Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Size: px
Start display at page:

Download "Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:"

Transcription

1 COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) CONSTRUCTION PERMIT PERMIT NO: 11PB859 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL Modification No. 1 ISSUED TO: Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: Comanche Generating Station, 2005 Lime Road, Pueblo, Pueblo County, Colorado THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: Unit 2: Babcock and Wilcox, Model and Serial No. NB23761, Cross-Fired (Wall-Fired) Dry Bottom Boiler, Nominally Rated at 3,482 mmbtu/hr. Sub-bituminous coal (pulverized) fired, with natural gas used for startup, shutdown and flame stabilization. This permit is issued as part of the Unit 3 Project THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND CONTROL ACT C.R.S. ( et seq), TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: 1. A lime spray dryer and low NO X burners and over-fire air shall be installed on Unit 2 to control SO 2 and NO X emission respectively. The annual emission and fuel consumption limits identified in Conditions 11 and 12 of this permit shall take effect 180 days after initial startup of the last control device for the last unit or upon startup of Unit 3, whichever is earlier. 2. This permit shall expire if the owner or operator does not commence construction of the Unit 3 Project within 18 months after either the date of issuance of the permit or the date on which such construction or activity was scheduled to commence as set forth in the permit, whichever is later; discontinues construction for a period of eighteen months or more; or does not complete construction within a reasonable time of the estimated completion date. (Reference: Colorado Regulation No. 3,Part B, III.F.4.a) Upon showing of good cause by the permittee, the Division may grant extensions of the permit not to exceed eighteen months per extension. (Reference: Colorado Regulation No. 3, Part B, III.F.4.b) 3. The permittee shall notify the Division 30 days prior to startup of each of the control devices. (Reference: Colorado Regulation No. 3, Part B, III.G.1).

2 page 2 4. Except as provided for in Condition 5, below, no owner or operators of a source shall allow or cause the emission into the atmosphere of any air pollutant which is in excess of 20% opacity (Reference: Colorado Regulation No. 1, Section II.A.1). 5. No owner or operator of a source shall allow or cause to be emitted into the atmosphere any air pollutant resulting from the building of a new fire, cleaning of fire boxes, soot blowing, start-up, process modifications or adjustment or occasional cleaning of control equipment which is in excess of 30% opacity for a period or periods aggregating more than six (6) minutes in any sixty (60) consecutive minutes (Reference: Colorado Regulation No. 1, Section II.A.4). 6. Particulate matter emissions from this unit shall not exceed 0.1 lb/mmbtu (Reference: Colorado Regulation No. 1, Section III. A.1.c). 7. Sulfur dioxide emissions from this unit shall not exceed 1.2 lb/mmbtu on a 3 hour rolling average (Reference: Colorado Regulation No. 1, Section VI.A.3.a.(ii) and VI.A.1). 8. Emissions of Lead (Pb) shall not be such that emissions, from the facility, result in an ambient lead concentration exceeding 1.5 micrograms per standard cubic meter averaged over a onemonth period (Reference: Colorado Regulation No. 8, Part C, Section I.B State-only enforceable). 9. This unit is subject to the continuous emission monitoring requirements as set forth in Colorado Regulation No. 1, Section IV, 40 CFR Part 60 Subpart D (as adopted by reference in Colorado Regulation No. 6, Part A) and 40 CFR Part 75. Continuous emission monitoring systems for opacity, sulfur dioxides and nitrogen oxides shall meet the requirements specified in the Title V Operating Permit. 10. This unit is subject to Colorado Regulation No. 6 - Standards of Performance for New Stationary Sources (NSPS), Part A - Federal Register Regulations Adopted By Reference, Subpart D - Standards of Performance for Fossil-Fuel-fired Steam Generators for Which Construction is Commenced After August 17, 1971, including, but not limited to, the following: a. Particulate Matter: Concentration in the gases discharged into the atmosphere shall not be in excess of 0.1 lbs/mmbtu (3-hour average) The gases discharged into the atmosphere shall not have opacity in excess of 20 percent (6-minute average), except for one 6-minute period per hour of not more than 27 percent opacity. Note that this opacity standard shall apply at all times except during periods of startup, shutdown and malfunction ( 60.11(c)), however, those instances during startup, shutdown and malfunction when the opacity standard is exceeded shall be identified in the Excess Emission Report required by Condition 8.6 of the Title V operating permit. b. Oxides of Nitrogen: Concentration in the gases discharged into the atmosphere shall not be in excess of 0.7 lbs/mmbtu, based on a 3-hr rolling average.

