NOISE ASSESSMENT TECHNICAL REPORT for the Duke Perris Boulevard Warehouse Project Perris, California

Size: px
Start display at page:

Download "NOISE ASSESSMENT TECHNICAL REPORT for the Duke Perris Boulevard Warehouse Project Perris, California"

Transcription

1 NOISE ASSESSMENT TECHNICAL REPORT for the Duke Perris Boulevard Warehouse Project Perris, California Prepared for: Albert A. Webb Associates 3788 McCray Street Riverside, CA Prepared by: 605 Third Street Encinitas, California Contact: Jonathan Leech AUGUST 2017

2 PAGE INTENTIONALLY BLANK

3 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA TABLE OF CONTENTS Section Page No. 1.0 INTRODUCTION Purpose Project Location and Description Location Project Description Noise Background and Terminology Noise Regulation and Management Federal State City of Perris EXISTING NOISE CONDITIONS Transportation Noise SIGNIFICANCE CRITERIA City of Perris Noise Significance Criteria Vibration Significance Criteria IMPACTS AND MITIGATION Transportation Noise Exposure Impact Analysis Mitigation Measures Operations Noise Generation Impact Analysis Mitigation Measures Construction Noise Construction - Equipment Inventory Construction Noise Assessment Mitigation Measures Ground-borne Vibration Impact Analysis Mitigation Measures REFERENCES i March 2014

4 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA TABLE OF CONTENTS (CONTINUED) Section Page No. FIGURES FIGURE 1 REGIONAL LOCATION...6 FIGURE 2 FIGURE 3 LOCAL SETTING...7 SITE PLAN...8 FIGURE 4 NOISE MEASUREMENT LOCATIONS...19 FIGURE 5 NEARBY SENSITIVE RECEPTORS...30 APPENDICES A B C D Ambient Noise Measurement Data FHWA Traffic Model Noise Calculation Worksheets Mechanical Equipment Noise Calculation Worksheets Roadway Noise Construction Model - Input and Results Data Sheets ii August 2017

5 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA ACRONYMS AND ABBREVIATIONS CFR CNEL db dba DOT FAA FHWA Hz Ldn Leq Lmin Lmax Lxx RMS SR VdB Code of Federal Regulation community noise equivalent level decibel A-weighted decibel U.S. Department of Transportation Federal Aviation Administration Federal Highway Administration hertz day-night sound level equivalent sound level minimum sound level maximum sound level percentile exceeded sound level root mean square State Route vibration decibels iv August 2017

6 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA INTENTIONALLY LEFT BLANK iv August 2017

7 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA 1.0 INTRODUCTION 1.1 Purpose This technical noise report evaluates noise effects of the project including noise generation potential associated with construction and operation of the proposed warehouse development. Noise generation sources from future implementation of the project include traffic, parking lot and loading dock activities, mechanical equipment, and short-term construction operations. 1.2 Project Location and Description Location The proposed Duke Perris Boulevard Warehouse Project ( Project ) would be located on the south side of Markham Street, between Perris Boulevard on the west and Redlands Avenue on the east, in the City of Perris, California. Please refer to Figure 1 for an illustration of the regional setting of the project. Vehicular access to the site would be provided from Perris Boulevard, Markham Street, and Perry Street. Please refer to Figure 2 for an illustration of the Local Setting of Project site, including relationship to the roadway system just described. With respect to the local setting illustrated on Figure 2, it can be seen that warehouse / distribution center uses are located immediately west, northeast, and east of the Project site. Currently vacant land abuts the Project site on the south, with Ramona Expressway and a mobile home park on the south side of this vacant land. Land to the southeast of the Project site is also currently vacant, with a residential neighborhood on the south side of Ramona Expressway in this direction Project Description The Project consists of a warehouse structure, which would suitable for a trucking distribution center. The building would contain approximately 1,189,393 square feet of floor area, and would be equipped with 92 dock doors on the north face of the building, and 92 dock doors on the south face of the building. The building is planned to have an office area at each of the four corners of the building, occupying perhaps 7,000 to 7,500 square feet of floor area apiece. The warehouse area would not have climate control, but each office space would probably be equipped with a roof-mounted package HVAC equipment. For independent zone control, it is assumed that the office space at each corner of the building would have three 4-ton package HVAC units (such as York Model ZF048). Employee parking would be provided at the eastern and western ends of the structure. Please refer to Figure 3 for a Site Plan August 2017

8 FIGURE 1 REGIONAL SETTING DUKE PERRIS BOULEVARD WAREHOUSE - NOISE TECHNICAL REPORT

9 FIGURE 2 LOCAL SETTING DUKE PERRIS BOULEVARD WAREHOUSE - NOISE TECHNICAL REPORT

10 FIGURE 3 SITE PLAN DUKE PERRIS BOULEVARD WAREHOUSE - NOISE TECHNICAL REPORT

11 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA 1.3 Noise Background and Terminology Fundamentals of Environmental Noise Vibrations, traveling as waves through air from a source, exert a force perceived by the human ear as sound. Sound pressure level (referred to as sound level) is measured on a logarithmic scale in decibels (db) that represent the fluctuation of air pressure above and below atmospheric pressure. Frequency, or pitch, is a physical characteristic of sound and is expressed in units of cycles per second or hertz (Hz). The normal frequency range of hearing for most people extends from about 20 to 20,000 Hz. The human ear is more sensitive to middle and high frequencies, especially when the noise levels are quieter. As noise levels get louder, the human ear starts to hear the frequency spectrum more evenly. To accommodate for this phenomenon, a weighting system to evaluate how loud a noise level is to a human was developed. The frequency weighting called A weighting is typically used for quieter noise levels which de-emphasizes the low frequency components of the sound in a manner similar to the response of a human ear. This A-weighted sound level is called the noise level and is referenced in units of dba. Since sound is measured on a logarithmic scale, a doubling of sound energy results in a 3 dba increase in the noise level. Changes in a community noise level of less than 3 dba are not typically noticed by the human ear (Caltrans 1998). Changes from 3 to 5 dba may be noticed by some individuals who are extremely sensitive to changes in noise. A 5 dba increase is readily noticeable (EPA 1973). The human ear perceives a 10 dba increase in sound level as a doubling of the sound level (i.e., 65 dba sounds twice as loud as 55 dba to a human ear). An individual s noise exposure occurs over a period of time; however, noise level is a measure of noise at a given instant in time. Community noise sources vary continuously, being the product of many noise sources at various distances, all of which constitute a relatively stable background or ambient noise environment. The background, or ambient, noise level gradually changes throughout a typical day, corresponding to distant noise sources, such as traffic volume, as well as changes in atmospheric conditions. Noise levels are generally higher during the daytime and early evening when traffic (including airplanes), commercial, and industrial activity is the greatest. However, noise sources experienced during nighttime hours when background levels are generally lower can be potentially more conspicuous and irritating to the receiver. In order to evaluate noise in a way that considers periodic fluctuations experienced throughout the day and night, a concept termed community noise equivalent level (CNEL) was developed, wherein noise measurements are weighted, added, and averaged over a 24-hour period to reflect magnitude, duration, frequency, and time of occurrence. A complete definition of CNEL is provided below August 2017

12 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Different types of measurements are used to characterize the time-varying nature of sound. These measurements include the equivalent sound level (LEQ), the minimum and maximum sound levels (LMIN and LMAX), percentile-exceeded sound levels (Lxx), the day night sound level (LDN), and the CNEL. Below are brief definitions of these measurements and other terminology used in this report. Decibel (db) is a unitless measure of sound on a logarithmic scale which indicates the squared ratio of sound pressure amplitude to a reference sound pressure amplitude. The reference pressure is 20 micropascals. A-weighted decibel (dba) is an overall frequency-weighted sound level in decibels that approximates the frequency response of the human ear. Equivalent sound level (LEQ) is the constant level that, over a given time period, transmits the same amount of acoustic energy as the actual time-varying sound. Equivalent sound levels are the basis for both the day night average sound levels (LDN) and community noise equivalent level (CNEL) scales. Maximum sound level (LMAX) is the maximum sound level measured during the measurement period. Minimum sound level (LMIN) is the minimum sound level measured during the measurement period. Percentile-exceeded sound level (Lxx) is the sound level exceeded x percent of a specific time period. L10 is the sound level exceeded 10% of the time. Day night average sound level (LDN). The LDN is a 24-hour average A-weighted sound level with a 10 db penalty added to the nighttime hours from 10:00 p.m. to 7:00 a.m. The 10 db penalty is applied to account for increased noise sensitivity during the nighttime hours. This metric is similar to CNEL (see definition below); resulting values from application of LDN versus CNEL rarely differ by more than 1 db, and therefore these two methods of describing average noise levels are often considered interchangeable. Community noise equivalent level (CNEL). The CNEL is the average equivalent A-weighted sound level during a 24-hour day. CNEL accounts for the increased noise sensitivity during the evening hours (7 p.m. to 10 p.m.) and nighttime hours (10 p.m. to 7 a.m.) by adding 5 db to the sound levels in the evening and 10 db to the sound levels at night. CNEL and LDN are often considered equivalent descriptors August 2017

