1 Ohio Canal Interceptor Tunnel OCIT-2 Site OCITConstruction Update Public Meeting November 6, :00 pm November 6, 2014 Agenda OCIT Project Overview Purpose Noise Basics Noise Mitigation Measures Vibration & Blasting Basics Vibration Mitigation Measures Other Construction Impacts & Mitigation Measures Contracting Basics Site Specifics Page 2 1

2 OCIT Projects Overview Page 3 Purpose Proactive To Minimize Impacts to Community Impacts Noise Vibration Traffic, Road Detours, Towpath Trail Detours Dust Lighting How we Minimize Control Potential Impacts by Specification Require Special Mitigation Page 4 2

3 Purpose Ensure Compliance with Regulations and Best Practices City, State, Federal Consider lessons learned and successful practices on recent projects Page 5 Noise Basics Sound: Vibrations transmitted through a solid, liquid or gas, capable of being detected by human hearing. Decibel measurement is a logarithmic scale. For example: 70dB is actually 10 times larger in terms of sound pressure than 60db. Human Perception of sound is non-linear. For example: 70dB seems to be twice as loud as 60dB. Page 6 3

4 Noise Basics Table 2 Table 3 Page 7 Criteria Federal FHWA Highway Construction Noise Handbook FHWA-HEP ODOT adheres to Federal Highway (FHWA) noise standards OSHA noise levels for workers ASC Performed Noise Study Measured Ambient Noise Predicted Construction Noise Page 8 4

5 Federal Noise Standards Different standards for: Residential Commercial Industrial Noise to be Maintained Below Federal Standards for Residential Use (Most Restrictive) Day: (7am to 6 pm) 75dB or Ambient + 5dB Night: Ambient + 3dB Page 9 Noise Mitigation Measures Noise Requirements Equipment Enclosures to Reduce Noise Noise Reducing Bed Liners. Three-sided Enclosures around Compressors. Noise Dampening Enclosure around noisy equipment. Low Noise Equipment "Smart" Beepers on equipment Beep at 5 db above ambient noise. Noise Fences/Barriers 8-foot minimum required by City code. Site specific design of fences. Page 10 5

6 Mitigation Measures Sound Enclosure Page 11 Vibration Basics Vibrations are measured with a seismograph. Vibrations are expressed in terms of maximum velocity of vibrations. This is called Peak Particle Velocity (PPV). Blast overpressure changes with cloud cover. Humans are more sensitive to blasting than structures. Humans perceive blasting at 4 times lower levels than will begin to damage plaster. Page 12 6

7 Blasting Basics Blasting will be performed to excavate rock. Blasts will be down at bottom of shaft. Not more than one blast a day. Blasting can be less impact to community than rock excavation by Jackhammers, since large noise only happens once a day. Sound created like pop and thunder, can be influence by cloud cover. CSO Long Term Control Plan Program Management Team Page 13 Vibration Mitigation Measures Initial Test Blast Highly supervised by a licensed blaster Monitored to confirm blasting procedures before production blasting begins. Blast Design The maximum PPV recommended for the OCIT project is 1.0 /s, except for bridges and utilities, where a PPV limit of 2.0 /s will be applied. Blasting hours will be restricted as needed. Page 14 7

8 Vibration Mitigation Measures o Blast Security and Warnings City permit required. Public Notification. Sequence of Blast Horns before detonation Volume should be sensitive to the surroundings, but loud enough to warn abutters and construction workers. Visible signs on roadways and sidewalks Will warn motorists and pedestrian to be prepared for traffic closure. Traffic will be stopped for 5 minutes during blast event. 24-hour security when explosives are stored on-site. Page 15 Blasting Videos Blasting Setup Blasting noise Page 16 8

9 Other Impacts Traffic Defined Truck Routes Road Detours Towpath Trail Detours Other CSO Program Projects, City of Akron Projects, and private development will also have effects on traffic Lighting Direct lights away from residencies Reduce lighting to only security needs during non-work hours Dust Water will be used in construction for mitigation Trucks will be washed Street Cleaning shall be performed Page 17 Traffic, Lighting, and Dust Mitigation Measures Limit Working Hours 24 hours/day at portal site for tunneling only 7:00 am to 9:00 pm at other sites Routine Trucking Operations (7:00 am to 9:00 pm) In all cases, must comply with noise standards Direct construction lighting away from residential and commercial structures. Stormwater pollution prevention plans define how the Contractor will control dust at the site. Page 18 9

