MICHIGAN DEPARTMENT OF TRANSPORTATION BID LETTING RESULTS LETTING OF FEBRUARY 2, 2018

Size: px
Start display at page:

Download "MICHIGAN DEPARTMENT OF TRANSPORTATION BID LETTING RESULTS LETTING OF FEBRUARY 2, 2018"

Transcription

1 MICHIGAN DEPARTMENT OF TRANSPORTATION BID LETTING RESULTS LETTING OF FEBRUARY, 018 PROJECTS PENDING RELEASE The project call numbers listed below are pending release for contract award with a corresponding reason. A release date provided indicates the project is resolved. Update date: //018; 8:45am CALL NUMBER REASON RELEASE DATE UBR 0/1/ UBR 0/1/ UBR 0/09/ UBR 0/1/ % 0// UBR 0/09/ % 0/09/ % 0// % 0/07/ Other 0/14/018-All Bids Rejected UBR-Selected for Unbalanced Bid Review Scroll down to view projects released for award.

2 Letting of February, 018 Letting Call: Project: STUL Low Bid: $1,6,750.5 Engineer Estimate: $1,419, % Start Date: June 11, 018 Completion Date: September 7, mi of hot mix asphalt reconstruction, aggregate base, concrete curb, gutter, sidewalk and ramps, storm and sanitary sewer, drainage, machine grading, slope restoration and pavement markings on Wallace Avenue from Lakeshore Drive (BL 94) to Lakeview Avenue in the city of St. Joseph, Berrien County. This is a Local Agency Project % DBE participation required Kalin Construction Co., Inc. $1,6,750.5 Same Hoffman Bros., Inc. $1,48,9.40 Same Kamminga & Roodvoets, Inc. $1,519, Same Al's Excavating, Inc. $1,58,415.5 Same 4 Northern Construction Services, Corp. $1,541,06.5 Same 5 Peters Construction Co. $1,607, Same 6 Total Number of Bidders: 6

3 Letting of February, 018 Letting Call: Project: ST Low Bid: $1,15, Engineer Estimate: $1,75, % Start Date: 10 days after award Completion Date: October 15, 018 Pump station rehabilitation including removal and replacement of mechanical and electrical components and miscellaneous structure upgrades and repairs on M-10 at Congress Street in the city of Detroit, Wayne County. No DBE participation required Bidder As-Submitted FOREIGN As-Checked FOREIGN Dan's Excavating, Inc. $1,15, Same Z Contractors, Inc. $1,164, Same Bidder As-Submitted DOMESTIC As-Checked DOMESTIC Dan's Excavating, Inc. $1,15, Same Z Contractors, Inc. $1,164, Same Total Number of Bidders: NOTE: The As-submitted low bid received is determined in accordance with the Buy America Requirements, CFR , for manufactured foreign and domestic steel/iron materials.

4 Letting of February, 018 Letting Call: Project: MBWB Low Bid: $8,87,15.5 Engineer Estimate: $9,699, % Start Date: February 6, 018 Completion Date: January 10, mi of second Blue Water Bridge structural steel painting and application of concrete penetrating sealer on I- 94/I-69 over the St. Clair River in the city of Port Huron, St. Clair County. This project includes a year warranty on bridge coating. No DBE participation required Atsalis Brothers Painting Co. $8,87,15.5 Same Civil Coatings and Construction Inc. $8,64,6.00 Same 60 Construction Company, Inc. $9,80,95.77 Same Liberty Maintenance, Inc. $11,476,81.00 Same 4 Abhe & Svoboda, Inc. $1,88, Same 5 Total Number of Bidders: 5 0/1/018

5 Letting of February, 018 Letting Call: Project: NH Low Bid: $6,408,750.1 Engineer Estimate: $,, % Start Date: March 1, 018 Completion Date: December 1, mi of concrete reconstruction and curb and gutter, earthwork, drainage, guardrail, signing, signal and pavement markings on US-11 from 10 Mile Road north to M-57 (14 Mile Road), Kent County. This project includes a 5 year materials and workmanship pavement warranty % DBE participation required Toebe Construction LLC $6,408,750.1 Same Interstate Highway Construction, Inc. $7,4,6.45 Same Kamminga & Roodvoets, Inc. $7,4,51.1 Same D. J. McQuestion/Crawford Contracting $8,099,64.66 Same 4 Ajax Paving Industries, Inc. $8,91,06.47 Same 5 Total Number of Bidders: 5 /1/018

6 Letting of February, 018 Letting Call: Project: NH Low Bid: $4,8,185.4 Engineer Estimate: $4,804, % Start Date: 10 days after award Completion Date: November 15, 018 Structural steel full painting, structural steel repairs and expansion joint repairs on US- over the Cut River, Mackinac County. This project includes a year sandstone restoration warranty and a year bridge coating warranty No DBE participation required Seaway Painting, L.L.C. $4,8,185.4 Same Atsalis Brothers Painting Co. $5,59,77.4 Same Civil Coatings and Construction Inc. $5,946,409.4 Same Abhe & Svoboda, Inc. $7,64, Same 4 Liberty Maintenance, Inc. $9,071, Same 5 Total Number of Bidders: 5

7 Letting of February, 018 Letting Call: Project: NH Low Bid: $6,868, Engineer Estimate: $7,69, % Start Date: April 16, 018 Completion Date: November, mi of hot mix asphalt base crushing, shaping and resurfacing, safety and drainage improvements on M-7 from the Grand Traverse county line to east of Kalkaska Road, Grand Traverse and Kalkaska Counties. This project includes a 5 year materials and workmanship pavement warranty..00 % DBE participation required Rieth-Riley Construction Co., Inc. $6,868, Same Elmer's Crane and Dozer, Inc. $7,55,56.54 Same Total Number of Bidders: /9/018

8 Letting of February, 018 Letting Call: Project: NH Low Bid: $1,61,840.5 Engineer Estimate: $1,157, % Start Date: May 14, 018 Completion Date: October 5, 018 Deck, barrier and substructure patching, joint replacement, structural steel repairs and approach work on US- /US-41 over Ford River and on M-5 over the Big Cedar River, Delta and Menominee Counties. This project includes a year bridge painting warranty. No DBE participation required Grand River Construction, Inc. $1,61,840.5 Same Anlaan Corporation $1,86, Same Hebert Construction Co. $1,67,70.17 Same PCiRoads, LLC $1,476,0.65 Same 4 Zenith Tech, Inc. $1,506,50.40 Same 5 Lunda Construction Company $1,618, Same 6 Total Number of Bidders: 6

9 Letting of February, 018 Letting Call: Project: BRT Low Bid: $85,79.11 Engineer Estimate: $1,05, % Start Date: 10 days after award Completion Date: June 0, 018 Bridge removal and replacement with galvanized steel beams, hot mix asphalt paving, earthwork and approach work on Custer Road over the Pere Marquette River, Mason County. This is a Local Agency Project % DBE participation required Milbocker and Sons, Inc. $85,79.11 Same Hardman Construction, Inc. $894,16.89 Same J. E. Kloote Contracting, Inc. $896, Same Anlaan Corporation $949, Same 4 E.T. MacKenzie Company $1,08, Same 5 Grand River Construction, Inc. $1,09,95.11 Same 6 Total Number of Bidders: 6

10 Letting of February, 018 Letting Call: Project: NH Low Bid: $4,874,10.06 Engineer Estimate: $5,551, % Start Date: June 4, 018 Completion Date: September 8, mi of hot mix asphalt surfacing and aggregate lift, concrete curb, gutter, culvert, guardrail, signage and pavement markings on US-/US-41 from of the city of Gladstone to south of Rapid River in the city of Gladstone, Delta County. This project includes a 5 year materials and workmanship pavement warranty. This project is a pilot for model delivery..00 % DBE participation required Payne & Dolan Inc. $4,874,10.06 Same James Peterson Sons, Inc. $5,0, Same Bacco Construction Company $5,68, Same Hebert Construction Co. $5,898, Same 4 M & M Excavating Company $5,99,.1 Same 5 Total Number of Bidders: 5 0/1/018