13 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Exterior Noise Distance Attenuation Noise sources are classified in two forms: (1) point sources, such as stationary equipment or a group of construction vehicles and equipment working within a spatially limited area at a given time, and (2) line sources, such as a roadway with a large number of pass-by sources (motor vehicles). Sound generated by a point source typically diminishes (attenuates) at a rate of 6.0 dba for each doubling of distance from the source to the receptor at acoustically hard sites and at a rate of 7.5 dba for each doubling of distance from source to receptor at acoustically soft sites. Sound generated by a line source (i.e., a roadway) typically attenuates at a rate of 3 dba and 4.5 dba per doubling distance, for hard and soft sites, respectively. Sound levels can also be attenuated by man-made or natural barriers. For the purpose of sound attenuation discussion, a hard or reflective site does not provide any excess ground-effect attenuation and is characteristic of asphalt or concrete ground surfaces, as well as very hard-packed soils. An acoustically soft or absorptive site is characteristic of unpaved loose soil or vegetated ground. Structural Noise Attenuation Sound levels can also be attenuated by man-made or natural barriers. Solid walls or slopes associated with elevation differences typically reduce noise levels by 5 to 10 dba (Caltrans 1998). Structures can also provide noise reduction by insulating interior spaces from outdoor noise. The outside-to-inside noise attenuation provided by typical structures in California ranges between 17 to 30 dba with open and closed windows, respectively, as shown in Table 1. Table 1 Outside-to-Inside Noise Attenuation (dba) Building Type Open Windows Closed Windows a Residences Schools Churches Hospitals/Offices/Hotels Theaters Source: Transportation Research Board, National Research Council, a As shown, structures with closed windows can attenuate exterior noise by a minimum of 25 to 30 dba August 2017

14 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Fundamentals of Vibration Vibration is an oscillatory motion that can be described in terms of displacement, velocity, or acceleration. The response of humans to vibration is very complex. However, it is generally accepted that human response is best approximated by the vibration velocity level associated with the vibration occurrence. Heavy equipment operation, including stationary equipment that produces substantial oscillation or construction equipment that causes percussive action against the ground surface, may be perceived by building occupants as perceptible vibration. It is also common for ground-borne vibration to cause windows, pictures on walls, or items on shelves to rattle. Although the perceived vibration from such equipment operation can be intrusive to building occupants, the vibration is seldom of sufficient magnitude to cause even minor cosmetic damage to buildings. When evaluating human response, ground-borne vibration is usually expressed in terms of root mean square (RMS) vibration velocity. RMS is defined as the average of the squared amplitude of the vibration signal. As for sound, it is common to express vibration amplitudes in terms of decibels defined as: L v = 20 log ( v rms v ref ) where vrms is the RMS vibration velocity amplitude in inches/second and vref is the decibel reference of 1x10-6 inches/second. To avoid confusion with sound decibels, the abbreviation VdB is used for vibration decibels. The vibration threshold of perception for most people is around 65 VdB. Vibration levels in the 70 to 75 VdB range are often noticeable but generally deemed acceptable, and levels in excess of 80 VdB are often considered unacceptable (FTA 2006). 1.4 Noise Regulation and Management Federal Federal Transit Administration and Federal Railroad Administration Standards Although the FTA standards are intended for federally funded mass transit projects, the impact assessment procedures and criteria included in the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (May 2006) are routinely used for projects August 2017

15 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA proposed by local jurisdictions. The FTA and Federal Railroad Administration (FRA) have published guidelines for assessing the impacts of ground-borne vibration associated with rail projects, which have been applied by other jurisdictions to other types of projects. The FTA measure of the threshold of architectural damage for conventional sensitive structures is 0.2 inch/second perturbation projection vector (PPV) State California Noise Control Act of 1973 Sections through of the California Health and Safety Code, known as the California Noise Control Act of 1973, declares that excessive noise is a serious hazard to the public health and welfare and that exposure to certain levels of noise can result in physiological, psychological, and economic damage. It also identifies a continuous and increasing bombardment of noise in the urban, suburban, and rural areas. The California Noise Control Act declares that the State of California has a responsibility to protect the health and welfare of its citizens by the control, prevention, and abatement of noise. It is the policy of the State to provide an environment for all Californians free from noise that jeopardizes their health or welfare. California Noise Insulation Standards (CCR Title 24) In 1974, the California Commission on Housing and Community Development adopted noise insulation standards for hotels, motels, dormitories, and multi-family residential buildings (CCR Title 24, Part 2). Title 24 establishes standards for interior room noise (attributable to outside noise sources). The City of Perris applies the interior noise criterion of CNEL 45 dba for single family residences, in addition to multi-family residential structures. California Noise Exposures Standards by Land Use Table 2 presents a land use compatibility chart for community noise prepared by the State of California, Department of Health. It identifies normally acceptable, conditionally acceptable and clearly unacceptable noise levels for siting various new land uses. A conditionally acceptable designation implies new construction or development should be undertaken only after a detailed analysis of the noise reduction requirements for each land use is made and the needed noise insulation features are incorporated in the design. By comparison, a normally acceptable designation indicates that standard construction can occur with no special noise reduction requirements August 2017

16 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Table 2 - Land Use/Noise Compatibility Guidelines August 2017

17 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA City of Perris City of Perris General Plan The City Perris adopted the current General Plan Noise Element in The following policies are applicable to the Project. Policy 1.A The State of California Noise/Land Use Compatibility Criteria shall be used in determining land use compatibility for new development. The State Noise/Land Use Compatibility Criteria are presented in Table 2 (above). The project would fall into the Industrial classification, with Normally Acceptable exterior noise levels ranging up to 70 dba CNEL, and Conditionally Acceptable exterior noise levels ranging up to 80 dba CNEL. Policy IV.A Reduce or avoid the existing and potential future impacts from air traffic on new sensitive noise land uses in areas where air traffic noise is 60 dba CNEL or higher. The Project site is located within the dba CNEL contour associated with March Inland Port. However, the Project is not considered noise sensitive, with exterior noise exposure levels up to 80 dba CNEL considered to be Conditionally Acceptable for the proposed use. Therefore the location of the project within the dba CNEL contour would not be inconsistent with this policy. Policy V.A New large scale commercial or industrial facilities located within 160 feet of sensitive land uses shall mitigate noise impacts to attain an acceptable level as required by the State of California Noise/Land Use Compatibility Criteria. Implementation Measure: V.A.1 An acoustical impact analysis shall be prepared for new industrial and large scale commercial facilities to be constructed within 160 feet of the property line of any existing noise sensitive land use. This analysis shall document the nature of the commercial or industrial facility as well as all interior or exterior facility operations that would generate exterior noise. The analysis shall document the placement of any existing or proposed noise-sensitive land uses situated within the 160-foot distance. The analysis shall determine the potential noise levels that could be received at these sensitive land uses and specify specific measures to August 2017

18 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA be employed by the large scale commercial or industrial facility to ensure that these levels do not exceed 60 dba CNEL at the property line of the adjoining sensitive land use. No development permits or approval of land use applications shall be issued until the acoustic analysis is received and approved by the City Staff There are no schools, churches, or residences located within 160 feet of the Project site. The closest residence to the site is on East Nance Street, approximately 1,120 feet north of the project site. This assessment does evaluate construction and operational noise levels at the closest residence, even though the residence is considerably further than 160 feet from the proposed Project. City of Perris Municipal Code Chapter of the Perris Municipal Code regulates new development including sensitive receptors located near arterials, railroads and the airport. Sensitive receptors refers to types of land uses that are adversely affected by various noise sources. Such land uses are defined in Section of the Municipal Code to include: residences, schools, libraries, hospitals, churches, offices, hotels, motels, and outdoor recreational areas. Factors used to define sensitive receptors include the potential for interference with speech communication, the need for freedom from noise intrusion, the potential for sleep interference, and subjective judgment. Noise impacted projects are defined as residential projects, or portions thereof, which are exposed to an exterior noise level of 60 dba CNEL or greater. Such projects must include noise insulation design and construction assemblies that achieve an exterior-to-interior noise reduction sufficient to keep interior noise levels to a maximum of 45 dba CNEL. The proposed warehouse project does not include residential space or other noise sensitive uses that would be subject to the 60 dba CNEL exterior noise level criterion. Sec Construction noise. It is unlawful for any person between the hours of 7:00 p.m. of any day and 7:00 a.m. of the following day, or on a legal holiday, with the exception of Columbus Day and Washington's birthday, or on Sundays to erect, construct, demolish, excavate, alter or repair any building or structure in such a manner as to create disturbing, excessive or offensive noise. Construction activity shall not exceed 80 dba in residential zones in the city August 2017

