1 Commonwealth of Kentucky Energy and Environment Cabinet Department for Environmental Protection Division for Air Quality 200 Fair Oaks Lane, 1 st Floor Frankfort, Kentucky (502) Proposed AIR QUALITY PERMIT Issued under 401 KAR 52:020 Permittee Name: Mailing Address: Cash Creek Generating, L.L.C. The Erora Group, L.L.C Brownsboro Road, Suite 110 Louisville, KY Source Name: Mailing Address: Source Location: Cash Creek Generation Station The Erora Group, L.L.C Brownsboro Road, Suite 110 Louisville, KY Kentucky State Highway 1078 in Henderson County Permit: V Agency Interest: Activity: APE Review Type: Title V / Title IV / Title I - PSD, CAIR Source ID: Regional Office: County: Owensboro Regional Office 3032 Alvey Park Dr. W., Suite 700 Owensboro, KY (270) Henderson Application Complete Date: November 25, 2008 Issuance Date: March 5, 2010 Revision Date: N/A Expiration Date: March 5, 2015 Version 06/26/09 John S. Lyons, Director Division for Air Quality

2 TABLE OF CONTENTS SECTION ISSUANCE PAGE A. PERMIT AUTHORIZATION Initial 2 B. EMISSION POINTS, EMISSIONS UNITS, APPLICABLE Initial REGULATIONS, AND OPERATING CONDITIONS Combined Cycle Combustion Turbines (Emission Units HRSG1 and HRSG2) 4 Auxiliary Boiler (Emission Unit AUXB) 16 Methanation Startup Heater (Emission Unit MSH) 23 Acid Gas Recovery Vent (Emission Unit AGR) 30 Sulfur Recovery Unit (Emission Unit TO) 35 Flare (emission Unit FLR) 42 Aspirator Vent (Emission Unit ASP) 47 Emergency Generator and Fire Pump (Emission Units EG and FP) 50 Cooling Tower (Emission Unit CT1-22) 57 Fugitive Equipment Leaks (Emission Units FE-SYN, FE-AGR, FE-SRU, 60 and FE-MET) Coal Handling (Emission Units DC-1, DC-2, DC-3, DC-4, CH-1, CH-2, CH-3, 65 CH-4, CH-5, and CH-6) Fugitive Emissions (Emission Units ST1, ST2, SLF, CPF, LFWE, and CPWE) 75 Methanol Storage Tank (Emission Unit MST) 80 C. INSIGNIFICANT ACTIVITIES Initial 83 D. SOURCE EMISSION LIMITATIONS AND TESTING Initial 84 REQUIREMENTS E. SOURCE CONTROL EQUIPMENT REQUIREMENTS Initial 87 F. MONITORING, RECORDKEEPING, AND REPORTING Initial 88 REQUIREMENTS G. GENERAL CONDITIONS Initial 91 H. ALTERNATE OPERATING SCENARIOS Initial 97 I. COMPLIANCE SCHEDULE Initial 98 J. ACID RAIN Initial 99 K. NOx BUDGET Initial 101 Permit Number Permit type Activity Number Complete Date V Initial APE /25/08 TBD Issuance Date Summary of Action Construction/Operating Permit

3 Permit Number: V Page 2 of 101 SECTION A PERMIT AUTHORIZATION Pursuant to a duly submitted application the Kentucky Division for Air Quality (Division) hereby authorizes the operation of the equipment described herein in accordance with the terms and conditions of this permit. This permit has been issued under the provisions of Kentucky Revised Statutes Chapter 224 and regulations promulgated pursuant thereto. The Division previously issued permit V to Cash Creek Generating Station for the construction of a coal integrated gasification combined cycle electrical generation unit. The PSD authority to construct that was granted with that permit is terminated with the issuance of the proposed permit for V The permittee shall not construct, reconstruct, or modify any affected facilities without first submitting a complete application and receiving a permit for the planned activity from the permitting authority, except as provided in this permit or in 401 KAR 52:020, Title V Permits. Issuance of this permit does not relieve the permittee from the responsibility of obtaining any other permits, licenses, or approvals required by the Kentucky Energy and Environment Cabinet (Cabinet) or any other federal, state, or local agency. Abbreviations BACT Btu Cabinet CAIR CEMS CH 4 CO CO 2 COMS Division dscf dscm g hp H 2 SO 4 H 2 S HRSGs hour J k lb m 3 MJ mmbtu mmcal MW MWh ng NO X O 2 Best Available Control Technology British thermal units Kentucky Energy and Environment Cabinet Clean Air Act Interstate Rule Continuous Emissions Monitoring System methane carbon monoxide carbon dioxide Continuous Opacity Monitoring System Kentucky Division for Air Quality dry standard cubic feet dry standard cubic meter gram horsepower sulfuric acid hydrogen sulfide heat recovery steam generators hr Joule kilo pound cubic meter mega Joules million British thermal units million calorie megawatt megawatt-hour nanograms nitrogen oxides oxygen

4 Permit Number: V Page 3 of 101 SECTION A PERMIT AUTHORIZATION (CONTINUED) Pa PM PM 2.5 PM 10 ppm ppmv RATA scfh scm SCR SO 2 TDS tph tpy VOC Pascal Particulate Matter Particulate Matter less than 2.5 microns in diameter Particulate Matter less than 10 microns in diameter parts per million parts per million by volume Relative Accuracy Test Audit standard cubic feet/hour standard cubic meter Selective Catalytic Reduction sulfur dioxide Total Dissolved Solids tons per hour tons per year Volatile Organic Compounds

5 Permit Number: V Page 4 of 101 REGULATIONS, AND OPERATING CONDITIONS Emission Unit: HRSG1 (HRSG1) Emission Unit: HRSG2 (HRSG2) Combined Cycle Combustion Turbine Combined Cycle Combustion Turbine Description: The combustion turbines and associated heat recovery steam generators (HRSG) produce electrical power for sale. The units are not lean premix or diffusion flame, and do not use water or steam injection for control of nitrogen oxides (NO X ). The HRSGs are used to provide steam to a steam turbine for additional power output. Construction Date: Estimated second quarter Fuel Input: 1938 million British thermal units per hour (mmbtu/hr), each turbine. Primary Fuel: Natural gas defined in 40 CFR 60, Subpart KKKK. Secondary Fuel: Natural gas defined in 40 CFR 60, Subpart Da (substitute natural gas). Power Output: Approximately megawatt (MW) at 59 degrees Fahrenheit (does not include power from steam turbine) Control Equipment: Selective catalytic reduction (SCR) for control of NO X. Catalytic oxidizer for control of formaldehyde and carbon monoxide (CO). APPLICABLE REGULATIONS: 401 KAR 51:017 Prevention of significant deterioration of air quality. This regulation is applicable with respect to particulate matter (PM), particulate matter less than 10 microns in diameter (PM 10 ), particulate matter less than 2.5 microns in diameter (PM 2.5 ), sulfur dioxide (SO 2 ), NO X, and CO emissions from a new major stationary source that commenced after September 22, KAR 51:210 CAIR NO X annual trading program. This regulation is applicable to Clean Air Interstate Rule (CAIR) NO X units that are subject to 40 CFR This regulation establishes requirements for the control of NO X emissions from large boilers and turbines used in power plants pursuant to the federal mandate published under 40 CFR to Refer to Section K. 401 KAR 51:220 CAIR NO X ozone season trading program. This regulation is applicable to the control of CAIR NO X Ozone Season units that are subject to 40 CFR This regulation establishes requirements for the control of NO X emissions from large boilers and turbines used in power plants pursuant to the federal mandate published under 40 CFR to Refer to Section K. 401 KAR 51:230 CAIR SO 2 trading program. This regulation is applicable to the control of CAIR SO 2 units under the CAIR SO 2 Trading Program that are subject to 40 CFR This regulation establishes requirements for the control of SO 2 emissions from large boilers and turbines used in power plants pursuant to the federal mandate published under 40 CFR to Refer to Section K. 401 KAR 63:020 Potentially hazardous matter or toxic substances. This regulation is applicable to an emission unit which emits or may emit potentially hazardous matter or toxic

