DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc.

Size: px
Start display at page:

Download "DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc."

Transcription

1 DRAFT/PROPOSED AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO Hoffman Enclosures, Inc. Hoffman Enclosure Inc/Pentair Equipment Protection 2100 Hoffman Way Anoka, Anoka County, MN The emission units, control equipment and emission stacks at the stationary source authorized in this permit amendment are as described in the Permit Applications Table. This permit amendment supersedes Air Emission Permit No and authorizes the Permittee to operate the stationary source at the address listed above unless otherwise noted in Table A. The Permittee must comply with all the conditions of the permit. Any changes or modifications to the stationary source must be performed in compliance with Minn. R to Any additions or changes to conditions incorporated into Minnesota s State Implementation Plan (SIP) under 40 CFR , designated Title I: SIP for SO 2 must go through the federal SIP approval process before becoming effective. Terms used in the permit are as defined in the state air pollution control rules unless the term is explicitly defined in the permit. Unless otherwise indicated, all the Minnesota rules cited as the origin of the permit terms are incorporated into the SIP under 40 CFR and as such as are enforceable by U.S. Environmental Protection Agency (EPA) Administrator or citizens under the Clean Air Act. Permit Type: State Permit; Non major for Part 70 and True Minor NSR; Title I SIP Conditions for SO 2 Operating Permit Issue Date: Major Amendment Issue Date: Expiration Date: Title I Conditions do not expire. Each new or revised condition designated Title I Condition: SIP for SO 2 is not effective or enforceable until approved by the EPA as a SIP revision under Title I of the Clean Air Act. Don Smith, P.E., Manager Air Quality Permits Section Industrial Division for John Linc Stine Commissioner Minnesota Pollution Control Agency TDD (for hearing and speech impaired only): (651) Printed on recycled paper containing at least 10% fibers from paper recycled by consumers

2 Permit Applications Table Permit Type Application Date Permit Action Total Facility Operating Permit January 31, Administrative Amendment November 16, Major Amendment January 6, TABLE OF CONTENTS Notice to the Permittee Permit Shield Facility Description Amendment Description Table A: Limits and Other Requirements Table B: Submittals Appendices Appendix B Insignificant Activities Appendix C Maximum Materials Contents and Operating Capacity

3 NOTICE TO THE PERMITTEE: Your stationary source may be subject to the requirements of the Minnesota Pollution Control Agency s (MPCA) solid waste, hazardous waste, and water quality programs. If you wish to obtain information on these programs, including information on obtaining any required permits, please contact the MPCA general information number at: Metro Area Outside Metro Area TTY The rules governing these programs are contained in Minn. R. chs Written questions may be sent to: Minnesota Pollution Control Agency, 520 Lafayette Road North, St. Paul, Minnesota Questions about this air emission permit or about air quality requirements can also be directed to the telephone numbers and address listed above. PERMIT SHIELD: Subject to the limitations in Minn. R , compliance with the conditions of this permit shall be deemed compliance with the specific provision of the applicable requirement identified in the permit as the basis of each condition. Subject to the limitations of Minn. R and , subp. 2, notwithstanding the conditions of this permit specifying compliance practices for applicable requirements, any person (including the Permittee) may also use other credible evidence to establish compliance or noncompliance with applicable requirements. FACILITY DESCRIPTION: Hoffman Enclosures creates metal enclosures that protect sensitive equipment from dust, dirt, oil, water, corrosion, and other contaminants. The facility is currently composed of eight Sheet Molding Compound (SMC) Compression Molding Presses, six cure/dry off ovens, three washers, an emergency diesel fire pump that is subject to Title I State Implementation Plan (SIP) conditions for sulfur dioxide (SO 2 ), two emergency natural gas generators, and a variety of insignificant activities. The main pollutant of concern is Styrene. AMENDMENT DESCRIPTION: The facility proposes to add compression molding equipment, which utilizes sheet molding compound as a raw material to make fiberglass electrical enclosures. The compression molding equipment will include eight presses of varying sizes. Volatile Organic Compounds (VOC) and Hazardous Air Pollutant (HAP) emissions are expected as a result of this addition. Currently, parts for these enclosures are being manufactured by an outside vendor. The parts are then shipped to Hoffman where they are assembled. Hoffman hopes to vertically integrate this operation so that all parts are made at Hoffman as well as assembled there.

4 TABLE A: LIMITS AND OTHER REQUIREMENTS Facility Name: Hoffman Enclosure Inc/Pentair Equipment Protection Permit Number: A-1 Table A contains limits and other requirements with which your facility must comply. The limits are located in the first column of the table (What To do). The limits can be emission limits or operational limits. This column also contains the actions that you must take and the records you must keep to show that you are complying with the limits. The second column of Table A (Why to do it) lists the regulatory basis for these limits. Appendices included as conditions of your permit are listed in Table A under total facility requirements. Subject Item: Total Facility What to do CONSTRUCTION AUTHORIZATION The Permittee is authorized to install and operate all items listed in GP001, as defined by the emissions unit information in Appendix C of this permit, at any time within 18 months after permit issuance of Permit No The units shall meet all the requirements of this permit (GP001). STATE IMPLEMENTATION PLAN (SIP) REQUIREMENTS ACTIVITIES NOT REQUIRING A MODIFICATION FOR THE SIP: The Permittee is authorized to make changes to the facility in compliance with Minnesota Rules and without obtaining a modification to the SIP as long as the change does not increase, from any emission point, the SO2 emission rates (in lb/hr) or overall SO2 emissions or alter equipment or parameters, which forms the basis for the SO2 modeling. Remodeling for Attainment Demonstrate: Before making any physical changes or changes to the method of operation which may affect SO2, the Permittee shall demonstrate to the MPCA that the SO2 plume dispersion characteristics following the physical change or change in method of operation will be equivalent to or better than the SO2 dispersion characteristics modeled. The information submitted must include, at a minimum, the locations, heights, and the diameters of the stacks, locations and dimensions of nearby buildings, the velocity and temperature of the gasses emitted, and the SO2 emission rates. ACTIVITIES REQUIRING A MODIFICATION FOR THE SIP: Activities requiring a modification of the SIP prior to the Permittee commencing the activity include, but are not limited to, the following: 1. Any decrease in the design stack gas volumetric flow rate; 2. Any decrease in the design stack gas exit temperature; 3. Any reduction in stack height; 4. Any increase in stack exit diameter; 5. any construction or modification of structures that increases the effective structural dimensions as they are used in the building wake effects algorithm in the ISC Air Dispersion Model, or its successor. Permanent Records for SIP: The Permittee shall permanently maintain the following information together with all amendments, revisions, and modifications to this information: 1. The Permittee shall maintain a file or files of the information on design, construction and operation of each emission facility, emission source, stack, structures pertinent to modeling for downwash, and any other information required to conduct SO2 ambient air quality modeling of emissions from the facility. Why to do it Minn. R , subp The Permittee shall maintain a file at the facility which includes all SO2 emission compliance demonstration plans which upon approval by the MPCA or EPA become integral and enforceable parts of the SIP. Construction and Operation of SIP Emission Units: The Permittee may begin actual construction of new emission units or modification to existing emission units upon permit issuance. However the Permittee shall not operate any new or modified emission unit until any required SIP amendment is approved by EPA. Notification of Activities Changes: The Permittee may undertake certain changes to the facility without obtaining a modification to the SIP. However, if the Permittee does make a change, and if the change in any way affects maximum allowable SO2 emissions (reduces the amount or changes the concentration, size, character, velocity, direction, or location of SO2 emissions), the Permittee shall notify the Commissioner in writing at least 30 days prior to undertaking the change. The notification shall describe the change and why it does not require a modification of the SIP. State Implementation Plan Recordkeeping: Retain all records at the stationary source for a period of six (6) years from the date of the required monitoring, sample, measurement, or report that corresponds with a "Title I Condition: State Implementation Plan (SIP) for SO2".

