WEEKLY OPERATING NOTICE

Size: px
Start display at page:

Download "WEEKLY OPERATING NOTICE"

Transcription

1 PRIVATE AND NOT FOR PUBLICATION B. R.31262/1 British Rail N S E A S T E R N REGION 3 9 WEEKLY OPERATING NOTICE CONTAINING TEMPORARY SPEED RESTRICTIONS TEMPORARY ENGINEERING WO RKS SIGNALLING AND PERMANENT W A Y ALTERATIONS GENERAL INSTRUCTIONS A N D NOTICES SATURDAY 25 SEPTEMBER TO FRIDAY 1 OCTOBER 1982 INCLUSIVE Trainmen must pay particular attention t o works contained in this notice and keep a good look-out for handsignals which may be exhibited in accordance wit h the Rules and Regulations. Work at places other than those mentioned may be in progress and Drivers must be on the look-out and be prepared to stop or run at reduced speed when, and where, handsignals may be exhibited.

2 NS-2 SECTION A TEMPORARY SPEED RESTRICTIONS (Until further notice unless otherwise specified) Warning Boards and Indicators provided unless otherwise shown. t Indicates that the Warning Boards and Indicators will be moved as the work progresses. Where two speeds are shown for a restriction e.g. 20, the Rule Book, Section T, clause 21.2 applies. Mileage Lines a t or between Re s tr i c ti on Location a f f e c t e d M. Ch. M. Ch. m.p.h. Remarks DONCASTER BLACK CARR M. TO SKELTON BRIDGE 1Potteric Carr Jn Trackwork. and Decoy North sin. Fast U n t i l Sunday 26 2 Potteric Carr sin. and Trackwork, Decoy North sin. F a s t F r o m Sunday 26 until Wednesday 29 Warning Board situated at 159m. 35ch. on the applies only to trains proceeding towards Askern. SHAFTHOLME Al. TO FERRYBRIDGE NORTH M. 3 Shaltholme and Norton sin. L.C. D o w n Trackwork. (82/25) 4 Norton LC and U p Trackwork. Shaftholme Jn. (82/35) Warning Board located at Signal No.K386 (on the line) applies only to trains proceeding onto the Wakefield/Goole line towards Pontefract. YORK TO SCARBOROUGH 5 Falsgrave and Seamer East Trackwork. (82/37) Until Tuesday 28

3 NS-3 SECTION A TEMPORARY SPEED RESTRICTIONS continued Location Lines affected DONCASTER MARSHGATE JN. TO LEEDS WEST M. Mileage at or between M. C h. M. C h. Restriction m.p.h. Remarks 6 Adwick Jn. and Subsidence. South Elmsall (82/8) Station 7 South Kirkby in Trackwork. (82/38) Until Tuesday 28 8 South Kirkby Jr) Trackwork. From Tuesday 28 9 South Kirkby Jr). and Fitzwilliam Main Trackwork. Station 10 South Kirkby Jr). and Fitzwilliam Station 11 South Kirkby Jr). and Fitzwilliam Station Main Main (82/33) Until Tuesday Trackwork. From 1500 Tuesday Trackwork. From Saturday 25 STAINFORTH M. TO SKELLOW ADWICK JN.' 12 Bramwith Stn.LC and Thorpe Road LC U p Bridgework. DIGGLE JN. LMR TO HEALEY MILLS HEA TON LODGE JN. 13 Diggle Jn. and Trackwork. Standedge Tunnel Main Main (LM) Goods Loop 14 Marsden Trackwork. Main Main (82/33) 15 Springwood Jr). and Marsden 16 Springwood Jn. and Marsden Trackwork. Until Tuesday Trackwork. (82/36)

4 NS-4 SECTION A TEMPORARY SPEED RESTRICTIONS continued Lines Location a f f e c t e d THORNHILL LNW JN. TO LEEDS HOLBECK EAST M. Mileage at or between Re s tr i c ti o n M. C h. M. C h. m. p. h. Remarks 17 Dewsbury Station and Batley U p Co n d it io n of viaduct (Dewsbury). HORBURY STATION JN. TO CRIGGLESTONE 18 Ho rb u ry Station Jn. S i n g l e and Crigglestone Jn Tra c k wo rk. (82/23) BARNSLEY STATION JN. TO HORBURY JN. 19 Barnsley Station Jn. Do wn and Darton Station 20 Barnsley Station Jo. 1 and Woolley Coal Siding 21 Wo o lle y Coal Siding Do wn and Woolley Tunnels 22 Woolley Tunnels D o w n and Horbury Jn Earthwork. (82/38) From Saturday Tra ckvvo rk. I (82/37) Subsidence. (82/21) Trackwork. (82/19) ALDWARKE NORTH JN. (MID) TO LEEDS NORTH 23 Swinton dn. and A ldwarke Jn. 24 Swinton Jn. and Aldwarke Jn Svvinton dn. and D o w n Cudworth Station Jn. Ma in Swinton Jn. and D o w n Cudworth Stn. Jn. M a i n Royston Jn. and Cudworth North Jn. Oakenshavv and Goose Hill Jn. Pontefract Pontefract Main Main Main Tra ckwo rk. Until Wednesday Tra c k wo rk. From Tuesday 28 until Thursday Subsid e n ce. (80/28) 30 Subsid e n ce. (78/4) 40 C o n d i t i o n of track. (82/36) 40 Subsid e n ce. (82/29)

5 SECTION A TEMPORARY SPEED RESTRICTIONS continued Location Lines affected NS-5 NORMANTON ALTOFTS JN. TO YORK CHALONERS WHIN JN. Mileage at or between R e s t r i c t i o n M. C h. M. C h. m. p. h. Remarks 29 Copmanthorpe and Bolton Percy 30 Copmanthorpe and Bolton Percy Norman ton Norma nton Trackwork. (82/35) Until Sunday Trackwork. (82/39) From Sunday Bolto n Percy and Copmanthorpe Norma nton Trackwork. (82/39) From Thursday 30 CASTLEFORD WEST JN. TO PONTEFRACT WEST JN. 32 Cutsyke Jn. and Prince of Wales U p Condition of track. (82/12) CASTLEFORD EAST JN. TO ALLERTON MAIN BOWERS OPENCAST 33 Castleford East Single Subsidence. Jn. and Ledston Station (81/50) WAKEFIELD KIRKGATE WEST TO GOOLE POTTERS GRANGE 34 Featherstone LC and Red Lane LC 35 Red Lane LC and Featherstone LC 36 Featherstone LC and Red Lane LC 37 Featherstone LC and Pontefract West 38 Knottingley West Jn.,and Pontefract Goods Jo. 39 Gowdal I Lane LC and Hensall Main Condition of track. (81/6) Condition of track Trackwork. (82/26) Condition of track. (81/49) Trackwork. (82/23) Trackwork. Until Wednesday 29

6 SECTION A TEMPORARY SPEED RESTRICTIONS continued Location ALDWARKE NORTH JN. (MID) TO BURTON SALMON 40 Swinton Jn. U p Trackwork. and Aldwarke Jn. P o n t e f r a c t ( 8 2 / 3 7 ) Until Tuesday Swinton Jo. and U p Trackwork. Aldwarke Jn. P o n t e f r a c t F r o m Tuesday 28 until Thursday Hickleton and U p Trackwork. Bolton-on-Deame ( 8 2 / 3 8 ) Station Warning Board at 11m. 47ch. (on the line) applies only to trains towards South Kirkby sin. 43 Moorthorpe Station Trackwork. h. and Pontefract ( 8 2 / 3 9 ) Baghi I I Station F r o m Sunday Moorthorpe Station Jn. and Pontefract Baghi II Station NS-6 Lines a t Mileage or between Re s tr i c ti on affected M. C h. M. C h. m. p. h. Remarks (82/29) 45 Pontefract Baghi I I Station and Moorthorpe Station Jo Trackwork. (82/37) 46 Moorthorpe Station U p Subsidence, Jn. and Pontefract ( 8 2 / 3 1 ) Baghi I I Station 47 Ferrybridge Power Ingoing Trackwork. Station L i n e U n t i l Wednesday 29 MOORTHORPE STATION M. TO SOUTH KIRKBY M. 48 Moorthorpe Station D o w n Jn. and South U p Kirkby Jn T ra c k wo rk. (82/31)

7 NS-7 SECTION A TEMPORARY SPEED RESTRICTIONS continued Mileage Lines a t or between Re s tr i c ti on Location affected M. C h. M. C h. m. p. h. Remarks LEEDS TO SKIPTON STATION SOUTH LMR 49 Thackley Tunnel and Thackley Trackwork. (82/37) Warning Boards at 205m. 36ch. (on the Main and Loop lines) apply only to trains towards Skipton. From Sunday Leeds Jn. and D o w n U p Trackwork. Shipley Bingley Jn. ( 8 2 / 3 9 ) From Sunday 26 Warning Board at 206m. 57ch. (on the line) applies only to trains towards Leeds Jn. (both routes). From Sunday 26 APPERLEY M. TO ILKLEY STATION 51 Apperley Lane Tunnel and Springs Tunnel T ra c k wo rk. (82/21) GUISELEY JN. TO ESHOLT Warning Board at 3m. 18ch. (on the line) applies only to trains towards Skipton. Applicable from Sunday 26 LEEDS TO HULL PARAGON 52 Gascoigne Wood D o w n Main Main , Trackwork. (82/24) THORNE M. TO GILBERDYKE 53 Goole LC and D o w n Goole Bridge Bridgework. HULL PARAGON STATION TO SEAMER WEST 54 Arram Station LC and Beverley North LC Condition of track. (82/25)

8 SECTION B NS- TEMPORARY ENGINEERING WORKS At or between L i n e s affected Remarks DONCASTER BLACK CARR Al. TO SKELTON BRIDGE 55 B la ck Carr in. and A l l Decoy North in. 56 Do n ca ste r North in. and Marshgate in. Continuously. Earthwork and bridgework (BR. No.323E) 153m. 78ch. and 154m. 05ch. Crane and mechanical equipment in use. ( 8 1 / 3 2 ) to Earthworks 156m. 18ch. and 156m. 23ch. ( 8 2 / 9 ) 57 Shaftholme in. and Selby Canal in. 58 Y o rk Station 59 Y o rk and Skelton 60 Loversall in. and Decoy North in. 61 Doncaster North and Doncaster South Yorks in. 62 Doncaster North and Doncaster South Yorks in. 63 Y o rk and Skelton and Fast Platform 1 Old Yard and Carriage Sdgs. BLO CKED and Fast and Platforms 3 and 4 and Main to Earthwork, 169 and 169Y2m.p. Cranes and mechanical equipment in use. (80/24) Repairing station roof 188m. 06ch. and 188m. l i c i t Scaffolding in use, to Bridgework lm. 05ch. Mechanical equipment in use. ( 8 2 / 3 3 ) to Track renewal and maintenance 154m. 04ch. and 154m. loch. Mechanical equipment in use. Trains to travel via Slow line to Offloading materials, track renewal and maintenance 156m. 04ch. and 155m. 70ch. Crane in use. Trains to be replatformed to Earthwork at 156m. 14ch. Possession to be given up for passage of trains to In connection with bridgework between York Yard North and Skelton. Cranes and mechanical equipment in use. Possession to be given up for passage of trains. 64 York Station U p Main and Platform 8 Main and Platform 8 WEDNESDAY 29 SEPTEMBER to T r a c k maintenance, 0 m.o. and Om. loch to Clifto n and Clifton Goods/ Clifton Loop to Signalling work. (See Section 'C').

