RICE NESHAP Frequently Asked Questions (FAQ)

Size: px
Start display at page:

Download "RICE NESHAP Frequently Asked Questions (FAQ)"

Transcription

1 RICE NESHAP Frequently Asked Questions (FAQ) What does RICE NESHAP mean? RICE NESHAP is an acronym for Reciprocating Internal Combustion Engines National Emission Standards for Hazardous Air Pollutants. In February 2010 the Environmental Protection Agency (EPA) officially made the RICE NESHAP ruling for compression ignition engines. The official EPA ruling for spark ignition engines was announced in August These rules are intended to reduce emissions of hazardous air pollutants (HAP) from previously unregulated engines. What is the difference between NSPS and RICE NESHAP? NESHAP for Stationary Reciprocating Internal Combustion Engines (RICE) o 40 CFR part 63 subpart ZZZZ o Applies to existing, new and reconstructed stationary CI and SI engines o Focus is on air toxics (30 HAPs) NSPS (New Source Performance Standards) for Internal Combustion Engines (ICE) o Stationary Compression Ignition (CI) ICE 40 CFR part 60 subpart IIII o Stationary Spark Ignition (SI) ICE 40 CFR part 60 subpart JJJJ o Applies to new, modified and reconstructed stationary CI and SI engines o Focus is on criteria pollutants (CO, NOx, and SOx) What are the requirements of the ruling? The affected stationary compression ignition diesel engines must comply with CO emission limits or must be fitted with emission controls, such as diesel oxidation catalysts, to reduce CO emissions by 70%. The rule also requires the use of Ultra-Low Sulfur Diesel (ULSD) fuel for stationary non-emergency engines greater than 300 HP with a displacement of less than 30 liters per cylinder. The regulation will be fully implemented by May The new regulations include provisions affecting work practices, metallic HAP emissions, operating limits, start-up requirements, regulation compliance and reporting of test results. The new regulations do not mandate a specific emission control technology but the EPA designed the standards based on the capabilities of current oxidation catalysts (OCs). When do I need to retrofit my engine with an emission control product to meet the requirements? May 3rd, 2013 (CI) and October 19th, 2013 (SI)

2 Who is affected by the RICE NESHAP ruling? This ruling affects existing stationary diesel engines in the following categories: Engines used at "Area sources" of HAP and constructed or reconstructed before June 12, 2006; Engines used at "Major sources" of HAP, have a site rating of less than or equal to 500 hp, and constructed or reconstructed before June 12, 2006; Engines used at "Major sources" of HAP for non-emergency purposes, have a site rating of greater than 500 hp, and constructed or reconstructed before December 19, If not in a non-attainment zone, is RICE NESHAP still in effect? Non-attainment zones have no bearing on this ruling. Each diesel and Natural Gas engine in the US is affected by this rule one way or another. The Area source and Major source categories are determined by that engine's specific pollutant output, in this case Carbon Monoxide. How is a major source of emissions defined? Major sources of air toxins are defined as those that emit or have the potential to emit 10 tons per year of a single hazardous air pollutant (HAP) or 25 tons (total) per year of multiple HAPs. How is an Area source of emissions defined? Area sources are those that are not classified as major sources. Will Crankcase Vent Systems be required? Non-Emergency CI engines > 300 HP located at major and area sources must install a closed or open crankcase vent filtration system if one has not previously been installed.

3 What levels of emission control must be achieved through RICE NESHAP? For CI Engines at a Major source: For CI Engines at an Area source: For SI Engines at a Major source: For SI Engines at an Area source: What emission control products are offered to meet RICE NESHAP requirements? Diesel oxidation catalysts (DOC) are recommended to meet the new emission regulations. Diesel particulate filtration (DPF) is also offered. For engines greater than 500 HP a continuous parametric monitoring system (CPMS) is required to satisfy monitoring of pressure drop across catalyst and temperature at catalyst. The pressure drop across the catalyst cannot exceed 2 H2O from the initial performance test and temperature at the catalyst must remain between 450 F and 1350 F to ensure an efficient catalytic reaction.

