The Shipbuilding & Offshore Market in Brazil

Size: px
Start display at page:

Download "The Shipbuilding & Offshore Market in Brazil"

Transcription

1 The Shipbuilding & Offshore Market in Brazil Opportunities for Suppliers Aberdeen, Newcastle and London 0 th to 4 th December 202

2 Agenda Brazilian Main Shipyards Offshore and Maritime Equipment Demand

3 Agenda Brazilian Main Shipyards Offshore and Maritime Equipment Demand

4 Major Shipyards and Gantries w/ Trade Relations with Petrobras

5 Capacity and Occupancy of Major Shipyards and Construction Sites ERG and ERG 2 Occupancy State City 8 Hull Constructions ( Replicantes - 8) Rio Grande do Sul Rio Grande (ERG 2) 3 Drilling Vessels Available Area Steel Throughput Building Modules, Topside and Integration (P-55) 834,300 m2 Dry Docks 20,000 tons per year Quays Slipways 2 0 Source: ENGENHARIA Current Situation Labor Peak: 7,750 people in Sep/205 In Operation (ERG ) / Under construction (ERG 2)

6 Rio Grande Shipyard ERG - RS Aerial View of the Estaleiro Rio Grande ERG - RS (09/03/2). () Ecovix's Sheets Yard; (2) Sub-blocks Yard of Ecovix's replicating hooves; (3) QUIP's modules gantry for topside and integration of the P-55; (4 ) IESA's modules gantry; (5) Pre-construction area, with detail to the yellow blocks of Konecranes Goliath type portico (largest crane in the world: 20m span and capacity of 2,000 tons) delivered in Aug/2; (6) Integration work of the P-55; (7) Construction work of Estaleiro ERG 2, where it will be built 3 Setebrasil's Drillships (NS Cassino, NS Curumim and NS Salinas)

7 Rio Grande Shipyard ERG - RS Aerial View of the Estaleiro Rio Grande ERG - RS (09/03/2). P-55 (Hull built in EAS - PE): () Water treatment module; (2) Electrostatic treater, (3) Amine drive's Module; (4) High pressure separator, (5) Flare tower, ( 6)Portico with 2,000 tons capacity; (7) Workshops, (8) Shipyard's utility central.

8 Estaleiro Rio Grande Rio Shipyard Grande ERG2 - RS 2 Works' Aerial View of Estaleiro Rio Grande 2 (ERG2) RS (09/03/2). Construction work of the Estaleiro ERG 2 where it will be built 3 Setebrasil's Vessels (NS Cassino, NS Curumim and NSSalinas). () Hull's blocks of 8 FPSOs replicating (P-66, P-67, P-68, P-69, P-70, P-7, P-72, P-73), which it will mounted in the ERG by Ecovix; (2) ERG2's workshops civil construction

9 Capacity and Occupancy of Major Shipyards and Construction Sites Brasfels Occupancy 6 Semi-submersible Drilling Rigs Hull Construction and Integration (P-6) 2 Building Modules and Integration (Replicantes and 4) State Rio de Janeiro Available Area 40,000 m2 Dry Docks City Angra dos Reis Steel Throughput 50,000 tons per year Quays Slipways 2 Integrations (Cidade de São Paulo and Cidade de Paraty) 2 3 Source: SINAVAL Current Situation Labor Peak: 7,900 people in Aug/204 In Operation

10 BrasFels Shipyard - RJ 2 3 Overview of Estaleiro BrasFels in Angra dos Reis - RJ (3/08/2). () P-6 (CL:65%): HULL'S Construction of TOPSIDE's TLWP and integration (deckbox and built modules in Singapore). (2) São Paulo City FPSO (CL: 65%): HULL's Conversion in China and integration of the 6 mod., Built in Brasfels (5 mod), Enaval ( mod), Thailand (8 mod) and China (2 mod). (3) Paraty City FPSO (CL: 65%): HULL's Conversion in Singapore and integration of 5 modules built in the Brasfels (5), Nuclep (4), Enaval (2), and Singapore (4).

11 BrasFels Shipyard - RJ Overview of Estaleiro BrasFels in Angra dos Reis - RJ (08/3/2). () Hull of P-6, (2) São Paulo City FPSO, (3) Paraty City FPSO; Paraty City FPSO's Modules: (4) TS072 - Main Gas Compressor B; (5) TS062 - Oil Treatment A; (6) TS063 - Oil Treatment B; (7) TS07 - Main Gas Compressor A; (8) TS075 - Gas Treatment B; (9) TS073 - Compressor CO 2 ; (CL: It was contracted full package of modules with 65% local content).

12 Modules of P-58 will be leaving from Rio de Janeiro (UTC) for Integration in Rio Grande (Porto do Rio Grande) 2 Natural Gas Dehydration Modules and Removal of CO 2 and H 2 S in Guanabara Bay - RJ (08/3/2). Average size of a module: 20W x 30L x 20H (area: 600 m 2 ) P-58: Transport by ferry the modules from () M0 - Natural gas dehydration and (2) M03 - Removal of CO 2 and H 2 S of P-58, it was built in the Engineering UTC gantry in Niterói (RJ), for the Estaleiro Honório Bicalho(QUIP's Gantry), in the Porto do Rio Grande (RS), where it will be held the integration of 5 modules to the FPSO's HULL, which it was converted into Singapore.

13 Capacity and Occupancy of Major Shipyards and Construction Sites Inhaúma Occupancy 4 Hull Conversion Transfer of Rights (P-74, P-75, P-76 and P- 77) State Rio de Janeiro Available Area 320,000 m2 City Rio de Janeiro Steel Throughput 42,000 tons per year Dry Docks 2 Quays 2 Slipways 0 Source: ENGENHARIA Current Situation Labor Peak: 4,800 people in Nov/202 In Modernization

14 Inhaúma Shipyard - RJ 2 Overview of Estaleiro Inhaúma, in Rio de Janeiro - RJ (08/3/2). () P-74: Conversion of the ship VLCC's hull (hull structural reinforcement, expansion, renovation and adaptation of accommodation, equipment installation and anchoring system's adjustment and utilities), (2) Dry dock recovered by Petrobras.

15 Capacity and Occupancy of Major Shipyards and Construction Sites Mauá Occupancy 8 Panamax State Rio de Janeiro City Niterói 0 Light Products Available Area Steel Throughput 334,000 m2 36,000 tons per year 2 Dark Products Dry Docks Quays Slipways Building Modules and Integration (FPSO Cidade de Ilhabela) 4 Source: SINAVAL Current Situation Labor Peak: 3,950 people in Sep/204 In Operation

16 Mauá Shipyard - RJ 3 2 Overview of Estaleiro Mauá, in Niterói - RJ (08/3/2). () Romulo Almeida Products Ship: Third Lot's Ship of 4 PROMEF 's products ships (st Phase), with delivery scheduled for Dec/2; (2) José Alencar Products Ship: Fourth Batch's ship of 4 PROMEF s products ships (st Phase), with delivery scheduled for Mar/3; (3) st Panamax Vessel: Construction, in the Estaleiro Mauá dry dock, st batch's Panamax Ship of 4 PROMEF ships (st Phase), with delivery scheduled for Jan/4.

17 Capacity and Occupancy of Major Shipyards and Construction Sites Atlântico Sul (EAS) Occupancy 4 Suezmax State Pernambuco City Ipojuca 8 Aframax Available Area,500,000 m2 Steel Throughput 60,000 tons per year Building Modules, Conversion and Integration (P- 62) Dry Docks Quays Slipways 7 Drilling Vessels 2 2 Source: SINAVAL Current Situation Labor Peak: 8,000 people in Aug/206 In Operation

18 Atlântico Sul Shipyard - PE Estaleiro Atântico Sul (Ipojuca-PE): Construction of the Zumbi dos Palmares ship in dry dock and integration of P-62 on the shipyard dock (08/29/2). () P-62: Integration of the FPSO to the 5 modules, including 3 built in EAS, 7 in the UTC gantry and 5 in the Nuclep gantry (2) Zumbi dos Palmares SHIP of Suezmax type (2nd Lot's Ship of PROMEF ) in dry dock; (3)Panel manufacturing workshops and pre-assembly of block, (4) Future area for construction of 7 Setebrasil's rigs ; (5) Future area of Estaleiro Promar, responsible for building the batch of 8 Promef Phase 2's gas tankers.

19 Capacity and Occupancy of Major Shipyards and Construction Sites Enseada do Paraguaçu (EEP) Occupancy 6 Drilling Vessels State Bahia City Maragogipe Available Area,600,000 m2 Steel Throughput 36,000 tons per year Dry Docks Quays Slipways 0 Source: SINAVAL Current Situation Labor Peak: 4,200 people in Apr/206 Under Construction

20 Enseada do Paraguaçu and Estaleiro de São Roque Shipyard - BA Overview of Future Estaleiro Enseada do Paraguaçu Area in Maragogipe - BA and the Estaleiro São Roque do Paraguaçu at the second view, the margins of Rio Paraguaçu (08/30/2). The estaleiro Enseada do Paraguaçu has contract with Setebrasil to build the 6 DRILLSHIPS (Ondine, Pituba, Boipeba, Interlagos, Itapema, Comandatuba). () Rio Paraguaçu; (2) Access Road; (3) Estaleiro de São Roque P59 and P-60; (4) work gantry of Estaleiro Enseada do Paraguaçu.