3 page 3 c. Sulfur Dioxide: Concentration in the gases discharged into the atmosphere shall not be in excess of 1.2 lbs/mmbtu, based on a 3-hr rolling average. In addition, the following requirements of Colorado Regulation No. 6, Part A, Subpart A, General Provisions, apply. d. At all times, including periods of start-up, shutdown, and malfunction, the facility and control equipment shall, to the extent practicable, be maintained and operated in a manner consistent with good air pollution control practices for minimizing emissions. Determination of whether or not acceptable operating and maintenance procedures are being used will be based on information available to the Division, which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source ( 60.11(d)). e. No article, machine, equipment or process shall be used to conceal an emission which would otherwise constitute a violation of an applicable standard. Such concealment includes, but is not limited to, the use of gaseous diluents to achieve compliance with an opacity standard or with a standard which is based on the concentration of a pollutant in the gases discharged to the atmosphere. ( 60.12). 11. This unit shall be limited to the fuel use rates as listed below and all other activities, operational rates and numbers of equipment as stated in the application. Monthly records of the actual consumption rate shall be maintained by the applicant and made available to the Division for inspection upon request. (Reference: Colorado Regulation No. 3, Part B, II.A.4) Natural Gas mmscf/quarter and 1,546 mmscf/yr Coal 473,184 tons/quarter and 1,857,120 tons/yr During the first twelve (12) months of operation, compliance with both the quarterly and annual consumption limitations shall be required. After the first twelve (12) months of operation, compliance with only the annual limitation shall be required. Compliance with the annual consumption limits shall be determined on a rolling twelve (12) month total. 12. Emissions of air pollutants from this unit shall not exceed the following limitations (as calculated in the Division's preliminary analysis). Compliance with the annual limits shall be determined on a rolling twelve (12) month total. By the end of each month a new twelve month total is calculated based on the previous twelve months data. The permit holder shall calculate monthly emissions and keep a compliance record on site for Division review. (Reference: Colorado Regulation No. 3, Part B, II.A.4) Unit 2 Only Particulate Matter (filterable): tons/quarter and 1,525 tons/yr Particulate Matter less than 10 (filterable): tons/quarter and 1,403 tons/yr Carbon Monoxide: tons/quarter and tons/yr Volatile Organic Compounds tons/quarter and 59.9 tons/yr Units 1 and 2, Together Sulfur Dioxide: tons/quarter and 3,686 tons/yr Nitrogen Oxides:...1,564.4 tons/quarter and 6,143 tons/yr

4 page 4 NO X and SO 2 emissions shall be determined using the continuous emission monitoring systems (CEMS) required by Condition 9. PM, PM 10, CO and VOC shall be calculated using the emission factors in the permit notes. During the first twelve (12) months of operation, compliance with both the quarterly and annual emission limitations shall be required. After the first twelve (12) months of operation, compliance with only the annual limitation shall be required. 13. This unit is subject to the following emission limitations as set forth in the Settlement Agreement, signed on December 3, 2004 between Public Service Company of Colorado (PSCo) and Concerned Environmental Community Parties (CECP), as follows (Reference: Colorado Regulation No. 3, Part B, II.A.4) a. Sulfur Dioxide Emissions (i) SO 2 emissions from this unit shall not exceed 0.12 lb/mmbtu, on a 30-day rolling average basis, including emissions from shutdown and malfunction events. The first two hours after coal is first fed to the boiler during a cold startup shall be excluded from the calculation of that day s SO 2 emissions (Paragraph 3.C). (ii) SO 2 emissions from Units 1 and 2 together shall not exceed 0.10 lb/mmbtu, on an annual rolling average basis (rolling on a daily basis) including emissions during startup, shutdown and malfunction events (Paragraph 3.C). b. Nitrogen Oxide Emissions (i) (ii) (iii) NO X emissions from this unit shall not exceed 0.20 lb/mmbtu, on a 30-day rolling average basis, including shutdown and malfunction events (Paragraph 4.C). NO X emissions from Units 1 and 2 together, shall not exceed 0.15 lb/mmbtu on an annual rolling average basis (rolling on a daily basis), including shutdown and malfunction events (paragraph 4.C). During cold startups, the following shall be excluded from the calculation of that day s NO X emissions: A. The first two hours when natural gas-fired igniters are in use, and B. The first four hours after coal is first fed to the boiler (paragraph 4.C). c. Installation and Compliance Schedule (i) The SO 2 and NO X control equipment for Units 1 and 2 shall be operational by December 31, 2008 (paragraph 6). (ii) PSCO shall meet the unit-specific emission limits no later than 180 days after initial startup of the SO 2 and NO X control equipment for each unit or by July 1, 2009, whichever is earlier (Paragraph 6). (iii) PSCO shall begin calculating compliance with the SO 2 and NO X combined annual rolling average emission limits (rolling on a daily basis) for Comanche 1 and 2 no later than 180 days after initial startup of the SO 2 and NO X control equipment for the last unit (paragraph 6). (iv) Compliance with the SO 2 and NO X emission limitations in Conditions 13.a and 13.b above shall be determined by the continuous emission monitoring systems required by Condition 9 (Paragraph 6). d. Monitoring, testing and emission limits for Mercury (i) Within one year after the date that the Unit 3 construction permit (04PB1015) is issued, PSCO shall install, properly maintain and operate a continuous mercury

