RFP Corrigendum No. 01

Size: px
Start display at page:

Download "RFP Corrigendum No. 01"

Transcription

1 RFP Corrigendum 01 The RFP document for selection of Transmission Service provider for the Package- 1 against tender specification ESD-765/4 has been modified to the extent below: S. Clause / Page 1. Definition of: Successful Bidder Transmission Service Agreement Clause no. 1.2 Annexure 2 : Para 1, line 2 Annexure 9: Subject & Para 1, line 2 Annexure 10A: Para 1, line 3 Instead of Build, own, operate and transfer 2. Definition Bid Bond shall mean the unconditional and irrevocable bank guarantee for Rupees 51 Crores (Rs Fifty One Crores only) to be submitted along with the Bid by the Bidder under Clause 2.20 of this RFP, Read as Build, Own, Operate & maintain and Transfer (BOOT) Bid Bond shall mean the unconditional and irrevocable bank guarantee for Rupees Crores (Rs Fifty One Crores Twenty Three Lacs only) to be submitted along with the Bid by the Bidder under Clause 2.20 of this RFP, as per the format Uttar Pradesh Power Transmission Corporation Limited Page 1

2 S. Clause / Page Instead of Read as as per the format prescribed in Annexure 2; prescribed in Annexure 2; 3 Clause 1.2 List of Works (Annexure A) Revised List of Works (Annexure B) 4. Clause 1.4 At the expiry of the TSA, the SPV along with the assets will be transferred to the Long term Transmission Customer(s) or nominee of Long term Transmission Customer(s) at the depreciated value. 5 Clause 1.5 (a) a) Provide to the Bidders a Survey Report for the Project at least thirty (30) days prior to the Bid Deadline. The Survey Report will contain information regarding the transmission line, i.e. voltage level, line configuration (i.e., S/C or D/C), indicative route alignment, conductor type, conductor configuration and type of terrain likely to be encountered. 6 Clause Project Schedule (Annexure C) Scheduled COD for overall Project: 5th May, Clause The Bidders should submit the Bids so as to reach the address specified in Clause by Hrs. on 15th October 2009: 8 Clause Important timelines are mentioned below: Date Event 10 th Aug 2009 Issuance of RFQ and RFP At the expiry of the TSA, all the assets of the SPV including Substations, Transmission Lines and other related physical assets will be transferred to the permitted nominee of the State Government at zero value. a) Provide to the Bidders a Survey Report for the 765kV line which has already been provided at the RFQ stage. The Survey Report will contain information regarding the transmission line, i.e. voltage level, line configuration (i.e., S/C or D/C), indicative route alignment, conductor type, conductor configuration and type of terrain likely to be encountered. However, Survey for all other lines will be the responsibility of the Bidders. Revised Project Schedule (Annexure D) Scheduled COD for overall Project: 31st December, The Bidders should submit the Bids so as to reach the address specified in Clause by Hrs. on 30 th March, 2010: Important timelines are mentioned below: Date Event 10 th August 2009 Issuance of RFQ and RFP Uttar Pradesh Power Transmission Corporation Limited Page 2

3 S. Clause / Page Instead of Read as 19 th Aug 2009 Submission of written clarifications/ amendments, if any, on the RFQ by Bidders so as to reach BPC by 1700 hours. Such written clarifications/ amendments shall be in the format provided in Annexure st Aug, 2009 Pre-bid meeting for any clarification on the RFQ 28 th Aug 2009 Submission of response to RFQ 4 th Sept 2009 Short listing based on responses received for RFQ and issue of additional information related to the project 16 th Sept 2009 Submission of written clarifications/ amendments, if any, on the balance RFP Project Documents only, by Bidders so as to reach BPC by 1700 hours. Such written clarifications/ amendments shall be in the format provided in Annexure rd Sept 2009 Pre-bid Meeting for any clarification on the RFP 30 th Sept 2009 Issue of final RFP Project Documents 15 th Oct 2009 Submission of Bid 15 th Oct 2009 Opening of Non-Financial Bid 20 th Oct 2009 Opening of Financial Bid 26 th Oct 2009 Selection of Successful Bidder 19 th August th October, th November th February nd February 2010 Submission of written clarifications/ amendments, if any, on the RFQ by Bidders so as to reach BPC by 1700 hours. Such written clarifications/ amendments shall be in the format provided in Annexure-7. Public hearing for any clarification on the RFQ Submission of response to RFQ Short listing based on responses received for RFQ and issue of additional information related to the project Submission of written clarifications/ amendments, if any, on the balance RFP Project Documents only, by Bidders so as to reach BPC by 1700 hours. Such written clarifications/ amendments shall be in the format provided in Annexure-7. Public Hearing for any clarification on the RFP 26 th February, th March 2010 Issue of final RFP Project Documents 30 th March 2010 Submission of Bid 30 th March 2010 Opening of Non-Financial Bid 15 th April 2010 Opening of Financial Bid 22 nd April th April 2010 Selection of Successful Bidder and issue of LoI Signing of RFP Project Documents and transfer of South East U.P. Power Transmission Company Ltd. Uttar Pradesh Power Transmission Corporation Limited Page 3

4 S. Clause / Page Instead of and issue of LoI 5 th Nov 2009 Signing of RFP Project Documents and transfer of South East U.P. Power Transmission Company Ltd. 9 Clause The Bidders shall submit the Bid which shall remain valid up to 12th April, The BPC reserves the right to reject any Bid which does not meet the aforementioned validity requirement. 10 Clause The cost of this RFQ including RFP is Rs. 11,250/- (Rupees eleven thousand two hundred fifty only) including VAT (12.5%) or USD 225 (US Dollars two hundred twenty five only) including VAT (12.5%) which shall be non-refundable. This amount shall be payable by a crossed demand draft or banker s cheque drawn in favour of Executive Engineer (A) Electricity Transmission Design Circle, UPPTCL payable at Lucknow. 11 Clause Opening of Envelope I (Non-Financial Bid): 15:00 hours (IST) on 15th October, 2009 Opening of Envelope II (Financial Bid): 15:00 hours (IST) on 20th October, Annexure 1 List of Long Term Transmission Customers Read as The Bidders shall submit the Bid which shall remain valid up to six months from the date of submission. The BPC reserves the right to reject any Bid which does not meet the aforementioned validity requirement The cost of this RFQ including RFP is Rs. 11,250/- (Rupees eleven thousand two hundred fifty only) including VAT (12.5%) or USD 225 (US Dollars two hundred twenty five only) including VAT (12.5%) for both the packages 1&2, which shall be non-refundable. This amount shall be payable by a crossed demand draft or banker s cheque drawn in favour of Executive Engineer (A) Electricity Transmission Design Circle, UPPTCL payable at Lucknow. Opening of Envelope I (Non-Financial Bid): 15:00 hours (IST) on 30th March, 2010 Opening of Envelope II (Financial Bid): 15:00 hours (IST) on 15th April, 2010 List of Long Term Transmission Customers Sl. Name of the Long Term Transmission Customers Allocate d Project Capacity in MW Sl. Name of the Long Term Transmission Customers Allocate d Project Capacity in MW 1 Paschimanchal Vidyut Vitran Nigam Ltd. 33% 1 Paschimanchal Vidyut Vitran Nigam Ltd. 40% Uttar Pradesh Power Transmission Corporation Limited Page 4