9 SECTION B TEMPORARY ENGINEERING WORKS continued At or between SHAFTHOLME JN. TO FERRYBRIDGE NORTH JN. 66 Shaftholme Jn. D o w n and and Norton LC B e t w e e n Trains NS-9 Lines affected R e m a r k s to Earthwork 6 8 Cranes and mechanical equipment in use. (82/33) 67 Shaftholme Jn. and D o w n and Norton LC B L O C K E D to Track maintenance 68 Mechanical equipment in use. YORK HOLGATE JN. TO SKEL TON 68 H o!gate Jn. and D o w n Goods to Track renewal Orn.p. and Om. 25ch, York Yard South B e t w e e n Trains M e c h a n i c a l equipment in use, ( 8 2 / 6 ) SUNDAY/MONDAY 26/27 SEPTEMBER 69 Y o r k Yard North and A l l Sun to Mon. Bridgework lm. 05ch. Skelton B L O C K E D Cranes and mechanical equipment in use. YORK YARD SOUTH TO YORK CLIFTON WEDNESDAY 29 SEPTEMBER 70 Clifton D o w n and Clifton Goods/ Clifton Loop to Signalling work. (See Section 'C'). YORK TO SCARBOROUGH 71 Y o rk Station Main and Platform 8 Main and Platform to T r a c k maintenance, Orn.p. and Om. loch to MONDAY/TUESDAY 27/28 SEPTEMBER 72 Malton and D o w n and Ri II ington B L O C K E D to Earthwork, 21m. 12ch. and 25m. 42ch. Crane and mechanical equipment in use.

10 NS-10 SECTION B - TEMPORARY ENGINEERING WORKS,- continued At or between L i n e s affected Remarks YORK SKELTON TO HARROGATE 73 Starbeck and Harrogate SATURDAY 26 SEPTEMBER 74 Starbeck D o w n and MONDAY 27 to WEDNESDAY 29 SEPTEMBER is Knaresborough D o w n and Station LC and B L O C K E D Starbeck LC to Track maintenance 19m. 51ch. and 19m. 72ch. Crane and mechanical equipment in use. ( 8 2 / 9 ) to Signalling work Mon and Tue to Tue and Wed. Track maintenance, 1 6 equipment in use. DONCASTER MARSHGATE JN. TO LEDS WEST M. 76 South D Elmsall o w n Station 77 H a r e Park Jn. and Wakefield Westgate South Jn. 78 Ha re Park Jo. and Wakefield Westgate South Jo. 79 Wakefield Westgate Station 80 Gelderd Road Jn. 8 and SATURDAY/SUNDAY 25/26 SEPTEMBER to Demolition work 164m. 48ch to Erecting and dismantling scaffolding and safety nets for renewal of overhead Dower lines 173m. 43ch. ( 8 2 / 3 3 ) Until Saturday 25 September, to Earthwork, 174m. 30ch. and 174m. 38ch. Crane in use. ( 8 2 / 3 7 ) to Bridgework (BR. No.5) 175m. 63ch. Restricted clearance. ( 8 2 / 1 1 ) to Earthwork, 184m. 22ch. Crane in use. ( 8 2 / 1 2 ) Until Saturday to Signalling work. 82 South Kirkby Jn. and Hare Park Jn, 83 Ha r e Park Jn. and Wakefield Westgate South Jn. 84 Carcroft Jn. and South Kirkby sin. 85 Marshgate Jn. and Castle Hills Jn. and Main and and and to Track renewal and reballasting 165m. 75ch. and 167m. loch. Cranes and mechanical equipment in use. Trains diverted via Askern to Earthwork 174m. 32ch. and 174m. 56ch. Mechanical equipment in use. Trains diverted via Askerno to Earthwork 160m. 12ch and 160m. 70ch. Mechanical equipment in use. Trains diverted via Askerno to Track maintenance, 156m. 60ch. and 158m.p. Crane and mechanical equipment in in use. Trains diverted.

11 NS-11 SECTION B TEMPORARY ENGINEERING WORKS continued At or between DONCASTER MARSHGATE JN. TO LEEDS WEST WV. continued MONDAY/TUESDAY 27/28 and TUESDAY 28 SEPTEMBER 86 A d wic k In. and D o w n South Kirkby Jn. B L O C K E D and MONDAY 27 SEPTEMBER to FRIDAY 1 OCTOBER 87 South Kirkby Jri. A l l TUESDAY/WEDNESDAY 28/29 SEPTEMBER Adwick Jn. and D o w n South Kirkby Jn. B L O C K E D TUESDAY/WEDNESDAY 28/29 and WEDNESDAY 29 SEPTEMBER South Kirkby Jn. and Hare Park..1n. Main Main Ma in WEDNESDAY/THURSDAY 29/30 and THURSDAY 30 SEPTEMBER 90 Ha re Park sin. and Wakefield Westgate South Jn. THURSDAY 30 SEPTEMBER 91 Wakefield Westgate D o w n Station and Gelderd Road Jn. U p Lines affected R e m a r k s THURSDAY/FRIDAY 30 SEPTEMBER/1 OCTOBER 92 Wakefield Westgate Station and Gelderd Road Jn. FRIDAY 1 OCTOBER Mon to to Tue to C6 15 Tue via Askern to via Askern. Track maintenance, 160m. 70ch. and 164%rn.p. Mechanical equipment in use Mon to trains diverted Tue. trains diverted to daily. Signalling work to Track maintenance, 164% and trains diverted via Askern Tue to ) Track renewal and ) track maintenance Tue to ) 166m. loch. and 171m. ) 70ch. Mechanical to Wed ) equipment in use. ) Tue to trains 'diverted via Askern to Wed. trains diverted via Askern Wed to to Thu to to Track maintenance 172m.p. and 174m. 70ch. Mechanical equipment in use. Track maintenance 179m. loch. and 181m.p. Mechanical equipment in use to T r a c k maintenance 180% and 184m.p to M e c h a n i c a l equipment in use. Possession to be given up for passage of 1D57, Leeds to Doncaster and 0)22, Leeds to Doncaster over line. 93 Bentley LC and Castle Hills South Jn to Track renewal 158m. 05ch. and 158m. 35ch. Mechanical equipment in use. Possession to be given up for passage of M.G.R. and local trip trains. Other trains diverted via Askern.

12 NS-12 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected Remarks STAINFORTH JN. TO SKELLOW AMICK M. 94 Stainforth Rd. and D o w n and Thorpe Road LC Continuously. Bridgework (BR.7 and 8), 164m. 53ch. and 164m. 44ch. ( 8 2 / 2 9 ) LEEDS GELDERD ROAD M. TO LEEDS HOLBECK WEST M. 95 Gelderd Road Jn to Earthworks 184m. 22ch. Crane in use. ( 8 2 / 1 2 ) Until Saturday 25 EASTWOOD LMR TO NORMANTON GOOSE HILL 96 Hebden Bridge D o w n and 97 Elland and Bradley Wood Jn. 98 Mirfi e ld Station D o w n and Slow 99 Wakefield Kirkgate P la t f o rms 1, 2 and 3 Station B e t w e e n Trains 100 Wakefield Kirkgate West sin. and Turners Lane in. Wakefield Kirkgate SATURDAY/SUNDAY 25/26 SEPTEMBER Eastwood and Hebden Bridge Hebden Bridge and Milner Royd Jn. 103 Hebden Bridge and Sowerby Bridge West Platform 1/ Main and Main/Platform 2 Through Line and to FRIDAY 1 OCTOBER to Signalling work to Erecting and dismantling scaffolding and safety nets for overhead power line maintenance 32m. 43ch. ( 8 2 / 3 2 ) Until Saturday to Platform work, 38m., Mechanical equipment in use. See Section '0' to Platform work, 47m. 55ch. and 47m. 70ch. Mechanical equipment in use. (See Section 'D') to Drainage, 47m. 63ch. and 48 m.p. Cranes in use. Possession to be given up for passage of trains to Track maintenance, 22 23m. 50ch. Mechanical equipment in use to Track maintenance, 23m. 50ch. and to Track maintenance, Horbury Jn. A l l to daily. Signalling work.

13 NS-13 SECTION B TEMPORARY ENGINEERING WORK continued At or between L i n e s affected Remarks SOVVERBY BRIDGE MILNER ROYD M. TO BRADFORD MILL LANE 105 M i l l Lane JiL A l l 106 Milner Royd sin. and D o w n and Dryclough Jn. B L O C K E D to Signalling work. ( 8 2 / 1 9 ) to Bridgework (No.2), 29m. 70ch. and 30m. 15ch. Crane in use. SUNDAY 26 to THURSDAY 30 SEPTEMBER 107 Ha lifa x and and Mill Lane Jri. B L O C K E D Sun to Wed to Mon to Thu. Bridgework (Nos.21 and 30) 32m. 32ch. and 35m. 24ch. Crane in use. Possession to be given up for passage of 1E27, Manchester Victoria to Bradford Exchange and 5L28, Halifax to Leeds over line. DIGGLE JN. LMR TO HEALEY MILLS HEATON LODGE M. 108 Marsden and Gledholt Jn. 109 Gledholt Jn. and Huddersfield and Fast and Slow to Bridgework (Nos.62, 65 and 79)an. construction work, 21m. 18ch. and 24m. 15ch. Crane and mechanical equipment in use. (81/48) to Bridgework (No.85), 25m 03ch. Crane and mechanical equipment in use. Springwood Jn. and U p Main Marsden B e t w e e n Trains SATURDAY/SUNDAY 25/26 SEPTEMBER 110 Diggle Jn. and Marsden 111 Stalybridge and Marsden Main Main Main Goods Loop and and Goods Loop to Sun ) Tunnelwork (Standedge ) Tunnel), 15m. 11 ch to Sun ) and 18m. 14ch. and ) in connection with to Sun ) engineering work ) between Marsden and Sat to Sun ) Gledholt Jn. ) Mechanical equipment in use to Sun. trains diverted via Hebden Bridge to Sun. Trains diverted via Hebden Bridge to Bridgework (No.39/B) and track renewal, 14 Hebden Bridge.