21 Capacity and Occupancy of Major Shipyards and Construction Sites Jurong Occupancy 6 Drilling Vessels State Espírito Santo City Aracruz 2 Building Modules and Integration(Replicantes 3 and 6) Available Area 825,000 m2 Steel Throughput 48,000 tons per year Dry Docks Quays Slipways 0 Source: SINAVAL Current Situation Labor Peak: 4,850 people in Oct/206 Under Construction

22 Jurong Aracruz Shipyard - ES Overview of the Estaleiro Jurong Aracruz Future Area, in Aracruz - ES (08/30/2). Deploying the shipyard is undergoing earthworks. The shipyard will carry out the integration FPSOs Replicantes P-68 and P-7. In all, it will be 6 modules for each FPSO, of which 6 it will be built at the Estaleiro Jurong Aracruz itself, 3 in the DM/TKK gantry in Itajai (SC), 4 in Charqueadas (RS) and 3 in Maceió (AL) The shipyard has a contract with Setebrasil to build 6 DRILLSHIPS (Guarapari, Camburi, Itaoca, Itaunas, Siri, Sahy).

23 Capacity and Occupancy of Major Shipyards and Construction Sites OSX Occupancy Products and PLSV State Rio de Janeiro City São João da Barra 7 Fixed Platforms Available Area 2,500,000 m2 Steel Throughput 80,000 tons per year 4 Hull Constructions Dry Docks Quays Slipways 6 Building Modules and Integration 8 3 Building Modules and Integration (FPSO Cidade de Mangaratiba and Replicantes 2 and 5) Current Situation Labor Peak(*):,500 in Jul/206 Source: SINAVAL Under construction Constructed and Owned by OSX (*)The peak considers only Petrobras projects

24 OSX Shipyard Porto do Açu - RJ 3 2 Overview of the Estaleiro OSX Future Area, in São João da Barra - RJ (08/30/2). Deploying the shipyard is undergoing earthworks. The shipyard will carry out the integration FPSOs Replicantes P-67 and P-70. In all, it will be 6 modules for each FPSO, of which 6 it will be built at the Estaleiro OSX itself, 3 in the DM/TKK gantry in Itajai (SC), 4 in Charqueadas (RS) and 3 in Maceió (AL) () Internal channel of navigation, with 6.5 km long and 300 feet wide; (2) Area where it will be built the dry dock of the shipyard; (3) Civil works of the future Shipbuilding Unit (UCN do Açu).

25 Capacity and Occupancy of Major Shipyards and Construction Sites Shipyards - 8 FPSO Replicantes Modules DM-TKK Consortium Itajaí (SC) Total Area of 98,300m 2 In Planning 8 Building Fuel Gas and Dehydration Modules 8 Building Generation 2 Modules 8 Building Generation Modules IESA Charqueada (RS) Total Area of 359,300m 2 Under Construction 8 Building CO² Compression Modules 8 Building Gas Compression Exportation Modules 8 Building Main Compression and Vapor Recovery Modules 8 Building Injection Gas Compression Modules Tomé/Ferrostal Maceió (AL) Total Area of 77,000m 2 Under Construction 8 Building Oil Processing Modules 8 Building Launchers, Receivers and Manifolds Modules 8 Building Oil Processing and Production Water Treatment Modules

26 Capacity and Occupancy of Major Shipyards and Construction Sites Other Shipyards and Construction Sites Occupancy 7 Gas Tankers Itajaí (SC) Shipyard 4 Panamax EISA (RJ) 3 Bunkers SUPERPESA (RJ) 3 Bunkers São Miguel (RJ) 8 GLPs STX Promar (PE) 2 Building Modules (P-58 and P-62) UTC (RJ) 2 Building Modules (P-58 and P-62) NUCLEP (RJ) Building Modules (Cidade de Paraty) EBSE (RJ) Occupancy Building and Integration Modules (Cidade de Ilhabela SBM/Brasa (RJ) 2 Building Probe (Jack-up P-59 and P-60) CRP (BA) 2 Building Modules (P-55 and P-63) Porto Rio Grande (RS) Building Modules and Integration (P-58) Porto Rio Grande (RS) 7 Light Products Rio Nave (RJ) 3 Dark Products Rio Nave (RJ)

27 Brasa Shipyard - RJ Overview of Estaleiro Brasa, in Niterói - RJ (08/3/2), The Estaleiro Brasa will build 0 of the 6 modules, Helideck, Flare tower, and measuring station of the Ilhabela City FPSO and it will make their integration to the hull which it is being converted in he Estaleiro CSSC in Guangzhou (China). The remaining 6 modules will be built in the gantry of Nuclep (4 modules) in Itaguaí, and in Guangzhou, China (2 modules). Construction bases of Ilhabela City FPSO's modules: () TS022 - Water Injection and utilities; (2) TS062 - Processing Oil A; (3) TS063 - Processing Oil B; (4) TS02 - Seawater treatmentandsulfate removal; (5) TS074 - Gas Treatment A; (6) TS07 - Gas compression A; (7) Gas compression B; (8)TS075 - Gas Treatment B; (9) Compression CO 2 ; (0) TS076 - Injection gas compression.

28 Nuclep Gantry - RJ Overview of Nuclep Gantry in Itaguaí - RJ (08/3/2). Modules of P-62 (Hull - Singapore and Integration - EAS): () M02A - Main compression A (CL: 76%); (2) M02B - Main Compression B (CL: 76%); (3) M02C - Main compression C (CL: 76%); (4) M09 - Booster compression (CL: 76%); (5) M2 - Cargo area and chemical storage (CL: 7%); Modules of P-58 (Hull - Singapore and Integration - Porto do Rio Grande): (6) M02A - Main compression A (CL: 76%); (7) M02B - Main Compression B (CL: 76%); (8) M02C - Main compression C (CL: 76%); Paraty City FPSO (Hull - Singapore and Integration BrasFels): (9) injection and gas compression (CL: 65%); (0) Manifold (CL: 65%).

29 Engineering UTC Gantry - RJ Overview of the Engineering UTC Gantry - RJ (08/3/2). Overview of the UTC's Gantry, which are being built FPSOs P-58's modules (Parque das Baleias) and P-62 (Snifter Module 4), which HULLS were converted into Singapore Modules of P-62: () and (2) M05 and M07 - Oil processing (CL: 76%); (3) M0 - Gas drying (CL: 75%); (4) M03 - Removal of CO 2 (CL: 75%), (5) M-0 - Water Injection (SC: 75%), (6) M0A - Sulfate removal (CL: 75%); Modules of P-58: (7) M0 - Water Injection (SC: 75%); (8) M05 - Processing oil (CL: 76%).

30 Agenda Brazilian Main Shipyards Offshore and Maritime Equipment Demand

31 Investments in the Country Catalyze the Shipbuilding and Offshore Industry: US$ 07.6 billion Exploration and Production US$ 3.5 billion Refining, Transportation and Commercialization US$ 7.6 billion 83.6 (64%) 89.9 (68%) 25.4 (9%) 2. (6%) 6.3 (2%) 5.2 (2%) 2.9 (4%) 5.6 (8%) 3.5 (5%).0 (%) 3.2 (44%) US$ 07.6 bi 2. (7%) Production Development Exploration Infrastructure and Support Expansion of Refining Park Operational improvement Compliance with Internal Market Allocation of National Oil Expansion of Fleet Petrochemicals Biofuels

32 Petrobras Vessels Current and projected fleet 2020 Strategic Planning Future Demand ( ) Critical Resources Jan/2 Situation Future Situation Accumulated Values () By 206 By 2020 Tanker Vessels (DWT x 000t) 6,000 9,000 24,500 Large Supply Boats* Production Units (SS and FPSO) Drilling Rigs (SWD > m) Tanker Vessels + 38 Production Units + 98 Large Supply Boats () The future situation of 2020 does not reflect the sum of the current situation with future demand, as there are vessels whose contracts expire by This demand may be revised as necessary. (2) Future Demand includes hired demand, demands in hiring phase and yet to be hired demand Drilling Rigs** Significant equipment demand mapping: Historically imported equipment with potential to attract foreign suppliers Equipment produced nationally but with potential bottlenecks in production capacity Source: Transpetro; PNG 202-6; Petrobras (E&P-SERV/US-CONT and AB-LO/TM) * AHTS, ORSV, PSV ** 28 will be constructed in Brazil

33 Tanker Vessels Fleet increase by 2020 Petrobras Fleet Growth Program with Brazilian Vessels PROMEF I and II EBN I and II 49 Vessels by Vessels by Suezmax 8 Aframax 4 Panamax 2 Products 8 LPG 3 Bunkers 3 delivered Vessels and 22 Vessels in advanced stage of construction 24 Vessels in hiring phase or initial construction phase 26 Products 6 Bunker 7 LPG 2 Vessels in advanced stage of construction 37 Vessels in hiring phase or initial construction phase Equipment demand not yet addressed for 6 Vessels (by 2020) Example of equipment with potential for national development 6 Vacuum Sewage Systems 53 Inert Gas Generation Unit 72 Life Boats + Davit.830 Accomodation Cabines Source: Transpetro; Petrobras (AB-LO/TM)