6 Permit Number: V Page 5 of 101 substances, provided such emissions are not elsewhere subject to the provisions of the administrative regulations of the Division. Refer to SECTION D for operating limitations and compliance demonstration method. 401 KAR 60: C.F.R. Part 60 standards of performance for new stationary sources incorporating by reference 40 CFR 60 Subpart KKKK Standards of Performance for Stationary Combustion Turbine. This regulation is applicable to NO X and SO 2 emissions from stationary combustion turbines with a heat input at peak load equal to or greater than 10.7 gigajoules (10 mmbtu) per hour that commenced construction, modification or reconstruction after February 18, CFR 64 Compliance Assurance Monitoring. This regulation is applicable with respect to CO. 40 CFR 75 Continuous Emission Monitoring. This regulation is applicable to continuous emissions monitoring system (CEMS) for NO X and SO 2. NON-APPLICABLE REGULATIONS 40 CFR 60 Subparts GG, Da, Db, or Dc. Pursuant to 40 CFR (b), combustion turbines are exempt from the requirements of Subpart GG and recovery steam generators and duct burners regulated under Subpart KKKK are exempt from the requirements of Subparts Da, Db, and Dc. 40 CFR 63 Subpart YYYY, National Emission Standards for Hazardous Air Pollutants for Stationary Combustion Turbines. This regulation applies to major sources of hazardous air pollutants. This permit contains a federally enforceable emission limit on formaldehyde so as to preclude the applicability of this regulation. 1. Operating Limitations: a. Pursuant to 401 KAR 51:017, the permittee shall install and operate whenever the combustion turbine is in operation, the following control technology, equipment and methods required to meet Best Available Control Technology (BACT) demonstration: (1) A SCR unit for control of NO X ; (2) Low NO X burners for control of NO X ; (3) A catalytic oxidizer for the control of CO; and (4) Combust only natural gas and substitute natural gas fuel for control of PM\PM 10 \PM 2.5. b. For compliance with the source-wide limits to preclude the applicability of 40 CFR 63, Subpart YYYY, the permittee shall install and operate whenever the combustion turbine is in operation, the catalytic oxidizer for the control of formaldehyde (refer to SECTION D paragraph 4). c. Pursuant to 401 KAR 51:017, the combustion turbines are restricted to the combustion of natural gas and substitute natural gas. Natural gas is any fuel that meets the definition of natural gas in 40 CFR Substitute natural gas is any fuel that meets the definition of natural gas in 40 CFR 60.41Da.

7 Permit Number: V Page 6 of 101 d. Pursuant to 401 KAR 51:017, the permittee shall not operate either combustion turbine at a firing rate less than 60 percent of the rated capacity on an hourly basis, except during periods of startup and shutdown events. Compliance Demonstration Methods: a. Refer to reporting requirements in SECTION F paragraph 9 for compliance with Operating Limitations a through d. b. Compliance with Operating Limitations b shall be demonstrated by fulfilling the following requirements: (1) Testing Requirements f; (2) Specific Monitoring Requirements g; (3) Specific Control Equipment Operating Conditions b; and (4) See SECTION D paragraph 4. c. Compliance with Operating Limitations a(4) and b, fuel use shall be demonstrated as follows: (1) If the fuel (natural gas as defined in 40 CFR ) is a naturally occurring mixture of hydrocarbon and non-hydrocarbon gases found in geologic formations beneath the earth's surface, of which the principal constituent is methane, the permittee shall maintain records showing fuel characteristics in a current, valid purchase contract, tariff sheet or transportation contract for the fuel, specifying the fuels major constituents and heat value; or (2) If the fuel is substitute natural gas (natural gas as defined in 40 CFR 60.41Da), produced in the gasification to natural gas process, the permittee shall develop a monitoring plan approved by the Division to demonstrate the following: (i) Procedure describing sampling and test methods used to verify that the fuel is composed of at least 70 percent methane by volume or has a calorific value between 34 and 43 mega Joules(MJ)/dry standard cubic meter (dscm) (910 and 1,150 British thermal unit (Btu)/dry standard cubic feet (dscf)); (ii) Heat content of the fuel; and (iii) Sample frequency shall meet the requirements of 40 CFR (3) The permittee shall use the following International Organization for Standardization methods, ISO through (to determine gas composition), and/or ISO 6976 (to determine calorific values.) d. For compliance with Operating Limitations c, a metering system shall be installed and operated to accurately and separately measure natural gas and substitute natural gas being fired in the combustion turbine. (Refer to SECTION F.9 for compliance reporting). 2. Emission Limitations: a. Pursuant to 401 KAR 51:017, based on BACT, the permittee shall not discharge into the atmosphere any gases from the combustion turbines that contain PM\PM 10 \PM 2.5, NO X, SO 2, and CO in concentrations that exceed the following limits:

8 Permit Number: V Page 7 of 101 (1) PM\PM 10 \PM lb/mmbtu based on a three (3) hour rolling average; (2) NO X lb/mmbtu based on a twenty-four (24) hour rolling average; (3) SO lb/mmbtu based on a three (3) hour rolling average; and (4) CO lb/mmbtu based on a twenty-four (24) hour rolling average. b. Pursuant to 401 KAR 51:017, to ensure the validity of the NAAQS and increment consumption modeling, the permittee shall not discharge into the atmosphere any gases from emission units HRSG1 or HRSG2 that contain PM\PM 10 \PM 2.5, NO X, SO 2, and CO that exceed the following limits: (1) PM\PM 10 \PM lb/hr based on a twenty-four (24) hour block average; (2) NO X lb/hr based on a thirty (30) day block average; (3) SO lb/hr based on a twenty-four (24) hour block average; and (4) CO 9.11 lb/hr based on an eight (8) hour block average. c. Pursuant to 40 CFR (a), the permittee shall not discharge into the atmosphere any gases from the combustion turbines that contain NO X in concentrations that exceed the following limits based on a three (3) hour rolling average, unless the permittee uses a CEMS, then excess emission are determined pursuant to (b)(1): (1) Natural gas 15 ppm at 15 percent oxygen (O 2 ) or 54 nanograms (ng)/joule (J) of useful output (0.43 lb/megawatt-hour (MWh); and (2) Substitute natural gas (fuels other than natural gas) 42 ppm at 15 percent O 2 or 160 ng/j of useful output (1.3 lb/mwh). d. Pursuant to 40 CFR (a), the permittee shall not discharge into the atmosphere any gases from the combustion turbines that contain SO 2 in concentrations that exceed the following limits: (1) 110 ng/j (0.90 lb/mwh) gross output based on a three (3) hour rolling average; or (2) Fuel combusted shall not contain total potential sulfur emissions that exceed 26 ng SO 2 /J (0.060 lb SO 2 /mmbtu) heat input. e. Pursuant to 40 CFR , when a combustion turbine is burning both natural gas and substitute natural gas, if the total heat input is greater than or equal to fifty (50) percent natural gas the permittee shall meet the natural gas emission limits. If the total heat input is greater than fifty (50) percent substitute natural gas the permittee shall meet the substitute natural gas emission limits. f. Refer to SECTION D paragraph 5 and 6 for source-wide limits of VOC and H 2 SO 4. Compliance Demonstration Methods: a. Compliance with PM\PM 10 \PM 2.5 Emission Limitations a(1) and b(1) shall be demonstrated by fulfilling the following requirements: (1) Operating Limitations a(4) and b; and (2) Specific Recordkeeping Requirements c(2). b. Compliance with NO X Emission Limitations a(2), b(2), and c shall be demonstrated by fulfilling the following requirements:

9 Permit Number: V Page 8 of 101 (1) Operating Limitations a(1) and (2); (2) Testing Requirements b and c; (3) Specific Monitoring Requirements b, c and d; (4) Specific Recordkeeping Requirements b and c; and (5) Specific Reporting Requirements a and b. c. Compliance with SO 2 Emission Limitations a(3), b(3), and d shall be demonstrated by fulfilling the following requirements: (1) Testing Requirements d; (2) Specific Monitoring Requirements e; (3) Specific Recordkeeping Requirements b and c; and (4) Specific Reporting Requirements a. d. Compliance with CO Emission Limitations a(4) and b(4) shall be demonstrated by fulfilling the following requirements: (1) Testing Requirements a and b; (2) Specific Monitoring Requirements f; and (3) Specific Recordkeeping Requirements b and c. e. Refer to reporting requirements in SECTION F paragraph 9 for compliance with Emission Limitations e. f. For compliance with Emission Limitations f see SECTION D paragraph 5 and Testing Requirements: a. Pursuant to 401 KAR 59:005, Section 2, the permittee shall demonstrate compliance with the VOC, and formaldehyde emission limits by conducting an initial performance test within sixty (60) days after achieving the maximum production rate at which the unit will be operated, but not later than 180 days after initial startup of such facility. The performance test for VOC shall be done on either HRSG1 or HRSG2. The performance test shall be conducted in accordance with 401 KAR 50:045 and shall be conducted a minimum of once every five (5) years (no more than sixty-two (62) calendar months following the previous performance test). b. Pursuant to 401 KAR 52:020, Section 26, the maximum and minimum temperature operation range for the combustion turbine shall be established using manufacturer information and shall be between 2,300 and 2,400 degree Fahrenheit. The performance test for CO shall be conducted at the lower operating temperature. c. Pursuant to 40 CFR , the initial NO X performance test required under 40 CFR 60.8 may be performed in the following alternative manner. (1) Perform a minimum of nine (9) relative accuracy test audit (RATA) reference method runs, with a minimum time per run of twenty-one (21) minutes, at a single load level, within plus or minus twenty-five (25) percent of 100 percent of peak load. The ambient temperature shall be greater than zero (0) degrees Fahrenheit during the RATA runs.