4 What levels of emission control can be offered with a Diesel Oxidation Catalyst (DOC)? Diesel oxidation catalysts are capable of reduction carbon monoxide (CO) emissions by 90%, hydrocarbon (HC) emissions by 80% and particulate matter (PM) emissions by 20%. The EPA is requiring a 70% reduction of CO emissions for the new ruling. How can I determine if my engine needs to comply with the ruling? To determine the HAP requirements for your specific engine, you must know the following information: Horsepower, operating hours per year, and if you have an Area or Major source of emissions. To determine what category your engine falls under refer to the Applicability Application in our RICE NESHAP Library and work with your regulator. Are there different rulings for natural gas engines versus diesel engines? The ruling made on February 17th 2010 only applies to diesel (CI) internal combustion engines. The EPA made a ruling on existing natural gas (SI) engines in August Are emergency engines affected by RICE NESHAP? Yes. Emergency engines are affected by the current ruling made by the EPA, but have different requirements than non-emergency engines. How is an "emergency" engine defined? An emergency engine is one that is operated for emergency purposes only such as during a power outage or conditioned power event. Maintenance and testing of the engine is limited to 100 hours per year. The engine is allowed to operate for nonemergency purposes for 50 hours per year, but these 50 hours are counted towards the total 100 hours provided for operation other than true emergencies. The 50 hours per year cannot be used to generate income. Use is unlimited in emergency situations. Note: The most recent proposed Amendment to RICE NESHAP states that the 100 hours will be available to use as needed for monitoring and testing, demand response for Energy Emergency Alert Level 2 Situations, and responding to at least a 5% or more change in voltage. Note: It is recommended that you work closely with the local and federal regulator to make final determination on whether or not an engine is classified as emergency or non-emergency to ensure compliance. How is a "non-emergency" engine defined? A non-emergency engine is any engine not defined as an emergency engine.

5 My facility has a backup generator; will I be impacted by RICE NESHAP? Are you receiving financial gain the use of the engine/generator? If you participate in any utility program; peak shaving, interruptible, demand management, etc Your answer is likely Yes and your engine is likely to be classified as Non- Emergency. What pollutants are regulated through RICE NESHAP? How are HAP emissions measured? Because CO has many measurement advantages over HAP, CO is used as the surrogate for HAP emissions from CI engines. Using a relationship determined by the EPA, HAP emission reduction is determined from CO emission reduction instead of individually measuring the 30 urban HAP. Do I need to do testing or monitoring on my engine after it is retrofit with an emission control device? Non-emergency CI Engines between 300 and 500 HP at either an Area or Major source: An initial performance test is required to demonstrate that emission standards are achieved using a Diesel Oxidation Catalyst. Non-emergency SI Engines between 100 and 500 HP at a Major source: An initial performance test is required to demonstrate that emission standards are achieved using an Oxidation Catalyst or NSCR catalyst.

6 Non-emergency CI and SI Engines greater than 500 HP located at an Area source: Testing depends on the use of your engine. For "Not Limited Use Engines", you must perform an initial performance test and re-test every 8,760 hours of operation or 3 years, whichever comes first. You must also continuously monitor and record the catalyst inlet temperature, and perform monthly monitoring of the pressure drop across the catalyst. For "Limited Use Engines", you must perform an initial performance test and retest every 8,760 hours of operation or 5 years, whichever comes first. You must also continuously monitor and record the catalyst inlet temperature, and perform monthly monitoring of the pressure drop across the catalyst. For non-emergency engines greater than 500 HP located at a Major source: You must perform an initial performance test, and re-test every 8,760 hours of operation or 5 years, whichever comes first. You must also continuously monitor and record the catalyst inlet temperature, and perform monthly monitoring of the pressure drop across the catalyst. When do I need to perform the initial performance test? This can be completed prior to the compliance date but isn t due until 180 days after the compliance date. Notification needs to be provided to the local and federal regulator at least 60 days prior to performing the initial performance test, as well as for subsequent performance tests. A compliance status notification is due within 60 days after the performance test to the regulator. Is there a site specific monitoring and maintenance plan that I need to create? Yes, you must develop a site-specific monitoring plan that addresses the following areas: Installation of CPMS sampling probe at appropriate location to give representative measurements Performance and equipment specifications for the CPMS Performance evaluation procedures and acceptance criteria for the CPMS (Calibration methods). Ongoing operation and maintenance procedures for the engine, emission control system, and crankcase vent filtration system (if applicable). Ongoing recordkeeping and reporting procedures. Conduct a performance evaluation for each CPMS in accordance with the sitespecific plan. Operate and maintain the CPMS in continuous operation according the sitespecific plan.

7 What are the reporting requirements? Reports are required to be submitted semiannually to your local and federal regulator for engines that are not limited use engines. Information contained within these reports includes: A copy of each notification and report that you submitted to comply with RICE NESHAP. Records showing compliance with emissions and operating limitations. If there are no deviations in emissions or operating limitations, a statement that there were no deviations during the reporting period. Records of any occurrence and duration of malfunction of operation as well as actions taken during the malfunction. If there were no malfunctions or deviations in the Emissions Control and Monitoring systems, a statement that there were no deviations during the reporting period. Records of performance tests. Records of all required maintenance performed on the Emissions Control and Monitoring Equipment. If Emergency Records of hourly usage from the non-resettable hour meter. Documentation must be provided on how many hours are spent for emergency operation and non-emergency operation. Complete guidance on reporting requirements are contained within as there are additional situational specific requirements. How long do I need to keep these reports? Five years following the date of each submittal. Are there state requirements that I have to follow as well? It s likely that you will be required to obtain a state specific Air Permit and follow all requirements for record keeping, emissions limitations, and reporting found within this permit. State and Federal RICE contacts are provided within the GT Exhaust RICE NESHAP Library; Scroll down to EPA Contacts and Fact Sheets. Is a monitoring device (CPMS) required to comply with RICE NESHAP? Catalyst inlet temperature on non-emergency CI and SI RICE engines greater than 500 HP is required to be continuously monitored and recorded by a Continuous Parametric Monitoring System (CPMS). Pressure drop across the catalyst must also be measured on a monthly basis. Both inlet temperature and pressure drop across the catalyst must be measured for the initial performance test.

