORNAMENTAL GRASSES (TYP.) STREET TREES (TYP.) PROPOSED FOUNTAIN PROPOSED BASIN S (TYP.) S (TYP.) S (TYP.) NORTH ENTRY ENLARGEMENT LANDSCAPE PLAN "=0' 6'-0" 6'-0" 5'-8" STONE COPING TRANSLUCENT MEDALLION - BACKLIGHT WITH LED. TYPICAL ALL SIDES BUT REAR STONE COPING R.O.W. '-0" '-7" R.O.W. '-7" '-0" TRANSLUCENT MEDALLION - BACKLIGHT WITH LED. TYPICAL ALL SIDES BUT REAR STONE COPING 5'-8" 9'-6" 9'-6" ENTRY ELEVATION (SOUTH ENTRY IS MIRRORED) N.T.S. NOTE: 9' MIN. SETBACK FROM R.O.W. SIGNAGE TO BE DOUBLE SIDED 5'-4" 5'-0" '-0" B M LIMESTONE COLORED BACKGROUND, LETTERING MAY BE INTERNALLY ILLUMINATED, SIGN AREA = S.F. STANDING SEAM METAL CAP WITH FAUX BRONZE FINISH 0'-0" " ERLIN EADOWS TRANSLUCENT MEDALLION - BACKLIGHT WITH LED. TYPICAL ALL SIDES BUT REAR STONE COPING WITH STONE 6'-0" '-0" '-" -/" PLAN VIEW /4" PLYWOOD SIGN BACK EXTERIOR GRADE PRESSURE TREATED "x4" CROSS MEMBERS PRESSURE TREATED (TYP.) 6"x6" POST PRESSURE TREATED (TYP.) "x4" BLOCKING PRESSURE TREATED (TYP.) /4" TH. PLYWOOD FRONT EXTERIOR GRADE, PRESSURE TREATED (TYP.) 5'-0" " DEVELOPMENT NAME DEVELOPER LOGO DEVELOPER PHONE NUMBER AND ADDRESS ELEVATION /4" PLYWOOD SIGN 6"x6" POST PRESSURE TREATED (TYP.) CONCRETE FOOTING (TYP.) ENTRY SIGN ELEVATION N.T.S. 4 TEMPORARY SIGN DETAIL N.T.S. ENTRY FEATURE - SEE DETAIL - THIS SHEET ROAD "N" TEMPORARY SIGN - SEE DETAIL 4 - THIS SHEET, MIN 9' FROM R.O.W. SMALL DECIDUOUS SHRUBS FLOWERING S ORNAMENTAL GRASSES S NORTH ROAD EXTENSION STREET TREES S GAZEBO - SEE DETAIL, SHEET D-4 S S ORNAMENTAL GRASSES S S ORNAMENTAL GRASSES 5 NORTH ENTRY FEATURE ENLARGEMENT LANDSCAPE PLAN "=0' NORTH LANDSCAPE S EXHIBIT D-5 4 N. 5th Street Suite 40 Columbus, OH 45
6
M1 BANK PETITION FOR FINAL SITE PLAN APPROVAL & CONDITIONAL USE PERMIT MANCHESTER ROAD DES PERES, MO 63131
M1 BANK PETITION FOR FINAL SITE PLAN APPROVAL & CONDITIONAL USE PERMIT 11679 MANCHESTER ROAD DES PERES, MO 63131 N. BALLAS RD BOPP RD PRELIMINARY - NOT FOR CONSTRUCTION SHEET INDEX - SITEPLAN & CUP G-0
More informationEXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY
EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY DESCRIPTION QTY J ] COST/ _ ] TOTAL AMOUNT STREET IMPROVEMENTS 16,271 LF $151.6 $2,467,247 WATER DISTRIBUTION SYSTEM LF $412,110
More informationANDERSON DRIVE & LANDSCAPE 10'-0" PUE SETBACK BUILDING SETBACK SIGN 20'-0" ENTRY /EXIT 71'-3" CHILD CARE CENTER 4,700 S.F. EXIT EXIT PLAYGROUND
SI GNAGE LANDSCAPE SETBACK T COMPACT 8'-0" 16'-0" LOCATION LIGHT POST LIGHT POST NEW STREET (E) STREET RELOCATE CL 36'-0" SHARED DRIVEWAY 20'-0" 6'-0" TRASH ENCLOSURE, SEE DETAIL 1/DR-2.1 20'-0" 20'-0"
More informationPARKING STANDARDS GENERAL DESIGN PRINCIPLES AND INTENT
West Hyattsville PARKING STANDARDS GENERAL DESIGN PRINCIPLES AND INTENT Intent To provide on-street parking and off-street surface/structured parking facilities that enhance pedestrian/motorist safety;
More informationDISTRICT. Regional Commercial (RC) Light Industrial (LI) No maximum. maximum. 60 acres. Smaller areas may be added to an existing RC area.
