AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation

Size: px
Start display at page:

Download "AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation"

Transcription

1 AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO Mayo Foundation St Marys 1216 Southwest 2nd Street Rochester, Olmsted County, MN The emission units, control equipment and emission stacks at the stationary source authorized in this permit reissuance are as described in the Permit Applications Table. Upon issuance, this permit supersedes Air Emission Permit No and authorizes the Permittee to operate the stationary source at the address listed above unless otherwise noted in Table A. The Permittee must comply with all the conditions of the permit. Any changes or modifications to the stationary source must be performed in compliance with Minn. R to Any additions or changes to conditions incorporated into Minnesota s State Implementation Plan (SIP) under 40 CFR , designated Title I: SIP for SO 2 NAAQS must go through the federal SIP approval process before becoming effective. Terms used in the permit are as defined in the state air pollution control rules unless the term is explicitly defined in the permit. Unless otherwise indicated, all the Minnesota rules cited as the origin of the permit terms are incorporated into the SIP under 40 CFR and as such as are enforceable by U.S. Environmental Protection Agency (EPA) Administrator or citizens under the Clean Air Act. Permit Type: Federal Permit; Part 70/Major for NSR; Title I SIP Conditions for SO 2 Operating Permit Issue Date: December 28, 2010 Expiration Date: December 28, 2015 All Title I Conditions do not expire. Each new or revised condition designated Title I Condition: SIP for SO 2 is not effective or enforceable until approved by EPA as a SIP revision under Title I of the Clean Air Act. Don Smith, Manager Air Quality Permits Section Industrial Division for Paul Eger Commissioner Minnesota Pollution Control Agency TDD (for hearing and speech impaired only): (651) Printed on recycled paper containing at least 10% fibers from paper recycled by consumers

2 Permit Applications Table Permit Type Application Date Permit Action Total Facility Operating Permit -Reissuance January 23, TABLE OF CONTENTS Notice to the Permittee Permit Shield Facility Description Table A: Limits and Other Requirements Table B: Submittals Table C: Compliance Schedule: not used in this permit Appendix A: not used in this permit Appendix B: Modeling Parameters Appendix C: Insignificant Activities Appendix D: Subpart WWWWW Requirements for New Ethylene Oxide Sterilizers Appendix E: Subpart WWWWW Requirements for Existing Ethylene Oxide Sterilizers

3 NOTICE TO THE PERMITTEE: Your stationary source may be subject to the requirements of the Minnesota Pollution Control Agency s (MPCA) solid waste, hazardous waste, and water quality programs. If you wish to obtain information on these programs, including information on obtaining any required permits, please contact the MPCA general information number at: Metro Area Outside Metro Area TTY The rules governing these programs are contained in Minn. R. chs Written questions may be sent to: Minnesota Pollution Control Agency, 520 Lafayette Road North, St. Paul, Minnesota Questions about this air emission permit or about air quality requirements can also be directed to the telephone numbers and address listed above. PERMIT SHIELD: Subject to the limitations in Minn. R , compliance with the conditions of this permit shall be deemed compliance with the specific provision of the applicable requirement identified in the permit as the basis of each condition. Subject to the limitations of Minn. R and , subp. 2, notwithstanding the conditions of this permit specifying compliance practices for applicable requirements, any person (including the Permittee) may also use other credible evidence to establish compliance or noncompliance with applicable requirements. FACILITY DESCRIPTION: St. Marys is a tertiary care hospital which includes several buildings located on a 49 acre campus. The primary emission units at the facility are three identical boilers which exhaust through a common stack, one cogeneration turbine, two emergency generators, and one nonemergency generator. Each boiler combusts natural gas with distillate fuel as backup. The cogeneration turbine burns only natural gas. One generator burns only distillate oil; the other two can burn distillate oil or natural gas (with a small amount of distillate oil; dual fuel). While St. Marys is owned and operated by the Mayo Foundation, it is not contiguous with the majority of the Mayo facilities in Rochester, and thus is a separate source under the New Source Review and Part 70 regulations. The facility is an existing major source under New Source Review and a minor HAP source. The facility is located in an area that was previously designated as non-attainment for SO 2. However, the area currently meets the ambient air quality standards, and was officially redesignated as attainment on May 8, The previous permit ( ), which includes the requirements contributing to the correction of the non-attainment problem and ultimate redesignation, was incorporated into Minnesota s State Implementation Plan (SIP) on October 12, 2010, with the requirements designated as non-expiring Title I conditions. This permit ( ) does not include changes to any of those requirements.

4 TABLE A: LIMITS AND OTHER REQUIREMENTS A-1 12/28/10 Facility Name: Permit Number: St Marys Table A contains limits and other requirements with which your facility must comply. The limits are located in the first column of the table (What To do). The limits can be emission limits or operational limits. This column also contains the actions that you must take and the records you must keep to show that you are complying with the limits. The second column of Table A (Why to do it) lists the regulatory basis for these limits. Appendices included as conditions of your permit are listed in Table A under total facility requirements. Subject Item: Total Facility What to do SITE-SPECIFIC REQUIREMENTS hdr Why to do it Parameters Used in Modeling: The stack parameters used in the most recently approved modeling are listed in Appendix B of this permit. Before making any physical changes or changes in the method of operation which may affect parameters listed in Appendix B, the Permittee shall demonstrate to the MPCA that the SO2 plume dispersion characteristics following the physical change or change in method of operation will be equivalent to or better than the SO2 dispersion characteristics modeled using the parameters in Appendix B. The information submitted must include, at a minimum, the locations, heights, and diameters of the stacks, locations and dimensions of nearby buildings, the velocity and temperature of the gasses emitted, and the SO2 emission rates. If the information does not demonstrate equivalent or better dispersion characteristics, or if a conclusion cannot readily be made about the dispersion, the Permittee must remodel. ACTIVITIES NOT REQUIRING A MODIFICATION TO THE SIP: The Permittee is authorized to make changes to the facility in compliance with Minnesota Rules and without obtaining a modification to the SIP as long as the change does not increase from any emission point, the SO2 emission rates (in lb/hr) or overall SO2 emissions or alter equipment or parameters described in Appendix B, which forms the basis for the SO2 modeling, unless such alteration demonstrates equivalent or better dispersion characteristics. Deviations from requirements cited as "Title I Condition: SIP for SO2 NAAQS" shall be reported semiannually with the Semiannual Deviations Report required by this permit (See Table B). Reporting for these conditions shall occur even if there were no deviations for the reporting period. State Implementation Plan Recordkeeping: Retain all records at the stationary source for a period of five years from the date of the required monitoring, sample, measurement, or report that corresponds with a "Title I Condition: SIP for SO2 NAAQS" requirement. The facility currently uses ozone-depleting substances as defined in 40 CFR pt. 82. Sections of the 1990 Clean Air Act Amendments and 40 CFR pt. 82 may apply to your facility. Read Sections and 40 CFR pt. 82 to determine all the requirements that apply to your facility. DETERMINING IF A PROJECT/MODIFICATION IS SUBJECT TO NSR These requirements apply if a reasonable possibility (RP) as defined in 40 CFR Section 52.21(r)(6)(vi) exists that a proposed project, analyzed using the actual-to-projected-actual (ATPA) test (either by itself or as part of the hybrid test at Section 52.21(a)(2)(iv)(f)) and found to not be part of a major modification, may result in a significant emissions increase (SEI). If the ATPA test is not used for the project, or if there is no RP that the proposed project could result in a SEI, these requirements do not apply to that project. The Permittee is only subject to the Preconstruction Documentation requirement for a project where a RP occurs only within the meaning of Section 52.2(r)(6)(vi)(a). Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan 40 CFR pt. 82 hdr Title I Condition: 40 CFR Section 52.21(r)(6); Minn. R ; Minn. R , subp. 2 Even though a particular modification is not subject to New Source Review (NSR), or where there isn't a RP that a proposed project could result in a SEI, a permit amendment, recordkeeping, or notification may still be required by Minn. R