10 Permit Number: V Page 9 of 101 (2) For each RATA run, concurrently measure the heat input to the unit using a fuel flow meter (or flow meters) and measure the electrical and thermal output from the unit. (3) Use the test data both to demonstrate compliance with the applicable NO X emission limit under Section and to provide the required reference method data for the RATA of the CEMS described under Section (4) Compliance with the applicable emission limit in Section is achieved if the arithmetic average of all of the NO X emission rates for the RATA runs, expressed in units of ppm or lb/mwh, does not exceed the emission limit. d. Pursuant to 401 KAR 52:020, Section 26, the SO 2 initial performance test required under 40 CFR 60.8 and 40 CFR may be performed in the following alternative manner. (1) Perform a minimum of nine (9) RATA reference method runs, with a minimum time per run of twenty-one (21) minutes, at a single load level, within plus or minus twenty-five (25) percent of 100 percent of peak load. The ambient temperature shall be greater than zero (0) degrees Fahrenheit during the RATA runs. (2) For each RATA run, concurrently measure the heat input to the unit using a fuel flow meter (or flow meters) and measure the electrical and thermal output from the unit. (3) Use the test data both to demonstrate compliance with the applicable SO 2 emission limit under Section and to provide the required reference method data for the RATA of the CEMS. (4) Compliance with the applicable emission limit in Section is achieved if the arithmetic average of all of the SO 2 emission rates for the RATA runs, expressed in units of ng/j or lb/mwh does not exceed the emission limit. e. Pursuant to 401 KAR 52:020, Section 26, the initial CO performance test required under 40 CFR 60.8 may be performed in the following alternative manner. (1) Perform a minimum of nine (9) RATA reference method runs, with a minimum time per run of twenty-one (21) minutes, at a single load level, within plus or minus twenty-five (25) percent of 100 percent of peak load. The ambient temperature shall be greater than zero (0) degrees Fahrenheit during the RATA runs. (2) For each RATA run, concurrently measure the heat input to the unit using a fuel flow meter (or flow meters) and measure the electrical and thermal output from the unit. (3) Use the test data both to demonstrate compliance with the applicable CO emission limit and to provide the required reference method data for the RATA of the CEMS. (4) Compliance with the applicable emission limit is achieved if the arithmetic average of all of the CO emission rates for the RATA runs, expressed in units of lb/hr or lb/mmbtu does not exceed the emission limit. f. Pursuant to 40 CFR 64.7 and 401 KAR 52:020, Section 26, during the performance test the permittee shall establish the VOC and formaldehyde destruction efficiency and operating limits for the catalytic oxidizer as follows.

11 Permit Number: V Page 10 of 101 (1) The catalytic oxidizer shall be operated within a temperature range of 450 to 750 degrees Fahrenheit. (2) During the performance test, monitor and record the temperature just before the catalyst bed and the temperature difference across the catalyst bed at least once every fifteen (15) minutes during each of the three (3) test runs. (3) Use the data collected during the performance test to calculate and record the average temperature just before the catalyst bed and the average temperature difference across the catalyst bed during the performance test. These are the minimum operating limits for the catalytic oxidizer. 4. Specific Monitoring Requirements: a. Pursuant to Section (b), the permittee must install, calibrate, maintain and operate a NO X CEMS as described in Sections (b) and b. Pursuant to 40 CFR (b), the permittee shall: (1) Install, certify, maintain, and operate a CEMS consisting of a NO X monitor and a diluent gas O 2 or CO 2 monitor, to determine the hourly NO X emission rate in ppm or lb/mmbtu; (2) For units complying with the output-based standard, install, calibrate, maintain, and operate a fuel flow meter (or flow meters) to continuously measure the heat input to the combustion turbine; (3) For units complying with the output-based standard, install, calibrate, maintain, and operate a watt meter (or meters) to continuously measure the gross electrical output of the combustion turbine in MWh; and (4) For combined heat and power units complying with the output-based standard, install, calibrate, maintain, and operate meters for useful recovered energy flow rate, temperature, and pressure, to continuously measure the total thermal energy output in Btu/hr. c. Pursuant to 40 CFR , the NO X CEMS shall meet the following requirements: (1) Each NO X diluent CEMS shall be installed and certified according to Performance Specification 2 in 40 CFR 60, Appendix B, except the seven (7) day calibration drift is based on unit operating days, not calendar days. With state approval, Procedure 1 in 40 CFR 60, Appendix F is not required. Alternatively, a NO X diluent CEMS that is installed and certified according to 40 CFR 75 Appendix A is acceptable for use. The RATA of the CEMS shall be performed on a lb/mmbtu basis; (2) As specified in 40 CFR 60.13(e)(2), during each full unit operating hour, both the NO X monitor and the diluent monitor shall complete a minimum of one (1) cycle of operation (sampling, analyzing, and data recording) for each fifteen (15) minute quadrant of the hour, to validate the hour. For partial unit operating hours, at least one (1) valid data point shall be obtained with each monitor for each quadrant of the hour in which the unit operates. For unit operating hours in which required quality assurance and maintenance activities are performed on the CEMS, a minimum of two (2) valid data points (one in each of two (2) quadrants) are required for each monitor to validate the NO X emission rate for the hour;

12 Permit Number: V Page 11 of 101 (3) Each fuel flow meter shall be installed, calibrated, maintained, and operated according to the manufacturer's instructions. Alternatively, with approval by the Division, fuel flow meters that meet the installation, certification, and quality assurance requirements of part 40 CFR 75 Appendix D are acceptable for use; (4) Each watt meter, steam flow meter, and each pressure or temperature measurement device shall be installed, calibrated, maintained, and operated according to manufacturer's instructions; and (5) The permittee shall develop and keep on-site a quality assurance (QA) plan for all of the continuous monitoring equipment described above. For the CEMS and fuel flow meters, the permittee may, with approval by the Division, satisfy the requirements of this paragraph by implementing the QA program and plan described in Section 1 of 40 CFR 75 Appendix B. d. Pursuant to 40 CFR , excess NO X emissions when using a CEMS can be determined as follows: (1) All CEMS data must be reduced to hourly averages as specified in Section 60.13(h); (2) For each unit operating hour in which a valid hourly average, as described in Section (b), is obtained for both NO X and diluent monitors, the data acquisition and handling system must calculate and record the hourly NO X emission rate in units of ppm or lb/mmbtu, using the appropriate equation from Method 19 in 40 CFR 60, Appendix A of this part. For any hour in which the hourly average O 2 concentration exceeds nineteen (19.0) percent O 2 (or the hourly average CO 2 concentration is less than one (1.0) percent CO 2 ), a diluent cap value of nineteen (19.0) percent O 2 or one (1.0) percent CO 2 (as applicable) may be used in the emission calculations; (3) Correction of measured NO X concentrations to fifteen (15) percent O 2 is not allowed; (4) If you have installed and certified a NO X diluent CEMS to meet the requirements of 40 CFR 75 of this chapter, states can approve that only quality assured data from the CEMS shall be used to identify excess emissions under 40 CFR 60, Subpart KKKK. Periods where the missing data substitution procedures in 40 CFR 75, Subpart D are applied are to be reported as monitor downtime in the excess emissions and monitoring performance report required under Section 60.7(c); (5) All required fuel flow rate, steam flow rate, temperature, pressure, and megawatt data must be reduced to hourly averages; (6) Calculate the hourly average NO X emission rates, in units of the emission standards under Section , using either ppm for units complying with the concentration limit or for combined-cycle and combined heat and power complying with the output-based standard, use Equation 1 Section , except that the gross energy output is calculated as the sum of the total electrical and mechanical energy generated by the combustion turbine, the additional electrical or mechanical energy (if any) generated by the steam turbine following the heat recovery steam generator, and 100 percent of the total useful thermal energy output that is not used to generate additional electricity or mechanical output, expressed in equivalent MW, as in the Equation 2 and 3 of Section ; and