5 S. Clause / Page Instead of Read as 2 Dakshinanchal Vidyut Vitran Nigam Ltd. 27% 3 Purvanchal Vidyut Vitran Nigam Ltd. 23% 2 Dakshinanchal Vidyut Vitran Nigam Ltd. 15% 3 Purvanchal Vidyut Vitran Nigam Ltd. 20% 4 Madhyanchal Vidyut Vitran Nigam Ltd. 17% 13 Annexure 4 - Scheduled COD 5th May, (25th Anniversary of the Grant of License) 4th May, Annexure 6 Point 8 4 Madhyanchal Vidyut Vitran Nigam Ltd. 5 Kanpur Electricty Supply Company Ltd. 20% - Scheduled COD 31st Dec, (25th Anniversary of the Grant of License) 30th Dec, 2035 Scheduled COD for the Project: 5 th May, 2012 Scheduled COD for the Project: 31st December, Annexure Annexure 16: Details of the Work (Attached as Annexure E) 5% All other terms & conditions shall remain unchanged. (P.K. Gupta) Superintending Engineer Uttar Pradesh Power Transmission Corporation Limited Page 5

6 ANNEXURE A: LIST OF WORKS RFP Corrigendum 01 Transmission System for 765 kv S/C Mainpuri-Bara Line with 765 kv/400 kv S. AIS at Mainpuri and Associated Schemes/Work I. Transmission Lines: 1) 765 kv SC Mainpuri - Unnao with Quad Bersimis (191 kms) 2) 400 kv DC Quad Moose Mainpuri - Aligarh (120 kms) 3) 400 kv DC Twin Moose Mainpuri (765kV) - Mainpuri (PG) (30 kms) 4) LILO of 400 kvagra Agra(PG) at 765kV Mainpuri with Twin Moose (90 kms) 5) 765kV 2x SC Mainpuri - Bara with Quad Bersimis (2x351 kms) 6) LILO of 400kV Panki-Obra at 400kV Rewa Road with Twin Moose (12 kms) 7) 400kV DC (Quad Moose) Rewa Road-Karchhana (20 kms) 8) 400kV DC (Quad Moose) Rewa Road-Meja (25 kms) 9) 400kV DC (Quad) Bara-Meja (20 kms) 10) 400kV DC (Quad Moose) Bara-Karchhana (20 kms) 11) 400kV D/C (Twin Moose) Tanda-Gonda (100 kms) 12) 400kV D/C (Twin Moose) Gonda-Shahjahanpur (230 kms) 13) LILO of 400kV Sarojininagar-Kursi Road (PG) at 400kV Sultanpur Rd., Lucknow with Twin Moose (20 kms) 14) LILO of 400kV Obra-Sultanpur at 400kV Aurai with Twin Moose (15 kms) II. III. Sub-Stations: 1) 2X1000MVA, 765/400 kv AIS at Mainpuri 2) 3X315MVA, 400/220kV GIS at Rewa Road 3) 2X315MVA, 400/220kV, 2X100MVA, 220/132kV AIS at Gonda AIS 4) 2X500MVA, 400/220kV, 2X160MVA, 220/132kV AIS at Sultanpur Road,Lucknow AIS 5) 2X200MVA, 400/132kV AIS at Aurai Switching-stations: 1) Mainpuri: One & half breaker scheme for 765&400kV sides and two main and transfer scheme for 220kV side 2) Rewa Road: One & half breaker scheme for 400kV side and two main and transfer scheme for 220kV side 3) Gonda: One & half breaker scheme for 400kV and two main and transfer scheme for 220kV & single main and transfer bus scheme for 132kVside 4) Sultanpur Road, Lucknow: One & half breaker scheme for 400kV and two main and transfer scheme for 220kV & single main and transfer bus scheme for 132kVside 5) Aurai: One & half breaker scheme for 400kV and two main and transfer scheme for 220kV & single main and transfer bus scheme for 132kVside Uttar Pradesh Power Transmission Corporation Limited

7 ANNEXURE B: REVISED LIST OF WORKS Sr. No (I) Transmission System for 765kV S/C Mainpuri-Bara Line with 765kV/ 400kV AIS at Mainpuri and Associated Schemes/ Work Transmission Lines: 1) 765kV SC Mainpuri - Unnao with Quad Bersimis (175Kms) 2) 400kV DC (Quad Moose)Mainpuri (765kV) -Aligarh (120kms) 3)LILO of both circuits of 400kV DC Orai - Mainpuri (PG) at Mainpuri (765kV) with Twin Moose (30Kms) 4) 765kV 2x SC Mainpuri - Bara with Quad Bersimis (2x350kms) 5) LILO of 400kV Panki - Obra at 400kV Rewa Road with Twin Moose (12 kms) 6) 400kV DC (Quad Moose) Rewa Road -Karchhana (30kms) 7) 400kV DC (Quad Moose) Rewa Road -Meja (25kms) 8) 400kV DC (Quad Moose) Bara - Meja (25kms) 9) 400kV DC (Quad Moose) Bara -Karchhana (30kms) 10) 400kV DC (Quad Moose) Tanda - Gonda (100kms) 11) 400kV DC (Quad Moose) Gonda -Shahjahanpur (230kms) 12) LILO of 400kV Sarojininagar - Kursi Road (PG) at 400kV Sultanpur Rd, Lucknow with Twin Moose (20kms) 13) LILO of 400kV Obra - Sultanpur at 400kV Aurai with Twin Moose (15kms) (II) Sub-Stations : (III) 1) 2x1000MVA (765/400kV) AIS at Mainpuri 2) 2x315MVA (400/220kV) GIS at Rewa Road 3) 2x315MVA (400/220kV), 2x100MVA (220/132kV) AIS at Gonda 4) 2x500MVA( 400/220kV), 2x160MVA, (220/132kV) GIS at Sultanpur Road, Lucknow 5) 2x315MVA ( 400/220kV), 2x160MVA(220/132kV) AIS at Aurai Bus Switching-Arrangement: 1) Mainpuri : One & half breaker with double main bus scheme for 765&400kV side 2) Rewa Road : Double Main Bus scheme for 400kV and 220kV side 3) Gonda : One & half breaker with double main bus scheme for 400kV,Double main and transfer scheme for 220kV & single main and transfer bus scheme for 132kV side 4) Sultanpur Road, Lucknow : Double Main Bus scheme for 400kV, 220kV & 132kV side 5) Aurai : One & half breaker with double main bus scheme for 400kV, Double main and transfer scheme for 220kV & single main and transfer bus scheme for 132kV side Uttar Pradesh Power Transmission Corporation Limited

8 ANNEXURE C: PROJECT SCHEDULE RFP Corrigendum 01 Sr. No I Name of the Transmission Element/Project Transmission Lines: 1) 765 kv SC Mainpuri - Unnao with Quad Bersimis (191 kms) 2) 400 kv DC Quad Moose Mainpuri - Aligarh (120 kms) 3) 400 kv DC Twin Moose Mainpuri (765kV) - Mainpuri (PG) (30 kms) 4) LILO of 400 kvagra Agra(PG) at 765kV Mainpuri with Twin Moose (90 kms) 5) 765kV 2x SC Mainpuri - Bara with Quad Bersimis (2x351 kms) 6) LILO of 400kV Panki-Obra at 400kV Rewa Road with Twin Moose (12 kms) 7) 400kV DC (Quad Moose) Rewa Road-Karchhana (20 kms) 8) 400kV DC (Quad Moose) Rewa Road-Meja (25 kms) 9) 400kV DC (Quad) Bara-Meja (20 kms) 10) 400kV DC (Quad Moose) Bara- Karchhana (20 kms) 11) 400kV D/C (Twin Moose) Tanda-Gonda (100 kms) 12) 400kV D/C (Twin Moose) Gonda-Shahjahanpur (230 kms) 13) LILO of 400kV Sarojininagar- Kursi Road (PG) at 400kV Sultanpur Rd., Lucknow with Twin Moose (20 kms) 14) LILO of 400kV Obra-Sultanpur at 400kV Aurai with Twin Moose (15 kms) Schedule d COD in months from Effective Date 24 months Percentage of Quoted Transmission Charges recoverable on Scheduled COD of the Element of the Project Element(s) which are pre-required for declaring the commercial operation (COD) of the respective Element/ project 100% Approval of State Govt under section 68 of Electricity Act Transmission License from Uttar Pradesh Electricity Regulatory Commission (UPERC) Clearance from Electrical Inspector. Statutory Consents, Clearances and Permits (way leave, environment & forest, civil aviation, railway/ road/river/canal/power crossing/ptcc, etc.) II Sub-Stations: 1) 2X1000MVA, 765/400 kv AIS at Mainpuri 2) 3X315MVA, 400/220kV GIS at Rewa Road 3) 2X315MVA, 400/220kV, 2X100MVA, 220/132kV AIS at Uttar Pradesh Power Transmission Corporation Limited