19 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA 2.0 EXISTING NOISE CONDITIONS 2.1 Transportation Noise Ambient Noise Monitoring - Roadways In an urban setting, roadways are typically a principal contributor to the ambient noise environment. As such, the evaluation of roadway noise is important in characterizing the overall existing noise conditions for an urban site. The Project site is essentially surrounded by existing roadways with varying levels of traffic. As part of this assessment, attended noise measurements with manual traffic counts were conducted adjacent to North Perris Boulevard, East Markham Street, Redlands Avenue, and Ramona Expressway on or adjacent to the subject property. This measurement program was intended to determine the existing noise levels in the Project vicinity resulting from traffic on these adjacent roadways. The measurements were made using a calibrated Rion Model NL-52 (S.N ) integrating sound level meter equipped with a Type 2551 ½-inch pre-polarized condenser microphone with pre-amplifier. When equipped with this microphone, the sound level meter meets the current American National Standards Institute standard for a Type 1 precision sound level meter. The sound level meter was positioned at a height of approximately five feet above the ground. The noise measurement locations are depicted as ST1, ST2 and ST3 on Figure 4. ST1 was approximately 15 feet from the edge of North Perris Boulevard; ST2 was approximately 25 feet from the edge of East Markham Street; ST3 was approximately 25 feet from the edge of Redlands Avenue; and ST4 was approximately 50 feet from the northern edge of Ramona Expressway. The measured average noise level was 70 dba LEQ at ST1, 50 dba LEQ an ST2, 61 dba LEQ at ST3, and 63 dba LEQ at ST4. Table 3 shows the measured noise levels and concurrent traffic volumes on the four roadways included in the traffic noise measurement program for this report August 2017

20 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Table 3 Measured Average Sound Levels and Traffic Counts Site Description Date/Time L 1 eq Street Cars MT 2 HT 3 Approximately 15 5/10/2017 ST1 ft. edge of 11:35 a.m. to 70 db North Perris Blvd pavement 11:40 a.m ST2 ST2 ST2 Approximately 25 ft. edge of pavement Approximately 25 ft. edge of pavement Approximately 50 ft. edge of pavement 5/10/ :44 a.m. to 11:54 a.m 5/10/ :57 a.m. to 12:17 p.m 5/10/ :22 p.m. to 12:27 p.m 50 db Markham Street db Redlands Avenue db Ramona Expressway Table Notes: General Notes: 1 Equivalent Continuous Sound Level (Time-Average Sound Level) 2 Medium Trucks 3 Heavy Trucks Temperature 60 degrees, overcast, calm wind. Airport Noise According to the City of Perris Noise Element (Exhibit N-3), the Project site is located within the dba CNEL contour associated with March Inland Port. The proposed warehouse project falls into the industrial land use category with respect to noise compatibility. Exterior noise levels up to 80 dba CNEL are considered Conditionally Acceptable for this type of land use. The site plan does not include any outdoor use areas August 2017

21 LEGEND ST# Short Term Measurement Location FIGURE 4 NOISE MEASUREMENT LOCATIONS DUKE PERRIS BOULEVARD WAREHOUSE - NOISE TECHNICAL REPORT

22 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA 3.0 SIGNIFICANCE CRITERIA Based on the criteria identified in Appendix G of the CEQA Guidelines, the proposed project would have a significant impact on noise if it would result in: 1. The exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies. 2. The exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels. 3. A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project. 4. A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project. 3.1 City of Perris Noise Significance Criteria Based on the City of Perris General Plan Noise Element and Noise Ordinance, the proposed project would have a significant impact on noise if it would result in: 1. Generation of noise in excess of 60 dba CNEL at the property line for any existing residential properties in the project vicinity. 2. Between the hours of 7:00 p.m. of any day and 7:00 a.m. of the following day, or on a legal holiday or Sunday, erection, construction, demolition, or excavation. 3.2 Vibration Significance Criteria Impacts related to excessive ground-borne vibration would be significant if the project results in the exposure of persons to or generation of excessive ground-borne vibration equal to or in excess of 0.2 inches/second PPV. Construction activities within 200 feet and pile driving within 600 feet would be potentially disruptive to vibration-sensitive operations (Caltrans 2002) August 2017

23 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA 4.0 IMPACTS AND MITIGATION 4.1 Transportation Noise Exposure Impact Analysis Roadway Noise The primary noise-related effect that most commercial projects produce is a potential for off-site increases in traffic, which is the main source of noise in most urban areas. Acoustical calculations were performed for existing traffic levels (presented in Section 2.1) as traffic is often a major contributor to the ambient or community noise level, and it is helpful therefore to quantify existing traffic related noise levels. Acoustical calculations were performed for the following scenarios: existing; existing plus project; ambient; ambient plus project; ambient plus cumulative; and, ambient plus cumulative plus project, along roadway segments identified in the traffic impact assessment (Webb Associates, 2017) as those which could be affected by implementation of the Project, using standard noise modeling equations adapted from the FHWA noise prediction model. The modeling calculations take into account the posted vehicle speed, average daily traffic volume, and the estimated vehicle mix. The model assumed pavement site propagation conditions. Table 4, Existing and Future Roadway Traffic Noise Levels (CNEL), presents the noise level results for each scenario. Noise levels are indicated at 50 feet from the centerline of each roadway segment. Noise levels at distances greater than 50 feet from the centerline would be lower due to attenuation provided by increased distance from the noise source. Generally, noise from heavily traveled roadways would experience a decrease of approximately 3 dba for every doubling of distance from the roadway. The noise model does not take into account the sound-attenuating effect of intervening structures, barriers, vegetation, or topography. Therefore, the noise levels predicted by the model are conservative. The proposed Project, along with future regional growth and other projects to be developed within the Project vicinity, would result in the addition of vehicle trips that would increase traffic noise. A potentially significant project impact would occur where Project traffic would increase noise levels from below 60 db CNEL to above 60 db CNEL (where noise sensitive land uses exist adjacent to the identified roadway segment) and where Project traffic would increase noise levels from below 70 db CNEL to above 70 db CNEL (for roadway segments within industrial zones). Where roadway noise levels are already above the applicable noise exposure standard (60 db CNEL for residences, 70 db CNEL for industrial), an increase of 3 db CNEL or more is identified as a potentially significant noise impact August 2017

24 August 2017 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Street Segment Existing Existing + Project Table 4 Noise Levels for Vicinity Roadways Under Traffic Assessment Scenarios (dba CNEL at 50 feet from roadway centerline) Difference Existing & Ambient Existing & Ambient + Project Difference Existing, Ambient, Cumulative Existing, Ambient, Cumulative + Project Difference Harley Knox Avenue I-215 S/B Ramps to I-215 N/B Ramps Harley Knox Avenue I-215 N/B Ramps to Patterson Avenue Harley Knox Avenue Patterson Avenue to Indian Avenue Harley Knox Avenue Indian Avenue to Perris Boulevard Harley Knox Avenue Perris Boulevard to Redlands Avenue Markham Street Perris Boulevard to Redlands Avenue Perry Street Perris Boulevard to Redlands Avenue Perris Boulevard Ramona Expressway to Perry Street Perris Boulevard Perry Street to Markham Street Perris Boulevard Markham Street to Harley Knox Avenue Redlands Avenue Harley Knox Avenue to Markham Street Redlands Avenue Markham Street to Perry Street N.A N.A. N.A N.A

25 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA With respect to the traffic noise analysis results presented in Table 4, there are three roadway segments that would go from an existing noise level less than 60 db CNEL to greater than 60 db CNEL with Project added traffic. These segments include Markham Street (Perris Boulevard to Redlands Avenue), and two segments of Redlands Avenue (Harley Knox to Markham Street, Markham Street to Perry Street). However, there are no residences located within 1,000 feet of these roadway segments, and therefore the industrial noise exposure criterion of 70 db CNEL would apply to these segments. Resulting traffic noise levels under each of the analysis scenarios would remain well below 70 db CNEL on these roadway segments, and therefore impacts would be less than significant for these segments. Along Perry Street (from Perris Boulevard to Redlands Avenue), traffic noise levels would increase by 6.9 dba CNEL, comparing the existing condition to the ambient plus cumulative plus project scenario. However, the traffic noise levels would remain below 60 dba CNEL, and there are also no residences within 1,000 feet of this roadway segment. Consequently traffic noise impacts for this segment of Perry Street would be less than significant. Along Harley Knox, from Perris Boulevard to Redlands Avenue, the Project would increase traffic noise by 3.5 db CNEL under the existing plus project scenario. However, there are no noise sensitive land uses within 300 feet of this segment, and the resulting noise level under all analysis scenarios would remain below 70 db CNEL, which is acceptable for industrial land uses. Traffic noise impacts for this segment of Harley Know would therefore be less than significant. For all of the remaining roadway segments identified in Table 4, the Project would contribute substantially less than 3 db CNEL to roadway traffic noise under all analysis scenarios. Consequently, Project impacts on roadway traffic noise would be less than significant Mitigation Measures The Project would not result in a significant traffic noise impact; therefore, no mitigation is required. Significance After Mitigation Mitigation is not required because impacts would be less than significant August 2017