34 Tanker Vessels Main demands for equipment Demand for the 6 Vessels to be delivered between 203 and 2020 Equipment Demand Equipment Demand MAIN ENGINE (UN) 6 AUXILIARY ENGINE (UN) 77 PROPELLERS (FPP & VPP) (UN) 6 AZIMUTAL & TUNNEL THRUSTERS (UN) 2 AUXILIARY BOILERS(UP TO 35 TONS PER HOUR) (UN) EXHAUSTED GAS ECONOMIZER/COMPOSED BOILER (UN) THERMAL OIL HEATER (UN) 2 START AIR COMPRESSORS (30 BAR) (UN) AIR COMPRESSOR (UN) 70 PLATE HEAT EXCHANGER (UN) 333 FRESH WATER GENERATOR (UN) 55 VALVES (UN) 75,270 ELETRIC(MAIN/AUX) SWITCHBOARDS (UN) 20 WINDLASS / WINCH (UN) 346 CHAINS (KM) 39 CRANES (3 TO 20 TONS) (UN) 24 ANCHORS (UN) 44 Source: Transpetro; Petrobras (AB-LO/TM) 66 5 LIFEBOAT (UN) 72 INFLATABLE BOATS (UN) 355 TOILET UNITS (UN),849 PURIFIERS (UN) 293 INTEGRATED BRIDGE (UN) 6 CARGO PUMPS(FUEL OIL,DIESEL OIL, LUB. OIL) (UN) CARGO PUMP (DEEP WELL) (UN) 384 MOORING LINES (UN X 200 METRES) 840 CHOCK, BOLLARD (UN) 7,27 ACCESS HATCH (UN),220 VACUUM SEWAGE SYSTEMS (UN) 6 INERT GAS GENERATION UNIT (UN) 53 LIFE BOATS + DAVIT (UN) 72 ARCHITECTURE MATERIALS (ACCOMODATION PACKAGE) MANUAL OPERATED VALVES (TON) 58,500 PIPES (TON) 9,800 FITTINGS (TON) 7,

35 Large Supply Vessels Fleet increase by 2020 Current Petrobras Fleet Quantity Future Demand AHTS Maintenence TO s + DMA s + New Production Units Instalation + FPSO`s and NT s Operation Large Supply Vessels OSRV Oil Recovery PSV General Cargo + Oil + Bulk + Cement by 2020 (almost the same quantity as the current fleet 26) TS Tugs + Oil Recovery LH SOS Standby + Handling Spy (messenger) SV SOS Standby UT / P Emergency Cargo / Passenger Example of equipment with potential for national development 98 Offshore and Provision Cranes 98 Vacuum Sewage Systems 396 Rescue Boats 55,700 Manual Operated Valves 44,550 ton of Piping 4,800 ton of Fitting Source: E&P-SERV/US-CONT

36 Equipment Demand for 98 vessels to be delivered by 2020 Demand Classified profiles (ton) Chock fast (UN 300L),584 Directional propulsion system (UN) 396 Transverse thrusters (UN) 396 Generator set (UN) 792 Emergency generator - port (UN) 98 Compressors (UN) 594 Oil Purifier (UN) 396 Oil water separator (UN) 98 Heat exchanger (UN) 792 Fans and blowers (UN) 7,326 Vacuum sewage system (system) 98 Air-conditioning system (system) 98 Fresh water heater (UN) 98 Provision Room (system) 98 Laundry equipment (set) 396 Trailer/mooring winch (UN) 396 Source: E&P-SERV/US-CONT Large Supply Vessels Main demands for equipment (/2) Equipment Demand Provisions crane (UN) 98 Compressors for bulk (UN) 98 Cargo pump (UN),88 Control systems and supervising machines (system) 98 Metal pipes (meters),584,000 Valves (estimated) (pieces) 297,000 Manual Operated Valves (estimated) (pieces) 222,750 Fittings (estimated) (ton) 4,800 Cable Seals (UN) 9,800 Main switchboard (set) 98 Distribution Panels (UN) 3,960 Starters (UN),980 Spotlights and reflectors (UN) Navigation lights (set) 98 Aldis lamp (UN) 98 Battery charger (UN) 98 Static Inverter/Frequency Converter (UN) 792 Window Wiper (UN) 4,950

37 Large Supply Vessels Main demands for equipment (2/2) Demand for 98 vessels to be delivered by 2020 Equipment Demand Equipment Demand Sound-Powered Telephone (UN) 792 Public Address System (system) 98 Transformers and Rectifiers (UN) 396 Radar (UN) 396 Navigation, communication and signaling equipments (set) 98 Ecosounder (UN) 98 VHF Radio (UN) 792 SSB Radio (UN) 396 Speed log (UN) 98 Automatic Pilot (UN) 98 Satellite navigator+ Ploter (UN) 396 Automation System/Micro Full (system) 98 Dynamic Positioning System(system) (system) 98 Steel doors (UN) 5,940 Ducts of natural and forced ventilation (UN) 594 Windows (UN) 7,524 Guards and wide eyes (UN) 5,940 Source: E&P-SERV/US-CONT Fixed firefighting system (system) 98 Smoke and heat detectors (set) 98 General alarm (system) 98 Whistle (UN) 98 Magnetic Compass (UN) 98 General bulkheads (m 2) 396,000 Ceiling and bulkhead liners (m 2) 396,000 Flooring (m2) 78,200 Doors class B (UN) 9,900 Anchors (UN) 396 Mooring lines (UN) 396 Mooring cables and trailer (UN),782 Rubber Fenders (UN) 3,960 Motorized service boats (UN) 98 Liferafts (UN),88 Lifebuoys and life jackets (UN),584 Boats transceivers (UN),88

38 Production Units Fleet increase by 2020 Operation Startup Timeline for Petrobras Production Units Production Units considered for the equipment demand analysis Equipment demand not yet addressed for 27 Production Units to be delivery by 2020 Example of potential equipment for national development Construction Site Abroad Abroad/Brazil ** Brazil To be defined 8 Chemical Injection Units 8 Offshore Cranes 27 Vacuum Sewage System 8 Offloading System 08 Life Boats + Davit 89,000 Manual Operated Valves 54,000 ton of Piping 43,200 ton of Fittings Source: PNG 202-6; Sinaval ND: Not defined CO: Cessão Onerosa (Transfer of Rights * Charted Production Unit ** Integrated in Brazil with imported Hull or Modules

39 Demand for the 27 Production Units to be delivered between 205 and 2020 Package/Skid Demand (units) ELETRO CHLORINATION UNIT 3 VAPOR RECOVERY UNIT 54 GAS DEHYDRATION UNIT 27 VACUUM DEAERATOR UNIT 27 CHEMICAL INJECTION UNIT 8 H2S REMOVAL UNIT 27 NITROGEN GENERATOR UNIT 27 SULPHATE REMOVAL UNIT 27 ELECTROSTATIC TREATERS PACKAGE 27 PRODUCED WATER TREATMENT 27 FLARE GAS RECOVERY COMPRESSION UNIT 27 FLARE 27 FRESH WATER MAKER 27 SHELL&TUBES HEAT EXCHANGE PACKAGE 27 PLATE HEAT EXCHANGERS PACKAGE 27 PRESSURE VESSELS / SEPARATORS PACKAGES 27 CENTRIFUGAL PUMPS PACKAGE 27 SEA WATER LIFT PUMPS PACKAGE 27 Source: PNG 202-6; Sinaval Production Units Main demands for equipment Topside Package/Skid Demand (units) WATER INJECTION PUMPS PACKAGE 27 WELL SERVICE PUMP PACKAGE 27 RECIPROCATING PUMPS PACKAGE 27 POSITIVE DISPLACEMENT PUMPS PACKAGE 27 FILTERS PACKAGE 27 PIG LAUNCHERS & RECEIVERS PACKAGE 27 MECHANICAL HANDLING EQUIPMENT PACKAGE 27 ICSS INTEGRATED CONTROL & SAFETY SYSTEM 27 HYDRAULIC POWER UNIT - HPU 27 FISCAL METERING SKID 27 ELECTRICAL AND AUTOMATION MODULE 27 HVAC SYSTEM 27 EXPORTATION GAS COMPRESSION UNIT 27 CO2 COMPRESSION UNIT 27 MAIN GAS COMPRESSOR 27 INJECTION GAS COMPRESSION UNIT 27 MAIN TURBOGENERATOR UNIT 27

40 Production Units Main demands for equipment Loose Equipment Demand for the 27 Production Units to be delivered between 205 and 2020 Equipment Demand COMPRESSOR 567 PRESSURE VESSEL (Scrubber/Separator/K.O.Drum),674 TANK 729 CONTROL PANEL (Distribution panel) 2,24 PUMPS 2,808 HYDROCYCLONES / GAS FLOTATION 89 FILTER 594 SHELL&TUBES HEAT EXCHANGER,269 PLATE HEAT EXCHANGER 486 MECHANICAL HANDLING EQUIPMENT 2,862 OIL DEHYDRATOR / PRE-OIL DEHYDRATOR 54 OIL DEHYDRATOR DEGASSER / PRE-OIL DEHYDRATOR DEGASSER 54 PIG LAUNCHERS & RECEIVERS 648 CONTROL, SHUTDOWN, CHOKE, PRESSURE SAFETY, DELUGE VALVES 2,600 MANUAL VALVES (un) 89,000 PIPING (ton) 54,000 FITTING (ton) 43,200 CABLE (Electrical/Instrumentation/Telecom) (km) 3,500 INSTRUMENTATION (Transmitter/Gauge/Indicator) (un) 54,000 Source: PNG 202-6; Sinaval