8 What are the operating limitations for engine temperature and pressure? For engines equipped with an Oxidation or NSCR catalyst, operators must maintain the catalyst such that the pressure drop across the catalyst does not change by more than 2 of water from where it was first measured during the initial performance test. In addition, for engines equipped with an Oxidation catalyst, the exhaust temperature must be maintained so that the catalyst inlet temperature is between 450 F and 1350 F. For engines operating with an NSCR catalyst, the exhaust temperature must be between 750 F and 1250 F. See above for the temperature and pressure monitoring requirements. Are the operating limitations and emissions standards required on start-up? Owners and operators must minimize the engine s time spent at idle and minimize the engine s startup to a period needed for appropriate and safe loading, not to exceed 30 minutes, after which time the engine must meet the applicable operating limitations and emissions standards. How is a limited use engine defined? A limited use engine is one that operates less than 100 hours per year. How is a not limited use engine defined? A not limited use engine is one that operates more than 100 hours per year. I m unable to obtain compliance by May 3 rd, 2013 for CI Engines or October 19 th, 2013 for SI engines. What are my options? The request for a compliance extension can be made no longer than 120 days prior to the affected source s compliance date. There are no specific reasons that must be submitted as part of the request for a compliance extension. The EPA or the delegated agency will review each request on a case-by-case basis. At a minimum, a request for a compliance extension should address why the owner/operator would not be able to install the appropriate air pollution controls within this 120-day period. Circumstances that arose beyond the control of the owner/operator also should be included in the request. The request must include the information specified in 40 CFR 63.6(i)(6). Instead of compliance, can I just pay the fine? Operating stationary RICE engines out of compliance may subject the owner/operator to daily fines and penalties as a violation of the Clean Air Act. It s reported that the federal level for non-compliance is $37,500 per day that would be dictated under the Clean Air Act Stationary Civil Penalty Policy. You would likely be in violation of state law as well and subject to state fines and penalties. While monetary penalties are civil in nature, willful negligence can give rise to criminal liability.

9 What if the engine is a residential, institutional or commercial emergency engine? If yes, it is exempt from the RICE NESHAP ruling. However, if the engine is used on a Peak shaving, On-Demand, or Curtailment contract and receives a financial incentive (discounted electric rate, tariff, or flat fee), the engine is considered nonemergency and therefore will fall under the RICE NESHAP ruling. Where can I look for basic information on the ruling from the EPA? The GT Exhaust RICE NESHAP Library provides a great deal of information on the ruling and what it takes to stay compliant. The EPA RICE NESHAP Implementation Q&A Document provides further detail to various parts of RICE NESHAP. Who is the proper person to contact at the EPA for further information? Visit the GT Exhaust RICE NESHAP Library and Scroll down to EPA Contacts and Fact Sheets for Local and Federal regulatory contacts.

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 Discussion Topics Background Important Terms Applicability Compliance Deadlines Emission/Operating Limits Performance/Compliance

More information

Internal Combustion Engines Air Updates 2010

Internal Combustion Engines Air Updates 2010 Internal Combustion Engines Air Updates 2010 Stationary Source or Non-road Engine? o Regulated stationary source: 1. At point of use for > 12 months or full operating season (3-12 months) Point of use

More information

RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1

RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1 RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1 This document provides guidance on the requirements for stationary engines at area sources of hazardous air

More information

RICE NESHAP Implementation. Ray Lukkarinen, P.E. Stanley Consultants, Inc.

