Streamlining Multiple Applicable Requirements
|
|
- Neil Merritt
- 6 years ago
- Views:
Transcription
1 Streamlining Multiple Applicable Requirements
2 What is Streamlining? 1. Streamlining is the process of determining one set of requirements to be incorporated into the Title V permit from among multiple applicable requirements for an emission unit to assure compliance with all the underlying applicable requirements. 2. The basic concept behind streamlining is that, as long as the permit contains the most stringent of the applicable requirements, the permit will assure compliance with underlying applicable requirements.
3 Legal Basis of Streamlining The legal basis for streamlining applicable requirements: 1. CAA Section 504(a): requires that title V permits contain emissions limits/standards and other terms as needed to assure compliance with applicable requirements. 2. This section does not require repetition of all terms and conditions of an applicable requirement when another applicable requirement or part 70 permit condition (i.e., streamlined requirement) can be used to assure compliance with that applicable requirement.
4 Legal Basis of Streamlining CFR 70.6(3)(i)(A). If more than one monitoring or testing requirement applies, the permit may specify a streamlined set of monitoring or testing provisions provided the specified monitoring or testing is adequate to assure compliance at least to the same extent as the monitoring or testing applicable requirements that are not included in the permit as a result of such streamlining; 4. White Paper #2 extended this streamlining to emissions limits
5 Considerations for Permitting Agency 1. "Streamlining may be initiated by either the applicant or the permitting authority, however, it can only be implemented where the applicant consents to its use. 2. The burden is on the applicant to file a complete title V application; thus, an application that includes streamlining would have to show that the streamlining clearly meets the streamlining provisions in 70.6(a)(3)(i)(A). 3. The PA then reviews and determine whether to approve and include it in the permit.
6 Considerations for Permitting Agency 4. The PA must also provide an adequate explanation of any streamlining to support public review in the Statement of Basis (Finding of Fact, Fact Sheet, Review memo) 5. The PA should encourage the source to include a permit shield with the streamlined requirements (Unless the Title V operating permit program doe not contain permit shield requirements)
7 Why Permit Shields? 1. If there is no shield in the Title V permit for an applicable requirement, an enforcement action may be brought against the source for violation of the rule and or permit containing the applicable requirement and the Title V permit itself. 2. If there is a shield in the Title V permit for an applicable requirement, an enforcement action may ONLY be brought against the source for a violation of the Title V permit.
8 What is a Permit Shield? A permit shield is specific permit language that, if properly written, can protect the source from enforcement of an applicable requirement under three cases: 1) A requirement applies to the source and a Title V permit condition explicitly includes the requirement, OR 2) A requirement applies to the source and a Title V permit condition assures compliance with the requirement (also known as streamlining), OR 3) A requirement does not apply to the source. A source may request the permitting authority to include a permit shield in the Title V permit under 504(f) of the CAA, and 70.6(f).
9 What a Permit Shield Cannot Do A permit shield cannot shield the source from: 1. The emergency provisions of State Statutes of the State Act; 2. Liability for any violations of applicable requirements or applicable requirements under the Act prior to or at the time of permit issuance; 3. The applicable requirements of acid rain provisions; and The authority of the Department or the Environmental Protection Agency to obtain information.
10 Permit Shield Example Permit Shield Language from a West Virginia Permit 1. The permittee has requested and is hereby granted a permit shield. The permit shield applies as long as the permittee operates in accordance with the terms and conditions within this permit. 2. The list below identifies requirements which are not applicable to the permittee and the determinations thereof. So long as the permittee operates within the constraints of these determinations, the permit shield shall apply to the following provisions. a. 40 C.F.R. 60 Subpart G, Standards of Performance for Stationary Gas Turbines. There are no turbines located at the Source. b. 40 C.F.R. 60 Subparts K and Ka, Standards of Performance for Storage Vessels for Petroleum Liquids. All tanks at the Source are below 40,000 gallons in capacity. c. 40 C.F.R. 60 Subpart Kb, Standards of Performance for Volatile Organic Liquid Storage Vessels. All tanks storing volatile organic liquids at the Source are below 10,000 gallons in capacity. d. 40 C.F.R. 60 Subpart KKK, Standards of Performance for Equipment Leaks of VOC From Onshore Natural Gas Processing Plants. The Source is not engaged in the extraction of natural gas liquids from field gas or in the fractionation of mixed natural gas products. e. 45 C.S.R. 21, To Prevent and Control Air Pollution from the Emission of Volatile Organic Compounds. The Source is not located in Cabell, Kanawha, Putnam, Wayne, nor Wood counties. f. 45 C.S.R. 27, To Prevent and Control the Emissions of Toxic Air Pollutants. Natural gas is included as a petroleum product and contains less than 5% benzene by weight. C.S.R exempts equipment "used in the production and distribution of petroleum products providing that such equipment does not produce or contact materials containing more than 5% benzene by weight." 3. Compliance with the conditions of this permit shall be deemed compliance with the corresponding applicable requirements as of the date of permit issuance and/or that the requirements specifically identified are not applicable to the permittee as of the date of permit issuance. C.S.R a.