5 TABLE A: LIMITS AND OTHER REQUIREMENTS A-2 12/28/10 Permit Number: Preconstruction Documentation -- Before beginning actual construction on a project, the Permittee shall document the following: 1. Project description 2. Identification of any emission unit (EU) whose emissions of an NSR pollutant could be affected 3. Pre-change potential emissions of any affected existing EU, and the projected post-change potential emissions of any affected existing or new EU. 4. A description of the applicability test used to determine that the project is not a major modification for any regulated NSR pollutant, including the baseline actual emissions, the projected actual emissions, the amount of emissions excluded due to increases not associated with the modification and that the EU could have accommodated during the baseline period, an explanation of why the amounts were excluded, and any creditable contemporaneous increases and decreases that were considered in the determination. Title I Condition: 40 CFR Section 52.21(r)(6); Minn. R ; Minn. R , subp. 4; Minn. R , subps. 4 & 5 The Permittee shall maintain records of this documentation. The Permittee shall monitor the actual emissions of any regulated NSR pollutant that could increase as a result of the project and that were analyzed using the ATPA test, and the potential emissions of any regulated NSR pollutant that could increase as a result of the project and that were analyzed using potential emissions in the hybrid test. The Permittee shall calculate and maintain a record of the sum of the actual and potential (if the hybrid test was used in the analysis) emissions of the regulated pollutant, in tons per year on a calendar year basis, for a period of 5 years following resumption of regular operations after the change, or for a period of 10 years following resumption of regular operations after the change if the project increases the design capacity of or potential to emit of any unit associated with the project. The Permittee must submit a report to the Agency if the annual summed (actual, plus potential if used in hybrid test) emissions differ from the preconstruction projection and exceed the baseline actual emissions by a significant amount as listed at 40 CFR Section 52.21(b)(23). Such report shall be submitted to the Agency within 60 days after the end of the year in which the exceedances occur. The report shall contain: Title I Condition: 40 CFR Section 52.21(r)(6); Minn. R ; Minn. R , subps. 4 & 5 Title I Condition: 40 CFR Section 52.21(r)(6); Minn. R ; Minn. R , subps. 4 & 5 a. The name and ID number of the facility, and the name and telephone number of the facility contact person b. The annual emissions (actual, plus potential if any part of the project was analyzed using the hybrid test) for each pollutant for which the preconstruction projection and significant emissions increase are exceeded. c. Any other information, such as an explanation as to why the summed emissions differ from the preconstruction projection. OPERATIONAL REQUIREMENTS Circumvention: Do not install or use a device or means that conceals or dilutes emissions, which would otherwise violate a federal or state air pollution control rule, without reducing the total amount of pollutant emitted. Operation Changes: In any shutdown, breakdown, or deviation the Permittee shall immediately take all practical steps to modify operations to reduce the emission of any regulated air pollutant. The Commissioner may require feasible and practical modifications in the operation to reduce emissions of air pollutants. No emissions units that have an unreasonable shutdown or breakdown frequency of process or control equipment shall be permitted to operate. Fugitive Emissions: Do not cause or permit the handling, use, transporting, or storage of any material in a manner which may allow avoidable amounts of particulate matter to become airborne. Comply with all other requirements listed in Minn. R Noise: The Permittee shall comply with the noise standards set forth in Minn. R to at all times during the operation of any emission units. This is a state only requirement and is not enforceable by the EPA Administrator or citizens under the Clean Air Act. Inspections: The Permittee shall comply with the inspection procedures and requirements as found in Minn. R , subp. 9(A). The Permittee shall comply with the General Conditions listed in Minn. R , subp. 16. RECORDKEEPING hdr Minn. R Minn. R , subp. 4 Minn. R Minn. R Minn. R , subp. 9(A) Minn. R , subp. 16 hdr

6 TABLE A: LIMITS AND OTHER REQUIREMENTS A-3 12/28/10 Permit Number: Recordkeeping: Retain all records at the stationary source for a period of five (5) years from the date of monitoring, sample, measurement, or report. Records which must be retained at this location include all calibration and maintenance records, all original recordings for continuous monitoring instrumentation, and copies of all reports required by the permit. Records must conform to the requirements listed in Minn. R , subp. 5(A). Recordkeeping: Maintain records describing any insignificant modifications (as required by Minn. R , subp. 3) or changes contravening permit terms (as required by Minn. R , subp. 2), including records of the emissions resulting from those changes. Recordkeeping: If the Permittee determines that no permit amendment or notification is required prior to making a change, the Permittee must retain records of all calculations required under Minn. R These records shall be kept for a period of five years from the date the change was made or until permit reissuance, whichever is longer. The records shall be kept at the stationary source for the current calendar year of operation and may be kept at the stationary source or office of the stationary source for all other years. The records may be maintained in either electronic or paper format. REPORTING/SUBMITTALS Shutdown Notifications: Notify the Commissioner at least 24 hours in advance of a planned shutdown of any control equipment or process equipment if the shutdown would cause any increase in the emissions of any regulated air pollutant. If the owner or operator does not have advance knowledge of the shutdown, notification shall be made to the Commissioner as soon as possible after the shutdown. However, notification is not required in the circumstances outlined in Items A, B, and C of Minn. R , subp. 3. At the time of notification, the owner or operator shall inform the Commissioner of the cause of the shutdown and the estimated duration. The owner or operator shall notify the Commissioner when the shutdown is over. Breakdown Notifications: Notify the Commissioner within 24 hours of a breakdown of more than one hour duration of any control equipment or process equipment if the breakdown causes any increase in the emissions of any regulated air pollutant. The 24-hour time period starts when the breakdown was discovered or reasonably should have been discovered by the owner or operator. However, notification is not required in the circumstances outlined in Items A, B, and C of Minn. R , subp. 2. Minn. R , subp. 5(C) Minn. R , subp. 5(B) Minn. R , subp. 4 hdr Minn. R , subp. 3 Minn. R , subp. 2 At the time of notification or as soon as possible thereafter, the owner or operator shall inform the Commissioner of the cause of the breakdown and the estimated duration. The owner or operator shall notify the Commissioner when the breakdown is over. Notification of Deviations Endangering Human Health or the Environment: As soon Minn. R , subp. 1 as possible after discovery, notify the Commissioner or the state duty officer, either orally or by facsimile, of any deviation from permit conditions which could endanger human health or the environment. Notification of Deviations Endangering Human Health or the Environment Report: Minn. R , subp. 1 Within 2 working days of discovery, notify the Commissioner in writing of any deviation from permit conditions which could endanger human health or the environment. Include the following information in this written description: 1. the cause of the deviation; 2. the exact dates of the period of the deviation, if the deviation has been corrected; 3. whether or not the deviation has been corrected; 4. the anticipated time by which the deviation is expected to be corrected, if not yet corrected; and 5. steps taken or planned to reduce, eliminate, and prevent reoccurrence of the deviation. Application for Permit Amendment: If a permit amendment is needed, submit an Minn. R through Minn. R application in accordance with the requirements of Minn. R through Minn. R Submittal dates vary, depending on the type of amendment needed.

7 TABLE A: LIMITS AND OTHER REQUIREMENTS A-4 12/28/10 Permit Number: Application for a major permit amendment: If any EU 012 NOx emission factor verification test measures the EU 012 NOx emission factor at g/hp-hr or greater, the Permittee shall submit an application for a major amendment. The application shall propose a reduction of the 2045 hr/yr EU 012 operating limit to a level that will limit EU 012 NOx emissions to no greater than 38.0 tons per year. Title I Condition: To avoid major modification status under 40 CFR Section 52.21(b)(2)(i) and Minn. R The application shall be submitted no later than 30 days after the Permittee's receipt of the MPCA letter approving the performance test results (i.e. a Notice of Verification). This requirement is repeated under Subject Item EU 012. Extension Requests: The Permittee may apply for an Administrative Amendment Minn. R , subp. 1(H) to extend a deadline in a permit by no more than 120 days, provided the proposed deadline extension meets the requirements of Minn. R , subp. 1(H). Emission Inventory Report: due on or before April 1 of each calendar year following Minn. R through Minn. R permit issuance. The report shall be submitted on a form approved by the Commissioner. Emission Fees: due 60 days after receipt of an MPCA bill. Minn. R through Minn. R