41 Production Units Main equipment demand Hull Demand for the 27 Production Units to be delivered between 205 and 2020 Equipment Demand (units) Equipment Demand (units) OFFSHORE CRANE API-2C (50T) 8 ALUMINIUM HELIDECK 27 LIFEBOAT & DAVIT 08 RESCUE BOAT & DAVIT 08 FOAM FIREFIGHTING SYSTEM 27 CO2 FIREFIGHTING SYSTEM 27 OFFLOADING SYSTEM 54 INERT GAS SYSTEM 27 SEWAGE TREATMENT & VACUUM UNIT 27 AUXILIARY & EMERGENCY DIESEL GENERATOR 54 DIESEL FIRE WATER PUMP 54 BALLAST PUMPS 08 COOLING WATER PUMPS 54 FRESH WATER GENERATOR 54 FIRE DETECTION SYSTEM 27 ENVIRONMENTAL & POSITIONING SYSTEM 27 NAVIGATION AID SYSTEM 27 OFFLOADING SYSTEM 27 MOORING SYSTEM 08 PULL-IN / PULL-OUT SYSTEM 27 SUBMERGED CARGO PUMPS 378 SUBMERGED DEBALLAST PUMPS 62 CONTROL VALVES SYSTEM (un) 5,400 HELICOPTER REFUELING SYSTEM 27 DIESEL PURIFIER 27 VAC SYSTEM 27 ACCOMODATION PACKAGE 27 AUTOMATION & ELECTRIC PACKAGE 27 PORTABLE WATER GENERATOR 54 Source: PNG 202-6; Sinaval

42 Drilling Rigs Fleet increase by 2020 Petrobras Drilling Rigs Startup Timeline +4 Drilling rigs considered for the equipment demand analysis +8 Equipment demand not yet addressed for the 28 drilling rigs to be delivery by Example of equipment with potential for national development Derrick Structure 28 Traveling equipment 28 Choke and Kill Manifold 28 sets of Risers 28 BOP (parcial) 28 sets Eletrical System 68 Main Diesel Generators (parcial) 28 Emergency generators 84 Deck Cranes 68 Azimut Thrusters 2,76 Pumps Construction Site 840 HVAC System 28 Accomodation Source: Petrobras; Sinaval Abroad Brazil * Being negotiated. Estimate will be confirmed at the contract signing

43 Drilling Rigs Main demands for equipment Drilling Package Demand for the 28 Drilling Rigs to be delivered between 206 and 2020 Equipment ELECTRICAL & INSTRUMENTS AUTOMATION SYSTEM (ESD,fire/gas detection, Ship Sever,electrical power (transfomers/swith borders) (System,UPS system) HEAVE COMPENSATION SET 28 TOPDRIVES & ASSOCIATED EQUIPMENT(907 mtx 2x857 KW) 28 VERTICAL PIPEHANDLING STANBUILDING 28 TRAVELING EQUIPMENT GENERAL 28 DRAWWORKS AND MACHINERY(8508 KN /0056 KN) 28 ROTARY TABLE & ASSOCIATED EQUIPMENT(47,5 KN, 40 rpm) 28 HYDRAULIC ROUGHNECKS FOR WELL CENTRE & STADBUILDING 28 RISER & PIPE RACK HANDLING SYSTEM 28 HYDRAULIC POWER UNIT(4x 50 KW + x 9 KW) 40 MUD SYSTEM (Pums, accessories, mixer)7500 psi x 4 un. 28 CHOKE & KILL MANIFOLD 28 DRILLERS CONTROL CABIN & CONTROL SYSTEM 28 BOP / XMAS TREE TRANSPORTATIO / HANDLING SYSTEM 28 RISER TENSIONING SYSTEM 28 BULK MUD & CEMENT SYSTEM 28 SUBSEA PACKAGE 28 Demand 28 Source: Petrobras; Sinaval

44 Drilling Rigs Main demands for equipment Ship Package Demand for the 28 Drilling Rigs to be delivered between 206 and 2020 Equipment ELECTRICAL & INSTRUMENTS AUTOMATION SYSTEM (ESD,fire/gas detection, Ship Sever,electrical power (transfomers/swith borders) (System,UPS system) Demand 28 MAIN DIESEL GENERATORS SETS(7680 KW X720 RPMX000v) 68 EMERGENCY GENERATOR SET (80 KW x800 rpmx600v) 28 DECK CRANE-Lattice boom 25tx42m 84 DECK CRANES-KNUCKLE BOOM -25TX45M + X85T X9M 56 AZIMUTH THRUSTERS(4500 kwx4,50m Dia) 68 ANCHORING & MORING EQUIPMENTS(electrichal hyd. Driven) 28 PUMPS( centrifugal,pneumatics,positive displac.) 2,76 HVAC SYSTEM (Main machines) (un) 84 HVAC SYSTEM (Self-container) (un) 840 ACCOMODATION MODULE (Persons) 28 PIPING ( ton) 6,970 FITTINGS (ton),030 CABLE (Electrical / Instrumentation / Telecom) (km) 22,400 VALVES (ton) 2,000 Source: Petrobras; Sinaval

45 Demand of Equipment - Detailed Information Detailed Main Equipment Demand Projections distributed in time (up to 2020) for: Vessels Supply Boats Production Units Drilling Rigs Thank You: Paulo Sergio Rodrigues Alonso conteudolocal@petrobras.com.br

Opportunities for Suppliers in the Off-shore and Naval Brazilian Industry. Rio Oil & Gas 2012

Opportunities for Suppliers in the Off-shore and Naval Brazilian Industry. Rio Oil & Gas 2012 Opportunities for Suppliers in the Off-shore and Naval Brazilian Industry Rio Oil & Gas 2012 Rio de Janeiro, September 18 th 2012 Agenda Major National Shipyards Technical File Offshore and Naval Equipment

More information

Opportunities for Suppliers in the Off-shore and Naval Brazilian Industry DEUTSCH-BRASILIANISCHE INDUSTRIE- UND HANDELSKAMMER RIO DE JANEIRO JUN2014

Opportunities for Suppliers in the Off-shore and Naval Brazilian Industry DEUTSCH-BRASILIANISCHE INDUSTRIE- UND HANDELSKAMMER RIO DE JANEIRO JUN2014 Opportunities for Suppliers in the Off-shore and Naval Brazilian Industry DEUTSCH-BRASILIANISCHE INDUSTRIE- UND HANDELSKAMMER RIO DE JANEIRO JUN2014 World Cenarium Global Marine Trends 2030 Strong growth

More information

PETROBRAS Brazilian Oil and Gas Exploration & Production Challenges and Opportunities

PETROBRAS Brazilian Oil and Gas Exploration & Production Challenges and Opportunities PETROBRAS Brazilian Oil and Gas Exploration & Production Challenges and Opportunities IBSEN FLORES LIMA June/2011 Seoul, Korea 1 Petrobras 2010 United Kingdom Mexico USA Colombia Equador Peru New York

More information

Offshore Oil Exploration & Transportation Logistics

Offshore Oil Exploration & Transportation Logistics SNAME Greek Section Athens, Greece 24 November 2011 Offshore Oil Exploration & Transportation Logistics Luiz Motta Director, Technology & Business Development, Europe ABS 1 Outline Oil world demand and

More information

HUISDRILL DEEPWATER DRILLSHIP HUISMAN PRODUCT BROCHURE

HUISDRILL DEEPWATER DRILLSHIP HUISMAN PRODUCT BROCHURE HUISDRILL DEEPWATER DRILLSHIP HUISMAN PRODUCT BROCHURE RILLING GENERAL INTRODUCTION 2 Huisman offers complete drilling packages and is dedicated to explore and realise new solutions to improve drilling

More information

EQUATORIAL DRILLER : The cost effective solution for efficient deep water drilling in mild environment. REV 1c

EQUATORIAL DRILLER : The cost effective solution for efficient deep water drilling in mild environment.  REV 1c : The cost effective solution for efficient deep water drilling in mild environment. REV 1c Concept The ED concept was born from the experiences of the Unocal 76 Deepwater Asia Team from 1997-2005. The

More information

A Modern and Versatile Diesel-Electric Anchor Handling Tug Supply Vessel Equipped with State-of-the-Art Technology.

A Modern and Versatile Diesel-Electric Anchor Handling Tug Supply Vessel Equipped with State-of-the-Art Technology. A Modern and Versatile Diesel-Electric Anchor Handling Tug Supply Vessel Equipped with State-of-the-Art Technology. Anchor Handling and Towing 30% Greater Cargo Capacity Fuel Savings Exceptional Maneuverability

More information

Management Presentation Rio de Janeiro August 2015

Management Presentation Rio de Janeiro August 2015 Management Presentation Rio de Janeiro August 2015 Index The Company Portfolio under Construction Funding Structure 2 2 Index The Company Portfolio under Construction Funding Structure 3 3 Pre-salt Discovery

More information

300 Man / 8 Point / 300MT+25MT Crane / Accommodation/Work Barge

300 Man / 8 Point / 300MT+25MT Crane / Accommodation/Work Barge z Eastern WB300 300 Berths in en-suite cabins 8 Point Mooring System Built 2012 300MT, Man Riding Main Crane 25MT, Auxiliary Crane 1,700 m 2 Open Deck Space 1,100 m 2 Covered Deck Space Helideck Fitted

More information

A FLEET FACING A DEMANDING SOCIETY. 59 Million tons shipped by sea. 670 Million m3 of crude, oil products and ethanol. Typical Operations

A FLEET FACING A DEMANDING SOCIETY. 59 Million tons shipped by sea. 670 Million m3 of crude, oil products and ethanol. Typical Operations A FLEET FACING A DEMANDING SOCIETY TRANSPETRO International Seminar of Government & Oil/Shipping Industry Cooperation Moving Forward Together 59 Million tons shipped by sea 670 Million m3 of crude, oil