26 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA 4.2 Operations Noise Generation Impact Analysis The implementation of the project would also result in changes to existing noise levels on the project site by developing new stationary sources of noise, including introduction of outdoor heating, ventilation and air conditioning (HVAC) equipment, and vehicle parking lot and truck loading dock activities. These sources may affect noise-sensitive vicinity land uses off the project site. The following analysis evaluates noise from exterior mechanical equipment and activities associated with vehicle parking lots and truck loading docks. Outdoor Mechanical Equipment The proposed warehouse space overall would not be served by heating or air conditioning equipment. However, the floor plan allows for a possible office space at each of the four corners of the building. Dimensions provided for the office areas on the Site Plan indicate the offices would each have floor area of approximately 6,250 square feet. Based on similar size offices in this region, it is anticipated that each office space would be equipped with three 4-ton package HVAC units. For the analysis of noise from HVAC equipment operation, a York Model ZF-048 package HVAC unit was used as a reference. Noise level data provided by the manufacturer was used to determine the noise levels which would be generated by each of the HVAC package units. The York Model ZF-048 package HVAC unit has a sound power rating of 80 dba (Johnson Controls 2015). Based on typical warehouse roof design, it is assumed a minimum 3.5-foot high parapet would extend along the perimeter of the roof. Assuming all the equipment is operating simultaneously for a minimum period of one hour, the worst-case calculated noise level at each property line is presented in Table 5. The calculation was performed at the mid-point of each of the four subject property lines. A second set of calculations was performed for the closest distance between each potential office location, and the adjacent property line. The results of these calculations are also presented in Table 5. Assuming the office areas were occupied from 8 AM to 5 PM, the resulting CNEL value was calculated and is also reported in Table 5. Project-related noise levels from HVAC operation at each of the property lines for the Project would remain well below the 60 dba CNEL recommended for noise-sensitive uses under the City s Noise Element Policy criteria. It should also be noted that noise sensitive uses are not located on any parcel located immediately adjacent to the project site. The noise level calculations are included in Appendix C August 2017

27 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Equipment Table 5 Mechanical Equipment Operation Noise Summary of Results Property Line Noise Level at Property Boundary Average Noise Level (dba Leq) CNEL (1) HVAC South, Mid-Point HVAC South, East Corner HVAC West, Mid-Point HVAC West, South Corner HVAC North, Mid-Point HVAC North, East Corner HVAC East, Mid-Point HVAC East, South Corner Assumes 8 AM to 5 PM operation of A/C unit for office occupancy The results of the mechanical equipment operations noise analysis indicate that the proposed project would comply with the City of Perris Noise Element Policy Criteria. Mechanical equipment operation would result in noise at project site property boundaries that are in each case well below the 60 dba CNEL limit. Parking Lot Activity A comprehensive study of noise levels associated with surface parking lots was published in the Journal of Environmental Engineering and Landscape Management (Volume 12, Issue 2, 2004). The study found that average noise levels during the peak period of use of the parking lot (generally in the morning with arrival of commuters, and in the evening with the departure of commuters), was 47 dba at 1 meter (3 feet) from the outside boundary of the parking lot. Each parking area would function as a point source for noise, which means that noise would attenuate at a rate of 6 dba with each doubling of distance. Given that parking areas are no closer than 12 feet from the property line of the project site, parking lot noise levels would be no greater than 35 dba LEQ at the property lines. These noise levels are similar to the highest noise levels from the HVAC equipment operation August 2017

28 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Even if the parking lot noise levels were to average 35 dba LEQ each hour between 8 AM and 5 PM, the parking lot noise level at the project site property line would not be greater than 31 dba CNEL. Adding together the HVAC noise level (29 dba CNEL as the worst case) and parking lot noise level (31 dba CNEL) would have a logarithmic sum of 34 dba CNEL. This combined level is well below the maximum recommended exterior noise exposure level for even residences (60 dba CNEL), and there are no residences located on any parcel immediately adjacent to the subject property. Refer to Table 6 for a summary of parking lot noise levels at the property boundary. Truck Loading Dock Activity The parking lot study (Journal of Environmental Engineering and Landscape Management (Volume 12, Issue 2, 2004) also examined noise levels associated with cargo truck delivery activity. The study concluded that average noise levels from truck loading/unloading areas was 96 dba at one meter (3 feet) from the boundary of the truck activity area. Truck loading docks are located not closer than 334 feet from the northern property line, and 185 feet from the southern property line. Using the outdoor attenuation rate of 6 dba with each doubling of distance, truck loading activity along the northern property line would produce noise levels of approximately 72 dba LEQ while noise levels along the southern property boundary from truck loading activity would average 75 dba LEQ. Even if the loading dock average noise levels were to occur each hour between 8 AM and 5 PM, the loading dock noise level at the project site property line would range between 68 dba CNEL (northern property boundary) and 71 dba CNEL (southern property boundary). These noise levels would be approximately equivalent to the existing noise level exposure in the vicinity associated with the March Inland Port (the site is within the dba CNEL contour). Also, because truck loading dock noise levels at the property line would be approximately 30 dba CNEL greater than the combined HVAC and vehicle parking lot noise levels (which would be 34 dba CNEL), the truck loading dock noise levels would be the dominant noise source and can be considered by themselves as the operational noise level to characterize the proposed project. This is because the logarithmic sum of sound levels which are greater than 10 dba apart equals the greater (louder) sound level. At the closest off-site residence to the north, truck loading dock noise levels would be attenuated to 42 dba LEQ (38 dba CNEL). At the closest off-site residence to the south, truck loading dock noise levels would be attenuated to 39 dba LEQ (35 dba CNEL). Refer to Table 6 for a summary of operational noise levels from each source, and their combined noise level at the subject property line and closest sensitive receptors August 2017

29 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Property Line Table 6 Combined Operational Noise Levels at Property Boundary (dba CNEL 1 ) HVAC Parking Lot Truck Loading Combined South, Mid-Point South, East Corner West, Mid-Point West, South Corner North, Mid-Point North, East Corner East, Mid-Point East, South Corner Closest Residence - North 38 Closest Residence - South 35 1 Assumes 8 AM to 5 PM operation of A/C units, parking lots, loading docks With respect to the results presented in Table 6, the project would have operational noise levels well below the City exterior noise criterion of 60 dba CNEL at the closest existing residences to the project site. Consequently, operational noise impacts would be less than significant Mitigation Measures The Project would not result in a significant operational noise impact; therefore, no mitigation is required. Significance After Mitigation Mitigation is not required because impacts would be less than significant. 4.3 Construction Noise Construction of the development proposed in the project would generate noise that could expose nearby receptors to elevated noise levels that may disrupt communication and routine activities. The magnitude of the impact would depend on the type of construction activity, equipment, August 2017

30 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA duration of the construction, distance between the noise source and receiver, and intervening structures. This section of the report discusses the noise levels calculated to result from construction of the project, at nearby sensitive receptors (i.e., residences) Construction - Equipment Inventory The California Air Resources Board CalEEMod (California Emissions Evaluation Model) was used to identify the construction equipment anticipated for development of a warehouse project of the proposed size. Based upon a warehouse with total floor area of 1,189,363 square feet, sited on a parcel of approximately 43 acres, CalEEMod (Version: CalEEMod ) identified the following anticipated equipment for each phase of the project construction. Construction Activity Equipment Needed Construction Activity Equipment Needed Construction Activity Equipment Needed Construction Activity Equipment Needed Table 7 Construction Equipment Per Phase Site Preparation (3) Dozer (2) Front End Loader (2) Backhoe Grading (1) Dozer (2) Excavator (2) Front End Loader (1) Grader (2) Scraper Building Construction (1) Crane (3) Backhoe (3) Front End Loader (1) Generator (1) Welder Paving (2) Paver (2) Roller (2) Grader August 2017

31 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Construction Noise Assessment With the noise sources identified above, a noise analysis was performed using a model developed under the auspices of the Federal Highway Administration (FHWA) called the Roadway Construction Noise Model (RCNM) (FHWA 2008). Input variables for RCNM consist of the receiver / land use types, the equipment type (i.e., backhoe, crane, truck, etc.), the number of equipment pieces, the duty cycle for each piece of equipment (i.e., percentage of hours the equipment typically works per day), and the distance from the sensitive noise. The reader is referred to Appendix D for the inputs used in the RCNM model, as well as results. The various construction equipment types and quantities (as described above) were used for this analysis. The RCNM has default duty cycle values for the various pieces of equipment, which were derived from an extensive study of typical construction activity patterns. Those default duty cycle values were utilized for this analysis. Noise-sensitive land uses in the vicinity of the project include a residence to the north (1,120 feet from the project site/construction boundary), mobile home park to the south (1,500 feet from the project site/construction boundary), and a residential neighborhood to the southeast (1,500 feet from the project site/construction boundary). These nearby noise-sensitive land uses are illustrated in Figure 5. The construction noise assessment is focused on noise levels that would occur at the distance of the closest residence (i.e., at 1,120 feet), construction noise levels at greater distances from the site would be less. However, the above distance separation assumption would not be representative of more typical construction noise, because in general the construction activities would not take place either at the nearest or at the farthest portions of the project site, but somewhere in between. Thus, in order to provide information on typical construction noise levels, the distance from the nearest receiver to the project s acoustic center was also analyzed. The acoustic center represents the idealized point from which the energy sum of all construction activity noise, near and far, would be centered. The acoustic center is derived by taking the square root of the product of the nearest and the farthest distances. For this project, the acoustic center was found to be approximately 1,548 feet from the nearest noise sensitive receiver located to the north. Given the overall size of the project site, and the relatively equal distribution of proposed development across the property, noise levels derived from the acoustic center of construction activity would provide a better representation of average noise level exposure across the entire construction process for a given off-site receiver, than using the minimum distance worst-case method August 2017