11 Permit Shield Example ( Statement of Basis Language) Language From a Statement of Basis (Fact Sheet, Review Memo, etc.) The following requirements have been specifically identified as not applicable based upon information submitted by the licensee in an application dated December (See Next Slide)
12 Permit Shield Examples (Statement of Basis) SOURCE CITATION DESCRIPTION BASIS FOR DETERMINATION Facility 40CFR Part 63, Subpart R NESHAP for Gasoline Distribution Facility is not major for HAPS Facilities Facility 40 CFR Part 63 Subpart Y, NESHAP for Marine Tank Vessel Loading Operations Facility is not major for HAPS and is permitted below the applicable throughput threshold Facility Facility 40 CFR Part 68 Chemical Accident Prevention Provisions Does not apply based on EPA proposed exemption dated 4/15/96
13 Streamlining Principles 1. Most stringent requirement "assures compliance" with multiple applicable requirements 2. Choose most stringent limit 3. Choose most "assuring" monitoring (e.g., if you streamline a 20% opacity limit that requires an annual source test with a 40% opacity limit that requires a COM, the streamlined limit is 20% opacity with a COM) 4. Include recordkeeping and reporting associated with the streamlined monitoring regime (where recordkeeping is the monitoring, apply "most assuring" test) 5. Compliance with all monitoring, recordkeeping and reporting associated with the subsumed limit(s) is not required
14 Streamlining Principles 6. The streamlining demonstration should include a side-by-side comparison of the requirements, and should be included in the Statement of Basis. (See White Paper #2 for more details on the streamlining demonstration). 7. The citation of authority for a streamlined permit condition should reference the authority for the streamlined limit, and the authority of all subsumed applicable requirements. 8. In order to protect the source from enforcement for noncompliance with subsumed applicable requirements, the permit shield should be granted in all instances of streamlining.
15 Streamlining Permit Language Example #1 A 200 mmbtu boiler that burns only coal is subject to the following applicable requirements for particulate matter : 25 Pa. Code Section A = 3.6E A: lb/mmbtu heat input E: Heat input (mmbtu/hour) NSPS Subpart Db [40 CFR 60.43b(a)(1)] = 0.05 lb/mmbtu A = lb/mmbtu The NSPS limit of 0.05 lb/mmbtu is the "streamlined" limit because it is more stringent. The SIP limit of lb/mmbtu is considered the "subsumed" limit (i.e., so long as the source complies with the NSPS limit, they are assuring compliance with the SIP limit). The permit condition could be written as: Unit #3: 200 mmbtu/hr boiler Permittee shall not cause to be discharged into the atmosphere any gases that contain particulate matter in the excess of 0.05 lb/mmbtu heat input. Commpliance with requirements specified in this streamlined permit conditoi assures compliance with the provisions in: 40 CFR 60.43(a)(1) and 25 Pa. Code Section Permit shield applies.
16 Streamlining Demonstration Steps Example #2- NOx Emissions For Combustion Turbine Step One: Identification of multiple requirements: a) SDAPC Rule 69.3 b) SDAPCD NSR permit c) 40 CFR 60 Subpart GG for Stationary Gas Turbines (SDAPCD Rule thru Rule ) Step Two: Determining most stringent NOx emission limit Rule 69.3: 42 O2 NSR Permit: 13 15% O2 Rule : Natural Gas :158.4 ppmdv 15% 02 Fuel Oil: ppmdv 15% 02
17 Streamlining Example #2 Step Two Discussion Based on the emission limits, NSR permit limit of 13 15% 02 is the most stringent limit for both fuel oil and natural gas and therefore is the streamlined requirement. The other emission limits are subsumed.
18 Streamlining Example #2 Step Three: Evaluate work practice requirements Rule 69.3: None NSR Permit: 1) The distribution of ammonia across the SCR unit plates shall be the optimum distribution to meet the emission limits. 2) SCR units shall be operated at all times when operating the turbine using the automatic ammonia (NH3) control system except when the automatic control system is in breakdown status and the SCR is controlled manually. [Permit Condition #511 3)During manual operation, a trained operator shall be on duty at all times and the NH 3 injection flow rate shall not be less than 250 SCFH when operating the combustion turbine. This condition shall apply at all times, except for a 90-minute period for each cold start-up. Rule : None
19 Streamlining Example #2 Step Three discussion The streamline work practice requirement will be the work practices associated with the most stringent emission limit in the NSR. The work practices contained in the NSR permit are considered to be the streamlined requirements. Any other work practice requirements are subsumed.