RICE NESHAP Implementation. Ray Lukkarinen, P.E. Stanley Consultants, Inc. RICE NESHAP Implementation Ray Lukkarinen, P.E. Stanley Consultants, Inc. Presentation Outline RICE NESHAP Overview (Existing CI Engines) Definition Compliance deadline Engine Categories CO Emission Limits

More information

Air Permitting: Municipal Facilities with Emergency Generators

Air Permitting: Municipal Facilities with Emergency Generators Air Permitting: Municipal Facilities with Emergency Generators Sam Cotter, P.E. sam.cotter@cardinalengineers.com 7060 S. Yale, Suite 603 Tulsa, OK 74136 Introduction Generators are located at our utility

More information

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

This is a new permit condition titled, 2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP) This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced

More information

A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines

A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines Presented by: Brandon Guillory & Andy Goldberg AWMA October 29, 2009 1 New Source

More information

RICE NESHAP RECORD KEEPING Stationary Engines

RICE NESHAP RECORD KEEPING Stationary Engines RICE NESHAP RECORD KEEPING Stationary Engines POWER PLANT COMPLIANCE Donna Oehm Some of the RICE NESHAP ZZZZ reporting requirements are like a $2 bill... *Relatively not in high demand *Legal obligation

More information

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE?

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE? OVERVIEW Compliance Webinar Reciprocating Internal Combustion Engines RICE September 16, 2013 Jesse Zahn, CHMM Jesse.zahn@hrpassociates.com HRP Associates, Inc. Clifton Park, NY 12065 What is RICE Unit

More information

South District. Reciprocating Internal Combustion Engines EPA S RICE NESHAP and NSPS. Carter B. Endsley, P.E. Air Resource Permitting

South District. Reciprocating Internal Combustion Engines EPA S RICE NESHAP and NSPS. Carter B. Endsley, P.E. Air Resource Permitting South District Reciprocating Internal Combustion Engines EPA S RICE NESHAP and NSPS Carter B. Endsley, P.E. Air Resource Permitting December 7, 2016 Content RICE Engines NESHAP and NSPS RICE Rules Emergency

More information

New Federal Regulations for Internal Combustion Engines. Doug Parce

New Federal Regulations for Internal Combustion Engines. Doug Parce New Federal Regulations for Internal Combustion Engines Doug Parce Pertinent Federal Regulations National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion

More information

Regulation No. 3 Changes For Internal Combustion Engines. Christine Hoefler November 14, 2012

Regulation No. 3 Changes For Internal Combustion Engines. Christine Hoefler November 14, 2012 Regulation No. 3 Changes For Internal Combustion Engines Christine Hoefler November 14, 2012 Overview Changes to Regulation No. 3 New Source Performance Standard (NSPS) IIII Conflicts with NSPS IIII 2

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Compression Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Spark Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction of the

More information

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted

More information

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR AIR POLLUTION CONTROL DISTRICT COUNTY OF SAN DIEGO FEDERAL SUBPART ZZZZ NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES WORKSHOP REPORT

More information

Area Source NESHAPS and Air Permits

Area Source NESHAPS and Air Permits Area Source NESHAPS and Air Permits 40 CFR 63 Subpart ZZZZ 40 CFR 63 Subpart JJJJJJ Richard Nelson Senior Air Quality Specialist (704) 336-6865 Richard.Nelson@MecklenburgCountyNC.gov Combustion Area Sources

More information

Example Notification of Compliance Status Report a

Example Notification of Compliance Status Report a Example Notification of Compliance Status Report a National Emission Standards for Hazardous Air Pollutants: Stationary Reciprocating Internal Combustion Engines 40 CFR part 63, subpart ZZZZ Note: The

More information

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations? Presented by Richard M. Cestone, PE, CHMM Birdsall Services Group For NJEWA Conference May 9, 2011 What happens when a permit has both federal and state regulations? 1 Facilities get confused with Federal

More information

RICE NESHAP Finalized Rule Summary Spark Ignited Engines

RICE NESHAP Finalized Rule Summary Spark Ignited Engines RICE NESHAP Finalized Rule Summary Spark Ignited Engines Oct. 19 2013 This document contains information regarding NESHAP finalized rule for spark ignited engines, compliance, testing and emission standards.

More information

Regulatory Impacts of Biogas-fired Internal Combustion Engines

Regulatory Impacts of Biogas-fired Internal Combustion Engines Regulatory Impacts of Biogas-fired Internal Combustion Engines Kit Liang, PE, Malcolm Pirnie Air, Water & Energy: Sustainability for Wastewater Treatment Plants California Water Environment Association

More information

Applicable Requirements - NSPS Subpart JJJJ

Applicable Requirements - NSPS Subpart JJJJ Facility Name: CO Station 3 Combustion Type: 4SRB Facility HAP Status: Area Fuel Type: Natural gas RICE Owner: RICE Operator: S2C Gathering Co Acme Operating Inc. Use Type: Max. Runtime: Non-emergency

More information

Electrical Power Generator Use and Procurement Guidance

Electrical Power Generator Use and Procurement Guidance Electrical Power Generator Use and Procurement Guidance For compliance with applicable air emission control regulations December 2016 Prepared by: Syracuse University Environmental Health & Safety Services

