1 MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) Fax: (0761) / Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC014880, -mdtransco.nic.co.in No.07-05/SG-9B-II/3786 Jabalpur, dated: To As per distribution list Sub: Minutes of 66 th meeting of Operation and Coordination Committee of MP. The Minutes of 66 th meeting of the Operation and Coordination Committee of MP held on 17 th November 2018 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur has been uploaded on the website of SLDC and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

2 Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No , The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, Bhopal, The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur,.Fax No The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax , 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax , 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No , The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No The General Manager(PM), MPPMCL, Jabalpur 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur, Fax No , 15. The Dy. General Manager (DCC CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No , The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No , The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No , 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No , 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No , 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal , Fax No , 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager s Office, Electrical Department, Jabalpur (MP), Fax: , - cede@wcr.gov.in, dyceetrdwcr@gmail.com, M , Mr.Satyendra Kumar (Dy.CE), Mob (CEDE, WCR). 22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) , Fax No , nhdc-isp@rediffmail.com 23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) , FaxNo , - pksaxena@nhdcl.com, saxena_pks123@rediffmail.com, omkareshwar.nhdc@gmail.com. 24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur , Fax No / , manish@bla.co.in 25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina Distt- Sagar, Fax No , jbtppbina400kvswitchyard@gmail.com jptpp.switchyard@jalindia.co.in, 26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, cbhandari@kalpatarupower.com 27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore , id :-solar@ujaas.com 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, - deepesh.sankwa@suzlon.com, Indore , Badree.hirve@suzlon.com

3 MINUTES FOR 66th MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 17th NOVEMBER 2018 AT 11:00 AM AT CONFERENCE HALL, SLDC, MPPTCL, NAYAGAON, JABALPUR. The 66th meeting of Operation & Coordination Committee of MP was held on 17th November 2018 at 11:00 AM at SLDC, MPPTCL, Nayagaon, Jabalpur. The list of participants is enclosed at Annexure Shri K.K.Parbhakar C.E.(SLDC) & Chairman OCC welcomed all the guests & participants for 66th OCCM of MP. Chairman OCC informed the committee that it is appreciable that MP has met the demand of MW today for first time without any system constraint & the grid parameters were also within limits in transmission network. He stated that the demand of MP above 13000MW has been met successfully with the coordination and support of MPPGCL which ensured the availability of about 4200MW thermal generation, MPPTCL ensured the availability of healthy & adequate transmission network and Discoms supported by providing adequate capacity of capacity banks which helped in maintaining the voltage & ensured availability of quality supply at consumer end. Discoms also supported in load management at local level by shifting the load of 11 KV feeders thus relieving the over loaded transmission network. In continuation to this, further he also added that NHDC has its own significance roll, as NHDC has ensured the availability of 1500MW Hydel Generation at any instant which helps in maintaining the load generation balance in MP Grid in short duration of time. MPPMCL has also ensured the adequate quantum of banking which has also supported in safe & secure grid operation. Further he stated that without the cooperation & support of any of these entities it would not be possible to meet the demand of 13035MW. Thereafter he stated that SLDC-MP has been appreciated for its functioning & managing the grid at various National Level platforms, which is due to the cooperation & support of each entity. Chairman OCC informed that in some areas like Guna, Sitamau and Mandsour the low voltage complaints has been received at Discom level but the voltage at were about 34 KV at transmission end. From the above it reveals that the voltage has been maintained at transmission end but the low voltage problem is still persisting at consumer end due to lack of capacitor banks at Discom level in these particular areas. It is therefore desired that all DCC s/discom shall avoid MVAR injection in grid and plan for proper capacity addition of capacitor banks particularly in these areas so that nominal voltage at consumer end may be ensured. Further Chairman OCC stated that from 1 st September 2018 pool account is maintained by SLDC. Now BSC has been implemented, thus the additional & capping have been adopted by commission as proposed by MPSLDC for balancing the pool account. In new DSM these additional & capping charges are incorporated & deposited in the pool account, thus amount deposited in pool account will be increased in continuous basis. Therefore, it would not be feasible to blocked the amount in the pool account as these companies are taking loan on higher rates for capacity enhancement. He mentioned that at regional level approximately Rs.2000 crore was blocked in regional pool account subsequently these amounts have been utilized as PSDF fund, similarly we are planning in consultation with commission for adopting a procedure according to which this pool balance amount could be adjusted /distributed to the concerned entities in the same calendar month which can be utilized by the entities for development & capacity/network enhancement. Thereafter he requested Member Secretary to take up the agenda points. Shri R.A.Sharma Member Secretary OCC & Addl. Chief Engineer, SLDC welcomed all the guests and participants for 66 th OCCM and requested all the participants for formal introduction.. He also congratulating all entities for extending full cooperation for managing rabi season and MP has successfully met demand above MW. Further he informed that in some areas like shujalpur voltage problem was reported which was mitigate by changing the tap position of transformers and reactors were also switched according to the system requirement. Generators are also requested to provide MVAR support within their capability curve. Thereafter the agenda points were taken up which are narrated here under in nutshell: ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 65 TH meeting of Operation & Coordination Committee of MP held on 14 th September 2018 at SLDC, MPPTCL, Jabalpur were forwarded to the Minutes OF 66th OCCM of MP 1

4 committee members vide No /SG-9B-II/3164 Jabalpur dated No comments have been received, hence committee confirms the minutes. ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS AUGUST 2018 TO SEPTEMBER Frequency Particulars: The committee was apprised that during August 2018 the system frequency was below Hz for 8.93% of time against 13.21% of time during September The system frequency was above Hz for % of time during August 2018 against 6.57 % of time during September The system frequency was within the IEGC range of Hz for % of the time during August 2018 against % of time during September The average monthly frequency was Hz during month of August 2018 and Hz during month of September The system frequency did not touch Hz during the above period. The detailed frequency particulars for the month of August 2018 and September 2018 are enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:- Month AUGUST 2018 SEPTEMBER 2018 Average frequency Minimum Integrated frequency over an hour Maximum integrated frequency over an hour Instantaneous Minimum Frequency Instantaneous Maximum Frequency Hz Hz Hz Hz Hz Hz Hz Hz Hz Hz 2.2 Operational Matters Operational Discipline : The committee was apprised that system operated in terms of frequency profile for the months AUGUST 2018 and SEPTEMBER 2018 is as given below for discussion by the committee : Month AUGUST 2018 SEPTEMBER 2018 % of time Frequency Below Hz % of time Frequency above Hz % of time frequency within the permissible range of Hz. Average monthly frequency 8.93% 10.63% 80.44% Hz 13.21% 06.57% 80.22% Hz Minutes OF 66th OCCM of MP 2

5 2.2.2 Voltage Profile: The committee was apprised that during the months AUGUST 2018 and SEPTEMBER 2018 the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid:- Sr. No. Name of 400 KV Substation AUGUST 2018 SEPTEMBER 2018 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Observed Observed Observed Observed Voltage KV Date Voltage KV Date Voltage KV Date Voltage KV Date 1 Indore Itarsi Bina Gwalior Nagda Satpura Birsinghpur ISP Bhopal Ashta Pithampur Singhaji The low voltages were observed in the Gwalior region, hence MPPTCL & Discoms are requested to maintain the voltage in Gwalior region by proper switching on capacitor banks in the area. SLDC ensure the switching off the reactors at PGCIL Gwalior through WRLDC as &when required Status of Capacitor Banks in sub-transmission system: The committee was apprised that the updated information of the status of capacitor banks in sub-transmission system as on 31 th SEPTEMBER 2018 as submitted by DISCOMs is detailed below: DISCOM Capacitor bank Capacitor Capacitor bank Require Requiremen Capacitor Balance installed in good Banks healthy installed but ment of t against banks already capacitor condition (No) but not in defective & are repair nonrepairable ADB T-V covered covered under banks to be service due to repairable (No) against in control ckt each capacitor other problem unit (No) banks schemes No of KVAR KVAR KVAR KVA R KVA R KVA KVAR KVAR KVAR R KVAR Units required KVAR KVAR 600 KVAR KVAR KVAR EZ KVAR CZ WZ Minutes OF 66th OCCM of MP 3

6 Member Secretary OCC stated that all the Discoms shall ensure the availability of the capacitor bank during Rabi season so that the low voltage problems are avoided and quality supply is ensured at consumer end. Further the availability of capacitor banks which are healthy but not in service due to control ckt problem shall be ensured by Discoms Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The committee was apprised that the updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on as submitted by MPPTCL is given below:- Voltage Capacitor bank Capacity Added Capacitor banks TOTAL Capacitor Bank Class installed as on after Last OCC already covered CAPACITY AS Installed but (MVAR) Meeting (MVAR) under ADB T-V ON defective & are not (MVAR) repairable (No & MVAR) 220 KV All in Service 132 KV Total Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The committee was apprised that the various ongoing Transmission Schemes completed during the financial year (up to SEPTEMBER 2018) and plan for completion of various ongoing Transmission Schemes for the Year is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively U/F and df/dt Relay Operation (i) (ii) U/F and df/dt Relay Operation: The committee was apprised that frequency did not touch Hz during AUGUST 2018 and SEPTEMBER There was no df/dt operation during the same period. Defective u/f, df/dt relays: The committee was apprised that MPPTCL has informed that all the df/dt and U/F relays are in operation, where the U/F relays are not available, the numerical relays programmed for under frequency operation. Defective df/dt relay at 220KV Sagar & 220KV S/S Chhatarpur have been replaced & at S/S Chapda the df/dt protection is provided through df/dt feature of DPR. All U/F stages are in good/ healthy & working condition. 2.3 Power Cuts / Load restrictions/differential Load Shedding by DISCOMS & group allocation to feeders: (i) The committee was apprised about the details of DISCOM wise Power supply given to various domestic categories during the period AUGUST 2018 and SEPTEMBER 2018 is enclosed at Annexure 2.3(i). (ii) Group Allocation to Newly Commissioned existing EHV substations:- The committee was apprised about the region wise list of feeders emanating from various newly commissioned/existing EHV Minutes OF 66th OCCM of MP 4

7 substations for which groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details of pending group allocation to feeders is given below:- SN DISCOM Region No of feeders for which groups to be allocated 01 Jabalpur Sagar 00 EAST 03 Rewa Total Indore WEST Ujjain Total Bhopal CENTRAL Gwalior Total 21 TOTAL Grand Total 38 Discoms are requested to furnish the details as per list enclosed at Annexure-2.3(ii) in the meeting. The representative from East Discom informed the committee that the 2 no. feeders i.e., 33KV Ghansor-II & 33KV Sankh feeders have been group allocated & one no. feeder in Rewa region will be group allocated within 3-4 day. The representative from West Discom informed the committee that the group allocation of feeders is under process and will be group allocated at the earliest. The representative from Central Discom informed the committee 8 no. feeders have been group allocated from Gwalior region and remaining 2 no feeders i.e., Karapura & Mangarh shall be removed from the list as only the bay has been constructed at substation but the construction of 33 KV feeders is pending. Further he informed the committee that in Bhopal region one no. feeder has been group allocated and group allocation of remaining feeders is under process and will be group allocated at the earliest. In view of the above it is requested that the order copy of the feeders which have been group allocated shall be submitted to P&D, MPPTCL under intimation to SLDC. ITEM NO. 3 : OPERATIONAL PLANNNING: 3.1 Generating Units under planned outage and proposed maintenance programme: The committee was apprised about the annual maintenance /outages of thermal generating units of MPPGCL during November 2018 to December 18 is NIL as intimated by ED(O&M:Gen.). The same was confirmed by the representative from MPPGCL. 3.2 Proposed shutdown programme of Transmission lines / Transformers: committee was apprised about the proposed shutdown of transmission elements for the period to submitted by MPPTCL is enclosed as Annexure-3.2. Minutes OF 66th OCCM of MP 5

8 3.3 Long Outages of transmission elements and protections: The committee was apprised about the status submitted by MPPGCL /MPPTCL are given below:- Sr. Line/Transformer/ etc Outage date Reason Response from Utility No under long Outage 1. 16MVA BBL make X mer at S/S Berasiya MVA NGEF make at S/S Ghatabillod MVA, 400/220 X mer-ii at 400kv S/s Bina X mer tripped on Differential & Buchholz Trip Indications X mer tripped on Differential & Buchholz trip indications Differential, Buchholz. MPPTCL informed that X mer is declared faulty & replacement is expected in Nov.-18. Representative from MPPTCL informed that the 16MVA failed X mer will be replaced by 20 MVA X mer from 132 KV S/s Manasa and is expectedto be charged by end of Nov-18. MPPTCL informed transformer replaced by new 50 MVA X mer on MPPTCL informed that another 400/220KV, 315MVA transformer commissioned on Dt MVA EMCO X mer at S/S Chicholi Tripped on Buchholz trip indications. MPPTCL informed that X mer is declared faulty & replacement is expected in Nov MVA, 220/ BHEL Make X mer at 400 KV S/s Ashta X mer tripped on Differential & Buchholz trip indications. MPPTCL informed that X mer has been replaced by another 160 MVA X mer on Dt MVA ECE make X mer at 220KV S/S Badod X mer tripped on Differential & Buchholz trip indications. MPPTCL informed that X mer was declared faulty & replaced by 20MVA,132/33KV Transformer on Dt MVA BHEL make X mer at S/S Dabra UAT-7B, STPS, Sarni MVA, 400/220 KV X mer at STPS X mer tripped on OSR and Differentail trip indications due to failure of OLTC. Differential relay & bucholz relay operated. X mer tripped at 21:55 Hrs. due to LA Burst. Emergency shutdown taken for 15 days from to for CPRI oil filtering and RLA testing work. Transformer is under GP and referred to OEM for replacement of defective diverter switch. MPPTCL informed that after replacement of defective Diverter Switch, transformer charged on Dt MPPGCL informed that tendering work is under progress and technocommercial has been opened on Correspondence is under progress. The same was confirmed by MPPGCL. MPPGCL informed that Owing to adverse report of RLA conducted on ICT during shutdown, proposal for permanent discontinuation of ICT from service has been submitted. Minutes OF 66th OCCM of MP 6

9 KV Transfer Bus Coupler at SGTPS SF6 Gas Leakage MPPGCL informed that Transfer Bus Coupler has been taken in service on MVAR (Make GE) Line Reactor at 400KV Sarni- Asta Ckt-I Under outage since due to concentration of Acetylene gas. DGA test of transformer oil of reactor was carried out by M/s CPRI, Bhopal. To carry out the internal inspection of reactor, NIT will be opened on 15th September 2018 and certain queries on techno commercial issues have been sought from M/s GE(T&D) India (OEM). Clarification is awaited. Any transmission element/ EHV element under outage, which has not been intimated/included under aforesaid outage list, should be invariably intimated to SLDC. All entities are requested to ensure the same. The utility may submit the latest status. ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF AUGUST 2018 AND SEPTEMBER 2018: The details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Annex. 4.2.i Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL & NHDC Hydel Units. Power Supply Position(Energy Balance Sheet). 4.2.ii. Power Supply Position Scenario:- The committee was apprised about the power supply position for the month of Aug-18 & Sept-18. POWER SUPPLY POSITION FOR THE MONTH : Aug 18 Particulars Max Dem Met on : 06- Aug-18 AT : Average Aug Average Aug Average Aug All Fig in MW Average Monthly STATE PEAK DEMAND MET BREAKUP :- STATE THERMAL (Actual Gen) STATE THERMAL (RSD) Total MW STATE HYDEL IPP (STATE) CENTRAL SECTOR (Schedule) CENTRAL SECTOR (Surrender) IPP (INTER STATE) RAILWAY Minutes OF 66th OCCM of MP 7

10 RENEWABLE ENERGY OTHERS BANKING / PURCHASE / SALE DEVIATION DEVIATION (AVERAGE) 178 ENERGY SUPPLY STATE (LU) Between (-521 to 519) Between (-639 to 638) Between (-407 to 404) Between (-639 to 638) POWER SUPPLY POSITION FOR THE MONTH : Sep 18 Particulars Max Dem Met on : 19- Sep-18 AT : Average Sep Average Sep Average Sep All Fig in MW Average Monthly STATE PEAK DEMAND MET BREAKUP :- STATE THERMAL (Actual Gen) STATE THERMAL (RSD) Total MW STATE HYDEL IPP (STATE) CENTRAL SECTOR (Schedule) CENTRAL SECTOR (Surrender) IPP (INTER STATE) RAILWAY RENEWABLE ENERGY OTHERS BANKING / PURCHASE / SALE DEVIATION DEVIATION (AVERAGE) 295 Between (-495 to 437) Between (-396 to 533) Between (-498 to 825) ENERGY SUPPLY STATE (LU) Member Secretary OCC stated that from the above data it can be gathered that the system was managed comfortably and in a balanced, safe & secure manner. Further he appreciated MPPMCL for their efforts in maintaining the deviation well within limits. Between (-498 to 825) Annex. 4.3 Annex. 4.4 Hourly Average of Availability and Demand. Hourly average schedule Vs Drawal of DISCOMs. Minutes OF 66th OCCM of MP 8