More information

Accommodation vessel DP Gezina

Accommodation vessel DP Gezina Accommodation vessel DP Gezina PRINCIPAL Year Built: 2007 Major Conversion: 2012-2013 Builder: Remontowa Imo No: 9295103 Call sign: 9HA3317 MMSI: 229 417 000 Class: LR +100A1, +LMC, UMS, DP (AA), SPS,

More information

BOURBON LIBERTY 300 SERIES. Anchor Handling Tug Supply Vessel. DP2-85 t Bollard Pull

BOURBON LIBERTY 300 SERIES. Anchor Handling Tug Supply Vessel. DP2-85 t Bollard Pull BOURBON LIBERTY 00 SERIES Anchor Handling Tug Supply Vessel DP - 8 t Bollard Pull BOURBON LIBERTY 00 SERIES Class BV XHULLXMACH, Unrestricted Navigation, Tug / Supply Vessel, LHNS, Oil Product, Fi-Fi,

More information

Outline Specification 60M -1500m 3 Live Fish Carrier

Outline Specification 60M -1500m 3 Live Fish Carrier 1 LOA - 60,5m LPP - 55,5m B -14m D MAIN DECK -6,Om D BOAT DECK -8,8m T MAX - ~5,3m Frame spacing - 0,6m Cargo tanks - 2x~825m3 (Net volume for fish -1500m3) Hull and superstructure of the vessel to be

More information

Designed for customers

Designed for customers Designed for customers operational excellence Bourbon Evolution 800 Multi-Purpose Supply Vessels RELIABLE, EFFICIENT AND INNOVATIVE A series of 10 multipurpose supply vessels focused on providing the highest

More information

M/V Pacific Intrepid

M/V Pacific Intrepid Clear Deck Space 1,200 m2 Deadweight 7,078-7,226 tonnes Crane Capacity 200 t @ 20 m radius Accommodation 372 Every endeavour has been made to ensure the accuracy of the information in this brochure. However,

More information

Efficient and flexible solution

Efficient and flexible solution Efficient and flexible solution for the most demanding clients Bourbon PX 105 MACS Series of Large Platform Supply Vessels Bourbon Front - Bourbon Clear - Bourbon Calm - Bourbon Rainbow Bourbon PX 105

More information

AZIMUTH STERN DRIVE 35/105 TERMINAL SUPPORT/ESCORT TUG

AZIMUTH STERN DRIVE 35/105 TERMINAL SUPPORT/ESCORT TUG AZIMUTH STERN DRIVE 35/105 TERMINAL SUPPORT/ESCORT TUG BRIEF DESCRIPTION This tug is a fully automated stern drive tug designed in response to a worldwide demand for highly efficient class of ship-assist/oil

More information

GPA 670 PSV Series DP2 Diesel-Electric Platform Support Vessel Exceptional Maneuverability

GPA 670 PSV Series DP2 Diesel-Electric Platform Support Vessel Exceptional Maneuverability DP2 Diesel-Electric Platform Support Vessel Optional Special Products Tanks A Modern Diesel-Electric Platform Support Vessel Equipped with State-of-the-Art Technology. Fuel Savings Greater Cargo Capacity

More information

SEA ROYAL. Dimensions Length Overall : 60 m. Registration. Breadth Moulded : 16 m. Depth Moulded : 6 m

SEA ROYAL. Dimensions Length Overall : 60 m. Registration. Breadth Moulded : 16 m. Depth Moulded : 6 m Registration Year built/ Builder : 2009 / Fujian Crown Ocean Shipping Industry Co.Ltd, China Flag : Sierra Leone Dimensions Length Overall : 60 m Breadth Moulded : 16 m Depth Moulded : 6 m Class : RINA,

More information

GPA 654 PSV Series D-P2 Diesel Electric Platform Support Vessel Low Emissions Crew Safety

GPA 654 PSV Series D-P2 Diesel Electric Platform Support Vessel Low Emissions Crew Safety A Modern Diesel-Electric Platform Support Vessel Equipped with State-of-the-Art Technology. Fuel Savings 30% Greater Cargo Capacity Reliability in Adverse Weather Conditions Main Systems Redundancy Exceptional

More information

Petrobras Business and Management Plan & Brazilian Local Content Regulation. Rio de Janeiro 11 th March 2013

Petrobras Business and Management Plan & Brazilian Local Content Regulation. Rio de Janeiro 11 th March 2013 Petrobras 2012-2016 Business and Management Plan & Brazilian Local Content Regulation Rio de Janeiro 11 th March 2013 Petrobras 2012-2016 Business and Management Plan Brazilian Local Content Regulation

More information

BOURBON LIBERTY 150 SERIES. Platform Supply vessels. DP2-1,701 t DWT

BOURBON LIBERTY 150 SERIES. Platform Supply vessels. DP2-1,701 t DWT BOURBON LIBERTY SERIES Platform Supply vessels DP -,7 t DWT BOURBON LIBERTY SERIES Class ABSXA, Offshore Support Vessel, Oil Recovery, Vessel Class (OSR- S), E, XAMS, XACCU, XDPS-, Fire-Fighting Vessel

More information

Brazil Market Increasing Opportunities for U.S. Suppliers of Oil & Gas Equipment and Services

Brazil Market Increasing Opportunities for U.S. Suppliers of Oil & Gas Equipment and Services Brazil Market Increasing Opportunities for U.S. Suppliers of Oil & Gas Equipment and Services (February 15, 2018 report from U.S. Commercial Service Rio) Report Highlights: Brazil is South America's largest

More information

Topaz Master. 85T BP M 5700 kw DP2 - AHTS. Vessel Specifications

Topaz Master. 85T BP M 5700 kw DP2 - AHTS. Vessel Specifications Topaz Master 85T BP - 64.8 M 5700 kw DP2 - AHTS Vessel Specifications Diesel-electric propulsion Lower fuel consumption, reduced environmental footprint 50-man accommodation - MLC compliant 420m 2 of clear

More information

JU Operator And Service Provider For Offshore Works

JU Operator And Service Provider For Offshore Works JU633617 Operator And Service Provider For Offshore Works Key Features One Solution For various offshore work requirements; built with capacity of an accommodation barge, a crane vessel, a crewboat and

More information

Accommodation, Crane Work Barge OCEAN MAINTAINER 1

Accommodation, Crane Work Barge OCEAN MAINTAINER 1 Specification of Accommodation, Crane Work Barge OCEAN MAINTAINER 1 Valentine Maritime (Gulf) LLC Y:\OM1\Specification\OM1 - Specification Rev18.doc Page 1 of 8 Accommodation, Crane Work Barge OCEAN MAINTAINER

More information

Introduction of AVIC International

Introduction of AVIC International Introduction of AVIC International Former China National Aero-Technology Import & Export Corporation (CATIC) reorganized to AVIC International Co. in 2009. CATIC was founded on Jan 21, 1979. State-owned

More information

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced Maersk Venturer Ultra deepwater drilling and development Deepwater Advanced Maersk Venturer TYPE Samsung 96K drillship BUILT Samsung Heavy Industries, 2014 CLASS American Bureau of Shipping FLAG Singapore

More information

Potential impacts on the production curve of Petrobras due to Operation Carwash

Potential impacts on the production curve of Petrobras due to Operation Carwash Page1 04/20/2015 Potential impacts on the production curve of Petrobras due to Operation Carwash By Yanna Clara(*) and Edmar de Almeida Operation Carwash considerably affected the development of the oil

More information

OML INTERVENTION I. Diesel Electric/ Self-Propelled/ Self-Elevating/ DPS-2 Accommodation/ Maintenance Jack-Up Barge PRINCIPAL PARTICULARS

OML INTERVENTION I. Diesel Electric/ Self-Propelled/ Self-Elevating/ DPS-2 Accommodation/ Maintenance Jack-Up Barge PRINCIPAL PARTICULARS OML INTERVENTION I Diesel Electric/ Self-Propelled/ Self-Elevating/ DPS-2 Accommodation/ Maintenance Jack-Up Barge PRINCIPAL PARTICULARS Year Built 2017 GRT / NRT 8100 / 2430 Hull No DJHC8008 Flag PANAMA

More information

Petrobras Gas Utilization Optimization Program (POAG-2015)

Petrobras Gas Utilization Optimization Program (POAG-2015) Petrobras Gas Utilization Optimization Program (POAG-2015) Denis Krambeck Dinelli Petrobras Domestic E&P Gas Production Planning 2 nd WOC1/PGCA Meeting Rio de Janeiro, Brazil 18-21 February 2013 Summary

More information

FPSOs in the Gulf of Mexico

FPSOs in the Gulf of Mexico FPSOs in the Gulf of Mexico Carlos Mastrangelo Kirk Barwick Lincoln Fernandes Erich Theisinger Petrobras America Inc. FPSO Introduction History Operational experience Summary Phased development concept

More information

PROCUREMENT POLICY AND CRITICAL EQUIPMENT SUPPLY. July /

PROCUREMENT POLICY AND CRITICAL EQUIPMENT SUPPLY. July / PROCUREMENT POLICY AND CRITICAL EQUIPMENT SUPPLY July / 2008 1 Disclosure The presentation may contain forecasts about future events. Such forecasts merely reflect the expectations of the Company's management.