More information

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

RICE NESHAP Finalized Rule Summary Diesel Compression Ignited Engines

RICE NESHAP Finalized Rule Summary Diesel Compression Ignited Engines RICE NESHAP Finalized Rule Summary Diesel Compression Ignited Engines May 3 2013 This document contains infmation regarding NESHAP finalized rule f compression ignited engines, compliance, testing and

More information

New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines

New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines NSPS Subpart JJJJ New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines 60.4230 NSPS is a federal rule Applies to all states Is NOT regional State rules cannot be less

More information

August CFR Part 63 Subpart ZZZZ review

August CFR Part 63 Subpart ZZZZ review August 2010 40 CFR Part 63 Subpart ZZZZ review April 27, 2011 Presentation to AWMA Rocky Mountain Section Matthew J. Hazleton TRC Littleton, CO 1 Overview: Brief History of Subpart ZZZZ June 2004; Initial

More information

Federal Engine Regulations NSPS JJJJ/NESHAP ZZZZ

Federal Engine Regulations NSPS JJJJ/NESHAP ZZZZ Federal Engine Regulations NSPS JJJJ/NESHAP ZZZZ Presented to OIPA: May 11-12 2011 A World of Energy Solutions NSPS JJJJ Slide 2 NSPS New Source Performance Standards History Regulates criteria pollutants

More information

RICE MACT / NSPS Update: How to Make Sense of this Difficult Issue

RICE MACT / NSPS Update: How to Make Sense of this Difficult Issue RICE MACT / NSPS Update: How to Make Sense of this Difficult Issue March 1, 2018 www.trcsolutions.com Overview Who is covered and by what rule? Brief overview of regulations What information you need to

More information

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels GP-005B State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels This general permit allows for the construction,

More information

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published

More information

AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES

AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES MAY 15, 2012 FOR MORE INFORMATION CONTACT NEGIB HARFOUCHE, PH.D. NJDEP DIVISION OF AIR QUALITY (609) 292-2137 nharfouc@dep.state.nj.us

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM February 2, 2012 SUBJECT: Superior Appalachian Pipeline, LLC Kissick Lane Frazer Township, PA 15084 Allegheny County Installation Permit No. 0837-I001

More information

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton Graphic Air Compliance Issues and Solutions Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton Agenda Permitting NJDEP - New General Permits for Emergency Generators NJDEP -

More information

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County) AIR QUALITY PERMIT Permit No. Effective Date April 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

U.S. EPA and State Perspectives on Clean Air Act Rules for Stationary/Emergency Engines

U.S. EPA and State Perspectives on Clean Air Act Rules for Stationary/Emergency Engines U.S. EPA and State Perspectives on Clean Air Act Rules for Stationary/Emergency Engines Presenters: Melanie King, Energy Strategies Group, Sector Policies and Programs Division, Office of Air Quality Planning

More information

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business.

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business. Major/Area Source Boiler MACT Rule Speaker: Eric Swisher 23rd Virginia Environmental Symposium April 11, 2012 Your environmental compliance is clearly our business. Overview Ground Rules Regulatory Framework

More information

A Tool for Specifying Diesel Genset Replacements Steve Stassel, Gray Stassel Engineering

A Tool for Specifying Diesel Genset Replacements Steve Stassel, Gray Stassel Engineering A Tool for Specifying Diesel Genset Replacements Steve Stassel, Gray Stassel Engineering Alaska Rural Energy Conference, April 28, 2016 (Technical Session 6, 10:30 am) EPA Regulations RICE NESHAP on or

More information

Retrofit Crankcase Ventilation for Diesel Engines

Retrofit Crankcase Ventilation for Diesel Engines mdec Mining Diesel Emissions Conference Toronto Airport Marriott Hotel, October 7-9th, 2014 Retrofit Crankcase Ventilation for Diesel Engines John Stekar, Catalytic Exhaust Products Diesel Engine Crankcase

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

EPA s Air Quality Regulations. Melanie King U.S. Environmental Protection Agency

EPA s Air Quality Regulations. Melanie King U.S. Environmental Protection Agency EPA s Air Quality Regulations for Stationary Engines Melanie King U.S. Environmental Protection Agency March 6, 2013 Agenda Background on Stationary Engines Overview of Recent Amendments Overview of Current

More information

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number STATEMENT OF BASIS Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number 701-0013 Introduction On June 30, 2017, the Department received an application to renew the Title V Major Source

More information

Regulatory and Permitting Requirements of Stationary Generators In Delaware

Regulatory and Permitting Requirements of Stationary Generators In Delaware Regulatory and Permitting Requirements of Stationary Generators In Delaware Delaware - DNREC Air Quality Management February 7, 2006 Mark A. Prettyman and Guadalupe J. Reynolds Outline Regulation No. 1144

