DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. ALLETE Inc dba Minnesota Power Inc

Size: px
Start display at page:

Download "DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. ALLETE Inc dba Minnesota Power Inc"

Transcription

1 DRAFT/PROPOSED AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO ALLETE Inc dba Minnesota Power Inc Minnesota Power Laskin Energy Center 5699 Colby Lake Road Hoyt Lakes, St. Louis County, Minnesota The emission units, control equipment and emission stacks at the stationary source authorized in this permit reissuance are as described in the Permit Applications Table. The conditions included in Stage 1 of this permit action are effective on the Stage 1 Issuance Date shown below. Stage 1 condition authorize construction of the facility and operation of EU 001 and EU 002 emission units at the address listed above until final action is take on Stage 2. Air Emission Permit No remains effective until the Stage 2 Issue Date shown below. Beginning on the Stage 2 Issue Date shown below, Air Emission Permit No supersedes Air Emission Permit No and authorizes the Permittee to operate the stationary source at the address listed above unless otherwise noted in Table A. The Permittee must comply with all the conditions of the permit. Any changes or modifications to the stationary source must be performed in compliance with Minn. R to Terms used in the permit are as defined in the state air pollution control rules unless the term is explicitly defined in the permit. Unless otherwise indicated, all the Minnesota rules cited as the origin of the permit terms are incorporated into the SIP under 40 CFR and as such as are enforceable by U.S. Environmental Protection Agency (EPA) Administrator or citizens under the Clean Air Act. Permit Type: Federal; Pt 70/Major for NSR Operating Permit Issue Date: <issue date> Stage 1 Issue Date Authorization to Construct and Operate: Stage 2 Issue Date Part 70 Reissuance: Expiration Date: <expiration date or Non Expiring> All Title I Conditions do not expire. Stage 1 Issuance Stage 2 Issuance Don Smith, P.E., Manager Don Smith, P.E., Manager Air Quality Permits Section Industrial Division Air Quality Permits Section Industrial Division for John Linc Stine for John Linc Stine Commissioner Minnesota Pollution Control Agency Commissioner Minnesota Pollution Control Agency Permit Applications Table TDD (for hearing and speech impaired only): (651) Printed on recycled paper containing at least 10% fibers from paper recycled by consumers

2 Permit Type Application Date Permit Action Total Facility Operating Permit Reissuance May 29, 2013 Reopening August 5, 2009 Administrative Amendment February 28, Major Amendment October 10, 2013 TABLE OF CONTENTS Notice to the Permittee Permit Shield Facility Description Table A: Limits and Other Requirements Table B: Submittals Appendices Appendix A [Reserved] Appendix B Acid Rain Permit Application Appendix C Insignificant Activities Required to be Listed Appendix D [Reserved] Appendix E Sulfur Dioxide (SO 2 ) Modeling Parameters Appendix F Nitrogen Oxides (NO X ) and Particulate matter smaller than 10 microns (PM 10 ) Modeling Parameters

3 NOTICE TO THE PERMITTEE: Your stationary source may be subject to the requirements of the Minnesota Pollution Control Agency s (MPCA) solid waste, hazardous waste, and water quality programs. If you wish to obtain information on these programs, including information on obtaining any required permits, please contact the MPCA general information number at: Metro Area Outside Metro Area TTY The rules governing these programs are contained in Minn. R. chs Written questions may be sent to: Minnesota Pollution Control Agency, 520 Lafayette Road North, St. Paul, Minnesota Questions about this air emission permit or about air quality requirements can also be directed to the telephone numbers and address listed above. PERMIT SHIELD: Subject to the limitations in Minn. R , compliance with the conditions of this permit shall be deemed compliance with the specific provision of the applicable requirement identified in the permit as the basis of each condition. Subject to the limitations of Minn. R and , subp. 2, notwithstanding the conditions of this permit specifying compliance practices for applicable requirements, any person (including the Permittee) may also use other credible evidence to establish compliance or noncompliance with applicable requirements. FACILITY DESCRIPTION: The Laskin Energy Center (LEC) is an electric generating facility located near Aurora, Minnesota. The net generating capacity is 110 megawatts. Prior to the implementation of the physical changes authorized by this permit action, this electric power facility contained two identical steam generating boilers, coal receiving, handling, and storage facilities, and ash handling and storage capabilities. Each boiler had twelve 4 million British thermal units (mmbtu/hr) natural gas/oil fired ignitors and dry low NO X combustors. Each boiler vented emissions to a high efficiency wet scrubber that discharged to the atmosphere through a common stack. The scrubbers controlled Particulate Matter (PM), PM 10, SO 2, and lead. The permit action authorizes the conversion of two existing boilers at LEC from predominantly coal combustion to exclusively natural gas combustion. This project will require that the burners in the two existing boilers be replaced in order to accommodate the fuel switch from coal to natural gas. The two boilers will continue to discharge to a common stack. As part of the conversion project, the coal crusher and ash handling equipment will be idled or removed. The coal piles will also be removed, eliminating the need for coal pile maintenance) and fugitive emissions from wind erosion. The existing scrubbers and low NO X coal burners will be retired. New low NO X natural gas burners will also be installed.

4 Facility Name: Minnesota Power - Laskin Energy Center Permit Number: A-1 Table A contains limits and other requirements with which your facility must comply. The limits are located in the first column of the table (What To do). The limits can be emission limits or operational limits. This column also contains the actions that you must take and the records you must keep to show that you are complying with the limits. The second column of Table A (Why to do it) lists the regulatory basis for these limits. Appendices included as conditions of your permit are listed in Table A under total facility requirements. Subject Item: Total Facility MODELING REQUIREMENTS What to do Why to do it THE FOLLOWING MODELING REQUIREMENT DOES NOT APPLY FOLLOWING THE CONVERSION OF BOILER #1 AND BOILER #2 TO NATURAL GAS. Parameters Used in Modeling: The parameters used in the modeling performed for determining emission and/or operational limits for this facility are listed in Appendix E of this permit. If the Permittee intends to change any of these parameters, the Permittee must submit the revised parameters to the Commissioner and receive written approval before making any changes. The revised parameter information submittal must include, but is not limited to: the locations, heights and diameters of the stacks; locations and dimensions of nearby buildings; velocity and temperatures of the gases emitted; and the emission rates. The plume dispersion characteristics due to the parameter revisions must equal or exceed the dispersion characteristics modeled for this permit, and the Permittee shall demonstrate this in the proposal. If the information does not demonstrate equivalent or better dispersion characteristics, or if a conclusion cannot readily be made about the dispersion, the Permittee must remodel. Parameters Used in Modeling (continued): For changes that do not involve an increase in an emission rate and that do not require a permit amendment, the proposal must be submitted as soon as practicable, but no less than 60 days before making the change to any parameter. For changes involving increases in emission rates and that require a minor permit amendment, the proposal must be submitted as soon as practicable, but no less than 60 days before making the change to any parameter. For changes involving increases in emission rates and that require a permit amendment other than a minor amendment, the proposal must be submitted prior to or with the permit amendment application. Minn. Stat. Section , subds. 4a & 9; Minn. R , subps 7A, 7L & 7M; Minn. R , subps. 1, 2 & 4; Minn. R CONTINUED CONTINUED This is a state only requirement and is not enforceable by the EPA Administrator and citizens under the Clean Air Act. DETERMINING IF A PROJECT/MODIFICATION IS SUBJECT TO NSR These requirements apply if a reasonable possibility (RP) as defined in 40 CFR Section 52.21(r)(6)(vi) exists that a proposed project, analyzed using the actual-to-projected-actual (ATPA) test (either by itself or as part of the hybrid test at Section 52.21(a)(2)(iv)(f)) and found to not be part of a major modification, may result in a significant emissions increase (SEI). If the ATPA test is not used for the project, or if there is no RP that the proposed project could result in a SEI, these requirements do not apply to that project. The Permittee is only subject to the Preconstruction Documentation requirement for a project where a RP occurs only within the meaning of Section 52.21(r)(6)(vi)(b). Title I Condition: 40 CFR Section 52.21(r)(6); Minn. R ; Minn. R , subp. 2 Even though a particular modification is not subject to New Source Review (NSR), or where there isn't a RP that a proposed project could result in a SEI, a permit amendment, recordkeeping, or notification may still be required by Minn. R