5 page 5 emissions monitoring system on Units 1 and 2 using Q-SEMS technology as described at 69 Federal Register at 4694 (January 30, 2004), or such other technology as the Parties may agree (paragraph 7.B). (ii) PSCO shall monitor mercury emissions from Units 1 and 2 beginning 18 months after the issuance of the Unit 3 permit and shall report the quality assured and quality controlled data to CECP and the Department on a calendar quarterly basis thereafter (paragraph 7.B). (iii) PSCo shall operate and maintain the mercury monitoring technology in accordance with EPA requirements and the manufacturing specifications. In the event of any mercury monitoring technology malfunction, PSCo shall either repair or replace such monitoring technology. If the mercury monitoring technology identified in the above paragraph is unable to meet applicable performance requirements despite PSCo s efforts to repair and replace such technology, PSCo agrees to install alternate mercury monitoring technology unless technologically or economically infeasible or to conduct annual stack testing if monitoring technology is technologically or economically infeasible (paragraph 7.C). e. Other Air Permit Issues (i) At all times, including periods of startup, shutdown and malfunction, PSCo shall, to the extent practicable, maintain and operate any emission control equipment required under Condition 1 in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Department which may include, but is not limited to, monitoring results, observations, review of operating and maintenance procedures, and inspection of the source (paragraph 8.G) 14. This source is subject to the provisions of Regulation No. 3. Part C, Operating Permits (Title V of the 1990 Federal Clean Air Act Amendments). The provisions of this construction permit must be incorporated into the operating permit. The application for the modification to the Operating Permit is due within one year of commencing operation of Unit 3. (Reference: Colorado Regulation No. 3, Part C, III.B.2). 15. Prior to issuance of final approval, the applicant shall submit to the Division for approval an operating and maintenance plan for all control equipment and control practices and a proposed recordkeeping format for demonstrating compliance on an ongoing basis. The applicant shall then follow the current Division approved Operating and Maintenance Plan. (Reference: Colorado Regulation No. 3, Part B, III.G.7) 16. Within one hundred and eighty days (180) after commencement of operation, compliance with the conditions contained on this permit shall be demonstrated to the Division. It is the permittee's responsibility to self certify compliance with the conditions. Failure to demonstrate compliance within 180 days may result in revocation of the permit (Reference Colorado Regulation No. 3, Part B, III.G.2). Information on how to certify compliance was mailed with the permit or can be obtained from the Division at A revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Colorado Regulation No. 3, Part A, II.C) a. Annually whenever a significant increase in emissions occurs as follows: For any criteria pollutant: For sources emitting less than 100 tons per year, a change in actual emissions of five

6 page 6 tons per year or more, above the level reported on the last APEN; or For sources emitting 100 tons per year or more, a change in actual emissions of five percent or 50 tons per year or more, whichever is less, above the level reported on the last APEN submitted; or For any non-criteria reportable pollutant: If the emissions increase by 50% or five (5) tons per year, whichever is less, above the level reported on the last APEN submitted to the Division. b. Whenever there is a change in the owner or operator of any facility, process, or activity; or c. Whenever new control equipment is installed, or whenever a different type of control equipment replaces an existing type of control equipment; or d. Whenever a permit limitation must be modified; or e. No later than 30 days before the existing APEN expires. Jacqueline Joyce Permit Reviewer Roland C. Hea, P.E. Construction Permits Unit Stationary Sources Program Initial Approval (C-10,140): Issued January 11, 1973 Initial Approval (C-10,140): Issued April 4, 1973 to extend the expiration date Final Approval (C-11,859): Issued April 17, 1978 This Modification: Permit was revised to make SO 2 and NO X reductions federally enforceable. In addition, the permit was revised to be consistent with currently issued construction permits, which entails including all applicable requirements and including annual limits on fuel consumption and emissions.

7 page 7 Notes to Permit Holder: 1) The production or raw material processing limits and emission limits contained in this permit are based on the production/processing rates requested in the permit application. These limits may be revised upon request of the permittee providing there is no exceedance of any specific emission control regulation or any ambient air quality standard. A revised air pollution emission notice (APEN) and application form must be submitted with a request for a permit revision. 2) This source is subject to the Common Provisions Regulation Part II, Subpart E, Upset Conditions and Breakdowns. The permittee shall notify the Division of any upset condition which causes a violation of any emission limit or limits stated in this permit as soon as possible, but no later than two (2) hours after the start of the next working day, followed by written notice to the Division explaining the cause of the occurrence and that proper action has been or is being taken to correct the conditions causing said violation and to prevent such excess emission in the future. 3) The emission levels contained in this permit are based on the following emission rates, design rate (mmbtu/hr) and 8,760 hrs/yr of operation or permitted fuel consumption limits. SO 2 and NO X emissions for Units 1 and 2 together are based on the following emission rates, the combined design rate of both units and 8,760 hrs/yr of operation. Pollutant Coal Emission Factor - Natural Gas (lb/mmscf) PM 0.1 lb/mmbtu N/A PM (PM) N/A SO lb/mmbtu N/A NO X 0.20 lb/mmbtu N/A CO 0.50 lb/ton 84 VOC 0.06 lb/ton 5.5 Note that compliance with the annual emission limitations shall be monitored as follows: for CO and VOC the above emission factors and fuel consumption, for PM and PM 10, the most recent Title V stack test emission factors (PM = lb/mmbtu, PM 10 = 0.92 x PM), fuel consumption and the average heat content of the coal and for NO X and SO 2 the CEMS. 4) The source is classified as a: Major Modification At a: Major Stationary Source. 5) For use in the modeling analysis conducted, condensable PM 10 emissions were estimated at 22.9 tons/yr. The source considered that condensable PM 10 emissions are composed of the following compounds. Pollutant Emission Factor (lb/mmbtu) Sulfuric Acid (H 2 SO 4 ) 3 x 10-5 Hydrogen Chloride (HCl) 7 x 10-4 Hydrogen Fluoride (HF) 2 x 10-4 Organic compounds (compounds 1.05 x 10-4 with boiling temperatures of 300 º F or less) Elemental Carbon (presumed to be 4.6 x % of filterable PM 10 )

8 page 8 Total Condensable PM x 10-3 The emission factors for H 2 SO 4, HCl and HF are based on performance tests. Note that these emission factors do not take credit for any emission reductions that will occur with the addition of the lime spray dryers. The emission factor for organic compounds is the same as the emission factor determined for Unit 3. The emission factor for elemental carbon was determined in the same manner as Unit 3, however, the Reg 1 PM limit (adjusted by 92% to get PM 10 ) was used to determine the emission factor.