10 Contracting Basics Contractor will conduct pre and post construction surveys. 100 feet on each side of the projected centerline of the tunnel. 200 feet on each side of the shaft and portal footprint. Historic structure survey. Noise fences/barriers shown on plans will be constructed. Specifications require the contractor to: Not make noise above federal guidelines. Not cause vibrations beyond set limits. Conduct work only during defined work hours. Perform routine trucking only during defined trucking hours and on defined routes. Perform special mitigation work defined in Specifications. Page 19 Page 20 10

11 Site Specifics OCIT-2, R-19, Innerbelt Work Hours 7:00 am 9:00 pm Trucking Hours 7:00 am 9:00 pm (Rush hour restrictions) Blasting Hours (In Development) Noise Federal Guidelines Blasting 1"/sec Buildings and 2"/sec Utilities/Bridges Road Closures (5 minute Dart Avenue & Rand Avenue during blast) Enclosures around compressors and generators "Smart" Beepers Direct lights away from residences Pile driving enclosure Page 21 OCIT - 2 R18 DIV HAUL ROUTE INNERBELT SHAFT SITE HAUL ROUTE 1 HAUL ROUTE 2 R19 SHAFT SITE OCIT-2 SHAFT SITE Page 22 11

12 OCIT - 2 RACK 18 HAUL ROUTE HAUL ROUTE 1 INNERBELT SHAFT SITE HAUL ROUTE 2 OCIT-2 SHAFT SITE R19 SHAFT SITE Page 23 OCIT - 2 RACK 19 HAUL ROUTE HAUL ROUTE 1 INNERBELT SHAFT SITE HAUL ROUTE 2 OCIT-2 SHAFT SITE R19 SHAFT SITE Page 24 12

13 Questions? OCIT Project Manager: Michelle DiFiore, PE www. November 6,

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Mississauga Bus Rapid Transit Preliminary Design Project

Mississauga Bus Rapid Transit Preliminary Design Project Mississauga Bus Rapid Transit Preliminary Design Project PUBLIC INFORMATION CENTRE OCTOBER 2008 WELCOME The Mississauga Bus Rapid Transit (BRT) Project Thank you for attending this Public Information Centre.

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Appendix C Noise and Vibration Worksheets

Appendix C Noise and Vibration Worksheets PUBLIC WORKS BUREAU OF ENGINEERING Appendix C Noise and Vibration Worksheets Central Outfall Sewer at 59 th Street Page C-1 CEQA Initial Study and 4 th Avenue Project January 2012 Receptor Noise Level

More information

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

OPERATIONS NOISE STUDY FOR A PROPOSED AUTOMATIC CAR WASH IN THE SHERMAN OAKS DISTRICT OF LOS ANGELES

OPERATIONS NOISE STUDY FOR A PROPOSED AUTOMATIC CAR WASH IN THE SHERMAN OAKS DISTRICT OF LOS ANGELES OPERATIONS NOISE STUDY FOR A PROPOSED AUTOMATIC CAR WASH IN THE SHERMAN OAKS DISTRICT OF LOS ANGELES October 12, 2017 PREPARED FOR: Ms. Chantly Banayan 4822 Van Nuys Blvd. Sherman Oaks, CA 91403 PREPARED

More information

Definitions of Acoustical Terms

Definitions of Acoustical Terms Appendix E Noise Definitions of Acoustical Terms Sound Measurements Decibel (db) A Weighted Decibel (dba) Maximum Sound Level (Lmax) Minimum Sound Level (Lmin) Equivalent Sound Level (Leq) Percentile

More information

Fixing the Line s Canarsie Tunnel. Manhattan CB6 11/5/2018

Fixing the Line s Canarsie Tunnel. Manhattan CB6 11/5/2018 Fixing the Line s Canarsie Tunnel Manhattan CB6 11/5/2018 Interborough Bus Service 80+ buses in the peak hour in the peak direction over the Williamsburg Bridge Projected to carry 17% of riders 1 Bus Priority