7-16-4. Table 2, Table of Standards.,, and Special Purpose Districts. TOOELE CITY, UTAH TABLE 2 TABLE OF STANDARDS MIXED USE, COMMERCIAL, INDUSTRIAL AND SPECIAL PURPOSE S s Maximum Lot Area maximum 25,000
More information/Volumes/work-1/e+a projects/2015 Projects/15-02-013 The Metro On Manchester - Brentwood MO/02 Schematic Design/B. Drawings/A. Archicad Files/ 8019 FAWN CT MARY SUSAN WARD FA W N CO 8015 FAWN CT MALLORY
More informationB E C K E R & F R O N D O R F Construction Cost Consulting Project Management
Project: Okehocking Nature Center Number: 07142E2 Client: M2 Architecture Date: June 5, 2009 Phase: DD B E C K E R & F R O N D O R F Construction Cost Consulting Project Management ESTIMATE SUMMARY CODE
More information77'-0" 77'-0" 40'-4" 9'-0" 0'-0" 1'-4" Site Plan Maximum Impervious Coverage Scale: /2"=1'-0" SET BACK (REAR) SET BACK (FRONT) 140'-0" 60'-8" 52'-4" 27'-0" 11'-8" 11'-8" 8'-8" 1'-8" FUTURE POOL POOL DECK
More informationA A A A 441 1,164 876 31 68 B D D C E B SIGNAGE LEGEND: A (4) MONUMENT SIGN B C D E (2) BELTERRA VILLAGE WALL SIGN (1) BV LOGO SIGN (ILLUMINATED) (2) BV LOGO SIGN (NON-ILLUMINATED) (3) BV PLANTER SIGN
More informationChapter. Parking SECTION OFF STREET PARKING AND LOADING REQUIREMENTS
Chapter 14 Parking It is the purpose and intent of this Ordinance that parking and loading areas be provided and adequately maintained in every zoning district for the purposes of promoting safe and efficient
More informationCONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO
Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,
More information#26115 Mt. Diablo Blvd. and Dewing Ave Mt. Diablo Blvd. Lafayette, CA 94549
R2: chg new N3 letterset to approved; add N18 AWN-ATM-M-D to add. approval - 5.29.14 R4: customer drawing - update legend - 6.16.14 Initial : Page No. 1 R2: chg new N3 letterset to approved; add N18 AWN-ATM-M-D
More informationDEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS
DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY NOVEMBER 30, 2017 SUBMITTED BY: LYDON LYNCH ARCHITECTS TABLE OF CONTENTS LETTER OF INTRODUCTION PROJECT
More informationARTICLE 15 PARKING AND LOADING REQUIREMENTS
ARTICLE 15 PARKING AND LOADING REQUIREMENTS SECTION 15.01 OFF-STREET PARKING REQUIREMENT There shall be provided in all districts at the time of erection or enlargement of any main building or structure,
More informationAppendix C. Cost Estimates
O Fallon Parks and Recreation Master Plan The cost estimates prepared for the ten year cost projections were estimated in 2010 US Dollars. The previous Implementation Strategies section of this Master
More informationCharter Township of Plymouth Zoning Ordinance No. 99 Page 164 Article 15: VP Vehicular Parking District Amendments:
Charter Township of Plymouth Zoning Ordinance No. 99 Page 164 PURPOSE ARTICLE XV VP VEHICULAR PARKING DISTRICT Vehicular Parking Districts (VP) are designed to accommodate off-street parking for the exclusive
More informationMETRO Magnolia Transit Center - Bid Tab
Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's
More informationFranklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation
7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,
More informationSUNSET BLVD. EL. 38'-0" EL. 56'-0" EL. 38'-0" ROOF TERRACE EL. 20'-0" PLAZA EL. 0'-0" PRIVATE TERRACE EL. 47'-0" POOL 3BR-UNIT A EL.