11 Letting of February, 018 Letting Call: Project: NH Low Bid: $1,708,7.91 Engineer Estimate: $,114, % Start Date: May 14, 018 Completion Date: August, mi of hot mix asphalt cold milling and resurfacing, detail 8 joint repairs, pavement repairs and pavement markings on US-11 from south of South Boardman Road to just north of M-7 in the village of Boardman, Kalkaska County. This project includes a year materials and workmanship pavement warranty % DBE participation required Rieth-Riley Construction Co., Inc. $1,708,7.91 Same Elmer's Crane and Dozer, Inc. $1,84,080.1 Same Payne & Dolan Inc. $1,98,61.77 Same Total Number of Bidders:

12 Letting of February, 018 Letting Call: Project: M , ETC Low Bid: $1,14,95.8 Engineer Estimate: $1,176,19.69 Start Date: July 0, 018 Completion Date: October 6, % DBE participation required -.74 % Bridge rehabilitation, epoxy overlay removal and replacement, deck patching, bridge barrier railing replacement, addition of a sidewalk on the east side of the structure, slope wall replacements, concrete surface coating, approach work, guardrail, drainage, and pavement markings on 9th street over I-94, Kalamazoo County. This project includes a year warranty on concrete surface coating. Z Contractors, Inc. $1,14,95.8 Same C. A. Hull Co., Inc. $1,49, Same Anlaan Corporation $1,6,06. Same Toebe Construction LLC $1,0, Same 4 Davis Construction, Inc. $1,0,58.94 Same 5 Total Number of Bidders: 5

13 Letting of February, 018 Letting Call: Project: HSIP Low Bid: $99, Engineer Estimate: $8, % Start Date: May 1, 018 Completion Date: November 15, 018 Application of special pavement marking on various routes, Clare, Gladwin, Gratiot, Isabella and Midland Counties. No DBE participation required P.K. Contracting, Inc. $99, Same R. S. Contracting, Inc. $4, Same Total Number of Bidders:

14 Letting of February, 018 Letting Call: Project: HSIP Low Bid: $1,451, Engineer Estimate: $1,69, % Start Date: 10 days after award Completion Date: June 15, mi of concrete curb, gutter, sidewalk and ramps, hot mix asphalt patching, signals, signing and pavement markings on Mack Avenue from Dequindre Street to Alter Road, on Mt. Elliott Street from Jefferson Avenue to Conant Street and on Conant Street from Mt. Elliott Street to Hamtramck Drive in the city of Detroit, Wayne County. This is a Local Agency Project..00 % DBE participation required Rauhorn Electric, Inc. $1,451, Same J. Ranck Electric, Inc. $1,484,60.61 Same Dan's Excavating, Inc. $1,551, Same Warren Contractors & Development, Inc. $1,814,991.7 Same 4 Total Number of Bidders: 4

15 Letting of February, 018 Letting Call: Project: STUL Low Bid: $74,859.1 Engineer Estimate: $448, % Start Date: June 4, 018 Completion Date: August 11, mi of hot mix asphalt resurfacing, spot replacement of curb and gutter, storm and sanitary sewer improvements, and ADA ramps on Grand Street from Pierce Street to Cardinal Drive in the city of Coldwater, Branch County. This is a Local Agency Project..00 % DBE participation required C & D Hughes, Inc. $74,859.1 Same Nashville Construction Company $81,40.98 Same Peters Construction Co. $88, Same The Isabella Corporation $414,18.49 Same 4 Epic Excavating, Inc. $417,41.89 Same 5 Rieth-Riley Construction Co., Inc. $417,1.6 Same 6 Kamminga & Roodvoets, Inc. $40, Same 7 F and M Concrete Construction LLC $447, Same 8 Northern Construction Services, Corp. $477, Same 9 Total Number of Bidders: 9

16 Letting of February, 018 Letting Call: Project: CMG Low Bid: $5, Engineer Estimate: $55, % Start Date: 10 days after award Completion Date: August 1, 018 Traffic signal modernization, concrete curb, gutter and sidewalk ramps on Capital Avenue SW at Jackson Street in the city of Battle Creek, Calhoun County. This is a Local Agency Project. No DBE participation required J. Ranck Electric, Inc. $5, Same Severance Electric Co., Inc. $66,08.5 Same Rauhorn Electric, Inc. $9, Same Total Number of Bidders:

17 Letting of February, 018 Letting Call: Project: HRRR Low Bid: $15, Engineer Estimate: $, % Start Date: July 9, 018 Completion Date: August 1, mi of hot mix asphalt surfacing, tree removal, earth excavation, rumble strips, signing and pavement markings on Poor Farm Road at Walker Road, Alcona County. This is a Local Agency Project. This is a Small Business Program project. Only those approved by MDOT as a Small Business may be eligible to bid as a prime contractor. No DBE participation required Katterman Trucking, Inc. $15, Same Wonsey Tree Service, Inc. $9,14.50 Same Wilson Truck and Excavating, LLC $44,408.1 Same John Henry Excavating Inc. $44, Same 4 Total Number of Bidders: 4

18 Letting of February 0, 018 Letting Call: Project: pp Low Bid: Engineer Estimate: Start Date: April 16, 018 Completion Date: September 19, mi of hot mix asphalt cold milling and resurfacing, joint and crack repairs, sidewalk ramps, culvert replacement, drainage modifications, signing and pavement markings on M-46 from the west village limits of Merrill to Brennan Road, from Brennan Road to M-5 and at three locations for culvert replacement in the village of Merrill, Saginaw County % DBE participation required This proposal has been postponed.

19 Letting of February, 018 Letting Call: Project: HSIP Low Bid: $,7,87.90 Engineer Estimate: $,48, % Start Date: May 7, 018 Completion Date: December 1, 018 Application of longitudinal pavement markings on various routes, Macomb, Oakland and Wayne Counties. No DBE participation required P.K. Contracting, Inc. $,7,87.90 Same R. S. Contracting, Inc. $,545,946.8 Same Total Number of Bidders:

20 Letting of February, 018 Letting Call: Project: HSIP Low Bid: $1,560,471.1 Engineer Estimate: $1,779, % Start Date: May 1, 018 Completion Date: November 0, 018 Application of permanent pavement markings on various trunkline routes, Berrien, Branch, Calhoun, Cass, Kalamazoo, St. Joseph, and Van Buren Counties. No DBE participation required P.K. Contracting, Inc. $1,560,471.1 Same R. S. Contracting, Inc. $1,84,455. Same Total Number of Bidders:

21 Letting of February, 018 Letting Call: Project: ST Low Bid: $598, Engineer Estimate: $589, % Start Date: June 4, 018 Completion Date: October 5, 018 Deck patching, epoxy overlay, pin and hanger replacements, zone painting, structural steel and substructure repair, joint replacements and concrete surface coating on M-14 (Michigan Avenue Capitol Loop) over the Grand River in the city of Lansing, Ingham County. This project includes a year warranty on concrete surface coating and a 5 year performance warranty on thin epoxy bridge deck overlay..00 % DBE participation required Anlaan Corporation $598, Same Grand River Construction, Inc. $609,18.08 Same C. A. Hull Co., Inc. $69,85.4 Same Z Contractors, Inc. $657,76. Same 4 Total Number of Bidders: 4

22 Letting of February, 018 Letting Call: Project: HSIP Low Bid: $51,449.0 Engineer Estimate: $511, % Start Date: 10 days after award Completion Date: December 1, 018 Application of special pavement markings on various routes, Clinton, Jackson and Livingston Counties. No DBE participation required P.K. Contracting, Inc. $51,449.0 Same R. S. Contracting, Inc. $565, Same Total Number of Bidders:

23 Letting of February, 018 Letting Call: Project: ST Low Bid: $400,91.87 Engineer Estimate: $47, % Start Date: September 10, 018 Completion Date: May 17, 019 Deck patching, epoxy overlay, steel repairs, pin, hanger and joint replacement, zone painting, substructure and return wall repairs and approach work on M-0 over the Muskegon River, Mecosta County. No DBE participation required Grand River Construction, Inc. $400,91.87 Same Anlaan Corporation $46,71.05 Same Milbocker and Sons, Inc. $599, Same C. A. Hull Co., Inc. $65, Same 4 Nashville Construction Company $649, Same 5 Davis Construction, Inc. $719, Same 6 Total Number of Bidders: 6

