MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

Size: px
Start display at page:

Download "MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED"

Transcription

1 MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) Fax: (0761) / vkbz,l vks : Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01 ISO: No.07-05/SG-9B-II/4317 Jabalpur, dated: To As per distribution list Sub: Agenda of 56 th meeting of Operation and Coordination Committee of MP. The Agenda of 56 th meeting of the Operation and C oordination Committee of MP scheduled on 8 th March 2017 at Hotel Kalchuri, South Civil Line, Jabalpur has been uploaded on the website of SLDC and can be downloaded. The details of the coordinating officers are as below:- 1. Shri Vijay Tripathi (Dy. Manager, NHDC) , -vktnhdc@gmail.com 2. Shri Prabhakar Rai (Asst. Manager) , -prabhakarrai29@gmail.com (K.K.Parbhakar) Member Secretary,OCC SLDC, MPPTCL, Jabalpur

2 Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No , The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, Bhopal, The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur,.Fax No The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No , The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No The General Manager(PM), MPPMCL, Jabalpur 11. The Superintending Engineer (GCC), MPPGCL, Jabalpur 12. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur, Fax No , 13. The Dy. General Manager (DCC CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No , The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No , The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No , 16. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No , 17. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No , 18. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal , Fax No , 19. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager s Office, Electrical Department, Jabalpur (MP), Fax: , - cede@wcr.gov.in, dyceetrdwcr@gmail.com, M , Mr.Satyendra Kumar (Dy.CE), Mob (CEDE, WCR). 20. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) , Fax No , nhdc-isp@rediffmail.com 21. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) , FaxNo , - omkareshwar.nhdc@gmail.com 22. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur , Fax No / , manish@bla.co.in 23. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina Distt- Sagar, Fax No , jptpp.switchyard@jalindia.com 24. The Deputy General Manager, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, cbhandari@kalpatarupower.com 25. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore , id :- solar@ujaas.com 26. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, - deepesh.sankwa@suzlon.com, Indore , Badree.hirve@suzlon.com

3 AGENDA FOR 56 TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP TO BE HELD AT 11:00 AM AT HOTEL KALCHURI, SOUTH CIVIL LINE, JABALPUR ON 08 th MARCH ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 55 th meeting of Operation & Coordination Committee of MP held on 22 nd December, 2016 at Hotel Vijan Mahal, Tilhari, Mandla Road, Jabalpur were forwarded to the committee members vide No /SG-9B-II/3871 dated [OCC may confirm the minutes] ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS Dec 2016 TO JAN Frequency Particulars: During January 2017 the system frequency was below 49.9 Hz for 6.19% of time against 11.04% of time during Dec The system frequency was above Hz for 23.35% of time during Jan 2017 against 19.38% of time during Dec The system frequency was within the IEGC range of Hz for 70.46% of the time during Jan 2017 against 69.58% of time during Dec The average monthly frequency was Hz during month of Dec 2016 and Hz during month of Jan The system frequency did not touch Hz during the above period. The detailed frequency particulars for the month of Dec 2016 and Jan 2017 are enclosed at Annexure-2.1. The brief detail of frequency profile is given here under: Month Average Minimum Maximum Instantaneous Instantaneous frequency integrated integrated Minimum Maximum frequency over frequency over Frequency Frequency an hour an hour Dec Hz Hz Hz Hz Hz Jan Hz Hz Hz Hz Hz 2.2 Operational Matters [Committee may like to note] Operational Discipline : System operated in terms of frequency profile for the months Dec 2016 and Jan 2017 is as given below for discussion by the committee : Month % of time % of time % of time Average No. of times Frequency Frequency frequency within monthly frequency Below 49.9 above Hz the permissible frequency dipped below Hz range of Hz Hz Dec % % % Hz 0 Jan % % % Hz 0 [Committee may like to note] Voltage Profile: During the months Dec 2016 and Jan 2017, the maximum and m inimum voltage as recorded at following important 400 KV s/s in MP Grid (Annexure 2.3.1)- Agenda for 56th OCCM of MP 1

4 Dec 2016 Jan 2017 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Name of observed Observed observed Observed Sr 400 KV Volt Voltag No Substation Voltage ag Voltage Date e Date Date Date KV e KV KV KV 1 Indore Itarsi Bina Gwalior Nagda Satpura Birsinghpur ISP [Committee may please note & discuss] Status of Capacitor Banks in sub-transmission system: The updated information of the status of capacitor banks in sub-transmission system as on 3 1st Jan 2017 as submitted by DISCOMs is detailed below: DISC OM Capacitor bank Capacitor Capacitor Req Requirem Capacitor Balance installed in Banks bank installed Uirem ent against banks capacitor good condition healthy but but defective & ent of non- already banks to be (No) not in service are repairable Repair repairable covered covered in due to control (No) Again capacitor under ADB Other ckt problem St banks T-V schemes Each (No) Unit No of KVA KVA KVA KVA KVA KVA KVA KVA KVA 100 KVA KVA KVA KVA KVA KVA R R R R R R R R R KVAR R R R R R R Units Require d EZ CZ WZ [Action: DISCOMS] Agenda for 56th OCCM of MP 2

5 2.3.3 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on as submitted by MPPTCL is given below (Annexure 2.3.3(a),2.3.3(b)& 2.3.3(c)):- Voltage Class Capacitor bank Capacity installed as on Added after (MVAR) Last OCC Meeting (MVAR) Capacitor banks already covered under ADB T-V Total capacity as on Capacitor Bank Installed but defective & are not repairable (No & MVAR) 220 KV MVAR MVAR All in Service 132 KV MVAR MVAR 33 KV MVAR MVAR Total MVAR MVAR [Action: MPPTCL] Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The various ongoing Transmission Schemes completed during the current financial year (up to Jan. 2017) and plan for completion of various ongoing Transmission Schemes for the Year is enclosed as Annexure 2.3.4(i) and 2.3.4(ii). [Action: Committee may like to note] U/F and df/dt Relay Operation (i) U/F and df/dt Relay Operation: Frequency did not touch Hz during Dec 2016 and Jan There was no df/dt operation during the same period. [Action: MPPTCL] (ii) Defective u/f, df/dt relays: MPPTCL has informed that all the df/dt relays are in good/healthy working condition and where the U/F relays are not available, the numerical relays programmed for under frequency operation. [Committee may like to note] 2.4 Power Cuts / Load restrictions/differential Load Shedding by DISCOMS & group allocation to 33 KV feeders : (i) Details of DISCOM wise Power supply given to various domestic categories during the period Dec 2016 and Jan 2017 is enclosed at Annexure 2.4(i). [Committee may like to note] (ii) Group Allocation to Newly Commissioned existing EHV substations:- The region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.4 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below:- SN DISCOM Region No of 33 KV feeders for which groups to be allocated 01 Jabalpur EAST Sagar Rewa Total 26 Agenda for 56th OCCM of MP 3