8 TABLE A: LIMITS AND OTHER REQUIREMENTS A-5 12/28/10 Permit Number: Subject Item: GP 001 Boilers Associated Items: EU 001 Boiler 1 EU 002 Boiler 2 EU 003 Boiler 3 EMISSION AND OPERATING LIMITS What to do hdr Why to do it Fuel Used: The Permittee shall burn only natural gas or very low sulfur oil, as defined in 40 CFR Section 60.41b. Sulfur Content of Fuel: less than or equal to 0.50 percent by weight (meets specifications of very low sulfur oil as defined in 40 CFR Section 60.41b) Nitrogen Oxides: less than or equal to 0.10 lbs/million Btu heat input using 30-day Rolling Average. This standard applies at all times. Opacity: less than or equal to 20 percent opacity using 6-minute Average, except for one 6-minute period per hour of not more than 27 percent opacity. This standard applies at all times except during periods of startup, shutdown, or malfunction. MONITORING REQUIREMENTS Sulfur Content of Fuel Oil: The Permittee shall obtain and maintain a fuel supplier receipt from the fuel oil supplier for each shipment of oil received, certifying that the oil meets the definition of very low sulfur oil as defined in 40 CFR Section 60.41b. The Permittee shall ensure that the fuel supplier uses an approved American Society of Testing and Materials (ASTM) method to determine the sulfur content of liquid fuels. NOx Emissions: The Permittee shall calibrate, maintain, and operate a continuous emission monitoring system (CEMS), and record the output of the system, for measuring NOx emissions discharged to the atmosphere. As allowed by 40 CFR 60.13(g), the Permittee operates one CEMS in the common duct for the three boilers. Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan; 40 CFR Section 60.42b(j); Minn. R CFR Section 60.44b(a); 40 CFR Section 60.46b(a); Minn. R CFR Section 60.43b(f) and (g); 40 CFR Section 60.46b(a); Minn. R hdr Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan; 40 CFR Section 60.42b(j)(2); Minn. R CFR Section 60.48b(b)(1), (c), and (d); 40 CFR Section 60.13(g); Minn. R The CEMS shall be operated and data recorded during all periods of operation of the boilers, except for CEMS breakdowns and repairs. Data is recorded during calibration checks, and zero and span adjustments. The 1-hour average NOx emission rates measured by the CEMS shall be expressed in lb/million Btu heat input, and shall be used to calculate the average emission rates. At least 2 data points must be used to calculate each 1-hour average. [For additional monitoring requirements, see Subject Item MR001.] When NOx emissions data are not obtained because of CEMs breakdowns or repairs, data will be obtained by using standby monitoring systems, Method 7 or 7A, or other approved reference methods to provide data for a minimum of 75% of the operating hours in each steam generating unit operating day, in at least 22 out of 30 successive steam generating unit operating days. Opacity: The Permittee shall calibrate, maintain, and operate a continuous monitoring system for measuring the opacity of emissions discharged to the atmosphere, and record the output of the system. 40 CFR Section 60.48b(f); Minn. R CFR Section 60.48b(a); 40 CFR Section 60.13(g); Minn. R As allowed by 40 CFR 60.13(g), the Permittee operates one COMS in the common duct for the three boilers. [For additional monitoring requirements, see Subject Item MR003.] PERFORMANCE TESTING REQUIREMENTS hdr Upon request, the Permittee shall use a 30-day performance test to determine compliance with the NOx standard. During periods when performance tests are not requested, NOx emission data collected via the CEM shall be used to calculate a 30-day rolling average emission rate on a daily basis and used to prepare excess emission reports, but will not be used to determine compliance with the NOx emission standard. A new 30-day rolling average emission rate is calculated each steam generating unit operating day as the average of all of the hourly NOx emission data for the preceding 30 steam generating unit operating days. RECORDKEEPING AND REPORTING REQUIREMENTS 40 CFR Section 60.46b(e)(4); Minn. R hdr

9 TABLE A: LIMITS AND OTHER REQUIREMENTS A-6 12/28/10 Permit Number: The Permittee shall record and maintain records of the amounts of each fuel combusted each day and calculate the annual capacity factor individually for distillate oil and natural gas. The annual capacity factor is determined on a 12-month rolling average basis with a new annual capacity factor calculated at the end of each calendar month. The Permittee shall maintain records of opacity.(see Subject Item MR003 for additional detail.) The Permittee shall maintain records of the following information for each steam generating unit operating day: (1) Calendar date. (2) The average hourly NOx emission rates (expressed as NO2), in lb/million Btu heat input. (3) The 30-day average NOx emission rates calculated at the end of each steam generating unit operating day. (4) Identification of the steam generating unit operating days when the calculated 30-day average NOx emission rates are in excess of the NOx emission standard, including the reasons for the excess emissions and a description of corrective actions taken. (5) Identification of the steam generating unit operation days for which data have not been obtained including reasons for not obtaining sufficient data and a description of corrective actions taken. (6) Identification of the times when emission data have been excluded from the calculation of average emission rates and the reasons for excluding data. (7) Identification of "F" factor used for calculations, method of determination, and type of fuel combusted. (8) Identification of the times when the pollutant concentration exceeded full span of the CEMS. (9) Description of any modifications to the CEMS that could affect the ability of the CEMS to comply with Performance Specification 2 or CFR Section 60.49b(d); Minn. R CFR Section 60.49b(f); Minn. R CFR Section 60.49b(g); Minn. R continued from above

10 TABLE A: LIMITS AND OTHER REQUIREMENTS A-7 12/28/10 Permit Number: Subject Item: GP 002 Boilers and Generators Associated Items: EU 001 Boiler 1 EU 002 Boiler 2 EU 003 Boiler 3 EU 004 Generator 5 EU 005 Generator 6 EU 012 Generator 7 (Non-emergency CI; <10 liter/cyl; 2500 kw) EMISSION LIMITS What to do hdr Why to do it Sulfur Dioxide: less than or equal to tons/year using 12-month Rolling Sum calculated monthly, as described below. MONITORING AND RECORDKEEPING Daily recordkeeping: Each day, record the total quantity of each type of fuel burned, and the sulfur content by weight of fuel oil in the tank from which oil is drawn on that day. Monthly Recordkeeping: SO2 Emissions Title I Condition: To avoid classification as a major modification under 40 CFR Section and Minn. R (limit originally set 3/27/91) hdr Title I Condition: To avoid classification as a major modification under 40 CFR Section and Minn. R Minn. R , subp. 4 and 5 By the 15th day of each month, calculate and record the following: a. The total quantity of natural gas used in the GP002 units during the previous month (G), in million cubic feet b. The total quantity of sulfur contained in distillate oil used in the GP002 units during the month (S), in pounds, calculated by multiplying the gallons of oil with sulfur content "x" by "x" and the density of the oil (pounds/gallon), plus the gallons of oil with sulfur content "y" by "y" and the density of the oil, etc. c. The SO2 emissions for the previous months (E), in tons, using the following equation: E = S G, where: = [(2 pounds of SO2/pound of sulfur) x (1 ton/2000 pounds)] and = [(0.6 pounds of SO2/million cubic feet of natural gas) x (1 ton/2000 pounds)] The 12-month rolling sum is calculated by summing the values of "E" calculated for the previous 12 months.

11 TABLE A: LIMITS AND OTHER REQUIREMENTS A-8 12/28/10 Facility Name: Permit Number: St Marys Subject Item: EU 004 Generator 5 Associated Items: GP 002 Boilers and Generators SV 002 No. 5 Generator Stack What to do Why to do it Fuel: The Permittee shall burn only diesel fuel oil in the generator. Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan Opacity: less than or equal to 20 percent opacity once operating temperatures have Minn. R , subp. 1 been attained Sulfur Dioxide: less than or equal to 0.50 lbs/million Btu heat input. The potential to Minn. R , subp. 2 emit from the unit is lb/mmbtu due to equipment design and allowable fuels. Sulfur Content of Fuel: less than or equal to 15 parts per million by weight as specified at 40 CFR Section (b)(1) for nonroad diesel fuel. This requirement is effective October 1, Diesel Fuel Sulfur Content Certification: The Permittee shall obtain and retain a written guarantee from the fuel supplier indicating that each shipment of diesel fuel delivered to the Facility for use in EU 004 will contain no more than percent by weight sulfur (15 ppmw) beginning October 1, Subpart ZZZZ Requirements - The following requirements are not effective until May 3, 2013 Carbon Monoxide: less than or equal to 23 parts per million (ppmvd) at 15% oxygen, or reduce CO emissions by 70% or more, beginning 5/3/2013. During periods of startup, you must minimize the engine's time spent at idle and minimize the startup time to a period needed for appropriate and safe loading of the engine, not to exceed 30 minutes. Comply with the applicable portions of Table 2b of 40 CFR part 63, Subpart ZZZZ, begining 5/3/2013 (applicability depends upon whether or not an oxidiation catalyst is used). Diesel Fuel Use: Beginning 5/3/2013, diesel fuel must meet the requirements in 40 CFR (b) for non-road diesel fuel. Beginning 5/3/2013: (a) You must be in compliance with the applicable emission limitations and operating limitations at all times; and (b) At all times, you must operate and maintain the generator and any associated air pollution control equipment and monitoring equipment in a manner consistent with safety and good air pollution control practices for minimizing emissions. The general duty to minimize emissions does not require you to make any further efforts to reduce emissions if levels required by the standard have been achieved. Determination of whether such O&M procedures are being used will be based on information available to the Administrator, which may include, but is not limited to, monitoring results, review of O&M procedures, review of O&M records, and inspection of the source. Initial Performance Test: due 180 days after 05/03/2013, according to the requirements of Table 4 of 40 CFR part 63, Subpart ZZZZ, and 40 CFR Section (d)-(g). During the initial performance test, you must establish each applicable operating limitation in Table 2b of 40 CFR part 63, Subpart ZZZZ. You must conduct an initial compliance demonstration according to Table 5 of 40 CFR part 63, Subpart ZZZZ, within 180 days after 5/3/2013. Subsequent Performance Tests: Conduct subsequent performance tests every 8760 hours or 3 years, whichever comes first. If you are using a continuous parameter monitoring system (CPMS) as specified in Table 5 of 40 CFR part 63, Subpart ZZZZ, you must install, operate, and maintain the CPMS according to the requirements in 40 CFR Section (b)(1)-(b)(8). Beginning 5/3/2013, monitor and collect data according to the following: Except for monitor malfunctions, associated repairs, and required quality assurance or control activities (including, as applicable, calibration checks and required zero and span adjustments), you must monitor continuously at all times that the stationary RICE is operating. You may not use data recorded during monitoring malfunctions, associated repairs, and required quality assurance or control activities in data averagea and calculations used to report emission or operating levels. You must, howerver, use all the valid data collected during all other periods. Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan; meets requirements of Minn. R , subp. 2 Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan hdr 40 CFR Section (a); Minn. R CFR Section (a); Minn. R CFR Section ; Minn. R CFR Section ; Minn. R CFR Section (a); 40 CFR Section (b); Minn. R CFR Section (a); 40 CFR Section (a); Minn. R CFR Section ; Minn. R CFR Section (b); Minn. R CFR Section ; Minn. R