9 page 9 GENERAL TERMS AND CONDITIONS: (IMPORTANT! READ ITEMS 5,6,7 AND 8) 1. This permit is issued in reliance upon the accuracy and completeness of information supplied by the applicant and is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance with this information and with representations made by the applicant or applicant's agents. It is valid only for the equipment and operations or activity specifically identified on the permit. 2. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been determined by the APCD to be necessary to assure compliance with the provisions of Section (7)(a), C.R.S. 3. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of, a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed denied ab initio. This permit may be revoked at any time prior to final approval by the Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the applicant, or the Division revokes a permit, the applicant or owner or operator of a source may request a hearing before the AQCC for review of the Division s action. 4. This permit and any required attachments must be retained and made available for inspection upon request at the location set forth herein. With respect to a portable source which is moved to a new location, a copy of the Relocation Notice (required by law to be submitted to the APCD whenever a portable source is relocated) should be attached to this permit. The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation No. 3, Part B, Section II.B. upon a request for transfer of ownership and the submittal of a revised APEN and the required fee. 5. Issuance (initial approval) of an emission permit does not provide "final" authority for this activity or operation of this source. Final approval of the permit must be secured from the APCD in writing in accordance with the provisions of (12)(a) C.R.S. and AQCC Regulation No. 3, Part B, Section III.G. Final approval cannot be granted until the operation or activity commences and has been verified by the APCD as conforming in all respects with the conditions of the permit. If the APCD so determines, it will provide written documentation of such final approval, which does constitute "final" authority to operate. Compliance with the permit conditions must be demonstrated within 180 days after commencement of operation. 6. THIS PERMIT AUTOMATICALLY EXPIRES IF you (1) do not commence construction or operation within 18 months after either the date of issuance of this permit or the date on which such construction or activity was scheduled to commence as set forth in the permit, whichever is later; (2) discontinue construction for a period of 18 months or more; or (3) do not complete construction within a reasonable time of the estimated completion date. Extensions of the expiration date may be granted by the APCD upon a showing of good cause by the permittee prior to the expiration date. 7. YOU MUST notify the APCD at least thirty days (fifteen days for portable sources) prior to commencement of the permitted operation or activity. Failure to do so is a violation of Section (12)(a), C.R.S. and AQCC Regulation No. 3, Part B, Section III.G.1., and can result in the revocation of the permit. You must demonstrate compliance with the permit conditions within 180 days after commencement of operation as stated in condition Section (2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee billing will terminate. 9. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections (enforcement), -121 (injunctions), -122 (civil penalties), (criminal penalties), C.R.S.

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 04PB1019 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL ISSUED TO:

More information

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County) AIR QUALITY PERMIT Permit No. Effective Date April 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted

More information

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015 AIR QUALITY PERMIT Permit No. Effective Date May 26, 2015 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

Air Quality Permit. PDC Energy Inc/Caerus Piceance LLC Metcalf Soil Treatment Facility. OA Project No

Air Quality Permit. PDC Energy Inc/Caerus Piceance LLC Metcalf Soil Treatment Facility. OA Project No Air Quality Permit PDC Energy Inc/Caerus Piceance LLC Metcalf Soil Treatment Facility OA Project No. 013-0036 760 Horizon Drive, Suite 102 Grand Junction, CO 81506 TEL 970.263.7800 FAX 970.263.7456 COLORADO

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

STATE OF COLORADO CONSTRUCTION PERMIT. Black Hills Electric Generation, LLC

STATE OF COLORADO CONSTRUCTION PERMIT. Black Hills Electric Generation, LLC COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVI AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 PERMIT NO: STATE OF COLORADO CONSTRUCTION PERMIT 09PB0591 DATE ISSUED: JULY 22, 2010 ISSUED TO: Black

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS GENERAL

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM June 17, 2004 SUBJECT: Review of Application Title V Operating Permit Bellefield Boiler Plant Boundary Street Pittsburgh, PA 15213 RE: Operating Permit

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

Streamlining Multiple Applicable Requirements

Streamlining Multiple Applicable Requirements Streamlining Multiple Applicable Requirements What is Streamlining? 1. Streamlining is the process of determining one set of requirements to be incorporated into the Title V permit from among multiple

More information

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

This is a new permit condition titled, 2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP) This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced

More information

Air Individual Permit Permit Limits to Avoid NSR

Air Individual Permit Permit Limits to Avoid NSR Air Individual Permit Permit Limits to Avoid NSR 13900128-001 Permittee: Facility name: Shakopee Distributed Generation Shakopee Distributed Generation Vierling Drive E Shakopee, Minnesota 55379 Scott

More information

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the 15A NCAC 02D.1206 HOSPITAL, MEDICAL, AND INFECTIOUS WASTE INCINERATORS (a) Applicability. This Rule applies to any hospital, medical, and infectious waste incinerator (HMIWI), except: (1) any HMIWI required

More information

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published

More information

AIR EMISSION SOURCE CONSTRUCTION PERMIT

AIR EMISSION SOURCE CONSTRUCTION PERMIT AIR EMISSION SOURCE CONSTRUCTION PERMIT Source ID No.: 0550023 Effective Date: Source Name: DRAFT Holcomb Station NAICS: 221112, Fossil fuel power generation (SIC 4911) Site Location: Site Owner/Operator

