1 MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR Phone website: Fax vkbz,l vks : ISO: No.07-05/SG-9B-II/1234 Jabalpur, dated 01/04/2014 To As per distribution list Sub: Minutes of 38 th meeting of Operation and Coordination Committee of MP. The Minutes of 38 th meeting of the Operation and Coordination Committee of MP held on 25 th February 2014 at AM at SLDC, MPPTCL, Jabalpur has been uploaded on the website of SLDC and can be downloaded. Encl : As above. ( K.K.Prabhakar) Member Secretary, OCC S. E. (LD), SLDC MPPTCL, Jabalpur

2 Distribution List The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No , The Chief Engineer (Plg & PS), MP Power Transmission Co. Limited, Jabalpur Fax No The Executive Director (O&M:Gen.), MP Power Generating Co. Limited, Jabalpur. Fax No The General Manager (PM), MP Power Management Company, Jabalpur. Fax No The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore Fax No Shri Rajiv Keskar, E. A. to Chairman MPPMCL, Energy Department, Vallabh Bhawan, Bhopal. Fax No The Sr. Vice President Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina Distt- Sagar Fax No The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur Fax no / The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore Fax No The Chief Engineer (Procurement), MP Power Transmission Co. Limited, Jabalpur Fax No The Chief Engineer (O&M:Hydel), MP Power Generating Co. Limited, Jabalpur. Fax No The Superintending Engineer (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co. Limited, Jabalpur. Fax No The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal Fax No The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) Fax No The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal Fax No The Vice President Welspun Solar MP Pvt.Ltd. C-11, Sector-65, Noida Noida (UP) Fax no

3 MINUTES OF 38 TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 25 TH FEBRUARY 2014 AT AM AT SLDC, MPPTCL, JABALPUR 38th meeting of Operation & Co-ordination Committee of MP was held on 25 TH February 2014 at State Load Despatch Centre, MPPTCL, Jabalpur. The list of participants is enclosed at Ann Shri P.A.R. Bende, Chairman, OCC welcomed all the participants attending 38 th Operation and Coordination Committee Meeting. He informed that Deviation Settlement Mechanism is implemented w.e.f in place of UI mechanism and hoped that all the intra state entities may have seen the commercial as well as operational effect of implementation of new deviation settlement Mechanism. He informed the committee that SLDC has taken all out efforts to avoid violation at state periphery but there is a sustained violation at Discom level during last one week, as Discoms do not exercise real time schedule are not interested to revise its schedule in real time. He also informed the committee members that Hon ble CERC has notified the revised tariff regulation to be effective from and requested that all the entities should go through the above tariff regulation. He further stated that as per limits on deviation volume specified in the regulation it is utmost necessary that adequate attention is paid by Discom in accurate load forecasting. The WRPC has decided to create a task force for development of a software for load forecasting. He further requested all the DISCOMs to nominate one officer for load forecasting as intimated by SLDC. He informed the committee that as per IEGC clause (g), SLDC has devised message formats in order to give directions in case of contingencies and/or threat to the system security. Thereafter, Chairman, OCC requested Shri R.A. Sharma, Member Secretary (OCC) to take up the agenda items for discussion. ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 37 h meeting of Operation & coordination committee of MP held on 21 st December 2013 at Hotel Kalchuri, Near Railway Station, Jabalpur were forwarded to the committee members vide No /SG-9B-II/176 dated No comments have been received from the members. The minutes of the 37 th meeting of Operation & coordination committee of MP have been confirmed by the Committee. ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS December 2013 TO January Frequency Particulars : Member Secretary Stated during January 2014 the system frequency was below 49.7 Hz for 0.62% of time against 1.93% of time during December The system frequency was within the IEGC range of Hz for % of the time during January 2014 against % of time during December The average monthly frequency was Hz during January 2014 whereas it was Hz in the month of December Regarding operation in high frequency range, frequency during the month of January 2014 was above Hz for 9.46% of time against 9.56% of time during December The system frequency did not touch 49.2 Hz during the above period. The detailed frequency particulars for the month of December 2013 and January 2014 are enclosed at Annexure-2.1. The brief details of frequency profile is given here under : Minutes of 38th OCC of MP 1

4 Month Average frequency minimum integrated frequency over an hour maximum integrated frequency over an hour Instantaneous minimum frequency Instantaneous maximum frequency December Hz Hz Hz Hz Hz January Hz Hz Hz Hz Hz 2.2 Operational Matters Operational Discipline : Member Secretary stated that system operated in terms of frequency profile for the months December 2013 and January 2014 is as given below for discussion by the committee : Month % of time Frequency Below 49.7 Hz % of time Frequency above Hz % of time frequency within the permissible range of Hz Average monthly frequency No. of times frequency dipped below 49.2 Hz December % 9.56% 88.51% Hz 0 January % 9.46% 89.92% Hz Messages for drawal curtailment : Member Secretary stated that the total number of messages of significant violation of IEGC by the DISCOMs by overdrawing at frequency below 49.7 Hz is as given hereunder: MONTH East Discom Central Discom West Discom Total December January Voltage Profile : Member Secretary stated that date wise voltage profile at some of the important 400 KV and 220 KV substations during the months December 2013 and January 2014 is enclosed at Annexure During the months December 2013 and January 2014, the deviation of voltage from the accepted limit on either side was recorded at following important 765/400 KV s/s in MP Grid. December 2013 January 2014 Sr No Name of 400 KV Substation Max. Voltage observed Voltage Date Min. Voltage observed Volt age Max. Voltage observed Min. Voltage observed Date Voltage Date Voltage Date 1 Indore Itarsi Bina Gwalior Nagda Khandwa Satpura Birsingpur ISP Bina 765kv Gwalior Minutes of 38th OCC of MP 2

5 KV Status of Capacitor Banks in sub-transmission system : Member Secretary stated that the updated information of the status of capacitor banks in sub-transmission system as on 31 st January 2014 as submitted by DISCOMs is detailed below : DISCOM Capacitor bank installed in good condition (No) Capacitor bank installed but defective & are repairable (No) Require ment of repair against each unit (No) Requirement against nonrepairable capacitor banks Provision of capacitor banks to be installed during various scheme Balance capacitor banks to be covered in other schemes 600 KVAR 1200 KVAR WZ CZ EZ KVA R KVA KVAR KVAR R No of 100 KVAR Units required KVAR KVAR KVAR KVAR KVAR KVAR KVAR Member Secretary stated that there is no change in the status of capacitor bank in East and West Discom. Chairman, OCC requested all the DISCOMs in next meeting DISCOMs should furnished the status of capacitor banks as on along with the proposed programmed for installing the new capacitor banks and plan for replacement of defective capacitor banks during the next year DISCOMs have also furnished the updated additional information as detailed below.: Figures are in MVAR SN Particularas WZ CZ EZ 1 MVAR capacity of connected capacitors in good condition MVAR capacity of connected capacitors in partially good condition MVAR capacity of connected capacitors in good condition including partially good condition MVAR capacity of connected capacitors covered under ADV T-V Scheme Nil 5 Grand total MVAR of capacitors including that are proposed in ADB T-V scheme Status of Shunt Capacitor Banks installed at various EHV Transmission Substation : Member Secretary stated that the updated information of the status of Installed capacitor banks(in MVAR) in EHV transmission system as on 31 st January 2014 as submitted by MPPTCL is given below : Voltage Class Capacitor bank installed in good condition (No/Mvar) Capacitor bank installed but defective & are Requireme nt of repair against Requirement against nonrepairable Capacitor banks already Balance capacitor banks to be Minutes of 38th OCC of MP 3

6 2.3.4 Status of completion of on going Transmission Schemes being executed by MPPTCL : Member Secretary stated that the various ongoing Transmission Schemes for the current financial year i.e. Year and latest status of completion of various ongoing Transmission Schemes for the current financial year i.e. Year upto as submitted by MPPTCL is enclosed as annexure 2.3.4(i) and 2.3.4(ii). Chairman OCC requested MPPTCL to submit the information of ongoing transmission Schemes for the year before next OCC meeting. Member Secretary, OCC stated that status of target date of completion should be updated and requested to review the same & revised details may be submitted to SLDC at the earliest, so that the same could be updated in the OCC meeting of WRPC U/F and df/dt Relay Operation repairable (No/Mvar) each unit (No/Mvar) capacitor banks covered under ADB T-V 220 KV 2 No / 62 MVAR All in Service KV 36 Nos / MVAR KV 366 Nos / 3319 MVAR Total 404 nos / MVAR covered in other schemes (i) U/F and df/dt Relay Operation: Member Secretary stated that Frequency did not touch Hz or below during December 2013 to January (ii) Defective u/f, df/dt relays: Member Secretary stated that MPPTCL has informed that there are no defective u/f and df/dt relays. 2.5 Power Cuts / Load restrictions/differential Load Shedding by DISCOMS & group allocation to 33 KV feeders : (i) (ii) Member Secretary stated that details of DISCOM wise Power supply given to various domestic categories during the period December 2013 and January 2014 is enclosed at Annexure 2.5(i). Chairman OCC informed to DISCOMS that during under drawl at high frequency, the supply to agriculture sector should be given to avoid additional charges at frequency above Hz. Group Allocation to Newly Commissioned existing EHV substations :- Member Secretary stated that as per information submitted by CE (Plng. & Design), the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.5 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below : SN DISCOM Region No of 33 KV feeders for which groups to be allocated 01 Jabalpur Sagar 00 EAST 03 Rewa Total Indore 02 WEST 06 Ujjain 06 Minutes of 38th OCC of MP 4