5 TABLE A: LIMITS AND OTHER REQUIREMENTS Facility Name: Hoffman Enclosure Inc/Pentair Equipment Protection Permit Number: A-2 Annual Report for the SIP: due 30 days after end of each calendar year following Effective Date of Permit to the Commissioner. The report shall contain the following information: a record of data used in calculating and calculations of the annual SO2 emissions, a record of each startup, shutdown, and breakdown of process and a summary record of excess SO2 emissions, and sulfur content exceedances (or the Permittee shall state if no exceedances, and noncompliance conditions occurred in the calendar year). The Annual Report shall contain a record of any deviations from any Title I Condition: State Implementation Plan (SIP) for SO2 NAAQS cited conditions. OPERATIONAL REQUIREMENTS The Permittee shall comply with National Primary and Secondary Ambient Air Quality Standards, 40 CFR pt. 50, and the Minnesota Ambient Air Quality Standards, Minn. R to Compliance shall be demonstrated upon written request by the MPCA. Circumvention: Do not install or use a device or means that conceals or dilutes emissions, which would otherwise violate a federal or state air pollution control rule, without reducing the total amount of pollutant emitted. Air Pollution Control Equipment: Operate all pollution control equipment whenever the corresponding process equipment and emission units are operated. Operation and Maintenance Plan: Retain at the stationary source an operation and maintenance plan for all air pollution control equipment. At a minimum, the O & M plan shall identify all air pollution control equipment and control practices and shall include a preventative maintenance program for the equipment and practices, a description of (the minimum but not necessarily the only) corrective actions to be taken to restore the equipment and practices to proper operation to meet applicable permit conditions, a description of the employee training program for proper operation and maintenance of the control equipment and practices, and the records kept to demonstrate plan implementation. Operation Changes: In any shutdown, breakdown, or deviation the Permittee shall immediately take all practical steps to modify operations to reduce the emission of any regulated air pollutant. The Commissioner may require feasible and practical modifications in the operation to reduce emissions of air pollutants. No emissions units that have an unreasonable shutdown or breakdown frequency of process or control equipment shall be permitted to operate. Fugitive Emissions: Do not cause or permit the handling, use, transporting, or storage of any material in a manner which may allow avoidable amounts of particulate matter to become airborne. Comply with all other requirements listed in Minn. R Noise: The Permittee shall comply with the noise standards set forth in Minn. R to at all times during the operation of any emission units. This is a state only requirement and is not enforceable by the EPA Administrator or citizens under the Clean Air Act. Inspections: The Permittee shall comply with the inspection procedures and requirements as found in Minn. R , subp. 9(A). The Permittee shall comply with the General Conditions listed in Minn. R , subp. 16. MONITORING REQUIREMENTS Monitoring Equipment Calibration - The Permittee shall either: 1. Calibrate or replace required monitoring equipment every 12 months; or 2. Calibrate at the frequency stated in the manufacturer's specifications. Minn. Stat. Section , subds. 4a & 9; Minn. R , subp. 7(A), 7(L), & 7(M); Minn. R , subps. 1, 2 & 4; Minn. R Minn. R Minn. R , subp. 2; Minn. R , subp. 16(J) Minn. R , subps. 14 and 16(J) Minn. R , subp. 4 Minn. R Minn. R Minn. R , subp. 9(A) Minn. R , subp. 16 Minn. R , subp. 4(D) For each monitor, the Permittee shall maintain a record of all calibrations, including the date conducted, and any corrective action that resulted. The Permittee shall include the calibration frequencies, procedures, and manufacturer's specifications (if applicable) in the Operations and Maintenance Plan. Any requirements applying to continuous emission monitors are listed separately in this permit. Operation of Monitoring Equipment: Unless otherwise noted in Tables A, B, and/or C, monitoring a process or control equipment connected to that process is not necessary during periods when the process is shutdown, or during checks of the monitoring systems, such as calibration checks and zero and span adjustments. If monitoring records are required, they should reflect any such periods of process shutdown or checks of the monitoring system. RECORDKEEPING Minn. R , subp. 4(D)