6 05 Indore WEST Ujjain Total Bhopal CENTRAL Gwalior Total 14 TOTAL Grand Total 62 meeting. Discoms are requested to furnish the details as per list enclosed at Annexure-2.4(ii) in the [ACTION : DISCOMs] ITEM NO. 3 : OPERATIONAL PLANNNING: 3.1 Generating Units under planned outage and proposed maintenance programme : The annual maintenance /outages of thermal generating units of MPPGCL during March.2017 to April 17 is Nil as intimated by ED(O&M:Gen.), MPPGCL, Jabalpur. [Committee May like to note] 3.2 Proposed shutdown programme of Transmission lines / Transformers: The proposed shutdown of transmission elements for the period to submitted by MPPTCL is enclosed as Annexure-3.2. [Committee May like to discuss] 3.3 Long Outages of transmission elements and protections : The status submitted by MPPGCL / MPPTCL are given below : S Line/Transformer/ Outage date Reason Response from Utility N Breaker/ Reactor etc under long Outage The 220 KV Bus Bar Protection Scheme of M/s GE India, Bangalore has been put into service on as intimated by MPPGCL. 220 KV Bus bar Due to mal-operation 1. protection scheme at KV Bus Bar SGTPS Birsinghpur Protection kept out. Agenda for 56th OCCM of MP 4

7 400 KV Rajgarh II is charged from 400 KV Main Bus-I, for ensuring connectivity with Main Bus-II. The work is in progress with work of providing Reactor on ISP Bay. 400 KV Rajgarh-I is shifted in Main Breaker of 400 Y-phase CT burst / diameter of 315 MVA ICT-IV, 2. KV Nagda-Rajgarh-II BKR Problem which has facility to connect on Main Bus-I and Main Bus-II. This will impact when outage of Bus-II occurs in outage of Nagda- Rajgarh II circuit. MPPTCL is requested to submit the latest status. The transformer bank is out of circuit from No. 105 MVA Units of these banks have Differential failed. The complete bank has to The 315 MVA X mer Sr. No is out of circuit from The Transformer has 315 MVA, 400/220 been shifted from Bina to M/s Due to Buchholtz 3. kv ICT-I at 400 kv BHEL works for repairs. The S/s Bina relay alarm. order for repair has been placed and expected to be commissioned by end of February 2017 as intimated by MPPTCL. The ICT has been removed for installation at Bina 400 KV S/s and commissioned there at 16:49 Hrs. on dtd MVA, 400/220 New 4. KV ICT at 400 KV Transformer of 315 MVA, 400/220 S/s, Julwaniya KV EMCO make has been Commissioned on dated as intimated by MPPTCL. 315 MVA, 400/220 X mer commissioned KV X mer II (TELK through bus coupler 5. make) Main Breaker Breaker since at 400 KV S/s Katni commissioning. It has come to notice that the transformer-ii has been connected through bus coupler breaker both side (400 KV & 220 KV) and there is no main breaker for this 315 MVA X mer-ii. In 54 th OCCM MPPTCL informed the committee work of 220 KV Ckt. breaker has been completed and 400 KV Ckt. Bkr. work is under progress. MPPTCL is requested to submit the latest status in the meeting. Agenda for 56th OCCM of MP 5

8 MVA, 132/66/33 Transformer failed KV X mer CGL make on as Sr. No at intimated by T&C, KV S/s Pichhore MPPTCL. The load is manageable through (1x20 + 1x40) MVA X mers in running condition at S/s Pichhore. Hence replacement of failed X mer is not required as intimated P&D to submit the letter for removal of transformer from Asset. Latest status in the matter is requested from T&C/P&D MPPTCL. It has been proposed to withdraw 12.5MVA, BBL Make the X mer from system as 7.. (Sr. No.-1428/3) at Not intimated X mer failed intimated by MPPTCL. Latest 132 KV S/s Chapda. status may please be submitted by T&C/ P&D, MPPTCL in the meeting. X mer is under investigation and testing. Internal Inspection of X mer shall be done as soon as MVA, ECE Make monsoon permits. Another 40 MVA BBL make Transformer has been commissioned on dated as intimated by MPPTCL. X mer (Sr. N0.- Tripped on differential 86020) at 132 KV S/s indication. Shajapur. Latest status regarding 40 MVA ECE Make X-mer may please be submitted in the meeting MVAR Line Reactor Katni Damoh Ckt at 400 KV S/s Damoh (PGCIL) 160 MVA, 220/132 Not intimated. 10. KV BHEL X mer at KV S/s Jabalpur 20 MVA, 132/33 KV Tan- of the bushing was not correct. Tripped on differential indication. Capacity enhancement work 11. X mer at 132 KV S/s (20 MVA X mer to be Jaora. replaced by 50 MVA X- mer) 50 MVAR line reactor put into service at 08:38 Hrs on as intimated by MPPTCL. The X mer is being sent to M/s BHEL for inspection/ repairs as intimated by MPPTCL. 20 MVA X mer has been shifted from Jaora to Neemuch as intimated by MPPTCL. Latest status regarding installation of 50 MVA X mer may please be submitted by MPPTCL MVAR 400KV Bus reactor-ii at STPS, Sarni Agenda for 56th OCCM of MP Not intimated The Bus-reactor is ready. However its 400 KV SF6 gas Circuit Breaker has got irregularities in closing & tripping timings. Further, tender for

9 MVA, 220/132 KV NGEF X-mer Sr.No at 220 KV S/s Neemuch Tripped on Buchholtz and PRV indications. servicing with replacement of required spares, testing & commissioning work of its GCB, has been opened and under process, as intimated by MPPGCL. MPPGCL is requested to submit the latest status in the meeting. After replacement of broken OLTC drive rod, 160 MVA NGEF X-mer charged on dtd , as intimated by MPPTCL. The utilities may submit the latest status. [Action : MPPGCL/MPPTCL] ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF DEC 2016 AND JAN 2017: The details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Annex. 4.2 Annex. 4.3 Annex. 4.4 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL & NHDC Hydel Units. Power Supply Position. Hourly Average of Availability and Demand. Hourly average schedule Vs Drawal of DISCOMs. [Committee may like to note] ITEM NO. 5.0 : SYSTEM DISTURBANCE IN MP DURING DEC 2016 AND JAN 2017 : There was no major grid disturbance in MP during Dec 2016 and Jan Moreover, the Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5.0. [Committee May like to discuss] ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The present status regarding schedule and commissioning of reactors / transmission elements is as below:- Sr. 400 KV S/S Size Implementing Expected Date of No. MVAR Agency Commissioning as intimated in last OCC 1 Bus Reactor : ISP 125 MVAR NHDC NHDC informed that the order for bus reactor has been placed on and tentative date of commissioning by end of June NHDC is requested to submit the latest status in the meeting. 2 Line reactor at Nagda- ISP line at Nagda end 3 Line Reactor on 400 kv Satpura ISP line at STPS. Agenda for 56th OCCM of MP 7 50 MVAR MPPTCL MPPTCL representative informed that the work will be completed by March MPPTCL is requested to submit the latest Status in the meeting. 50 MVAR MPPGCL MPPGCL representative informed that procurement of line reactor is under process

