1 Draft Air Individual Permit Major Amendment Permittee: Facility name: Northern Natural Gas Company - Owatonna Compressor Station Northern Natural Gas Company - Owatonna Compressor Station 8801 SW 88th Street Ellendale, MN Steele County Operating permit issuance date: April 21, 1998 Expiration date: Non-expiring Permit * All Title I Conditions do not expire Major Amendment: [Action Issue Date] Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR The emission units, control equipment and emission stacks at the stationary source authorized in this permit amendment are as described in the submittals listed in the Permit Applications Table. This permit amendment supersedes Air Emission Permit No and authorizes the Permittee to operate and construct the stationary source at the address listed above unless otherwise noted in the permit. The Permittee must comply with all the conditions of the permit. Any changes or modifications to the stationary source must be performed in compliance with Minn. R to Terms used in the permit are as defined in the state air pollution control rules unless the term is explicitly defined in the permit. Unless otherwise indicated, all the Minnesota rules cited as the origin of the permit terms are incorporated into the SIP under 40 CFR and as such are enforceable by the U.S. Environmental Protection Agency (EPA) Administrator or citizens under the Clean Air Act. Signature: [ ] For This document has been electronically signed. Don Smith, P.E., Manager Air Quality Permits Section Industrial Division for the Minnesota Pollution Control Agency

2 Table of Contents 1. Permit applications table Where to send submittals Facility description Summary of subject items Limits and other requirements Submittal/action requirements Page

3 Permit issued: [month day, year] Permit expires: [month day, year] Page 3 of Permit applications table Subsequent permit applications: Title description Application receipt date Action number Total Facility Operating Permit 09/15/ Administrative Amendment Not Applicable Major Amendment 09/28/

4 Permit issued: [month day, year] Permit expires: [month day, year] Page 4 of Where to send submittals Send submittals that are required to be submitted to the EPA regional office to: Chief Air Enforcement Air and Radiation Branch EPA Region V 77 West Jackson Boulevard Chicago, Illinois Each submittal must be postmarked or received by the date specified in the applicable Table. Those submittals required by Minn. R to must be certified by a responsible official, defined in Minn. R , subp. 21. Other submittals shall be certified as appropriate if certification is required by an applicable rule or permit condition. Send submittals that are required by the Acid Rain Program to: U.S. Environmental Protection Agency Clean Air Markets Division 1200 Pennsylvania Avenue NW (6204N) Washington, D.C Send any application for a permit or permit amendment to: Fiscal Services 6 th Floor Minnesota Pollution Control Agency 520 Lafayette Road North St. Paul, Minnesota Also, where required by an applicable rule or permit condition, send to the Permit Document Coordinator notices of: a. Accumulated insignificant activities b. Installation of control equipment c. Replacement of an emissions unit, and d. Changes that contravene a permit term Unless another person is identified in the applicable Table, send all other submittals to: AQ Compliance Tracking Coordinator Industrial Division Minnesota Pollution Control Agency 520 Lafayette Road North St. Paul, Minnesota Or a signed and scanned PDF copy to: submitstacktest.pca@state.mn.us (for submittals related to stack testing) AQRoutineReport.PCA@state.mn.us (for other compliance submittals) (See complete instructions in Routine Air Report Instructions Letter at

5 Permit issued: [month day, year] Permit expires: [month day, year] Page 5 of Facility description The Northern Natural Gas Company - Owatonna Compressor Station (Facility) is located at 8801 SW 88th Street in Ellendale, Steele County, Minnesota. The Northern Natural Gas Company - Owatonna Compressor Station is used to pressurize natural gas in order to facilitate its transmission through a pipeline system. The existing facility consists of one natural gas-fired turbine and a diesel-fired emergency generator. The existing facility is subject to New Source Performance Standards for the turbine, and National Emission Standard for Hazardous Air Pollutants for the emergency generator. This permit action authorizes installation and operation of one additional natural-gas fired turbine, two natural gasfired process heaters, and a new natural gas-fired four-stroke lean burn spark ignition emergency generator. The turbines' operating hours will be limited to ensure that site-wide CO emissions do not exceed 96 tons per year. The existing diesel-fired emergency generator will be removed and replaced with the natural gas-fired four-stroke lean burn spark ignition emergency generator. Flanges, valves and compressor seals are also added to the permit.

6 Permit issued: [month day, year] Permit expires: [month day, year] Page 6 of Summary of subject items SI ID: Relationshi Description p Type TFAC 1: Northern Natural Gas Co - Owatonna COMG 1: Turbine Hours has of Operation members EQUI 1: Stationary sends to Natural Gas-Fired Turbine EQUI 2: Emergency Generator EQUI 3: Natural Gas- Fired Turbine EQUI 4: Emergency Generator Related SI ID: Description EQUI 1, EQUI 3 STRU 1: Solar Mars Turbine S Stack sends to STRU 2 sends to STRU 3: Solar Mars Turbine S Stack sends to STRU 4: Cummins GTA38E Generator Stack EQUI 5: Heater sends to STRU 5: Process Heater EQUI 6: Heater sends to STRU 6: Process Heater SI ID: Description FUGI 1: Flanges FUGI 2: Compressor Seals FUGI 3: Valves STRU 1: Solar Mars Turbine S Stack STRU 2: STRU 3: Solar Mars Turbine S Stack STRU 4: Cummins GTA38E Generator Stack STRU 5: Process Heater STRU 6: Process Heater STRU 7: Compressor Building STRU 8: Compressor Building 2 STRU 9: Control Building STRU 10: Generator Building Relationshi p Type Related SI ID: Description

7 Permit Expires: [month day, year] Page 7 of Limits and other requirements TFAC Northern Natural Gas Co - Owatonna PERMIT SHIELD: Subject to the limitations in Minn. R , compliance with the conditions of this permit shall be deemed compliance with the specific provision of the applicable requirement identified in the permit as the basis of each condition. Subject to the limitations of Minn. R and , subp. 2, notwithstanding the conditions of this permit specifying compliance practices for applicable requirements, any person (including the Permittee) may also use other credible evidence to establish compliance or noncompliance with applicable requirements. This permit shall not alter or affect the liability of the Permittee for any violation of applicable requirements prior to or at the time of permit issuance. [Minn. R (A)(2)] Circumvention: Do not install or use a device or means that conceals or dilutes emissions, which would otherwise violate a federal or state air pollution control rule, without reducing the total amount of pollutant emitted. [Minn. R ] Air Pollution Control Equipment: Operate all pollution control equipment whenever the corresponding process equipment and emission units are operated. [Minn. R , subp. 16(J), Minn. R , subp. 2] Operation and Maintenance Plan: Retain at the stationary source an operation and maintenance plan for all air pollution control equipment. At a minimum, the O & M plan shall identify all air pollution control equipment and control practices and shall include a preventative maintenance program for the equipment and practices, a description of (the minimum but not necessarily the only) corrective actions to be taken to restore the equipment and practices to proper operation to meet applicable permit conditions, a description of the employee training program for proper operation and maintenance of the control equipment and practices, and the records kept to demonstrate plan implementation. [Minn. R , subp. 14, Minn. R , subp. 16(J)] Operation Changes: In any shutdown, breakdown, or deviation the Permittee shall immediately take all practical steps to modify operations to reduce the emission of any regulated air pollutant. The Commissioner may require feasible and practical modifications in the operation to reduce emissions of air pollutants. No emissions units that have an unreasonable shutdown or breakdown frequency of process or control equipment shall be permitted to operate. [Minn. R , subp. 4] Fugitive Emissions: Do not cause or permit the handling, use,