9 Sr. No III Name of the Transmission Element/Project Gonda AIS 4) 2X500MVA, 400/220kV, 2X160MVA, 220/132kV AIS at Sultanpur Road,Lucknow AIS 5) 2X200MVA, 400/132kV AIS at Aurai Switching-stations: 1) Mainpuri: One & half breaker scheme for 765&400kV sides and two main and transfer scheme for 220kV side 2) Rewa Road: One & half breaker scheme for 400kV side and two main and transfer scheme for 220kV side 3) Gonda: One & half breaker scheme for 400kV and two main and transfer scheme for 220kV & single main and transfer bus scheme for 132kVside 4) Sultanpur Road, Lucknow: One & half breaker scheme for 400kV and two main and transfer scheme for 220kV & single main and transfer bus scheme for 132kVside 5) Aurai: One & half breaker scheme for 400kV and two main and transfer scheme for 220kV & single main and transfer bus scheme for 132kVside Schedule d COD in months from Effective Date Percentage of Quoted Transmission Charges recoverable on Scheduled COD of the Element of the Project Element(s) which are pre-required for declaring the commercial operation (COD) of the respective Element/ project Scheduled COD for overall Project: 5th May, Uttar Pradesh Power Transmission Corporation Limited

10 ANNEXURE D: REVISED PROJECT SCHEDULE Sr. No I II III Name of the Transmission Element/Project Transmission Lines: 1) 765kV SC Mainpuri - Unnao with Quad Bersimis (175Kms)* 2) 400kV DC (Quad Moose)Mainpuri (765kV) -Aligarh (120kms)* 3)LILO of both circuits of 400kV DC Orai - Mainpuri (PG) at Mainpuri (765kV) with Twin Moose (30Kms)* 4) 765kV 2x SC Mainpuri - Bara with Quad Bersimis (2x350kms) 5) LILO of 400kV Panki - Obra at 400kV Rewa Road with Twin Moose (12 kms)* 6) 400kV DC (Quad Moose) Rewa Road -Karchhana (30kms) 7) 400kV DC (Quad Moose) Rewa Road -Meja (25kms) 8) 400kV DC (Quad Moose) Bara - Meja (25kms) 9) 400kV DC (Quad Moose) Bara - Karchhana (30kms) 10) 400kV DC (Quad Moose) Tanda - Gonda (100kms) 11) 400kV DC (Quad Moose) Gonda - Shahjahanpur (230kms) 12) LILO of 400kV Sarojininagar - Kursi Road (PG) at 400kV Sultanpur Rd, Lucknow with Twin Moose (20kms) 13) LILO of 400kV Obra - Sultanpur at 400kV Aurai with Twin Moose (15kms) Sub-Stations : 1) 2x1000MVA (765/400kV) AIS at Mainpuri* 2) 2x315MVA (400/220kV) GIS at Rewa Road* 3) 2x315MVA (400/220kV), 2x100MVA (220/132kV) AIS at Gonda 4) 2x500MVA( 400/220kV), 2x160MVA, (220/132kV) GIS at Sultanpur Road, Lucknow 5) 2x315MVA ( 400/220kV), 2x160MVA(220/132kV) AIS at Aurai Bus Switching-Arrangement: 1) Mainpuri : One & half breaker with Scheduled COD in months from Effective Date 30 months Percentage of Quoted Transmission Charges recoverable on Scheduled COD of the Element of the Project 100% Element (s) which are prerequired for declaring the commercial operation (COD) of the respective Element/project Approval of Sate Govt under section 68 of Electricity Act Transmission License from Uttar Pradesh Electricity Regulatory Commission (UPERC) Clearance from Electrical Inspector. Statutory Consents, Clearances and Permits (way leave, Environment & forest, civil aviation, railway/ road/ river/ canal/ power crossing/ PTCC,etc.) Uttar Pradesh Power Transmission Corporation Limited

11 Sr. No Name of the Transmission Element/Project Scheduled COD in months from Effective Date double main bus scheme for 765 & 400kV side* 2) Rewa Road : Double Main Bus scheme for 400kV and 220kV side* 3) Gonda : One & half breaker with double main bus scheme for 400kV, Double main and transfer scheme for 220kV & single main and transfer bus scheme for 132kV side 4) Sultanpur Road, Lucknow : Double Main Bus scheme for 400kV, 220kV & 132kV side 5) Aurai : One & half breaker with double main bus scheme for 400kV, Double main and transfer scheme for 220kV & single main and transfer bus scheme for 132kV side *Scheduled COD of these elements would be 30th October, 2011 Percentage of Quoted Transmission Charges recoverable on Scheduled COD of the Element of the Project Element (s) which are prerequired for declaring the commercial operation (COD) of the respective Element/project Scheduled COD for overall Project: 31st December, (Elements mentioned in Serial I (1), (2), (3) & (5) and Serial II (1) & (2) would have Scheduled COD in 30th October, 2011) Uttar Pradesh Power Transmission Corporation Limited

12 ANNEXURE E: DETAILS OF THE WORKS Package-1 : 765kV S/C Mainpuri - Bara line with 765/400kV AIS at Mainpuri & Associated Schemes / Work Scope of work in Substation Sl. Name of Substation Type Rating Bus Switching Scheme 1 765/400kV Manipuri AIS 2x1000MVA 765/400kV 2 400/220kV Rewa Road GIS 2x315MVA 400/220kV 3 400/220/132kV Gonda AIS 2x315MVA 400/220kV, 2x100MVA 220/132kV 4 400/220/132kV Sultanpur Road, Lucknow GIS 2x500MVA 400/220kV, 2x160MVA 220/132kV One & half breaker with double main bus scheme for 765kV & 400kV side Double Main bus scheme for 400kV and 220kV side One & half breaker with double main bus scheme for 400kV side, Double main and transfer scheme for 220kV & single main and transfer bus scheme for 132kV side Double Main bus scheme for 400kV, 220kV & 132 kv side Feeder Bay - 5, Tfr Bay - 2, BR Bay - 1, No of bays 765kV 400kV 220kV 132kV Feeder Bay - 6, NA NA Tfr Bay - 2, NA Feeder Bay - 10, Tfr Bay - 2, BR Bay - 1, BC -1, NA Feeder Bay - 4, Tfr Bay - 2, BR-1, Spare Bay -2 NA Feeder Bay - 2, Tfr Bay - 2, BR - 1, BC - 1, Spare Bay -2 Feeder Bay - 4, Tfr Bay - 2, BC-1, Feeder Bay - 2, Tfr Bay - 4, BC - 1, BT - 1, Spare Bay -2 Feeder Bay - 2, Tfr Bay - 4, BC-1, NA Feeder Bay - 4, Tfr Bay -2, TBC-1, Spare Bay -2 Feeder Bay - 6, Tfr Bay - 2, BC-1, Uttar Pradesh Power Transmission Corporation Limited Page 12