More information

MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR)

MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR) MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR) Prepared by: ENVIRONMENTAL MANAGEMENT DIVISION LOS ANGELES HARBOR DEPARTMENT With Assistance From: RBF CONSULTING Contact: ENVIRONMENTAL

More information

Construction Noise Memorandum

Construction Noise Memorandum Construction Noise Memorandum To: Ms. Paula Daneluk Date: June 13, 2013 Development Impact 9370 Studio Court, Suite 160 Elk Grove, CA 95758 From: Paul Bollard Bollard Acoustical Consultants, Inc. 3551

More information

Your Guide to Production in New Orleans

Your Guide to Production in New Orleans Your Guide to Production in New Orleans The Mayor s Office of Cultural Economy and The Office of Film and Video welcome you to The City of New Orleans! We want your film, TV, music video or commercial

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Confederation Line Stage 1 and 2. Our Lady of Fatima Church May 10 th, 2018

Confederation Line Stage 1 and 2. Our Lady of Fatima Church May 10 th, 2018 Confederation Line Stage 1 and 2 Our Lady of Fatima Church May 10 th, 2018 Agenda Confederation Line Stage 1 Overview project, consortium, vehicles Confederation Line Stage 2 Overview project, benefits

More information

Appendix D. Noise Calculations

Appendix D. Noise Calculations Appendix D Noise Calculations Summary of Boating Activity Changes Associated with each Alternative Peak Day Boating Trips Structure Existing With Alt increase with alt 2 increase with alt 3 increase with

More information

Appendix I Noise Background and Modeling Data

Appendix I Noise Background and Modeling Data SERRANO II RESIDENTIAL PROJECT REVISED INITIAL STUDY/MITIGATED NEGATIVE DECLARATION CITY OF CLAREMONT Appendix Appendix I Noise Background and Modeling Data March 2015 SERRANO II RESIDENTIAL PROJECT REVISED

More information

Purple Line Extension Section 1 Construction Community Meeting January 17, 2019

Purple Line Extension Section 1 Construction Community Meeting January 17, 2019 Purple Line Extension Section 1 Construction Community Meeting January 17, 2019 1 Agenda Section 1 MOW 64 Facility Project Construction Updates: Fossils Project-wide Tunneling Wilshire/Western Wilshire/La

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

CITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS

CITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS CITY OF FONTANA HANDBOOK ON RESIDENTIAL APPROACH CONSTRUCTION PERMITS GENERAL INFORMATION A driveway approach is an area, construction or improvement between the roadway of a public street and private

More information

Lower River Floodplain Restoration and Levee/Towne Road Re-Alignment Noise Analysis

Lower River Floodplain Restoration and Levee/Towne Road Re-Alignment Noise Analysis Lower River Floodplain Restoration and Levee/Towne Road Re-Alignment Noise Analysis This project is not anticipated to create additional noise beyond the current background levels. Although Towne Road

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Public Meeting #2 March 13, 2018 Summit Park District Welcome to the second Public Meeting for the preliminary engineering and environmental studies of Illinois 43

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

Lincoln 40 Residential

Lincoln 40 Residential Lincoln 40 Residential City of Davis, California March 15, 2017 jcb Project # 2016-180 Prepared for: Attn: Nick Pappani 1501 Sports Drive Sacramento, CA 95834 Prepared by: j.c. brennan & associates, Inc.

More information

Item No. 10 Town of Atherton

Item No. 10 Town of Atherton Item No. 10 Town of Atherton CITY COUNCIL STAFF REPORT REGULAR AGENDA TO: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI COMMUNITY SERVICES DIRECTOR DATE: DECEMBER

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

CHAPTER 69 PARKING REGULATIONS

CHAPTER 69 PARKING REGULATIONS 69.01 Parking Limited or Controlled 69.08 Persons with Disabilities Parking 69.02 Park Adjacent to Curb 69.09 Truck Parking Limited 69.03 Park Adjacent to Curb One-way Street 69.10 Snow Removal 69.04 Angle

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation - Ohio Turnpike Infrastructure Commission Turnpike Mitigation Program Application The application has been improved to enable project sponsors to save the application