6 TABLE A: LIMITS AND OTHER REQUIREMENTS Facility Name: Hoffman Enclosure Inc/Pentair Equipment Protection Permit Number: A-3 Recordkeeping: Retain all records at the stationary source, unless otherwise specified within this permit, for a period of five (5) years from the date of monitoring, sample, measurement, or report. Records which must be retained at this location include all calibration and maintenance records, all original recordings for continuous monitoring instrumentation, and copies of all reports required by the permit. Records must conform to the requirements listed in Minn. R , subp. 5(A). Recordkeeping: Maintain records describing any insignificant modifications (as required by Minn. R , subp. 3) or changes contravening permit terms (as required by Minn. R , subp. 2), including records of the emissions resulting from those changes. If the Permittee determines that no permit amendment or notification is required prior to making a change, the Permittee must retain records of all calculations required under Minn. R For nonexpiring permits, these records shall be kept for a period of five years from the date that the change was made. The records shall be kept at the stationary source for the current calendar year of operation and may be kept at the stationary source or office of the stationary source for all other years. The records may be maintained in either electronic or paper format. REPORTING/SUBMITTALS Shutdown Notifications: Notify the Commissioner at least 24 hours in advance of a planned shutdown of any control equipment or process equipment if the shutdown would cause any increase in the emissions of any regulated air pollutant. If the owner or operator does not have advance knowledge of the shutdown, notification shall be made to the Commissioner as soon as possible after the shutdown. However, notification is not required in the circumstances outlined in Items A, B and C of Minn. R , subp. 3. At the time of notification, the owner or operator shall inform the Commissioner of the cause of the shutdown and the estimated duration. The owner or operator shall notify the Commissioner when the shutdown is over. Breakdown Notifications: Notify the Commissioner within 24 hours of a breakdown of more than one hour duration of any control equipment or process equipment if the breakdown causes any increase in the emissions of any regulated air pollutant. The 24-hour time period starts when the breakdown was discovered or reasonably should have been discovered by the owner or operator. However, notification is not required in the circumstances outlined in Items A, B and C of Minn. R , subp. 2. Minn. R , subp. 5(C) Minn. R , subp. 5(B) Minn. R , subp. 4 Minn. R , subp. 3 Minn. R , subp. 2 At the time of notification or as soon as possible thereafter, the owner or operator shall inform the Commissioner of the cause of the breakdown and the estimated duration. The owner or operator shall notify the Commissioner when the breakdown is over. Notification of Deviations Endangering Human Health or the Environment Report: Minn. R , subp. 1 Within 2 working days of discovery, notify the Commissioner in writing of any deviation from permit conditions which could endanger human health or the environment. Include the following information in this written description: 1. the cause of the deviation; 2. the exact dates of the period of the deviation, if the deviation has been corrected; 3. whether or not the deviation has been corrected; 4. the anticipated time by which the deviation is expected to be corrected, if not yet corrected; and 5. steps taken or planned to reduce, eliminate, and prevent reoccurrence of the deviation. Application for Permit Amendment: If a permit amendment is needed, submit an Minn. R application in accordance with the requirements of Minn. R through Minn. R Submittal dates vary, depending on the type of amendment needed. Extension Requests: The Permittee may apply for an Administrative Amendment to Minn. R , subp. 1(H) extend a deadline in a permit by no more than 120 days, provided the proposed deadline extension meets the requirements of Minn. R , subp. 1(H). Performance testing deadlines from the General Provisions of 40 CFR pt. 60 and pt. 63 are examples of deadlines for which the MPCA does not have authority to grant extensions and therefore do not meet the requirements of Minn. R , subp. 1(H). Emission Inventory Report: due on or before April 1 of each calendar year following Minn. R permit issuance, to be submitted on a form approved by the Commissioner. Emission Fees: due 30 days after receipt of an MPCA bill. Minn. R

7 TABLE A: LIMITS AND OTHER REQUIREMENTS Facility Name: Permit Number: Hoffman Enclosure Inc/Pentair Equipment Protection Subject Item: GP 001 SMC Compression Molding Presses Associated Items: EU 061 SMC Compression Molding Press #1 EU 062 SMC Compression Molding Press #2 EU 063 SMC Compression Molding Press #3 EU 064 SMC Compression Molding Press #4 EU 065 SMC Compression Molding Press #5 EU 066 SMC Compression Molding Press #6 EU 067 SMC Compression Molding Press #7 EU 068 SMC Compression Molding Press #8 A-4 What to do The requirements of this group apply separately to each unit listed under this group. OPERATIONAL REQUIREMENTS Total Particulate Matter: less than or equal to 0.30 grains/dry standard cubic foot of exhaust gas unless required to further reduce emissions to comply with the less stringent limit of either Minn. R or Minn. R Opacity: less than or equal to 20 percent opacity Why to do it Minn. R , subp. 1(A) Minn. R , subp. 1(B)

8 TABLE A: LIMITS AND OTHER REQUIREMENTS Facility Name: Permit Number: Hoffman Enclosure Inc/Pentair Equipment Protection Subject Item: GP 002 Ovens and Washers A-5 Associated Items: EU 001 Modular Washer EU 002 Modular Dry-Off Oven EU 003 Modular Cure Oven EU 015 Midline Cure Oven EU 016 Midline Dry-Off Oven EU 018 Midline Washer EU 020 Wallmount Washer EU 021 Wallmount Dry-Off Oven EU 022 Wallmount Powder Cure Oven 1 What to do The requirements of this group apply separately to each unit listed under this group. OPERATIONAL REQUIREMENTS Total Particulate Matter: less than or equal to 0.40 lbs/million Btu heat input. The potential to emit from the unit is lb/mmbtu due to equipment design and allowable fuels. Opacity: less than or equal to 20 percent opacity except for one six-minute period per hour of not more than 60 percent opacity. Sulfur Dioxide: less than or equal to 2.0 lbs/million Btu heat input. The potential to emit from the unit is lb/mmbtu due to equipment design and allowable fuels. Why to do it Minn. R , subp. 1 Minn. R , subp. 2 Minn. R , subp. 1

9 TABLE A: LIMITS AND OTHER REQUIREMENTS Facility Name: Permit Number: Hoffman Enclosure Inc/Pentair Equipment Protection Subject Item: GP 015 Natural Gas Emergency Generators A-6 Associated Items: EU Natural Gas Emergency Generator - Computer Room EU Natural Gas Emergency Generator - Plant What to do The requirements of this group apply separately to each unit listed under this group. OPERATIONAL REQUIREMENTS Opacity: less than or equal to 20 percent opacity once operating temperaturs have been attained. Sulfur Dioxide: less than or equal to 0.50 lbs/million Btu heat input. The potential to emit from the unit is lb/mmbtu due to equipment design and allowable fuels. RECORDKEEPING REQUIREMENTS Why to do it Minn. R , subp. 1 Minn. R , subp. 2 Hours of Operation: The Permittee shall maintain documentation on site that the Minn. R , subps. 4 & 5 unit is an emergency generator by design that qualifies under the U.S. EPA memorandum entitled "Calculating Potential to Emit (PTE) for Emergency Generators" dated September 6, 1995, limiting operation to 500 hours per year. The Permittee shall keep records of fuel type and usage on a monthly basis. Minn. R , subp. 5