14 NS-14 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected R e m a r k s DIGGLE AL LMR TO HEALEY MILLS HEATON LODGE M. continued continued 112 Marsden and D o w n to T r a c k renewal, Gledholt Jn. b r i d g e w o r k (No.62 and to ) and slip treatment, 1 8 m. 65ch. and 2 3 Cranes and mechanical Springwood Jn. and to equipment in use. Marsden B L O C K E D to trains diverted via Hebden Bridge to Trains diverted via Hebden Bridge. to FRIDAY 1 OCTOBER 113 Marsden A l l 114 Huddersfield A l l to daily. Signalling work to daily. Signalling work. MONDAY 27 SEPTEMBER to FRIDAY 1 OCTOBER 115 Gledholt Jn. and D o w n Slow to daily. Drainage 25 and 25tArn.p. Huddersfield B L O C K E D C r a n e and mechanical equipment in use. trains to travel over Fast line. WEDNESDAY 29 SEPTEMBER 116 Springwood Jn. U p to Track renewal 22m. 30ch. and and Marsden B L O C K E D 2 1 m. 70ch. Mechanical equipment in use. trains diverted via Hebden Bridge. THORNHILL L.N.W.,IN. TO LEEDS HOLBECK EAST..IN. SATURDAY/SUNDAY 25/26 and 117 Batley and D o w n Sat to Drainage 36m. 18ch. Morley B e t w e e n Trains a n d 38m. 16ch. Crane Sat to a n d mechanical e q u i p m e n t in use to Sun BARNSLEY STATION JN. TO HORBURY JN. 118 Barnsley Station sin. Do wn and to Track maintenance, 481/4 and and Horbury Jn. B L O C K E D 4 7 SATURDAY/SUNDAY 25/26 SEPTEMBER 119 Wo o lle y Coal Siding Do wn to Tunnelwork (Woolley New Tunnel), and Crigglestone In. 4 7 m. 33ch. and 46m. 34ch.

15 NS-15 SECTION B TEMPORARY ENGINEERING WORKS continued At or between L i n e s affected R e m a r k s BARNSLEY STATION JN. TO HORBURY JN. continued SATURDAY/SUNDAY 25/26 and 120 Barnsley Station in. and Woolley Coal Siding SUNDAY 26 SEPTEME3ER to FRIDAY 1 OCTOBER Sat to Sat to to Sun Track renewal and earthwork, 52m.p. and 48m. 54ch. Cranes and mechanical equipment in use to Sun. Single line working over line. 121 Wo o lle y Coal Siding Do wn and 122 Horbury Jn. A l l to daily. Signalling work to daily. Signalling work. ALDWARKE NORTH M. (MID) TO LEEDS NORTH 123 Swinton Jn. and Cudworth Station Jn. Main to Earthwork, 174% and 174Y2m.p. C r a n e in use. ( 8 2 / 3 7 ) Until Saturday Royston sin. and Oakenshaw South and to Earthwork, slip treatment and track renewal, 178m. 77ch. and 179m. 35ch. Cranes and mechanical equipment in use. ( 8 1 / 5 0 ) 125 Stourton and A l l Leeds North Jn to Signalling work. 126 Cudworth Station Jn. and Cudworth South Jn to Bridgework (No.185), 175m. 34ch. Crane in use. Restricted clearance. to FRIDAY 1 OCTOBER 127 Dearne Valley North Jn. and Cudworth Station to daily. Signalling work. OAKENSHAW SOUTH M. TO OAKENSHAW 128 Oakenshaw South Jn. and and Oakenshaw Jn. Betwe e n Trains to Erecting/dismantling scaffolding and safety nets for overhead power line renewal. 49m. 02ch. ( 8 2 / 3 4 ) Until Saturday 25

16 NS-16 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected Remarks NORMANTON ALTOFTS JN. TO YORK CHALONERS WHIN 129 Whitwood and Castleford Station 130 Frysto n and Burton Salmon 131 Chaloners Whin Jn. and Church entoh and and Normanton to Signalling work to Bridgework (No.43) 18m. 09ch. Crane and mechanical equipment in use. (82/31) to Earthwork 5 and 6m.p. Cranes and mechanical equipment in use. ( 8 1 / 8 ) 132 Hillam Gates LC to Signalling work. 133 Sherburn- i n-e 'met South to Signalling work. 134 Burton Salmon and Milford 135 Sherburn-in-Elmet North L.C. and Church Fenton South Jn. 136 Ch u rch Fenton North Jn. and Chaloners Whin Jn. Main and Normanton Leeds to Level crossing work 15m. 57ch. Crane in use to Track maintenance 11m. 30ch. and 10m. 76ch. trains to travel over Goods line to Track renewal and building work 7m. 50ch. and 2 equipment in use. Trains to travel over Leeds lines MONDAY 27 to WEDNESDAY 29 SEPTEMBER 137 Chaloners Whin sin. and Church Fenton North Jr). Normanton to daily. Track renewal 6 and 5 Crane in use. THURSDAY 30 SEPTEMBER and FRIDAY 1 OCTOBER 138 Church Fenton North In. and Chaloners Whin Normanton and Normanton to ) Daily. Track renewal ) 6m. loch. and to ) Crane and mechanical ) equipment in use to daily. Possession to be given up for passage of 2L94, Bradford Exch. to York over Normanton line. Other trains to travel over Leeds lines. CASTLEFORD WEST M. TO PONTEFRACT WEST JN. 139 Castleford West Jn. and Prince of Wales and to Signalling work.

17 NS-17 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected R e m a r k s CASTLEFORD EAST M. TO ALLERTON MAIN BOWERS OPENCAST SATURDAY 25 SEPTEMBER 140 Castleford East Jn. S i n g l e and erton Main B L O CK E D to Track renewal 4m. 43ch. and 3m. 22ch. Mechanical equipment in use. MONDAY 27 SEPTEMBER 141 Ca stle fo rd East S i n g l e to Track renewal 4m. 43ch. and 3m. Jn. and erton B L O C K E D 2 2 c h. Mechanical equipment in use. Possession Main t o be given up for passage of trains. SHERBURN-IN-ELMET SOUTH TO GASCOIGNE WOOD 142 Sherburn-in-Elmet South to Signalling work. WAKEFIELD KIRKGAM WEST M. TO GOOLE POTTERS GRANGE 143 Wakefield (K) Station Platforms 1, 2 & to Platform work 47m. 55ch. and 4 7 m. 70ch. Mechanical equipment in use. (See Section D). ( 8 1 / 4 6 ) 144 O a kenshaw Jn. and D o w n and to Erecting/dismantling scaffolding Crofton West In. B e t w e e n Trains a n d safety nets for overhead power line renewal 49m. 02ch. ( 8 2 / 3 4 ) Until Saturday Knottingley A l l to Signalling work. SATURDAY/SUNDAY 25/26 SEPTEMBER 146 Cro fto n East Jn. and Pontefract West Jn. and Main to Loading rails c h. Crane in use. Possession to be given up for passage of trains. 147 Pontefract Goods D o w n and to Loading rails 5 7 Jn. and Knottingley 1 5 c h. Crane in use. Possession to be given up for West Jn. p a s s a g e of 1L22, Kings Cross to Bradford Exchange (diverted) over line and 1D57, Leeds to Doncaster (diverted) and 1236, Blackpool North to Kings Cross over line. 148 Knottingley and D o w n to Track maintenance, 5 9 Sudforth Lane r T h p.

18 NS-18 SECTION B - TEMPORARY ENGINEERING WORKS - continued At or between Lines affected Remarks WAKEFIELD KIRKGATE WEST JN. TO GOOLE POTTERS GRANGE JN. -- continued 149 Crofton West Jn, and U p Calder Bridge Jn, 150 Hensall Jn. and D o w n and Snaith Station LC B L O C K E D to Track maintenance, 49m.p. and 48m, 70ch to Track renewal, 66m. 37ch and 66m. 42ch. to FRIDAY 1 OCTOBER 151 Oakenshaw Jn. and A l! Featherstone LC to daily. Signalling work. ALDWARKE NORTH M. (MID) TO BURTON SALMON 152 Hickle to n and Moorthorpe Station Jn. Al! to Earthwork, 11m. 65ch. and 11m. 35ch. Crane and mechanical equipment in use. (82/31) 153 Hickle to n and Ferrybridge 154 Moorthorpe Station 155 Moorthorpe Station Jn. and Pontefract Baghill Station 156 Moorthorpe Stn. Jn. and Ferrybridge South Jn. 157 Moorthorpe Station Jn. and Ferrybridge South Jn. and and to Signalling work. ( 8 2 / 3 0 ) to Platform work. Mechanical equipment in use. (See Section 'D'). (8 2 / 2 7 ) to Bridgework (No.43) and earthwork 10m. 69ch. and 9m. 21ch. Crane and mechanical equipment in use. Restricted clearance.(82/25) to ) Track maintenance, ) to ) Mechanical equipment ) in use. ( 8 2 / 2 9 ) to to Bridgework (No.26), 5 meta. (82/1) SATURDAY/SUNDAY 25/26 SEPTEMBER 158 Dearne Jn. and Hickleton 159 Moorthorpe Stn. Jo. and Ferrybridge Sth. Jn. 160 Swinton Jn. and Aldwarke Jn. and and Pontefract to Track renewal 15m. loch. and 15m. 58ch. Cranes and mechanical equipment in use to Track renewal 9m.13ch. and 7m. 45ch. Cranes and mechanical equipment in use to Track maintenance, 164m. 61ch, and 164m. 57ch.

19 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected R e m a r k s ALDWARKE NORTH M. (MID) TO BURTON SALMON continued continued 161 Ferrybridge North sin. and Burton Salmon 162 Ferrybridge Power Station Branch and MONDAY/TUESDAY 27/28 SEPTEMBER NS to In connection with track renewal in Ferrybridge Power Station to Possession to be given up for passage of trains to Track maintenance and loading rails, Om. 15ch. and Om. 50ch. Crane and mechanical equipment in use. 163 Ferrybridge South Jn. and Moorthorpe South Jn. MONDAY 27 to WEDNESDAY 29 SEPTEMBER 164 Moorthorpe South and Main and Moorthorpe B L O C K E D Station Jri to Track renewal, 8m. 05ch. and 7m. 45ch. Mechanical equipment in use. Possession to be given up for passage of MGR ald local trip trains. Other trains diverted via Cudworth Mon and Tue to Tue and Wed. Track maintenance, 11m. 45ch. and 11m. 15ch. Mechanical equipment in use Mon and Tue to Tue and Wed. Possession to be given up for passage of trains and MGR and local trip trains. Other trains diverted via Cudworth to Tue and Wed. Possession to be given up for passage of trains. MOORTHORPE STATION JN. TO SOUTH KIRKBY JNI. to FRIDAY 1 OCTOBER 165 Moorthorpe Station D o w n and Jn. and South Kirkby Jn to daily. Signalling work. MONDAY 27 SEPTEMBER to FRIDAY 1 OCTOBER 166 Moorthorpe Station D o w n and and South B L O C K E D Kirkby in Mon to Thu to Tue to Fri. Track renewal, 1 equipment in use. Possession to be given up for passage of MGR and local trip trains. LEEDS WHITEHALL dhl. TO BRADFORD EXCHANGE 167 Whitehall Jn. and D o w n and Hammerton Street 168 Mill Lane Jn, 169 Wo rtle y West Jn. and U p Holbeck West Jn. B L O C K E D to Signalling work. ( 8 2 / 1 9 ) to Signalling work. ( 8 2 / 1 9 ) to Track maintenance, Om. 50ch. and Om. loch. Possession to be given up for passage of trains.