10 and tender has been opened & will be made available by February MPPGCL is requested to submit the latest status in the meeting. 4 Bus Reactor at SSTPS 125 MVAR MPPGCL Work will be carried out under PSDF as intimated by MPPGCL. MPPGCL representative informed in the 54 th OCCM that NIT shall be floated in the last week of Oct and Reactor is expected by June MPPGCL is requested to submit the latest status in the meeting. The latest status may be submitted in the meeting. [Action: MPPGCL/MPPTCL/NHDC] 6.2 Provision of synchronization facility at EHV sub-stations of MPPTCL:- As per Grid Code, the synchronization facility should be available at all the Power Stations, 400 KV Substations and 220 KV Sub-stations and 132 KV sub-stations in the path of black start. In last OCC meeting MPPTCL representative informed the committee that order for 69 no. synchronization trolleys has been placed and 1 no. synchronization trolley has been delivered for checking and t esting purpose at 220KV S/S Barwaha. Further MPPTCL representative informed that the synchronization trolley will be delivered in Feb As desired by MPPTCL, SLDC has already forwarded list of 27 Nos EHV substations on where synchronization trolleys are to be installed on priority. This list enclosed all the 400 KV substations and 220 KV /132 KV substations which falls on the routes of black start. The status of installation and commissioning of synchronization trolleys at the 27 EHV substations has not been intimated by the MPPTCL till this date. MPPTCL is requested to submit latest status along with time line in the meeting. [Action: MPPTCL] 6.3 Ten Daily Reservoir operation table of MPPGCL HPS:- In the meeting held in Regional Office of MPPMCL at Bhopal on to discuss availability from Sardar Sarovar Project, ISP & OPS and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation table from WRD and NVDA for their operation of their hydro generators. In last 54 th & 55 th OCCM, request has been made to MPPGCL for furnishing the same to SLDC within a week, but it has not yet been provided by MPPGCL. It is requested that MPPGCL in coordination with NVDA and WRD to, prepare the ten daily reservoil operation table of all their hydel power stations and submit to SLDC at the Agenda for 56th OCCM of MP 8

11 earliest for optimum utilisation of available water in the reservoirs during the summer season. [Action: MPPGCL] 6.4 Operation of LBB and Bus Bar Protection and delay in restoration at ISP :- At Hrs on , while stopping machine no. 7 of ISP, Local Breaker Backup protection operated of Unit No. 7 resulting in operation of 400 KV Main Bus-II Bus Bar protection. 400 KV ISP-Indore-II and 400 KV STPS-ISP lines which were on Main Bus-II also tripped. The restoration of 400 KV ISP-Indore-II and 400 KV STPS-ISP lines was done at hrs and hrs respectively. ISP did not intimate the reason for delay in charging of these important 400 KV lines. It is indicate that 400 KV ISP-Indore-II and 400 KV STPS-ISP lines form important corridor for transfer of power from Central to West MP and outage of this critical corridor for such a long period without any justified reason is not desirable for safe, secure and reliable operation of the State Grid. The ISP is requested to avoid unwarranted delay in charging transmission elements in future. [Action: NHDC] 6.5 Non-compliance of SLDC instructions by Gandhisagar HPS On , Wind Power generation in MP was suddenly increased to 1000 MW from 140 MW during the evening peak hours. SLDC had to accommodate such a huge additional power in the system by maintaining the grid parameter within operational limits. As emergency measures hydro generation is to be c urtailed immediately which is the only possible solution for keeping the grid security intact till the effect of backing down / surrender of power in thermal generating stations is obtained. Gandhisagar Hydel Power Station was instructed to stop three machines for which code were issued at 20:25 Hrs through GCC. The shift officials of Gandhisagar HPS were reluctant to stop the machines even during emergency conditions despite SLDC request to act immediately. After repeated persuasion machines were not stopped by Operation staff Gandhisagar. Finally the matter was brought in the notice of CE (O&M:Hydel) and after his intervention, the machines were stopped at 21:01 Hrs, 21:05 Hrs & 21:10 Hrs. This act of the shift officials of Gandhisagar is violation of Clause 3.83 of MPEGC, Clause 5.1 (d) of IEGC and Sec. 29 of EA-2003 i.e. non-compliance of SLDC instructions. It is requested that the shift officials of Hydel Power Stations may be instructed to follow the instructions of SLDC promptly in future. [Action: MPPGCL] 6.6 Scheduling of DVC and Inter-state IPP Power :- Scheduling of DVC and Interstate IPP is being done by the WRLDC. Under day ahead scheduling these entities furnished entitlement of MP to SLDC and these entitlements are forwarded to MPPMCL Control Room for preparing requisitions. The requisition received from MPPMCL again forwarded to DVC / IPPs for obtaining their consent to the power requisitioned by the MPPMCL. On receiving the correspondence from DVC / IPPs the same is again forwarded to MPPMCL. Finally, MPPMCL again gives comments (agreed/ Not Agreed) on the revised quantum of power in 15 minutes time block agreed by the generator. Now SLDC punched the final requisition submitted by MPPMCL in WRLDC web based Scheduling Portal and forwarded to the concern. Similar procedure is also being adopted during the real time scheduling. Agenda for 56th OCCM of MP 9

12 This procedure of scheduling is not mandated in IEGC / MPEGC / BSC 2015 and also consumes the valuable time of system operators of SLDC which is otherwise required for smooth system operation. Also during real time scheduling such procedural delay is causing on scheduling of power from designated time block. MPPMCL in future submit requisition to SLDC only after obtaining the consent of DVC / Interstate IPPs and SLDC shall not make communication with these entities for obtaining consent on t he requisition furnished by the MPPMCL and the same requisition shall be treated as final and punched on the web based scheduling portal of WRLDC. [Action: MPPMCL] 6.7 Questionnaire on Hydro Generating Stations :- As per decision taken in 18 th meeting of Forum of Load Despatcher (FOLD) held on 21 st November 2016, working Group on Hydro for studying the various aspects of hydro Stations may be formed. NLDC has furnished a a questionnaire on Hydro generating stations which is to be f illed and submitted in respect of each hydro generating station to NLDC, New Delhi within a week time on following Id, SLDC vide letter no /RPC-28A/4187 dtd (alongwith Questionnaire enclosed as Annexure-6.7), requested MPPGCL, ISP, OSP and NHDC to submit the reply directly to NLDC under intimation to this office and WRLDC MPPGCL and ISP/OSP/NHDC are requested the status of the same in the meeting [Action: MPPGCL/ISP/OSP/NHDC] 6.8 : MONITORING OF SCHEMES FUNDED FROM PSDF :- it was decided in t he 6th meeting of NPC held on 19th December 2016 at Bengaluru, that all the RPCs in the monthly OCC meetings may follow up with the utilities to expedite the completion of schemes by giving due priority. The implementation of most of the schemes are based on the recommendation of the enquiry committee on grid disturbance of July 2012 headed by Chairperson, CEA. Therefore timely implementation of these schemes would enhance the grid security and reliability. Accordingly the details of grant sanctioned from PSDF for the schemes of MP is enclosed at Annexure- 6.8A. The status of implementation of above schemes (physical as well as financial progress) may please be reviewed and the entities are requested to expedite implementation of the schemes. The utilities were advised to furnish the information in the format enclosed at Annexure 6.8B by first week of every month on regular basis to Member Convener, PSDF project monitoring group (AGM, NLDC, POSOCO) with a copy to NPC, WRPC division and SLDC [Action: MPPGCL/MPPTCL] 6.9 MAPPING OF FEEDERS WIRED UNDER AUFLS TO SLDC SCADA :-. In the 4th, 5th & 6th NPC meetings, mapping of the Feeders / Lines covered under AUFLS on SCADA systems of SLDC's/RLDC's was discussed. NPC have desired that monitoring of the feeders / loads under the AUFLS shall be done at SLDC's / RLDC's, so as to ascertain that the desired results are ensured during the events, frequency falling below the AUFLS frequency settings. In the 6th NPC meeting it was therefore desired that all the loads/feeders wired under the AUFLS is monitored in Western Region also and the progress be s ubmitted to NPC. A list of feeders/loads implemented under AUFLS in WR was compiled at WRPC in 2014 and same is uploaded in website of WRPC under news section and PCM Minutes section. MPPTCL is requested to initiate the process of mapping these feeders in the SCADA System so that same Agenda for 56th OCCM of MP 10