11 [Committee may like to note] ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING OF AUGUST 2018 AND SEPTEMBER 2018: The committee was apprised about the Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5. ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The committee was apprised about the present status regarding schedule and commissioning of reactors / transmission elements is as below:- S.No. 400 KV S/s Size MVAR Implementing Agency Expected Date of Commissioning as intimated in last OCC 1. Bus Reactor : ISP 2. Line Reactor on 400 kv Sapura ISP line at STPS 3. Bus Reactor at SSTPS 125 MVAR NHDC 50 MVAR MPPGCL 125 MVAR The latest status may be submitted in the meeting. MPPGCL Bus reactor test charged on However for final charging telemetry compliance required to be completed. Representative from ISP informed the committee that the reactor cannot be configured in the existing RTU as the RTU is of old configuration, hence purchase of new RTU is being processed. MPPGCL informed that the price bid has to be opened and the reactor will be commissioned by December Representative from MPPGCL informed the committee that the expected to be commissioned by June Work will be carried out under PSDF as intimated by MPPGCL in 62 nd OCC MPPGCL informed the committee that the reactor is under procurement and will be commissioned by December Representative from MPPGCL informed the committee that the drawing has been approved and reactor is expected to be commissioned by March SYSTEM CONSTRAINT AT SATNA, MAIHAR, REWA, SIDHI AREA: The committee was apprised that as discussed in previous meetings of MP-OCCM any one convincing measures have not been brought in the notice of OCCM to handle the constraints faced in above area which was elaborated in length in the meetings earlier time to time. It is therefore required that transmission network/ Transformer capacity at Maihar, Rewa, Sidhi and Satna area may be re-examined and concrete solution may be work out at the earliest so that in future load of this area could be handled with reliability and security. In this context it is felt following work may be expedite to handle increasing load of Rewa area: Minutes OF 66th OCCM of MP 9

12 (1) Shifting of any one ckt of 220 kv Satna-Kotar line from 220kv s/s Satna to Satna PG S/S utilizing 4th Satna -Satna interconnector which is carrying significantly less load due to higher line length in comparison to other interconnectors. (2) Erection of 2nd 220/132 kv ICT at 220kv s/s Maihar. (3) Completion of 132 KV Auxiliary bus at Maihar so as to enable to take 132 KV Maihar -Amarpatan feeder on Auxiliary Bus during any contingency or for load management purpose. At present Auxiliary Bus at Maihar is in incomplete shape. (4) Early completion of 220kv connectivity with RUMS Rewa i.e. 220KV Rewa-Rewa UMSP CKT I & II and 220KV Sidhi -Rewa USMP CKT no I and II. This arrangement shall give stability at Rewa /Satna area; therefore, it should be given utmost priority. It is indicated that 400/ 220 KV ICT No I AND II have already been commissioned at UMSP Rewa, however we are not in a position to utilize the same. The MPPTCL is requested to give updates on the matter and action taken to mitigates the line/ict constrain. Representative from MPPTCL-EHT informed the committee that surver for shifting of any one ckt of 220 KV Satna Kotar line from 220 KV S/s Satna (MPPTCL) to Satna (PGCIL) has been done and one no. tower has to erected and work is expected to be completed by end of December-18. Further for erection of 2nd 220/132 kv ICT at 220kv s/s Maihar, MPPTCL informed that land problem was persisting at Maihar S/s which has been resolved but papers will be handed over after elections. Thereafter the commissioning work of the transformer & other works at 220 KV S/s Maihar will be processed. Representative from MPPTCL informed the committee that the work for 220kv connectivity with RUMS Rewa will being after elections & is expected to be completed within a year. Member Secretary OCC stated that the above changes in the network shall be implemented prior to next rabi season as the load management without these changes load will not be manageable in Satna, Rewa & Maihar areas. 6.3 PROTECTION AUDIT OF HYDEL POWER STATIONS OF MPPGCL:- The committee was apprised that the MPPGCL vide letter No /601-PSDF, dtd 21/02/2018 has conveyed that protection audit of switchyard associated with 10 hydro power plants of MPPGCL is required to be carried out by WRPC. Further, it was decided that work or protection audit of all switchyard carried by a team constituted by WRPC accordingly nominations were invited from utilities for protection audit team. Vide this office dtd the name of officers from MPPTCL, NHDC and MPPGCL was conveyed to WRPC. MPPGCL is insisting for early completion of aforesaid protection audit, considering provisions of MOM of TESG meeting of PSDF regarding the observations for PSDF grant on MPPGCL proposal in 37th meeting held on As a sequel to above, SE (Protection), WRPC is intimated that looking to difficulties at WRPC level to constitute a committee for aforesaid work, it has been directed that committee may be constituted MP- SLDC. However, detailed programme for Protection Audit to be carried out be intimated to WRPC, so that WRPC may depute one member from WRPC their end. MPPGCL is therefore requested to furnish detailed programme for conducting Protection Audit along with data required in this regard as requested by WRPC earlier, so that proposed Protection Audit could be carried out. Vide this office letter no 07-05/RPC-37A/3218 DTD Minutes OF 66th OCCM of MP 10

13 12/11/20118,CE O&M-Hydel, MPPGCL has been requested to provide Protection details and associated equipment details in prescribed format of protection Audit so that further action on the matter may be initiated. Representative from MPPGCL informed the committee that the desired information will be provided within 3-4 days. 6.4 DETAILS OF PROTECTION AUDIT AND IMPLEMENTED DEFENSE MECHANISM:- The committee was apprised that WRPC vide their dtd: informed that The Chief Engineer(NPC), CEA, New Delhi vide letter no.7/gsc/npc/cea/2018/ dtd: (enclosed as Annexure-6.4) intimated that in a meeting with Hon ble MoSP(IC) on for discussion of the draft National Electricity Plan, CEA has been requested to prepare report & presentations covering aspects of grid reliability and security, especially with respect to grid failure, etc. Therefore Chief Engineer (NPC) has requested to furnish following details in prescribed format:- i. Protection Audit carried out so far and its observation (As per Annexure-I). ii. Islanding scheme implemented in the region (As per Annexure-II). iii. SPS implemented in the region (As per Annexure-III). iv. Status of implementation of AUFLS in the region (As per Annexure-IV). v. Status of implantation of df/dt relays & its settings in the region (As per Annexure-V). In view of the above it is requested to all the concerned entities are requested to furnish the desired data in the prescribed formats to SLDC/WRLDC/WRPC. The matter was discussed in the meeting. 6.5 LOW VOLTAGE PROBLEM AT KATNI, REWA, MAIHAR AND SATNA AREA: The committee was apprised that the outage has been availed on 400 KV Birsinghpur-KatniCkt No.-II on dtd for 3 days for replacement of circuit breaker at Birsinghpur Power House. In the above, context it is mentioned that 400 KV Katni- Damoh line and 220 KV Katni-Damoh Ckt were under break down since long due to tower collapse. Considering continuous pursuance of Power House officials outage on 400 KV Birsinghpur Katni Ckt. No-II was permitted. On dtd during evening peak and on dtd , looking to low voltage observed at Katni substation SGTPS Power House officials were contacted and requested to operate their units in over excited mode to inject reactive power in the system within the capability curve so that system may be operated near nominal voltage. However, it has been observed that in spite of repeated request the units were not injected any significant MVAR support. At 11:20 hrs on dtd the code was issued to SGTPS unit indicating required MVAR to be injected in the system, however the MVAR support was not increased, on the contrary few units were absorbing the MVAR from the system. In the above context it is mentioned that looking to ensuing Ravi Season load is in increasing trend and MVR demand of the system is increased significantly, it is therefore requested that the reactive power may be injected into the grid by all the generating units within the capability curve as per provisions of grid code. In Minutes OF 66th OCCM of MP 11

14 view of above it is requested that the concerned official may please be directed suitably in this regard and be adhered to directives to control the low voltage, by injecting maximum MVAR within capability curve. MPPGCL was requested to comply with the instructions of SLDC and it is requested to issue necessary instructions to control room so that the thermal machines can be run to provide required MVAR support within their capability curve limits. 6.6 DELAY IN SYNCHRONIZING UNIT OF BARGI POWER HOUSE AFTER ISSUE OF CODE FROM SLDC ON DTD DURING EVENING PEAK:- The committee was apprised that it is being observed that unit No.-I at Bargi HPS, takes considerable time in synchronizing, after issue of code from SLDC. In the above context, it is conveyed that on dtd the code was issued by SLDC at 17:03 hrs for taking the units of Bargi Hydel Power Station, on bar looking to increasing trend of demand and considering system exigencies. The unit No.-II was synchronized at 17:15 hours, however, the unit I could be synchronized only at 18:20 hrs after elapse of one hour seventeen minutes. Delay in synchronizing the unit with the system is not understandable. Moreover, no any reason was conveyed to SLDC for such abnormal delay. It may be appreciated that during evening peak hours load are in increasing trend and system frequency goes to minimum level. Looking to system contingency, such delay is not desirable and not warranted for smooth operation of integrated system. The MPPGCL is requested to indicate the reason of aforesaid problem and remedial action thereof. MPPGCL representative informed the committee that there is a problem in one of the breakers (make Crompton Greaves) which was previously under the scope to be repaired. But after the inspection it has been proposed by the company that the breaker shall be replaced. Member Secretary OCC stated that MPPGCL shall take up the matter seriously and shall expedite the breaker repair/replacement work and shall also ensure the availability of Hydel Machine as per the system requirement. 6.7 INSPECTION OF RELAYS OF AUTOMATIC UNDER FREQUENCY LOAD SHEDDING AND CERTIFICATION THEREOF: - The committee was apprised that it is desired that for safe & secure operation of integrated system, the under frequency relay should be connected in the system in healthy condition. Accordingly, WRPC is pressing hard to provide the self-certified status of healthiness of relays of Automatic Under Frequency Load Shedding (AUFLS) and periodic checking of the same. Vide this office various correspondence. The CE (T&C) and also SE(T&Cs) were requested to provide status of healthiness of relays of Automatic Under Frequency Load Shedding on priority basis to SLDC, so that same may be communicated to WRPC. Inspite of repeated request vide various correspondence, moreover the matter had been raised in OCC meeting of MP in time to time, however the desired information are still awaited from utilities. It is therefore desired that the above matter may be treated as urgent and status of healthiness of Automatic Under Frequency Relays may be provided to SLDC and also the under frequency may be tested Minutes OF 66th OCCM of MP 12

15 periodically. In this context it is also mentioned that time to time WRPC official as well as SLDC official shall visit the sub-stations to ascertain the healthiness of under frequency relay. Member Secretary OCC stated that inspection & thereafter submission of healthiness certificate of AUFLS is a regular practice & requested all SE(T&C) to submit the status of healthiness of relays of Automatic Under Frequency Load Shedding on priority basis to SLDC, so that same may be communicated to WRPC. The matter was discussed in the meeting. 6.8 UNDER FREQUENCY RELAY OPERATION AT 15:47 HRS ON DTD AT CHHINDWARA:- The committee was apprised that on , at 15:47 hrs under frequency relay was operated at 220 KV substation Chhindwara and 132 KV substation Chhindwara, resulted interruption to 11 nos feeders. The system frequency at that moment was running at the level of Hz. It appears that under frequency relay was mal-operated at Chhindwara sub-station. The SE (Testing), Chhindwara has been requested vide this office letter that under frequency relay at Chhindwara be got tested and the cause of tripping may please be conveyed to this office. It is therefore requested MPPTCL may please apprise the reason of under frequency relay operation and action taken thereof. Representative from MPPTCL informed the committee that testing of relay has been carried out and no cause was found for mal-operation of the relay. Further SE(T&C), Chhindwara has issued instructions to replace these relays. The matter was discussed in the meeting. 6.9 PROVISION OF SYNCHRONIZATION FACILITY AT EHV SUB-STATIONS OF MPPTCL AND AT ALL POWER HOUSE: - The committee was apprised that as per Grid Code, the synchronization facility should be available at all the Power Stations, 400 KV Sub-stations, 220 KV Sub-stations and 132 KV sub-stations in the path of black start. In 60 TH OCC meeting MPPTCL representative informed the committee that order for 69 no. synchronization trolleys has been placed and 1 no. synchronization trolley has been delivered for checking and testing purpose at 220KV S/S Barwaha. In subsequent meetings this issue has been discussed. However, no any fruitful progress has been observed so far. In the above context it is indicated that at Manikheda HPS and Rajghat HPS synchronization facility is not available. It is felt that every Hydel Power station should be equipped with synchronization facilities invariably for system reliability and Crises Management. Also at Manikheda HPS & Rajghat HPS single bus system exists, hence MPPGCL is requested to explore the possibility for commissioning of Double Main Transfer Bus system. Thus, MPPGCL is requested to provide synchronization facility at Manikheda HPS and Rajghat HPS and MPPGCL may kindly provide status of making synchronization facility in aforesaid HPS. The MPPTCL may kindly provide the status of installation and commissioning of synchronization trolleys at different substations. Further, is also requested to indicate, whether synchronization facility could be provided at Karera & Pichhore substation on priority basis. Representative from MPPTCL informed the committee that the list of sub-stations where the synchronization trolley have been provided will be submitted at the earliest. Minutes OF 66th OCCM of MP 13

16 Representative from MPPGCL informed the committee that at Rajghat HPS there no space available for extension and providing DMT system and at Manikheda possibility of providing DMT bus scheme can be explored. Member Secretary OCC requested MPPGCL to explore the possibility for installing DMT bus scheme at Manikheda HPS and intimate the same to SLDC DELAY IN SUBMISSION OF DOCUMENTS FOR FIRST TIME CHARGING OF ELEMENTS:- The committee was apprised about the Procedure for interconnection of new transmission elements is briefly narrated hereunder:- Intimation by Transmission Licensee to RLDC / SLDC(Annexure A1-A5): 10 days prior to anticipated date of first time charging. Acknowledgement and comments of RLDC/ SLDC to Tr. Licensee ( Format-II): Within 3 days. Submission of request for first time charging by Tr. Licensee to RLDC//SLDC (Annexure B1-B5): 3 days prior to anticipated date of first time charging. RLDC shall issue Provisional Charging Approval for first time charging to licensee and in case of interregional element RLDC to issue consent/ request to NLDC for IR lines. In case of intrastate line charging approval shall be conveyed by SLDC: (within 2 days). Licensee to submit dummy SEM reading to RLDC to ensure that the Meter processing Software is able to read the SEM data from the new meters. Licensee to take Operational Code from RLDC /SLDC Control Room for switching operations. The code shall be issued keeping view of grid reliability. Transmission Licensee submit Post Charging documents (Annexure C1 to C4). RLDC/ N LDC shall verify the post charging documents and issue certificate for interstate / Interregional lines / ISTS lines. The respective testing department shall furnish regarding measures taken to take care new element interconnection for protection co-ordination for adjacent s/s and accordingly undertaking shall be provided. It is requested that licensee / utilities shall strictly adhere with time schedule for documentation of first time charging of new transmission elements of all interstate line and all EHV elements 400kv and above. It may also be ensured that FTC formalities should have completed before availing outage for integration of element. The authority submitted FTC document should ensure compliance of protection/ metering/telemetry issue in coordination with T&C official. It is also desired that all necessary data should have made available to all adjacent s/s for relay coordination well before targeted date. The authority submitted FTC document should ensure all formalities have been completed otherwise it would be difficult to obtain clearance from WRLDC. In general, non-attachment of requisite papers/ SLD/ document of standing committee approval /approval of Electrical inspector /noncompliance of relay coordination of adjacent s/s / providing information incorrectly caused delay in obtaining FTC approval. Therefore, it is desired that FTC document completed in all respect may be provided in stipulated time schedule so that FTC formalities could be completed within targeted date of charging. Minutes OF 66th OCCM of MP 14