12 TABLE A: LIMITS AND OTHER REQUIREMENTS A-9 12/28/10 Permit Number: Beginning 5/13/2013, you must demonstrate continuous compliance with the CO concentration or reduction requirements according to the methods in Table 6 of 40 CFR part 63, Supbart ZZZZ. Notification of Intent to conduct a performance test: due 60 days before the performance test is scheduled to begin. Notification of CMS performance evaluation: due simultaneously with the Notification of Intent to conduct a performance test. Notification of Compliance Status: If the initial compliance demonstration does not include a performance test, the Notification of Compliance Status must be submitted before the close of business on the 30th day following the completion of the initial compliance demonstration. If the initial compliance demonstration does include a performance test, the Notification of Compliance Status must be submitted efore the close of business on the 60th day following the completion of the initial compliance demonstratin. Semiannual Compliance Report: A semiannual compliance report meeting the requirements shown in Table 7 of 40 CFR part 63, subpart ZZZZ is required. The report may be submitted with the Semiannual Deviations Report as listed in Table B of this permit. The Report must include the information described in 40 CFR Section (c) and Table 7 of 40 CFR part 63, subpart ZZZZ. Recordkeeping: Beginning 5/13/2013, you must keep the following records: - A copy of each notification and report submitted to comply with Subpart ZZZZ, including all documentation supporting any Initial Notification or Notification of Compliance Status; 40 CFR Section (a); Minn. R CFR Section (a) and (g); 40 CFR Section 63.7(b); 40 CFR Section 63.9(e); Minn. R CFR Section (a); 40 CFR Section 63.9(g); Minn. R CFR Section (a); 40 CFR Section (c); 40 CFR Section 63.9(h); Minn. R CFR Section (a), (b)(5), and (c); Minn. R CFR Section (a) and (d); Minn. R Records of the occurrence and duration of each malfunction of process equipment or air pollution control and monitoring equipment; - Records of performance tests and performance evaluations; - Records of all required maintenance performed on the air pollution control and monitoring equipment; - Records of actions taken during periods of malfunction to minimize emissions, including all corrective actions; and - Applicable records required by Table 6 of 40 CFR part 63, subpart ZZZZ. Recordkeeping for CEMS or CPMS: Beginning 5/3/2013, you must keep the following records: 40 CFR Section (b); Minn. R Records described in 40 CFR Section 63.10(b)(2)(vi) - (xi); - Previous (superseded) versions of the performance evaluation plan as required in 40 CFR Section 63.8(d)(3); and - Requests for alternatives to the relative accuracy test for CEMS or CPMS as required in 40 CFR Section 63.8(f)(6)(i) (if applicable).

13 TABLE A: LIMITS AND OTHER REQUIREMENTS A-10 12/28/10 Facility Name: Permit Number: St Marys Subject Item: EU 005 Generator 6 Associated Items: GP 002 Boilers and Generators SV 003 No. 6 Generator Stack What to do Why to do it Fuel: The Permittee shall burn only natural gas or diesel fuel oil in the generator. Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan Sulfur Content of Fuel: less than or equal to 15 parts per million by weight as specified at 40 CFR Section (b)(1) for nonroad diesel fuel. This requirement is effective October 1, Opacity: less than or equal to 20 percent opacity once operating temperatures have been attained Sulfur Dioxide: less than or equal to 0.50 lbs/million Btu heat input. The potential to emit from the unit is lb/mmbtu due to equipment design and allowable fuels. Operating Hours: less than or equal to 1040 hours/year using 12-month Rolling Sum Recordkeeping - Hours of Operation: By the 15th day of each month, calculate and record the hours the generator was operated during the previous month, and the total hours operated during the previous 12 months. Diesel Fuel Sulfur Content Certification: The Permittee shall obtain and retain a written guarantee from the fuel supplier indicating that each shipment of diesel fuel delivered to the Facility for use in EU 005 will contain no more than percent by weight sulfur (15 ppmw) beginning October 1, Subpart ZZZZ Requirements - The following requirements are not effective until May 3, 2013 Carbon Monoxide: less than or equal to 23 parts per million (ppmvd) at 15% oxygen, or reduce CO emissions by 70% or more, beginning 5/3/2013. During periods of startup, you must minimize the engine's time spent at idle and minimize the startup time to a period needed for appropriate and safe loading of the engine, not to exceed 30 minutes. Comply with the applicable portions of Table 2b of 40 CFR part 63, Subpart ZZZZ, begining 5/3/2013 (applicability depends upon whether or not an oxidiation catalyst is used). Diesel Fuel Use: Beginning 5/3/2013, diesel fuel must meet the requirements in 40 CFR (b) for non-road diesel fuel. Beginning 5/3/2013: (a) You must be in compliance with the applicable emission limitations and operating limitations at all times; and (b) At all times, you must operate and maintain the generator and any associated air pollution control equipment and monitoring equipment in a manner consistent with safety and good air pollution control practices for minimizing emissions. The general duty to minimize emissions does not require you to make any further efforts to reduce emissions if levels required by the standard have been achieved. Determination of whether such O&M procedures are being used will be based on information available to the Administrator, which may include, but is not limited to, monitoring results, review of O&M procedures, review of O&M records, and inspection of the source. Initial Performance Test: due 180 days after 05/03/2013, according to the requirements of Table 4 of 40 CFR part 63, Subpart ZZZZ, and 40 CFR Section (d)-(g). During the initial performance test, you must establish each applicable operating limitation in Table 2b of 40 CFR part 63, Subpart ZZZZ. You must conduct an initial compliance demonstration according to Table 5 of 40 CFR part 63, Subpart ZZZZ, within 180 days after 5/3/2013. Subsequent Performance Tests: Conduct subsequent performance tests every 8760 hours or 3 years, whichever comes first. If you are using a continuous parameter monitoring system (CPMS) as specified in Table 5 of 40 CFR part 63, Subpart ZZZZ, you must install, operate, and maintain the CPMS according to the requirements in 40 CFR Section (b)(1)-(b)(8). Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan; meets requirements of Minn. R , subp. 2 Minn. R , subp. 1 Minn. R , subp. 2 Title I Condition: To avoid classification as a major modification under 40 CFR Section and Minn. R Title I Condition: To avoid classification as a major modification under 40 CFR Section and Minn. R Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan hdr 40 CFR Section (a); Minn. R CFR Section (a); Minn. R CFR Section ; Minn. R CFR Section ; Minn. R CFR Section (a); 40 CFR Section (b); Minn. R CFR Section (a); 40 CFR Section (a); Minn. R CFR Section ; Minn. R CFR Section (b); Minn. R