More information

EMERGENCY ACCESS POLICY

EMERGENCY ACCESS POLICY Cowlitz 2 Fire & Rescue Policies and Operating Guidelines Policy: EMERGENCY ACCESS POLICY Number Effective Date Approved and Issued: 4001 8/28/02 8/28/02 1.0 REFERENCE 23 CFR Part 650 Subpart C Code of

More information

Section 6H.01 Typical Applications

Section 6H.01 Typical Applications December 27, 2010 Draft Page 6H-1 Section 6H.01 Typical Applications Support: 01 Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. 02 The needs and control of all

More information

Food Truck Consulting Study of Proposed Food Truck Regulations

Food Truck Consulting Study of Proposed Food Truck Regulations Food Truck Consulting Study of Proposed Food Truck Regulations Introduction The City of San Diego is considering revisions to its mobile vending ordinance. The revised ordinance would, in part, 1) prevent

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 0-1994-23 AN ORDINANCE AMENDING CHAPTER 12, GARBAGE AND REFUSE, OF THE LAURINBURG CITY CODE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LAURINBURG Section 1: Chapter 12, Garbage and

More information

CHAPTER 15 STREET LIGHTING TABLE OF CONTENTS

CHAPTER 15 STREET LIGHTING TABLE OF CONTENTS CHAPTER 15 STREET LIGHTING TABLE OF CONTENTS Section Title Page 15.1 General... 15-1 15.1.1 Fort Collins (City Limits Only) Street Lighting...15-1 15.1.2 Loveland (City Limits Only) Street Lighting...15-1

More information

Railway noise mitigation factsheet 01: Overview of railway noise

Railway noise mitigation factsheet 01: Overview of railway noise Railway noise mitigation factsheet 01: Overview of railway noise 1.1 Noise sources and indicative noise levels Exterior noise sources on high-speed trains can be broadly categorised as follows and are

More information

CONFEDERATION LINE EAST SEGMENT

CONFEDERATION LINE EAST SEGMENT The O-Train Confederation Line project is the first stage in Ottawa s future light rail network. The 12.5 kilometre electric rail system will replace existing diesel powered buses, providing rapid transit

More information

FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT. itrans Consulting Inc 100 York Boulevard Richmond Hill, Ontario L4B 1J8

FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT. itrans Consulting Inc 100 York Boulevard Richmond Hill, Ontario L4B 1J8 FINAL REPORT FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT Project Number: #W08-5107A August 28, 2008 SUBMITTED TO: Tara Erwin itrans Consulting Inc 100 York Boulevard Richmond Hill,

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

Sight Distance. A fundamental principle of good design is that

Sight Distance. A fundamental principle of good design is that Session 9 Jack Broz, PE, HR Green May 5-7, 2010 Sight Distance A fundamental principle of good design is that the alignment and cross section should provide adequate sight lines for drivers operating their

More information

November 14, 2016 Reference No

November 14, 2016 Reference No November 14, 2016 Reference No. 11115752 Mr. Andrew Booth Engineering Services City Service Centre 9505-112 Grande Prairie, Alberta T8V 6H8 Dear Mr. Booth: Re: 2016 Arterial Traffic Noise Survey City of

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 8.b Meeting Date: December 19, 2016 Department: PUBLIC WORKS SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Public Works Director City Manager Approval: File No.: 18.01.79

More information

Ottawa LRT Stage 2. McKellar Park Information Session

Ottawa LRT Stage 2. McKellar Park Information Session Ottawa LRT Stage 2 McKellar Park Information Session Stage 2 Background Approved unanimously by Ottawa City Council in July 2015 East to Place d Orléans, west to Bayshore and Baseline, and south to Bowesville

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by

More information

FRIDLEY CITY CODE CHAPTER 124. NOISE (Ref. 733, 834, 1075)

FRIDLEY CITY CODE CHAPTER 124. NOISE (Ref. 733, 834, 1075) FRIDLEY CITY CODE CHAPTER 124. NOISE (Ref. 733, 834, 1075) 124.01. PURPOSE The Council of the City of Fridley deems that certain levels and amounts of noise are detrimental to the health, safety and general

More information

M60/M62 smart motorways

M60/M62 smart motorways Public information exhibition Highways England creative N150128 Welcome We re improving the M60 between junction 8 (Carrington Spur) and M62 junction 20 (Rochdale and Oldham). The M60 and M62 are vital