17 The matter was discussed in the meeting REPORTING OF FLASH REPORT, DR AND EL OF TRANSMISSION ELEMENTS & DETAILED TRIPPING REPORT:- The committee was apprised that as per the provisions of Regulation 5.2 (r) of CERC (Indian Electricity Grid Code) Regulations 2010 and Regulation of 5(9) of CERC (Indian Electricity Grid Code) (First Amendment) Regulations, 2012 all the Regional Entities of the Region shall furnish the tripping details including DR & SEL output to RLDC with in 24 hrs of the event for analysis and identify the real time measures required in future to ensure secured grid operation. The flash report is also required to be furnished to SLDC within an hour of tripping. It is observed that FLASH REPORT, DR & EL of station is not made available after tripping of transmission grid element by the State Grid Entities and the flash report is also not being sent after repeated pursuation. It is also to inform that as per CEA Protection Standards, in case of tripping of Inter Regional Lines of voltage class 220 KV & above, the DR/EL files shall be invariably submitted to RLDC under intimation to this office. All intra-state entities are requested to submit the FIR, DR & EL of station during tripping of transmission grid elements. The matter was discussed in the meeting TEN DAILY RESERVOIR OPERATION TABLE OF MPPGCL HPS: - The committee was apprised about the meeting held in Regional Office of MPPMCL at Bhopal on to discuss availability from Sardar Sarovar Project, ISP & OPS and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation table from WRD and NVDA for their operation of their hydro generators. In last 54 th, 55 th & 56 th OCCM, request has been made to MPPGCL for furnishing the same to SLDC within a week. In last meeting MPPGCL has submitted the Ten Daily Reservoir Table of Bargi and Bansagar Hydel Power Stations. It is requested that MPPGCL shall submit the Ten Daily Reservoir Table of remaining hydel power stations in coordination with NVDA and WRD for optimum utilization of available water in the reservoirs during the summer season. The matter was discussed in the meeting ABNORMAL VOLTAGE VARIATION OBSERVED IN PMU AT 400 KV S/s BINA:- The committee was apprised about the abnormal voltage variations is being observed in PMU s at 400 KV S/s Bina (plots enclosed as Annexure-6.13 (3 pages) since May SLDC has taken up the matter with T&C, MPPTCL and M/s GE. M/s GE engineer visit was arranged to 400 KV S/s Bina to investigate the problem in PMUs & it has been informed by GE site engineer that the voltage spikes are also observed in the input values of PMU from Bus PT s & line CVT secondary, hence it can be gathered that these PMU s are showing correct values and there is no issue in PMU. Minutes OF 66th OCCM of MP 15

18 Further it is also to intimate that the abnormal voltage spikes are still being observed in the PMU of 400 KV Main Bus I & II and 400 KV Bina(M.P) JP BinaCkt installed at 400 KV S/s Bina and the magnitude &frequency of spikes is continuously increasing with time.in addition to above, it is to also intimate that the voltage spikes are observed in 400 KV Bina-JP BinaCkt even when the line is hand-tripped from both ends. The matter was discussed in 64 th OCCM and MPPTCL was requested to arrange for testing of Bus PT s, line CVT & related equipments installed at 400 KV S/s Bina for investigation of root cause of these voltage spikes observed, for its rectification and ensure healthiness of equipments at site. MPPTCL may kindly update the status. The committee was apprised about the ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : Black Start mock drill of Hydel stations of MPPGCL:- The committee was apprised that during the black start mock drill successfully carried out at Hydel power station as mentioned below:- S.NO. NAME OF HPS DATE OF MOCK DRILL 1 Pench & Bargi HPS Joint Mock Drill Gandhi Sagar HPS Rajghat HPS MPPGCL may apprise the same in the meeting. It to inform that the dates proposed to conduct the Black Start Mock Drill of various HPS is as below:- S.NO. NAME OF HPS DATE OF MOCK DRILL 1 ISP OSP Manikheda HPS Birsinghpur HPS above. In view of the above all the concerned entities may confirm the proposed dates. MPPGCL, ISP & OSP confirmed the proposed dates for conducting the Black Start Mock Drill same as ITEM NO. 08: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 8.1 Testing & Callibration of meters and non-receipt of timely JMR data: 1. SLDC representative requested CE(T&C) office to apprise the status of testing / calibration of interface meters as per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of meter) Regulation 2010 to the committee. CE(T&C) office representative informed that interface meters installed at indore and bhopal circles are under testing process. Further, they have informed that instructions are being issued to other circle offices for testing / calibration of metes. Minutes OF 66th OCCM of MP 16

19 2. SLDC representative informed that inspite of the repeated requests made by SLDC in the previous 63 rd,64 rd and 65 rd OCCM the JMR data in standard format is not received by SLDC by 7 th of every month and requested CE(T&C) office to furnish the same by 7 th of every month. CE(T&C) office has assured that instructions will be issued to all circle offices for furnishing the JMR data in standard format by 7 th of every month at id - abtmpsem@gmail.com. 3. SLDC representative informed that CE(T&C) office has to provide list of 150 Nos newly commissioned interface points as per order no dated and subsequent amendment no dated placed on M/s Secure Meters Ltd. by CE(Procurement) office for AMC of 150 Nos AMR system (modem, optical cable, Yagi antenna, configuration). He further informed that in the absence of list the meters are not integrated with AMR system of SLDC and thus the data is not being received by SLDC. Every month SLDC is assessing the data of around 100Nos of ABT meters due to non-availability of data. He requested CE(T&C) office to immediately issue the list of 150 nos. meters installed at the interface points to M/s Secure Meters Ltd. so that same are integrated with AMR System of SLDC. CE(T&C) office assured that list of 150 Nos interface points shall be issued to M/s Secure Meters Ltd shortly. 4. SLDC representative inform that data of ABT meters installed at the interface points of Open Access Customers ( M/s SEL, M/s Prism Cement Unit-2 & M/s Maihar Cement) is not being downloaded through AMR System of SLDC and site officials are also not furnishing the load survey data of these meters. He requested the CE(T&C) office to issue instructions to field offices for data downloading and furnishing the same to SLDC. CE(T&C) office assued that instructions shall be issued to site officials. 8.2 NON RECEIPT OF ABT METER DATA OF RAILWAY TSS THROUGH AMR SYSTEM: SLDC representative informed that ABT meter data of following TSS of Railways is not being received through AMR system. 1. Railway TSS Bordhai. 2. Railway TSS Umreth. 3. Railway TSS Mansakra. Railway representative informed that Railways will coordinate with M/s Secure Meters Ltd. and MPPTCL for resolving the problems related with downloading of meter data of above TSS through AMR installed at SLDC. 8.3 AMR FACILITY FOR THE ABT METERS INSTALLED AT MPPGCL : SLDC representative informed that MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points and all the meters were successfully integrated with AMR server. He also informed that ABT meter data of 49 Nos meters were not received through AMR system in the month of September 2018, the status of data received through AMR system was also ed to GCC, MPPGCL on 6 th September He requested MPPGCL to take up the matter with site officials and M/s Secure Meters Ltd. to resolve the problems related with non readability of meters integrated successfully and provide AMC of AMR facility to M/s Secure Meters Ltd. so that complete data is received by SLDC. MPPGCL representative intimated that matter is being taken up with M/s Secure Meters Ltd for providing AMC of AMR system. SLDC representative requested MPPGCL to furnish the meter master of ABT meters installed at the interface points as standy meters and provide AMR facility on standby and check meters. Minutes OF 66th OCCM of MP 17

20 MPPGCL assured that instructions will be issued to site officials for providing the meter master of standby meters. MPPGCL also assured to look into the matter for providing AMR facility on check and standby meters. SLDC representative requested MPPGCL to issue instructions to officials of SSTPS PH-I & II for furnishing the JMR data of Secure meters where AMR is provided and data is downloaded by SLDC. MPPGCL assured that instructions will be issued to site officials. SLDC representative informed that in case of Thermal Power Stations of MPPGCL, the injection recorded by the ABT meters installed at the outgoing feeders generally do not match with the generation recorded at Generator end and requested MPPGCL to advise the site officials for monthly checking / verification of feeder wise data with Generator and Station Xmer wise data. He also requested MPPGCL for testing / calibration of meters installed at the Power Stations as per CEA regulations. MPPGCL assured that instructions will be issued to site officials for checking / verification of data and also informed that testing / calibration of meters has been done at power stations. 8.4 PROVIDNG AMR FACILITY AT GT-I & II OF BLA POWER HOUSE: The agenda point could not be discussed as no officer from M/s BLA Power has attended the meeting. 8.5 NON RECEIPT OF ABT METER DATA OF ISP & OSP HPS THROUGH AMR SYSTEM: SLDC representative informed that ABT meter data of ISP & OSP HPS is not being received through AMR system installed at SLDC and requested ISP & OSP to coordinate with M/s Secure Meters Ltd. & SLDC for resolving the problems related with downloading of meter data through AMR. ISP & OPS assured to coordinate with M/s Secure Meters Ltd and SLDC for downloading of meter data. 8.6 NON RECEIPT OF MONTHLY INJECTION DATA (JMR) OF NEWLY COMMISSIONED WIND & SOLAR POWER PROJECT FOR ISSUANCE OF MONTHLY STATE ENERGY ACCOUNT : SLDC representative informed that the concerned SE(O&M) s do not furnish the monthly injection data of following newly commissioned Wind & Solar Power Project connected at 33KV level. However, SLDC is incorporating the injection data recorded in ABT meter in SEA, but, verification of data could not be done. i) 15MW Solar Power Project of M/s Simcom Pvt. Ltd. having (Simcom(1MW), Eastman(4MW), Made Easy(10MW) connected through 33KV Ctk-I and 4 MW Solar Project of M/s Ramesh Steels connected through 33 Ckt-II at 220KV Ganjbasoda. SE(O&M) Vidisha. SLDC representative requested DDC, Bhopal to take up the matter with their CE(Comml), office for issuance of directives to concerned SE(O&M) to furnish the JMR generation data by 3 rd or 4 th of every month. DCC Bhopal assured to take up the matter with CE(Comml), Bhopal. Further, SLDC representative informed that inspite of the repeated request the SE(O&M) Dewas is not furnishing the monthly wind & solar injection data timely, the data for the month of September 18 was received on 7 th Octo18. SLDC representative requested DDC, Indore to take up the matter with CE(Comml), office for issuance of directives to SE(O&M) Dewas to furnish the Minutes OF 66th OCCM of MP 18

21 JMR generation data by 3 rd or 4 th of every month. DCC, Indore has assured to take up the matter with CE(Comml), Indore. Further, SLDC representative informed that monthly injection data of the following wind & solar generators connected at level and above is not furnished by the concerned EE(T), MPPTCL. SLDC consider the data received through AMR or through MRI by site official in monthy SEA, but verification of data could not be done. i) 42MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 220KV Badnagar substation through Ckt. ii) 21MW Wind Power Project of M/s Sarjan Realities Ltd. connected at 220KV Badnagar substation through Ckt. SLDC representative requested CE(T&C) office to issue necessary instructions to field offices for furnishing the JMR data of the above RE Projects. CE(T&C) office have assured to issue instructions to field offices for furnishing the JMR data of above mentioned RE Projects connected at level and above. 8.7 Implementation of REG DSM Regulations Non receipt of load survey data of ABT meters installed at the Pooling Stations of Wind & Solar Power Project for issuance of monthly Deviation Settlement Mechanism Account: SLDC representative informed that the concerned Nodal officers are not furnishing the complete load survey data of the ABT meters installed at the qualified Wind & Solar Power Project connected at 33KV level. The ABT meter data of the following Pooling Stations has not been received by SLDC neither through AMR nor through mail from concerned Discoms for the month of September i. 15MW Ujjas-I Rajgarth (Baiora). ii. 14.4MW Ujjas-I Barod. iii MW Ujjas-II Barod. iv MW Ujjas-I Susner. SLDC representative requested to DDCs, Indore and Bhopal to take up the matter with their CE(Comml), office for issuance of directives to concerned nodal officers to furnish the meter load survey data of above wind & Solar polling stations. DCC Indore & Bhopal has assured to take up the matter with CE(Comml). 8.8 TIME DRIFT IN ABT METER INSTALLED AT THE POOLING STATIONS OF WIND AND SOLAR GENERATING STATIONS AND SLIDING WINDOW PROBLEM: SLDC representative informed that the following ABT meters installed at Pooling Stations of Wind & Solar Power Projects has time drift and thus not recording the correct data. He also informed that SLDC has already requested to Generators with copy to concerned licensee vide letter no dated 29/10/2018 for time synchronization of the ABT meters with GPS so that correct DSM account of these Wind and Solar Projects is issued by SLDC. Sr.No. FEEDER NAME LOCATION NAME Location VOLTAGE LEVEL Meter No 1 UJAAS 1 BERCHHA S/S BERCHHA Grid S/s End 33 XB UJAS -2 ICHHAWAR S/S ICHHAWAR Grid S/s End 33 MPC59975 Minutes OF 66th OCCM of MP 19

22 3 GLOBUS STEEL & POWER S/s SITAMOU Generator End 33 XC (i) NTPC-1 220KV S/S RAJGARH (B) Generator End 132 XC (ii) NTPC-2 220KV S/S RAJGARH (B) Generator End 132 XC (i) CLEAN SOLAR -1 ALOT S/S ALOT Grid S/s End 33 XC (ii) CLEAN SOLAR -2 ALOT S/S ALOT Grid S/s End 33 XC KV BHADRESH_SUSNER S/S SUSNER Grid S/s End 33 XB UJAAS-1 AGAR S/S AGAR Grid S/s End 33 MPC UJAAS-2 AGAR S/S AGAR Grid S/s End 33 MPC59596 SLDC representative further informed that ABT meters installed at the following Solar Generating Stations are recording the 15 minutes block wise data on slinding window principal thus blockwise data do not match with midnight data. These meters needs immediate replacement. i. 5MW Designco Manufacturer & Exporter connected at S/s Arniyakala. ii. 12MW Avenger solar pvt Ltd. connected at S/s Suwasara. SLDC representative requested to DDCs, Indore & Bhopal take-up the issue with concerned officials for time synchronization and replacement of ABT meters. DCC Indore & Bhopal assured to take up the issue with concerned officials of Discoms. SLDC representative also requested CE(T&C) office to issue instructions to concerned officers for time synchronization of ABT meter installed at the 50 MW NTPC Rajgarh Solar Project. CE(T&C) office assured that instructions will be issued. ITEM NO. 9: SCADA AND E&T RELATED ISSUES: 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS & HAVING TRACTION FEEDERS- It was informed during the meeting that integration of 152 RTUs has been completed & integration of telemetry of Five RTUs (132 KV Raghogarh, 132 KV Isagarh, 132 KV Pratappura, 132 KV Dabra, 132 KV Udaipura) with SLDC SCADA is pending. Further, SLDC informed that telemetry of Birsingpur HPS and Zinna HPS is also not available and same needs to be provided by MPPGCL. SLDC informed that MPERC regularly monitors & enquires about the reason of RTUs pending for integration & thus SLDC requested MPPTCL & MPPGCL to take up this matter on topmost priority. MPPTCL informed that telemetry of integration of 132 KV Pratappura shall be done after operationalization of Malanpur Wide Band node. MPPTCL further informed that integration of 132 KV Dabra shall done through Gwalior or Mahalgaon Wide Band Node, integration of 132 KV Raghogarh & 132 KV Isagarh shall be done within 15 days & integration of 132 KV Udaipura shall be done by end of Dec 18. MPPGCL informed that tender for procurement of RTUs of Birsingpur HPS and Zinna HPS has been dropped & tendering process shall be again initiated. Further MPPGCL informed that as discussed in the meeting on Telemetry and voice communication related issues of Minutes OF 66th OCCM of MP 20

23 thermal/hydel power stations conducted in SLDC on dtd , MPPGCL will finalise the data channel plan in coordination with SLDC and MPPTCL and also initiate procurement of PLCC cabinet /outdoor equipments/ VFT modems, if required so that the data channel shall be available before commissioning of RTU. 9.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS SLDC informed that the telemetry discrepancies pertaining to MPPGCL generating stations has already been discussed in meeting on Telemetry and voice communication related issues of thermal/hydel power stations conducted in SLDC on dtd & the list of telemetry discrepancies pertaining to MPPTCL/IPP substations is detailed below :- Sl No. Name of Substation whose RTU is required to be upgraded KV ISP KV Kirnapur Name of feeders/transformers required to be included in telemetry 1. Telemetry of 125 MVAR Bus Reactor not available. 2. Telemetered values of 400 KV Nagda MVAR is 10 times of actual value. 2. Telemetered values of 400 KV Bus-1,2 Voltage & Frequency, 400 KV Indore-1 MVAR. 3. MVAR Values of Gen-3 & Gen-6 4. All digital telemetry not available. Wrong MW/MVAR value of 132 KV Dongargarh KV Seoni i.wrong CB status of 160 MVA Xmer II (Secondary side) ii.wrong value of 220 KV Bus II Voltage iii.132 KV Bus Voltage & Frequency KV Bhopal MVA Xmer-IV Main & Tie CB KV Shujalpur-1 MVAR KV Astha CB status of 220 KV Mugaliyachhap KV Rajgarh Biaora (i) 220 KV Bus Coupler & TBC CB status (ii) 132 KV Voltage & Frequency KV Indore 400 KV Itarsi-II line reactor CB wrong status KV Chhegaon Wrong CB status of :- i. 132 KV IC I & II ii. 220/132 KV Xmer II (Sec side) KV Satna Wrong CB status of 132 KV Kymore, 132 KV Interconnector II & 132/ Xmer II KV Kotar Wrong CB status of 220 KV Satna 1, 132 KV Rampur Baghelan, 132 KV RTS KV Chichli CB status of 132 KV Udaipura 1 & KV Betul CB status of 220/132 KV Xmer II & 132/ Xmer II KV Mandideep CB status of 220/132 KV Xmer II & III, 132 KV Wardhman, 132 Anant, 132/ Xmer ISP informed that the case for purchasing new RTUs has been initiated by ISP in response to which SLDC informed that this process may take considerable time & thus SLDC requested ISP to arrange for MFM compatible with existing RTUs so that the telemetry of 125 MVAR Bus Reactor Minutes OF 66th OCCM of MP 21