20 NS-20 SECTION B - TEMPORARY ENGINEERING WORKS - continued At or between Lines affected Remarks LEEDS WHITEHALL JN. TO BRADFORD EXCHANGE - continued THURSDAY 30 SEPTEMBER and FRIDAY 1 OCTOBER 170 Ar m ley Moor G.F. and Mill Lane Jn to to ) Daily. Track renewal ) lm. 49ch. to 191m. ) 78ch. Mechanical ) equipment in use. Possession to be given up for passage of trains. LEEDS TO SKIPTON STATION SOUTH LMR 171 Leeds West Jn. 172 Whitehall in, and Kirkstall 173 Kirkstall Jn. Goods Loop 174 Kirkstal I in. and and Apperley Jn. 175 Apperley Jn. and and Thackley Jn, 176 Bingley Station 177 Keighley Station Jn. and Cononley and and SATURDAY/SUNDAY 25/26 SEPTEMBER 178 Apperley Jn. and Guiseley Main Main to Signalling work to Signalling work. ( 8 2 / 1 9 ) to Earthwork 197m. 45ch. and 198m.p. Mechanical equipment in use. (82/10) to Bridgework (Nos24 and 33) 198m. i loch. ond 201m. 45ch. Restricted clearance. (82/32) to Tunnelwork (Thackley Tunnel) 203m. 42ch. and 204m. 32ch. Mechanical equipment in use. ( 8 1 / 3 0 ) to Platform work 208m. 68ch. Mechanical equipment in use. (See Section 'D'). (82/38) to Signalling work to Track renewal, 204m. 35ch. and 204m. 66ch. Mechanical equipment in use. 179 Apperley sin. and Guiseley Jn. Main Main Main to ) Track renewal 204m. ) 35ch. and 204m. 66ch to ) Cranes and mechanical ) in use to to ) Possession to be given ) up for passage of 2M71, Leeds to Morecambe over line under Single line working to Single line working over line. 120 Gu;seley Jn. and D o w n and Shipley Bingley In. BL OCKED to Track renewal 205m. 64ch. and 205m. 77ch. Crane in use. Possession to be given up for passage of 2M71, Leeds to Morecambe over line.

21 NS-21 SECTION B - TEMPORARY ENGINEERING WORKS - continued At or between L i n e s affected R e m a r k s LEEDS TO SKIPTON STATION SOUTH LMR continued - continued 181 Keighley Station Jn. and Steeton L.C. and a 0 n 4 d 00 to Loading materials 212m. 14ch. 212m. 30ch. Crane in use. Possession to be given up for passage of trains. to FRIDAY 1 OCTOBER 182 Gu ise ley Jn. and Shipley Bingley Jn. MONDAY 27 SEPTEMBER 183 Thackley Jn. and to daily. Signalling work. Main and Loop to Signalling work. (See Section 'C'). LEEDS WORTLEY JN. TO HARROGATE 184 Wortley Jn. and Horsforth and to Signalling work. 185 Horsforth and Weeton Stn. and SATURDAY/SUNDAY 25/26 SEPTEMBER to Demolition work 8 30ch. ( 8 2 / 3 0 ) Until Saturday Horsforth and Rigton and to Tunnelwork (Bramhope Tunnel) 5m. 65ch and 7m. 77ch. Mechanical equipment in use. APPERLEY JN. TO ILKLEY STATION 187 Apperley in. and D o w n and Burley in. B e t w e e n Trains 188 E sh o lt Jn. and Guiseley Station 189 I l k l e y Station and Platform Esh o it Jn. and D o w n and Guiseley Station B L O C K E D 191 Esh o lt sin. and D o w n and Ilkley Jn. B L O C K E D to FRIDAY 1 OCTOBER to Construction work 204 and 205 (82/35) to Tunnelwork (Greenbottom Tunnel), 204m. 62ch. and 204m. 68ch. Restricted clearance. (82/27) to Platform work 211m. 23ch. Mechanical equipment in use. (See Section 'D'). (82/38) to Earthwork, 205m. 06ch. Mechanical equipment in use to Earthwork and track maintenance, 205m. 06ch. and 205m. 45ch. 192 Gu ise ley Station and to daily. Signalling work.

22 NS-22 SECTION B TEMPORARY ENGINEERING WORKS continued At or between GUISELEY JN. TO ESHOLT Lines affected Remarks 193 G u ise ley Jo. and Esholt Jn. and to Construction work 3m 38ch and 0 m.o. Crane and mechanical equipment in use. SHIPLEY LEEDS JN. TO BRADFORD FORSTER SQUARE to FRIDAY 1 OCTOBER 194 Leeds Jri. and Shipley Bradford Jn. and to daily. Signalling work. SHIPLEY BRADFORD JN. TO SHIPLEY BINGLEY to FRIDAY 1 OCTOBER 195 Shipley Bradford Jn. S in g le and Shipley Bingley Jn to daily. Signalling work. LEEDS TO HULL PARAGON 196 L e e d s East Jn. and D o w n and Marsh Lane Jn. 197 Leeds East Jo. and Micklefield Stn. Jn to Bridgework (Marsh Lane Viaduct) 20m. 25ch. and 1 9 equipment in use. ( 8 2 / 1 8 ) to Signalling work. 198 Gasooigne Wood and Selby West Jo. and Main to Demolition work, earthwork and bridgework, 6rnop. and 2m. 48ch. Cranes and mechanical equipment in use. ( 8 0 / 2 1 ) 199 Gascoigne Wood 200 Broomfleet and Main 201 H u l l Paragon E ' line to Drainage, 6m. 30ch. and 6m. 16ch. Crane and mechanical equipment in use. Possession to be given up for passage of 1D52, Leeds to Hull over Main line to Signalling work to Track maintenance, Om. 19ch. and Om. 21ch. to FRIDAY 1 OCTOBER 202 Cro ss Gates Station Do wn and and Peckfield to daily. Signalling work.

23 SECTION B TEMPORARY ENGINEERING WORKS continued At or between LEEDS TO HULL PARAGON continued MONDAY 27 SEPTEMBER to FRIDAY 1 OCTOBER 203 Selby and Gascoigne Wood Lines affected TUESDAY 28 and WEDNESDAY 29 SEPTEMBER 204 Brough East LC U p and Broomfleet B L O C K E D Station LC D o w n NS-23 Remar ks to daily. In connection with engineering work. Possession to be given up for passage of trains to daily. Track maintenance, 12 and 1 3 Possession to be given up for passage of 8D67, Hull to Doncaster over line. THORNE JN. TO GILBERDYKE 205 Potters Grange Jr'. and Goole LC 206 Goole LC and Sa I tmarshe Station LC to Bridgework and earthwork, 7m. 20ch. and 6m. 65ch. Mechanical equipment in use. ( 8 1 / 2 3 ) to ) Bridgework 5m. 31ch. ) Crane in use to to ) Possession to of 1D62, Doncaster to Hull over line under Single line working to Single line working over the line. HESSLE HAVEN TO DAIRYCOATES WEST VIA HULL YARD 207 H e s s l e Haven and D o w n and Dairycoates West B e t w e e n Trains to Track renewal, lm. 62ch. and 2m. 2ch. Crane in use. ( 8 2 / 1 8 ) DAIRYCOATES WEST TO NEPTUNE STREET 208 D a irycoates West D o w n and and Neptune Street B e t we e n Trains 209 Dairycoates West LC Do wn and to Track abandonment, lm. 69ch. and 1 use. ( 8 2 / 1 6 ) Until Monday to Track maintenance l'am.p. and lm. 52ch. Crane in use. HESSLE ROAD TO ALEXANDRA DOCK SUNDAY Hessle Road and and Alexandra Dock B L O C K E D to Trimming bushes 21/4m.p. and 4m.p. Mechanical equipment in use.

24 SECTION C NS-24 SIGNALLING AND PERMANENT WAY ALTERATIONS Items marked thus w i l l not appear in future issues and a note must be taken of them by al l concerned With effect from Monday 13 September the 20m.p.h. and speed restrictions between Royston In. and Oakenshaw South Jri. (179m. 25ch. and 179m. 40ch.) will become differential restrictions of 20 over 40 in accordance with Section 1 clause 10 on page 1.57 of the General Appendix. (40) WEDNESDAY 29 SEPTEMBER YORK (CLIFTON) DETAILS OF WORK REFEREED TO IN SECTION B Clifton Loop ground position light signal No.Y172 will be elevated 5 ft. above rail level, 6 ft. 4 ins. from the running edge. ( 4 2 ) MONDAY 27 SEPTEMBER THACKLEY JUNCTION The points Main/ Loop will be secured out of use in the normal position until further notice. ( U. F. N. ) MIRFIELD DETAILS OF WORK ALREADY CARRIED OUT The points leading to the Sidings have been secured out of use in the normal position pending removal. ( 4 1 ) SOUTH KIRKBY JUNCTION The facing lead from the Main into South Kirkby Colliery has been restored to its former position. The trailing crossover between the and Main lines has been re-positioned 30 yards nearer to South Elmsall, Signalling Alterations Main ground position light signal (L647) has been re-positioned in the Main cess 80 yards further south. A 2-way stencil-type route indicator has been provided, and the following indications apply: Indication D e s t i n a t i o n Main L656 signal Branch M28 signal A new ground position light signal L651 has been provided in the Main cess at the Main end of the Main to Main trailing crossover. A 3-way stencil-type route indicator has been provided and the following indications will apply: Indication Destination Bunker line B Bunker line A Main L645 signal

25 NS-25 SECTION C SIGNALLING AND PERMANENT WAY ALTERATIONS continued DETAILS OF WORK ALREADY CARRIED OUT continued BETWEEN LEEDS AND GARFORTH The following catch points in the line have been secured out of use pending removal and replacement by plain line: 17m. 52ch. 655 yards before reaching Leeds L791 signal 17m. 20ch, 830 yards before reaching L793 signal 16m. 42ch yards before reaching L795 signal 15m. 74ch. 510 yards before reaching L797 signal 15m. 26ch. 600 yards before reaching L799 signal BETWEEN THORNHILL LNW JUNCTION (RAVENSTHORPE) AND LEEDS HOLBECK EAST JUNCTION (MORLEY TUNNEL) The following catch points in the line have been secured out of use pending removal and replacement by plain line: 32m. 76ch. 700 yards before reaching Batley signal No.15 33m. 39ch. 630 yards before reaching Batley signal No.14 34m. loch. 530 yards before reaching Batley signal No.13 34m. 45ch. 720 yards before reaching Batley signal No.12 35m. 17ch. 595 yards before reaching Batley signal No.11 35m. 60ch. 840 yards before reaching Batley signal No.10 MOORHOUSE JUNCTION Main signal L.662 has been converted to an Automatic signal. The left-hand off-set subsidiary on Main L.669 signal has been abolished. The trailing Main to Main crossover has been secured out of use pending removal together with associated signalling. (40) WAKEFIELD KIRKGATE Rail access to Whithams Top Yard from the Goods line has been terminated and the sidings have been secured out of use pending removal. ( 4 1 ) MARSDEN The new mains crossover has been brought into use 100 yards east of its former position. The associated ground disc signal applying Main to Main has been replaced by a ground position light signal (No.14) applying: Main to Main or Set back along Main to NEW LIMIT OF SHUNT Indicator at the Diggle end of the Platform (east face of Bridge No.45). The ground disc signal applying Main to Main has been replaced by a ground position light signal (No.17). ( A m e n d e d ) (41)