SUNSET BLVD. -2' -2'-0" (EL. +40.00') + (EL. +4000') +'-0" 0" (EL. 40.00') (N) (N) -4'-0" (EL. +40.00') +'-0" (EL. 40.00') 0.0 0' ) 0 +2'-" 2 (EL. ( 40.0') 40.0 ) (N) (EL. 4000') 4 (EL. +4000') 4 2 +2'-0"
More informationBig Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California
Big Easy RV & Boat Storage A Green Energy Project 36215 Jana Lane Wildomar, California 1 PROJECT OVERVIEW Project Description The construction and operation of a solar generation facility consisting of
More informationSTORE NUM.: 284 CROSS STREETS: San Pablo Ave & Monroe St. ADDRESS: 1075 Monroe St. Albany, CA
STORE NUM.: 284 CROSS STREETS: San Pablo Ave & Monroe St. ADDRESS: 1075 Monroe St. Albany, CA WALL SIGNS: Building Elevation NOTES: North South East West Area Allowed per Elevation Signs Allowed per Elevation
More informationHowever, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit.
We apologize for any inconvenience that this construction may cause and appreciate your patience while we work hard to improve The Crescent for our customers. Effective Tuesday, July 28 Shoring for the
More informationTHE CITY OF MARION HISTORIC DOWNTOWN STREETSCAPE PLAN DIRECTIONAL SIGNAGE
THE CITY OF MARION HISTORIC DOWNTOWN STREETSCAPE PLAN DIRECTIONAL SIGNAGE PREPARED BY: CITY OF MARION PLANNING AND DEVELOPMENT DEPARTMENT DECEMBER 2010 HIGHWAY & INTERSTATE DESTINATION SIGNAGE Interstate
More informationTo: Operations & Scheduling Committee Date: 09/21/2017. From: Ruby Horta, Director of Planning & Marketing Reviewed by:
To: Operations & Scheduling Committee Date: 09/21/2017 From: Ruby Horta, Director of Planning & Marketing Reviewed by: SUBJECT: Walnut Creek Transit Village Background: Construction at Walnut Creek BART
More informationPublic Health Services San Joaquin Co.
Proposed San Joaquin Co. Stockton, California REVISIONS No. Description Cover Sheet Data CS No. Description Site Plan A1 No. Description Enlarged Existing Lab Area Site / Demolition Plan A2 No. Description
More informationPARKING REGULATIONS MAP
2.6. PARKING REGULATIONS This section contains development standards and design guidelines regulating the creation of new parking facilities. Regulations for the provision of an adequate, but not excessive
More informationReceived June 2, 2017 PLN-PUDC
MASTER LAND USE PLAN for: a prestigious community presented by: Breeden Investment Properties and Davenport Management Company Virginia Beach, Virginia 23452(757) 468-6800 Received PLN-PUDC-2016-008 page
More informationDR SE WAY SOMERSIDE. C-N Neighborhood Commercial Site. R-LD - Development in accordance. Fully Landscaped Park/ Playground.