24 can be expedited. Further ISP requested SLDC to arrange for a transducer so that its compatibility with the existing RTU may be tested. In response, SLDC requested MPPTCL to arrange a transducer for ISP to which MPPTCL agreed. MPPTCL informed that they will arrange for rectification of the discrepancies at priority. SLDC further informed that the status of telemetry is being monitored by MPERC through MIS report and hence telemetry is required to be maintained properly with highest possible availability. It was also informed by SLDC that lot of inconvenience in grid management is observed due to above discrepancy and hence upgradation of above mentioned RTU is to be taken up on top most priority for which MPPGCL and MPPTCL agreed. 9.3 EXTENSION OF RGMO/FGMO SIGNAL TO SLDC/WRLDC :- SLDC informed that as per IEGC 5.2(f), RGMO/FGMO is mandatory for all thermal units above 200 MW and hydro units above 10 MW. Further considering the high penetration of renewable to grid and also the Government target to achieve 175 GW, it is essential to monitor operation of RGMO/FGMO at SLDC/RLDC for ensuring grid security and compliance of regulation. Subsequently SLDC vide letter no /RPC-27/3739 dated , letter No. SE/LD:E&T/693 dated , letter No. SE/LD:E&T/34 dated , letter No. SE/LD:E&T/143 dtd ,, letter No. SE/LD:E&T/309 dtd , letter No. SE/LD:E&T/980 dtd requested MPPGCL/NHDC for integration of telemetry of RGMO/FGMO in RTU installed at power station and forward the object address configured in RTU so that same may also be configured in SLDC SCADA and RGMO/FGMO status may be displayed in SCADA system. The matter was again taken up vide this office UO No.38 dated 21/08/2017. However, extension of RGMO/FGMO signal of following generating units is still to be extended to SLDC SCADA system:- S.No. Name of Generating Station Unit.No. MPPGCL response 1 Satpura TPS 6,7,8,9 MPPGCL informed that Unit 6,7,8,9 are not compatible for RGMO as these units are having LM3 turbines with mechanical governor. However as per the CERC order dtd , CERC has stated amended notification that if a generating unit cannot be operated in RGMO, it shall be operated in FGMO with manual intervention to operate in the manner required under RGMO. SLDC thus requested MPPGCL to arrange for extending the FGMO signal status to SLDC/WRLDC. 2 SGTPS 1,2,3,4 MPPGCL informed that it is under tendering process & shall be completed within 3-4 months. 3 BARGI HPS 1,2 MPPGCL informed that equipments from BHEL have been received & commissioning shall be done during AOH of Units in PENCH HPS 1,2 MPPGCL informed that generating units are in depth & weak signals are being received in RTU panel. MPPGCL further informed that they are looking after this issue & RGMO signal extension Minutes OF 66th OCCM of MP 22

25 shall be done shortly. 5 Singhaji TPS Phase II 3 MPPGCL informed that they will take up the matter with Singhaji TPS and arrange the telemetry on top most priority. 9.4(A) NON AVAILABILITY/ UNRELIABLE TELEMETRY OF HYDEL POWER STATIONS :- SLDC informed that the telemetry of Bansagar III, Tons, Pench, Bargi, Madikheda is very unreliable & frequent long outage with abnormal delay in restoration of same is observed. The RTU availability of MPPGCL HPS is as detailed here under :- Name of HPS Present Status Availability July-18 Aug-18 Sep-18 Oct-18 Pench Intermittent Bansagar-III Intermittent Madikheda Intermittent Rajghat Intermittent Gandhisagar Intermittent Bargi Intermittent Tons Intermittent Birsingpur HPS Telemetry not provided to SLDC. Zinna HPS It was also informed that as per CERC communication regulation 2017, availability of telemetry is required to be ensured more than 99.9% however as indicated above the telemetry availability of Hydel Power Stations is very low. MPPGCL provided the order copy of nomination & contact details of officers at each power house looking after telemetry work. SLDC also requested MPPGCL to arrange required spares (PLCC/RTU/MFM etc.) at Power Stations so that availability of telemetry may be achieved as desired by CERC. Further SLDC informed MPPGCL that training may be arranged by SLDC to MPPGCL engineers looking after telemetry work so that the routine matters regarding telemetry outages may be solved at priority. MPPGCL agreed to arrange the same. 9.4(b) Non Availability/ Unreliable voice communication Between SLDC to Thermal/ Hydel Power Stations :- SLDC informed that despite constant pursuance most of the PLCC voice communication of various power stations to SLDC is out since long time. The details of outage are here as under:- Sr.No Name HPS/TPS of 2 wire PLCC Exchange at Remark MPPGCL response in channel Power Station meeting dtd PLCC channel is Exchange is out 1.Restoration of AE Bargi informed that quotation not working since since long time PLCC channel is from M/s ABB for purchasing of last 5 months. pending due to new card is still pending. SLDC faulty Card of the suggested to check the card in Minutes OF 66th OCCM of MP 23

26 1 Bargi PLCC exchange at spare PLCC cabinet available at Bargi end. other Power Houses and take the card on loan basis. During 2. BSNL landline the discussion representative number/ Mobile from Rajghat HPS informed that number not card is available in his Power working most of House. In response SLDC the time. suggested Bargi HPS take the card from Rajghat HPS and restore the voice communication of Bargi HPS at the earliest. SLDC also suggested to contact T&C division, and arrange the desired module from T&C, on loan basis. It was also requested to procure spare modules in advance so that so long outage in future may be avoided. 2 Pench 3 Bansagar- IV Communication Exchange is out 1. The repair/ EE from O/o CE (O&M) ensure rom SLDC through since long time replacement of that laying of required cable ubscriber of exchange at along with converter (RS232 to earby Seoni Power Station end RS485) to shift telemetry on tation Exchange is is still pending. wideband node and extend VoIP working 2.Provided Idea & 2 wire voice facility upto Mobile phone at control room of Pench HPS shall station is not be completed before working at the commissioning of Wideband time of equipment. emergency. 3.Widebandequip ment at Pench shall be commissioned at the end of Nov 18, therefore laying of CAT 5 cable & telephone cable from wideband equipment to Control room is required in advance to extend VoIP & 2 wire voice facilty. PLCC voice Exchange is not It is informed by Mr.Vinay, AE, Tons HPS communication is available communication informed that he will visit not established officers from Satna Bansagar-IV for restoration of that power voice communication of amplifier of PLCC Bansagar-IV at the earliest. panel at Bansagar- IV was shiftied to Bansagar-III, on MPPGCL instruction. Therefore Power amplifier for Bansagar-IV is Minutes OF 66th OCCM of MP 24

27 required to be arranged by MPPGCL. 4 Madikheda 5 Rajghat 6 Gandhisagar PLCC voice Exchange is not 1. Exchange at SLDC informed that recently channel is not available Madikheda is Pichore wideband node working since last required. commissioned therefore 2 wire 2 years. 2. Coordinating PLCC voice communication efforts from could be restored to established MPPTCL and PLCC channel upto Pichhore MPPGCL is wideband. Madikheda HPS required for informed that requirement of restoration of PLCC cabinet has already PLCC channel. submitted to central office therefore as PLCC cabinet available to him, voice channel will be commissioned upto Pichhore substation. SLDC further requested MPPGCL officers from Jabalpur to expedite the procurement of material desired by site officers. PLCC voice Exchange is not 1. Exchange at SLDC suggested to extend voice channel is not available Rajghat is facility upto Rajghat HPS while working since last required. making the subscriber of 220 KV 2 years 2. Coordinating Bina in coordination with AE efforts from Bina. Therefore to commissioned MPPTCL and above link voice channel MPPGCL is between Rajghat HPS to 220 KV required for Bina shall require to be restoration of established and connect to this PLCC channel. channel in PDH equipment at220 KV Bina to extend the voice facility of Rajghat HPS upto SLDC/Backup SLDC. PLCC voice 1. Coordinating It was informed by SLDC that in channel is not efforts from case of distance between working since last MPPTCL and wideband equipment and RTU, 4 month MPPGCL is the RS232 to RS485 converter required for along with cable between these restoration of two locations is required to be PLCC channel. laid. EE from O/o CE (O&M) 2. Wideband assured that laying of required equipment at cable along with converter to Gandhi Sagar shift telemetry on wideband shall be node and extend VoIP & 2 wire commissioned at voice facility upto control room of the end of Nov 18, Gandhi Sagar HPS shall be therefore laying of completed before commissioning CAT 5 cable & of Wideband equipment. telephone cable from wideband equipment to Control room is required in advance to extend VoIP & 2 wire voice facilty PLCC voice The AE Birsinghpur informed that Minutes OF 66th OCCM of MP 25

28 channel is not 7 Birsinghpur HPS working since long /TPS time due to faulty PLCC exchange at Birsinghpur. 8. Satpura TPS PLCC voice Exchange channel is not faulty since long working since last time. 1 years. commissioning of presently voice communication new exchange at between SLDC to thermal power Birsinghpur TPS is house is proper & the required to be commissioning of EPAX at site is expedited. under progress. AE Birsinghpur assured that the voice channel of Birsinghpur HPS shall be restored within one month. is 1. AE Satpura informed that faulty Repair/replacemencard shall be repaired at the t of Exchange & earliest. Further, SLDC informed Card of PLCC that the OPGW has already equipment at been laid between 400 KV Ashta Satpura TPS side and Satpura TPS and suggested is still pending. that alternate path can be established using this path by installing end optical equipment. SLDC informed that PLCC voice communication has of Pench HPS has been restored after long time. SLDC further informed that it is noticed during extending 2 wire voice facility upto Singhaji 1 & 2 TPS & OSP HPS from nearest wide band node utilizing PLCC channel, the 2 wire print in ETL make & OG Print in PUNCOM make is not available in PLCC cabinets at power station end. therefore voice facility is not extended upto power stations viz. Singhaji 1 TPS, Singhaji 2 TPS & OSP. Further it may be possible that 2 wire print/ OG Module may not be available for extending voice facility upto Madikheda HPS & Rajghat HPS & needs to be verified. SLDC requested MPPGCL & NHDC to arrange / ensure the availability of 2 wire print/ OG print in their PLCC cabinets so as 2 wire voice facility could be extended upto power stations utilising the optical network. MPPGCL & NHDC agreed to look into the matter at priority. SLDC informed that the restoration of above PLCC voice Communication is of utmost importance as lot of inconvenience in system operation is observed by SLDC as voice communication through Mobile/ P&T lines is not reliable and remains out /unreachable for most of the time. MPPGCL agreed to discuss this matter with its higher officials. 9.5 NON AVAILABLITY & WRONG TIME STAMPING OF SOE AT SLDC SCADA SLDC informed that on some instances, it has been observed that the SOE was not received or wrong time stamping of SOE was received in SLDC SCADA system. The matter was taken up with field for verification for proper configuration /connections of SOE data in RTUs & after long pursuance, the matter was investigated and it was found that the settings inf code 2 & inf code 4 were not correct in Dongfeng make RTUs. These settings have now verified and changed in some of the RTUs and SOE with correct time stamping from RTUS where settings were modified is now receipt in SLDC SCADA/EMS system. Further SLDC informed that the SOE verification of all RTUs is being done & out of 152 RTUs, SOE verification of 50 RTUs has been done & requested MPPTCL to expedite the SOE verification of balance RTUs at the earliest. MPPTCL informed that they have instructed all the field offices to coordinate with SLDC for SOE verification. Minutes OF 66th OCCM of MP 26

29 9.6 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS & INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :- The long outage of telemetry & substations having intermittent telemetry due to heavy noise in communication channel was discussed in detail:- Sl No. Name of Sub Station Out from /Remark KV Mungaoli More than six months KV Waidhan S/s Very intermittent 03 Pench HPS Very intermittent 04 Bargi HPS Very intermittent 05 Tons HPS Very intermittent KV Rewa Very intermittent 07 Bansagar III HPS Very intermittent KV Chhindwara Very intermittent KV Anuppur Very intermittent KV Shahdol Very intermittent SLDC informed that telemetry of 132 KV Mungaoli is restored & requested MPPTCL & MPPGCL to sort out rectification of above RTU/data channel on top most priority. SLDC further informed that MPERC vide Letter dated has directed to submit reason for long outage for RTU & also directed to ensure proper functioning of RTUs UTILIZATION OF W.B NODE AT BIRSINGHPUR TPS : SLDC informed that as discussed in last various OCC, the W.B node at Birsinghpur TPS has already been commissioned in 2016 & despite constant pursuance utilization of node is still pending since last two years due to pending work of laying of cable form W.B node location to PLCC room, Exchange room and RTU. It was informed by SLDC that complete scheme to extend wideband facility upto RTU was prepared by SLDC and forwarded to SGTPS around two years back. However, required converter and laying of fiber optic cable is still pending. MPPGCL informed that the procurement work is under progress. SLDC informed that the matter regarding utilisation of wideband nodes at Gandhi Sagar and Pench HPS was also discussed in last OCC meetings & meeting dtd & MPPGCL was requested to ensure that distance between wide band equipment & nearby RTU panel should not be more than 15 meter. MPPGCL informed that in Pench HPS distance is under the limit. However in the case of Gandhisagar, MPPGCL agreed to look into this matter. Minutes OF 66th OCCM of MP 27

30 9.8 TELEMETRY OF RAILWAY TSS SUB STATIONS: - SLDC informed that the telemetry of existing 38 Nos railway Traction Sub Stations & upcoming 25 new railway TSS is required to be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP. SLDC informed that despite constant pursuance in last various OCC meetings no progress in the matter has been observed. Further SLDC informed in the meeting & vide letter dtd that before initiating commissioning of telemetry, the scheme is to be approved by SLDC, so that any integration issue may be avoided.sldc also informed that railway has not yet submitted the architecture of telemetry scheme, details of equipments & protocol to be used. Railway informed that the tender has been issued & equipments have been delivered. Further Railways informed that currently the telemetry of Railway TSS is being extended to Railway Zonal office & further it will be integrated with SLDC. Railways informed that they will arrange a meeting with SLDC before initiating the integration of telemetry with SLDC. Railways also informed that the telemetry integration of Railway TSS shall be completed by next OCC meeting. 9.9 INFORMATION REQUIRED FOR PMU ANALYTICS UNDER URTDSM PROJECT:- SLDC informed that under the Unified Real Time Dynamic State Measurement URTDSM Project, the analytics applications has been installed at SLDC MP for which the relay setting details are required for its configuration from all the sub-stations where PMU s are installed and its adjacent sub-stations. SLDC also informed that the matter has been constantly being pursued by SLDC from last 3 OCC Meetings, however still the required information is pending to be provided by MPPTCL. SLDC thus requested MPPTCL to furnish the data at the earliest. MPPTCL agreed to provide the same on priority. ITEM NO 12 : DATE AND VENUE OF NEXT OCC MEETING :The committee was apprised that it is proposed to hold the 67th Operation and Coordination Committee meeting of MP on The host and venue of the upcoming OCC meetings of MP is detailed below:- S.NO. OCC MEETING TENTATIVE HOSTING ENTITY OF MP DATE TH MP-OCCM KALPTARU TH MP-OCCM NHDC TH MP-OCCM MPPGCL ST MP-OCCM DISCOM(CZ) ND MP-OCCM JP BINA In view of the hosting entity may confirm the same in the meeting. Kalptaru confirmed for hosting the 68th MP-OCCM in the month of February 2019 and the final date and venue of the meeting will be decided & conveyed later. The other entities also confirmed the above dates. *********** Minutes OF 66th OCCM of MP 28