More information

3. GENERAL CONDITIONS

3. GENERAL CONDITIONS 2 3. GENERAL CONDITIONS a) This Plan Approval authorizes the construction of a 272 net megawatt waste coal-fired, circulating fluidized bed boiler by Robinson Power Company (RPC), P. O. Box 127, Burgettstown,

More information

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

AIR QUALITY PERMIT P 01 0 May 14, 2007

AIR QUALITY PERMIT P 01 0 May 14, 2007 AIR QUALITY PERMIT Permit No. Effective Date 4911 099 0033 P 01 0 May 14, 2007 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12 9 1, et seq and the Rules, Chapter 391

More information

AIR QUALITY PERMIT. Vulcan Construction Materials, LLC-Gainesville RM

AIR QUALITY PERMIT. Vulcan Construction Materials, LLC-Gainesville RM AIR QUALITY PERMIT Permit No. Effective Date January 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT APPENDIX D APPENDIX D REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL NEW JERSEY STATE DEPARTMENT

More information

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number STATEMENT OF BASIS Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number 701-0013 Introduction On June 30, 2017, the Department received an application to renew the Title V Major Source

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit No. : 0159-AR-4 IS ISSUED TO: 2201 N. Redmond Rd. Jacksonville, AR 72023 Pulaski County THIS PERMIT IS THE ABOVE REFERENCED PERMITTEE S AUTHORITY TO CONSTRUCT, MODIFY,

More information

AIR QUALITY PERMIT. Longleaf Energy Associates, LLC C/o LS Power Development, LLC Two Tower Center, 11 th Floor East Brunswick, New Jersey 08816

AIR QUALITY PERMIT. Longleaf Energy Associates, LLC C/o LS Power Development, LLC Two Tower Center, 11 th Floor East Brunswick, New Jersey 08816 AIR QUALITY PERMIT Permit No. Effective Date In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant to or in

More information

MAJOR SOURCE OPERATING PERMIT

MAJOR SOURCE OPERATING PERMIT MAJOR SOURCE OPERATING PERMIT Permitee: Facility Name: Facility No.: Location: INTERNATIONAL PAPER CO. INTERNATIONAL PAPER RIVERDALE MILL 104-0003 SELMA, ALABAMA In accordance with and subject to the provisions

More information

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations? Presented by Richard M. Cestone, PE, CHMM Birdsall Services Group For NJEWA Conference May 9, 2011 What happens when a permit has both federal and state regulations? 1 Facilities get confused with Federal

More information

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by Huntington Power Plant Notice of Intent Submitted to the Utah Division of Air Quality And Prepared by 1407 West North Temple Salt Lake City, Utah 84116 April 11, 2008 1.0 Introduction PacifiCorp Energy

More information

Appendix K. Final DOC Conditions

Appendix K. Final DOC Conditions Appendix K Final DOC Conditions Puente Power Project 262 MW (net nominal) GE 7HA.01 Combustion Turbine Generator (CTG) The CTG is simultaneously subject to the emission limits, monitoring requirements,

More information

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY AIR EMISSION PERMIT NO. 12300012-002 IS ISSUED TO NORTHERN STATES POWER COMPANY NSP - HIGH BRIDGE GENE 501 Shepard Road St. Paul, Ramsey County, Minnesota 551023004 The emission units, control equipment

More information

SYNOPSIS OF PROPOSED GEORGIA DEPARTMENT OF PUBLIC SAFETY RULES CHAPTER TRANSPORTATION NETWORK COMPANIES AND TAXI SERVICES

SYNOPSIS OF PROPOSED GEORGIA DEPARTMENT OF PUBLIC SAFETY RULES CHAPTER TRANSPORTATION NETWORK COMPANIES AND TAXI SERVICES SYNOPSIS OF PROPOSED GEORGIA DEPARTMENT OF PUBLIC SAFETY RULES CHAPTER 570-35 TRANSPORTATION NETWORK COMPANIES AND TAXI SERVICES Purpose: The rules provide for the registration and regulation of transportation

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company AIR EMISSION PERMIT NO. 16300110-001 IS ISSUED TO Northern Natural Gas Company NORTHERN NATURAL GAS - HUGO No Street Address Hugo, Washington County, Minnesota 55038 The emission units and emission stacks

More information

Regulation No. 3 Changes For Internal Combustion Engines. Christine Hoefler November 14, 2012

Regulation No. 3 Changes For Internal Combustion Engines. Christine Hoefler November 14, 2012 Regulation No. 3 Changes For Internal Combustion Engines Christine Hoefler November 14, 2012 Overview Changes to Regulation No. 3 New Source Performance Standard (NSPS) IIII Conflicts with NSPS IIII 2

More information

Board Administration and Regulatory Coordination Unit. Division 3. Air Resources Board

Board Administration and Regulatory Coordination Unit. Division 3. Air Resources Board 2423. Exhaust Emission Standards and Test Procedures--Heavy-Duty Off-Road Diesel Cycle Engines. (a) This section shall be applicable to new heavy-duty off-road compression-ignition engines, produced on

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: N-6311-9-1 ISSUANCE DATE: 12/17/2008 LEGAL OWNER OR OPERATOR: FISCALINI FARMS & FISCALINI DAIRY MAILING ADDRESS: 7231 COVERT RD MODESTO, CA 95358 LOCATION: 4848 JACKSON