13 5 400/220/132kV Aurai AIS 2x315MVA 400/220kV, 2x160MVA 220/132kV One & half breaker with double main bus scheme for 400kV, Double main and transfer scheme for 220kV & single main and transfer bus scheme for 132kV side NA Feeder Bay - 2, Tfr Bay - 2, BR - 1, Feeder Bay - 2, Tfr Bay - 4, BC - 1, BT - 1, Feeder Bay - 7, Tfr Bay - 2, TBC - 1, NOTE :- 1. All the 765kV & 400kV Sub-station shall be constructed with latest design & technology in accordance with latest IS & IEC. All the Substations shall have Sub-station automation system (SAS) comprising SCADA system for transferring data to CLDS. 2. Digital PLCC cabinets shall be installed at each 765kV & 400kV sub-stations for protection and data communication. Other end digital PLCC cabinets (which are inter face points with UPPTCL, Other PPP Package & generator of Bara, Meja, Karchhana) shall also be procured by the developer. The interface would be associated for erection, testing & commissioning of these cabinets. 3. Stringing of Bus for spare bays is under the scope of developer. No equipment shall be commissioned in spare bay. Scope of Work in Lines Sl. Name of line Approx. Line Length ( Km) Provision of OPGW 1 765kV SC Mainpuri - Unnao with Quad Bersimis 175 To be provided 2 400kV DC (Quad Moose) Mainpuri (765kV) - Aligarh 120 To be provided 3 LILO of both circuits of 400kV DC Orai - Mainpuri (PG) at Mainpuri ( 765kV ) 30 To be provided on one circuit 4 765kV 2xSC Mainpuri - Bara with Quad Bersimis 2x350 To be provided on one line 5 LILO of 400kV Panki-Obra at 400kV Rewa Road 12 with Twin Moose 6 400kV DC (Quad Moose) Rewa Road-Karchhana 30 To be provided Uttar Pradesh Power Transmission Corporation Limited Page 13

14 Sl. Name of line Approx. Line Length ( Km) Provision of OPGW 7 400kV DC (Quad Moose) Rewa Road-Meja 25 To be provided 8 400kV DC (Quad Moose) Bara-Meja 25 To be provided 9 400kV DC (Quad Moose) Bara-Karchhana 30 To be provided kV DC (Quad Moose) Tanda-Gonda 100 To be provided kV DC (Quad Moose) Gonda-Shahjahanpur 230 To be provided 12 LILO of 400kV Sarojninagar-Kursi Road (PG) at kV Sultanpur Road Lucknow with Twin Moose 13 LILO of 400kV Obra-Sultanpur at 400kV Aurai with Twin Moose 15 NOTE: 1. The Steady state active power flow from 765kV Bus in UP, considering Ultimate system peak load of 18957MW, has been preliminary worked out by UPPTCL and is enclosed in the CD. 2. The indicative MW & MVAR loadings of different 765, 400 & 220kV feeders as worked out by UPPTCL and enclosed in the CD. 3. The indicative ultimate system short circuit levels as worked out by UPPTCL ( as enclosed in the CD) show that short circuit levels of 40KA for 1sec will be sufficient for all substations except for Rewa Road, which should be 63KA for 1 sec. 4. OPGW shall be laid on the lines as mentioned above. 5. The repeater station, wherever required shall be commissioned by prospective Developer. Uttar Pradesh Power Transmission Corporation Limited Page 14

Annexure. Technical Details Package 1

Annexure. Technical Details Package 1 Annexure Technical Details Package 1 PACKAGE-1 765 kv S/C Mainpuri-Bara Line with 765 kv/4 kv AIS at Mainpuri and Associated Schemes/Work Scope of work in Substation Sl.No. 1 Name of Substation Type Rating

More information

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise) DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 07.01.2016 PRESENT: 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Sri Indu

More information

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow No.UPERC/ Secy/JD(G)/2018/ dated : 20 th August, 2018 Public Notice The Commission is in process of reviewing

More information

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level) Annex-I Corrigendum to Minutes of the 36 th meeting of the Empowered Committee on Transmission held on 26 th July, 2016 at 3:30 PM at Conference Room of CEA, 2 nd Floor, Sewa Bhawan, R.K. Puram, New Delhi

More information

Tender documents for supply, erection & commissioning of Plante Type Battery to 2x210 MW IB Thermal Power Station.

Tender documents for supply, erection & commissioning of Plante Type Battery to 2x210 MW IB Thermal Power Station. ORISSA POWER GENERATION CORPORATION LIMITED IB THERMAL POWER STATION AT/P.O: BANHARPALI, DIST: JHARSUGUDA, PIN: 768234 (ORISSA), INDIA GRAM: IB THERMAL, TEL: 06645-222209/222210, FAX: 06645-222209/54/30

More information

CORRIGENDUM # 1. Rate Cotnract for Hiring ofvehicle for CNG, PNG and Other Activities TENDER NO: IGL/ND/C&P/CM15118

CORRIGENDUM # 1. Rate Cotnract for Hiring ofvehicle for CNG, PNG and Other Activities TENDER NO: IGL/ND/C&P/CM15118 CORRIGENDUM # Rate Cotnract for Hiring ofvehicle for CNG, PNG and Other Activities TENDER NO: IGL/ND/C&P/CM8 Sr. No. Description Clause/ Para/ Section Amendment/Addition/Modification/Deletion Comemrcial

More information

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai - 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded

Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded T.O.O.{CE-Constructionl400kV)

More information

Supply, Installation and Commissioning of 1 No 50 Watt LED. based SPV SLS at Nadia District Library, Krishna Nagar, Nadia.

Supply, Installation and Commissioning of 1 No 50 Watt LED. based SPV SLS at Nadia District Library, Krishna Nagar, Nadia. Supply, Installation and Commissioning of 1 No 50 Watt LED based SPV SLS at Nadia District Library, Krishna Nagar, Nadia. TENDER DOCUMENT. (A Govt. of West Bengal Company) Bikalpa Shakti Bhavan, Plot J1/10,

More information

DISTRICT RURAL DEVELOPMENT AGENCY, SIVAGANGA SIVAGANGA DISTRICT. TENDER NOTICE NO.1287/2009/JDO Dated

DISTRICT RURAL DEVELOPMENT AGENCY, SIVAGANGA SIVAGANGA DISTRICT. TENDER NOTICE NO.1287/2009/JDO Dated DISTRICT RURAL DEVELOPMENT AGENCY, SIVAGANGA SIVAGANGA DISTRICT TENDER NOTICE NO.1287/2009/JDO Dated 12.11.2009 Sealed Tenders are invited from reputed manufacturers/ Firms for the supply of following

More information

INVITATION FOR QUOTATION. TEQIP-III/2018/uceo/Shopping/48

INVITATION FOR QUOTATION. TEQIP-III/2018/uceo/Shopping/48 INVITATION FOR QUOTATION TEQIP-III/2018/uceo/Shopping/48 29-Dec-2018 To, Sub: Invitation for Quotations for supply of Goods Dear Sir, 1. You are invited to submit your most competitive quotation for the

More information

ASSAM POWER GENERATION CORPORATION LIMITED. NOTICE INVITING TENDER

ASSAM POWER GENERATION CORPORATION LIMITED. NOTICE INVITING TENDER ASSAM POWER GENERATION CORPORATION LIMITED. NOTICE INVITING TENDER NO. APGCL/CGM (G)/CTPS/Disposal/2018-19/01. DISPOSAL OF 2X30 MW CTPS UNITS INCLUDING MAIN PLANT AND BUILDINGS. The Chief General Manager