32 FIGURE 5 NEARBY SENSITIVE RECEPTORS DUKE PERRIS BOULEVARD WAREHOUSE - NOISE TECHNICAL REPORT

33 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Using the provided construction information, the RCNM construction noise model was used to predict noise from on-site construction activities. The results are summarized in Table 8 (see Appendix D for compete results). As shown, the highest noise levels from construction are predicted to range from approximately 57 dba Leq (during Phase 3) to 60 dba Leq (during Phase 2) at the nearest receiver. This maximum noise level is considered to be a peak exposure, applicable not more than 10-15% of the total construction period, only while the construction activity is taking place along the northern property boundary (i.e., closest to the nearest off-site receiver). The average construction noise levels (for construction taking place at a range of locations on-site and modeled at the acoustical center for analysis purposes) range from approximately 54 dba LEQ (during Phase 3) to approximately 57 dba LEQ (during Phase 2), and are also shown in Table 8. The average noise levels (based upon the acoustic center) are considered a better representation of the overall noise exposure experience for adjacent receivers over the duration of each construction phase. Table 8 presents the summary results of the construction noise analysis. Table 8 Construction Noise Summary of Results (dba LEQ) Receiver Location/ Description Land Use Construction Noise Level (dba Leq) by Construction Phase Phase 1: Site Preparation Phase 2: Grading Phase 3: Building Construction Phase 4: Paving Nearest Receivers / Construction at Nearest Property Boundary (1120') Nearest Receivers /Construction at Acoustic Center (1548') Residential Residential August 2017

34 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Table 9 shows the construction noise analysis results in terms of the Community Noise Equivalent Level (CNEL), the 24-hour weighted average noise level. It was assumed for the purposes of this calculation that construction would occur over a typical 8-hour workday. In terms of CNEL, the worst-case noise levels based upon the minimum separation distance from construction activities to off-site receivers are predicted to range from approximately 53 dba CNEL (during Phase 3) to 56 dba CNEL (during Phase 2) at the nearest residential receiver. The average constructionrelated noise levels (for construction taking place at a range of locations on-site and modeled at the acoustical center for analysis purposes) range from approximately 50 dba CNEL (during Phase 3) to approximately 53 dba CNEL (during Phase 2), and are also shown in Table 9. Table 9 On-Site Construction Noise Summary of Results (dba CNEL) Construction Noise Level (dba Leq) by Construction Phase Receiver Location/ Description Land Use Phase 1: Site Preparation Phase 2: Grading Phase 3: Building Construction Phase 4: Paving Nearest Receivers / Construction at Nearest Property Boundary (1120') Nearest Receivers /Construction at Acoustic Center (1548') Residential Residential The project would be required to comply with the Perris noise ordinance (Chapter of the Perris Municipal Code, Sec Construction noise) by adhering to the following construction schedule: August 2017

35 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA Construction activity for site preparation and for future development shall be consistent with City Noise Ordinance requirements, which limits construction activities to the hours between 7:00 AM and 7:00 PM, Monday through Saturday. Average noise levels from construction activities may be mildly annoying at times, but restricting construction activities to the daytime period will avoid disruption of evening time relaxation and overnight sleep periods. While the 60 dba CNEL restriction for exterior noise exposure is not intended to apply to construction activities, the construction process as restricted by City ordinance would result in average construction noise levels at adjacent residential property lines that comply with the 60 dba CNEL operational (permanent) exterior noise limit Mitigation Measures The project is required to comply with the City of Perris construction noise ordinance. With adherence to the Ordinance the project would not result in a significant construction-related noise impact; therefore, no mitigation is required. Significance After Mitigation Mitigation is not required because impacts would be less than significant. 4.4 Ground-borne Vibration Impact Analysis The main concern associated with ground-borne vibration is annoyance; however, in extreme cases, vibration can cause damage to buildings, particularly those that are old or otherwise fragile. Some common sources of ground-borne vibration are trains, and construction activities such as blasting, pile-driving, and heavy earth-moving equipment. The primary source of ground-borne vibration occurring as part of the project is construction activity. According to Caltrans, the highest measured vibration level during highway construction was 2.88 inches/second PPV at 10 feet from a pavement breaker. Other typical construction activities and equipment, such as D-8 and D-9 Caterpillars, earthmovers, and trucks have not exceeded 0.10 inches/second PPV at 10 feet. Vibration sensitive instruments and operations may require special consideration during construction. Vibration criteria for sensitive equipment and operations are not defined and are often case-specific. As a guide, major construction activity within 200 feet and pile driving within 600 feet may be potentially disruptive to sensitive operations (Caltrans 2002). No pile driving is anticipated to be necessary for project development August 2017

36 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA The construction activities on the project site would have virtually no potential to expose vicinity off-site residences to ground-borne vibration, because construction activities would not take place within 200 feet of any existing off-site residence. Ground vibrations from construction activities do not often reach the levels that can damage structures or affect activities that are not vibrationsensitive, although the vibrations may be felt by nearby persons in close proximity and result in annoyance (FTA 2006). In addition, the construction activity would not include blasting or pile driving, and would, therefore, not result in a significant impact from ground-borne vibration Mitigation Measures The project would not result in a significant ground-borne vibration impact; therefore, no mitigation is required. Significance After Mitigation Mitigation is not required because impacts would be less than significant August 2017

37 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA INTENTIONALLY LEFT BLANK August 2017

38 Noise Assessment Technical Report for the Duke Perris Boulevard Warehouse Project, Perris CA 5.0 REFERENCES Caltrans California Vehicle Noise Emission Levels. Report No. FHWA/CA/TL-87/03. January CA%20Vehicle%20Noise%20Emission%20Levels.pdf. Caltrans Technical Noise Supplement A Technical Supplement to the Traffic Noise Analysis Protocol. California Department of Transportation; Environmental Program; Environmental Engineering; Noise, Air Quality, and Hazardous Waste Management Office. October Technical%20Noise%20Supplement.pdf. Caltrans Transportation-Related Earthborne Vibrations. Report No. TAV R9201. California Department of Transportation; Environmental Program; Environmental Engineering; Noise, Air Quality, and Hazardous Waste Management Office. February 20, TRANSPORTATION%20RELATED%20EARTHBORNE%20VIBRATIONS.pdf. City of Perris General Plan Noise Element. Amended August 30, EPA (Environmental Protection Agency) Noise from Construction Equipment and Operations, Building Equipment and Home Appliances. Prepared by Bolt, Beranek & Newman, Boston, Massachusetts. Washington, D.C.: EPA. FHWA (Federal Highway Administration) FHWA, Roadway Construction Noise Model (RCNM) (2008). FTA (Federal Transit Administration) Transit Noise & Vibration Impact Assessment. Federal Transit Administration, Office of Planning and Environment. May Johnson Controls York Technical Guide, YTG-Y Pranas Baltrënas, Dainius Kazlauskas & Egidijus Petraitis (2004) Testing on noise levels prevailing at motor vehicle parking lots and numeral simulation of its dispersion, Journal of Environmental Engineering and Landscape Management, 12:2, Transportation Research Board Webb Associates (2017) Traffic Impact Analysis Report for DPR High-Cube Warehouse in the City of Perris, CA August 2017

39 APPENDIX A Ambient Noise Measurement Data

40 Field Noise Measurement Data Project Name Duke Perris Project # 9279 Observer(s) Connor Burke Date auto cburke@dudek.com Record: 509 Meteorological Conditions Temp (F) 60 Humidity % (R.H.) 69 Wind Calm Wind Speed (MPH) 2 Wind Direction East Sky Overcast Instrument Name List (ENC) Rion NL-52 Instrument Name (ENC) Rion NL-52 Instrument Name Lookup Key (ENC) Rion NL-52 Manufacturer Rion Model NL-52 Serial Number Calibrator Name (ENC) LD CAL150 Calibrator Name (ENC) LD CAL150 Calibrator Name Lookup Key (ENC) LD CAL150 Calibrator Manufacturer Larson Davis Calibrator Model LD CAL150 Calibrator Serial # 5152 Pre-Test (dba SPL) 94 Post-Test (dba SPL) 94 Windscreen Yes Weighting? A-WTD Slow/Fast? Slow ANSI? Yes Instrument and Calibrator Information Recordings Record # 1 Site ID ST1 Site Location Latitude: , Longitude: , Altitude: , Speed: , Horizontal Accuracy: , Vertical Accuracy: , Time:11:35:02 AM PDT Begin (Time) 11:35:00 End (Time) 11:40:00 Leq 70 Lmax 81.6 Lmin 44.8 Other Lx? L90, L50, L10 L L L Primary Noise Source Traffic Page 1/7

41 Other Noise Sources (Background) Is the same instrument and calibrator being used as previously notated? Are the meteorological conditions the same as previously notated? Distant Aircraft Yes Yes Distance to Roadway (feet) 15 Distance to Roadway - Centerline/Edge of Edge of Pavement Pavement Estimated Vehicle Speed (MPH) 45 Count Duration (Min) 5 Source Info and Traffic Counts Counting Both Directions? Yes Autos 1 Number of Vehicles - Autos 100 Medium Trucks 1 Number of Vehicles - Medium Trucks 4 Heavy Trucks 1 Number of Vehicles - Heavy Trucks 2 Buses 1 Number of Vehicles - Buses 1 Traffic Counts Description / Photos Photo Site Photos Comments / Description Facing west towards Perris Page 2/7