10 TABLE A: LIMITS AND OTHER REQUIREMENTS Facility Name: Permit Number: Hoffman Enclosure Inc/Pentair Equipment Protection Subject Item: EU 025 Emergency Generator A-7 What to do Opacity: less than or equal to 20 percent opacity once operating temperatures have been attained (Visible air contaminants). THIS LIMIT WILL BE TERMINATED ON THE DATE THE USEPA APPROVES THE REVISION TO THE SIP. Sulfur Dioxide: less than or equal to 0.5 lbs/million Btu heat input using 3-hour Rolling Average. THIS LIMIT WILL BE TERMINATED ON THE DATE THE USEPA APPROVES THE REVISION TO THE SIP. OTHER LIMITS AND REQUIREMENTS Fuel Type: The Permittee shall burn only No. 2 diesel fuel in the diesel engine generator. THIS LIMIT WILL BE TERMINATED ON THE DATE THE USEPA APPROVES THE REVISION TO THE SIP. Sulfur Content of Fuel: less than or equal to 0.5 percent by weight diesel fuel. THIS LIMIT WILL BE TERMINATED ON THE DATE THE USEPA APPROVES THE REVISION TO THE SIP. Diesel Fuel Certification: The Permittee shall retain written documentation of each shipment of diesel fuel oil received for the diesel generator on site. The written documentation shall include the following information: the sulfur content of the diesel fuel, certifying that the sulfur content did not exceed 0.5 percent by weight and the method used to determine the sulfur content. THIS LIMIT WILL BE TERMINATED ON THE DATE THE USEPA APPROVES THE REVISION TO THE SIP. RECORDKEEPING REQUIREMENT Recordkeeping: The Permittee shall record and maintain the fuel usage for the unit on a monthly basis by the 15th day after the completion of the month. THIS LIMIT WILL BE TERMINATED ON THE DATE THE USEPA APPROVES THE REVISION TO THE SIP. Why to do it Minn. R , subp. 1 ; Minn. R , subp. 2 ; Minn. R , subps. 4 and 5

11 TABLE A: LIMITS AND OTHER REQUIREMENTS Facility Name: Permit Number: Hoffman Enclosure Inc/Pentair Equipment Protection Subject Item: EU 047 Emergency Diesel Fire Pump A-8 Associated Items: SV Diesel Fire Pump List EMISSION LIMITS What to do Sulfur Dioxide: less than or equal to 0.50 lbs/million Btu heat input using 3-hour Rolling Average. Opacity: less than or equal to 20 percent opacity once operating temperatures have been attained. OPERATING CONDITIONS Why to do it ; Minn. R , subp. 2 Minn. R , subp. 1 Fuel Type: The Permittee shall burn only No. 2 diesel fuel in the diesel fire pump. Sulfur Content of Fuel: less than or equal to 0.5 percent by weight of diesel fuel. RECORDKEEPING REQUIREMENTS Diesel Fuel Certification: The Permittee shall retain written documentation of each shipment of diesel fuel oil received for the diesel generator on site. The written documentation shall include the following information: the sulfur content of the diesel fuel, certifying that the sulfur content did not exceed 0.5 percent by weight and the method used to determine the sulfur content. Recordkeeping: The Permittee shall record and maintain the fuel usage for the unit on a monthly basis by the 15th day after the completion of the month. Hours of Operation: The Permittee shall maintain documentation on site that the unit is an emergency generator by design that qualifies under the U.S. EPA memorandum entitled "Calculating Potential to Emit (PTE) for Emergency Generators" dated September 6, 1995, limiting operation to 500 hours per year. ; Minn. R , subp. 5 Minn. R , subps. 4 & 5

12 TABLE B: SUBMITTALS Facility Name: Hoffman Enclosure Inc/Pentair Equipment Protection Permit Number: Also, where required by an applicable rule or permit condition, send to the Permit Document Coordinator notices of: - accumulated insignificant activities, - installation of control equipment, - replacement of an emissions unit, and - changes that contravene a permit term. B-1 Send any application for a permit or permit amendment to: Fiscal Services Minnesota Pollution Control Agency 520 Lafayette Road North St. Paul, Minnesota Unless another person is identified in the applicable Table, send all other submittals to: AQ Compliance Tracking Coordinator Industrial Division Minnesota Pollution Control Agency 520 Lafayette Road North St. Paul, Minnesota Each submittal must be postmarked or received by the date specified in the applicable Table. Those submittals required by parts to must be certified by a responsible official, defined in Minn. R , subp. 21. Other submittals shall be certified as appropriate if certification is required by an applicable rule or permit condition. Send submittals that are required to be submitted to the U.S. EPA regional office to: Chief Air Enforcement Air and Radiation Branch EPA Region V 77 West Jackson Boulevard Chicago, Illinois Send submittals that are required by the Acid Rain Program to: U.S. Environmental Protection Agency Clean Air Markets Division 1200 Pennsylvania Avenue NW (6204N) Washington, D.C Table B lists most of the submittals required by this permit. Please note that some submittal requirements may appear in Table A or, if applicable, within a compliance schedule located in Table C. Table B is divided into two sections in order to separately list one-time only and recurrent submittal requirements.

13 TABLE B: RECURRENT SUBMITTALS Facility Name: Hoffman Enclosure Inc/Pentair Equipment Protection Permit Number: B-2 What to send When to send Portion of Facility Affected Semiannual Deviations Report due 30 days after end of each calendar Total Facility half-year starting 01/31/2008. The first semiannual report submitted by the Permittee shall cover the calendar half-year in which the permit is issued. The first report of each calendar year covers January 1 - June 30. The second report of each calendar year covers July 1 - December 31. If no deviations have occurred, the Permittee shall submit the report stating no deviations. Compliance Certification due 31 days after end of each calendar year starting 01/31/2008 (for the previous calendar year). The Permittee shall submit this to the Commissioner on a form approved by the Commissioner. This report covers all deviations experienced during the calendar year. Total Facility

14 Appendix B: Insignificant Activities Facility Name: Hoffman Enclosures, Inc. Permit Number: Insignificant Activities and Applicable Requirements The table below lists the insignificant and conditionally insignificant activities that are currently at the facility and their associated general applicable requirements. Minn. R , subpart 3(B) 3(I) Rule Description of the Activity 2. indirect heating equipment with a capacity less than 420,000 Btu/hour, but only if the total combined capacity of all fuel burning equipment at the stationary source with a capacity less than 420,000 Btu/hour is less than or equal to 1,400,000 Btu/hour. Hoffman Enclosures currently has a laundry clothes dryer, and a laundry hot water heater. The total combined capacity is approximately 420,000 Btu/hr. Individual emissions units at a stationary source, each of which have a potential to emit the following pollutants in amounts less than: 1. 4,000 lbs/year of carbon monoxide; 2. 2,000 lbs/year each of nitrogen oxide, sulfur dioxide, particulate matter (PM), particulate matter less than ten microns (PM 10 ), volatile organic compounds (including hazardous air pollutant containing VOC), and ozone; and 3. 1,000 tons/year of CO 2 e Hoffman Enclosures currently has a Batch System cure and dry off oven; a wand washer and burner; and several gasketing units that qualify under this subpart. Each of these units has a potential to emit less than: 1. 1,100 lbs/year of carbon monoxide; 2. 1,300 lbs/year of NOx, 8 lbs/year of SO 2, 100 lbs/year of PM, PM10, and PM2.5; and 70 lbs/year of VOC; tons/year of CO 2 e Applicable Requirement Minn. R Minn. R ; Minn. R