More information

Current and future Brazilian heavy lift, offshore and subsea installation markets

Current and future Brazilian heavy lift, offshore and subsea installation markets Offshore Construction, Heavy Lift & Pipelay Conference Amsterdam, 2015 Current and future Brazilian heavy lift, offshore and subsea installation markets Leonardo Roncetti TechCon Engineering & Consulting

More information

THE OFFSHORE Drilling Solution

THE OFFSHORE Drilling Solution THE OFFSHORE Drilling Solution ATLANTIC 7 RIG brings energy to the world as a global provider of offshore drilling services to the petroleum industry. www.rigatlantic7.com Technical Information General

More information

BUSINESS OVERVIEW FEBRUARY

BUSINESS OVERVIEW FEBRUARY BUSINESS OVERVIEW FEBRUARY 2018 Except for historical information, the statements made in this presentation constitute forward looking statements. These include statements regarding the intent, belief

More information

Conversion from Car Passenger Ferry into Passenger Ship

Conversion from Car Passenger Ferry into Passenger Ship Conversion from Car Passenger Ferry into Passenger Ship Shipyard TROGIR LOGOS HOPE Educational Book Exhibits Ltd. (OM Ships International) Redelivered: December 2006 Original vessel ex GUSTAV VASA, ex

More information

ANCHOR HANDLING / TOWING VESSEL VALENTINE-3

ANCHOR HANDLING / TOWING VESSEL VALENTINE-3 Specification of ANCHOR HANDLING / TOWING VESSEL VALENTINE-3 Valentine Maritime (Gulf) LLC P:\V3\Specification\Valentine-3 - Specification Rev05.doc Page 1 of 7 ANCHOR HANDLING / TOWING VESSEL VALENTINE-3

More information

Design: KMAR 404 Built: 1998 IMO No:

Design: KMAR 404 Built: 1998 IMO No: Design: KMAR 404 Built: 1998 IMO No: 9166613 IMO No 9166613 Tank capacites Cargo Cement Mud Fuel Oil Fresh water Base Oil Brine Drill Water Oil Rec. Tank ID Contents Capacity (m 3 ) 2,400 2,500 0,900 1,000

More information

Design: UT 722L Build: 2005 IMO No: NorSkan Copacabana

Design: UT 722L Build: 2005 IMO No: NorSkan Copacabana Design: UT 722L Build: 2005 IMO No: 9283435 IMO N o 9 2 8 3 4 3 5 Tank capacities All figures are based on a 100% tank volume Densities are estimated values and actual cargo densities may alter the above

More information

VectRA AVT 3000 BUILDING FOR THE FUTURE

VectRA AVT 3000 BUILDING FOR THE FUTURE BUILDING FOR THE FUTURE This specification describes a high-performance Voith Schneider Propeller (VSP) tug in tractor configuration, designed for maximum efficiency in the performance of both harbour

More information

KONGSBERG Maritime AGENDA 07/11/2012. Geir Håøy - President Kongsberg Maritime. Introduction to Kongsberg Maritime. Our markets.

KONGSBERG Maritime AGENDA 07/11/2012. Geir Håøy - President Kongsberg Maritime. Introduction to Kongsberg Maritime. Our markets. KONGSBERG Maritime Geir Håøy - President Kongsberg Maritime AGENDA Introduction to Kongsberg Maritime Our markets Our positions Initiatives going forward Conclusion Page 2 1 Distribution of operating revenues:

More information

DMS Fortune 57m BHP - Anchor Handling Tug Supply Vessel. Vessel Specifications

DMS Fortune 57m BHP - Anchor Handling Tug Supply Vessel. Vessel Specifications DMS Fortune 57m - 4750 BHP - Anchor Handling Tug Supply Vessel Vessel Specifications Vessel Specifications Registration Year built / builder 2004 / Guangdong Yuexin Ocean Engineering Co. Ltd., China Flag

More information

CORPORATE PRESENTATION. Rio de Janeiro February 2013

CORPORATE PRESENTATION. Rio de Janeiro February 2013 CORPORATE PRESENTATION Rio de Janeiro February 2013 EBX S PUBLICLY HELD COMPANIES Mkt Cap US$ 6.748 bn Mkt Cap US$ 0.795 bn Mkt Cap US$ 1.298 bn LLX is part of the EBX Group, an industrial conglomerate

More information

DRILLING BARGE SS AMEQ CASPIAN SEA

DRILLING BARGE SS AMEQ CASPIAN SEA DRILLING BARGE SS AMEQ CASPIAN SEA Convert Two Conventional Drilling Barges, Re- design and re-build to MODU DWF Specifications SS GRE Caspian MODU 1 and SS GRE Caspian MODU DWF reactivation; 6-8 months

More information

UT 706 FAR SPIRIT. * PSV - Platform Supply Vessel

UT 706 FAR SPIRIT. * PSV - Platform Supply Vessel UT 706 FAR SPIRIT * PSV - Platform Supply Vessel UT 706 FAR SPIRIT IMO No. 8111001 Tank capacities Far Spirit - 08.04 M 3 SG Fuel Oil 0,830 Pot Water 1,000 Drill Water 1,000 Ballast Water 1,025 Liquid

More information

M/V OCEAN SUPPLIER. Vestland Marine Sp. z o.o. Chwarznieńska str 87E, Gdynia, PL. ME 303 Anchor Handling Tug Supply Vessel (AHTS), DPS-1

M/V OCEAN SUPPLIER. Vestland Marine Sp. z o.o. Chwarznieńska str 87E, Gdynia, PL. ME 303 Anchor Handling Tug Supply Vessel (AHTS), DPS-1 ME 303 Anchor Handling Tug Supply Vessel (AHTS), DPS-1 Vestland Marine Sp. z o.o. Chwarznieńska str 87E, 81-602 Gdynia, PL Genera Anchor Handling Tug Supply Vessel; DPS-1 GENERAL SHIPS NAME CALL SIGN C6VL3

More information

Switchgear Services Ltd DESIGN, MANUFACTURE, INSTALLATION AND SERVICE OF QUALITY ELECTRICAL SWITCHGEAR ENGINEERING

Switchgear Services Ltd DESIGN, MANUFACTURE, INSTALLATION AND SERVICE OF QUALITY ELECTRICAL SWITCHGEAR ENGINEERING Switchgear Services Ltd DESIGN, MANUFACTURE, INSTALLATION AND SERVICE OF QUALITY ELECTRICAL SWITCHGEAR ENGINEERING Switchgear House The Courtyard Green Lane Heywood Lancs OL10 2EX England Tel +44 (0)1706

More information

Outline Specification. Of a 5,500 tons. IMO II Chemical Tanker

Outline Specification. Of a 5,500 tons. IMO II Chemical Tanker Leissner Maritime Outline Specification Of a 5,500 tons IMO II Chemical Tanker Fitted with: Stainless steel cargo tanks LNG or Methanol fuelled Double hull / double deck Project: P.1557 Deadweight: 5,500

More information

BUILT: 2009 Dry Dock World Pertama FLAG: Panama CLASS: ABS + A1 + (E) + AMS + ACCU + ICE CO + DP3 + HE LIDECK + ES + FiFi 2

BUILT: 2009 Dry Dock World Pertama FLAG: Panama CLASS: ABS + A1 + (E) + AMS + ACCU + ICE CO + DP3 + HE LIDECK + ES + FiFi 2 GOLIATH The Goliath is one of the largest offshore construction vessels in the world. This multi-functional vessel is equipped with DPIII and a 1600mt crane, primarily for offshore installation. The Goliath

More information

YN TSHD MAIN FUNCTIONS

YN TSHD MAIN FUNCTIONS 000 - MAIN FUNCTIONS Loading hopper with SB trailing suction pipe Emptying hopper through bottom doors Emptying the hopper through shore discharge connection on the bow Emptying hopper through a rainbow

More information

Competitive position and future opportunities of the European Marine Supplies Industry

Competitive position and future opportunities of the European Marine Supplies Industry Competitive position and future opportunities of the European Marine Supplies Industry Selected Results of a study for the European Commission 2013/2014 Joachim Brodda BALance Technology Consulting Sector

More information

L/B KAYD CLASS 245' SELF-ELEVATING VESSEL -- YEAR BUILT OFFICIAL NUMBER CALL SIGN WDC7940

L/B KAYD CLASS 245' SELF-ELEVATING VESSEL -- YEAR BUILT OFFICIAL NUMBER CALL SIGN WDC7940 L/B KAYD CLASS 245' SELF-ELEVATING VESSEL -- YEAR BUILT - 2005 OFFICIAL NUMBER 1176595 CALL SIGN WDC7940 DIMENSIONS: Length (Overall) Beam (Overall) Beam (Barge Only) Depth (Barge Only) Design Draft 137.5'

More information

The all-aluminum Metal Shark 100 Defiant is based on the state-ofthe-art Damen Stan Patrol This

The all-aluminum Metal Shark 100 Defiant is based on the state-ofthe-art Damen Stan Patrol This Based on the proven Damen Stan Patrol 5009, the Metal Shark 165 Defiant (shown) is a capable patrol vessel featuring Sea Axe technology that combines greatly enhanced efficiency with unsurpassed seakeeping

More information

Hybrid Riser Tower Tailored for Local Shallow Water Needs

Hybrid Riser Tower Tailored for Local Shallow Water Needs Hybrid Riser Tower Tailored for Local Shallow Water Needs Frank Lim Subsea Malaysia at Oil and Gas Asia 2017, Kuala Lumpur Overview Historical Bundle Hybrid Riser Towers Shallow Water Case Study Background

More information

Strategic Expansion for Sustainable Growth

Strategic Expansion for Sustainable Growth Group YEAR IN Quarterly REVIEWResults Estaleiro Jurong Aracruz, Sembcorp Marine s 82.5-hectare New Integrated Brazilian Yard Facility, will be developed over a period of three years and in stages with

More information

Universidad Nacional Experimental Marítima del Caribe Vicerrectorado Académico Coordinación de Idiomas English VI. Maritime Engineering

Universidad Nacional Experimental Marítima del Caribe Vicerrectorado Académico Coordinación de Idiomas English VI. Maritime Engineering Universidad Nacional Experimental Marítima del Caribe Vicerrectorado Académico Coordinación de Idiomas English VI. Maritime Engineering Marine facilities Unit V. Auxiliary machinery Speaking and writing.