31 Annexure-2.1 S. No. Particulars FREQUENCY PARTICULARS Aug-18 Sep-18 1 INTEGRATED OVER AN-HOUR 1.1 Maximum Frequency Hz Between hrs & Hrs on Hz Between hrs & Hrs on Minimum Frequency Hz Between hrs & Hrs on Hz Between hrs & Hrs on Average Frequency Hz Hz 2 INSTANTANEOUS FREQUENCY 2.1 Maximum Frequency Hz 2.2 Minimum Frequency Hz 3 Percentage of time when frequency was :- AT HRS ON AT 19.12:30 HRS ON Hz Hz AT 13.03:00 HRS ON AT 21.18:23. HRS ON %age of time when frequency was Aug-18 Sep Below 48.5 Hz Between Hz and 48.8 Hz Between Hz and 49.2 Hz Between Hz and 49.5 Hz Between Hz and 49.7 Hz Between Hz and 49.9 Hz Between 49.9 Hz and Hz Between Hz AND 51.5 Hz Above 51.5 Hz No. of times frquency touched Hz No. of times frquency touched Hz No. of times frquency touched 51.0 Hz 0 0 Minutes OF 66th OCCM of MP 29

32 I EHV TRANSMISSION LINES S. No. NAME OF THE TRANSMISSION LINE / (FINANCED BY) A. 400 KV TRANSMISSION LINES B. 220 KV TRANSMISSION LINES 1 M.P POWER TRANSMISSION COMPANY LIMITED TRANSMISSION WORKS COMPLETED DURING (UP TO ) LILO of both ckt of Badod-Kota/Modak 220kV line at 220Kv S/s Suwasara (ADB-III Saving) TYPE OF CIR CUITS ROUTE LENGTH CIRCUIT KMS. NIL 0 0 MONTH OF COMPLETIO N Annexure-2.2.5(i) DATE OF COMMI- SSIONING DCDS June' Kv DCDS Morena(400KV S/s CWRTL Adani Group) - Sabalgarh DCDS line with lilo of one ckt of line at Morena 220Kv s/s (ADB-III Saving) DCDS Aug' kV DCDS Khandwa(400 PGCIL) - Chhanera 3 line(2x39.217) ADB-III (S) C. 132 KV TRANSMISSION LINES 132Kv DCDS 2 phase 4wire line from 220Kv s/s 1 Ashoknagar for PS to 132kV RTS Ashoknagar (2x4.726) DCDS Oct' DCDS April' kV DCSS line from 132kV Balwada - water pumping station No.2 of NVDA at village Mukhtyara (1x2.421) (Contribution Supervision Work) 132 kv DCDS Line Chichli - Udaypura (On 220Kv Tower) (ADB-III) LILO of one ckt of Vidisha - Gairatganj line at 132kV Raisen(2x18.221) (ADB-III Saving) LILO of both ckt. Of 132 kv Balaghat - Bhanegaon line at Balaghat/Kirnapur 400kV S/s.(2x x1.216) (ADB-III) DCSS May' DCDS June' DCDS June' DCDS June' kV MACT (Bhopal) - Mugaliachhap line (4x x10.536) DCDS June' (ckt-i) (ckt-ii) kv DCSS Dewas-Agrod line (1x20.76) (ADB- III) 2nd ckt of 132kV Maihar - Amarpatan 132kV line (GEC) 132kv DCSS Mugaliyachhap - Bilkishganj line (1x17.274) (ADB-III Saving) 132Kv DCSS line from 400Kv s/s Katni - RTS Patwara (1x19.417) (CCW) 132kv Mugaliya Chaap - Sehore DCSS line (1x x1.140) (JICA) 132 kv DCSS Dewas-Barotha line (1x17.428) (JICA) LILO of one ckt of 132kv Neemuch - Mandsore line at Budha Sub-station (2x21.503) (ADB-saving) LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Suwasara 220KV S/s (4x1.423) (ADB-saving) DCSS June' nd ckt June' DCSS June' DCSS June' DCSS July' DCSS July' DCDS July' DCDS July' kv DCDS Rajgarh - Khujner/Sindaota line (2x x1.457) (ADB-saving) DCDS July'2018 1x kv DCSS line Chhindwara-Saori line (1x31.23) (ADB-saving) DCSS July' Kv DCSS 2 phase 2wire line from 132Kv s/s Shahpura(JBP) for 5MVA PS to RTS Bhitoni (1x5.968) (Contrib) 132Kv DCSS line PS III &IV for NVDA at Simrol (1x8.031) (Contrib only supervision) DCSS July' DCSS July' % Kv DCSS 2 phase 2wire line from 220Kv s/s Maihar for PS to TSS Bhadanpur(1x13.06) (CCW) DCSS Oct'2018 charged on Minutes OF 66th OCCM of MP 30

33 II. EHV SUB - STATIONS S. NAME OF SUBSTATION / (DISTRICT) / No. (FINANCED BY) A. 400 KV SUBSTATIONS KV sub-station Kirnapur with 2x100MVA 400/220 kv x-mer+ 1X40 MVA X-mer (Dist- BALAGHAT) ADB-III B. 220 KV SUBSTATIONS a. 220 KV NEW SUBSTATIONS /132kV S/s Suwasara (2x160MVA + 1x50) ADB-III S 220 kv Indore N/Z (Upgradation) with 2x160MVA (UBI) VOLTAGE RATIO (KV) No.OF X-mer & Cap. (MVA) EFFECTIVE CAPACITY MVA MONTH OF COMPL- ETION 400/132 1x Oct' /132 kv 1x160 1x June'2018 Aug' /132 1x July'2018 DATE OF COMMI- SSIONING 1x100 MVA charged on (132 KV side) (2nd X-mer) (1st unit) 3 Upgradation of Chhanera 132Kv S/s to 220kv with 2x160MVA +1x50MVA X-mer (50 MVA X-mer charged on ) (ADB-III S) 220/132 kv 2x Sept' & both X-mer charged from 132 KV & from 220KV C. 132 KV SUBSTATIONS a. NEW SUBSTATIONS 1 Udaipura 132kv s/s with 1x40 MVA (ADB-III) 132/33 kv 1x40 40 April' (33) (132) Bilkishganj 132kv s/s with 1x50 MVA (ADB-III Saving) Waraseoni 132kv s/s1x40 MVA (Dist- Balaghat) (ADB-III) Khujner/Sindaota 132kv s/s with 1x50 MVA (ADB-III Saving) 132/33 kv 1x50 50 June' /33 kv 1x40 40 July' (33kV) 132/33 kv 1x50 50 July' Budha 132kV S/s with 1x50MVA (ADB-III Saving) 132/33 kv 1x50 50 July' Bisnoor 132kv s/s with 1x50 MVA (ADB-III Saving) Patera 132kv s/s with 1x50 MVA (ADB-III Saving) 132/33 kv 1x50 50 Aug' (33KV) 132/33 kv 1x50 50 Aug' Saori 132kV S/s with 1x50MVA (ADB-III Saving) 132/33 kv 1x50 50 Aug' Rehli 132kv s/s with 1x50 MVA (ADB-III S) 132/33 kv 1x50 50 Sept' Satna-II 132kV S/s with 2x50MVA (ADB-III Saving) 132/33 kv 2x Oct' from side Minutes OF 66th OCCM of MP 31

34 S. No. NAME OF THE TRANSMISSION LINE CKT. KMS. PROGRESS IN % (Oct'2018) A. 400 KV TRANSMISSION LINES 1 400kV DCDS (Quad moose) line from Shri Singaji TPS (stage-ii) - Pithampur (2x x68.626) % 2 400kV DCDS (Quad moose) line from Pithampur - Badnawar (2x70) % 3 LILO of 400kV Seoni - Bhilai SC line at 400kV S/s Balaghat/Kirnapur (2x3.375) % 4 LILO of both ckt. Of 400kV Nagda to Rajgarh line at 400kV S/s Badnawar (4x8.163) 33 59% kv DCDS line from Nagda 400 kv S/s to Mandsaur 400 kv S/s % kv DCDS line for LILO of one ckt of Satna(PGCIL) - Bina(PGCIL) 400 kv at Sagar 400 kv S/s 56 30% kv DCDS line from Ashta 400 kv S/s to Ujjain 400 kv S/s % kv DCDS line from Indore (PGCIL) 765 kv S/s to Ujjain 400 kv S/s % kv DCDS line from Nagda 400 kv S/s to Ujjain 400 kv S/s % B. 220 KV TRANSMISSION LINES 1 2nd Ckt of 220kv Satna - Chhatarpur line (152) % 2 LILO of one ckt of 220 KV DCDS jabalpur-amarkantak line & 132 KV Jabalpur - Maneri S/C at proposed 220 KV S/s Gorabazar JBP 29% 3 Annexure ii EHV TRANSMISSION WORKS UNDER PROGRESS AS ON LILO of both Ckt of Indore-II (jaitpura) - Ujjain 220kV line at Indore (PGCIL) 765 kv S/S (4x6.012) % 4 LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) (2x32.782) 66 5% 5 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 38% 6 220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1+4x5.6) % 7 220Kv DCDS Julwaniya- Kukshi (2X58) % 8 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 19% 9 LILO of 2nd ckt Nagda - Neemuch 220kV line at 220Kv S/s Daloda (2x12.2) % 10 Part (b).lilo of 220kV Sarni - Pandhurna at 220kV S/s Betul (2x38.864) (Note: Betul220 & Betul400 I/C line 3.76 cktkm. charged % kV DCDS line from Julwaniya 400kV S/s in Sendhwa 220kV S/s 70 76% kV DCDS line from Badnawar 400kV S/s - Kanwan 220kV S/s 63 47% kV DCDS line from Kanwan 220kV S/s - Dhar 220kV S/s % 14 LILO of both ckt Nagda - Neemuch 220kV line at 400Kv S/s Mandsore(Sitamau) (2x22.427) % kV DCDS line from Mandsaure(Sitamau) 400kV S/s - Maruti Shakti Pool 220kV S/s % kV DCDS line from Betul 220kV S/s - Gudgaon 220kV S/s 94 65% kV DCDS line from Neemuch 220kV S/s to Ratangarh 400kV S/s % kV interconnector between Sailana 400kV S/s & Ratlam switching 220kV S/s % 19 2nd circuiting of Ratlam switching - Daloda 220kV DCSS line 72 36% 20 LILO of Ratlam - Daloda 220kV line at 220Kv S/s Jaora (2x3.51) % kv Sabalgarh - Sheopur line (2x110) 220 7% Kv DCDS line from 220kV Pooling S/s RUMS at Goojarkhedi, Suwasara (For interconnection of Solar PV Plant of RUMS) % a) 220kV line from 220kV S/s RUMS at Gujarkhedi, Suwasara to tap point (2x8.813) b) Tap point to 400 kv S/s Sitamau (2x34.613) kV DCDS Barsitadesh (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X0.917) & kV DCDS Ramnagar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line (2X2.572) 1x % 1st ckt charged on & 2nd ckt on dtd kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s PGCIL % line) (2X0.917) Minutes OF 66th OCCM of MP 32 Page 1 of 4

35 132 KV TRANSMISSION LINES 1 132kv DCSS Gautampur -Depalpur line (1x19) 19 59% 2 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 42% kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s (1x53.209) % 4 LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20) 40 69% kv DCSS Guna-Eshagarh line (1x72) 72 32% 6 LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS line at 132 KV S/s Morwan (2x1) 2 0% kv Sirmour - Katra DCDS line (2x37.67) % 8 LILO of 132 kv Jaora - Khachrod line at Bhesola 132 KV S/s (2x0.729) % 9 LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87) % KV Shyampur - Pilukhedi DCSS line (1x22.834) % KV Gourjhamar - Deori DCSS line (1x27.493) % nd ckt of 132 KV Sheopur- Baroda line & LILO of its both ckt at 220 KV S/s Sheopur for 132 KV interconnection of 132 KV S/s Sheopur & 220 KV S/s Sheopur. (2nd ckt- 34 cktkm+2x1+4x5) 132kV DCDS line from 400 kv Ujjain to Vikram Udyogpuri (Narwar) (2x21.43) 56 7% % 14 2nd circuiting of 132 kv Nepa- Dharni (MSEB line) & LILO for 132kV S/s Pipalpani (34.8 ckm 2nd ckt + 2x1.225) % 15 1 Datiya- Bhitarwar DCSS line (1x35.296) % 16 LILO of 132 KV Badod - Garoth line at S/s Shyamgarh % kv DCSS Khurai- Khimlasa line (1x20.937) % kv DCSS Panagar - Patan line (1x22.749) % kv DCSS Badnagar - Chhayan Line (1x31) 31 64% kv DCSS Dhar - Teesgaon line (1x15.35) % 21 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad % kv DCSS Udaipura - Silvani line (1x25.8) % kv DCSS Narsinghpur - Devnagar (1x23) 23 19% kv DCSS Karakbel - Belkheda (1x24.445) % kv DCDS Narsinghpur - Karakbel line (2x23) 46 31% 26 LILO of 132 kv Bhikangaon Khargone line at Biston 132 KV S/s 38 10% 27 LILO of 2ND CIRCUIT OF Gwalior- Pichhore at 132Kv S/s Dabra (2X0.108) (ADB-III) (balance work) (Note: LILO at Chinour cktkm charged on ) % 28 LILO of one ckt.(balaghat-katangi ckt) Of 132 kv Balaghat - Seoni/Katangi line at 132 kv S/s Waraseoni (2x4.7) % kV DCSS Sagar - Rehli line (1x40) 40 62% kV DCSS line Chichli - Palohabada (1x25.606) % 31 LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth line at Bhanpura 220KV S/s (4x14) 56 73% kv DCSS Betul-Bisnoor/Masod line (1x35.245) 35 78% kv DCDS line Guna-Bhonra (2x21.394) 21 60% kv DCSS Chichli-Palohabada line (1x25.606) % kv DCSS Damoh-Patera line (1x38) 38 69% 36 LILO of 132 kv Satna-Maihar line at Satna-II S/s (2x11.047) % kv Birsinghpur -Shahdol DCSS line (1x45) (Revised Estt. Sanc.no.0187dtd ) % 38 2nd circuiting of 132kv Birsinghpur -Shahdol DCSS line (1x45) (Sanc.no.0204dtd ) % kV DCDS line from Sendhwa 220 kv S/s - Pansemal 132kV line % kV interconnector between Kanwan 220 kv S/s & Kanwan 132kV S/s (2x Cktkm 2nd ckt) 26 50% kV DCDS line from Kanwan 220 kv S/s - Teesgaon 132kV line 24 58% 42 2nd ckt of 132kV Rajgarh(Dhar)220 kv S/s - Jhabua 132kV line % 43 LILO of both ckt of 132kV Neemuch - Mandsore at Mandsore(Sitamau) 400 kv S/s (2x71.464) % kV interconnector between Gudgaon 220 kv S/s & Gudgaon 132kV S/s (LILO of 132kV Betul - Gudgaon at 220kV S/s Gudgaon) % 45 2nd Circuiting of Sidhi 220 Mauganj 132 kv DCSS line (new line 6 km involved)(2x ckm 2nd ckt) 60 18% kV DCDS interconnector between Sailana 400kV S/s & Sailana 132kV S/s (2x18.344) % 47 2nd ckt of 132kV Alot - Sitamau 132kV line % Minutes OF 66th OCCM of MP 33 Page 2 of 4