More information

Red Wing US 63 Bridge and Approach Roadways

Red Wing US 63 Bridge and Approach Roadways Traffic Noise Analysis Report Red Wing US 63 Bridge and Approach Roadways TH 63 over the Mississippi River Red Wing, MN MN State Project Number: 2515-21 WI Project ID Number: 7210-00-06 June 2015 Red Wing

More information

Effective [one year after date of adoption] the provisions of this rule shall apply to:

Effective [one year after date of adoption] the provisions of this rule shall apply to: VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 55.1 PAVED ROADS AND PUBLIC UNPAVED ROADS (Adopted / / ) A. Applicability Effective [one year after date of adoption] the provisions of this rule shall

More information

801-R-xxx LAW ENFORCEMENT OFFICER FOR WORK ZONE SAFETY. (Adopted xx-xx-17)

801-R-xxx LAW ENFORCEMENT OFFICER FOR WORK ZONE SAFETY. (Adopted xx-xx-17) 801-R-xxx LAW ENFORCEMENT OFFICER FOR WORK ZONE SAFETY (Adopted xx-xx-17) Description This work shall consist of providing a Law Enforcement Officer, LEO, to assist with the safe, efficient, orderly movement

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: 3:00 PM TITLE: ALL ABOARD FLORIDA QUIET ZONES, SEALED CORRIDORS AND PUBLIC SAFETY AGENDA ITEM DATES: MEETING

More information

CHAPTER 72: STOPPING, STANDING AND PARKING

CHAPTER 72: STOPPING, STANDING AND PARKING CHAPTER 72: STOPPING, STANDING AND PARKING Section 72.01 Stopping vehicles in streets prohibited; exceptions 72.02 Obstruction of traffic 72.03 Method of parking 72.04 Parking prohibited in specified places

More information

Work Zone Safety. Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene

Work Zone Safety. Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene Work Zone Safety Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene 1 Agenda Manuals/Codes/Statistics Setup & Removal of Work Zones Devices and Locations

More information

Chapter 70 TRAFFIC AND VEHICLES*

Chapter 70 TRAFFIC AND VEHICLES* Chapter 70 TRAFFIC AND VEHICLES* ---------- *Cross reference(s)--abandoned motor vehicles, 2-147; alcoholic beverages, ch. 6; fees, ch. 26; fire prevention and protection, ch. 30; manufactured homes and

More information

RESTRICTIONS ON PARKING; POSTED LIMITATIONS.

RESTRICTIONS ON PARKING; POSTED LIMITATIONS. CHAPTER 3 Parking Regulations 9-3-1 Restrictions on Parking; Posted Limitations 9-3-2 Parking Restrictions During Street Maintenance or Temporary Snow Removal 9-3-3 Stopping or Parking Prohibited in Certain

More information

CTA Capital Construction Update December 12, 2006

CTA Capital Construction Update December 12, 2006 Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction

More information

Operations Center FAQs

Operations Center FAQs RICHARDSON INDEPENDENT SCHOOL DISTRICT Where all students learn, grow and succeed Operations Center FAQs Richardson ISD is constructing an operations center on vacant district land between Greenville Avenue

More information

Importance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018

Importance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018 Importance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018 Amarpal Matharu, PE, MBA Traffic Operation Manager, Illinois Tollway

More information

Neighbourdhood Committee NDG / Westmount / Montréal-Ouest. March 28, 2018

Neighbourdhood Committee NDG / Westmount / Montréal-Ouest. March 28, 2018 Neighbourdhood Committee NDG / Westmount / Montréal-Ouest March 28, 2018 2 Presentation Outline Feedback on questions Green Strip development - consultation Noise surveys Montréal-Ouest Updates work and

More information

CR 510/85 Street from CR 512 to 58 Avenue

CR 510/85 Street from CR 512 to 58 Avenue Date: November 14, 2017 To: CR 510/ 85 Street PD& Project File From: Metric ngineering, Inc. Subject: FM No.: 405606-2-22-02 Air Quality Screening Test CR 510/85 Street from CR 512 to 58 Avenue Indian