24 Letting of February, 018 Letting Call: Project: M Low Bid: $1,045, Engineer Estimate: $1,17, % Start Date: August 6, 018 Completion Date: September 0, mi of hot mix asphalt cold milling and resurfacing on M-7 from M- easterly to south of County Road 669 in the village of Empire, Leelanau County. This project includes a year materials and workmanship pavement warranty. No DBE participation required Rieth-Riley Construction Co., Inc. $1,045, Same Elmer's Crane and Dozer, Inc. $1,167,669.9 Same Total Number of Bidders:

25 Letting of February, 018 Letting Call: Project: STL , ETC Low Bid: $41, Engineer Estimate: $48, % Start Date: April 16, 018 Completion Date: June 8, mi of hot mix asphalt cold milling and resurfacing, detail 8 joint repairs, concrete curb, gutter, sidewalk and ramps and pavement markings on M-7 from north of rd Street north to south of US-10 in the village of Baldwin, Lake County..00 % DBE participation required Rieth-Riley Construction Co., Inc. $41, Same Elmer's Crane and Dozer, Inc. $48, Same Total Number of Bidders:

26 Letting of February, 018 Letting Call: Project: STG Low Bid: $59, Engineer Estimate: $86, % Start Date: April 16, 018 Completion Date: June 8, mi of non-freeway signing on M-0, Mecosta and Newaygo Counties. No DBE participation required Action Traffic Maintenance, Inc. $59, Same Give 'em A Brake Safety, LLC $17, Same J. Ranck Electric, Inc. $61, Same Total Number of Bidders:

27 Letting of February, 018 Letting Call: Project: STU Low Bid: $,154,509.8 Engineer Estimate: $,60, % Start Date: 10 days after award Completion Date: September 1, mi of hot mix asphalt cold milling, resurfacing and widening for center left-turn lane, concrete curb, gutter, sidewalk and ramps, earth excavation, aggregate base, storm and sanitary sewer, drainage, box culvert and pedestrian signals on 1 Mile Road from Drake Road to Farmington Road in the city of Farmington Hills, Oakland County. This is a Local Agency Project % DBE participation required L. D'Agostini & Sons, Inc. $,154,509.8 Same Dan's Excavating, Inc. $,40,64.97 Same Angelo Iafrate Construction Company $,477,51.9 Same V.I.L. Construction, Inc. $,67, Same 4 Rohde Bros. Excavating, Inc. $4,01, Same 5 Fonson Company, Inc. $4,174,66.76 Same 6 Total Number of Bidders: 6

28 Letting of February, 018 Letting Call: Project: STU Low Bid: $1,65, Engineer Estimate: $1,8, % Start Date: 10 days after award Completion Date: July 1, mi of hot mix asphalt cold milling and resurfacing, drainage, pavement repairs and guardrail at locations on Flushing Road, Genesee County. This is a Local Agency Project..00 % DBE participation required Lois Kay Contracting Co. $1,65, Same Ace-Saginaw Paving Company $1,54,98.6 Same C & D Hughes, Inc. $1,445,506.9 Same Pyramid Paving and Contracting Co. $1,45,14.44 Same 4 Florence Cement Company $1,456, Same 5 Cadillac Asphalt, L.L.C. $1,50, Same 6 Ajax Paving Industries, Inc. $,1, Same 7 Total Number of Bidders: 7

29 Letting of February, 018 Letting Call: Project: STU , ETC Low Bid: $1,56, Engineer Estimate: $1,649, % Start Date: 10 days after award Completion Date: May 0, mi of hot mix asphalt cold milling and resurfacing, concrete sidewalk, ADA ramps and signal work at various intersections and on Howard Street from Stadium Drive to Oakland Drive in the city of Kalamazoo, Kalamazoo County. This is a Local Agency Project..00 % DBE participation required Severance Electric Co., Inc. $1,56, Same J. Ranck Electric, Inc. $1,684, Same Total Number of Bidders:

30 Letting of February, 018 Letting Call: Project: CM Low Bid: $49,6.95 Engineer Estimate: $70, % Start Date: 10 days after award Completion Date: May 1, 019 Installation of fiber optic with connection at existing traffic signal controllers at signalized intersections, and concrete curb, gutter and sidewalk on East Paris Avenue from Burton Street to Cascade Road and on Cascade Road from East Paris Avenue to Cascade West Parkway in the city of Grand Rapids, Kent County. This is a Local Agency Project. No DBE participation required Severance Electric Co., Inc. $49,6.95 Same J. Ranck Electric, Inc. $64,69.98 Same Rauhorn Electric, Inc. $65,1.00 Same Strain Electric Company $68, Same 4 Total Number of Bidders: 4

31 Letting of February, 018 Letting Call: Project: EDF Low Bid: $0, Engineer Estimate: $408, % Start Date: April 9, 018 Completion Date: June 15, mi of hot mix asphalt base crushing and shaping, shoulder paving, signing and recessed pavement markings on North Otsego Lake Drive from Old US-7 to Dickerson Road, Otsego County. This is a Local Agency Project. No DBE participation required Payne & Dolan Inc. $0, Same Rieth-Riley Construction Co., Inc. $45,87.67 Same Pyramid Paving and Contracting Co. $75,64.66 Same Total Number of Bidders:

32 Letting of February, 018 Letting Call: Project: STUL Low Bid: $0,11.85 Engineer Estimate: $7, % Start Date: 10 days after award Completion Date: August 15, mi of hot mix asphalt resurfacing, concrete sidewalk ramps, watermain and pavement markings on Broadway Avenue from Glenside Boulevard to Maple Grove Road in the city of Roosevelt Park, Muskegon County. This is a Local Agency Project..00 % DBE participation required Michigan Paving and Materials Company $0,11.85 Same Asphalt Paving, Inc. $05, Same Superior Asphalt, Inc. $15, Same Rieth-Riley Construction Co., Inc. $1,15.80 Same 4 Kamminga & Roodvoets, Inc. $46, Same 5 C & D Hughes, Inc. $69, Same 6 Total Number of Bidders: 6

33 Letting of February, 018 Letting Call: Project: NH Low Bid: $,96, Engineer Estimate: $,865, % Start Date: September 4, 018 Completion Date: October 6, mi of hot mix asphalt cold milling and resurfacing, shoulder corrugations and pavement markings on I-75 from the south Cheboygan county line to north of Webb Road, Cheboygan County. This project includes a year materials and workmanship pavement warranty % DBE participation required Rieth-Riley Construction Co., Inc. $,96, Same Payne & Dolan Inc. $,64, Same Total Number of Bidders:

34 Letting of February, 018 Letting Call: Project: STU Low Bid: $1,58, Engineer Estimate: $1,6, % Start Date: 10 days after award Completion Date: September 4, mi of hot mix asphalt reconstruction, concrete curb and gutter, storm sewer, watermain and pavement markings on Harris Road from Michigan Avenue to Holmes Road, Washtenaw County. This is a Local Agency Project % DBE participation required Bailey Excavating, Inc. $1,58, Same Fonson Company, Inc. $1,74,97.0 Same Springline Excavating, LLC $1,776,77.1 Same Florence Cement Company $1,794,116.9 Same 4 Mead Bros. Excavating Inc. $1,944, Same 5 Ric-Man Construction, Inc. $,018,079.6 Same 6 Angelo Iafrate Construction Company $,088, Same 7 Pamar Enterprises, Inc. $,89,587.8 Same 8 Total Number of Bidders: 8

35 Letting of February, 018 Letting Call: Project: TA Low Bid: $99,09.0 Engineer Estimate: $1,451, % Start Date: 10 days after award Completion Date: August 1, mi of hot mix asphalt shared-use path and drainage improvements on Chevy Commons Trail from Chevrolet Avenue to east of North Grand Traverse Avenue in the city of Flint, Genesee County. This is a Local Agency Project % DBE participation required Anlaan Corporation $99,09.0 Same Fisher Contracting Company $1,099, Same Z Contractors, Inc. $1,11,40.01 Same E.T. MacKenzie Company $1,118,775.0 Same 4 L.J. Construction, Inc. $1,151, Same 5 Toebe Construction LLC $1,151, Same 6 Total Number of Bidders: 6