26 NS-26 SECTION C SIGNALLING AND PERMANENT WAY ALTERATIONS continued DETAILS OF WORK ALREADY CARRIED OUT continued PECKFIELD The catch points in the Main line at 11m. 38ch. have been removed and replaced by plain line(39) SOUTH KIRKBY JUNCTION TO MOORTHORPE STATION JUNCTION : RE-MODELLING OF SOUTH KIRKBY JUNCTION South Kirkby Junction The Junction between the and Branch and the and Main lines has been relayed in a modified form 100 yards further south. The and Branch lines have been realigned accordingly. The positions of the new and altered signals in relation to the re-modelled junction are as shown on the diagram included in this notice. Between South Kirkby Junction and Moorthorpe Station Junction The trailing crossover between the and Branch lines has been repositioned 200 yards nearer to Moorthorpe. The Marshalling Loop has been extended 200 yards towards Moorthorpe. Description of Signals: Signal Line Route Indication Application to or towards (Stencil) L652 Marshalling M28 Branch Loop L654 Branch "M" L645 Main (Via Branch Crossover) Bunker Line 'A' Bunker Line 'B' L649 Marshalling Loop L666 Branch L645 Main

27 E)dSTI BIGNALLING FROM SHEFFIELD LEA6 A A ExisTING SIGNALLINQ PATER 0e0CD-M-t SBVIC'S, I 734N 05 MW o- 3 P0,*4 Ts TELE. L6to& J unc-i IMR*.E.Y1 on E NIS L15G TING r e - I 250YOS 6IGNALLIN4 _COP 4. jg PoiNTS 3_ TELE * LG57 P \ Q ORMG0 /C-70 L T cow N BRANCH DOW N 1,LSON MAIN UP B R A C = F t c o i A A SOUTH K E N JUNCTION REMODELLI NG ( 5UNDAs r 2I s r AUGUST 1982) (SIGNAL No PREFINES - LEEDS 5 5 EXISTING SIGNALLING, INT0CoLLIER'y M - MOORTHORPE 50uTH 45) PONTB PADLOCKED CRIPPLE Ex is ilne L. 6 0 BOG L,NE T o l e o o N o s idginall CISr_ SOuTH NIR KEW. COLLIERY BUNAEFO L L. 4E4S - DOwN MAIN VearD'al LG46,e0o-fm- 135cylos- 1Z3174 Zoo, ExiSTiNt,, FLVC._30 To LEEDS

28 NS-28 SECTION D GENERAL INSTRUCTIONS AND NOTICES A thick ver ticle line denotes new or amended items 41. Running Li nes and Signal ling System Page 111 Loops and Refuge Sidings ERSECTIONAL APPENDIX (NORTHERN AREA) TABLE "A" DETAILS OF RUNNING LINES Location ALDWARKE NORTH JN. (MID) TO LEEDS NORTH JN. Between Royston Jrh and Oakenshaw South Jn, Amend: M. C h Permanent Speed Restrictions U p m ph. At or Between m. 25ch. and m. 40ch. Catch, Spring and unworked trailing points (1\11D40D) Page 156 LEEDS TO HULL PARAGON Between St Georges Road LC and Anlaby Road in. Amend: l m. Och. and Om. 40ch. Between Anlaby Road Jrh and Hull Paragon Del ete: Om. 40ch. and Om. 48ch. (ND40D) LOCAL INSTRUCTIONS Page 372 F E R R Y B R I D G E 'C' POWER STATION Add C.E.G.B. Level Crossing The instructions in the General Appendix headed "Automatic Open Crossings, Locally monitored ()NOM.) At crossings where trains are required to stop" apply at this crossing. If it becomes necessary for a set-back movement to take place over the crossing, the Guard must be stationed at the Crossing to stop road traffic, before such movement commences. "Incoming" Open Level Crossing The instructions in the General Appendix headed "Open Crossings" apply at this crossing. If it becomes necessary for a set back movement to be made over the crossing, a member of the C.E.G.13. staff will be stationed at the crossing and no movement over the crossing must be made without his authority. ( )

29 NS-29 SECTION D GENERAL INSTRUCTIONS AND NOTICES continued LOCAL INSTRUCTIONS continued From TABLE Z LI NE S EQUIPPED WITH THE AUTOMATIC WARNING SYSTEM To Line R e m a r k s Page 271 (Page 127 Supp. Optg. Insts) ALDWARKE NORTH JN. (MID) TO BURION'SALMON Delete : Moorthorpe B u r t o n D o w n and Add : Aldwarke North In. Hickleton D o w n and Pontefract Bagh II B u r t o n Salmon and ( 4 0 D ) Page 18 (1) and (2) INSTRUCTIONS TO STAFF DEALING WITH M.G.R. TRAINS AND BUNKER/RAPID LOADING COLLIERIES B.R.30059/5 PRINCE OF WALES COLLIERY Delete instructions and substitute: 1. Wh e n signal 1 is cleared, the arriving train must proceed to the marker board for the locomotive to be detached. 2. Wh e n the train is ready for tare weighing and part loading, the Guard must advise the Bunker Operator accordingly. 3. T h e train must be propelled for tare weighing and part loading under the control of the laoding signals at 1 m.p.h. 4. Wh e n the wagons next to the locomotive have been part loaded the Bunker Operator will advise the Guard that the direction of the train for loading will be reversed and the Guard must advise the Driver accordingly. 5. T h e train must then be hauled through the bunker under control of the loading signals at 1m.p.h. for completion of loading and for gross weighing. Crippled Wagons 6. T h e Guard must advise the Bunker Operator when a wagon requires to be detached in the cripple siding. When a movement is ready to return via the Bunker line to the approach side of signal 1, the Guard must inform the Bunker Operator. When a train is re-formed after detaching operations have been completed, the Guard must adv:se the Bunker Operator it is ready to return to the approach side of signal 1. ( 4 0 D )

30 NS-30 SECTION D GENERAL INSTRUCTIONS AND NOTICES continued INSTRUCTIONS TO STAFF DEALING WITH M.G.R. TRAINS AND BLINKER/RAPID LOADING COLLIERIES B.R.30059/5 continued Page 21 (1)/(2) SOUTH KIRKBY COLLIERY Delete and substitute: 1. Tr a i ns for Discharge 1,1 T r a i n s must be drawn through the hopper under the control of the unloading signals. 1.2 Di s c h a r g e will take place whilst propelling at 1 unloading signals. 1.3 T h e cg,w Examiner will inform the Guard if any defective wagons require to be detached in the cripple sidings. The C&W Examiner will also inform the Discharge Hopper Operator. 1.4 O n completion of discharge the train must be propelled towards line 'A under the authority of signal C I f the train is to depart towards Leeds it must be propelled behind the appropriate signal the trains is to depart empty towards Moorthorpe the locomotive must be detached and run round. 1.7 T h e Guard must advise the Signalman when the train is ready to depart. 2. Tr a i ns for Loading 2.1 T r a i n s must proceed at 3 m.p.h. for tare weighing to the furthermost loading signal. 2.2 Tr a i n s must then be propelled at 1 control of the Loading signals. 2.3 Throughout the weighing and loading operations, the Guard must be positioned at the emergency stop switch. In an emergency the train must be brought to a stand by operation of this switch. Train movements must not be allowed to re-commence until the Guard has advised the Bunker Operator that it is safe to do so. The Guard must also operate this switch to stop the train and enable the last wagon to be loaded whilst stationary. 2.4 I f a defective wagon requires to be detached in the cripple sidings the Guard must inform the Loading Bunker Operator. 2.5 O n completion of gross weighing the Guard will be handed the train documents and the train must then be propelled to line B'. 2.6 I f the train is to depart towards Leeds it must be propelled behind signal I f the train is to depart towards Moorthorpe the locomotive must be detached and run round. 2.8 T h e Guard must advise the Signalman when the train is ready to depart. 3. Cr i ppl e Siding 3.1 W h e n it is necessary to detach a defective wagon into the cripple siding the Colliery Controller will provide staff with the padlock key for 'the points, to assist in the detaching operation. 3.2 A f t e r the locomotive has run round and Signal 1 and 3 are cleared the Guard must signal the Driver to set back to the rear of signal A f t e r detaching operations have been completed the train must depart via Moorthorpe.

31 NS-31 SECTION D GENERAL INSTRUCTIONS AND NOTICES continued INSTRUCTIONS TO STAFF DEALING WITH M.G.R. TRAINS AND BUNKER/RAPID LOADING COLLIERIES B.R.30059/5 continued Page 21 (1)1(2) SOUTH KIRKBY COLLIERY substitute continued 4. Le v e l Crossing When a failure affecting the operation of the level crossing occurs, trainmen must be prepared to work to the instructions and hand signals of the attendant provided. 5. Failure of N.C.B. Signals Should a signal failure occur, the Colliery Controller will arrange for the points to be set in the proper position. The Guard must, after checking the position of the points, work to the Colliery Controller's instructions and hand signal the Driver as necessary. 6. Maximum permissible speeds Between main line connections and level crossing 15 m.p.h. Between level crossina and discharae/loadina lines 5 m.p.h. (40D) Page 22 WOOLLEY COAL SIDINGS Delete all instructions and substitute: WOOLLEY COAL SIDING 1. A l l trains must be propelled into the siding from the Main line. 2. Wh e n a train is propelled into the sidings, it must be stopped with the locomotive in rear of the colliery outlet signal, where the Driver must await further instructions. MISCELLANEOUS NOTICES KEIGHLEY STATION From Sunday 26 September, to daily, drivers of trains stopping at Keighley Station to observe instructions of handsignalman ancvor warning notices during renewal of platform copings. BINGLEY STATION Commencing Sunday 19 September from to daily, drivers of trains stopping at Bingley Station to observe instructions of Handsignalman and/or warning notices during repairs to platform areas. DONCASTER STATION Due to track renewal Platform (No.1) drivers of trains booked to call at Platform 3A must bring their trains to a stand at D282 Signal. Until Further Notice.

32 NS-32 SECTION D GENERAL INSTRUCTIONS AND NOTICES continued MISCELLANEOUS NOTICES continued WAKEFIELD KIRKGATE STATION Drivers of trains required to stop at Wakefield Kirkgate Station to observe instructions of handsignalmen and/or warning notices during repairs to platforms. MIRFIELD STATION Until further notice, between to daily. Drivers of trains stopping at Mirfieid to observe instructions of Handsignalman and/or warning notices during resurfacing of platform area. MOORTHORPE STATION Until Further Notice From to daily, drivers of trains stopping in the Platform to observe instructions of Handsignalman and/or warning notices during repairs to platform copings. MP.32/NS G. GRAHAM York C h i e f Operating Manager 13 SEPTEMBER, 1982

WEEKLY OPERATING NOTICE

WEEKLY OPERATING NOTICE PRIVATE AND NOT FOR PUBLICATION B R. 3 1 2 6 2 / 1 British Rail N S E A S T E R N REGION 3 8 WEEKLY OPERATING NOTICE CONTAINING TEMPORARY SPEED RE S TRI CTI ONS TEMPORARY ENGINEERING W O R K S SIGNALLING

More information

British Rail PERIODICAL OPERATING NOTICE

British Rail PERIODICAL OPERATING NOTICE PRIVATE AND NOT FOR PUBLICATION BR.31262/D British Rail ND EASTERN REGION (Northern Area) 32D PERIODICAL OPERATING NOTICE CONTAINING GENERAL INSTRUCTIONS AND NOTICES SATURDAY 4 AUGUST 1984 TO FRIDAY 5

More information

West Yorkshire - Timetable Notes.