20 Streamlining Example #2 Step Four: Evaluate monitoring requirements Rule 69.3: Continuous Monitoring for operational characteristics of the unit and NOx emissions reduction system NSR Permit: Continuous Monitoring of NOx and O2 (1 hour average) Rule : Continuous Monitoring off fuel consumption, ratio of water to fuel, and fuel nitrogen and sulfur content.
21 Streamlining Example #2 Step Four Discussion: The continuous monitoring requirements for the CEMS in the NSR Permit conditions are considered to be the streamlined requirements since they are associated with the most stringent emission limit. The other requirements are subsumed.
22 Streamlining Example #2 Step Five: Evaluate record keeping/reporting Rule 69.3: Operating log & General record keeping NSR Permit: All records Of performance testing measurements shall be made available to the district upon request for at least two years following the date the information is recorded. By reference, Rule 19.2 requirements, 1. Occurrence and duration of any startup, shutdown or malfunction in the operation of the facility 2. Performance testing, evaluations, calibrations, check, adjustments, and maintenance of any CEMs, 3. Emission measurements, 4, Quarterly Reports Rule : General record keeping; Nitrogen content in the fuel; Sulfur content in the fuel 40 CFR 60.4 and 60.7 Quarterly and Excess emissions reporting
23 Streamlining Example #2 Step Five Discussion: The record keeping requirements in the NSR permit are the most stringent and therefore are the streamlined requirements. The other requirements are subsumed.
24 Final Suggested Permit Language Example #2 Final Streamlined Requirement may be written: Source ID 023: 650 mmbtu/hr Combustion Turbine: Emissions limit Permittee shall not cause to be discharged into the atmosphere any gases that contain NOx in the excess of 13 15% 02. This streamlined permit condition assures compliance with the emissions limits contained in: Rule 69.3; NSR Permit No ; 40 CFR 60 Subpart GG; Rule thru Rule
25 Final Suggested Permit Language Example #2 Work Practice Requirements The distribution of ammonia across the SCR unit plates shall be the optimum distribution to meet the emission limits. SCR units shall be operated at all times when operating the turbine using the automatic ammonia (NH3) control system except when the automatic control system is in breakdown status and the SCR is controlled manually. [Permit Condition #511 During manual operation, a trained operator shall be on duty at all times and the NH 3 injection flow rate shall not be less than 250 SCFH when operating the combustion turbine. This condition shall apply at all times, except for a 90-minute period for each cold start-up. Permit shall Continuously Monitoring NOx and O2 content of flue gas and calculate average emissions on an hourly basis. This streamlined permit condition assures compliance with work practice requirements contained in SDAPCD NSR permit **(Note: No other rules have work practice requirements to be subsumed)
26 Final Suggested Permit Language Example #2: Recordkeeping and Reporting All records of performance testing measurements shall be made available to the district upon request for at least two years following the date the information is recorded. By reference, Rule 19.2 requirements, 1. Occurrence and duration of any startup, shutdown or malfunction in the operation of the facility 2. Performance testing, evaluations, calibrations, check, adjustments, and maintenance of any CEMs, 3. Emission measurements, 4, Quarterly Report This streamlined permit condition assures compliance with record keeping and Reporting requirements of: Rule 69.3; NSR Permit No ; Rule thru Rule (40 CFR 60 Subpart GG)
27 Suggested Permit Shield Language Example #2 1. The permittee has requested and is hereby granted a permit shield**. The permit shield applies as long as the permittee operates in accordance with the terms and conditions within this permit. 2. The list below identifies requirements which are not applicable to the permittee and the determinations thereof. So long as the permittee operates within the constraints of these determinations, the permit shield shall apply to the following provisions: a. Rule 69.3; b. NSR Permit No ; c. 40 CFR 60 Subpart GG; d. Rule thru Rule **(Note: This is only applicable if the Title V permit program has a permit shield provision)
28 Streamlining Example #3 PA Title V Permit The Pennsylvania SIP limit for sulfur dioxide (SO2) emissions from certain combustion sources requires compliance be determined on a real-time (instantaneous) basis. PA Sulfur Regulation in the Pennsylvania Code with the same numerical emissions limit requires compliance determined over a one hour period. Pennsylvania has demonstrated that a source that is in compliance with the state limit over a one hour period can be considered federally enforceable (in compliance with the Federal limit (Pennsylvania SIP)) on an instantaneous basis. To "streamline" these limits, the Title V permit: 1) lists the SO2 emissions limit from the Pennsylvania Code; 2) cites the authority of the Pennsylvania Code regulation which contains this limit; and 3) states that "Compliance with the requirement specified in this streamlined permit condition assures compliance with the provisions specified in the SIP approved SO2 limits found at 40 CFR (c)(1)." The Statement of Basis must include a technical justification demonstrating that the state limits assure compliance with the Federal limits. Also, a copy of this streamlining language and the technical demonstration should be included.