LAND & BUSINESS SUPPORT DEPT Southlands Phase 6A Plan 01231 City of Medicine Hat Land & Business Support Ph (03) 52-1 Fax (03) 502-055 land_properties@medicinehat.ca updated August 20, 201 SOMERSET BAY
More information±25,934 SF C-3 ZONED PAD
±25,934 SF C-3 ZONED PAD SOUTH 5TH AVENUE, TUCSON, ARIZONA CONTACT US DAVE VOLK Vice President +1 520 323 5102 david.volk@cbre.com BRUCE SUPPES Vice President +1 520 323 5155 bruce.suppes@cbre.com PROPERTY
More informationGENERAL NOTES AND REQUIREMENTS FOR PLUMBING AND ELECTRICAL WORK
GENERAL NOTES AND REQUIREMENTS FOR PLUMBING AND ELECTRICAL WORK SCALE: 1"=20'-0" OUTDOOR EQUIPMENT STORAGE YARD HISTORIC SITE USE PLAN PARKING LOT AND EQUIPMENT CIRCULATION AREA 11. LOAD'G SPACE 4. 3.
More informationSAN FRANCISCO VETERANS WAR MEMORIAL
WAR CA 94107 \\NETGEAR\Share\ S\CURRENT S\San Francisco Veterans Memorial\Post Award\SCHEMATIC DESIGN\SD Historical package\sd_historical_062612 Folder\Links\Narduli_Cochran_aerial_large.jpg 50% DEVELOPMENT
More informationCHECKLIST CONDITIONAL USE PERMIT APPLICATION Authority: New Castle Municipal Code & et seq.
Administration Department (970) 984-2311 Fax: (970) 984-2716 www.newcastlecolorado.org Town of New Castle PO Box 90 450 W. Main Street New Castle, Co 81647 CHECKLIST CONDITIONAL USE PERMIT APPLICATION
More informationZONING ORDINANCE, ARTICLE 15: OFF-STREET PARKING REQUIREMENTS PAGE
ZONING ORDINANCE, ARTICLE 15: OFF-STREET PARKING REQUIREMENTS PAGE 15:1 ARTICLE 15 OFF-STREET PARKING REQUIREMENTS 3-340 General Provisions A. Every use or structure instituted, constructed, erected, enlarged,
More informationBADLANDS ENVIRONMENTAL CONSULTANTS, INC E. Central Ave. Bismarck, ND (701) AIR MONITORING & SAMPLE ANALYSIS REPORT
BADLANDS ENVIRONMENTAL CONSULTANTS, INC. 1006 E. Central Ave. Bismarck, ND 58501 (701) 223-7335 AIR MONITORING & SAMPLE ANALYSIS REPORT CLIENT: LOCATION: ND DOT ND DOT Admin Building Bismarck, ND BEC #:
More informationCOMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321
COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street S, P.O. Box 490 Albany, OR 97321 Ph: 541-917-7550 Fax: 541-917-7598 www.cityofalbany.net STAFF REPORT Application for Site Plan Review and Adjustment
More informationTraffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015
Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast
More information2.0 Development Driveways. Movin Out June 2017
Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.
More informationSt. Johns River State College BID-SJR Addendum Three ADDENDUM THREE DATED JUNE 13, 2016
St. Johns River State College BID-SJR-10-2016 Addendum Three ADDENDUM THREE DATED JUNE 13, 2016 TO BID-SJR-10-2016 Bid Specifications/Project Manual (Plans) PARKING LOT REHABILITATION PROJECT FOR: DRAWING
More informationBE IT ORDAINED BY THE COUNCIL OF THE CITY OF TOPEKA, KANSAS: Section 1. That section , Scope and application, of The Code of the
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 (Published in the Topeka Metro News May 19, 2014) ORDINANCE NO. 19904 AN ORDINANCE introduced by City Manager Jim Colson, amending City of Topeka Code Sections
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationNEIGHBORING BUILDING 275' - 10" TRASH & RECYCLING VAN H/C L/T T 11' - 6 1/2" 32' - 0" 32' - 0" 53' - 6" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 27' - 0"