7 07 Total Bhopal CENTRAL Gwalior Total 02 TOTAL Grand Total 16 Discoms are requested to furnish the details as per list enclosed at annexure-2.5(ii) ITEM NO. 3 : OPERATIONAL PLANNNING 3.1 Generating Units under planned outage and proposed maintenance programme : Member Secretary stated that there is no planned outages of MPPGCL thermal units during January 14 to March Proposed shutdown programme of Transmission lines / Transformers : Member Secretary stated that the proposed shutdown of transmission elements for the period to submitted by MPPTCL is given at Annexure 3.2. However T&C has not furnished the compiled data of proposed shutdown for onward transmission to WRPC for OCC meeting as decided in 26 th OCC meeting. T&C section is requested to furnish the compiled proposed shutdown programmed of T&C and EHT The Member Secretary stated the compiled information OF EHT and T&C Division for OCC of WR is not being submitted as the office of CE(T&C), MPPTCL as decided in the 26 th OCC of MP. Representative from T&C has assured to submit the same to SLDC from next month Long Outages of transmission elements and protections : Member Secretary stated that the transmission elements as detailed below are under long outages : S N Line/Transformer/Br eaker/ Reactor etc under long outage 1 63MVAR Bus-I Reactor at Satpura TPS 2 Bus bar Differential protection scheme at Amarkantak TPS KV Bus bar protection scheme at SGTPS Birsinghpur KV Bus bar differential protection at TONS HPS Outage date Reason Response from Utility Damage of all three limbs along with reactor tank Since installation Since commissioning of 220 KV switch yard Since commissioning Not commissioned The scheme not available Not mentioned Installation and Commissioning in bay no.17 is under progress. For work contract estimate approval and tendering in process. Expected by May 14 Offer received. Case file under process for placement of order. However the same is also included in R&U scheme of WRPC One offer is received. Case file under process for placement of order. However the same is also included in R&U scheme of WRPC.. New scheme with digital relays is required to be procured & commission. Case is under progress. However the same is also included in R&U scheme of Minutes of 38th OCC of MP 5

8 7 400 KV main breaker of Birsingpur-Katni-I at Katni End 8 132/33KV 20 MVA transformer at 132 KV S/s Gadarwara WRPC Not available Spares received at site and same be available by the end of February The transformer was charged on The utilities may submit the latest status. ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF December 2013 and January 2014 : Member Secretary stated that the details of actual generation, Schedule from Central Sector demand etc. are given in the following Annexures: Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL& NHDC Hydel Units. Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs. ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING DECEMBER 2013 AND JANUARY 2014 : Member Secretary stated that the Grid Disturbances and Grid Incidents in MP during December 2013 and January 2014 are given in Annexure 5.0. ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES 6.1 Method for Best fit Schedule of RBPH Machines at SSP : Member Secretary stated that each beneficiary state of SSP are having different demand/load pattern and thus they want RBPH machines to be scheduled as to meet their power requirement during different hours of the day. The matter was discussed in the 50 th, 51 st and 52 nd meeting of PSC of NCA..RBPH machines are presently scheduled as per guidelines agreed in the 46 th meeting of PSC of NCA. Taking into account the decision taken in the 50 th meeting of PSC of NCA, a method for best fit schedule of RBPH machines of SSP was prepared by NCA and same was discussed in the 51 st PSC meeting of NCA. This procedure intends to accommodate the requirement of beneficiary states during different part of the day as per their entitlement of power given in the NWDT Award. In the 53 rd PSC meeting it was decided that the best schedule as per prepared by NCA shall be implemented from 20 th December 2013 after obtaining consent by the respective authorities of Government of MP, Maharashtra and Gujrat. Member Secretary, OCCM informed that it was decided in 25 th WRPC meeting that best fit schedule of RBPH shall be implemented wef However WRLDC has not started scheduling power of SSP as per best fit schedule submitted by NCA. The matter has been taken with WRLDC and NCA. 6.2 Change of CT ratio of all feeders at Omkareshwar Hydel Power Station : Member Secretary stated that in the last meeting MPPTCL representative informed the committee that a letter has been received from CEA in which request has been made for submission of following information/drawings to examine adequacy of 800/1 Amp CTs in 220 KV feeders and advise accordingly : 1. Single line diagram of the switch yard indicating rating of generator transformers. 2. Maximum power flow expected in worst contingency condition. 3. (a) Short circuit level adopted for the yard equipment; (b) Maximum Fault current for the 220 KV feeder Minutes of 38th OCC of MP 6

9 4. Technical parameters of 500/a A and 800/a A CTs along with information of tappings. 5. Design calculation for 500/1 A CT for 220 KV switch yard by NHDC The copy of CEA letter dtd was handed over to Omkareshwar representative in the meeting. NHDC is requested to furnish the latest status of the same in the meeting. The representative from Omkareshwar informed that the information required by CEA has been brought by them and shall be submitted to MPPTCL. Chairman OCC requested MPPTCL to look up the matter and informed accordingly to CEA, New Delhi. 6.3 Bus Bar Protection Scheme :- Member Secretary stated that it has been noticed that bus bar protection scheme is not in place at some of the EHV sub stations / Generating stations. Action is to be taken by respective utilities for upgradation of protection system and bus bar protection system should be kept in service all the time and problem if any should be rectified on priority. The implementation of Bus-Bar protection at all the 220 KV /400 KV substation has been raised at various forums at regional level. The WRLDC and WRPC are continuously insisting for early implementation of Bus-Bar Protection. In the last OCC meetings of MP, the entities of state grid are requested to submit the details of substation /power stations where the bus bar protection is in service and schedule for installation and commissioning of bus-bar protection scheme at remaining substations/ power stations. However the information is not furnished by any entity. The State Entities are requested to submit the details of busbar protection scheme in the following format in the meeting. The matter was discussed in the meeting and Member Secretary informed the committee members that the details of availability of Bus Bar Protection scheme at different power stations and substation was discussed in last 2-3 OCC meetings of MP but the information is not been submitted by any entities of the state. He further informed that SLDC prepared a format as mentioned above and requested all the entities to submit the information to SLDC at the earliest. 6.4 Synchronisation of SR Grid with NEW Grid :- Member Secretary stated that a very important National event in the Indian Power Sector development took place on 31st December 2013 at 20:25 hrs, when the Southern Regional grid was synchronized with the N-E-W Grid by charging the 765 kv Raichur-Sholapur-I line. With this the entire power system of the country operated synchronously as One All-India Grid. The momentous event was preceded by a number of activities and action plans formulated by CEA and MOP. NLDC accordingly had suggested Minutes of 38th OCC of MP 7

10 certain SPSs, referred to as NLDC SPS, to take care of contingencies that might take place in the All India grid. WR constituents actively participated in the same, and they are discussed in the following items of the agenda notes 6.5 RGMO status of generating units in WR :- Member Secretary stated that in the 455 th & 456 th OCC meeting of WR, WRLDC pointed out that all the eligible units are not participating in RGMO/FGMO. Further units that are participating in RGMO/FGMO give very less relief. Some units give negative relief. Primary response from eligible generating is a prerequisite for frequency control and it is mandated as per IEGC. MPPGCL is requested to submit the latest status of implementation of RGMO in their reaming thermal and hydel units. The chairman OCC informed that as per amended IEGC all the entities have to revise their governor settings and inform to SLDC. He further requested MPPGCL to take up necessary action to install the RGMO in remaining units and submit the plan to SLDC. 6.6 SENDING DISTURBANCE RECORDER(DR)/SEQUENTIAL EVENT LOGGER (SERS) OUTPUT TO WRLDC: Member Secretary stated that with Reference to section 5.9.6(c) of the IEGC and section the Operating Procedure of WR-2013, the DR/SER details for all grid incidents/disturbances need to be sent by the concerned agency to RLDC, within 24 hrs of the incident. It is observed that in many grid incidents/disturbances DR s and SERs output s not being submitted to SLDC even with the final report submitted by the entities to SLDC. All the entities are requested to submit the DRs and SERs output within 24 hrs of the incident to SLDC along with the detailed tripping report in the prescribed format so that the compiled information could be furnished to RLDC. Member Secretary, OCC state that the matter was discussed in several OCC meeting of MP, but even that the information is not being received from the entities with the tripping reports. He requested all the entities to submit the same along with the tripping report without fail. 6.7 IMPLEMENTATION OF AUTOMATIC DEMAND MANAGEMENT SYSTEM : Member Secretary stated that Hon ble CERC in the Suo Motu Petition No. 208/SM/2011 in the matter of implementation of Automatic Demand Management Schemes have issued an order on and point No. 37 of this order is reproduced as under; Quote 37. We had directed in our order dated to all SLDCs to file the current status of the Automatic Load Management Scheme, reasons for not implementing the scheme and status of contingency procedures. None of the respondents, except DTL, has complied with our directions. We are of the view that these respondents have not only failed to comply with our directions but have also failed to discharge their responsibility under the Act and the Grid Code. We direct the staff of the Commission to process the case for initiation of action under Section 142 of the Act against the officers in-charge of STUs/SLDCs of the respondents States issuing show cause notice as to why penalty should not be imposed on them for noncompliance with our directions and the provisions of the Act and the Grid Code. Unquote. Minutes of 38th OCC of MP 8

11 In compliance of the directives of energy department issued vide Dy. Secretary (energy Department) Letter no. 164/2013/13 dtd a meeting was organized by MPPTCL on in the conference hall of the Director (Tech), MPPTCL, Jabalpur to discuss the integration of demand management schemes of Discoms with Transmission SCADA System. The matter was discussed in detail and finally it was decided that the SLDC shall provide the logics for Automatic demand management scheme to MPPTC. Accordingly SLDC prepared the logics for ADMS and forward to all DISCOMS and MPPMCL for their comments. A special meeting was also held on at SLDC to discuss issue of Automatic Demand Management Scheme and other regulations. The logics for ADMS prepared by SLDC were discussed in detail and based on the discussions the logics for ADMS have been finalized and forwarded to all Discoms/MPPMC/MPPTCL for their comments if any. The logics so prepared have been submitted to CE(Planning and Design), MPPTCL for taking up the matter with SCADA vendor. The copy of logics prepared by SLDC is enclosed as Annexure 6.7. The matte was discussed in the meeting. MPPTCL representative informed that the proposal as received from SCADA Vendor has already been submitted to SLDC. Chairman, OCC requested MPPTCL to organize a meeting with SCADA Vendor to discuss the issue. MPPTCL inform that they shall communicate the date of meeting after confirmation from SCADA vendor. 6.8 LOAD FORECASTING : Member Secretary stated that as per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs, SEB, distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations. Therefore it is imperative that adequate attention may be paid towards load forecasting. The matter was discussed in the 455th OCC as well as in the 25 th TCC/WRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting. SLDC has already intimated to all the DISCOMs vide letter no /RPC-55/710 dtd to furnished the name of the task force member from each DISCOMs who should not be below the rank of SE. The DISCOMs are requested to nominate one officer in the task force, not below the rank of superintending Engineer. ITEM NO 6.9 :COMPLIANCE OF IEGC. Member Secretary stated that Hon ble CERC vide notification No.L-1/18/2010-CERC dated the Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Second Amendment) Regulations, 2014 and come into force with effect from n The important amendments to be complied regularly by the State utilities are given below :- (i) Compliance to IEGC clause (g) w.e.f : The amended IEGC (g) is as under : Quote RLDCs shall devise standard instantaneous message formats in order to give directions in case of contingencies and/or threat to the system security to reduce deviation from schedule by the bulk consumer, SLDC/State Utility/ ISGS/Regional Entity/Injecting Utility at different overdrawal/under drawal/over-injection/under-injection conditions depending upon the severity. The concerned Minutes of 38th OCC of MP 9