5 Facility Name: Minnesota Power - Laskin Energy Center Permit Number: A-2 Preconstruction Documentation -- Before beginning actual construction on a project, the Permittee shall document the following: 1. Project description 2. Identification of any emission unit (EU) whose emissions of an NSR pollutant could be affected 3. Pre-change potential emissions of any affected existing EU, and the projected post-change potential emissions of any affected existing or new EU. 4. A description of the applicability test used to determine that the project is not a major modification for any regulated NSR pollutant, including the baseline actual emissions, the projected actual emissions, the amount of emissions excluded due to increases not associated with the modification and that the EU could have accommodated during the baseline period, an explanation of why the amounts were excluded, and any creditable contemporaneous increases and decreases that were considered in the determination. Title I Condition: 40 CFR Section 52.21(r)(6); Minn. R ; Minn. R , subp. 4; Minn. R , subps. 4 & 5 The Permittee shall maintain records of this documentation. The Permittee shall monitor the actual emissions of any regulated NSR pollutant that could increase as a result of the project and that were analyzed using the ATPA test, and the potential emissions of any regulated NSR pollutant that could increase as a result of the project and that were analyzed using potential emissions in the hybrid test. The Permittee shall calculate and maintain a record of the sum of the actual and potential (if the hybrid test was used in the analysis) emissions of the regulated pollutant, in tons per year on a calendar year basis, for a period of 5 years following resumption of regular operations after the change, or for a period of 10 years following resumption of regular operations after the change if the project increases the design capacity of or potential to emit of any unit associated with the project. The Permittee must submit a report to the Agency if the annual summed (actual, plus potential if used in hybrid test) emissions differ from the preconstruction projection and exceed the baseline actual emissions by a significant amount as listed at 40 CFR Section 52.21(b)(23). Such report shall be submitted to the Agency within 60 days after the end of the year in which the exceedances occur. The report shall contain: a. The name and ID number of the facility, and the name and telephone number of the facility contact person b. The annual emissions (actual, plus potential if any part of the project was analyzed using the hybrid test) for each pollutant for which the preconstruction projection and significant emissions increase are exceeded. c. Any other information, such as an explanation as to why the summed emissions differ from the preconstruction projection. Before beginning actual construction of any project which includes any electric utility steam generating unit (EUSGU), the Permittee shall submit a copy of the preconstruction documentation (items 1-4 under Preconstruction Documentation, above) to the Agency. This condition shall not be construed to require the Permittee to obtain any determination from the Administrator before beginning construction. Title I Condition: 40 CFR Section 52.21(r)(6); Minn. R ; Minn. R , subps. 4 & 5 Title I Condition: 40 CFR Section 52.21(r)(6); Minn. R ; Minn. R , subps. 4 & 5 Title I Condition: 40 CFR Section 52.21(r)(6)(ii); Minn. R ; Minn. R ; Minn. R , subps. 4 & 5 The Permittee shall comply with state and federal permitting rules and obtain the required permits prior to beginning construction. For any project which includes any EUSGU, the Permittee must submit an annual report to the Agency, within 60 days after the end of the calendar year. The report shall contain: Title I Condition: 40 CFR Section 52.21(r)(6); Minn. R ; Minn. R , subps. 4 & 5 a. The name and ID number of the facility, and the name and telephone number of the facility contact person b. The quantified annual emissions analyzed using the ATPA test, plus the potential emissions associated with the same project analyzed as part of a hybrid test. c. Any other information, such as an explanation as to why the summed emissions differ from the preconstruction projection, if that is the case.

6 Facility Name: Minnesota Power - Laskin Energy Center Permit Number: A-3 For any project which does not include any EUSGU, the Permittee must submit a report to the Agency if the annual summed (actual, plus potential used in hybrid test) emissions differ from the preconstruction projection and exceed the baseline actual emissions by a significant amount as listed at 40 CFR Section 52.21(b)(23). Such report shall be submitted to the Agency within 60 days after the end of the year in which the exceedances occur. The report shall contain: Title I Condition: 40 CFR Section 52.21(r)(6); Minn. R ; Minn. R , subps. 4 & 5 a. The name and ID number of the facility, and the name and telephone number of the facility contact person b. The annual emissions (actual, plus potential if any part of the project was analyzed using the hybrid test) for each pollutant for which the preconstruction projection and significant emissions rate is exceeded. c. Any other information, such as an explanation as to why the summed emissions differ from the preconstruction projection. OPERATIONAL REQUIREMENTS The Permittee shall comply with National Primary and Secondary Ambient Air Quality Standards, 40 CFR pt. 50, and the Minnesota Ambient Air Quality Standards, Minn. R to Compliance shall be demonstrated upon written request by the MPCA. Circumvention: Do not install or use a device or means that conceals or dilutes emissions, which would otherwise violate a federal or state air pollution control rule, without reducing the total amount of pollutant emitted. Air Pollution Control Equipment: Operate all pollution control equipment whenever the corresponding process equipment and emission units are operated. Operation and Maintenance Plan: Retain at the stationary source an operation and maintenance plan for all air pollution control equipment. At a minimum, the O & M plan shall identify all air pollution control equipment and control practices and shall include a preventative maintenance program for the equipment and practices, a description of (the minimum but not necessarily the only) corrective actions to be taken to restore the equipment and practices to proper operation to meet applicable permit conditions, a description of the employee training program for proper operation and maintenance of the control equipment and practices, and the records kept to demonstrate plan implementation. Operation Changes: In any shutdown, breakdown, or deviation the Permittee shall immediately take all practical steps to modify operations to reduce the emission of any regulated air pollutant. The Commissioner may require feasible and practical modifications in the operation to reduce emissions of air pollutants. No emissions units that have an unreasonable shutdown or breakdown frequency of process or control equipment shall be permitted to operate. Fugitive Emissions: Do not cause or permit the handling, use, transporting, or storage of any material in a manner which may allow avoidable amounts of particulate matter to become airborne. Comply with all other requirements listed in Minn. R Noise: The Permittee shall comply with the noise standards set forth in Minn. R to at all times during the operation of any emission units. This is a state only requirement and is not enforceable by the EPA Administrator or citizens under the Clean Air Act. Inspections: The Permittee shall comply with the inspection procedures and requirements as found in Minn. R , subp. 9(A). The Permittee shall comply with the General Conditions listed in Minn. R , subp. 16. PERFORMANCE TESTING Performance Testing: Conduct all performance tests in accordance with Minn. R. ch unless otherwise noted in Tables A, B, and/or C. Performance Test Notifications and Submittals: Performance Tests are due as outlined in Table A of the permit. See Table B for additional testing requirements. Performance Test Notification (written): due 30 days before each Performance Test Performance Test Plan: due 30 days before each Performance Test Performance Test Pre-test Meeting: due 7 days before each Performance Test Performance Test Report: due 45 days after each Performance Test Performance Test Report - Microfiche Copy: due 105 days after each Performance Test The Notification, Test Plan, and Test Report may be submitted in an alternative format as allowed by Minn. R Minn. Stat. Section , subds. 4a & 9; Minn. R , subp. 7(A), 7(L), & 7(M); Minn. R , subps. 1, 2 & 4; Minn. R Minn. R Minn. R , subp. 2; Minn. R , subp. 16(J) Minn. R , subps. 14 and 16(J) Minn. R , subp. 4 Minn. R Minn. R Minn. R , subp. 9(A) Minn. R , subp. 16 Minn. R. ch Minn. R ; Minn. R , subps. 1-4, Minn. R , subps. 1-2

