BADLANDS ENVIRONMENTAL CONSULTANTS, INC E. Central Ave. Bismarck, ND (701) AIR MONITORING & SAMPLE ANALYSIS REPORT
|
|
- Joshua Lee
- 5 years ago
- Views:
Transcription
1 BADLANDS ENVIRONMENTAL CONSULTANTS, INC E. Central Ave. Bismarck, ND (701) AIR MONITORING & SAMPLE ANALYSIS REPORT CLIENT: LOCATION: ND DOT ND DOT Admin Building Bismarck, ND BEC #: P Number Date Type Location Flow Rate (L/min.) Sampling Time (Minutes) Volume (Liters) Results (F/cc) 1 10/10/08 Blank Laboratory Fibers/ 2 10/10/08 Blank Field Fibers/ 3 10/10/08 Background 4 th Floor North West End /10/08 Background 4 th Floor West Side /10/08 Background 4 th Floor South West End /10/08 Background 4 th Floor South East End /10/08 Background 4 th Floor East Side /10/08 Background 4 th Floor North East End /13/08 Background 5 th Floor Near Stairwell /13/08 Background 5 th Floor Middle of Penthouse /13/08 Blank Laboratory Fibers/ 12 10/13/08 Background 3 rd Floor South East Corner, in Stairwell 13 10/13/08 Background 3 rd Floor Lobby, North Wall /13/08 Background 3 rd Floor North East Corner, in stairwell 15 10/13/08 Ambient 4 th Floor South West End /13/08 Ambient 4 th Floor North East End /14/08 Ambient 4 th Floor South West End /14/08 Ambient 4 th Floor North East End /14/08 Ambient 4 th Floor Middle of Break Area /14/08 side 4 th Floor Middle of Break Area /14/08 Blank Field Fibers/
2 22 10/14/08 side 4 th Floor North Stairs, by /14/08 side 4 th Floor South Stairs, by *24 10/14/08 Inside Work 4 th Floor South West End Area 25 10/15/08 side 4 th Floor Middle of Break Area /15/08 side 4 th Floor North Stairs, by /15/08 side 4 th Floor South Stairs, by /15/08 Inside Work 4 th Floor North End of Area Containment, Near Workers 29 10/15/08 side 4 th Floor Middle of Break Area /15/08 side 4 th Floor North Stairs, by < /15/08 Blank Laboratory Fibers/ 32 10/15/08 side 4 th Floor South Stairs, by /15/08 Ambient 3 rd Floor South West End of Room /15/08 Ambient 3 rd Floor North End of Lobby /15/08 Ambient 3 rd Floor Across from Room < /15/08 Inside Work 4 th Floor South West End, Near /15/08 Dirty Room 4 th Floor Dirty Room in the < /16/08 Clean Room 4 th Floor Clean Room in the /16/08 side 4 th Floor North Stairs, by < /16/08 side 4 th Floor South Stairs, by < /16/08 Blank Field Fibers/ 42 10/16/08 Ambient 3 rd Floor South West End of Room < /16/08 Ambient 3 rd Floor North End of Lobby /16/08 Ambient 3 rd Floor Across from Room /16/08 Ambient 4 th Floor North East End /16/08 side 47 10/16/08 side 4 th Floor North Stairs, by critical barrier 4 th Floor South Stairs, by critical barrier
3 48 10/16/08 Ambient 3 rd Floor Across from Room /16/08 Ambient 3 rd Floor North End of Lobby < /16/08 Ambient 3 rd Floor Across from Room < /16/08 Blank Laboratory Fibers/ 52 10/16/08 Negative Air 4 th Floor North West End, 7 th /16/08 Inside Work 4 th Floor North East End, Near /20/08 side 4 th Floor North Stairs, by /20/08 side 4 th Floor South Stairs, by /20/08 Ambient 3 rd Floor Across from Room /20/08 Ambient 3 rd Floor North End of Lobby /20/08 Ambient 3 rd Floor Across from Room < /20/08 Negative Air 4 th Floor North West End, 4 th < /20/08 Inside Work 4 th Floor East Side, Near /20/08 Blank Field Fibers/ 62 10/20/08 side 4 th Floor Middle of Break Area /20/08 side 4 th Floor North Stairs, by /20/08 side 4 th Floor South Stairs, by /20/08 Load 4 th Floor 2 nd Stage of the Load < /20/08 Inside Work 4 th Floor East Side, Near /20/08 Ambient 1 st Floor Lobby Area, Near <0.003 Elevators 68 10/21/08 side 4 th Floor North Stairs, by /21/08 side 4 th Floor South Stairs, by /21/08 Ambient 3 rd Floor Across from Room /21/08 Blank Laboratory Fibers/ 72 10/21/08 Ambient 3 rd Floor North End of Lobby /21/08 Ambient 3 rd Floor Across from Room /21/08 Inside Work 4 th Floor North West End, Near
4 75 10/21/08 Dirty Room 4 th Floor Dirty Room in the /21/08 side 4 th Floor Middle of Break Area /21/08 side 4 th Floor North Stairs, by /21/08 side 4 th Floor South Stairs, by /21/08 Ambient 1 st Floor Lobby Area, Main /21/08 Inside Work 4 th Floor East Side, near Load Area 81 10/21/08 Blank Field Fibers/ 82 10/21/08 Load 4 th Floor 1st Stage of the Load /22/08 side 4 th Floor North Stairs, by /22/08 side 4 th Floor South Stairs, by /22/08 Ambient 3 rd Floor Across from Room /22/08 Ambient 3 rd Floor North End of Lobby /22/08 Ambient 3 rd Floor Across from Room /22/08 Inside Work 4 th Floor North West End, Near /22/08 Negative Air 4 th Floor North West End, 4 th < /22/08 side 4 th Floor North Stairs, by /22/08 Blank Laboratory Fibers/ 92 10/22/08 side 4 th Floor South Stairs, by < /22/08 Ambient 1 st Floor Lobby Area, Main /22/08 Inside Work 4 th Floor East Side, near Area workers 95 10/22/08 Load 4 th Floor 1st Stage of the Load < /23/08 side 4 th Floor North Stairs, by /23/08 side 4 th Floor South Stairs, by /23/08 Ambient 3 rd Floor Across from Room < /23/08 Ambient 3 rd Floor North End of Lobby /23/08 Ambient 3 rd Floor Across from Room