29 Enforcement 1. Upon receiving a part 70 permit, a source implementing the streamlined approach would not be subject to an EPA enforcement action for any failure to meet monitoring, recordkeeping, and reporting requirements that are subsumed within the streamlined requirement and specified under the permit shield. 2. These requirements would no longer be independently enforceable once the permit has been issued, provided that the source attempts in good faith to implement the monitoring, recordkeeping, and reporting requirements specified in the permit.
30 Streamlining Guidance Streamlining guidance/examples: EPA White Paper #2: Region 3 Website:
31 Thank You For more information contact: Paul T. Wentworth Phone:
AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)
AIR QUALITY PERMIT Permit No. Effective Date April 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant
More informationRULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)
RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions
More information3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).
RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose
More informationALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM
ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM February 2, 2012 SUBJECT: Superior Appalachian Pipeline, LLC Kissick Lane Frazer Township, PA 15084 Allegheny County Installation Permit No. 0837-I001
More informationIndustrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary
Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published
More informationThe Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706
DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner
More informationAir Individual Permit Permit Limits to Avoid NSR
Air Individual Permit Permit Limits to Avoid NSR 13900128-001 Permittee: Facility name: Shakopee Distributed Generation Shakopee Distributed Generation Vierling Drive E Shakopee, Minnesota 55379 Scott
More informationAIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company
AIR EMISSION PERMIT NO. 16300110-001 IS ISSUED TO Northern Natural Gas Company NORTHERN NATURAL GAS - HUGO No Street Address Hugo, Washington County, Minnesota 55038 The emission units and emission stacks
More informationSTATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number
STATEMENT OF BASIS Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number 701-0013 Introduction On June 30, 2017, the Department received an application to renew the Title V Major Source
More informationMICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION May 1, 2015 PERMIT TO INSTALL 4-13B ISSUED TO Zoetis LLC LOCATED AT 306 Pitcher Street Kalamazoo, Michigan IN THE COUNTY OF Kalamazoo STATE
More informationGeneral Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013
General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38 Citizens Advisory Council Meeting March 19, 2013 Headings : White Text 40 pt. Calibri GP-5 General Information
More informationFacility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788
Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: 04-13-08700037 Application #: 22788 Date SIP Application Received: August 11, 2014 Date Title V Application
More informationSTATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98)
RULE 69.3 STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) (a) APPLICABILITY This rule shall apply to any stationary
More informationPublic Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 11PB859 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL Modification
More informationMARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA
Air Permitting of Sources at Natural gas Production, Compression and Processing Facilities MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Tom Wolf, Governor John Quigley, Secretary Overview
More informationGENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS GENERAL
More informationENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION
SIC Code: 4911 (Energy Production) DATE: 06/17/2005 Page 1 of 6 DATE APPLICATION RECEIVED: March 31, 2004 (Application # FY04-0427) FACILITY DESCRIPTION Pinetree-Bethlehem (the Permittee) operates a 17.1
More informationALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM
ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM June 17, 2004 SUBJECT: Review of Application Title V Operating Permit Bellefield Boiler Plant Boundary Street Pittsburgh, PA 15213 RE: Operating Permit
More informationAIR QUALITY PERMIT. Kennesaw State University - Marietta Campus
AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted
More informationThis rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.
RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule
More informationAppendix K. DOC Conditions
Appendix K DOC Conditions Mission Rock Energy Center Five (5) GE LM6000-PG-Sprint Combustion Turbine Generators (CTGs) Total = 275 MW Nominal Each CTG is simultaneously subject to the emission limits,
More informationPart 70 Operating Permit Amendment
Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing
More information6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?
Presented by Richard M. Cestone, PE, CHMM Birdsall Services Group For NJEWA Conference May 9, 2011 What happens when a permit has both federal and state regulations? 1 Facilities get confused with Federal
More informationSAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks
SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks Approved By: Signed Seyed Sadredin Director of Permit Services
More informationHuntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by
Huntington Power Plant Notice of Intent Submitted to the Utah Division of Air Quality And Prepared by 1407 West North Temple Salt Lake City, Utah 84116 April 11, 2008 1.0 Introduction PacifiCorp Energy
More informationDRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission
DRAFT/PROPOSED AIR EMISSION PERMIT NO. 08500034 002 Total Facility Operating Permit Reissuance IS ISSUED TO Hutchinson Utilities Commission Hutchinson Utilities Commission Plant 2 1100 Industrial Boulevard
More informationAppendix K. Final DOC Conditions
Appendix K Final DOC Conditions Puente Power Project 262 MW (net nominal) GE 7HA.01 Combustion Turbine Generator (CTG) The CTG is simultaneously subject to the emission limits, monitoring requirements,
More informationELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)
RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified
More informationMajor/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business.