12 SLDC/other regional entity shall ensure immediate compliance with these directions of RLDC and send a compliance report to the concerned RLDC." Unquote Accordingly WRLDC/ SLDC has prepared message formats in order to give directions in case of contingencies and/or threat to the system security to reduce deviation from schedule by the bulk consumer. The message formats for intra state entities is attached as Annexure 6.11(i) Member Secretary also requested the state utilities to send compliance report of action taken on receipt of message /instructions from SLDC/WRLDC. ii) Compliance to IEGC Clause 5.5 on Periodic Reports : Member Secretary stated that as per IEGC clause c) RLDC is preparing Weekly report and the same is uploading in website regularly. One of the point of Weekly report (c) & (h) is to report the Non-compliance of instructions of SLDC by SEB/distribution licenses / bulk consumers, to curtail drawal resulting in noncompliance of IEGC and accordingly SLDC is submitting the reports to WRLDC Line outages planned vs. implemented : Member Secretary stated that the matter of nonavailing approved outages has been raised in several OCCMs of WRPC. It was reported by the WRLDC that constituents of WR do not avail most of the outages of transmission elements approved in OCCM. This is viewed seriously by the WRLDC and WRPC. The report of approved outages versus actually availed outages during the month is to be submitted to the WRPC for onward submission to the Central Electricity Authority. If any approved outage of transmission element is not availed on the scheduled date, reason for not availing the shutdown is also to be intimated to WRLDC/WRPC. The reason for not availing the planned outage is not being intimated by any entities of the state. All the entities are requested to intimate the reason for not availing the planned outage, so that the same shall be forwarded to WRLDC. In 456 TH OCC meeting of WRPC, SE(Operation), WRPC pointed out that out of approved transmission outages bulk quantum of outages are not availed by constituents even when there is no real time condition problem. A special meeting to discuss the reasons for not availing the outages approved by OCC was held on and the reasons for the same were categorized after getting the appropriate information from the constituents. These categories are as below : 1. Reliability consent not given by WRLDC 2. Real time consent not given by WRLDC 3. Clearance not given by concerned SLDC 4. Manpower problem by Agency 5. Material problem by Agency 6. Outage preponed/postponed 7. Outage availed in opportunity 8. Outage was not required 9. Request for outage not received in D-3 days 10. Weather problem Minutes of 38th OCC of MP 10

13 Member Secretary requested the utilities to furnish the report to SLDC for the last month latest by 3 rd of the following month giving the reason for non-availing of approved shutdown Frequent Tripping of 400 KV SGTPS Katni circuit II : Member Secretary stated that 400 KV SGTPS Katni circuit II tripped very often on high voltage during the month November and December. This line was kept charge during this period to meet the load of Satna and Rewa areas due to outage of one of the 315 MVA ICT at 400 KV substation Satna (PGCIL). Such frequent tripping is not only destabilize power stability of SGTPS complex but also endanger the life of SF6 gas circuit breaker. As intimated by SE(ET&I-III) the overvoltage setting of this feeder is kept at 107%(428 KV) with 5 sec delay at Katni substation. The MPPTCL may look into the matter and change the setting of over voltage if required to avoid the frequent tripping of this important transmission element. The installation of bus reactor of adequate capacity at 400 kv sub-station, Katni may also be planned to avoid high voltage problem Injection of reactive power by generating units during high voltage : Member Secretary stated that it has been observed that thermal / hydel generating units are not absorbing reactive power within their capability curve during high voltage period. SLDC has requested time and again to all the SSGS generating units to absorb reactive power during high voltages and export reactive power during low voltage scenario to ensure safe and secured grid operation with due compliance IEGC / MPEGC. The WRLDC has intimated that unit of Satpura TPS and SGTPS are injecting reactive power into the grid during high voltage scenario during the month of December WRLDC also furnished the scatter plot of voltage Vs reactive power as well as active power Vs reactive power for the generating unit no. 6, 7, 8 & 9 of STPS and unit no,. 1 &2 of SGTPS as analysed from SCADA data available at WRLDC for the month of December The has been sent to ED(O&M: Gen), MPPGCL for issuing instruction to the thermal generating station for compliance of IEGC / MPEGC regulations ensuring the safety, reliability & security of the integrated grid Delay in communicating the SLDC instruction to Generating station by GCC: Member Secretary stated that it has been reported by the shift engineers of the SLDC control room sometimes the instruction of SLDC for start / stop of hydel machine have not been executed by the GCC timely. If the delay in forwarding instruction of SLDC is due to communication problem, the same may be intimated to SLDC control room immediately, so that either the hydel power station could be contracted directly by the SLDC as better communication facilities are available at SLDC or some alternate arrangement could be made for meet out the requirement of the grid. ITEM NO. 7 : BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : 7.1 TRIAL RUN OF DG SETS : Member Secretary informed that as per IEGC regulation 5.8(b), Diesel Generator sets for black start would be tested on weekly basis and test report shall be sent to RLDC on quarterly basis. In 456 th and 455 th OCC meeting of WRPC, it was intimated that the test report of Diesel Generator sets are not being submitted by the state utility on regular basis and since Feb MPPGCL has stopped sending the reports. All the intra state generating companies have been requested to immediately start furnishing reports to SLDC/RLDC. The entities which have stopped sending reports since 2012 may also submit the photocopy of the DG set trial register in support of operation of trial run. Minutes of 38th OCC of MP 11

14 7.2 Black Start mock drill of Indira Sagar, Bargi, Pench and Gandhisagar : Member Secretary informed that as mandated by sec 5.8(b) of IEGC all the units need to conduct black start exercise once in every six month. As planned Black Start mock drill of Indira Sagar, Bargi, Pench and Gandhisagar has to be carried out, as the first black start mock drill of these stations has already completed more than a year. The black start mock drill of Bargi HPS and Pench HPS could not be conducted on the scheduled date due to outage of Diesel generator sets at these stations. MPPGCL informed that the DG sets of Gandhisagar is available and the machines of Gandhisagar are available for black start mock drill. Chairman requested MPPGCL to propose a suitable date for carrying out the black start mock drill of Gandhisagar. ISP has informed that DG sets is available and black mock drill can be performed. Member Secretary requested MPPGCL to ensure the availability of DG sets at Pench and Bargi HPS. 7.3 Black Start mock drill of Tons, Madhikeda, Rajghat and Birsingpur HPS: Member Secretary stated that Chief Engineer (O&M) Hydel, MPPGCL has informed vide letter no dtd that the governor operation at Tons, Madikeda, Rajghat and Birsingpur HPS is on manual mode due to some technical requirement for spares for putting the Governor into Auto mode. He further informed that after availing services from OEM Engineer (BHEL) / Ex- BHEL Engineer the mock drill exercise of these HPS shall be possible after next AOH. Chairman, OCC informed that MPPGCL should submit a complete plan to SLDC at the earliest regarding availability of Tons, Madhikheda, Rajghta and Birsingpur HPS for Black Start operation. ITEM NO 8: SOME IMPORTANT MATTERS REQUIRED IMMEDIATE ATTENTION: 8.1 Quarterly Review of Crisis Management Plan: Member Secretary stated that NHDC & SLDC have submitting the quarterly crisis management report to Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai. All the other entities are requested to submit the CMP report in prescribed format for the Second quarter (Oct 2013 to December 2013) for the year Status of Physical & Cyber Security in Power Sector regarding : Member Secretary stated that status of physical & cyber security in Power Sector for the third quarter (October 2013 to December 2013) have not been received from any of the constituents. All the entities may like to furnish the Status of physical & cyber security in Power Sector for third quarter (October 2013 to December 2013) directly to the Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai. ITEM NO. 9: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 9.1 Replacement of faulty ABT meters and providing new ABT meters at Sub-stations : Member Secretary stated that the substation wise list of 2 Nos. faulty ABT meters and the requirement of 7 Nos. ABT compliant meters to be installed in place of Non ABT meters at various sub-stations are enclosed herewith as Annexure 9.1. The present status along with plan for replacement / installation of ABT meters may be apprised to the Committee. The matter was discussed in the meeting and MPPTCL has assured to replace the faulty meters and Non-ABT meters as indicated in Annexure 9.1. Minutes of 38th OCC of MP 12