More information

Streamlining Multiple Applicable Requirements

Streamlining Multiple Applicable Requirements Streamlining Multiple Applicable Requirements What is Streamlining? 1. Streamlining is the process of determining one set of requirements to be incorporated into the Title V permit from among multiple

More information

Air Individual Permit Permit Limits to Avoid NSR

Air Individual Permit Permit Limits to Avoid NSR Air Individual Permit Permit Limits to Avoid NSR 13900128-001 Permittee: Facility name: Shakopee Distributed Generation Shakopee Distributed Generation Vierling Drive E Shakopee, Minnesota 55379 Scott

More information

How to Comply with EPA Regulations for Stationary Reciprocating Internal Combustion Engines ( RICE ) Roy Crystal, EPA Region 1 (New England)

How to Comply with EPA Regulations for Stationary Reciprocating Internal Combustion Engines ( RICE ) Roy Crystal, EPA Region 1 (New England) How to Comply with EPA Regulations for Stationary Reciprocating Internal Combustion Engines ( RICE ) Roy Crystal, EPA Region 1 (New England) 1 Overview How RICE & RICE Emission Controls Work Common RICE

More information

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC 2011 Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC Ohio EPA, Division of Air Pollution Control 1/1/2011 Page 2

More information

RICE MACT 40 CFR 63, Subpart ZZZZ. SI Source Requirements 7/18/2013

RICE MACT 40 CFR 63, Subpart ZZZZ. SI Source Requirements 7/18/2013 RICE MACT 40 CFR 63, Subpart ZZZZ SI Source Requirements 7/18/2013 Area Key Definitions Stationary RICE Reciprocating internal combustion engine that uses motion to convert heat energy into mechanical

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

Draft Air Individual Permit Major Amendment Brooks Ave South Thief River Falls, MN Pennington County

Draft Air Individual Permit Major Amendment Brooks Ave South Thief River Falls, MN Pennington County Draft Air Individual Permit Major Amendment 11300023-101 Permittee: Facility name: Digi-Key Corp Digi-Key Corp 701 Brooks Ave South Thief River Falls, MN 56701-2757 Pennington County Operating permit issuance

More information

EPA Tier 4 and the Electric Power Industry

EPA Tier 4 and the Electric Power Industry EPA Tier 4 and the Electric Power Industry The initiative to lower diesel engine emissions started with on-highway engines in 1973 and now extends to non-road mobile equipment, marine and locomotive engines,

More information

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota TABLE B: SUBMITTALS Table B lists most of the submittals you must provide. Table B is divided into three sections; one-time submittals or notifications, intermittent submittals or notifications and recurring

More information

STATEMENT OF BASIS Boise Cascade Wood Products, LLC Thorsby Engineered Wood Products Thorsby, Chilton County, Alabama Facility/Permit No.

STATEMENT OF BASIS Boise Cascade Wood Products, LLC Thorsby Engineered Wood Products Thorsby, Chilton County, Alabama Facility/Permit No. STATEMENT OF BASIS Boise Cascade Wood Products, LLC Thorsby Engineered Wood Products Thorsby, Chilton County, Alabama Facility/Permit No. 403-S006 This draft Title V Major Source Operating Permit (MSOP)

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 08500002-101 Permittee: Hutchinson Utilities Commission - Plant 1 Facility name: Hutchinson Utilities Commission - Plant 1 44 4th Ave NE Hutchinson, MN 55350-1829

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: S-7658-1-0 ISSUANCE DATE: 10/30/2009 LEGAL OWNER OR OPERATOR: ABEC BIDART-STOCKDALE LLC MAILING ADDRESS: C/O CALIFORNIA BIOENERGY LLC 2828 ROUTH STREET SUITE 500 DALLAS,

More information

Air Quality Compliance Issues in the Oil & Natural Gas Industry OIPA Air Emission Workshops

Air Quality Compliance Issues in the Oil & Natural Gas Industry OIPA Air Emission Workshops Air Quality Compliance Issues in the Oil & Natural Gas Industry OIPA Air Emission Workshops May 11-12, 2011 Donald K. Shandy Ivan L. London 900 Robinson Renaissance, 119 N. Robinson Oklahoma City, Oklahoma

More information

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013) RULE 9610 STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013) 1.0 Purpose The purpose of this rule is to provide an administrative mechanism

More information

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers. Tune-up Information National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers 40 CFR Part 63 Subpart JJJJJJ Who must conduct a tune-up

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT DATE: 3/1/10, updated 5/5/10 TO: Interested Parties SUBJECT: Frequently asked questions regarding compliance with Rule 4320, Advanced Emission Reduction

More information

EPA TIER 4 AND THE ELECTRIC POWER INDUSTRY. Tim Cresswell Tier 4 Product Definition Manager Electric Power Division