More information

NOCK/PRC/03(1218)2016-

NOCK/PRC/03(1218)2016- Page 1 of 5 Please refer to Tender for Supply Installation and Commissioning of Chip Based Fuel Management Solutions - REF No. NOCK/PRC/03(1218)2016- advertised on Thursday, 2 nd March. We hereby issue

More information

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019. NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service Effective: For bills rendered on and after February 1, 2019. SEDC:60/7/8/9 SECTION 1. AVAILABILITY AND APPLICABILITY 1.1

More information

To Date: 23/03/2017. Respective Bidders,

To Date: 23/03/2017. Respective Bidders, To Date: 23/03/2017 Respective Bidders, Sub: Up-gradation, Operation and Maintenance of Street Lights in Navi Mumbai in Lieu of Rights of Sharing Energy Savings and Advertisement Rights on Public-Private-Partnership

More information

Regional Office: Vijayapura Plot No6, Trimurthy Nagar Managuli Bypass Road, Vijayapura Diesel Generator Required on Rental Basis

Regional Office: Vijayapura Plot No6, Trimurthy Nagar Managuli Bypass Road, Vijayapura Diesel Generator Required on Rental Basis Regional Office: Vijayapura Plot No6, Trimurthy Nagar Managuli Bypass Road, Vijayapura - 586109 Diesel Generator Required on Rental Basis Bank desires to hire diesel generator on rental basis for the following

More information

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 1 OF 7 TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH 1.0 SCOPE:

More information

The Energy Queensland Group Notice of no non-network options

The Energy Queensland Group Notice of no non-network options The Energy Queensland Group Notice of no non-network options 24 September 2018 MCE Mount Crosby East Establish new substation to replace Mount Crosby Substation (SSMTC) Page 1 of 1 DISCLAIMER While care

More information

VOLUME III. Draft Power Purchase Agreement ADDENDUM - 2

VOLUME III. Draft Power Purchase Agreement ADDENDUM - 2 GOVERNMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Ministry of Power and Renewable Energy Ceylon Electricity Board REQUEST FOR PROPOSALS FOR THE DEVELOPMENT OF A 300MW COMBINED CYCLE POWER PLANT

More information

PROCUREMENT PLAN RENEWABLE ENERGY INTEGRATION PROJECT (REIP)

PROCUREMENT PLAN RENEWABLE ENERGY INTEGRATION PROJECT (REIP) Public Disclosure Authorized PROCUREMENT PLAN RENEWABLE ENERGY INTEGRATION PROJECT (REIP) Revision 4.0 Public Disclosure Authorized I. General 1. Project Information Country Borrower Project Name Loan

More information

TECHNICAL BID T 3627

TECHNICAL BID T 3627 TECHNICAL BID T 3627 Supply of Mechanical Measuring Instruments for TMD-II OF UKAI TPS. Due on At 3.30 P.M. (if Possible) EMD paid YES / NO EMD D. D. No. Date : OR SSI / NSIC Certification Number : Duly

More information

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 Website: www.hpgcl.org.in E-mail- ceplg@hpgcl.org.in EXPRESSION

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA TENDER FOR

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA TENDER FOR GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA - 390 007 TENDER FOR Design,Engineering, manufacturing, supply, erection, testing & commissioning of 66

More information

Amendment to Schedule 15 for Ballasts Electromagnetic & Electronic ballasts

Amendment to Schedule 15 for Ballasts Electromagnetic & Electronic ballasts Revision 1 Date: 28/01/2016 Amendment to Schedule 15 for Ballasts Electromagnetic & Electronic ballasts In the said schedule, (i) in paragraph 7, for sub-paragraph (i) the following shall be substituted,

More information

SAVE ENERGY FOR BENEFIT OF SELF AND NATION

SAVE ENERGY FOR BENEFIT OF SELF AND NATION Taluka: Thasra Dist : Kheda Pin: 388 239 Telephone No. 02699-235 522 Fax No. 02699-235 607 CHIEF ENGINEER (C&O), GSECL,, INVITES TENDERS FROM INTERESTED BIDDERS, FOR SUPPLY OF ABOVE MATERIAL. THE DETAILS

More information

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014. NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service Effective: For bills rendered on and after January 1, 2014. SECTION 1. AVAILABILITY AND APPLICABILITY 1.1 This Rate Schedule

More information

TENDER DOCUMENT PART-II

TENDER DOCUMENT PART-II 1 NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT TAMILNADU REGIONAL OFFICE TENDER DOCUMENT PART-II (PRICE BID) Supply, Installation, Testing and Commissioning of 25 kva DG Sets with Acoustic Enclosure

More information

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region 1.0 Applications for Connectivity and Long Term (Open) Access. Applications for grant of Connectivity

More information

(i) in paragraph 9, for sub-paragraph (i) the following shall be substituted, namely:-

(i) in paragraph 9, for sub-paragraph (i) the following shall be substituted, namely:- Revision 3 Date: 28/01/2016 Amendment to Schedule 6 for Induction Motor In the said schedule, (i) in paragraph 9, for sub-paragraph (i) the following shall be substituted, namely:- Effective from 1 st

More information

uploaded shortly and can be downloaded from

uploaded shortly and can be downloaded from Amendment - 01 NIT - SECI/C&P/OFBK5/062017 dated 21/07/2017 Setting up of 5 MW at Ordnance factory kanpur under VGF scheme Sr. No. Ref. Section clause No. existing clause Amended clause 1 1.3. The Solar

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision Author Date B0 For comments Yale Zhou January 26, 2016 B1 Updated as per comments Yale Zhou February 1, 2016 Final issuance Yale

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL Palabora Copper REQUEST FOR PROPOSAL SUPPLY AND DELIVERY OF PIPES, FITTINGS AND FLANGES TO PALABORA COPPER TENDER NUMBER: RFP.PC.2015/144 PART 1 PROPOSAL INFORMATION AND CONDITIONS Page 1 Supply and Delivery

More information

Tamil Nadu Handicrafts Development Corporation Ltd, Chennai. (Government of Tamil Nadu Undertaking)

Tamil Nadu Handicrafts Development Corporation Ltd, Chennai. (Government of Tamil Nadu Undertaking) Tamil Nadu Handicrafts Development Corporation Ltd, Chennai. (Government of Tamil Nadu Undertaking) Tender No: THDC/1611/DC/2017 dated 26.09.2017 Tender for the supply, erection and commissioning of machineries,

More information

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region TRANSMISSION GROUP MERC 5 th August 2011 2 Actual Flows for Mumbai Peak FY12 ( 3209 MW) Tie Line Flows (Amp & MW) during Mumbai

More information

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India SECI/SD/EoI/20000 MW Mfg./I/2017 18.12.2017 Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India 1. Objective of EOI: SECI intends to invite Expression of Interest from the

More information

File No. EL/EE/NAD/Tech/1-13/2018/822 Dated: 29/08/2018 OFFICE OF THE EXECUTIVE ENGINEER NORTH ANDAMAN DIVISION ELECTRICITY DEPARTMENT DIGLIPUR

File No. EL/EE/NAD/Tech/1-13/2018/822 Dated: 29/08/2018 OFFICE OF THE EXECUTIVE ENGINEER NORTH ANDAMAN DIVISION ELECTRICITY DEPARTMENT DIGLIPUR OFFICE OF THE EXECUTIVE ENGINEER NORTH ANDAMAN DIVISION ELECTRICITY DEPARTMENT DIGLIPUR Unique No.* Name of Work Name of Department Tender No.* Complete Mechanical works, Electrical works, Body works,