42 Recordings Record # 2 Site ID ST2 Site Location Latitude: , Longitude: , Altitude: , Speed: , Horizontal Accuracy: , Vertical Accuracy: , Time:11:44:01 AM PDT Begin (Time) 11:44:00 End (Time) 11:54:00 Leq 50.2 Lmax 67.4 Lmin 38.8 Other Lx? L90, L50, L10 L L L Other (Specify Metric) Primary Noise Source Other Primary Noise Source Other Distant traffic Other Noise Sources (Background) Birds, Distant Aircraft, Distant Traffic Other Noise Sources Additional Description Four small sedans. Is the same instrument and calibrator being used Yes as previously notated? Are the meteorological conditions the same as Yes previously notated? Distance to Roadway (feet) 25 Distance to Roadway - Centerline/Edge of Edge of Pavement Pavement Estimated Vehicle Speed (MPH) 35 Count Duration (Min) 10 Source Info and Traffic Counts Counting Both Directions? Yes Autos 1 Number of Vehicles - Autos 4 Traffic Counts Description / Photos Page 3/7

43 Photo Site Photos Comments / Description Facing north towards Markham Recordings Record # 3 Site ID ST3 Site Location Latitude: , Longitude: , Altitude: , Speed: , Horizontal Accuracy: , Vertical Accuracy: , Time:11:57:03 AM PDT Begin (Time) 11:57:00 End (Time) 12:17:00 Leq 61 Lmax 83.2 Lmin 34.8 Other Lx? L90, L50, L10 L L L Primary Noise Source Other Primary Noise Source Other Traffic Other Noise Sources (Background) Birds, Distant Aircraft, Distant Conversations / Yelling, Distant Traffic Other Noise Sources Additional Description Backup alarm. Is the same instrument and calibrator being used Yes as previously notated? Are the meteorological conditions the same as Yes previously notated? Page 4/7

44 Distance to Roadway (feet) 25 Distance to Roadway - Centerline/Edge of Edge of Pavement Pavement Estimated Vehicle Speed (MPH) 40 Count Duration (Min) 20 Source Info and Traffic Counts Counting Both Directions? Yes Autos 1 Number of Vehicles - Autos 96 Medium Trucks 1 Number of Vehicles - Medium Trucks 2 Heavy Trucks 1 Number of Vehicles - Heavy Trucks 3 Traffic Counts Description / Photos Photo Site Photos Comments / Description Facing east. Page 5/7

45 Recordings Record # 4 Site ID ST4 Site Location Latitude: , Longitude: , Altitude: , Speed: , Horizontal Accuracy: , Vertical Accuracy: , Time:12:22:12 PM PDT Begin (Time) 12:22:00 End (Time) 12:27:00 Leq 62.8 Lmax 73 Lmin 51.9 Other Lx? L90, L50, L10 L L L Primary Noise Source Traffic Other Noise Sources (Background) Distant Aircraft, Distant Conversations / Yelling, Distant Traffic, Rustling Leaves Is the same instrument and calibrator being used Yes as previously notated? Are the meteorological conditions the same as Yes previously notated? Distance to Roadway (feet) 50 Distance to Roadway - Centerline/Edge of Edge of Pavement Pavement Estimated Vehicle Speed (MPH) 45 Count Duration (Min) 5 Source Info and Traffic Counts Counting Both Directions? Yes Autos 1 Number of Vehicles - Autos 170 Medium Trucks 1 Number of Vehicles - Medium Trucks 4 Heavy Trucks 1 Number of Vehicles - Heavy Trucks 5 Motorcyles 1 Number of Vehicles - Motorcyles 2 Traffic Counts Description / Photos Page 6/7

46 Powered by TCPDF ( Photo Site Photos Comments / Description Facing south towards Ramona Expressway Page 7/7

REVISED NOISE ASSESSMENT TECHNICAL REPORT for the Duke Patterson Avenue Warehouse Project Perris, California

REVISED NOISE ASSESSMENT TECHNICAL REPORT for the Duke Patterson Avenue Warehouse Project Perris, California REVISED NOISE ASSESSMENT TECHNICAL REPORT for the Duke Patterson Avenue Warehouse Project Perris, California Prepared for: Albert A. Webb Associates 3788 McCray Street Riverside, CA 92506 Prepared by:

More information

Appendix I Noise Background and Modeling Data

Appendix I Noise Background and Modeling Data SERRANO II RESIDENTIAL PROJECT REVISED INITIAL STUDY/MITIGATED NEGATIVE DECLARATION CITY OF CLAREMONT Appendix Appendix I Noise Background and Modeling Data March 2015 SERRANO II RESIDENTIAL PROJECT REVISED

More information

Definitions of Acoustical Terms

Definitions of Acoustical Terms Appendix E Noise Definitions of Acoustical Terms Sound Measurements Decibel (db) A Weighted Decibel (dba) Maximum Sound Level (Lmax) Minimum Sound Level (Lmin) Equivalent Sound Level (Leq) Percentile

More information

Lower River Floodplain Restoration and Levee/Towne Road Re-Alignment Noise Analysis

Lower River Floodplain Restoration and Levee/Towne Road Re-Alignment Noise Analysis Lower River Floodplain Restoration and Levee/Towne Road Re-Alignment Noise Analysis This project is not anticipated to create additional noise beyond the current background levels. Although Towne Road

More information

Lincoln 40 Residential

Lincoln 40 Residential Lincoln 40 Residential City of Davis, California March 15, 2017 jcb Project # 2016-180 Prepared for: Attn: Nick Pappani 1501 Sports Drive Sacramento, CA 95834 Prepared by: j.c. brennan & associates, Inc.

More information

Appendix C Noise and Vibration Worksheets

Appendix C Noise and Vibration Worksheets PUBLIC WORKS BUREAU OF ENGINEERING Appendix C Noise and Vibration Worksheets Central Outfall Sewer at 59 th Street Page C-1 CEQA Initial Study and 4 th Avenue Project January 2012 Receptor Noise Level

More information

OPERATIONS NOISE STUDY FOR A PROPOSED AUTOMATIC CAR WASH IN THE SHERMAN OAKS DISTRICT OF LOS ANGELES

OPERATIONS NOISE STUDY FOR A PROPOSED AUTOMATIC CAR WASH IN THE SHERMAN OAKS DISTRICT OF LOS ANGELES OPERATIONS NOISE STUDY FOR A PROPOSED AUTOMATIC CAR WASH IN THE SHERMAN OAKS DISTRICT OF LOS ANGELES October 12, 2017 PREPARED FOR: Ms. Chantly Banayan 4822 Van Nuys Blvd. Sherman Oaks, CA 91403 PREPARED

More information

Construction Noise Memorandum

Construction Noise Memorandum Construction Noise Memorandum To: Ms. Paula Daneluk Date: June 13, 2013 Development Impact 9370 Studio Court, Suite 160 Elk Grove, CA 95758 From: Paul Bollard Bollard Acoustical Consultants, Inc. 3551

More information

Silverado Village Project

Silverado Village Project Environmental Noise Assessment Silverado Village Project Elk Grove, California BAC Job # 2011-053 Prepared For: Vintara Holdings, LLC Attn: Mr. Paul Eblen 140 Diamond Creek Place Roseville, CA 95747 Prepared

More information

Appendix D. Noise Calculations

Appendix D. Noise Calculations Appendix D Noise Calculations Summary of Boating Activity Changes Associated with each Alternative Peak Day Boating Trips Structure Existing With Alt increase with alt 2 increase with alt 3 increase with

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

APPENDIX E. Noise Data and Environmental Noise Assessment

APPENDIX E. Noise Data and Environmental Noise Assessment APPENDIX E Noise Data and Environmental Noise Assessment Environmental Noise Assessment Rocklin Crossings Retail Center Rocklin, California BAC Job # 2006-004 Prepared For: Rocklin Crossings, LLC. Attn:

More information

Noise. Noise Fundamentals. Noise Descriptors. City of Redlands - Redlands Crossing Center

Noise. Noise Fundamentals. Noise Descriptors. City of Redlands - Redlands Crossing Center 3.11-3.11.1 - Introduction This section describes the existing noise setting and potential noise related effects from implementation on the site and its surrounding area. Section 15125 of the State CEQA

More information

Report Addendum. Terry Keller, SDDOT. Noise Study Technical Report I-29 from Tea Interchange to Skunk Creek Sioux Falls, South Dakota

Report Addendum. Terry Keller, SDDOT. Noise Study Technical Report I-29 from Tea Interchange to Skunk Creek Sioux Falls, South Dakota Report Addendum To: Terry Keller, SDDOT From: HDR Project: Noise Study Technical Report I-29 from Tea Interchange to Skunk Creek Sioux Falls, South Dakota cc: file Date: May 28, 2010; rev July 16, July

More information

PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA

PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA Assessment of Helicopter Noise A report Prepared on behalf of: JamCo Constructions Pty Ltd PO Box 631 Yarraville Victoria 3013 Ref: 11573-3jg March 2015

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

NOISE AND VIBRATION TECHNICAL REPORT

NOISE AND VIBRATION TECHNICAL REPORT NOISE AND VIBRATION TECHNICAL REPORT For the Proposed Culver City, CA Prepared for: Platform Hayden Tract III, LLC 9900 Culver Boulevard, 1A Culver City, CA 90232 Prepared by: 233 Wilshire Boulevard, Suite

More information

Mississauga Bus Rapid Transit Preliminary Design Project

Mississauga Bus Rapid Transit Preliminary Design Project Mississauga Bus Rapid Transit Preliminary Design Project PUBLIC INFORMATION CENTRE OCTOBER 2008 WELCOME The Mississauga Bus Rapid Transit (BRT) Project Thank you for attending this Public Information Centre.