More information

Module 3.5 Limited Spaces Lesson Plan

Module 3.5 Limited Spaces Lesson Plan MONTANA TEEN DRIVER EDUCATION AND TRAINING Module 3.5 Limited Spaces Lesson Plan Traffic Education Curriculum Benchmarks Performing Turnabouts The student is expected to describe and demonstrate good habits

More information

JCP&L Verbatim Response to Middletown Township s Questions

JCP&L Verbatim Response to Middletown Township s Questions JCP&L Verbatim Response to Middletown Township s Questions Township officials sent 13 questions about the proposed Monmouth County Reliability Project to JCP&L on June 10 th. JCP&L provided direct responses

More information

With Cummins PowerCommand Cloud, you can ensure you are always on.

With Cummins PowerCommand Cloud, you can ensure you are always on. POWER COMMAND CLOUDTM MANAGE YOUR POWER SYSTEMS. GLOBALLY. ANYWHERE. ANYTIME. ALWAYS ON. POWER COMMAND CLOUD TM In today s always on modern world, Cummins PowerCommand Cloud is there to keep you in touch

More information

Our Approach to Automated Driving System Safety. February 2019

Our Approach to Automated Driving System Safety. February 2019 Our Approach to Automated Driving System Safety February 2019 Introduction At Apple, by relentlessly pushing the boundaries of innovation and design, we believe that it is possible to dramatically improve

More information

Dallas CBD Second Light Rail Alignment (D2)

Dallas CBD Second Light Rail Alignment (D2) Dallas CBD Second Light Rail Alignment (D2) Subway Project Refinement Stakeholder Meeting December 7, 2016 Discussion Items Background Schedule Public/Stakeholder Involvement Comments/Questions from Audience

More information

MOTOR VEHICLE ORIENTED BUSINESSES.

MOTOR VEHICLE ORIENTED BUSINESSES. ARTICLE 23. MOTOR VEHICLE ORIENTED BUSINESSES. Sec. 25-23.1. Conditional Use. Motor vehicle oriented businesses (MVOB) shall require a Conditional Use Permit in all districts as indicated in Appendix B,

More information

No Thoroughfare. Gated Private Road Ahead

No Thoroughfare. Gated Private Road Ahead No Thoroughfare Gated Private Road Ahead 1 Think: Safety and Security In our Community 2 Mainlands Secondary Entrance Barrier Gate Proposal Technology and Cost Study (as Prepared by Gate Committee on April

More information

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES NOTE: This is a courtesy copy of this rule. The official version can be found in the New Jersey Administrative Code. Should there be any discrepancies between this text and the official version, the official

More information

APPENDIX E. Noise Data and Environmental Noise Assessment

APPENDIX E. Noise Data and Environmental Noise Assessment APPENDIX E Noise Data and Environmental Noise Assessment Environmental Noise Assessment Rocklin Crossings Retail Center Rocklin, California BAC Job # 2006-004 Prepared For: Rocklin Crossings, LLC. Attn:

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

City of Beverly Hills North Santa Monica Blvd Reconstruction. Traffic & Parking Commission June 04, 2015

City of Beverly Hills North Santa Monica Blvd Reconstruction. Traffic & Parking Commission June 04, 2015 City of Beverly Hills North Santa Monica Blvd Reconstruction Traffic & Parking Commission June 04, 2015 1 Overview of June 4 TPC Overview of Possible Traffic Mitigation Measures Toolbox During Construction

More information

SECTION 25-MOTORIZED CART SAFETY

SECTION 25-MOTORIZED CART SAFETY SECTION 25-MOTORIZED CART SAFETY 25.1 Operator Guidelines 25.2 Motorized Cart Inventory List 25.3 Vehicle Inspection Checklist (optional) 25.4 Motorized Cart Safety Acknowledgement Form Aug. 2010 Updated:

More information

Confederation Line West Queensway Terrace North. May 27, 2017

Confederation Line West Queensway Terrace North. May 27, 2017 Confederation Line West Queensway Terrace North May 27, 2017 Agenda Background Lincoln Fields Station Concept LRT alignment, southwest of Lincoln Fields to Queensway, including: Pedestrian bridge replacement