14 TABLE A: LIMITS AND OTHER REQUIREMENTS A-11 12/28/10 Permit Number: Beginning 5/3/2013, monitor and collect data according to the following: 40 CFR Section ; Minn. R Except for monitor malfunctions, associated repairs, and required quality assurance or control activities (including, as applicable, calibration checks and required zero and span adjustments), you must monitor continuously at all times that the stationary RICE is operating. You may not use data recorded during monitoring malfunctions, associated repairs, and required quality assurance or control activities in data averagea and calculations used to report emission or operating levels. You must, howerver, use all the valid data collected during all other periods. Beginning 5/13/2013, you must demonstrate continuous compliance with the CO concentration or reduction requirements according to the methods in Table 6 of 40 CFR part 63, Supbart ZZZZ. Notification of Intent to conduct a performance test: due 60 days before the performance test is scheduled to begin. Notification of CMS performance evaluation: due simultaneously with the Notification of Intent to conduct a performance test. Notification of Compliance Status: If the initial compliance demonstration does not include a performance test, the Notification of Compliance Status must be submitted before the close of business on the 30th day following the completion of the initial compliance demonstration. If the initial compliance demonstration does include a performance test, the Notification of Compliance Status must be submitted efore the close of business on the 60th day following the completion of the initial compliance demonstratin. Semiannual Compliance Report: A semiannual compliance report meeting the requirements shown in Table 7 of 40 CFR part 63, subpart ZZZZ is required. The report may be submitted with the Semiannual Deviations Report as listed in Table B of this permit. The Report must include the information described in 40 CFR Section (c) and Table 7 of 40 CFR part 63, subpart ZZZZ. Recordkeeping: Beginning 5/13/2013, you must keep the following records: - A copy of each notification and report submitted to comply with Subpart ZZZZ, including all documentation supporting any Initial Notification or Notification of Compliance Status; 40 CFR Section (a); Minn. R CFR Section (a) and (g); 40 CFR Section 63.7(b); 40 CFR Section 63.9(e); Minn. R CFR Section (a); 40 CFR Section 63.9(g); Minn. R CFR Section (a); 40 CFR Section (c); 40 CFR Section 63.9(h); Minn. R CFR Section (a), (b)(5), and (c); Minn. R CFR Section (a) and (d); Minn. R Records of the occurrence and duration of each malfunction of process equipment or air pollution control and monitoring equipment; - Records of performance tests and performance evaluations; - Records of all required maintenance performed on the air pollution control and monitoring equipment; - Records of actions taken during periods of malfunction to minimize emissions, including all corrective actions; and - Applicable records required by Table 6 of 40 CFR part 63, subpart ZZZZ. Recordkeeping for CEMS or CPMS: Beginning 5/3/2013, you must keep the following records: 40 CFR Section (b); Minn. R Records described in 40 CFR Section 63.10(b)(2)(vi) - (xi); - Previous (superseded) versions of the performance evaluation plan as required in 40 CFR Section 63.8(d)(3); and - Requests for alternatives to the relative accuracy test for CEMS or CPMS as required in 40 CFR Section 63.8(f)(6)(i) (if applicable).

15 TABLE A: LIMITS AND OTHER REQUIREMENTS A-12 12/28/10 Facility Name: Permit Number: St Marys Subject Item: EU 006 Turbine Engine Associated Items: SV 004 Cogeneration Turbine Stack What to do EMISSION LIMITS AND OPERATING REQUIREMENTS hdr Why to do it Nitrogen Oxides: less than or equal to 190 parts per million at 15% O2, on a dry 40 CFR Section (a)(2); Minn. R basis Sulfur Content of Fuel: less than or equal to 0.80 percent by weight 40 CFR Section (b); Minn. R Fuel is limited to natural gas, as defined in 40 CFR Section (u). Minn. R , subp. 2 MONITORING REQUIREMENTS The Permittee shall monitor the total sulfur content of the fuel being fired in the turbine, except as provided under 40 CFR Section (h)(3) Notwithstanding the provisions of 40 CFR Section (h)(1), the Permittee may elect not to monitor the total sulfur content of the gaseous fuel combusted in the turbine, if the gaseous fuel is demonstrated to meet the definition of natural gas in 40 CFR Section (u), regardless of whether an existing custom schedule approved by the administrator requiring such monitoring. The permittee shall follow the requirements of either 40 CFR Section (h)(3)(i) or (ii). [Note: The Permittee has stated their intent to follow 40 CFR Section (h)(3)(i).] The Permittee shall use the gas quality characteristics in a current, valid purchase contract, tariff sheet, or transportation contract for the gaseous fuel, specifying that the maximum total sulfur content of the fuel is 20.0 grains/100 scf or less, to make the demonstration that the fuel meets the definition of natural gas in 40 CFR Section (u). [Note: The Permittee has stated their intent to combust pipeline quality natural gas.] Custom Nitrogen Monitoring Schedule: The requirement to monitor the nitrogen content of the fuel is waived, provided only pipeline quality natural gas is combusted in the turbine. [Note: This custom schedule was approved through and is carried forward from the original Title V permit, issued 7/23/2003.] REPORTING REQUIREMENTS Reporting: If there is a change in fuel supply, the Permittee shall notify the MPCA of such change for re-examination of the custom fuel monitoring schedule. A substantial change in fuel quality shall be considered as a change in fuel supply. Sulfur monitoring shall be conducted weekly during the interim period when the custom fuel monitoring schedule is being re-examined. hdr 40 CFR Section (h)(1); Minn. R CFR Section (h)(3); Minn. R CFR Section (h)(3)(i); Minn. R CFR Section (c); Minn. R ; EPA guidance memo dated August 14, 1987 hdr 40 CFR Section (c); Minn. R ; EPA guidance memo dated August 14, 1987; EPA approval letter dated May 2, 2003

16 TABLE A: LIMITS AND OTHER REQUIREMENTS A-13 12/28/10 Facility Name: Permit Number: St Marys Subject Item: EU 012 Generator 7 (Non-emergency CI; <10 liter/cyl; 2500 kw) Associated Items: GP 002 Boilers and Generators SV 005 No. 7 Generator Stack What to do LIMITS AND OPERATING RESTRICTIONS hdr Why to do it Fuel: The Permittee shall burn only diesel fuel oil in the generator. Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan Fuel Requirements - Beginning October 1, 2010, the Permittee must use diesel fuel in EU 012 that meets the following requirements of 40 CFR Section (b) for nonroad diesel fuel: (1) Sulfur content maximum 15 ppm (for nonroad diesel); and, (2) Cetane index minimum of 40 or aromatic content maximum of 35% by volume. The provisions of pt. 60, subp. IIII apply to the Permittee for operation of EU 012 because EU 012 was manufactured after April 1, 2006, and the Permittee commenced construction of EU 012 after July 11, Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan; 40 CFR Sections (b) and (b); Minn. R ; 40 CFR Section (c); Minn. R CFR Section (a)(2)(i); Minn. R For the purposes of pt. 60, subp. IIII, the date that construction commences is the date EU 012 is ordered by the Permittee. The Permittee must install an EU 012 engine that meets the requirements for 2007 model year engines. Opacity: less than or equal to 20 percent opacity once operating temperatures have been attained Sulfur Dioxide: less than or equal to 0.50 lbs/million Btu heat input. The potential to emit from the unit is lb/mmbtu due to equipment design and allowable fuels. Operating Hours: less than or equal to 2045 hours/year using 12-month Rolling Sum calculated monthly by the last day of each month. This limit may be revised based on results from emission factor testing required by this permit. 40 CFR Section (a); Minn. R ; 40 CFR Section (c); Minn. R Minn. R , subp. 1 Minn. R , subp. 2 Title I Condition: To avoid classification as a major modification under 40 CFR Section 52.21(b)(2)(i) and Minn. R During the initial 12 months of operation, the applicable operating hours limit as of month 'n' shall be the following: month 1 = 400 hrs month 2 = 650 hrs month 3 = 870 hrs month 4 = 1080 hrs month 5 = 1260 hrs month 6 = 1420 hrs month 7 = 1560 hrs month 8 = 1690 hrs month 9 = 1810 hrs month 10 = 1920 hrs month 11 = 2000 hrs month 12 = 2045 hrs MONITORING AND RECORDKEEPING REQUIREMENTS Recordkeeping - Operating Hours: by the last day of each calendar month, the Permittee shall: 1. record the EU 012 operating hours during the provious calendar month; and 2. calculate and record EU 012 operating hours during the previous 12-month period by summing the monthly operating hours records for the previous 12 months. Diesel Fuel Sulfur Content Certification: The Permittee shall obtain and retain a written guarantee from the fuel supplier indicating that each shipment of diesel fuel delivered to the Facility for use in EU 012 will contain no more than percent by weight sulfur (15 ppmw) beginning October 1, PART 60 SUBPART IIII REQUIREMENTS hdr Title I Condition: To avoid classification as a major modification under 40 CFR Section 52.21(b)(2)(i) and Minn. R ; Minn. R , subp. 4 and 5 Title I Condition: SIP for SO2 NAAQS, 40 CFR pt. 50, and MN State Implementation Plan hdr The Permittee must comply with the emission standards in Section (b) and table 1 of subp. IIII when operating EU CFR Sections (b) and (b); pt. 60, subp. IIII table 1; Minn. R ; 40 CFR Section (c); Minn. R Hyrocarbons: less than or equal to 1.3 grams/kilowatt-hour 40 CFR Sections (b) and (b); pt. 60, subp. IIII table 1; Minn. R ; 40 CFR Section (c); Minn. R