More information

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region a) Power Supply to M/s Noida Power Company Limited (NPCIL) NPCL has applied to CTU for connectivity for

More information

Tender No:- MTL/PUR/213/Elect/ (K)/9. 2 NEW Moulded case Circuit Breaker with O/L & S/C No 02

Tender No:- MTL/PUR/213/Elect/ (K)/9. 2 NEW Moulded case Circuit Breaker with O/L & S/C No 02 Tender No:- MTL/PUR/213/Elect/2015-16 (K)/9 Date:-26/10/2016 Type Of Bid Bidding type Bid closing On Bid Opening On EMD : LIMITED TENDER : Single Bid : 18/11/2016 at 14.00 hrs.(ist) : : As per Annexure

More information

SECTION 1 SCOPE, SPECIFIC TECHNICAL REQUIREMENT AND QUANTITIES

SECTION 1 SCOPE, SPECIFIC TECHNICAL REQUIREMENT AND QUANTITIES Tamil Nadu Transmission Corporation Limited Bharat Heavy Electricals Limited 400/110 KV Substation at Thappagundu & 400/230-110 KV Substation at Anikadavu, Technical specification for 420/245/132kV Isolators

More information

OIL INDIA LIMITED Fax (A Govt. of India Enterprise) Udyan Vihar, Narengi, Guwahati, Assam

OIL INDIA LIMITED Fax (A Govt. of India Enterprise) Udyan Vihar, Narengi, Guwahati, Assam OIL INDIA LIMITED Fax-91 0361 2643686 (A Govt. of India Enterprise) Email-oilmatpl@oilindia.in Udyan Vihar, Narengi, Guwahati, Assam OIL INDIA LIMITED invites sealed tenders for the following: Tender No.

More information

REQUEST FOR PROPOSALS FOR THE ESTABLISHMENT OF SOLAR PV POWER PLANT ON BUILD, OWN AND OPERATE BASIS. International Competitive Bidding (ICB)

REQUEST FOR PROPOSALS FOR THE ESTABLISHMENT OF SOLAR PV POWER PLANT ON BUILD, OWN AND OPERATE BASIS. International Competitive Bidding (ICB) REQUEST FOR PROPOSALS FOR THE ESTABLISHMENT OF SOLAR PV POWER PLANT ON BUILD, OWN AND OPERATE BASIS International Competitive Bidding (ICB) Polonnaruwa Solar PV Power Project (10 MWp) Tender No: CEB/EPT/SP/RFP1

More information

Comprehensive project bid to grant in concession GTS Project 220 Kv Tintaya - Azangaro Transmission Line. GTS: Guaranteed Transmission System

Comprehensive project bid to grant in concession GTS Project 220 Kv Tintaya - Azangaro Transmission Line. GTS: Guaranteed Transmission System Comprehensive project bid to grant in concession GTS Project 220 Kv Tintaya - Azangaro Transmission Line GTS: Guaranteed Transmission System CALLED Location: Cusco and Puno region Purpose: Concession for

More information

Supply & Installation of Latest Version NX CAD Academic Software (NX9)

Supply & Installation of Latest Version NX CAD Academic Software (NX9) ISO 9001:2008 TENDER FOR Supply & Installation of Latest Version NX CAD Academic Software (NX9) Tender Inquiry No. NSIC/NTSC/CAD/CAM/CNC/UG- NX Software/051/15-16 NSIC- Technical Services Centre (A Government

More information

NIT No.:-10/WEX/MCR/HYD. PRESS/2-303/ /Dt

NIT No.:-10/WEX/MCR/HYD. PRESS/2-303/ /Dt Annexure-1 NIT No.:-/WEX/MCR/HYD. PRESS/2-303/21-12/Dt.02.03.22 Name of work:-retrofitting of new hydraulic power pack on 63 Ton Hydraulic Press, Plan No.1/2-303 SCOPE OF SUPPLY AND WORK: 1.0 Purpose of

More information

BaartaIya iva&aana isaxaa EvaM AnausaMDaana samstaana paunao

BaartaIya iva&aana isaxaa EvaM AnausaMDaana samstaana paunao BaartaIya iva&aana isaxaa EvaM AnausaMDaana samstaana paunao INDIAN INSTITUTE OF SCIENCE EDUCATION AND RESEARCH PUNE Dr. Homi Bhabha Road, Pune : 411 008 Date: December 21, 2015 TENDER FOR TRANSPORT SERVICES

More information

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE Objections/ comments invited from various stakeholders on ARR filing and Tariff Petition of Hydro Electric Stations, Gas Turbine

More information

Ayeyarwady Integrated River basin Management Project (AIRBM)

Ayeyarwady Integrated River basin Management Project (AIRBM) Public Disclosure Authorized Public Disclosure Authorized I. GENERAL Ayeyarwady Integrated River basin Management Project (AIRBM) Procurement Plan 1. Project information a. Country/Borrower: Myanmar b.

More information

Before the. Case No. 106 of 2009

Before the. Case No. 106 of 2009 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

Palabora Copper REQUEST FOR PROPOSAL SUPPLY AND DELIVERY OF BEARINGS AND ACCESSORIES RFP.PC.2017/18 PART 1 PROPOSAL INFORMATION AND CONDITIONS

Palabora Copper REQUEST FOR PROPOSAL SUPPLY AND DELIVERY OF BEARINGS AND ACCESSORIES RFP.PC.2017/18 PART 1 PROPOSAL INFORMATION AND CONDITIONS Palabora Copper REQUEST FOR PROPOSAL SUPPLY AND DELIVERY OF BEARINGS AND ACCESSORIES RFP.PC.2017/18 PART 1 PROPOSAL INFORMATION AND CONDITIONS THIS CONTRACTS IS FOR BIDDERS THAT ARE MORE THAN 26% BLACK

More information

FORTISBC INC. PRUDENCY REVIEW KETTLE VALLEY SUBSTATION EXHIBIT A2 5

FORTISBC INC. PRUDENCY REVIEW KETTLE VALLEY SUBSTATION EXHIBIT A2 5 ALANNA GILLIS ACTING COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660 4700 BC TOLL

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATIONS FOR SELECTIVE LEVEL METER GETCO/E/TS- PACC SLM 03504/R0, Dt: 2.04.2008 Page

More information

In-House Paper on the implementation of Single Part Tariff in Power Distribution

In-House Paper on the implementation of Single Part Tariff in Power Distribution December 9, 2016 In-House Paper on the implementation of Single Part Tariff in Power Distribution Background: Tariff Introduction: Tariff is the price Structure at which electricity is sold to the consumers.

More information

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007.