13 Permit Number: V Page 12 of 101 (7) For combined cycle and combined heat and power units with heat recovery, use the calculated hourly average emission rates from paragraph (6) of this section to assess excess emissions on a thirty (30) unit operating day rolling average basis, as described in Section (b)(1). e. Pursuant to 401 KAR 52:020, Section 26, the permittee shall install a SO 2 CEMS, the permittee and shall certify, operate, and maintain, in accordance with all the requirements of 40 CFR 75, a CEMS and a flow monitoring system with an automated data acquisition and handling system for measuring and recording concentration (in ppm), volumetric gas flow (in standard cubic feet/hour (scfh)), and mass emissions (in lb/hr) discharged to the atmosphere, except as provided in 40 CFR and and 40 CFR 75 Subpart E. f. Pursuant to 401 KAR 52:020, Section 26, material incorporated by reference, the permittee shall install, calibrate, maintain, and operate a CO CEMS. The permittee shall install, calibrate, operate, test, and monitor all continuous monitoring systems and monitor devices in accordance with 40 CFR g. Pursuant to 40 CFR 64.6 (c), the permittee must meet the following continuous monitoring requirements for the catalytic oxidizer. (1) Install gas temperature monitors upstream and downstream of the catalyst bed as required by Testing Requirements f(2) and (3). (i) Locate the temperature sensor in a position that provides a representative temperature. (ii) Use a temperature sensor with a measurement sensitivity of five (5) degrees Fahrenheit or one (1) percent of the temperature value, whichever is larger. (iii) Refer to SECTION E paragraph 2 for additional requirements. (2) Collect temperature data at least once every fifteen (15) minutes and reduce the data to three (3) hour block averages. (i) Maintain the three (3) hour average temperature before the catalyst bed at or above the temperature limit established according Testing Requirements f(2). (ii) (iii) Maintain the three (3) hour average temperature difference across the catalyst bed at or above the temperature limit established according to Testing Requirements f(3). Refer to SECTION F for additional requirements. h. Pursuant to 401 KAR 51:160, 401 KAR 51:210 and 401 KAR 51:220, the permittee shall monitor the total NO X emissions during each NO X control period as specified in 40 CFR to 96.76, 40 CFR to and to i. Pursuant to 401 KAR 51:230, the permittee shall monitor the total SO 2 emissions during each SO 2 control period as specified in to Specific Recordkeeping Requirements: a. Pursuant to 401 KAR 59:005, Section 3(2), the permittee shall maintain the records of the occurrence and duration of any startup, shutdown, or malfunction in the

14 Permit Number: V Page 13 of 101 operation of the combustion turbines; any malfunction of the air pollution control equipment; or any periods during which a continuous emission monitoring system or monitoring device is inoperative. The permittee shall maintain records of the date, time and duration of cold startup, hot startup and cumulative startup events per rolling twelve (12) month period. b. Pursuant to 401 KAR 52:020, Section 26, the permittee shall maintain the following records on site: (1) All measurements, including CEMS, monitoring devices, and performance test results; and all continuous monitoring system performance evaluations and calibration checks; (2) Manufacturer's maintenance and operating instructions for the pollution control devices and process equipment; and (3) Maintenance conducted on control devices, instrumentation, and process equipment. c. The permittee shall maintain the following records on site with totals calculated on a monthly basis and a twelve (12) month rolling total: (1) Emissions of PM\PM 10 \PM 10, NO X, SO 2 and CO with data from monitoring devices or by calculations using emission factors, data from performance tests, fuel usage, and process rates or other applicable data along with supporting calculations. (2) Fuel usage and fuel specifications from supplier; (3) Hours of operation of each combustion turbine; and (4) Records of applicable fuel sampling, including but not limited to, time of sampling event, vendor information, sulfur content analysis, percent methane analysis, and heat value analysis. d. Pursuant to 40 CFR 64.9, the following records shall be maintained for the catalytic oxidizer: (1) Records of the date, time and duration of each deviation from the operating limits; and (2) Records required demonstrating continuous compliance with each operating limit. 6. Specific Reporting Requirements: a. Pursuant to 40 CFR , the permittee must submit the following reports: (1) Pursuant to 40 CFR (a), reports of excess emissions and monitor downtime, in accordance with 40 CFR 60.7(c) (excess emissions shall be reported for all periods of unit operation, including start-up, shutdown, and malfunction); and (2) Pursuant to 40 CFR (b), a written report of the results of each performance test before the close of business on the 60 th day following the completion of the performance test. b. Pursuant to 40 CFR , for the purpose of reporting required in 40 CFR 60.7(c), excess emissions and monitor downtime for NO X are defined as follows.

15 Permit Number: V Page 14 of 101 (1) An excess emissions is any unit operating period in which the four (4) hour or thirty (30) day rolling average NO X emission rate exceeds the applicable emission limit in Section A four (4) hour rolling average NO X emission rate is the arithmetic average of the average NO X emission rate in ppm or ng/j (lb/mwh) measured by the CEMS for a given hour and the three (3) unit operating hour average NO X emission rates immediately preceding that unit operating hour. Calculate the rolling average if a valid NO X emission rate is obtained for at least three (3) of the four (4) hours. A thirty (30) day rolling average NO X emission rate is the arithmetic average of all hourly NO X emission data in ppm or ng/j (lb/mwh) measured by the continuous emission monitoring equipment for a given day and the twenty-nine (29) unit operating days immediately preceding that unit operating day. A new thirty (30) day average is calculated each unit operating day as the average of all hourly NO X emissions rates for the preceding thirty (30) unit operating days if a valid NO X emission rate is obtained for at least seventy-five (75) percent of all operating hours. (2) A period of monitor downtime is any unit operating hour in which the data for any of the following parameters are either missing or invalid: NO X concentration, CO 2 or O 2 concentration, fuel flow rate, steam flow rate, steam temperature, steam pressure, or MW. The steam flow rate, steam temperature, and steam pressure are only required if you will use this information for compliance purposes. c. Pursuant to 40 CFR , all reports required under 40 CFR 60.7(c) must be postmarked by the 30 th day following the end of each six (6) month period. d. Pursuant to 40 CFR 64.9, the permittee shall include in the semi-annual report required by SECTION F paragraph 6, summary information on the number, duration and cause (including unknown cause if applicable) of excursions from normal operation and the corrective actions taken, where excursions are defined as the following: (1) Each occurrence where the three (3) hour average temperature before the catalyst bed was below the temperature limit established most recent performance according to Testing Requirements f(2); and (2) Each occurrence where the three (3) hour average temperature difference across the catalyst bed was below the temperature limit established most recent performance according to Testing Requirements f(3). 7. Specific Control Equipment Operating Conditions: a. Pursuant to 40 CFR (a), the permittee shall operate and maintain the stationary combustion turbine, air pollution control equipment, and monitoring equipment in a manner consistent with good air pollution control practices for minimizing emissions at all times including during startup, shutdown, and malfunction. b. For compliance with the BACT Operating Limitations a(3), and during operation of the combustion turbines, the permittee shall meet the following operating limits for the catalytic oxidizer:

16 Permit Number: V Page 15 of 101 (1) The average temperature measured just before the catalyst bed in any three (3) hour period must not fall below the limit established according to Testing Requirements f(2); and (2) The average temperature difference across the catalyst bed in any three (3) hour period shall not fall below the temperature difference established according to Testing Requirements f(3).