Major/Area Source Boiler MACT Rule Speaker: Eric Swisher 23rd Virginia Environmental Symposium April 11, 2012 Your environmental compliance is clearly our business. Overview Ground Rules Regulatory Framework
More informationAIR EMISSION PERMIT NO IS ISSUED TO. Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets
AIR EMISSION PERMIT NO. 10901019-002 IS ISSUED TO Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets Rochester Public Utilities 3605 Highway 52 North Rochester, Olmsted County,
More informationRICE NESHAP Frequently Asked Questions (FAQ)
RICE NESHAP Frequently Asked Questions (FAQ) What does RICE NESHAP mean? RICE NESHAP is an acronym for Reciprocating Internal Combustion Engines National Emission Standards for Hazardous Air Pollutants.
More informationDRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc.
DRAFT/PROPOSED AIR EMISSION PERMIT NO. 00300155 002 Major Amendment IS ISSUED TO Hoffman Enclosures, Inc. Hoffman Enclosure Inc/Pentair Equipment Protection 2100 Hoffman Way Anoka, Anoka County, MN 55303
More informationAIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation
AIR EMISSION PERMIT NO. 10900008-004 Total Facility Operating Permit - Reissuance IS ISSUED TO Mayo Foundation St Marys 1216 Southwest 2nd Street Rochester, Olmsted County, MN 55902 The emission units,
More informationALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM
ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM April 18, 2014 SUBJECT: Cellco Partnership, dba Verizon Wireless 18 Abele Road Bridgeville, PA 15017 Allegheny County Operating Permit No. 0867 TO:
More informationPERMIT TO INSTALL. Table of Contents
Permit No. 118-18 Page 1 of 23 PERMIT TO INSTALL Table of Contents COMMON ACRONYMS... 2 POLLUTANT / MEASUREMENT ABBREVIATIONS... 3 GENERAL CONDITIONS... 4 EMISSION UNIT SPECIAL CONDITIONS... 6 EMISSION
More informationMICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION MAY 19, 2005 NEW SOURCE REVIEW PERMIT TO INSTALL NO
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION MAY 19, 2005 NEW SOURCE REVIEW PERMIT TO INSTALL NO. 87-05 ISSUED TO PLAST-O-FOAM, LLC LOCATED AT 24601 CAPITAL BLVD. CLINTON TWP., MICHIGAN
More informationAIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY
AIR EMISSION PERMIT NO. 12300012-002 IS ISSUED TO NORTHERN STATES POWER COMPANY NSP - HIGH BRIDGE GENE 501 Shepard Road St. Paul, Ramsey County, Minnesota 551023004 The emission units, control equipment
More information3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3.
VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 59 - ELECTRICAL POWER GENERATING EQUIPMENT - OXIDES OF NITROGEN EMISSIONS (Adopted 10/6/69, Revised 5/23/72, 7/18/72, 10/31/72, 8/14/79, 12/7/82, 6/4/91,
More informationNARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015
Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,
More informationSummaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC
2011 Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC Ohio EPA, Division of Air Pollution Control 1/1/2011 Page 2
More informationState of New Jersey. Department of Environmental Protection Air Quality Permitting
GP021 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP 021) Combined Heat and Power Combustion Turbine(s) less than or equal to 65 MMBTU per hour This
More informationState of New Jersey. Department of Environmental Protection Division of Air Quality
GOP-006 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-006) Combined Heat and Power Stationary Spark Ignition Reciprocating Engine(s) less
More informationDraft Air Individual Permit Part 70 Reissuance
Draft Air Individual Permit Part 70 Reissuance 10900008-101 Permittee: Facility name: Mayo Clinic Mayo Clinic Hospital Saint Marys Campus 1216 2nd St SW Rochester, MN 55902-1906 Olmsted County Expiration
More informationSAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT
SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT DATE: 3/1/10, updated 5/5/10 TO: Interested Parties SUBJECT: Frequently asked questions regarding compliance with Rule 4320, Advanced Emission Reduction
More informationAIR EMISSION SOURCE CONSTRUCTION PERMIT
AIR EMISSION SOURCE CONSTRUCTION PERMIT Source ID No.: 0550023 Effective Date: Source Name: DRAFT Holcomb Station NAICS: 221112, Fossil fuel power generation (SIC 4911) Site Location: Site Owner/Operator
More informationApplicable Requirements - NSPS Subpart JJJJ
Facility Name: CO Station 3 Combustion Type: 4SRB Facility HAP Status: Area Fuel Type: Natural gas RICE Owner: RICE Operator: S2C Gathering Co Acme Operating Inc. Use Type: Max. Runtime: Non-emergency