15 Conditionally Insignificant Activities Minn. R Rule Description of the Activity Emissions from equipment venting particulate matter or particulate matter less than 10 microns inside a building, provided that emissions from the equipment are: a). filtered through an air cleaning system; and b). vented inside of the building 100% of the time. Hoffman Enclosures currently has 7 lasers, 13 grinding and welding operations, a sanding unit, a sawing unit, and 9 powder coating booths that are all vented inside of the facility 100% of the time. Applicable Requirement Minn. R

16 Appendix C: Maximum Materials Contents and Operating Capacity Facility Name: Hoffman Enclosures, Inc. Permit Number: The table below gives the maximum operating capacity and the maximum materials contents (at the time of PER Action 002 issuance) used in calculating potential to emit for units listed in GP 001. The values listed in the table are not limits; however, changing to a material that has a higher VOC or solids content, or increasing the application rate, is considered a change in method of operation that must be evaluated under Minn. R , subp. 3 to determine if a permit amendment or notification is required under Minn R Emission Units (GP 001 SMC Compression Molding Presses) Maximum Operating Capacity (lb/hr) Material VOC Content (%) Material VOC HAP Content (%) EU EU EU EU EU EU EU EU

AIR EMISSION PERMIT NO IS ISSUED TO. Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets

AIR EMISSION PERMIT NO IS ISSUED TO. Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets AIR EMISSION PERMIT NO. 10901019-002 IS ISSUED TO Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets Rochester Public Utilities 3605 Highway 52 North Rochester, Olmsted County,

More information

Air Individual Permit Permit Limits to Avoid NSR

Air Individual Permit Permit Limits to Avoid NSR Air Individual Permit Permit Limits to Avoid NSR 13900128-001 Permittee: Facility name: Shakopee Distributed Generation Shakopee Distributed Generation Vierling Drive E Shakopee, Minnesota 55379 Scott

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company AIR EMISSION PERMIT NO. 16300110-001 IS ISSUED TO Northern Natural Gas Company NORTHERN NATURAL GAS - HUGO No Street Address Hugo, Washington County, Minnesota 55038 The emission units and emission stacks

More information

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 AIR EMISSION PERMIT NO. 14500026-001 IS ISSUED TO St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 The emission units, control equipment and emission stacks at

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Polaris Industries Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Polaris Industries Inc. AIR EMISSION PERMIT NO. 02500051-001 IS ISSUED TO Polaris Industries Inc. Polaris Industries, Inc. - Wyoming 7290 Viking Boulevard East Wyoming, Chisago County, MN 55092 The emission units, control equipment

More information

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation AIR EMISSION PERMIT NO. 04900030-006 Total Facility Operating Permit - Reissuance IS ISSUED TO Northern States Power Co a Minnesota Corporation XCEL ENERGY - PRAIRIE ISLAND NUCLEAR PLANT 1717 Wakonade

More information

DRAFT/PROPOSED AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. GE Osmonics Inc

DRAFT/PROPOSED AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. GE Osmonics Inc DRAFT/PROPOSED AIR EMISSION PERMIT NO. 05300834 004 Major Amendment IS ISSUED TO GE Osmonics Inc GE Osmonics Inc 5951 Clearwater Drive Minnetonka, Hennepin County, MN 55343 The emission units, control

More information

Preliminary Draft Air Individual Permit State Permit

Preliminary Draft Air Individual Permit State Permit Preliminary Draft Air Individual Permit State Permit 12100021-101 Permittee: Facility name: CHS Inc - Prairie Lakes Coop - Glenwood Grain Elevator CHS Inc - Prairie Lakes Coop - Glenwood Grain Elevator

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission DRAFT/PROPOSED AIR EMISSION PERMIT NO. 08500034 002 Total Facility Operating Permit Reissuance IS ISSUED TO Hutchinson Utilities Commission Hutchinson Utilities Commission Plant 2 1100 Industrial Boulevard

More information

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia AIR EMISSION PERMIT NO. 13700028-003 IS ISSUED TO City of Virginia 620 South 2nd Street Virginia, St. Louis County, Minnesota 55792 The emission units, control equipment and emission stacks at the stationary

More information

AIR EMISSION PERMIT NO IS ISSUED TO INTERSTATE POWER COMPANY

AIR EMISSION PERMIT NO IS ISSUED TO INTERSTATE POWER COMPANY AIR EMISSION PERMIT NO. 09100007-002 IS ISSUED TO INTERSTATE POWER COMPANY INTERSTATE POWER - FOX LAKE STATION County Road 28 Sherburn, Martin County, Minnesota 561710367 The emission units, control equipment

More information

AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P.

AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P. AIR EMISSION PERMIT NO. 16300087-006 Total Facility Oper. Permit - Reissuance IS ISSUED TO LSPCottage Grove, L.P. LSPCOTTAGE GROVE COGENERATION FACILITY 9525 105th Street Court South Cottage Grove, Washington

More information

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota TABLE B: SUBMITTALS Table B lists most of the submittals you must provide. Table B is divided into three sections; one-time submittals or notifications, intermittent submittals or notifications and recurring

More information

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY AIR EMISSION PERMIT NO. 12300012-002 IS ISSUED TO NORTHERN STATES POWER COMPANY NSP - HIGH BRIDGE GENE 501 Shepard Road St. Paul, Ramsey County, Minnesota 551023004 The emission units, control equipment

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 08500002-101 Permittee: Hutchinson Utilities Commission - Plant 1 Facility name: Hutchinson Utilities Commission - Plant 1 44 4th Ave NE Hutchinson, MN 55350-1829

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. ALLETE Inc dba Minnesota Power Inc

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. ALLETE Inc dba Minnesota Power Inc DRAFT/PROPOSED AIR EMISSION PERMIT NO. 13700013 007 Total Facility Operating Permit Reissuance IS ISSUED TO ALLETE Inc dba Minnesota Power Inc Minnesota Power Laskin Energy Center 5699 Colby Lake Road

More information

Draft Air Individual Permit Major Amendment Clearwater Dr Minnetonka, MN Hennepin County

Draft Air Individual Permit Major Amendment Clearwater Dr Minnetonka, MN Hennepin County Draft Air Individual Permit Major Amendment 05300834-102 Permittee: Facility name: GE Osmonics Inc GE Osmonics Inc 5951 Clearwater Dr Minnetonka, MN 55343 Hennepin County Operating permit issuance date:

More information

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation AIR EMISSION PERMIT NO. 10900008-004 Total Facility Operating Permit - Reissuance IS ISSUED TO Mayo Foundation St Marys 1216 Southwest 2nd Street Rochester, Olmsted County, MN 55902 The emission units,