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007. Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007. No Date of Exemption To whom Exemption was granted Clause to which Exemption has been granted Concise

More information

BOXING FEDERATION OF INDIA

BOXING FEDERATION OF INDIA BOXING FEDERATION OF INDIA REQUEST FOR PROPOSAL (RFP) FOR HIRING DIESEL GENERATOR (DG) SETS HOSTING AIBA WOMEN S WORLD BOXING CHAMPIONSHIP, DELHI, 2018 DATE OF ISSUE: October 15, 2018 LAST DATE & TIME

More information

2681-IND: Bihar Power System Improvement Project

2681-IND: Bihar Power System Improvement Project Invitation for Bids (Please refer to Corrigendum 1 IFB, published on 20 October 2015) Date: 22 September 2015 Loan No. and Title: 2681-IND: Bihar Power System Improvement Project Contract Nos. Deadline

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007 KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No.1/1/KSERC-2006/ Dated, Thiruvananthapuram 6 th August,2007 KSERC (Supply of Power from Captive Generating Plants to Distribution Licensees)

More information

TECHNICAL SPECIFICATIONS FOR 11KV AIR BREAK (A.B.) SWITCHES :

TECHNICAL SPECIFICATIONS FOR 11KV AIR BREAK (A.B.) SWITCHES : TECHNICAL SPECIFICATIONS FOR 11KV AIR BREAK (A.B.) SWITCHES : 1. SCOPE : This specification covers design, manufacturing, testing at manufacturer s works, inspection, packing & delivery of 11 KV Air Break

More information

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010 FINAL FACILITY STUDY 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1 September 10, 2010 I. Introduction This is a revised facility study performed for Transmission Queue Request 2009

More information

INVITATION FOR QUOTATION. TEQIP-II/2015/GJ1G02/Shopping/M-EE-09

INVITATION FOR QUOTATION. TEQIP-II/2015/GJ1G02/Shopping/M-EE-09 INVITATION FOR QUOTATION TEQIP-II/2015/GJ1G02/Shopping/M-EE-09 02-Dec-2015 Sub: Invitation for Quotations for supply of Goods Dear Sir, 1. You are invited to submit your most competitive quotation for

More information

BIDDERS SHOULD SUBMIT THE DOWNLOADED DOCUMENTS, DULY FILLED, STAMPED AND SIGNED, AS PER THE INSTRUCTIONS GIVEN HEREUNDER.

BIDDERS SHOULD SUBMIT THE DOWNLOADED DOCUMENTS, DULY FILLED, STAMPED AND SIGNED, AS PER THE INSTRUCTIONS GIVEN HEREUNDER. Taluka: Thasra Dist : Kheda Pin: 388 239 Telephone No. 02699-235 522 Fax No. 02699-235 607 CHIEF ENGINEER (C&O), GSECL,, INVITES TENDERS FROM INTERESTED BIDDERS, FOR SUPPLY OF ABOVE MATERIAL. THE DETAILS

More information

LATEST DEVELOPMENTS IN NEPAL POWER SECTOR INCLUDING THE STATUS OF D-M 400 KV CBTL

LATEST DEVELOPMENTS IN NEPAL POWER SECTOR INCLUDING THE STATUS OF D-M 400 KV CBTL Third Meeting of Taskforce 2, February 25-26, 2015; Colombo, Sri Lanka LATEST DEVELOPMENTS IN NEPAL POWER SECTOR INCLUDING THE STATUS OF D-M 400 KV CBTL Surendra Rajbhandari Chief, Project Management Directorate,

More information

I N V O I C E S U M M A R Y

I N V O I C E S U M M A R Y I N V O I C E S U M M A R Y Send To: Chief Engineer Copy To: New Power House Industrial area phase I Near Transport Chowk, Chandigarh 160001 (On behalf of Aravali Power Company Pvt. Ltd.) Beneficiary:

More information

May 2017 Pei Sue Ong, Capital Accounting Advice Manager Pacific Gas and Electric Company

May 2017 Pei Sue Ong, Capital Accounting Advice Manager Pacific Gas and Electric Company Accounting for New Technologies Storage Batteries May 2017 Pei Sue Ong, Capital Accounting Advice Manager Pacific Gas and Electric Company 1 Agenda 1. Storage Battery Technologies 2. PG&E Owned Storage

More information

HVDC Systems in India

HVDC Systems in India HVDC Systems in India Outline Introduction HVDC Systems presently in operation Main Data/Salient Features Upcoming Projects Future Challenges Transmission Network - Present 765kV/400kV lines: about 1,03,000

More information

Tender Document for. NAME OF THE SUPPLIER / MANUFACTURER: NREDCAP Registration No: /

Tender Document for. NAME OF THE SUPPLIER / MANUFACTURER: NREDCAP Registration No: / Tender Document for Supply of around 50,000 Nos of Solar Lanterns to the P.O, ITDA's of West Godavari, East Godavari, Visakhapatnam, Vizianagaram and Srikakulam Districts for distribution to all S.T students

More information

ii) PC based works station with monitor and printer having below mentioned specifications:

ii) PC based works station with monitor and printer having below mentioned specifications: GAS CHROMATOGRAPH ANNEXURE-A Gas with TCD,FID & Methanizer as below for NFL Bhatinda, Panipat & Nangal Unit (one each): i)gas customized & factory fitted capable of concurrent (parallel) operations of

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT ENQUIRY NOTICE INVITING TENDER Phone:

More information

Department : COIMBATORE LPG Plant Department officer : PL.KANNAN. System ID : 11 Tender Reference No. :

Department : COIMBATORE LPG Plant Department officer : PL.KANNAN. System ID : 11 Tender Reference No. : Domain : Parent department: bpcleproc.in BPCL Tender Document Department : COIMBATORE LPG Plant Department officer : PL.KANNAN System ID : 11 Tender Reference : 1000227459 Tender Title : HOT REPAIR OF

More information

CORRIGENDUM/ ADDENDUM 09 ADDITIONAL REQUIREMENT OF ELEVATOR.

CORRIGENDUM/ ADDENDUM 09 ADDITIONAL REQUIREMENT OF ELEVATOR. AMENDMENT-02 TO TECHNICAL SPECIFICATION FOR ELEVATOR (SPEC NO. PE-TS-408-502-A001) 1x800 MW WANAKBORI STPP. CORRIGENDUM/ ADDENDUM 09 ADDITIONAL REQUIREMENT OF ELEVATOR. CL. NO. 2.0 Scope of equipment supply

More information

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized General. Project information Country: Borrower: Loan number: Project Implementation Agency

More information

TENDER DOCUMENT FOR SUPPLY & INSTALLATION OF SPORTS & GYMNASIUM EQUIPMENTS

TENDER DOCUMENT FOR SUPPLY & INSTALLATION OF SPORTS & GYMNASIUM EQUIPMENTS TENDER DOCUMENT FOR SUPPLY & INSTALLATION OF SPORTS & GYMNASIUM EQUIPMENTS DIRECTORATE OF PHYSICAL EDUCATION & SPORTS UNIVERSITY OF KASHMIR HAZRATBAL, SRINAGAR, J&k-190006 Cost of tender document: Rs.500/-

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

TECHNICAL SPECIFICATION FOR SUPPLY OF LT DISTRIBUTION KIOSK FOR 250/315 KVA & 63/100 KVA RATING DISTRIBUTION TRANSFORMERS AGAINST TN-2077

TECHNICAL SPECIFICATION FOR SUPPLY OF LT DISTRIBUTION KIOSK FOR 250/315 KVA & 63/100 KVA RATING DISTRIBUTION TRANSFORMERS AGAINST TN-2077 spec- 200 Amp. & 400 Amp. LT Dist. Kiosk.doc - 1 - SCHEDULE-III TECHNICAL SPECIFICATION FOR SUPPLY OF LT DISTRIBUTION KIOSK FOR 250/315 KVA & 63/100 KVA RATING DISTRIBUTION TRANSFORMERS AGAINST TN-2077

More information

University of Peradeniya INVITATION FOR BIDS

University of Peradeniya INVITATION FOR BIDS University of Peradeniya INVITATION FOR BIDS 1) The Chairman of University Procurement Committee, invites sealed bids from authorized local lessors to procure following vehicles through operational lease

More information

APPENDIX C FACILITY ILLUSTRATION

APPENDIX C FACILITY ILLUSTRATION APPENDIX C FACILITY ILLUSTRATION 21m 21m 21m 0m 5.4m 3.5m access road (allow for water management on sides) Future Expansion 20m 24.5m 61m 49m 69m 20m Future Expansion 5m 100m 4.3m 9m 100m Space for MV