More informationTECHNICAL SUPPORT DOCUMENT. Nevada Power Company, dba NV Energy. Walter M. Higgins III Generating Station
TECHNICAL SUPPORT DOCUMENT TECHNICAL INFORMATION PRESENTED IN REVIEW OF AN APPLICATION FOR A PART 70 OP APPLICATION SUBMITTED BY Nevada Power Company, dba NV Energy For Generating Station Part 70 OP Number:
More informationAIR QUALITY PERMIT P 01 0 May 14, 2007
AIR QUALITY PERMIT Permit No. Effective Date 4911 099 0033 P 01 0 May 14, 2007 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12 9 1, et seq and the Rules, Chapter 391
More informationFacility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: Application #: 40411
Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: 04-13-089-00100 Application #: 40411 Date SIP Application Received: September 28, 2015 Date Title V Application
More informationDraft Air Individual Permit Major Amendment
Draft Air Individual Permit Major Amendment 08500002-101 Permittee: Hutchinson Utilities Commission - Plant 1 Facility name: Hutchinson Utilities Commission - Plant 1 44 4th Ave NE Hutchinson, MN 55350-1829
More informationAIR QUALITY PERMIT. Longleaf Energy Associates, LLC C/o LS Power Development, LLC Two Tower Center, 11 th Floor East Brunswick, New Jersey 08816
AIR QUALITY PERMIT Permit No. Effective Date In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant to or in
More informationAUTHORITY TO CONSTRUCT
AUTHORITY TO CONSTRUCT PERMIT NO: N-6311-9-1 ISSUANCE DATE: 12/17/2008 LEGAL OWNER OR OPERATOR: FISCALINI FARMS & FISCALINI DAIRY MAILING ADDRESS: 7231 COVERT RD MODESTO, CA 95358 LOCATION: 4848 JACKSON
More informationAIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Archer Daniels Midland Co
AIR EMISSION PERMIT NO. 04900001-002 Administrative Amendment IS ISSUED TO Archer Daniels Midland Co ADM - RED WING 126 La Grange Street Red Wing, Goodhue County, MN 55066 The emission units, control equipment
More informationAIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P.
AIR EMISSION PERMIT NO. 16300087-006 Total Facility Oper. Permit - Reissuance IS ISSUED TO LSPCottage Grove, L.P. LSPCOTTAGE GROVE COGENERATION FACILITY 9525 105th Street Court South Cottage Grove, Washington
More informationPermit Holder. Permitted Equipment
Air Quality Registration Stationary Spark Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction of the
More informationAIR EMISSION PERMIT NO IS ISSUED TO INTERSTATE POWER COMPANY
AIR EMISSION PERMIT NO. 09100007-002 IS ISSUED TO INTERSTATE POWER COMPANY INTERSTATE POWER - FOX LAKE STATION County Road 28 Sherburn, Martin County, Minnesota 561710367 The emission units, control equipment
More informationReproduction of Permit Terms and Conditions
Page 1 of 92 This version of facility specific terms and conditions was converted from a database format to an HTML file during an upgrade of the Ohio EPA, Division of Air Pollution Control's permitting
More informationAPPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT
APPENDIX D APPENDIX D REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL NEW JERSEY STATE DEPARTMENT
More informationAIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301
AIR EMISSION PERMIT NO. 14500026-001 IS ISSUED TO St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 The emission units, control equipment and emission stacks at
More informationRICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010
RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 Discussion Topics Background Important Terms Applicability Compliance Deadlines Emission/Operating Limits Performance/Compliance
More informationPERMIT TO INSTALL. Table of Contents
Permit No. 206-14 Page 1 of 27 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit
More informationAIR EMISSION PERMIT NO IS ISSUED TO. Archer Daniels Midland Company. ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066
AIR EMISSION PERMIT NO. 04900001-001 IS ISSUED TO Archer Daniels Midland Company ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066 The emission units, control equipment and emission stacks
More informationMICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 28, 2005 PERMIT TO INSTALL
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION September 28, 2005 PERMIT TO INSTALL 187-05 ISSUED TO Zeeland Board of Public Works LOCATED AT 8943 Riley Street Zeeland, Michigan IN THE
More informationDraft Air Individual Permit Part 70 Reissuance