More information

DRAFT Air Individual Permit Part 70 Reissuance

DRAFT Air Individual Permit Part 70 Reissuance DRAFT Air Individual Permit Part 70 Reissuance 13500008-101 Permittee: Facility name: Polaris Industries Inc - Roseau Polaris Industries Inc - Roseau 301 5th Ave SW Roseau, MN56751 Roseau County Expiration

More information

Air Individual Permit State Permit Hardman Ave S South St. Paul, MN 55075

Air Individual Permit State Permit Hardman Ave S South St. Paul, MN 55075 Air Individual Permit State Permit 03700070-007 Permittee: Facility name: Sanimax USA LLC Sanimax USA LLC 505 Hardman Ave S South St. Paul, MN 55075 Expiration date: Non-expiring Permit * All Title I Conditions

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302

AIR EMISSION PERMIT NO IS ISSUED TO. Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302 AIR EMISSION PERMIT NO. 00900006-001 IS ISSUED TO Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302 The emission units, control equipment and emission stacks at the

More information

Air Individual Permit Part 70 Reissuance

Air Individual Permit Part 70 Reissuance Air Individual Permit Part 70 Reissuance 12300057-101 Permittee: Facility name: Rayven Inc Rayven Inc 431 Griggs Street N Saint Paul, MN 55104-4108 Ramsey County Expiration date: December 5, 2023 * All

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 14700009-101 Permittee: Facility name: Northern Natural Gas Company - Owatonna Compressor Station Northern Natural Gas Company - Owatonna Compressor Station

More information

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Ardent Mills LLC

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Ardent Mills LLC AIR EMISSION PERMIT NO. 03700020-004 Major Amendment IS ISSUED TO Ardent Mills LLC ARDENT MILLS FLOUR MILL 2005 Vermillion Street South Hastings, Dakota County, Minnesota 55033 The emission units, control

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 10900008-101 Permittee: Facility name: Mayo Clinic Mayo Clinic Hospital Saint Marys Campus 1216 2nd St SW Rochester, MN 55902-1906 Olmsted County Expiration

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Cogentrix

AIR EMISSION PERMIT NO IS ISSUED TO. Cogentrix AIR EMISSION PERMIT NO. 16300087-004 IS ISSUED TO Cogentrix 9525 105th Street Court South Cottage Grove, Washington County, MN 55016 The emission units, control equipment and emission stacks at the stationary

More information

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County) AIR QUALITY PERMIT Permit No. Effective Date April 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Mayo Foundation

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Mayo Foundation AIR EMISSION PERMIT NO. 10900008-003 Major Amendment IS ISSUED TO Mayo Foundation SAINT MARYS HOSPITAL 1216 Second Street Southwest Rochester, Olmsted County, Minnesota 55902 The emission units, control

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE, Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE, Inc. AIR EMISSION PERMIT NO. 13700013-005 IS ISSUED TO Minnesota Power Division of ALLETE, Inc. MINNESOTA POWER - LASKIN ENERGY CENTER County Road 633 Aurora, St. Louis County, MN 55705 The emission units,

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Archer Daniels Midland Company. ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066

AIR EMISSION PERMIT NO IS ISSUED TO. Archer Daniels Midland Company. ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066 AIR EMISSION PERMIT NO. 04900001-001 IS ISSUED TO Archer Daniels Midland Company ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066 The emission units, control equipment and emission stacks

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc AIR EMISSION PERMIT NO. 13700013-006 IS ISSUED TO Minnesota Power Division of ALLETE Inc MINNESOTA POWER - LASKIN ENERGY CENTER 5699 Colby Lake Road Hoyt Lakes, St. Louis County, MN 55750 The emission

More information

Air Individual Permit Major Amendment

Air Individual Permit Major Amendment Air Individual Permit Major Amendment 01900022-101 Permittee: Facility name: Elkay Wood Products Company - Waconia Elkay Wood Products Company - Waconia 180 Industrial Boulevard Waconia, MN 55387-1736

More information

Air Individual Permit Major Amendment Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR

Air Individual Permit Major Amendment Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR Air Individual Permit Major Amendment 13100058-101 Permittee: Facility name: Northern Natural Gas Co - Faribault Northern Natural Gas Co - Faribault 21903 Canby Ave Faribault, MN 55021 Rice County Operating

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Co dba Xcel Energy

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Co dba Xcel Energy AIR EMISSION PERMIT NO. 04900030-004 IS ISSUED TO Northern States Power Co dba Xcel Energy XCEL ENERGY - PRAIRIE ISLAND NUCLEAR 1717 Wakonade Drive East Welch, Goodhue County, MN 55089 The emission units,

More information

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Archer Daniels Midland Co

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Archer Daniels Midland Co AIR EMISSION PERMIT NO. 04900001-002 Administrative Amendment IS ISSUED TO Archer Daniels Midland Co ADM - RED WING 126 La Grange Street Red Wing, Goodhue County, MN 55066 The emission units, control equipment

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 15300004-101 Permittee: Co-permittee name: Facility name: Viking Gas Transmission - Cushing ONEOK Partners, L.P. Viking Gas Transmission - Cushing 31888 400th

More information

AIR EMISSION PERMIT NO IS ISSUED TO. CertainTeed Corporation

AIR EMISSION PERMIT NO IS ISSUED TO. CertainTeed Corporation AIR EMISSION PERMIT NO. 13900013-003 IS ISSUED TO oration oration 3303 East 4th Avenue Shakopee, Scott County, MN 55379 The emission units, control equipment and emission stacks at the stationary source

More information

Draft Air Individual Permit Major Amendment Brooks Ave South Thief River Falls, MN Pennington County

Draft Air Individual Permit Major Amendment Brooks Ave South Thief River Falls, MN Pennington County Draft Air Individual Permit Major Amendment 11300023-101 Permittee: Facility name: Digi-Key Corp Digi-Key Corp 701 Brooks Ave South Thief River Falls, MN 56701-2757 Pennington County Operating permit issuance

More information

DRAFT. AIR EMISSION PERMIT NO Major Amendment. Central MN Renewables

DRAFT. AIR EMISSION PERMIT NO Major Amendment. Central MN Renewables DRAFT AIR EMISSION PERMIT NO. 09700026 005 Major Amendment Central MN Renewables CENTRAL MN RENEWABLES 7936 Heron Little Falls, Morrison County, Minnesota 56345 The emission units, control equipment and

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 10500001-007 Permittee: Facility name: Swift Pork Co - Worthington Swift Pork Co - Worthington 1700 Highway 60 NE Worthington, MN 56187 Nobles County Expiration

More information

AIR EMISSION PERMIT NO IS ISSUED TO

AIR EMISSION PERMIT NO IS ISSUED TO AIR EMISSION PERMIT NO. 13300023-002 IS ISSUED TO AGRI - ENERGY, LLC 502 South Walnut Luverne, Rock County, Minnesota 56156 FOR THE FACILITY PREVIOUSLY PERMITTED UNDER AIR EMISSION PERMIT NO. 13300023-001