ALLEY NEIGHBORING BUILDING 25' - 0" ' - 0" LINE OF BASEMENT BELOW LINE OF CANOY ABOVE 2" SANITARY SEWER " WATER MAIN L L/T T GRAND AVE. B R 33' - 0" 24' - 5" 2' - 4" 2' - 4" 2' - 4" 24' - 5" SITE LAN /"
More information3 December 12, 2012 Public Hearing APPLICANT:
BEACH 3 December 12, 2012 Public Hearing APPLICANT: PROPERTY OWNER: KRIST ENTERPRISES STAFF PLANNER: Stephen J. White REQUEST: Modification of a Conditional Use Permit for motor vehicle sales (approved
More informationARTICLE XX OFF STREET PARKING AND LOADING REQUIREMENTS
20 200 Zoning 20 200 ARTICLE XX OFF STREET PARKING AND LOADING REQUIREMENTS Wherever a building or structure is erected, enlarged or capacity increased, or the use is changed in any zoning district, improved
More informationCenter Street Partners, LLC
OWNER enter Street Partners, LL BERKELEY PROJET ARHITET PROJET TEAM PROJET NO. TITLE SHEET DRAWING LIST PROJET DATA JRDV ARHITETS IN. OPYRIGHT enter Street Partners, LL PROJET 169'-4 1 2" 65'-1 1 2" 27'-3
More informationSTREET IMPROVEMENTS PROPOSAL BID ITEMS
STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove
More informationTemporary Sales Trailer Application
Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 Temporary Sales Trailer Application General: Requests for temporary sales trailers, which comply with
More informationSUBDISTRICTS LEGAL DESCRIPTIONS DELETED FOR BREVITY. (60.1) WINDOW SIGN means a sign painted or affixed to a window.
ITEM LANGUAGE SEC. 51A-7.1701. OVERALL LEGAL DESCRIPTION DELETED FOR BREVITY. ALL LEGAL DESCRIPTIONS SHOULD BE REMOVED FROM THE BODY OF THE SPSD AND ATTACHED TO THE ORDINANCE. OVERALL BOUNDARY PROPOSED
More informationDirector of Building and Deputy Chief Building Official
STAFF REPORT ACTION REQUIRED Sign Variance 515 Drewry Avenue Date: September 22, 2009 To: From: Wards: Reference Number: North York Community Council Director of Building and Deputy Chief Building Official
More informationWATERS TECHNOLOGY PARK
WATERS TECHOLOGY PARK LARGE PROJECT PRE-APPLICATIO OCTOBER 2017 1 WATERS TECHOLOGY PARK - EXISTIG SITE CODITIOS Retail Center San Mateo County Fairgrounds Proposed Dog Park ew Crosswalk at orfolk Street
More informationWESTSIDE PUMP STATION RELIABILITY IMPROVEMENTS CIVIC DESIGN REVIEW - PHASE 2 - JANUARY 23, 2017
WESTSIDE PUMP STATION RELIABILITY IMPROVEMENTS CIVIC DESIGN REVIEW - PHASE 2 - JANUARY 23, 2017 CITY & COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WESTSIDE T/S PROJECT BACKGROUND AND OBJECTIVE
More informationCity of Casselberry Planning Division
City of Casselberry Planning Division 95 Triplet Lake Drive, Casselberry, Florida 32707 Telephone (407) 262-7700, Ext. 1106 Fax (407) 262-7763 Email: ehanna@casselberry.org SIGN REGUALTIONS SEE ULDR Article
More informationDESCRIPTION QUANTITY PRICE TOTAL
GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00
More informationPUBLIC INFRASTRUCTURE PROJECTS
PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING
More informationChapter PARKING REGULATIONS
17.112.010 Chapter 17.112 PARKING REGULATIONS Sections: 17.112.010 Scope of Regulations Applicability. 17.112.020 Schedule of Off-Street Parking Requirements. 17.112.030 Off-Street Loading Requirements.