Draft Air Individual Permit Part 70 Reissuance 15300004-101 Permittee: Co-permittee name: Facility name: Viking Gas Transmission - Cushing ONEOK Partners, L.P. Viking Gas Transmission - Cushing 31888 400th
More informationDEP7007CC Compliance Certification
Commonwealth of Kentucky Natural Resources & Environmental Protection Cabinet Department for Environmental Protection DIVISION FOR AIR QUALITY DEP7007CC Compliance Certification Division Use Only ID# Permit
More informationAIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia
AIR EMISSION PERMIT NO. 13700028-003 IS ISSUED TO City of Virginia 620 South 2nd Street Virginia, St. Louis County, Minnesota 55792 The emission units, control equipment and emission stacks at the stationary
More informationWORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR
AIR POLLUTION CONTROL DISTRICT COUNTY OF SAN DIEGO FEDERAL SUBPART ZZZZ NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES WORKSHOP REPORT
More information2017Compliance Table with methods.xlsx
University of Michigan Renewable Operating Permit Annual Monitoring/Recordkeeping Compliance Table January 1, 2017 through December 31, 2017 Permit Condition Emission Unit: EU-B0260-06 Boiler 6 at Central
More information1. General Information
TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO. 16300087 006 This technical support document (TSD) is intended for all parties interested in the draft permit and to meet the requirements
More informationPERMIT TO INSTALL. Table of Contents
Permit No. 19-18 Page 1 of 49 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit
More informationRULE 2280 PORTABLE EQUIPMENT REGISTRATION (Adopted October 20, 1994; Amended May 16, 1996)
RULE 2280 PORTABLE EQUIPMENT REGISTRATION (Adopted October 20, 1994; Amended May 16, 1996) 1.0 Purpose The purpose of this rule is to provide an administrative mechanism, and establish standards for registration
More informationPublic Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 04PB1019 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL ISSUED TO:
More informationAIR PERMIT ABBEVILLE, HENRY COUNTY, ALABAMA DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE
AIR PERMIT PERMITTEE: FACILITY NAME: LOCATION: PEGASUS WEST, LLC PEGASUS WEST, LLC ABBEVILLE, HENRY COUNTY, ALABAMA PERMIT NUMBER 606-S008-X001 DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE Sawmill Green
More informationMACK TRUCKS, INC PENNSYLVANIA AVENUE, HAGERSTOWN, MD PART 70 OPERATING PERMIT NO
SECTION I SOURCE IDENTIFICATION... 4 1. DESCRIPTION OF FACILITY... 4 2. FACILITY INVENTORY LIST... 4 SECTION II GENERAL CONDITIONS... 6 1. DEFINITIONS... 6 2. ACRONYMS... 6 3. EFFECTIVE DATE... 7 4. PERMIT
More informationTitle V. Model General Permit Template. SERIES 18 Tanks. Template # SJV-TK
Title V Model General Permit Template SERIES 18 Tanks Template # SJV-TK TK-18 18-1 Fixed roof tank Tank used at drilling and production facility prior to custody transfer Except for complying with sections
More informationThe subject renewal application was received on February 28, 2017 and was determined to be administratively complete on March 9, 2017.
COMMONWEAL TH OF PENNSYLVANIA Department of Environmental Protection December 7, 2017 814/332-6940 Fax: 814/332-6117 SUBJECT: TO: FROM: THROUGH: Review of Application for Renewal Title V Permit AUTH ID
More informationThis is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"
This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced
More informationFederal Engine Regulations NSPS JJJJ/NESHAP ZZZZ
Federal Engine Regulations NSPS JJJJ/NESHAP ZZZZ Presented to OIPA: May 11-12 2011 A World of Energy Solutions NSPS JJJJ Slide 2 NSPS New Source Performance Standards History Regulates criteria pollutants
More informationGeneral Permit (005B) for Emergency Generator(s) burning Gaseous Fuels
GP-005B State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels This general permit allows for the construction,
More informationALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM
ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM December 2, 2016 SUBJECT: Bay Valley Foods, LLC 1080 River Avenue Pittsburgh, PA 15212-5995 Allegheny County Title V Operating Permit No. 0079 (renewal)
More informationPart 71 Federal Operating Permit Final Statement of Basis El Paso Natural Gas Company Dilkon Compressor Station Permit No.
Navajo Nation Environmental Protection Agency Air Quality Control/Operating Permit Program Post Office Box 529, Fort Defiance, AZ 86504 Rt.112 North, Bldg # 2837 Telephone (928) 729-4096, Fax (928) 729-4313
More informationAIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE, Inc.