EPA TIER 4 AND THE ELECTRIC POWER INDUSTRY. Tim Cresswell Tier 4 Product Definition Manager Electric Power Division EPA TIER 4 AND THE ELECTRIC POWER INDUSTRY Tim Cresswell Tier 4 Product Definition Manager Electric Power Division March 2014 INTRODUCTION The initiative to lower diesel engine emissions started with on-highway

More information

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Air Permitting of Sources at Natural gas Production, Compression and Processing Facilities MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Tom Wolf, Governor John Quigley, Secretary Overview

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation AIR EMISSION PERMIT NO. 10900008-004 Total Facility Operating Permit - Reissuance IS ISSUED TO Mayo Foundation St Marys 1216 Southwest 2nd Street Rochester, Olmsted County, MN 55902 The emission units,

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM August 26, 2014 SUBJECT: Veterans Affairs Medical Center Oakland Facility University Drive C Pittsburgh, PA 15240 Allegheny County Synthetic Minor

More information

Minutes of November 14, Littleton/Englewood IT

Minutes of November 14, Littleton/Englewood IT Minutes of November 14, 2012 at Littleton/Englewood WWTP In Attendance: Michael Wicklund Tim Grotheer Jerry Raisch Al Baker Nancy Keller Stephanie Fevig Boyd Hansen Mike Bittner Bruce Joslin Martha Hahn

More information

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In Re: Petition by Duke Energy Florida, LLC, for Approval of Modifications to the Approved Standby Generation Tariff and Program Participation Standards Docket

More information

Appendix K. DOC Conditions

Appendix K. DOC Conditions Appendix K DOC Conditions Mission Rock Energy Center Five (5) GE LM6000-PG-Sprint Combustion Turbine Generators (CTGs) Total = 275 MW Nominal Each CTG is simultaneously subject to the emission limits,

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Appendix B: Rule Consistency Analysis August 20, 2009 APPENDIX B. Rule Consistency Analysis

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Appendix B: Rule Consistency Analysis August 20, 2009 APPENDIX B. Rule Consistency Analysis APPENDIX B Rule Consistency Analysis For Proposed Amendments to Rule 4602 August 20, 2009 B-1 Final Draft Staff Report with Appendices This page intentionally blank. B-2 Final Draft Staff Report with Appendices

More information

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation AIR EMISSION PERMIT NO. 04900030-006 Total Facility Operating Permit - Reissuance IS ISSUED TO Northern States Power Co a Minnesota Corporation XCEL ENERGY - PRAIRIE ISLAND NUCLEAR PLANT 1717 Wakonade

More information

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater 11/21/2016 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-007) Boiler or Heater Greater than or equal to 1 MMBTU/hr and less than 5 MMBTU/hr

More information

Printed: April 13, 2016 Page 1 of 35

Printed: April 13, 2016 Page 1 of 35 Facility Name: US Army Signal Center and Fort Gordon City: Fort Gordon County: Richmond AIRS #: 04-13-245-00021 Application #: TV-22837 Date Application Received: September 10, 2014 Date Application Deemed

More information

Bureau of Air Quality Technical Support Document General Permit GP-5 January 31, 2013

Bureau of Air Quality Technical Support Document General Permit GP-5 January 31, 2013 Bureau of Air Quality Technical Support Document General Permit GP-5 January 31, 2013 1/31/2013 Page 1 of 79 Contents Executive Summary:... 6 Introduction:... 7 Definitions:... 8 Applicability / Scope:...

More information

Questions & Answers. Vermont Clean Diesel Grant Program. Release Date: July 14, 2017 Proposals Due: August 14, 2017 at 4:00 pm

Questions & Answers. Vermont Clean Diesel Grant Program. Release Date: July 14, 2017 Proposals Due: August 14, 2017 at 4:00 pm Questions & Answers Vermont Clean Diesel Grant Program Release Date: July 14, 2017 Proposals Due: August 14, 2017 at 4:00 pm Q & A/ In Person Meeting: July 25, 2017 10:00 am - 12:00 pm National Life Building

More information

The subject renewal application was received on February 28, 2017 and was determined to be administratively complete on March 9, 2017.