More informationParking Survey Oct 2009 DRAFT October 2, DRAFT -- Parking Situation Current Status
DRAFT -- Parking Situation Current Status During Sept & Oct 009 members of P&Z walked much of the Town to informally survey the on-street parking situation in Dewey. This unofficial survey includes 14
More informationNew RepairBase Line Item additions for the Update
Roof Sheathing Install or Repair Gutters/Downspouts - 2nd Story or Above - Labor only - Add per LF Gutters and Downspouts Remove Felt Underlayment from Roof - Removal of Roofing, Disposal and Haul Away
More informationSTAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman
# 5 ) UN-15-17 LA SIERRA AUTO SALES SPECIAL USE PERMIT VEHICLE SALES PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: April 12, 2017 Item: UN-15-17 Prepared by: Robert Eastman GENERAL
More informationPARKING LOT REHABILITATION PROJECT FOR: SJRSC PALATKA CAMPUS
PARKING LOT REHABILITATION PROJECT FOR: DRAWING INDE SHEET NO. DRAWING TITLE C. COVER SHEET C1. - C1.17 PALATKA CAMPUS C4. CONSTRUCTION DETAILS PROJECT SITE PROJECT SITE C. 8 4 8 16 32 1 inch = 8 ft. C1.16
More informationSTANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationCreekSide XVI & XVIII
Project Overview CreekSide XVI & XVIII Building Dimensions CreekSide XVI - 155,866 square feet CreekSide XVIII - 236,140 square feet 32 clear height 50 x 54 column spacing and 60 speed bay CreekSide Advantage
More informationENGINEERING & ENVIRONMENTAL
1-800-292-8989 www.iowaonecall.com CITY OF WEST BRANCH, IOWA THIS ENGINEERING DOCUMENT HAS BEEN REVIEWED BY THE JURISDICTION AND IS RECOMMENDED FOR FILING WITH THE CITY CLERK ENGINEERING & ENVIRONMENTAL
More informationPROPOSED DEVELOPMENT 18 OTEHA VALLEY ROAD EXTENSION, ALBANY
PLACEMAKERS TIMBER YARD PLACEMAKERS CAR PARK SEATING CAFE EXISTING PLACEMAKERS SIGNAGE DAIRY FLAT HIGHWAY OTEHA VALLEY ROAD EXTENSION LOCALITY PLAN Scale 1:500 @ A1, 1:1000 @ A3 OTEHA VALLEY ROAD SCALE:
More informationA13 AVILA RANCH DEVELOPMENT PLAN SITE PLAN. Typical 58 R-1 Residential Street Section STREET SECTION. July 19, 2016 #
STREET SECTION SITE PLAN Typical 58 R-1 Residential Street Section 0 4 8 16 SCALE: 1 =8 (24 x36 sheet) A13 STREET SECTION SITE PLAN Typical 60 Collector Street Section 0 4 8 16 SCALE: 1 =8 (24 x36 sheet)
More informationERUSD 2025 Board Workshop #1
The image part with relationship ID rid4 was not found in the file. ERUSD 2025 Board Workshop #1 December 12, 2017 12/5/17 1 Cabinet Meeting 12/4/2017 Cactus Group 7 School Allowance $ 1,101,039 Filed
More informationC-SM (SOUTH MAIN STREET COMMERCIAL DISTRICT)
Planning and Building Agency Planning Division 20 Civic Center Plaza P.O. Box 1988 (M-20) Santa Ana, CA 92702 (714) 647-5804 www.santa-ana.org C-SM (SOUTH MAIN STREET COMMERCIAL DISTRICT) Sec. 41-520.