17 Permit Number: V Page 16 of 101 Emission unit: AUXB (AUXB) Auxiliary Boiler Description: The auxiliary boiler is used to provide process steam during startup. The unit has a high heat release rate greater than 730,000 J/sec-m 3 (70,000 Btu/hr-ft 3 ). Construction Date: Estimated second quarter Fuel Input: mmbtu/hr. Primary Fuel: Natural gas. Control Equipment: None. APPLICABLE REGULATIONS: 401 KAR 51:017 Prevention of significant deterioration of air quality. This regulation is applicable with respect to PM\PM 10 \PM 2.5, SO 2, NO X, and CO emissions from a new major stationary source that commenced after September 22, KAR 51:220 CAIR NO X ozone season trading program. This regulation is applicable to the control of CAIR NO X Ozone Season units that are subject to 40 CFR This regulation establishes requirements for the control of NO X emissions from large boilers and turbines used in power plants pursuant to the federal mandate published under 40 CFR to Refer to Section K. 401 KAR 59:015 New indirect heat exchangers. This regulation is applicable with respect to PM, NO X, and SO 2 emissions from a source with a capacity of more than 250 mmbtu/hr heat input that commenced after August 17, KAR 60: C.F.R. Part 60 standards of performance for new stationary sources incorporating by reference 40 CFR 60, Subpart Db Standards of Performance for Industrial-Commercial-Institutional Steam Generating Units. This regulation is applicable with respect to NO X and SO 2 emissions from each affected facility with a heat input capacity greater than 100 mmbtu/hr that commenced after June 19, KAR 63:020 Potentially hazardous matter or toxic substances. This regulation is applicable to an emission unit which emits or may emit potentially hazardous matter or toxic substances, provided such emissions are not elsewhere subject to the provisions of the administrative regulations of the Division. Refer to SECTION D for operating limitations and compliance demonstration method. NON-APPLICABLE REGULATIONS: 40 CFR 60, Subpart D Standards of Performance for Fossil-Fuel-Fired Steam Generators. Not applicable pursuant to 40 CFR Part 60.40b(j). 1. Operating Limitations: a. Pursuant to 401 KAR 51:017, the permittee shall install and operate whenever the auxiliary boiler is in operation, the following control technology, equipment and methods required to meet BACT demonstration:

18 Permit Number: V Page 17 of 101 (1) Combust only natural gas fuel for control of PM\PM 10 \PM 2.5 and SO 2 ; (2) Low NO X burners for control of NO X ; and (3) Maximum operation shall be 500 hours based on a twelve (12) month rolling total for control of PM\PM 10 \PM 2.5, NO X, SO 2, and CO. b. Pursuant to 40 CFR 60.44b(j), the unit is limited to the firing of natural gas and a combined annual capacity factor of ten (10) percent. Compliance Demonstration Methods: a. Compliance with Operating Limitations a(1) and (2) shall be demonstrated by Specific Recordkeeping Requirements b, and reporting requirements in SECTION F paragraph 9. b. Compliance with Operating Limitations a(3) and b shall be demonstrated by meeting the obligations of Specific Recordkeeping Requirements f, and reporting requirements in SECTION F paragraph Emission Limitations: a. Pursuant to 401 KAR 51:017, based on the BACT, the permittee shall not discharge into the atmosphere any gases from the auxiliary boiler that contain PM\PM 10 \PM 2.5, NO X, SO 2, and CO in concentrations that exceed the following limits based on a three (3) hour rolling average: (1) PM\PM 10 \PM lb/mmbtu; (2) NO X lb/mmbtu; (3) SO lb/mmbtu; and (4) CO lb/mmbtu. b. Pursuant to 401 KAR 51:017, to ensure the validity of the NAAQS and increment consumption modeling, the permittee shall not discharge into the atmosphere any gases from the combustion turbines that contain PM\PM 10 \PM 2.5, NO X, SO 2, and CO that exceed the following limits: (1) PM\PM 10 \PM lb/hr based on a twenty-four (24) hour block average; (2) NO X lb/hr based on a thirty (30) day-block average; (3) SO lb/hr based on a twenty-four (24) hour block average; and (4) CO lb/hr based on an eight (8) hour block average. c. Pursuant to 40 CFR 60 Subpart Db, the permittee shall not discharge into the atmosphere any gases from the auxiliary boiler that contain NO X and SO 2 in concentrations that exceed: (1) NO X 86 ng/j (0.2 lb/mmbtu) heat input (high heat release rate). [Section 60.44b(a)] Compliance demonstration shall be on a twenty-four hour (24) average basis for initial performance test and three (3) hour average basis for subsequent performance tests [60.44b(j)]; and (2) SO 2 87 ng/j (0.20 lb/mmbtu) heat input or eight (8) percent (0.08) of the potential SO 2 emission rate (92 percent reduction) and 520 ng/j (1.2 lb/mmbtu) heat input. [Section 60.42b(k)(1)] Compliance demonstration shall be based on a three (3) hour average.

19 Permit Number: V Page 18 of 101 d. Pursuant to 401 KAR 59:015, the permittee shall not discharge into the atmosphere any gases from the auxiliary boiler that contains PM, NO X and SO 2 in concentrations that exceed the following limits based on a three (3) hour average: (1) PM 0.10 lb/mmbtu heat input [Section 4(1)(b)]; (2) NO X 0.20 lb/mmbtu (0.36 gram (g)/million calorie (mmcal) [Section 6(1)(a)]; and (3) SO lb/mmbtu actual heat input. [Section 5(1)(b)] e. Pursuant to 401 KAR 59:015, Section 4(2), emissions shall not exhibit greater than twenty (20) percent opacity except: (1) Indirect heat exchangers with heat input capacity of 250 mmbtu/hr or more, a maximum of twenty-seven (27) percent opacity shall be permissible for not more than one (1) six (6) minute period in any sixty consecutive minutes; and (2) For emissions from an indirect heat exchanger during building a new fire for the period required to bring the boiler up to operating conditions provided the method used is that recommended by the manufacturer and the time does not exceed the manufacturer's recommendations. f. For limits on source-wide emissions of VOC, refer to SECTION D, paragraph 5. Compliance Demonstration Methods: a. Compliance with PM\PM 10 \PM 2.5 Emission Limitations a(1), b(1) and d(1) is demonstrated by fulfilling the following requirements: (1) Operating Limitations a(1); (2) Testing Requirements a; and (3) Specific Recordkeeping Requirements d. b. Compliance with NO X Emission Limitations a(2), b(2), c(1) and d(2) shall be demonstrated by fulfilling the following requirements: (1) Testing Requirements b and c; (2) Monitoring Requirements a; (3) Specific Recordkeeping Requirements d; and (4) Specific Reporting Requirements a, b, c and e. c. Compliance with SO 2 Emission Limitations a(3), b(3) and c(2) and d(3) shall be demonstrated by fulfilling the following requirements: (1) Testing Requirements a; (2) Specific Monitoring Requirements b; (3) Specific Recordkeeping Requirements b and d; and (4) Specific Reporting Requirements a, b, c and d. d. Compliance with CO Emission Limitations a(4) and b(4) shall be demonstrated by fulfilling the following requirements: (1) Testing Requirements a. (2) Specific Recordkeeping Requirements d.

20 Permit Number: V Page 19 of 101 e. Compliance with opacity Emission Limitations e shall be demonstrated by fulfilling the requirements of Operating Limitations a(1). f. For compliance with Emission Limitations f see SECTION D paragraph Testing Requirements: a. Pursuant to 401 KAR 59:005, Section 2 the permittee, the permittee shall demonstrate compliance with the PM\PM 10 \PM 2.5, SO 2 and CO emission limits by conducting an initial performance test within sixty (60) days after achieving the maximum production rate at which the unit will be operated, but not later than 180 days after initial startup of such facility. The performance test shall be conducted in accordance with 401 KAR 50:045 and shall be conducted a minimum of once every five (5) years (no more than sixty-two (62) calendar months following the previous performance test). b. Pursuant to 40 CFR 60.46b(c), the permittee must demonstrate continuous compliance with NO X emission standards through the following performance testing: (1) Pursuant to 40 CFR 60.46b(g), the permittee shall demonstrate the maximum heat input capacity of the steam generating unit by operating the facility at maximum capacity for twenty-four (24) hours. The permittee shall determine the maximum heat input capacity by using the heat loss method or the heat input method described in Sections 5 and 7.3 of the ASME Power Test Codes 4.1 (incorporated by reference, see 40 CFR 60.17). The demonstration of maximum heat input capacity shall be made during the initial performance test for a boiler that meets the criteria of 60.44b(j). Subsequent demonstrations may be required by the Division at any other time. If this demonstration indicates that the maximum heat input capacity of the boiler is less than that stated by the manufacturer of the boiler, the maximum heat input capacity determined during this demonstration shall be used to determine the capacity utilization rate for the boiler. Otherwise, the maximum heat input capacity provided by the manufacturer is used; and (2) Pursuant to 40 CFR 60.46b(h), the permittee shall complete the following performance tests: (i) Conduct an initial performance test as required under 40 CFR 60 Subpart A, Section 60.8 over a minimum of twenty-four (24) consecutive steam generating unit operating hours at maximum heat input capacity to demonstrate compliance with the NO X emission standards under Section 60.44b using Method 7, 7A, 7E in 40 CFR 60, Appendix A, or other reference methods approved by the Division and EPA; and (ii) Conduct subsequent performance tests once per calendar year or every 400 hours of operation (whichever comes first) to demonstrate compliance with the NO X emission standards under Section 60.44b over a minimum of three (3) consecutive steam generating unit operating hours at maximum heat input capacity using Method 7, 7A, 7E in 40 CFR 60, Appendix A, or other reference methods approved by the Division and EPA.