36 48 132kV Julwaniya400 - Shahpura DCSS line (2nd ckt x46.866) % 49 LILO of 132Kv Bhopal(220kV) - Bairagarh line at 132kV S/s Badwai (IT Park) (2x0.513) % Kv DCSS 2 phase 2wire line from 220Kv s/s KOtar for PS to RTS kaima1x26.938) % kV DCSS Sirmore - RTS Dabhaura line (1x56.1) % Kv DCDS line from 132Kv s/s Morwa for Power supply of 21.6MVA in phase manner on 132kV for RTS Singroli (1x1.809) % Kv DCSS 2 phase 2wire line from 132Kv s/s Barhi for PS to RTS Khanna Banjari(1x3.174) 132Kv DCSS 2 phase 2wire line from 132Kv s/s Beohari for PS to RTS Beohari (1x20.278) 132Kv DCSS 2 phase 2wire line from 220Kv s/s Sidhi for PS to RTS Marwasgram(1x51.341) 132Kv DCSS 2 phase 2wire line from 132Kv s/s Dongrital for PS to RTS Gajra Bahara (1x17.435) 132Kv DCSS 2 phase 2wire line from 132 Kv s/s Nowgaon for PS to RTS Harpalpur (1x49.851) % % % % % Kv DCSS 2 phase 2wire line from 132Kv s/s Prithvipur to RTS Niwadi for p/s to RTS Niwadi (1x22.712) % KV line from Seoni 220 KV S/s - Nainpur 132 KV S/s % Kv DCSS 2 phase 2wire line Nainpur Ghansor line (1x34.413) % KV 2 phase 2 wire DCSS line for PS to 132/25 KV 5 MVA RTS at Linga from 220 KV S/s Chhindwara % KV 2 phase 2 wire DCSS line for PS to 132/25 KV 5 MVA RTS at Sausar from 132 KV S/s Boregaon % 63 2nd ckt of 132Kv 2ph 2 wire line from 220Kv s/s Bina - RTS Mungaoli RVNL % Kv 2ph 2 wire DCSS Neemuch - RTS Neemuch line % Kv 2ph 2 wire DCSS Jaora - RTS Jaora line % Kv DCSS line from GWSTPP to upcoming Make up Water Pump House river Narmada (Line-II)(1x24.152) % Kv DCSS line from 220kV s/s Rajgarh(Biora) - Birampura Pumping station Distt- Rajgarh of water Resources Department % S. No. A. 400 KV SUBSTATIONS 1 NAME OF THE SUBSTATION 400 KV sub-station Kirnapur with 2x100MVA 400/220 kv x-mer+ 1X40 MVA X-mer EFFECTIVE CAPACITY MVA % 1x100 MVA charged on (132 KV side) KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer % KV sub-station Mandsore with 2x315MVA 400/220 KV X-mer + 2x160 MVA 630 5% KV sub-station Sagar with 2x315MVA 400/220 KV X-mer % KV sub-station Ujjain with 2x315MVA 400/220 KV X-mer+ 2x % B. a 220 KV SUBSTATIONS 1 Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA 160 9% 2 Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA 160 9% 3 Adampur 220/33kv S/s 2x50MVA 100 8% 4 Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA % 5 220/132kV S/s Sailana (2x160MVA + 1x63) % 6 220/132kV S/s Jaora (Upgradation) (2x160MVA + 1x40) % 7 220/132kV S/s Sendhwa (Upgradation) (1x160MVA + 1x63) % 8 220/132kV S/s Kanwan (Upgradation) (1x160MVA + 1x63) % 9 220/132kV S/s Gudgaon (1x160MVA + 1x63) % /132kV S/s Ratangarh (2x160MVA + 1x63) 320 2% Minutes OF 66th OCCM of MP 34 Page 3 of 4

37 11 33/220 Kv Pooling Sub-station at Barsitadesh 3x100MVA /220kV Pooling Sub-station at Ramnagar 3x rd- 100 MVA charged on 2nd- 100 MVA charged on 13 33/220kV Pooling Sub-station at Badwar (3x100) 300 9% C. 132 KV SUBSTATIONS (a) NEW SUBSTATIONS 1 Biston 132kv s/s1x40 MVA 40 9% 2 Shamgarh 132kv s/s1x40 MVA 40 4% 3 Teesgaon 132kv s/s 1x40MVA 40 21% 4 Bada malehra 132kv s/s 1x40MVA 40 4% 5 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) 40 35% 6 Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur) 40 40% 7 Khimlasa 132kv s/s 1x40 MVA 40 3% 8 Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) 40 17% 9 Narsinghgarh 132kv s/s with 1x40 MVA 40 7% 10 Silvani 132kv s/s with 1x40 MVA 40 26% 11 Palohabada 132kv s/s with 1x50 MVA 50 19% 12 Shahpura 132kv s/s with 1x40 MVA (Barwani) 40 57% 13 Bhesola 132kV S/s with 1x50 MVA 50 3% 14 Pilukhedi 132kV S/s with 1x50 MVA 50 2% 15 Pipalpani 132kV S/s with 1x50 MVA 50 48% 16 Vikram Udyogpuri 132kV S/s with 1x63 MVA 63 4% 17 Bhitarwar 132kV S/s with 1x50 MVA 50 10% 18 Morwan 132kV S/s with 1x40 MVA 40 1% 19 IT Park Badwai 132kv s/s with 1x63 MVA (Bhopal) 63 44% Minutes OF 66th OCCM of MP 35 Page 4 of 4

38 Annexure-2.3(i) Discoms wise Average Supply Hours PARTICULARS East Zone Central Zone West Zone MP Aug-18 Sep-18 Aug-18 Sep-18 Aug-18 Sep-18 Aug-18 Sep-18 Commissinary HQ 23:50 23:53 23:37 23:32 23:48 23:48 23:44 23:44 District HQ 23:53 23:49 23:46 23:41 23:51 23:49 23:50 23:47 Tehsil HQ 23:47 23:46 23:31 23:23 23:39 23:42 23:39 23:37 Rural -Mixed 23:39 23:33 22:51 22:32 22:36 23:05 23:18 23:06 Rural -DLF 23:39 23:33 23:01 22:52 23:24 23:30 23:23 23:19 Rural -Irrigation 9:58 9:58 9:33 9:27 9:38 9:43 9:43 9:43 Minutes OF 66th OCCM of MP 36

39 Point 2.3(ii) LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated) JABALPUR REGION Name of EHV Substation Name of 33KV feeder 220KV NIL Date of commissioning of feeder bay Date of commissioning of feeder Lakhanadon 33KV Ghansor-II Chourai 33KV Sankh Name of EHV Substation 220 KV Anuppur Name of EHV Substation REWA REGION Name of 33KV feeder 220KV 33KV Jaithari feeder (Mojer bear) NIL SAGAR REGION Name of 33KV feeder 220KV NIL NIL Date of commissioning of feeder bay Date of commissioning of feeder bay Date of commissioning of feeder Date of commissioning of feeder Minutes OF 66th OCCM of MP 37

40 Agenda Point 2.3(ii) LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated) INDORE REGION Name of EHV Substation 220KV Pithampur (Sec-III) Name of 33KV feeder 400KV NIL 220KV 33KV Mittal Corp-2 33KV SRF Date of commissioning of feeder bay Date of commissioning of feeder Raukhedi 33KV Exep.Panther-III Kasrawad 33KV Bamandi Sanawad 33KV Dhakalgaon Singot 33KV Khar 33KV Khalwa UJJAIN REGION Chandrawatiganj 33KV Chandrawatiganj Electronic GhataBillod Name of EHV Substation 33KV AKVN (Namkeen Cluster) 33KV Pankhedi 33KV Kesoor-II Name of 33KV feeder 220KV NIL Date of commissioning of feeder bay Date of Charging of feeder Agar 33KV Agar Town-II Arniyakalan 33KV Designco Manufacture & Exporter (5MW Solar Power Plant) Zarda 33KV Semliya Minutes OF 66th OCCM of MP 38

41 LIST OF 33KV FEEDERS UNDER MPPKVVCL,BHOPAL (For which group to be allocated) BHOPAL REGION Name of EHV Substation Name of 33KV feeder 220 KV 220 KV Ganjbasoda Simcon Solar Power Date of charging of feeder bay Agenda Point 2.3(ii) Date of charging of feeder KV 132 KV Gopalpur AE, PHE KV Amrawad- Khurd Katara Hills-II KV Tamot Obedullaganj KV Lateri Aligarh Kotra Madankhedi Anantpura 132 KV Salamatpur Dewanganj Aamkheda 132 KV Udaipura Thaladigawan Boras Name of EHV Substation GWALIOR REGION Name of 33KV feeder 220 KV NIL 132 KV Date of charging of feeder bay Date of charging of feeder 132 KV Datia Karapura KV Ron Mangarh Vijaypur 33kV Dord Chinor Badagaon 33kV Banbar 33kV Chinor 33kV Karhiya 33kV Gharsondi 33kV Dimani 33kV Khadiyahar 33kV Ajnodha Minutes OF 66th OCCM of MP 39

42 Sr- No KV A- 400 KV TRANSFORMERS MVA CGL MAKE X-MER-III at 400KV S/s Bina Date Time Date Time 01/Nov/18 08:00 03/Nov/08 17:00 Continue Annexure3.2 SHUTDOWN OF TRANSMISSION ELEMENTS FOR THE PERIOD FROM TO Line / Transformer / Reactor / Bay From Urgent NIFPS Commissioning Work & post monsoon mantinance TIE BAY OF 315MVA BHEL X-MER-I 04/Dec/18 08:00 04/Dec/18 17:00 Daily For maintenance of bay equipments To Basis (Daily/ Continue) Reason TIE BAY OF 315MVA BHEL X-MER-II 06/Dec/18 08:00 06/Dec/18 17:00 Daily For maintenance of bay equipments B- 400 KV REACTORS KV 50MVAR LINE OF REACTOR RAJGARH-I 400KV 50MVAR LINE REACTOR OF RAJGARH-II 19/Nov/18 08:00 19/Nov/18 18:00 Daily For Maintenance & Testing Work. 20/Nov/18 08:00 20/Nov/18 18:00 Daily For Maintenance & Testing Work MVAR BHEL BUS REACTOR 11/Dec/18 08:00 12/Dec/18 17:00 Continue For maintenance & jumper replacement work C- 400 KV FEEDER & BAYS OF 400 KV- S/S KV Julwaniya-Chhegaon 04/Dec/18 09:00 04/Dec/18 17:00 Daily For post monsoon Maintenance work KV Julwaniya-SSTPS 06/Dec/18 09:00 06/Dec/18 17:00 Daily For post monsoon Maintenance work KV Transfer Bus Coupler Bay at 400KV S/s Julwania 07/Dec/18 10:00 07/Dec/18 17:00 Daily For post monsoon Maintenance work KV Bina-Bhopal-I 12/Nov/18 08:00 15/Nov/18 17:00 Continue For post monsoon maintaince work & CVT & LA Replacement Work KV BHOPAL-I (Tie CB) at 400KV S/s Bina 400KV BHOPAL-II (Main CB) at 400KV S/s Bina 01/Dec/18 09:00 07/Dec/18 17:00 Continue 10/Dec/18 09:00 15/Dec/18 17:00 Continue S/D is required only on Tie CB of line For CB replacement work. Load of line will be managed by main CB. S/D is required only on Main CB For CB replacement work. Load of line will be managed by Tie CB KV Bina-Bhopal-I 17/Dec/18 09:00 19/Dec/18 17:00 Continue For line CVT replacement work KV NAGDA-ISP 05/Nov/18 08:00 06/Nov/18 18:00 Continue For maintenance & relay replacement with Testing Work KV Katni-Birsingpur I 03/Dec/18 09:00 03/Dec/18 17:00 Daily For post monsoon Maintenance work KV Katni-Birsingpur II 05/Dec/18 09:00 05/Dec/18 17:00 Daily For post monsoon Maintenance work KV Katni-Damoh 09/Dec/18 09:00 09/Dec/18 17:00 Daily For post monsoon Maintenance work KV Main Bus No-I at 400KV S/s Katni 11/Dec/18 9:00 11/Dec/18 17:00 Daily For post monsoon Maintenance work. Minutes OF 66th OCCM of MP 40

43 Sr- No KV Line / Transformer / Reactor / Bay 400KV Main Bus No-II at 400KV S/s Katni Basis From To (Daily/ Reason Date Time Date Time Continue) 15/Dec/18 9:00 15/Dec/18 17:00 Daily For post monsoon Maintenance work. D- 220 KV FEEDER & BAYS KV Damoh-400 PGCIL DAMOH-I 26/Nov/18 10:00 26/Nov/18 17:00 Daily For post monsoon Maintenance work KV Damoh-400 PGCIL DAMOH-II 28/Nov/18 10:00 28/Nov/18 17:00 Daily For post monsoon Maintenance work. 220KV Damoh-400 PGCIL DAMOH /Nov/18 10:00 30/Nov/18 17:00 Daily For post monsoon Maintenance work. III KV Sagar-400 PGCIL DAMOH-I 12/Nov/18 10:00 12/Nov/18 17:00 Daily For post monsoon Maintenance work KV Sagar-400 PGCIL DAMOH-II 16/Nov/18 10:00 16/Nov/18 17:00 Daily For post monsoon Maintenance work KV Sagar-BINA-I 13/Nov/18 10:00 13/Nov/18 17:00 Daily For post monsoon Maintenance work KV Sagar-BINA-II 14/Nov/18 10:00 14/Nov/18 17:00 Daily For post monsoon Maintenance work KV Damoh-PGCIL-I 19/Dec/18 10:00 19/Dec/18 17:00 Daily For Testing and maintenance work KV Damoh-PGCIL-II 21/Dec/18 10:00 21/Dec/18 17:00 Daily For Testing and maintenance work KV Damoh-PGCIL-III 27/Dec/18 10:00 27/Dec/18 17:00 Daily For Testing and maintenance work KV Damoh- Katni 08/Dec/18 10:00 08/Dec/18 17:00 Daily For Testing and maintenance work KV Damoh- Tikamgarh 24/Dec/18 10:00 24/Dec/18 17:00 Daily For Testing and maintenance work KV Sagar-PGCIL-I 10/Dec/18 10:00 10/Dec/18 17:00 Daily For Testing and maintenance work KV Sagar-PGCIL-II 13/Dec/18 10:00 13/Dec/18 17:00 Daily For Testing and maintenance work KV Sagar- Bina-I 17/Dec/18 10:00 17/Dec/18 17:00 Daily For Testing and maintenance work KV Sagar- Bina-II 19/Dec/18 10:00 19/Dec/18 17:00 Daily For Testing and maintenance work KV Malanpur- Adani 02/Nov/18 09:00 02/Nov/18 17:00 Daily For post monsoon Maintenance work KV Malanpur- Auriya 15/Nov/18 09:00 15/Nov/18 17:00 Daily For post monsoon Maintenance work KV Malanpur- PGCIL-I 16/Nov/18 09:00 16/Nov/18 17:00 Daily For post monsoon Maintenance work KV Malanpur- PGCIL-II 17/Nov/18 09:00 17/Nov/18 17:00 Daily For post monsoon Maintenance work KV Gwalior-II - PGCIL-I 13/Nov/18 09:00 13/Nov/18 17:00 Daily For post monsoon Maintenance work KV Gwalior-II - PGCIL-II 14/Nov/18 09:00 14/Nov/18 17:00 Daily For post monsoon Maintenance work KV Mahalgaon- PGCIL-I 21/Nov/18 09:00 21/Nov/18 17:00 Daily For post monsoon Maintenance work KV Mahalgaon- PGCIL-II 22/Nov/18 09:00 22/Nov/18 17:00 Daily For post monsoon Maintenance work KV Mahalgaon- Bina 28/Nov/18 09:00 28/Nov/18 17:00 Daily For post monsoon Maintenance work KV Mahalgaon-Datia 29/Nov/18 09:00 29/Nov/18 17:00 Daily For post monsoon Maintenance work KV Malanpur- Adani 21/Dec/18 09:00 21/Dec/18 17:00 Daily For Testing and maintenance work KV Malanpur- Auriya 18/Dec/18 09:00 18/Dec/18 17:00 Daily For Testing and maintenance work KV Malanpur- PGCIL-I 04/Dec/18 09:00 04/Dec/18 17:00 Daily For Testing and maintenance work KV Malanpur- PGCIL-II 05/Dec/18 09:00 05/Dec/18 17:00 Daily For Testing and maintenance work KV Mahalgaon- PGCIL-I 11/Dec/18 09:00 11/Dec/18 17:00 Daily For Testing and maintenance work KV Mahalgaon- PGCIL-II 12/Dec/18 09:00 12/Dec/18 17:00 Daily For Testing and maintenance work KV Mahalgaon- Bina 19/Dec/18 09:00 19/Dec/18 17:00 Daily For Testing and maintenance work KV Mahalgaon-Datia 20/Dec/18 09:00 20/Dec/18 17:00 Daily For Testing and maintenance work KV Mehgaon --Malanpur 05/Nov/18 09:00 05/Nov/18 17:00 Daily For post monsoon Maintenance work KV Mehgaon-Auraiya 09/Nov/18 09:00 09/Nov/18 17:00 Daily For post monsoon Maintenance work MVA X-mer-I At 220KV s/s Mehgaon 12/Nov/18 09:00 12/Nov/18 17:00 Daily For post monsoon Maintenance work. Minutes OF 66th OCCM of MP 41