13 shall be made available to WRLDC. MPPTCL is requested to update the list of feeders under AUFLS and intimate the feeders which have already been mapped in their SCADA System and are monitored on line by them. Also constraints, if any, faced in mapping AUFLS feeders in their SCADA System may be intimated. [Committee may like to Discuss] 6.10 REPORTING OF FLASH REPORT, DR and EL FOR 400KV, Interstate Transmission Elements & Detailed Tripping Report:- As per the provisions of Regulation 5.2 (r) of CERC (Indian Electricity Grid Code) Regulations 2010 a nd Regulation of 5(9) of CERC (Indian Electricity Grid Code) (First Amendment) Regulations, 2012 all the Regional Entities of the Region shall furnish the tripping details including DR & SEL output to RLDC with in 24 hrs of the event for analysis and identify the real time measures required in future to ensure secured grid operation. The flash report is also required to be furnished to SLDC within an hour of tripping. It is observed that FLASH REPORT, DR & EL of station is not made available during tripping of transmission grid element by the State Grid Entities and the flash report is also sent after repeated pursuation. All intra-state entities are requested to submit the FIR, DR & EL of station during tripping of transmission grid elements. [Action: MPPTCL/MPPGCL/IPPs/NHDC/ISP/OSP] 6.11 Status of ADMS system :- The ADMS system did not operate during over-drawal by MP on 06th and 7th February during morning hours. In this reference it is to bring to notice that vide various correspondence, SLDC had given its clearance for activation of ADMS on completion of some formalities like modification of ADMs logic, completion of ADMS Reports, round the clock monitoring of control centers from where ADMS is operating, Proper configuration of groups and feeders information as provided by DISCOMs and arrangement for modification of group/feeder information in case of change, Availability of infrastructure at DCC for monitoring of ADMS activities, Familiarization of DCC /SLDC control room officers for using ADMS system information.. It appears that the activation of ADMS is still pending. The present status of ADMS /time schedule for putting system in operation may please be informed. [Action: MPPTCL] 6.12 Extension of RGMO/FGMO signal to SLDC/WRLDC:- As per IEGC 5.2(f), RGMO/FGMO is mandatory for all thermal units above 200 MW and h ydro units above 10 MW. Further considering the high penetration of renewable to grid and also the Government target to achieve 175 GW, it is essential to monitor operation of RGMO/FGMO at SLDC/RLDC for ensuring grid security and compliance of regulation. Subsequently SLDC vide letter no /RPC-27/3739 dated and letter No. SE/LD:E&T/693 dated requested MPPGCL/NHDC for integration of telemetry of RGMO/FGMO in RTU installed at power station and forward the object address configured in RTU so that same may also be configured in SLDC SCADA and RGMO/FGMO status may be displayed in SCADA system. However, no feedback in the matter is received, so far. The present status of the same may please be provided as the same is required to be forwarded to WRLDC. [Action: MPPGCL/IPPs/NHDC/ISP/OSP] Agenda for 56th OCCM of MP 11

14 6.13 Availing of outage of Interstate and 400 KV transmission elements: The standard procedure for availing outages on interstate and 400 KV transmission elements has been devised by WRPC and WRLDC in line with guidelines of CEA and NLDC. This process is approved in OCC meeting of WRPC. This procedure has already been communicated to state grid entities for strict compliance by the SLDC. Matter was discussed in various meetings of MP also. As per standard procedure of WRPC, all the proposed outages of interstate and 400 KV transmission elements of next month should be got approved in the OCC meeting of WRPC in the current month. All the constituents of WR shall inform to the WRLDC for readiness for availing outage of transmission elements on D-3 basis i.e. three days before the date of approved outage. During 491st OCC meeting it was decided that non-occ outages should be discouraged. Only under exceptional cases, the request for transmission outage after issue of OCC minutes must be pos ted through for concurrence of the WRPC members (OCC group ) at least three days in advance (D-3). WRPC members may respond back in within three hours. After three hours the proposal shall deemed to have been concurred by WRPC for further processing by WRLDC. A detailed procedure for approval of transmission lines /elements outage planning procedure in Western Region is attached at Annexure The above procedure will be implemented w.e.f. 01st March, It has been noticed that the standard procedure for availing outages on interstate and 400 KV transmission elements is not followed by the MPPTCL. WRLDC repeatedly instructed MP SLDC to adhere to the approved procedure of outages and stop requesting for routine nature outages in real time of operation. It is requested that the standard procedure finalized in OCC meetings of MP and WRPC must be f ollowed strictly for availing outages on interstate and 400 KV transmission elements, in future and S LDC shall not forward any outage message to WRLDC during the real time of operation except of emergency nature. [Committee may like to Discuss] 6.14 Integration of New Transmission Elements into the Grid:- The transmission system in Madhya Pradesh is growing at a r apid pace. The process of integration/charging of new transmission elements belonging to each entity requires compliance of certain regulatory requirements and sharing of information/submission of documents to SLDC/RLDC. Therefore mandatory documents and not limited to, to be submitted to SLDC/RLDC prior to issue of charging code for new transmission element are as follows:- 1. Copy of approval by Electrical Inspector. 2. Intimation by Transmission Licensee Regarding anticipated charging of new elements (Annexure 6.14-A) 3. List Of Elements to be charged and Element Rating details. (Annexure B). 4. Undertaking by Transmission Licensee in respect of Telemetry and communication (Annexure C). All the intra-state entities are requested to provide the above data in prescribed formats (enclosed) to SLDC/RLDC prior to charging of new transmission elements. The matter has already been discussed and brought to the notice of all entities during 54 th & 55 th OCCM. However, the desired information is still not being furnished for all the new transmission elements. All the intra-state entities are again requested to furnish the required information for integration of all new transmission elements into the grid, to SLDC/RLDC prior to their charging. [Action: MPPTCL/MPPGCL/IPP/REGs/Railway] Agenda for 56th OCCM of MP 12

15 6.15 Certification of Declared Capacity of Hydro Generators by SLDC :- CERC vide order dtd in petition No. 40/MP/2016 filed by NHDC, has issued following directions :- Quote Regulation 31 (3) of 2014 Tariff Regulations requires that the declared capacity for any day of the month should correspond to the capacity which a generating station can deliver for at least three hours as certified by the nodal load despatch centre after the day is over. Since the petitioner has declared the capacity based on machine and water availability, MPSLDC cannot restrict the PAFM on the ground that machines were not operated as per the directions of the local authorities. The calculation of PAFM by RLDC/SLDC has to be based on capacity declared by the generator considering machine and water availability finalized by SSRRC. Accordingly, the PAFM of ISPS for the period from to and for all the instances till date shall be recalculated by MPSLDC based on capacity declared by the generator in place of restrictions imposed by local authorities. MPSLDC is further directed to revise the SEA(s) of ISPS and OPS in the light of the above direction Unquote Accordingly, NHDC has submitted the revised PAFM for the year to and MPPGCL has submitted the revised PAFM wef to for certification by SLDC. The verification of PAFM submitted by NHDC and MPPGCL is under progress and shall be completed by the end of March [ Committee may like to Discuss] ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : Black Start mock drill of Hydel stations of MPPGCL :- The last black start mock drill of Gandhisagar Bargi, Pench, Indira Sagar Power Station (ISP), Omkareshwar Power Station (OSP), Tons HPS and Birsinghpur HPS were successfully completed during the year As per IEGC Black Start Mock Drill shall be conducted in every 6 months duration. MPPGCL and NHDC are requested to submit the plan for carrying out black start mock drill of Gandhisagar Bargi, Pench, Indira Sagar Power Station (ISP), Omkareshwar Power Station (OSP), Tons HPS and Birsinghpur HPS for the year Suitable dates may be communicated to SLDC well in advance for making necessary arrangements. MPPGCL may also intimate the preparedness and s uitable dates for carrying out the black start mock drill of Rajghat and Madikheda. [Action : MPPGCL/NHDC] ITEM NO 8: ALLOCATION OF THE POWER TO DISCOM, EAST DISCOM REGARDING: SLDC is allocating the power to DISCOMs of MP as per GoMP Notification dtd effective from and MPPMCL is allocating the unallocated power to DISCOMs on day ahead and real time basis as per the forecasted demand furnished by the DCCs. However, the Energy Deptt. Govt. of MP vide notification No.2211/F-3-13/2016/XIII dtd. 21st March, 2016 has allocated all existing and future generating capacity to MPPMCL for maintaining uniform tariff across the State w.e.f. April Due to more allocation of power to Agenda for 56th OCCM of MP 13