15 9.2 Replacement of faulty ABT meters and providing new ABT meter at Power stations : Member Secretary stated that the ABT meter is not installed at 0.4kV Mangthar feeder, SGTPS. The plan for replacement / installation may be apprised to the Committee. GCC, MPPGCL representative stated that matter has taken up DCC of East Discom for installation of ABT meters on 415 volt mangthar feeder at SGTPS. Member Secretary requested MPPGCL to expedite the matter at the earliest and intimate the status to SLDC. 9.3 Providing AMR facility for the ABT meters installed at MPPGCL / IIP s / NHDC/ OAC s/oag s/ REG s : In compliance to state commission directives for computation of weekly transmission losses and UI charges, SLDC has requested the Intra State entities including REG s coming under RRF mechanism for providing the AMR facility by installation of modem and SIM at the interface point and arrangement of Application Protocol Interface (API) (where ever M/s Secure make meters are not installed ) for data communication with AMR System of M/s Secure Meters Ltd. installed at SLDC. The Commission had given the cut-off date for commissioning of AMR system by 28 th Feb MPPGCL / IIP s / NHDC/ REG s/oac s/oag s are requested to submit the status of the same. MPPGCL informed that they have issued the LOI to M/s Secure Meters Ltd for providing AMR facility at MPPGCL power stations. M/s BLA & M/s Jaypee Bina has informed that modem configuration has been done by M/s Secure for providing meter data through AMR at SLDC. Member Secretary requested ISP and OSP to replace the L&T and Elster make meters installed at ISP and OSP for providing AMR facility at their end. 9.4 Renewable Regulatory Fund (RRF) Mechanism: The CERC vide notification dated has amended the CERC (Indian Electricity Grid Code) (Second Amendment) Regulations In the regulations 2014, the Commission has revised the applicability criteria for RRF mechanism that pooling stations commissioned after shall come under RRF mechanism and where there is no separate pooling station for a wind / solar generator and the generating station is connected through common feeder and terminated at a sub-station of Distribution Company / STU /CTU, the sub-station of distribution company / STU / CTU shall be considered as the pooling station for such wind / solar generator, as the case may be. SLDC has furnished the list of the wind / solar projects and requested the West and Central Discoms to identify available pooling stations commissioned on or after The status of availability of separate pooling station may be discussed. DCC representatives of West and Central Discoms have assured to take up the matter with their Commercial Sections for providing requisite information to SLDC. 9.5 Energy Accounting of Renewable Energy Generation: As per the request made by the Discoms during the workshop conduct at SLDC on 26 th and 27 th Nov 2013, SLDC was distributing the energy procured centrally by the MPPMCL on the basis of actual drawal made by the Discoms in the current month. However, due to delay in receipt of discom drawal from T&C office by 5 th of every month, SLDC has started the distribution of energy on the basis of actual energy input in the previous financial year as per MPERC (Cogeneration and generation of Electricity from Renewable sources of energy) (Revision -I) Regulations 2010 from the month of Jan 2014 in the State Energy Account. The issue may be discussed in the meeting. Member Secretary informed the MPPMCL / Discoms that SLDC has started the distribution of energy on the basis of actual energy input in the previous financial year as per MPERC (Cogeneration and generation of Electricity from Renewable sources of energy) (Revision -I) Regulations 2010 from the month of Jan 2014 in the State Energy Account. Further Member Secretary stated that in case MPPMCL / Discoms have any objection they take up the matter with MPERC. ITEM NO 10: SCADA/EMS RELATED ISSUES: Minutes of 38th OCC of MP 13

16 10.1 STATUS OF PROCUREMENT OF NEW RTUs :- The matter was discussed in detail and SLDC informed that 37 No of RTU are to be procured by MPPTCL and 2 Nos. RTU is to be procured by MPPGCL. SLDC requested to expedite the procurement action. MPPTCL and MPPGCL informed that the tender for procurement of RTUs shall be issued shortly ARRANGEMENT OF INFRASTRUCTURE FOR REPORTING OF RTUS TO DUAL CONTROL CENTERS, AS PER REQUIREMENT OF MAIN SLDC AT JABALPUR AND BACKUP SLDC AT BHOPAL. The matter was discussed in detail and representative from MPPTCL desired to know the fund requirement for material to be procured. SLDC clarified that the fund required for the material to be procured for communication requirement of backup SLDC is to be arranged by concern utility and not by SLDC. Further, SLDC explained that the procurement of material is required to be arranged on priority basis so that data channels are available before commissioning of backup SLDC. Representative of MPPTCL and MPPGCL agreed for the same ARRANGEMENT OF NECESSARY SPACE, POWER SUPPLY FOR INSTALLATION OF WIDE BAND EQUIPMENTS:- It was clarified by SLDC that the Master Telecom project of WR is being looked after by Addl. CE (procurement) desired detail regarding space and other requirement has already been received from PGCIL. Hence necessary arrangement of space in all wideband nodes is to made in advance. SLDC further requested MPPTCL to provide address details of wideband locations as material for wideband locations where replacement is planned is ready for delivery. MPPTCL representatives agreed to provide address details to PGCIL within a week PROGRESS OF INSTALLATION OF NEW RTUS ALONG WITH PLCC DATA LINKS AT EHV S/S It was informed by SLDC that RTU at 220KV Rewa S/s is still not commissioned. RTU at 20KV Chichli is also commissioned by shifting of RTU available at 132KV Bahadurpur S/s. Further, frequent failure of MFM is observed. SLDC further requested to take up the matter with Firm for taking appropriate action for removal of telemetry discrepancy, commissioning of balance RTUs and planning of maintenance of Chemtrol RTUS MAINTENANCE OF RTU S AND AVAILABILITY OF SPARES:- MPPGCL:- It was informed by SLDC that the spare procured earlier is going to be exhausted soon & therefore procurement of spares needs to be arranged. It was assured by MPPGCL to initiate the necessary action in the matter, at the earliest. MPPTCL:- It was informed by MPPTCL that the order D20 CPU has already been placed and spare is expected to be delivered shortly. SLDC further requested MPPTCL to arrange spare CMRs and transducers as rectification of telemetry discrepancies are pending because of non availability of CMRs and Transducers with field offices. MPPTCL representative agreed to take immediate action STATUS OF TELEMETRY ARRANGEMENTS FOR SINGAJI TPS & SATPURA TPS:- It was informed By SLDC that only Ex-Bus generation of Singaji and STP extention is available and HV side generation is not available. MPPGCL informed that the same shall be arranged sortly. Minutes of 38th OCC of MP 14

17 SLDC further informed that second communication channel of Singaji TPP is also required to be commissioned through 400KV Pithampur. MPPGCL and MPPTCL representative assured to arrange commissioning of second channel on priority basis THE ARRANGEMENT OF DATA CHANNELS FOR REMOTE VDU INSTALLED AT GCC, DCC & CMD MPPTCL CHAMBER. it was informed by SLDC that reliable 2 MBPS leased line from SLDC to various locations where Remote VDUS are installed is required to be arranged on priority basis. All concern agreed to arrange the same, by June 2014, so that remote VDUs from new SCADA/EMS system shall be commissioned. SLDC further clarified that for functioning of present Remote VDUs, leased line with V35 interface are required. However, for Remote VDUs under new SCADA/EMS system, leased line with G 703 interface shall be required. Accordingly all concern is advised to arrange leased line with V.35 interface and also arrange V.35 to G703 interface converter. All concern i.e. MPPGCL, MPPTCL, East DISCOM, MPPMCL agreed for the same DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS & UPGRADATION OF EXISTING RTU s The matter was discussed in detail and SLDC explained that the rectifications of telemetry discrepancies are pending due to shortage of material (transducers, MFM, relays). MPPTCL assured that the material at division level shall be arranged shortly. It was also assured by MPPTCL that action for upgradation of RTU at 220KV Sarni S/s & 220KV Pandurna which is required because of interdiscom feeders shall be initiated shortly. It was informed by MPPTCL that modification in RTU configuration at 220KV Sarni S/s is required for this work. SLDC inform that same shall be arranged by Sub-LDC Bhopal on priority. It was informed by SLDC that telemetry discripiency and upgradation for RTU work is still pending for Hydel Power Stations. MPPGCL assured to complete the telemetry discripiency and completion of extention of process connections of SOE at HYDEL power stations at the earliest. It was specifically informed by SLDC that the telemetry of Bus and Line reactor at all 400KV S/s is required to be arranged as WRLDC is pressing hard for providing telemetry of bus and line reactors. MPPTCL and MPPGCL agreed for arranging the same on priority basis PROVIDING ALTERNATE DATA CHANNELS & EXPRESS VOICE CHANNELS FOR RTU STATIONS:- The matter was discussed in detail specifically data channels of 220KV Anuppur and Morwa S/s. It was informed by T&C that problem is due to outdoor equipments at ATPS. MPPGCL assured to initiate action for arranging outdoor equipments for ATPS on priority basis. Further, it was agreed that the action for providing alternate data channel and voice channels shall be taken on priority basis LONG OUTAGE OF RTUS:- The matter was discussed and MPPTCL and MPPGCL assured to take necessary action for restoration of telemetry on priority basis and also take preventive action to avoid long outages. Further, unreliable functioning of telemetry of Omkareshwar and Indira Sagar Hydel Power Station was discussed in detail and it was categorically informed by SLDC that lot of problem in grid management is being faced by SLDC due to unreliable functioning of telemetry of Indira Sagar and Omkareshwar HPS. Minutes of 38th OCC of MP 15

18 Minutes of 38th OCC of MP 16

19 Minutes of 38th OCC of MP 17

20 S. No. Particulars FREQUENCY PARTICULARS दसम बर-13 जनवर INTEGRATED OVER AN-HOUR 1.1 Maximum Frequency 50.5 Hz Between hrs & Hrs on Hz Between hrs & Hrs on Minimum Frequency Hz Between hrs & Hrs on Hz Between hrs & Hrs on Average Frequency Hz Hz 2 INSTANTANEOUS FREQUENCY 2.1 Maximum Frequency Hz 2.2 Minimum Frequency Hz 3 Percentage of time when frequency was :- AT HRS ON AT HRS ON Hz 49.4 Hz AT HRS ON AT HRS ON %age of time when frequency was दसम बर-13 जनवर Below 48.5 Hz Between Hz and 48.8 Hz Between Hz and 49.2 Hz Between Hz and 49.5 Hz Between Hz and 49.7 Hz Between Hz and 50.2 Hz Between Hz and 51.0 Hz Between 51.0 Hz AND 51.5 Hz Above 51.5 Hz No. of times frquency touched Hz No. of times frquency touched Hz No. of times frquency touched 51.0 Hz 0 0 Minutes of 38th OCC of MP 18

21 Voltage Profile During the Month of Dec Date Indore Itarsi Bina Gwalior Nagda Birsingpur Satpura ISP Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Voltage Profile During the Month of Jan Date Indore Itarsi Bina Gwalior Nagda Birsingpur Satpura ISP Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Minutes of 38th OCC of MP 19