More information

Appendix K. DOC Conditions

Appendix K. DOC Conditions Appendix K DOC Conditions Mission Rock Energy Center Five (5) GE LM6000-PG-Sprint Combustion Turbine Generators (CTGs) Total = 275 MW Nominal Each CTG is simultaneously subject to the emission limits,

More information

OPERATING PERMIT. Bill Barrett Corporation Bailey Compressor Station

OPERATING PERMIT. Bill Barrett Corporation Bailey Compressor Station OPERATING PERMIT Issued: June 1, 2012 AIR POLLUTION CONTROL DIVISION COLORADO OPERATING PERMIT FACILITY NAME: Bailey Compressor Station FACILITY ID: 045/1477 ISSUE DATE: June 1, 2012 EXPIRATION DATE:

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM February 2, 2012 SUBJECT: Superior Appalachian Pipeline, LLC Kissick Lane Frazer Township, PA 15084 Allegheny County Installation Permit No. 0837-I001

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Spark Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction of the

More information

State of New Jersey. Department of Environmental Protection Division of Air Quality

State of New Jersey. Department of Environmental Protection Division of Air Quality GOP-006 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-006) Combined Heat and Power Stationary Spark Ignition Reciprocating Engine(s) less

More information

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) 1.0 Purpose The purpose of this rule is to limit emissions

More information

AIR PERMIT ABBEVILLE, HENRY COUNTY, ALABAMA DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE

AIR PERMIT ABBEVILLE, HENRY COUNTY, ALABAMA DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE AIR PERMIT PERMITTEE: FACILITY NAME: LOCATION: PEGASUS WEST, LLC PEGASUS WEST, LLC ABBEVILLE, HENRY COUNTY, ALABAMA PERMIT NUMBER 606-S008-X001 DESCRIPTION OF EQUIPMENT, ARTICLE OR DEVICE Sawmill Green

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

DEP7007CC Compliance Certification

DEP7007CC Compliance Certification Commonwealth of Kentucky Natural Resources & Environmental Protection Cabinet Department for Environmental Protection DIVISION FOR AIR QUALITY DEP7007CC Compliance Certification Division Use Only ID# Permit

More information

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted 06-01-95 INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION, EMERGENCY STANDBY 111 EXEMPTION,

More information

State of New Jersey. Department of Environmental Protection Air Quality Permitting

State of New Jersey. Department of Environmental Protection Air Quality Permitting GP021 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP 021) Combined Heat and Power Combustion Turbine(s) less than or equal to 65 MMBTU per hour This

More information

RULE 2280 PORTABLE EQUIPMENT REGISTRATION (Adopted October 20, 1994; Amended May 16, 1996)

RULE 2280 PORTABLE EQUIPMENT REGISTRATION (Adopted October 20, 1994; Amended May 16, 1996) RULE 2280 PORTABLE EQUIPMENT REGISTRATION (Adopted October 20, 1994; Amended May 16, 1996) 1.0 Purpose The purpose of this rule is to provide an administrative mechanism, and establish standards for registration

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit #: 759-AR-6 IS ISSUED TO: CYRO Industries 1500 Richard Prewitt Drive Osceola, Arkansas 72370 Mississippi County CSN: 47-0194 THIS PERMIT IS YOUR AUTHORITY TO CONSTRUCT,

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT DATE: 3/1/10, updated 5/5/10 TO: Interested Parties SUBJECT: Frequently asked questions regarding compliance with Rule 4320, Advanced Emission Reduction

More information

DRAFT AUTHORITY TO CONSTRUCT

DRAFT AUTHORITY TO CONSTRUCT A/C NO.: 25780 ISSUED BY: DATE ISSUED: TBD JORGE DEGUZMAN DATE EXPIRES: ISSUED TO: TBD PRIME DATA CENTERS DBA SVO BUILDING ONE LLC LOCATION: 2407 AK ST., MCCLELLAN PARK, CA 95652 DESCRIPTION: IC ENGINE

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM April 18, 2014 SUBJECT: Cellco Partnership, dba Verizon Wireless 18 Abele Road Bridgeville, PA 15017 Allegheny County Operating Permit No. 0867 TO:

More information

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business.

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business. Major/Area Source Boiler MACT Rule Speaker: Eric Swisher 23rd Virginia Environmental Symposium April 11, 2012 Your environmental compliance is clearly our business. Overview Ground Rules Regulatory Framework

More information

Applicable Requirements - NSPS Subpart JJJJ

Applicable Requirements - NSPS Subpart JJJJ Facility Name: CO Station 3 Combustion Type: 4SRB Facility HAP Status: Area Fuel Type: Natural gas RICE Owner: RICE Operator: S2C Gathering Co Acme Operating Inc. Use Type: Max. Runtime: Non-emergency

More information

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia AIR EMISSION PERMIT NO. 13700028-003 IS ISSUED TO City of Virginia 620 South 2nd Street Virginia, St. Louis County, Minnesota 55792 The emission units, control equipment and emission stacks at the stationary

More information

SUPPLEMENT to PERMIT No Woodspecs, Inc. Waterford, Michigan September 6, 2000 GENERAL CONDITIONS

SUPPLEMENT to PERMIT No Woodspecs, Inc. Waterford, Michigan September 6, 2000 GENERAL CONDITIONS SUPPLEMENT to PERMIT No. 165-00 Woodspecs, Inc. Waterford, Michigan GENERAL CONDITIONS 1. Rule 201(1) - The process or process equipment covered by this permit shall not be reconstructed, relocated, altered,

More information

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater 11/21/2016 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-007) Boiler or Heater Greater than or equal to 1 MMBTU/hr and less than 5 MMBTU/hr

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc.