West Yorkshire - Timetable Notes. West Yorkshire - Timetable Notes. Introduction. This timetable covers the period July 1991 to May 1992. This timetable is a heavy freight orientated timetable where the passenger trains are outnumbered

More information

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 8 MAY FRIDAY 4 JUNE 1911

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 8 MAY FRIDAY 4 JUNE 1911 FOR THE INFORMATION OF RAILWAY STAFF ONLY British Rail EASTERN REGION B.R.31262/D No. 19D (NORTHERN AREA) GENERAL INSTRUCTIONS AND NOTICES SATURDAY 8 MAY (4 WEEKLY PERIOD) TO FRIDAY 4 JUNE 1911 INCLUSIVE

More information

East Coast Berwick to Alnmouth

East Coast Berwick to Alnmouth East Coast Berwick to Alnmouth NW 0 Scottish Border Berwick Station Scremerston Tweedmouth Goswick Beal Crossovers Crag Mill Chathill Station Belford Fallodon & Christon Bank Little Mill Crosovers Alnmouth

More information

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 26 SEPTEMBER FRIDAY 23 OCTOBER 1970

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 26 SEPTEMBER FRIDAY 23 OCTOBER 1970 1 B.R.31262/D ND British Rail EASTERN REGION (NORTHERN AREA) No. 39D GENERAL INSTRUCTIONS AND NOTICES SATURDAY 26 SEPTEMBER (4 WEEKLY PERIOD) 10 FRIDAY 23 OCTOBER 1970 INCLUSIVE For additional items during

More information

NATIONAL PASSENGER SURVEY - WAVE 23 Autumn 2010 REPORT FOR WEST YORKSHIRE PTE

NATIONAL PASSENGER SURVEY - WAVE 23 Autumn 2010 REPORT FOR WEST YORKSHIRE PTE NATIONAL PASSENGER SURVEY - WAVE 23 REPORT FOR Contacts David Greeno Passenger Focus 1 Drummond Gate London, SW1V 2QQ Tel: 00 123 0837 Email: david.greeno@passengerfocus.org.uk David Chilvers Continental

More information

Morwell. (88 miles 75 chains 47 links, km)

Morwell. (88 miles 75 chains 47 links, km) Morwell (88 miles 75 chains 47 links, 144.372 km) 01.06.1877 Opened with line between Morwell and Sale. Staff and Ticket not provided initially. (VR to 62, Leo Harrigan, WTT) (01.04.1878) By this date,

More information

Ouyen - Pinnaroo GALAH (298 MILES)

Ouyen - Pinnaroo GALAH (298 MILES) Ouyen - Pinnaroo TIEGA (295 1/4 MILES) (19.12.1910) Opened for goods not requiring shed accommodation or crane power. Traffic handled by Construction Branch. (WN 51) 25.06.1912 Line opened. No-one-in-charge.

More information

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 1 DECEMBER 1979

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 1 DECEMBER 1979 PRIVATE AND NOT FOR PUBLICATION B.R. 31262/ a) ND British Rail EASTERN REGION 48D (Northern Area) GENERAL INSTRUCTIONS AND NOTICES SATURDAY 1 DECEMBER 1979 TO FRIDAY 1 FEBRUARY 1980 INCLUSIVE For additional

More information

Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH)

Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH) Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH) 01.02.1873 Open for passengers on Geelong - Ballarat line (Chronological Index) (31.12.1878) By this date, open for general goods (Commissioners

More information

WORKING TIMETABLE MANDATORY TRAIN SERVICES

WORKING TIMETABLE MANDATORY TRAIN SERVICES (C) Swanage Railway Co. Ltd. 016 SECTION WG (SWANAGE BRANCH) WORKING TIMETABLE OF MANDATORY TRAIN SERVICES WORGRET JCN TO SWANAGE DIESEL GALA 016 6 MAY 014 to 8 MAY 016 (including preview day May) When

More information

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES Spa Valley Railway 2018 SECTION WE A DESTINATION AT EVERY STATION! WORKING TIMETABLE OF PASSENGER TRAIN SERVICES SOUTHERN REGION (CENTRAL DIVISION) SPA VALLEY LINE Thursday 2 nd, Friday 3 rd, Saturday

More information

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES Spa Valley Railway 08 SECTION WE A DESTINATION AT EVERY STATION! WORKING TIMETABLE OF PASSENGER TRAIN SERVICES SOUTHERN REGION (CENTRAL DIVISION) SPA VALLEY LINE Thursday nd, Friday 3 rd, Saturday 4 th

More information

WORKING TIMETABLE MANDATORY TRAIN SERVICES

WORKING TIMETABLE MANDATORY TRAIN SERVICES SECTION WG ( BRANCH) WORKING TIMETABLE OF MANDATORY TRAIN SERVICES WORGRET JCN TO DIESEL GALA 14 9 MAY 14 to 11 MAY 14 When trains are running late, drivers must endeavour to make up time with due regard

More information

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2.

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2. GE/RT8000/T11 Rule Book Module T11 Movement of engineering trains and on-track plant under T3 arrangements Issue 2 January 2007 Comes into force 02 June 2007 Issue Date Comments Comes into force 1 June

More information

Module T3. Possession of a running line for engineering work. GE/RT8000/T3 Rule Book. Issue 6. September 2015

Module T3. Possession of a running line for engineering work. GE/RT8000/T3 Rule Book. Issue 6. September 2015 GE/RT8000/T3 Rule Book Module T3 Possession of a running line for engineering work Issue 6 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document

More information

Warragul. (61 miles 20 chains 0 links, km)

Warragul. (61 miles 20 chains 0 links, km) Warragul (61 miles 20 chains 0 links, 96.766 km) GALLAGHERS LANE (60 MILES 37 CHAINS) 30.10.1945 Flashing lights provided. Work automatically for all trains. (WN 45, AGST 16/298/2) 80.09.1971 Provision

More information

Somerton SOMERTON (13 MILES 42 CHAINS)

Somerton SOMERTON (13 MILES 42 CHAINS) Somerton SOMERTON (13 MILES 42 CHAINS) Somerton has had four phases of existence. The first, from 1881 to 1889, was as a simple passenger platform which served the village of Somerton on Sydney Road. Between

More information

List of Permanent Way Drawings at the National Railway Museum, York Last updated 13 November 2015

List of Permanent Way Drawings at the National Railway Museum, York Last updated 13 November 2015 List of Permanent Drawings at the National Railway Museum, York Last updated 1 November 015 Introduction This is oldpway s list of drawings of permanent way that are at the National Railway Museum in York.

More information

Lane Closure Manual. Route Report Index: US12-A US12-03 (WB) US12-01 (EB WB) US12-02 (EB)

Lane Closure Manual. Route Report Index: US12-A US12-03 (WB) US12-01 (EB WB) US12-02 (EB) Route Report Index: US1-A?A@ 15 %&'( 94?A@ 5?A@?A@ 95 +, 16 9?A@?A@ 47 %&'( 95 5?A@ 65 +, 8 +, 1 5 %&'( 94 %&'( 69 4 %&'( 5 W %&'( 5 E +, 61?A@ 95 %&'( %&'( 69 4 9 4 %&'( 94 %&'( 49 4 NOTE: Lane closures

More information

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1. SP (issue 1).qxd 16/4/03 1:04 pm Page 1 GE/RT8000 - SP Rule Book Module SP Speeds Issue 1 June 2003 Comes into force 6 December 2003 SP (issue 1).qxd 16/4/03 1:04 pm Page 2 Issue Date Comments Comes into

More information

Broadmeadows BROADMEADOWS (10 1/2 MILES)

Broadmeadows BROADMEADOWS (10 1/2 MILES) Broadmeadows BROADMEADOWS (10 1/2 MILES) Broadmeadows is situated at the top of the long climb out of the Moonee Ponds Creek valley. It served the established communities of Keilor (to the west) and Campbellfield

More information

STATISTICS FOR MISSION Circuit Attendance Statistics Summary October 2010

STATISTICS FOR MISSION Circuit Attendance Statistics Summary October 2010 2 Huddersfield (Pennine) CROSLAND HILL 44 47 40 45 42 46 38 42 2 6 2 6 1 1 1 1 GLEDHOLT 64 74 59 65 58 66 53 58 4 7 4 7 3 5 3 5 GOLCAR 34 43 34 43 31 37 30 37 3 6 3 6 0 0 0 0 HUDDERSFIELD MISSION 52 95

More information

TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 19 OCTOBER FRIDAY 25 OCTOBER 1974

TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 19 OCTOBER FRIDAY 25 OCTOBER 1974 PRIVATE AND NOT FOR PUBLICATION B. R. 3 1 2 6 2 British Rail' NN EASTERN REGION No.42 TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 19 OCTOBER

More information

Uncontrolled When Printed Document to be superseded as of 01/06/2013 To be superseded by GORT3056-E Iss 3 published on 02/03/2013

Uncontrolled When Printed Document to be superseded as of 01/06/2013 To be superseded by GORT3056-E Iss 3 published on 02/03/2013 Section E MOVEMENT OF FREIGHT TRAINS Contents Page Latest Issue Contents E1 December 03 E1 Authorised Vehicles E3 December 03 E2 E3 E4 E5 Movement of Defective Vehicles Special Movement Conditions Vehicles

More information

The West Lancashire Light Railway OPERATING RULE BOOK

The West Lancashire Light Railway OPERATING RULE BOOK The West Lancashire Light Railway OPERATING RULE BOOK Revision 4-5th November 2008 This supersedes any previous versions of the Rule Book CONTENTS 1 Definitions and Abbreviations 2 Method of Operation

More information

No. 38D GENERAL INSTRUCTIONS AND NOTICES

No. 38D GENERAL INSTRUCTIONS AND NOTICES PRIVATE AND NOT FOR PUBLICATION BR.31262/3D LM British Rail (EASTERN REGION) No. 38D GENERAL INSTRUCTIONS AND NOTICES AFFECTING EASTERN REGION TRAINMEN WORKING OVER THE LONDON MIDLAND REGION (Excluding

More information

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book GERT8000-HB11 Rule Book Duties of the person in charge of the possession (PICOP) Issue 6 September 2017 Comes into force 02 December 2017 Handbook 11 Uncontrolled when printed Published by: RSSB The authoritative