8 Permit Expires: [month day, year] Page 8 of 27 transporting, or storage of any material in a manner which may allow avoidable amounts of particulate matter to become airborne. Comply with all other requirements listed in Minn. R [Minn. R ] Noise: The Permittee shall comply with the noise standards set forth in Minn. R to at all times during the operation of any emission units. This is a state only requirement and is not enforceable by the EPA Administrator or citizens under the Clean Air Act. [Minn. R ] Inspections: The Permittee shall comply with the inspection procedures and requirements as found in Minn. R , subp. 9(A). [Minn. R , subp. 9(A)] The Permittee shall comply with the General Conditions listed in Minn. R , subp. 16. [Minn. R , subp. 16] Performance Testing: Conduct all performance tests in accordance with Minn. R. ch unless otherwise noted in this permit. [Minn. R. ch. 7017] Performance Test Notifications and Submittals: Performance Test Notification and Plan: due 30 days before each Performance Test Performance Test Pre-test Meeting: due 7 days before each Performance Test Performance Test Report: due 45 days after each Performance Test The Notification, Test Plan, and Test Report must be submitted in a format specified by the commissioner. [Minn. R , Minn. R , subps. 1-4, Minn. R , subps. 1-2] Limits set as a result of a performance test (conducted before or after permit issuance) apply until superseded as stated in the MPCA's Notice of Compliance letter granting preliminary approval. Preliminary approval is based on formal review of a subsequent performance test on the same unit as specified by Minn. R , subp. 3. The limit is final upon issuance of a permit amendment incorporating the change. [Minn. R , subp. 3] Monitoring Equipment Calibration - The Permittee shall either: 1. Calibrate or replace required monitoring equipment every 12 months; or 2. Calibrate at the frequency stated in the manufacturer's specifications. For each monitor, the Permittee shall maintain a record of all calibrations, including the date conducted, and any corrective action that resulted. The Permittee shall include the calibration frequencies, procedures, and manufacturer's specifications (if applicable) in the Operations and Maintenance Plan. Any requirements applying to continuous emission monitors are listed separately in this permit. [Minn. R , subp. 4(D)] Operation of Monitoring Equipment: Unless noted elsewhere in this permit, monitoring a process or control equipment connected to

9 Permit Expires: [month day, year] Page 9 of 27 that process is not necessary during periods when the process is shutdown, or during checks of the monitoring systems, such as calibration checks and zero and span adjustments. If monitoring records are required, they should reflect any such periods of process shutdown or checks of the monitoring system. [Minn. R , subp. 4(D)] Recordkeeping: Retain all records at the stationary source, unless otherwise specified within this permit, for a period of five (5) years from the date of monitoring, sample, measurement, or report. Records which must be retained at this location include all calibration and maintenance records, all original recordings for continuous monitoring instrumentation, and copies of all reports required by the permit. Records must conform to the requirements listed in Minn. R , subp. 5(A). [Minn. R , subp. 5(C)] Recordkeeping: Maintain records describing any insignificant modifications (as required by Minn. R , subp. 3) or changes contravening permit terms (as required by Minn. R , subp. 2), including records of the emissions resulting from those changes. [Minn. R , subp. 5(B)] If the Permittee determines that no permit amendment or notification is required prior to making a change, the Permittee must retain records of all calculations required under Minn. R For non-expiring permits, these records shall be kept for a period of five years from the date that the change was made. The records shall be kept at the stationary source for the current calendar year of operation and may be kept at the stationary source or office of the stationary source for all other years. The records may be maintained in either electronic or paper format. [Minn. R , subp. 4] Shutdown Notifications: Notify the Commissioner at least 24 hours in advance of a planned shutdown of any control equipment or process equipment if the shutdown would cause any increase in the emissions of any regulated air pollutant. If the owner or operator does not have advance knowledge of the shutdown, notification shall be made to the Commissioner as soon as possible after the shutdown. However, notification is not required in the circumstances outlined in Items A, B and C of Minn. R , subp. 3. At the time of notification, the owner or operator shall inform the Commissioner of the cause of the shutdown and the estimated duration. The owner or operator shall notify the Commissioner when the shutdown is over. [Minn. R , subp. 3] Breakdown Notifications: Notify the Commissioner within 24 hours of a breakdown of more than one hour duration of any control equipment or process equipment if the breakdown causes any increase in the emissions of any regulated air pollutant. The 24- hour time period starts when the breakdown was discovered or reasonably should have been discovered by the owner or operator.

10 Permit Expires: [month day, year] Page 10 of 27 However, notification is not required in the circumstances outlined in Items A, B and C of Minn. R , subp. 2. At the time of notification or as soon as possible thereafter, the owner or operator shall inform the Commissioner of the cause of the breakdown and the estimated duration. The owner or operator shall notify the Commissioner when the breakdown is over. [Minn. R , subp. 2] Notification of Deviations Endangering Human Health or the Environment: As soon as possible after discovery, notify the Commissioner or the state duty officer, either orally or by facsimile, of any deviation from permit conditions which could endanger human health or the environment. [Minn. R , subp. 1] Notification of Deviations Endangering Human Health or the Environment Report: Within 2 working days of discovery, notify the Commissioner in writing of any deviation from permit conditions which could endanger human health or the environment. Include the following information in this written description: 1. the cause of the deviation; 2. the exact dates of the period of the deviation, if the deviation has been corrected; 3. whether or not the deviation has been corrected; 4. the anticipated time by which the deviation is expected to be corrected, if not yet corrected; and 5. steps taken or planned to reduce, eliminate, and prevent reoccurrence of the deviation. [Minn. R , subp. 1] Application for Permit Amendment: If a permit amendment is needed, submit an application in accordance with the requirements of Minn. R through Minn. R Submittal dates vary, depending on the type of amendment needed. Upon adoption of a new or amended federal applicable requirement, and if there are 3 or more years remaining in the permit term, the Permittee shall file an application for an amendment within nine months of promulgation of the applicable requirement, pursuant to Minn. R , subp. 3. [Minn. R , subp. 3, Minn. R ] Extension Requests: The Permittee may apply for an Administrative Amendment to extend a deadline in a permit by no more than 120 days, provided the proposed deadline extension meets the requirements of Minn. R , subp. 1(H). Performance testing deadlines from the General Provisions of 40 CFR pt. 60 and pt. 63 are examples of deadlines for which the MPCA does not have authority to grant extensions and therefore do not meet the requirements of Minn. R , subp. 1(H). [Minn. R , subp. 1(H)] Emission Inventory Report: due on or before April 1 of each calendar year following permit issuance. Submit in a format specified by the Commissioner. [Minn. R ] Emission Fees: due 30 days after receipt of an MPCA bill. [Minn. R.

11 Permit Expires: [month day, year] Page 11 of ] The Permittee is authorized to install and operate EQUI3, EQUI4, EQUI5, EQUI6, FUGI1, FUGI2, FUGI3, STRU3, STRU4, STRU5, STRU6, STRU8, STRU9 and STRU10 as defined by the emissions unit information in Section 4 of this permit, within three years after issuance of permit The units shall meet all the requirements of this permit. [Minn. R , subp. 2] COMG 1 Turbine Hours of Operation The Permittee shall limit Operating Hours <= 13,620 hours per year 12-month rolling sum of combined runtime hours of EQUI1 and EQUI3. [To avoid major source under 40 CFR 70.2 & Minn. R ] Daily Recordkeeping: On each day of operation the Permittee shall record the daily hours of operation for both EQUI1 and EQUI3. Records shall be kept in a log at the facility. [Minn. R , subps. 4-5, To avoid major source under 40 CFR 70.2 & Minn. R ] Monthly Recordkeeping: Using the daily records, by the 15th day of each month, the Permittee shall calculate and record the following: 1. The total hours of operation for both EQUI1 and EQUI3 for the previous calendar month. 2. The 12-month rolling sum of hours of operation for both EQUI1 and EQUI3 for the previous 12-month period by summing the monthly hours data for the previous 12 months. [Minn. R , subps. 4-5] EQUI 1 EU001 Stationary Natural Gas-Fired Turbine The Permittee may replace the existing turbine with a similar turbine as described below. [Minn. R , subp. 11] If the Permittee replaces the existing turbine with a similar turbine, the Permittee shall meet the following conditions: 1. The maximum Brake horsepower (BHP) of the turbine may not exceed 16,000 BHP. 2. The turbine must be equipped with a low-nox burner and combust only pipeline-quality natural gas. 3. The Permittee shall calculate and keep a permanent record of the potential emission rates in lb/hr, of PM, PM10, PM2.5, SO2, NOx, and CO for the replacement turbine. 4. If the replacement turbine is a previously-operated unit that is an affected facility as defined in 40 CFR Section , and the Permittee has previously met all applicable requirements in 40 CFR Sections 60.7 and 60.8 for the replacement turbine, notify the MPCA of the replacement no later than 30 days after completion of installation of the replacement turbine. The notification shall