5 101 10/23/08 Blank Field Fibers/ /23/08 Inside Work 4 th Floor West Side, Near /23/08 Dirty Room 4 th Floor Dirty Room in the < /23/08 side 4 th Floor Middle of Break Area /23/08 side 4 th Floor North Stairs, by /23/08 side 4 th Floor South Stairs, by /23/08 Ambient 3 rd Floor North End of Lobby *108 10/23/08 Inside Work Area 4 th Floor East Side, near Load Particulate Overload Comments: < = The fiber concentration is reported as less than its Limit of Detection (LOD) based on sample air volume. #24 had a lot of dust and particulates on the sample #108 had a lot of dust from the crew sweeping the work area, making it impossible to read.
Prepared for: Prepared by: 4005 Port Chicago Highway Concord, California
AIR MONITORING SUMMARY REPORT Time-Critical Removal Action for the Experimental Ship Shielding Range, Parcel E-2 Hunters Point Naval Shipyard San Francisco, California Contract Number N62473-10-D-0807
More informationTechnical Information
Technical Information CCC Total Gross Square Footage: 2,200,000 square feet. Elevations for Each Level: Lower Level: 5,197 6 Street Level: 5,214 Upper Level: 5,241 6 (It is 16 6 from the Lower Level floor
More informationA-001 IRISH CULT URAL CENT ER HUDSON VALLEY COVER SHEET SHEET INDEX. Name. Abeel Street CONSULTANTS
SHEET INEX & Planning PLLC - BIM Server: HMKBIM - BIM Server /Ashokan/ICCHV - A-00 COVER SHEET - Printed by Brad Will, AIA on Monday, ecember, 0 at : PM I Monday, ecember, 0 Ô CULT URAL CENT ER Name A-00
More informationHowever, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit.
We apologize for any inconvenience that this construction may cause and appreciate your patience while we work hard to improve The Crescent for our customers. Effective Tuesday, July 28 Shoring for the
More informationTechnical Information
Technical Information CCC Total Gross Square Footage: 2,200,000 square feet. Lower Level: 114,860 square feet Street Level: 313,525 square feet (Includes theatre) Upper Level: 625,969 square feet Elevations
More informationDEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS
DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY NOVEMBER 30, 2017 SUBMITTED BY: LYDON LYNCH ARCHITECTS TABLE OF CONTENTS LETTER OF INTRODUCTION PROJECT
More information1 st Quarter Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations. Prepared for:
1 st Quarter 2018 Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations Prepared for: Prepared by: Mr. Bryce C. Bird Director Division of Air Quality 195 North
More informationElemental Analysis Advanced
better analysis counts Elemental Analysis Advanced Rapid sulfur measurement plus 12 elements from P to Zn. ASTM D4294 ISO 8754 IP 336 Advanced Software and Data Management Petra offers the latest software
More information1st Quarter Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations
1st Quarter 2014 Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations Steven A. Root Digitally signed by Steven A. Root DN: cn=steven A. Root, o=weatherbank,
More information4th Quarter Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations
4th Quarter 2016 Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations Steven Root Digitally signed by Steven Root DN: cn=steven Root, o=weatherbank, Inc., ou,
More information3 rd Quarter Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations. Prepared for:
3 rd Quarter 2018 Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations Prepared for: Prepared by: Mr. Bryce C. Bird Director Division of Air Quality 195 North
More informationRated voltage: 100~277 VAC Frequency: 50/60Hz Wattage: 14 W
Customer Company & Address: MaxLite ADD: 12 York Ave, West Caldwell, NJ 07006 Contact Person: Francisco Garza Telephone: 973-244-7300x142 Telephone: fgarza@maxlite.com Manufacturer: Country of Origin:
More informationImproved Oil Recovery Pilot Projects. Todd Hoffman Spring Symposium Montana Tech 21 April 2017