36 Letting of February, 018 Letting Call: Project: STU Low Bid: $1,,09.85 Engineer Estimate: $1,40, % Start Date: April 16, 018 Completion Date: September 8, mi of hot mix asphalt cold milling and resurfacing, concrete pavement repair, sidewalk and ramps, guardrail, signing and pavement markings on Pelham Road from Allen Road to Wick Road in the cities of Taylor and Allen Park, Wayne County. This is a Local Agency Project % DBE participation required Florence Cement Company $1,,09.85 Same Ajax Paving Industries, Inc. $1,71,71.88 Same Cadillac Asphalt, L.L.C. $1,10,89.69 Same Total Number of Bidders:

37 Letting of February, 018 Letting Call: Project: STU Low Bid: $1,1,0.00 Engineer Estimate: $1,087, % Start Date: April 1, 018 Completion Date: June 9, mi of hot mix asphalt cold milling and resurfacing, concrete pavement repair, curb, gutter, sidewalk and ramps, drainage and pavement markings on Goddard Road from east of Telegraph Road (US-4) to west of Pardee Road in the city of Taylor, Wayne County. This is a Local Agency project % DBE participation required Cadillac Asphalt, L.L.C. $1,1,0.00 Same Ajax Paving Industries, Inc. $1,5, Same Florence Cement Company $1,61, Same Total Number of Bidders: //018

38 Letting of February, 018 Letting Call: Project: BO Low Bid: $1,086,56.77 Engineer Estimate: $1,01, % Start Date: 10 days after award Completion Date: December 1, 018 Bridge removal and replacement with three-sided precast concrete culvert, guardrail, drainage, cofferdams, steel piling and approach work on South Hill Island Road over Flower Bay (Lake Huron), Mackinac County. This is a Local Agency Project..00 % DBE participation required Davis Construction, Inc. $1,086,56.77 Same John Henry Excavating Inc. $1,09,66.75 Same Grand River Construction, Inc. $1,146,570.9 Same Anlaan Corporation $1,56, Same 4 Elmer's Crane and Dozer, Inc. $1,6,44.00 Same 5 Milbocker and Sons, Inc. $1,0,81.17 $1,0, Hebert Construction Co. $1,418,819.6 Same 7 Bacco Construction Company $1,910, Same 8 Total Number of Bidders: 8

39 Letting of February, 018 Letting Call: Project: HSIP Low Bid: $96,57.8 Engineer Estimate: $996, % Start Date: June 18, 018 Completion Date: August 17, mi of hot mix asphalt cold milling and resurfacing, concrete curb and gutter, signing and pavement markings on Lee Road at Whitmore Lake Road, Livingston County. This is a Local Agency Project..00 % DBE participation required Cadillac Asphalt, L.L.C. $96,57.8 Same Rieth-Riley Construction Co., Inc. $944, Same Ajax Paving Industries, Inc. $1,158, Same Total Number of Bidders:

40 Letting of February, 018 Letting Call: Project: BO Low Bid: $766,94.96 Engineer Estimate: $817, % Start Date: 10 days after award Completion Date: September 15, 018 Bridge removal and replacement with three-sided, pre-cast concrete culvert, hot mix asphalt overlay, guardrail, cofferdams, steel piling, temporary structure, riprap and approach work on NP Road over the Carp River, Marquette County. This is a Local Agency Project..00 % DBE participation required A. Lindberg & Sons, Inc. $766,94.96 Same Associated Constructors, LLC $847, Same MJO Contracting, Inc. $95,70.97 Same Bacco Construction Company $1,16,4.95 Same 4 Hebert Construction Co. $1,186, Same 5 Total Number of Bidders: 5

41 Letting of February, 018 Letting Call: Project: STL , ETC Low Bid: $758,06.7 Engineer Estimate: $794, % Start Date: May 15, 018 Completion Date: August 4, mi of chip sealing, fog sealing, intermittent hot mix asphalt paving and pavement markings on various routes, Manistee County. This is a Local Agency Project. No DBE participation required Highway Maintenance and Construction $758,06.7 Same Company Pavement Maintenance Systems, LLC $778,94.95 Same Total Number of Bidders:

42 Letting of February, 018 Letting Call: Project: STL Low Bid: $657,75.79 Engineer Estimate: $751, % Start Date: April 17, 018 Completion Date: November, mi of hot mix asphalt cold milling and resurfacing, subgrade undercutting, geotextile stabilization, subgrade underdrain, culvert removal and replacement and slope restoration on Hansen Road from west of Gordon Road to east of LaSalle Road, Mason County. This is a Local Agency Project..00 % DBE participation required C & D Hughes, Inc. $657,75.79 Same D. J. McQuestion & Sons, Inc. $708, Same Wonsey Tree Service, Inc. $745,19.00 Same Milbocker and Sons, Inc. $774,177.5 Same 4 Elmer's Crane and Dozer, Inc. $809,67.50 Same 5 Hallack Contracting, Inc. $815,05.50 Same 6 Kamminga & Roodvoets, Inc. $860,81.6 Same 7 Schippers Excavating, Inc. $999, Same 8 Total Number of Bidders: 8

43 Letting of February, 018 Letting Call: Project: STL Low Bid: $484, Engineer Estimate: $507, % Start Date: 10 days after award Completion Date: 0 Working Days 1.51 mi of hot mix asphalt base crushing, shaping and resurfacing, aggregate shoulders, concrete curb and gutter and pavement markings on River Road from Peterson Road east to Buys Road, Muskegon County. This is a Local Agency Project..00 % DBE participation required Rieth-Riley Construction Co., Inc. $484, Same Michigan Paving and Materials Company $490,16.57 Same Superior Asphalt, Inc. $545, Same Total Number of Bidders:

44 Letting of February, 018 Letting Call: Project: STUL Low Bid: $440,980. Engineer Estimate: $46, % Start Date: June 7, 018 Completion Date: August 4, mi of hot mix asphalt reconstruction, storm sewer, concrete curb, gutter, sidewalk and ramps and pavement markings on School Street from Calumet Avenue (US-41) to Boundary Street, Houghton County. This is a Local Agency Project. No DBE participation required B & B Contracting, Calumet, Inc. $440,980. Same MJO Contracting, Inc. $507, Same Bacco Construction Company $557,6.10 Same FA Industrial Services, Inc. $577,49.40 Same 4 Hebert Construction Co. $65, Same 5 Total Number of Bidders: 5

45 Letting of February, 018 Letting Call: Project: STUL Low Bid: $8,8.00 Engineer Estimate: $96, % Start Date: 10 days after award Completion Date: June 9, mi of hot mix asphalt cold milling and resurfacing and pavement markings on Sheridan Road from the Muskegon city limits north to Apple Avenue (M-46), Muskegon County. This is a Local Agency Project. No DBE participation required Rieth-Riley Construction Co., Inc. $8,8.00 Same Michigan Paving and Materials Company $97,9.05 Same Superior Asphalt, Inc. $405, Same Total Number of Bidders:

46 Letting of February, 018 Letting Call: Project: STU Low Bid: $40,107. Engineer Estimate: $69, % Start Date: April, 018 Completion Date: June 1, mi of hot mix asphalt resurfacing and widening, concrete curb, gutter, sidewalk and ramps, storm sewer, and pavement markings on nd Avenue from Quincy Street to Corporate Grove Drive in the city of Hudsonville, Ottawa County. This is a Local Agency Project..00 % DBE participation required Brenner Excavating, Inc. $40,107. Same Michigan Paving and Materials Company $41, Same Peters Construction Co. $50,5.76 Same Epic Excavating, Inc. $51,105. Same 4 Superior Asphalt, Inc. $55, Same 5 Kamminga & Roodvoets, Inc. $59,70.80 Same 6 Rieth-Riley Construction Co., Inc. $60,11.00 Same 7 Milbocker and Sons, Inc. $6,514.9 Same 8 Nagel Construction, Inc. $67,47.58 Same 9 Al's Excavating, Inc. $7,517.0 Same 10 C & D Hughes, Inc. $85, Same 11 Schippers Excavating, Inc. $94,96.0 Same 1 Total Number of Bidders: 1