12 Permit Expires: [month day, year] Page 12 of 27 include a copy of all previously submitted notifications required by 40 CFR Section 60.7 and results of performance tests required by 40 CFR Section If the replacement turbine is a new unit that is an affected facility, complete all applicable notification and testing requirements in 40 CFR Sections 60.7 and [Minn. R , subp. 2] Notification of Replacement: Postmarked within 60 days after making the replacement. Include the maximum BHP of the turbine and the potential emission rates in the notification. [Minn. R , subp. 2] The Permittee shall limit Nitrogen Oxides <= percent by volume at 15 percent oxygen and on a dry basis. [40 CFR (d), Minn. R ] Opacity <= 20 percent opacity once operating temperatures have been attained. [Minn. R , subp. 1] Sulfur Dioxide <= pounds per million Btu heat input. The potential to emit from the unit is lb/mmbtu due to equipment design and allowable fuels. [Minn. R , subp. 2(B)] The Permittee shall limit Sulfur Content of Fuel <= 0.8 percent by weight. [40 CFR (b), Minn. R ] Fuel type: Natural gas only by design. [Minn. R , subp. 35a] The Permittee shall keep records of fuel type and usage on a monthly basis. [Minn. R , subp. 5] See COMG1 for the annual hours of operation limit. [Minn. R , subp. 2] The Permittee may, but is not required to, for purposes of determining excess emissions, use a CEMS that meets the requirements of 40 CFR Section (b). Also, if the Permittee has previously submitted and received EPA, State, or local permitting authority approval of a procedure for monitoring compliance with the applicable NOx emission limit under 40 CFR Section , that approved procedure may continue to be used. [40 CFR (c), Minn. R ] (1) The Permittee shall monitor the total sulfur content of the fuel being fired in the turbine, except as provided in 40 CFR Section (h)(3). The sulfur content of the fuel must be determined using total sulfur methods described in 40 CFR Section (b)(10). Alternatively, if the total sulfur content of the gaseous fuel during the most recent performance test was less than 0.4 weight percent (4000 ppmw), ASTM D , 94, D , D , or Gas Processors Association Standard (all of which are incorporated by reference, see 40 CFR Section 60.17), which measure the major sulfur compounds may be used; and (2) The Permittee shall monitor the nitrogen content of the fuel combusted in the turbine, if the Permittee claims an allowance for fuel bound nitrogen (i.e., if an F-value greater than zero is being or

13 Permit Expires: [month day, year] Page 13 of 27 will be used by the Permittee to calculate STD in 40 CFR Section ). The nitrogen content of the fuel shall be determined using methods described in 40 CFR Section (b)(9) or an approved alternative. (3) Notwithstanding the provisions of 40 CFR Section (h)(1), the Permittee may elect not to monitor the total sulfur content of the gaseous fuel combusted in the turbine, if the gaseous fuel is demonstrated to meet the definition of natural gas in 40 CFR Section (u), regardless of whether an existing custom schedule approved by the administrator for 40 CFR pt. 60, subp. GG requires such monitoring. The Permittee shall use one of the following sources of information to make the required demonstration: (i) The gas quality characteristics in a current, valid purchase contract, tariff sheet or transportation contract for the gaseous fuel, specifying that the maximum total sulfur content of the fuel is 20.0 grains/100 scf or less; or (ii) Representative fuel sampling data which show that the sulfur content of the gaseous fuel does not exceed 20 grains/100 scf. At a minimum, the amount of fuel sampling data specified in section or of appendix D to 40 CFR pt. 75 is required. (4) For any turbine that commenced construction, reconstruction or modification after October 3, 1977, but before July 8, 2004, and for which a custom fuel monitoring schedule has previously been approved, the Permittee may, without submitting a special petition to the Administrator, continue monitoring on this schedule. [40 CFR (h), Minn. R ] The frequency of determining the sulfur and nitrogen content of the fuel shall be as follows: (2) Gaseous fuel. Any applicable nitrogen content value of the gaseous fuel shall be determined and recorded once per unit operating day. For Permittees that elect not to demonstrate sulfur content using options in 40 CFR Section (h)(3), and for which the fuel is supplied without intermediate bulk storage, the sulfur content value of the gaseous fuel shall be determined and recorded once per unit operating day. (3) Custom schedules. Notwithstanding the requirements of 40 CFR Section (i)(2), operators or fuel vendors may develop custom schedules for determination of the total sulfur content of gaseous fuels, based on the design and operation of the affected facility and the characteristics of the fuel supply. Except as provided in 40 CFR Section (i)(3)(i) and (i)(3)(ii), custom schedules shall be substantiated with data and shall be approved by the Administrator before they can be used to comply with the standard in 40 CFR Section (i) The two custom sulfur monitoring schedules set forth in 40 CFR Section (i)(3)(i)(A) through (D) and in 40 CFR Section (i)(3)(ii) are acceptable, without prior Administrative approval: (A) The Permittee shall obtain daily total sulfur content measurements for 30 consecutive unit operating days, using the

14 Permit Expires: [month day, year] Page 14 of 27 applicable methods specified in 40 CFR pt. 60, subp. GG. Based on the results of the 30 daily samples, the required frequency for subsequent monitoring of the fuel's total sulfur content shall be as specified in 40 CFR Section (i)(3)(i)(B), (C), or (D), as applicable. (B) If none of the 30 daily measurements of the fuel's total sulfur content exceeds 0.4 weight percent (4000 ppmw), subsequent sulfur content monitoring may be performed at 12-month intervals. If any of the samples taken at 12-month intervals has a total sulfur content between 0.4 and 0.8 weight percent (4000 and 8000 ppmw), follow the procedures in 40 CFR Section (i)(3)(i)(C). If any measurement exceeds 0.8 weight percent (8000 ppmw), follow the procedures in 40 CFR Section (i)(3)(i)(D). (C) If at least one of the 30 daily measurements of the fuel's total sulfur content is between 0.4 and 0.8 weight percent (4000 and 8000 ppmw), but none exceeds 0.8 weight percent (8000 ppmw), then: (1) Collect and analyze a sample every 30 days for three months. If any sulfur content measurement exceeds 0.8 weight percent (8000 ppmw), follow the procedures in 40 CFR Section (i)(3)(i)(D). Otherwise, follow the procedures in 40 CFR Section (i)(3)(i)(C)(2). (2) Begin monitoring at 6-month intervals for 12 months. If any sulfur content measurement exceeds 0.8 weight percent (8000 ppmw), follow the procedures in 40 CFR Section (i)(3)(i)(D). Otherwise, follow the procedures in 40 CFR Section (i)(3)(i)(C)(3). (3) Begin monitoring at 12-month intervals. If any sulfur content measurement exceeds 0.8 weight percent (8000 ppmw), follow the procedures in 40 CFR Section (i)(3)(i)(D). Otherwise, continue to monitor at this frequency. (D) If a sulfur content measurement exceeds 0.8 weight percent (8000 ppmw), immediately begin daily monitoring according to 40 CFR Section (i)(3)(i)(A). Daily monitoring shall continue until 30 consecutive daily samples, each having a sulfur content no greater than 0.8 weight percent (8000 ppmw), are obtained. At that point, the applicable procedures of 40 CFR Section (i)(3)(i)(B) or (C) shall be followed. [40 CFR (i)(2)-(3)(i), Minn. R ] (ii) The Permittee may use the data collected from the 720-hour sulfur sampling demonstration described in section of appendix D to 40 CFR pt. 75 to determine a custom sulfur sampling schedule, as follows: (A) If the maximum fuel sulfur content obtained from the 720 hourly samples does not exceed 20 grains/100 scf (i.e., the maximum total sulfur content of natural gas as defined in 40 CFR Section (u)), no additional monitoring of the sulfur content of the gas is required, for the purposes of 40 CFR pt. 60, subp. GG. (B) If the maximum fuel sulfur content obtained from any of the 720 hourly samples exceeds 20 grains/100 scf, but none of the sulfur content values (when converted to weight percent sulfur) exceeds