Improved Oil Recovery Pilot Projects Todd Hoffman Spring Symposium Montana Tech 21 April 2017 Outline Slide 2 Previous IOR Pilot Tests What s been done, what s worked, and what we ve learned Future IOR
More informationNEIGHBORING BUILDING 275' - 10" TRASH & RECYCLING VAN H/C L/T T 11' - 6 1/2" 32' - 0" 32' - 0" 53' - 6" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 27' - 0"
ALLEY NEIGHBORING BUILDING 25' - 0" ' - 0" LINE OF BASEMENT BELOW LINE OF CANOY ABOVE 2" SANITARY SEWER " WATER MAIN L L/T T GRAND AVE. B R 33' - 0" 24' - 5" 2' - 4" 2' - 4" 2' - 4" 24' - 5" SITE LAN /"
More informationEnvironmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre
Waste Management of Canada Corporation Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre ATMOSPHERIC PARTICULATE MATTER EXISTING CONDITIONS REPORT Prepared
More informationWASHINGTON HILTON LOBBY LEVEL
WASHINGTON HILTON FLOOR PLANS LOBBY LOBBY LEVEL LEVEL KALORAMA JAY THE COFFEE BEAN & TEA LEAF L ENFANT INDEPENDENCE HOLMEAD MORGAN NORTH FRONT LOBBY TDL BAR OAK LAWN THE DISTRICT LINE RESTAURANT PISCATAWAY
More informationTest was abandoned as the 4-inch submersible pump (rated for 5 gpm) was clogged right after the pump was turned on.
# Test Purpose Date Duration Result Comments 1 BW6 constantrate pumping test; 7/31 Target duration: 48 hours Target rate= 5 pgm 1) Estimate large scale equivalent T and S interval of BW6; 2) Start a series
More informationPressure Drop (Reference (typical)) 0.19 kpa 0.48 kpa Operating Temperature
MEMS Mass Flow Sensor D6F-P A Compact, High-performance Flow Sensor with Dust Segregation Structure. Built in Dust Segregation System (DSS) with cyclone flow structure, diverts particulates from sensor
More informationAPPENDIX A: BABCOCK CHAIN-OF-CUSTODY, DRIVING DIRECTIONS, AND LABORATORY PROCEDURES (Procedures provided electronically by request only)
Riverside County Flood Control and Water Conservation District Volume II - QAPP Consolidated Monitoring Program October 2017 APPENDIX A: BABCOCK CHAIN-OF-CUSTODY, DRIVING DIRECTIONS, AND LABORATORY PROCEDURES
More informationBrakes and Clutches: Maintaining and Repairing Interacting Surfaces.
AIHA Fall Conference Template The Chartered Society for Worker Health Protection OH2016 25-28 April 2016 Glasgow, Scotland Session 7b Asbestos Wednesday, April 27, 2016 Brakes and Clutches: Maintaining
More informationProduct Structure. ABB Industrial drives, ACS800-31
ABB Industrial drives, ACS800-31 Product Structure All rights reserved. Welcome to the product structure training module for the ACS800-31, ABB Industrial drive. If you need help navigating this module,
More informationDirector of Building and Deputy Chief Building Official
STAFF REPORT ACTION REQUIRED Sign Variance 515 Drewry Avenue Date: September 22, 2009 To: From: Wards: Reference Number: North York Community Council Director of Building and Deputy Chief Building Official
More informationPROPOSED DEVELOPMENT 18 OTEHA VALLEY ROAD EXTENSION, ALBANY
PLACEMAKERS TIMBER YARD PLACEMAKERS CAR PARK SEATING CAFE EXISTING PLACEMAKERS SIGNAGE DAIRY FLAT HIGHWAY OTEHA VALLEY ROAD EXTENSION LOCALITY PLAN Scale 1:500 @ A1, 1:1000 @ A3 OTEHA VALLEY ROAD SCALE:
More informationSTORE NUM.: 284 CROSS STREETS: San Pablo Ave & Monroe St. ADDRESS: 1075 Monroe St. Albany, CA
STORE NUM.: 284 CROSS STREETS: San Pablo Ave & Monroe St. ADDRESS: 1075 Monroe St. Albany, CA WALL SIGNS: Building Elevation NOTES: North South East West Area Allowed per Elevation Signs Allowed per Elevation
More informationTHE LANGUAGE FUNCTION USED IN GIVING DIRECTIONS. bagi Sisawa SMPN 5 Sleman pada tanggal 25 Juli 2007
THE LANGUAGE FUNCTION USED IN GIVING DIRECTIONS 1 Disajikan oelh Niken Anggraeni, S.S., M.A. sebagai makalah pada Program Wisata Kampus bagi Sisawa SMPN 5 Sleman pada tanggal 25 Juli 2007 A. Introduction
More informationMarch Government Center Station
March 2014 Government Center Station Green Reconstruction Line / Blue Project Line Option for Green Construction Line / Blue Staging Line February 12, 2010 Project Purpose Accessibility Last Key Station
More informationASBESTOS BULK SAMPLING RECORD Dresser Services, Inc. PO Box 378, Bakersfield, CA Office: (661) Fax: (661)
The samples itemized below were collected from the following location: FMS BUILDING. CALIFORNIA NATIONAL GUARD 612 EAST WARNER AVENUE SANTA ANA, CA 93451 922171 3/18/09 MEN S RESTROOM NE CORNER TEXTURE