7 Facility Name: Minnesota Power - Laskin Energy Center Permit Number: A-4 Limits set as a result of a performance test (conducted before or after permit issuance) apply until superseded as stated in the MPCA's Notice of Compliance letter granting preliminary approval. Preliminary approval is based on formal review of a subsequent performance test on the same unit as specified by Minn. R , subp. 3. The limit is final upon issuance of a permit amendment incorporating the change. MONITORING REQUIREMENTS Monitoring Equipment Calibration - The Permittee shall either: Minn. R , subp. 3 Minn. R , subp. 4(D) 1. Calibrate or replace required monitoring equipment every 12 months; or 2. Calibrate at the frequency stated in the manufacturer's specifications. For each monitor, the Permittee shall maintain a record of all calibrations, including the date conducted, and any corrective action that resulted. The Permittee shall include the calibration frequencies, procedures, and manufacturer's specifications (if applicable) in the Operations and Maintenance Plan. Any requirements applying to continuous emission monitors are listed separately in this permit. Operation of Monitoring Equipment: Unless otherwise noted in Tables A, B, and/or C, monitoring a process or control equipment connected to that process is not necessary during periods when the process is shutdown, or during checks of the monitoring systems, such as calibration checks and zero and span adjustments. If monitoring records are required, they should reflect any such periods of process shutdown or checks of the monitoring system. RECORDKEEPING Recordkeeping: Retain all records at the stationary source, unless otherwise specified within this permit, for a period of five (5) years from the date of monitoring, sample, measurement, or report. Records which must be retained at this location include all calibration and maintenance records, all original recordings for continuous monitoring instrumentation, and copies of all reports required by the permit. Records must conform to the requirements listed in Minn. R , subp. 5(A). Recordkeeping: maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of the facility including malfunction of the air pollution control equipment or any periods during which a continuous monitoring system or monitoring device is inoperative. Recordkeeping: Maintain records describing any insignificant modifications (as required by Minn. R , subp. 3) or changes contravening permit terms (as required by Minn. R , subp. 2), including records of the emissions resulting from those changes. If the Permittee determines that no permit amendment or notification is required prior to making a change, the Permittee must retain records of all calculations required under Minn. R For expiring permits, these records shall be kept for a period of five years from the date the change was made or until permit reissuance, whichever is longer. The records shall be kept at the stationary source for the current calendar year of operation and may be kept at the stationary source or office of the stationary source for all other years. The records may be maintained in either electronic or paper format. REPORTING/SUBMITTALS Shutdown Notifications: Notify the Commissioner at least 24 hours in advance of a planned shutdown of any control equipment or process equipment if the shutdown would cause any increase in the emissions of any regulated air pollutant. If the owner or operator does not have advance knowledge of the shutdown, notification shall be made to the Commissioner as soon as possible after the shutdown. However, notification is not required in the circumstances outlined in Items A, B and C of Minn. R , subp. 3. At the time of notification, the owner or operator shall inform the Commissioner of the cause of the shutdown and the estimated duration. The owner or operator shall notify the Commissioner when the shutdown is over. Minn. R , subp. 4(D) Minn. R , subp. 5(C) Minn. R , subp. 2 Minn. R , subp. 5(B) Minn. R , subp. 4 Minn. R , subp. 3

8 Facility Name: Minnesota Power - Laskin Energy Center Permit Number: A-5 Breakdown Notifications: Notify the Commissioner within 24 hours of a breakdown of more than one hour duration of any control equipment or process equipment if the breakdown causes any increase in the emissions of any regulated air pollutant. The 24-hour time period starts when the breakdown was discovered or reasonably should have been discovered by the owner or operator. However, notification is not required in the circumstances outlined in Items A, B and C of Minn. R , subp. 2. At the time of notification or as soon as possible thereafter, the owner or operator shall inform the Commissioner of the cause of the breakdown and the estimated duration. The owner or operator shall notify the Commissioner when the breakdown is over. Shutdown and Breakdown Reporting Requirement for the Dust Collector Systems for Material Handling Equipment: Minn. R , subp. 2 Minn. R , subp. 2 Shutdowns and breakdowns shall be reported on a quarterly basis to the Agency. The quarterly report shall include an identification of any dust collector that experienced a breakdown and/or shutdown, the time and reason for the breakdown or shutdown, a description of any repairs made, and the date and time the dust collector was placed back in service. Notification of Deviations Endangering Human Health or the Environment: As soon Minn. R , subp. 1 as possible after discovery, notify the Commissioner or the state duty officer, either orally or by facsimile, of any deviation from permit conditions which could endanger human health or the environment. Notification of Deviations Endangering Human Health or the Environment Report: Minn. R , subp. 1 Within 2 working days of discovery, notify the Commissioner in writing of any deviation from permit conditions which could endanger human health or the environment. Include the following information in this written description: 1. the cause of the deviation; 2. the exact dates of the period of the deviation, if the deviation has been corrected; 3. whether or not the deviation has been corrected; 4. the anticipated time by which the deviation is expected to be corrected, if not yet corrected; and 5. steps taken or planned to reduce, eliminate, and prevent reoccurrence of the deviation. Application for Permit Amendment: If a permit amendment is needed, submit an Minn. R application in accordance with the requirements of Minn. R through Minn. R Submittal dates vary, depending on the type of amendment needed. Extension Requests: The Permittee may apply for an Administrative Amendment to Minn. R , subp. 1(H) extend a deadline in a permit by no more than 120 days, provided the proposed deadline extension meets the requirements of Minn. R , subp. 1(H). Performance testing deadlines from the General Provisions of 40 CFR pt. 60 and pt. 63 are examples of deadlines for which the MPCA does not have authority to grant extensions and therefore do not meet the requirements of Minn. R , subp. 1(H). Emission Inventory Report: due on or before April 1 of each calendar year following Minn. R permit issuance, to be submitted on a form approved by the Commissioner. Emission Fees: due 30 days after receipt of an MPCA bill. Minn. R ACID RAIN PROGRAM REQUIREMENTS Comply with all acid rain requirements. These are included in Tables A and B and also in the acid rain permit attached as Appendix B. Emissions from the stationary source cannot exceed any allowances that the source lawfully holds under federal acid rain regulations, except as allowed by Minn. R , subp. 7. If the unit has excess emissions, the designated representative shall submit a proposed offset plan in accordance with 40 CFR Section 72.9(e). Keep the certificate of representation, all emissions monitoring information, copies of all reports, compliance certifications and related submissions and all records made or required under the Acid Rain Program on site for a period of 5 years from the date the document was created. Recordkeeping: Keep on site at the source each of the following documents for a period of 5 years from the date the document is created: The certificate of representation, all emissions monitoring information, copies of all reports, compliance certifications, and other submissions or records made under the Acid Rain Program, copies of all documents used to complete an acid rain permit application. 40 CFR pts. 72, 73, 75 and 76; Minn. R Minn. R , subp CFR Section 72.9(e); Minn. R CFR Section 72.9(f); Minn. R CFR Section 72.9(f)(l); Minn. R

9 Facility Name: Minnesota Power - Laskin Energy Center Permit Number: A-6 Apply for Acid Rain Program Permit reissuance: The designated representative shall submit a complete Acid Rain permit application for each source with an affected unit at least 6 months prior to the expiration of an existing Acid Rain Permit in accordance with 40 CFR Section 72.30(c). CONSTRUCTION AUTHORIZATION Under Air Emission Permit No , the Permittee is authorized to modify EU 001 and EU 002 to burn only natural gas. The modified units shall meet all applicable requirements of this permit. Within 18 months of the issuance of Air Emission Permit No , the authorization to initiate construction expires. The authorization to construct also expires if there is an interruption in construction of 18 months or more. The Permittee must keep a record of the dates of installation and start-up on site. The Permittee may apply for an extension of the construction authorization deadline by following the Administrative Amendment provisions in Minn. R CFR Section 72.30(c); Minn. R [Stage 1] Title I Condition: To avoid classification of changes as major modifications under 40 CFR Section & Minn. R

10 Facility Name: Permit Number: Minnesota Power - Laskin Energy Center Subject Item: GP 001 Boilers A-7 Associated Items: CE 001 Wet Scrubber - High Efficiency CE 002 Wet Scrubber - High Efficiency CE 006 Overfire Air CE 007 Overfire Air CE 008 Low NOx Burners CE 009 Low NOx Burners EU 001 Boiler - Unit #1; CE 001, CE 006, CE 008 EU 002 Boiler - Unit #2; CE 002, CE 007, CE 009 SV 001 Common Boiler Stack FIRST OPERATING SCENARIO What to do Why to do it THE FOLLOWING CONDITIONS APPLY TO TO GP 001 PRIOR TO THE CONVERSION OF BOILER - UNIT #1 AND BOILER - UNIT #2 TO NATURAL GAS Carbon Monoxide: less than or equal to tons/year on a calendar year basis for both boilers combined. This limit and associated recordkeeping is suspended if CO emission factor testing of EU 001 and EU 002 demonstrates a CO emission factor less than or equal to lb/mmbtu for each emission unit. This limit is re-instated if a subsequent EU 001 or EU 002 CO emission factor test measures CO in excess of lb/mmbtu. GP 001 CO Emissions Monitoring and Recordkeeping: The Permittee shall calculate and record the GP 001 calendar year CO emissions by January 30 of each year, for the previous calendar year. SECOND OPERATING SCENARIO Minn. R , subp. 2 to avoid 100 tpy environmental review potential emission increase threshold Minn. R , subp. 4 and 5 to avoid 100 tpy environmental review potential emission increase threshold THE FOLLOWING CONDITIONS APPLY TO GP 001 AFTER THE CONVERSION OF BOILER - UNIT #1 AND BOILER - UNIT #2 TO NATURAL GAS Permit conditions in GP 001 expire upon the conversion of Boiler - Unit #1 and Boiler - Unit #2 to natural gas. [STAGE 1] Minn. R , subp. 2