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc. DRAFT/PROPOSED AIR EMISSION PERMIT NO. 00300155 002 Major Amendment IS ISSUED TO Hoffman Enclosures, Inc. Hoffman Enclosure Inc/Pentair Equipment Protection 2100 Hoffman Way Anoka, Anoka County, MN 55303

More information

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Permit Amendment No.: 2436-211-0013-V-03-1 Effective Date: July 25, 2014 Facility Name: Facility Address: Mailing Address: Parent/Holding Company: Georgia-Pacific Wood

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: S-7658-1-0 ISSUANCE DATE: 10/30/2009 LEGAL OWNER OR OPERATOR: ABEC BIDART-STOCKDALE LLC MAILING ADDRESS: C/O CALIFORNIA BIOENERGY LLC 2828 ROUTH STREET SUITE 500 DALLAS,

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc AIR EMISSION PERMIT NO. 13700013-006 IS ISSUED TO Minnesota Power Division of ALLETE Inc MINNESOTA POWER - LASKIN ENERGY CENTER 5699 Colby Lake Road Hoyt Lakes, St. Louis County, MN 55750 The emission

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE, Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE, Inc. AIR EMISSION PERMIT NO. 13700013-005 IS ISSUED TO Minnesota Power Division of ALLETE, Inc. MINNESOTA POWER - LASKIN ENERGY CENTER County Road 633 Aurora, St. Louis County, MN 55705 The emission units,

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit No. : 1582-AR-5 IS ISSUED TO: ConAgra Frozen Foods 3100 East Main Street Russellville, AR 72801 Pope County THIS PERMIT IS THE ABOVE REFERENCED PERMITTEE S AUTHORITY

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION May 1, 2015 PERMIT TO INSTALL 4-13B ISSUED TO Zoetis LLC LOCATED AT 306 Pitcher Street Kalamazoo, Michigan IN THE COUNTY OF Kalamazoo STATE

More information

REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (1) This rule applies to the following emission units:

REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (1) This rule applies to the following emission units: RULE 12. REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (a) APPLICABILITY (1) This rule applies to the following emission units: Existing internal combustion emergency standby

More information

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC 2011 Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC Ohio EPA, Division of Air Pollution Control 1/1/2011 Page 2

More information

SECTION.1400 NITROGEN OXIDES

SECTION.1400 NITROGEN OXIDES SECTION.1400 NITROGEN OXIDES 15A NCAC 02D.1401 DEFINITIONS (a) For the purpose of this Section, the definitions at G.S 143-212 and G.S. 143-213, and 15A NCAC 02D.0101 shall apply, and in addition the following

More information

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.15.1 - BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) A. Applicability The provisions of this

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT

ALLEGHENY COUNTY HEALTH DEPARTMENT ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM 301 39th Street, Bldg. #7 Pittsburgh, PA 15201-1891 Major Source Title V Operating Permit Issued To: ACHD Permit #: 0047 Facility: Date of Issuance:

More information

STATEMENT OF BASIS. University of Arkansas for Medical Sciences (UAMS) 4301 West Markham St. Little Rock, Arkansas 72205

STATEMENT OF BASIS. University of Arkansas for Medical Sciences (UAMS) 4301 West Markham St. Little Rock, Arkansas 72205 STATEMENT OF BASIS For the issuance of Draft Air Permit # 2125-AOP-R3 1. PERMITTING AUTHORITY: Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118-5317

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 180619-093 WHEREAS, In March, 2018, three companies began operating shared electric scooter programs (Powered Scooter Share

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 14700009-101 Permittee: Facility name: Northern Natural Gas Company - Owatonna Compressor Station Northern Natural Gas Company - Owatonna Compressor Station

More information

OUTOKUMPU STAINLESS USA, LLC CALVERT, AL FACILITY NO.: MAJOR SOURCE OPERATING PERMIT INITIAL TITLE V DRAFT

OUTOKUMPU STAINLESS USA, LLC CALVERT, AL FACILITY NO.: MAJOR SOURCE OPERATING PERMIT INITIAL TITLE V DRAFT CALVERT, AL FACILITY NO.: 503-0106 MAJOR SOURCE OPERATING PERMIT INITIAL TITLE V DRAFT (THIS PAGE LEFT BLANK INTENTIONALLY) Table of Contents PROCESS DESCRIPTION... 2 MELT SHOP... 4 STATE REGULATIONS...

More information

RICE NESHAP Frequently Asked Questions (FAQ)

RICE NESHAP Frequently Asked Questions (FAQ) RICE NESHAP Frequently Asked Questions (FAQ) What does RICE NESHAP mean? RICE NESHAP is an acronym for Reciprocating Internal Combustion Engines National Emission Standards for Hazardous Air Pollutants.

More information

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3.