More informationBERLIN MEADOWS. Faris Planning & Design SOUTH LANDSCAPE PLAN EXHIBIT D-1 PLANT KEY TYPICALS SEE PLANT LIST FOR SPECIFIC PLANT SPECIES
ROA PRESERVE S TO FULLEST EXTENT POSSIBLE SEE DETAIL ON SHEET D- FOR TOT LOT 54 84 85 86 56 87 57 88 89 90 9 9 58 59 60 65 66 9 94 95 96 97 98 75 76 77 78 79 80 99 00 0 0 SEE DETAIL ON SHEET D- FOR TOT
More informationAPPENDIX C. Existing Utilities
APPENDIX C Existing Utilities THIS PAGE INTENTIONALLY BLANK Existing Utilities Numerous utilities exist within the project area, including natural gas, sewer, water, electric, communications, and street
More informationSUNSET BLVD. EL. 38'-0" EL. 56'-0" EL. 38'-0" ROOF TERRACE EL. 20'-0" PLAZA EL. 0'-0" PRIVATE TERRACE EL. 47'-0" POOL 3BR-UNIT A EL.
SUNSET BLVD. -2' -2'-0" (EL. +40.00') + (EL. +4000') +'-0" 0" (EL. 40.00') (N) (N) -4'-0" (EL. +40.00') +'-0" (EL. 40.00') 0.0 0' ) 0 +2'-" 2 (EL. ( 40.0') 40.0 ) (N) (EL. 4000') 4 (EL. +4000') 4 2 +2'-0"
More informationEN 1154:1997 / A1:2002
Exova Warringtonapt Key Industrial Park Fernside Road Willenhall West Midlands WV13 3YA T : +44 (0) 1902 722 122 F : +44 (0) 1902 727 242 E : willenhall@exova.com W: www.exova.com EN 1154:1997 / A1:2002
More informationThe 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200
PITTSBURGH SCHOOL DISTRICT 2017/2023 CAPITAL PROGRAM The following is the proposed 2017 / 2023 Capital Program. These projects have been identified as a result of Board Actions, input from Facilities,
More informationCOTTER CORPORATION CANON CITY MILLING FACILITY
CALENDAR YEAR 2004 APPENDIX C Water Quality Monitoring Report COTTER CORPORATION CANON CITY MILLING FACILITY Canon City, Colorado June 30, 2005 COTTER CORPORATION WATER SAMPLING LOCATIONS JUNE 30, 2005
More informationBackground. Speed Prediction in Work Zones Using the SHRP 2 Naturalistic Driving Study Data
Speed Prediction in Work Zones Using the SHRP 2 Naturalistic Driving Study Data Minnesota Towards Zero Deaths Conference October 2017 Shauna Hallmark, Amrita Goswamy, Omar Smadi, Sue Chrysler Background
More informationCity Hall New Induction and LED Lighting
The City of St. Petersburg is the 4 th largest city in the State of Florida serving a population of 245,314. St. Petersburg was designated as the first city in the state to become a Green City by the Florida
More informationCC PR 28 April Operational and Cleanliness verification of a Lonestar 3.0 with ATLAS Sampling Module 2.x
Operational and Cleanliness verification of a Lonestar 3.0 with ATLAS Sampling Module 2.x Issue/Version Date Author Details AAA 20/11/2015 Céline Lainé New document AAB 05/01/2016 Andrew Pauza Edited with
More informationDOBSON COMMUNCATIONS:
DOBSON COMMUNCATIONS: Sheet List Sheet Number Sheet Name A0 Cover Sheet A Dimenstioned Floor plan A2 Floor Plan with room tags A3 Refelected A4 Furniture Plan A5 Furniture Schedule A6 Door and Window Schedule
More informationASHRAE GAS-PHASE AIR CLEANER TEST REPORT. Test Laboratory: RTI 3040 Cornwallis Road Research Triangle Park, NC
ASHRAE 145.2 GAS-PHASE AIR CLEANER TEST REPORT Manufacturer: Product Name: Challenge: RTI Report No. Air Filter Company Media Filter for VOCs Toluene BR04201603 Test Laboratory: RTI 3040 Cornwallis Road
More informationTable Station Elements
The overall layout of the station in the Preferred Alternative (Modified Alternative 2) is described in Table 7.5-1. Table 7.5-1 Station Elements Ground Level Mezzanine Level Platform Level Existing/Upgraded
More informationMonitor Chlorine in Crude at Sub-ppm Levels
better analysis counts Monitor Chlorine in Crude at Sub-ppm Levels Benchtop and Online Analysis Solutions Total Chlorine Analysis in Liquid Hydrocarbons Clora is a compact analyzer to measure total chlorine
More information4th Quarter Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations
4th Quarter 2013 Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations Steven A. Root Digitally signed by Steven A. Root DN: cn=steven A. Root, o=weatherbank,
More informationSTATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS
STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT
More information58 th STREET 87,717 RSF. New Mixed-Use Development NEW CONSTRUCTION POSSESSION Q3 2016
ew Mixed-Use 600 EW COSTRUCTIO POSSESSIO Q3 2016 87,717 RSF prime commercial space available for healcare use. 6,407 RSF prime corner retail space available. 600 ew Mixed-Use 87,717 RSF of prime commercial