47 Letting of February, 018 Letting Call: Project: STRH Low Bid: $14, Engineer Estimate: $44, % Start Date: 10 days after award Completion Date: August 1, mi of hot mix asphalt, embankment, earth excavation, aggregate base, sewer and pavement markings on Petersburg Road at Norfolk Southern Railroad, Monroe County. This is a Local Agency project. This is a Small Business Program project. Only those approved by MDOT as a Small Business may be eligible to bid as a prime contractor. No DBE participation required Nashville Construction Company $14, Same Erie Construction, LLC $59, Same Total Number of Bidders:

48 Letting of February, 018 Letting Call: Project: HSIP Low Bid: $141,85.00 Engineer Estimate: $165, % Start Date: June 5, 018 Completion Date: August 19, 018 Signal modernization, pedestrian signal upgrades, detection, and audible pedestrian beacons on Michigan Street from Monroe Avenue to Bostwick Avenue in the city of Grand Rapids, Kent County. This is a Local Agency Project. No DBE participation required Strain Electric Company $141,85.00 Same J. Ranck Electric, Inc. $155,806.9 Same Severance Electric Co., Inc. $164,47.70 Same Total Number of Bidders:

49 Letting of February, 018 Letting Call: Project: STRH Low Bid: $6,56.85 Engineer Estimate: $85, % Start Date: June 11, 018 Completion Date: August 11, mi of grade crossing rebuilds, cold milling and resurfacing, and maintaining traffic on M-49 north of Allen Township and south of Reading Township and on M-99 in the cities of Jonesville and Hillsdale, Hillsdale County. No DBE participation required Armond Cassil Railroad Construction, Inc $6,56.85 Same Michigan Paving and Materials Company $04, Same Total Number of Bidders:

50 Letting of February, 018 Letting Call: Project: FM Low Bid: $4, Engineer Estimate: $7, % Start Date: June 4, 018 Completion Date: 0 Calendar Days Rehabilitate Runway 11/9 - Slurry Seal and Airfield Marking at the Luce County Airport, city of Newberry, Luce County. No DBE participation required Ameriseal of Ohio, Inc. $4, Same Total Number of Bidders: 1

51 Letting of February, 018 Letting Call: Project: FM Low Bid: $56, Engineer Estimate: $11, % Start Date: May 14, 018 Completion Date: 6 Calendar Days Repair of control joints, crack sealing, and paint marking at the Kirsch Municipal Airport, city of Sturgis, St. Joseph County. No DBE participation required Interstate Sealant & Concrete, Inc. $56, Same Scodeller Construction, Inc. $85, Same Fahrner Asphalt Sealers, L.L.C. $85, Same Michigan Joint Sealing, Inc. $107, Same 4 C & D Hughes, Inc. $109,5.00 Same 5 Pavement Maintenance Systems, LLC $116, Same 6 Diamond Coring Company, Inc. $156, Same 7 Total Number of Bidders: 7

52 Letting of February, 018 Letting Call: Project: NH Low Bid: $,08, Engineer Estimate: $,76, % Start Date: April 16, 018 Completion Date: July 1, mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter and sidewalk ramps, shoulder gravel and pavement markings on US-1 from the east village limits of Quincy easterly to the west village limits of Jonesville, Branch and Hillsdale Counties. This project includes a year materials and workmanship pavement warranty..00 % DBE participation required Michigan Paving and Materials Company $,08, Same Rieth-Riley Construction Co., Inc. $,10,71.74 Same Gerken Paving, Inc. $,158,154.6 Same Total Number of Bidders:

53 Letting of February, 018 Letting Call: Project: ST , ETC Low Bid: $1,965, Engineer Estimate: $,00, % Start Date: July 9, 018 Completion Date: September 14, mi of hot mix asphalt cold milling and resurfacing, joint repairs, shoulder work and resurfacing carpool lots on I-69 from Taylor Road to Range Road, on I-69 at Wadhams Road and at M-19, St. Clair County. This project contains a year materials and workmanship pavement warranty % DBE participation required Ajax Paving Industries, Inc. $1,965, Same Ace-Saginaw Paving Company $,04, Same Total Number of Bidders:

54 Letting of February, 018 Letting Call: Project: HSIP Low Bid: $1,61, Engineer Estimate: $1,670, % Start Date: April 16, 018 Completion Date: November 0, 018 Application of permanent pavement markings on various trunkline routes, Alger, Baraga, Chippewa, Delta, Dickinson, Gogebic, Houghton, Iron, Keweenaw, Luce, Mackinac, Marquette, Menominee, Ontonagon, and Schoolcraft Counties. No DBE participation required P.K. Contracting, Inc. $1,61, Same R. S. Contracting, Inc. $,157,01.00 Same Total Number of Bidders:

55 Letting of February, 018 Letting Call: Project: ST Low Bid: $77, Engineer Estimate: $814, % Start Date: July 9, 018 Completion Date: August 4, mi of overband crack filling pretreatment, double and single chip sealing, fog sealing and pavement markings on M-16 from M-40 to US-11 and on M-40 from the south city limits of Marcellus to the west city limits of Marcellus, Cass County. This project includes two year pavement performance warranties. No DBE participation required Fahrner Asphalt Sealers, L.L.C. $77, Same Pavement Maintenance Systems, LLC $819, Same Highway Maintenance and Construction Company $856,48.6 Same Total Number of Bidders:

56 Letting of February, 018 Letting Call: Project: M Low Bid: $76,08.44 Engineer Estimate: $751, % Start Date: April 0, 018 Completion Date: July 7, mi of hot mix asphalt cold milling and single-course overlay, shoulder gravel, signing and pavement markings on M-156 from Park Drive to Brown Road, Lenawee County. This project includes a year materials and workmanship pavement warranty. No DBE participation required Michigan Paving and Materials Company $76,08.44 Same Gerken Paving, Inc. $77,50.1 Same Total Number of Bidders: /9/018

57 Letting of February, 018 Letting Call: Project: ST Low Bid: $694,89.41 Engineer Estimate: $640, % Start Date: May 9, 018 Completion Date: November 15, 018 Superstructure replacement, substructure patching, rehabilitation of the water control structure, concrete curb, gutter and culvert, guardrail, steel sheet piling, approach work and pavement markings on M-89 over the Kalamazoo River Overflow, Allegan County..00 % DBE participation required Anlaan Corporation $694,89.41 Same Milbocker and Sons, Inc. $696,995.6 Same Grand River Construction, Inc. $776,10.4 Same Total Number of Bidders:

58 Letting of February, 018 Letting Call: Project: ST Low Bid: $541,81.69 Engineer Estimate: $555, % Start Date: July 9, 018 Completion Date: September 14, mi of hot mix asphalt cold milling and resurfacing, detail 8 joint repairs and ADA ramps on M-66 from south of Walnut Street north to north of Cedar Street in the city of Stanton, Montcalm County. This project includes a year materials and workmanship pavement warranty % DBE participation required Rieth-Riley Construction Co., Inc. $541,81.69 Same Michigan Paving and Materials Company $57, Same Central Asphalt, Inc. $904,77.05 Same Total Number of Bidders:

59 Letting of February 0, 018 Letting Call: Project: MX B11 Low Bid: Engineer Estimate: Start Date: 10 days after award Completion Date: May 1, 018 Removal of concrete and HMA pavement, miscellaneous debris, masonry and concrete foundations, fence and trees at various locations within the proposed Gordie Howe International Bridge Plaza & Interchange Area in the city of Detroit, Wayne County % DBE participation required This proposal has been withdrawn.