More information

NOISE IMPACT ANALYSIS BALL ROAD BASIN GENERAL PLAN AMENDMENT AND ZONE CHANGE PROJECT

NOISE IMPACT ANALYSIS BALL ROAD BASIN GENERAL PLAN AMENDMENT AND ZONE CHANGE PROJECT NOISE IMPACT ANALYSIS BALL ROAD BASIN GENERAL PLAN AMENDMENT AND ZONE CHANGE PROJECT CITY OF ANAHEIM LEAD AGENCY: CITY OF ANAHEIM PREPARED BY: VISTA ENVIRONMENTAL 1021 DIDRIKSON WAY LAGUNA BEACH, CALIFORNIA

More information

Attachment E3 Vibration Technical Memorandum

Attachment E3 Vibration Technical Memorandum Attachment E3 Technical Memorandum 77 South Bedford Street Burlington, MA 01803 T 781.229.0707 F 781.229.7939 E jross@hmmh.com W www.hmmh.com TECHNICAL MEMORANDUM To: Alisa Swank, CH2M HILL Jodi Ketelsen,

More information

East Area 1 Specific Plan Noise Study

East Area 1 Specific Plan Noise Study speeds, roadway geometry, and site conditions. Average vehicle noise rates (energy rates) utilized in the Federal Highway Administration Highway Noise Prediction Model have been modified to reflect average

More information

FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT. itrans Consulting Inc 100 York Boulevard Richmond Hill, Ontario L4B 1J8

FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT. itrans Consulting Inc 100 York Boulevard Richmond Hill, Ontario L4B 1J8 FINAL REPORT FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT Project Number: #W08-5107A August 28, 2008 SUBMITTED TO: Tara Erwin itrans Consulting Inc 100 York Boulevard Richmond Hill,

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

APPENDIX D NOISE IMPACT ASSESSMENT

APPENDIX D NOISE IMPACT ASSESSMENT APPENDIX D NOISE IMPACT ASSESSMENT AURORA ACOUSTICAL CONSULTANTS Inc. 745 Warren Drive East Aurora, New York 14052 716-655-2200 info@auroraacoustical.com NOISE IMPACT ASSESSMENT OF NIGHTTIME PARKING LOT

More information

1. Introduction and Principal Conclusions

1. Introduction and Principal Conclusions III.L 1. Introduction and Principal Conclusions Based upon the analysis conducted, the project does not exceed any of the threshold limits established in the Town Code. Therefore, the project has no significant

More information

5.5 NOISE EXISTING REGULATORY SETTING STATE OF CALIFORNIA GUIDELINES. California Government Code CITY OF EL SEGUNDO. El Segundo General Plan

5.5 NOISE EXISTING REGULATORY SETTING STATE OF CALIFORNIA GUIDELINES. California Government Code CITY OF EL SEGUNDO. El Segundo General Plan 5.5 Noise 5.5 NOISE The purpose of this section is to evaluate noise source impacts to on-site and surrounding land uses as a result of Project implementation. This section evaluates short-term constructionrelated

More information

1.1 Purpose of This Environmental Impact Report EIR Process Use of This Report Report Organization...

1.1 Purpose of This Environmental Impact Report EIR Process Use of This Report Report Organization... Table of Contents SUMMARY PAGE S.1 Project Location and Project Characteristics... S-1 S.2 Project Objectives... S-9 S.3 Project Approvals... S-11 S.4 Impacts and Mitigation Measures... S-12 S.5 Alternatives...

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

APPENDIX I Noise Technical Report

APPENDIX I Noise Technical Report APPENDIX I Noise Technical Report ACOUSTICAL ASSESSMENT REPORT for the Prepared for: South Baltimore, LLC Prepared by: 605 Third Street Encinitas, California 92024 NOVEMBER 2013 Printed on 30% post-consumer

More information

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices ASSESSMENT

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices ASSESSMENT ABERDEEN HARBOUR EXPANSION PROJECT November 2015 Volume 3: Technical Appendices Appendix 20-C CONSTRUCTION NOISE ASSESSMENT 20-C CONSTRUCTION NOISE ASSESSMENT 20-C.1 CONSTRUCTION NOISE ASSESSMENT The

More information

December Wilmington School & Residence Sound Attenuation Program. Report #3: Noise Contour Development Methodology Report

December Wilmington School & Residence Sound Attenuation Program. Report #3: Noise Contour Development Methodology Report December 2013 Wilmington School & Residence Sound Attenuation Program Report #3: Noise Contour Development Methodology Report Wilmington School & Residence Sound Attenuation Program Report #3: Noise

More information

ORDINANCE CONCERNING NOISE LEVELS IN UNINCORPORATED LARIMER COUNTY. Ordinance No

ORDINANCE CONCERNING NOISE LEVELS IN UNINCORPORATED LARIMER COUNTY. Ordinance No ORDINANCE CONCERNING NOISE LEVELS IN UNINCORPORATED LARIMER COUNTY Ordinance No. 97-03 BE IT ORDAINED by the Board of County Commissioners of Larimer County: Section 1. Purpose: The Board of County Commissioners

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

11 October 12, 2011 Public Hearing APPLICANT:

11 October 12, 2011 Public Hearing APPLICANT: 11 October 12, 2011 Public Hearing APPLICANT: CARING TRANSITIONS PROPERTY OWNER: HARDEE REALTY CORPORATION REQUEST: Conditional Use Permit (motor vehicle rental) STAFF PLANNER: Leslie Bonilla ADDRESS /

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Red Wing US 63 Bridge and Approach Roadways

Red Wing US 63 Bridge and Approach Roadways Traffic Noise Analysis Report Red Wing US 63 Bridge and Approach Roadways TH 63 over the Mississippi River Red Wing, MN MN State Project Number: 2515-21 WI Project ID Number: 7210-00-06 June 2015 Red Wing

More information

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject:

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject: MEMORANDUM Date: August 12, 2014 TG: 13329.01 To: From: Subject: Jeremy Krout EPD Solutions Inc. Rafik Albert EPD Solutions Inc. Rawad Hani Transpo Group AP North Lake Solar Project Traffic Scoping The

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

Noise and Vibration Analysis Technical Report (Final)

Noise and Vibration Analysis Technical Report (Final) Noise and Vibration Analysis Technical Report (Final) for the Denver West Corridor Light Rail Transit Project Final Design Assessment Prepared by: KM Chng Environmental Inc. June 25, 2007 (Rev. 5a) TABLE

More information

Illinois Route 60/83 Widening and Reconstruction IL Route 176 to IL Route 60 P Traffic Noise Analysis Technical Report FINAL

Illinois Route 60/83 Widening and Reconstruction IL Route 176 to IL Route 60 P Traffic Noise Analysis Technical Report FINAL Illinois Route 60/83 Widening and Reconstruction IL Route 176 to IL Route 60 P-91-084-97 Traffic Noise Analysis Technical Report FINAL August 2017 Prepared for Prepared by IL Route 60/83 IL 176 to IL 60

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

THE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection

THE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection THE UNIVERSITY OF HONG KONG LIBRARIES Hong Kong Collection TECHNICAL MEMORANDUM ON NOISE FROM PERCUSSIVE PILING Environmental Protection Department Noise Control Authority This Technical Memorandum, originally

More information

14 NOISE ELEMENT. A. Background

14 NOISE ELEMENT. A. Background 14 The purpose of the Noise Element is to identify and evaluate noise generation in the City of Chino in order to minimize problems from intrusive sound and to ensure that development does not expose people

More information

CHAPTER 40A NOISE CONTROL

CHAPTER 40A NOISE CONTROL 40A.01 Purpose 40A.05 Noise Disturbance Prohibited 40A.02 Definitions 40A.06 Vehicle Noise 40A.03 Measurement of Noise and Sound 40A.07 Permits 40A.04 Test Measurement and Requirements for 40A.08 Exemptions

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

APPENDIX VMT Evaluation

APPENDIX VMT Evaluation APPENDIX 2.7-2 VMT Evaluation MEMORANDUM To: From: Mr. Jonathan Frankel New Urban West, Incorporated Chris Mendiara LLG, Engineers Date: May 19, 2017 LLG Ref: 3-16-2614 Subject: Villages VMT Evaluation

More information

NOISE ANALYSIS TECHNICAL REPORT. Route 58 Martin Luther King Freeway. Portsmouth Virginia