More informationPASS. Vincent Chow Wai Kit Manager, Chemical Laboratory
Recipient Email: DawnG@greaterchina-usa.com Pages: Page 1 of 6 SAMPLE INFORMATION: Description: Custom Stress Ball Assortment: - Purchase Order Number: 11866JD SKU/style No.: - Toy Co./Agency: - Factory
More informationPhotometric Test Report. MaxLite Inc 10 York Avenue, West Caldwell, NJ Ramesh Raghavan, x146,
Photometric Test Report Relevant Standards IES LM-79-2008 Prepared For MaxLite Inc 0 York Avenue, West Caldwell, NJ 07006 Ramesh Raghavan, 973-244-7300 x46, rraghavan@maxlite.com Catalog Number BLHE-223DU50-[blank,
More informationTHE NEW HENRY B. GONZÁLEZ CONVENTION CENTER
THE NEW HENRY B. GONZÁLEZ CONVENTION CENTER Now Open 514,000 of contiguous exhibit space 86,878 column free space 54,000 Stars at Night Ballroom the LARGEST in Texas 72 meeting rooms LEARN MORE AT MEETINGS.VISITSANANTONIO.COM
More informationDiscover the steps to MOBILITY
SPECIALISTS IN BARRIER-FREE DESIGN Discover the steps to MOBILITY TOLL FREE 1-800-441-4181 www.mobilityelevator.com We are #1 in providing Elevator & Lift Solutions The Americans with Disabilities Act
More informationREPORT. Emission Test Chamber Study according to COV. Product: CLIPSO 495D (04/09/10/011/04) IAL Project-No.: IAL / Order-No.
REPORT Emission Test Chamber Study according to COV Product: CLIPSO 495D (04/09/10/011/04) Project-No.: Order-No.: IAL-08-0563 IAL-00669-11 / Client: CLIPSO PRODUCTION 5, rue de l église 68800 Vieux-Thann
More informationLocations of Reading High School and Reading Middle School Home Athletic Events by Sport (Scroll Down for Directions to Each Venue.
Locations of Reading High School and Reading Middle School Home Athletic Events by Sport (Scroll Down for Directions to Each Venue.) JV and Varsity Basketball, Volleyball, and Wrestling Reading High School
More informationDave Matthews Band 25 th Anniversary Show
PARKING INFORMATION FOR Dave Matthews Band 25 th Anniversary Show SATURDAY, MAY 7 TH @8:00PM (6:00PM DOORS) PARKING IS SOLD OUT. Pre-Paid Parking Only Around the Arena Lots Alternative event-day parking
More informationNORTHWEST OHIO HOUSING MARKET 2nd Quarter Contact Your Realtor To Find Out What s Happening In Your Neighborhood.
Local Market Update NORTHWEST OHIO HOUSING MARKET 1,627 Unchanged $244k Total Volume +8 Increase $124,100k Median Sales Price +8 Increase 3.48 Average Interest Rate Buying Power Contact Your Realtor To
More informationTECHNICAL BULLETIN: Instructions for Upgrading to V3.3 Sun Sensors. Sun Sensor Identification:
TECHNICAL BULLETIN: 09-16-2003 Instructions for Upgrading to V3.3 Sun Sensors Sun Sensor Identification: This Upgrade is only applicable to Version III controllers. These controllers use remote sensor
More informationTHE CARMONY BUILDING ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED ELECTRICAL SYMBOLS AND ABBREVIATIONS
LIGHTING ELECTRICAL SYMBOLS AND ABBREVIATIONS ABBREVIATIONS ELECTRICAL GENERAL NOTES EQUIPMENT POWER DEVICES NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION
More informationNORTHWEST MISSOURI STATE UNIVERSITY
Updated: 5/1/2010 Administration Building 100F Werner Fiberglass 6' 250 good 1st S. JC Fastenal Fiberglass 12' 300 good 1st S. JC Fastenal Fiberglass 10' 300 good 2nd JC Werner Fiberglass 6' 300 good 318b
More informationNew Construction, Mixed Use Opportunity 6351 Crawfordsville Rd, Indianapo-
635 Crawfordsville Rd, Indianapo- 00 S Chauncey Ave, West Lafayette, IN 47906 Completed State Street Project Property Highlights: - New construction, mixed use development located on Purdue University
More informationSketch Plans. for the Addition and Renovation of. BISHOP REDING CATHOLIC SECONDARY SCHOOL Milton, Ontario. September 26, 2018
Sketch Plans for the Addition and Renovation of BISHOP REDING CATHOLIC SECONDARY SCHOOL Milton, Ontario September 26, 2018 Table of Contents 1.0 Building Program...1 2.0 Site Plan...4 3.0 Floor Plans...5
More informationCHEMICAL CHARACTERIZATION OF PARTICULATE MATTER EMISSIONS FROM A CATALYZED TRAP EQUIPPED NATURAL GAS FUELED TRANSIT BUS
CHEMICAL CHARACTERIZATION OF PARTICULATE MATTER EMISSIONS FROM A CATALYZED TRAP EQUIPPED NATURAL GAS FUELED TRANSIT BUS Mridul Gautam, Sairam Thiagarajan, Tim Burlingame, Scott Wayne, Dan Carder Department
More informationAD Small premium. 5,500 TO 15,000m 3 /h. Some of the manufacturing details include: Quick-opening apertures with. attachments.