More information

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES Spa Valley Railway 2017 SECTION WE A DESTINATION AT EVERY STATION! WORKING TIMETABLE OF PASSENGER TRAIN SERVICES SOUTHERN REGION (CENTRAL DIVISION) SPA VALLEY LINE Thursday 3 rd, Friday 4 th, Saturday

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Shunting and Marshalling Rule Number: 4013 Version 1.0, 31 March 2016 Shunting and Marshalling Rule Number: 4013 Document Control Identification Document title

More information

TA20 ARTC Code of Practice for the Victorian Main Line Operations

TA20 ARTC Code of Practice for the Victorian Main Line Operations TA20 ARTC Code of Practice for the Victorian Main Line Operations Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1.2 07 August 2011. 2.0 04 October

More information

WEEKLY OPERATING NOTICE

WEEKLY OPERATING NOTICE PRIVATE AND NOT FOR PUBLICATION B.R.31262/3 British Rail L M E A S T E R N REGION 3 9 WEEKLY OPERATING NOTICE CONTAIN ING TEMPORARY SPEED RESTRI CTI ONS TEMPORARY ENGINEERING W O R K S SIGNALLING A N D

More information

NHS Rotherham Pharmacy Opening Hours

NHS Rotherham Pharmacy Opening Hours NHS Opening Hours Address Mon Tue Wed Thu Fri Sat Sun Asda Asda Superstore Aldwarke Lane 08:00-12:30 08:00-12:30 08:00-12:30 08:00-12:30 08:00-12:30 08:00-12:30 10:00-12:30 14:30-22:00 14:30-22:00 14:30-22:00

More information

DRIVING AND OFF-DUTY TIME

DRIVING AND OFF-DUTY TIME FACT SHEET DRIVING AND OFF-DUTY TIME for Heavy Vehicle Drivers 4 PREVIOUS DAYS RULE To drive, you are required to have taken at least 24 consecutive hours of off-duty time during the 4 previous days. In

More information

Working of Trains - Rules 1 to 45

Working of Trains - Rules 1 to 45 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 201 0 04 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This

More information

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book GERT8000-HB15 Rule Book Duties of the machine controller (MC) and ontrack plant operator Handbook 15 Issue 5 September 2017 Comes into force 02 December 2017 Published by: RSSB The authoritative version

More information

UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS

UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS (revised July 2005) (amended April 2012) REFERENCE DOCUMENTS These Regulations should be read in conjunction with the following

More information

TOC Waiver. ARTC website

TOC Waiver. ARTC website TOC Waiver Reference Number 12475 Distributed To: ARTC website Distribution Date: 05/06/2014 Requested By: Subject: Effective Period: ARTC RAS Manual Stage 1 implementation for the ARTC in New South Wales

More information

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES Spa Valley Railway 2017 SECTION WE A DESTINATION AT EVERY STATION! WORKING TIMETABLE OF PASSENGER TRAIN SERVICES SOUTHERN REGION (CENTRAL DIVISION) SPA VALLEY LINE Thursday 3 rd, Friday 4 th, Saturday

More information

Your guide to public transport during the Sea Odyssey event in Liverpool April 2012

Your guide to public transport during the Sea Odyssey event in Liverpool April 2012 Your guide to public transport during the Sea Odyssey event in Liverpool 20-22 April 2012 The Sea Odyssey, Liverpool Changes to public transport On 20, 21 and 22 April 2012, the routes of many bus services

More information

Centralised Traffic Control System - Rules 1 to 17

Centralised Traffic Control System - Rules 1 to 17 Centralised Traffic Control System - Rules 1 to 17 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 2 13 May 2012 0 04 October 2015 Australian Rail

More information

Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11

Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11 Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04

More information

GORT3056 WORKING MANUAL FOR RAIL STAFF FREIGHT TRAIN OPERATIONS

GORT3056 WORKING MANUAL FOR RAIL STAFF FREIGHT TRAIN OPERATIONS Document supersedes Iss 4 and comes into force on 02/12/2017 RSSB WORKING MANUAL FOR RAIL STAFF FREIGHT TRAIN OPERATIONS Working Manual for Rail Staff Freight Train Operations Page 1 Document supersedes

More information

Terminology. Glossary of Railway. Glossary of Railway Terminology

Terminology. Glossary of Railway. Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Issue 1 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents approved

More information

SUPPLEMENTARY OPERATING INSTRUCTIONS

SUPPLEMENTARY OPERATING INSTRUCTIONS For the information of Railway Staff only BR 31293 British Rail EASTERN REGION (NORTHERN AREA) SUPPLEMENTARY OPERATING INSTRUCTIONS COMMENCING 8 FEBRUARY 1975, UNTIL FURTHER NOTICE Miscellaneous Notices

More information

ASHPRINGTON ROAD Part 1

ASHPRINGTON ROAD Part 1 MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD Part 1 By Graham Plowman Photographed by Paul Plowman 2 MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD A 00 layout based on the Western Region Main Line between Exeter

More information

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue Section E MOVEMENT OF FREIGHT TRAINS Contents Page Latest Issue Contents E1 E1 Authorised Vehicles E2 E2 Loads for which Special E3 Conditions have to be Applied E3 Vehicles Equipped with E6 Changeover

More information

Wallan WALLAN (29 MILES 40 CHAINS)

Wallan WALLAN (29 MILES 40 CHAINS) Wallan WALLAN (29 MILES 40 CHAINS) Like most of the other stations on the line to Seymour the township of Wallan is located on the Hume Highway and is some 2 kilometres west of the station. The station

More information

Driver s Responsibilities and Duties For the Port Adelaide 457mm Gauge Railway

Driver s Responsibilities and Duties For the Port Adelaide 457mm Gauge Railway NATIONAL RAILWAY MUSEUM Port Adelaide Driver s Responsibilities and Duties For the Port Adelaide 457mm Gauge Railway A supporting document of the National Railway Museum 457mm Railway - Safety Management

More information

Preparation and movement of trains

Preparation and movement of trains GERT8000-TW1 Rule Book Uncontrolled When Printed Preparation and movement of trains Issue 11 Module TW1 September 2016 Comes into force 03 December 2016 Published by: RSSB The authoritative version of

More information

Making Rail Accessible

Making Rail Accessible LNER.co.uk Making Rail Accessible Helping older and disabled customers August 2018 1 Contents 1 Policy Summary 3 2 Assistance for Customers 4 3 Alternative Accessible Transport 6 4 Customer Information

More information

RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK

RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK R A I L T R A C K Safety and Standards Directorate RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK Railtrack, Safety and Standards Directorate Railtrack House DP01 Euston Square LONDON NW1 2EE 08/1999

More information

Activity. Briefing: The activity commences shortly after the arrival of W93 at Mt Victoria (11 55).

Activity. Briefing: The activity commences shortly after the arrival of W93 at Mt Victoria (11 55). Activity Title: W93 Down Local Passenger Service Wednesday only Day / Time: Wednesday only, 11 55am Season & Weather: Summer & Clear Difficulty: Medium Time to complete: 1.5 hours Description: Activity

More information

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012 GE/RT8000/HB15 Rule Book Handbook 15 Duties of the machine controller (MC) and on-track plant operator Handbook 15 Issue 1 Valid from June 2011 Published by: RSSB Block 2 Angel Square 1 Torrens Street

More information

The Picton/Mittagong line was opened in March 1867 as part of the Main South line.

The Picton/Mittagong line was opened in March 1867 as part of the Main South line. Read below as Bob Newham, Loco Division Passenger Organiser, explores some of the incredible history behind rail in New South Wales. As you will discover, the month of March has many stories to tell March

More information

Wollaston Dudley. Monday to Friday. Via Stourbridge, Pedmore, Lye, Merry Hill Centre and Darby End Stourbridge Interchange Website Page 1

Wollaston Dudley. Monday to Friday. Via Stourbridge, Pedmore, Lye, Merry Hill Centre and Darby End Stourbridge Interchange Website Page 1 7 Wollaston Dudley Via Stourbridge, Pedmore, Lye, Merry Hill Centre and Darby End. Monday to Friday Wollaston, Traffic Island.. 0635 0655 0710 0730 0750 0815 0835 0900 0920 0940 1000 1020 Norton, Shenstone

More information

TEMPORARY SPEED RESTRICTIONS - c SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC.

TEMPORARY SPEED RESTRICTIONS - c SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. PRIVATE AND NOT FOR PUBLICATION B.R.31262 British Rail S TEMPORARY SPEED RESTRICTIONS - c SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 10 AUGUST TO FRIDAY 16 AUGUST 1974 Trainmen must pay particular

More information

Issue 5. Glossary of Railway Terminology. Glossary of Railway. Terminology

Issue 5. Glossary of Railway Terminology. Glossary of Railway. Terminology Glossary of Railway Terminology Issue 5 Glossary of Railway Terminology December 2018 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic

More information

Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street

Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street Department of Environmental Services, Transportation Division Sept. 27, 2018

More information

Agenda Cover Memorandum

Agenda Cover Memorandum Agenda Cover Memorandum Meeting Date: August 21, 2017 Meeting Type: COW (Committee of the Whole) City Council Budget Workshop Item Title: Final approval of an Ordinance amending various sections of Article

More information

Day of Open Evening 2018

Day of Open Evening 2018 Day of Open Evening 2018 University Website link Thursday 26th April Aberystwyth University Online Open Day https://www.ucas.com/events/aberystwyth university online open day 332771 Tuesday 10th July Aberystwyth

More information

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

WIM #37 was operational for the entire month of September Volume was computed using all monthly data. SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains

More information

Overview of FMCSA s Proposed Hours of Service Rules For Truck Drivers. Rob Abbott Vice President of Safety Policy American Trucking Associations

Overview of FMCSA s Proposed Hours of Service Rules For Truck Drivers. Rob Abbott Vice President of Safety Policy American Trucking Associations Overview of FMCSA s Proposed Hours of Service Rules For Truck Drivers Rob Abbott Vice President of Safety Policy American Trucking Associations Background 2003 Final Rule 2003 Legal Challenge 2005 New

More information

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015 GE/RT8000/SP Rule Book Module SP Speeds Issue 5 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk/rgsonline Contents

More information

Day of Open Evening 2018 Monday 3rd April Kendal College Open Day Event college open day event

Day of Open Evening 2018 Monday 3rd April Kendal College Open Day Event   college open day event Day of Open Evening 2018 University Website link Monday 3rd April Kendal College Open Day Event https://www.ucas.com/events/kendal college open day event 332936 Wednesday 25th April Sparsholt College Hampshire

More information

newspapers_ xls

newspapers_ xls NRS datasets in 2017 are a blend of NRS and AMP print data. Due to the different methodologies, the PAMCo Board have mandated that NRS and AMP data should not be compared for commercial or marketing purposes.