15 Permit Expires: [month day, year] Page 15 of weight percent (4000 ppmw), then the minimum required sampling frequency shall be one sample at 12 month intervals. (C) If any sample result exceeds 0.4 weight percent sulfur (4000 ppmw), but none exceeds 0.8 weight percent sulfur (8000 ppmw), follow the provisions 40 CFR Section (i)(3)(i)(C). (D) If the sulfur content of any of the 720 hourly samples exceeds 0.8 weight percent (8000 ppmw), follow the provisions of 40 CFR Section (i)(3)(i)(D). [40 CFR (i)(3)(ii), Minn. R ] The Permittee shall submit reports of excess emissions and monitor downtime, in accordance with 40 CFR Section 60.7(c). Excess emissions shall be reported for all periods of unit operation, including startup, shutdown and malfunction. For the purpose of reports required under 40 CFR Section 60.7(c), periods of excess emissions and monitor downtime that shall be reported are defined as follows: (2) Sulfur dioxide. If the Permittee is required to monitor the sulfur content of the fuel under 40 CFR Section (h): (i) For samples of gaseous fuel obtained using daily sampling, flow proportional sampling, or sampling from the unit's storage tank, an excess emission occurs each unit operating hour included in the period beginning on the date and hour of any sample for which the sulfur content of the fuel being fired in the gas turbine exceeds 0.8 weight percent and ending on the date and hour that a subsequent sample is taken that demonstrates compliance with the sulfur limit. (iii) A period of monitor downtime begins when a required sample is not taken by its due date. A period of monitor downtime also begins on the date and hour of a required sample, if invalid results are obtained. The period of monitor downtime shall include only unit operating hours, and ends on the date and hour of the next valid sample. [40 CFR (j)(2), Minn. R ] All reports required under 40 CFR Section 60.7(c) shall be postmarked by the 30th day following the end of each 6-month period. [40 CFR (j)(5), Minn. R ] EQUI 2 EU002 Emergency Generator EQUI2 will be shut down and replaced by EQUI4 as authorized by permit no Simultaneous operation of EQUI2 and EQUI4 is prohibited. [Minn. R , subp. 2] Opacity <= 20 percent opacity once operating temperatures have been attained. [Minn. R , subp. 1] Sulfur Dioxide <= pounds per million Btu heat input. [Minn. R , subp. 2] The Permittee shall change oil and filter every 500 hours of operation or annually, whichever comes first. [40 CFR pt. 63, subp. ZZZZ(Table 2d), Minn. R ] The Permittee shall inspect air cleaner every 1,000 hours of operation or annually, whichever comes first, and replace as

16 Permit Expires: [month day, year] Page 16 of 27 necessary. [40 CFR pt. 63, subp. ZZZZ(Table 2d), Minn. R ] The Permittee shall inspect all hoses and belts every 500 hours of operation or annually, whichever comes first, and replace as necessary. [40 CFR pt. 63, subp. ZZZZ(Table 2d), Minn. R ] EQUI 3 Natural Gas-Fired Turbine The Permittee shall limit Nitrogen Oxides <= 25 parts per million at 15 percent oxygen, or 150 ng/j of useful output (1.2 lb/mwh). [40 CFR (a), 40 CFR pt. 60, subp. KKKK(Table 1), Minn. R ] The Permittee shall limit Sulfur Dioxide <= 110 nanograms per joule (0.90 pounds per megawatt-hour (lb/mwh)) gross output. [40 CFR (a)(1), Minn. R ] Opacity <= 20 percent opacity once operating temperatures have been attained. [Minn. R , subp. 1] Sulfur Dioxide <= pounds per million Btu heat input. The potential to emit from the unit is lb/mmbtu due to equipment design and allowable fuels. [Minn. R , subp. 2(B)] Fuel type: Natural gas only by design. [Minn. R , subp. 35a] The Permittee shall keep records of fuel type and usage on a monthly basis. [Minn. R , subp. 5] See COMG1 for the annual hours of operation limit. [Minn. R , subp. 2] The Permittee must operate and maintain EQUI3, air pollution control equipment, and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions at all times including during startup, shutdown, and malfunction. [40 CFR , Minn. R ] The Permittee must perform annual performance tests in accordance with 40 CFR Section to demonstrate continuous compliance. If the NOx emission result from the performance test is less than or equal to 75 percent of the NOx emission limit for the turbine, the Permittee may reduce the frequency of subsequent performance tests to once every 2 years (no more than 26 calendar months following the previous performance test). If the results of any subsequent performance test exceed 75 percent of the NOx emission limit for the turbine, the Permittee must resume annual performance tests. [40 CFR (a), Minn. R ] The Permittee must submit reports of excess emissions and monitor downtime, in accordance with 40 CFR Section 60.7(c). Excess emissions must be reported for all periods of unit operation, including startup, shutdown, and malfunction. [40 CFR (a),

17 Permit Expires: [month day, year] Page 17 of 27 Minn. R ] The Permittee must submit a written report of the results of each performance test to the Agency before the close of business on the 60th day following the completion of the performance test. [40 CFR (b), Minn. R ] For samples of gaseous fuel and for oil samples obtained using daily sampling, flow proportional sampling, or sampling from the unit's storage tank, an excess emission occurs each unit operating hour included in the period beginning on the date and hour of any sample for which the sulfur content of the fuel being fired in the combustion turbine exceeds the applicable limit and ending on the date and hour that a subsequent sample is taken that demonstrates compliance with the sulfur limit. [40 CFR (a), Minn. R ] The NOx performance test must be done at any load condition within plus or minus 25 percent of 100 percent of peak load. The Permittee may perform testing at the highest achievable load point, if at least 75 percent of peak load cannot be achieved in practice. The Permittee must conduct three separate test runs for each performance test. The minimum time per run is 20 minutes. [40 CFR (b), Minn. R ] Compliance with the applicable NOx emission limit in 40 CFR Section must be demonstrated at each tested load level. Compliance is achieved if the three-run arithmetic average NOx emission rate at each tested level meets the applicable emission limit in 40 CFR Section [40 CFR (b)(4), Minn. R ] The ambient temperature must be greater than 0 degrees F during the NOx performance test. [40 CFR (b)(6), Minn. R ] The Permittee must conduct an initial performance test, as required in 40 CFR Section 60.8 for SO2. Subsequent SO2 performance tests shall be conducted on an annual basis (no more than 14 calendar months following the previous performance test). (1) The Permittee shall periodically determine the sulfur content of the fuel combusted in the turbine, a representative fuel sample would be collected following ASTM D4177 (incorporated by reference, see 40 CFR Section 60.17) for oil. Alternatively, for oil, the Permittee may follow the procedures for manual pipeline sampling in section 14 of ASTM D4057 (incorporated by reference, see 40 CFR Section 60.17). The fuel analyses of 40 CFR Section may be performed either by the Permittee, a service contractor retained by the Permittee, the fuel vendor, or any other qualified agency. Analyze the samples for the total sulfur content of the fuel using: (ii) For gaseous fuels, ASTM D1072, or alternatively D3246, D4084, D4468, D4810, D6228, D6667 or Gas Processors Association Standard 2377 (all of which are incorporated by reference, see 40 CFR Section ). [40 CFR (a)(1)(ii), Minn. R ] The Permittee shall submit a notification of any physical or

18 Permit Expires: [month day, year] Page 18 of 27 operational change which increases emission rate: due 60 days (or as soon as practical) before the change is commenced. [40 CFR 60.7(a)(4), Minn. R , subp. 1] Recordkeeping: The Permittee shall maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of the facility including; any malfunction of the air pollution control equipment; or any periods during which a continuous monitoring system or monitoring device is inoperative. [40 CFR 60.7(b), Minn. R , subp. 1] Recordkeeping: The Permittee shall maintain a file of all measurements, maintenance, reports and records for at least five years. This requirement is more stringent than 40 CFR Section 60.7(f), which specifies two years. [40 CFR 60.7(f), Minn. R , subp. 5(C), Minn. R , subp. 1] No owner or operator shall build, erect, install, or use any article, machine, equipment or process, the use of which conceals an emission which would otherwise constitute a violation of an applicable standard. [40 CFR 60.12, Minn. R ] Operations during periods of startup, shutdown, and malfunction shall not constitute representative conditions for the purpose of a performance test nor shall emissions in excess of the level of the applicable emission limit during periods of startup, shutdown, and malfunction be considered a violation of the applicable emission limit unless otherwise specified in the applicable standards. [40 CFR 60.8(c), Minn. R , subp. 2(A)] EQUI 4 Emergency Generator The Permittee shall limit Nitrogen Oxides <= 2.0 grams per horsepower-hour (160 ppmvd at 15% O2). [40 CFR (e), 40 CFR (c), 40 CFR pt. 60, subp. JJJJ(Table 1), Minn. R , Minn. R ] The Permittee shall limit Carbon Monoxide <= 4.0 grams per horsepower-hour (540 ppmvd at 15% O2). [40 CFR (e), 40 CFR (c), 40 CFR pt. 60, subp. JJJJ(Table 1), Minn. R , Minn. R ] The Permittee shall limit Volatile Organic Compounds <= 1.0 grams per horsepower-hour (86 ppmvd at 15% O2). [40 CFR (e), 40 CFR (c), 40 CFR pt. 60, subp. JJJJ(Table 1), Minn. R , Minn. R ] Opacity <= 20 percent opacity once operating temperatures have been attained. [Minn. R , subp. 1] Sulfur Dioxide <= pounds per million Btu heat input. The potential to emit from the unit is lb/mmbtu due to equipment design and allowable fuels. [Minn. R , subp. 2(B)] Fuel type: Natural gas only by design. [Minn. R , subp. 35a]