22 Minutes of 38th OCC of MP 20

23 Minutes of 38th OCC of MP 21

24 Minutes of 38th OCC of MP 22

25 Minutes of 38th OCC of MP 23

26 Minutes of 38th OCC of MP 24

27 Minutes of 38th OCC of MP 25

28 Minutes of 38th OCC of MP 26

29 Minutes of 38th OCC of MP 27

30 Minutes of 38th OCC of MP 28

31 Minutes of 38th OCC of MP 29

32 Discoms wise Average Supply Hours PARTICULARS East Zone Central Zone दसम बर-13 जनवर -14 दसम बर-13 जनवर -14 Commissinary HQ 23:57 23:54 23:42 23:36 District HQ 23:58 23:59 23:44 23:43 Tehsil HQ 23:55 23:56 23:38 23:33 Rural -Mixed 23:54 23:53 23:29 23:24 Rural -DLF 23:54 23:53 23:29 23:24 Rural -Irrigation 9:59 9:59 9:45 9:43 PARTICULARS West Zone MP दसम बर-13 जनवर -14 दसम बर-13 जनवर -14 Commissinary HQ 23:52 23:50 23:50 23:46 District HQ 23:47 23:46 23:50 23:51 Tehsil HQ 23:36 23:35 23:44 23:43 Rural -3Phase 23:12 23:09 23:35 23:33 Rural -1Phase 23:27 23:23 23:38 23:35 Total Rural 9:48 9:41 9:51 9:48 Minutes of 38th OCC of MP 30

33 Annexure-2.5(ii) LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated) JABALPUR REGION Name of EHV Substation Name of 33kV feeder 132KV Date of charging of feeder 132kV Bankhedi 33kV Panagar REWA REGION 132kV Deosar 220kV Anuppur 33kV Deosar 33kV Bargawan 33kV Chitrangi 33kV Shahdol-I 33kV Shahdol-II 132KV 220KV LIST OF 33KV FEEDERS UNDER MPPKVVCL, BHOPAL GWALIOR REGION Name of EHV Substation Name of 33KV feeder Date of charging of feeder 132KV 132KV Mohna 33KV Ghatigaon 33KV Sehasaram LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE INDORE REGION Name of EHV Substation 132KV Rau Name of EHV Substation 33KV Mhow 33KV Harsola Name of 33KV feeder 132KV UJJAIN REGION Name of 33KV feeder 132KV Date of Charging of feeder -- Date of Charging of feeder 132KV Ujjain 33KV Jyoti Nagar KV Makdon 33KV Banco (Solar Gen Plant) 33KV Gata KV Susner 33KV Friends Salt (Solar Gen Plant) KV Khachrod 33KV Grasim - 132KV MSP 33KV Singawada -- ¼Dewas½ Minutes of 38th OCC of MP 31

34 Annexure- 3.2 S.No. Name of 400KV Substation Proposal of Shut Downs for Maintenance Programme of Transimission Elements for March 2014 Name of feeder/transformer Proposed date of shutdown Time From - To Work to be done 1 Bhopal 220 KV Shujapur No to Hrs Premansoon Maintenance 2 Bhopal 315 MVA Transformer No to Hrs Premansoon Maintenance 3 Bhopal 220 KV ICT No to Hrs Premansoon Maintenance 4 Bhopal 315 MVA Transformer No. 1 & Tie bay to Hrs Premansoon Maintenance 5 Bhopal 315 MVA Transformer No to Hrs Premansoon Maintenance 6 Bhopal 220 KV ICT No to Hrs Premansoon Maintenance 7 Bhopal 315 MVA Transformer No. 2 & Tie bay to Hrs Premansoon Maintenance 8 Bhopal 220 KV Bhopal IC to Hrs Premansoon Maintenance 9 Bhopal 220 KV Bhopal IC to Hrs Premansoon Maintenance 10 Bhopal 220 KV Bus Transfer to Hrs Premansoon Maintenance 11 Bhopal 220 KV Vidisha to Hrs Premansoon Maintenance 12 Bhopal 220 KV Bina to Hrs Premansoon Maintenance 13 Bhopal 220 KV Shujaplpur to Hrs Premansoon Maintenance 14 Bhopal 400 KV Itarsi to Hrs Premansoon Maintenance 15 Bhopal 400 KV Itarsi to Hrs Premansoon Maintenance 16 Bhopal 400 KV Itarsi to Hrs Premansoon Maintenance 17 Bhopal 400 KV Itarsi to Hrs Premansoon Maintenance 18 Bhopal 220 KV Bairagarh No to Hrs Premansoon Maintenance 19 Bhopal 220 KV Bairagarh No to Hrs Premansoon Maintenance 20 Bhopal 220 KV Ashta to Hrs Premansoon Maintenance 21 Bhopal 220 KV Bus Tie to Hrs Premansoon Maintenance 22 Bhopal 220 KV Bus to Hrs Premansoon Maintenance 23 Indore 315 MVA 400/220 kv Xmer IV to Hrs Maintenance & Relay Testing 24 Indore 400 kv ISP I to Hrs Maintenance & Relay Testing 25 Indore 400 kv ISP II to Hrs Maintenance & Relay Testing 26 Indore 400 kv Nagda to Hrs Maintenance & Relay Testing 27 Indore 400 kv Bus Transfer to Hrs Maintenance & Relay Testing 28 Indore 400 kv Bus Coupler to Hrs Maintenance & Relay Testing 29 Indore 400 kv Main Bus I to Hrs Maintenance & Relay Testing 30 Indore 400 kv Main Bus II to Hrs Maintenance & Relay Testing 31 Indore 220 kv Pithampur to Hrs Maintenance & Relay Testing 32 Indore 220 kv Badnagar to Hrs Maintenance & Relay Testing 33 Indore 220 kv South Zone I to Hrs Maintenance & Relay Testing 34 Indore 220 kv South Zone II to Hrs Maintenance & Relay Testing Minutes of 38th OCC of MP 32

35 S.No. Name of 400KV Substation Name of feeder/transformer Proposed date of shutdown Time From - To Work to be done 35 Indore 220 kv Jetpura I to Hrs Maintenance & Relay Testing 36 Indore 220 kv Jetpura II to Hrs Maintenance & Relay Testing 37 Indore 220 kv Indore-East to Hrs Maintenance & Relay Testing 38 Indore 220 kv Dewas to Hrs Maintenance & Relay Testing 39 Indore 220 kv Barwah I to Hrs Maintenance & Relay Testing 40 Indore 220 kv Barwah II to Hrs Maintenance & Relay Testing 41 Indore 220 kv Bus Transfer to Hrs Maintenance & Relay Testing 42 Indore 220 kv Bus Coupler to Hrs Maintenance & Relay Testing 43 Indore 220 kv Main Bus I to Hrs Maintenance & Relay Testing 44 Indore 220 kv Main Bus II to Hrs Maintenance & Relay Testing 45 Nagda 400 KV Tie C.B. Bay III to Hrs Routine Maintenance Minutes of 38th OCC of MP 33

36 Minutes of 38th OCC of MP 34

37 Unitwise / Stationwise Genration in MU A. Thermal Stn. Name AMARKANTAK SATPURA SANJAY GANDHI SSTPS MPPGCL THERMAL UNIT No. Capacity MW Dec-13 Jan PH II PH III TOT PH I PH II PH III PH IV TOT PH I PH II PH III TOT PH AMARKANTAK POWER HOUSE-I RETIRED FROM SERVICE WEF B. Hydel Station Name GANDHISAGAR R.P.SAGAR J.SAGAR CHAMBAL M.P.CHAMBAL PENCH M.P.PENCH BARGI TONS BIRSINGHPUR B.SGR(DEOLONDH) B.SGR(SILPARA) RAJGHAT M.P.RAJGHAT B.SGR(JINHA) MADIKHEDA TOTAL HYDEL MPPGCL Hydel MPSEB HYDEL Share C. NHDC (Ex-Bus) Ann Capacity MW Dec-13 Jan Capacity Station Name MW Dec-13 Jan-13 Indira Sagar Hydel Project Omkareshwar Hydel Project Minutes of 38th OCC of MP 35

38 MP SUPPLY EXCLUDING AUXILIARY CONS. in Million Units Ann 4.2 S.No. Particulars दसम बर-13 जनवर MPSEB Thermal Availability MPSEB Hydel Availability Indira Sagar Omkareshwar Schedule / Drawal From Central Sector Schedule of DVC Schedule of Sujen Lanco AMK + Essar Sasan Sardar Sarovar Additional Power Purchase Sale of Power Banking of Power Energy Exchange Unschedule Interchange Medium Term Power Purchase from CSPDCL & Balco Other Imp / Exp Total MPSEB Supply excl. Aux. Cons Average Supply per Day Maximum Daily M.P. Supply Minimum Daily M.P. Supply Registered Demand : MW Unrestricted Demand : MW Minutes of 38th OCC of MP 36

39 Own Generation Hourly Average Own Generation, Schedule Drawal, Actual Drawal & Demand Month :- दसम बर 2013 Schedule from Annexure-4.3 Load Shedding FIGURES IN MW Hrs. FREQ. THER. THER. Incl Excl Aux Aux Total IPPs HYD. ISP OSP Injectio n Total CPPs Injectio n Total CSS DVC ER Sugen Lanco Sasan Essar SSP SE Z Banking Sale Pur Riha Total nd+ MTO STO Mata A A tilaat Rajg MP hat Total Tot Avl. Act. Drl UI Intra State STO A DEMA ND MET SCH UN SCH TOTAL REST. DEM AND UNRE ST. DEMA ND 1: : : : : : : : : : : : : : : : : : : : : : : : Avg TO 06 HRS. 06 TO 12 HRS. 12 TO 18 HRS. 06TO 18 HRS. 18 TO 24 HRS Minutes of 38th OCC of MP 37

40 Own Generation Hourly Average Own Generation, Schedule Drawal, Actual Drawal & Demand Month :- जनवर 2014 Schedule from Annexure- 4.3 Load Shedding FIGURES IN MW Hrs. FREQ. THER. THER. Incl Excl Aux Aux Total IPPs HYD. ISP OSP Injectio n Total CPPs Injectio n Total CSS DVC ER Sugen Lanco Sasan Essar SSP SE Z Banking Sale Pur Riha Total nd+ MTO STO Mata A A tilaat Rajg MP hat Total Tot Avl. Act. Drl UI Intra State STO A DEMA ND MET SCH UN SCH TOTAL REST. DEM AND UNRE ST. DEMA ND 1: : : : : : : : : : : : : : : : : : : : : : : : Avg TO 06 HRS. 06 TO 12 HRS. 12 TO 18 HRS. 06TO 18 HRS. 18 TO 24 HRS Minutes of 38th OCC of MP 38