More information

Maersk Interceptor. Gusto MSC CJ70-X150MD Harsh Environment Jack-up 150 m Water Depth Optimized Drilling Efficiency Subsea Capabilities

Maersk Interceptor. Gusto MSC CJ70-X150MD Harsh Environment Jack-up 150 m Water Depth Optimized Drilling Efficiency Subsea Capabilities Maersk Interceptor Gusto MSC CJ70-X150MD Harsh Environment Jack-up 150 m Water Depth Optimized Drilling Efficiency Subsea Capabilities Maersk Drilling Maersk Interceptor TYPE Gusto MSC CJ70-X150MD, Ultra

More information

BOĞAÇAY RAmparts 2400 SX 60/70/75 BUILDING FOR THE FUTURE

BOĞAÇAY RAmparts 2400 SX 60/70/75 BUILDING FOR THE FUTURE BUILDING FOR THE FUTURE The RAmparts 2400 SX tug is twin Z-drive, diesel powered tug designed for maximum efficiency in the performance of ship-handling duties for sea going ships. The hull form and layout

More information

GustoMSC 375 Ft. Jack Up Drilling Unit. Fitted With NOV Drilling Package RIG 2. Overview

GustoMSC 375 Ft. Jack Up Drilling Unit. Fitted With NOV Drilling Package RIG 2. Overview GustoMSC 375 Ft. Jack Up Drilling Unit Fitted With NOV Drilling Package RIG 2 Overview 1.Rig Certificates Overview Description Overview 2.Principal Parameters Item Length Including Helideck Specification

More information

KCM 80m PSV DP2 - VOS PRINCIPLE (3257)

KCM 80m PSV DP2 - VOS PRINCIPLE (3257) KCM 80m PSV DP2 - VOS PRINCIPLE (3257) GENERAL COMMUNICATIONS EQUIPMENT Place of Build Fujian Southeast Shipyard, China HF radio 1 x Furuno Model RC-1800T Vessel Type PSV VHF Radio 1 x Furuno FM-8800S

More information

Design: Aker OSCV 06L DSV Built: 2009 IMO No: Call sign: C6XW3 SKANDI ARCTIC DSV

Design: Aker OSCV 06L DSV Built: 2009 IMO No: Call sign: C6XW3 SKANDI ARCTIC DSV Design: Aker OSCV 06L DSV Built: 009 IMO No: 94138 Call sign: C6XW3 SKANDI ARCTIC DSV IMO No 94138 The vessel is designed as a vessel for world wide operations Low resistance hull lines designed for speed

More information

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Ship s Power Plants

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Ship s Power Plants Page 1 of 8 Compiled by Approved by Chief Examiner Syllabus Committee: 26 February 2013 OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE Deck: Page 2 of 8 KNOWLEDGE, UNDERSTANDING

More information

2014 Global Energy Conference Credit Suisse. Rudimar Lorenzatto Exploration & Production June, 2014

2014 Global Energy Conference Credit Suisse. Rudimar Lorenzatto Exploration & Production June, 2014 2014 Global Energy Conference Credit Suisse Rudimar Lorenzatto Exploration & Production June, 2014 DISCLAIMER FORWARD-LOOKING STATEMENTS: DISCLAIMER The presentation may contain forward-looking statements

More information

4th Mare Forum Indonesia - The Next Maritime Eldorado of the East

4th Mare Forum Indonesia - The Next Maritime Eldorado of the East 4th Mare Forum Indonesia - The Next Maritime Eldorado of the East March 22nd, Jakarta Indonesia Geopolitics The shift of power from West to East BRICS and the CIVETS Charles Tang President of The Brazil

More information

EXPANSION OF THE PANAMA CANAL AND ITS IMPACT ON TANKERS. José Ramón Arango S. Liquid Bulk Segment October 4th 2017

EXPANSION OF THE PANAMA CANAL AND ITS IMPACT ON TANKERS. José Ramón Arango S. Liquid Bulk Segment October 4th 2017 EXPANSION OF THE PANAMA CANAL AND ITS IMPACT ON TANKERS José Ramón Arango S. Liquid Bulk Segment October 4th 2017 Agenda Panama Canal Expansion Panama Canal Expansion Performance Impact of the Expansion

More information

Section 25 Project Surplus Packages - Sales Item

Section 25 Project Surplus Packages - Sales Item Section 25 Project Surplus Packages - Sales Item 25030112 Complete Offshore Drilling Package Built to full North Sea Specifications BRAND NEW. DETAIL AS FOLLOWS: A Complete Package of Offshore Drilling

More information

L27/38 GenSets Ordered for TML Heavy Transport Vessels

L27/38 GenSets Ordered for TML Heavy Transport Vessels MAN power for innovative SeaMetric heavy-lifters L27/38 GenSets Ordered for TML Heavy Transport Vessels 11 February 2008. SeaMetric International AS, Stavanger, Norway has during December 2007 ordered

More information

Capital Markets Day 2007 Kongsberg Maritime 25 September 20O7

Capital Markets Day 2007 Kongsberg Maritime 25 September 20O7 Capital Markets Day 27 Kongsberg Maritime 25 September 2O7 WORLD CLASS through people, technology and dedication 1 Kongsberg Maritime Offshore & Merchant Marine Offshore & Merchant Marine Introduction

More information

KCM 80M PSV VOS PRIMROSE (3253) GENERAL COMMUNICATIONS EQUIPMENT Place of Build Fujian Southeast Shipyard, China HF radio Furuno Model RC-1800T Vessel Type PSV VHF Radio Furuno FM-8800S Year Built 2016

More information

GUIDELINE FOR OFFSHORE INSTALATIONS PRODUCTION FACILITIES INDEX OF REVISIONS DESCRIPTION AND/OR REVISED SHEETS

GUIDELINE FOR OFFSHORE INSTALATIONS PRODUCTION FACILITIES INDEX OF REVISIONS DESCRIPTION AND/OR REVISED SHEETS LIST No. I-LI-3000.00-1200-941-PGG-002 CLIENT OR USER JOB OR PROJECT AREA OR UNIT E&P GUIDELINE FOR OFFSHORE INSTALATIONS PRODUCTION FACILITIES SHEET CC 1 of 11 WITHOUT SCALE ENGP TITLE MASTER VENDOR LIST

More information

rem SUPPLIER UT 755 LN PLATFORM SUPPORT VESSEL

rem SUPPLIER UT 755 LN PLATFORM SUPPORT VESSEL PRELIMINARY rem SUPPLIER UT 755 LN PLATFORM SUPPORT VESSEL The REM fleet is designed by experienced and recognized Norwegian naval architects and built by yards in Norway. The fleet consists of PSV, AHTS,

More information

Delta 85 Flushdeck Flybridge MY Feelin' Free

Delta 85 Flushdeck Flybridge MY Feelin' Free Delta 85 Flushdeck Flybridge MY Feelin' Free Make: Model: Length: Delta 85 Flushdeck Flybridge MY 91 ft Price: $ 899,000 Year: 1982 Condition: Used Boat Name: Hull Material: Draft: Number of Engines: 2

More information

Jan-Erik Räsänen, ABB Marine and Cranes/Tanker day Spore, ABB Marine Energy Efficiency Tanker day Singapore Oct 11th 2013

Jan-Erik Räsänen, ABB Marine and Cranes/Tanker day Spore, ABB Marine Energy Efficiency Tanker day Singapore Oct 11th 2013 Jan-Erik Räsänen, ABB Marine and Cranes/Tanker day Spore, 11.10.2013 ABB Marine Energy Efficiency Tanker day Singapore Oct 11th 2013 ABB Group October 11, 2013 Slide 1 ABB Marine Energy Efficiency Content

More information

25.65m Ex-DANISH COASTAL DEFENCE PATROL BOAT SPIRIT OF ROMO

25.65m Ex-DANISH COASTAL DEFENCE PATROL BOAT SPIRIT OF ROMO ! 25.65m Ex-DANISH COASTAL DEFENCE PATROL BOAT SPIRIT OF ROMO Sistership Sales Price: 175000 BUILDER: YEAR: REFIT YEAR: MODEL: FLAG: LYING: LENGTH: BEAM: DRAFT: SPEED RANGE: CREW: CONSTRUCTION Svendborg

More information

63' FAST INTERCEPTOR BOAT

63' FAST INTERCEPTOR BOAT 63' FAST INTERCEPTOR BOAT 1) MAIN DATA Length overall 19.92 m Moulded length 17.60 m Maximum Beam 3.60 m Inside beam 3.50 m Speed at 100% RPM 75 knots Cruising speed 55 knots Draft 0.78 m Depth 1.70 m

More information

The 16th Japan-Brazil Joint Economic Committee Meeting. September 24, Toyo Engineering Corporation

The 16th Japan-Brazil Joint Economic Committee Meeting. September 24, Toyo Engineering Corporation The 16th Japan-Brazil Joint Economic Committee Meeting September 24, 2013 Toyo Engineering Corporation Contents 1. Globalization of TOYO 2. TOYO in Upstream field 3. TOYO in Power sector 4. TOYO in Brazil