11 Facility Name: Permit Number: Minnesota Power - Laskin Energy Center Subject Item: GP 002 Scrubbers A-8 Associated Items: CE 001 Wet Scrubber - High Efficiency CE 002 Wet Scrubber - High Efficiency FIRST OPERATING SCENARIO What to do Why to do it THE FOLLOWING REQUIREMENTS APPLY TO EACH SCRUBBER IN GP 002 INDIVIDUALLY PRIOR TO THE CONVERSION OF BOILER - UNIT #1 AND BOILER - UNIT #2 TO NATURAL GAS The Permittee shall operate and maintain the scrubbers (CE 001 and CE 002) at all times that any emission unit controlled by the scrubbers (EU 001 and EU 002) is in operation. The Permittee shall document periods of non-operation of the control equipment. The Permittee shall operate and maintain control equipment such that it achieves an overall control efficiency for Total Particulate Matter: greater than or equal to 90 percent The Permittee shall operate and maintain the scrubbers in accordance with the Operation and Maintenance (O & M) Plan. The Permittee shall keep copies of the O & M Plan available onsite for use by staff and MPCA staff. Temperature: less than or equal to 175 degrees F using 3-hour Average at the common stack, unless a new limit is set pursuant to Minn. R , subp. 3 based on the values recorded during the most recent MPCA-approved performance test where compliance was demonstrated. The new limit shall be implemented upon receipt of the Notice of Compliance letter granting preliminary approval. The limit is final upon issuance of a permit amendment incorporating the change. If the 3-hour rolling average temperature is above the maximum temperature limit, the PM emitted during that time shall be considered uncontrolled until the average temperature is below the maximum temperature limit. This shall be reported as a deviation. Temperature Monitoring: The Permittee shall maintain and operate a thermocouple monitoring device that continuously indicates and records the stack temperature. The monitoring equipment must be in use and properly maintained whenever operation of the monitored control equipment is required. The monitoring device shall have a margin of error less than +/- 2.0 percent of the temperature being measured. The recording device shall also calculate the three-hour rolling average temperature. Recorded values outside the range specified in this permit are considered Deviations as defined by Minn. R , subp. 8a. Opacity: less than or equal to 20 percent using 3-hour average, unless a new limit is set pursuant to Minn. R , subp. 3 based on the values recorded during the most recent MPCA-approved performance test where compliance was demonstrated. The new limit shall be implemented upon receipt of the Notice of Compliance letter granting preliminary approval. The limit is final upon issuance of a permit amendment incorporating the change. If the 3-hour rolling average opacity is above the maximum opacity limit, the PM emitted during that time shall be considered uncontrolled until the average opacity is below the maximum opacity limit. This shall be reported as a deviation. Opacity Monitoring: The Permittee shall maintain and operate an opacity monitoring device that continuously indicates and records the opacity of the stack. The monitoring equipment must be in use and properly maintained whenever operation of the monitored control equipment is required. The monitoring device shall have a margin of error less than +/- 2.0 percent. The recording device shall also calculate the three-hour rolling average. Recorded values outside the range specified in this permit are considered Deviations as defined by Minn. R , subp. 8a. Daily Monitoring: The Permittee shall physically verify the operation of the temperature recording device at least once each operating day to verify that it is working and recording properly. The Permittee shall maintain a written or electronic record of the daily verifications. The Permittee shall maintain a high temperature alarm for the boiler operator. The Permittee shall maintain a continuous hard copy readout or computer disk file of the temperature and opacity readings and calculated three hour rolling average temperatures and opacity at the common stack. Annual Calibration: The Permittee shall calibrate the temperature monitor at least annually and shall maintain a written record of the calibration and any action resulting from the calibration. Minn. R , subps. 2 and 14 Minn. R , subps. 2 and CFR Section 64.7(b); Minn. R Minn. R , subps. 2 and 14 Minn. R , subps. 2 and 14; 40 CFR Section 64.3(b)(4)(ii); Minn. R ; 40 CFR Section 64.7(b); Minn. R Minn. R , subps. 2 and 14; 40 CFR Section 64.3(b)(4)(ii); Minn. R Minn. R , subps. 2 and 14; 40 CFR Section 64.3(b)(4)(ii); Minn. R ; 40 CFR Section 64.7(b); Minn. R Minn. R , subps. 2 and 14; 40 CFR Section 64.3(b); Minn. R Minn. R , subps. 2 and 14; 40 CFR Section 64.9(b); Minn. R CFR Section 64.3; Minn. R

12 Facility Name: Permit Number: Minnesota Power - Laskin Energy Center Quarterly Inspections: At least once per calendar quarter, the Permittee shall inspect the control equipment internal and external system components. The Permittee shall maintain a written record of the inspection and any corrective actions taken resulting from the inspection. Annual Inspection: At least once per calendar year, the Permittee shall conduct an internal inspection of the control device that includes all operating systems of the control device. The Permittee shall maintain a written record of the inspection and any action resulting from the inspection. For periods when the scrubber exhaust is below the maximum temperature and opacity, the Permittee shall use either one of the following when completing calculations as required elsewhere in this permit: a. The overall control efficiency limit specified in this permit for this equipment (90%); or b. The overall control efficiency determined during the most recent MPCA approved performance test. If the tested efficiency is less than the efficiency limit in this permit, the Permittee must use the tested value in all calculations until the efficiency is demonstrated to be above the permit limit through a new test. Corrective Actions: If the temperature and/or opacity is above the maximum specified by this permit or if the scrubber or any of its components are found during the inspections to need repair, the Permittee shall take corrective action as soon as possible. Corrective actions shall return the temperature and/or opacity to at least the permitted maximum and/or include completion of necessary repairs identified during the inspection, as applicable. Corrective actions include, but are not limited to, those outlined in the O & M Plan for the scrubbers. The Permittee shall keep a record of the type and date of any corrective action taken. Documentation of Need for Improved Monitoring: If the Permittee fails to achieve compliance with an emission limitation or standard for which the monitoring did not provide an indication of an excursion or exceedance while providing valid data, or the results of compliance or performance testing document a need to modify the existing maximum exhaust temperature, the Permittee shall promptly notify the MPCA and, if necessary, submit a permit amendment application to address the necessary monitoring changes. As required by 40 CFR Section 64.9(a)(2), for the Semi-Annual Deviations Report listed in Table B of this permit and/or the Notification of Deviations Endangering Human Health and the Environment listed earlier in Table A of this permit, as applicable, the Permittee shall include the following related to the monitoring identified as required by 40 CFR pt. 64: 1) Summary information on the number, duration, and cause of excursions or exceedances, as applicable, and the corrective action taken; and 2) Summary information on the number, duration, and cause for monitor downtime incidents. The Permittee shall maintain records of monitoring data, monitor performance data, corrective actions taken, and other supporting information required to be maintained. The Permittee may maintain records on alternative media, such as microfilm, computer files, magnetic tape disks, or microfiche, provided that the use of such alternative media allows for expeditious inspection and review, and does not conflict with other applicable recordkeeping requirements. SECOND OPERATING SCENARIO THE FOLLOWING CONDITIONS APPLY TO GP 002 AFTER THE CONVERSION OF BOILER - UNIT #1 AND BOILER - UNIT #2 TO NATURAL GAS Permit conditions in GP 002 expire upon the conversion of Boiler - Unit #1 and Boiler - Unit #2 to natural gas. A-9 40 CFR Section 64.3; Minn. R CFR Section 64.3; Minn. R Minn. R , subp. 4 and 5 40 CFR Section 64.7(d); Minn. R CFR Section 64.7(e); Minn. R CFR Section 64.9(a)(2); Minn. R CFR Section 64.9(b); Minn. R [STAGE 1] Minn. R , subp. 2