21 Permit Number: V Page 20 of 101 c. Pursuant to 40 CFR 60.44b(j), compliance with the NO X emission limits are determined on a twenty-four (24) hour average basis for the initial performance test and three (3) hour average basis for subsequent performance tests for any facility that meets the following requirements: (1) Combust only natural gas; (2) Have a combined annual capacity factor of ten (10) percent or less for natural gas; and (3) Are subject to a federally enforceable requirement limiting operation of the affected facility to the firing of natural gas and limiting operation of the affected facility to a combined annual capacity factor of ten (10) percent or less for natural gas. 4. Specific Monitoring Requirements: a. Pursuant to 40 CFR 60.46b(c) the permittee does not have to install a NO X CEMS if the requirements in 60.46b(g) and (h) are meet. Refer to Testing Requirements b(1) and (2). b. Pursuant to 40 CFR 60.47b(f), the permittee does not have to install or operate a SO 2 CEMS if firing only very low sulfur gaseous fuel with a potential SO 2 emission rate of 140 ng/j (0.32 lb/mmbtu) heat input or less [60.42b(k)(2)], and fuel records are maintained pursuant to Section 60.49b(r)(1). Refer to Specific Recordkeeping Requirements b. c. Pursuant to 401 KAR 51:160 and 401 KAR 51:220, the permittee shall monitor the total NO X emissions during each NO X control period as specified in 40 CFR to and to Specific Recordkeeping Requirements: a. Pursuant to 401 KAR 59:005, Section 3(2), the permittee shall maintain the records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of the auxiliary boiler; or any periods during which a monitoring device is inoperative. b. The permittee must maintain fuel records pursuant to Section 60.49b(r)(1). c. Pursuant to 401 KAR 52:020, Section 26, the permittee shall maintain the following records on site: (1) All measurements, including monitoring devices and performance test results; and all calibration checks; (2) Manufacturer's maintenance and operating instructions for process equipment; and (3) Maintenance conducted on control devices, instrumentation, and process equipment. d. The permittee shall document and maintain the records showing emissions of PM\PM 10 \PM 2.5, NO X, SO 2 and CO with data from monitoring devices or by calculations using emission factors, data from performance tests, fuel usage, and

22 Permit Number: V Page 21 of 101 process rates or other applicable data along with supporting calculations based on a monthly basis and a twelve (12) month rolling total. e. Pursuant to 40 CFR 60.49b(d), the permittee must record and maintain records of the amount of fuel combusted during each calendar month. f. Pursuant to 40 CFR 60.49b(p), the permittee shall maintain records of the following information each operating day: (1) Calendar date; (2) The number of hours of operation; and (3) A record of the hourly steam load. 6. Specific Reporting Requirements: a. Pursuant to 40 CFR 60.49b(a), the permittee shall submit notification of the date of initial startup, as provided by 40 CFR This notification shall include: (1) The design heat input capacity of the boiler and identification of the fuel to be combusted; (2) If applicable, a copy of any federally enforceable requirement that limits the annual capacity factor for fuels under Sections 60.44b(i), (j), 60.45b(d), (g), 60.46b(h), or 60.48b(i); and (3) The annual capacity factor at which the permittee anticipates operating the facility. b. Pursuant to 40 CFR 60.49b(b), the permittee shall submit to the Division the performance test data from the initial performance test and shall submit to the Division the maximum heat input capacity data from the demonstration of the maximum heat input capacity of the boiler. c. Pursuant to 40 CFR 60.49b(h), the permittee shall submit excess emission reports that occurred during the reporting period. d. Pursuant to 40 CFR 60.49b(r)(1), the permittee shall submit a report to the Division certifying that only natural gas that is known to contain insignificant amounts of sulfur were combusted in the affected facility during the reporting period. e. Pursuant to 40 CFR 60.49b(q), the permittee shall submit to the Division a report containing: (1) The annual capacity factor over the previous twelve (12) months; and (2) Results of any NO X performance tests required during the reporting period, the hours of operation during the reporting period, and the hours of operation since the last NO X emission test. f. Pursuant to 40 CFR 60.49b(v), the permittee may submit electronic quarterly reports for NO X and SO 2 in lieu of submitting the written reports required under Section 60.49b(h), (i), (j), (k), and (l). The format of each quarterly electronic reports shall be coordinated with the Division. The electronic report shall be submitted no later than thirty (30) days after the end of the calendar quarter and shall be accompanied by a certification statement from the permittee, indicating whether compliance with the

Appendix K. DOC Conditions

Appendix K. DOC Conditions Appendix K DOC Conditions Mission Rock Energy Center Five (5) GE LM6000-PG-Sprint Combustion Turbine Generators (CTGs) Total = 275 MW Nominal Each CTG is simultaneously subject to the emission limits,

More information

Appendix K. Final DOC Conditions

Appendix K. Final DOC Conditions Appendix K Final DOC Conditions Puente Power Project 262 MW (net nominal) GE 7HA.01 Combustion Turbine Generator (CTG) The CTG is simultaneously subject to the emission limits, monitoring requirements,

More information

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County) AIR QUALITY PERMIT Permit No. Effective Date April 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published

More information

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

This is a new permit condition titled, 2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP) This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced

More information

Streamlining Multiple Applicable Requirements

Streamlining Multiple Applicable Requirements Streamlining Multiple Applicable Requirements What is Streamlining? 1. Streamlining is the process of determining one set of requirements to be incorporated into the Title V permit from among multiple

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 118-18 Page 1 of 23 PERMIT TO INSTALL Table of Contents COMMON ACRONYMS... 2 POLLUTANT / MEASUREMENT ABBREVIATIONS... 3 GENERAL CONDITIONS... 4 EMISSION UNIT SPECIAL CONDITIONS... 6 EMISSION

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Cogentrix

AIR EMISSION PERMIT NO IS ISSUED TO. Cogentrix AIR EMISSION PERMIT NO. 16300087-004 IS ISSUED TO Cogentrix 9525 105th Street Court South Cottage Grove, Washington County, MN 55016 The emission units, control equipment and emission stacks at the stationary

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION May 1, 2015 PERMIT TO INSTALL 4-13B ISSUED TO Zoetis LLC LOCATED AT 306 Pitcher Street Kalamazoo, Michigan IN THE COUNTY OF Kalamazoo STATE

More information

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) 1.0 Purpose The purpose of this rule is to limit emissions

More information

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3.