16 East Discom and less to West Discom the East Discom remains in under drawal and West Discom in over drawal. These leads to gap between average cost of supply (ACS), resulting increase in average revenue realization (ARR) per unit in East Discom. It is requested to provide a solution so as to minimize the under drawal of East Discom and over drawal of West Discom. The date wise under drawal/over drawal of Discoms for the month of Feb.2017 (up to ) is enclosed as Annexure-8. [Action The Committee may like to discuss/discoms/mppmcl.] 9. Non-reporting of tripping incidence occurred on at 220Kv S/S Sabalgarh. At around hrs on dtd , 220Kv Shivpuri-Sabalgarh feeder-ii tripped with following indication: Shivpuri - ACN, zone-iii, FT-1, trip ABC Sabalgarh - No indication It is gathered that 160MVA, 220/132Kv transformer No.I&II at 220KV S/S Sabalgarh also tripped at the same time with O/C R phase, E/F indication resulting total failure of 132Kv supply at Sabalgarh, Shivpurkalan and Baroda substations. It has come to notice that officials on duty at Sabalgarh S/s had not intimated about above incidence by hrs to upper substation (220Kv S/S Shivpuri). Thus, the officials on duty at 220KV Shivpuri S/s, Sub-LDC Bhopal and SLDC Jabalpur were in dark about these tripping incidence, resulting delay in normalization of system. It is also gathered that above tripping occurred during shifting of load of 132 KV Shivpurkalan ckt-i to Auxiliary bus at Sabalgarh S/s.Non reporting of tripping of transmission elements after incidence occurred, is not in the interest of safe,srcure and reliable operation of integrated grid. The committee may like to discuss in order to adhere the grid code for maintaining safe, secure system operation & to avoid any delay in normalization. [ACTION: MPPTCL] ITEM NO. 10: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 10.1 Status of AMR system installed at SLDC: In the month of Jan 2017, the complete data of 555 meters was received through AMR system and data of 68 Nos meters (Monthly-51 & Partial 17) was not received through AMR system. The incomplete data is received due to site related issues such as network problem, modem switched off, meter defective or replaced, misalignment of optical cable or due to some other problems. The status of data received through AMR system is invariably sent to all concerned offices including SE(T&C) offices through for furnishing the missing data alongwith monthly JMR data latest by 4 th of every month. The Committee may like to discuss Agenda for 56th OCCM of MP 14

17 the following as an action plan for receiving the complete data through AMR system in in a time bound manner. 1. CE(T&C) office may take up the matter with M/s Secure Meters Ltd for resolving the site related issues such as time drift in meters, meter defective, network problem and SIM defective. Details are shown in enclosed Annexure Integration of ABT meters installed at the interface points of newly commissioned substation / Xmers / HT consumers / OACs / REGs 60 Nos as Annexure SLDC vide dated forwarded the list of interface points to CE(T&C) office for furnishing the details of meters, modem and SIMs for integrating the ABT meters with AMR system of SLDC. (T&C) office is requested to furnish the same on priority basis. 3. CE(T&C) office is requested to issue instructions to field offices that they should ensure that modems are not switched off and opt ical cable is properly connected & aligned. This will improve the readability of meters installed at the interface points. ITEM NO 11: SCADA/EMS RELATED ISSUES: [Action : CE(T&C) MPPTCL] 11.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS & HAVING TRACTION FEEDERS- The telemetry of new 220KV S/s, important 132KV S/s having injection from renewable generating Stations, and Captive Power Plant, is to be provided through Dongfeng RTUS installed and commissioned under MPPTCL SCADA project. Total 50 Nos. Sub Stations has already been identified and forwarded to MPPTCL for arranging integration of telemetry. The integration of around Seven RTUs ( 132KV Rewa, 132KV Biora,132KV Arniakala,132KV Kannod, 132KV Poliakala, 132KV Jeerapur, 132KV Petlabad) is still pending for want of commissioning of data channel which is pending due to shortage of PLCC panels/modems etc. The telemetry of one more RTU at 132KV S/s Tarana is also required to be integrated with SLDC SCADA system. In addition to the above, telemetry of Six number of RTUs (132KV Kushi, 132KV Banmore S/s, 132Kv Shankargarh, 132KV Bercha, 132KV Morena S/s, 132KV Datia, 132KV Mungaoli S/s, S/s, 132KV Shujalpur S/s, 132KV Meghnagar S/s) is also pending to be commissioned for monitoring of railway drawal. Further, most of the RTUs commissioned recently is not working properly and functioning intermittently. The telemetry of 220 KV Ashok Nagar, 132KV Khilchipur, 132KV Mandideep 132 kv Dewas BNP,132 KV Shankargrah, 132KV Momin Barodia 132KV Sitamau is commissioned but functioning intermittently The telemetry of these identified Sub Stations is urgently required for monitoring of grid. Hence the progress in the matter as well as further schedule of commissioning, including data channel, plan for arrangement of modems, and r ectification of SOE issue may please be provided by T&C. Agenda for 56th OCCM of MP 15

18 [Action: - CE (T&C)/CE (T&P), MPPTCL] 11.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN ELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS & The present status of telemetry discrepancy including upgradation requirement is enclosed herewith as annexure The list of important locations where RTU upgradation is required to accommodate renewable feeders/other feeders/transformers is detailed is also given hereunder:- Sl. No. Name of Substation whose RTU is required to be upgraded KV Birsingpur S/s Name of feeders/transformers required to be included in telemetry The telemetry of 220KV IC-1 & 4 feeder is not available since last six month KV Jaora S/s 33 KV Chowksi wind 1,2 is not available KV Alot S/s 33 KV Narbheram is not available KV Badnagar S/s 132 KV Kshema Power is not available KV Anuppur S/s 132KV Shahdol,132KV Kotma 2, 132KV TRF 2 telemetry not available KV Kotma S/s 132KV Anuppur feeder telemetry not available KV Shivpuri S/s 220/132KV Transformer telemetry is not available KV Pandurna 220KV Pandurna-Chindwara telemetry is not available KV Chatarpur S/s Telemetry of 132/33KV Transformer-2 not available KV Satna Satna 220KV-Satna PG Interconnector 3 telemetry is not available The commissioning of new SCADA/EMS system at SLDC is completed and for successful functioning of EMS system the availability of complete telemetry including CB status is a prerequisite. H ence the work regarding telemetry discrepancy mentioned in enclosed annexure is to be taken up on highest priority. MPPGCL and MPPTCL may please provide completion schedule regarding rectification of telemetry discrepancy and upgradation of RTU s. [ACTION: T&C, MPPTCL & O&M: GEN, MPPGCL] 11.3 PRESENT STATUS OF PROCURMENT OF RTUs BY MPPGCL:- The matter of procurement of RTU for Rajghat HPS and Bansgar III HPS was discussed in detail in last sixteen OCCM meetings as well as on two number special telemetry meetings, without any conclusive result. T he Telemetry of Rajghat HPS is out since LAST TWO & HALF YEARS. In the last meeting it was informed by MPPGCL that order for RTU has been placed by MPPGCL. The latest status in the matter along with commissioning schedule, may please be provided by MPPGCL. [ Action: - ED (O&M: GEN: MMPPGCL)] Agenda for 56th OCCM of MP 16