13 Facility Name: Permit Number: Minnesota Power - Laskin Energy Center Subject Item: GP 003 COMS/CEMS Requirements A-10 Associated Items: MR 007 Opacity MR 008 SO2 MR 009 NOx MR 010 CO2 What to do THE FOLLOWING CONDITIONS APPLY TO THE GP 003 MONITORS BOTH PRIOR TO AND FOLLOWING THE CONVERSION OF BOILER - UNIT #1 AND BOILER - UNIT #2 TO NATURAL GAS COMS REQUIREMENTS (PART 75) Additional monitoring requirements are located at the individual MR level. Monitoring Data: All COMS data must be reduced to six-minute averages. A six minute average is valid only if it contains data from at least five minutes within the averaging period. COMS data shall be reduced and calculated as outlined in Minn. R , subp. 3. COMS Certification: The owner or operator shall ensure that each COMS required by this part meets the initial certification requirements of this section and shall ensure that all applicable initial certification tests under paragraph (c) of this section are completed by the deadlines specified in 40 CFR Section 75.4 and prior to use in the Acid Rain Program. In addition, whenever the owner or operator installs a continuous emission or opacity monitoring system in order to meet the requirements of Sections through 75.18, where no continuous emission or opacity monitoring system was previously installed, initial certification is required. (Section 75.20(c)(8) outlines the COMS certification requirements.) COMS Certification Test Plan: due 30 days before COMS Certification Test COMS Certification Test Pretest Meeting: due 7 days before COMS Certification Test COMS Certification Test Report: due 45 days after COMS Certification Test COMS Certification Test Report - Microfiche Copy: due 105 days after COMS Certification Test The Notification, Test Plan, and Test Report may be submitted in alternate format as allowed by Minn. R , subp. 2 Certification Application: The owner or operator shall apply for certification of each continuous emission or opacity monitoring system used under the Acid Rain Program. The owner or operator shall submit the certification application in accordance with 40 CFR Section and each complete certification application shall include the information specified in Section Continuous Operation: COMS must be operated and data recorded during all periods of emission unit operation including periods of emission unit start-up, shutdown, or malfunction except for periods of acceptable monitor downtime. This requirement applies whether or not a numerical emission limit applies during these periods. A COMS must not be bypassed except in emergencies where failure to bypass would endanger human health, safety, or plant equipment. Why to do it 40 CFR Section 75.10(d)(2); Minn. R , subp. 1, 2, & 3 40 CFR Section CFR Section 75.61; Minn. R , subp. 1-3; Minn. R , subp CFR Sections 75.20(a)(2), 75.60(b)(1), & Minn. R QA Plan: Develop and implement a written plan that describes in detail (or that refers to separate documents containing) complete, step-by-step procedures and operations of the activities outlined in 40 CFR pt. 75 Appendix B, Section 1.1. Upon request from regulatory authorities, the source shall make all procedures, maintenance records, and ancillary supporting documentation from the manufacturer (e.g., software coefficients and troubleshooting diagrams) available for review during an audit. Electronic storage of the information in the QA/QC plan is permissible, provided that the information can be made available in hardcopy upon request during an audit. COMS Daily Calibration Drift Test: The Calibration Drift shall be quantified and recorded at zero (low-level) and upscale (high-level) calibration drift at least once daily according to the procedures listed in 40 CFR Section 60.13(d)(2) and pt. 60, Appendix B, Performance Specification 1. The zero and upscale calibration levels must be determined using the span value specified in the applicable requirement. If the applicable requirement does not specify a span value, a span value of 60, 70, or 80 percent opacity must be used unless an alternative span value is approved by the commissioner. 40 CFR pt. 60, Appendix F, shall be used to determine out-of-control periods for COMS. 40 CFR pt. 75, Appendix B, Section 1; Minn. R , subp CFR Section 75.14; Minn. R , subp. 2

14 Facility Name: Permit Number: Minnesota Power - Laskin Energy Center COMS Calibration Error Audit: due before the end of each calendar half-year following Permit Issuance. Audits are to be at least three months apart but no more than eight months apart except that a calibration error audit need not be conducted during any semiannual period in which the emission unit operated less than 24 hours. The calibration error audit shall be conducted according to the procedures in 40 CFR pt. 60, Appendix B, Performance Specification No. 1. COMS Attenuator Calibration: The Permittee shall have an independent testing company conduct calibrations of each of the neutral density filters used in the calibration error audit according to the procedure in 40 CFR pt. 60, Appendix B. These calibrations shall be conducted within the time frame of opacity stability guaranteed by the attenuator manufacturer but not less frequently than annually. Recordkeeping: The owner or operator must retain records of all COMS monitoring data and support information for a period of five years from the date of the monitoring sample, measurement or report. Records shall be kept at the source. A-11 Minn. R , subp. 3 Minn. R , subp CFR Section 75.57(a); Minn. R This requirement is more stringent than the 40 CFR pt. 75 requirement to retain records for three years. CEMS REQUIREMENTS The CEMS requirements listed below outline the typical standards of 40 CFR Pt. 75 when combined with Minn. R. Additional monitoring requirements may also apply to the Facility based on the standard and it is the responsibility of the Facility to meet all applicable requirements. Installation Notification: due 60 days before installing the continuous emissions monitoring system. The notification shall include plans and drawings of the system. CEMS Certification: The owner or operator shall ensure that each CEMS required by this part meets the initial certification requirements of this section and shall ensure that all applicable initial certification tests under paragraph (c) of this section are completed by the deadlines specified in 40 CFR Section 75.4 and prior to use in the Acid Rain Program. Certify all CEMS required by the Acid Rain Program in accordance with 40 CFR pt. 75, Appendix A, Section 6. CEMS Certification Test Plan: due 30 days before CEMS Certification Test CEMS Certification Test Pretest Meeting: due 7 days before CEMS Certification Test CEMS Certification Test Report: due 45 days after CEMS Certification Test CEMS Certification Test Report Microfiche Copy: due 105 days after CEMS Certification Test The Notification, Test Plan, and Test Report may be submitted in alternate format as allowed by Minn. R , subp. 2. Certification Application: The owner or operator shall apply for certification of each continuous emission or opacity monitoring system used under the Acid Rain Program. The owner or operator shall submit the certification application in accordance with 40 CFR Section and each complete certification application shall include the information specified in Section Continuous Operation: CEMS must be operated and data recorded during all periods of emission unit operation including periods of emission unit start-up, shutdown, or malfunction except for periods of acceptable monitor downtime. This requirement applies whether or not a numerical emission limit applies during these periods. A CEMS must not be bypassed except in emergencies where failure to bypass would endanger human health, safety, or plant equipment. Monitoring Data: Hourly averages shall be computed using at least one data point in each fifteen minute quadrant of an hour, where the unit combusted fuel during that quadrant of an hour. Not withstanding this requirement, an hourly average may be computed from at least two data points separated by a minimum of 15 minutes (where the unit operates for more than one quadrant of an hour) if data is unavailable as a result of the performance of calibration, quality assurance, or preventive maintenance activities pursuant to 40 CFR Section and appendix B of pt. 75, or backups of data from the data acquisition and handling system, or recertification, pursuant to Section The owner or operator shall use all valid measurements or data points collected during an hour to calculate the hourly averages. All data points collected during an hour shall be, to the extent practicable, evenly spaced over the hour. CEMS QA/QC: The owner or operator of an affected facility shall operate, calibrate, and maintain each CEMS according to the QA/QC procedures in 40 CFR pt. 75, Appendix B as amended. Minn. R , subp CFR Section 75.20; 40 CFR pt. 75, Appendix A, Section 6 40 CFR Section 75.61; Minn. R , subp. 1-3; Minn. R , subp CFR Sections 75.20(a)(2), 75.60(b)(1), & Minn. R CFR Section 75.10(d)(1); Minn. R , subp. 1 and 2 40 CFR Section 75.21

15 Facility Name: Minnesota Power - Laskin Energy Center Permit Number: A-12 QA Plan: Develop and implement a written plan that describes in detail (or that refers to separate documents containing) complete, step-by-step procedures and operations of the activities outlined in 40 CFR pt. 75, Appendix B, Section 1.1. Upon request from regulatory authorities, the source shall make all procedures, maintenance records, and ancillary supporting documentation from the manufacturer (e.g., software coefficients and troubleshooting diagrams) available for review during an audit. Electronic storage of the information in the QA/QC plan is permissible, provided that the information can be made available in hardcopy upon request during an audit. Daily Calibration Error (CE) Test: Conduct daily CE testing of each gas monitoring system according to the procedures in Section of 40 CFR pt. 75, Appendix A and of each flow monitoring system according to the procedures in Section of 40 CFR pt. 75, Appendix A. Linearity and Leak Check Test (Acid Rain Program): due before end of each calendar quarter following CEM Certification Test Linearity and Leak Check Test (Acid Rain Program): due before the end of each QA operating quarter (calendar quarter in which there are at least 168 unit operating hours) following Permit Issuance in accordance with procedures in 40 CFR pt. 75, Appendix B, Sections and 2.2.2, and Appendix A, Section 6.2. Perform a leak check at least once during each QA operating quarter and no less than 30 days apart only if a differential pressure flow monitor has been installed. CEMS Relative Accuracy Test Audit (RATA): Due semianually following Permit Issuance, i.e., once every two successive QA operating quarters (calendar quarter in which there are at least 168 unit operating hours). Conduct a RATA on all CEMS required by the Acid Rain Program, in accordance with 40 CFR pt. 75, Appendix B. Relative accuracy test audits may be performed annually (i.e., once every four successive QA operating quarters, rather than once every two successive QA operating quarters) if any of the conditions listed in 40 CFR pt. 75, Appendix B, Sections (a) through (i) are met. Recordkeeping: The owner or operator must retain records of all CEMS monitoring data and support information for a period of five years from the date of the monitoring sample, measurement or report. Records shall be kept at the source. Quarterly Reports: Electronically report the data and information in 40 CFR Section (a), (b), and (c) to the Administrator quarterly. 40 CFR pt. 75, Appendix B, Section 1; Minn. R , subp CFR pt. 75, Appendix B, Section CFR pt. 75, Appendix B, Sections & 2.2.2; Minn. R CFR pt. 75, Appendix B, Section 2.3.1; Minn. R Minn. R ; 40 CFR Section CFR Section 75.64; Minn. R , subp. 1 & 2