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3. VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 59 - ELECTRICAL POWER GENERATING EQUIPMENT - OXIDES OF NITROGEN EMISSIONS (Adopted 10/6/69, Revised 5/23/72, 7/18/72, 10/31/72, 8/14/79, 12/7/82, 6/4/91,

More information

State of New Jersey. Department of Environmental Protection Air Quality Permitting

State of New Jersey. Department of Environmental Protection Air Quality Permitting GP021 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP 021) Combined Heat and Power Combustion Turbine(s) less than or equal to 65 MMBTU per hour This

More information

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015 AIR QUALITY PERMIT Permit No. Effective Date May 26, 2015 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

Air Individual Permit Permit Limits to Avoid NSR

Air Individual Permit Permit Limits to Avoid NSR Air Individual Permit Permit Limits to Avoid NSR 13900128-001 Permittee: Facility name: Shakopee Distributed Generation Shakopee Distributed Generation Vierling Drive E Shakopee, Minnesota 55379 Scott

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

DEP7007CC Compliance Certification

DEP7007CC Compliance Certification Commonwealth of Kentucky Natural Resources & Environmental Protection Cabinet Department for Environmental Protection DIVISION FOR AIR QUALITY DEP7007CC Compliance Certification Division Use Only ID# Permit

More information

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number STATEMENT OF BASIS Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number 701-0013 Introduction On June 30, 2017, the Department received an application to renew the Title V Major Source

More information

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION SIC Code: 4911 (Energy Production) DATE: 06/17/2005 Page 1 of 6 DATE APPLICATION RECEIVED: March 31, 2004 (Application # FY04-0427) FACILITY DESCRIPTION Pinetree-Bethlehem (the Permittee) operates a 17.1

More information

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS GENERAL

More information

AIR EMISSION SOURCE CONSTRUCTION PERMIT

AIR EMISSION SOURCE CONSTRUCTION PERMIT AIR EMISSION SOURCE CONSTRUCTION PERMIT Source ID No.: 0550023 Effective Date: Source Name: DRAFT Holcomb Station NAICS: 221112, Fossil fuel power generation (SIC 4911) Site Location: Site Owner/Operator

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

State of New Jersey. Department of Environmental Protection Division of Air Quality

State of New Jersey. Department of Environmental Protection Division of Air Quality GOP-006 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-006) Combined Heat and Power Stationary Spark Ignition Reciprocating Engine(s) less

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 11PB859 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL Modification

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM February 2, 2012 SUBJECT: Superior Appalachian Pipeline, LLC Kissick Lane Frazer Township, PA 15084 Allegheny County Installation Permit No. 0837-I001

More information

SECTION.1400 NITROGEN OXIDES

SECTION.1400 NITROGEN OXIDES SECTION.1400 NITROGEN OXIDES 15A NCAC 02D.1401 DEFINITIONS (a) For the purpose of this Section, the definitions at G.S 143-212 and G.S. 143-213, and 15A NCAC 02D.0101 shall apply, and in addition the following

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 14700009-101 Permittee: Facility name: Northern Natural Gas Company - Owatonna Compressor Station Northern Natural Gas Company - Owatonna Compressor Station

More information

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 28, 2005 PERMIT TO INSTALL

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 28, 2005 PERMIT TO INSTALL MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION September 28, 2005 PERMIT TO INSTALL 187-05 ISSUED TO Zeeland Board of Public Works LOCATED AT 8943 Riley Street Zeeland, Michigan IN THE

More information

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788 Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: 04-13-08700037 Application #: 22788 Date SIP Application Received: August 11, 2014 Date Title V Application

More information

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert PA RACT 2 Reasonably Available Control Technology Presented by Suzanne Dibert Affected Facilities Facilities with potential emissions that exceed 100 tons per year (tpy) for NOx (nitrogen oxide) and 50

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Spark Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction of the

More information

MAJOR SOURCE OPERATING PERMIT

MAJOR SOURCE OPERATING PERMIT MAJOR SOURCE OPERATING PERMIT Permitee: Facility Name: Facility No.: Location: INTERNATIONAL PAPER CO. INTERNATIONAL PAPER RIVERDALE MILL 104-0003 SELMA, ALABAMA In accordance with and subject to the provisions

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: N-6311-9-1 ISSUANCE DATE: 12/17/2008 LEGAL OWNER OR OPERATOR: FISCALINI FARMS & FISCALINI DAIRY MAILING ADDRESS: 7231 COVERT RD MODESTO, CA 95358 LOCATION: 4848 JACKSON

More information

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT APPENDIX D APPENDIX D REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL NEW JERSEY STATE DEPARTMENT

More information

AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P.

AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. LSPCottage Grove, L.P. AIR EMISSION PERMIT NO. 16300087-006 Total Facility Oper. Permit - Reissuance IS ISSUED TO LSPCottage Grove, L.P. LSPCOTTAGE GROVE COGENERATION FACILITY 9525 105th Street Court South Cottage Grove, Washington

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission DRAFT/PROPOSED AIR EMISSION PERMIT NO. 08500034 002 Total Facility Operating Permit Reissuance IS ISSUED TO Hutchinson Utilities Commission Hutchinson Utilities Commission Plant 2 1100 Industrial Boulevard

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM June 17, 2004 SUBJECT: Review of Application Title V Operating Permit Bellefield Boiler Plant Boundary Street Pittsburgh, PA 15213 RE: Operating Permit

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 1-18 Page 1 of 14 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit

More information

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations? Presented by Richard M. Cestone, PE, CHMM Birdsall Services Group For NJEWA Conference May 9, 2011 What happens when a permit has both federal and state regulations? 1 Facilities get confused with Federal

More information

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers. Tune-up Information National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers 40 CFR Part 63 Subpart JJJJJJ Who must conduct a tune-up

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Permit Amendment No.: 2436-211-0013-V-03-1 Effective Date: July 25, 2014 Facility Name: Facility Address: Mailing Address: Parent/Holding Company: Georgia-Pacific Wood

More information

2017Compliance Table with methods.xlsx

2017Compliance Table with methods.xlsx University of Michigan Renewable Operating Permit Annual Monitoring/Recordkeeping Compliance Table January 1, 2017 through December 31, 2017 Permit Condition Emission Unit: EU-B0260-06 Boiler 6 at Central

More information

State of New Jersey. General Permit (GP-009A)

State of New Jersey. General Permit (GP-009A) 03/21/2013 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-009A) For Boiler(s) and Indirect Fired Process Heater(s) Each Greater Than or Equal to 10

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 19-18 Page 1 of 49 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 10900008-101 Permittee: Facility name: Mayo Clinic Mayo Clinic Hospital Saint Marys Campus 1216 2nd St SW Rochester, MN 55902-1906 Olmsted County Expiration

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 206-14 Page 1 of 27 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: S-7658-1-0 ISSUANCE DATE: 10/30/2009 LEGAL OWNER OR OPERATOR: ABEC BIDART-STOCKDALE LLC MAILING ADDRESS: C/O CALIFORNIA BIOENERGY LLC 2828 ROUTH STREET SUITE 500 DALLAS,

More information

AIR EMISSION PERMIT NO IS ISSUED TO INTERSTATE POWER COMPANY

AIR EMISSION PERMIT NO IS ISSUED TO INTERSTATE POWER COMPANY AIR EMISSION PERMIT NO. 09100007-002 IS ISSUED TO INTERSTATE POWER COMPANY INTERSTATE POWER - FOX LAKE STATION County Road 28 Sherburn, Martin County, Minnesota 561710367 The emission units, control equipment

More information

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 Discussion Topics Background Important Terms Applicability Compliance Deadlines Emission/Operating Limits Performance/Compliance

More information

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.15.1 - BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) A. Applicability The provisions of this

More information

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the 15A NCAC 02D.1206 HOSPITAL, MEDICAL, AND INFECTIOUS WASTE INCINERATORS (a) Applicability. This Rule applies to any hospital, medical, and infectious waste incinerator (HMIWI), except: (1) any HMIWI required

More information

AIR QUALITY PERMIT P 01 0 May 14, 2007

AIR QUALITY PERMIT P 01 0 May 14, 2007 AIR QUALITY PERMIT Permit No. Effective Date 4911 099 0033 P 01 0 May 14, 2007 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12 9 1, et seq and the Rules, Chapter 391

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM August 26, 2014 SUBJECT: Veterans Affairs Medical Center Oakland Facility University Drive C Pittsburgh, PA 15240 Allegheny County Synthetic Minor

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM April 18, 2014 SUBJECT: Cellco Partnership, dba Verizon Wireless 18 Abele Road Bridgeville, PA 15017 Allegheny County Operating Permit No. 0867 TO:

More information

AIR QUALITY PERMIT. Longleaf Energy Associates, LLC C/o LS Power Development, LLC Two Tower Center, 11 th Floor East Brunswick, New Jersey 08816

AIR QUALITY PERMIT. Longleaf Energy Associates, LLC C/o LS Power Development, LLC Two Tower Center, 11 th Floor East Brunswick, New Jersey 08816 AIR QUALITY PERMIT Permit No. Effective Date In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant to or in

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 04PB1019 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL ISSUED TO:

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company AIR EMISSION PERMIT NO. 16300110-001 IS ISSUED TO Northern Natural Gas Company NORTHERN NATURAL GAS - HUGO No Street Address Hugo, Washington County, Minnesota 55038 The emission units and emission stacks

More information

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS RULE 1146.1. EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (a) Definitions 1. ANNUAL HEAT INPUT means the actual amount