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3. VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 59 - ELECTRICAL POWER GENERATING EQUIPMENT - OXIDES OF NITROGEN EMISSIONS (Adopted 10/6/69, Revised 5/23/72, 7/18/72, 10/31/72, 8/14/79, 12/7/82, 6/4/91,

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks Approved By: Signed Seyed Sadredin Director of Permit Services

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission DRAFT/PROPOSED AIR EMISSION PERMIT NO. 08500034 002 Total Facility Operating Permit Reissuance IS ISSUED TO Hutchinson Utilities Commission Hutchinson Utilities Commission Plant 2 1100 Industrial Boulevard

More information

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 Discussion Topics Background Important Terms Applicability Compliance Deadlines Emission/Operating Limits Performance/Compliance

More information

MACK TRUCKS, INC PENNSYLVANIA AVENUE, HAGERSTOWN, MD PART 70 OPERATING PERMIT NO

MACK TRUCKS, INC PENNSYLVANIA AVENUE, HAGERSTOWN, MD PART 70 OPERATING PERMIT NO SECTION I SOURCE IDENTIFICATION... 4 1. DESCRIPTION OF FACILITY... 4 2. FACILITY INVENTORY LIST... 4 SECTION II GENERAL CONDITIONS... 6 1. DEFINITIONS... 6 2. ACRONYMS... 6 3. EFFECTIVE DATE... 7 4. PERMIT

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 28, 2005 PERMIT TO INSTALL

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 28, 2005 PERMIT TO INSTALL MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION September 28, 2005 PERMIT TO INSTALL 187-05 ISSUED TO Zeeland Board of Public Works LOCATED AT 8943 Riley Street Zeeland, Michigan IN THE

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 08500002-101 Permittee: Hutchinson Utilities Commission - Plant 1 Facility name: Hutchinson Utilities Commission - Plant 1 44 4th Ave NE Hutchinson, MN 55350-1829

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets

AIR EMISSION PERMIT NO IS ISSUED TO. Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets AIR EMISSION PERMIT NO. 10901019-002 IS ISSUED TO Rochester Public Utilities for Two Standby/Peaking Diesel-Fired Generator Sets Rochester Public Utilities 3605 Highway 52 North Rochester, Olmsted County,

More information

State of New Jersey. General Permit (GP-009A)

State of New Jersey. General Permit (GP-009A) 03/21/2013 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-009A) For Boiler(s) and Indirect Fired Process Heater(s) Each Greater Than or Equal to 10

More information

AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P.

AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P. AIR EMISSION PERMIT NO. 16300087-006 Total Facility Oper. Permit - Reissuance IS ISSUED TO LSPCottage Grove, L.P. LSPCOTTAGE GROVE COGENERATION FACILITY 9525 105th Street Court South Cottage Grove, Washington

More information

April 4, Wayne Marshall Principal White Street Renewables, LLC P.O. Box 659 Huntersville, NC 28070

April 4, Wayne Marshall Principal White Street Renewables, LLC P.O. Box 659 Huntersville, NC 28070 PAT MCCRORY Governor DONALD R. VANDER V AART Secretary Air Quality ENVIRONMENTAL QUALITY SHEILA C. HOLMAN Director April 4, 2016 Wayne Marshall Principal White Street Renewables, LLC P.O. Box 659 Huntersville,

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 206-14 Page 1 of 27 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit

More information

MISCELLANEOUS: Supporting On-Line Documents; Definitions; Acronyms (Attached); Appendix X HAPs List

MISCELLANEOUS: Supporting On-Line Documents; Definitions; Acronyms (Attached); Appendix X HAPs List Page A2 of A20 TABLE OF CONTENTS Part A FACILITY SPECIFIC REQUIREMENTS... A3 A100 Introduction... A3 A101 Permit Duration (expiration)... A3 A102 Facility: Description... A3 A103 Facility: Applicable Regulations...

More information

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels GP-005B State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels This general permit allows for the construction,

More information

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION SIC Code: 4911 (Energy Production) DATE: 06/17/2005 Page 1 of 6 DATE APPLICATION RECEIVED: March 31, 2004 (Application # FY04-0427) FACILITY DESCRIPTION Pinetree-Bethlehem (the Permittee) operates a 17.1

More information

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 AIR EMISSION PERMIT NO. 14500026-001 IS ISSUED TO St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 The emission units, control equipment and emission stacks at

More information

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR AIR POLLUTION CONTROL DISTRICT COUNTY OF SAN DIEGO FEDERAL SUBPART ZZZZ NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES WORKSHOP REPORT

More information

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year.

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year. 1 of 11 8/21/2012 10:19 AM SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1146 - EMISSIONS OF OXIDES OF NITROGEN FROM INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS

More information

Full Compliance Evaluation Report Off-Site Report

Full Compliance Evaluation Report Off-Site Report STATE OF NEW HAMPSHIRE DEPARTMENT OF ENVIRONMENTAL SERVICES AIR RESOURCES DIVISION Full Compliance Evaluation Report Off-Site Report CONCORD STEAM CORPORATION 105 ½ PLEASANT STREET CONCORD, NH 03302-1377

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Cogentrix

AIR EMISSION PERMIT NO IS ISSUED TO. Cogentrix AIR EMISSION PERMIT NO. 16300087-004 IS ISSUED TO Cogentrix 9525 105th Street Court South Cottage Grove, Washington County, MN 55016 The emission units, control equipment and emission stacks at the stationary

More information

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788 Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: 04-13-08700037 Application #: 22788 Date SIP Application Received: August 11, 2014 Date Title V Application

More information

AIR QUALITY PERMIT Issued under 401 KAR 52:020

AIR QUALITY PERMIT Issued under 401 KAR 52:020 Commonwealth of Kentucky Energy and Environment Cabinet Department for Environmental Protection Division for Air Quality 200 Fair Oaks Lane, 1 st Floor Frankfort, Kentucky 40601 (502) 564-3999 Proposed

More information