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission DRAFT/PROPOSED AIR EMISSION PERMIT NO. 08500034 002 Total Facility Operating Permit Reissuance IS ISSUED TO Hutchinson Utilities Commission Hutchinson Utilities Commission Plant 2 1100 Industrial Boulevard

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc AIR EMISSION PERMIT NO. 13700013-006 IS ISSUED TO Minnesota Power Division of ALLETE Inc MINNESOTA POWER - LASKIN ENERGY CENTER 5699 Colby Lake Road Hoyt Lakes, St. Louis County, MN 55750 The emission

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE, Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE, Inc. AIR EMISSION PERMIT NO. 13700013-005 IS ISSUED TO Minnesota Power Division of ALLETE, Inc. MINNESOTA POWER - LASKIN ENERGY CENTER County Road 633 Aurora, St. Louis County, MN 55705 The emission units,

More information

AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P.

AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P. AIR EMISSION PERMIT NO. 16300087-006 Total Facility Oper. Permit - Reissuance IS ISSUED TO LSPCottage Grove, L.P. LSPCOTTAGE GROVE COGENERATION FACILITY 9525 105th Street Court South Cottage Grove, Washington

More information

Air Individual Permit Permit Limits to Avoid NSR

Air Individual Permit Permit Limits to Avoid NSR Air Individual Permit Permit Limits to Avoid NSR 13900128-001 Permittee: Facility name: Shakopee Distributed Generation Shakopee Distributed Generation Vierling Drive E Shakopee, Minnesota 55379 Scott

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 10900008-101 Permittee: Facility name: Mayo Clinic Mayo Clinic Hospital Saint Marys Campus 1216 2nd St SW Rochester, MN 55902-1906 Olmsted County Expiration

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc.

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc. DRAFT/PROPOSED AIR EMISSION PERMIT NO. 00300155 002 Major Amendment IS ISSUED TO Hoffman Enclosures, Inc. Hoffman Enclosure Inc/Pentair Equipment Protection 2100 Hoffman Way Anoka, Anoka County, MN 55303

More information

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY AIR EMISSION PERMIT NO. 12300012-002 IS ISSUED TO NORTHERN STATES POWER COMPANY NSP - HIGH BRIDGE GENE 501 Shepard Road St. Paul, Ramsey County, Minnesota 551023004 The emission units, control equipment

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 08500002-101 Permittee: Hutchinson Utilities Commission - Plant 1 Facility name: Hutchinson Utilities Commission - Plant 1 44 4th Ave NE Hutchinson, MN 55350-1829

More information

AIR EMISSION PERMIT NO IS ISSUED TO INTERSTATE POWER COMPANY

AIR EMISSION PERMIT NO IS ISSUED TO INTERSTATE POWER COMPANY AIR EMISSION PERMIT NO. 09100007-002 IS ISSUED TO INTERSTATE POWER COMPANY INTERSTATE POWER - FOX LAKE STATION County Road 28 Sherburn, Martin County, Minnesota 561710367 The emission units, control equipment

More information

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia AIR EMISSION PERMIT NO. 13700028-003 IS ISSUED TO City of Virginia 620 South 2nd Street Virginia, St. Louis County, Minnesota 55792 The emission units, control equipment and emission stacks at the stationary

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company AIR EMISSION PERMIT NO. 16300110-001 IS ISSUED TO Northern Natural Gas Company NORTHERN NATURAL GAS - HUGO No Street Address Hugo, Washington County, Minnesota 55038 The emission units and emission stacks

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets

AIR EMISSION PERMIT NO IS ISSUED TO. Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets AIR EMISSION PERMIT NO. 10901019-002 IS ISSUED TO Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets Rochester Public Utilities 3605 Highway 52 North Rochester, Olmsted County,

More information

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation AIR EMISSION PERMIT NO. 10900008-004 Total Facility Operating Permit - Reissuance IS ISSUED TO Mayo Foundation St Marys 1216 Southwest 2nd Street Rochester, Olmsted County, MN 55902 The emission units,

More information

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Mayo Foundation

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Mayo Foundation AIR EMISSION PERMIT NO. 10900008-003 Major Amendment IS ISSUED TO Mayo Foundation SAINT MARYS HOSPITAL 1216 Second Street Southwest Rochester, Olmsted County, Minnesota 55902 The emission units, control

More information

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 AIR EMISSION PERMIT NO. 14500026-001 IS ISSUED TO St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 The emission units, control equipment and emission stacks at

More information

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation AIR EMISSION PERMIT NO. 04900030-006 Total Facility Operating Permit - Reissuance IS ISSUED TO Northern States Power Co a Minnesota Corporation XCEL ENERGY - PRAIRIE ISLAND NUCLEAR PLANT 1717 Wakonade

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 15300004-101 Permittee: Co-permittee name: Facility name: Viking Gas Transmission - Cushing ONEOK Partners, L.P. Viking Gas Transmission - Cushing 31888 400th

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Cogentrix

AIR EMISSION PERMIT NO IS ISSUED TO. Cogentrix AIR EMISSION PERMIT NO. 16300087-004 IS ISSUED TO Cogentrix 9525 105th Street Court South Cottage Grove, Washington County, MN 55016 The emission units, control equipment and emission stacks at the stationary

More information

DRAFT/PROPOSED AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. GE Osmonics Inc

DRAFT/PROPOSED AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. GE Osmonics Inc DRAFT/PROPOSED AIR EMISSION PERMIT NO. 05300834 004 Major Amendment IS ISSUED TO GE Osmonics Inc GE Osmonics Inc 5951 Clearwater Drive Minnetonka, Hennepin County, MN 55343 The emission units, control

More information

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Ardent Mills LLC

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Ardent Mills LLC AIR EMISSION PERMIT NO. 03700020-004 Major Amendment IS ISSUED TO Ardent Mills LLC ARDENT MILLS FLOUR MILL 2005 Vermillion Street South Hastings, Dakota County, Minnesota 55033 The emission units, control

More information

Air Individual Permit Major Amendment

Air Individual Permit Major Amendment Air Individual Permit Major Amendment 01900022-101 Permittee: Facility name: Elkay Wood Products Company - Waconia Elkay Wood Products Company - Waconia 180 Industrial Boulevard Waconia, MN 55387-1736

More information

Preliminary Draft Air Individual Permit State Permit

Preliminary Draft Air Individual Permit State Permit Preliminary Draft Air Individual Permit State Permit 12100021-101 Permittee: Facility name: CHS Inc - Prairie Lakes Coop - Glenwood Grain Elevator CHS Inc - Prairie Lakes Coop - Glenwood Grain Elevator

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 10500001-007 Permittee: Facility name: Swift Pork Co - Worthington Swift Pork Co - Worthington 1700 Highway 60 NE Worthington, MN 56187 Nobles County Expiration

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Polaris Industries Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Polaris Industries Inc. AIR EMISSION PERMIT NO. 02500051-001 IS ISSUED TO Polaris Industries Inc. Polaris Industries, Inc. - Wyoming 7290 Viking Boulevard East Wyoming, Chisago County, MN 55092 The emission units, control equipment

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Archer Daniels Midland Company. ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066

AIR EMISSION PERMIT NO IS ISSUED TO. Archer Daniels Midland Company. ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066 AIR EMISSION PERMIT NO. 04900001-001 IS ISSUED TO Archer Daniels Midland Company ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066 The emission units, control equipment and emission stacks

More information

Air Individual Permit State Permit Hardman Ave S South St. Paul, MN 55075

Air Individual Permit State Permit Hardman Ave S South St. Paul, MN 55075 Air Individual Permit State Permit 03700070-007 Permittee: Facility name: Sanimax USA LLC Sanimax USA LLC 505 Hardman Ave S South St. Paul, MN 55075 Expiration date: Non-expiring Permit * All Title I Conditions

More information

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Archer Daniels Midland Co

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Archer Daniels Midland Co AIR EMISSION PERMIT NO. 04900001-002 Administrative Amendment IS ISSUED TO Archer Daniels Midland Co ADM - RED WING 126 La Grange Street Red Wing, Goodhue County, MN 55066 The emission units, control equipment

More information

Draft Air Individual Permit Major Amendment Clearwater Dr Minnetonka, MN Hennepin County