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Mayo Foundation

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Mayo Foundation AIR EMISSION PERMIT NO. 10900008-003 Major Amendment IS ISSUED TO Mayo Foundation SAINT MARYS HOSPITAL 1216 Second Street Southwest Rochester, Olmsted County, Minnesota 55902 The emission units, control

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 10900008-101 Permittee: Facility name: Mayo Clinic Mayo Clinic Hospital Saint Marys Campus 1216 2nd St SW Rochester, MN 55902-1906 Olmsted County Expiration

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets

AIR EMISSION PERMIT NO IS ISSUED TO. Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets AIR EMISSION PERMIT NO. 10901019-002 IS ISSUED TO Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets Rochester Public Utilities 3605 Highway 52 North Rochester, Olmsted County,

More information

AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P.

AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P. AIR EMISSION PERMIT NO. 16300087-006 Total Facility Oper. Permit - Reissuance IS ISSUED TO LSPCottage Grove, L.P. LSPCOTTAGE GROVE COGENERATION FACILITY 9525 105th Street Court South Cottage Grove, Washington

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc.

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc. DRAFT/PROPOSED AIR EMISSION PERMIT NO. 00300155 002 Major Amendment IS ISSUED TO Hoffman Enclosures, Inc. Hoffman Enclosure Inc/Pentair Equipment Protection 2100 Hoffman Way Anoka, Anoka County, MN 55303

More information

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation AIR EMISSION PERMIT NO. 04900030-006 Total Facility Operating Permit - Reissuance IS ISSUED TO Northern States Power Co a Minnesota Corporation XCEL ENERGY - PRAIRIE ISLAND NUCLEAR PLANT 1717 Wakonade

More information

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 AIR EMISSION PERMIT NO. 14500026-001 IS ISSUED TO St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 The emission units, control equipment and emission stacks at

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 08500002-101 Permittee: Hutchinson Utilities Commission - Plant 1 Facility name: Hutchinson Utilities Commission - Plant 1 44 4th Ave NE Hutchinson, MN 55350-1829

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company AIR EMISSION PERMIT NO. 16300110-001 IS ISSUED TO Northern Natural Gas Company NORTHERN NATURAL GAS - HUGO No Street Address Hugo, Washington County, Minnesota 55038 The emission units and emission stacks

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission DRAFT/PROPOSED AIR EMISSION PERMIT NO. 08500034 002 Total Facility Operating Permit Reissuance IS ISSUED TO Hutchinson Utilities Commission Hutchinson Utilities Commission Plant 2 1100 Industrial Boulevard

More information

Air Individual Permit Permit Limits to Avoid NSR

Air Individual Permit Permit Limits to Avoid NSR Air Individual Permit Permit Limits to Avoid NSR 13900128-001 Permittee: Facility name: Shakopee Distributed Generation Shakopee Distributed Generation Vierling Drive E Shakopee, Minnesota 55379 Scott

More information

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

This is a new permit condition titled, 2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP) This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. ALLETE Inc dba Minnesota Power Inc

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. ALLETE Inc dba Minnesota Power Inc DRAFT/PROPOSED AIR EMISSION PERMIT NO. 13700013 007 Total Facility Operating Permit Reissuance IS ISSUED TO ALLETE Inc dba Minnesota Power Inc Minnesota Power Laskin Energy Center 5699 Colby Lake Road

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE, Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE, Inc. AIR EMISSION PERMIT NO. 13700013-005 IS ISSUED TO Minnesota Power Division of ALLETE, Inc. MINNESOTA POWER - LASKIN ENERGY CENTER County Road 633 Aurora, St. Louis County, MN 55705 The emission units,

More information

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia AIR EMISSION PERMIT NO. 13700028-003 IS ISSUED TO City of Virginia 620 South 2nd Street Virginia, St. Louis County, Minnesota 55792 The emission units, control equipment and emission stacks at the stationary

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc AIR EMISSION PERMIT NO. 13700013-006 IS ISSUED TO Minnesota Power Division of ALLETE Inc MINNESOTA POWER - LASKIN ENERGY CENTER 5699 Colby Lake Road Hoyt Lakes, St. Louis County, MN 55750 The emission

More information

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted

More information

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY AIR EMISSION PERMIT NO. 12300012-002 IS ISSUED TO NORTHERN STATES POWER COMPANY NSP - HIGH BRIDGE GENE 501 Shepard Road St. Paul, Ramsey County, Minnesota 551023004 The emission units, control equipment

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Cogentrix

AIR EMISSION PERMIT NO IS ISSUED TO. Cogentrix AIR EMISSION PERMIT NO. 16300087-004 IS ISSUED TO Cogentrix 9525 105th Street Court South Cottage Grove, Washington County, MN 55016 The emission units, control equipment and emission stacks at the stationary

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 15300004-101 Permittee: Co-permittee name: Facility name: Viking Gas Transmission - Cushing ONEOK Partners, L.P. Viking Gas Transmission - Cushing 31888 400th

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 14700009-101 Permittee: Facility name: Northern Natural Gas Company - Owatonna Compressor Station Northern Natural Gas Company - Owatonna Compressor Station

More information

DRAFT/PROPOSED AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. GE Osmonics Inc

DRAFT/PROPOSED AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. GE Osmonics Inc DRAFT/PROPOSED AIR EMISSION PERMIT NO. 05300834 004 Major Amendment IS ISSUED TO GE Osmonics Inc GE Osmonics Inc 5951 Clearwater Drive Minnetonka, Hennepin County, MN 55343 The emission units, control

More information

AIR EMISSION PERMIT NO IS ISSUED TO INTERSTATE POWER COMPANY

AIR EMISSION PERMIT NO IS ISSUED TO INTERSTATE POWER COMPANY AIR EMISSION PERMIT NO. 09100007-002 IS ISSUED TO INTERSTATE POWER COMPANY INTERSTATE POWER - FOX LAKE STATION County Road 28 Sherburn, Martin County, Minnesota 561710367 The emission units, control equipment

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Polaris Industries Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Polaris Industries Inc. AIR EMISSION PERMIT NO. 02500051-001 IS ISSUED TO Polaris Industries Inc. Polaris Industries, Inc. - Wyoming 7290 Viking Boulevard East Wyoming, Chisago County, MN 55092 The emission units, control equipment

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

Draft Air Individual Permit Major Amendment Brooks Ave South Thief River Falls, MN Pennington County

Draft Air Individual Permit Major Amendment Brooks Ave South Thief River Falls, MN Pennington County Draft Air Individual Permit Major Amendment 11300023-101 Permittee: Facility name: Digi-Key Corp Digi-Key Corp 701 Brooks Ave South Thief River Falls, MN 56701-2757 Pennington County Operating permit issuance

More information

Air Individual Permit Major Amendment Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR

Air Individual Permit Major Amendment Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR Air Individual Permit Major Amendment 13100058-101 Permittee: Facility name: Northern Natural Gas Co - Faribault Northern Natural Gas Co - Faribault 21903 Canby Ave Faribault, MN 55021 Rice County Operating

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Co dba Xcel Energy

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Co dba Xcel Energy AIR EMISSION PERMIT NO. 04900030-004 IS ISSUED TO Northern States Power Co dba Xcel Energy XCEL ENERGY - PRAIRIE ISLAND NUCLEAR 1717 Wakonade Drive East Welch, Goodhue County, MN 55089 The emission units,