More information

Full Compliance Evaluation Report Off-Site Report

Full Compliance Evaluation Report Off-Site Report STATE OF NEW HAMPSHIRE DEPARTMENT OF ENVIRONMENTAL SERVICES AIR RESOURCES DIVISION Full Compliance Evaluation Report Off-Site Report CONCORD STEAM CORPORATION 105 ½ PLEASANT STREET CONCORD, NH 03302-1377

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 7, 2017 PERMIT TO INSTALL ISSUED TO McLaren Flint Hospital

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 7, 2017 PERMIT TO INSTALL ISSUED TO McLaren Flint Hospital MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION September 7, 2017 PERMIT TO INSTALL 55-17 ISSUED TO McLaren Flint Hospital LOCATED AT 401 South Ballenger Highway Flint, Michigan IN THE

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION MAY 19, 2005 NEW SOURCE REVIEW PERMIT TO INSTALL NO

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION MAY 19, 2005 NEW SOURCE REVIEW PERMIT TO INSTALL NO MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION MAY 19, 2005 NEW SOURCE REVIEW PERMIT TO INSTALL NO. 87-05 ISSUED TO PLAST-O-FOAM, LLC LOCATED AT 24601 CAPITAL BLVD. CLINTON TWP., MICHIGAN

More information

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia

AIR EMISSION PERMIT NO IS ISSUED TO. City of Virginia AIR EMISSION PERMIT NO. 13700028-003 IS ISSUED TO City of Virginia 620 South 2nd Street Virginia, St. Louis County, Minnesota 55792 The emission units, control equipment and emission stacks at the stationary

More information

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater 11/21/2016 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-007) Boiler or Heater Greater than or equal to 1 MMBTU/hr and less than 5 MMBTU/hr

More information

Facility Name: Packaging Corporation of America City: Clyattville County: Lowndes County AIRS #: Application #: 22133

Facility Name: Packaging Corporation of America City: Clyattville County: Lowndes County AIRS #: Application #: 22133 Facility Name: Packaging Corporation of America City: Clyattville County: Lowndes County AIRS #: 04-13-185-00001 Application #: 22133 Date SIP Application Received: September 16, 2013 Date Title V Application

More information

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68. RULE 69.4. STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted 9/27/94; Rev. Effective11/15/00; Rev. Effective 7/30/03) (a) APPLICABILITY (1) Except

More information

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY

AIR EMISSION PERMIT NO IS ISSUED TO NORTHERN STATES POWER COMPANY AIR EMISSION PERMIT NO. 12300012-002 IS ISSUED TO NORTHERN STATES POWER COMPANY NSP - HIGH BRIDGE GENE 501 Shepard Road St. Paul, Ramsey County, Minnesota 551023004 The emission units, control equipment

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 15300004-101 Permittee: Co-permittee name: Facility name: Viking Gas Transmission - Cushing ONEOK Partners, L.P. Viking Gas Transmission - Cushing 31888 400th

More information

General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013

General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013 General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38 Citizens Advisory Council Meeting March 19, 2013 Headings : White Text 40 pt. Calibri GP-5 General Information

More information

RICE NESHAP Frequently Asked Questions (FAQ)

RICE NESHAP Frequently Asked Questions (FAQ) RICE NESHAP Frequently Asked Questions (FAQ) What does RICE NESHAP mean? RICE NESHAP is an acronym for Reciprocating Internal Combustion Engines National Emission Standards for Hazardous Air Pollutants.

More information

Regulatory and Permitting Requirements of Stationary Generators In Delaware

Regulatory and Permitting Requirements of Stationary Generators In Delaware Regulatory and Permitting Requirements of Stationary Generators In Delaware Delaware - DNREC Air Quality Management February 7, 2006 Mark A. Prettyman and Guadalupe J. Reynolds Outline Regulation No. 1144

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks Approved By: Signed Seyed Sadredin Director of Permit Services

More information

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Mayo Foundation

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Mayo Foundation AIR EMISSION PERMIT NO. 10900008-003 Major Amendment IS ISSUED TO Mayo Foundation SAINT MARYS HOSPITAL 1216 Second Street Southwest Rochester, Olmsted County, Minnesota 55902 The emission units, control

More information

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year.

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year. 1 of 11 8/21/2012 10:19 AM SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1146 - EMISSIONS OF OXIDES OF NITROGEN FROM INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS

More information

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Air Permitting of Sources at Natural gas Production, Compression and Processing Facilities MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Tom Wolf, Governor John Quigley, Secretary Overview

More information

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97 RULE 425.2 Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97 I. Purpose The purpose of this Rule is to limit oxides of nitrogen (NOx) emissions

More information

TECHNICAL SUPPORT DOCUMENT. Nevada Power Company, dba NV Energy. Walter M. Higgins III Generating Station

TECHNICAL SUPPORT DOCUMENT. Nevada Power Company, dba NV Energy. Walter M. Higgins III Generating Station TECHNICAL SUPPORT DOCUMENT TECHNICAL INFORMATION PRESENTED IN REVIEW OF AN APPLICATION FOR A PART 70 OP APPLICATION SUBMITTED BY Nevada Power Company, dba NV Energy For Generating Station Part 70 OP Number:

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 68-12B Page 1 of 16 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 549-97A Page 1 of 19 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 10, 2014 REVISED July 7, 2017 PERMIT TO INSTALL 97-14

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 10, 2014 REVISED July 7, 2017 PERMIT TO INSTALL 97-14 MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION September 10, 2014 REVISED July 7, 2017 PERMIT TO INSTALL 97-14 ISSUED TO Henry Ford Hospital System LOCATED AT HFHS Rochester Hills Data

More information

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR AIR POLLUTION CONTROL DISTRICT COUNTY OF SAN DIEGO FEDERAL SUBPART ZZZZ NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES WORKSHOP REPORT

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT ISSUED BY: DATE ISSUED: TBD JORGE DeGUZMAN DATE EXPIRES: TBD ISSUED TO: SACRAMENTO MUNICIPAL UTILITY DISTRICT FINANCING AUTHORITY (SFA) COSUMNES POWER PLANT LOCATION: 14295A CLAY EAST RD., HERALD, CA 95638

More information

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by Huntington Power Plant Notice of Intent Submitted to the Utah Division of Air Quality And Prepared by 1407 West North Temple Salt Lake City, Utah 84116 April 11, 2008 1.0 Introduction PacifiCorp Energy

More information

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted 06-01-95 INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION, EMERGENCY STANDBY 111 EXEMPTION,

More information

Air Individual Permit Major Amendment Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR

Air Individual Permit Major Amendment Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR Air Individual Permit Major Amendment 13100058-101 Permittee: Facility name: Northern Natural Gas Co - Faribault Northern Natural Gas Co - Faribault 21903 Canby Ave Faribault, MN 55021 Rice County Operating

More information

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Mayo Foundation AIR EMISSION PERMIT NO. 10900008-004 Total Facility Operating Permit - Reissuance IS ISSUED TO Mayo Foundation St Marys 1216 Southwest 2nd Street Rochester, Olmsted County, MN 55902 The emission units,

More information

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98)

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) RULE 69.3 STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) (a) APPLICABILITY This rule shall apply to any stationary

More information

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016)

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.34 NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) A. Purpose and Applicability The purpose of this rule is to reduce emissions of oxides

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. August 5, 2016 PERMIT TO INSTALL F. ISSUED TO MAHLE Industries, Inc.

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. August 5, 2016 PERMIT TO INSTALL F. ISSUED TO MAHLE Industries, Inc. MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION August 5, 2016 PERMIT TO INSTALL 295-03F ISSUED TO MAHLE Industries, Inc. LOCATED AT 23030 MAHLE Drive Farmington Hills, Michigan IN THE

More information

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 AIR EMISSION PERMIT NO. 14500026-001 IS ISSUED TO St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 The emission units, control equipment and emission stacks at

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power Division of ALLETE Inc AIR EMISSION PERMIT NO. 13700013-006 IS ISSUED TO Minnesota Power Division of ALLETE Inc MINNESOTA POWER - LASKIN ENERGY CENTER 5699 Colby Lake Road Hoyt Lakes, St. Louis County, MN 55750 The emission

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc.

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc. DRAFT/PROPOSED AIR EMISSION PERMIT NO. 00300155 002 Major Amendment IS ISSUED TO Hoffman Enclosures, Inc. Hoffman Enclosure Inc/Pentair Equipment Protection 2100 Hoffman Way Anoka, Anoka County, MN 55303