Draft Air Individual Permit Major Amendment Clearwater Dr Minnetonka, MN Hennepin County Draft Air Individual Permit Major Amendment 05300834-102 Permittee: Facility name: GE Osmonics Inc GE Osmonics Inc 5951 Clearwater Dr Minnetonka, MN 55343 Hennepin County Operating permit issuance date:

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power & Light and the City of Duluth

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power & Light and the City of Duluth AIR EMISSION PERMIT NO. 13700015-001 IS ISSUED TO Minnesota Power & Light and the City of Duluth MINNESOTA POWER AND LIGHT - ML HIBBARD 30 West Superior Street Duluth, St. Louis County, Minnesota 55802

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302

AIR EMISSION PERMIT NO IS ISSUED TO. Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302 AIR EMISSION PERMIT NO. 00900006-001 IS ISSUED TO Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302 The emission units, control equipment and emission stacks at the

More information

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County) AIR QUALITY PERMIT Permit No. Effective Date April 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

DRAFT Air Individual Permit Part 70 Reissuance

DRAFT Air Individual Permit Part 70 Reissuance DRAFT Air Individual Permit Part 70 Reissuance 13500008-101 Permittee: Facility name: Polaris Industries Inc - Roseau Polaris Industries Inc - Roseau 301 5th Ave SW Roseau, MN56751 Roseau County Expiration

More information

Air Individual Permit Major Amendment Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR

Air Individual Permit Major Amendment Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR Air Individual Permit Major Amendment 13100058-101 Permittee: Facility name: Northern Natural Gas Co - Faribault Northern Natural Gas Co - Faribault 21903 Canby Ave Faribault, MN 55021 Rice County Operating

More information

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

This is a new permit condition titled, 2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP) This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 14700009-101 Permittee: Facility name: Northern Natural Gas Company - Owatonna Compressor Station Northern Natural Gas Company - Owatonna Compressor Station

More information

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Newport Terminal Corp

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Newport Terminal Corp DRAFT AIR EMISSION PERMIT NO. 16300010 005 Major Amendment IS ISSUED TO Newport Terminal Corp NEWPORT TERMINAL CORP 50 21st Street Newport, Washington County, MN 55055 The emission units, control equipment

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 04PB1019 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL ISSUED TO:

More information

DRAFT. AIR EMISSION PERMIT NO Major Amendment. Central MN Renewables

DRAFT. AIR EMISSION PERMIT NO Major Amendment. Central MN Renewables DRAFT AIR EMISSION PERMIT NO. 09700026 005 Major Amendment Central MN Renewables CENTRAL MN RENEWABLES 7936 Heron Little Falls, Morrison County, Minnesota 56345 The emission units, control equipment and

More information

Draft Air Individual Permit Major Amendment Brooks Ave South Thief River Falls, MN Pennington County

Draft Air Individual Permit Major Amendment Brooks Ave South Thief River Falls, MN Pennington County Draft Air Individual Permit Major Amendment 11300023-101 Permittee: Facility name: Digi-Key Corp Digi-Key Corp 701 Brooks Ave South Thief River Falls, MN 56701-2757 Pennington County Operating permit issuance

More information

Streamlining Multiple Applicable Requirements

Streamlining Multiple Applicable Requirements Streamlining Multiple Applicable Requirements What is Streamlining? 1. Streamlining is the process of determining one set of requirements to be incorporated into the Title V permit from among multiple

More information

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota TABLE B: SUBMITTALS Table B lists most of the submittals you must provide. Table B is divided into three sections; one-time submittals or notifications, intermittent submittals or notifications and recurring

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted

More information

Air Individual Permit Part 70 Reissuance

Air Individual Permit Part 70 Reissuance Air Individual Permit Part 70 Reissuance 12300057-101 Permittee: Facility name: Rayven Inc Rayven Inc 431 Griggs Street N Saint Paul, MN 55104-4108 Ramsey County Expiration date: December 5, 2023 * All

More information

Background Information for SIP Revision Xcel Energy, Inver Hills Facility, Saint Paul, Minnesota

Background Information for SIP Revision Xcel Energy, Inver Hills Facility, Saint Paul, Minnesota Background Information for SIP Revision Xcel Energy, Inver Hills Facility, Saint Paul, Minnesota This document describes the State Implementation Plan (SIP) revision for Northern States Power Company s

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Co dba Xcel Energy

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Co dba Xcel Energy AIR EMISSION PERMIT NO. 04900030-004 IS ISSUED TO Northern States Power Co dba Xcel Energy XCEL ENERGY - PRAIRIE ISLAND NUCLEAR 1717 Wakonade Drive East Welch, Goodhue County, MN 55089 The emission units,

More information

AIR EMISSION PERMIT NO IS ISSUED TO

AIR EMISSION PERMIT NO IS ISSUED TO AIR EMISSION PERMIT NO. 13300023-002 IS ISSUED TO AGRI - ENERGY, LLC 502 South Walnut Luverne, Rock County, Minnesota 56156 FOR THE FACILITY PREVIOUSLY PERMITTED UNDER AIR EMISSION PERMIT NO. 13300023-001

More information

DRAFT/PROPOSED Air Individual Permit Major Amendment

DRAFT/PROPOSED Air Individual Permit Major Amendment DRAFT/PROPOSED Air Individual Permit Major Amendment 14300014 011 Permittee: Facility name: Heartland Corn Products Heartland Corn Products 53331 State Highway 19 E Winthrop, MN 55396 Operating permit

More information

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the 15A NCAC 02D.1206 HOSPITAL, MEDICAL, AND INFECTIOUS WASTE INCINERATORS (a) Applicability. This Rule applies to any hospital, medical, and infectious waste incinerator (HMIWI), except: (1) any HMIWI required

More information

Major Amendment December 29, 1999 Total Facility Operating Permit February 12, 1996

Major Amendment December 29, 1999 Total Facility Operating Permit February 12, 1996 AIR EMISSION PERMIT NO. 03700015-001 IS ISSUED TO Northern States Power Company NSP - Inver Hills Generating Plant 3185 117th Street Inver Grove Heights, Dakota County, Minnesota 55077 The emission units,

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 11PB859 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL Modification

More information

AIR EMISSION PERMIT NO IS ISSUED TO. CertainTeed Corporation

AIR EMISSION PERMIT NO IS ISSUED TO. CertainTeed Corporation AIR EMISSION PERMIT NO. 13900013-003 IS ISSUED TO oration oration 3303 East 4th Avenue Shakopee, Scott County, MN 55379 The emission units, control equipment and emission stacks at the stationary source

More information

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015 AIR QUALITY PERMIT Permit No. Effective Date May 26, 2015 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788 Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: 04-13-08700037 Application #: 22788 Date SIP Application Received: August 11, 2014 Date Title V Application

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing

More information

Appendix K. DOC Conditions

Appendix K. DOC Conditions Appendix K DOC Conditions Mission Rock Energy Center Five (5) GE LM6000-PG-Sprint Combustion Turbine Generators (CTGs) Total = 275 MW Nominal Each CTG is simultaneously subject to the emission limits,

More information

2017Compliance Table with methods.xlsx

2017Compliance Table with methods.xlsx University of Michigan Renewable Operating Permit Annual Monitoring/Recordkeeping Compliance Table January 1, 2017 through December 31, 2017 Permit Condition Emission Unit: EU-B0260-06 Boiler 6 at Central

More information

Appendix K. Final DOC Conditions

Appendix K. Final DOC Conditions Appendix K Final DOC Conditions Puente Power Project 262 MW (net nominal) GE 7HA.01 Combustion Turbine Generator (CTG) The CTG is simultaneously subject to the emission limits, monitoring requirements,

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

AIR PERMIT ABBEVILLE, HENRY COUNTY, ALABAMA DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE

AIR PERMIT ABBEVILLE, HENRY COUNTY, ALABAMA DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE AIR PERMIT PERMITTEE: FACILITY NAME: LOCATION: PEGASUS WEST, LLC PEGASUS WEST, LLC ABBEVILLE, HENRY COUNTY, ALABAMA PERMIT NUMBER 606-S008-X001 DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE Sawmill Green

More information

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT APPENDIX D APPENDIX D REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL NEW JERSEY STATE DEPARTMENT

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

Part 70 Manufacturing General Air Emission Permit

Part 70 Manufacturing General Air Emission Permit Part 70 Manufacturing General Air Emission Permit 05301002-101 PERMITTEE: FACILITY NAME: Greatbatch Ltd dba Greatbatch Medical Greatbatch Ltd dba Greatbatch Medical 730 24 th Ave SE Minneapolis, MN 55414