44 Sr- No KV Line / Transformer / Reactor / Bay 160MVA X-mer-II At 220KV s/s Mehgaon Basis From To (Daily/ Reason Date Time Date Time Continue) 14/Nov/18 09:00 14/Nov/18 17:00 Daily For post monsoon Maintenance work KV Datia- Bina 19/Nov/18 09:00 19/Nov/18 17:00 Daily For post monsoon Maintenance work KV Datia- Gwalior 28/Nov/18 09:00 28/Nov/18 17:00 Daily For post monsoon Maintenance work MVA X-Mer-I at 220KV S/S Datia 24/Nov/18 09:00 24/Nov/18 17:00 Daily For post monsoon Maintenance work MVA X-Mer-II at 220KV S/S Datia 28/Nov/18 09:00 28/Nov/18 17:00 Daily For post monsoon Maintenance work KV Mehgaon -Malanpur 03/Dec/18 09:00 03/Dec/18 17:00 Daily For post monsoon Maintenance work KV Mehgaon-Auraiya 04/Dec/18 09:00 04/Dec/18 17:00 Daily For post monsoon Maintenance work KV Datia- Bina 19/Dec/18 09:00 19/Dec/18 17:00 Daily For post monsoon Maintenance work KV Datia- Gwalior 21/Dec/18 09:00 21/Dec/18 17:00 Daily For post monsoon Maintenance work KV Shivpuri at 220KV Main Bus-I 12/Nov/18 09:00 12/Nov/18 17:00 Daily For post monsoon Maintenance work KV Shivpuri at 220KV Main Bus- II 14/Nov/18 09:00 14/Nov/18 17:00 Daily For post monsoon Maintenance work KV Shivpuri-Bina (PGCIL) 10/Dec/18 09:00 10/Dec/18 17:00 Daily For post monsoon Maintenance work KV Shivpuri-Bina )(MPPTCL) 11/Dec/18 09:00 11/Dec/18 17:00 Daily For post monsoon Maintenance work KV Shivpuri-Sabalgarh-I 13/Dec/18 09:00 13/Dec/18 17:00 Daily For post monsoon Maintenance work KV Shivpuri-Sabalgarh-II 14/Dec/18 09:00 14/Dec/18 17:00 Daily For post monsoon Maintenance work KV Chhegaon-Nimrani -II 12/Nov/18 10:00 12/Nov/18 18:00 Daily For post monsoon Maintenance work KV Barwaha-Nimrani Tap Omkareshwar 13/Nov/18 10:00 13/Nov/18 18:00 Daily For post monsoon Maintenance work KV Barwaha-Omkareshwar 14/Nov/18 10:00 14/Nov/18 18:00 Daily For post monsoon Maintenance work KV Nimrani-Barwaha Tap Omkareshwar 15/Nov/18 10:00 15/Nov/18 18:00 Daily For post monsoon Maintenance work MVA X-mer Bay at 220KV S/s Barwaha 05/Dec/18 10:00 05/Dec/18 17:00 Daily For Tan Delta measurements KV Barwaha-Handiya 06/Dec/18 10:00 06/Dec/18 17:00 Daily For Testing and maintenance work KV Barwaha-Indore-I 07/Dec/18 10:00 07/Dec/18 17:00 Daily For Testing and maintenance work KV Barwaha-Indore-II 08/Dec/18 10:00 08/Dec/18 17:00 Daily For Testing and maintenance work MVA-I X-mer Bay at 220KV S/s Nimrani 09/Dec/18 10:00 09/Dec/18 17:00 Daily For Tan Delta measurements KV Nimrani-Julwaniya 10/Dec/18 10:00 10/Dec/18 17:00 Daily For Testing and maintenance work KV Nimrani-Chhegaon-I Feeder 11/Dec/18 10:00 11/Dec/18 17:00 Daily For Testing and maintenance work KV Bina-Guna 19/Nov/18 08:00 19/Nov/18 17:00 Daily For post monsoon Maintenance work KV Bina-Ashoknagar 20/Nov/18 08:00 20/Nov/18 17:00 Daily For post monsoon Maintenance work KV Bina-Datiya 21/Nov/18 08:00 21/Nov/18 17:00 Daily For post monsoon Maintenance work KV Bina-Gwalior 22/Nov/18 08:00 22/Nov/18 17:00 Daily For post monsoon Maintenance work KV BINA I/C-1 26/Nov/18 08:00 26/Nov/18 17:00 Daily For post monsoon Maintenance work KV BINA I/C-2 27/Nov/18 08:00 27/Nov/18 17:00 Daily For post monsoon Maintenance work KV Bina-Sagar-I 28/Nov/18 08:00 28/Nov/18 17:00 Daily For post monsoon Maintenance work. Minutes OF 66th OCCM of MP 42

45 Basis Sr- Line / Transformer / Reactor From To KV (Daily/ Reason No / Bay Date Time Date Time Continue) KV Bina-Sagar-II 29/Nov/18 08:00 29/Nov/18 17:00 Daily For post monsoon Maintenance work KV BUS TIE BAY at 220KV S/s Bina 30/Nov/18 08:00 30/Nov/18 17:00 Daily For post monsoon Maintenance work KV BUS TIE BAY at 220KV S/s Bina 20/Dec/18 08:00 22/Dec/18 17:00 Continue For 220 KV CT replacement work KV MAIN BUS 2 at 220KV S/s Bina 20/Dec/18 08:00 22/Dec/18 17:00 Continue For 220 KV BUS TIE CT replacement work KV ICT-I at 220KV S/s Sukha 27/Nov/18 9:00 28/Nov/18 17:00 Continue For Testing and maintenance work KV ICT-I at 220KV S/s Sukha 09/Dec/18 9:00 10/Dec/18 17:00 Continue For isolator replacement work KV ICT-II at 220KV S/s Sukha 12/Nov/18 9:00 14/Nov/18 17:00 Continue For Breaker replacement work KV ICT-II at 220KV S/s Sukha 04/Dec/18 9:00 05/Dec/18 17:00 Continue For post monsoon Maintenance work. Minutes OF 66th OCCM of MP 43

46 Unitwise / Stationwise Genration in MU A. Thermal Stn. Name UNIT No. Capacity MW Aug-18 Sep PH III TOT PH II PH III PH IV TOT PH I PH II PH III TOT PH PH II TOT MPPGCL THERMAL Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan B. Hydel AMARKAN SATPURA SANJAY GANDHI SSTPS GANDHISAGAR R.P.SAGAR J.SAGAR CHAMBAL M.P.CHAMBAL PENCH M.P.PENCH BARGI TONS BIRSINGHPUR B.SGR(DEOLONDH) B.SGR(SILPARA) RAJGHAT M.P.RAJGHAT B.SGR(JINHA) MADIKHEDA TOTAL HYDEL MPPGCL Hydel MPSEB HYDEL Share Station Name C. NHDC (Ex-Bus) Ann 4.1 Capacity MW Aug-18 Sep Capacity Station Name MW Aug-18 Sep-18 Indira Sagar Hydel Project Omkareshwar Hydel Project Minutes OF 66th OCCM of MP 44

47 S No. Source Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Total A. M.P. Availability 1 Thermal Hydel Total B. Exchange with other States / Systems 1 Indira Sagar Omkareshwar MPPMCL Schedule from Central Sector of WR MPPMCL Schedule from Central Sector ER Total MPPMCL Schedule from Central Sector (WR+ER) Deviation Energy of (WR+ER) NET NR ISGS POWER SCH to MP RUMS SOLAR REWA Schedule From Sugen LANCO Amk SASAN ESSAR J P Nigri MB Power JHABUA Power Other Open Access Schedule other than MPPMCL Incl. Seci Himachal Pradesh HYDAL BARH Schedule from Sardar Sarovar SCH to Railway from RGPPL_ebid Schedule from SEZ Schedule from Rihand+Matatila Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd Including Short term purchase against MTOA ENERGY BALANCE SHEET Year : All figures in Million Unit Additional Power Purchase Energy Exchange Banking of Energy Sale of Power Total MP Schedule (Including Railway) Total MP Drawal (Including Railway) Wheeled Energy of Tawa HEG Wheeled Energy of Wind Farm Wheeled Energy of Solar Plant Wheeled Energy of Bio-Mass Wheeled Energy of Ascent Hydro Export to MSEB (Nepa-Dharni) Deviation Energy of MPPGCL Thermal + Infirm Energy of Singajil Energy Purchased by MP from Wind Farm Energy Purchased by MP from Solar Plant Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. 40 purchase by MP +Wheeled enrgy of CPP / IPP Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green 41 Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW Deviation Energy of ISP Schedule Energy of BLA Power against LTOA Schedule Energy of JP BINA Power against LTOA Import from bargi Left Bank Canal Power House + ISP NVDA Chambal Complex Excess / less Overshare by MP Rajghat Hydel Power Station Excess / Less Overshare by MP State Supply (Ex-Power st. Bus) AVERAGE DAILY (Ex-Bus) MINIMUM DAILY (MP Periphery) MAXIMUM DAILY (MP Periphery) State Supply (Ex-Power st. Bus):- YEAR : Year ((18-19)-(17-18))*100/Year (17-18) Unshedule L/S : Year Frequency Correction Restricted Requirement : Year Shedule L/S : Year Un-Restricted Requirement : Year Minutes OF 66th OCCM of MP 45

48 ENERGY BALANCE SHEET : Demand & Sypply Hours Year : S.NO. Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Yr C. 1 MORNING PEAK (MAX) DEMAND MET LOAD RELIEF LOAD SHEDDING D. 1 EVENING PEAK (MAX) DEMAND MET LOAD RELIEF LOAD SHEDDING F. REGISTERED MAXIMUM G. COMPUTED MAXIMUM DEMAND H. UNRESTRICTED MAXIMUM DEMAND I. 1. Average Power Supply per day to Div. Head Quarters 23:47 23:44 23:43 23:43 23:44 23:44 0:00 20:18 2. District Head Quarters 23:49 23:48 23:45 23:50 23:50 23:47 0:00 20:21 3. Tahsil Head Quarters 23:42 23:40 23:34 23:36 23:39 23:37 0:00 20:13 4. Rural -Mixed 23:19 23:16 23:01 23:07 23:18 23:06 0:00 19:50 5. Rural -DLF 23:25 23:23 23:05 23:17 23:23 23:19 0:00 19:56 6. Rural -Irrigation 9:47 9:44 9:33 9:40 9:43 9:43 0:00 8:17 J LOAD FACTOR % FREQUENCY ANALYSIS YEAR S.N PARTICULARS Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Yr A. INTGRATED FREQUENCY 1 MAXIMUM MINIMUM B. INSTANTANEOUS FREQUENCY 1 MAXIMUM MINIMUM C. AVG FREQUENCY D. % TIME WHEN FREQUENCY WAS 1 ABOVE 51.5 Hz TO 51.5 Hz TO Hz TO 49.9 Hz TO 49.7 Hz TO 49.5 Hz TO 49.2 Hz TO 48.8 Hz BELOW 48.5 Hz Minutes OF 66th OCCM of MP 46

49 Own Generation Hourly Average Own Generation, Schedule Drawal, Actual Drawal & Demand Month :- August 2018 Schedule from Load Shedding FIGURES IN MW Hrs. FREQ. Total Total THER. THER. IPPs CPPs Incl Excl HYD. ISP OSP Total Injecti Injectio Aux Aux on n RUMS (SOL SCH Net Sug CSS NR to Lanco Sasan Essa AR) Jhabu JP MB to REW a SSP SEZ Banking Sale Pur en r Nigri Power Railw MP A TO Power MPP ay MCL Rih and +Ma STO tatil A a- Raj ghat Total Tot Avl. Act. Drl Expor Devia DEMAN t to -tion D MET MS SCH UNREST REST.. DEMAN UN DEMAN SCH TOTAL D D 1: : : : : : : : : : : : : : : : : : : : : : : : Avg TO 06 HRS. 06 TO 12 HRS. 12 TO 18 HRS. 06TO 18 HRS. 18 TO 24 HRS Minutes OF 66th OCCM of MP 47

50 Own Generation Hourly Average Own Generation, Schedule Drawal, Actual Drawal & Demand Month :- September 2018 Schedule from Load Shedding FIGURES IN MW Hrs. FREQ. Total Total THER. THER. IPPs CPPs Incl Excl HYD. ISP OSP Total Injecti Injectio Aux Aux on n RUMS (SOL SCH Net Sug CSS NR to Lanco Sasan Essa AR) Jhabu JP MB to REW a SSP SEZ Banking Sale Pur en r Nigri Power Railw MP A TO Power MPP ay MCL Rih and +Ma STO tatil A a- Raj ghat Total Tot Avl. Act. Drl Expor Devia DEMAN t to -tion D MET MS SCH UNREST REST.. DEMAN UN DEMAN SCH TOTAL D D 1: : : : : : : : : : : : : : : : : : : : : : : : Avg TO 06 HRS. 06 TO 12 HRS. 12 TO 18 HRS. 06TO 18 HRS. 18 TO 24 HRS Minutes OF 66th OCCM of MP 48

51 Discomwise Hourly Average Schedule Drawal, Actual Drawal &Over(+)/Under(-) Drawal Month :- August 2018 FIGURES IN MW EZONE CZONE WZONE Railway Hrs. FREQ. SCH Demand Met O/U DRL SCH LS Unsch LS Restricte Unrestrict d ed Demand Demand SCH Demand Met O/U DRL SCH LS Unsch LS Restricte Unrestrict d ed Demand Demand SCH Demand Met O/U DRL SCH LS Unsch LS Restricte d Demand Unrestrict ed Total Sch Demand Total Drawal 1: : : : : : : : : : : : : : : : : : : : : : : : Avg TO 06 HRS. 06 TO 12 HRS. 12 TO 18 HRS. 06TO 18 HRS. 18 TO 24 HRS Minutes OF 66th OCCM of MP 49

52 Discomwise Hourly Average Schedule Drawal, Actual Drawal &Over(+)/Under(-) Drawal Month :- September 2018 FIGURES IN MW EZONE CZONE WZONE Railway Hrs. FREQ. SCH Demand Met O/U DRL SCH LS Unsch LS Restricte Unrestrict d ed Demand Demand SCH Demand Met O/U DRL SCH LS Unsch LS Restricte Unrestrict d ed Demand Demand SCH Demand Met O/U DRL SCH LS Unsch LS Restricte d Demand Unrestrict ed Total Sch Demand Total Drawal 1: : : : : : : : : : : : : : : : : : : : : : : : Avg TO 06 HRS. 06 TO 12 HRS. 12 TO 18 HRS. 06TO 18 HRS. 18 TO 24 HRS Minutes OF 66th OCCM of MP 50

53 System Disturbance / System Incidence ANNEXURE-5 1. System Disturbance on in 220kv s/s Mehgaon area: On dated at around 16:45 Hrs. M.P system was normal and frequency of National Grid was 50.06Hz.At 16:49 Hrs, B-ph CT of 220kv Mehgaon-Adani ckt failed at 220kv s/s Mehgaon thereafter Bus Bar protection resulting in the tripping of following feeders : 220kv/132kv 160 MVA X-mer -I 220kv/132kv 160 MVA X-mer -I 220kv Mehgaon-Adani ckt 220kv Mehgaon -Auraiyackt This caused the total interruption in 220kv Mehgaon s/s, 132kv s/s Pratappura, 132kv s/s Ron, 132kv s/s Bhind, 132kv s/s Lahar, 132kv s/s Seondha.There was load loss of around 121 MW and no generation loss. Supply restored by charging Malanpur- Mahgaon line at 17:17 hrs and later supply extended to all nearby s/s gradually. 2. System Disturbance on in 400kv Indore, MPPTCL: On dated at around 13:00 Hrs. M.P system was normal, and frequency of National Grid was Hz. At 13:04 Hrs, 220kv Bus-Bar protection of Main Bus-I operated at 400kv s/s Indore, resulting in the tripping of followingelementsas given below: 400/220kv, 315 MVA, ICT-II 400/220kv, 315 MVA, ICT-III 220kv Indore-Pithampurckt 220kv Indore-Jetpurackt 220kv Indore-Barwahackt-II 220kv Bus tie There was no generation loss and no load loss occurred. 220kv Main Bus-I charged at 13:13 hrs, later the tripped elements got restored gradually. 3. System Disturbance on in Birsinghpur area: On dated at around 18:00 Hrs. M.P system was normal and frequency of National Grid was Hz.At 18:03 Hrs,220kv Bus Bar protection operated at 220kv s/s Birsinghpur,resulting into tripping of following elements, some ckts of Rewa area also tripped on over load protection. 220kv Birsinghpur-Birsinghpur - I/C-I 220kv Birsinghpur-Birsinghpur - I/C-II 220kv Birsinghpur-Birsinghpur - I/C-III 220kv Birsinghpur-Birsinghpur - I/C-IV 220kv Birsinghpur-Jabalpur - ckt-i 220kv Birsinghpur-Jabalpur - ckt-ii Minutes OF 66th OCCM of MP 51