19 Permit Expires: [month day, year] Page 19 of Hours of Operation: The Permittee shall maintain documentation on site that the unit is an emergency generator by design that qualifies under the U.S. EPA memorandum entitled "Calculating Potential to Emit (PTE) for Emergency Generators" dated September 6, 1995, limiting operation to 500 hours per year. [Minn. R , subps. 4-5] The Permittee shall keep records of fuel type and usage on a monthly basis. [Minn. R , subp. 5] EQUI4 is a new stationary RICE located at an area source and the Permittee must meet the requirements of 40 CFR pt. 63, subp. ZZZZ by meeting the requirements of 40 CFR pt. 60, subp. JJJJ for spark ignition engines. No further requirements apply for such engines under 40 CFR pt. 63, subp. ZZZZ. [40 CFR (c)(1), Minn. R ] The Permittee is an owner and operator of an emergency stationary SI ICE that commenced construction after June 12, 2006, where the stationary SI ICE was manufactured on or after January 1, 2009, for emergency engines with a maximum engine power greater than 19 KW (25 HP). [40 CFR (a)(4)(iv), 40 CFR (c), Minn. R , Minn. R ] The Permittee must operate and maintain EQUI4 that achieves the emission standards as required in 40 CFR Section over the entire life of the engine. [40 CFR , 40 CFR (c), Minn. R , Minn. R ] The Permittee may not install engines that do not meet the applicable requirements in 40 CFR Section after January 1, [40 CFR (c), 40 CFR (c), Minn. R , Minn. R ] The Permittee is purchasing an engine certified according to procedures specified in 40 CFR pt. 60, subp. JJJJ, for the same model year and demonstrating compliance according to one of the methods specified in 40 CFR Section (a). The Permittee must keep a maintenance plan and records of conducted maintenance and must, to the extent practicable, maintain and operate the engine in a manner consistent with good air pollution control practice for minimizing emissions. In addition, the Permittee must conduct an initial performance test and conduct subsequent performance testing every 8,760 hours or 3 years, whichever comes first, thereafter to demonstrate compliance. [40 CFR (b)(1)(ii), 40 CFR (c), Minn. R , Minn. R ] The Permittee must operate EQUI4 according to the requirements in 40 CFR Section (d)(1) through (3). In order for the engine to be considered an emergency stationary ICE under 40 CFR pt. 60, subp. JJJJ, any operation other than emergency operation, maintenance and testing, emergency demand response, and operation in non-emergency situations for 50 hours per year, as described in 40 CFR Section (d)(1) through (3), is prohibited. If the Permittee does not operate the engine according to the requirements in 40 CFR Section (d)(1) through (3), the

20 Permit Expires: [month day, year] Page 20 of 27 engine will not be considered an emergency engine under 40 CFR pt. 60, subp. JJJJ and must meet all requirements for nonemergency engines. (1) There is no time limit on the use of emergency stationary ICE in emergency situations. (2) The Permittee may operate EQUI4 for any combination of the purposes specified in 40 CFR Section (d)(2)(i) for a maximum of 100 hours per calendar year. Any operation for nonemergency situations as allowed by 40 CFR Section (d)(3) counts as part of the 100 hours per calendar year allowed by 40 CFR Section (d)(2). (i) EQUI4 may be operated for maintenance checks and readiness testing, provided that the tests are recommended by federal, state or local government, the manufacturer, the vendor, the regional transmission organization or equivalent balancing authority and transmission operator, or the insurance company associated with the engine. The Permittee may petition the Administrator for approval of additional hours to be used for maintenance checks and readiness testing, but a petition is not required if the Permittee maintains records indicating that federal, state, or local standards require maintenance and testing of emergency ICE beyond 100 hours per calendar year. (3) EQUI4 may be operated for up to 50 hours per calendar year in non-emergency situations. The 50 hours of operation in nonemergency situations are counted as part of the 100 hours per calendar year for maintenance and testing and emergency demand response provided in 40 CFR Section (d)(2). Except as provided in 40 CFR Section (d)(3)(i), the 50 hours per year for non-emergency situations cannot be used for peak shaving or non-emergency demand response, or to generate income for a facility to an electric grid or otherwise supply power as part of a financial arrangement with another entity. (i) The 50 hours per year for non-emergency situations can be used to supply power as part of a financial arrangement with another entity if all of the following conditions are met: (A) The engine is dispatched by the local balancing authority or local transmission and distribution system operator; (B) The dispatch is intended to mitigate local transmission and/or distribution limitations so as to avert potential voltage collapse or line overloads that could lead to the interruption of power supply in a local area or region. (C) The dispatch follows reliability, emergency operation or similar protocols that follow specific NERC, regional, state, public utility commission or local standards or guidelines. (D) The power is provided only to the facility itself or to support the local transmission and distribution system. (E) The Permittee identifies and records the entity that dispatches the engine and the specific NERC, regional, state, public utility commission or local standards or guidelines that are being followed for dispatching the engine. The local balancing authority or local transmission and distribution system operator may keep these records on behalf of the engine owner or operator. [40 CFR

21 Permit Expires: [month day, year] Page 21 of (d), 40 CFR (c), Minn. R , Minn. R ] (a) Each performance test must be conducted within 10 percent of 100 percent peak (or the highest achievable) load and according to the requirements in 40 CFR Section 60.8 and under the specific conditions that are specified in 40 CFR pt. 60, subp. JJJJ, Table 2. (b) The Permittee may not conduct performance tests during periods of startup, shutdown, or malfunction, as specified in 40 CFR Section 60.8(c). If EQUI4 is non-operational, the Permittee does not need to startup the engine solely to conduct a performance test; however, the Permittee must conduct the performance test immediately upon startup of the engine. (c) The Permittee must conduct three separate test runs for each performance test required in 40 CFR Section , as specified in 40 CFR Section 60.8(f). Each test run must be conducted within 10 percent of 100 percent peak (or the highest achievable) load and last at least 1 hour. (d) To determine compliance with the NOx mass per unit output emission limitation, convert the concentration of NOx in the engine exhaust using the following equation: ER = Cd * x 10^-3 * Q * T / HP-hr Where: ER = Emission rate of NOx in g/hp-hr Cd = Measured NOx concentration in parts per million by volume (ppmv) x 10^-3 = Conversion constant for ppm NOx to grams per standard cubic meter at 20 degrees Celsius Q = Stack gas volumetric flow rate, in standard cubic meter per hour, dry basis T = Time of test run, in hours HP-hr = Brake work of the engine, horsepower-hour (HP-hr). (e) To determine compliance with the CO mass per unit output emission limitation, convert the concentration of CO in the engine exhaust using the following equation: ER = Cd * x 10^-3 * Q * T / HP-hr Where: ER = Emission rate of CO in g/hp-hr Cd = Measured CO concentration in ppmv x 10^-3 = Conversion constant for ppm CO to grams per standard cubic meter at 20 degrees Celsius Q = Stack gas volumetric flow rate, in standard cubic meters per hour, dry basis T = Time of test run, in hours HP-hr = Brake work of the engine in HP-hr. (f) For purposes of 40 CFR pt. 60, subp. JJJJ, when calculating emissions of VOC, emissions of formaldehyde should not be included. To determine compliance with the VOC mass per unit