More information

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment APPENDIX Q SUBWAY OPERATIONS REPORT Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

More information

TORONTO MUNICIPAL CODE CHAPTER 903, PARKING FOR PERSONS WITH DISABILITIES. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES

TORONTO MUNICIPAL CODE CHAPTER 903, PARKING FOR PERSONS WITH DISABILITIES. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES 903-1. General definitions. 903-2. Specific definitions 903-3. Interpretation. 903-4. Use and display of permit. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES ARTICLE I On-Street and Off-Street Parking

More information

BUS SERVICES IN CHAMBERLAYNE ROAD NW10

BUS SERVICES IN CHAMBERLAYNE ROAD NW10 INTRODUCTION BUS SERVICES IN CHAMBERLAYNE ROAD NW10 1 LONDON BUSES 1. This note reviews the issues in Chamberlayne Road, Kensal Rise. It covers the range of bus routes in the area, their characteristics

More information

Uncontrolled when printed Supersedes GERT8000-RBBL Iss 31.1 with effect from 01/12/2018. Rule Book Briefing Leaflet. Issue 32

Uncontrolled when printed Supersedes GERT8000-RBBL Iss 31.1 with effect from 01/12/2018. Rule Book Briefing Leaflet. Issue 32 Rule Book Briefing Leaflet Issue 32 December 2018 The following modules and handbooks will be reissued and come into force on 01 December 2018: Glossary Glossary of Railway Terminology Handbook 8 IWA,

More information

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology Glossary of Railway Terminology Issue 4 Glossary of Railway Terminology December 2017 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic

More information

CAMPUS CONNECTOR MONDAY - THURSDAY. bold italicized times denote p.m. Monday - Thursday continued on next page. Effective August 29th, 2016

CAMPUS CONNECTOR MONDAY - THURSDAY. bold italicized times denote p.m. Monday - Thursday continued on next page. Effective August 29th, 2016 50 ( only) CAMPUS CONNECTOR Bayberry North Shuttle & 48 North & South Shuttles 531 539 543 546 549 552 607 601 609 613 616 619 622 637 613 621 625 628 631 634 649 625 633 637 640 643 646 701 637 645 649

More information

Module M4. Floods and snow. GE/RT M4 Rule Book. Issue 1. June 2003

Module M4. Floods and snow. GE/RT M4 Rule Book. Issue 1. June 2003 GE/RT8000 - M4 Rule Book Module M4 Floods and snow Issue 1 June 2003 Comes into force 6 December 2003 Issue Date Comments Comes into force 1 June 2003 Initial issue 6 December 2003 Copyright 2003 Railway

More information

Train Order System - Rules 1 to 37

Train Order System - Rules 1 to 37 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04 October 2015 1 01 July 2018 Australian Rail Track Corporation Limited (ARTC)

More information

Diesel Traction in Action Volume 3

Diesel Traction in Action Volume 3 Diesel Traction in Action Volume 3 1 D345 s main line return on a railtour to Holyhead, "The Christmas Cracker". It launches its train out of Birmingham N. S. (30th November 2002). 2 In heavy rain one

More information

LATIMER ROAD UXBRIDGE ROAD AND SINGLE LINE TO OLYMPIA

LATIMER ROAD UXBRIDGE ROAD AND SINGLE LINE TO OLYMPIA LATIMER ROAD UXBRIDGE ROAD AND SINGLE LINE TO OLYMPIA INTRODUCTION This is another article based on redundant London Transport files. The file also contains details of some other schemes, which will also

More information

Jones Motor Group, INC

Jones Motor Group, INC Jones Motor Group, INC Orientation log test Name: RM ID or DRIVER #: Date: Score: Recruiter: Use the information provided at the top of the page to fill out the logs at the bottom of the page. Use your

More information

SKEENA SUBDIVISION. Mile TERRACE Y 0.0 AMSBURY 9.6 EXSTEW SALVUS KWINITSA SKEENA 58.5 TYEE SOCKEYE 78.

SKEENA SUBDIVISION. Mile TERRACE Y 0.0 AMSBURY 9.6 EXSTEW SALVUS KWINITSA SKEENA 58.5 TYEE SOCKEYE 78. [107 ] Method of Control W SKEENA SUBDIVISION E Mile Siding Capacity In Feet DOB / TGBO SWITCHING ZONES Hot Box and Dragging Equipment Detectors RTC Radio Channel, Tones and DTMF Codes TERRACE Y 0.0 0.0

More information

Class 142 Diesel Multiple Unit

Class 142 Diesel Multiple Unit Class 142 Diesel Multiple Unit Contents How to install... 2 Technical information... 3 Liveries... 4 Cab guide... 12 Keyboard controls... 13 Features... 14 Manual destination blind... 15 Electronic destination

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3.

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3. GE/RT8000/DC Rule Book Module DC DC electrified lines Issue 3 March 2014 Comes into force 07 June 2014 Conventions used in the Rule Book Example A black line in the margin indicates a change to that rule

More information

SCHEDULE OF DIMENSNSION. BY S.K.Bansal SPP/IRICEN

SCHEDULE OF DIMENSNSION. BY S.K.Bansal SPP/IRICEN SCHEDULE OF DIMENSNSION BY S.K.Bansal SPP/IRICEN Schedule of dimension is nothing but a schedule, which lays down :- Limiting values, recommended values, and infringement to limiting values, which can

More information

Kippax & District Motor Company Ltd. - History Kippax & District Motor Company Ltd. - Bus Fleet List

Kippax & District Motor Company Ltd. - History Kippax & District Motor Company Ltd. - Bus Fleet List CONTENTS Kippax & District Motor Company Ltd. - History 1920-1968 Kippax & District Motor Company Ltd. - Bus Fleet List 1920-1968. Page 3 Page 7 Cover Illustration: No. 15 (GWX824) was a 1948 Leyland PD2/1

More information

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998 Rapid Response Railway Group Standard Lineside Signal Spacing Synopsis This Standard specifies the minimum distance that must be provided between the first signal displaying a cautionary aspect and the

More information

Shepparton - Katamatite

Shepparton - Katamatite Shepparton - Katamatite KIA ORA INDUSTRIES (CAMPBELL S SOUP) SIDING (115 MILES 51 CHAINS) 23.11.1961 Siding opened for traffic for Kia Ora Industries (Campbell s Soups (Aust) Pty Ltd). Siding situated

More information

DIARIES PLANNERS. ACADEMIC YEAR

DIARIES PLANNERS.   ACADEMIC YEAR & DIARIES PLANNERS www.tallon.co.uk ACADEMIC YEAR & DIARIES PLANNERS ACADEMIC 2018 2019 3197 A5 Flexi Cover 6/36 WTV with Embossing Product: 5013922031972 Inner: 5013922131979 Outer: 5013922831978 12/48

More information

Arts House/ Victoria Theatre/ Victoria Concert Hall/ Asian Civilisations Museum GENERAL ROAD CLOSURE AND TRAFFIC DIVERSION PLANS

Arts House/ Victoria Theatre/ Victoria Concert Hall/ Asian Civilisations Museum GENERAL ROAD CLOSURE AND TRAFFIC DIVERSION PLANS Arts House/ Victoria Theatre/ Victoria Concert Hall/ Asian Civilisations Museum GENERAL ROAD CLOSURE AND TRAFFIC DIVERSION PLANS 1) General road closure and traffic diversion plan (Coleman Street, Supreme

More information

PUBLIC TRANSPORT CORPORATION VICTORIA SW 384/95 SW 384/95 DISTRIBUTION: Centrol, Transport House Safeworking Department Metrol, all PTC Rail Depots, Stations and Level 14 Transport House Signalboxes Tel:

More information

Document Control Identification. Document History. Authorisation

Document Control Identification. Document History. Authorisation Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail 1 October 2016 Table of Contents Glossary for this Rule... 4... 9... 9... 9... 10... 11... 12... 13...

More information

Photography BGORUG NEWS RELEASE RAIL DISRUPTION TO CONTINUE AS ELECTRIFICATION PROJECT OVERRUNS

Photography BGORUG NEWS RELEASE RAIL DISRUPTION TO CONTINUE AS ELECTRIFICATION PROJECT OVERRUNS BARKING GOSPEL OAK RAIL USER GROUP F O U N D E D 1 9 6 4 Chair: Graham Larkbey Secretary: Glenn Wallis (020) 8529 2361; 07789 791224 www.barking-gospeloak.org.uk info@barking-gospeloak.org.uk @RidingtheGoblin

More information

Protecting Workers on the Track

Protecting Workers on the Track Transport for London London Underground Access Protecting Workers on the Track Train Movements Learning information booklet Effective April 2014 Issue 1 MAYOR OF LONDON Contents Section page 1 Introduction

More information

LOUIS BERGER POWER JANUARY - DECEMBER 2016

LOUIS BERGER POWER JANUARY - DECEMBER 2016 LOUIS BERGER POWER JANUARY - DECEMBER 2016 Solutions for a better world power.louisberger.com RAPID AND RELIABLE TURNKEY POWER SOLUTIONS WORLDWIDE Liberia Electricity Corporation 10 MW power plant. February

More information

South Gloucestershire Challenge Fund and Cycle Ambition Fund

South Gloucestershire Challenge Fund and Cycle Ambition Fund South Gloucestershire Challenge Fund and Cycle Ambition Fund The Challenge Fund A4174 scheme is coordinated and delivered by South Gloucestershire Council who were awarded 14 million pounds from the Department

More information

Revised August 2018 COLONSAY PLANT DRIVER ORIENTATION

Revised August 2018 COLONSAY PLANT DRIVER ORIENTATION Revised August 2018 COLONSAY PLANT DRIVER ORIENTATION This is an outdoor loading facility. ONLINE BOOKING SYSTEM All Trucks MUST have a time booked 24 hours in advance for loading prior to arrival at the

More information

WIM #29 was operational for the entire month of October Volume was computed using all monthly data.

WIM #29 was operational for the entire month of October Volume was computed using all monthly data. OCTOBER 2015 WIM Site Location WIM #29 is located on US 53 near Cotton in St Louis county. System Operation WIM #29 was operational for the entire month of October 2015. Volume was computed using all monthly

More information

To use the macro that modifies the colors, you must enable macros.

To use the macro that modifies the colors, you must enable macros. Excel Calendar Help Note: These instructions apply to Excel 2000/2002(XP)/2003 A monthly calendar template for Excel 2007 is available on the following web page: http://www.vertex42.com/calendars/monthly-calendar.html

More information

Purple Line Extension. Rodeo Station AUR MOA October 24, 2017

Purple Line Extension. Rodeo Station AUR MOA October 24, 2017 Purple Line Extension Rodeo Station AUR MOA October 24, 2017 1 Agenda Project Overview Section 2 Pre-Construction Updates Rodeo Drive Station Advance Utility Relocation (AUR) SCE Phase I, underway SCE

More information

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT In order to understand the vehicle classes and groupings, the MnDOT Vehicle Classification Scheme and the Vehicle Classification

More information

INSTRUCTIONS FOR INSTALLATION AND USE OF A SCENARIO PACK FOR RAILWORKS

INSTRUCTIONS FOR INSTALLATION AND USE OF A SCENARIO PACK FOR RAILWORKS (PRIVATE and not for Publication) F.S. 101/2 fastline simulation AGES OF THE TRAIN 01 ECML FREIGHT 1973-1986 INSTRUCTIONS FOR INSTALLATION AND USE OF A SCENARIO PACK FOR RAILWORKS This book is for the

More information