More information

Air Individual Permit State Permit Hardman Ave S South St. Paul, MN 55075

Air Individual Permit State Permit Hardman Ave S South St. Paul, MN 55075 Air Individual Permit State Permit 03700070-007 Permittee: Facility name: Sanimax USA LLC Sanimax USA LLC 505 Hardman Ave S South St. Paul, MN 55075 Expiration date: Non-expiring Permit * All Title I Conditions

More information

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Ardent Mills LLC

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Ardent Mills LLC AIR EMISSION PERMIT NO. 03700020-004 Major Amendment IS ISSUED TO Ardent Mills LLC ARDENT MILLS FLOUR MILL 2005 Vermillion Street South Hastings, Dakota County, Minnesota 55033 The emission units, control

More information

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Archer Daniels Midland Co

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Archer Daniels Midland Co AIR EMISSION PERMIT NO. 04900001-002 Administrative Amendment IS ISSUED TO Archer Daniels Midland Co ADM - RED WING 126 La Grange Street Red Wing, Goodhue County, MN 55066 The emission units, control equipment

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Archer Daniels Midland Company. ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066

AIR EMISSION PERMIT NO IS ISSUED TO. Archer Daniels Midland Company. ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066 AIR EMISSION PERMIT NO. 04900001-001 IS ISSUED TO Archer Daniels Midland Company ADM - RED WING 118 Main Street Red Wing, Goodhue County, MN 55066 The emission units, control equipment and emission stacks

More information

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County) AIR QUALITY PERMIT Permit No. Effective Date April 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

Air Individual Permit Major Amendment

Air Individual Permit Major Amendment Air Individual Permit Major Amendment 01900022-101 Permittee: Facility name: Elkay Wood Products Company - Waconia Elkay Wood Products Company - Waconia 180 Industrial Boulevard Waconia, MN 55387-1736

More information

Preliminary Draft Air Individual Permit State Permit

Preliminary Draft Air Individual Permit State Permit Preliminary Draft Air Individual Permit State Permit 12100021-101 Permittee: Facility name: CHS Inc - Prairie Lakes Coop - Glenwood Grain Elevator CHS Inc - Prairie Lakes Coop - Glenwood Grain Elevator

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 10500001-007 Permittee: Facility name: Swift Pork Co - Worthington Swift Pork Co - Worthington 1700 Highway 60 NE Worthington, MN 56187 Nobles County Expiration

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

Background Information for SIP Revision Xcel Energy, Inver Hills Facility, Saint Paul, Minnesota

Background Information for SIP Revision Xcel Energy, Inver Hills Facility, Saint Paul, Minnesota Background Information for SIP Revision Xcel Energy, Inver Hills Facility, Saint Paul, Minnesota This document describes the State Implementation Plan (SIP) revision for Northern States Power Company s

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

Draft Air Individual Permit Major Amendment Clearwater Dr Minnetonka, MN Hennepin County

Draft Air Individual Permit Major Amendment Clearwater Dr Minnetonka, MN Hennepin County Draft Air Individual Permit Major Amendment 05300834-102 Permittee: Facility name: GE Osmonics Inc GE Osmonics Inc 5951 Clearwater Dr Minnetonka, MN 55343 Hennepin County Operating permit issuance date:

More information

DRAFT Air Individual Permit Part 70 Reissuance

DRAFT Air Individual Permit Part 70 Reissuance DRAFT Air Individual Permit Part 70 Reissuance 13500008-101 Permittee: Facility name: Polaris Industries Inc - Roseau Polaris Industries Inc - Roseau 301 5th Ave SW Roseau, MN56751 Roseau County Expiration

More information

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota TABLE B: SUBMITTALS Table B lists most of the submittals you must provide. Table B is divided into three sections; one-time submittals or notifications, intermittent submittals or notifications and recurring

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302

AIR EMISSION PERMIT NO IS ISSUED TO. Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302 AIR EMISSION PERMIT NO. 00900006-001 IS ISSUED TO Quebecor Printing Inc - St Cloud 660 Mayhew Lake Rd NE St Cloud, Benton County, MN 56302 The emission units, control equipment and emission stacks at the

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

Major Amendment December 29, 1999 Total Facility Operating Permit February 12, 1996

Major Amendment December 29, 1999 Total Facility Operating Permit February 12, 1996 AIR EMISSION PERMIT NO. 03700015-001 IS ISSUED TO Northern States Power Company NSP - Inver Hills Generating Plant 3185 117th Street Inver Grove Heights, Dakota County, Minnesota 55077 The emission units,

More information

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Newport Terminal Corp

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Newport Terminal Corp DRAFT AIR EMISSION PERMIT NO. 16300010 005 Major Amendment IS ISSUED TO Newport Terminal Corp NEWPORT TERMINAL CORP 50 21st Street Newport, Washington County, MN 55055 The emission units, control equipment

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power & Light and the City of Duluth

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power & Light and the City of Duluth AIR EMISSION PERMIT NO. 13700015-001 IS ISSUED TO Minnesota Power & Light and the City of Duluth MINNESOTA POWER AND LIGHT - ML HIBBARD 30 West Superior Street Duluth, St. Louis County, Minnesota 55802

More information

Air Individual Permit Part 70 Reissuance

Air Individual Permit Part 70 Reissuance Air Individual Permit Part 70 Reissuance 12300057-101 Permittee: Facility name: Rayven Inc Rayven Inc 431 Griggs Street N Saint Paul, MN 55104-4108 Ramsey County Expiration date: December 5, 2023 * All

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing

More information

RICE NESHAP Frequently Asked Questions (FAQ)

RICE NESHAP Frequently Asked Questions (FAQ) RICE NESHAP Frequently Asked Questions (FAQ) What does RICE NESHAP mean? RICE NESHAP is an acronym for Reciprocating Internal Combustion Engines National Emission Standards for Hazardous Air Pollutants.

More information

Streamlining Multiple Applicable Requirements

Streamlining Multiple Applicable Requirements Streamlining Multiple Applicable Requirements What is Streamlining? 1. Streamlining is the process of determining one set of requirements to be incorporated into the Title V permit from among multiple

More information

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 Discussion Topics Background Important Terms Applicability Compliance Deadlines Emission/Operating Limits Performance/Compliance

More information

AIR EMISSION PERMIT NO IS ISSUED TO. CertainTeed Corporation

AIR EMISSION PERMIT NO IS ISSUED TO. CertainTeed Corporation AIR EMISSION PERMIT NO. 13900013-003 IS ISSUED TO oration oration 3303 East 4th Avenue Shakopee, Scott County, MN 55379 The emission units, control equipment and emission stacks at the stationary source

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 04PB1019 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL ISSUED TO:

More information

DRAFT. AIR EMISSION PERMIT NO Major Amendment. Central MN Renewables

DRAFT. AIR EMISSION PERMIT NO Major Amendment. Central MN Renewables DRAFT AIR EMISSION PERMIT NO. 09700026 005 Major Amendment Central MN Renewables CENTRAL MN RENEWABLES 7936 Heron Little Falls, Morrison County, Minnesota 56345 The emission units, control equipment and

More information

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the 15A NCAC 02D.1206 HOSPITAL, MEDICAL, AND INFECTIOUS WASTE INCINERATORS (a) Applicability. This Rule applies to any hospital, medical, and infectious waste incinerator (HMIWI), except: (1) any HMIWI required

More information

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015 AIR QUALITY PERMIT Permit No. Effective Date May 26, 2015 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published

More information

DRAFT/PROPOSED Air Individual Permit Major Amendment

DRAFT/PROPOSED Air Individual Permit Major Amendment DRAFT/PROPOSED Air Individual Permit Major Amendment 14300014 011 Permittee: Facility name: Heartland Corn Products Heartland Corn Products 53331 State Highway 19 E Winthrop, MN 55396 Operating permit

More information

RICE NESHAP RECORD KEEPING Stationary Engines

RICE NESHAP RECORD KEEPING Stationary Engines RICE NESHAP RECORD KEEPING Stationary Engines POWER PLANT COMPLIANCE Donna Oehm Some of the RICE NESHAP ZZZZ reporting requirements are like a $2 bill... *Relatively not in high demand *Legal obligation

More information

AIR EMISSION PERMIT NO IS ISSUED TO

AIR EMISSION PERMIT NO IS ISSUED TO AIR EMISSION PERMIT NO. 13300023-002 IS ISSUED TO AGRI - ENERGY, LLC 502 South Walnut Luverne, Rock County, Minnesota 56156 FOR THE FACILITY PREVIOUSLY PERMITTED UNDER AIR EMISSION PERMIT NO. 13300023-001

More information

SECTION.1400 NITROGEN OXIDES

SECTION.1400 NITROGEN OXIDES SECTION.1400 NITROGEN OXIDES 15A NCAC 02D.1401 DEFINITIONS (a) For the purpose of this Section, the definitions at G.S 143-212 and G.S. 143-213, and 15A NCAC 02D.0101 shall apply, and in addition the following

More information

Appendix K. DOC Conditions

Appendix K. DOC Conditions Appendix K DOC Conditions Mission Rock Energy Center Five (5) GE LM6000-PG-Sprint Combustion Turbine Generators (CTGs) Total = 275 MW Nominal Each CTG is simultaneously subject to the emission limits,

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

RICE NESHAP Implementation. Ray Lukkarinen, P.E. Stanley Consultants, Inc.