22 Permit Expires: [month day, year] Page 22 of 27 output emission limitation, convert the concentration of VOC in the engine exhaust using the following equation: ER = Cd * x 10^-3 * Q * T / HP-hr Where: ER = Emission rate of VOC in g/hp-hr Cd = VOC concentration measured as propane in ppmv x 10^-3 = Conversion constant for ppm VOC measured as propane, to grams per standard cubic meter at 20 degrees Celsius Q = Stack gas volumetric flow rate, in standard cubic meters per hour, dry basis T = Time of test run, in hours HP-hr = Brake work of the engine, in HP-hr. (g) If the Permittee chooses to measure VOC emissions using either Method 18 of 40 CFR part 60, appendix A, or Method 320 of 40 CFR part 63, appendix A, then the Permittee has the option of correcting the measured VOC emissions to account for the potential differences in measured values between these methods and Method 25A. The results from Method 18 and Method 320 can be corrected for response factor differences using the following two equations. RFi = CMi / CAi Where: RFi = Response factor of compound i when measured with EPA Method 25A CMi = Measured concentration of compound i in ppmv as carbon CAi = True concentration of compound i in ppmv as carbon Cicorr = RFi * Cmeas Where: Cicorr = Concentration of compound i corrected to the value that would have been measured by EPA Method 25A, ppmv as carbon Cimeas = Concentration of compound i measured by EPA Method 320, ppmv as carbon The corrected VOC concentration can then be placed on a propane basis using the following equation: CPeq = * Cicorr Where: CPeq = Concentration of compound i in mg of propane equivalent per DSCM. [40 CFR , 40 CFR (c), Minn. R , Minn. R ] The Permittee must keep the following records of the information: 1. All notifications submitted to comply with 40 CFR pt. 60, subp. JJJJ and all documentation supporting any notification. 2. Maintenance conducted on the engine.

Air Individual Permit Permit Limits to Avoid NSR

Air Individual Permit Permit Limits to Avoid NSR Air Individual Permit Permit Limits to Avoid NSR 13900128-001 Permittee: Facility name: Shakopee Distributed Generation Shakopee Distributed Generation Vierling Drive E Shakopee, Minnesota 55379 Scott

More information

Air Individual Permit Major Amendment Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR

Air Individual Permit Major Amendment Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR Air Individual Permit Major Amendment 13100058-101 Permittee: Facility name: Northern Natural Gas Co - Faribault Northern Natural Gas Co - Faribault 21903 Canby Ave Faribault, MN 55021 Rice County Operating

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc.

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc. DRAFT/PROPOSED AIR EMISSION PERMIT NO. 00300155 002 Major Amendment IS ISSUED TO Hoffman Enclosures, Inc. Hoffman Enclosure Inc/Pentair Equipment Protection 2100 Hoffman Way Anoka, Anoka County, MN 55303

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company AIR EMISSION PERMIT NO. 16300110-001 IS ISSUED TO Northern Natural Gas Company NORTHERN NATURAL GAS - HUGO No Street Address Hugo, Washington County, Minnesota 55038 The emission units and emission stacks

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 15300004-101 Permittee: Co-permittee name: Facility name: Viking Gas Transmission - Cushing ONEOK Partners, L.P. Viking Gas Transmission - Cushing 31888 400th

More information

Preliminary Draft Air Individual Permit State Permit

Preliminary Draft Air Individual Permit State Permit Preliminary Draft Air Individual Permit State Permit 12100021-101 Permittee: Facility name: CHS Inc - Prairie Lakes Coop - Glenwood Grain Elevator CHS Inc - Prairie Lakes Coop - Glenwood Grain Elevator

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 08500002-101 Permittee: Hutchinson Utilities Commission - Plant 1 Facility name: Hutchinson Utilities Commission - Plant 1 44 4th Ave NE Hutchinson, MN 55350-1829

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 10900008-101 Permittee: Facility name: Mayo Clinic Mayo Clinic Hospital Saint Marys Campus 1216 2nd St SW Rochester, MN 55902-1906 Olmsted County Expiration

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets

AIR EMISSION PERMIT NO IS ISSUED TO. Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets AIR EMISSION PERMIT NO. 10901019-002 IS ISSUED TO Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets Rochester Public Utilities 3605 Highway 52 North Rochester, Olmsted County,

More information

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation AIR EMISSION PERMIT NO. 04900030-006 Total Facility Operating Permit - Reissuance IS ISSUED TO Northern States Power Co a Minnesota Corporation XCEL ENERGY - PRAIRIE ISLAND NUCLEAR PLANT 1717 Wakonade

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission DRAFT/PROPOSED AIR EMISSION PERMIT NO. 08500034 002 Total Facility Operating Permit Reissuance IS ISSUED TO Hutchinson Utilities Commission Hutchinson Utilities Commission Plant 2 1100 Industrial Boulevard

More information

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 AIR EMISSION PERMIT NO. 14500026-001 IS ISSUED TO St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 The emission units, control equipment and emission stacks at

More information

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted

More information

Draft Air Individual Permit Major Amendment Brooks Ave South Thief River Falls, MN Pennington County

Draft Air Individual Permit Major Amendment Brooks Ave South Thief River Falls, MN Pennington County Draft Air Individual Permit Major Amendment 11300023-101 Permittee: Facility name: Digi-Key Corp Digi-Key Corp 701 Brooks Ave South Thief River Falls, MN 56701-2757 Pennington County Operating permit issuance

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 10500001-007 Permittee: Facility name: Swift Pork Co - Worthington Swift Pork Co - Worthington 1700 Highway 60 NE Worthington, MN 56187 Nobles County Expiration

More information

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County) AIR QUALITY PERMIT Permit No. Effective Date April 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

DRAFT Air Individual Permit Part 70 Reissuance

DRAFT Air Individual Permit Part 70 Reissuance DRAFT Air Individual Permit Part 70 Reissuance 13500008-101 Permittee: Facility name: Polaris Industries Inc - Roseau Polaris Industries Inc - Roseau 301 5th Ave SW Roseau, MN56751 Roseau County Expiration

More information

Draft Air Individual Permit Major Amendment Clearwater Dr Minnetonka, MN Hennepin County

Draft Air Individual Permit Major Amendment Clearwater Dr Minnetonka, MN Hennepin County Draft Air Individual Permit Major Amendment 05300834-102 Permittee: Facility name: GE Osmonics Inc GE Osmonics Inc 5951 Clearwater Dr Minnetonka, MN 55343 Hennepin County Operating permit issuance date:

More information

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

This is a new permit condition titled, 2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP) This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced

More information

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation AIR EMISSION PERMIT NO. 10900008-004 Total Facility Operating Permit - Reissuance IS ISSUED TO Mayo Foundation St Marys 1216 Southwest 2nd Street Rochester, Olmsted County, MN 55902 The emission units,

More information

Air Individual Permit State Permit Hardman Ave S South St. Paul, MN 55075

Air Individual Permit State Permit Hardman Ave S South St. Paul, MN 55075 Air Individual Permit State Permit 03700070-007 Permittee: Facility name: Sanimax USA LLC Sanimax USA LLC 505 Hardman Ave S South St. Paul, MN 55075 Expiration date: Non-expiring Permit * All Title I Conditions

More information

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia AIR EMISSION PERMIT NO. 13700028-003 IS ISSUED TO City of Virginia 620 South 2nd Street Virginia, St. Louis County, Minnesota 55792 The emission units, control equipment and emission stacks at the stationary

More information

AIR EMISSION PERMIT NO IS ISSUED TO INTERSTATE POWER COMPANY

AIR EMISSION PERMIT NO IS ISSUED TO INTERSTATE POWER COMPANY AIR EMISSION PERMIT NO. 09100007-002 IS ISSUED TO INTERSTATE POWER COMPANY INTERSTATE POWER - FOX LAKE STATION County Road 28 Sherburn, Martin County, Minnesota 561710367 The emission units, control equipment

More information

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota TABLE B: SUBMITTALS Table B lists most of the submittals you must provide. Table B is divided into three sections; one-time submittals or notifications, intermittent submittals or notifications and recurring

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Cogentrix

AIR EMISSION PERMIT NO IS ISSUED TO. Cogentrix AIR EMISSION PERMIT NO. 16300087-004 IS ISSUED TO Cogentrix 9525 105th Street Court South Cottage Grove, Washington County, MN 55016 The emission units, control equipment and emission stacks at the stationary

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Spark Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction of the

More information

Air Individual Permit Major Amendment

Air Individual Permit Major Amendment Air Individual Permit Major Amendment 01900022-101 Permittee: Facility name: Elkay Wood Products Company - Waconia Elkay Wood Products Company - Waconia 180 Industrial Boulevard Waconia, MN 55387-1736

More information

Air Individual Permit Part 70 Reissuance

Air Individual Permit Part 70 Reissuance Air Individual Permit Part 70 Reissuance 12300057-101 Permittee: Facility name: Rayven Inc Rayven Inc 431 Griggs Street N Saint Paul, MN 55104-4108 Ramsey County Expiration date: December 5, 2023 * All

More information

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY AIR EMISSION PERMIT NO. 12300012-002 IS ISSUED TO NORTHERN STATES POWER COMPANY NSP - HIGH BRIDGE GENE 501 Shepard Road St. Paul, Ramsey County, Minnesota 551023004 The emission units, control equipment

More information

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Mayo Foundation

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Mayo Foundation AIR EMISSION PERMIT NO. 10900008-003 Major Amendment IS ISSUED TO Mayo Foundation SAINT MARYS HOSPITAL 1216 Second Street Southwest Rochester, Olmsted County, Minnesota 55902 The emission units, control

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P.

AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P. AIR EMISSION PERMIT NO. 16300087-006 Total Facility Oper. Permit - Reissuance IS ISSUED TO LSPCottage Grove, L.P. LSPCOTTAGE GROVE COGENERATION FACILITY 9525 105th Street Court South Cottage Grove, Washington

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Polaris Industries Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Polaris Industries Inc. AIR EMISSION PERMIT NO. 02500051-001 IS ISSUED TO Polaris Industries Inc. Polaris Industries, Inc. - Wyoming 7290 Viking Boulevard East Wyoming, Chisago County, MN 55092 The emission units, control equipment

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015 AIR QUALITY PERMIT Permit No. Effective Date May 26, 2015 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. ALLETE Inc dba Minnesota Power Inc

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. ALLETE Inc dba Minnesota Power Inc DRAFT/PROPOSED AIR EMISSION PERMIT NO. 13700013 007 Total Facility Operating Permit Reissuance IS ISSUED TO ALLETE Inc dba Minnesota Power Inc Minnesota Power Laskin Energy Center 5699 Colby Lake Road

More information

Appendix K. Final DOC Conditions

Appendix K. Final DOC Conditions Appendix K Final DOC Conditions Puente Power Project 262 MW (net nominal) GE 7HA.01 Combustion Turbine Generator (CTG) The CTG is simultaneously subject to the emission limits, monitoring requirements,

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc AIR EMISSION PERMIT NO. 13700013-006 IS ISSUED TO Minnesota Power Division of ALLETE Inc MINNESOTA POWER - LASKIN ENERGY CENTER 5699 Colby Lake Road Hoyt Lakes, St. Louis County, MN 55750 The emission

More information

State of New Jersey. Department of Environmental Protection Division of Air Quality

State of New Jersey. Department of Environmental Protection Division of Air Quality GOP-006 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-006) Combined Heat and Power Stationary Spark Ignition Reciprocating Engine(s) less

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE, Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE, Inc. AIR EMISSION PERMIT NO. 13700013-005 IS ISSUED TO Minnesota Power Division of ALLETE, Inc. MINNESOTA POWER - LASKIN ENERGY CENTER County Road 633 Aurora, St. Louis County, MN 55705 The emission units,

More information

DRAFT/PROPOSED AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. GE Osmonics Inc

DRAFT/PROPOSED AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. GE Osmonics Inc DRAFT/PROPOSED AIR EMISSION PERMIT NO. 05300834 004 Major Amendment IS ISSUED TO GE Osmonics Inc GE Osmonics Inc 5951 Clearwater Drive Minnetonka, Hennepin County, MN 55343 The emission units, control

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

Appendix K. DOC Conditions

Appendix K. DOC Conditions Appendix K DOC Conditions Mission Rock Energy Center Five (5) GE LM6000-PG-Sprint Combustion Turbine Generators (CTGs) Total = 275 MW Nominal Each CTG is simultaneously subject to the emission limits,

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

State of New Jersey. Department of Environmental Protection Air Quality Permitting

State of New Jersey. Department of Environmental Protection Air Quality Permitting GP021 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP 021) Combined Heat and Power Combustion Turbine(s) less than or equal to 65 MMBTU per hour This

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Compression Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: S-7658-1-0 ISSUANCE DATE: 10/30/2009 LEGAL OWNER OR OPERATOR: ABEC BIDART-STOCKDALE LLC MAILING ADDRESS: C/O CALIFORNIA BIOENERGY LLC 2828 ROUTH STREET SUITE 500 DALLAS,

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 04PB1019 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL ISSUED TO:

More information

DRAFT/PROPOSED Air Individual Permit Major Amendment

DRAFT/PROPOSED Air Individual Permit Major Amendment DRAFT/PROPOSED Air Individual Permit Major Amendment 14300014 011 Permittee: Facility name: Heartland Corn Products Heartland Corn Products 53331 State Highway 19 E Winthrop, MN 55396 Operating permit

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Co dba Xcel Energy

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Co dba Xcel Energy AIR EMISSION PERMIT NO. 04900030-004 IS ISSUED TO Northern States Power Co dba Xcel Energy XCEL ENERGY - PRAIRIE ISLAND NUCLEAR 1717 Wakonade Drive East Welch, Goodhue County, MN 55089 The emission units,

More information

Streamlining Multiple Applicable Requirements

Streamlining Multiple Applicable Requirements Streamlining Multiple Applicable Requirements What is Streamlining? 1. Streamlining is the process of determining one set of requirements to be incorporated into the Title V permit from among multiple

More information

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels GP-005B State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels This general permit allows for the construction,

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 11PB859 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL Modification

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Archer Daniels Midland Company. ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066

AIR EMISSION PERMIT NO IS ISSUED TO. Archer Daniels Midland Company. ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066 AIR EMISSION PERMIT NO. 04900001-001 IS ISSUED TO Archer Daniels Midland Company ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066 The emission units, control equipment and emission stacks

More information

RICE NESHAP Frequently Asked Questions (FAQ)

RICE NESHAP Frequently Asked Questions (FAQ) RICE NESHAP Frequently Asked Questions (FAQ) What does RICE NESHAP mean? RICE NESHAP is an acronym for Reciprocating Internal Combustion Engines National Emission Standards for Hazardous Air Pollutants.

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: N-6311-9-1 ISSUANCE DATE: 12/17/2008 LEGAL OWNER OR OPERATOR: FISCALINI FARMS & FISCALINI DAIRY MAILING ADDRESS: 7231 COVERT RD MODESTO, CA 95358 LOCATION: 4848 JACKSON

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302

AIR EMISSION PERMIT NO IS ISSUED TO. Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302 AIR EMISSION PERMIT NO. 00900006-001 IS ISSUED TO Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302 The emission units, control equipment and emission stacks at the

More information

SECTION.1400 NITROGEN OXIDES

SECTION.1400 NITROGEN OXIDES SECTION.1400 NITROGEN OXIDES 15A NCAC 02D.1401 DEFINITIONS (a) For the purpose of this Section, the definitions at G.S 143-212 and G.S. 143-213, and 15A NCAC 02D.0101 shall apply, and in addition the following

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 28, 2005 PERMIT TO INSTALL

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 28, 2005 PERMIT TO INSTALL MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION September 28, 2005 PERMIT TO INSTALL 187-05 ISSUED TO Zeeland Board of Public Works LOCATED AT 8943 Riley Street Zeeland, Michigan IN THE

More information

Applicable Requirements - NSPS Subpart JJJJ

Applicable Requirements - NSPS Subpart JJJJ Facility Name: CO Station 3 Combustion Type: 4SRB Facility HAP Status: Area Fuel Type: Natural gas RICE Owner: RICE Operator: S2C Gathering Co Acme Operating Inc. Use Type: Max. Runtime: Non-emergency

More information

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Ardent Mills LLC

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Ardent Mills LLC AIR EMISSION PERMIT NO. 03700020-004 Major Amendment IS ISSUED TO Ardent Mills LLC ARDENT MILLS FLOUR MILL 2005 Vermillion Street South Hastings, Dakota County, Minnesota 55033 The emission units, control

More information

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Archer Daniels Midland Co

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Archer Daniels Midland Co AIR EMISSION PERMIT NO. 04900001-002 Administrative Amendment IS ISSUED TO Archer Daniels Midland Co ADM - RED WING 126 La Grange Street Red Wing, Goodhue County, MN 55066 The emission units, control equipment

More information

RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1

RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1 RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1 This document provides guidance on the requirements for stationary engines at area sources of hazardous air