NOISE ANALYSIS TECHNICAL REPORT. Route 58 Martin Luther King Freeway. Portsmouth Virginia NOISE ANALYSIS TECHNICAL REPORT Route 58 Martin Luther King Freeway Portsmouth Virginia May 2008 Prepared for: Virginia Department of Transportation NOISE ANALYSIS TECHNICAL REPORT Route 58 Martin Luther

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Environmental Noise Assessment Stonebridge Golf & Country Club Maintenance Facility. Nepean, Ontario

Environmental Noise Assessment Stonebridge Golf & Country Club Maintenance Facility. Nepean, Ontario Environmental Noise Assessment Stonebridge Golf & Country Club Maintenance Facility Nepean, Ontario REPORT: GmE 09-042-Noise Prepared For: Rob Pierce 3584 Jockvale Road Nepean, Ontario K2C 3H2 Prepared

More information

Purpose: General Provisions:

Purpose: General Provisions: 10-19-1 Purpose: The purpose of off-street parking requirements is to promote traffic/pedestrian safety and efficiency and to minimize hard surfaced areas to reduce storm water run-off and visual impacts

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Appendix 6-E: Baseline Sound Study and Environmental Sound Evaluation

Appendix 6-E: Baseline Sound Study and Environmental Sound Evaluation Draft Environmental Impact Statement Cricket Valley Energy Project Dover, NY Appendix 6-E: Baseline Sound Study and Environmental Sound Evaluation CAVANAUGH TOCCI ASSOCIATES, INCORPORATED 327 F BOSTON

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

Mr. John Aitken June 6, 2017 Page 2

Mr. John Aitken June 6, 2017 Page 2 Mr. John Aitken June 6, 2017 Page 2 quarterly period of 2016. Fluctuations in noise exposure from reporting period to reporting period are to be expected due to ongoing changes in aircraft activity levels,

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

STAFF REPORT # CHANGE OF ZONING

STAFF REPORT # CHANGE OF ZONING STAFF REPORT #17-2000-0007 CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application

More information

Re: Amend Sections and File No ZA Marcus Lotson, Development Services Planner

Re: Amend Sections and File No ZA Marcus Lotson, Development Services Planner Page 1 To: From: The Planning Commission MPC Staff Date: April 5, 2016 Subject: Re: Amend Sections 8-3082 and 8-3090 Marcus Lotson, Development Services Planner Issue: Proposed amendments to the zoning

More information

Federal Railroad Administration, DOT CFR section Description Guideline PART 179

Federal Railroad Administration, DOT CFR section Description Guideline PART 179 Federal Railroad Administration, DOT 210.3 PENALTY ASSESSMENT GUIDELINES Continued 49 CFR section Description Guideline PART 179 179.1(e)... Tank car not constructed according to specifications also cite

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

City of Pacific Grove

City of Pacific Grove Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency

More information

inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE

inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE Copyright SFA - InterNoise 2000 1 inter.noise 2000 The 29th International Congress Exhibition on Noise Control Engineering 27-30 August 2000, Nice, FRANCE I-INCE Classification: 0.2 ITALIAN LEGISLATION

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

Appendix J. Noise Impact Assessment Report

Appendix J. Noise Impact Assessment Report Appendix J Noise Impact Assessment Report Appendix J Sheridan Park Drive Extension Municipal Class Environmental Assessment Noise Impact Assessment Report City of Mississauga R.J. Burnside & Associates

More information

ARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.02 OFF STREET PARKING AND LOADING SPACE REQUIREMENTS

ARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.02 OFF STREET PARKING AND LOADING SPACE REQUIREMENTS ARTICLE 7 OFF-STREET PARKING AND LOADING/UNLOADING 7.01 STORAGE IN FRONT YARD Nothing in this Ordinance shall permit the storage or parking of any vehicle or non-permanent structure within the required

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS

SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS City of Panama City, Florida Public Works Department 9 Harrison Avenue Panama City, Florida 32401 Phone: (850) 872-3015 Effective 1/22/08 Table of

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Applicable California Vehicle Code Sections, 2015 Edition

Applicable California Vehicle Code Sections, 2015 Edition Applicable California Vehicle Code Sections, 2015 Edition Speed limits in California are governed by the California Vehicle Code (CVC), Sections 22348 through 22413; also, pertinent sections are found

More information

Construction Staging Area 4 Avenue Road

Construction Staging Area 4 Avenue Road REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

Ch. 157 ESTABLISHED SOUND LEVELS CHAPTER 157. ESTABLISHED SOUND LEVELS

Ch. 157 ESTABLISHED SOUND LEVELS CHAPTER 157. ESTABLISHED SOUND LEVELS Ch. 157 ESTABLISHED SOUND LEVELS 67 157.1 CHAPTER 157. ESTABLISHED SOUND LEVELS Subchap. A. GENERAL PROVISIONS... 157.1 B. NOISE LIMITS... 157.11 C. ADMINISTRATIVE PROVISIONS... 157.21 D. INSTRUMENTATION...

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

Operations Center FAQs

Operations Center FAQs RICHARDSON INDEPENDENT SCHOOL DISTRICT Where all students learn, grow and succeed Operations Center FAQs Richardson ISD is constructing an operations center on vacant district land between Greenville Avenue

More information

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

EXECUTIVE SUMMARY. Introduction

EXECUTIVE SUMMARY. Introduction EXECUTIVE SUMMARY Introduction The purpose of this study is to ensure that the Village, in cooperation and coordination with the Downtown Management Corporation (DMC), is using best practices as they plan

More information

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: November 7, 2016

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: November 7, 2016 # 2 HOLDOVER Revised ZON2016-01992 BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: November 7, 2016 CASE NUMBER 6065 APPLICANT NAME LOCATION VARIANCE REQUEST ZONING ORDINANCE REQUIREMENT ZONING AREA OF PROPERTY

More information

Noise Impact Assessment

Noise Impact Assessment Noise Impact Assessment Deer Creek Energy Limited Joslyn North Mine Prepared For Millennium EMS Solutions Prepared By Mr. James Farquharson, CET Mr. Clifford Faszer, P. Eng. Faszer Farquharson & Associates

More information

Appendix H: Noise. City of Redlands - Redlands Crossing Center Draft EIR

Appendix H: Noise. City of Redlands - Redlands Crossing Center Draft EIR City of Redlands - Redlands Crossing Center Draft EIR Appendix H: Noise Michael Brandman Associates H:\Client (PN-JN)\0629\06290016\EIR\06290016 Sec99-00 Appendices Title TOC Dividers.doc City of Redlands

More information

Noise and Vibration Assessment

Noise and Vibration Assessment CITY OF MODESTO GENERAL PLAN UPDATE Noise and Vibration Assessment Modesto, California May 18, 2017 Prepared for: Mr. Jerry Haag Jerry Haag Urban Planner 2029 University Berkeley, CA 94704 Prepared by:

More information

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE

More information

8.6 NOISE Environmental Consequences

8.6 NOISE Environmental Consequences 8.6 NOISE 8.6.1 Affected Environment Limited noise data are available for PTA. The dominant noise sources at PTA include military aircraft (mostly helicopters), military vehicle traffic, and ordnance use

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Cotton Belt Corridor Regional Rail

Cotton Belt Corridor Regional Rail Cotton Belt Corridor Regional Rail Noise and Vibration Test Program for the DCTA Stadler DMU April 14, 14 Final Version Prepared by Harris Miller Miller & Hanson Inc. Prepared for Dallas Area Rapid Transit

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

10 May 14, 2014 Public Hearing

10 May 14, 2014 Public Hearing 10 May 14, 2014 Public Hearing APPLICANT: PROPERTY OWNER: AEGEAN ASSOCIATES CUP-Truck and Trailer Rentals STAFF PLANNER: Kristine Gay REQUEST: Conditional Use Permit for Truck and Trailer Rentals ADDRESS

More information

Appendix D Noise Data

Appendix D Noise Data Appendix D Noise Data Construction Noise Summary Lmax (dba) at Various Leq (dba) at Various Construction Phase 50 100 200 400 800 1,600 3,200 6,400 50 100 200 400 800 1,600 3,200 6,400 Phase 1 Decommissioning

More information

Eastside Transit Corridor Phase 2 Draft Environmental Impact Statement/ Environmental Impact Report APPENDIX T

Eastside Transit Corridor Phase 2 Draft Environmental Impact Statement/ Environmental Impact Report APPENDIX T Draft Environmental Impact Statement/ Environmental Impact Report APPENDIX T NOISE AND VIBRATION TECHNICAL MEMORANDUM State Clearinghouse Number: 2010011062 Noise and Vibration Technical Memorandum December

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Act 229 Evaluation Report

Act 229 Evaluation Report R22-1 W21-19 W21-20 Act 229 Evaluation Report Prepared for Prepared by Table of Contents 1. Documentation Page 3 2. Executive Summary 4 2.1. Purpose 4 2.2. Evaluation Results 4 3. Background 4 4. Approach

More information

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy A. GENERAL Speed humps are an effective and appropriate device for safely reducing vehicle speeds on certain types of streets when installed accordance with the provisions of this policy. In order for

More information

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information