19 11.4 COMMISSIONING OF COMMUNICATION CHANNELS FOR DUAL REPORTIG OF RTUS AS PER BACKUP SLDC REQUIREMENT:- The commissioning of SCADA/EMS system at SLDC Jabalpur and backup SLDC Bhopal is already completed however the additional communication channel required for dual control centre reporting as per backup SLDC requirement is yet to be commissioned by MPPTCL & MPPGCL The RTU wise progress may please be provided by MPPTCL & MPPGCL. The Strengthening of existing wideband communication node is also required to be arranged so as two ensure reliable backbone communication network. The immediate requirement in the matter has already been submitted by SLDC to MPPTCL and M PPGCL. The present status of the same may please be provided Arrangement of Air Conditioners for wideband locations :- In order to ensure proper functioning of wideband node equipments, these locations are required to be equipped with air conditioners so as to ensure proper environmental conditions. SLDC is perusing the matter regarding arrangement of air conditioner at wideband locations since However, it is gathered that the aircondtioners at wideband locations namely 220KV Jabalpur, 400KV Bina, 220Kv Satna, 220Kv Itarsi and 220KV Damoh, 400Kv Nagda is either faulty or not available. SLDC vide letter dated has already informed that equipment failure due to improper or no air conditioning environment has not been covered under maintenance contract/guarantee period and f ailure of equipments at these locations, due to environmental conditions is required to be attended at the cost of company. The schedule of arranging air conditioner at these locations may please be intimated by MPPTCL. Further wideband node equipments at 220Kv Chindwara, 220KV Seoni, 220KV Ratlam,220KV Shivpuri, 220KV Indore SZ, 220KV Shujalpur, 220KV Neemuch,132KV Waidhan, 220KV Rajgarh, 220KV Maalnpur,400KV Pithampur, 220KV Pithampur, 132KV Indore Chambal, Pench & Gandhisagar HPS is expected to be commissioned within next four months. The necessary provision of space, DCPS, Air conditions is required to be ensured by MPPTCL & MPPGCL. [Action: - CE (T&C)/CE (T&P), MPPTCL, ED (O&M: GEN: MPPGCL)] 11.6 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS The long outage of telemetry of following S/s is discussed in detail:- Sl No. Name of Sub Station Out from /Remark 01 Rajghat HPS Out from last two & half years KV Morwa S/s More than one and half Year KV Waidhan Out from six month. Channel problem between Anuppur to Jabalpur KV Beohari Out from more than six month KV Umariya Out due to PLCC channel KV REWA Out due to PLCC channel KV DEOLOAN Out due to PLCC channel Agenda for 56th OCCM of MP 17

20 MPPTCL, MPPGCL requested to sort out rectification of above RTU/data channel on top most priority Telemetry of Railway TSS Sub Stations:- The telemetry of 36 Nos railway Traction Sub Stations is required to be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP. Accordingly, to finalize the telemetry scheme, a meeting of various filed offices from railway & SLDC was held at SLDC Jabalpur on various occasions. The further clarification required in the matter was also provided to railway officers during the meeting held at SLDC in first week of October 2016 and November. Railway officials to provide progress in the matter. ITEM No 12 : DATE AND VENUE OF NEXT OCC MEETING : It is proposed to hold 57 th Operation and Coordination Committee meeting of MP on The host and venue of the same shall be decided in the meeting. *********** Agenda for 56th OCCM of MP 18

21 S. No. Particulars FREQUENCY PARTICULARS Dec-16 Annexure- 2.1 Jan-17 1 INTEGRATED OVER AN-HOUR 1.1 Maximum Frequency Hz Between hrs & Hrs on Hz Between hrs & Hrs on Minimum Frequency Hz Between hrs & Hrs on Hz Between hrs & Hrs on Average Frequency Hz 50 Hz 2 INSTANTANEOUS FREQUENCY AT Maximum Frequency Hz HRS ON AT HRS 2.2 Minimum Frequency Hz ON Percentage of time when frequency was : Hz Hz AT HRS ON AT HRS ON %age of time when frequency was Dec-16 Jan Below 48.5 Hz Between Hz and 48.8 Hz Between Hz and 49.2 Hz Between Hz and 49.5 Hz Between Hz and 49.7 Hz Between Hz and 49.9 Hz Between 49.9 Hz and Hz Between Hz AND 51.5 Hz Above 51.5 Hz No. of times frquency touched Hz No. of times frquency touched Hz No. of times frquency touched 51.0 Hz 0 0 Agenda for 56th OCCM of MP 19

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01 MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com vkbz,l vks : 9001-2008

More information

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01 MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com vkbz,l vks : 9001-2008

More information

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/1234

More information

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

No.07-05/SG-9B-II/4084 Jabalpur, dated:

No.07-05/SG-9B-II/4084 Jabalpur, dated: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/4084

More information

In view of the above list of important grid element & exception list is as below:-

In view of the above list of important grid element & exception list is as below:- OUTAGE PROCEDURE As per standard procedure of WRPC, all EHV elements which have been listed under the list of important grid elements of Western Region, the outages for such elements required OCCM approval.

More information

No.07-05/SG-9B-II/1594 Jabalpur, dated

No.07-05/SG-9B-II/1594 Jabalpur, dated MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/1594

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

No.07-05/SG-9B-II/ 1179 Jabalpur, dated been uploaded on the website of SLDC and can be downloaded.