The subject renewal application was received on February 28, 2017 and was determined to be administratively complete on March 9, 2017. COMMONWEAL TH OF PENNSYLVANIA Department of Environmental Protection December 7, 2017 814/332-6940 Fax: 814/332-6117 SUBJECT: TO: FROM: THROUGH: Review of Application for Renewal Title V Permit AUTH ID

More information

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788 Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: 04-13-08700037 Application #: 22788 Date SIP Application Received: August 11, 2014 Date Title V Application

More information

Appendix K. Final DOC Conditions

Appendix K. Final DOC Conditions Appendix K Final DOC Conditions Puente Power Project 262 MW (net nominal) GE 7HA.01 Combustion Turbine Generator (CTG) The CTG is simultaneously subject to the emission limits, monitoring requirements,

More information

Board Administration and Regulatory Coordination Unit. Division 3. Air Resources Board

Board Administration and Regulatory Coordination Unit. Division 3. Air Resources Board 2423. Exhaust Emission Standards and Test Procedures--Heavy-Duty Off-Road Diesel Cycle Engines. (a) This section shall be applicable to new heavy-duty off-road compression-ignition engines, produced on

More information

Clean Air Construction Standard Draft for Public Comment November 5, 2018

Clean Air Construction Standard Draft for Public Comment November 5, 2018 Clean Air Construction Standard Draft for Public Comment November 5, 2018 Applicability & Effective Date Effective January 1, 2020, the following requirements apply to City of Portland (City) and Multnomah

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) 1.0 Purpose The purpose of this rule is to limit emissions

More information

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date])

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date]) RULE 9610 STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date]) 1.0 Purpose The purpose of this rule is to provide an administrative mechanism

More information

EPA Regulations and Their Affect on Rural Alaska Powerplants Steve Stassel, Gray Stassel Engineering

EPA Regulations and Their Affect on Rural Alaska Powerplants Steve Stassel, Gray Stassel Engineering EPA Regulations and Their Affect on Rural Alaska Powerplants Steve Stassel, Gray Stassel Engineering Alaska Rural Energy Conference, April 27, 2016 (Technical Session 4, 1:30 pm) Prime Power Engine Selection

More information

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT APPENDIX D APPENDIX D REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL NEW JERSEY STATE DEPARTMENT

More information

Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: Application #: 40411

Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: Application #: 40411 Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: 04-13-089-00100 Application #: 40411 Date SIP Application Received: September 28, 2015 Date Title V Application

More information

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia AIR EMISSION PERMIT NO. 13700028-003 IS ISSUED TO City of Virginia 620 South 2nd Street Virginia, St. Louis County, Minnesota 55792 The emission units, control equipment and emission stacks at the stationary

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing

More information

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 OFFICE OF AIR AND RADIATION WHAT YOU SHOULD KNOW ABOUT USING, INSTALLING, OR BUYING AFTERMARKET CATALYTIC CONVERTERS As of January 1,

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION May 1, 2015 PERMIT TO INSTALL 4-13B ISSUED TO Zoetis LLC LOCATED AT 306 Pitcher Street Kalamazoo, Michigan IN THE COUNTY OF Kalamazoo STATE

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM April 18, 2014 SUBJECT: Cellco Partnership, dba Verizon Wireless 18 Abele Road Bridgeville, PA 15017 Allegheny County Operating Permit No. 0867 TO:

More information

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015 AIR QUALITY PERMIT Permit No. Effective Date May 26, 2015 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

IAPH Tool Box for Port Clean Air Programs

IAPH Tool Box for Port Clean Air Programs ENGINE STANDARDS Background Ports around the world depend on the efficiency of the diesel engine to power port operations in each source category ocean/sea-going vessels, harbor craft, cargo handling equipment,

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company AIR EMISSION PERMIT NO. 16300110-001 IS ISSUED TO Northern Natural Gas Company NORTHERN NATURAL GAS - HUGO No Street Address Hugo, Washington County, Minnesota 55038 The emission units and emission stacks

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 04PB1019 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL ISSUED TO:

More information

MAJOR SOURCE OPERATING PERMIT THIRD TITLE V RENEWAL DRAFT

MAJOR SOURCE OPERATING PERMIT THIRD TITLE V RENEWAL DRAFT HATTER S POND GAS PRODUCTION, TREATING, & PROCESSING FACILITY MOBILE COUNTY, AL FACILITY NO.: 503-4004 MAJOR SOURCE OPERATING PERMIT THIRD TITLE V RENEWAL DRAFT (THIS PAGE LEFT BLANK INTENTIONALLY) Table

More information

TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO

TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO. 14500029 003 This technical support document (TSD) is intended for all parties interested in the draft permit and to meet the requirements that

More information

REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (1) This rule applies to the following emission units:

REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (1) This rule applies to the following emission units: RULE 12. REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (a) APPLICABILITY (1) This rule applies to the following emission units: Existing internal combustion emergency standby

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

Evolution Of Tier 4 Regulations & Project Specific Diesel Engine Emissions Requirements

Evolution Of Tier 4 Regulations & Project Specific Diesel Engine Emissions Requirements Evolution Of Tier 4 Regulations & Project Specific Diesel Engine Emissions Requirements Association of Equipment Managers (AEM) CONEXPO / CON-AGG 2014 Las Vegas, NV March 5, 2014 1 1 Topics To Be Covered

More information