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by

More information

Overview. Prioritization of Safety Strategies Development of the Minnesota Sinusoidal Rumble Strip Implementation and Public Relations Considerations

Overview. Prioritization of Safety Strategies Development of the Minnesota Sinusoidal Rumble Strip Implementation and Public Relations Considerations Victor Lund, PE, Traffic Engineer St. Louis County, Minnesota October 11, 2018 Overview Prioritization of Safety Strategies Development of the Minnesota Sinusoidal Rumble Strip Implementation and Public

More information

Garrett Hill Master Plan

Garrett Hill Master Plan Garrett Hill Master Plan Visioning Workshop February 13, 2007 Campbell Thomas & Company Agenda Welcome Existing conditions summary Critical issues Visioning exercise Summary & next steps Critical Assets

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

Environmental Noise Assessment Stonebridge Golf & Country Club Maintenance Facility. Nepean, Ontario

Environmental Noise Assessment Stonebridge Golf & Country Club Maintenance Facility. Nepean, Ontario Environmental Noise Assessment Stonebridge Golf & Country Club Maintenance Facility Nepean, Ontario REPORT: GmE 09-042-Noise Prepared For: Rob Pierce 3584 Jockvale Road Nepean, Ontario K2C 3H2 Prepared

More information

CHAPTER 69 PARKING REGULATIONS

CHAPTER 69 PARKING REGULATIONS 69.01 Parking Limited or Controlled 69.08 Persons with Disabilities Parking 69.02 Park Adjacent to Curb 69.09 Truck Parking Limited 69.03 Park Adjacent to Curb One-way Street 69.10 Snow Removal 69.04 Diagonal

More information

NOISE ASSESSMENT TECHNICAL REPORT for the Duke Perris Boulevard Warehouse Project Perris, California

NOISE ASSESSMENT TECHNICAL REPORT for the Duke Perris Boulevard Warehouse Project Perris, California NOISE ASSESSMENT TECHNICAL REPORT for the Duke Perris Boulevard Warehouse Project Perris, California Prepared for: Albert A. Webb Associates 3788 McCray Street Riverside, CA 92506 Prepared by: 605 Third

More information

LEED v4 Building Design and Construction Quiz #3 LT

LEED v4 Building Design and Construction Quiz #3 LT LEED v4 Building Design and Construction Quiz #3 LT 1. How are walking and bicycling distance measured? A. Straight-line radius from a main building entrance B. Straight-line radius from any building entrance

More information

AND LIVESTOCK OPERATIONS

AND LIVESTOCK OPERATIONS (Adopted February 14, 1997)(Amended December 11, 1998) (Amended September 10, 1999)(Amended April 2, 2004) RULE 1186. PM 10 EMISSIONS FROM PAVED AND UNPAVED ROADS, AND LIVESTOCK OPERATIONS (a) (b) Purpose

More information

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017 Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work:

More information

Purple Line Extension, Section 2 Southern California Edison, Phase I

Purple Line Extension, Section 2 Southern California Edison, Phase I Purple Line Extension, Section 2 Southern California Edison, Phase I 1 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work: 10am-6pm Left

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

NYC s Peak Rate Parking Pilot NACTO / FHWA State of the Practice Workshop: Parking Management and Pricing in the United States

NYC s Peak Rate Parking Pilot NACTO / FHWA State of the Practice Workshop: Parking Management and Pricing in the United States NYC s Peak Rate Parking Pilot NACTO / FHWA State of the Practice Workshop: Parking Management and Pricing in the United States PARK Smart Pilots Goals: Reduce parking durations Increase turnover Increase

More information

US FOREST SERVICE TECHNOLOGY AND DEVELOPMENT CENTER PROJECT UPDATE

US FOREST SERVICE TECHNOLOGY AND DEVELOPMENT CENTER PROJECT UPDATE US FOREST SERVICE TECHNOLOGY AND DEVELOPMENT CENTER PROJECT UPDATE Robert Wetherell Recreation/Safety/Uniforms Program Leader NATIONAL TECHNOLOGY AND DEVELOPMENT PROGRAM MTDC (Missoula, MT) and SDTDC (San