No.07-05/SG-9B-II/ 1179 Jabalpur, dated been uploaded on the website of SLDC   and can be downloaded. MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

MINUTES OF THE 47 th SLCF MEETING HELD ON

MINUTES OF THE 47 th SLCF MEETING HELD ON MINUTES OF THE 47 th SLCF MEETING HELD ON 23.11.2016 Shri. Rafikul Islam, Chief Engineer (SLDC), WBSETCL & Chairperson, SLCF welcomed all the participant members to the 47 th SLCF meeting.. ITEM-1: CONFIRMATION

More information

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION, BHOPAL Sub : In the matter of determination of Parallel Operation Charges. Suo-Motu Petition No. 73/2012 ORDER (Date of order 31 st December, 2012) MPERC,

More information

Renewable Regulatory Fund (RRF) Mechanism : -

Renewable Regulatory Fund (RRF) Mechanism : - Renewable Regulatory Fund () Mechanism : - : Chronology of events Outline : Objectives at a glance : Approach : Applicability Role of different stakeholders Brief on CERC Orders on State Load Dispatch

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007 KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No.1/1/KSERC-2006/ Dated, Thiruvananthapuram 6 th August,2007 KSERC (Supply of Power from Captive Generating Plants to Distribution Licensees)

More information

The Electric Power System

The Electric Power System The Electric Power System INDIA Indian Power System 1 2 Basic facts Area:3.288 million km² Population:1.25 Billion Electricity consumers: 216 Million- (31.3.2013) Number of TSOs: 14- (31.3.2013) Numbe

More information

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow No.UPERC/ Secy/JD(G)/2018/ dated : 20 th August, 2018 Public Notice The Commission is in process of reviewing

More information

STATE LOAD DISPATCH CENTRES (SLDC)

STATE LOAD DISPATCH CENTRES (SLDC) ACTIVITIES OF SLDC STATE LOAD DISPATCH CENTRES (SLDC) **The State Load Despatch Centre:- As per section 33 of Electricity Act - 2003 (Central Act 36 of 2003), SLDC performs powers as defined below:- SLDC

More information

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on 16-12-2015 2)In-principle Approval_Tumkur Phase-I Government of India Ministry of Power Central Electricity Authority PSP & PA- I Division

More information

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region 1.0 Applications for Connectivity and Long Term (Open) Access. Applications for grant of Connectivity

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014 Policy & Regulatory Issues : Solar & Wind Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014 About Us Vision To develop a solution with low cost, high technology power generation & fulfill

More information

Agenda of 11 th System Studies Meeting in NER

Agenda of 11 th System Studies Meeting in NER Agenda of 11 th System Studies Meeting in NER Date: 16.12.2015. Venue: Hotel Nandan, Guwahati 1. Review of SPS I, II, III & SPS IV related to Palatana GBPP, OTPC after commissioning of Palatana Module

More information

Intra-State Availability Based Tariff (ABT)

Intra-State Availability Based Tariff (ABT) Intra-State Availability Based Tariff (ABT) What is ABT? 1. In Year 2000, the CERC revised the tariff structures of inter- state generators from drawal-based tariffs to ABT to discipline grid operations.

More information

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1 TRANSMISSION CAPACITY ADDITION PROGRAMME DURING 2006-07 Sl. No. Contents Page No. 1 Introduction 1 2 Chapter 1 Transmission Capacity Additions During 2005-06 of 10 th plan period 3 Chapter 2 Construction

More information

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority ,.,.;i')!i,:;;',;~~~. 'ffrff mm I Government of India ~ ~.I Ministry of Power 4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority III ~~~~~~I"1",~~1 ;J' :. r System Planning & Project Appraisal Division

More information

Need Assessment Document (NAD) DDUGJY

Need Assessment Document (NAD) DDUGJY Need Assessment Document (NAD) DDUGJY Index SNo. Details Page No. 1.0 General Instruction 3 2.0 Objectives of DDUGJY 5 3.0 Scope of works 7 4.0 General information of project area 10 5.0 Details of existing

More information

In-House Paper on the implementation of Single Part Tariff in Power Distribution

In-House Paper on the implementation of Single Part Tariff in Power Distribution December 9, 2016 In-House Paper on the implementation of Single Part Tariff in Power Distribution Background: Tariff Introduction: Tariff is the price Structure at which electricity is sold to the consumers.

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna 800 021 ------------------------------------------------------------------------------------------------------------- ROOFTOP

More information

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in

More information

UTTARAKHAND POWER CORPORATION LIMITED

UTTARAKHAND POWER CORPORATION LIMITED UTTARAKHAND POWER CORPORATION LIMITED PUBLIC-NOTICE In terms of the provisions of section 45 of the Electricity Act, 2003, the consumers and the general public are hereby informed of the tariff and charges

More information

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE Objections/ comments invited from various stakeholders on ARR filing and Tariff Petition of Hydro Electric Stations, Gas Turbine

More information

Case No. 163 of In the matter of

Case No. 163 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION Presentation by Engr. O. C. Akamnnonu Chief Executive Officer, Ikeja Electricity Distribution Company AGENDA WORK THROUGH

More information

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION Work Order No: File Reference: 16/2/1 This application form for the connection of small scale embedded generation is for small

More information

GC108: EU Code: Emergency & Restoration: Black start testing requirement

GC108: EU Code: Emergency & Restoration: Black start testing requirement Stage 01: Modification Proposal Grid Code GC108: EU Code: Emergency & Restoration: Black start testing requirement Purpose of Modification: This modification seeks to align the GB Grid Code with the European

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

CASE No. 35 of In the matter of

CASE No. 35 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid

Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid India need regulations for energy storage to implement grid ancillary services

More information

RFP Corrigendum No. 01

RFP Corrigendum No. 01 RFP Corrigendum 01 The RFP document for selection of Transmission Service provider for the Package- 1 against tender specification ESD-765/4 has been modified to the extent below: S. Clause / Page 1. Definition

More information

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED GUIDELINES FOR EMPANELMENT OF GRID TIED INVERTER MANUFACTURERS FOR IMPLEMENTATION OF SRTPV PROGRAM IN BESCOM. I. NEW EMPANELMENT 1. The grid tied inverter manufacturer shall register their application

More information

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 Website: www.hpgcl.org.in E-mail- ceplg@hpgcl.org.in EXPRESSION

More information

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region a) Power Supply to M/s Noida Power Company Limited (NPCIL) NPCL has applied to CTU for connectivity for

More information

Key DRAFT OPERATING CODE 2 LEGAL TEXT

Key DRAFT OPERATING CODE 2 LEGAL TEXT Key DRAFT OPERATING CODE 2 LEGAL TEXT 1) Blue Text From Grid Code 2) Black Text Changes / Additional words 3) Orange/ Brown text From RfG 4) Purple From HVDC Code 5) Green From DCC (not used in this document)

More information

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India.

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India. Document: BHEL/EDN/SCPV/D91/EOI Revision: 01 Date: 12-Oct-2009 EXPRESSION OF INTEREST (EOI) FOR TECHNOLOGY PARTNERSHIP IN SEMICONDUCTOR DEVICE MANUFACTURING (IGBT Encapsulation Technology, Expansion of

More information

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G.Road, Bangalore-560 001 Present: Shri M.R. Sreenivasa Murthy Chairman Shri H. D. Arun Kumar Shri D.B. Manival

More information

Before the. Case No. 106 of 2009

Before the. Case No. 106 of 2009 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007.