41 Discomwise Hourly Average Schedule Drawal, Actual Drawal &Over(+)/Under(-) Drawal Month :- दसम बर 2013 EZONE CZONE WZONE Annexure-4.4 FIGURES IN MW Hrs. FREQ. SCH Demand Met O/U DRL SCH LS Unsch LS Restricte Unrestric d ted Demand Demand SCH Demand Met O/U DRL SCH LS Unsch LS Restricte Unrestric d ted Demand Demand SCH Demand Met O/U DRL SCH LS Unsch LS Restricte Unrestric d ted Demand Demand 1: : : : : : : : : : : : : : : : : : : : : : : : Avg TO 06 HRS. 06 TO 12 HRS. 12 TO 18 HRS. 06TO 18 HRS. 18 TO 24 HRS Minutes of 38th OCC of MP 39

42 Discomwise Hourly Average Schedule Drawal, Actual Drawal &Over(+)/Under(-) Drawal Month :- जनवर 2014 EZONE CZONE WZONE Annexure-4.4 FIGURES IN MW Hrs. FREQ. SCH Demand Met O/U DRL SCH LS Unsch LS Restricte Unrestric d ted Demand Demand SCH Demand Met O/U DRL SCH LS Unsch LS Restricte Unrestric d ted Demand Demand SCH Demand Met O/U DRL SCH LS Unsch LS Restricte Unrestric d ted Demand Demand 1: : : : : : : : : : : : : : : : : : : : : : : : Avg TO 06 HRS. 06 TO 12 HRS. 12 TO 18 HRS. 06TO 18 HRS. 18 TO 24 HRS Minutes of 38th OCC of MP 40

43 Annexure-5.0 SYSTEM DISTURBANCE December 2013 & January 2014 System Disturbance / System Incidence : 1. System Disturbance on at 220KV S/s Shivpuri: On dated at around 03:05 Hrs MP System was normal and frequency of N-E-W Grid was HZ. Prior to fault 132 KV Motijheel Banmore Ckt I & II, 132 KV Motijheel Mahalgaon Ckt and 132 KV Motijheel Tigra Ckt were open hence 132 KV S/s Motijheel and 132 KV S/s Jora was radially fed from 220 KV S/s Sabalgarh. At 03:10 Hrs. 220 KV Shivpuri Bina (PGCIL) Ckt tripped from both ends due to transient fault and 220 KV Shuvpuri Bina Ckt tripped from 220 KV S/s Bina end only, resulting 132 KV Shivpuri Pachhore Ckt tripped due to over loading and 132 KV Interconnector II also tripped from 220 KV S/s Shivpuri end. Consequently interruption occurred at 220 KV S/s Shivpuri, 220 KV s/s Sabalgarh, 132 KV S/s Shivpuri, 132 KV S/s Kolaras, 132 KV S/s Mohna, 132 KV S/s Vijaypur, 132 KV S/s Sheopur, 132 KV S/s Jora, 132 KV S/s Motijheel. There was consumer load loss of approx MWH due to above tripping. There was no generation loss and System was normalized in due course of time. 2. System Disturbance on at 400 KV Indore: On dated at around 06:00 Hrs MP System was normal and frequency of National Grid was HZ. At 400 KV S/s Indore, all 400 KV feeders were in charged condition and normally loaded. At 06:05:41 Hrs fault occurred on Y- Phase of 400 KV Indore Itarsi Ckt I and after 40 msec (i.e., at 06:05:41:530 Hrs) Y Phase breaker of 400 KV Indore Itarsi Ckt I opened. After 960 msec (i.e., at 06:05:42:491 Hrs) Y Phase Breaker of 400 KV Indore Itarsi Ckt I auto- reclosed. But as the fault was not cleared Main 2 protection relay again operated at 06:05:42:877 Hrs and after 40 msec (i.e., at 06:05:42:917 Hrs) Breaker of all the three phases opened with Y Phase, Zone I, Km relay indication. Due to the above tripping Bus Bar Protection for Main Bus II operated. After taking the Bus Bar protection out from service, 400 KV Bus II at 400 KV S/s Indore was charged by charging 400/220 KV ICT IV at 07:32 Hrs. Subsequently system were normalized in due course of time. Minutes of 38th OCC of MP 41

44 Annexure 6.9 LOGIC TO BE IMPLEMENTED IN TRANSCO SCADA FOR ADMS Requirement in SCADA Terminal at DISCOM Control Centre: The DCC terminal of Transco SCADA shall have a overviews for ADMS and other features which shall include (for particular DISCOM) : (i) The list of groups which qualify to be operated under ADMS on the day of the week with real time total load of the group. (ii) The LIST of ADMS Groups on the week day with current status of the Group i.e. OPERATED or NORMAL. There should be provision for Enabling/Disabling the group for ADMS. It shall also be possible to Trip/Close particular selected Group from this window by issuing command. The user operations shall be permitted through password. (iii) When selected the group, a separate window shall open listing the 33 KV feeders in the group with status ( Operated / Normal ). From here the provision shall be available to Enable/Disable each feeder for ADMS operation. It shall also be possible to Trip/Close particular selected feeder from this Window by issuing command. The user operations shall be permitted through password. (iv) There shall be an Alarm Window which will list the activities by the user and also the list of Group/feeders operated under ADMS (if a Group/feeder normalized then the alarm should disappear). It shall also have listing of failed operations (i.e. if a group/feeder failed to Trip/Close through ADMS). Each activity Alarm (User actions, Group/Feeder Operation, Failed Operations) shall be displayed in different colour. (v) It shall be possible to open at least 4 windows simultaneously and by size zoom it shall be possible to view four active windows at a time. (vi) The addition/deletion of feeder/group shall not be permissible through DCC terminal. This activity shall be permitted to the System Administrator of Transco SCADA. Following data shall be transferred from SLCD SCADA to Transco SCADA system on ICCP for ADMS purpose. (i) (ii) MP Schedule, MP Drawal and MP Deviation (+ OD, - UD) and Local Frequency. EZ, WZ, CZ DISCOM Schedule, Drawal and Deviation (+ OD, - UD) Minutes of 38th OCC of MP 42

45 LOGICS FOR ADMS (1) The Group covered on the day under UFR shall be excluded from ADMS. (2) If Freq <50.00 Hz and MP OD is > 12% of schedule or 150 MW whichever is less continuously for 15 minute duration, then calculate the quantum to be shed through ADMS. (3) Calculate the Overdrawing DISCOM s Load to shed on the basis of its prorata quantum in MP O/D. (example : suppose OD is MP is 300 MW and 12% of schedule is 100 MW then load to be shed will be 300 MW, D1 O/D by 200 MW, D2 by 150 MW and D3 U/D by 50 MW, then D1 shall shed =200*300/350= 171 MW. load and D2 shall shed by (150*300/350)= 129 MW, by operating 1 or more groups in the overdrawing DISCOM as per requirement (equal to the prorata overdrawal quantum). This would either lead to Zero or slightly underdrawal position. (4) If the total quantum of Groups to be shed in a overdrawing DISCOM exceeds its total prorata quantum, then in last groups less feeders shall operate to match to ZERO O/D. (5) The groups in particular DISCOM shall operate under ADMS in rotation. This means that if there are total 30 groups, then group 1 will again operate next time after group 30. (6) The under drawing entities shall not operate. (7) The group if continuously under ADMS outage should be automatically normalized after 1 hour of operation and simultaneously next group shall operate to compensate for OD. (8) On clearing of the OD condition and U/D reached upto 100 MW for continuously 15 minute or more than 150 MW instantly, then normalisation shall start with First- Operated first normalized basis. (9) Iterations (1) to (8) shall be continuous process. This would ensure that the ADMS operates only when the MP overdrawal crosses 12% 0r 150 MW (whichever is less) barrier continuously for 15 minute duration. (10) If the Group/feeder does not operate, then Alarm message shall appear in the DCC Terminal of TRANSO SCADA, giving the details of the Feeders not operated in that particular group or the non-operation of complete group. In such case DCC may issue instruction to s/s through Control Centre (sub LDC or Transco SCADA centre) to trip particular 33 KV feeders or can manually issue trip command from SCADA. Minutes of 38th OCC of MP 43

46 (11) In case of underdrawal more than 150 MW below Hz or any Under drawal above Hz, the DISCOMs should immediately check if any ADMS group is under operated condition and restore the same. Also ensure addition of more loads by normalizing irrigation feeders and rescheduling of power. Minutes of 38th OCC of MP 44

47 स द श प रर A * MESSAGE TYPE - A * MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, JABALPUR Phone Fax Annexure-6.11(i) स दभर /Ref दन क / Date. समय / Time - षक / From : प ल भ र, र जय भ र षषण क, जलपपर/ Shift Incharge/ SLDC, Jabalpur ष / To : प ल भ र / Shift Incharge र ज य न त इक ई/ Intra State Entity र ज य न त रक इक/ Intra State Entity र ज य न त रक इक/ Intra State Entity प वर क ष कडस East Discom इ दर स गर/ISP ज स स /GCC मध य क ष कडस/Central Discom सतप र /Satpura TPS एमप प एमस एल/MPPMCL प म क ष कडम/ West Discom ज प ब न / ब एलए/ स जय ग ध /SGTPS अमरक टक/ATPS स घ ज /SSTPS वषय/ Sub : नध र रनर स र स ध र ववचनर/ रDeviation beyond stipulated limits Regulations (a), (b), 6.4.6, and of CERC (IEGC)(Second Amendment) Regulations 2014 read along with Regulation 7.1 and 7.2 of CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014 stipulate that the deviation from schedule of a control area shall not exceed 12% of the schedule or 150 MW whichever is less. The present deviation of your control area (DISCOM or Generator) exceeds the stipulated limits. Details are as below: र ज य न रक इक ई/ अन स च / वचलन स म / व त वक नक स / वचलन Intra State Entity Schedule (MW) Deviation Limit (MW) {12% of Schedule or 150 MW whichever is less} अ त पष Actual Drawal / Actual Injection (MW) Deviation (MW) You are hereby directed u/s 33 of the Electricity Act, 2003 to take suitable measures to ensure immediate compliance of the above mentioned regulations, failing which SLDC shall be constrained to take suo motu actions without further notice. Matter urgent please. प ल भ र / Shift In charge स चन थर प र त ल/ copy for information to : प चसरप रभ, प० ०भ ०प ०क ०, म बई/ Shift Incharge/ WRLDC, Mumbai Minutes of 38th OCC of MP 45