54 220kv Birsinghpur-Rewackt 132kv Rewa-Mangawanckt 132kv Rewa-Zinnackt 132kv Rewa-Sagrackt 132kv Rewa-Rampur Naikin ckt. This caused the total interruption in 220kv s/s Birsinghpur, 132kv s/s Umaria.There was load loss of around 16 MW and generation loss of around 400 MW. 160 MVA x-mer charged at 18:43 hrs at Birsinghpur. Later the other elements restored gradually and supply extended to Umaria. 4. System Disturbance on in 132kv s/s Seoni: On dated at around 10:30 Hrs. M.P system was normal and frequency of National Grid was 50.04Hz.At 10:30 Hrs, B-ph CT burst of 132kv Seoni-Seoni I/C-I at 132kv s/s Seoni,resulting in the tripping of following feeders : 132kv Seoni-Seoni I/C-I 132kv Seoni-Seoni I/C-II 132kv Benegaon-Dongargarh, 132kv Lakhnadaun-Bargickt This caused the total interruption in 132kv Seoni s/s, 132kv s/s Mandla,132kv s/s Balaghat, 132kv s/s Lakhnadaun, 132kv s/s Baihar, 132kv s/s Lalbarra, 132kv s/s Katangi, 132kv s/s Benegaon, 132kv s/s Nainpur.There was load loss of around 146MW and no generation loss. Supply restored by charging 132kv Seoni-Seoni I/C-II at 10:42 hrs and later supply extended to all nearby s/s gradually. 5. System Disturbance on in 132kv s/s Seoni: On dated at around 18:27 Hrs. M.P system was normal, and frequency of National Grid was Hz. At 18:27 Hrs, 132kv R-ph Wavetrap jumper of 132kv Seoni-Seoni I/C-II opened and hanged at 132kv s/s Seoni, resulting in the tripping of followingelementsas given below: 132kv Seoni-Seoni I/C-I 132kv Seoni-Seoni I/C-II 132kv Benegaon-Dongargarh, 132kv Lakhnadaun-Bargickt This caused the total interruption in 132kv Seoni s/s, 132kv s/s Mandla,132kv s/s Balaghat, 132kv s/s Lakhnadaun, 132kv s/s Baihar, 132kv s/s Lalbarra, 132kv s/s Katangi, 132kv s/s Benegaon, 132kv s/s Nainpur.There was load loss of around 236 MW and no generation loss. Supply restored by charging 132kv Seoni-Seoni I/C-Iat 18:38 hrs and later supply extended to all nearby s/s gradually. ********* Minutes OF 66th OCCM of MP 52

55 Minutes OF 66th OCCM of MP 53

56 Minutes OF 66th OCCM of MP 54

57 Minutes OF 66th OCCM of MP 55

58 Minutes OF 66th OCCM of MP 56

59 Minutes OF 66th OCCM of MP 57

60 Minutes OF 66th OCCM of MP 58

61 Minutes OF 66th OCCM of MP 59

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01 MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com vkbz,l vks : 9001-2008

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

No.07-05/SG-9B-II/4084 Jabalpur, dated:

No.07-05/SG-9B-II/4084 Jabalpur, dated: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/4084

More information

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/

More information

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/1234

More information

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01 MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com vkbz,l vks : 9001-2008

More information

No.07-05/SG-9B-II/1594 Jabalpur, dated

No.07-05/SG-9B-II/1594 Jabalpur, dated MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/1594

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com vkbz,l vks : 9001-2008

More information

In view of the above list of important grid element & exception list is as below:-

In view of the above list of important grid element & exception list is as below:- OUTAGE PROCEDURE As per standard procedure of WRPC, all EHV elements which have been listed under the list of important grid elements of Western Region, the outages for such elements required OCCM approval.

More information

No.07-05/SG-9B-II/ 1179 Jabalpur, dated been uploaded on the website of SLDC and can be downloaded.

No.07-05/SG-9B-II/ 1179 Jabalpur, dated been uploaded on the website of SLDC   and can be downloaded. MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/

More information

MINUTES OF THE 47 th SLCF MEETING HELD ON

MINUTES OF THE 47 th SLCF MEETING HELD ON MINUTES OF THE 47 th SLCF MEETING HELD ON 23.11.2016 Shri. Rafikul Islam, Chief Engineer (SLDC), WBSETCL & Chairperson, SLCF welcomed all the participant members to the 47 th SLCF meeting.. ITEM-1: CONFIRMATION

More information

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow No.UPERC/ Secy/JD(G)/2018/ dated : 20 th August, 2018 Public Notice The Commission is in process of reviewing

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007 KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No.1/1/KSERC-2006/ Dated, Thiruvananthapuram 6 th August,2007 KSERC (Supply of Power from Captive Generating Plants to Distribution Licensees)

More information

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise) DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION

More information

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level) Annex-I Corrigendum to Minutes of the 36 th meeting of the Empowered Committee on Transmission held on 26 th July, 2016 at 3:30 PM at Conference Room of CEA, 2 nd Floor, Sewa Bhawan, R.K. Puram, New Delhi

More information

Intra-State Availability Based Tariff (ABT)

Intra-State Availability Based Tariff (ABT) Intra-State Availability Based Tariff (ABT) What is ABT? 1. In Year 2000, the CERC revised the tariff structures of inter- state generators from drawal-based tariffs to ABT to discipline grid operations.

More information

Renewable Regulatory Fund (RRF) Mechanism : -

Renewable Regulatory Fund (RRF) Mechanism : - Renewable Regulatory Fund () Mechanism : - : Chronology of events Outline : Objectives at a glance : Approach : Applicability Role of different stakeholders Brief on CERC Orders on State Load Dispatch

More information

Need Assessment Document (NAD) DDUGJY

Need Assessment Document (NAD) DDUGJY Need Assessment Document (NAD) DDUGJY Index SNo. Details Page No. 1.0 General Instruction 3 2.0 Objectives of DDUGJY 5 3.0 Scope of works 7 4.0 General information of project area 10 5.0 Details of existing

More information

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on 16-12-2015 2)In-principle Approval_Tumkur Phase-I Government of India Ministry of Power Central Electricity Authority PSP & PA- I Division

More information

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION, BHOPAL Sub : In the matter of determination of Parallel Operation Charges. Suo-Motu Petition No. 73/2012 ORDER (Date of order 31 st December, 2012) MPERC,

More information

Agenda of 11 th System Studies Meeting in NER

Agenda of 11 th System Studies Meeting in NER Agenda of 11 th System Studies Meeting in NER Date: 16.12.2015. Venue: Hotel Nandan, Guwahati 1. Review of SPS I, II, III & SPS IV related to Palatana GBPP, OTPC after commissioning of Palatana Module

More information

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in

More information

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E 1. Scope 1.1 The general process is described in the implementation procedure for design approvals of aircraft, engine and propeller from CIS and in the implementation procedure for design approvals of

More information

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Key DRAFT OPERATING CODE 2 LEGAL TEXT

Key DRAFT OPERATING CODE 2 LEGAL TEXT Key DRAFT OPERATING CODE 2 LEGAL TEXT 1) Blue Text From Grid Code 2) Black Text Changes / Additional words 3) Orange/ Brown text From RfG 4) Purple From HVDC Code 5) Green From DCC (not used in this document)

More information

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority ,.,.;i')!i,:;;',;~~~. 'ffrff mm I Government of India ~ ~.I Ministry of Power 4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority III ~~~~~~I"1",~~1 ;J' :. r System Planning & Project Appraisal Division

More information

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation CONNECTION ASSESSMENT & APPROVAL PROCESS ASSESSMENT SUMMARY Applicant: Project: Cardinal Substation Modification of 115kV Substation CAA ID: 2002 EX071 Long Term Forecasts & Assessments Department\ Consistent

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

Case No. 163 of In the matter of

Case No. 163 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

STATE LOAD DISPATCH CENTRES (SLDC)

STATE LOAD DISPATCH CENTRES (SLDC) ACTIVITIES OF SLDC STATE LOAD DISPATCH CENTRES (SLDC) **The State Load Despatch Centre:- As per section 33 of Electricity Act - 2003 (Central Act 36 of 2003), SLDC performs powers as defined below:- SLDC

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna 800 021 ------------------------------------------------------------------------------------------------------------- ROOFTOP

More information

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region 1.0 Applications for Connectivity and Long Term (Open) Access. Applications for grant of Connectivity

More information

Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid

Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid India need regulations for energy storage to implement grid ancillary services

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION Presentation by Engr. O. C. Akamnnonu Chief Executive Officer, Ikeja Electricity Distribution Company AGENDA WORK THROUGH

More information

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED GUIDELINES FOR EMPANELMENT OF GRID TIED INVERTER MANUFACTURERS FOR IMPLEMENTATION OF SRTPV PROGRAM IN BESCOM. I. NEW EMPANELMENT 1. The grid tied inverter manufacturer shall register their application

More information

IJRASET 2013: All Rights are Reserved

IJRASET 2013: All Rights are Reserved Power Factor Correction by Implementation of Reactive Power Compensation Methods of 220 KV Substation MPPTCL Narsinghpur Ria Banerjee 1, Prof. Ashish Kumar Couksey 2 1 Department of Energy Technology,

More information

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 Website: www.hpgcl.org.in E-mail- ceplg@hpgcl.org.in EXPRESSION

More information

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G.Road, Bangalore-560 001 Present: Shri M.R. Sreenivasa Murthy Chairman Shri H. D. Arun Kumar Shri D.B. Manival

More information

Report. the feasibility of

Report. the feasibility of Report on the feasibility of Additional Interconnection between India and Bangladesh Joint Technical Team (JTT) of India and Bangladesh July 2016 Contents 1.0 Background 1 2.0 Additional power export to

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1 TRANSMISSION CAPACITY ADDITION PROGRAMME DURING 2006-07 Sl. No. Contents Page No. 1 Introduction 1 2 Chapter 1 Transmission Capacity Additions During 2005-06 of 10 th plan period 3 Chapter 2 Construction

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD ABSTRACT --------------------------------------------------------------------------------------------------------- Electricity - Madurai Region -

More information

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI.09.001 Date: 29/05/2009 For Annual Operation and Maintenance Service Contract of HT/LT Panels,Motors,Transformers,UPS,Air Conditiners,Lightings

More information

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005. BUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT-III) Our Ref: CMD-III/16:8034 25 Oct 2004 Subject: Implementation of revised IS 8034:2002 Submersible Pump Sets and revised STI (Doc:STI/8034/5 ) IS

More information

Supply of Batteries

Supply of Batteries Supply of Batteries 207-8 SUPPLY OF BATTERIES OF VARIOUS RATINGS E-PROCUREMENT (REVERSE AUCTION) NIT No: 07/ 207-8 Name of the work Supply of Batteries to our Branches / Offices /ATM Completion Time EMD

More information

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE Objections/ comments invited from various stakeholders on ARR filing and Tariff Petition of Hydro Electric Stations, Gas Turbine

More information

Project #148. Generation Interconnection System Impact Study Report

Project #148. Generation Interconnection System Impact Study Report Project #148 Generation Interconnection System Impact Study Report June 05, 2012 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Energy Resource Interconnection

More information

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India 26th March 2014 Infrastructure Revitalization in India 1 Outline Indian Power System Indian Grid - WAMS

More information

Case Nos. 12 & 48 of 2009

Case Nos. 12 & 48 of 2009 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 16 AASHAADHA, 1937(S) (NO.PATNA 737) PATNA, TUESDAY, 7 TH JULY 2015 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION

More information

In-House Paper on the implementation of Single Part Tariff in Power Distribution

In-House Paper on the implementation of Single Part Tariff in Power Distribution December 9, 2016 In-House Paper on the implementation of Single Part Tariff in Power Distribution Background: Tariff Introduction: Tariff is the price Structure at which electricity is sold to the consumers.

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region a) Power Supply to M/s Noida Power Company Limited (NPCIL) NPCL has applied to CTU for connectivity for

More information

Impact of Distributed Energy Resources on Transmission System Reliability

Impact of Distributed Energy Resources on Transmission System Reliability S E P T E M B E R 1 3, 2 0 1 8 W E B I N A R Impact of Distributed Energy Resources on Transmission System Reliability National Council on Electricity Policy (NCEP) Alan McBride D I R E C T O R, T R A

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05. Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05. 1. List of the participants is enclosed at Annex - I. Member (PS) CEA welcomed

More information

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew. Guide Department: Interconnection Services Document No: GD-1401 v1.0 Title: WIND ISLANDING Issue Date: 11-24-2014 Previous Date: N/A Contents 1 PURPOSE... 2 2 SCOPE AND APPLICABILITY... 2 3 ROLES AND RESPONSIBILITIES...

More information

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon पत क स च : Sl. Organization Address Tele/Fax No./email No. 1 PGCIL Sh. I S Jha, Chairman & Managing Director, Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana-122001.

More information

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION Work Order No: File Reference: 16/2/1 This application form for the connection of small scale embedded generation is for small

More information

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Interconnection Feasibility Study Report GIP-222-FEAS-R3 Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.

More information

Respondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad

Respondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad 1 CONSUMER GRIEVANCE REDRESSAL FORUM CENTRAL REGION (Formed under Section 42(5) of the Electricity Act 2003) 220 kv Substation Compound, HMTColony P.O. Kalamasery, Pin 683 503 Phone No. 0484-2556500 Website

More information

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation Feasibility Study Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection J.E.D. Solid Waste Management Facility Holopaw Substation September 2013 1 of 12 Table of Contents GENERAL... 3 SHORT

More information

Before the. Case No. 106 of 2009

Before the. Case No. 106 of 2009 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007.

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007. Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007. No Date of Exemption To whom Exemption was granted Clause to which Exemption has been granted Concise

More information

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012 POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 PREPARED BY: Electricity System Operations Planning and Performance DATE: 5 June 2012 FINAL

More information

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION Summary Abhay Kumar Mata Prasad R C Maheshwari Asea Brown Boveri Ltd. 4th Floor, 71 Nehru Place, New Delhi

More information

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014 Policy & Regulatory Issues : Solar & Wind Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014 About Us Vision To develop a solution with low cost, high technology power generation & fulfill

More information

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for Form B Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for Grid Connected Rooftop and Small SPV Power Plants (For the project above 5 kwp & upto

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2.

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2. Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft 2012-11-29 Proposed New ISO Rules Section 502.5 Version 2.0 Generating Unit Technical Requirements

More information

Contact person: Pablo Taboada Mobile:

Contact person: Pablo Taboada   Mobile: Contact person: Pablo Taboada e-mail: ptaboada@aenor.es Mobile: 34 609015450 Génova 6 28004 Madrid. Spain Phone: 34 91 4326004 Fax: 34 91 3190581 CDM Executive Board RESPONSE TO REQUEST FOR REVIEW Request

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

CASE No. 35 of In the matter of

CASE No. 35 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 07.01.2016 PRESENT: 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Sri Indu

More information

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AEP Texas (comprised of its Central and North Divisions

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

RFP Corrigendum No. 01

RFP Corrigendum No. 01 RFP Corrigendum 01 The RFP document for selection of Transmission Service provider for the Package- 1 against tender specification ESD-765/4 has been modified to the extent below: S. Clause / Page 1. Definition

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents Annexure-1-B ANNEXURE TO TARIFF ORDER PASSED BY MPERC For Financial Year 2005-06 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Sr No Particulars

More information

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th Alex Bettencourt Managing Director National Association Made Up of Entire Industry Utilities Industry Academia / R&D

More information

Western Alberta Transmission Line (WATL) HVDC Project

Western Alberta Transmission Line (WATL) HVDC Project Submission for the ACEC Canada Canadian Consulting Engineering Awards 2016 Western Alberta Transmission Line (WATL) HVDC Project Submitted by Teshmont Consultants LP as a Consultant to AltaLink Attachment

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

The Electric Power System

The Electric Power System The Electric Power System INDIA Indian Power System 1 2 Basic facts Area:3.288 million km² Population:1.25 Billion Electricity consumers: 216 Million- (31.3.2013) Number of TSOs: 14- (31.3.2013) Numbe

More information

North Eastern Regional Power Committee

North Eastern Regional Power Committee North Eastern Regional Power Committee Agenda For 6 th Protection Coordination Sub-Committee Meeting Time of meeting : 10:00 AM. Date of meeting : 11 th December, 2012 (Tuesday) Venue : Hotel Grand Starline

More information

EOL tvo'. Eo11)E cyj

EOL tvo'. Eo11)E cyj EOL tvo'. Eo11)E-16132.1cyj grregt-f-altffrtg (atr-{a- whii3t491-.j-0 urataftcr-414wf4arr4 at* s 284129 irt ar eei1ta01:0510-2412716, achoubey@bheljhs.co.in Expression Of Interest (E0I): "For Bending Of

More information

Facilities Study for Alberta to US Available Transfer Capability

Facilities Study for Alberta to US Available Transfer Capability Facilities Study for Alberta to US Available Transfer Capability Report No: NPP2002-05 June 3, 2002 System Planning & Grid Operations, Transmission Line of Business Engineering Services Executive Summary

More information

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal Reactive Power Requirements and Financial Compensation July 21, 2016 Table of Contents 1. Introduction... 3 2. Changes to Proposal... 4 3. Plan for Stakeholder Engagement... 4 4.... 4 6. Next Steps...

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India SECI/SD/EoI/20000 MW Mfg./I/2017 18.12.2017 Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India 1. Objective of EOI: SECI intends to invite Expression of Interest from the

More information