AIR EMISSION PERMIT NO. 13700013-005 IS ISSUED TO Minnesota Power Division of ALLETE, Inc. MINNESOTA POWER - LASKIN ENERGY CENTER County Road 633 Aurora, St. Louis County, MN 55705 The emission units,
More informationPermit Holder. Permitted Equipment
Air Quality Registration Stationary Compression Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction
More informationAIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Mayo Foundation
AIR EMISSION PERMIT NO. 10900008-003 Major Amendment IS ISSUED TO Mayo Foundation SAINT MARYS HOSPITAL 1216 Second Street Southwest Rochester, Olmsted County, Minnesota 55902 The emission units, control
More informationALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM
ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM August 26, 2014 SUBJECT: Veterans Affairs Medical Center Oakland Facility University Drive C Pittsburgh, PA 15240 Allegheny County Synthetic Minor
More informationAUTHORITY TO CONSTRUCT
AUTHORITY TO CONSTRUCT PERMIT NO: S-7658-1-0 ISSUANCE DATE: 10/30/2009 LEGAL OWNER OR OPERATOR: ABEC BIDART-STOCKDALE LLC MAILING ADDRESS: C/O CALIFORNIA BIOENERGY LLC 2828 ROUTH STREET SUITE 500 DALLAS,
More informationDRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. ALLETE Inc dba Minnesota Power Inc
DRAFT/PROPOSED AIR EMISSION PERMIT NO. 13700013 007 Total Facility Operating Permit Reissuance IS ISSUED TO ALLETE Inc dba Minnesota Power Inc Minnesota Power Laskin Energy Center 5699 Colby Lake Road
More informationNARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015
Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,
More informationFull Compliance Evaluation Report Off-Site Report
STATE OF NEW HAMPSHIRE DEPARTMENT OF ENVIRONMENTAL SERVICES AIR RESOURCES DIVISION Full Compliance Evaluation Report Off-Site Report CONCORD STEAM CORPORATION 105 ½ PLEASANT STREET CONCORD, NH 03302-1377
More informationAIR QUALITY PERMIT Issued under 401 KAR 52:020
Commonwealth of Kentucky Energy and Environment Cabinet Department for Environmental Protection Division for Air Quality 200 Fair Oaks Lane, 1 st Floor Frankfort, Kentucky 40601 (502) 564-3999 Proposed
More informationAIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES
AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES MAY 15, 2012 FOR MORE INFORMATION CONTACT NEGIB HARFOUCHE, PH.D. NJDEP DIVISION OF AIR QUALITY (609) 292-2137 nharfouc@dep.state.nj.us
More informationMICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 7, 2017 PERMIT TO INSTALL ISSUED TO McLaren Flint Hospital
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION September 7, 2017 PERMIT TO INSTALL 55-17 ISSUED TO McLaren Flint Hospital LOCATED AT 401 South Ballenger Highway Flint, Michigan IN THE
More informationAIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc
AIR EMISSION PERMIT NO. 13700013-006 IS ISSUED TO Minnesota Power Division of ALLETE Inc MINNESOTA POWER - LASKIN ENERGY CENTER 5699 Colby Lake Road Hoyt Lakes, St. Louis County, MN 55750 The emission
More informationRULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)
RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) 1.0 Purpose The purpose of this rule is to limit emissions
More informationMAJOR SOURCE OPERATING PERMIT
MAJOR SOURCE OPERATING PERMIT Permitee: Facility Name: Facility No.: Location: INTERNATIONAL PAPER CO. INTERNATIONAL PAPER RIVERDALE MILL 104-0003 SELMA, ALABAMA In accordance with and subject to the provisions
More informationPERMIT APPLICATION REVIEW SUMMARY
PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS
More informationPermit No. NN OP
NAVAJO NATION ENVIRONMENTAL PROTECTION AGENCY Navajo Nation Operating Permit Program Rt. 112 North, Building F004-051 P.O. Box 529, Fort Defiance, AZ 86504 Detailed Information Permitting Authority: NNEPA
More informationDraft Air Individual Permit Major Amendment
Draft Air Individual Permit Major Amendment 14700009-101 Permittee: Facility name: Northern Natural Gas Company - Owatonna Compressor Station Northern Natural Gas Company - Owatonna Compressor Station
More information(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.
RULE 69.4. STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted 9/27/94; Rev. Effective11/15/00; Rev. Effective 7/30/03) (a) APPLICABILITY (1) Except
More informationSAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Appendix B: Rule Consistency Analysis August 20, 2009 APPENDIX B. Rule Consistency Analysis
APPENDIX B Rule Consistency Analysis For Proposed Amendments to Rule 4602 August 20, 2009 B-1 Final Draft Staff Report with Appendices This page intentionally blank. B-2 Final Draft Staff Report with Appendices
More information