More information# BP Gas Station Special Use Permit Amendment for Signs Project Review for Planning and Zoning Commission
#2011-40 BP Gas Station Special Use Permit Amendment for Signs Project Review for Planning and Zoning Commission Meeting Date: October 5, 2011 Requests: Location: Acreage: Zoning: Surrounding Properties:
More informationItems Unit Quantity Unit Price Total Unit Price Total
Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH
More informationSection III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year
Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020
More informationPLANNING COMMISSION REPORT Regular Agenda -- Public Hearing Item. PC Staff Report 5/23/16 TEXT AMENDMENT TO LAND DEVELOPMENT CODE; VALET PARKING (SLD)
PC Staff Report 5/23/16 TA-16-00128 Item No. 5-1 PLANNING COMMISSION REPORT Regular Agenda -- Public Hearing Item PC Staff Report 5/23/16 ITEM NO. 5 TEXT AMENDMENT TO LAND DEVELOPMENT CODE; VALET PARKING
More informationCITY OF PITTSFIELD PURCHASING DEPARTMENT
CITY OF PITTSFIELD PURCHASING DEPARTMENT City Hall 70 Allen Street Room 102 Pittsfield, MA 01201 (413) 499-9470 Telephone (413) 448-9818 Fax Colleen Hunter-Mullett, Purchasing Agent VENDOR REGISTRATION
More informationE555ParkingRamp East5thStreetSitePlan March1st,2018
E555ParkingRamp East5thStreetSitePlan March1st,2018 GRAYBAR THE LYON APARTMENTS SITE + BUILDING DATA A BUILDING DIMENSIONS: L 337-7 X 127 KEY DES MOINES STREET CONSTRUCTION LIMIT B O A O 3 FLOORS 71 SURFACE
More informationC H A P T E R 45 Auto and Bicycle Parking and Loading
C H A P T E R 45 Auto and Bicycle Parking and Loading Sections 17.45.1 Purpose 17.45.2 General Requirements 17.45.3 Number of Parking Spaces Required by Use 17.45.4 Parking Lot Design Standards and Location
More informationDUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS
PRELIMINARY ENGINEERING PLANS DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS ERIC CARLSON ARCHITECTS LOCATION MAP DRAWINGS INDE CONTACTS REV DATE NOT TO SCALE BENCHMARKS CRISSEY AVENUE IL ROUTE 38
More informationSITE PLANS ASSISTED LIVING REDEVELOPMENT
SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE
More information6 East 6 th St. Phone P.O. Box 708 Tdd Lawrence, KS Fax
6 East 6 th St. www.lawrenceks.org/pds Phone 785-832-3150 P.O. Box 708 Tdd 785-832-3205 Lawrence, KS 66044 Fax 785-832-3160 To: File From: Planning Staff Date: June 16, 2010 Re: Parking for Duplex or Detached
More information- CODE OF ORDINANCES Chapter 54 - ZONING ARTICLE IV. - SUPPLEMENTARY DISTRICT REGULATIONS DIVISION 2. GENERAL STANDARDS
Sec. 54-349. General application. Sec. 54-350. Setbacks on federal, state and county highways. Sec. 54-351. Lots and yards. Sec. 54-352. Accessory uses and structures. Sec. 54-353. Height exceptions. Sec.
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANT A CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR 9500 GILMAN DRIVE #0916 CAMPUS ARCHITECT- FACILITIES DESIGN
More information8150 Sunset Bl Valet on Crescent Heights Bl 4 messages
Eileen Hunt 8150 Sunset Bl Valet on Crescent Heights Bl 4 messages Eileen Hunt To: Jeannie Shen Thu, Jan 30, 2014 at 11:11 AM
More informationAppendix C Preferred Solution
Appendix C Preferred Solution C.1 Conceptual Design Drawings C.2 Preferred Option Ideas and Inspiration C.3 Concept Renderings C.4 Cost Estimate Appendix C.1 Conceptual Design Drawings Plan View Brock
More informationFORM A: ACCESSIBILITY CHECKLIST. Questions. Possible Solutions A. PARKING. Location Name Location Address: (street address) (city) (state) (zip)
FORM A: ACCESSIBILITY CHECKLIST Survey Date: Location Name Location Address: (street address) (city) (state) (zip) Questions A. PARKING 1) Does the facility have: a) accessible parking spaces available?
More information10 May 14, 2014 Public Hearing
10 May 14, 2014 Public Hearing APPLICANT: PROPERTY OWNER: AEGEAN ASSOCIATES CUP-Truck and Trailer Rentals STAFF PLANNER: Kristine Gay REQUEST: Conditional Use Permit for Truck and Trailer Rentals ADDRESS
More informationDate: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:
DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project
More informationCOMMISSION CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN AUGUST, 2017
SAN FRANCISCO PUBLIC UTILITIES COMMISSION CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN AUGUST, 2017 Civic Design Review - Conceptual Design August 2017 Page 2 PROJECT BACKGROUND AND OBJECTIVE: The Central Bayside
More informationI1 --'i..m I, - THE CORPORATION OF THE CITY OF BRAMPTON BY-LAW. To amend By-law as amended.