48 स द श प रर- B * MESSAGE TYPE B * MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, JABALPUR Phone Fax स दभर /Ref दन क / Date. समय / Time - षक / From : प ल भ र, र जय भ र षषण क, जलपपर/ Shift Incharge/ SLDC, Jabalpur ष / To : प ल भ र / Shift Incharge र ज य न त इक ई/ Intra State Entity र ज य न त रक इक/ Intra State Entity र ज य न त रक इक/ Intra State Entity प वर क ष कडस East Discom इ दर स गर/ISP ज स स /GCC मध य क ष कडस/Central Discom सतप र /Satpura TPS एमप प एमस एल/MPPMCL प म क ष कडम/ West Discom ज प ब न / ब एलए/ स जय ग ध /SGTPS अमरक टक/ATPS स घ ज /SSTPS वषय / Sub : ए र दश म नर तर वचलन / Sust ai ned devi at i on i n one di r ect i on Regulations (a), (b), 6.4.6, and of CERC (IEGC)(Second Amendment) Regulations 2014 read along with Regulation 7.1, 7.2 of CERC (Deviation Settlement Mechanism and related matters), Regulations, 2014 stipulate that an entity (buyer or seller) shall have to make sign of their deviation from schedule changed, at least once every 12 time blocks. The direction of deviation of your control area has remained as under: र ज य न रक इक ई/ Intra State Entity अन स च / Schedule (MW) वचलन स म / Deviation Limit (MW) {12% of Schedule or 150 MW whichever is less} व त वक नक स / अ त क ष Actual Drawal / Actual Injection (MW) वचलन Deviation (MW) You are hereby directed u/s 33 of the Electricity Act, 2003 to take suitable measures to ensure immediate compliance of the above mentioned regulations, failing which SLDC shall be constrained to take suo motu actions without further notice. Matter urgent please. प ल भ र / Shift In charge स चन थरप न च ल/ copy for information to : प चसरप रभ, प० ०भ ०प ०क ०, म बई/ Shift Incharge/ WRLDC, Mumbai Minutes of 38th OCC of MP 46

49 स द श प रर C * MESSAGE TYPE - C * MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, JABALPUR Phone Fax स दभर /Ref दन क / Date. समय / Time - षक / From : प ल भ र, र जय भ र षषण क, जलपपर/ Shift Incharge/ SLDC, Jabalpur ष / To : प ल भ र / Shift Incharge र ज य न त इक ई/ Intra State Entity र ज य न त रक इक/ Intra State Entity र ज य न त रक इक/ Intra State Entity प वर क ष कडस East Discom इ दर स गर/ISP ज स स /GCC मध य क ष कडस/Central Discom सतप र /Satpura TPS एमप प एमस एल/MPPMCL प म क ष कडम/ West Discom ज प ब न / ब एलए/ स जय ग ध /SGTPS अमरक टक/ATPS स घ ज /SSTPS वषय / Sub : र जय भ र षषण क स र नद श क अव / Non-compl i ance of di r ect i ons f r om SLDC/WRLDC. Section 33 of the Electricity Act 2003 and Regulations (f), (g) and of CERC (IEGC) Regulation 2010, read along with CERC (IEGC)( Second Amendment) Regulation 2014 stipulate that all the directions by the SLDC to the concerned entities shall be duly complied with. र ज य न त रक इक/ Intra State Entity Reference number of message through which direction was issued/ र जय भ र षण कक क द रर जस क Issue Date/ज र र करनसर रन र ख Issue Time/ ज र र करनसर र र नद श दय गय थ However compliance to the above mentioned directions is neither apparent nor have we received the compliance report for the same. Matter urgent please. प ल भ र / Shift In charge स चन थरप न च ल/ copy for information to : 1. स ब धनर स त र य इक ई क प र मHead of concerned Regional Entity. 2. प चसरप रभ, प० ०भ ०प ०क ०, म बई/ Shift Incharge/ WRLDC, Mumbai Minutes of 38th OCC of MP 47

No.07-05/SG-9B-II/4084 Jabalpur, dated:

No.07-05/SG-9B-II/4084 Jabalpur, dated: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/4084

More information

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/

More information

No.07-05/SG-9B-II/1594 Jabalpur, dated

No.07-05/SG-9B-II/1594 Jabalpur, dated MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/1594

More information

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01 MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com vkbz,l vks : 9001-2008

More information

No.07-05/SG-9B-II/ 1179 Jabalpur, dated been uploaded on the website of SLDC and can be downloaded.

No.07-05/SG-9B-II/ 1179 Jabalpur, dated been uploaded on the website of SLDC   and can be downloaded. MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 vkbz,l vks : 9001-2008 ISO: 9001-2008 No.07-05/SG-9B-II/

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com vkbz,l vks : 9001-2008

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01

Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur , CIN-U40109MP2001SGC01 MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com vkbz,l vks : 9001-2008

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

In view of the above list of important grid element & exception list is as below:-

In view of the above list of important grid element & exception list is as below:- OUTAGE PROCEDURE As per standard procedure of WRPC, all EHV elements which have been listed under the list of important grid elements of Western Region, the outages for such elements required OCCM approval.

More information

Renewable Regulatory Fund (RRF) Mechanism : -

Renewable Regulatory Fund (RRF) Mechanism : - Renewable Regulatory Fund () Mechanism : - : Chronology of events Outline : Objectives at a glance : Approach : Applicability Role of different stakeholders Brief on CERC Orders on State Load Dispatch

More information

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION, BHOPAL Sub : In the matter of determination of Parallel Operation Charges. Suo-Motu Petition No. 73/2012 ORDER (Date of order 31 st December, 2012) MPERC,

More information

STATE LOAD DISPATCH CENTRES (SLDC)

STATE LOAD DISPATCH CENTRES (SLDC) ACTIVITIES OF SLDC STATE LOAD DISPATCH CENTRES (SLDC) **The State Load Despatch Centre:- As per section 33 of Electricity Act - 2003 (Central Act 36 of 2003), SLDC performs powers as defined below:- SLDC

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

MINUTES OF THE 47 th SLCF MEETING HELD ON

MINUTES OF THE 47 th SLCF MEETING HELD ON MINUTES OF THE 47 th SLCF MEETING HELD ON 23.11.2016 Shri. Rafikul Islam, Chief Engineer (SLDC), WBSETCL & Chairperson, SLCF welcomed all the participant members to the 47 th SLCF meeting.. ITEM-1: CONFIRMATION

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007 KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No.1/1/KSERC-2006/ Dated, Thiruvananthapuram 6 th August,2007 KSERC (Supply of Power from Captive Generating Plants to Distribution Licensees)

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow No.UPERC/ Secy/JD(G)/2018/ dated : 20 th August, 2018 Public Notice The Commission is in process of reviewing

More information

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Case No. 163 of In the matter of

Case No. 163 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region 1.0 Applications for Connectivity and Long Term (Open) Access. Applications for grant of Connectivity

More information

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in

More information

Before the. Case No. 106 of 2009

Before the. Case No. 106 of 2009 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on 16-12-2015 2)In-principle Approval_Tumkur Phase-I Government of India Ministry of Power Central Electricity Authority PSP & PA- I Division

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority ,.,.;i')!i,:;;',;~~~. 'ffrff mm I Government of India ~ ~.I Ministry of Power 4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority III ~~~~~~I"1",~~1 ;J' :. r System Planning & Project Appraisal Division

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna 800 021 ------------------------------------------------------------------------------------------------------------- ROOFTOP

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

Intra-State Availability Based Tariff (ABT)

Intra-State Availability Based Tariff (ABT) Intra-State Availability Based Tariff (ABT) What is ABT? 1. In Year 2000, the CERC revised the tariff structures of inter- state generators from drawal-based tariffs to ABT to discipline grid operations.

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

In-House Paper on the implementation of Single Part Tariff in Power Distribution

In-House Paper on the implementation of Single Part Tariff in Power Distribution December 9, 2016 In-House Paper on the implementation of Single Part Tariff in Power Distribution Background: Tariff Introduction: Tariff is the price Structure at which electricity is sold to the consumers.

More information

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 16 AASHAADHA, 1937(S) (NO.PATNA 737) PATNA, TUESDAY, 7 TH JULY 2015 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION

More information

GC108: EU Code: Emergency & Restoration: Black start testing requirement

GC108: EU Code: Emergency & Restoration: Black start testing requirement Stage 01: Modification Proposal Grid Code GC108: EU Code: Emergency & Restoration: Black start testing requirement Purpose of Modification: This modification seeks to align the GB Grid Code with the European

More information

Case Nos. 12 & 48 of 2009

Case Nos. 12 & 48 of 2009 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

Respondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad

Respondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Pattanakkad 1 CONSUMER GRIEVANCE REDRESSAL FORUM CENTRAL REGION (Formed under Section 42(5) of the Electricity Act 2003) 220 kv Substation Compound, HMTColony P.O. Kalamasery, Pin 683 503 Phone No. 0484-2556500 Website

More information

IJRASET 2013: All Rights are Reserved

IJRASET 2013: All Rights are Reserved Power Factor Correction by Implementation of Reactive Power Compensation Methods of 220 KV Substation MPPTCL Narsinghpur Ria Banerjee 1, Prof. Ashish Kumar Couksey 2 1 Department of Energy Technology,

More information

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012 POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 PREPARED BY: Electricity System Operations Planning and Performance DATE: 5 June 2012 FINAL

More information

Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid

Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid India need regulations for energy storage to implement grid ancillary services

More information

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region

Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region Additional Agenda for 31 st Standing Committee Meeting of Power System Planning for Northern Region a) Power Supply to M/s Noida Power Company Limited (NPCIL) NPCL has applied to CTU for connectivity for

More information

Agenda of 11 th System Studies Meeting in NER

Agenda of 11 th System Studies Meeting in NER Agenda of 11 th System Studies Meeting in NER Date: 16.12.2015. Venue: Hotel Nandan, Guwahati 1. Review of SPS I, II, III & SPS IV related to Palatana GBPP, OTPC after commissioning of Palatana Module

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1 TRANSMISSION CAPACITY ADDITION PROGRAMME DURING 2006-07 Sl. No. Contents Page No. 1 Introduction 1 2 Chapter 1 Transmission Capacity Additions During 2005-06 of 10 th plan period 3 Chapter 2 Construction

More information

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW- This document is scheduled to be published in the Federal Register on 08/29/2016 and available online at http://federalregister.gov/a/2016-20620, and on FDsys.gov 6450-01-P DEPARTMENT OF ENERGY Southeastern