AD Small premium ECOLOGICAL EVAPORATIVE COOLERS 5,500 TO 15,000m 3 /h MET MANN has developed a new line of evaporative coolers known as AD Small Premium, with flow levels of 5,500; 9,000; 12,000 and 15,000
More informationECOLOGICAL EVAPORATIVE COOLERS 5,500 TO 15,000m 3 /h
EVAPORATIVE COOLING AD Small premium ECOLOGICAL EVAPORATIVE COOLERS 5,500 TO 15,000m 3 /h MET MANN has developed a new line of evaporative coolers known as AD Small Premium, with flow levels of 5,500;
More informationLa Caserne. 103 Dalhousie Québec (Québec) Canada, G1K 4B9. Telephone : (418) Fax : (418) Telephone : (418)
La Caserne 103 Dalhousie Québec (Québec) Canada, G1K 4B9 Telephone : (418) 692-5323 Fax : (418) 692-2390 Internet : www.exmachina.qc.ca Technical director : Patrick Durnin Telephone : (418) 692-5353 Email
More informationTwo Stage Rotary Vane Vacuum Pumps Operation and Maintenance Manual
Two Stage Rotary Vane Vacuum Pumps Operation and Maintenance Manual Model 100 3.5 100 l/min. 3.5 CFM 6 m 3 /hr. Model 200 7 200 l/min. 7 CFM 12 m 3 /hr. Model 400 14 400 l/min. 14 CFM 24 m 3 /hr. Model
More informationFlow Control Division
Flow Control Division Kämmer Valves Product Profile Kämmer manufactures a complete line of automatic control valves for special applications. This bulletin briefly describes each product. There is a detailed
More informationPower Connect TM Series RX60
Specification sheet Power Connect TM Series RX60 Features and benefits Robust product design and testing - The generator is designed to operate under extreme environmental conditions including cold weather
More informationTitle Goes Here and Can Run Solar Photovoltaic up to 3 lines as shown here Systems as you see
Title Goes Here and Can Run Solar Photovoltaic up to 3 lines as shown here Systems as you see CHAPTER 2 Outline the components of a solar photovoltaic system Describe the operation of a solar photovoltaic
More informationCarter Ground Fueling Underwing Refueling Nozzle Model 64349
Carter Ground Fueling Underwing Refueling Nozzle Model 64349 Design Concepts s Carter brand is the leading manufacturer of nozzles qualified in accordance with SAE AS5877 (MIL-N-5877). Model 64349H underwing
More informationAPPENDIX C: COSTS BACK-UP
APPENDIX C: COSTS BACK-UP SECTION 2010-2015 Executive Recap DESCRIPTION MAC LTCP PLAN RANGE LOW HIGH Humphrey Terminal Expansion - Phase I (Add 17 Gates) $224,077,000 - $263,620,000 OTHER PHASE SCOPE
More informationCurve Number: FR Engine Critical Parts List: CPL 2893 Date: 19Jun00. Aspiration : Turbocharged and Aftercooled
Curve Number: FR-90766 Engine Critical Parts List: CPL 2893 Date: 19Jun00 Displacement : 5.88 litre (359.0 in 3 ) Bore : 102 mm (4.02 in.) Stroke : 120 mm (4.72 in.) No. of Cylinders : 6 Aspiration : Turbocharged
More informationSupporting Information. Occurrence of dichloroacetamide herbicide safeners and co-applied herbicides in. Midwestern US streams
1 2 3 Supporting Information Occurrence of dichloroacetamide herbicide safeners and co-applied herbicides in Midwestern US streams 4 Emily E. Woodward, 1,* Michelle L. Hladik, 1 and Dana W. Kolpin 2 5
More informationHot Spot Recommendations
Recommendations Name of Location MP Curves I-95 Bridge 76-75.5 & Gang Advanced 1 2 1 ise under bridge 125 MPH end of Torresdale Curve 75-75.5 S' Curve 1 3 3 S curves east & west Traffic noise from I-95
More informationCOMMISSION CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN AUGUST, 2017
SAN FRANCISCO PUBLIC UTILITIES COMMISSION CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN AUGUST, 2017 Civic Design Review - Conceptual Design August 2017 Page 2 PROJECT BACKGROUND AND OBJECTIVE: The Central Bayside
More informationUnderground Residential Conduit Installation Requirements Revised March 15, 2018
Program Explanation Underground Residential Conduit Installation Requirements Revised March 15, 2018 Design Limitations This option is available for new 1 Ø residential underground electrical services
More informationEquipment Maintenance: Impact on Efficiency. Matt Killen, LACAP, Baton Rouge, LA
Equipment Maintenance: Impact on Efficiency Matt Killen, LACAP, Baton Rouge, LA All equipment should be maintained and or calibrated to ensure accuracy and eliminate down time. Trucks, Generators, Power
More informationREPORT. Emission Test Chamber Study according to COV. Product: CLIPSO 705 No Sweat (06/04/10/009/09) IAL Project-No.