More information

TENDER. Enq. No. IIITMK/ 0648/18 Date: 07/09/18 Due on:17/09/20183pm

TENDER. Enq. No. IIITMK/ 0648/18 Date: 07/09/18 Due on:17/09/20183pm TENDER Enq. No. IIITMK/ 0648/18 Date: 07/09/18 Due on:17/09/20183pm On behalf of INDIAN INSTITUTE OF INFORMATION TECHNOLOGY & MANAGEMENT KERALA (IIITMK), the Registrar invites offers for supply and laying

More information

CUSTOMER/ TWIN ARROWS PROJECT

CUSTOMER/ TWIN ARROWS PROJECT A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset

More information

INVITATION FOR TENDER FOR SUPPLY OF SOLAR PV SYSTEMS

INVITATION FOR TENDER FOR SUPPLY OF SOLAR PV SYSTEMS INVITATION FOR TENDER FOR SUPPLY OF SOLAR PV SYSTEMS Sealed tender offers are invited in two separate sealed covers (Technical and Commercial offers) from eligible manufacturers/suppliers or their direct

More information

Engineers Ireland Site Visit 23 rd March 2010

Engineers Ireland Site Visit 23 rd March 2010 Whitegate Independent Power Plant CER Site Visit 24 th October 2008 CER Site Visit 24 th October 2008nt Engineers Ireland Site Visit 23 rd March 2010 Agenda Presentation of project and progress to date.

More information

Solar Energy Corporation of India New Delhi-17

Solar Energy Corporation of India New Delhi-17 Solar Energy Corporation of India New Delhi-7 : SECI/Cont./SRT-IV-P/7/0/ Date: 6-07-0 Subject: tification of L bidders of different States in Part-A and for price matching by L, L,L.and so on..0 The Request

More information

High Commission of India Colombo CORRIGENDUM

High Commission of India Colombo CORRIGENDUM High Commission of India Colombo CORRIGENDUM Reference Tender. COL/COM/228/8/2011-Vhc dated 26 October 2016 for Supply and Delivery of Vehicles for the Faculties of Engineering and Agriculture, University

More information

Total Ex. Tax/VAT. (Rs.) (if any) in Rs. (Bought out/direct) length 587M 226M

Total Ex. Tax/VAT. (Rs.) (if any) in Rs. (Bought out/direct) length 587M 226M ORISSA POWER TRANSMISSION CORPORATION LIMITED Supply & Laying of 132 KV XLPE Double Circuit (4 cable per Circuit including one spare) underground 1000 Sq. mm annealed Copper XLPE EHV Cable with Associated

More information

Queries received on. Page No. / Clause No. Queries / Modifications / Changes Suggested. S. No. Technical Specifications as per RFP

Queries received on. Page No. / Clause No. Queries / Modifications / Changes Suggested. S. No. Technical Specifications as per RFP Pre-Bid Queries for NIT Supply of 13179 Nos. of 300Wp Solar Home Power Packs and 4184 Nos. of 40Wp Solar Street Lights including 5 years comprehensive guarantee for Electrification of 895 Nos. of Off-Grid

More information

Algebra II Pacing Guide

Algebra II Pacing Guide Unit 13: Exploring a Business Venture (10 days) 8 May 13 - May 24 n/a MISD Pacing Guide Date Range Unit 01: Introduction to Functions in 15 Aug. 21 - Sept. 11 Sept. 12 Unit 02: Absolute Value Functions,,

More information

PUD ELECTRIC SYSTEM INTERCONNECTION

PUD ELECTRIC SYSTEM INTERCONNECTION APPENDIX A PROCEDURES & REQUIREMENTS for OKANOGAN PUD ELECTRIC SYSTEM INTERCONNECTION Version 4.0 December 2011 Version 4.0 12/28/2011 Page 1 of 15 TABLE OF CONTENTS DEFINITIONS 1.0 Introduction 2.0 Procedures

More information

4 64c hit. Wm % 41/7/4$1 The undersigned has the honour to r epor t. Mr. Mr. Approved and ordered this 18th day of August, A.D

4 64c hit. Wm % 41/7/4$1 The undersigned has the honour to r epor t. Mr. Mr. Approved and ordered this 18th day of August, A.D 1917. Approved and ordered this 18th day of August, A.D. 19 58. At the Executive Council Chamber, Victoria, enatu-governor. PRESENT: t i The Honourable W. Bennett Mr. Chant Mr. Peterson Mr. Westwood Mr.

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION COST DATA BOOK FOR RECOVERY OF EXPENSES & OTHER CHARGES FROM PROSPECTIVE CONSUMERS FOR TAKING ELECTRIC SUPPLY (APPLICABLE TO ALL DISTRIBUTION LICENSEES IN

More information

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008 Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008 2 Table of Contents Administrative Data...3 Network Performance...3 Reliability Measures

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED Procurement Authorization Amendment Purchase 285 Forty Foot Low Floor Clean Diesel City Buses Date: November 30, 2016 To: From: TTC Board Chief Executive Officer Summary This

More information

TOTAL PROPOSED CONTRACT PRICE Ring Power Corporation $4,875,951

TOTAL PROPOSED CONTRACT PRICE Ring Power Corporation $4,875,951 TAMPA WATER Supplying Water To The Region DATE: December 4, 2007 TO: FROM: SUBJECT: J err y L. Maxwell, General Manager AGENDA ITEM l-2b Donald J. Polmann, Director of Science and Engineering System Configuration

More information

NIT No. DEERS/SSDI-JK/05 of 2018 Dated 29/08/2018 E-Tender id No: 2018_FD_ 60565

NIT No. DEERS/SSDI-JK/05 of 2018 Dated 29/08/2018 E-Tender id No: 2018_FD_ 60565 1 Phone/Fax: 0194-2494585 Government of Jammu & Kashmir, Department of Environment and Remote Sensing, SDA Housing Colony, Bemina, Srinagar, Kashmir-190018 Website: www.jkdears.com Email:dirjkers@gmail.com

More information

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G.Road, Bangalore-560 001 Present: Shri M.R. Sreenivasa Murthy Chairman Shri H. D. Arun Kumar Shri D.B. Manival

More information

Section VI: List of Requirements (REVISED)

Section VI: List of Requirements (REVISED) As per Technical Specifications attached in Section VII Date: 18/06/2018 of Electrical Items With reference to the above tender, the following Corrigendum may kindly be noted against the Section VI, Section

More information

Units of Instruction MISD Pacing Guide Days Date Range Test Date

Units of Instruction MISD Pacing Guide Days Date Range Test Date MISD Pacing Guide Date Range Test Date Introduction: Processes of Investigations (1 day) Aug. 21 Unit 01: Matter (12 days) Aug. 22-Sept. 7 Sep. 10 Unit 02: Atomic Structure and the Periodic Table (15 days)

More information

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 16 AASHAADHA, 1937(S) (NO.PATNA 737) PATNA, TUESDAY, 7 TH JULY 2015 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION

More information

TECHNICAL SPECIFICATION FOR 11 KV AIR BREAK (A.B.) SWITCHES:

TECHNICAL SPECIFICATION FOR 11 KV AIR BREAK (A.B.) SWITCHES: TECHNICAL SPECIFICATION FOR 11 KV AIR BREAK (A.B.) SWITCHES: 1. SCOPE : This specification covers design, manufacturing, testing at manufacturer s works, inspection, packing & delivery of 11 KV Air Break

More information

SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL

SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL Submitted By: FIRSTGREEN CONSULTING PVT LTD MA, 74, DLF Phase III Gurgaon 122002 info@firstgreen.co

More information