60 Letting of February, 018 Letting Call: Project: IM , ETC Low Bid: $188,0.00 Engineer Estimate: $157, % Start Date: March 1, 018 Completion Date: October, 00 Landscaping at the US-17 Lansing Rest Area, I-96 Grand Ledge Rest Area and I-96 Okemos Rest Area, Clinton and Ingham Counties. This is a Small Business Program project. Only those approved by MDOT as a Small Business may be eligible to bid as a prime contractor. No DBE participation required Diane Dukes, Inc. $188,0.00 Same Total Number of Bidders: 1 /9/018

61 Letting of February, 018 Letting Call: Project: NH Low Bid: $,118, Engineer Estimate: $,8, % Start Date: April 9, 018 Completion Date: July, mi of hot mix asphalt cold milling and resurfacing, concrete patching and sidewalk ramps on US-4 from I-96 to M-5 in the city of Detroit, Wayne County. This project includes a year materials and workmanship pavement warranty % DBE participation required Ajax Paving Industries, Inc. $,118, Same Cadillac Asphalt, L.L.C. $,71,56.4 Same Total Number of Bidders:

62 Letting of February, 018 Letting Call: Project: M Low Bid: $1,80, Engineer Estimate: $1,9, % Start Date: July 9, 018 Completion Date: September 14, mi of hot mix asphalt micro-cold milling and resurfacing, centerline and shoulder pavement repairs and corrugations and pavement markings on M- from Pearsall Road to southeast of Tebo School Road, Antrim and Charlevoix Counties. This project includes a year materials and workmanship pavement warranty. No DBE participation required Rieth-Riley Construction Co., Inc. $1,80, Same Payne & Dolan Inc. $1,98, Same Elmer's Crane and Dozer, Inc. $1,89,00.14 Same Total Number of Bidders:

63 Letting of February, 018 Letting Call: Project: ST Low Bid: $1,678, Engineer Estimate: $1,88, % Start Date: July 16, 018 Completion Date: 5 Working Days 7.06 mi of intermittent hot mix asphalt cold milling and resurfacing, ADA ramps, detail 7 and 8 joint repairs, berm grading and pavement markings on US-41 from Agent Street north to Cliff Drive, on M-6 from Winona Street to Wolverine Street and on M-0 from 11th Street to US-41, Keweenaw County. This project includes two year materials and workmanship pavement warranties..00 % DBE participation required Bacco Construction Company $1,678, Same Payne & Dolan Inc. $1,766, Same Total Number of Bidders:

64 Letting of February, 018 Letting Call: Project: M Low Bid: $1,45,506.9 Engineer Estimate: $1,74, % Start Date: April 10, 018 Completion Date: May 18, mi of hot mix asphalt cold milling, repairs and resurfacing and curb ramp construction on M-6 from north of US-1 to west of Hilton Street in the villages of Cassopolis and Edwardsburg, Cass County. This project includes a year materials and workmanship pavement warranty. No DBE participation required Michigan Paving and Materials Company $1,45,506.9 Same Rieth-Riley Construction Co., Inc. $1,481,874.0 Same Total Number of Bidders:

65 Letting of February, 018 Letting Call: Project: M Low Bid: $1,186,798.0 Engineer Estimate: $1,586, % Start Date: August 6, 018 Completion Date: October 1, mi of hot mix asphalt cold milling and resurfacing, replacement of traffic recorder sensors and pavement markings on M-60 from Old US-7 to the west village limits of Homer in the village of Tekonsha, Calhoun County. This project contains a year materials and workmanship pavement warranty. No DBE participation required Rieth-Riley Construction Co., Inc. $1,186,798.0 Same Michigan Paving and Materials Company $1,50, Same Total Number of Bidders:

66 Letting of February, 018 Letting Call: Project: M Low Bid: $1,177,06.09 Engineer Estimate: $1,416, % Start Date: June 5, 018 Completion Date: August 17, mi of cold milling and single-course resurfacing on M-55 from east of M- to west of Beach Road and on M- from south of Grand Jean Road to north of Oyster Road, Ogemaw County. This project includes a year materials and workmanship pavement warranty. No DBE participation required Rieth-Riley Construction Co., Inc. $1,177,06.09 Same Bolen Asphalt Paving, Inc. $1,44,89.69 Same Pyramid Paving and Contracting Co. $1,5,96.47 Same Total Number of Bidders:

67 Letting of February, 018 Letting Call: Project: NH Low Bid: $978,878.6 Engineer Estimate: $1,001, % Start Date: September 10, 018 Completion Date: October 8, mi of hot mix asphalt cold milling and resurfacing on US-1 from the north branch of the Pentwater River north to the Oceana north county line, Oceana County. This project includes a year materials and workmanship pavement warranty % DBE participation required Rieth-Riley Construction Co., Inc. $978,878.6 Same Michigan Paving and Materials Company $1,46, Same Total Number of Bidders:

68 Letting of February, 018 Letting Call: Project: M Low Bid: $791, Engineer Estimate: $87, % Start Date: August 6, 018 Completion Date: August 1, mi of hot mix asphalt cold milling and resurfacing and pavement markings on M-66 from north of the north Nashville village limit north to Coats Grove Road, Barry County. This project includes a year materials and workmanship pavement warranty. No DBE participation required Rieth-Riley Construction Co., Inc. $791, Same Michigan Paving and Materials Company $798,0. Same Total Number of Bidders:

69 Letting of February, 018 Letting Call: Project: NH Low Bid: $859,06.8 Engineer Estimate: $867, % Start Date: July 0, 018 Completion Date: September 9, mi of overband crack filling, microsurfacing, aggregate shoulders and pavement markings on US-141 from south of Basilio Road northerly to the north Iron county line, Iron County. This project includes a year pavement performance warranty. No DBE participation required Pavement Maintenance Systems, LLC $859,06.8 Same Strawser Construction Inc. $1,009, Same Total Number of Bidders:

70 Letting of February, 018 Letting Call: Project: NH Low Bid: $1,17,59.97 Engineer Estimate: $1,85, % Start Date: May 14, 018 Completion Date: June, mi of hot mix asphalt cold milling and resurfacing on US-10 from the east village limits of Custer to the Mason/Lake county line. This project includes a year materials and workmanship pavement warranty..00 % DBE participation required Elmer's Crane and Dozer, Inc. $1,17,59.97 Same Rieth-Riley Construction Co., Inc. $1,471,701.4 Same Total Number of Bidders:

71 Letting of February, 018 Letting Call: Project: NH Low Bid: $1,08,50.0 Engineer Estimate: $1,170, % Start Date: September 17, 018 Completion Date: October 5, mi of hot mix asphalt cold milling and resurfacing, joint repairs, concrete curb, gutter, sidewalk and ramps on M-84 from south of State Street to south of McCarty Road in the city of Saginaw, Saginaw County. This project includes a year materials and workmanship pavement warranty % DBE participation required Ace-Saginaw Paving Company $1,08,50.0 Same Pyramid Paving and Contracting Co. $1,4,88.00 Same Total Number of Bidders: //018

72 Letting of February, 018 Letting Call: Project: M Low Bid: $581,04.6 Engineer Estimate: $598, % Start Date: July 9, 018 Completion Date: May, mi of hot mix asphalt cold milling and resurfacing, detail 8 joint repairs, ADA ramps and pavement markings on M-91 from Snows Lake Road north to south of Sunny Side Drive in the city of Greenville, Montcalm County. This project includes a year materials and workmanship pavement warranty. No DBE participation required Rieth-Riley Construction Co., Inc. $581,04.6 Same Michigan Paving and Materials Company $656,888.7 Same Central Asphalt, Inc. $886, Same Total Number of Bidders:

73 Letting of February, 018 Letting Call: Project: NH Low Bid: $74, Engineer Estimate: $70, % Start Date: September 4, 018 Completion Date: June 10, mi of hot mix asphalt cold milling and resurfacing, ADA ramps and approach work on US-10BR (Eastman Avenue) from south of Wackerly Street northerly to Airport Road in the city of Midland, Midland County. This project includes a year materials and workmanship pavement warranty..00 % DBE participation required Pyramid Paving and Contracting Co. $74, Same Rieth-Riley Construction Co., Inc. $91,67.9 Same Ace-Saginaw Paving Company $409,95.57 Same Central Asphalt, Inc. $507, Same 4 Total Number of Bidders: 4 /7/018