I1 --'i..m I, - THE CORPORATION OF THE CITY OF BRAMPTON BY-LAW Number 1.--'-----.3_3_ a _.2_0_(}_6 To amend By-law 270-2004 as amended. The Council of the Corporation of the City of Brampton hereby ENACTS
More informationHousing Development Corp of Dekalb
Housing Development Corp of Dekalb Campaign Contributions Disclosure Form Have you as applicant, agent for applicant, property owner, or person associated with the application for property, located at,
More informationDowntown Community Plan Adopted April 2006
Downtown Community Plan Adopted April 2006 Chapter 5.8 Goals and Policies: Sustainable Development Far Bonus Program: Eco-Roof Urban plazas, street activation and Neighborhood Centers Suburban vs. Urban
More informationTRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT
TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic
More informationTechnical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:
Technical Memorandum To: Tom Hanrahan Jeff Sharp From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Barrie Lockhart Road LP Conformity Review Scott Young Sorbara Group
More informationEast Allen County Schools Facilities History Calendar Years October 5, 2015
East Allen County Schools Facilities History Calendar Years 2007 2015 October 5, 2015 Heritage Attendance Area Heritage Jr./Sr. High School (includes K-12) 2007: Repaved Front Student Parking Lot; and
More informationTHE CORPORATION OF THE TOWNSHIP OF KING ACCESSIBILITY ADVISORY COMMITTEE MINUTES TUESDAY, APRIL 14 TH, 2015
THE CORPORATION OF THE TOWNSHIP OF KING ACCESSIBILITY ADVISORY COMMITTEE MINUTES TUESDAY, APRIL 14 TH, 2015 Township Accessibility Advisory Committee met at 1:03 p.m. in the Planning Boardroom, Township
More informationTerminal Alternatives
Chapter 5 Terminal Alternatives Missoula International Airport Master Plan Update Prepared for Missoula County Airport Authority OCTOBER 2008 Contents Section Page 5 Terminal Alternatives...5-1 5.1 Terminal
More informationORDINANCE NO AN ORDINANCE AUTHORIZING AND REGULATING THE OPERATION OF GOLF CARTS IN THE CITY OF NEW CASTLE, HENRY COUNTY, INDIANA
ORDINANCE NO. 3682 AN ORDINANCE AUTHORIZING AND REGULATING THE OPERATION OF GOLF CARTS IN THE CITY OF NEW CASTLE, HENRY COUNTY, INDIANA WHEREAS, the State of Indiana, by its adoption of I.C. 9-21-1-3.3
More informationThe following provisions shall apply to the Broughton Street district:
Sec. 8-3119. Broughton Street sign district created. The following provisions shall apply to the Broughton Street district: (1) District identified. The Broughton Street district shall be that area encompassed
More informationParking and Loading. Page 1 of 7
Parking and Loading 21.03.020 Off-street parking and loading. A. Purpose. The purpose of this section is to ensure that sufficient off-street parking and loading areas are provided and properly designed
More informationWinnipeg Transit Bus Maintenance Garage Expansion Project
Winnipeg Transit Bus Maintenance Garage Expansion Project Thank you for your interest in this project! We invite you to review information on the display boards, meet project team members to share your
More informationSPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES
9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54
More informationWelcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,
Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, is now called the Valley Line. We are here to present
More informationBID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.
PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00
More informationDRIVEWAY/APPROACH PERMIT APPLICATION Applicant Type: Architect/Engineer Contractor Owner
DRIVEWAY/APPROACH PERMIT APPLICATION Applicant Type: Architect/Engineer Contractor Owner Lake Elmo City Hall 651-747-3900 3880 Laverne Avenue North Lake Elmo, MN 55042 Project Address: Property Owner:
More information2011 LOCAL STREET IMPROVEMENTS
11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE
More information