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

Major Amendment December 29, 1999 Total Facility Operating Permit February 12, 1996

Major Amendment December 29, 1999 Total Facility Operating Permit February 12, 1996 AIR EMISSION PERMIT NO. 03700015-001 IS ISSUED TO Northern States Power Company NSP - Inver Hills Generating Plant 3185 117th Street Inver Grove Heights, Dakota County, Minnesota 55077 The emission units,

More information

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted

More information

Background Information for SIP Revision Xcel Energy, Inver Hills Facility, Saint Paul, Minnesota

Background Information for SIP Revision Xcel Energy, Inver Hills Facility, Saint Paul, Minnesota Background Information for SIP Revision Xcel Energy, Inver Hills Facility, Saint Paul, Minnesota This document describes the State Implementation Plan (SIP) revision for Northern States Power Company s

More information

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Newport Terminal Corp

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Newport Terminal Corp DRAFT AIR EMISSION PERMIT NO. 16300010 005 Major Amendment IS ISSUED TO Newport Terminal Corp NEWPORT TERMINAL CORP 50 21st Street Newport, Washington County, MN 55055 The emission units, control equipment

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 04PB1019 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL ISSUED TO:

More information

DRAFT/PROPOSED Air Individual Permit Major Amendment

DRAFT/PROPOSED Air Individual Permit Major Amendment DRAFT/PROPOSED Air Individual Permit Major Amendment 14300014 011 Permittee: Facility name: Heartland Corn Products Heartland Corn Products 53331 State Highway 19 E Winthrop, MN 55396 Operating permit

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

Part 70 Manufacturing General Air Emission Permit

Part 70 Manufacturing General Air Emission Permit Part 70 Manufacturing General Air Emission Permit 05301002-101 PERMITTEE: FACILITY NAME: Greatbatch Ltd dba Greatbatch Medical Greatbatch Ltd dba Greatbatch Medical 730 24 th Ave SE Minneapolis, MN 55414

More information

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015 AIR QUALITY PERMIT Permit No. Effective Date May 26, 2015 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power & Light and the City of Duluth

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power & Light and the City of Duluth AIR EMISSION PERMIT NO. 13700015-001 IS ISSUED TO Minnesota Power & Light and the City of Duluth MINNESOTA POWER AND LIGHT - ML HIBBARD 30 West Superior Street Duluth, St. Louis County, Minnesota 55802

More information

Streamlining Multiple Applicable Requirements

Streamlining Multiple Applicable Requirements Streamlining Multiple Applicable Requirements What is Streamlining? 1. Streamlining is the process of determining one set of requirements to be incorporated into the Title V permit from among multiple

More information

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS GENERAL

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 11PB859 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL Modification

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

This is a new permit condition titled, 2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP) This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced

More information

Part 70 Low-Emitting Facility General Permit Air Emission General Permit No. [ ]

Part 70 Low-Emitting Facility General Permit Air Emission General Permit No. [ ] Part 70 Low-Emitting Facility General Permit Air Emission General Permit No. [ ] PERMITTEE: CO-PERMITEE NAME: FACILITY NAME: PERMIT ISSUANCE DATE: EXPIRATION DATE: {Permittee Name} {Co-Permittee Name}

More information

SUPPLEMENT to PERMIT No Woodspecs, Inc. Waterford, Michigan September 6, 2000 GENERAL CONDITIONS

SUPPLEMENT to PERMIT No Woodspecs, Inc. Waterford, Michigan September 6, 2000 GENERAL CONDITIONS SUPPLEMENT to PERMIT No. 165-00 Woodspecs, Inc. Waterford, Michigan GENERAL CONDITIONS 1. Rule 201(1) - The process or process equipment covered by this permit shall not be reconstructed, relocated, altered,

More information

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO

TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO. 14500029 003 This technical support document (TSD) is intended for all parties interested in the draft permit and to meet the requirements that

More information

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the 15A NCAC 02D.1206 HOSPITAL, MEDICAL, AND INFECTIOUS WASTE INCINERATORS (a) Applicability. This Rule applies to any hospital, medical, and infectious waste incinerator (HMIWI), except: (1) any HMIWI required

More information

AIR PERMIT ABBEVILLE, HENRY COUNTY, ALABAMA DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE

AIR PERMIT ABBEVILLE, HENRY COUNTY, ALABAMA DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE AIR PERMIT PERMITTEE: FACILITY NAME: LOCATION: PEGASUS WEST, LLC PEGASUS WEST, LLC ABBEVILLE, HENRY COUNTY, ALABAMA PERMIT NUMBER 606-S008-X001 DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE Sawmill Green

More information

DRAFT/PROPOSED. Part 70 Low Emitting Facility General Permit Air Emission General Permit No. [fill in]

DRAFT/PROPOSED. Part 70 Low Emitting Facility General Permit Air Emission General Permit No. [fill in] DRAFT/PROPOSED Part 70 Low Emitting Facility General Permit Air Emission General Permit No. [fill in] PERMITTEE: CO PERMITEE NAME: FACILITY NAME: PERMIT ISSUANCE DATE: EXPIRATION DATE: {Permittee Name}

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM June 17, 2004 SUBJECT: Review of Application Title V Operating Permit Bellefield Boiler Plant Boundary Street Pittsburgh, PA 15213 RE: Operating Permit

More information

MAJOR SOURCE OPERATING PERMIT

MAJOR SOURCE OPERATING PERMIT MAJOR SOURCE OPERATING PERMIT Permitee: Facility Name: Facility No.: Location: INTERNATIONAL PAPER CO. INTERNATIONAL PAPER RIVERDALE MILL 104-0003 SELMA, ALABAMA In accordance with and subject to the provisions

More information

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Air Permitting of Sources at Natural gas Production, Compression and Processing Facilities MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Tom Wolf, Governor John Quigley, Secretary Overview

More information

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

Air Quality Permit File SOOP # Lindy Paving, Inc. I Homer City Plant

Air Quality Permit File SOOP # Lindy Paving, Inc. I Homer City Plant OffiCIAL FILE COPY SOUTHWEST REGIONAL OFFICE MEMO TO FROM THROUGH DATE Air Quality Permit File SOOP # 32-00311 Lindy Paving, Inc. I Homer City Plant Sheila A. Shaffer~ Air Quality Engineering S~ecialist