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007. Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007. No Date of Exemption To whom Exemption was granted Clause to which Exemption has been granted Concise

More information

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise) DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION

More information

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012 POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 PREPARED BY: Electricity System Operations Planning and Performance DATE: 5 June 2012 FINAL

More information

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0 ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES 2018-04-24 - Revision 0 EUB Decision 2007-071 Board Direction 52 For questions or comments regarding

More information

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI.09.001 Date: 29/05/2009 For Annual Operation and Maintenance Service Contract of HT/LT Panels,Motors,Transformers,UPS,Air Conditiners,Lightings

More information

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India 26th March 2014 Infrastructure Revitalization in India 1 Outline Indian Power System Indian Grid - WAMS

More information

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 16 AASHAADHA, 1937(S) (NO.PATNA 737) PATNA, TUESDAY, 7 TH JULY 2015 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION

More information

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT By Girija Shankar Sharma, M.Tech (Power System), DGM (O&M-Opn), NTPC-Rihand, E-mail: gssharma@ntpc.co.in Presentation Points System Description and Grid

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

ROLLOVER RIGHTS OF LONG TERM FIRM TRANSMISSION SERVICE

ROLLOVER RIGHTS OF LONG TERM FIRM TRANSMISSION SERVICE ROLLOVER RIGHTS OF LONG TERM FIRM TRANSMISSION SERVICE In this Section: Overview Evaluation of Initial Requests Rollover Request Competing Request Competing Examples 1.0 OVERVIEW Pursuant to Section 2.2

More information

IJRASET 2013: All Rights are Reserved

IJRASET 2013: All Rights are Reserved Power Factor Correction by Implementation of Reactive Power Compensation Methods of 220 KV Substation MPPTCL Narsinghpur Ria Banerjee 1, Prof. Ashish Kumar Couksey 2 1 Department of Energy Technology,

More information

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1 Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide Version 1.1 October 21, 2016 1 Table of Contents: A. Application Processing Pages 3-4 B. Operational Modes Associated

More information

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level) Annex-I Corrigendum to Minutes of the 36 th meeting of the Empowered Committee on Transmission held on 26 th July, 2016 at 3:30 PM at Conference Room of CEA, 2 nd Floor, Sewa Bhawan, R.K. Puram, New Delhi

More information

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon

SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon पत क स च : Sl. Organization Address Tele/Fax No./email No. 1 PGCIL Sh. I S Jha, Chairman & Managing Director, Powergrid Corporation of India Ltd., SAUDAMINI, Plot No.2, Sector-29, Gurgaon, Haryana-122001.

More information

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 07.01.2016 PRESENT: 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Sri Indu

More information

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Australian Capital Territory Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Disallowable instrument DI2016 189 made under the Utilities Technical Regulation

More information

Report. the feasibility of

Report. the feasibility of Report on the feasibility of Additional Interconnection between India and Bangladesh Joint Technical Team (JTT) of India and Bangladesh July 2016 Contents 1.0 Background 1 2.0 Additional power export to

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT ENQUIRY NOTICE INVITING TENDER Phone:

More information

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 1 of 5. Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 2 Definitions 2 Not seen the definition for Inspector. But with, - Qualifications,

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

Respondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad

Respondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad 1 CONSUMER GRIEVANCE REDRESSAL FORUM CENTRAL REGION (Formed under Section 42(5) of the Electricity Act 2003) 220 kv Substation Compound, HMTColony P.O. Kalamasery, Pin 683 503 Phone No. 0484-2556500 Website

More information

Details of concern person for future communication/clarification. Mobile No. Address

Details of concern person for future communication/clarification. Mobile No.  Address 114 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] GENERATION OF ELECTRICITY FORMAT-1 PERIODICITY-ANNUAL DATA OF YEAR 20 20. Submission by 30th June NAME AND ADDRESS OF UTILITY: Sl. No. (A) Name

More information

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document Decision 2013-127 Alberta Electric System Operator Saleski Transmission Project Needs Identification Document ATCO Electric Ltd. Saleski 901S Substation and 144-kV Transmission Line 7L142 Facility Application

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

North Eastern Regional Power Committee

North Eastern Regional Power Committee North Eastern Regional Power Committee Agenda For 6 th Protection Coordination Sub-Committee Meeting Time of meeting : 10:00 AM. Date of meeting : 11 th December, 2012 (Tuesday) Venue : Hotel Grand Starline

More information

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for Form B Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for Grid Connected Rooftop and Small SPV Power Plants (For the project above 5 kwp & upto

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 1 OF 7 TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH 1.0 SCOPE:

More information

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai

Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on at Mumbai 545-558 Minutes of the 37 th Meeting of Standing Committee on Power System Planning in Western Region held on 5-09-2014 at Mumbai 1.0 The 37 th meeting of the Standing Committee on Power System Planning

More information

POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU TEL: FAX: PUBLIC NOTICE

POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU TEL: FAX: PUBLIC NOTICE POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU - 180007 TEL: 0191-2532809 FAX: 0191-2530265 PUBLIC NOTICE Comments / Suggestions on Annual Revenue Requirement (ARR) and Electricity Proposal

More information

Exemptions currently in force

Exemptions currently in force exemptions by Western Power s currently in force Neerabup Units G11 & G12 3.3.3.1 (a) 16 Jan 2008 Ongoing Modified performance criteria: 0.8 Lagging 101.3 MVAr 0.9 Leading 68.5 MVAr Financial contribution

More information

Roof Top Solar Power Net Metering Solution. Guidelines for implementation of Net Metering for Roof Top Solar Power System

Roof Top Solar Power Net Metering Solution. Guidelines for implementation of Net Metering for Roof Top Solar Power System Roof Top Solar Power Net Metering Solution Guidelines for implementation of Net Metering for Roof Top Solar Power System 1. Net Metering arrangement is permitted for 3 Phase connections only. The interconnection

More information

Enhancing Grid Stability in India

Enhancing Grid Stability in India India Japan Energy Forum 2017 Enhancing Grid Stability in India 9 January 2017 Nomura Research Institute 7 th Floor, Tower A, Building 5 DLF Cyber City, Phase III Gurgaon, India Otemachi Financial City

More information

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min Gas Advisory Board Draft Agenda Meeting No. 1 Location: Parmelia Hilton, Swan B Room 14 Mill Street, Perth WA 6000 Date: 20 December 2011 Time: 11:15am 12:15pm Item Subject Responsible Time 1. WELCOME

More information

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION Summary Abhay Kumar Mata Prasad R C Maheshwari Asea Brown Boveri Ltd. 4th Floor, 71 Nehru Place, New Delhi

More information

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008 Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008 2 Table of Contents Administrative Data...3 Network Performance...3 Reliability Measures

More information

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010 FINAL FACILITY STUDY 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1 September 10, 2010 I. Introduction This is a revised facility study performed for Transmission Queue Request 2009

More information

PROCUREMENT SCHEDULE FOR EQUIPMENTS AND MATERIALS REQUIRED FOR CoE - BASIC, ADVANCE MODULES & UPGRADATION IN 28 I.T.Is ( Proposals) 2010 May

PROCUREMENT SCHEDULE FOR EQUIPMENTS AND MATERIALS REQUIRED FOR CoE - BASIC, ADVANCE MODULES & UPGRADATION IN 28 I.T.Is ( Proposals) 2010 May losure Authorized PP Referance # NCB 8 NCB 12 S1 S2 64475 v5 PROJECT: VOCATIONAL TRAINING IMPROVEMENT PROJECT COUNTRY: INDIA NAME OF THE STATE: Madhya Pradesh NAME OF I.T.Is: Gas Bhopal, Jhabua, Seoni,

More information

CASE No. 114 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

CASE No. 114 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER 1 Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER Lisa Dangelmaier Hawaii Electric Light lisa.dangelmaier@hawaiielectriclight.com Hawai'i Electric Light System Overview

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Case Nos. 12 & 48 of 2009

Case Nos. 12 & 48 of 2009 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report 260 TO: FROM: SUBJECT: ECAC Members Jamie Asbury, deputy energy manager, Business/Regulatory Five (5) Generator Interconnection

More information

ELE-PT-E-2003 Senior Electrical Protection & Commissioning Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS

ELE-PT-E-2003 Senior Electrical Protection & Commissioning Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS 104660-ELE-PT-E-2003 Senior Electrical Protection & Commissioning Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has about 14 years hands-on experience in low, medium voltage and

More information