More information

Need Assessment Document (NAD) DDUGJY

Need Assessment Document (NAD) DDUGJY Need Assessment Document (NAD) DDUGJY Index SNo. Details Page No. 1.0 General Instruction 3 2.0 Objectives of DDUGJY 5 3.0 Scope of works 7 4.0 General information of project area 10 5.0 Details of existing

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE Objections/ comments invited from various stakeholders on ARR filing and Tariff Petition of Hydro Electric Stations, Gas Turbine

More information

CASE No. 35 of In the matter of

CASE No. 35 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010 FINAL FACILITY STUDY 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1 September 10, 2010 I. Introduction This is a revised facility study performed for Transmission Queue Request 2009

More information

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 1 OF 7 TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH 1.0 SCOPE:

More information

CASE No. 114 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

CASE No. 114 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description Final Draft Report Assessment Summary Hydro One Networks Inc. : Refurbish 115/44 kv, 25/33/42 MVA DESN Station CAA ID Number: 2007-EX360 1.0 General Description Hydro One is proposing to replace the existing

More information

Enhancing Grid Stability in India

Enhancing Grid Stability in India India Japan Energy Forum 2017 Enhancing Grid Stability in India 9 January 2017 Nomura Research Institute 7 th Floor, Tower A, Building 5 DLF Cyber City, Phase III Gurgaon, India Otemachi Financial City

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 1 of 5. Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 2 Definitions 2 Not seen the definition for Inspector. But with, - Qualifications,

More information

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676) P.O BOX 429, NUKU ALOFA, Tel: (676) 27-390 Fax: (676) 23-047 Email: jvanbrink@tongapower.to 22 October 2012 Lord Dalgety Electricity Commission Tu atakilangi Nuku alofa Dear Lord Dalgety Compliance Reporting

More information

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Australian Capital Territory Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Disallowable instrument DI2016 189 made under the Utilities Technical Regulation

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014 Policy & Regulatory Issues : Solar & Wind Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014 About Us Vision To develop a solution with low cost, high technology power generation & fulfill

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT ENQUIRY NOTICE INVITING TENDER Phone:

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION Work Order No: File Reference: 16/2/1 This application form for the connection of small scale embedded generation is for small

More information

Emerald Reactive Support Alternative Solution Expressions of interest

Emerald Reactive Support Alternative Solution Expressions of interest Emerald Reactive Support Alternative Solution Expressions of interest Publishing Date 21/02/2017 Closing Date 21/03/2017 1. Executive Summary Ergon Energy Corporation Limited (EECL) is seeking expressions

More information

WP2 - CFD Private Network Meter Commissioning, Proving and Calibration Tests

WP2 - CFD Private Network Meter Commissioning, Proving and Calibration Tests WP2 - CFD Private Network Meter Commissioning, Proving and Calibration Tests EMRS Working Practice Public Version: 2.0 Date: 13 October 2017 Table of Contents Change Amendment Record 3 1. Introduction

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1 Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide Version 1.1 October 21, 2016 1 Table of Contents: A. Application Processing Pages 3-4 B. Operational Modes Associated

More information

Electric Networks/Ina Lehto Updated Original 12/2011

Electric Networks/Ina Lehto Updated Original 12/2011 1 TECHNICAL APPENDIX 2 TO THE GUIDELINES CONNECTING AN ELECTRICITY GENERATION INSTALLATION TO THE DISTRIBUTION NETWORK CONNECTING AN INSTALLATION WITH A NOMINAL RATED CAPACITY OF OVER 100 These instructions

More information

List of members of TCC. Chairman & Managing Director, MPPGCL, 12 Executive Director (O&M-Gen), MPPGCL, Jabalpur. Jabalpur.

List of members of TCC. Chairman & Managing Director, MPPGCL, 12 Executive Director (O&M-Gen), MPPGCL, Jabalpur. Jabalpur. MAILING LIST FOR 22ND WRPC List of members of WRPC List of members of TCC 1 CMD,MSEDCL& Chairman, WRPC 1 Director(Operation),MSETCL & Chairman, TCC 2 Member (GO&D), CEA, New Delhi 2 Chief Engineer (GM),

More information

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India.

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India. Document: BHEL/EDN/SCPV/D91/EOI Revision: 01 Date: 12-Oct-2009 EXPRESSION OF INTEREST (EOI) FOR TECHNOLOGY PARTNERSHIP IN SEMICONDUCTOR DEVICE MANUFACTURING (IGBT Encapsulation Technology, Expansion of

More information

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update MEETING DATE: August 31, 2005 SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update RECOMMENDATION It is recommended that the Commission: i) Receive for information

More information

DRAFT. Guidelines on Power quality & safety issues in usage of roof-top solar pv system CENTRAL ELECTRICITY AUTHORITY

DRAFT. Guidelines on Power quality & safety issues in usage of roof-top solar pv system CENTRAL ELECTRICITY AUTHORITY DRAFT Guidelines on Power quality & safety issues in usage of roof-top solar pv system CENTRAL ELECTRICITY AUTHORITY 2018 1. INTRODUCTION Solar energy has become the most popular renewable energy source

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER 1 Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER Lisa Dangelmaier Hawaii Electric Light lisa.dangelmaier@hawaiielectriclight.com Hawai'i Electric Light System Overview

More information

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION Presentation by Engr. O. C. Akamnnonu Chief Executive Officer, Ikeja Electricity Distribution Company AGENDA WORK THROUGH

More information

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017) NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. (0) 0 0 IN THE MATTER OF the Electrical Power Control Act,, SNL, Chapter E-. (the EPCA ) and the Public

More information

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India 26th March 2014 Infrastructure Revitalization in India 1 Outline Indian Power System Indian Grid - WAMS

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017 MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES Published: 3 August 2017 INCIDENT CLASSIFICATIONS

More information

Taxis and Accessible Services Division Medallion Reform Background May 1, 2018

Taxis and Accessible Services Division Medallion Reform Background May 1, 2018 Introduction: Taxis and Accessible Services Division Medallion Reform Background May 1, 2018 SFMTA s Taxis and Accessible Services Division is responsible for the regulation of the private businesses that

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 07.01.2016 PRESENT: 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Sri Indu

More information

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AEP Texas (comprised of its Central and North Divisions

More information

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

Updates. Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission and Regional Updates Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission Overview 16,400 circuit-miles of transmission lines 12,685 MW record peak demand

More information

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew. Guide Department: Interconnection Services Document No: GD-1401 v1.0 Title: WIND ISLANDING Issue Date: 11-24-2014 Previous Date: N/A Contents 1 PURPOSE... 2 2 SCOPE AND APPLICABILITY... 2 3 ROLES AND RESPONSIBILITIES...

More information

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517 Website: www.hpgcl.org.in E-mail- ceplg@hpgcl.org.in EXPRESSION

More information

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G.Road, Bangalore-560 001 Present: Shri M.R. Sreenivasa Murthy Chairman Shri H. D. Arun Kumar Shri D.B. Manival

More information

PHILIPPINE DISTRIBUTION CODE 2017 EDITION

PHILIPPINE DISTRIBUTION CODE 2017 EDITION PHILIPPINE DISTRIBUTION CODE 2017 EDITION PDC 2017- Background Revised the PDC 2001 Starts of revision in 2010 April 18 and 24, 2012 conducted a series of expository presentation for Visayas and Mindanao

More information

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg :Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg Technical Branch (Per) TANGEDCO Proceedings. (FB) No.

More information

YUKON DEVELOPMENT CORPORATION

YUKON DEVELOPMENT CORPORATION YUKON DEVELOPMENT CORPORATION 2 http://www.ydc.yk.ca YUKON DEVELOPMENT CORPORATION ANNUAL REPORT 2016 TABLE OF CONTENTS Message from the Chair...4 Message from the President and Chief Executive Office...

More information

SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT /

SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT / SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT / 2005-06 SR.NO ITEM PAGE 1. SCOPE 2 2. WEATHER CONDITIONS 2 3. RATED VOLTAGE & FREQUENCY 2 4. GENERAL REQUIREMENT

More information

Key DRAFT OPERATING CODE 2 LEGAL TEXT

Key DRAFT OPERATING CODE 2 LEGAL TEXT Key DRAFT OPERATING CODE 2 LEGAL TEXT 1) Blue Text From Grid Code 2) Black Text Changes / Additional words 3) Orange/ Brown text From RfG 4) Purple From HVDC Code 5) Green From DCC (not used in this document)

More information

SPP Notification to Construct

SPP Notification to Construct February 19, 2014 SPP Notification to Construct Mr. Mo Awad Westar Energy, Inc. P.O. Box 889 Topeka, KS 66601 RE: Notification to Construct Approved Reliability Network Upgrades Dear Mr. Awad, Pursuant

More information

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation CONNECTION ASSESSMENT & APPROVAL PROCESS ASSESSMENT SUMMARY Applicant: Project: Cardinal Substation Modification of 115kV Substation CAA ID: 2002 EX071 Long Term Forecasts & Assessments Department\ Consistent

More information

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal Reactive Power Requirements and Financial Compensation July 21, 2016 Table of Contents 1. Introduction... 3 2. Changes to Proposal... 4 3. Plan for Stakeholder Engagement... 4 4.... 4 6. Next Steps...

More information

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD ABSTRACT --------------------------------------------------------------------------------------------------------- Electricity - Madurai Region -

More information

Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota

Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota P a g e 1 Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota The purpose of this document is to provide Garden Operators further documentation of engineering

More information

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011 POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011 PREPARED BY: Electricity System Operations Planning and Performance DATE: 22 March 2012 FINAL

More information

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0 ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES 2018-04-24 - Revision 0 EUB Decision 2007-071 Board Direction 52 For questions or comments regarding

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014 Solar and Smart Meter Update 1 April 2014 to 30 June 2014 Released July 2014 2 CONTENTS 1. Solar and Smart Meter Cases... 3 2. SMART METER UPDATE... 4 2.1. EWOV Smart Meter Cases Increase by 36%... 4 2.2.

More information

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05.

Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05. Minutes of the 19 th meeting of the Standing committee on transmission system of Northern Region held at Amritsar on 01/10/05. 1. List of the participants is enclosed at Annex - I. Member (PS) CEA welcomed