74 Letting of February, 018 Letting Call: Project: NH , ETC Low Bid: $,5, Engineer Estimate: $,96, % Start Date: 10 days after award Completion Date: October 15, mi of hot mix asphalt cold milling and resurfacing, shoulder reconstruction, ADA ramps and pavement markings on M-1 from H-40 to M-8 and on M-8 from M-1 to Dick Road, Chippewa County. This project includes two year materials and workmanship pavement warranties..00 % DBE participation required Payne & Dolan Inc. $,5, Same Bacco Construction Company $,604, Same Rieth-Riley Construction Co., Inc. $4,05,88.7 Same Total Number of Bidders:

Michigan Commercial Motor Vehicles

Michigan Commercial Motor Vehicles June 2016 Revised 10/3/17 2016 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data

More information

VEHICLE TYPE CRASH INVOLVEMENT

VEHICLE TYPE CRASH INVOLVEMENT VEHICLE TYPE CRASH INVOLVEMENT TYPES Number Total MOST SEVERE OUTCOME IN CRASH MOST SEVERE OUTCOME IN VEHICLE Motor Vehicles Fatal Crash Injury PDO Fatality in Veh Injury PDO Number Total Passenger Car

More information

Economics of Law Practice in Michigan

Economics of Law Practice in Michigan 20 2014 Attorney Income and Billing Rate Key Findings Report The survey was conducted in May 2014 and requested income and billing rate information for 2013. he State Bar of Michigan Economics of Law Practice

More information

State Bar of Michigan

State Bar of Michigan State Bar of Michigan 2017 Economics of Law Practice Attorney Income and Billing Rate Summary Report Contents Economics of Law Practice in Michigan 2017 Attorney Income and Billing Rate Summary Report

More information

NOTICE TO BIDDERS LETTING OF: Friday, April 06, 2018 ADDENDUM "A"

NOTICE TO BIDDERS LETTING OF: Friday, April 06, 2018 ADDENDUM A NOTICE TO BIDDERS LETTING OF: Friday, April 06, 2018 ADDENDUM "A" Prospective bidders of the 4/6/18, Michigan Department of Transportation (MDOT), Bid Letting, are hereby advised that this Addendum "A"

More information

NOTICE TO BIDDERS LETTING OF: Friday, August 04, 2017 ADDENDUM "A"

NOTICE TO BIDDERS LETTING OF: Friday, August 04, 2017 ADDENDUM A NOTICE TO BIDDERS LETTING OF: Friday, August 04, 2017 ADDENDUM "A" Prospective bidders of the August 4, 2017, Michigan Department of Transportation (MDOT), Bid Letting, are hereby advised that this Addendum

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

PRE-BID ADDENDUM NO. 1

PRE-BID ADDENDUM NO. 1 !!"# $%!!&"#!! '() & &&"# PRE-BID ADDENDUM NO. 1 Project Bid: 2010 Pickard and Harris Sewer Relining Project Bid Date: February 9, 2010 Time: Opening: 1:30 p.m. Office of City Clerk 320 W. Broadway Street

More information

General Decision Number: MI /21/2015 MI1. Superseded General Decision Number: MI State: Michigan

General Decision Number: MI /21/2015 MI1. Superseded General Decision Number: MI State: Michigan General Decision Number: MI150001 08/21/2015 MI1 Superseded General Decision Number: MI20140001 State: Michigan Construction Types: Highway (Highway, Airport & Bridge xxxxx and Sewer/Incid. to Hwy.) Counties:

More information

2040 Metropolitan Transportation Plan -- Table XVII-1

2040 Metropolitan Transportation Plan -- Table XVII-1 C:\7. \Projects\ 2040MTP Project List_Nov16-16.xlsx ID # NAME LIMITS DESCRIPTION COST () AGENCY PROJECT TYPE* 2017 1 B Dr S and Capital Ave SW B Dr S from 3.5 Mile Rd eastward to M-66 (1.7 mi); Capital

More information

Panama Court CDBG Program Addendum #1

Panama Court CDBG Program Addendum #1 COMMISSIONERS DOUGLAS E. FULLER CHAIR BARBARA RYAN FULLER VICE-CHAIR RODRICK K. GREEN MEMBER WASHTENAW COUNTY BOARD OF COUNTY ROAD COMMISSIONERS 555 NORTH ZEEB ROAD ANN ARBOR, MICHIGAN 48103 WWW.WCROADS.ORG

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

OTTAWA COUNTY ROAD COMMISSION Bid Comparison

OTTAWA COUNTY ROAD COMMISSION Bid Comparison OTTAWA COUNTY ROAD COMMISSION Bid Comparison Contract ID: Description: Location: Projects(s): 28th & Mason Reconstruct with pavement 28th Ave. and Mason St between Adams St. and 32nd Ave. Jamestown Township

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

Kalamazoo Area Transportation Study FY Transportation Improvement Program 10/1/2016 (05/30/18)

Kalamazoo Area Transportation Study FY Transportation Improvement Program 10/1/2016 (05/30/18) Agency Project Name Limits Length Primary Work Project Description Phase Phase MDOT Job ID 2017 Various MDOT Trunkline Highway Preservation Regionwide Trunkline Highway Preservation CON 0 612 M 612 01/25/17

More information

INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS

INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS Manitoba Infrastructure and Transportation Contract Services Branch 1630-215 Garry Street Winnipeg,

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Michigan Traffic Crash Facts

Michigan Traffic Crash Facts 1994 Michigan Traffic Crash Facts Office of Highway Safety Planning Michigan Department of State Police EXECUTIVE SUMMARY The 1994 traffic fatality count was 1,419, up 0.4 percent from the 1993 figure

More information

Transportation Data Center Data Set Codebook NUMBER 98-5 SEPTEMBER 1998 MICHIGAN The University of Michigan Transportation Research Institute

Transportation Data Center Data Set Codebook NUMBER 98-5 SEPTEMBER 1998 MICHIGAN The University of Michigan Transportation Research Institute Transportation Data Center Data Set Codebook NUMBER 98-5 SEPTEMBER 1998 MICHIGAN 1997 The University of Michigan Transportation Research Institute STATE OF MICHIGAN 1997 MOTOR VEHICLE ACCIDENT CODEBOOK

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: March 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD DESIGN BUILD CONTRACTS Sealed proposals for certain highway

More information

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Guam Transportation Program Project Updates Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Agenda Road Construction Highlights Ongoing Construction Route 17 Rehabilitation and

More information

SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018

SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018 SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018 The Wednesday, March 21, 2018, meeting of the St. Charles County Road Board was called to order at 4:30 p.m. in Room 542 of the Administration

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY BINGHAMTON METROPOLITAN TRANSPORTATION STUDY ANNUAL LISTING OF FEDERAL AID PROJECT OBLIGATIONS FEDERAL FISCAL YEAR Federal regulations require an annual listing of transportation projects, including investments

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

FALL 2017 ADVERTISING SCHEDULE

FALL 2017 ADVERTISING SCHEDULE INFRASTRUCTURE FALL 2017 ADVERTISING SCHEDULE CONSTRUCTION AND MATERIAL SUPPLY TENDERS Manitoba Infrastructure Contract Services Branch 1630 215 Garry Street Winnipeg, MB R3C 3P3 204 945 3637 The Construction

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

US 67 WIDENING PROJECT

US 67 WIDENING PROJECT US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the

More information

Schedule of Pay Items

Schedule of Pay Items Schedule of Pay Items 4/27/2018 9:33 AM AASHTOWare Project Version 4.0 Revision 189 Report v1 Letting Call: 180601 001 Letting Date: June 1, 2018 Contract ID: 392144-202845 Description: Runway 17/35 rehabilitation

More information

Regional DWI Courts. Hon. Patrick Bowler, Ret. Michigan Judicial Outreach Liaison. Hon. Harvey Hoffman District Court Judge Eaton County, MI

Regional DWI Courts. Hon. Patrick Bowler, Ret. Michigan Judicial Outreach Liaison. Hon. Harvey Hoffman District Court Judge Eaton County, MI Regional DWI Courts Hon. Patrick Bowler, Ret. Michigan Judicial Outreach Liaison Hon. Harvey Hoffman District Court Judge Eaton County, MI Caution - We Are All Different State Laws State Resources Geographic