REPORT Emission Test Chamber Study according to COV Product: CLIPSO 705 No Sweat (06/04/10/009/09) Project-No.: Order-No.: IAL-08-0563 IAL-00669-11 / Client: CLIPSO PRODUCTION 5, rue de l église 68800
More informationTest Result No.1. Lead (Pb) % ND See comment if > % Cadmium (Cd) % ND Mercury (Hg) % ND
Reference No.: WTF16F0961094C age 2 of 5 Test Results: Test Item(s) Unit Test Result No.1 MDL Maximum Allowable Limit Lead (b) % ND 0.0002 See comment if > 0.004 % Cadmium (Cd) % ND 0.0002 0.002 Mercury
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: May 28, 2009 SUBJECT: DON MILLS STATION ACTION ITEM RECOMMENDATIONS It is recommended that the Commission: 1. Endorse the
More informationInstruction Manual for the Revolutionary Science RS-200 RevSpin Microcentrifuge
Instruction Manual for the Revolutionary Science RS-200 RevSpin Microcentrifuge REVOLUTIO NARY SCIENCE Manufacturer of Precision Laboratory Equipment Table of Contents Introduction 2 Recommended Safeguards
More informationWorker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal
Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal TABLE OF CONTENTS SECTION TITLE PAGE 1.0 DATE AND TIME OF INCIDENT 4 2.0 NAME & ADDRESS OF PRINCIPAL PARTIES 4 2.1 Employer
More informationInfraStruXure PDU Power Cable
InfraStruXure PDU Power Cable Installation and Specifications 12AWG Power Cable with L21-20C Connector 10AWG Power Cable with L6-30C Connector 6AWG Power Cable with 3-pole, 4-wire, Grounding Connector
More informationwhere nature and technology meet FILTRATION Solutions for filtration applications PETROGAS GAS-SYSTEMS BV
where nature and technology meet Solutions for filtration applications PETROGAS GAS-SYSTEMS BV www.petrogas.nl An introduction Clean and aerosol free gas is critical for industrial equipment to operate
More informationSpectrAA Report. 2:04 AM 11/25/2014 Page 1 of 22
SpectrAA Report. 2:04 AM 11/25/2014 Page 1 of 22 Analyst Date Started Worksheet Comment Methods Computer name Serial Number: 9:21 PM 11/24/2014 CH461 - Pb 11_21_14 cp 02 Pb,Pb E3ED16988D8C4E9 AA1110M047
More informationCenter Street Partners, LLC
OWNER enter Street Partners, LL BERKELEY PROJET ARHITET PROJET TEAM PROJET NO. TITLE SHEET DRAWING LIST PROJET DATA JRDV ARHITETS IN. OPYRIGHT enter Street Partners, LL PROJET 169'-4 1 2" 65'-1 1 2" 27'-3
More informationPowers TM Controls SW 141 Differential Static Airflow Switches
Powers TM Controls SW 141 Differential Static Airflow Switches Document No. 155-052P25 SW 1 0518 Description The SW 141 Airflow Switch senses static differential pressure and the diaphragm operated snap
More informationLOON LAKE HYDRO ACOUSTIC SURVEY RESULTS AND TREATMENT DATA 2012
LOO LAKE HYDRO ACOUSTIC SURVEY RESULTS AD TREATMET DATA 212 632 W. Eastwood Drive Mequon, WI Hydro acoustics utilizes sound energy to detect objects and contours underwater. By integrating digital echo
More informationQA INTERNATIONAL, LTD. INSPECTION REPORT
Report No.: QAIXXXXXX Job No.: XXXX Date: XXXXX Page 1 of 12 INSPECTION SUMMARY DETAILS QAI CLIENT COMPANY: XXXXX INSPECTION DATE: XXXXX QAI CLIENT CONTACT: FACTORY NAME: XXXXX CC: - SUPPLIER / AGENT:
More informationFOR SALE OR LEASE EBERHARDT & BARRY INC.