More information

MACK TRUCKS, INC PENNSYLVANIA AVENUE, HAGERSTOWN, MD PART 70 OPERATING PERMIT NO

MACK TRUCKS, INC PENNSYLVANIA AVENUE, HAGERSTOWN, MD PART 70 OPERATING PERMIT NO SECTION I SOURCE IDENTIFICATION... 4 1. DESCRIPTION OF FACILITY... 4 2. FACILITY INVENTORY LIST... 4 SECTION II GENERAL CONDITIONS... 6 1. DEFINITIONS... 6 2. ACRONYMS... 6 3. EFFECTIVE DATE... 7 4. PERMIT

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM April 18, 2014 SUBJECT: Cellco Partnership, dba Verizon Wireless 18 Abele Road Bridgeville, PA 15017 Allegheny County Operating Permit No. 0867 TO:

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing

More information

DEP7007CC Compliance Certification

DEP7007CC Compliance Certification Commonwealth of Kentucky Natural Resources & Environmental Protection Cabinet Department for Environmental Protection DIVISION FOR AIR QUALITY DEP7007CC Compliance Certification Division Use Only ID# Permit

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Spark Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction of the

More information

SECTION.1400 NITROGEN OXIDES

SECTION.1400 NITROGEN OXIDES SECTION.1400 NITROGEN OXIDES 15A NCAC 02D.1401 DEFINITIONS (a) For the purpose of this Section, the definitions at G.S 143-212 and G.S. 143-213, and 15A NCAC 02D.0101 shall apply, and in addition the following

More information

State of New Jersey. General Permit (GP-009A)

State of New Jersey. General Permit (GP-009A) 03/21/2013 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-009A) For Boiler(s) and Indirect Fired Process Heater(s) Each Greater Than or Equal to 10

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit No. : 0159-AR-4 IS ISSUED TO: 2201 N. Redmond Rd. Jacksonville, AR 72023 Pulaski County THIS PERMIT IS THE ABOVE REFERENCED PERMITTEE S AUTHORITY TO CONSTRUCT, MODIFY,

More information

State of New Jersey. Department of Environmental Protection Air Quality Permitting

State of New Jersey. Department of Environmental Protection Air Quality Permitting GP021 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP 021) Combined Heat and Power Combustion Turbine(s) less than or equal to 65 MMBTU per hour This

More information

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published

More information

JOHNS HOPKINS UNIVERSITY 3400 N. CHARLES STREET BALTIMORE, MD PART 70 OPERATING PERMIT NO

JOHNS HOPKINS UNIVERSITY 3400 N. CHARLES STREET BALTIMORE, MD PART 70 OPERATING PERMIT NO SECTION I SOURCE IDENTIFICATION...4 1. DESCRIPTION OF FACILITY...4 2. FACILITY INVENTORY LIST...4 SECTION II GENERAL CONDITIONS...7 1. DEFINITIONS...7 2. ACRONYMS...7 3. EFFECTIVE DATE...8 4. PERMIT EXPIRATION...8

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: N-6311-9-1 ISSUANCE DATE: 12/17/2008 LEGAL OWNER OR OPERATOR: FISCALINI FARMS & FISCALINI DAIRY MAILING ADDRESS: 7231 COVERT RD MODESTO, CA 95358 LOCATION: 4848 JACKSON

More information

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT APPENDIX D APPENDIX D REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL NEW JERSEY STATE DEPARTMENT

More information

W.L. GORE & ASSOCIATES, INC CHERRY HILL PLANT 2401 SINGERLY ROAD, ELKTON, MD PART 70 OPERATING PERMIT NO

W.L. GORE & ASSOCIATES, INC CHERRY HILL PLANT 2401 SINGERLY ROAD, ELKTON, MD PART 70 OPERATING PERMIT NO SECTION I SOURCE IDENTIFICATION...4 1. DESCRIPTION OF FACILITY...4 2. FACILITY INVENTORY LIST...4 SECTION II GENERAL CONDITIONS...8 1. DEFINITIONS...8 2. ACRONYMS...8 3. EFFECTIVE DATE...9 4. PERMIT EXPIRATION...9

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Compression Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction

More information

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 Discussion Topics Background Important Terms Applicability Compliance Deadlines Emission/Operating Limits Performance/Compliance

More information

Reproduction of Permit Terms and Conditions

Reproduction of Permit Terms and Conditions Page 1 of 92 This version of facility specific terms and conditions was converted from a database format to an HTML file during an upgrade of the Ohio EPA, Division of Air Pollution Control's permitting

More information

Engineering Summary New NGC, Inc.

Engineering Summary New NGC, Inc. 1 Engineering Summary New NGC, Inc. Application #: FY04-0335 AFS #: 3301500045 County: Rockingham Engineer: Laughton Date: March 2004 Permitting Background/History New NGC, Inc. (NGC), formerly known as

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: S-7658-1-0 ISSUANCE DATE: 10/30/2009 LEGAL OWNER OR OPERATOR: ABEC BIDART-STOCKDALE LLC MAILING ADDRESS: C/O CALIFORNIA BIOENERGY LLC 2828 ROUTH STREET SUITE 500 DALLAS,

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 28, 2005 PERMIT TO INSTALL

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 28, 2005 PERMIT TO INSTALL MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION September 28, 2005 PERMIT TO INSTALL 187-05 ISSUED TO Zeeland Board of Public Works LOCATED AT 8943 Riley Street Zeeland, Michigan IN THE

More information

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater 11/21/2016 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-007) Boiler or Heater Greater than or equal to 1 MMBTU/hr and less than 5 MMBTU/hr

More information

State of New Jersey. Department of Environmental Protection Division of Air Quality

State of New Jersey. Department of Environmental Protection Division of Air Quality GOP-006 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-006) Combined Heat and Power Stationary Spark Ignition Reciprocating Engine(s) less

More information

AIR QUALITY PERMIT. Vulcan Construction Materials, LLC-Gainesville RM

AIR QUALITY PERMIT. Vulcan Construction Materials, LLC-Gainesville RM AIR QUALITY PERMIT Permit No. Effective Date January 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels GP-005B State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels This general permit allows for the construction,

More information

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE?

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE? OVERVIEW Compliance Webinar Reciprocating Internal Combustion Engines RICE September 16, 2013 Jesse Zahn, CHMM Jesse.zahn@hrpassociates.com HRP Associates, Inc. Clifton Park, NY 12065 What is RICE Unit

More information

General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013

General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013 General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38 Citizens Advisory Council Meeting March 19, 2013 Headings : White Text 40 pt. Calibri GP-5 General Information

More information

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC 2011 Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC Ohio EPA, Division of Air Pollution Control 1/1/2011 Page 2

More information

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) 1.0 Purpose The purpose of this rule is to limit emissions

More information

Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: Application #: 40411

Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: Application #: 40411 Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: 04-13-089-00100 Application #: 40411 Date SIP Application Received: September 28, 2015 Date Title V Application

More information