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

CITY of NOVI CITY COUNCIL

CITY of NOVI CITY COUNCIL CITY of NOVI CITY COUNCIL Agenda Item 3 July 9, 2018 ci tyofnovi.org SUBJECT: Approval to award design engineering services to AECOM Great Lakes, Inc., for the Flint Street Realignment and Reconstruction

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

CTA Capital Construction Update December 12, 2006

CTA Capital Construction Update December 12, 2006 Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

TEN YEAR HISTORY OF FALL ENROLLMENTS

TEN YEAR HISTORY OF FALL ENROLLMENTS TEN YEAR HISTORY OF FALL ENROLLMENTS 2008 2007 F a l l S e m e s t e r 2006 2005 2004 2003 2002 2001 2000 1999 1998 0 50,000 100,000 150,000 200,000 250,000 Number of Students 3 TABLE 1: TEN YEAR HISTORY

More information

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors. system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Michigan. Traffic. Profile

Michigan. Traffic. Profile June 2014 Revised 5/11/15 Michigan 2013 Traffic Crash Profile Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

CTA Capital Construction Update May 17, 2007

CTA Capital Construction Update May 17, 2007 Block 37 Signals Project Brown Line Howard CTA Capital Construction Update May 17, 2007 1 Capital Construction Update Agenda Howard Station Reconstruction Brown Line Capacity Expansion Project Block 37

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

30.70+/- Acre Development. Opportunity th Street SW. Byron Center, MI M DEVELOPMENT OPPORTUNITY. Clyde Park Ave SW

30.70+/- Acre Development. Opportunity th Street SW. Byron Center, MI M DEVELOPMENT OPPORTUNITY. Clyde Park Ave SW DEVELOPMENT OPPORTUNITY Clyde Park Ave SW - Utilities near site - Byron Township - Near M-6 and - MP Master planned Industrial 6 M PRESENTED BY: David Rapp Associate Vice President Investment MOBILE +

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

TRANSPORTATION IMPROVEMENT PROGRAM

TRANSPORTATION IMPROVEMENT PROGRAM 2016 2021 TRANSPORTATION IMPROVEMENT PROGRAM 25 21 12 1 24 C B 26 13 29 30 3 6 19 7 27 14 18 17 15 16 28 22 11 10 9 A 7 D E 4 23 5 2 8 20 PROJECTS ON THE TIP PROJECTS ADDED TO THE TIP MAP I.D. PROJECT

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Committee of the Whole December 1, 016 City Council December 19, 016 Agenda Item: Bids for City Project No. 7551 Lift Station No. 17 & 17A Rehabilitation Submitted by:

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

Public Works. Capital Projects FY

Public Works. Capital Projects FY Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

May 11, Ms. Kavita Kale Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway Post Office Box Lansing, MI 48909

May 11, Ms. Kavita Kale Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway Post Office Box Lansing, MI 48909 Amy C. Monopoli Counsel Regulatory & Legislative Phone: 774-452-4227 amonopoli@itctransco.com May 11, 2017 Ms. Kavita Kale Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway

More information

Local Public Agency Obligated Projects SFY 2015

Local Public Agency Obligated Projects SFY 2015 Local Public Agency Obligated Projects SFY 2015 Des# Project Description/Location Sponsor Project Type Funding Type Previously Obligated (Prior to SFY 2015) SFY 2015 Obligated Total Obligation Unobligated

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

Hillsdale Academy Directions to Sporting Events

Hillsdale Academy Directions to Sporting Events Hillsdale Academy Directions to Sporting Events ADDISON HIGH SCHOOL 219 N Comstock St., Addison, MI 49220 Phone 517-547-6121 Take State Road EAST out of Hillsdale. Follow State Road until it turns LEFT

More information

2015 Capital Improvement Plan

2015 Capital Improvement Plan 2015 Capital Improvement Plan 15 Unallocated 2014 s Grants/ Donations Prior Year Special Assessment New 48" Intake Improvement and Zebra Mussel Control 690,000 690,000 690,000 - Alley Paving 980,000 280,000

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 130407 PID 88799 AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014

More information

Price per ton. Total Contract. Price

Price per ton. Total Contract. Price Regular Meeting Thursday, April 6 th, 2017 The regular meeting of the Board of County Road Commissioners of Newaygo County was called to order by Chairman Harmon at 8:00 am on Thursday, April 6, 2017 at

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

HURON COUNTY ENGINEER S OFFICE

HURON COUNTY ENGINEER S OFFICE HURON COUNTY ENGINEER S OFFICE 2017 ENGINEER S ANNUAL REPORT The Ohio Revised Code requires that each Ohio County Engineer publish an annual report to the commissioners outlining the general condition

More information

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build 1 2013 Planned s System Route UPC Category Locality Project Description 395 98836 Bridge Arlington Clean/Re-Paint 7 Bridges I-395 Corridor Arlington/Alexandria 4/9/2013 $ 3.45 HOT Lanes Bicycle/Pedestrian

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

Rural Planning. Highway Projects - CULLMAN COUNTY

Rural Planning. Highway Projects - CULLMAN COUNTY 4/17/2015 ALABAMA DEPARTMENT OF TRANSPORTATION Page - 1 of 9 Length CR-1742 4.770 Highway s - CULLMAN COUNTY RESURFACE CR-1742 FROM SR-74 (US-278) TO SR-67 RESURFACING 100063223 ST-022-888-011- ( ) CONSTRUCTION

More information

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, DECEMBER 27, 2017

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, DECEMBER 27, 2017 The Board of Public Works and Safety of Plymouth, Indiana, met in Regular Session on December 27, 2017, at 6:00 p.m. in the meeting room of the Plymouth Fire Department, 111 N. Center St., Plymouth, IN.

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

APPENDIX G. Greenhouse Gas and Climate Change Analysis

APPENDIX G. Greenhouse Gas and Climate Change Analysis APPENDIX G Greenhouse Gas and Climate Change Analysis GHG Running Exhaust and Fuel Cycle Emissions (CO2e) Year Emission Factor (g/mi)* ADT (vehicles per day) Length (mi) g/day MT/day MT/year 2015 638.13

More information

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation Capital Improvements Update April 2014: Pl dp j t Planned Projects through 2019 - $ 102,233,755 Available Funding through 2019 $ 149,764,558 pp p,, Un-appropriated - $ 47,530,803 Staff s Recommendation

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status or) STREET RESURFACING, WATER MAIN AND SEWER 1 ERGB Construction Engr Phase III $ 150,000 $ 723,804 1/11/16 Const Phase Status 2 ERGB Improvements $ 150,000 $ 11,173,776 2016 1Q Const Finalizing lighting

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170480 PID 100480 BRO-US 52-00.00 Federal Type: TWO LANE RESURFACING Letting Date: 8/10/2017 Completion Date:

More information

Kentucky Highway District 6

Kentucky Highway District 6 Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Harris Township 2017 Road inspections

Harris Township 2017 Road inspections 1 P a g e Harris Township 2017 Road inspections The 2017 Road Inspections were done on May 9 and May 11. The entire board rode together and discussed the roads. This report is a summary of the road inspection

More information

SCHEDULE A. SPEED LIMITS (A part of Section )

SCHEDULE A. SPEED LIMITS (A part of Section ) SCHEDULE A SPEED LIMITS (A part of Section 340.0003) A traffic and engineering investigation having been made on the following described highways in Brown County, the maximum permissible speed at which

More information

Items Unit Quantity Unit Price Total Unit Price Total

Items Unit Quantity Unit Price Total Unit Price Total Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH

More information

South Dakota Transportation Improvement Program Economic Stimulus Package ( AND STIPs) Report Date 09/26/2011

South Dakota Transportation Improvement Program Economic Stimulus Package ( AND STIPs) Report Date 09/26/2011 South Dakota Transportation Improvement Program Economic Stimulus Package (2009-2013 AND 2010-2014 STIPs) Report Date 09/26/2011 Item 1.00 ES 0903(78)142 000M Jackson 32.2 I90E EBL, Fm E of the SD73 N

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No EXISTING PAVEMENT EVALUATION WILLMER ENGINEERING INC. Prepared For Clark Patterson Lee Suwanee, Georgia Prepared By WILLMER ENGINEERING INC. 3772 Pleasantdale Road Suite 165 Atlanta, Georgia 30340-4270

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information