RICE NESHAP Implementation. Ray Lukkarinen, P.E. Stanley Consultants, Inc. RICE NESHAP Implementation Ray Lukkarinen, P.E. Stanley Consultants, Inc. Presentation Outline RICE NESHAP Overview (Existing CI Engines) Definition Compliance deadline Engine Categories CO Emission Limits

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Spark Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction of the

More information

Appendix K. Final DOC Conditions

Appendix K. Final DOC Conditions Appendix K Final DOC Conditions Puente Power Project 262 MW (net nominal) GE 7HA.01 Combustion Turbine Generator (CTG) The CTG is simultaneously subject to the emission limits, monitoring requirements,

More information

Part 70 Manufacturing General Air Emission Permit

Part 70 Manufacturing General Air Emission Permit Part 70 Manufacturing General Air Emission Permit 05301002-101 PERMITTEE: FACILITY NAME: Greatbatch Ltd dba Greatbatch Medical Greatbatch Ltd dba Greatbatch Medical 730 24 th Ave SE Minneapolis, MN 55414

More information

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) 1.0 Purpose The purpose of this rule is to limit emissions

More information

State of New Jersey. General Permit (GP-009A)

State of New Jersey. General Permit (GP-009A) 03/21/2013 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-009A) For Boiler(s) and Indirect Fired Process Heater(s) Each Greater Than or Equal to 10

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 11PB859 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL Modification

More information

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels GP-005B State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels This general permit allows for the construction,

More information

A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines

A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines Presented by: Brandon Guillory & Andy Goldberg AWMA October 29, 2009 1 New Source

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: N-6311-9-1 ISSUANCE DATE: 12/17/2008 LEGAL OWNER OR OPERATOR: FISCALINI FARMS & FISCALINI DAIRY MAILING ADDRESS: 7231 COVERT RD MODESTO, CA 95358 LOCATION: 4848 JACKSON

More information

TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO

TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO TECHNICAL SUPPORT DOCUMENT For DRAFT AIR EMISSION PERMIT NO. 14500029 003 This technical support document (TSD) is intended for all parties interested in the draft permit and to meet the requirements that

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Compression Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction

More information

State of New Jersey. Department of Environmental Protection Air Quality Permitting

State of New Jersey. Department of Environmental Protection Air Quality Permitting GP021 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP 021) Combined Heat and Power Combustion Turbine(s) less than or equal to 65 MMBTU per hour This

More information

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers. Tune-up Information National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers 40 CFR Part 63 Subpart JJJJJJ Who must conduct a tune-up

More information

DEP7007CC Compliance Certification

DEP7007CC Compliance Certification Commonwealth of Kentucky Natural Resources & Environmental Protection Cabinet Department for Environmental Protection DIVISION FOR AIR QUALITY DEP7007CC Compliance Certification Division Use Only ID# Permit

More information

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788 Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: 04-13-08700037 Application #: 22788 Date SIP Application Received: August 11, 2014 Date Title V Application

More information

AIR PERMIT ABBEVILLE, HENRY COUNTY, ALABAMA DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE

AIR PERMIT ABBEVILLE, HENRY COUNTY, ALABAMA DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE AIR PERMIT PERMITTEE: FACILITY NAME: LOCATION: PEGASUS WEST, LLC PEGASUS WEST, LLC ABBEVILLE, HENRY COUNTY, ALABAMA PERMIT NUMBER 606-S008-X001 DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE Sawmill Green

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: S-7658-1-0 ISSUANCE DATE: 10/30/2009 LEGAL OWNER OR OPERATOR: ABEC BIDART-STOCKDALE LLC MAILING ADDRESS: C/O CALIFORNIA BIOENERGY LLC 2828 ROUTH STREET SUITE 500 DALLAS,

More information

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3.

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3. VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 59 - ELECTRICAL POWER GENERATING EQUIPMENT - OXIDES OF NITROGEN EMISSIONS (Adopted 10/6/69, Revised 5/23/72, 7/18/72, 10/31/72, 8/14/79, 12/7/82, 6/4/91,

More information

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations? Presented by Richard M. Cestone, PE, CHMM Birdsall Services Group For NJEWA Conference May 9, 2011 What happens when a permit has both federal and state regulations? 1 Facilities get confused with Federal

More information

State of New Jersey. Department of Environmental Protection Division of Air Quality

State of New Jersey. Department of Environmental Protection Division of Air Quality GOP-006 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-006) Combined Heat and Power Stationary Spark Ignition Reciprocating Engine(s) less

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM April 18, 2014 SUBJECT: Cellco Partnership, dba Verizon Wireless 18 Abele Road Bridgeville, PA 15017 Allegheny County Operating Permit No. 0867 TO:

More information

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT APPENDIX D APPENDIX D REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL NEW JERSEY STATE DEPARTMENT

More information

Applicable Requirements - NSPS Subpart JJJJ

Applicable Requirements - NSPS Subpart JJJJ Facility Name: CO Station 3 Combustion Type: 4SRB Facility HAP Status: Area Fuel Type: Natural gas RICE Owner: RICE Operator: S2C Gathering Co Acme Operating Inc. Use Type: Max. Runtime: Non-emergency

More information

Electrical Power Generator Use and Procurement Guidance

Electrical Power Generator Use and Procurement Guidance Electrical Power Generator Use and Procurement Guidance For compliance with applicable air emission control regulations December 2016 Prepared by: Syracuse University Environmental Health & Safety Services

More information

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC 2011 Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC Ohio EPA, Division of Air Pollution Control 1/1/2011 Page 2

More information

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Air Permitting of Sources at Natural gas Production, Compression and Processing Facilities MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Tom Wolf, Governor John Quigley, Secretary Overview

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM February 2, 2012 SUBJECT: Superior Appalachian Pipeline, LLC Kissick Lane Frazer Township, PA 15084 Allegheny County Installation Permit No. 0837-I001

More information

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.15.1 - BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) A. Applicability The provisions of this

More information

Air Quality Permit File SOOP # Lindy Paving, Inc. I Homer City Plant

Air Quality Permit File SOOP # Lindy Paving, Inc. I Homer City Plant OffiCIAL FILE COPY SOUTHWEST REGIONAL OFFICE MEMO TO FROM THROUGH DATE Air Quality Permit File SOOP # 32-00311 Lindy Paving, Inc. I Homer City Plant Sheila A. Shaffer~ Air Quality Engineering S~ecialist

More information

MACK TRUCKS, INC PENNSYLVANIA AVENUE, HAGERSTOWN, MD PART 70 OPERATING PERMIT NO

MACK TRUCKS, INC PENNSYLVANIA AVENUE, HAGERSTOWN, MD PART 70 OPERATING PERMIT NO SECTION I SOURCE IDENTIFICATION... 4 1. DESCRIPTION OF FACILITY... 4 2. FACILITY INVENTORY LIST... 4 SECTION II GENERAL CONDITIONS... 6 1. DEFINITIONS... 6 2. ACRONYMS... 6 3. EFFECTIVE DATE... 7 4. PERMIT

More information

San Diego County Air Pollution Control District Old Grove Rd San Diego, CA (858) TITLE V OPERATING PERMIT APCD2006-TVP

San Diego County Air Pollution Control District Old Grove Rd San Diego, CA (858) TITLE V OPERATING PERMIT APCD2006-TVP San Diego County Air Pollution Control District 10124 Old Grove Rd San Diego, CA 92131 (858) 586-2600 TITLE V OPERATING PERMIT APCD2006-TVP-960991 Issued To: Solar Turbines Inc. Site Address 4200 Ruffin

More information