FOR SALE OR LEASE Property Video: https://vimeo.com/215049252/1384e4fcbe 500,000± SF Manufacturing / Distribution Facility - 25.48± Acres Formerly 1888 Mills 904 N. Hightower Street Thomaston, Upson County,
More informationNew Construction, Mixed Use Opportunity 6351 Crawfordsville Rd, Indianapo-
6351 Crawfordsville Rd, Indianapo- 100 S Chauncey Ave, West Lafayette, IN 47906 Completed State Street Project Property Highlights: - New construction, mixed use development located on Purdue University
More informationFoyers Supreme Inc. Fireplace Products Project # 019-S Model: Fusion Type: Residential Wood Fired Heater February 19, 2016
Foyers Supreme Inc. Fireplace Products Type: Residential Wood Fired Heater February 19, 2016 EPA Certification Testing to Method 28R Certification and Auditing of Wood Heaters Contact: Mr. Emmanuel Marcakis
More informationDenver Office 8361 S. Sangre De Cristo Road, Suite 120 Littleton, CO Phone Fax May 28, 2013
Denver Office 8361 S. Sangre De Cristo Road, Suite 120 Littleton, CO 80127 Phone 303.468.8763 Fax 303.904.2038 May 28, 2013 Mr. Moe Alcaron Denver Public Schools 1350 E. 33 rd Avenue Denver, Colorado 80205
More informationCREEP PERFORMANCE TEST REPORT. Rendered to: TREX COMPANY LLC. Seclusions Composite Privacy Fence System TYPE: Composite Fence System
Architectural Testing CREEP PERFORMANCE TEST REPORT Rendered to: TREX COMPANY LLC Seclusions Composite Privacy Fence System TYPE: Composite Fence System Report No.: Report Date: Expiration Date: 130 Derry
More informationLandside Access Modernization Program (LAMP)
Landside Access Modernization Program (LAMP) LAX Los Angeles International Airport is the 2 nd busiest airport in the United States and is the largest airport in California. Since the start of the economic
More informationMOLD INSPECTION REPORT. UCD Anschutz Medical Campus Building E. 19 th Ave. Aurora, CO 80045
MOLD INSPECTION REPORT For the Subject Property: UCD Anschutz Medical Campus Building 402 12474 E. 19 th Ave. Aurora, CO 80045 Report Date: August 7, 2015 Inspection/Testing Date: SET Project: 15-0801
More informationAdvantages of Using Raman. Spectroscopy to Monitor Key. Gasoline Blending Parameters
Advantages of Using Raman Spectroscopy to Monitor Key Standards Certification Education & Training Publishing Conferences & Exhibits Gasoline Blending Parameters Presenter : Lee Smith, PhD President -
More informationStation Plaza STATION AREA FOOTPRINT SIGNALIZED INTERSECTION (EXISTING) KENT/DES MOINES I-5 STATION OPTION SITE PLAN
Federal Way Link Extension F-29 Appendix F Conceptual Design Drawings SOUND TRANSIT FEDERAL WAY LINK EXTENSION 30 2/25/2015 12:30:48 PM BRHARRIS C:\PWWORKING\SEA\D1078842\A_FWLE_I-5_MAINLINE.DWG DRAFT
More informationGENERAL HOUSEKEEPING. 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash?
Inspection Checklist GENERAL HOUSEKEEPING 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash? 2. Is oil, grease, or other liquids, when spilled on the floor
More informationAMERICA S CENTER. America s. Center
AMERICA S CENTER America s Center America s Center 502,000 sq. ft. of contiguous exhibit space 340,000 sq. ft. of exhibit space with contiguous ceiling height of 40 ft., air wall track is 34 ft. and utilities
More informationDOWNTOWN PARKING STUDY AND STRATEGIC PLAN
INTRODUCTION This report includes a summary of several key components of the Rapid City Downtown Parking Study and Strategic Plan, including: Current Conditions Analysis (Inventory and Occupancy and Length
More informationDSL-240 MkIII Single Pass Dust Monitor Measures mg/m 3 using DDP
Ideal for monitoring dust levels in the exhaust gas of industrial combustion or air filtration processes. Innovative Dynamic Detection Principle (DDP) measurement technique Immune to gradual reductions
More informationIndustrial Hygiene Strategies for Assessing Exposures During Onshore Drilling Activities
Industrial Hygiene Strategies for Assessing Exposures During Onshore Drilling Activities Bradley King, PhD, MPH, CIH NIOSH Western States Division Disclaimer: The findings and conclusions in this report
More informationAppendix A.1 Calculations of Engine Exhaust Gas Composition...9
Foreword...xi Acknowledgments...xiii Introduction... xv Chapter 1 Engine Emissions...1 1.1 Characteristics of Engine Exhaust Gas...1 1.1.1 Major Components of Engine Exhaust Gas...1 1.1.2 Units Used for
More informationNDDOT Truck Harmonization Study
NDDOT Truck Harmonization Study Upper Great Plains Transportation Institute North Dakota State University North Dakota Association of County Engineers January 21, 2016 Bismarck ND Ramkota Hotel Tim Horner,
More information