More information

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 Discussion Topics Background Important Terms Applicability Compliance Deadlines Emission/Operating Limits Performance/Compliance

More information

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT APPENDIX D APPENDIX D REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL NEW JERSEY STATE DEPARTMENT

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM February 2, 2012 SUBJECT: Superior Appalachian Pipeline, LLC Kissick Lane Frazer Township, PA 15084 Allegheny County Installation Permit No. 0837-I001

More information

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the 15A NCAC 02D.1206 HOSPITAL, MEDICAL, AND INFECTIOUS WASTE INCINERATORS (a) Applicability. This Rule applies to any hospital, medical, and infectious waste incinerator (HMIWI), except: (1) any HMIWI required

More information

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) 1.0 Purpose The purpose of this rule is to limit emissions

More information

State of New Jersey. General Permit (GP-009A)

State of New Jersey. General Permit (GP-009A) 03/21/2013 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-009A) For Boiler(s) and Indirect Fired Process Heater(s) Each Greater Than or Equal to 10

More information

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68. RULE 69.4. STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted 9/27/94; Rev. Effective11/15/00; Rev. Effective 7/30/03) (a) APPLICABILITY (1) Except

More information

Major Amendment December 29, 1999 Total Facility Operating Permit February 12, 1996

Major Amendment December 29, 1999 Total Facility Operating Permit February 12, 1996 AIR EMISSION PERMIT NO. 03700015-001 IS ISSUED TO Northern States Power Company NSP - Inver Hills Generating Plant 3185 117th Street Inver Grove Heights, Dakota County, Minnesota 55077 The emission units,

More information

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3.

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3. VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 59 - ELECTRICAL POWER GENERATING EQUIPMENT - OXIDES OF NITROGEN EMISSIONS (Adopted 10/6/69, Revised 5/23/72, 7/18/72, 10/31/72, 8/14/79, 12/7/82, 6/4/91,

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power & Light and the City of Duluth

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power & Light and the City of Duluth AIR EMISSION PERMIT NO. 13700015-001 IS ISSUED TO Minnesota Power & Light and the City of Duluth MINNESOTA POWER AND LIGHT - ML HIBBARD 30 West Superior Street Duluth, St. Louis County, Minnesota 55802

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing

More information

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS GENERAL

More information

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert PA RACT 2 Reasonably Available Control Technology Presented by Suzanne Dibert Affected Facilities Facilities with potential emissions that exceed 100 tons per year (tpy) for NOx (nitrogen oxide) and 50

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION May 1, 2015 PERMIT TO INSTALL 4-13B ISSUED TO Zoetis LLC LOCATED AT 306 Pitcher Street Kalamazoo, Michigan IN THE COUNTY OF Kalamazoo STATE

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 206-14 Page 1 of 27 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit

More information

AIR PERMIT ABBEVILLE, HENRY COUNTY, ALABAMA DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE

AIR PERMIT ABBEVILLE, HENRY COUNTY, ALABAMA DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE AIR PERMIT PERMITTEE: FACILITY NAME: LOCATION: PEGASUS WEST, LLC PEGASUS WEST, LLC ABBEVILLE, HENRY COUNTY, ALABAMA PERMIT NUMBER 606-S008-X001 DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE Sawmill Green

More information

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE?

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE? OVERVIEW Compliance Webinar Reciprocating Internal Combustion Engines RICE September 16, 2013 Jesse Zahn, CHMM Jesse.zahn@hrpassociates.com HRP Associates, Inc. Clifton Park, NY 12065 What is RICE Unit

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 10, 2014 REVISED July 7, 2017 PERMIT TO INSTALL 97-14

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 10, 2014 REVISED July 7, 2017 PERMIT TO INSTALL 97-14 MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION September 10, 2014 REVISED July 7, 2017 PERMIT TO INSTALL 97-14 ISSUED TO Henry Ford Hospital System LOCATED AT HFHS Rochester Hills Data

More information

A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines

A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines Presented by: Brandon Guillory & Andy Goldberg AWMA October 29, 2009 1 New Source

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM June 17, 2004 SUBJECT: Review of Application Title V Operating Permit Bellefield Boiler Plant Boundary Street Pittsburgh, PA 15213 RE: Operating Permit

More information

RICE NESHAP RECORD KEEPING Stationary Engines

RICE NESHAP RECORD KEEPING Stationary Engines RICE NESHAP RECORD KEEPING Stationary Engines POWER PLANT COMPLIANCE Donna Oehm Some of the RICE NESHAP ZZZZ reporting requirements are like a $2 bill... *Relatively not in high demand *Legal obligation

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 118-18 Page 1 of 23 PERMIT TO INSTALL Table of Contents COMMON ACRONYMS... 2 POLLUTANT / MEASUREMENT ABBREVIATIONS... 3 GENERAL CONDITIONS... 4 EMISSION UNIT SPECIAL CONDITIONS... 6 EMISSION

More information

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations? Presented by Richard M. Cestone, PE, CHMM Birdsall Services Group For NJEWA Conference May 9, 2011 What happens when a permit has both federal and state regulations? 1 Facilities get confused with Federal

More information

AIR EMISSION PERMIT NO IS ISSUED TO. CertainTeed Corporation

AIR EMISSION PERMIT NO IS ISSUED TO. CertainTeed Corporation AIR EMISSION PERMIT NO. 13900013-003 IS ISSUED TO oration oration 3303 East 4th Avenue Shakopee, Scott County, MN 55379 The emission units, control equipment and emission stacks at the stationary source

More information

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published

More information

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater 11/21/2016 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-007) Boiler or Heater Greater than or equal to 1 MMBTU/hr and less than 5 MMBTU/hr

More information

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98)

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) RULE 69.3 STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) (a) APPLICABILITY This rule shall apply to any stationary

More information

AIR EMISSION PERMIT NO IS ISSUED TO

AIR EMISSION PERMIT NO IS ISSUED TO AIR EMISSION PERMIT NO. 13300023-002 IS ISSUED TO AGRI - ENERGY, LLC 502 South Walnut Luverne, Rock County, Minnesota 56156 FOR THE FACILITY PREVIOUSLY PERMITTED UNDER AIR EMISSION PERMIT NO. 13300023-001

More information

COMMONWEALTH OF VIRGINIA STATE AIR POLLUTION CONTROL BOARD 9VAC5 CHAPTER 540. EMERGENCY GENERATOR GENERAL PERMIT

COMMONWEALTH OF VIRGINIA STATE AIR POLLUTION CONTROL BOARD 9VAC5 CHAPTER 540. EMERGENCY GENERATOR GENERAL PERMIT COMMONWEALTH OF VIRGINIA STATE AIR POLLUTION CONTROL BOARD 9VAC5 CHAPTER 540. EMERGENCY GENERATOR GENERAL PERMIT Part I Definitions. 9VAC5-540-10. 9VAC5-540-20. General. Terms defined. Part II General

More information

Electrical Power Generator Use and Procurement Guidance

Electrical Power Generator Use and Procurement Guidance Electrical Power Generator Use and Procurement Guidance For compliance with applicable air emission control regulations December 2016 Prepared by: Syracuse University Environmental Health & Safety Services

More information

RULE 2280 PORTABLE EQUIPMENT REGISTRATION (Adopted October 20, 1994; Amended May 16, 1996)

RULE 2280 PORTABLE EQUIPMENT REGISTRATION (Adopted October 20, 1994; Amended May 16, 1996) RULE 2280 PORTABLE EQUIPMENT REGISTRATION (Adopted October 20, 1994; Amended May 16, 1996) 1.0 Purpose The purpose of this rule is to provide an administrative mechanism, and establish standards for registration

More information

Regulatory and Permitting Requirements of Stationary Generators In Delaware

Regulatory and Permitting Requirements of Stationary Generators In Delaware Regulatory and Permitting Requirements of Stationary Generators In Delaware Delaware - DNREC Air Quality Management February 7, 2006 Mark A. Prettyman and Guadalupe J. Reynolds Outline Regulation No. 1144

More information

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Newport Terminal Corp

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Newport Terminal Corp DRAFT AIR EMISSION PERMIT NO. 16300010 005 Major Amendment IS ISSUED TO Newport Terminal Corp NEWPORT TERMINAL CORP 50 21st Street Newport, Washington County, MN 55055 The emission units, control equipment

More information