More information

TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO

TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO. 14500029 003 This technical support document (TSD) is intended for all parties interested in the draft permit and to meet the requirements that

More information

MAJOR SOURCE OPERATING PERMIT

MAJOR SOURCE OPERATING PERMIT MAJOR SOURCE OPERATING PERMIT Permitee: Facility Name: Facility No.: Location: INTERNATIONAL PAPER CO. INTERNATIONAL PAPER RIVERDALE MILL 104-0003 SELMA, ALABAMA In accordance with and subject to the provisions

More information

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert PA RACT 2 Reasonably Available Control Technology Presented by Suzanne Dibert Affected Facilities Facilities with potential emissions that exceed 100 tons per year (tpy) for NOx (nitrogen oxide) and 50

More information

DEP7007CC Compliance Certification

DEP7007CC Compliance Certification Commonwealth of Kentucky Natural Resources & Environmental Protection Cabinet Department for Environmental Protection DIVISION FOR AIR QUALITY DEP7007CC Compliance Certification Division Use Only ID# Permit

More information

MACK TRUCKS, INC PENNSYLVANIA AVENUE, HAGERSTOWN, MD PART 70 OPERATING PERMIT NO

MACK TRUCKS, INC PENNSYLVANIA AVENUE, HAGERSTOWN, MD PART 70 OPERATING PERMIT NO SECTION I SOURCE IDENTIFICATION... 4 1. DESCRIPTION OF FACILITY... 4 2. FACILITY INVENTORY LIST... 4 SECTION II GENERAL CONDITIONS... 6 1. DEFINITIONS... 6 2. ACRONYMS... 6 3. EFFECTIVE DATE... 7 4. PERMIT

More information

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater 11/21/2016 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-007) Boiler or Heater Greater than or equal to 1 MMBTU/hr and less than 5 MMBTU/hr

More information

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS GENERAL

More information

AIR EMISSION SOURCE CONSTRUCTION PERMIT

AIR EMISSION SOURCE CONSTRUCTION PERMIT AIR EMISSION SOURCE CONSTRUCTION PERMIT Source ID No.: 0550023 Effective Date: Source Name: DRAFT Holcomb Station NAICS: 221112, Fossil fuel power generation (SIC 4911) Site Location: Site Owner/Operator

More information

SECTION.1400 NITROGEN OXIDES

SECTION.1400 NITROGEN OXIDES SECTION.1400 NITROGEN OXIDES 15A NCAC 02D.1401 DEFINITIONS (a) For the purpose of this Section, the definitions at G.S 143-212 and G.S. 143-213, and 15A NCAC 02D.0101 shall apply, and in addition the following

More information

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) 1.0 Purpose The purpose of this rule is to limit emissions

More information

JOHNS HOPKINS UNIVERSITY 3400 N. CHARLES STREET BALTIMORE, MD PART 70 OPERATING PERMIT NO

JOHNS HOPKINS UNIVERSITY 3400 N. CHARLES STREET BALTIMORE, MD PART 70 OPERATING PERMIT NO SECTION I SOURCE IDENTIFICATION...4 1. DESCRIPTION OF FACILITY...4 2. FACILITY INVENTORY LIST...4 SECTION II GENERAL CONDITIONS...7 1. DEFINITIONS...7 2. ACRONYMS...7 3. EFFECTIVE DATE...8 4. PERMIT EXPIRATION...8

More information

State of New Jersey. General Permit (GP-009A)

State of New Jersey. General Permit (GP-009A) 03/21/2013 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-009A) For Boiler(s) and Indirect Fired Process Heater(s) Each Greater Than or Equal to 10

More information

Regulatory and Permitting Requirements of Stationary Generators In Delaware

Regulatory and Permitting Requirements of Stationary Generators In Delaware Regulatory and Permitting Requirements of Stationary Generators In Delaware Delaware - DNREC Air Quality Management February 7, 2006 Mark A. Prettyman and Guadalupe J. Reynolds Outline Regulation No. 1144

More information

W.L. GORE & ASSOCIATES, INC CHERRY HILL PLANT 2401 SINGERLY ROAD, ELKTON, MD PART 70 OPERATING PERMIT NO

W.L. GORE & ASSOCIATES, INC CHERRY HILL PLANT 2401 SINGERLY ROAD, ELKTON, MD PART 70 OPERATING PERMIT NO SECTION I SOURCE IDENTIFICATION...4 1. DESCRIPTION OF FACILITY...4 2. FACILITY INVENTORY LIST...4 SECTION II GENERAL CONDITIONS...8 1. DEFINITIONS...8 2. ACRONYMS...8 3. EFFECTIVE DATE...9 4. PERMIT EXPIRATION...9

More information

Full Compliance Evaluation Report Off-Site Report

Full Compliance Evaluation Report Off-Site Report STATE OF NEW HAMPSHIRE DEPARTMENT OF ENVIRONMENTAL SERVICES AIR RESOURCES DIVISION Full Compliance Evaluation Report Off-Site Report CONCORD STEAM CORPORATION 105 ½ PLEASANT STREET CONCORD, NH 03302-1377

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: N-6311-9-1 ISSUANCE DATE: 12/17/2008 LEGAL OWNER OR OPERATOR: FISCALINI FARMS & FISCALINI DAIRY MAILING ADDRESS: 7231 COVERT RD MODESTO, CA 95358 LOCATION: 4848 JACKSON

More information

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS RULE 1146.1. EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (a) Definitions 1. ANNUAL HEAT INPUT means the actual amount

More information

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by Huntington Power Plant Notice of Intent Submitted to the Utah Division of Air Quality And Prepared by 1407 West North Temple Salt Lake City, Utah 84116 April 11, 2008 1.0 Introduction PacifiCorp Energy

More information

Prepared for: BP-Husky Refining LLC 4001 Cedar Point Road Oregon, Ohio Prepared by:

Prepared for: BP-Husky Refining LLC 4001 Cedar Point Road Oregon, Ohio Prepared by: BP-HUSKY REFINING LLC REVISION TO FCCU WET GAS COMPRESSOR RECONSTRUCTION PERMIT TO INSTALL (04-01482) TO INCORPORATE FINAL FCCU NO X EMISSIONS LIMITS Prepared for: BP-Husky Refining LLC 4001 Cedar Point

More information

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year.

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year. 1 of 11 8/21/2012 10:19 AM SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1146 - EMISSIONS OF OXIDES OF NITROGEN FROM INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS

More information

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.15.1 - BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) A. Applicability The provisions of this

More information

Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: Application #: 40890

Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: Application #: 40890 Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: 04-13-103-00007 Application #: 40890 Date SIP Application Received: March 7, 2016 Date Title

More information

RICE NESHAP Frequently Asked Questions (FAQ)

RICE NESHAP Frequently Asked Questions (FAQ) RICE NESHAP Frequently Asked Questions (FAQ) What does RICE NESHAP mean? RICE NESHAP is an acronym for Reciprocating Internal Combustion Engines National Emission Standards for Hazardous Air Pollutants.

More information

AIR QUALITY PERMIT. Vulcan Construction Materials, LLC-Gainesville RM

AIR QUALITY PERMIT. Vulcan Construction Materials, LLC-Gainesville RM AIR QUALITY PERMIT Permit No. Effective Date January 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

AIR QUALITY PERMIT Issued under 401 KAR 52:020

AIR QUALITY PERMIT Issued under 401 KAR 52:020 Commonwealth of Kentucky Energy and Environment Cabinet Department for Environmental Protection Division for Air Quality 200 Fair Oaks Lane, 1 st Floor Frankfort, Kentucky 40601 (502) 564-3999 Proposed

More information

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 Discussion Topics Background Important Terms Applicability Compliance Deadlines Emission/Operating Limits Performance/Compliance

More information

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

State of New Jersey. Department of Environmental Protection Air Quality Permitting

State of New Jersey. Department of Environmental Protection Air Quality Permitting GP021 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP 021) Combined Heat and Power Combustion Turbine(s) less than or equal to 65 MMBTU per hour This

More information

Reproduction of Permit Terms and Conditions

Reproduction of Permit Terms and Conditions Page 1 of 92 This version of facility specific terms and conditions was converted from a database format to an HTML file during an upgrade of the Ohio EPA, Division of Air Pollution Control's permitting

More information

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted 06-01-95 INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION, EMERGENCY STANDBY 111 EXEMPTION,

More information

RICE NESHAP RECORD KEEPING Stationary Engines

RICE NESHAP RECORD KEEPING Stationary Engines RICE NESHAP RECORD KEEPING Stationary Engines POWER PLANT COMPLIANCE Donna Oehm Some of the RICE NESHAP ZZZZ reporting requirements are like a $2 bill... *Relatively not in high demand *Legal obligation