More information

Dura-Plate 301. Onshore/Offshore Track Record

Dura-Plate 301. Onshore/Offshore Track Record Onshore/Offshore VIETSOVPETRO VSP Port Oil rig repair Two Helideck Top side 2011 GRYPHON ENERGY Jack-up rig RUBICONE 191 RIG Hull, legs, drill cover repair (3,500 m2) 2011 VTP Tank farm s 11 tanks External

More information

03 MORDEC MORDEC MORDEC MORDEC MORDEC 15 MORDEC 16 MORDEC 17 MORDEC

03 MORDEC MORDEC MORDEC MORDEC MORDEC 15 MORDEC 16 MORDEC 17 MORDEC Cranes 1 Contents: Company Introduction...... Page 03 MORDEC Cranes.........Page 04-06 MORDEC Marine Deck Crane...Page 07-10 MORDEC Offshore Pedestal Crane...Page 11-12 MORDEC Offshore Lattice Boom Crane....Page

More information

FAR FROM THE COASTS, CLOSE TO THE BEST CHOICE YOU EVER MADE

FAR FROM THE COASTS, CLOSE TO THE BEST CHOICE YOU EVER MADE FAR FROM THE COASTS, CLOSE TO THE BEST CHOICE YOU EVER MADE Absolute expertise, absolute accuracy, absolute reliability. Nothing else. M.E.P. Pellegrini Marine Equipments proposes a complete fshore crane

More information

TECHNICAL SPECIFICATION OF TUG

TECHNICAL SPECIFICATION OF TUG Type of Vessel: CP ASD Tug, with Ship Assist Anchor Handling Fi Fi tug with Escort capability. Oil Recovery Ship 1 Classification: ABS+A1, RINA: C E, Escort salvage Vessel, tug; Towing escort tug; Service,

More information

CHARACTERISTICS OF POLLUTION RESPONSE VESSELS FOR THE GULF OF FINLAND

CHARACTERISTICS OF POLLUTION RESPONSE VESSELS FOR THE GULF OF FINLAND CHARACTERISTICS OF POLLUTION RESPONSE VESSELS FOR THE GULF OF FINLAND OIL COMBATTING SEMINAR St. Petersburg Harri Eronen Kaj Riska March 2006 TASKS THE INCREASING OIL TRANSPORT IN THE GULF OF FINLAND MEANS

More information

INSTALLATION OF A SUBMERGED BUOY FOR SUPPORTING RISERS (BSR) SYSTEM IN CAMPOS BASIN SITE

INSTALLATION OF A SUBMERGED BUOY FOR SUPPORTING RISERS (BSR) SYSTEM IN CAMPOS BASIN SITE Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands Proceedings of the 30 th International Conference

More information

Focus on Brazil. Frederic Delormel, Senior Vice President, Brazil March 30, 2010

Focus on Brazil. Frederic Delormel, Senior Vice President, Brazil March 30, 2010 Focus on Brazil Frederic Delormel, Senior Vice President, Brazil March 30, 2010 Petrobras Production objectives Petrobras Oil & Gas production (1,000x boe/d) 5,729 632 Worldwide 3,655 341 In Brazil 2,003

More information

Topaz Daughter Class Amani / Faye / Isra / Megan / Seema / Sophie / Xara 75 M 3,300 DWT Platform Supply Vessel. Vessel Specifications

Topaz Daughter Class Amani / Faye / Isra / Megan / Seema / Sophie / Xara 75 M 3,300 DWT Platform Supply Vessel. Vessel Specifications Topaz Daughter Class Amani / Faye / Isra / Megan / Seema / Sophie / Xara 75 M 3,300 DWT Platform Supply Vessel Vessel Specifications Vessel Specifications Registration Year built / Builder Class 2013,

More information

OOC Jaguar. Opielok Offshore Carriers

OOC Jaguar. Opielok Offshore Carriers DP2 Platform SuppLy Vessel Specifications OOC Jaguar Opielok Offshore Carriers O p e r a t o r s o f m o d e r n o f f s h o r e p l a t f o r m s u p p l y v e s s e l s Vessel & Crew Specifications General

More information

28m ASD Tug 42T BP, Priced to Sell Listing ID: 1296

28m ASD Tug 42T BP, Priced to Sell Listing ID: 1296 Australia - Chile - Indonesia - Great Britain - New Zealand - Panama - Philippines - South Korea - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) 28mASDTug 42TBP,PricedtoSell

More information

Brazil s Pre-Salt Development and CO2 Management

Brazil s Pre-Salt Development and CO2 Management 3rd OVERALL SCHEDULE US-NORWAY BILATERAL MEETING AND CAPTURE WORKSHOP AND 3rd INTERNATIONAL WORKSHOP ON OFFSHORE GEOLOGIC CO2 Research Council of Norway, Drammensveien 288, Lysaker, Oslo, Norway May 2-4,

More information

Petrobras. Nelson Silva Chief Strategy and Performance Officer April, 2017

Petrobras. Nelson Silva Chief Strategy and Performance Officer April, 2017 Petrobras Nelson Silva Chief Strategy and Performance Officer April, 2017 Agenda - Petrobras among the peers - Tracking the 2017-2021 Business and Management Plan (BMP) - Zero Base Budget - Risk Management

More information

SH GROUP FACILITIES. Kuopiovej Svendborg. Denmark

SH GROUP FACILITIES. Kuopiovej Svendborg. Denmark SH GROUP FACILITIES Kuopiovej 20. 5700 Svendborg. Denmark. +45 6221 7810. sh@shgroup.dk www.shgroup.dk SH GROUP A/S - HEADQUATERS DENMARK SH Group head office administration, service, sales and engineering

More information

STG. Offshore Vessel Summary Sea Trucks Group. Sea Trucks Group

STG. Offshore Vessel Summary Sea Trucks Group.  Sea Trucks Group STG Sea Trucks Group Sea Trucks Group Offshore Vessel Summary 2014 www.seatrucksgroup.com Delivering the difference www.seatrucksgroup.com 3 About Sea Trucks Founded in 1977, the Sea Trucks Group is an

More information

Super 116E Class. Self-Elevating Drilling Unit (SEDU)

Super 116E Class. Self-Elevating Drilling Unit (SEDU) Super 116E Class Self-Elevating Drilling Unit (SEDU) B RAISING THE BAR FOR JACKUP RIG PERFORMANCE Cameron s LETOURNEAU Super 116E Class jackup rig provides the oil and gas industry with a proven versatile

More information

BOA SUB C. Subsea / Offshore Construction Vessel

BOA SUB C. Subsea / Offshore Construction Vessel Accommodation: 153 beds 400 t AHC + 30 t AHC auxiliary crane to 3,000 m (9,843 ft) 600/500/500 t AH/towing winches to 3,000 m (9,843 ft) 7.2 m x 7.2 m (23.6 ft x 23.6 ft) moon pool 2 x 220 HP WROV s in

More information

L/B MYRTLE CLASS 245' SELF-ELEVATING VESSEL -- YEAR BUILT OFFICIAL NUMBER CALL SIGN WDA8679

L/B MYRTLE CLASS 245' SELF-ELEVATING VESSEL -- YEAR BUILT OFFICIAL NUMBER CALL SIGN WDA8679 L/B MYRTLE CLASS 245' SELF-ELEVATING VESSEL -- YEAR BUILT - 2002 OFFICIAL NUMBER 1125196 CALL SIGN WDA8679 DIMENSIONS: Length (Overall) Beam (Overall) Beam (Barge Only) Depth (Barge Only) Design Draft

More information

We form a vital backbone for industrial growth through our specialization in engineering processes & services

We form a vital backbone for industrial growth through our specialization in engineering processes & services We form a vital backbone for industrial growth through our specialization in engineering processes & services www.asiapropel.com COMPANY PARTICULARS ALSO KNOWN AS AP IS A MALAYSIAN BASED COMPANY THAT HAVE

More information

NORDIC QUEEN. Vessel Specification

NORDIC QUEEN. Vessel Specification NORDIC QUEEN Vessel Specification Length 75.55 m Call Sign: 3EXE8 Breadth 19.20 m IMO: 9444778 Draught 6.50 m Class: Lloyds Register Depth to 1 st Deck 7.60 m 100A1 OSV ECO(TOC) Deck Space 680m 2 @ 10mt/m

More information

Williamsburg, VA SYSTEM # DESCRIPTION

Williamsburg, VA SYSTEM # DESCRIPTION Williamsburg, VA SYSTEM # DESCRIPTION DS0100 FLYAWAY DEEP OCEAN SALVAGE SYSTEM (FADOSS), 15 KIP DS0111 FLYAWAY DEEP OCEAN SALVAGE SYS, 30 KIP (2ND GEN) DS0120 FLYAWAY DEEP OCEAN SALVAGE SYSTEM (FADOSS),

More information

Simple, safe and cylindrical

Simple, safe and cylindrical Simple, safe and cylindrical Designed as an alternative to conventional ship-shaped FPSOs, the Norwegian company Sevan Marine has designed, developed and is now successfully operating completely new floating

More information

COMPRESSED GAS, EXPANDED OPPORTUNITIES.

COMPRESSED GAS, EXPANDED OPPORTUNITIES. COMPRESSED GAS, EXPANDED OPPORTUNITIES. THE NEW BENEFITS FROM COMPRESSED NATURAL GAS CNG32000 is a ship for the maritime transport of CNG (Compressed Natural Gas), designed by Fincantieri Offshore, which

More information

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading Rig Equipment List Substructure Mast Drawworks Top Drive NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance Capacity: 500,000# loading Six well skidding system NOV- Telescoping Height: 80

More information