More information

POLICIES OF COLORADO STATE UNIVERSITY UNIVERSITY POLICY. Draft PURPOSE OF THIS POLICY

POLICIES OF COLORADO STATE UNIVERSITY UNIVERSITY POLICY. Draft PURPOSE OF THIS POLICY POLICIES OF COLORADO STATE UNIVERSITY UNIVERSITY POLICY Policy Title: Service Carts Policy ID # 5-6030-013 Effective Date: Category: 5. Administration Policy Owner: Vice President for University Operations

More information

Questions and Answers from March 1 st, 2016 Roadbuilders Introduction Webinar

Questions and Answers from March 1 st, 2016 Roadbuilders Introduction Webinar Questions and Answers from March 1 st, 2016 Roadbuilders Introduction Webinar No. Question Answer 1 Is it mandatory to have an Engineer sign off on all TMP's containing a lane closure even in a 50 or 60

More information

EMGA Mitchell McLennan Pty Limited (EMM) has been engaged to complete quarterly attended noise

EMGA Mitchell McLennan Pty Limited (EMM) has been engaged to complete quarterly attended noise 12 December 2014 Level 5, 21 Bolton Street Newcastle NSW 2300 PO Box 506 Leonard Sharp Environment and Community Liaison Officer Broken Hill Operations Pty Ltd CBH Resources Rasp Mine Newcastle, NSW, 2300

More information

NOISE LOCAL LAW FOR VILLAGE OF ROUND LAKE

NOISE LOCAL LAW FOR VILLAGE OF ROUND LAKE NOISE LOCAL LAW FOR VILLAGE OF ROUND LAKE 130-1. Declaration of policy. It is hereby declared to be the public policy of the Village to reduce the ambient noise level in the Village so as to preserve,

More information

Human Resources Policy Manual. Topic: Utility Cart/Golf Cart Policy Policy # Version: 2.0 Effective Date: 8/1/2013

Human Resources Policy Manual. Topic: Utility Cart/Golf Cart Policy Policy # Version: 2.0 Effective Date: 8/1/2013 Human Resources Policy Manual Topic: Utility Cart/Golf Cart Policy Policy # 128.00 Version: 2.0 Effective Date: 8/1/2013 1.) Introduction Purpose & Scope This policy provides guidelines for the operation

More information

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017 MANASSAS PARK STATION PARKING EXPANSION Public Meeting June 20, 2017 1 AGENDA Project Status Schematic Design Circulation Traffic Analysis Proposed Garage Location Next Steps Cost Estimate 2 PROJECT PHASES

More information

1. Introduction and Principal Conclusions

1. Introduction and Principal Conclusions III.L 1. Introduction and Principal Conclusions Based upon the analysis conducted, the project does not exceed any of the threshold limits established in the Town Code. Therefore, the project has no significant

More information

PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA

PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA Assessment of Helicopter Noise A report Prepared on behalf of: JamCo Constructions Pty Ltd PO Box 631 Yarraville Victoria 3013 Ref: 11573-3jg March 2015

More information

What is the definition of the Right of Way? If a motorist of a large vehicle can not see you, what area of space are you located?

What is the definition of the Right of Way? If a motorist of a large vehicle can not see you, what area of space are you located? What is the definition of the Right of Way? If a motorist of a large vehicle can not see you, what area of space are you located? How much longer will it take a truck to stop during bad weather conditions?

More information

Back-Up Sensor System

Back-Up Sensor System Back-Up Sensor System Model No.: PKC0RE Owner s Manual and Warranty Information OFF ON 0.4m/1.3ft 0.6m/2.0ft 1.0m/3.3ft 1.2m/4.0ft 1.5m/5.0ft LEFT RIGHT Read these instructions completely before using

More information

In the Interest of Safety

In the Interest of Safety Operation Lifesaver Presents: In the Interest of Safety Andy Blenko 1 It Happens Every Day. 2 United States Highway Rail Crossing Incidents 2500 2280 2096 2000 1500 2013 2014 1000 Ohio Ranking No. 8 of

More information

District 5 Gering job openings 8/3/2016

District 5 Gering job openings 8/3/2016 1 District 5 Gering job openings 8/3/2016 Highway Maintenance Worker Senior OPENING DATE: 08/03/16 08/17/16 11:59 PM Chappell spreaders. Proficiency in the operations of heavy highway maintenance equipment.

More information